2 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
TABLE OF CONTENTS
SECTION 1: Land Development Applications and Servicing Agreements Fee Schedule 1
3
Rezoning Application Fees
3
Concept Plans and Plan Amendments
6
Subdivisions and Condominium Applications
6
Additional Land Development Fees
8
SECTION 2: Development Permit and Compliance Certificate Fee Schedule
9
Development Permits
9
Other Development Permits & Supporting Services
11
Additional Fees
13
Pre-Application Meeting
14
Inspection Fees
14
SECTION 3: Building Permit and Trade Permit Fee Schedule
15
Building Permits
15
HVAC Permits
16
Plumbing Permits & Sewer Permits
16
Gas Permits
17
Electrical Permits
18
Hoarding Building Permits
19
Additional Fees
20
SECTION 4: Residential Permit Fees
22
Background Information
22
Renovations and Additions to Existing Homes
23
New Residential Building (Up to Two Dwellings)
26
Uses in Residential Zones
27
Additional Fees
28
Mechanical and Electrical Permits
29
Zoning Confirmation Fees
30
APPENDICES
31
Appendix A: Building Permit Fees for Additions and Alterations to Single Detached Housing
31
Appendix B: New Single Detached House Permit Fee Schedule
32
Appendix C: Single Dwelling Backyard Housing Permit Fee Schedule
33
Appendix D: Electrical Permit Fee
34
Appendix E: Safety Codes Council Levy
35
Updated December 2025
Return to Table of Contents
3 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
SECTION 1: Land Development Applications and Servicing Agreements Fee Schedule 1
Rezoning Application Fees
Proposed Category
Proposed Zone(s)
Base Fee
Area Rate (per ha)
Small Scale Residential
RSF; RS; RR; PLD; GLD; GLDF; CCLD; CCSD; OLD; SLD; RCES; RAES
$1,830
$245
Medium Scale Residential
RSM; RM; PRH; ALA; GRH; GLRA; GMRA; CCMD; RVRH; ORH; ORA; BRH; BMR; BLMR;
SRH; SRA; RTCMR
$2,640
$245
Large Scale Residential
RL; CCHD; RTCR; HDR
$4,355
$260
Small Scale Commercial / Mixed Use
CN; MUN; CCNC
$2,700
$680
Large Scale Commercial / Mixed Use
CB; CG; AED; ASC; AUVC; GVC; TC-C; RTCC; MRC; MMUT; MMS; MED; UC3ES; CMUV;
CMU; RMU; UW; HA; CCA; JAMSC
$4,880
$680
Industrial
BE; IM; IH; EIB; EIM; ECB; EETB; EETC; EETL; EETM; EETR; EETIM; IBES; ILES; DC/IND
$2,745
$340
Urban Services / Open Space
A; PS; PSN; PU; NA; A1 through A6; UF; UI; AJ; BP; NSRVES
$1,835
$245
Agriculture
AG; FD; AES
$1,835
$245
Proposed Category
Type
Base Fee
Additional Buildable Floor Area (Site Area m² x
Increase in FAR) ³
Area Rate
(per m² of Buildable Area)
Total
Mixed Use (MU)
MU Zoning with FAR Modifier
$4,880 +
( ______ m² x
$0.32) =
$_______
Proposed Category
Type
Base Fee
Buildable Floor Area (Site Area m² x FAR) ³
Area Rate
(per m² of Buildable Area)
Total
Direct Controls (DC)
Administrative
$7,930 +
N/A =
$7,930
Minor
$7,930 +
( ______ m² x
$0.62) =
$_______
Major
$15,855 +
( ______ m² x
$1.06) =
$_______
Updated December 2025
Return to Table of Contents
4 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Notes for Rezoning Application Fees
- The highest base fee is charged among proposed categories. Any applicable area rates are charged per proposed category - see example below.
- If an application has proposed zones in the same category, the proposed category's base rate will be charged once.
- Except MU and DCs, each zone within the same category or different category will be charged its associated area rate based on the site area (ha) for the boundary of the
proposed zone(s).
Proposed Height (h) Modifiers changes under RSM, RM and RL zones shall be charged their respective category base fee and area rates.
- If you are rezoning from a zone within the Agriculture category you will be charged for the full area of application (i.e., titled area). If you are rezoning from a zone that is
not within the Agriculture category you will only be charged for the site area.
- The increase in FAR for the MU zone will be calculated by subtracting the existing FAR from the proposed FAR. A reduction in FAR from the original development rights will
not result in a reduction in fees.
- Existing FAR is the maximum base FAR listed within a zone taking into account Floor Area Ratio (f) Modifiers. Embedded FAR modifiers such as for inclusive design or
supportive housing will not be taken into account. Existing zones without a listed maximum FAR will have an FAR of 0.
- Direct Control Types are characterized as follows:
- Administrative: A standard zone is being rezoned to a DC for a minor technical reason (i.e. minor numerical changes to regulations, removal of uses from a standard
zone), minor amendments to an existing DC zone.
- Minor: Changes to the character of the site that do not significantly change the intensity of the use.
- Resembles a standard zone with minor changes to uses that change the character of the zone.
- Addition or changes to regulation(s) from Standard Zone.
- No increase in FAR from existing zoning.
- Only "architectural" changes to height that do not result in additional floor area.
- Major:
- Significant changes to the character and intensity of uses. (i.e. commercial, residential and mixed use towers, adding residential uses to commercial site or non-residential
uses to residential site, large-site rezonings)
- Increase 2 or more of FAR/height/density
- Major additions of uses from previous standard zone or DC
- Major changes or additions of regulations from standard zone or DC
- Application requires comprehensive site planning supported by technical studies
- Rezoning applications are subject to a notification and engagement fee component.
- The applicant must pay the difference in fees, prior to third reading of the amending Bylaw, for any application resulting in a zone in a higher fee category than that initially applied for,
whether the application was amended by the applicant, Development Services, or City Council. If the resulting Zone is in a lower fee category, no refund shall be made.
Updated December 2025
Return to Table of Contents
5 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Example Rezoning Application:
From (AG) base FAR of 0
To (RM) @ 4.0 ha, (CG) @ 3.0 ha, and (MU) 5.0 FAR @ 4,500 m²
Description
(Category)(Zone)
(site area (ha) or Buildable Area (m²) as appropriate)
(A)
Base Fee
(B)
Area (ha or m²)
(C)
Area Rate
(per ha or m²)
(D)
Area Rate Fee
(B x C)
(E)
Sub total
(A + D)
Medium Scale Residential Category (RM) @ 4.0 ha
N/A
4.00 ha
$245.00/ha
$980.00
$980.00
Large Scale Commercial/Mixed Use (CG) @ 3.0 ha
N/A
3.00 ha
$680.00/ha
$2,040.00
$2,040.00
MU - FAR Modifier, 5.0 FAR @ 4,500 m² Site
$4,880.00
22500 m² (Additional FAR x Site
Area)
$0.32/m²
$7,200.00
$12,080.00
Total Rezoning Fees
$15,100.00
Updated December 2025
Return to Table of Contents
6 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Concept Plans and Plan Amendments 2
Application Type
Fee
Text Amendment to the Zoning Bylaw
Major
$24,680
Minor
$12,340
Municipal Development Plan or District Policy Amendment
$10,680
Each District Plan, Area Structure Plan, Neighbourhood Structure Plan, Neighbourhood Area Structure Plan, Area Redevelopment Plan Servicing Design Concept Brief,
Outline Plan or related Amendment
per gross ha
$360
minimum fee
$3,270
Authorization Fee
$3,270
Subdivisions and Condominium Applications 3
Subdivision Application Type
Base
Fee
Re-phasing Fee
Lot Fee
Quantity of
Lots
Total
New applications
Lots within the RS, RSF, RSM, or RR zones
--
--
$310
x
______
=
$ ____
Lots within the RL, RM, MUN, CN, MU, CG or CB zones
--
--
$2,475
x
______
=
$ ____
Lots 1.0 ha or less within the BE, IM, or IH zones
--
--
$1,170
x
______
=
$ ____
Lots over 1.0 ha within the BE, IM or IH zones
--
--
$2,710
x
______
=
$ ____
Others that are not covered by the above categories, except reserve lot or public
utility lot
--
--
$745
x
______
=
$ ____
Change Request and Resubmission
$745
+
$745
+
( $ ______
x
_____ )
=
$ ____
(If Required)
(If Required. Refer to Lot Fee, above)
Updated December 2025
Return to Table of Contents
7 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Subdivision Endorsement Type
Fee
Each lot within
Lots within the RS, RSF, RSM, or RR zones
$745
Lots within the RL, RM, MUN, CN, MU, CG or CB zones
$2,615
Lots 1.0 ha or less within the BE, IM, or IH zones
$1,595
Lots over 1.0 ha within the BE, IM or IH zones
$3,185
Others that are not covered by the above categories, except reserve lot or public utility lot
$745
Planning and Development Business Model (PDBM) Top Up Fee
$50
Time Extension for Endorsement (Only applied to second or more request)
$745
Other Applications
Fee
Bare Land Condominium
Application Fee (per bare land unit to be created)
Refer to Subdivision Application Fees
Endorsement Fee (per bare land unit to be created)
Refer to Subdivision Endorsement Fees
Flat fee for parking stalls converted to a bare land unit (per stall)
$175
Strata Space Plan
Application Fee
Refer to Subdivision Application Fees
Endorsement Fee
Refer to Subdivision Endorsement Fees
Condominium Fees
Application fee per unit excluding common property pursuant to the Condominium Property Regulation
$40
Flat fee for parking stalls converted to condominium units (per stall)
$32
Updated December 2025
Return to Table of Contents
8 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Additional Land Development Fees
Application Type
Fee
Re-circulation (3rd and subsequent recirculation) OR
Re-activation (on an existing file that has been on hold for 12 months or more)
$1,195
Pre-Application Meeting ⁴
$490
Notification and Engagement Fee per component (ie Rezoning, Plan Amendment, Road Closure) ⁴
$1,650
Re-notification Fee (per label)
$3.50
DC Notification Fee (per label)
$6.00
DC Notification Fee minimum
$48
International Notification Fee (per label)
$6.00
Road Closure Applications
$1,835
Change of Address (per address) ⁵
$405
Servicing Agreements Fees⁴
Arterial Roadway Administration Fee
$2,340
Show Home Agreement Application OR
Boundary Assessment Fee OR
Interim Construction Agreement Fee
$1,195
Inspection Fees (fee charged per hectare with a minimum value of 3.0 hectares)
$10,455
Section 1 Notes
¹ The Subdivision Officer and Director of Planning Coordination may reduce or waive Land Development Application Fees, including any additional fees, where payment of the fee will result in a
hardship or an inequity.
² Area Structure Plan amendments application fee excludes amendments that are necessitated by an amendment to the Neighbourhood Structure Plan.
³ Floor Area Ratio as defined under Zoning Bylaw 20001.
⁴ Subject to GST. Periodic reviews of fees may identify adjustments to ensure compliance with CRA regulations.
⁵ Applications for address changes are only permitted where the existing address is creating inherent confusion for the delivery of public services and the general public, or Emergency Response
and Administration deem necessary.
Updated December 2025
Return to Table of Contents
9 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
SECTION 2: Development Permit and Compliance Certificate Fee Schedule
Development Permits
Residential
Development
Permit Fee
Lot Grading
Inspection Fee
(Bylaw 18093)
Total
Home Improvement Permits
Solar panels or renewable energy
$105
--
$105
Accessory building;
Hot tub, swimming pool, ponds;
Uncovered deck
$145
--
$145
Driveway;
Exterior alterations with NO increase in floor area or height (single detached, duplex, semi-detached, or backyard housing);
Site alterations;
Fireplace;
Home addition to mobile homes;
Home addition with NO increase in floor area or height (single detached, duplex, semi-detached, or backyard housing);
Overheight fence
$195
--
$195
Exterior alterations to existing multi-unit housing or row housing (up to 4 units), including vehicle access;
Home addition to single detached, duplex, or semi-detached housing with increase in floor area or height;
Secondary suites.
$415
--
$415
New Residential Dwellings
Single detached house, semi-detached house, duplex, residential sales centres, and backyard housing ¹' ⁵
$625
+ $160
= $785
Duplex, semi-detached, and 2 unit backyard housing ¹' ⁶
$625
+ $320
= $945
Multi-unit housing building, up to 4 units (eg: apartment, row housing, cluster, lodging housing, supportive housing, backyard
housing, etc) ¹' ⁵
$1,040
+ $500
= $1,540
Each additional dwelling above 4 for Row Housing, Multi-unit Housing and Backyard Housing
$85 x ___ units
+ ($65 x ___ for each unit
on the first level)
= $ _____
Each additional dwelling unit in residential portion above the first 4 units
$85 x ___ units
+ ($65 x ___ for each unit
on the first level)
= $ _____
Residential Related and Move On Applications
Residential demolition
$105
--
$105
Residential move on, recreational vehicle parking
$195
--
$195
Home based business / permitted development / minor home occupancy
$145
--
$145
Home based business - discretionary
$415
--
$415
Updated December 2025
Return to Table of Contents
10 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Non-Residential, Large Scale Residential (5+ Units) and Mixed Use Applications
Development
Permit Fee
Lot Grading
Inspection Fee
(Bylaw 18093)
Total
New or Additions to Existing Buildings (including mixed use)
Non-residential gross floor area (GFA) up to 500 m² (5,381.95 sq. ft.) and up to 4 units in residential portion
per building
$1,220
+ $500
$1,720
Additional non-residential Gross Floor Area above 500 m²
(5,381.95 sq. ft.)
$1.2 x ___ m²
= $ _____
Each additional dwelling unit in residential portion above the
first 4 units
$85 x ___ units
+ ($65 x ___ for each unit on
the first level)
= $ _____
Change of Use
Permitted use, child care services or uses in direct control zones
$415
--
$415
Discretionary Use
$545
--
$545
Commercial Related Applications
Non-residential demolition
$105
--
$105
Satellite signal receiving antenna, satellite dish, amateur radio antennae and support structures
$195
--
$195
Outdoor patio (on site), special events, christmas tree lot, temporary garden greenhouse, garden centre,
solar panels.
Place on site a seacan structure accessory to the Principal Building or Use; up to 2 seacans per site totaling
no more than 60 m²; fee is per seacan. The non-residential gross floor area fee calculation applies for more
than 2 seacans and greater than 60 m².
$415
--
$415
Exterior alterations or renovations to existing non-residential buildings/site
$415
--
$415
Standalone parking facility
$960
--
$960
Updated December 2025
Return to Table of Contents
11 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Other Development Permits & Supporting Services
Encroachment Applications - Bylaw 12513
Fee
Application Fee
Encroachments under 0.05 m
No Charge
Applications that do not require circulation
$300
Applications that require circulation
$500
Encroachment Fee
Encroachments onto easements; aerial, canopy or projecting signs encroachments
$50
Encroachments under 0.05 m
$100
Encroachments under 0.3 m and under 2 m² in area
$100
Encroachments under 0.3 m and under 5 m² in area
$350
Encroachments over 0.3 meters and/or over 5 square meters in area
A = Assessed Value of the Owner's Land
B = Area of the Owner's Land
C = Area of the Encroachment
(A/B) x C
Updated December 2025
Return to Table of Contents
12 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Application Type
Fee
Compliance Certificates and Zoning Confirmation
Single detached, semi-detached or duplex (Regular Service)
Regular Service
$145
Single detached, semi-detached or duplex (Express Service)
Express Service
$310
Multi-unit housing, non-residential (Regular Service)
Regular Service
$310
Multi-unit housing, non-residential (Express Service)
Express Service
$625
Compliance certificate revision
$105
Zoning confirmation letter (per site)
$145
Pick-up/mail out of compliance certificates
$52
Sign Developments
Portable signs - valid for 90 days
$105
Portable signs - valid for 365 days
$310
Fascia signs
$195
Freestanding signs, projecting signs, or comprehensive sign design plan
$415
Minor/major digital signs (per panel)
$960
Off premise advertising fee (per sign) (to be added to the base use category fee - other than digital signs)
50% of the base
fee
Urban Agriculture
Urban Agriculture - Hen Enclosure, Urban Indoor Farm, Urban Outdoor Farm
$105
Cell Towers
Freestanding, rooftop
$3,475
Crossing Bylaw 13521
The application fee for an access permit for a residential property ²
$50
The application fee for an access permit for a non-residential property ²
$750
Updated December 2025
Return to Table of Contents
13 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Additional Fees
Application Type
Fee
Leave as Built & Existing Without Permit
Development existing without a required development permit and building permit
Double regular
application fee may apply
Leave as built - accessory building for house/other residential renovations & additions
$145
Leave as built - single detached, semi-detached, duplex
$195
Leave as built - other development permits (multi-unit housing, non-residential)
$415
Revision Fees
Minor amendment to a home improvement permit development permit - minor residential applications
$120
Minor amendment to a minor development permit - single detached, semi-detached, duplex, backyard housing and row housing (up to 4 units) (this
includes re-examination of plan fee)
$195
Minor amendments to a major development permit: residential development of multi-unit housing (5+ units), cluster, lodging housing, supportive housing;
and non-residential development
$415
Recirculation fee (for the third and subsequent re-circulations),
Extension of development permit commencement fee
50% original regular
application fee
Non-refundable Administrative Fee (or 20%, whichever is greater), for permit work not started ³
$120
Re-examination of plans fee for major development permits
$285
Non-Sufficient Funds (NSF) Fee
$52
Variance Request Fee
Variance request fee to be added to the base application fee (excluding driveway, overheight fence, recreational vehicle parking, home based business -
discretionary, leave as built and the per unit fees). Calculated as a % of base fee.
25% of base fee
Updated December 2025
Return to Table of Contents
14 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Pre-Application Meeting ⁴
Application Type
Fee
Multi-dwelling residential (apartments, row houses, supportive houses, and lodging houses), non-residential (commercial, industrial, institutional, and similar
buildings), and mixed-use (a mix of residential and non-residential) developments
$490
Low density infill developments - new construction or alteration to single detached housing, semi-detached housing, duplex housing, or backyard housing (up to
two principal dwellings)
$195
Inspection Fees
Application Type
Fee
Development Permit Inspections ⁵
Non-residential developments and residential developments (5+ units) in redeveloping areas for the first two inspections
$575
Lot Grading Inspection Fee - Bylaw 18093
Single detached, semi-detached, and duplex (per dwelling unit)
$160
Multi-unit housing (per building)
$500
Each additional multi-unit housing unit above the first 4 units on the first level
$65
Each additional multi-unit backyard housing dwelling above the first 4 units
$65
Any other land use - minimum fee per building, addition to building or alterations of surface drainage
$500
Re-inspection
$180
Section 2 Notes
Note: This table reflects only the fees associated with Zoning Bylaw 20001 and the Drainage Bylaw 18093. All other fees, such as those relating to Safety Code Permits or the Business Licence
Bylaw 20002 are found on other fee schedules.
¹ The Re-inspection fee would apply after the first two inspections as per Lot Grading Fee in the Drainage Bylaw 18093.
² a) Residential property is defined as three or less self-contained dwelling units located on one site that is used for residential purposes. b) Non-residential property is defined as, but not limited
to, a multi-family unit, commercial or industrial property.
³ The Development Planner may reduce or waive Development Permit Fees, including any additional fees, where payment of the fee will result in hardship or inequity.
⁴ Subject to GST. Periodic reviews of fees may identify adjustments to ensure compliance with CRA regulations
⁵ Small scale residential Development Permit Inspection fees are included in the Development Permit fee.
Updated December 2025
Return to Table of Contents
15 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
SECTION 3: Building Permit and Trade Permit Fee Schedule
Building Permits
Application Type
Fee
Calculated Construction Value per square foot of floor area
New semi-detached, duplex, row-housing or stacked row-housing (floor area of the basement and garage should be excluded)
$125
New residential and mixed use residential projects, not more than 6 storeys in height
$185
New residential and mixed use residential projects, not more than 12 storeys in height
$220
New residential and mixed use residential projects, buildings not more than 39 storeys in height
$230
New residential and mixed use residential projects, buildings 40 or more storeys in height
$235
New hotels and motels
$215
New parkade development
$115
For Additions/Alterations to Single Detached Housing
For minor residential projects: accessory building, uncovered deck, hot tub, swimming pool, detached garage, single-family house demolition, wheelchair ramp,
or mobile home move on installation
$120
Construction value: $0 - $10,000
$120
Construction value: $10,001 - $50,000
$385
Construction value: $50,001 - $100,000
$1,080
Construction value: $100,000+
$2,100
For New or Additions/ Alterations Commercial, Industrial, Institutional or additions/alterations to Multi-family Developments, Mixed Use
Developments, Hotels and Motels, or Parkades
For each $1,000 of Construction Value for the first $1,000,000; and
$11.00
For each $1,000 of Construction Value over $1,000,000;
$10.00
Minimum Fee
$285
Updated December 2025
Return to Table of Contents
16 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Application Type
Building Mechanical Permit Fee
Electrical Permit
Fee ²
Total Fee
Combo Building Mechanical Permit Fee - Single Detached Housing and Backyard Housing ¹ Developments
0 - 1650 sq. ft.
$1,080
+
$290
=
$1,370
1651 - 3000 sq. ft.
$1,645
+
$335
=
$1,980
3001 - 4500 sq. ft.
$2,810
+
$385
=
$3,195
4501 - 6000 sq. ft.
$5,575
+
$440
=
$6,015
Over 6000 sq. ft.
$8,505
+
$480
=
$8,985
HVAC Permits
Application Type
Fee
Alterations/Replacing Existing HVAC in Residential Multi-development (per unit)
$120
New Residential Multi-family Development - per $1,000 of Construction Value
$0.60
New Single Detached Housing or Single Unit in Residential Multi-family Development
$120
Other Developments - per $1,000 of Construction Value
$0.60
Other Developments - minimum fee
$185
Plumbing Permits & Sewer Permits
Application Type
Fee
Plumbing Permit for Residential Multi-family Development and Single Detached Housing Development (per dwelling unit)
$120
Sewer Connection: Residential Multi-family Development - per dwelling unit
$120
Sewer Connection: Residential Multi-family Development - Maximum Fee
$225
Plumbing Permits for Other Developments - per $1,000 of Construction Value
$0.60
Plumbing Permits for Other Developments - Minimum Fee
$185
Updated December 2025
Return to Table of Contents
17 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Gas Permits
Application Type
Fee
Commercial, Industrial, Institutional or Multi-family Developments
Construction value: $0 - $20,000
$185
Construction value: $20,001 - $500,000
$270
Construction value: $500,001 - $1,000,000
$365
Construction value: $1,000,001 - $5,000,000
$545
Construction value: $5,000,001+
$905
Additional Meter Set (per meter)
$49
Single Detached Housing or Single Unit in a Residential Multi-family Developments
$120
Temporary Heat - Commercial Permits
$185
Temporary Heat - Single Detached Housing or Single Unit in a Residential Multi-family Development
$120
Updated December 2025
Return to Table of Contents
18 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Electrical Permits
Application Type
Fee
Other New Developments
New Semi-detached or Row Housing - Wiring Permit Fee per unit
$240
New Apartment, Duplex Housing or Stacked Dwellings - Wiring Permit Fee
$130
Underground Branch Circuit Conduit (i.e. between house and garage) Inspection Fee
$125
Annual Electrical Permits
Electrical Installation Cost - Minimum Fee
$345
Annual Electrical Permit Fee (per $100 of Electrical Installation Cost)
$1.14
Inspection Fee - First and Each Additional Hour
$160
For Owners Residing in a Single Family Residential Dwelling and Stand Alone Electrical Permits
Minor Alterations - minimum fee with Electrical Installation Cost up to $3,000
$160
Electrical Installation Cost: $0 - $3,000
$160
Electrical Installation Cost: $3,001 - $10,000
$230
Electrical Installation Cost: $10,001 - $50,000
$405
Electrical Installation Cost: $50,001 - $250,000
$835
Electrical Installation Cost: $250,000+
$2,695
For Electrical Permits Obtained in Connection with Other Permits
Construction Value: $0 - $24,000
$160
Construction Value: $24,001 - $80,000
$230
Construction Value: $80,001 - $400,000
$405
Construction Value: $400,001 - $2,000,000
$835
Construction Value: $2,000,000+
$2,695
Additional Meter Set (per Meter) ³
$49
Updated December 2025
Return to Table of Contents
19 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Hoarding Fees (Monthly) 6
Application Type
Fee
Covered way hoarding for maintaining existing safe pedestrian connections adjacent to a project
Boulevard, sidewalk or roadway occupied by a covered way hoarding - per lineal metre
$5.69
Hoarding projecting from the property line towards a roadway for a temporary exclusive-use area
Boulevard, sidewalk or roadway occupied area from property line up to 2.4 metres into roadway (not alley) - per square metre
$4.46
Boulevard, sidewalk or roadway occupied area exceeding 2.4 metres projection into roadway (not alley) - per square metre
$17.42
Hoarding projecting from a property line towards an alley for a temporary exclusive-use area
Alley occupied area from a property line up to 1.5 metres into an alley - per square metre
$4.46
Alley occupied area exceeding 1.5 metres projection into an alley - per square metre of alley occupied
$17.42
Note: The building permit for temporary hoarding may include a monthly charge for the use of public right-of-way. This fee, which is based on the area and location occupied, is applied
from the start of the hoarding installation until the successful final inspection after its removal.
The monthly rates listed are pro-ratable and are subject to GST. Please note that any damage to public property from the hoarding must be repaired to the satisfaction of the City.
Periodic reviews of these fees may identify adjustments to ensure compliance with CRA regulations.
Updated December 2025
Return to Table of Contents
20 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Additional Fees
Application Type
Fee
Additional Inspections (per inspection)
$285
Mailing Out Minor Building Permit Flat Plans
$28
Search of Records/Outstanding Orders Search (per titled lot)
$120
Reproduction Fee: 8" x 11" document over 20 pages (per page)
$0.25
Reproduction Fee: for larger documents (fee charged per sq ft by vendor)
$1.00
Interior Alterations to Commercial/Industrial Buildings Commenced BEFORE Permit is Issued
$430
Occupant Load Certificate
$120
Re-examination of Revised Plans
For minor residential projects as listed above, projects with construction value of $0 - $10,000:
$120
For all other projects ⁴ :
$285
Unmetered Construction Water Fee
For New Home Construction - single dwellings including backyard housing
0 - 1650 sq. ft.
$31.70
1651 - 3000 sq. ft.
$56.39
3001 - 4500 sq. ft.
$96.80
4501 - 6000 sq. ft.
$133.10
Over 6000 sq. ft.
$169.40
For Commercial Construction - including all multi-unit residential
Per $1,000 of Construction Value ⁵
$0.44
Maximum Fee
$625
Non-refundable Administrative Fee (or 20%), for permit work not yet started
$120
Reactivation of an expired permit - fee of one half the original permit fee but not less than the minimum fee for that permit type.
Pre-Application Meeting ⁶
Commercial Building Permits - Commercial, Industrial, Institutional, Mixed Use, and Multi-dwelling (over 5 units and/or multi-building residential
construction sites) Building Applications
$490
After Hours Inspections ⁷
Up to three hours including travel time when commenced out of business hours
$575
Each additional half hour or part thereof
$96
Festivals and Special Events ⁸
First hour of inspection
standard commercial
and trade minimum fee
Updated December 2025
Return to Table of Contents
21 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Application Type
Fee
per schedule above
Each additional half hour or part thereof
$96
Section 3 Notes
Safety Codes Fee is applicable to Building Permits, Gas Permits, Temporary Gas Permits, Plumbing Permits, HVAC Permits, Sewer Permits, and Electrical Permits. It is 4% of each individual
permit fee, with a minimum of $4.50 and a maximum of $560 per permit.
4% of Safety Codes Permit Cost (per permit) (Min. $4.50 Max. $560)
Construction Value means the value of the construction of an undertaking as determined by the City Manager.
Combined Building Mechanical Permit Fee means a single fee payable for all of the following permits for an undertaking: a building permit, a gas permit, a heating, ventilating, and
air-conditioning permit, and a plumbing permit.
Electrical Installation Cost means the cost of the materials and labour to install a particular electrical undertaking.
Floor Area is used as a denominator in determining the "cost per square foot" value. We have adopted the Canadian Institute of Quantity Surveyors' definition of Floor Area which dictates:
1. Measure each floor to the outer face of the external walls;
2. No deductions for openings at stairs, elevators or vertical ducts are made;
3. A deduction is made for a non-service vertical protrusion, e.g., atrium space;
4. Mezzanine floors are generally included;
5. Balconies are excluded; enclosed solariums in residential condominiums are included;
6. Sloping and stepped floors (auditoriums/movie theatres) are measured flat; and,
7. Exclude all external covered walkways
If a permit is extended or reactivated, the fee payable for the permit is one-half of the amount required for a new permit for the project, provided no changes have been made or proposed
to what was originally approved.
¹ Includes multi-unit Backyard Housing.
² House Wiring Permit Fees are based on the Floor Area of the House.
³ The Electrical Additional Meter Set fee applies to additional meters required for separate entryway addresses but not for individual apartment/condo units that share one entryway. The first
meter is included in the Electrical Permit fee.
⁴ If a re-examination of revised plans involves an increase in:
- construction value of more than $25,000, or
- total floor area of the project,
then permit fees will be adjusted according to the prevailing fee schedule.
⁵ City of Edmonton - EPCOR Water Services Bylaw 19626.
⁶ Subject to GST. Periodic reviews of fees may identify adjustments to ensure compliance with CRA regulations.
⁷ Business hours are 8:00 AM - 4:30 PM on weekdays. Inspections requested outside of that time (evenings, weekends, and statutory holidays) are subject to the charges listed.
⁸ Festivals and Special Events are charged standard commercial and trade minimum fees which include permit review, permit issue and up to an hour on-site inspection. Each additional half
hour or part thereof when inspection occurs are charged at the rate listed.
Updated December 2025
Return to Table of Contents
22 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
SECTION 4: Residential Permit Fees
Background Information
This Section
This section of the Planning and Development Fee Schedule consolidates fees that are relevant for residential uses. Fees included in this section
may be previously stated above.
Why Permits?
Permits are here for your protection. They are the result of years of experience, testing and feedback. Having the proper permits ensures that
what is being built is safe and aligns with the appearance and use of your neighborhood.
What Permits are
Required?
If you are proposing new development, renovating existing development, or changing the use of a current building, you may require permits
from the City of Edmonton. Depending on the type of construction, you may need to apply for different types of permits. Some of the permits
that may be required are:
Development
Permit
A development permit ensures that the location, size and use of a building comply with the Zoning Bylaw 20001. Development permits and
approvals need to be obtained for new construction, renovations, and changes to how a building is being used.
All properties within the City of Edmonton are zoned and that zoning determines what type of building and what use is allowed. To determine
the development regulations for your property, find your property's zone at maps.edmonton.ca. Then look up your zone and other applicable
regulations in Zoning Bylaw 20001.
Development permits are either Permitted Developments or Discretionary Developments.
Permitted Development: Permitted Use and comply with all of the regulations of the Zoning Bylaw.
Discretionary Development: Discretionary Use or require a variance to one or more the regulations in the Zoning Bylaw. If the development is a
Discretionary Development, notification of the application to the surrounding properties is required.
Building Permit
While development permits regulate the location, size and use of buildings on your property, building permits are intended to ensure that the
work to be done on your property meets the minimum requirements of the Building Code. Most projects require both a development and a
building permit.
Mechanical and
Electrical Permits
Mechanical permits regulate the utilities servicing a property. This includes the water and sewer lines, interior plumbing, gas, heating, ventilation,
air conditioning, and electricity. If any construction includes mechanical work, separate permits may be required and are applied for separately.
Separate permits are issued for each type of mechanical work that is being completed. This includes HVAC, Plumbing, Gas, and Electrical.
Every building, mechanical and electrical permit requires payment of a safety code fee, which is collected on behalf of the Safety Codes Council.
The safety code fee is calculated as 4% of the total permit cost with a minimum of $4.50 and a maximum of $560.
Additional
Information
This document is not a complete list of the permits and fees that may be required. Additional permits and licences are issued by the City of
Edmonton including: parking permits, pet licences, and business licences. For the complete fee listings, application forms and additional
information visit www.edmonton.ca.
Updated December 2025
Return to Table of Contents
23 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Updated December 2025
Return to Table of Contents
Renovations and Additions to Existing Homes
¹ Total Permit Fee excludes any applicable Variance or Off-premise advertising supplements.
Application Type
Explanation
Development
Permit
Application Fee
Building Permit
Fee
Safety Codes Fee
Total Permit Fee ¹
Accessory building
Any building or structure other than the primary residence or backyard
housing.
Examples: detached garages, detached carport, gazebos, sheds, greenhouses,
pergolas, playground structure, lean to, etc.
$145
$120
$4.80
(or 4% of
Building Permit
Fee)
$269.80
Exterior alterations
with NO increase in
floor area or height
(single detached,
duplex,
semi-detached, or
backyard housing);
Site alterations
Minor exterior alterations that do not increase the size of the house.
Examples : installing a skylight, replacing a window
- Note: When a window or door is being replaced, permits are only required if
the replacement is larger than the original or closer to the property line.
$195
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $319.80
Fireplace
The installation of a gas or solid fuel burning appliance (wood, pellet or coal
burning fireplace or stove).
* If a new fireplace chassis is being constructed on the outside of a house a
development permit is also required.
- A gas fireplace will also require a gas permit and may require an electrical
permit for the electrical switches.
- An electric fireplace will require an electrical permit.
$195
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $124.80 or
Min: $319.80 (If
development
permit
required)
Home addition to
mobile homes
Any construction added to the primary building that has a roof or has a
structural design that could hold a roof is considered to be an addition.
$195
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $319.80
Home addition with
NO increase in floor
area or height (single
detached, duplex,
semi-detached, or
backyard housing)
Any construction added to the primary building that has a roof or has a
structural design that could hold a roof is considered to be an addition.
$195
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building
Permit Fee)
Min: $319.80
24 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Updated December 2025
Return to Table of Contents
Exterior alterations to
existing multi-unit
housing or row
housing (up to 4
units), including
vehicle access;
Home addition to
single detached,
duplex, or
semi-detached
housing with increase
in floor area or
height;
Secondary suites.
Any construction added to the primary building that has a roof or has a
structural design that could hold a roof is considered an addition.
Examples: sunroom, covered deck, attached garage, veranda, new bay window
that increases floor area
$415
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
$539.80
Hot tub, swimming
pool, ponds
A man-made body of water deeper than 2 feet. Both a development permit and
building permit are required for permanent swimming pools deeper than 2 feet.
- This also includes hot tubs and ponds with a body of water deeper than 2 feet.
- Temporary pools (i.e. set up during the summer months only) require building
permit review when sized to hold water more than 2 feet in depth.
- Swimming pools require building permits for both the initial installation and
the removal of an existing pool.
$145
$120
$4.80
(or 4% of
Building Permit
Fee)
Min: $269.80
Interior Alterations
Changes or alterations that affect the building structure or matters affecting
health and safety will require a building permit. If interior alterations are under
$5,000 and do NOT include construction involving the structural or bearing
walls e.g.,opening a doorway in a non-load-bearing partition between 2 rooms
would not require a building permit; partitioning a room to create two rooms of
which at least one is a sleeping room does require building permit review as the
work may affect health and safety of the occupants.
- If renovations include mechanical or electrical work, separate permits may be
required.
- A development permit is not required UNLESS the renovation is being done for
the operation of a business, or to be used as a secondary suite.
- If the floor space is increasing it is considered a Home Addition.
N/A
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $124.80
25 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Updated December 2025
Return to Table of Contents
Overheight fence
A fence, wall or gate that is greater than 1.3 metres in front yards or 2.0 metres
in all other yards. On corner sites, a fence is greater than 1.3 metres on the
flanking side of the property between the house and the property line where
vehicle access is from the flanking side.
$195
N/A
N/A
$195
Residential
Demolition
A development and building permit is required to demolish a building and
ensure that conditions are safe when the demolition is complete.
- If the building is being moved, a demolition permit is required.
- If applying to demolish and then build a new structure, only a building permit
is required for the demolition (in addition to all required permits for the new
structure).
$105
$120
$4.80
(or 4% of
Building Permit
Fee)
$229.80
Recreational Vehicle
Parking
Recreational Vehicle (RV) means a motorized or non-motorized vehicle or
structure designed for recreation and travel purposes. A development permit is
required to park an RV in a front yard or in a flanking side yard of a residential
property between November 1 and March 31.
Typical RV examples include motor homes, travel trailers, fifth wheels, truck
campers, tent trailers, park model trailers, camper van conversions, small utility
trailers, boats, snowmobiles, all-terrain vehicles, jet skis, or motorcycles and
trailers to carry them.
$195
N/A
N/A
$195
Satellite Dish
A Satellite Signal Receiving Antenna is an antenna used for the purpose of
receiving television and radio broadcasts transmitted by satellite. If the satellite
dish is attached to a building it will also require a building permit.
- No permits are required for small (pizza sized) satellite dishes (under 1 metre
in diameter).
$195
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $319.80
Secondary Suite
A development consisting of a dwelling located within, and accessory to, a
single detached house, semi-detached house, row house or backyard house. A
secondary suite has cooking, food preparation, sleeping, and sanitary facilities
which are physically separate from those of the principal dwelling. Mechanical
permits are not included in these fees. If construction involves any plumbing,
gas, heating, ventilation, or electrical work, see Mechanical and Electrical Permit
section for applicable fees.
$415
Min. $120
(Based on
Construction
Value - See
Appendix A)
$4.80
(or 4% of
Building Permit
Fee)
Min: $539.80
26 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Updated December 2025
Return to Table of Contents
Uncovered Deck
A deck (or wheelchair ramp) that has no roof or walls may require a
development permit, a building permit or both.
- If a hot tub is being installed in the uncovered deck during the construction of
the deck, the hot tub and uncovered deck are treated as one application and
are processed together. Only the uncovered deck fee is required.
- If the deck has a roof or walls it is considered a home addition.
$145
$120
$4.80
(or 4% of
Building Permit
Fee)
Min: $269.80
27 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
New Residential Building (Up to Two Dwellings)
¹ Total Permit Fee excludes any applicable Variance or Off-premise advertising supplements.
Application
Type
Explanation
Development
Permit
Application Fee
Building Permit Fee
Safety Codes Fee
Lot Grading Fee
Total Permit Fee
¹
Duplex,
Semi-detached
Duplex: Development consisting of a building of two dwellings, with
one dwelling placed over the other with individual and separate
access to each dwelling.
Semi-detached housing: Development consisting of a building with
two dwellings side by side.
$625
$11 For each
$1,000 of
Construction
Value for the first
$1,000,000; and;
$10 For each
$1,000 of
Construction
Value over
$1,000,000; (Min.
$285)
4% of Safety
Codes Permit
Cost (per
permit) (Min.
$4.50 Max.
$560)
$320
Varies
(See Safety
Codes
Building
Permit Fee
Schedule)
Mobile Home
Move On
Development consisting of transportable single detached housing
that is suitable for permanent occupancy and is designed to be
transported on its own wheels.
$195
$120
$4.80
(or 4% of
Building
Permit Fee)
N/A
$319.80
Residential
Move On
Any building that has been constructed off-site and relocated onto a
lot (excluding Mobile Homes and Modular Homes) requires a
development and building permit when it is moved onto a lot. These
structures may be temporary or permanent.
- Examples: residential houses, office trailers, portable school
classrooms
- Note: if a structure is being removed from one site to be moved on
to another site, either a residential or commercial demolition permit
is required for the original site.
$195
$120
$4.80
(or 4% of
Building
Permit Fee)
N/A
$319.80
Single Detached
House
A Single Detached House with or without New Secondary Suite, New
Modular Home or a Backyard Housing means development consisting
of a single dwelling.
- Water usage rates are also applicable based on EPCOR rates.
$625
See Appendix B - New Single Detached House Permit Fee
Schedule
See Appendix C - Single Dwelling Backyard Housing Permit Fee
Schedule
Updated December 2025
Return to Table of Contents
28 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Uses in Residential Zones
¹ Total Permit Fee excludes any applicable Variance or Off-premise advertising supplements.
Application
Type
Explanation
Development Permit
Application Fee
Business Licence or
Building Permit Fee
Total Permit Fee ¹
Child Care
Service
A development that provides temporary care and supervision of children.
This use includes facility-based early learning and child care programs.
This use does not include a Home Based Business operating as Home Based Child Care.
$415
$120 (Occupancy
Certificate)
$535
Home Based
Business /
Permitted
Development /
Minor Home
Occupancy
Any business that is considered to be operating out of a property that has been zoned
residential. Some home based businesses may be exempt from the development permit
requirement per the Zoning Bylaw regulations.
Home based businesses may require review for building permits and/or specific trade
permits, based on the scope of work.
$145
See Business
Licence Fees
Document
$145 plus
business licence
fee, plus safety
codes permits
fees (if required)
Home Based
Business -
Discretionary
In general, a home based business that requires one or more variances to the Zoning
Bylaw regulations is a Discretionary Development.
Home based businesses may require review for building permits and/or specific trade
permits, based on the scope of work.
$415
See Business
Licence Fees
Document
$415 plus
business licence
fee, plus safety
codes permits
fees (if required)
Residential Sales
Centre
A permanent or temporary building or structure used for a limited period of time for the
purpose of marketing residential land or buildings. In order to operate a building as a
residential sales centre, a development permit is required before operation can begin.
- Development permits are typically issued for a five year period and the use will require a
new permit if operation continues after the expiration date.
$625
N/A
$625
Supportive
Housing
A building, or part of a building, containing 1 or more sleeping units or dwellings that
provide accommodations and on-site or off-site social, physical, or mental health supports
to ensure an individual's daily needs are met.
- A development permit may be required as well as building permit review .
$415
$120 (Occupancy
Certificate)
$535
Updated December 2025
Return to Table of Contents
29 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Additional Fees
Application
Type
Explanation
Fee
Administrative
Where circulation has not commenced, a non-refundable administrative fee or 20% of the development
permit fee (whichever is greater) will be retained for administration costs. Where circulation has commenced
or if a decision has been made, there will be no refund of the fees paid.
$120
Development
existing without
a required
Development
Permit and
Building Permit
When a building or structure has been constructed in the past without the applicable permits it is said to be
existing without permits. Additional charges may apply when permits are obtained after the structure is built.
Double regular application fee may
apply
Leave As Built
A Leave as Built permit must be obtained when a structure has been built with the proper permits, but the
structure was not built in accordance with the approved plans or the zoning regulations.
Accessory Buildings and Additions:
$145
Single Detached, Semi-detached,
Duplex: $195
Minor
Amendments
Any amendments that are made to an application after it has been issued will be charged an additional fee.
- Major amendments to applications are treated similar to an application resubmission and require payment
of the regular permit fees.
Minor Residential Applications: $120
Single Detached, Semi-detached,
Duplex and Multi-unit Housing up to 4
Units (this includes re-examination of
Plan Fee) Applications: $195
Re-circulation
Any application that requires more than two circulations to other City departments will be charged an
additional fee equal to 50% of the original permit fee.
50% original permit fee
Re-inspection
An additional fee will be charged for every re-inspection required as a result of the following:
- No address on site, building or suite as applicable;
- Inspector unable to access the building after having been requested to inspect;
- Project not ready for inspection after a request for inspection has been made;
- Previously identified deficiency has not been corrected after a request for inspection has been made.
$285
Updated December 2025
Return to Table of Contents
30 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Mechanical and Electrical Permits
Application
Type
Explanation
Permit Fee
Safety Codes Fee
Total Fee
Heating,
Ventilation and
Air Condition
Permit
An HVAC permit is required for any renovations or new construction that involves any heating,
ventilation or air conditioning work.
- Examples: furnace replacement; new HVAC system.
$120 per
unit
Renovations
: $0.60 /per
$1000 CV
$4.80
(or 4% of Building
Permit Fee)
Varies
Gas Permit
A gas permit is required for any renovations or new construction that involves any gas work.
- Examples: gas or gas line installation, conversion of a non-gas barbeque to a gas burning barbeque,
installation of a gas fireplace.
$120
$4.80
(or 4% of Building
Permit Fee)
$124.80
Plumbing Permit
A plumbing permit is required for any renovations or new construction that involves any plumbing
work.
- Examples: new bathroom, installation of a backflow preventer, installation of a backwater valve.
$120
$4.80
(or 4% of Building
Permit Fee)
$124.80
Electrical Permit -
Homeowner
Minimum Fee
An electrical permit is required for any renovations or new construction that involves any electrical
work. If the work is completed by the homeowner, they must apply for the permit in person
(excludes Service change, see above).
If an electrical contractor is completing the work, they need to apply for the permit. Gas, Plumbing,
HVAC and electrical permits are included in building permit applications for new Single,
Semi-detached or Row house. Single, Semi-detached or Row house permits do not include electrical
permit for a finished basement.
- The minimum fee is for projects with an electrical installation cost of $3,000 or less. For the
complete fee listing see Appendix D.
- Examples: garages, basements, electric fireplaces.
$160 + $160
For Each
Additional
Hour
$6.40
(or 4% of Building
Permit Fee)
$166.40
Updated December 2025
Return to Table of Contents
31 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Zoning Confirmation Fees
Application
Type
Explanation
Single Detached,
Semi-detached,
Duplex
All Others
(Multi-unit
Residential)
Compliance
Certificate
A Compliance Certificate indicates that a building or buildings on a Site are located in accordance with the Setback
regulations of this Bylaw or the Setbacks specified in Development Permits which may have been issued for the Site.
- Express service compliance certificates will be completed in under three working days, excluding the day it was
received.
Regular
Service: $145
Express
Service: $310
Regular Service:
$310
Express Service:
$625
Compliance
Certificate
Re-stamp
A compliance certificate re-stamp may be useful if the request for a compliance certificate determined that the
property does not comply with the regulations of the Zoning Bylaw. After the problem is corrected (obtaining permits,
obtaining an encroachment agreement or removing the offending structure), the real property report can be
re-evaluated for compliance and re-stamped.
- A compliance certificate re-stamp is done if it is requested within 6 months from the date that the original
compliance letter was issued by Development Services.
- If a re-stamp is requested more than 6 months from the compliance issue date, the application is considered a new
compliance request. Regular compliance certificate fees apply.
$105
$105
Search of Files
for
Outstanding
Orders
A Search of Records and Plans Request is an examination of the files in the Development Services Branch/Sustainable
Development records vault and the Community Standards Branch/Community Services - Complaints and Investigation
Section.
$120 per
titled lot
$120 per titled
lot
Written
Confirmation
of Zoning
A zoning letter is written confirmation from the City of Edmonton indicating the zoning of the requested property.
$145 per site
$145 per site
Updated December 2025
Return to Table of Contents
32 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
APPENDICES
Appendix A: Building Permit Fees for Additions and Alterations to Single Detached Housing
Construction Value
Building Permit Fee
Safety Codes Fee
$0 - $10,000
$120
$4.80
$10,001 - $50,000
$385
$15.40
$50,001 - $100,000
$1,080
$43.20
Over $100,000
$2,100
$84.00
Notes:
- Construction value is the value of proposed construction of the building, including the following:
- Building (all material and labour used in construction of the building including all building services)
- Electrical (fire alarm and detection system, and fire protection equipment)
- Plumbing (fixtures, drainage, venting, water systems)
- Heating (systems and equipment for heating, ventilating and air-condition services)
- Does not include: landscaping, parking lots on grade, curbs, access roads, sidewalks, other site development not related to building structure,
furnishings/appliances/non-fixed appurtenances, window coverings, mechanical process equipment not required for building services or regulated by Safety Codes
Act, temporary service connections such as power for contractor use, insure or bonding, interim financing, permit fees, professional consulting fees.
Updated December 2025
Return to Table of Contents
33 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Appendix B: New Single Detached House Permit Fee Schedule
Floor Area (MAIN FLR
+ 2ND FLR + 3RD FLR
(does not include
basement and/or
garage)
Development
Permit
Application
Fee
Combined
Building,
Mechanical Permit
Fee
Building & Mech
Safety Codes Fees
Wiring Electrical
Permit Fees
Electrical Safety
Codes Fee
Construction
Water Rates
Construction
Value
Lot Grading Fee
Total Application
Fee
0 - 1650 sq. ft.
$625.00
$1,080.00
$43.20
$290.00
$11.60
$31.70
$160.00
$2,241.50
1651 - 3000 sq. ft.
$625.00
$1,645.00
$65.80
$335.00
$13.40
$56.39
$160.00
$2,900.59
3001 - 4500 sq. ft.
$625.00
$2,810.00
$112.40
$385.00
$15.40
$96.80
$160.00
$4,204.60
4501 - 6000 sq. ft.
$625.00
$5,575.00
$223.00
$440.00
$17.60
$133.10
$160.00
$7,173.70
Over 6000 sq. ft.
$625.00
$8,505.00
$340.20
$480.00
$19.20
$169.40
$160.00
$10,298.80
Notes:
- Applies to main and second floor areas only, third floor (if applicable). Developed basement area is not included in determining floor area in this schedule.
- Determination of first floor by definition in Building Code: First Storey is the uppermost storey having its floor level not more than 2 metres above grade.
- This permit is for the construction of a new house only. It does not include a propane permit for temporary heat or for additional work done afterwards
- This appendix is for standard wood frame construction, other types of construction will require contract value to be submitted.
- These electrical permit fees do not include the Underground Branch Circuit Conduit Inspection Fee for the installation of electrical conduit in a trench between the house
and the garage/backyard housing/garage pad.
Updated December 2025
Return to Table of Contents
34 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Appendix C: Single Dwelling Backyard Housing Permit Fee Schedule
Floor Area (MAIN FLR
+ 2ND FLR + 3RD FLR
(does not include
basement and/or
garage)
Development
Permit
Application Fee
Combined
Building,
Mechanical Permit
Fee
Building & Mech
Safety Codes Fees
Wiring Electrical
Permit Fees
Electrical Safety
Codes Fee
Construction
Water Rates
Construction
Value
Lot Grading Fee
Total Application
Fee
0 - 1650 sq. ft.
$625.00
$1,080.00
$43.20
$290.00
$11.60
$31.70
$160.00
$2,241.50
1651 - 3000 sq. ft.
$625.00
$1,645.00
$65.80
$335.00
$13.40
$56.39
$160.00
$2,900.59
3001 - 4500 sq. ft.
$625.00
$2,810.00
$112.40
$385.00
$15.40
$96.80
$160.00
$4,204.60
4501 - 6000 sq. ft.
$625.00
$5,575.00
$223.00
$440.00
$17.60
$133.10
$160.00
$7,173.70
Over 6000 sq. ft.
$625.00
$8,505.00
$340.20
$480.00
$19.20
$169.40
$160.00
$10,298.80
Notes:
- This permit is for the construction of a new Backyard Housing only. It does not include a propane permit for temporary heat or for additional work done afterwards (e.g. garage
gas heater, barbeque gas outlets, new deck, install heat recovery unit, hot tub installation, etc.)
- This appendix is for standard wood frame construction, other types of construction will require contract value to be submitted.
- These electrical permit fees do not include the Underground Branch Circuit Conduit Inspection Fee for the installation of electrical conduit in a trench between the house and
the backyard housing.
Updated December 2025
Return to Table of Contents
35 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Appendix D: Electrical Permit Fee
Installation Cost
Permit Fee
$0 - $3,000
$160
$3,001 - $10,000
$230
$10,001 - $50,000
$405
$50,001 - $250,000
$835
Over $250,000
$2,695
Notes:
- This schedule represents the fee for stand-alone electrical permits. Permits for new buildings and other major construction will have a fee based on total construction
value. Contact Development Services for more information on these fees. Electrical Installation Cost is the Total Amount of Materials and Labour. Safety Code Levy is
applicable to these fees, and is equal to 4% of the permit fee with a minimum of $4.50 and a maximum of $560.00.
- This appendix does not include the Underground Branch Circuit Inspection Fee for the installation of electrical conduit in a trench between the house and the
garage/backyard housing/garage pad.
Updated December 2025
Return to Table of Contents
36 City of Edmonton Planning and Development FEE SCHEDULES, EFFECTIVE JANUARY 1, 2026
Appendix E: Safety Codes Council Levy
The Safety Codes Council is an independent, regulatory body that
provides safety codes oversight and inspection services.
Safety Codes Council Levy *
2014 to 2023
Category
Fee
Building, Electrical, Gas & Plumbing
Safety Codes Council levy applies to the total permit fee at 4%, minimum of $4.50 to a
maximum of $560.
* Alberta Safety Codes Authority Council Fee Schedule.
- For information about the Safety Codes Council, visit the Alberta Safety Codes Council.
Updated December 2025