Off-Site Levy Bylaw No. 21/24

Brooks, Alberta · No. 21/24 · adopted 2021-12-20 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 201890b3b029 · verified 2026-10-22 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

CITY OF BR@OKS BYLAW NO. 21/24 A BYLAW OF THE CITY OF BROOKS, IN THE PROVINCE OF ALBERTA, TO ESTABLISH OFF-SITE LEVIES FOR LAND THAT IS TO BE SUBDIVIDED OR DEVELOPED WITHIN THE CITY OF BROOKS WHEREAS, Section 648 of the Municipal Government Act allows Council to pass a Bylaw for the imposition and payment of Off-Site Levies in respect of land that is to be developed or subdivided; AND WHEREAS Council deems it necessary and expedient to collect Off-Site Levies to pay for the capital cost of infrastructure required to service Growth of the City; AND WHEREAS the City has engaged in consultation with landowners and representatives of the development industry to address and define existing and future infrastructure required for Growth of the City and the allocation of the capital costs of such infrastructure; AND WHEREAS Council has received the Report, which set out a fair and equitable calculation of Off-Site Levies in accordance with the Municipal Government Act and the Off-Site Levy Regulation; AND WHEREAS Council has advertised its intention to consider the enactment of this Bylaw pursuant to the requirements of the Municipal Government Act; NOW THEREFORE, the Council duly assembled, enacts as follows: 1. Name of Bylaw 100. This Bylaw shall be known and referred to as the "Off-Site Levy Bylaw". 2. Definitions 200. The following terms shall have the following meanings in this Bylaw: 201. "Bylaw" means the City of Brooks Bylaw 21/24, as may be amended from time to time; 202. "Chief Administrative Officer' means the Chief Administrative Officer for the City, regardless of any subsequent title that may be conferred on that officer by Council or Statue, or their designate; Bylaw No. 21/24 Page 2 of 7 203. "City" means the City of Brooks, a Municipal Corporation in the Province of Alberta, or the geographic area contained within the boundaries of the City of Brooks, as the context may require; 204. "Council" means the Municipal Council for the City; 205. "Developable Land" means all land contained within the Development Area: 206. upon which Development takes place after the date of enactment of this Bylaw; or, 207. for which Subdivision approval is obtained after the date of enactment of this Bylaw; excluding: 208. all Developed Land; 209. all land designated pursuant to a Subdivision as: 210. environmental reserve; 211. conservation reserve; 212. municipal reserve; 213. community services reserve; 214. school reserve; 215. municipal and school reserve; 216. arterial road right of way; 217. stormwater management facilities; or 218. public utility lots; 219. any land owned by a school board that is to be developed for a school building project within the meaning of the Education Act; 220. "Developed Land" means land that has been subject to Development or a Subdivision prior to the date this Bylaw comes into force, and in respect of which Off-Site Levies for the same infrastructure have been paid; Bylaw No. 21/24 Page 3 of 7 221. "Development" means "Development" as defined in the Municipal Government Act; 222. "Development Agreement" means "Development Agreement" as defined in the Municipal Government Act, 223. "Development Area' includes the area of land within the municipal boundaries of the City identified in Schedule "A" of this Bylaw; 224. "Development Permit" means "Development Permit" as defined in the Municipal Government Act; 225. "Growth" means: 226. the creation of new Lots through Subdivision; and, 227. the occurrence of Development; 228. "Lot" means "Lot" as defined in the Municipal Government Act, 229. "Municipal Government Act' means the Municipal Government Act, RSA 2000, c. M 26, as amended or repealed and replaced from time to time; 230. "Off-Site Infrastructure" means those components and projects referred to in the Report, in relation to water facilities, sanitary sewer facilities and roads and transportation infrastructure to be paid for in whole or in part by Off-Site Levies under the Bylaw; 231. "Off-Site Levies" means the Off-Site Levies imposed pursuant to this Bylaw; 232. "Off-Site Levy Regulation" means the Off-Site Levies Regulation, Alta. Reg. 187/2017, as amended or repealed and replaced from time to time; 233. "Report" means the City of Brooks: 2021 Offsite Levy Update, July 15, 2021, prepared by Corvus Business Advisors, attached as Schedule "B" of this Bylaw; and, 234. "Subdivision" means "Subdivision" as defined in the Municipal Government Act. 3. Object of Levy 300. The objective of Off-Site Levies is to provide funds to pay for all or part of the capital costs of the Off-Site Infrastructure required for Growth, as determined in the Report. Bylaw No. 21/24 Page 4 of 7 4. Imposition of Levy 400. Off-Site Levies are hereby established and imposed in respect of all Developable Land on the basis set out in the Report. 401. The amount of the Off-Site Levies imposed is as calculated in the Report. 402. Off-Site Levies will be assessed on all Developable Land on a per hectare basis. 403. Unless otherwise agreed, payment of Off-Site Levies imposed under this Bylaw is due: 404. in the case of Subdivision, at or prior to plan endorsement; and, 405. in the case of Development, as a condition of the issuance of the Development Permit. 5. Authority of the Chief Administrative Officer 500. The Chief Administrative Officer is delegated the authority to enforce and administer this Bylaw, including, but not limited to the authority to: 501. enter into Development Agreements on behalf of the City with respect to, among other things, the collection of Off-Site Levies; 502. defer or waive collection of Off-Site Levies imposed pursuant to this Bylaw; and, 503. require security for payment of any deferred Off-Site Levies. 504. The Chief Administrative Officer may delegate the authority to enforce and administer this Bylaw. 6. Development Agreement 600. Council may, from time to time adopt policies or guidelines for the assistance and direction for the Chief Administrative Officer in determining which Development and Subdivision applications require a Development Agreement. 601. Where it is determined that a Development Agreement is appropriate for any application for Development or Subdivision, the developer or the landowner, as the case may be, shall enter into a Development Agreement with the City that provides for the payment of Off-Site Levies in accordance with this Bylaw or that provides for the deferral of Off-Site Levies, including requiring security for the payment of such deferred Off-Site Levies. Bylaw No. 21/24 Page 5 of 7 7. Annual Report 700. Within ninety (90) days of the end of each calendar year, the Chief Administrative Officer shall provide an annual report to Council regarding the Off-Site Levies imposed under this Bylaw, including: 701. Off-Site Infrastructure constructed during the previous calendar year; 702. Construction costs of Off-Site Infrastructure constructed in the previous calendar year; 703. Estimated construction costs for Off-Site Infrastructure yet to be constructed and an explanation as to any adjustments to the estimates since the previous annual report; 704. Amount collected in Off-Site Levies during the previous calendar year and the amount of Off-Site Levies due and payable, but uncollected, as of December 31 of the previous calendar year; and, 705. Specifics of the total value of Off-Site Levies being held by City and yet to be expended on Off-Site Infrastructure, interest earned and commitments for future expenditures of such monies as of December 31 of the previous calendar year. 8. Accounting 800. All funds collected pursuant to this Bylaw shall be accounted for in a special fund for each category of Off-Site Infrastructure and expended only as permitted under the Municipal Government Act. 9. Review 900. The City shall review the rates for Off-Site Levies annually and, if required, shall amend this Bylaw accordingly to update the rates for Off-Site Levies. 10. General 1000. Nothing in this Bylaw precludes the City from: 1001. imposing further or different levies, duly enacted by Bylaw, on any portion of the Developable Lands in respect of which the City has not collected Off-Site Levies; 1002. deferring collection of Off-Site Levies on any portion of Developable Lands, including requiring security for payment of such deferred Off- Site Levies; or, Bylaw No. 21/24 Page 6 of 7 1003. reducing or forgiving payment of Off-Site Levies required pursuant to this Bylaw, or otherwise providing for credits for other Off-Site Infrastructure or oversize infrastructure constructed by a developer in calculating and/or collecting the Off-Site Levies that become payable pursuant to this Bylaw. 1004. Schedules "A" and "B" of this Bylaw, and specifically, without restricting the generality of the foregoing, the rates for Off-Site Levies set out in the Report, may be updated or amended from time to time by resolution of Council. 1005. In the event that any provision of this Bylaw is declared invalid or void by any Court having competent jurisdiction, then such invalid or void provision shall be severed from the Bylaw and the remaining provisions of the Bylaw shall be maintained and deemed valid. 11. Transition 1100. This Bylaw applies to: 1101. any Subdivision where the date of Subdivision approval occurs on or after the date this Bylaw comes into force; and, 1102. any Development where the date of issuance of a Development Permit occurs on or after the date this Bylaw comes into force. 1103. Development Agreements entered into prior to the enactment of this Bylaw shall remain valid and in effect. 1104. Any Off-Site Levies payable under Development Agreements entered into prior to the enactment of this Bylaw, are confirmed and shall continue to be payable notwithstanding the repeal of previous Off-Site Levy Bylaws pursuant to Subsection (1200). As of the effective date of this Bylaw, the rates for Off-Site Levies payable under existing Development Agreements shall be in accordance with this Bylaw. 12. Repeal of Bylaw 1200. Bylaw No. 06/21 and all amendments thereto are hereby repealed. 13. Effective Date 1300. This Bylaw shall take effect at the date of final passing thereof. Bylaw No. 21/24 Page 7 of 7 Read a first time this 20th day of December, 2021. Read a second time this 20th day of December, 2021. Read a third time and finally passed this 20th day of December, 2021. Ca ae oe re (Mayor a Chief Administrative Officer SCHEDULE "A" Map of Development Area a Ran eee Ho S5h R cael AWE ON gy ieee a Bi ie a Wig area WY Pelle ted be SLE ee Oe Es Funes ieee ee || ag | 3 we . if, Y 10) Pett ri vat NS buh lt ee, % hae Syma Forel A NO SON) NNO Ve ess ty ey) Io = che) TN ees Sia ISI 0 ech aa ib Lee iB 20 | EES te DS Seri ( ah fess "hea oie! I te) Oe ea, ees Qa "et <i Brink SS Sr hy Vi Se 1) tes? Aa 6 ijax: Se) TRL] NRG seal ganas Bw ete WS Gi) se melt De Wee sO ry ee ON oo tons . NX y) NS SS hy, he N2MC ay, Mts a G~. if (eo) (avo, Gar G7: UNO Sek' fe 2 ae ee \\ Wasi ape tara] "i = -- rar? Sm TEEN) 7 i O Mae Wn 7 Bt It Lon We 1} fe DY sul AY > oA Bar on" A By, fof Nass es ee :@: ae ie SX | amos OC) GARE sae fe ene j Ss ee = hSo/s EK +) ie @..38235 ry '\ (21) Che Dla MON ane Oe. /n'\ iv 7 h od. Eee SOR Dl etd out evan EN alia "ny . wal Rate ye sia at Canta Vii St A } hk ee i OR oy a RG: Bocas ce Camm) NS Nees Po bead Wags ogdlat meee ole a SNe ons eae 3 ! } | A Ce ae Se Nau os O56 NS Pic SN - ae Tf ER I Sree NES Pe Mit NN NG ef | o fr} O=ni Ou = MS OES RR A Sela \ 4 , yy e FS ah Fel fi 'ae . ESS Bet, ms TAINS Palle (ee) . \ a ON Rial ki Mi 4 | : " N } I {| i vos IS SSS eR ee an" 7 IN SCHEDULE " B" City of Brooks: 2021 Offsite Levy Update, July 15, 2021, prepared by Corvus Business Advisors Vine Advisors City of Brooks: 2021 Offsite Levy Update July 15", 2021 Prepared by: Greg Weiss, President CORVUS Business Advisors 9670 -- 95 Avenue Edmonton, AB T6C 2A4 (780) 428-4110 [email protected] www.corvusbusinessadvisors.com This document has been prepared by CORVUS Business Advisors for the sole purpose and exclusive use of the City of Brooks. LORY U S wean Win Advisors July 15, 2021 City of Brooks 201 - 1st Avenue West Box 879 Brooks, Alberta T1R 1B7 RE: City of Brooks 2021 Offsite Levy Update Enclosed is our report in support of the City of Brooks 2021 offsite levy rate update. If you have any questions do not hesitate to contact me. Sincerely, Greg Weiss President | CORVUS Business Advisors Inc. | | 9670 -- 95 Avenue | Edmonton | Alberta | T6C 2A4 | 780-428-4110 | City of Brooks 2021 Offsite Levy Update 1 DOCUMENT INFORMATION Version Number Revision Date Summary of Changes and Author July 15", 2021 Created by CORVUS Business Advisors. July 15", 2021 1 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update 2 CONTENTS Ded! | INFRODUGCTION c.sceviysecorsessegsyetcuipe bie Pine gudys yes oeldy yelvsuyy douse ibakeqhssavaunne das sacs ti esteaiaiedssedsstesccsenes Suiieeos SZ" MBTHODOLOGY 0, cach ese ay cos cnsgugsey igs cestode tespsaccesssdeocess assess seasasedzusadaassaegsasnievedbedibatavede sapeaineteae APPENDIX A: OFFSITE LEVY AREAS AND LAND STAGING .j.........cccscssescsesseessenesssseenseerssesneseeesene V4 APPENDIX F: OFFSITE INFRASTRUCTURE DEFINITIONS ..........ccsscsscessssssseeseseeseseestsetserssesseeseees 41 APPENDIX H: OFFSITE LEVY ACCOUNT RECONCILIATIONS ........sssssssesessssssessenscsssssssseseessseeees 45 July 15", 2021 12 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update 3 INTRODUCTION 3.1. Introduction Bylaw 06/21, established by the City of Brooks ("the City") in 2006 defines offsite levy charges for transportation, water, sanitary sewer and stormwater offsite infrastructure. The City wishes to update this bylaw, amending offsite infrastructure included in the bylaw in alignment with the City's recent actual expenditures, receipts, latest capital/master plans, and ensuring updated costs and development forecasts are reflected fairly and equitably in new rates in accordance with Section 648 of the Municipal Government Act ("MGA"), thereby ensuring a financially sustainable community. This report outlines the methodology and information used in establishing updated transportation, water, sanitary sewer and stormwater offsite levy rates for the City. 3.2 Methodology The City has various infrastructure capital/master plans, and these plans have been used as a start point for developing key information for this offsite levy review. MPE Engineering and City staff reviewed existing plans and verified offsite projects for transportation, water, sanitary sewer, and stormwater infrastructure. MPE Engineering and City staff also verified benefits to existing development, future development, and benefiting areas. Support provided by CORVUS Business Advisors ("CORVUS") included: * Provision of the latest CORVUS offsite levy model. * Incorporation and configuration of data in the offsite levy model (data provided by City staff). « Incorporation of area measurements and land development forecasts (provided by City staff). * Incorporation of infrastructure costs and allocation percentages for existing development, new development, and other parties (provided by MPE Engineering). * Reconciliation of account opening balances (historical reconciliation details provided by City staff). * Determination of transportation, water, sanitary sewer, and stormwater levy rates. * Preparation of the offsite levy report. « Presentation of results to Administration and Council. * Training of City staff on the use of the model, and provision of training materials and videos. Offsite levy rates within the CORVUS model are forecast using a rolling 25-year review period. During this review, a cut-off date of December 31°, 2020 was established, and so the review period stems from 2021 to 2045. The cut-off date coincides with the City's most recent year-end when the project started. Project expenditures, receipts etc. were gathered as "actuals" from the City's financial records up to the cut-off date. Beyond the cut-off date, July 15, 2021 13 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update all financial details are estimates. When the City completes its next rate update, information from January 1%, 2021 up to the new cut-off date will be converted from estimates to actuals, and the rolling 25-year review period will move further out. Costs that benefit development prior to and within the 25-year review period are included in rates. Costs that benefit development beyond the review period (called "financial oversizing") are excluded from rates. In future years, when rates are updated and the rolling 25-year period moves further out, offsite infrastructure costs beyond 2045 will gradually be included in rates. 4 KEY FINDINGS The following provides a summary of key findings pertaining to the updating of the City's offsite levy rates: Offsite Infrastructure Costs. Offsite infrastructure costs to be included in the offsite levy bylaw total approximately $99.80 million. An overview of offsite infrastructure costs and maps is provided in Appendices B1 (Transportation), C1 (Water), D1 (Sanitary Sewer), and E1 (Stormwater); and a definition of each offsite infrastructure type is provided in Appendix F. Before determining how the infrastructure costs will be allocated to parties that benefit (e.g., existing/residual development, future development, other municipalities etc.), financing provided by way of special ear-marked grants and other contributions are deducted from offsite infrastructure costs. For this review, the City identified approximately $25.12 million in ear-marked grants and contributions. An overview of ear-marked grants and contributions and resulting net costs is provided in Appendices B2, C2, D2, and E2. The share of costs which benefits existing/residual development (the City's share) is $45.69 million; and, the share of costs which benefits other stakeholders (e.g., neighbouring municipalities) is $0.00. The share of costs which benefits future development totals approximately $28.99 million ($7.67 million + $21.31 million) and is based on the allocations shown in Appendices B4, C4, D4, and E4. However, $7.67 million of the cost which benefits future development is beyond the 25-year review period (called "financial oversizing"). Financial oversizing is determined based on the anticipated year of construction (construction staging) which is provided in Appendices B3, C3, D3, and E3. Of the $28.99 million in total offsite infrastructure costs which benefits future development, the portion that is within the 25-year review period and included in rates today (the offsite levy share) is approximately $21.31 million, as shown in the table below. A complete summary of offsite infrastructure net cost "flow-thru" is provided in Appendices B6, C6, D6, and E6. July 15, 2021 14 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Summary of Infrastructure Costs & Allocations Developer Cost ' ; Other Aer en Developer | Special Grants | Muni Share of f , | Beyond 25 Yrs aE» : Transportation $ 3,561,170 $ 1,241,355 $ - $ 212,265 $ 554,106 § 5,568,897 Water $ 5,278,901 $ 18,695,125 $ - $ 4,891,285 $ 7,271,669 $ 36,136,980 Sanitary $ 16,279,817 $ 23,261,451 $ . $ 1,823,655 $ 12,457,602 $ 53,822,525 Stormwater $ - $ 2495465 $ - $ 745,743 $ 1,029,653 $ 4,270,860 Total $25,119,888 $ 45,693,396 $ - $ 7,672,948 $ 21,313,030 $ 99,799,262 Offsite Levy Collections. Before allocating infrastructure costs to benefitting lands, offsite levy costs must be reduced by the total levies collected to date. Up to December 31*, 2020, the City collected approximately $6.09 million in offsite levies as summarized in the table below. Details associated with levy collections are shown in Appendices B5, C5, D5, and ES. Summary of Levies Collected to Date Levies Collected To Date | Transportation $ 643,897 Water $ 2,498,996 Sanitary $ 2,569,024 Stormwater $ 378,520 Total $ 6,090,437 Offsite Levy Areas and Forecast Development. To facilitate the allocation of infrastructure costs to those lands that benefit from the infrastructure, the City is parsed into 25 offsite levy areas. The area boundaries, numbering schema, and area measurements are described in Appendix A along with an offsite levy map. An overview of offsite infrastructure allocations to each benefitting area is provided in Appendices B7, C7, D7, and E7. To calculate offsite levy rates, it is necessary to forecast the amount of land that will develop during the 25-year review period. Land development forms the denominator of the rate calculation. A larger denominator reduces rates but could potentially result in under- collection thereby placing an increased burden on taxpayers. A smaller denominator increases rates but could potentially result in over-collection thereby placing an increased burden on future development. Accordingly, land development forecasts need to be: (a) reasonable and reflect current planning assumptions including the current pace of development in the community, and (b) updated regularly. For this review, the City is forecasting development of approximately 182 ha. during the 25- year review period (the land development forecast is shown in Appendix A). Offsite Levy Reserves. The City is currently managing offsite levy receipts and withdrawals via several accounts. These should be consolidated into four offsite levy accounts (i.e., one reserve/account for each infrastructure type), in alignment with MGA requirements. The July 15", 2021 15 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update reason the MGA stipulates the requirement for separate accounts is because offsite levies can only be used for the type of infrastructure for which they were collected (e.g., water levies can only be used to construct water offsite infrastructure, not sanitary sewer infrastructure etc.). During this review, several amendments to historical information were identified. Accordingly, the City's offsite levy account balances require amendment as discussed further below and shown in Appendices B8, C8, D8, and E8. Interest. Offsite levy account balances (both actual and forecast) are impacted by interest. Actual inflows and forecast balances that are in a positive/surplus position earn interest (as required by the MGA). Actual outflows and forecast balances that are in a negative/deficit position are charged interest (forecast balances that are negative indicate the requirement for front-ending). Forecast offsite levy account balances over the 25-year review period are shown in Appendices B9, C9, D9, and E9. Front-ending. Front-ending is an extremely important concept that underpins rigorous management of offsite levies. Front-ending represents monies owed by future development to the front-ending party (municipality or developer) for past construction undertaken on behalf of future development--i.e., a front-ending party will often pay for its share of an Offsite infrastructure project in addition to that portion of the project which benefits future development when offsite levy account balances are insufficient. In Brooks, it is our understanding that the City is the only party with front-ending obligations/claims currently. As such, all excess cash in levy accounts should be used to pay-down the front-ending obligations due to the City (described below). There are generally 2 alternatives for repaying front-ending obligations to claimants: (1) the First-In First-Out (FIFO) approach, and (2) the Average Outstanding Claim (AOC) approach. The approach that the City will use moving forward should be described in an offsite levy policy and practices framework that is separate from the rate bylaw. Offsite Levy Account Adjustments. At end 2020, City documentation reflected a surplus balance of $643,897.00 in the transportation account. However, after adjustments for front- ending obligations due to the City and claim repayments, the balance in the transportation account should be amended to reflect a surplus of $189,680.29 at end 2020. This balance assumes excess cash ($454,216.71) will be transferred from the levy account to the City as partial payment for front-ending obligations due to the City. A complete reconciliation of the transportation account balance is provided in Appendix B8. At end 2020, City documentation reflected a surplus balance of $763,751.00 in the water account. However, after adjustments for front-ending obligations due to the City and claim repayments, the balance in the water account should be amended to reflect a deficit of $(365,758.34) at end 2020. This balance assumes excess cash ($763,751.00) will be transferred from the levy account to the City as payment for front-ending obligations due to the City. A complete reconciliation of the water account balance is provided in Appendix C8. At end 2020, City documentation reflected a surplus balance of $2,575,769 in the sanitary July 15, 2021 /6 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update sewer account. However, after adjustments for front-ending obligations due to the City and claim repayments, the balance in the sanitary sewer account should be amended to reflect a surplus of $1,603,398.50 at end 2020. This balance assumes excess cash ($972,370.50) will be transferred from the levy account to the City as payment for front-ending obligations due to the City. A complete reconciliation of the sanitary sewer account balance is provided in Appendix D8. At end 2020, City documentation reflected a surplus balance of $378,520.00 in the stormwater account. This balance is in alignment with the balance reflected in the model at end 2020. A complete reconciliation of the stormwater account balance is provided in Appendix E8. Together, these account adjustments are enabling the withdrawal of approximately $2.19 million as payment for front-ending obligations owed to the City. However, of this withdrawal City staff have determined that approximately $0.33 million is required to replenish unrelated deposits and withdrawals from other uncommitted accounts. The balance of approximately $1.86 million is available to the City and should be utilized to fund the City's share of transportation, water, and sanitary sewer projects that are prioritized in the City's 10-year capital plan. Offsite Levy Account Reconciliation Withdrawals | 2007-2020 Account Reconcilation Withdrawals _ Transportation $ 454,217 Water $ 763,751 Sanitary $ 972,371 Stormwater $ - Total $ 2,190,338 5 RATE UPDATES For future development to pay for its share of the $99.80 million offsite infrastructure costs contained in the City's capital plans, rates are approximately $79,823 per net hectare on a weighted average basis, as shown in the tables below. A comparison of rates to other municipalities is shown in Appendix G. Offsite Levy Rates (Per Net Hectare): High, Low, & Averages 'Afranisportatlony|| Seycreast bw tee Serres oh teed Peer eee. 4) eeaeee ea re | Wel hertss RMA Race) eins haves ry qwrt | (Mette | Nettie) | (ata) | iNet) High TSC OS 889431$ ~~ 63,739/$ 13,507 $ 102,682 | low. SS 217511 $ a oe2 ig TS 89.322 | Weighted Average|$ [$5 9761$ --50,143[$ 3,704 $ 79,823 | ' Highs, Lows, and Averages are shown for information purposes only. Developers pay the actual rate applicable to their specific development area. July 15, 2021 7 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Summary of Offsite Levy Rates by Area (Per Net Hectare) Transportation Water Sanitary ie Stormwater 10 $ - §$ 38,943 $ 42,317 $ - §$ 81,260 20 $ - §$ 21,751 $ 55,356 $ 8,479 $ 85,586 3.0 $ - §$ 21,751 $ 55,356 $ 8,479 $ 85,586 40 ¢ - § 21,751 $ 42,317 $ 8,479 $ 72,547 5.0 §$ - § 21,751 $ 42,317 $ 8479 $ 72,547 60 $ - § 21,751 $ 42,317 $ 8,479 $ 72,547 70 $ - § 21,751 $ 29,092 $ 8,479 $ 59,322 80 86¢ - §$ 21,751 $ 42,317 $ 8,479 $ 72,547 90 ¢ - §$ 21,751 $ 42,317 $ - § 64,068 10.0 $ - §$ 21,751 $ 62,988 $ 13,507 $ 98,246 11.0 $ - §$ 21,751 $ 62,988 $ - § 84,738 120 $ - § 21,751 $ 62,988 $ 13,507 $ 98,246 13.0 §$ - § 21,751 $ 62,988 $ 8,479 $ 93,217 14.0 $ - § 21,751 $ 62,988 $ - § 84,738 15.0 §$ - §$ 21,751 §$ 62,988 $ - § 84,738 16.0 $ - § 21,751 $ 62,988 $ - §$ 84,738 17.0 $ - §$ 21,751 $ 62,988 $ 8,479 $ 93,217 18.0 $ - §$ 21,751 $ 62,988 $ 8,479 $ 93,217 19.0 §$ - § 38,943 $ 48,661 $ - § 87,604 20.0 $ - §$ 38,943 $ 47,831 $ - §$ 86,774 21.0 $ - § 38,943 $ 53,036 $ - § 91,979 22.0 $ - §$ 38,943 $ 48,661 $ - §$ 87,604 23.0 $ - §$ 38,943 $ 63,739 $ - §$ 102,682 24.0 $ - §$ 37,449 $ 59,364 $ - §$ 96,813 25.0 $ - § 21,751 $ 59,364 $ - §$ 81,115 6 RECOMMENDATIONS In addition to implementing the offsite levy rates outlined in Section 5, CORVUS recommends the following: 1. Consolidated offsite levy related accounts into 4--one for each offsite infrastructure type. These accounts should include only to offsite levy related details, in alignment with MGA requirements. 2. Amend the balances of offsite levy accounts as reflected in Appendices B8- transportation: $189,680, C8-water: $(365,758), D8-sanitary sewer: 1,603,398, E8- stromwater: $378,520; and in so doing, withdraw excess funds from these accounts as partial repayment of front-ending obligations due to the City (see table opposite). Together, these account adjustments are enabling the withdrawal of approximately $2.19 million as payment for front-ending obligations owed to the City. However, of this withdrawal City staff have determined that approximately $0.33 million is required to replenish unrelated deposits and withdrawals from other uncommitted accounts. The balance of approximately $1.86 million is available to the City and July 15%, 2021 /8 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update should be utilized to fund the City's share of transportation, water, and sanitary sewer projects that are prioritized in the City's 10-year capital plan. 3. Develop an offsite levy policy and practices framework to support ongoing management of the bylaw. Topic areas within the framework should include: (1) levy exemptions, (2) levy deferrals, (3) installment payments, (4) indemnification, (5) interim financing, (6) front-ending reimbursement, (7) offsite infrastructure inspection, acceptance, and warranty, (8) interest on unpaid balances, (9) interest rate changes, (10) inflation rate changes, etc. 4. Establish a formal and regular communication and documentation process between the Finance, Planning, and Engineering departments to enable the accurate documentation of offsite levy expenditure and front-ending details. 5. Establish individual accounts and/or sub-ledgers for each account to track amounts owed to each front-ending claimant--the City is the only front-ending claimant currently but that will likely change in the future. In so doing, ensure the same interest charging rate that is reflected in the offsite levy model (in any given year) is used to calculate interest on outstanding front-ending balances. 6. During the reconciliation of account balances in the future, ensure the interest earning and charge rates that underpin the offsite levy model for that time period are used to determine account interest impacts. This is outlined in the offsite levy model user guide and instructions. 7. Limit future withdrawals from offsite levy accounts to only that portion of project cost for which future development is responsible (i.e., Project Cost X Developer Share %). 8. Ensure funds withdrawn from offsite levy accounts are only used to finance offsite levy projects contained in the offsite levy bylaw. 9. Update offsite levy rates annually and provided an annual report to Council outlining the status of levies (monies collected, remaining front-ending debts, etc.). This is a newly amended requirement of the MGA. 10.Recent changes to the MGA enable municipalities to charge offsite levies for recreation facilities, fire stations, police stations, and libraries. The City should consider _ whether it wishes to adopt such levies in the future and, if so, begin developing the support documentation that will be needed to create such levies. July 15, 2021 19 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update 7 ACKNOWLEDGEMENTS CORVUS Business Advisors would like to thank all City of Brooks staff from Engineering, Planning, and Finance who supported the work of this review, as well as MPE Engineering. 8 DISCLAIMER CORVUS Business Advisor relied upon the City of Brooks and its advisors to provide all of the data and information used to construct the offsite levy model and create the rates, such as planning data and assumptions, development forecasts and assumptions, infrastructure costs and costs estimates, allocations to benefitting parties, allocation to benefitting areas, and other assumptions etc. As such, CORVUS Business Advisors makes no guarantee as to the accuracy of the input data and information provided by these groups or the results that stem from this data and information. Offsite levy rates are not intended to stay static; they are based on assumptions and the best available information of the day. Planning assumptions, cost estimates etc. can change from year-to-year. Accordingly, the MGA requires that offsite levy rates be updated with the most available information on a regular basis (usually annually). When information changes, it will be reflected in a future update, and rates adjusted accordingly. July 15", 2021 /10 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX A: OFFSITE LEVY AREAS AND LAND STAGING The City of Brooks is parsed into 25 offsite levy areas, as shown in the map below. Areas take into consideration the intersection points of existing/planned infrastructure basins (e.g., sanitary sewer basins), and also various natural and man-made barriers (e.g., rivers, highways, etc.). All offsite levy infrastructure costs are allocated to one or more of these areas. Offsite Levy Areas 'Le eee SCN el REY. V0 UM Tey" | fers ear pr a OF (aa a 1) ile a OG Ao iat! Et Bo N ; 4 y Ny] vif eo es ie Ogee) Nene 2 a a ee at hte; poh} | Cs) bik ono. Vall Le WR if ) I Ny! yy hs ee. a. | een haa Pe hs jag 3" ey Y ANE AS ae aa es ise ee "are (es a a Pell alk dA nna N@eame 2 © sala Se 7 sl WE: Seer Cy aim iad 'Th cs 7 RNase sas Sei | Wiig. i i as ms my = PON yj = ie = <. ieee eral eM ON Oh, 89 co, See ME al ah il ra | =: ia : ke AK) rs Opava 3, ' o) 'alee Ns La : a salina =f Reet co is ie YF ee etedinweey) YW IP ee i ie EY nt ta He ts al, Te ey) he a Re 'i baNS a) en if Yoh il iil i: aE ee, VO eet eae "SF én Naa | ae | 'ae Me Wis ahead 8 a a Om LN i ye | SP en (isc) ip See ant Sra [to he Nel \ i a AS -- tet ee ele ee Oar a, SNC "as NT ones | a iO eli ct) et -- Tie NE I na 0) CEM Miers a me an aged | 2 ING pa) EE Se alee Naty Gna fig"? fee La | | stm Ba 9 BB as: a a ER ee Ee ear a SN DP a 7 aaa Ll a Bs HN ee Sy ad July 15", 2021 /11 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Total net development area, the amount of land available for development in all offsite levy areas, is approximately 1675 ha. In calculating net development area, allowances have been made for environmental reserves, municipal reserves, and arterial road right of way, stormwater management facilities, public utility lots, and other non-developable area. Offsite Levy Net Development Area? Feo tl BCE AT RIN abv be 8 | ena MR See i an Eee Sane met w| Development |. =. | Environmental spel <7 | IMunlChpal dl eae eeu aaa atc eet Area Ref. #| 9st ocation |oross Area (ha.)| oo | «6 Sub-total «=| "| Way and Other | Development Bs tl onary 1] Reserves (hay | SUTIN | Reserves Ipeauctons (nail Ares (na) | 2.1 (SGC Csr) 278.53| 27.85 NO) --S 244.938 | |_ 3.1 [CCC neces! 64.04/ 6.40 /Rtees| --=--=87.664 | | 41 Sc rs| 865.47| SSS |memine| --===--s75.66 | | 6.1 [SeeMap | 04 tT toate t0.42[ ao (92.25 | 6) oes! 15.13| 151 §©|-- 13.62 | | 7) Cn 3260| 3.26 |eOna) 28.63 | | 8.1 i cOciieees| 50.67| 5.00 |Mmmtiog| == 44.42 | | 9.1 [SCC COME! 292.99 | 23.24 || ~~ 200.14 | | 10.1 |S0NG CC TOR| 26.75| == 3.68 /MmOOn] --32.10 | | 111 [ccc ns! 26.65| 2.66 (ens! 23,02 | | 121 cc ie) 50.01) 5.00|MmEngO)] --=«43.81 | | 13.1 rs) 25.11) 2.51 |e ----«22.60 | | 14.1 cc cr| 39.83| 3.3S|EumMO! ----«28.26 | | 15.1 |SeeMap | BST a6] 70.29] 7.03] | C88. | 16.1 Se RewOs eer) --=»« 17.04] ss. 7O MMOS! --=«d15.883 | |__ 17.1 '|SeeMap | tof tare] tes es (105.06 | |__ 18.1' [See Map = 76s | i37.e8[ 13.79 |S (124.00 | 19.1 |SeeMap | tee] tones tog [St 9 | | 20.) a Crs! 3192) 313 |/nen ~§©_26.19 | | 21.1 SSG CCS Een! == 98.14] 3.81 | 84.33 | |__22.1__'[See/Map 602 | 5.02 1.50 | aa 7.68 | | 23.1 |S6CNS | SZC! 2662| 266/mcmesBa | --«*18.85 | |__24.1 |SeeMap [ton az92t 430 (oe 7.44 | | 25.1 Ses enocivieeenoba| = 43.55] 4.36 (| ~--SS «89.20 | Summary of Offsite Levy Net Development Area PRUE Des chiption aun oe eceha anaes Gross Development Area 1,923.07 Less Environment Reserve 23.20 Less Municipal Reserve 189.99 Less ROW Allowance 35.05 Net Development Area 1,674.84 *Note: 1 Hectare (ha.) = ~2.47 Acres Net development area definitions will be applied in determining offsite levy obligations of developers on application for subdivision or development within City of Brooks. Net development area is defined as follows: e Gross Area -- The area of lands to be developed in hectares that have not previously paid an offsite levy. ? Area measurements were provided by Town staff. July 15", 2021 /12 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update o Less: Any environmental reserves contained within the development area Including environmental reserves and environmental easements. o Less: A 10% allowance for Municipal Reserves. o Less: The measurement of arterial road right of way, stormwater management facilities, public utility lots, and other non-developable area that bisects the development lands. e Equals: Net Developable Area, which is the area subject to offsite levies. A rate planning period of 25-years underpins the offsite levy model and rate calculations. Many municipalities use this planning period as it provides a reasonable timeframe to recoup the costs associated with offsite levy infrastructure construction, and it aligns with the timeframes of many municipal capital planning and construction cycles. Of the 1675 ha. of net land available across all offsite levy areas, approximately 1009 ha. (60%) have been developed to date, and planners estimate that approximately 182 ha. (11%) will develop during the next 25-years (the rate planning period) as shown in the tables below. Summary of Anticipated Development during the 25 Year Rate Pianning Period Developed To Date 1,009.18 60.3% Developed In Next 25 Years 181.77 10.9% Developed Beyond 25 Years 483.89 28.9% Net Development Area 1,674.84 July 15", 2021 113 CORVUS Business Advisors Be, SOPRA | RRA ra eBeeeaek aa ey Shei ke| SSiclaiig S La FSS ce i Wad ; = Be) | BSRS ESSE F Tesco usta ° j 5 al ° eeeeece gisig I S ace aq olo|c} Et -- SRE EBEEE galsialg | ae | 8 M c| ic EE alalalalalalzlalzle ytd eae | ee ees | Fe REEEE 3 a fe celle S| | GU GCEGE | |g aeeeeee canna o| ----- Bace alz ai c Osho see 8 5 S i a Besse 8 5 2 a aegeks a EERBBES jel wai o b e | a Becese ears | Beaes 3 3 lem A CREE EE ® 8 eesegeaele | [ee =| ES ® a F318 E | [gafestedees Bae Becece-e 3 = @ a|}6 EE EEE e = 8 rc) ; = g (8 Bee : ele Co) b-- 5 SE UPEEE ECE Fi o ial Ei ; 3 ; a BEEP : ee He A a S pe a EEEECCEOBEECEL on a fst a e385 8 8 Se eeREee ee 8 q, Jes i eee EERE aia 3 re) gy eels oo] |e 8 5 x 4 (Sis Y 5 8 RIBIN 3 S gs 2 i ee eaarh ies : : BEROGGGBSUEGORERECGD + eleislals aa =i > ne) 50 City of Brooks 2021 Offsite Levy Update APPENDIX B: TRANSPORTATION B1. Transportation Offsite Infrastructure To support future growth, transportation offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $5.57 million as outlined in the table below. It is important to note that these costs represent "gross" costs, of which only a portion will go to support development during the 25-year review period. The remainder of this section outlines how the "net" costs for development are determined. Summary of Transportation Offsite Infrastructure Beh) Pt US) TR ees ete | Costof | Future Debenture [Estimated Costof) Men df ca doth al 7PRBoat Description | completed Work | Interest. Nore. ge rect noe | 1 [Csi $ 1,732,070 Seen $ = $1,732,070] |__2 |CassilsRoad and 2ndStreetWest_ SCT S$ 051427[/$ = SC CS (8,051,427 | |__4 _|2nd Street West (South) Capacity Improvements == so| $ |S 785,400] $ 785,400 | |_100 [Unallocated Offsite Levies CollectedtoDec31,2020 [| $ | -|/$ - [g ss - [gs [$s 4,783,497/$ =~ $785,400 1$ 5,568,897 | *Costs estimates provided by City staff. **Estimates include engineering, contingencies, and land costs if any. ***Historical financing charges (if any) are included in the cost of completed work. ****Unallocated levies to end-2020 were set-up as an individual project (#100) and credited 100% to future development and to all offsite levy areas. "Offsite infrastructure definitions are contained in Appendix F. *""**Project numbers that are "hidden" pertain to projects that have since been removed from the bylaw. B2. Transportation Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to development, other than those costs that have been provided by way of special ear-marked grant or contribution (i.e., contributed infrastructure). City of Brooks has/will receive $3.56 million in special ear-marked grants or contributions for transportation offsite levy infrastructure as shown in the table below (note, if the City receives other ear-marked grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $2.01 million. Special Grants and Contributions for Transportation Offsite Infrastructure i di : i "|| toy SO ge "Special Provincial | Other Reduced Prolec! al ~ --- ' i : F 3 F 4 'hy i ete rae) (Historie & Future ewer: et Sh | 4 [2nd Street West (South) Capacity Improvements __|$ 785,400/$ Ss - |$ = +|$ - |$ 785.400, [100 Unallocated Offsite Levies Collected toDec31,2020.|$ - '(§ - |§ =. |$§ «|g. | July 15", 2021 115 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update B3. Year of Construction The timing of construction is used to determine the impact of inflation on cost, the impact of forecast account balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Forecast Year of Construction el ecu BR 6 i) ee SEE SEE ae |__2 |Cassils Road and2ndStreetWest_ == Cid| S208 SC" | 4 [2nd Street West (South) Capacity Improvements |] 2038 "The share of projects constructed beyond the 25-year review period are not included in rates today (see financial oversizing in next section). **Project costs are inflated by 3% per annum to the year of construction. B4. Transportation Offsite Infrastructure Benefiting Parties The transportation offsite infrastructure previously outlined will benefit various parties to varying degrees. Three potential benefiting parties were identified including: 1. City of Brooks -- a portion of the transportation infrastructure which is required to service existing residents. This residual benefit is determined at the point in time when the project is added to the bylaw (i.e., it does not fluctuate from year-to-year). 2. Other Stakeholders -- other municipalities that benefit from the infrastructure. 3. Future Development: o Financial Oversizing -- that portion of cost (i.e., leviable transportation infrastructure costs) which benefits future development beyond the 25-year review period. o In Rates -- that portion of cost (i.e., leviable transportation infrastructure costs) which benefits future development within the 25-year review period. The table below outlines the allocation of transportation offsite levy infrastructure costs to benefiting parties. July 15", 2021 /16 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Allocation of Transportation Infrastructure to Benefiting Parties bem ||) sPreiegs Description: rl a i reco =| Mul Share % cr Never | ae | $ 653.48 | | 97.16% | "Allocations were determined by City staff. ** Projects with costs allocated to other stakeholders are associated with road projects partially funded by Alberta Transportation. "Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. For example, a project which is slated to be constructed in year 20 of the 25-year review period will have 20% (5/25) of its costs in rates today, and 80% (20/25) of its costs will sit beyond the 25-year review period. B5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $0.55 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers (if any) need to be considered in determining the residual/net costs to developers. City staff have advised that $0.64 million in transportation levies have been applied/collected as shown in the table below. This results in an adjusted offsite levy cost of approximately $(0.09) million. Offsite Levy Funds Applied to Date IY ce Ny Cae Ath OSL /Develocer |. OffsiteLew |e. cu t.4 | Adjusted tem | Project Description OSL! Developer | Funds Collected | Funds Colected | pe veiopor (Levy) B6. Summary of Transportation Offsite Levy Cost Flow-through As shown in the figure below, the total cost for transportation infrastructure that forms the basis of the rate is approximately $(0.09) million. The cost allocations to each benefitting party are based on the benefitting percentages shown in previous section. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). July 15", 2021 117 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Total Transportation Offsite Levy Costs = Future Less: Levy = Off-site (OSL Share) $0.64M $(0.09)M $0.55M = Future Development "Financial Oversizing" $0.21M - Less: Special : Project Grants & = Project / = Other Costs Contributions Balance Share $5.57M $3.56M $2.01M $0.00M = Existing Development (Muni Share) $1.24M B7. Transportation Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by City staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Transportation Allocations to Benefitting Areas litem | Developer Cost [74 [2 [3s] "4 [os [6 [or [ie To Piso [nt 2 ia a as te 47] 0 [40] 20 ai 22] a3 Ta 7 28] ER AB 1 FL TL BF JT JS J TT TW ET ET }2|[s 2485421 4 [4 ta a a a a ot a a aaa a a aa Ee sn ee Re Ee ee ee ee ee ee ee 14 [$99,800 | SAI Ft NIA OA a AA | A | A ee neha | le wh [ton] fists oe | | B8. Account Balance At December 31', 2020 the transportation account balance was in a deficit of $189,680.29. This amount takes into consideration expenditures and front-ending obligations up to end- 2020. This balance also assumes that remaining funds of $454,216.71 currently in the account are transferred to the City to pay down front-ending obligations owed to the City. Details associated with account reconciliations are summarized in Appendix H. July 15", 2021 /18 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Transportation Offsite Levy Reserve Balance Description Dr Cr Balance Opening Balance 2006 $ 511,399.00 $ 511,399.00 OSL Receipts 2006 - 2020 $ 118,372.00 $ 629,771.00 OSL Refunds 2006 - 2020 $ - $ 629,771.00 OSL Receipt Allocations (Withdrawals) 2006 - 2020 $ - $ 629,771.00 Interest Earned (Charged (2006 2020) $ 14,126.00 $ 643,897.00 Account Balance per Muni Records (Unallocated Receipts) $ 643,897.00 Front-ending (2006 - 2020) $ 454,216.71 $ 189,680.29 Balance $189,680.29 B9. Development and Transportation Infrastructure Staging Impacts Transportation offsite infrastructure will be constructed in staged fashion over the 25-year review period. To compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.00%° interest allowance is charged to the account when it is forecast to be in a negative balance. Further, a 1.00% interest credit is provided to the account when it is forecast to be in a positive balance. The graph and table below outline the forecast transportation levy account balances over the 25-year development period. If necessary, an interest staging adjustment is applied to rates (slightly positive or slightly negative) to ensure that the forecast account balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers)*. Anticipated Transportation Offsite Levy Account Balances Transportation Reserve $250,000 $200,000 +, --------_--_---- eee eo | . ---- Reserve Balance $150,000 eS ---- l -- wr $100,000 +~-------- ------ $50,000, ~}----_--__________--_ _____S-t-0-#. $- os f 8 8 Vee 8 8 2 N N N N N N N N N 3 The 20-year debenture rate at the Alberta Capital Finance Authority at the time of writing was ~2.00%. * At present, the City has collected more funds in the transportation account than is currently necessary. This surplus will be reduced as additional transportation costs are brought on board in the future. July 15", 20214 /19 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Anticipated Transportation Offsite Levy Account Balances Reserve Balance Year Receipts Expenditure Interest Balance 2021 $ - $ - $ 1,897 $ 191,577 2022 $ = $ - $ 1,916 $ 193,493 2023 $ - $ - $ 1,935 §$ 195,428 2024 $ - $ - $ 1,954 $ 197,382 2025 $ - $ - $ 1,974 $ 199,356 2026 $ - $ : $ 1,994 $ 201,349 2027 $ * $ - $ 2,013 $ 203,363 2028 $ - $ > $ 2,034 § 205,397 2029 $ - $ - $ 2,054 $ 207,451 2030 $ - $ - $ 2,075 $ 209,525 2031 $ - $ - $ 2,095 $ 211,620 2032 $ - $ - $ 2,116 §$ 213,736 2033 $ - $ - $ 2,137 $ 215,874 2034 $ - $ - $ 2,159 $ 218,033 2035 $ = $ - $ 2,180 $ 220,213 2036 $ - $ - $ 2,202 $ 222,415 2037 $ - $ * $ 2,224 $ 224,639 2038 $ - $ 8,255 $ 2,164 §$ 218,548 2039 $ - $ 42,514 $ 1,760 $ 177,794 2040 $ - $ 61,305 $ 1,165 $ 117,654 2041 $ - $ 45,103 $ 726 $ 73,277 2042 $ - $ 18,582 $ 547 $ 55,242 2043 $ - $ - $ 552 $ 55,794 2044 $ - $ - $ 558 $ 56,352 2045 $ - $ - $ 564 $ 56,915 July 15%, 2021 / 20 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX C: WATER C1. Water Offsite Infrastructure In order to support future growth, water offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $36.14 million as outlined in the table below. It is important to note that these costs represent "gross" costs, of which only a portion will go to support development during the 25-year review period. The remainder of this section outlines how the "net" costs for development are determined. Summary of Water Offsite Infrastructure Completed [1 |RawWaterinjake dS tzezeri[$ dS (dS 1,222,871, | 2 [Water Treatment Plant CTS 1450,000/$ TS CS 1,450,000] | 3 |Water Treatment Plant Upgrade TS 7e79e6]$ SC 727,986 | | 4 [300mm Diameter Mainto Fairview Reservior S| $ Ss 175,000/$ [S$ TS (175,000 | 5 |WaterReseior SC S34 000/$ SS 1,534,000 | | 6 Upgrade Filters at Water Treatment Plant =| $s 479,050/$ | [SS 479,050 | | __7 Water Supply, Treatment & Storage- NRSC | $s 6.708,047/$ TS 6,708,047 | | 8 |EastSectorWaterMains SG ORGS SS 416,026 | | 10 _|industrialMainLoop-Phase?_ CT SC SS 164,000]$ 6,164,000 | 41 industrial MainLoop-Phase2 CT SS 6,031,000] $ 6,031,000 | | 12 |industrialiMainLoop-PhaseS SS 7,045,000] $ 7,045,000 | | 43 |SoutheastMainLoop-Phasei Cd] SCC «dS CS 1,186,000] $ 1,186,000 | |_14 |Southeast MainLoop-Phase2 TS SS 1,350,000] $ 1,350,000 | 45 |Southeast MainLoop-PhaseS CT SCS 1,648,000 $ 1,648,000 | 100 [Unallocated Offsite Levies CollectedtoDec31,2020 | $ == - |g gg |$__---12,712,980/$ ss - ~|$ 23,424,000 | $ 36, 136,980 | *Costs estimates provided by City staff. **Estimates include engineering, contingencies, and land costs if any. ***Historical financing charges (if any) are included in the cost of completed work. *"*Unallocated levies to end-2020 were set-up as an individual project (#100) and credited 100% to future development and to all offsite levy areas. "Offsite infrastructure definitions are contained in Appendix F. """*Project numbers that are "hidden" pertain to projects that have since been removed from the bylaw. Location of Water Offsite Infrastructure C2. Water Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to development, other than those costs that have been provided by way of special ear-marked grant or contribution (i.e., contributed infrastructure). The City has/will receive approximately $5.28 million in special ear-marked grants and contributions for water offsite levy infrastructure as shown in the table below (note, if the City receives other ear-marked grants or contributions July 15", 2021 121 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $30.86 million. Special Grants and Contributions for Water Offsite Infrastructure (Osh SD he ti tric.. > Te all ba min ee | ly eernnntnad Smee mmars ry | on mt ay aah tres rice w mall 1 prt A cat ig | special Provincial jpevelopes. ie s oe tom | __Prolect Description] estimated Cost | us crates --)| Contributions | Estimated Cost Oa ai ed ie ey nea ccc uke | 1 |RawWaterintake 222,871 $ 68,798 1S 13.6731 $ = 240,460 | | 3 _|WaterTreatment Plant Upgrade CS C727,986/$ _--s36B.993/$ ss - "|S 363,993 | |___4 {300mm Diameter Mainto Fairview Reservior _---=S§_--s[$~--175,000/$ Ss 87,500/$ = = - '|$ _--_--~87,500 | |S _|WaterReservior CS 534,0001$ 767000 1$ - S 767,000] |_6 [Upgrade Filters at Water Treatment Plant _--= =| $479,050 [$ 4,580,876 ]$ ss - "(S$ (1,101,826) |__7 [Water Supply, Treatment &Storage- NRSC_ | $6, 708,047/$ SC CS 708,047 | | _8 _|EastSectorWaterMains SG ORES 73.825 /$ 142,201 | |__11__|industrialMainLoop-Phase2 CS O31000T$ SC TS (6,031,000 | |__12__|IndustrialMainLoop-Phase3_ CS 7,045,000]$ = SC 7,045,000 | |__13 _|SoutheastMainLoop-Phase1 CS 1186,000]$ = TS 1,186,000] |__14 _|SoutheastMainLoop-Phase2 Cd S| 1,350,000/$ [S$ CCC" KC*dS (1.350,000] |__15 |SoutheastMainLoop-Phase3 CS 164BCOCOTS SC 1,648,000 | C3. Year of Construction The timing of construction is used to determine the impact of inflation on cost, the impact of forecast account balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Forecast Year of Construction mm | Project Description Genstiucton Start ti)" it : fs, 'i { | Put \ my | _2 _|WaterTreatment Plant == CC--"'(C;! Cr OC2O06:CCS | 3 [Water Treatment Plant Upgrade Memes e0C8 can |_| | 4 [300mm Diameter Main to Fairview Reservior [2006 | 6 [Upgrade Filters at Water Treatment Plant __----Ss| 2006 | 7 __|Water Supply, Treatment & Storage - NRSC eee 010 ea | 8 [EastSectorWaterMains 2008S | 11 _ [industrial Main Loop - Phase 2 | ee e203a ro | |__12 [industrial Main Loop - Phase 3 ie Ses a0 | | 13 |SoutheastMainLoop-Phase1_ CTC 2025 | 14 [Southeast Main Loop - Phase 2 _ a | 15 [Southeast Main Loop - Phase 3 ase ae "The share of projects constructed beyond the 25-year review period are not included in rates today (see financial oversizing in next section). ** Project costs are inflated by 3% per annum to the year of construction. July 15%, 2021 /22 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update C4. Water Offsite Infrastructure Benefiting Parties The water offsite infrastructure previously outlined will benefit various parties to varying degrees. Three potential benefiting parties were identified including: 1. City of Brooks -- a portion of the water infrastructure which is required to service existing residents. This residual benefit is determined at the point in time when the project is added to the bylaw (i.e., it does not fluctuate from year-to-year). 2. Other Stakeholders -- other municipalities that benefit from the infrastructure. 3. Future Development: o Financial Oversizing -- that portion of cost (i.e., leviable water infrastructure costs) which benefits future development beyond the 25-year review period. o In Rates -- that portion of cost (i.e., leviable water infrastructure costs) which benefits future development within the 25-year review period. The table below outlines the allocation of water offsite levy infrastructure costs to benefiting parties. Allocation of Water Infrastructure to Benefiting Parties Developer Share Reduced P, Other Stakeholder} Beyond 25 Yi OSL / Develo, provec Desecration ESHA Cost") "Shee / remarcia seek | Oversizing %) [1 [Raw Waterintake TS 2a0400 | res 27H | 2 |WaterTreatmentPiat $226,704) 77.28% | TT iY | 3 [Water Treatment Plant Upgrade S$ ~------(363,003| 7.28% | TT --*S [4 [300mm Diameter Mainto Fairview Reservior |$ --_--87,500|_-- 77.23% | | Cd S| --*' | 5 WHO |S 767,00 aaa ihe! 22.77% | [6 [Upgrade Filters at Water Treatment Plant |S (1,101,826) 77.28% | | TT [7 [Water Supply, Treatment & Storage- NRSC (|S 6,708,047 [60.26% | | 8TH [10 industrial Main Loop-Phase? $6,164,000] 60.26% | | 72% (| ~--7.03% --*S [12 industrial MainLoop-PhaseS |S ~~ 7,045,000| 60.26% | | rBe2% | 11.13% --S | 13 [Southeast MainLoop-Phasei_ |S 1,186,000] 60.84% | | 81% | 8.18 [15 [Southeast MainLoop-Phase3_ TS «1,648,000 60.84% | | 88.15% | 31% CS [100 [Unallocated Offsite Levies CollectedtoDecsi,2020 [$f «i100,00% [$s "30)868,075 | *Allocations were determined by City staff. "Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. For example, a project which is slated to be constructed in year 20 of the 25-year review period will have 20% (5/25) of its costs in rates today, and 80% (20/25) of its costs will sit beyond the 25-year review period. C5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $7.27 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. City staff have advised that approximately $2.50 million in water levies have been applied/collected as shown in the table below. This results in an adjusted offsite levy July 15", 2021 123 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update cost of approximately $4.77 million. Offsite Levy Funds Applied to Date : ey |r OffsiteLevyy | ,. Paded Offsite Levy |. 80 Ovy Adjusted het ee Hi es OSL/ Developer |.' | Funds Collected | Project Description -- | Geet «| ~Funds Collected | co.) | Developer (Levy) [1 |RawWaterinfake dS aroz[$ = 1s ----- [$s 54750] | 2 WCC RGR |$ 51.621 /(§0uS - |$ 51,621] | 3 [Water Treatment PlantUpgrade CS CBBT SCC SCC' SSCS CC«CS 2,881 | |__4 [300mm Diameter MaintoFairiewReservor Ss [$s s19,924/$ SC !:C*dSCCSC«*D 94.9244 | | 5 |WateriResevich Ge |$ 174646[§Gumememn|$ - |$ 174,646] | 6 Upgrade Filters at Water TreatmentPlant_ _--§ == [$s (250,886)/$ = TSC SCdS (250,886) |__7 |Water Supply, Treatment &Storage- NRSC [$2,666,003 [$ 4,735,245 [$ = S (980,848 | |_8 |GastSectorWaterMains CGO S CSC' E!:SCdS C6 ,038 | |_10 [Industrial MainLoop-Phaset St G5.907/$ SC SCS 1,665,907] |__11 [IndustrialMainLoop-Phase2-- CS 12G.441/$ SC OS C,246,447 | |__12 _|industrialMainLoop-PhaseS Cd SC784004| GO SC:SCdT SS SCSC«C784,004 | |_13 [Southeast MainLoop-Phasei_ CdS 93,116 |S CC Cd SCC CdS CSC893,116 | |_14 [Southeast MainLoop-Phase2 0S 213,084 $ SC - S213,084 | |_15 [Southeast MainLoop-Phase3_ Std TG SC SCS «104,048 |_100 [Unallocated Offsite Levies CollectedtoDec31,2020 [$s sss - ~=[$ ~~ 7ea75i/$ i - =O ((763,751)| [$7,274,669/$ -- 2aosose [$$ 4,772,673 | C6. Summary of Water Offsite Levy Cost Flow-through As shown in the figure below, the total cost for water infrastructure that forms the basis of the rate is approximately $4.77 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in previous section. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). Total Water Offsite Levy Costs = Future Less: Levy = Off-site Development Receipts B alance (OSL Share)| iadiaiies 64.77M = Future Development "Financial Oversizing" $4.89M - Less: Special :, Project Grants & = Project = Other Costs Contributions Balance Share $36.14M $5,28M $30.86M $0.00M = Existing Development (Muni Share) $18.70M July 15", 2021 124 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update C7. Water Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by City staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Water Allocations to Benefitting Areas om | Preeti [ae ee ele elie alle ee |e [| [ie] ae ae] | a 4 |S 54,753 |g dl Aa | a | ch) Ad] 0 ct Wt | Le || a ee a BEF 2 6 Fl WE We 0 DI HG J 0 OP 0 He Fd LT PT EM EA Ba i PW PW 0 PD dW 0 14 |S 10,024 [EA eae et | a A | | A ced oa ch | A 0 | Nn nV Ont al] ctl 0 [ea | aT ME ED DL Be FB TD TST TE BT fT DD] [6 [s(250,806)[ 4 [4 [ata [ata fat ee a aaa a a aa) MA Ef PD DF BT OT WE FD ah NY Bs Pe I ee ee I es CM ET 0 p41 fs 1,246,441 4 ta ta ta ta tata fa ta tt a a a a a a a a a a a a a [42 [784,004 [HRA Rieeg| SA | A ck | AL | ek As | A |g ae P| Wg | | aN | eo |e a | oe 13 [$303,116 |i me | | | eet me | | | (me ea | | | mcs ee | eee | ee) ed | 4 | at a2 | ed 2 | Ana 114 | $213,084 |/Zc1e ees me evel (ease en me | cy vce ee ee | ar | om sn | pee] Hu | | Md | pr | a | Ad | | | | 1 15 |S 104,048 rte] came | me ern | Eset] | | rec | ed | emt a | ey] ea | et | | sal P| A | Lioo|s (763.751) | 1 Papa ta papa tay a aa 4 4 4 a a a a at a a Tt a C8. Account Balance At December 31%, 2020 the water account balance was in a deficit of $(365,758.34). This amount takes into consideration expenditures and front-ending obligations up to end-2020. This balance also assumes that funds of $763,751.00 currently in the account are transferred to the City to pay down front-ending obligations owed to the City. Details associated with account reconciliations are summarized in Appendix H. Water Offsite Levy Reserve Balance Description Dr Cr Balance Opening Balance 2006 $ 1,635,066.00 $ 1,635,066.00 OSL Receipts 2006 - 2020 $ 894,522.00 $ 2,529,588.00 OSL Refunds 2006 - 2020 $ 46,183.00 $ 2,483,405.00 OSL Receipt Allocations (Withdrawals) 2006 - 2020 $ 1,735,245.00 $ 748,160.00 Interest Earned (Charged (2006 2020) $ 15,591.00 $ 763,751.00 Account Balance per Muni Records (Unallocated Receipts) $ 763,751.00 Front-ending (2006 - 2020) $ 1,129,509.34 $ (365,758.34) Balance $__ (365,758.34) C9. Development and Water Infrastructure Staging Impacts Water offsite infrastructure will be constructed in staged fashion over the 25-year review period. We have reviewed the availability of offsite levy funds to meet these construction requirements and found that offsite levy account funds will not be sufficient to pay for construction of water infrastructure from time to time--front ending of infrastructure will be required. A front-ender is the party that constructs and pays up front for infrastructure that benefits other parties. July 15, 2021 125 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update To compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.00%° interest allowance is charged to the account when it is forecast to be in a negative balance. Further, a 1.00% interest credit is provided to the account when it is forecast to be in a positive balance. The graph and table below outline the forecast water levy account balances over the 25-year development period. If necessary, an interest staging adjustment is applied to rates (slightly positive or slightly negative) to ensure that the forecast account balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). Anticipated Water Offsite Levy Account Balances Water Reserve $1,000,000 = $600,000" 4s ee = --+*-- Reserve Balance $- pea -- os a a a ee CL ae ae Cd a | 7 : - wo nt top) -- ie] w Ld [o>] re o « $(500,000) a N N N N N N N N N N $(1,000,000) +-- 1 A -- $(1,500,000) +-- --__--__--__-- > $(2,000,000) Year 5 The 20-year debenture rate at the Alberta Capital Finance Authority at the time of writing was ~2.09%. July 15, 2021 126 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Anticipated Water Offsite Levy Account Balances Opening Balance Year Receipts Expenditure Interest Balance 2021 $ 157,846 $ - $ (4,158) $ (212,070) 2022 $ 164,955 $ : $ (942) $ (48,057) 2023 $ 172,384 $ . $ 1,243 $ 125,570 2024 $ 180,146 $ - $ 3,057 $ 308,773 2025 $ 188,267 $ 44,246 $ 4,528 $ 457,322 2026 $ 196,739 $ 364,584 $ 2,895 $ 292,372 2027 $ 205,601 $ 46,940 $ 4,510 $ 455,543 2028 $ 214,859 $ = $ 6,704 $ 677,106 2029 $ 224,543 $ 211,032 $ 6,906 $ 697,523 2030 $ 234,657 $ 1,738,904 $ (16,134) $ (822,859) 2031 $ 245,219 $ 223,884 $§$ (16,030) $ (817,554) 2032 $ 256,265 $ - $ (11,226) $ (572,514) 2033 $ 267,800 $ 177,713 $ (9,649) $ (492,075) 2034 $ 279,860 $ 1,464,353 $§$ (33,531) $ (1,710,100) 2035 $ 292,469 $ 188,535 $ (32,123) $ (1,638,289) 2036 $ 305,651 $ 33,198 $ (27,317) $ (1,393,153) 2037 $ 319,412 $ 273,550 §$ (26,946) $ (1,374,237) 2038 $ 333,797 $ 35,220 $ (21,513) $ (1,097,172) 2039 $ 348,832 $ 133,471 $ (17,636) $ (899,448) 2040 $ 364,545 $ 1,099,804 $ (32,694) $ (1,667,402) 2041 $ 380,965 $ 141,600 §$ (28,561) $ (1,456,597) 2042 $ 398,104 $ 19,356 $ (21,557) $ (1,099,406) 2043 $ 416,054 $ 159,494 §$ (16,857) $ (859,702) 2044 $ 434,787 $ 20,535 $ (8,909) $ (454,359) 2045 $ 454,359 $ - $ = $ (0) July 15", 2021 /27 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX D: SANITARY SEWER D1. Sanitary Sewer Offsite Infrastructure In order to support future growth, sanitary sewer offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $53.82 million as outlined in the table below. It is important to note that these costs represent "gross" costs, of which only a portion will go to support development during the 25-year review period. The remainder of this section outlines how the "net" costs for development are determined. Summary of Sanitary Sewer Offsite Infrastructure r | ae Ves sat | Estimated Cost of | 1 _ |New Sewage Treatment Facity, Pumping Station and Forcerman --| s 2,930,163. _|s _-_|s 2,930,106] |__2 __|Modification and Expansion Wastewater Treatment Facility (| $--*4,283,041/$ - |$ --- ~+'(|$ 4,283,941 | | 3____|Pump Station Modifications and Forcemain |S 1,156,.2511$ = |S --- ~+'($ 1,156,251 | _4 _ |East Sector Sanitary Sewer Upgrade S211 $C dS CSC (dS C82 611 | | _5 _|Cassils Road East SanitarySewerMan CS 153,225/$ = SC CdS «153,225 | | 9 |Eastbrook Sanitary Sewer Pump Station Upgrade |S 536,830/$ SC «SC«d S$ «536,830 | [10 |Main Trunk (Old Lagoons to Hort Lift Station) ss S ~----S552,456/$ = (|S «3.5 12,014|$ 4,064,470 | | 11 |Main Trunk (7th Street Eastto OldLagoons) | SCS (I$ --<4.133,000[$ _ 4,133,000 | [12 |South industrial Trunk MainUpsize CT SCS S$ --«*1,716,000[$ _1,716,000 | |_13 |Eastbrook Lift Station and ForcemainUpgrades | SCS ~~ S$ --*1,729,000[$ _1,729,000 | | 14 |Parkland Lift StationUpgrades Cd SCS CC (I$ --_--«329,0001$ __ 329,000 [15 [Meadowbrook LiftStationUpgrades CT SCS IS --«*1,358,0001$ '1,958,000 | |_16__|Wastewater Treatment Upgrades CCT SCS (I$ 30,200,000] $ 30,200,000, [100 Unallocated Offsite Levies CollectedtoDec 31,2020. | $C GSC GSC Cs [$0845.57 [$$ A977 O14 | $63,822,525 | *Costs estimates provided by City staff. **Estimates include engineering, contingencies, and land costs if any. ***Historical financing charges (if any) are included in the cost of completed work. "Unallocated levies to end-2020 were set-up as an individual project (#100) and credited 100% to future development and to all offsite levy areas. "Offsite infrastructure definitions are contained in Appendix F. ""***Project numbers that are "hidden" pertain to projects that have since been removed from the bylaw. D2. Sanitary Sewer Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to development, other than those costs that have been provided by way of special ear-marked grant or contribution (i.e., contributed infrastructure). City of Brooks has/will receive approximately $16.28 million in special ear-marked grants and contributions for sanitary sewer offsite levy infrastructure as shown in the table below (note, if the City receives additional ear-marked grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $37.54 million. July 15t, 2021 / 28 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Special Grants and Contributions for Sanitary Sewer Offsite Infrastructure oe roe Sh om Te |i. I Special erovseiel| Meipsrcbenn | Aa bens Av ; '| Total Project | Grants | | | Reduced Project - (oo) APORIR GT cy, aeatted cont tions) || Goreme Entec Pe YR Ue ED RE WTA ARE | Rey a | eiaL A TSI S MR iar e AP P a [1 |New Sewage Treatment Faolity, Pumping Station and Forcemain |$ 2,930,188 |$ __2,785.454/$ Ss - --(|$ (144,704 | |__2|Modification and Expansion Wastewater Treatment Faciity '| $ --'4,283,941|$ _1,623,849|$ 2,075,000|$ 685,092 | [3 [Pump Station Modifications and Forcemain dS ~----«*1,156,251|$ 878,1261$ = ~|$ 578,125] | 4 |East Sector Sanitary Sewer Upgrade CdS SC, 180,768 |S --_--*51,835 | |__5 [Cassis Road East Sanitary SewerMan dS ~Si153,225/6 76,812/$ > |S --_76,613 | [9 |Eastbrook Sanitary Sewer Pump Station Upgrade S$ ~~--i1.536.80018 - |S + |S 1,596,830 [10 [Main Trunk (Old Lagoons to Hort Lift Station) = S$ ~--«i4,084.470/§ = |$ = |$ 4,064,470 | [11 [Main Trunk (7th Street Eastto Old Lagoons) dS ~~ --<4,133,0001$ =~ |$ = (|$ 4,133,000 | [12 [South industrial Trunk Main Upsize CdS ~--«*,716,0001$ = [$= '($1,716,000 | | 13 [Eastbrook Lift Station and Forcemain Upgrades SSS ~--*'1,729,000/$ - |$ = ~+|$ 1,729,000] | 14 [Parkland Lift Station Upgrades CdS 29,0008 '|S = '(1S 329,000] | 15 [Meadowbrook Lift Station Upgrades C«d SS ~--Ci1,358,000/$ Ss - (1S = ~'($ 1,958,000) | 16 [Wastewater Treatment Upgrades «dL S$ 30,200,000 $ 9,080000|$ = ~'($ 21,140,000] [100 [Unallocated Offsite Levies CollectedtoDec31,2020, |$ |}j- i$ =| |$ .« (i$ - | [$63,822,525 [$ 14,204,817|$ 2,076,000|$ 97,642,708 | D3. Year of Construction The timing of construction is used to determine the impact of inflation on cost, the impact of forecast account balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Forecast Year of Construction Au A a bs ae eta | Construction |__1 __|New Sewage Treatment Facility, Pumping Station and Forcemain | 2006 ~--_--sixi |__2 ___| Modification and Expansion Wastewater Treatment Facilit |____3 __|Pump Station Modifications and Forcemain | 4 _|Bast Sector Sanitary Sewer Upgrade 20068 | |__5 ___|Cassils Road East Sanitary Sewer Main ee OUG | |___ 9 __|Eastbrook Sanitary Sewer Pump Station Upgrade 2012 | 10 __|Main Trunk (Old Lagoons to Hort Lift Station Sa | _11 __|Main Trunk (7th Street East to Old Lagoons eee | |_12 __|South Industrial Trunk Main Upsize eee 2029 ee | |___13 _|Eastbrook Lift Station and Forcemain Upgrades eee eOZ0L. | Parkland Lift Station Upgrades LENOX, al Meadowbrook Lift Station Upgrades 520282 "| Wastewater Treatment Upgrades pen 2020 ae *The share of projects constructed beyond the 25-year review period are not included in rates today (see financial oversizing in next section). ** Project costs are inflated by 3% per annum to the year of construction. D4. Sanitary Sewer Offsite Infrastructure Benefiting Parties The sanitary sewer offsite infrastructure previously outlined will benefit various parties to varying degrees. Three potential benefiting parties were identified including: July 15", 2021 /29 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update 1. City of Brooks -- a portion of the sanitary sewer infrastructure which is required to service existing residents. This residual benefit is determined at the point in time when the project is added to the bylaw (i.e., it does not fluctuate from year-to-year). 2. Other Stakeholders -- other municipalities that benefit from the infrastructure. 3. Future Development: o Financial Oversizing -- that portion of cost (i.e., leviable sanitary sewer infrastructure costs) which benefits future development beyond the 25-year review period. o In Rates -- that portion of cost (i.e., leviable sanitary sewer infrastructure costs) which benefits future development within the 25-year review period. The table below outlines the allocation of sanitary sewer offsite levy infrastructure costs to benefiting parties. Allocation of Sanitary Sewer Infrastructure to Benefiting Parties ; Developer Share. 'Estimat inal Oversizing %) [_3___|Pump Station Modifications and Forcemain S'S ----878,128 | 77.23% | «dT id I | |__4___|East Sector Sanitary Sewer Upgrade SS SS'1,835[ 208% | *t *i| ~ ----_a7.92% | | 9 |Eastbrook Sanitary Sewer Pump Station Upgrade| $1,536,639 70.60% | |_| 29.31% _| | 11 |Main Trunk (7th Street East to Old Lagoons) _______|$ 4,133,000| 69.23% | | fs% | 39.14% | [13 [Eastbrook Lift Station and Forcemain Upgrades [$1,729,000 70.60% | | 6.86% | 23.45% | | 14 [Parkland Lit Station Upgrades dS 320,000 75.75% 1 id idm | ist _--+t [400 |Unallocated Offsite Levies ColactedioDecai2020(s OT TY 10.00% | *Allocations were determined by City staff. **Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. For example, a project which is slated to be constructed in year 20 of the 25-year review period will have 20% (5/25) of its costs in rates today, and 80% (20/25) of its costs will sit beyond the 25-year review period. ***Financial oversizing for Projects 3,4,5,6,7,8,and 13 was removed as these projects are allocated to offsite levy areas which have no lands developing beyond the 25-year review period. D5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $12.46 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. City staff have advised that approximately $2.57 million in sanitary sewer levies have been applied/collected as shown in the table below. This results in an adjusted offsite levy cost of approximately $9.89 million. July 15", 2021 /30 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Offsite Levy Funds Applied to Date Lil sonality | _ Offsite Levy ( Adjusted j | OSL/ Developer}. | Funds Collected ee eat Bro Dereritin '| cot ial ae | Starting Jen pevelgps (ia) | _1 [New Sewage Treatment Faclity, Pumping StationandForcemain |$ --3z,956[$ Ss - [$s Sd (92,.956 | [2 |Modification and Expansion Wastewater Treatment Faciity «(| $ ----=155,905/$ = |$ --- ~+(|$ 155,995] [3 [Pump Station Modifications andForcemain TS t31,699/§ = $C CdS «131,639 [4 [East Sector Sanitary Sewer Upgrade StS CC dS CSC«dS SS CCC«C0« 56 | [5 |CassilsRoadEastSanitarySewerMain IS t9,460/$ $C «CdS C«*19,8600] |_9_ |Eastbrook Sanitary Sewer Pump Station Upgrade |S ~------450,431$ ges $ CC SC«dS «10,4633 | [10 [Main Trunk (Old Lagoons to Hort Lift Station) --[S--1.615,.411/$ [$C «dS (1,615,411 | | 11 |Main Trunk (7th Street Eastto Old Lagoons) S$ 17,7451 = SC «CdS «1,617,745 | | 12 |South industrial Trunk MainUpsize dS 0,053/$ = S$ «L$ «489,053 | | 13 [Eastbrook Lift Station and Forcemain Upgrades. |S 405.4011 $C «dS «405,401 | [44 [Parkland Lift StationUpgrades CS 73388 SC SC «dS 73,388 | [15 [Meadowbrook Lift StationUpgrades CS 88,7651 IS C ~S«d S$ «88,765 [16 Wastewater Treatment Upgrades dS 7057,703/$ = [$+ $ 7,057,703 | [100 [Unallocated Offsite Levies CollectedtoDec31,2020, IS C'(W:*C*dS Sit eOB|s CLS (2,511,695)| [s_ 12,467,602 [$2,569,024f$ = = S$ --(,888,578 | D6. Summary of Sanitary Sewer Offsite Levy Cost Flow-through As shown in the figure below, the total costs for sanitary sewer infrastructure that forms the basis of the rate is approximately $9.89 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in the previous section. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). Total Sanitary Sewer Offsite Levy Costs = Future Less: Levy = Off-site Development Receipts Balance* (OSL Share) $2.57M ¢9 89M $12.46M = Future Development "Financial Oversizing" $1.82M - Less: Special , Project Grants & = Project = Other Costs Contributions Balance Share $53.82M $16.28M $37.54M $0.00M = Existing Development (Muni Share) $23.26M D7. Sanitary Sewer Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy July 15", 2021 /31 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by City staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Sanitary Sewer Allocations to Benefitting Areas fom] Pree Le tells delle] e [eae salsa] lalla lalelel aa RU ESE 6 0 0 BH lr Ws de We L_2 |S 155,005 [ASA eT a st |e | | ee |e | ae gf | cn | | | | unt | et eve ate et wat EE ST TT TL HD | 4 [$19,656 | eet] cece) net) dec | | ee | (ee |u|] | ein [| ee | eet apart | ee use| an a | rh [|S _['S 10,460 | [| | | [Sm Pme | |r| |e | | rs [on | me | oe | ae (ome | am |e | ao [| 1 S| S 410,463 [aes aaa | ea | | | Fe | a | | Pc | ner nt | eA (|| | | | ee | | 1 40 |S 1,645,414 [isa] Sl Aa eT A | nh RAT na] mt] et | | ec | te te 114 |S 4,647,745 RBA) Bae aa ata | | 8 | | ck | a | a nl | | e)| || ee eve | EAR EE SESE IE SESE SIE Sea ESS SSS SIE ae 113. [$ 405,401 [ama Neat Ge | Uae] Rn | [|| em ar |g PL at Wor | | | | | [ed] | 1.14 |$ 73,366 |RSS Ramen Ea Ss) em | | |e | om | ese | | ese | Oe In| Rre| eenl| pen | eu meh ee | coe (| 4 | 4 | A [18 [$388,765 [Pe fae teal] se frase] wel ue fas | | |e | | coll cal] len oA [Ae adel ee aA lone| Tie {s7osr7o3[ a [a tata tty arta tata tata aaa tl [aaa a a at Loos _taseisot 1 Ta tata tats tata tata t stata tate t tata ta tra aaa 9,888,578 D8. Account Balance At December 31%, 2020 the sanitary sewer account balance was in a surplus of $1,603,398.50. This amount takes into consideration expenditures and front-ending obligations up to end-2020. This balance also assumes that funds of $972,370.50 currently in the account are transferred to the City to pay down front-ending obligations owed to the City. Details associated with account reconciliations are summarized in Appendix H. Sanitary Sewer Offsite Levy Reserve Balance Description Dr Cr Balance Opening Balance 2006 $ 1,888,174.00 $ 1,888,174.00 OSL Receipts 2006 - 2020 $ 682,873.00 $ 2,571,047.00 OSL Refunds 2006 - 2020 $ 28,276.00 $ 2,542,771.00 OSL Receipt Allocations (Withdrawals) 2006 - 2020 $ 57,329.00 $ 2,485,442.00 Interest Earned (Charged (2006 2020) $ 90,327.00 $ 2,575,769.00 Account Balance per Muni Records (Unallocated Receipts) $ 2,575,769.00 Front-ending (2006 - 2020) $ 972,370.50 _$ 1,603,398.50 Balance $ 1,603,398.50 D9. Development and Sanitary Sewer Infrastructure Staging Impacts Sanitary sewer offsite infrastructure will be constructed in staged fashion over the 25-year development period. We have reviewed the availability of offsite levy funds to meet these construction requirements and found that offsite levy account funds will not be sufficient to pay for construction of sanitary sewer infrastructure from time to time--front ending of infrastructure will be required. A front-ender is the party that constructs and pays up front for infrastructure that benefits other parties. To compensate parties for capital they provide in front-ending offsite infrastructure July 15", 2021 / 32 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update construction, a 2.00%° interest allowance is charged to the account when it is forecast to be in a negative balance. Further, a 1.00% interest credit is provided to the account when it is forecast to be in a positive balance. The graph and table below outline the forecast water levy account balances over the 25-year development period. If necessary, an interest staging adjustment is applied to rates (slightly positive or slightly negative) to ensure that the forecast account balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). Anticipated Sanitary Sewer Offsite Levy Account Balances Sanitary Reserve $2,000,000 . are ( $(1,000,000) ego yaoneea a = = ee CO ee i iS er anon Le ieee, a hee || ees Sei La ee $(9,000,000) Year § The 20-year debenture rate at the Alberta Capital Finance Authority at the time of writing was ~2.09%. July 15", 2021 /33 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Anticipated Sanitary Sewer Offsite Levy Account Balances Opening Balance Year Receipts Expenditure Interest Balance 2021 $ 304,709 $ 1,227,712 $ 6,804 $§$ 687,199 2022 $ 318,433 $ 333,015 $ 6,726 $ 679,344 2023 $ 332,773 $ 1,380,798 $ (7,374) $ (376,054) 2024 $ 347,756 $ 240,929 $ (5,385) $ (274,612) 2025 $ 363,434 §$ 846,366 $ (15,151) $ (772,695) 2026 $ 379,788 $ 3,680,270 $ (81,464) $ (4,154,641) 2027 $ 396,897 $ 3,804,583 $ (151,247) $ (7,713,574) 2028 $ 414,768 $ 917,868 $ (164,333) $ (8,381,007) 2029 $ 433,462 $ 61,952 $ (160,190) $ (8,169,687) 2030 $ 452,986 $ 255,241 $ (159,439) $ (8,131,381) 2031 $ 473,376 $ 262,898 $ (158,418) $ (8,079,321) 2032 $ 494,699 §$ 67,696 $ (153,046) $ (7,805,364) 2033 $ 516,966 $ : $ (145,768) $ (7,434,166) 2034 $ 540,247 $ - $ (137,878) $ (7,031,797) 2035 $ 564,588 $ - $ (129,344) $ (6,596,554) 2036 $ 590,034 $ E $ (120,130) $ (6,126,650) 2037 $ 616,600 $ : $ (110,201) $ (5,620,252) 2038 $ 644,368 $ = $ (99,518) $ (5,075,401) 2039 $ 673,391 $ - $ (88,040) $ (4,490,050) 2040 $ 703,724 $ - $ (75,727) $ (3,862,052) 2041 $ 735,423 $ = $ (62,533) $ (3,189,162) 2042 $ 768,508 $ - $ (48,413) $ (2,469,067) 2043 $ 803,159 $ - $ (33,318) $ (1,699,227) 2044 $ 839,322 $ - $ (17,198) $ (877,103) 2045 $ 877,103 $ = $ 0 $ 0 July 15", 2021 134 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX E: STORMWATER E1. Stormwater Offsite Infrastructure In order to support future growth, stormwater offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $4.27 million as outlined in the table below. It is important to note that these costs represent "gross" costs, of which only a portion will go to support development during the 25-year review period. The remainder of this section outlines how the "net" costs for development are determined. Summary of Stormwater Offsite Infrastructure ; ' | Estimated Cost of : Ar | Completed 13. [Marshall Drain Channel Upgrades - Phase 1________| $s _-|s_- |s 1,120,548 1.120.545 | [14 [Marshall Drain Channel Upgrades =-Phase2 Ts T§ TS aert0|$ 881,010 | 15 [Marshall Drain Channel Upgrades-Phase3_ | SC «dS CS ,455] $463,455 | | 16 |Marshall Drain Channel Upgrades-Phase4 dT SC SC OS 1272,510[$ _--*1,272,510| | 17 |Greenbrook Pond Overflow Channel CT SCC' «dG OSC 24, 340[$ 524,340 | 100 [Unallocated Offsite Levies CollectedtoDec3i,20200 [$s -|$ - {gs §- {g - | i$ [SS 4 270,860 [$4,270,860 | *Costs estimates provided by City staff. "Estimates include engineering, contingencies, and land costs if any. ***Historical financing charges (if any) are included in the cost of completed work. *""Unallocated levies to end-2020 were set-up as an individual project (#100) and credited 100% to future development and to all offsite levy areas. *"""*Offsite infrastructure definitions are contained in Appendix F. *"***Project numbers that are "hidden" pertain to projects that have since been removed from the bylaw. E2. Stormwater Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to development, other than those costs that have been provided by way of special ear-marked grant or contribution (i.e., contributed infrastructure). City of Brooks has/will receive approximately $0.00 in special ear-marked grants and contributions for stormwater offsite levy infrastructure as shown in the table below (note, if the City receives other ear-marked grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $4.27 million. July 15", 2021 135 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Special Grants and Contributions for Stormwater Offsite Infrastructure We tee ate | Special Provincial eeuremecnoeee | if ae Le Ay biel Cha aie | TotalProject |" "Gio, | Agreement | Reduced Project. PRO ESR = BM estimated Cost (tistone# Future)|, Contrbutions | Estimated Cost SON ed Tiel al lls ar | GRR UC eA MEER) | A Suc |_13 [Marshall DrainChannelUpgrades-Phase1 |S 1,120,545[$ SS 1,129,545 | |_14 |Marshall Drain Channel Upgrades-Phase2_ TS 881,10] $ SC 881,010] | 15 [Marshall DrainChannelUpgrades-Phase3 CTS 63,455/$ | SCC! CdS (4455 | |_16 |Marshall Drain Channel Upgrades-Phase4_ St 272.510/$ = $C OS 1272,510 | |_ 17 |Greenbrook Pond Overflow Channel CdS S24 40S CS 524,340 | | 100 [Unallocated Offsite Levies CollectedtoDec31,2020 [$s == - |g So » [g gs [$4 270,860/$ ss TS 4,270,860 | E3. Year of Construction The timing of construction is used to determine the impact of inflation on cost, the impact of forecast account balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Forecast Year of Construction | ramon | [13 |Marshall Drain Channel Upgrades -Phase1_| 2024 _| | 14 |Marshall Drain Channel Upgrades-Phase2 | 2029 | 15 [Marshall Drain Channel Upgrades-Phase3 | 2034 | 16 |Marshall Drain Channel Upgrades-Phase4_ | 2039 "The share of projects constructed beyond the 25-year review period are not included in rates today (see financial oversizing in next section). ** Project costs are inflated by 3% per annum to the year of construction. E4. Stormwater Offsite Infrastructure Benefiting Parties The stormwater offsite infrastructure previously outlined will benefit various parties to varying degrees. Three potential benefiting parties were identified including: 1. City of Brooks -- a portion of the stormwater infrastructure which is required to service existing residents. This residual benefit is determined at the point in time when the project is added to the bylaw (i.e., it does not fluctuate from year-to-year). 2. Other Stakeholders -- other municipalities that benefit from the infrastructure. 3. Future Development: o Financial Oversizing -- that portion of cost (i.e., leviable stormwater infrastructure costs) which benefits future development beyond the 25-year review period. July 15", 2021 /36 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update o In Rates -- that portion of cost (i.e., leviable stormwater infrastructure costs) which benefits future development within the 25-year review period. The table below outlines the allocation of stormwater offsite levy infrastructure costs to benefiting parties. Allocation of Stormwater Infrastructure to Benefiting Parties tem] Pret once, | Rear | Munthe | eae | onmea | shea [13 [Marshall Drain Channel Upgrades-Phasei dS ~----1,120,545| 5zee% | S| OH Od CSCO [16 [Marshall Drain Channel Upgrades -Phase4 | $ ----',272,510| 2.68% | «dt S~Cia. 07% | 13.28% p «4,270,860 *Allocations were determined by City staff. "Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. For example, a project which is slated to be constructed in year 20 of the 25-year review period will have 20% (5/25) of its costs in rates today, and 80% (20/25) of its costs will sit beyond the 25-year review period. E5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of $1.03 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. City staff have advised that $0.38 million in stormwater levies have been applied/collected as shown in the table below. This results in an adjusted offsite levy cost of $0.65 million. Offsite Levy Funds Applied to Date 'lhe See ay Sa re 08L/ Developer | _ MsHe Lewy | unde Cotactea | Adlustod 4 fem | Project Description: ea os a \hergsecxne Starting Jan 4, | Developer (Levy) | 15 |MarshallDrainChannelUpgrades-Phase3_ S$ 105,267/$ = = = =©9- |$ - |$ 105,267 | | 16 [Marshall DrainChannelUpgrades-Phase4 |S) t8G01]/$ = - |S - |$ 168,601 E6. Summary of Stormwater Offsite Levy Cost Flow-through As shown in the figure below, the total cost for stormwater infrastructure that forms the basis of the rate is $0.65 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in previous section. The offsite levy balance (due from July 15", 2021 137 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update developers) is allocated to various benefitting areas (as described in the next section). Total Stormwater Offsite Levy Costs = Future soe Levy = Off-site Development eceipts Balance* (OSL Share)| "ial 60 65M $1.03M 50.38M = Future Development "Financial Oversizing" $0.75M . Less: Special Project Grants & = Project = Other Costs Contributions Balance Share $4.27M $0,00M $4.27M $0.00M = Existing Development (Muni Share) $2.50M E7. Stormwater Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by City staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Stormwater Allocations to Benefitting Areas tom] Poe Litas als tele [e [el ola | etal al ele [| ele] e alee las 13 [$470,357 [agelteg alg g) act | A] eh | | ee | ee ee ff a Negra ies || ee nce eed] |< | 114 |S 283,466 | ma A | Oc aa] Ve | Ve | en) S| el] We) aCe | ee | ee | Se | ee eee] | ed 115 [$105,267 |i id ites art daa cpa Cd |e | emer |e men eer) | C0 | | el | et [rl || 116 [$168,601 |e egies ined | te Me a adc |e 9 | |e) es PPO On] re | ee | | cam] ee |G | 117 [$1,042 | BS mes | a ey |e 0] | ee a | | em | ed | | ce | | eet re | ce | oe {400 ts _care.soye stat atatststatatatitstatststststs tats tata tats tats E8. Account Balance At December 31°, 2020 the stormwater account balance was in a surplus of $378,520.00. This amount takes into consideration expenditures and front-ending obligations up to end- 2020. Details associated with account reconciliations are summarized in Appendix H. July 15%, 2021 /38 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Stormwater Offsite Levy Reserve Balance Description Dr Cr Balance Opening Balance 2006 $ 243,133.00 $ 243,133.00 OSL Receipts 2006 - 2020 $ 151,111.00 $ 394,244.00 OSL Refunds 2006 - 2020 $ 30,861.00 $ 363,383.00 OSL Receipt Allocations (Withdrawals) 2006 - 2020 $ - $ 363,383.00 Interest Earned (Charged (2006 2020) $ 15,137.00 $ 378,520.00 Account Balance per Muni Records (Unallocated Receipts) $ 378,520.00 Front-ending (2006 - 2020) $ -__$ 378,520.00 Balance $___ 378,520.00 E9. Development and Stormwater Infrastructure Staging Impacts Stormwater offsite infrastructure will be constructed in staged fashion over the 25-year development period. To compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.00%' interest allowance is charged to the account when it is forecast to be in a negative balance. Further, a 1.00% interest credit is provided to the account when it is forecast to be in a positive balance. The graph and table below outline the forecast water levy account balances over the 25-year development period. If necessary, an interest staging adjustment is applied to rates (slightly positive or slightly negative) to ensure that the forecast account balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). Anticipated Stormwater Offsite Levy Account Balances Storm Reserve $500,000 $300,000 " $100,000 ened cog eC ee eae ae oo SNe 8, 8 ek 9 we oe | a ee A GL: see Year ' The 20-year debenture rate at the Alberta Capital Finance Authority at the time of writing was ~2.09%. July 15", 2021 /39 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Anticipated Stormwater Offsite Levy Account Balances Opening Balance Year Receipts Expenditure Interest Balance 2021 $ 22,510 $ 5 $ 4,010 $ 405,040 2022 $ 23,523 $ = $ 4,286 $ 432,849 2023 $ 24,583 §$ = $ 4,574 §$ 462,006 2024 $ 25,690 §$ 51,397 §$ 4,363 §$ 440,661 2025 $ 26,848 §$ 423,513 $ 440 $ 44,436 2026 $ 28,056 $ 54,527 §$ 180 $ 18,144 2027 $ 29,320 $ 232 $ 472 $ 47,705 2028 $ 30,640 $ 1,911 $ 764 §$ 77,198 2029 $ 32,021 $ 36,157 $ 731 $ 73,792 2030 $ 33,463 $ 295,908 $ (3,773) $ (192,426) 2031 $ 34,969 §$ 38,098 $ (3,911) $ (199,465) 2032 $ 36,545 §$ = $ (3,258) $ (166,179) 2033 $ 38,189 §$ $ (2,560) $ (130,549) 2034 $ 39,909 $ 15,459 $ (2,122) $ (108,221) 2035 $ 41,707 $ 127,380 $ (3,878) $ (197,771) 2036 $ 43,587 $ 16,400 $ (3,412) $ (173,996) 2037 $ 45,550 $ 4 $ (2,569) $ (131,015) 2038 $ 47,601 $ - $ (1,668) $ (85,083) 2039 $ 49,745 $ 28,703 $ (1,281) $ (65,322) 2040 $ 51,986 $ 236,515 $ (4,997) $ (254,848) 2041 $ 54,327 §$ 30,451 $ (4,619) $ (235,591) 2042 $ 56,771 $ - $ (3,576) $ (182,396) 2043 $ 59,331 $ - $ (2,461) $ (125,526) 2044 $ 62,003 §$ - $ (1,270) $ (64,794) 2045 $ 64,794 $ - $ (0) $ (0) July 15, 2021 /40 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX F: OFFSITE INFRASTRUCTURE DEFINITIONS F1. Transportation The City of Brooks maintains a roadway classification system consistent with the definition of arterial, collector, and local roads contained in the Transportation Association of Canada's Manual of Geometric Design Standards for Canadian Roads. New developments contribute their proportionate share of the cost of the following via the transportation offsite levy charge: * Urban arterial roads. * Rural grid roads which function as a major road network. * Arterial roadway landscaping and pedestrian linkages. * Noise attenuation facilities required for upgrading in conjunction with completion of arterials in developed areas. * Arterial/arterial road intersection signals. * Arterial/collector road intersection signals. * Underground power costs applicable to arterial road construction. « Lands purchased to accommodate any leviable infrastructure. All other transportation related infrastructure, such as local and collector roads within new development areas, is constructed by developers, at their cost, in conjunction with the development. F2. Water New developments contribute their proportionate share of the cost of the following via the water offsite levy charge: « New water transmission mains. Water "transmission" mains are distinguished from water "distribution" mains by their function, not size. Transmission mains are typically larger, service a large area, and provide little or no direct service along their length. In comparison, distribution mains are typically smaller and are used for local servicing (i.e., service connections to abutting lots and blocks). * New water distribution mains that benefit an entire basin. * Water reservoirs and fill/supply mains. * Water supply and treatment facilities. * Existing water transmission mains and water distribution mains that are required to be expanded or upgraded to meet current standards and benefit an entire basin. These projects are proportionately allocated to existing developed benefiting areas through utility rates and new undeveloped benefiting areas through offsite levies. * Lands purchased to accommodate any leviable infrastructure. July 15", 2021 141 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update All other water related infrastructure, such as local water distribution lines within new development areas, is constructed by developers, at their cost, in conjunction with the development. F3. Sanitary Sewer New developments contribute their proportionate share of the cost of the following via the sanitary sewer offsite levy charge: «» New wastewater trunks. Wastewater "trunks" are distinguished from wastewater "collectors" by their function, not size. Trunks are typically larger, service large areas, and are located along arterial or otherwise leviable roads. In comparison, collectors are typically used for local servicing (i.e., service connections to abutting lots and blocks). » New wastewater collectors that benefit an entire basin. « Lift stations that benefit an entire basin. « Wastewater treatment and disposal facilities. « Existing trunk mains and collector mains that are required to be expanded or upgraded to meet current standards and benefit an entire basin. These projects are proportionately allocated to existing developed benefiting areas through utility rates and new undeveloped benefiting areas through offsite levies. « Lands purchased to accommodate any leviable infrastructure. All other sanitary sewer related infrastructure, such as local sanitary sewer collectors within new development areas, is constructed by developers, at their cost, in conjunction with the development. F4. Stormwater New developments contribute their proportionate share of the cost of the following via the stormwater offsite levy charge: = New stormwater trunks. Stormwater "trunks" are distinguished from stormwater "collectors" by their function, not size. Trunks are typically larger, service large catchment areas, and are located along arterial or otherwise leviable roads. In comparison, collectors are typically used for local servicing (i.e., service connections to abutting lots and blocks). = New stormwater collectors that benefit an entire basin. » Stormwater lift stations and that benefit an entire basin. « New overland drainage infrastructure that benefits an entire basin. # Existing trunk mains and collector mains that is required to be expanded or upgraded to meet current standards and benefits an entire basin. These projects are proportionately allocated to existing developed benefiting areas through utility rates and new undeveloped benefiting areas through offsite levies. July 15%, 2021 142 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update « Any leviable infrastructure, per the above, to provide an adequate stormwater outlet to an entire benefitting basin. « Lands purchased to accommodate any leviable infrastructure. All other stormwater related infrastructure, such as local stormwater collectors within new development areas, is constructed by developers, at their cost, in conjunction with the development. July 15%, 2021 143 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX G: COMPARISON OF RATES The table below compares the new City offsite levy rates to other municipalities. City of Beaumont" Residential (roads, water, sewer) $53,900 - $77,600 (2019) City of Fort Saskatchewan (West Park) (roads, water, sewer, storm) $62.900 - $76,700 (2017) Town of Stony Plain (roads, water, sewer, recreation) $74,950 (2021) City of Lacombe (roads, water, sewer, storm) $19,800 - $120,100 (2013) Town of Edson" (roads, water, sewer) $77,400 (2016) Town of Rocky Mountain House' (roads, water, sewer) (by Dev Agreement) $79,700 (2016) City of Brooks* (roads, water, sewer, storm) $79,823 (2021) Parkland County* (roads, water, sewer, storm) $82,500 (2018) Sturgeon County -- Sturgeon Valley* (roads, water, sewer) $82,800 (2021) City of Spruce Grove* (roads, water, sewer) $83,000 (2020) City of Beaumont* Industrial (roads, water, sewer) $80,900 - $116,390 (2019) Town of Sylvan Lake* (roads, water, sewer, storm) $85,000 (2021) Town of Blackfalds (roads, water, sewer, storm) $90,100 (2015) Town of Calmar* (roads, water, sewer) $95,700 (2020) Lacombe County (Joint Economic Area) (water, sewer) $95,000 (2016) Town of Strathmore (roads, water, sewer) $96,300 (2017) City of Cold Lake* (roads, water, sewer, storm) $103,000 (2007) City of Fort Saskatchewan (South Fort) (roads, water, sewer, storm) $104,100 (2017) Leduc County' - Nisku (roads, water, sewer) $109,000 (2017) Town of Redcliff* (roads, water, sewer, storm) $109,200 (2016) City of Lloydminster (roads, water, sewer) $112,900 (2011) Town of Devon* (roads, water, sewer) $119,900 (2019) Town of High River (roads, water, sewer) $130,000 (2013) City of Leduc* (roads, water, sewer) $138,500 (2021) Town of Cochrane (roads, water, sewer, storm, recreation) $250,000 (2020) Town of Okotoks (roads, water, sewer) $198,600 (2020) City of Red Deer* (roads, water, sewer, storm) $203,300 (2019) City of Chestermere* (roads, water, sewer, storm, recreation) $226,980 (2021) Red Deer County (Gasoline Alley) (roads, water, sewer, storm) $220,000 (2017) City of Medicine Hat* (subsidy) (roads, water, sewer, storm) $250,000 (2019) City of Lethbridge (roads, water, sewer, storm) $281,000 (2020) City of St. Albert* (roads, water, sewer, storm) +$300,000 (2020) City of Edmonton (roads, water, sewer, storm) +$300,000 City of Calgary (roads, water, sewer, storm, rec, stabilization) +$350,000 *CORVUS clients "Information adapted from online sources as at Jan 1%, 2021. July 15", 2021 144 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update APPENDIX H: OFFSITE LEVY ACCOUNT RECONCILIATIONS At present, the City manages offsite levy funds together with several other infrastructure reserves. During this review, City staff gathered details associated with all infrastructure accounts (including offsite levies) to enable the identification and separation of finance details associated only with offsite levies (moving forward, the City must manage offsite levy account details separately in alignment with MGA requirements). For each infrastructure type (e.g., water) 2 tables were created--one includes the details associated with all infrastructure reserves, and one includes the details associated only with offsite levies (see below). Information highlighted in 'yellow' pertains to transactions that are not offsite levy related and have been removed from offsite levy account reconciliations. Transportation All Accounts Withdrawals Opening Balance OSL Receipts OSL Refunds (Funds Applied pale ra saieetones sap acre Closing Balance to Projects) | 2006 [| $511,399.00] $40,778.00 TT StazasSoo] OT SSC*dY:C«S 429,722.00] | 2007 {| $429,722.00] $14,957.00] | | (8120,785.00)[ $43,219.00 | S$367,123.00 | |__2008 | _ $367,113.00] $23,agooo[ | | (563,594.00)[ $75,603.00 |S ($402,302.00 | | 2009 | $402,302.00 || 9$4;747,00)| [0875 3.00) $328,216.00 | |_2010 | $328,216.00] $a0a.o0| | | (8:75,391.00)|$120,080.00| $8,035.00] $381,744.00 | | 2011 | $381,744.00| _gagouoo[ | 887,375.00[ | 8445.00] $303,705.00 | |__2012__ | __ $303,705.00 | ____g2,agsoo] | (537,375.00)[ | $876.00] $268,894.00 | | 2013 | $268,804.00] _--$3,aasoo[ | (S 134,667.00)[ $137,372.00 | 2014 | __ $137,372.00 [i ioa)8 1000) ee) Ee (S37/07500) | R|RE ES] $103,508.00 | |_ 2016 | __ $69,581.00 |g S100) | (Se 87500)| EEE | $33,365.00 | |_2017__ | _-$33,365.00 | g5aaio0 837,375.00) StagI00 | (S2,357.00)] | 201g | _($2,357.00)|__$43707}00 | 1887,375.00)[ TT 82,420:00 | ($24,605.00)] | 2019 | __($24,605.00) $323.00] | (837,375.00)[ $1,834.00 ($59,823.00)] |_ 2020 [_($59,823.00)] aes See ee | | CS7 475,00) (CeECENAIRNIENSSO700)| ($96,303.00)] ---- $118,372.00 ________$0.00_____$0.00_($979,100.00)___ $238,902.00 _$14,126.00_ OSL ONLY Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSL Refunds pimped sag Cipenditures Adjustments (Charged) Closing Balance | 2006 [e550 800100) | 070 | | en! $552,177.00 | |__2007__ | __$552,177.00 |aNGt09e it) | |e] $567,134.00 | | 2008 | __$567,134.00 [Neds 00000) i ||: $590,324.00 | |__2009__|__$590,314.00 [ENA EET! $592,061.00 | |_2010 | $592,061.00] $go4so0[ PT 58,035%00 | $600,900.00 | |_2011_ | $600,900.00] _ggggnoo] 84500 | $610,236.00 | | 2012 [$610,236.00] $2aagoof 8376.00] $612,800.00 | | 2013 | __ $612,800.00 [ESS AAg C0 | | es| $615,945.00 | |_2014__ | _ $615,945.00 |Nes 640000) | inns! $619,456.00 | | 2015 | $619,456.00 | anes ase le en s| $622,904.00 | | 2016 | __-$622,904.00 |e 010) ee | | $624,063.00 | |_2017_|__ $624,063.00 [[is884100)| Sl | |e memeSIg09100)| $625,716.00 | | 2018 [$625,716.00 |b 13/70700) |e |Se S| seersia2000| $640,843.00 | | 2019 | $640,843.00 |/ See 828100) | en Cesk ||SaeeN|MrSsGeR00)| $643,000.00 | | 2020__|__ $643,000.00 | SEae eieeas| ee | ET|METSe9700)| $643,897.00 | $118,372.00 $0.00 $0.00 $0.00 $0.00 $14,126.00 Front-ending $454,216.71 Adjusted Balance $189,680.29 Funds to be withdrawn as front-ending pay down $454,216.71 July 15", 2021 /45 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Water All Accounts Withdrawals Opening Balance OSL Receipts OSL Refunds (Funds Applied attache ce otter sist gto Closing Balance ia Beodacte Expenditures Adjustments (Charged) |__ 2006 __|INRS11685/068100/ [Rises 163 453100) | ieee | SO || | Cee! $1,828,559,00 | 99/62/00 |i a | | aiel|ee| $1.928,186.00 | $1,928,186.00 |__ $280,355.00) (8'126,160.00)[ | $:2,082,381.00 | | 2009 | _$2,082,381.00 | i Poa ee ee 32,401.00)! | $:2,070,276.00 | |__2010 | __$2,070,276.00 | $99742100)| eae | ee |e a ieee --$2,080,018.00 | |__2011 | _ $2,080,018.00 $44,096.00 ($46,183.00)|__($390,086,00)[ | CC CCCSdSS$:1,687,845.00 | |_2012__| _$1,687,845.00 811767100 |e | ESCO CoO) | | S| boes!| $847,760.00 [2013 | _$847,760.00| $i7iavoo| (| (saagaosool, tC SC™~"'"'CS'*SCOC#C#C(#U#dL +_+éS46,769.00| | 2014 | _ $416,769.00 | i] i Le a a a Le | 2015 | __ $400,750.00 | 91927100 || as| SP S| e| eue eto =| $409,677.00 | |__2016 | --_ $409,677.00 980100] | | ns |i kei! $418,059.00 | A aes | Pee | a ae 2,779.00 SOD Nara Se SF ee 3,981,00 $592,606.00 | iia i763)75 3/00) | aes aa | ORNS | USNs eee | ume 5,917.00 |__ 2020 |___ $602,276.00 | Enna | eer | pe | | 2,914.00 $894,522.00 ($46,183.00) _($1,735,245.00) $0.00 ($158,561.00) $15,591.00 OSL ONLY Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSL Refunds paraetivng Expenditures Adjustments (Charged) Closing Balance | 2006 __|5)$23685/066)00)] lino 103/493100\| aa | | | MeMii| $128,559.00 | $9916 27500) | ae | ee [S| eee seeeeeeeee || $1,928, 186.00 | $280/955(00)| aimee || Re Si | |e. || $2,208541.00 | | 2009 | $2,208,541.00 | iia 20;206100) | Annan | || Cee!) $2,228,837,00 | | 2010 | _$2,228,837.00 | 9/7 2100) | eaten | eee Nan |e eee | aces |eerees.| $2,238,579.00 |__2011 | __$2,238,579.00|__$44,096.00|__($46,183.00 390,086,00)| $1,846, 406.00 | £31)707)00) | ae | ON 2 09,0070) | C/o! $1,006,321.00 | 17/107 (00) | eae | SOO I0E OO) | es |e) $575,330.00 | 9/720/00]| Soe MCE NO 0) (Ma | nn Meenas!) § $559,311.00 | |__2015 | __ $559,311.00 | $5/927100| [isa ate toe ign eke | Kceineaite.| $568,238.00 | | 2016 | $568,238.00 | £80200) a neers § | $576,620.00 | $576,620.00 S5/604100)| = | Soa eee | fee a | ne | 2,779.00 | __ $585,003.00 | 2018 |__ $585,003.00 |IEImNd 6271 821000) laa | | | $3,981.00 {2019 [$751,167.00 | Reams 3)7e 900) mm | en | || 5,917.00 |_ 2020 | __ $760,837.00 | Rane meee] Annes | | Se | 2,914.00 $894,522.00 ($46,183.00) ($1,735,245.00) $0.00 $0.00 $15,591.00 Front-ending $1,129,509.34 Adjusted Balance ($365,758.34) Funds to be withdrawn as front-ending pay down $763,751.00 July 15", 2021 /46 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update SS eS eS Sanitary Sewer All Accounts Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSLRefunds (Funds Applied Bmendicues Aliustimiik (Charged) Closing Balance to Projects | 2006 | $1,888,174.00 4916200] sd] ~_--«($27,363.00 $20,000.00) 123,920.00] ----Sss--s[--($2,156,593.00 | $2,156,593.00 73)11,0,00) | aus $6,072.00 31,670.00 243,424.00| | «$2, 440,385.00 | AGA 691 (00) | escent | eae ee mening |(081(C477/250\00) | S| Seem § $2,127,304.00 |_ 2009 | $2,127,304.00|___$1a,a7a00| | SCCC*C*C*~"';*C*dYC"C#dS189;,682.00)#i ~--«$:16,723.00--=Ss--S~*d~SC=éS 2, 110,59.00 | | 2010 | $2,110,519.00| __--*$5,392.00/ ~~ --~--=«|~_--_--'($87,968,00)) ($129,797.00) $178,394.00| + +~+~+«|~_~$2,076,540.00 |__2011 | _$2,076,540.00 | $18,456,00 $28,276.00)| | ~(83:15,956.00[ = S| SS SS--S*d~--«éS$2,750,764.00 | | 2012 | _$1,750,764.00 | 16 ;70600)| ko ae | oe ee a) 129,198,00)| ice eeees)| $1,648,272.00 |__2013 | $1,648,272.00 | CE ES as TT 143,494.00] |_--«$1,434,279.00 |__2014 | _$1,434,279.00 | SC ae eae $68,065.00 466,077.00] ----S------s|~--«$:1,841,478.00 | | 2015 | $1,841,478.00 OA) Se] aa EE) $78,026.00] |_--«$:1,749,631.00 | |__2016 | __$1,749,631.00| $5,247.00] | CSC*édL~=C«C(S1061,929.00)| $969,560.00 ----S=----S--s*|~_--'$2,563,109.00 DEG eae Fa | 126,790.00)|___ $460,685.00 | 18,824.00] _ $2,919,650.00 | 2018 | $2,919,650.00 (Og a | Fa | 109,169.00) 686,461.00 24,405.00 | _$3,671,873.00 |__2019 | _$3,671,873.00 | 2/06 2,00) | Sena anna et | Suse cei (0°(52;201,589]00) 617,564.00 31,619.00 | 2020 [_ $3,031,579.00 | Earnest | eaten | ereemnnEUNNENnES | [65077 205100) 629,011,00 15,479.00 $682,873.00 ($28,276.00) ($121,403.00) ($4,181,183.00) -- $4,758,339.00 $90,327.00 OSL ONLY Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSL Refunds peednecee Enpendhures Adjustments (Charged) Closing Balance | 2006 | $1,888,174.00| _$isige200[ Cd S21;259100) || |GnnnnnNen| $2,068,747.00 | 78}910100)| soe ee $2072.00) | | | knee $2,140,785.00 | $164/(60/00)| Sateen |e ee | occas |e, | $2,304,954.00 | |__2009 | $2,304,954.00 911)0 70000) ee | a | | | Ci hnEN| $2,316,128,00 | | 2010 | $2,316,128.00| $5,392,00[ Cd $29)060/00)| || Ne enns| $2,281,552,00 |_2011 | _$2,281,552.00 eB RP bh) | |. | | | $2272,732.00 | | 2012 | $2,271,732.00 |RERMS15)700(00)| aaa | | | || S2,257,438.00 | |__2013 | _ $2,287,438.00 | 16)369100)| | Sees | (ee aa |e oo |e eeen| $2,303,807.00 | | 2014 | _ $2,303,807.00 | 918710) ||, | || | ees) $2,312,994.00 | |__2015 | __ $2,312,994.00 | 10)79 00) | i | | || ners| $2,323,785,00 | | 2016 |_ $2,323,785.00 |IENIsa)287) 00] eee | | | EENEEEE| -- S2.329,032.00 | Sin hae aS rr $18,824.00 | _ $2,351,678.00 | 2018 | $2,351,678.00 Iii s0)52 (OG) | ean | | 24,405.00 |_2019 | _$2,526,609.00 O00 eS ESS Se a EY VCH | 2020 | $2,560,290.00 | amanata| annennnnnn | CO nI / | MNNNNN/MMENESIb070100)| _ $2,575,769.00 | $682,873.00 ($28,276.00) ($57,329.00) $0.00 $0.00 $90,327.00 Front-ending ___ $972,370.50 Adjusted Balance $1,603,398.50 Funds to be withdrawn as front-ending pay down $972,370.50 July 15%, 2021 147 CORVUS Business Advisors City of Brooks 2021 Offsite Levy Update Stormwater All Accounts Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSL Refunds estoy Expenditures Adjustments (Charged) Closing Balance | 2006 | __ $243,133.00 Lo ae Oy eS $6,763.00)| | _S.290,558.00 | 491540100! | eaeeeeenieed | MEA |[enn (61000000) | EINE | $288,107.00 | |__2008__|__$288,107.00 |NNNIo3240200] i | | |r| $300,209.00 | | 2009 | __$300,209.00 | SIN GN0) | [as ST | SS | Se See Ee $301,397.00 91502100) || S| see | "Tamer! $302,759.00 | |_2011__| __ $302,759.00 | __$10,364,00 S000) | ane || ese | $282,262.00 | | 2012 | ___ $282,262.00 78500) |= ees eee Pall eaten) || | $283,047.00 | 2013 | $283,047.00 |e 2553100) | i | |Sen!| $285,602.00 | | 2014 | $285,602.00 | 41097100) a | || --peee= | $290,499.00 | | 2015 | $290,499.00 |S 227100) i | | ar| $302,826.00 | |__2016 | _ $302,826.00 | 5700) i at! |(So et | $303,610.00] |__2017__|__ $303,610.00 | ESSsmsarnamensant | enna | On] | (CO =| 2,929.00 301000) | | | | enleSS 79100)| $347,340.00 | | __2019 | ___ $347,340.00 || | Cs | rns) (MNENENEN|(GNnC5(55200)| $352,992.00 | | 2020 | $352,992.00 |e (One ee | | Oo on nn || $2,765.00 $151,111.00 ($30,861.00) $0.00 ($22,763.00) $0.00 $15,137.00 OSL ONLY Withdrawals Other Project Other Interest Earned Opening Balance OSL Receipts OSLRefunds (Funds Applied Expenditures Adjustments (Charged) Closing Balance to Projects' | 2006 | __$243,133.00 | SEO SSRs | | a a A $297,321.00 131549100] | Seeeeeaes | eee | ume" | $310,870.00 | |__2008__|__ $310,870.00 |IEENNG 721102100] ee | in| ace) $222,972.00 | |_2009 | _ $322,972.00 | SI}168 01) See! |e || MNT eANENT I] $324,160.00 | $324,160.00 [RCS 00)) i | | cra |cameetert| $325,522.00 | |_2011 | _$325,522.00 | 10,364.00 Ot) ie |e |fcCectees)| $305,025.00 | | 2012 | --_ $305,025.00 | 785100) | i i | | eet. 3| $305,810.00 | |_2013 | __ $305,810.00 | EMNie 2/5510] Ce | || SUMITs| $308,365.00 | | 2014 | _- $308,365.00 |aames 07100) Aa | | es) aNnn|| $313,262.00 | |_2015__|__'$313,262.00 | aig p 700 | nSTs| $325,589.00 | | 2016 | _ $325,589.00 0) ns | | | eee tre |S kt] $326,373.00 | |__2017__|__ $326,373.00 | ERI | | | $2,929.00 | 2018 | $329,302.00 |G 7/010100)| ad | AN |([MNss 70100] $370,103.00 | |__2019__|__ $370,103.00 | REaaaaaenan| | |! |EEEEEMNEETNE|INNENECS/CO2100)| | $375,755.00 | |_2020__|__ $375,755.00 | ERE en | ee | ere | ENCE $2,765.00 $151,111.00 ($30,861.00) $0.00 $0.00 $0.00 $15,137.00 Front-ending $0.00 Adjusted Balance $378,520.00 Funds to be withdrawn as front-ending pay down $0.00 July 15", 2021 148 CORVUS Business Advisors