| schedule scope | Off-site levy for subdivided or developed land in City of Cold Lake, covering water, sewer, storm, and roadway infrastructure on a per hectare basis. | "OFF-SITE LEVY FOR LAND THAT IS TO BE SUBDIVIDED OR DEVLEOPED" |
| notable fees | Water Distribution $19,550.34/ha; Sanitary Sewer $13,520.11/ha; Storm Sewer $0; Roadway Network $43,172.07/ha; Total $76,242.52/ha. Storm Water Management Surcharge $26,704. | "2010 OFFSITE LEVY RATES" |
scout note
Establishes off-site levies charged to developers for the cost of municipal infrastructure required to service new development in Cold Lake.