What development charges or levies apply to new construction? How much per new home?
In the City of Camrose, Alberta, development charges & levies rules are set by Off-Site Levy Bylaw 3289-23 (City Lands) and 1 other bylaw, verified 2026-10-22. Levy per hectare: per net developable hectare basis; Schedule "B" area-specific totals (Area 10.0: $119,135; Area 23.0: $337,908). Services covered: potable water; sanitary sewage; storm drainage; transportation networks; and land required in connection with any of the foregoing facilities.
Off-Site Levy Bylaw 3289-23 (City Lands)
adopted bylaw
area levy
per net developable hectare basis; Schedule "B" area-specific totals (Area 10.0: $119,135; Area 23.0: $337,908)
Levies are applied on a per net deve/opable hectare basis
services covered
potable water; sanitary sewage; storm drainage; transportation networks; and land required in connection with any of the foregoing facilities
City of Camrose off-site levy bylaw for City lands (replaces 3220-22); levies imposed per hectare by area.
Off-Site Levy Bylaw 3290-23 (Coordinated Service Areas, City and Camrose County)
adopted bylaw
area levy
per net developable hectare basis; Schedule "B" total levies vary by area (e.g., Area 23.0: $337,908; Area 9.0: $119,136)
Schedule "B" **
services covered
potable water; sanitary sewage; storm drainage; transportation networks; and land required in connection with any of the foregoing facilities
s. 6
scout note
Joint City of Camrose and Camrose County off-site levy bylaw for Coordinated Service Areas; replaces 3219-22; third reading December 18, 2023. Levies per hectare by area for water, sewer, transportation and storm facilities.