Off-Site Levy Bylaw C14-17 (Office Consolidation 2025)

Fort Saskatchewan, Alberta · adopted 2017-07-10 · summary & facts

This is the exact embedded text of the captured official document. Snapshot bf650eb84079 · verified 2026-10-22 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 This document is consolidated into a single publication for the convenience of users. The Official Bylaw and all amendments thereto are available from the Legislative Services Department and should be consulted in interpreting and applying this Bylaw. In the case of any dispute, the original Off-Site Levy Bylaw and amendments must be consulted. CITY OF FORT SASKATCHEWAN OFF-SITE LEVY BYLAW BYLAW NO. C14-17 A BYLAW OF THE CITY OF FORT SASKATCHEWAN IN THE PROVINCE OF ALBERTA TO PROVIDE FOR THE IMPOSITION OF AN OFF-SITE LEVY FOR LANDS PROPOSED FOR SUBDIVISION AND DEVELOPMENT IN DEFINED NEW GROWTH AREAS WITHIN MUNICIPAL BOUNDARIES. WHEREAS the Municipal Government Act, RSA 2000, c.M-26, as amended or repealed and replaced from time to time, permits Council to impose a levy known as an Off-Site Levy in respect of land to be developed or subdivided within a municipality's limits, and to authorize an agreement to be entered into for payment of the levy; AND WHEREAS the municipality has engaged in consultation with representatives of the development industry to address and define existing and future infrastructure requirements of the municipality with respect to circumstances of the municipality and the benefits of development; AND WHEREAS Council received advice and reports respecting upgrades to Off-Site Infrastructure which set out a fair and equitable calculation of Off-Site Levies in accordance with the purpose of the Municipal Government Act, RSA 2000, c.M-26, as amended or repealed and replaced from time to time; AND WHEREAS Council advertised its intention to consider the provision of this Bylaw pursuant to the requirements of the Municipal Government Act, RSA 2000, c.M-26, as amended or repealed and replaced from time to time. NOW THEREFORE, the Council of the City of Fort Saskatchewan, duly assembled, enacts as follows: This Bylaw is cited as the City of Fort Saskatchewan "Off-Site Levy Bylaw". 1. DEFINITIONS For the purposes of this Bylaw, the following words shall mean: (a) "Act" means the Municipal Government Act, R.S.A. 2000, c. M-26, as amended or repealed and replaced from time to time; (b) "City" means City of Fort Saskatchewan; City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 (c) "City Council" means the Council of the City of Fort Saskatchewan; (d) "Development Agreement" means an executed contract between a developer and the City of Fort Saskatchewan which establishes servicing and development requirements, and obligations; (e) "Developable Land" means all lands utilized and included for the purposes of growth and which are subdivided or developed (as those terms are defined under the Act, s. 616), except for lands: (i) designated as Environmental Reserve, (ii) designated as Municipal Reserve, or (iii) for which an Off-Site Levy was previously paid to the City; excluding the Developed Land. (f) "Developed Land" means land: (i) that has been subdivided or developed prior to the date of this Bylaw, (ii) for which all Off-Site Levy payments have been paid, and (iii) for which services have been provided in accordance with a Development Agreement; (g) "Environmental Reserve" (ER) means land designated as Environmental Reserve by a subdivision authority or municipality in accordance with the Act; (h) 1"Future Urban Area" means the lands annexed from Strathcona County in 2020 as identified on Figure 1.1 of the "Future Urban Area Levy Report" (Schedule E')." (i) "Light / Medium Industrial Development Area" means the area(s) as identified on Appendix "A" of the "Light / Medium Industrial Levies Report" (Schedule "D"); (j) "Municipal Reserve" (MR) means the land designated as Municipal Reserve by a subdivision authority or municipality in accordance with the Act; (k) "Off-Site Levy" means the levy imposed pursuant to Section 5 of this Bylaw; (l) "Off-Site Infrastructure" means those components and projects referred to in the Southfort Levies Report, Westpark Levies Report and Light/Medium Industrial Levies Report, in relation to water facilities, sanitary sewer facilities, arterial roads, and storm water management facilities; (m) "Southfort Development Area" means the area(s) as identified on Figure 1.1 of the "Southfort Levies Report" (Schedule "B"); (n) "Subdivision Authority" means the person(s) or body appointed by Council pursuant to 1 Bylaw C18-25 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Section 623(1) of the Act; and (o) "Westpark Development Area" means the area(s) as identified on Figure 1.1 of the "Westpark Levies Report" (Schedule "C"). 2. PRINCIPLES (a) That a levy shall be imposed, which shall be known as an Off-Site Levy, upon all Developable Land within the Southfort Development Area, the Westpark Development Area, the Light/Medium Industrial Development Area, 2and the Future Urban Area at the rates prescribed in this Bylaw; (b) That this Bylaw has been established to provide funds for the construction of the Off-Site Infrastructure required for growth; (c) That municipal infrastructure projects and associated costs have been determined through the preparation of the: (i) Southfort Levies Report - Schedule "B" attached hereto and forming part of this Bylaw; (ii) Westpark Levies Report - Schedule "C" attached hereto and forming part of this Bylaw; and (iii) Light / Medium Industrial Levies Report - Schedule "D" attached hereto and forming part of this Bylaw. (iv) 3Future Urban Area Levy Report - Schedule "E" attached hereto and forming part of this Bylaw. (v) 4Community Recreation and Fire Services Levy Report - Scheduled "F" attached hereto and forming part of this Bylaw. (d) That the following principles provide guidance for interpretation of this Bylaw and form the basis of the provisions: (i) 5Collecting Off-Site Levies in the Southfort, Westpark, Light/Medium Industrial Development, and Future Urban Areas will provide the capital that will fund the infrastructure required for growth. Those who benefit from the infrastructure, which is defined within the Southfort, Westpark, Light/Medium Industrial Development, and Future Urban Areas, should share proportionally on a per hectare basis in its costs. 2 C18-25 3 C18-25 4 C28-25 5 C18-25 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 (ii) The Off-Site Levy rates may be subject to inflationary increases. (iii) Infrastructure should be provided to maintain cost effective and orderly growth. Thus, non-contiguous development should be discouraged and Off-Site Levy projects should be constructed only when there is a demonstrated need for said infrastructure. (iv) The calculation of the Off-Site Levy should be an open transparent process that is clear and understandable. (v) The management of the Off-Site Levy account should be an audited process, with reports available to the public and industry. (vi) Provisions of Off-Site Infrastructure by developers of Developable Land will not create an advantage or penalty due to the time or location of development. (vii) The Off-Site Levy will help allow the City to recover the cost of infrastructure required for growth: a. Using financing strategies that remain sustainable; b. Facilitating development by reducing risk on early developers and ensuring future developers share the costs of the facilities from which they benefit; and (viii) Promoting cost effective and orderly development; (ix) The Off-Site Levy will help promote orderly development by: a. Providing Off-Site Infrastructure, once the appropriate planning is in place, and when warranted in development; and b. Providing infrastructure for contiguous development; (x) The Off-Site Levy will help create transparent process by: a. Providing opportunity for industry input into the levy, its definition and administration; b. Conforming with the Act; and c. Providing reports on levies; (xi) The Off-Site Levy will help create clear process for calculation of the rate, levies and credits by: a. Creating consistent and predictable levies and credits; b. Creating predictable and stable levies over time; and c. Documenting a process for establishing the levy rate. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 3. APPLICATION (a) That the Off-Site Levy, as set out in this Bylaw, is imposed and payable for all lands to be subdivided or developed within the Southfort, Westpark and Light/Medium Industrial Development Areas, excepting all lands designated as Municipal Reserve or Environmental Reserve. (b) 6That the Off-Site Levy is payable in relation to Off-Site Infrastructure set out in Schedules "B", "C", "D", "E", and "7F" attached hereto and forming part of this Bylaw. (c) That the City shall require that all subdivision and development be carried out in accordance with the executed Development Agreement between the City and a developer(s). (d) That all Development Agreements, as per Section 3(3), shall ensure: (i) that provision is made for the payment of the Off-Site Levy as specified in this Bylaw; (ii) that no further Off-Site Levy be required to be paid under Development Agreements where the Off-Site Levy has been previously collected in full in respect to all lands which are the subject of subdivision or development application; (e) 8 That subject to the other provisions of this Bylaw, the Off-Site Levy will be assessed on all Developable Land within the Southfort, Westpark. Light/Medium Industrial Development, and Future Urban Areas. (f) That notwithstanding the provisions of Section 3(e) above, an Off-Site Levy will be assessed on the greater of the following: (i) the estimated surface area of a storm water management facility during a 1 in 100 year storm event, that is located within a portion of land that is designated Municipal Reserve; or (ii) that area defined legally as a public utility lot. (g) That the City's Administration is authorized to enter into Development Agreements on behalf of the City, which agreements may, among other things implement the provisions of this Bylaw and ensure collection of the Off-Site Levy, provided that the terms of the Development Agreements shall comply with the requirements of this Bylaw. (h) That unless otherwise specified in a Development Agreement, an Off-Site Levy shall be calculated and become due and payable upon execution of the Development Agreement; if a Development Agreement does provide for deferred payment of any portion of the Off- 6 C18-25 7 C28-25 8 C18-25 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Site Levy payable under the Development Agreement, the Development Agreement shall provide that: (i) any portion of the Off-Site Levy deferred shall be protected through security, on terms outlined in the Development Agreement; (ii) the deferred portion of the Off-Site Levy shall be subject to adjustment, such that the amount of the Off-Site Levy payable by the developer shall be the off-site levy prescribed by this Bylaw at the time of payment, not at the time of endorsement of the Development Agreement; and (iii) the deferred portion of the Off-Site Levy shall be a maximum of FIFTY (50%) PERCENT of the Off-Site Levy payable, and the maximum period for deferral shall be one (1) year from the date of entry into the Development Agreement: or (iv) any other form of payment deferral for the Light/Medium Industrial Development Area as approved by Council. (i) That Council may from time to time adopt policies or guidelines for the assistance and direction of the City's Administration in determining which development and subdivision applications are required for the Development Agreement. 4. LEVY CALCULATION (a) That the Off-Site Levy shall be calculated using the rates set out in 9Schedule "A", and formalized through an executed Development Agreement, as follows: Assessment formula: Gross Area - (ER + MR) = Net Area X Levy Rate = Assessed Off-Site Levy (b) That prepayment of the Off-Site Levy shall not be permitted under any circumstances. (c) In order to implement the spirit and intent of the prohibition that there shall be no prepayment of an Off-Site Levy, the City Administration may: (i) refuse endorsing a Development Agreement (or an addendum for a stage under a Development Agreement); or (ii) require as a term of the Development Agreement (or an addendum for a stage under a Development Agreement) that the developer delay payment of all or part of the Off-Site Levy payable under the Development Agreement (or an addendum for a stage of a Development Agreement) if it appears that the underground local improvements in relation to the Development Agreement (or a stage under that Development Agreement) will not be constructed to the point of issuance of the Construction Completion Certificate within 12 months of the entry into the Development Agreement (or the addendum for a stage of the Development 9 C28-25 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Agreement). If the City requires the developer to delay payment of the Off-Site Levy payable under a Development Agreement (or an addendum), the City may prescribe the terms for the delayed payment, including provisions for security and adjustment. 5. ACCOUNTING All funds collected pursuant to this Bylaw shall be accounted for in a special fund and expended only as permitted under the provisions of the Act. 6. 10REVIEW PROCESS That this Bylaw shall be reviewed as necessary, but no later than every two years. 7. SEVERABILITY That if at any time any provision of this Bylaw is declared or held to be illegal, invalid, or ultra vires, in whole or in part, then that provision shall not apply and the remainder of this Bylaw shall continue in full force and effect and shall be constructed as it had been enacted without the illegal, invalid or ultra vires provision. 8. TRANSITIONAL PROVISION That not withstanding the provisions of this Bylaw, a Development Agreement approved by the City of Fort Saskatchewan prior to the passing of this Bylaw shall remain valid and in effect until such time that all provisions of the agreement have been met. 9. REPEAL Upon third reading of Bylaw C14-17, Bylaw C1-14 and all amendments thereto are hereby repealed. 10. EFFECTIVE DATE This Bylaw becomes effective upon third and final reading. (NOTE: Consolidation made under Section 69 of the Municipal Government Act, R.S.A. 2000,c.M-26 and Bylaw C5-13, and printed under the Director, Legislative Service's authority) Bylaw C14-17, passed by Council, July 10, 2017 Amendments: Bylaw C5-19, April 9, 2019 Bylaw C18-25, August 26, 2025 Bylaw C28-25, December 9, 2025 (Replaced Schedule "A" and Schedule "F" to Bylaw C14-17) 10 C5-19 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Report City of Fort Saskatchewan Southfort Levy Report Report City of Fort Saskatchewan Southfort Levy Report Schedule "B" to Bylaw C14-17 June 2017 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 REPORT i Table of Contents SECTION PAGE NO. Table of Contents i 1 Introduction 1-0 1.1 GENERAL 1-0 1.2 LOCATION 1-0 1.3 DEVELOPMENT LEVIES 1-0 1.4 CRITERIA 1-1 1.5 FIGURE 1.1 - SOUTHFORT AREA BOUNDARY 1-3 2 Waterworks System 2-0 2.1 GENERAL 2-0 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM 2-0 2.3 EXISTING WATER LEVIES 2-0 2.4 WATER SYSTEM DEVELOPMENT LEVIES 2-0 2.5 TABLE 2.1 - WATER INFRASTRUCTURE COSTS 2-2 2.6 FIGURE 2.1 - WATERWORKS SYSTEM IMPROVEMENTS 2-3 3 Sanitary Sewer System 3-0 3.1 GENERAL 3-0 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS 3-0 3.3 EXISTING SANITARY SEWER OFF-SITE LEVY 3-0 3.4 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES 3-1 3.5 TABLE 3.1 - SANITARY INFRASTRUCTURE COSTS 3-2 3.6 FIGURE 3.1 - SANITARY SYSTEM IMPROVEMENTS 3-3 4 Transportation System 4-0 4.1 GENERAL 4-0 4.2 EXISTING ROADWAY LEVIES 4-0 4.3 ROADWAY DEVELOPMENT LEVIES 4-0 4.4 TABLE 4.1 - TRANSPORTATION INFRASTRUCTURE COSTS 4-1 4.5 FIGURE 4.1 - TRANSPORTATION IMPROVEMENTS 4-3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Table of Contents ii SECTION PAGE NO. 5 Stormwater Drainage System 5-0 5.1 GENERAL 5-0 5.2 SOUTHFORT AREA STORMWATER MANAGEMENT PLAN 5-0 5.3 EXISTING STORMWATER LEVIES 5-0 5.4 STORMWATER DEVELOPMENT LEVIES 5-1 5.5 TABLE 5.1 - STORM MANAGEMENT INFRASTRUCTURE COSTS 5-2 5.6 FIGURE 5.1 - STORM SYSTEM IMPROVEMENTS 5-3 6 Recommendations 6-0 6.1 TABLE 6.1 - OFF-SITE LEVIES 6-1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-0 1 Introduction 1.1 GENERAL The City of Fort Saskatchewan has identified the Southfort area as being a prime location for development and is currently seeing continued growth within the area. The Southfort Area Structure Plan (ASP) has been developed and updated, in order to assist the City in properly planning and staging this development. The ASP identifies future land uses as well as locations of major infrastructure, which will form the backbone of this community. The growth and development of a community will generally create some impact on the municipal infrastructure systems. Minimally, development requires an extension of municipal services such as water, sewer, roadways, etc. More extensive and continued growth and development of a community will require the municipal infrastructure systems to be expanded to satisfactorily accommodate such growth. It is the philosophy of the City of Fort Saskatchewan that development will be responsible for its own municipal infrastructure as well as for its proportionate share of the off-site infrastructure from which it will benefit. This is achieved through the assessment of Development Levies against the individual developers. In January of 2003, the City of Fort Saskatchewan engaged Associated Engineering Alberta Ltd. to undertake the creation of a clear, concise and defensible model for establishing Development Levies for lands within the Southfort ASP boundaries. The report was updated in January 2017 by the City of Fort Saskatchewan. 1.2 LOCATION The Southfort area is located on the southeast side of Highway 21, mainly in Sections 29-54-22, 19-54-22, and 20-54-22 and is bounded to the south and east by Strathcona County. It is comprised of existing commercial developments; the Fort Saskatchewan Correctional Facility and agricultural land. Figure 1.1 shows the Southfort area boundary. 1.3 DEVELOPMENT LEVIES In the context of this report, Development Levies are defined as capital costs, assessed by the City of Fort Saskatchewan, against developing lands for their proportionate share of the costs of municipal infrastructure systems, constructed by the City or other developers, which benefit the development areas. 1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-1 1.3.1 Off-Site Levies Under authority of the Municipal Government Act, the City is permitted to impose Off-Site Levies against development to cover the costs of any or all of the following: a) New or expanded facilities for the storage, transmission, treatment or supplying of water. b) New or expanded facilities for the treatment, movement and disposal of sanitary sewage. c) New or expanded storm sewer drainage facilities. d) New or expanded roads required for or impacted by a subdivision or development. e) Lands required for or in connection with any facilities described in (a) to (d) above. 1.4 CRITERIA In this study, lands dedicated as Municipal Reserve (MR) are excluded as a Development Levy contributing area. Traditionally, the City has required the Developer to develop the MR lands in accordance with the City's needs, as negotiated through the Development Agreement. Hence, Development Levies are not applied against such lands, thereby reducing the contributing lands area accordingly. It was also necessary to establish some general assumptions as Development Levy calculation criteria:  The City will continue to assume responsibility for the provision of those infrastructure systems and facilities which they deem to be a benefit to the City at large and/or a single development parcel.  The Development Levies are generally based on constructing municipal improvements consistent with the requirements identified in the revised Southfort Area Structure Plan to serve the lands within the plan area.  The storm drainage infrastructure is based on the Southfort Stormwater Management Plan, prepared for the City of Fort Saskatchewan by Associated Engineering in 2004.  The Development Levy rates are expressed on a per hectare basis.  Gross Area is defined as the total area of a parcel(s) of land irrespective of their potential for development or land use.  Gross Developable Area is defined as the gross area less lands for Municipal Reserve. The Development Levy and charge rates contained in this document are based on Gross Developable Area.  All costs are estimated in 2016 dollars. These cost estimates should be reviewed annually or no later than every three years, to reflect current year construction costs.  An inflation factor has been applied to all estimates, to more accurately estimate the construction costs for the projected year of construction. For the January 2017 update, an inflation rate of 2.0% per annum was used.  Where conditional grants have been secured by the City, towards a specific project, the project cost has been reduced by the amount of the grant. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-2  Unconditional grants, even though they may have been utilized by the City for financing a project, are not deducted from the final project costs, as it can be rationalized that such funding could have been used for other projects. Assumptions and/or calculation criteria specific to each Development Levy are further highlighted, in more detail, within each respective section of this report. It must be clarified what is intended, when it is stated that the City will continue to assume the responsibility for certain infrastructure systems and facilities. Historically the City has designed and constructed sanitary trunk sewer facilities, arterial roadways, water reservoirs, trunk watermains and stormwater management facilities, which serve more than a single development area. Although the City accepts this responsibility, each development agreement can define whether the City or the developer designs and constructs these major facilities. If the development agreement establishes that the developer will undertake this work, then presumably it will also establish the formula and schedule for recovery from other benefiting developments. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 0146* 95 AV 93A AV 79 ST WOODHAVEN CL PARKVIEW BAY PARKWEST CRT RIVERPARK RD WESTMEWS CR WESTMEWS CR WESTPARK WYND 80 ST RIVER GLEN RIVER GLEN RIVERPOINT 92 AV 95B AV 83 ST 81 ST 81A ST 79 ST 81 ST 89B ST 90A ST ASH PT ASPEN GATE WESTWOOD HWY 15 HWY 15 WESTPARK WAY W E S T P A R K B L V D 9 90 ST 82 ST 84 ST 97 AV 92 ST 94 AV 99 AV WESTWOOD WAY SOUTHFORT DR 84 ST WAY WOODBEND 94 ST 86 AV W ES T W OOD L N CEMETERY RD 81 ST 97 AV RIVER VALLEY DR 89A ST 87A ST 93 ST 91 AV 79 ST 83A ST 90 AV 95A AV 83A ST 86 ST WOODSMERE CLOSE VALLEYVIEW RIDGE VALLEY CRT VALLEY CL WESTWOOD 85A ST 82A ST 95A AV 93 ST 85A ST 87A ST 81 ST 89 ST 85 ST 83 ST 87 ST 97A AV 93 AV 95B AV 79 ST WESTPARK DR WESTPARK RD RIVERPARK DR WESTMEWS DR WESTPARK CRT RIVERPARK RD FIRST ST (112 ST) NORTH AV CLOVER DR CENTRE ST (111 ST) 109 ST 101 ST 88 ST 83 AV 88 AV 100 A ST 90 ST 93 ST RIVERPOINTE CR 96 ST 93 AV 94 AV 97 ST 94 AV 81A ST 82 ST 92A AV 92 AV 94 AV 93 AV 92 AV 93 AV 80 ST 94 AV 97 AV 96 AV 98 AV 96 AV 91 ST 89 ST 98 AV 91 ST 90 ST 95 AV 85 ST 100 AV 97 AV 84 ST 93 AV 86 ST VALLEY POINTE RD ALDERSON CLOSE GREEN WESTWOOD 98 AV 86 ST 87 ST 85 ST 86 ST 90A ST 83 ST 100 AV 85 ST 98 AV 87 ST 92 AV 95A AV 89 ST 88 ST 88 ST 95 AV 84 ST 95 AV 96 AV 82 ST 92 AV 100 AV 100 AV 96 AV 92 AV 92 ST 95 AV 87 ST GREENFIELD WAY CLOSE CRES GREENFIELD PL POINTE WINDERMERE CRT WINDSOR PLACE CLOSE RIVERPOINTE PLACE RIVERPOINTE 96 AV 81 ST 80 ST WESTWOOD GREEN WEDGEWOOD CRES WESTPARK WAY HWY 21 HWY 21 HILLVIEW CL 99 93 AV SHERRIDON 86 AV 94 AV 99 AV 84 ST WESTPARK DR WESTMEWS DR WESTMEWS DR 95A AV WYND GALLOWAY WYND GREENFIELD GREENFIELD 90A ST ALMOND BAY ACADIAN WYND BIRCH PL BOXWOOD BEND WHISTLER PL WISTERIA LN WISTERIA LN VALHALLA PL G R E E N F I E L D W A Y GALLOWAY WYND HILLCREST PT BOXWOOD BEND WOODBEND WAY CRES ALLARD WAY BECKER SOUTHFORT DR CALVERT WYND WOODBRIDGE LINK SOUTHFORT DR HILLSIDE TERR HILLTOP RDGE BRUNETTE PLACE VALE TERRACE GREENFIELD BEND GREENFIELD WYND GREENFIELD BAY GREENFIELD LINK C R A N B E R R Y B E N D CEDAR POINTE CHERRY POINTE C Y P R E S S L I N K C A R A G A N A W A Y WESTPARK DR SONORA CR SIENNA GATE SEQUOIA BEND SONORA CR SANTA FE CRT NAVAJO LN CATALINA CRT CANYON RD SOUTHFORT BLVD TOWN CREST RD RED CANYON WY RED CANYON WY ROCKLEY PL ROCKWELL CL REED CRT RENO PT RIDGELAND WY WOODHILL LN 94 ST RR 224 92 ST CAM PB ELL CHOKECHERRY LN WESTBROOK WYND CRANSTON PLACE RADCLIFFE WYND RADCLIFFE WYND WOODCREST LN WE LL I NGTO N PL WILSHIRE BLVD WHITNEY TERR WESLEYAN CRT COTTONWOOD CR DURRAND BEND ALLARD WAY DICKENS ST DITTRICH AV C A T A L I N A C R T S I E N NA B L V D SEDONA PL SANTANA CR SANDSTONE DR 98 AV ELLISON CRT MONARCH CL MEADOWVIEW DR GREENFIELD WYND C A R A G A N A W A Y SOUTHRIDGE BLVD ROSEBERRY LN DAVIS ST DURRAND BEND DRAGONFLY PT WEMBLEY CR WILLOW LINK SANTANA CR SIERRA WYND CRANBERRY BEND CHESTNUT WY CEDAR GATE HICKORY RD CURRANT CR RIDGEVIEW CL RICHMOND LINK WILSHIRE BLVD BREMNER CRES HEMLOCK CL ELM ST SOLANO CRT GARCIA CL W ES TWO O D LN REDDING WY RICHMOND LINK RIDGE POINT GATE D I L L I NGHA M AV ELLICE BEND GREENFIELD GATE S I E N NA BL VD R T WOODHILL LN SOUTHPOINTE BLVD SPARROW CL Date: January 25, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 1.1 Figure 1.1 Southfort Area Boundary Southfort Development Levies N Southfort Area Boundary Undeveloped Boundary (as of December 31, 2016) 236.23 ha 8.85 ha Gross Area (Total) = 575.00 ha Gross Area (Developed) = 329.92 ha Gross Area (Undeveloped) = 245.08 ha City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-0 2 Waterworks System 2.1 GENERAL The City's water supply is treated water, purchased from the City of Edmonton (EPCOR) through the Capital Region Northeast Water Services Commission (CRNWSC). The treated water is distributed by the City, to its customers, through its waterworks system consisting of water storage reservoirs and pumping facilities, primary feeder mains and distribution mains. 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM Traditionally, the City's philosophy regarding its waterworks system expansion has been that development is responsible, at their entire cost, for the construction of all new distribution mains up to a specified diameter. Primary feeder mains, treated water storage reservoirs and pumping facilities benefit the entire water distribution system and thus, the City has assumed responsibility for their construction. The costs of such facilities are then assessed proportionately against lands through a Water Off-Site Levy. Capital improvements to the water supply system are the responsibility of the CRNWSC, of which the City of Fort Saskatchewan is a member. The costs of such improvements are assessed proportionately, against the City, through the Commission's water utility rate structure. Therefore, these costs are not included in the City's Water Off-Site Levy. The Westpark Reservoir and Pumphouse are currently included as an off-site levy for the Westpark Development, proportionate to its projected usage. The remainder of the expenditure will be included in the Southfort Levy costs. 2.3 EXISTING WATER LEVIES The existing completed waterworks projects can be found in Table 2.1. The table shows the levied costs for the infrastructure. 2.4 WATER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions, namely:  Water supply for the City will continue to be from the City of Edmonton through the CRNWSC, who shall continue to be responsible for all capital improvements/expansions to the supply systems. Such costs are therefore not included in the calculation of the City's Water Off-Site Levy.  The City will be responsible for the construction of the alternate reservoir supply line, off the CRNWSC transmission main. These expenditures will be included as off-site levies to the development of Southfort. 2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-1  Development will continue to be responsible, at its entire cost, for the construction of all distribution mains, up to and including 400 mm diameter in size, to serve the Southfort area.  The City will continue to be responsible for the construction of all primary feeder mains, treated water storage reservoirs and pumping facilities. These expenditures will be included as off-site levies to the development of Southfort.  Conditional grants, such as those secured through the Alberta Transportation and Utilities Municipal Water and Wastewater Partnership Program*, will be applied to the specific projects, thereby reducing the overall project cost used in calculating the Water Off-site Levy Rate. Currently the level of funding available to the City through this program is approximately 30% of the eligible project costs.  Unconditional grants, even if applied against waterworks system improvements, will not be considered when calculating the Water Off-Site Levy Rate. * The AT&U Municipal Water and Wastewater Partnership Program grant funding formula is based on the population of the community. Under the formula, as the population of the community increases, the percentage of cost covered by the program decreases. Therefore, it is prudent to update project costs regularly, to ensure that the off-site levy rates are current and meet the financial requirements of the City. Figure 2.1 represents the Southfort area water system as envisioned in the Southfort ASP and City of Fort Saskatchewan Water Distribution System Master Plan. As per the assumptions previously outlined, the City assumes the responsibility for constructing all watermains greater than 400 mm in diameter. The cost of this construction will be included in the calculation for Water System Development Levies. Table 2.1 outlines a cost estimate for each improvement based on 2016 dollars and future construction costs, with an inflation rate as indicated. Conditional grants, which had previously been secured for a specific project, have been incorporated to arrive at the estimated net cost to the City. For future waterworks system improvements, it has been assumed that there will be no grant funding available for such projects. This assumption is based on the fact that the amount of grant funding available to a municipality will continue to be directly related to its population. The need for constructing the future reservoir storage capacities will, to a large degree, be directly related to increases in the population of the City. Such increased population, however, will decrease the amount of grant funding available. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-2 2.5 TABLE 2.1 - WATER INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Costs from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Water 2.1.1 450mm SOUTHFORT BOULEVARD WATER LINE (66.8% SHARE) COMPLETE $815,723.15 $0.00 $0.00 $815,723.15 2.1.2 WESTPARK RESERVOIR & 450mm WATERMAIN (66.8% SHARE) COMPLETE $2,452,968.31 $0.00 $0.00 $2,452,968.31 2.1.3 WESTPARK RESERVOIR EXPANSION (66.8% SHARE) COMPLETE $216,809.08 $2,847,502.84 $0.00 $3,064,311.92 2.1.4 300 mm WATER SUPPLY LINE (66.8% SHARE) COMPLETE $1,031,385.92 $43,598.44 $0.00 $1,074,984.36 2.1.5 300mm 86 AVENUE WATER CONNECTOR COMPLETE $72,384.00 $0.00 $0.00 $72,384.00 2.2 MODELLING COMPLETE $15,000.00 $0.00 $0.00 $15,000.00 $4,604,270.46 $2,891,101.28 $0.00 $7,495,371.74 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: January 20, 2017 Drawn: CL Scale: NTS Dwg. No. 2.1 Figure 2.1 Waterworks System Improvements Southfort Development Levies Revision: B Watermain Westpark Reservoir 2.1.3 2.1.2 2.1.4 2.1.1 2.1.5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-0 3 Sanitary Sewer System 3.1 GENERAL The sanitary sewage collection system in the Southfort area will be comprised of a series of lateral (local), collector and trunk sewers, intercepting wastewater from the various individual contributors and conveying this wastewater to an existing 750 mm diameter main in the northeast corner of the Area Structure Plan (ASP) boundary. The point of discharge for the City sanitary sewage is the Alberta Capital Region Wastewater Commission (ACRWC) Regional Trunk Sewer, which conveys the wastewater to the ACRWC Sewage Treatment Plant. Capital improvements to the regional trunk line are the responsibility of the ACRWC of which the City of Fort Saskatchewan is a member. The costs of such capital improvements are assessed proportionately against the City through the Commission's sewage utility rate structure. Therefore, they are not included in the City's Sanitary Sewer Off-Site Levy calculations. The Sanitary Servicing Plan, as identified in the Southfort ASP, indicates that the majority of the lands within the ASP boundary generally slope toward the northeast and that a gravity system will service most of the area. The extreme southeast catchment will require a Sanitary Lift Station, to pump the sewage into the proposed gravity system. 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS Traditionally, the City's philosophy regarding sanitary sewer systems has been that development shall be responsible for the entire cost of constructing laterals and collectors. The City assumes the responsibility for constructing all trunk mains 525 mm in diameter and larger. The cost of this construction will be included in the calculation for Sanitary Sewer System Development Levies. 3.3 EXISTING SANITARY SEWER OFF-SITE LEVY The existing Ross Creek Sanitary Trunk Sewer was constructed in 1976/1977. The total project cost was established as $2.83 million in 1977. The portion of the total project costs assigned to the Southfort area is 28%, based on total service area. The cost share was calculated on the basis of actual project costs plus actual debenture charges for the financing of the project. The existing completed sanitary projects are found in Table 3.1. The table shows the levied cost for these infrastructures. 3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-1 3.4 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions:  The Developer will continue to be responsible for the construction of lateral and collector sanitary sewer systems.  The City of Fort Saskatchewan will continue to be a member of the ACRWC. Any expansion or improvement costs, related to the Commission System, will be assessed against the City by the Commission, through its sewer utility rate structure. Therefore, costs related to the Commission System have not been included in the City's Sanitary Sewer Off-Site Levy calculations.  Sanitary Sewers 525 mm diameter and larger are considered to be Trunk Sanitary Sewers.  No grant funding will be available towards the construction of trunk sewer systems.  The cost of all leviable projects will be applied against all lands within the ASP boundary. Figure 3.1 shows the sanitary servicing plan, as developed in the Southfort ASP. Table 3.1 outlines a cost estimate for each improvement based on 2016 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-2 3.5 TABLE 3.1 - SANITARY INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Costs from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Sanitary 3.1.1 675mm SOUTHFORT DRIVE SANITARY TRUNK COMPLETE $233,840.00 $0.00 $0.00 $233,840.00 3.1.2 675mm ALLARD WAY SANITARY TRUNK COMPLETE $360,240.00 $0.00 $0.00 $360,240.00 3.1.3 525mm 92 ST. GREENWAY SANITARY TRUNK COMPLETE $284,400.00 $0.00 $0.00 $284,400.00 3.1.4 525mm 94 STREET DEEP SANITARY 2020 $1,448,969.44 $0.00 $430,362.29 $1,879,331.73 3.1.5 750mm 86 AVE SANITARY TRUNK COMPLETE $850,000.00 $0.00 $0.00 $850,000.00 3.1.6 EXISTING 86 AVE TRUNK DEBENTURE COMPLETE $118,114.00 $0.00 $0.00 $118,114.00 3.1.7 SANITARY MODEL COMPLETE $15,000.00 $0.00 $0.00 $15,000.00 $3,310,563.44 $0.00 $430,362.29 $3,740,925.73 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: December 2016 Drawn: MK/SK Scale: NTS Dwg. No. 3.1 Figure 3.1 Sanitary System Improvements Southfort Development Levies Revision: A Sanitary Line 3.1.3 3.1.4 3.1.1 3.1.5 3.1.2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-0 4 Transportation System 4.1 GENERAL The City of Fort Saskatchewan maintains a roadway classification system generally consistent with the definitions for arterial, collector and local roads contained in the "Geometric Design Standards for Canadian Roads and Streets," a manual published by the Transportation Association of Canada. In the hierarchy of roadway classifications, the principle function of arterial roads is to provide for the efficient movement of people, goods and services between the primary traffic generation areas of a community. Typically, arterial roadways are designed as relatively free-flowing facilities, intersected by other arterial or major collector type roadways but provide no direct access to individual properties. Arterial roadways are generally considered to be a greater benefit to the City at large rather than directly to individual developers. However, this does not negate developers' responsibility to contribute their proportionate share towards the cost of these arterials, since to a large degree development generates the need for these arterial roadways. An updated Transportation Study for the Southfort Area Structure Plan was completed in September 2015. 4.2 EXISTING ROADWAY LEVIES The existing transportation projects completed are found in Table 4.1. The table shows the levied cost for these infrastructures. 4.3 ROADWAY DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions:  Arterial roadways included in the Transportation Off-Site Levy calculations are those highlighted in Figure 4.1.  Arterial roadways will typically be constructed to an ultimate 4-lane, divided, paved urban structure and are the standards upon which the cost estimates are based.  Arterial roadways will typically be constructed in two stages with the first or initial stage being a two- laned urban roadway complete with street lighting and the ultimate stormwater drainage system. The second stage is all works remaining to complete the arterial roadway. Additional improvements may be required depending on pace of growth and need.  A blanket assessment levy for roads is recommended against all development irrespective of land use.  Right-of-ways to facilitate construction of arterial roadways will be acquired through the subdivision development process. Table 4.1 outlines the cost estimates for the Transportation Off-Site Levy rate. 4 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-1 4.4 TABLE 4.1 - TRANSPORTATION INFRASTRUCTURE COSTS (continued on following page) Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Costs from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Transportation 4.1.1 WIDENING SOUTHFORT DRIVE & 94TH STREET - PHASE 1 INCLUDING INTERSECTION D SIGNALIZATION COMPLETE $5,690,445.78 $10,129.30 $0.00 $5,700,575.08 4.1.2 WIDENING SOUTHFORT DRIVE / 86TH AVENUE - PHASE 1 INCLUDING INTERSECTION E COMPLETE $2,306,934.01 $2,231,738.92 $0.00 $4,538,672.93 4.1.3 WIDENING SOUTHFORT DRIVE FROM ALLARD WAY TO SOUTH GREENFIELD WAY & 84TH STREET FROM SOUTHFORT DRIVE TO GALLOWAY WYND INCLUDING INTERSECTION F & I SIGNALIZATION 2017 $0.00 $0.00 $4,250,000.00 $4,250,000.00 4.1.4 WIDENING SOUTHFORT DRIVE FROM SOUTH GREENFIELD WAY TO SOUTHFORT BOULEVARD 2020 $0.00 $0.00 $1,000,000.00 $1,000,000.00 4.1.5 WIDENING SOUTHFORT DRIVE FROM SOUTHFORT BOULEVARD TO SOUTHRIDGE BOULEVARD 2023 $0.00 $0.00 $2,200,000.00 $2,200,000.00 4.1.6 WIDENING 94TH STREET FROM HOSPITAL TO SIENNA BOULEVARD 2020 $0.00 $0.00 $2,850,000.00 $2,850,000.00 4.1.7 WIDENING 84TH STREET FROM HWY 21 to GALLOWAY WYND INCLUDING INTERSECTION G COMPLETE $1,394,397.11 $0.00 $0.00 $1,394,397.11 4.1.8 WIDENING SOUTHFORT BOULEVARD FROM HWY 21 TO SOUTHFORT DRIVE 2021 $0.00 $0.00 $2,500,000.00 $2,500,000.00 4.1.9 SOUTHRIDGE BOULEVARD INCLUDING INTERSECTION L 2017 $404,093.54 $1,871,812.44 $231,964.60 $2,507,870.58 4.1.10 SIENNA BOULEVARD WIDENING COMPLETE $0.00 $264,239.66 $0.00 $264,239.66 4A 88TH AVENUE AND 101 STREET INTERSECTION A SIGNALIZATION 2030 $0.00 $0.00 $388,081.99 $388,081.99 4B 86TH AVENUE AND 101 STREET INTERSECTION B SIGNALIZATION COMPLETE $200,000.00 $0.00 $0.00 $200,000.00 4C 94TH STREET & CORNERSTONE/SOUTHPOINTE COMMERCIAL INTERSECTION SIGNALIZATION 2017 $0.00 $0.00 $300,000.00 $300,000.00 4H GALLOWAY WYND AND 84TH STREET INTERSECTION K SIGNALIZATION 2019 $0.00 $0.00 $312,120.00 $312,120.00 4K SOUTHFORT DR AND SOUTHFORT BLVD INTERSECTION SIGNALIZATION 2020 $0.00 $0.00 $318,362.40 $318,362.40 4M RIDGEPOINT GATE AND SOUTHRIDGE BLVD INTERSECTION SIGNALIZATION 2027 $0.00 $0.00 $365,698.33 $365,698.33 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-2 TABLE 4.1 - TRANSPORTATION INFRASTRUCTURE COSTS (continued from previous page) Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Costs from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Transportation 4N SOUTHFORT DR AND SOUTHRIDGE BLVD INTERSECTION SIGNALIZATION 2023 $0.00 $0.00 $337,848.73 $337,848.73 4O SIENNA BLVD AND 94TH ST INTERSECTION SIGNALIZATION 2020 $0.00 $0.00 $318,362.40 $318,362.40 4.2 TRANSPORTATION MODELLING COMPLETE $30,000.00 $0.00 $0.00 $30,000.00 4.3 TRANSPORTATION MASTER PLAN COMPLETE $34,650.00 $0.00 $0.00 $34,650.00 4.4 AREA STRUCTURE PLAN COMPLETE $35,000.00 $0.00 $0.00 $35,000.00 4.5 AREA STRUCTURE PLAN UPDATE 2027 $0.00 $0.00 $70,000.00 $70,000.00 $10,095,520.44 $4,377,920.32 $15,442,438.45 $29,915,879.21 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: January 17, 2017 Drawn: CL Scale: NTS Dwg. No. 4.1 Figure 4.1 Transportation Improvements Southfort Development Levies Revision: B Arterial Roadway Intersection Improvement 4.1.1 B C D E F G H I J K L M N O A 4.1.3 4.1.4 4.1.5 A 4.1.1 4.1.6 4.1.3 4.1.8 4.1.9 4.1.10 4.1.2 4.1.2 4.1.7 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-0 5 Stormwater Drainage System 5.1 GENERAL Management of stormwater is an important component in the development of a community. It must be handled effectively, to preserve and promote the general health, welfare, security and economic well-being of the public. Traditionally, in urban centres, stormwater is handled in keeping with the minor/major drainage concept wherein:  Minor systems are designed and implemented to accommodate drainage to avoid property damage and flooding and to minimize inconvenience to the public from 1 in 5 year rainfall events.  Major systems are designed and implemented for flood control to avoid loss of life, injuries and significant damage to property, from events greater than 1 in 5 year return, producing unusual, high intensity rainfall and/or large volume runoff. Minor systems are typically comprised of underground piping, manholes, catch basins and outfall structures but can also be designed as a rural-type drainage system consisting of ditches and culverts. Major systems can be large diameter underground piping, open channels, stormwater detention/retention ponds, natural streams or any combination thereof, capable of conveying runoff from events up to and including a 1 in 100 year return period, to the ultimate receiving stream or water body. 5.2 SOUTHFORT AREA STORMWATER MANAGEMENT PLAN The Southfort Area Structure Plan (ASP) identified several stormwater ponds and trunk sewers within the ASP boundary. Much of the area north of 94th Street forms part of a separate basin with a portion (Penitentiary Lands) being outside of the Gross Developable Area as identified in this study. There are two separate outfalls which ultimately discharge to Ross Creek. A Southfort Stormwater Management Plan (SWMP) was undertaken by Associated Engineering in 2004/2005. The development of this SWMP involved input from the engineering consultants for the major developers in the area, in addition to the City Public Works department. Option 4 of this SWMP has been recommended. Development Levies related to the major infrastructure presented in Option 4 have been incorporated into this document. 5.3 EXISTING STORMWATER LEVIES The existing stormwater projects completed are found in Table 5.1. The table shows the levied cost for this infrastructure. 5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-1 5.4 STORMWATER DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions:  The Developer will continue to be responsible for the construction of catch basins and storm sewers up to and including 1200 mm diameter in size.  Storm sewers greater than 1200 mm diameter in size are considered to be trunk sewers. The costs of these sewers will be included in the Stormwater Development Levies.  There is no grant funding available towards the construction of trunk sewer systems.  All stormwater management ponds will be the responsibility of the developer, with the exception of Wetland E. Each stormwater management basin area is considered to be responsible for the stormwater management pond serving that basin area.  Drainage parkways I and II, Wetland E, the Outfall Ditch and Overflow to Ross Creek, the Yorkville Ditch upgrade, the 2005 Southfort Stormwater Management Plan and the Ross Creek Floodplain study are all considered to be cost recoverable against the entire Southfort Development Area.  Note: If storm sewers larger than 1200 mm diameter are constructed in lieu of parkways, these costs will be assessed against the entire Southfort Development Area. Figure 5.1 shows the stormwater infrastructure projects included in the Southfort Off-site Levy. Table 5.1 outlines a cost estimate for each improvement based on 2016 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-2 5.5 TABLE 5.1 - STORM MANAGEMENT INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Costs from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Storm 5.1.1 DRAINAGE PARKWAY 2 - POND 9 TO POND 11 COMPLETE $395,231.83 $0.00 $0.00 $395,231.83 5.1.2 DRAINAGE PARKWAY 2 - POND 11 TO WETLAND E COMPLETE $196,203.43 $0.00 $0.00 $196,203.43 5.1.3 DRAINAGE PARKWAY 1 2030 $0.00 $0.00 $2,588,180.88 $2,588,180.88 5.1.4 WETLAND E 2027 $2,581,457.48 $0.00 $1,208,267.27 $3,789,724.75 5.1.5 OUTFALL FROM WETLAND E TO ROSS CREEK COMPLETE $1,724,660.73 $436,616.45 $0.00 $2,161,277.18 5.1.6 OVERFLOW FROM WETLAND E TO ROSS CREEK 2027 $0.00 $0.00 $1,206,062.84 $1,206,062.84 5.1.7 YORKVILLE DITCH UPGRADE 2030 $0.00 $0.00 $2,193,603.71 $2,193,603.71 5.1.8 ROSS CREEK FLOODPLAIN STUDY COMPLETE $57,750.00 $0.00 $0.00 $57,750.00 5.1.9 STORM MANAGEMENT PLAN COMPLETE $70,000.00 $0.00 $0.00 $70,000.00 $5,025,303.47 $436,616.45 $7,196,114.70 $12,658,034.62 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: December 2016 Drawn: SK Scale: NTS Dwg. No. 5.1 Figure 5.1 Storm System Improvements Southfort Development Levies Revision: A Drainage Parkway or Ditch Wetland 5.1.1 5.1.2 5.1.6 5.1.5 5.1.4 5.1.3 5.1.7 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 6 - Recommendations 6-0 6 Recommendations Based on the findings of this study, it is recommended that:  The City of Fort Saskatchewan continues to assume responsibility for the construction of the municipal infrastructure systems which they deem to be of benefit to the City at large.  The City maintains its current philosophy that development will be responsible for its proportionate share of the cost of municipal infrastructure systems expansion through the assessment of development levies against all benefiting lands.  The City maintain its existing philosophy regarding storm water drainage systems, wherein the development industry is required to manage stormwater in accordance with the Alberta Environmental Protection guidelines respecting stormwater release rates and the City of Fort Saskatchewan Municipal Engineering Standards requirements.  The City periodically reviews the Development Levies to ensure that the rates are consistent with the overall City funding requirements.  The Off-Site Levies be established at: o Water Levy $ 14,505.98 / ha o Sanitary Sewer Levy $ 7,239.91 / ha o Transportation Levy $ 57,896.96 / ha o Stormwater Levy $ 24,497.41 / ha The combined Southfort Levy will be $ 104,140.26 / ha. Table 6.1 is a summary of the combined Southfort Levy in 2016 dollars. 6 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 6 - Recommendations 6-1 6.1 TABLE 6.1 - OFF-SITE LEVIES Summary Development Area Hectares TOTAL AREA 575 UNDEVELOPED AREA (DEC 31/16) 245.080 10% MUNICIPAL RESERVE 24.508 LEVIABLE AREA 220.572 Levy Cost Breakdown Item Total Cost % of Levy Cost WATER $7,495,371.74 13.93% $14,505.98 SANITARY $3,740,925.73 6.95% $7,239.91 TRANSPORTATION $29,915,879.21 55.60% $57,896.96 STORM $12,658,034.62 23.52% $24,497.41 TOTAL $53,810,211.30 100.00% $104,140.26 Collected LEVY FUNDS (DEC 31/16) $30,022,038.18 TOTAL INTEREST (DEC 31/16) $817,746.73 TOTAL $30,839,784.91 Total Levy Funds Required TOTAL LEVY FUNDS REQUIRED $22,970,426.39 Current Levy Rate per Hectare CURRENT LEVY RATE PER HECTARE $104,140.26 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Report City of Fort Saskatchewan Westpark Levy Report Schedule "C" to Bylaw C14-17 June 2017 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 REPORT i Table of Contents SECTION PAGE NO. Table of Contents i 1 Introduction 1-1 1.1 GENERAL 1-1 1.2 LOCATION 1-1 1.3 DEVELOPMENT LEVIES 1-1 1.4 CRITERIA 1-2 1.5 FIGURE 1.1 - WESTPARK AREA BOUNDARY 1-4 2 Waterworks System 2-1 2.1 GENERAL 2-1 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM 2-1 2.3 EXISTING WATER LEVIES 2-1 2.4 WATER SYSTEM DEVELOPMENT LEVIES 2-1 2.5 TABLE 2.1 - WATER INFRASTRUCTURE COSTS 2-3 2.6 FIGURE 2.1 - WATERWORKS SYSTEM IMPROVEMENTS 2-4 3 Sanitary Sewer System 3-1 3.1 GENERAL 3-1 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS 3-1 3.3 EXISTING SANITARY SEWER LEVIES 3-1 3.4 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES 3-1 3.5 TABLE 3.1 - SANITARY SEWER INFRASTRUCTURE 3-3 3.6 FIGURE 3.1 - SANITARY SYSTEM IMPROVEMENTS 3-4 4 Transportation System 4-1 4.1 GENERAL 4-1 4.2 EXISTING TRANSPORTATION LEVIES 4-1 4.3 TRANSPORTATION DEVELOPMENT LEVIES 4-1 4.4 TABLE 4.1 - TRANSPORTATION INFRASTRUCTURE COSTS 4-2 4.5 FIGURE 4.1 - TRANSPORTATION IMPROVEMENTS 4-3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Table of Contents ii SECTION PAGE NO. 5 Stormwater Drainage System 5-1 5.1 GENERAL 5-1 5.2 WESTPARK AREA STORMWATER MANAGEMENT PLAN 5-1 5.3 EXISTING STORMWATER LEVIES 5-1 5.4 STORMWATER DEVELOPMENT LEVIES 5-2 5.5 TABLE 5.1 - STORM MANAGEMENT INFRASTRUCTURE COSTS 5-3 5.6 FIGURE 5.1 - STORM SYSTEM IMPROVEMENTS 5-4 6 Other Leviable Charges 6-1 6.1 GENERAL 6-1 6.2 TABLE 6.1 - OTHER COMBINED PAYMENTS FOR LEVIABLE PROJECTS PREVIOUSLY LISTED (WATER, SEWER, ROADS, STORM) 6-1 7 Recommendations 7-1 7.1 TABLE 7.1 - OFF-SITE LEVIES 7-2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-1 1 Introduction 1.1 GENERAL The Westpark area has been in development since the mid 1980's. It is approximately 85% developed with all of its major capital projects constructed. The City of Fort Saskatchewan has identified the Westpark area as being a prime location for development and is currently seeing growth into the area. The Westpark Area Structure Plan (ASP) was developed to assist the City in properly planning and staging this development. The ASP identifies future land uses as well as major infrastructure which will form the backbone of this new community. The growth and development of a community will generally create some impact on the municipal infrastructure systems. Minimally, development requires an extension of municipal services such as water, sewer, roadways, etc.; more extensive and continued growth and development of a community will require the municipal infrastructure systems to be expanded to satisfactorily accommodate such growth. It is the philosophy of the City of Fort Saskatchewan that development will be responsible for its own municipal infrastructure as well as for its proportionate share of the off-site infrastructure from which it will benefit. This is achieved through the assessment of Development Levies against the individual developers. 1.2 LOCATION The Westpark area is located on the northwest side of Highway 21, mainly in River Lot 19 and River Lot 21, and is bounded to the south by Strathcona County and to the west by the North Saskatchewan River. It is comprised of existing commercial developments, existing residential developments, agricultural land, and recreation reserve lands. Figure 1.1 shows the Westpark area boundary. 1.3 DEVELOPMENT LEVIES In the context of this report, Development Levies are defined as those capital costs assessed by the City of Fort Saskatchewan against developing lands for their proportionate share of the costs of municipal infrastructure systems constructed by the City or other developers which benefit the development areas. 1.3.1 Off-Site Levies Under authority of the Municipal Government Act, the City is permitted to impose Off-Site Levies against development to cover the costs of any or all of the following: a) New or expanded facilities for the storage, transmission, treatment or supplying of water. b) New or expanded facilities for the treatment, movement and disposal of sanitary sewage. c) New or expanded storm sewer drainage facilities. 1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-2 d) New or expanded roads required for or impacted by a subdivision or development. e) Lands required for or in connection with any facilities described in (a) to (d) above. 1.4 CRITERIA In this study, lands dedicated as Municipal Reserve (MR) are excluded as a Development Levy contributing area. Traditionally, the City has required the developer to develop the MR lands in accordance with the City's needs, as negotiated through the Development Agreement. Hence, Development Levies are not applied against such lands, thereby reducing the contributing lands area accordingly. It was also necessary to establish some general assumptions as Development Levy calculation criteria:  The City will continue to assume responsibility for the provision of those infrastructure systems and facilities which they deem to be a benefit to the City at large and/or a single development parcel.  The Development Levies are generally based on constructing municipal improvements consistent with the requirements identified in the Westpark Area Structure Plan to serve the lands within the plan area.  The storm drainage infrastructure is based on the Westpark Stormwater Management Plan prepared for the City of Fort Saskatchewan by Stanley Consulting in 1997 and updated by Focus Intech in 2002.  The Development Levy rates are expressed on a per hectare basis.  Gross Area is defined as the total area of a parcel(s) of land irrespective of their potential for development or land use.  Gross Developable Area is defined as the gross area less lands for Environmental and Municipal Reserve. The development levy rates contained in this document are based on Gross Developable Area.  All costs are estimated in 2016 dollars. These cost estimates should be reviewed annually or no later than every three years, to reflect current year construction costs.  An inflation factor has been applied to all estimates to more accurately estimate the construction costs for the projected year of construction.  Where conditional grants have been secured by the City towards a specific project, the project cost has been reduced by the amount of the grant.  Unconditional grants, even though they may have been utilized by the City for financing a project, are not deducted from the final project costs, as it can be rationalized that such funding could have been used for other projects. Assumptions and/or calculation criteria specific to each Development Levy are further highlighted in more detail within each respective section of this report. It must be clarified what is intended, when it is stated that the City will continue to assume the responsibility for certain infrastructure systems and facilities. Historically the City has designed and constructed sanitary trunk sewer facilities, arterial roadways, water reservoirs, trunk watermains and stormwater management City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-3 facilities, which serve more than a single development area. Although the City accepts this responsibility, each development agreement can define whether the City or the developer designs and constructs these major facilities. If the development agreement establishes that the developer will undertake this work, then presumably it will also establish the formula and schedule for recovery from other benefiting developments. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 0146* Date: April 24, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 1.1 Figure 1.1 Westpark Area Boundary Westpark Development Levies N Westpark Area Boundary Undeveloped Boundary (as of December 31, 2016) Gross Area (Total) = 287.172 ha Gross Area (Developed) = 237.206 ha Gross Area (Undeveloped) = 49.966 ha City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-1 2 Waterworks System 2.1 GENERAL The City's water supply is treated water purchased from the City of Edmonton (EPCOR) through the Capital Region Northeast Water Services Commission (CRNWSC). The treated water is then distributed by the City to its customers through its waterworks system consisting of water storage reservoirs and pumping facilities, primary feeder mains and distribution mains. 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM Traditionally, the City's philosophy regarding its waterworks system expansion has been that development is responsible, at their entire cost, for the construction of all new distribution mains up to a specified diameter. Primary feeder mains, treated water storage reservoirs and pumping facilities benefit the entire water distribution system and thus, the City has assumed responsibility for their construction. The cost of such facilities is then assessed proportionately against lands through a Water Off-Site Levy. Capital improvements to the water supply system are the responsibility of the Capital Region Northeast Water Services Commission of which the City of Fort Saskatchewan is a member. The costs of such improvements are assessed proportionately against the City through the Commission's water utility rate structure and therefore these costs are not included in the City's Water Off-Site Levy. The Westpark Reservoir and Pumphouse are currently included as an off-site levy for the Westpark Development, proportionate to its projected usage. The remainder of the expenditure will be included in the Southfort Levy costs. 2.3 EXISTING WATER LEVIES The existing waterworks projects completed are found in Table 2.1 and show the levied cost for these infrastructures. This table also shows the levied costs for the infrastructure. 2.4 WATER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions, namely:  Water supply for the City will continue to be from the City of Edmonton through the Capital Region Northeast Water Services Commission (CRNWSC), who shall continue to be responsible for all capital improvements/expansions to the supply systems; such costs are therefore not included in the calculation of the City's Water Off-Site Levy.  The City will be responsible for the construction of the alternate reservoir supply line, off the CRNWSC transmission main. 2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-2  Development will continue to be responsible, at its entire cost, for the construction of all distribution mains up to and including 400 mm diameter in size to serve the Westpark area.  The City will continue to be responsible for the construction of all primary feeder mains, treated water storage reservoirs and pumping facilities.  Conditional grants, such as those secured through the Alberta Transportation and Utilities Municipal Water and Wastewater Partnership Program*, will be applied to the specific projects, thereby reducing the overall project cost used in calculating the Water Off-Site Levy Rate (currently the level of funding available to the City through this program is approximately 30% of the eligible project costs).  Unconditional grants, even if applied against waterworks system improvements, will not be considered when calculating the Water Off-Site Levy rate. * The AT&U Municipal Water and Wastewater Partnership Program grant funding formula is based on the population of the community. Under the formula, as the population of the community increases, the percentage of cost covered by the program decreases. It is therefore, prudent to update project costs regularly to ensure that the off-site levy rates are current and meet the financial requirements of the City. Figure 2.1 represents the Westpark area water system as envisioned in the Westpark Area Stucture Plan (ASP). As per the assumptions previously outlined, the City assumes the responsibility for constructing all watermains greater than 400 mm in diameter. The cost of this construction will be included in the calculation for Water System Development Levies. Table 2.1 outlines a cost estimate for each improvement based on 2016 dollars and future construction cost with an inflation rate as indicated. Conditional grants, which had previously been secured for a specific project, have been incorporated to arrive at the estimated net cost to the City. For future waterworks system improvements, it has been assumed that there will be no grant funding available for such projects. This assumption is based on the fact that the amount of grant funding available to a municipality will continue to be directly related to its population. The need for constructing the future reservoir storage capacities will, to a large degree, be directly related to increases in the population of the City. Such increased population, however, will decrease the amount of grant funding available. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-3 2.5 TABLE 2.1 - WATER INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Cost from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Water 2.1.1 DISTRIBUTION MAIN 95A AVENUE 1988 $37,000.00 $0.00 $0.00 $37,000.00 2.1.2 95 A AVENUE WATER MAIN OVER SIZING 1999 $41,713.00 $0.00 $0.00 $41,713.00 2.1.3 WESTPARK RESERVOIR / 450mm WATERMAIN 2000 $1,219,139.94 $0.00 $0.00 $1,219,139.94 2.1.4 5000 m³ RESERVOIR EXPANSION 2014 $131,375.68 $1,267,241.77 $0.00 $1,398,617.45 2.1.5 ALTERNATE RESERVOIR SUPPLY LINE 2013 $163,403.00 $385,177.26 $0.00 $548,580.26 $1,592,631.62 $1,652,419.03 $0.00 $3,245,050.65 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 N o r t h Date: January 27, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 2.1 Westpark Development Levies N Watermain Westpark Resevoir City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-1 3 Sanitary Sewer System 3.1 GENERAL The sanitary sewage collection system in the Westpark area will be comprised of a series of lateral (local), collector and trunk sewers intercepting wastewater from the various individual contributors and conveying this wastewater to an existing 450 mm diameter main in the northeast corner of River Lot 21 which discharges into an existing Lift Station in the northeast corner of River Lot 19. This lift station pumps through a 250mm forcemain and tie into to a 375 mm gravity trunk sewer at 88 St and 100 Ave. The point of discharge for the City sanitary sewage is the Alberta Capital Region Wastewater Commission (ACRWC) Regional Trunk Sewer, which conveys the wastewater to the ACRWC Sewage Treatment Plant. Capital improvements to the regional trunk line are the responsibility of the ACRWC of which the City of Fort Saskatchewan is a member. The costs of such capital improvements are assessed proportionately against the City through the Commission's sewage utility rate structure and therefore are not included in the City's Sanitary Sewer Off-Site Levy calculations. The Sanitary Servicing Plan as identified in the Westpark Area Structure Plan (ASP) indicates that the majority of the lands within the ASP boundary generally slope toward the northwest and that a gravity system will service most of the area. The extreme west catchment will require a Sanitary Lift Station, to pump the sewage into the proposed gravity system. 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS Traditionally, the City's philosophy regarding sanitary sewer systems has been that development shall be responsible for the entire cost of constructing laterals and collectors. The City assumes the responsibility for constructing all trunk mains 525 mm in diameter and larger. The cost of this construction will be included in the calculation for Sanitary Sewer System Development Levies. 3.3 EXISTING SANITARY SEWER LEVIES The existing sanitary projects completed are found in Table 3.1 and show the levied cost for these infrastructures. 3.4 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions:  The Developer will continue to be responsible for the construction of lateral and collector sanitary sewer systems. 3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-2  The City of Fort Saskatchewan will continue to be a member of the ACRWC and any expansion or improvement costs related to the Commission System will be assessed against the City by the Commission through its sewer utility rate structure; costs related to the Commission System have, therefore, not been included in the City's Sanitary Sewer Off-Site Levy calculations.  Sanitary Sewers 525 mm diameter and larger are considered to be Trunk Sanitary Sewers.  Little or no grant funding is, or will be, available towards the construction of trunk sewer systems.  The cost of all trunk mains and the Sanitary Lift Station will be applied against all lands within the ASP boundary. Figure 3.1 shows the sanitary servicing plan, as developed in the Westpark Area Structure Plan. Table 3.1 outlines a cost estimate for each improvement based on 2016 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-3 3.5 TABLE 3.1 - SANITARY SEWER INFRASTRUCTURE Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Cost from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Sanitary 3.1.1 375 mm SANITARY TRUNK 95A AVENUE 1988 $53,000.00 $0.00 $0.00 $53,000.00 3.1.2 450 mm SANITARY TRUNK RIVERPARK DRIVE 1988 $446,000.00 $0.00 $0.00 $446,000.00 3.1.3 WESTPARK LIFT STATION-INTERIM 1988 $130,000.00 $0.00 $0.00 $130,000.00 3.1.4 WESTPARK LIFTSTATION UPGRADE AND SANITARY FORCEMAIN 2009 $2,701,271.47 $26,131.73 $0.00 $2,727,403.20 3.1.5 STAGE 8B SANITARY OVER-SIZE $13,900.00 $0.00 $0.00 $13,900.00 $3,344,171.47 $26,131.73 $0.00 $3,370,303.20 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 N o r t h Sa sk at c Date: January 27, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 3.1 Westpark Development Levies N Sanitary Main Westpark Lift Station City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-1 4 Transportation System 4.1 GENERAL The City of Fort Saskatchewan maintains a roadway classification system generally consistent with the definitions for arterial, collector and local roads contained in the "Geometric Design Standards for Canadian Roads and Streets," a manual published by the Transportation Association of Canada. In the hierarchy of roadway classifications, the principle function of arterial roads is to provide for the efficient movement of people, goods and services between the primary traffic generation areas of a community. Typically, arterial roadways are designed as relatively free-flowing facilities, intersected by other arterial or major collector type roadways, and provide no direct access to individual properties. Arterial roadways are generally considered to be a greater benefit to the City at large than directly to individual developers. This does not, however, negate developers' responsibility to contribute their proportionate share towards the cost of these arterials, since to a large degree, development generates the need for these arterial roadways. 4.2 EXISTING TRANSPORTATION LEVIES The existing transportation projects completed are found in Table 4.1 and show the levied cost for these infrastructures. 4.3 TRANSPORTATION DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions:  Arterial roadways included in the Roadway Off-Site Levy calculations are those highlighted in Figure 4.1.  Arterial roadways will typically be constructed to an ultimate 4-lane, divided, paved urban structure and are the standards upon which the cost estimates are based.  Arterial roadways will typically be constructed in two stages with the first or initial stage being a two- laned urban roadway complete with street lighting and the ultimate stormwater drainage system. The second stage is all works remaining to complete the arterial roadway. Additional improvements may be required depending on the pace of growth and need.  A blanket assessment levy for roads is recommended against all development irrespective of land use.  Right-of-ways to facilitate construction of arterial roadways will be acquired through the subdivision development process. Table 4.1 outlines the cost estimates for Transportation Off-site Levy rate. 4 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-2 4.4 TABLE 4.1 - TRANSPORTATION INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Cost from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Transportation 4.1.1 95A AVENUE 16m ARTERIAL ACCESS 1988 $80,466.00 $0.00 $0.00 $80,466.00 4.1.2 95A AVENUE 16m ARTERIAL EXTENSION 1997 $85,000.00 $0.00 $0.00 $85,000.00 4.1.3 TEMPORARY ACCESS 1994 $173,838.00 $0.00 $0.00 $173,838.00 4.1.4 WESTPARK BLVD 15.8m ARTERIAL ACCESS 1999 $1,287,914.00 $0.00 $0.00 $1,287,914.00 4.1.5 OVER SIZING FROM 11.5 m TO 15.8 m 2000 $316,986.00 $0.00 $0.00 $316,986.00 4.1.6 BRADSON RECOVERIES 2001 $113,215.00 $0.00 $0.00 $113,215.00 4.1.7 OVER SIZING FROM 11.5 m TO 15.8 m (FUTURE) 2008 $56,828.88 $0.00 $0.00 $56,828.88 4.1.8 SOUTH WESTPARK ARTERIAL ACCESS 2008 $2,317,496.58 $0.00 $0.00 $2,317,496.58 4.1.9 AREA STRUCTURE PLAN 1987 $16,000.00 $0.00 $0.00 $16,000.00 4.1.10 AREA STRUCTURE PLAN UPDATE 2003 $25,000.00 $0.00 $0.00 $25,000.00 $4,472,744.46 $0.00 $0.00 $4,472,744.46 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: January 27, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 4.1 Westpark Development Levies N Arterial Roadway City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-1 5 Stormwater Drainage System 5.1 GENERAL Management of stormwater is an important component in the development of a community and must be handled effectively to preserve and promote the general health, welfare, security and economic well being of the public. Traditionally, in urban centres, stormwater is handled in keeping with the minor/major drainage concept wherein:  Minor systems are designed and implemented to accommodate drainage to avoid property damage and flooding and to minimize inconvenience to the public from 1 in 5 year rainfall events.  Major systems are designed and implemented for flood control to avoid loss of life, injuries, and significant damage to property from events greater than 1 in 5 year return, producing unusual high intensity rainfall and/or large volume runoff. Minor systems are typically comprised of underground piping, manholes, catch basins, and outfall structures but can also be designed as a rural-type drainage system consisting of ditches and culverts. Major systems can be large diameter underground piping, open channels, stormwater detention/retention ponds, natural streams, or any combination thereof, capable of conveying runoff from events up to and including a 1 in 100 year return period, to the ultimate receiving stream or water body. 5.2 WESTPARK AREA STORMWATER MANAGEMENT PLAN The Westpark Area Structure Plan identified several stormwater ponds and trunk sewers within the ASP boundary. The stormwater systems from River Lots 19 and 21 discharge through the River's Edge Wetland. The wetland was designed and constructed to provide treatment of the stormwater before it discharges into the North Saskatchewan River. The area south of River Lot 21 and portions of River Lot 21 below the valley break will discharge through a separate outfall and stormwater treatment facility to the North Saskatchewan River. A Westpark Stormwater Management Plan (SWMP) was undertaken by Stanley Consulting in 1997 and later update by Focus Intec in 2002. Development Levies related to the major infrastructure presented in the plans have been incorporated into this document. 5.3 EXISTING STORMWATER LEVIES The existing storm water projects completed are found in Table 5.1 and show the levied cost for these infrastructures. 5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-2 5.4 STORMWATER DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions:  The Developer will continue to be responsible for the construction of catch basins and storm sewers up to and including 1200 mm diameter in size.  Storm sewers greater than 1200 mm diameter in size are considered to be trunk sewers. The costs of these sewers will be included in the Stormwater Development Levies.  No grant funding is available towards the construction of trunk sewer systems.  All stormwater management ponds will be the responsibility of the developer. Each stormwater management area is considered to be responsible for the stormwater management pond serving that area.  The costs associated with construction of stormwater treatment facilities will be included in the Stormwater Development Levies. Figure 5.1 shows the stormwater servicing plan, as developed in the Westpark Stormwater Management Plan 2002. Table 5.1 outlines a cost estimate based on Gross Developable Area in 2016 dollars and future construction cost with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-3 5.5 TABLE 5.1 - STORM MANAGEMENT INFRASTRUCTURE COSTS Item Project Description Year of Construction Historical Project Cost Up to Dec 31, 2013 Historical Project Cost from Jan 1, 2014 to Dec 31, 2016 Future Cost Estimate for Remainder of Work Total Storm 5.1.1 1200mm STORM TRUNK 1996 $173,000.00 $0.00 $0.00 $173,000.00 5.1.2 WESTPARK STORM SEWER SYSTEM 1997 $12,008.00 $0.00 $0.00 $12,008.00 5.1.3 RIVER LOT 19 STORM OUTFALL - INTERIM 1988 $33,332.00 $0.00 $0.00 $33,332.00 5.1.4 RIVER LOT 19 STORM - PERMANENT 1999 $117,799.00 $0.00 $0.00 $117,799.00 5.1.5 RIVER LOT 19 STORM OUTFALL 2000 $113,593.00 $0.00 $0.00 $113,593.00 5.1.6 WETLANDS 2001 $709,776.00 $0.00 $0.00 $709,776.00 5.1.7 STORM MANAGEMENT REPORT 1987 $32,000.00 $0.00 $0.00 $32,000.00 $1,191,508.00 $0.00 $0.00 $1,191,508.00 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Date: January 27, 2017 Revision: B Drawn: CL NOT TO SCALE Dwg. No. 5.1 Westpark Development Levies N Storm Sewer Main City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 6 - Other Leviable Charges 6-1 6 Other Leviable Charges Leviable projects completed by developers within their subdivision were reimbursed to the developer as separate payments after the work was completed. These project costs were accounted for in the specific lists but levy payments were not attributed to them. Those payments are identified and quantified here. Table 6.1 outlines these payments from the levy account to specific developers. 6.2 TABLE 6.1 - OTHER COMBINED PAYMENTS FOR LEVIABLE PROJECTS PREVIOUSLY LISTED (WATER, SEWER, ROADS, STORM) ITEM ORIGINAL ESTIMATE TOTAL EXISTING COST TOTAL FUTURE COST TOTAL COST 6.1 OTHER COMBINED 6.1.1 BRADSON GROUP - COST RECOVERIES $263,389.00 $263,389.00 $263,389.00 6.1.2 95A AVENUE/WESTPARK INFRASTRUCTURE $199,000.00 $199,000.00 $199,000.00 6.1.3 WESTPARK INFRASTUCTURE $76,691.00 $76,691.00 $76,691.00 6.1.4 TRANSFER TO WESTPARK COMMUNITY ENHANCEMENT RESERVE $18,641.00 $18,641.00 $18,641.00 $557,721.00 $557,721.00 $557,721.00 6 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 7 - Recommendations 7-1 7 Recommendations Based on the findings of this study, it is recommended that:  The City of Fort Saskatchewan continues to assume responsibility for the construction of the municipal infrastructure systems which they deem to be of benefit to the City at large.  The City maintains its current philosophy that development will be responsible for its proportionate share of the cost of municipal infrastructure systems expansion through the assessment of off-site levies against all benefiting lands.  The City maintain its existing philosophy regarding stormwater drainage systems wherein the development industry is required to manage stormwater in accordance with the Alberta Environmental Protection guidelines respecting stormwater release rates and the City of Fort Saskatchewan Municipal Engineering Standards requirements.  The City periodically reviews the Development Levies to ensure that the rates are consistent with the overall City funding requirements.  The Development Levies for Westpark will be set as follows:  Water System Levy $ 18,420.16 / ha  Sanitary Sewer Levy $ 19,131.14 / ha  Transportation Levy $ 25,389.02 / ha  Stormwater Levy $ 13,781.61 / ha The levy is proportioned appropriately according to the developable/developed area receiving service. The stormwater levy has been proportioned and applies to Area 1, outlined in Figure 1.1, as the current items listed in Table 5.1 service Area 1 only. The water, sanitary, and transportation levies are applicable to both Area 1 and Area 2. The combined levies for each area are as follows:  Area 1 $ 76,721.93 / ha  Area 2 $ 62,940.32 / ha Table 7.1 is a summary of the levy for Westpark in 2016 dollars. 7 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 7 - Summary of Costs and Price Breakdowns 7-2 7.1 TABLE 7.1 - OFF-SITE LEVIES Summary Development Area Hectares TOTAL DEVELOPMENT AREA 287.172 UNDEVELOPED AREA (DEC 31/16) 49.966 10% MUNICIPAL RESERVE 4.997 TOTAL LEVIABLE AREA 44.969 AREA 1 22.069 AREA 2 22.900 Total Levy Cost Breakdown Item Total Cost % of Total Levy Cost Collected (w/ interest) WATER $3,245,050.65 26.43% $2,416,712.07 SANITARY $3,370,303.20 27.45% $2,509,992.39 TRANSPORTATION $4,472,744.46 36.42% $3,331,022.13 STORM $1,191,508.00 9.70% $887,361.12 TOTAL $12,279,606.31 100.00% $9,145,087.70 Levy Funds Collected - Breakdown LEVY FUNDS (DEC 31/16) $9,088,258.82 TOTAL INTEREST (DEC 31/16) $56,828.88 TOTAL $9,145,087.70 Levy Funds Required Item Total Leviable Area WATER $828,338.58 SANITARY $860,310.81 TRANSPORTATION $1,141,722.33 STORM* $304,146.88 TOTAL $3,134,518.61 Current Levy Rates per Hectare Item Area 1 Area 2 WATER $18,420.16 $18,420.16 SANITARY $19,131.14 $19,131.14 TRANSPORTATION $25,389.02 $25,389.02 STORM* $13,781.61 n/a TOTAL $76,721.93 $62,940.32 * Only Area 1 contributes to the portion of the levy designated for the stormwater sewerage system, as the projects outlined in the stormwater section are to service Area 1 only. Other rates are based off of the percentage of the total undeveloped leviable area (Areas 1 and 2). City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Report City of Fort Saskatchewan Light / Medium Industrial Area Levy Report Schedule "D" to Bylaw C5-19 March 2019 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan: Light/Medium Industrial Area Offsite Levy Review Version 4 March 22, 2019 - City of Fort Saskatchewan City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / i 1 DOCUMENT INFORMATION Version Number Revision Date Summary of Changes and Author 1.0 April 25th, 2016 Created by CORVUS Business Advisors 2.0 June 13th, 2016 Reviewed by Project Team 3.0 March 1, 2019 Updated by City of Fort Saskatchewan (V4) 4.0 March 22, 2019 Updated by City of Fort Saskatchewan (V4) City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / ii 2 CONTENTS 1 DOCUMENT INFORMATION ........................................................................................................... I 2 CONTENTS ...................................................................................................................................... II 3 INTRODUCTION .............................................................................................................................. 1 3.1 INTRODUCTION ............................................................................................................................. 1 3.2 METHODOLOGY ............................................................................................................................ 1 4 KEY FINDINGS ................................................................................................................................ 2 5 RATES ............................................................................................................................................. 4 6 RECOMMENDATIONS .................................................................................................................... 5 7 ACKNOWLEDGEMENTS .......................................................................................................... 6 8 DISCL AIMER ................................................................................................................................... 6 APPENDIX A: OFFSITE LEVY AREAS AND STAGING .................................................................. 7 APPENDIX B: WATER OFFSITE INFRASTRUCTURE ..................................................................... 11 APPENDIX C: SANITARY OFFSITE INFRASTRUCTURE ................................................................ 19 APPENDIX D: TRANSPORTATION OFFSITE INFRASTRUCTURE ................................................. 26 APPENDIX E: STORMWATER OFFSITE INFRASTRUCTURE ......................................................... 34 APPENDIX F: BENCHMARK COMPARISONS ................................................................................. 41 APPENDIX G: RESERVE RECONCILIATION .................................................................................... 42 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / 1 3 INTRODUCTION 3.1 Introduction The City wishes to facilitate growth in the Light/Medium Industrial Area by updating transportation, water, sanitary, and stormwater offsite infrastructure requirements to ensure they meet the needs of development in the Light/Medium Industrial Area, and also ensure that accompanying charges are fair and equitable, comply with legislative and regulatory requirements, and recover the full cost of the infrastructure in order to ensure a financially sustainable community. This report outlines the methodology and information used in updating transportation, water, sanitary, and stormwater offsite levy rates for the Light/Medium Industrial Area, as well as other key findings and recommendations. 3.2 Methodology The purpose of Version 4 is to update the construction staging to better reflect the current development expectations. It also updates the servicing requirements resulting from detailed design progressing as part of development. The servicing changes adjust the boundary of Area 3 and eliminate levy projects for stormwater servicing. The report, model and levies have been updated to reflect these changes. The CORVUS Business Advisors' June 13, 2016 report is still used as the basis and explanation of the levy model. The City of Fort Saskatchewan has created various infrastructure master plans, and these plans have been used as key inputs into this offsite levy rate review. City staff reviewed existing plans and identified offsite projects for transportation, water, sanitary, and stormwater infrastructure1. Each project was assessed for benefiting areas using the offsite levy areas identified in this report. The City's assessment also included determination of benefits to existing development and future development. Support provided by CORVUS Business Advisors included:  Provision of the CORVUS offsite levy model, including configuration, priming, and data loading.  Facilitation of a workshop to determine offsite levy area boundaries.  Incorporation of offsite levy area measurements and land development forecasts (provided by City planning staff).  Incorporation of infrastructure costs and allocation percentages for existing development, new development, and other parties (provided by City engineering staff). 1 It was not within CORVUS' scope of work to review the City's master plans. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 2 City of Fort Saskatchewan Offsite Levy Review  Establishment of offsite levy reserve opening balances (details provided by City staff).  Development of transportation, water, sanitary, and stormwater offsite levy rates for each offsite levy area.  Presentation of offsite levy rates and background information to Administration, Council, and the public. Offsite levy rates are forecast using a rolling 25-year review period. During this review, a cut- off date of December 31st, 2015 was established, and so the review period stems from 2016 to 2041. Costs that benefit development prior to and within the review period are included in rates. Costs that benefit development beyond the review period (called financial "oversizing") are excluded from rates. In future years, when rates are updated and the rolling 25-year period moves further out, offsite infrastructure costs beyond 2040 will gradually find their way into rates. The cut-off date coincides with the City's most recent year-end. Project expenditures, offsite levy receipts etc. were gathered as "actuals" from the City's financial records up to the cut- off date. Beyond the cut-off date, all financial details are estimates. When the City completes its next rate update, information from January 1st, 2017 up to the new cut-off date will be converted from estimates to actuals. 4 KEY FINDINGS Key findings pertaining to the establishment of City offsite levy rates are as follows:  Offsite infrastructure costs to be included in the offsite levy bylaw total approximately $26.69 million (2018 dollars), a decrease of 9% from 2017 (a decrease in infrastructure costs places downward pressure on rates). An overview of offsite infrastructure costs and maps is provided in Appendices B1, C1, D1, and E1. Before determining how the infrastructure costs will be allocated to parties that benefit (e.g., existing development, new development, other municipalities etc.), offsite infrastructure costs are always reduced by special ear-marked grants and development contributions. An overview of grants and contributions and resulting net costs is provided in Appendices B2, C2, D2, and E2. Financial oversizing (the amount of cost which is allocated to future development beyond the 25-year review period) is based on the anticipated year of construction. An overview of construction staging is provided in Appendices B3, C3, D3, and E3. That portion of cost which is allocated to future development (versus existing development and other allocations) is provided in Appendices B4, C4, D4, and E4. Before allocating infrastructure costs to benefitting lands, offsite levy costs must be reduced by amounts collected to date. An overview of offsite levies that have been collected by the City is provided in Appendices B5, C5, D5, and E5. Of the $26.69 million in total offsite infrastructure costs, the share allocated to future development that is included in rates today (the offsite levy share) is $17.70 million, as shown in the table below. The share allocated to future development that is City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 3 City of Fort Saskatchewan Offsite Levy Review beyond the 25-year review period (financial oversizing) is $7.90 million. The share allocated to existing development (the City's share) is $0.21 million; and, the share allocated to other stakeholders (e.g., Strathcona County) is $0.00. A complete summary of offsite infrastructure net cost "flow-thru" is provided in Appendices B6, C6, D6, and E6. Summary of Infrastructure Costs & Allocations  Lands do not necessarily benefit from all offsite levy infrastructure. In order to equitability facilitate the allocation of infrastructure costs to those lands that benefit from the infrastructure, the Light/Medium Industrial Area is parsed into several smaller offsite levy areas. The area boundaries, numbering schema, and area measurements are described in Appendix A along with an offsite levy map; and, an overview of which offsite infrastructure has been allocated to each area is provided in B7, C7, D7, and E7.  To calculate offsite levy rates, it is necessary to forecast the amount of land that will develop during the 25-year review period. Land development forms the denominator of the rate calculation. A larger denominator reduces rates, but could potentially result in under-collection thereby placing an increased burden on tax payers. A smaller denominator increases rates, but could potentially result in over-collection thereby placing an increased burden on future development. Accordingly, land development forecasts need to be (a) reasonable and reflect current planning assumptions including the current pace of development in the community, and (b) updated regularly. For this review, the City is forecasting development in the Light/Medium Industrial Area of approximately 270 ha. over the 25-year review period (approximately 10.8 ha. per year on average). This is a decrease of 20% from the 2017 bylaw (an increase in land development places downward pressure on rates). The land development forecast and underpinning assumptions are shown in Appendix A.  Interest. Offsite levy reserves/accounts (both actual and forecast) are impacted by interest. Actual reserve inflows, and forecast reserve balances that are in a positive Position earn interest (as required by the MGA). Actual reserve outflows, and forecast reserve balances that are in a negative position are charged interest (negative forecast balances indicate that front-ending will be required). An overview of reserve/account interest rates and forecast balances over the 25-year review period is shown in Appendices B9, C9, D9, and E9.  Front-ending. Front-ending is an extremely important concept that underpins rigorous management of offsite levies. Front-ending represents debts owed by future City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 4 City of Fort Saskatchewan Offsite Levy Review development to the municipality for past construction undertaken by the municipality on behalf of future development--i.e., a municipality will often pay for its share of an offsite infrastructure project in addition to that portion of the project which benefits future development when offsite levy reserve balances are insufficient to pay for future development's share of infrastructure. Because front-ending balances represent debts owed to the municipality, they need to be clearly reflected in official municipal documents such as levy account/reserve balances, financial statements (e.g., front-ending notes), or accounts receivables, etc. This documentation enables the municipality to collect on these debts as future development occurs, and offsite levies are collected. 5 RATES For future development to pay for its share of the $26.69 million infrastructure costs in the Light/Medium Industrial Area, rates range from $29,961 to $61,904 per net hectare (depending on location), with the weighted average offsite levy rate being $46,143 per net hectare, as shown in tables below. The average rate is generally lower than other municipalities of similar size in Alberta (a comparison of rates to other municipalities is outlined in Appendix F). Most importantly, these rates reflect the actual cost of infrastructure required to facilitate development in the City's Light/Medium Industrial Area. Weighted Averages *Weighted averages are shown above are for information purposes only. Developers pay the offsite levy rate specific to their offsite levy area, as shown in the table below. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 5 City of Fort Saskatchewan Offsite Levy Review Summary of Offsite Levies by Area 6 RECOMMENDATIONS CORVUS recommends the following: 1. Implement the offsite levy rates outlined in Section 5. 2. Ensure the offsite levy bylaw reflects the requirement for an annual update of offsite levy rates and delivery of an annual update report to Council. In addition to enabling compliance with MGA requirements, regular updates ensure offsite levy rates do not "decay", and Council is apprised regularly of the status of changes, reserves balances, etc. 3. Establish sub-ledgers for each reserve/account to track amounts owed to front- ending parties. 4. Update offsite levy reserve/account balances annually (and financial statements, and other internal documentation) to reflect the "true" balance, including front-ending. 5. During the reconciliation of future reserve balances, the interest earning and charge rates that underpin the offsite levy bylaw for that time period should be used to determine reserve interest impacts. This is outlined in the offsite levy model user guide and instructions for the annual rate update. 6. Develop an offsite levy policy framework to aide in effective implementation of the bylaw. 7. Undertake a water and sewer utility rates study to enable sustainable funding of the City's share of offsite infrastructure projects. Current utility rates should be brought current and in alignment with current master plans and offsite levy financing summarized in this report, etc. 8. Implement a long term financial sustainability assessment model that provides Council with confidence that the City is on a financially sustainable path, contains reasonable tax impacts, and includes the impact of the City's share of various City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 6 City of Fort Saskatchewan Offsite Levy Review development costs plus any front-ending that will be required on behalf of various offsite levy reserves. 9. Recent changes to the MGA will enable municipalities to charge separately for offsite levies (i.e., transportation vs. water vs. sewer vs stormwater). Accordingly, the City should maintain accurate records to reflect which properties pay which offsite levies, and build this into the City's administrative procedures. 7 ACKNOWLEDGEMENTS CORVUS Business Advisors would like to thank all City of Fort Saskatchewan staff and advisors from Engineering, Planning, and Finance, who supported the work of this review. 8 DISCLAIMER CORVUS Business Advisor has relied upon City of Fort Saskatchewan to provide all of the data and information used to construct the offsite levy model and create the rates, such as planning data and assumptions, development forecasts and assumptions, infrastructure costs and costs estimates, allocations to benefitting parties, allocation to benefitting areas, and other assumptions etc. As such, CORVUS Business Advisors makes no guarantee as to the accuracy of the input data and information provided by these groups or the results that stem from this data and information. Offsite levy rates are not intended to stay static; they are based upon educated assumptions and the best available information of the day. Planning assumptions, cost estimates etc. can change each year. Accordingly, the Municipal Government Act requires that offsite levy rates be updated with the most available information on a regular basis (usually annually). When information changes, it will be reflected in a future update, and rates adjusted accordingly. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 7 City of Fort Saskatchewan Offsite Levy Review APPENDIX A: OFFSITE LEVY AREAS AND STAGING A1. Offsite Levy Areas In order to equitably facilitate the allocation of infrastructure to benefiting lands, the City's Light/Medium Industrial Area is parsed into 7 offsite levy areas, as shown in the map below. These areas are generally about a quarter section in size but also take into consideration existing/planned infrastructure basins (i.e., transportation, water, sanitary, and stormwater basins) as well as natural and man-made barriers (e.g., rivers, highways, etc.). All offsite levy infrastructure costs are allocated to one or more areas. Offsite Levy Areas Total net development area, the amount of land available for development across all offsite levy areas, is approximately 553 net ha. In calculating net development area only those lands remaining to be developed within the area that have not previously paid offsite levies have been considered (as required by legislation/regulation). Further, allowances have been made to net development area calculations for environmental reserves, municipal reserves, and arterial road right of way. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 8 City of Fort Saskatchewan Offsite Levy Review Offsite Levy Net Development Area Summary of Offsite Levy Net Development Area Description ha. Gross Development Area 658.43 Less Environment Reserve 10.13 Less Municipal Reserve 64.30 Less ROW Allowance 30.80 Net Development Area 552.67 *Note: 1 Hectare (ha.) = ~2.47 Acres City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 1, 2019 CORVUS Business Advisors / 9 City of Fort Saskatchewan Offsite Levy Review Net development area definitions will be applied in determining offsite levy obligations of developers on application for subdivision or development within City of Fort Saskatchewan. Net development area is defined as follows:  Gross Area - The area of lands to be developed in hectares that have not previously paid an offsite levy. o Less: Any environmental reserves contained within the development area. o Less: A 10% allowance for Municipal Reserves. o Less: Arterial road right of way that bisects the development lands.  Equals: Net Developable Area, which is the area subject to offsite levies. A2. Development Staging A rate planning period of 25-years underpins the offsite levy model and rate calculations. This planning period is used by many municipalities as it provides a reasonable time frame to recoup the costs associated with offsite levy infrastructure construction, and it aligns with the timeframes of many municipal capital planning and construction cycles. Of the 553 net ha.of development area available across all offsite levy development areas, planners estimate that approximately 269.28 ha. (48.7%) of this land is estimated to develop during the next 25-years (the rate planning period) as shown in the tables below. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Version 4 - March 22, 2019 CORVUS Business Advisors / 10 City of Fort Saskatchewan Offsite Levy Review Anticipated Development During the 25-year Rate Planning Period2 Summary of Anticipated Development during the 25-year Rate Planning Period 2 Assumptions: 1. In general, Areas 2, 3, and 4 will experience new development before the other areas. 2. TAG lands will be developed before Busse lands in Area 1. 3. New development will concentrate near Highway 15 and will progress southeast. 4. DA coming forward in 2019 5. The annual absorption rate will be approximately 10 ha with spikes as new areas are opened up. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / 11 APPENDIX B: WATER OFFSITE INFRASTRUCTURE B1. Water Offsite Infrastructure Costs In order to support future growth, water offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $9.74 million as outlined in the table below. Actual costs, debenture interest (if any), and cost estimates were provided by City engineering staff. It is important to note that these costs represent "gross" costs, of which only a portion will go to support future development during the 25-year review period. The remainder of this section outlines how the "net" costs for future development are determined. Summary of Water Offsite Infrastructure *Costs are based on 2015/16 estimates. **Estimates include engineering (10%) and contingencies (10%). Item Project Description Cost of Completed Work Debenture Interest Estimated Cost of Work Yet to be Completed Total Project Estimated Cost 1 400mm Watermain Along 118 St. $ - $ - 879,046 $ 879,046 $ 2 450mm Watermain to Area 2 $ 2,784,799 $ - - $ 2,784,799 $ 3 450mm watermain along Josephburg Road to Area 5 $ - $ - 969,803 $ 969,803 $ 4 450mm watermain along Josephburg Road to 125 St. $ - $ - 1,019,324 $ 1,019,324 $ 5 450mm Watermain Area 3 $ - $ - 560,898 $ 560,898 $ 6 450mm Watermain Area 3 to DOW $ - $ - 622,130 $ 622,130 $ 7 450mm Watermain Dow to 125 St. $ - $ - 1,345,968 $ 1,345,968 $ 8 400mm Watermain Along 125 St. $ - $ - 1,559,060 $ 1,559,060 $ 2,784,799 $ - $ 6,956,229 $ 9,741,028 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors A map showing the location of this infrastructure is shown below. Location of Water Offsite Infrastructure City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors B2. Water Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to future development, other than those costs that have been provided by way of special grant or contribution (i.e., contributed infrastructure). The City of Fort Saskatchewan received $0.88 million in special grants and contributions for water offsite levy infrastructure as shown in the table below (note, if the City receives other grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $8.86 million. Special Grants and Contributions for Water Offsite Infrastructure Item Project Description Total Project Estimated Cost Special Provincial Grants Developer Agreement Contributions Reduced Project Estimated Cost 1 400mm Watermain Along 118 St. $ 879,046 $ - $ - $ 879,046 2 450mm Watermain to Area 2 $ 2,784,799 $ - $ 464,397 $ 2,320,401 3 450mm watermain along Josephburg Road to Area 5 $ 969,803 $ - $ - $ 969,803 4 450mm watermain along Josephburg Road to 125 St. $ 1,019,324 $ - $ 1,019,324 5 450mm Watermain Area 3 $ 560,898 $ - $ 92,823 $ 468,075 6 450mm Watermain Area 3 to DOW $ 622,130 $ - $ 102,956 $ 519,174 7 450mm Watermain Dow to 125 St. $ 1,345,968 $ - $ 222,744 $ 1,123,224 8 400mm Watermain Along 125 St. $ 1,559,060 $ - $ - $ 1,559,060 $ 9,741,028 $ - $ 882,920 $ 8,858,107 *$882,920 grant received from Dow Chemical allocated to various benefitting projects. B3. Water Infrastructure Staging The timing of construction is used to determine the impact of inflation on cost, the impact of forecast reserve balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Water Infrastructure Staging Item Project Description Year of Construction 1 400mm Watermain Along 118 St. 2022 2 450mm Watermain to Area 2 2014 3 450mm watermain along Josephburg Road to Area 5 2028 4 450mm watermain along Josephburg Road to 125 St. 2034 5 450mm Watermain Area 3 2019 6 450mm Watermain Area 3 to DOW 2021 7 450mm Watermain Dow to 125 St. 2025 8 400mm Watermain Along 125 St. 2036 *The share of projects constructed beyond the 25-year review period (2043) are not included in rates today (see financial oversizing in next Section). City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors B4. Water Offsite Infrastructure Benefiting Parties The water offsite infrastructure previously outlined will benefit various parties to varying degrees. During this review three potential benefiting parties were identified including:  City of Fort Saskatchewan - a portion of the water infrastructure which is required to service existing residents.  Other Stakeholders and Financial Oversizing - other parties (such as neighboring municipalities) that benefit from the infrastructure, as well as that portion of cost which benefits future development beyond the 25-year review period ("financial oversizing").  City of Fort Saskatchewan Future Development - all growth related infrastructure (i.e., levyable water infrastructure costs) during the 25-year rate planning period. The table below outlines the allocation of water offsite levy infrastructure costs to benefiting parties. Project allocations were determined by City engineering staff. Allocation of Water Infrastructure to Benefiting Parties *Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. Oversizing shown as 100% reflects projects constructed entirely beyond the 25-year review period. B5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $6.42 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. The City has collected $3.17 million in offsite levies to date. This results in an adjusted offsite levy cost of approximately $3.25 million. Item Project Description Reduced Project Estimated Cost Other Stakeholder Share & Financial Oversizing % OSL / Developer Share % 1 400mm Watermain Along 118 St. 879,046 $ 12.0% 88.0% 2 450mm Watermain to Area 2 2,320,401 $ 0.0% 100.0% 3 450mm watermain along Josephburg Road to Area 5 969,803 $ 36.0% 64.0% 4 450mm watermain along Josephburg Road to 125 St. 1,019,324 $ 60.0% 40.0% 5 450mm Watermain Area 3 468,075 $ 0.0% 100.0% 6 450mm Watermain Area 3 to DOW 519,174 $ 8.0% 92.0% 7 450mm Watermain Dow to 125 St. 1,123,224 $ 24.0% 76.0% 8 400mm Watermain Along 125 St. 1,559,060 $ 68.0% 32.0% 8,858,107 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Offsite Levy Funds Collected to Date & Adjusted Levy Cost *Offsite levies collected to Dec. 31st, 2017 were allocated to projects based on the pro rata proportion of total estimated project cost. B6. Summary of Water Offsite Levy Cost Flow-through As shown in the figure below, the total cost for water infrastructure that forms the basis of the rate is approximately $3.67 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in Section B4. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). Total Water Offsite Levy Costs B7. Water Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by the City engineering staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Item Project Description Developer Cost (Leviable Costs) Offsite Levy Funds Collected to Dec 31, 2015 Offsite Levy Funds Collected Starting Jan 1, 2016 Adjusted Developer (Levy) Cost 1 400mm Watermain Along 118 St. 773,560 $ $ 286,057 - $ 487,503 $ 2 450mm Watermain to Area 2 2,320,401 $ $ 906,222 - $ 1,414,179 $ 3 450mm watermain along Josephburg Road to Area 5 620,674 $ $ 315,591 - $ 305,083 $ 4 450mm watermain along Josephburg Road to 125 St. 407,730 $ $ 331,706 - $ 76,024 $ 5 450mm Watermain Area 3 468,075 $ $ 182,526 - $ 285,549 $ 6 450mm Watermain Area 3 to DOW 477,640 $ $ 202,452 - $ 275,188 $ 7 450mm Watermain Dow to 125 St. 853,650 $ $ 438,001 - $ 415,649 $ 8 400mm Watermain Along 125 St. 498,899 $ $ 507,345 - $ (8,446) $ 6,420,630 $ 3,169,900 $ - $ 3,250,730 $ Project Costs $9.74M = Project Balance $8.86M = Future Development (OSL Share) $6.42M = Future Development "Financial Oversizing" $2.44M Less: Special Grants & Contributions $0.88M = Other Share $0.00M = Existing Development (City Share) $0.00M Less: Levy Receipts Collected $3.17M = Off-site Balance* $3.25M City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Benefiting Areas for Water Offsite Infrastructure B8. Reserve Balance In accordance with the MGA, 4 reserves/accounts need to be created (one each for transportation, water, sanitary, and stormwater). At December 31st, 2015, the balance of the City's Light/Medium industrial Area water reserve is $507,216.80 as shown in the table below. A reconciliation of activities from the exiting reserve and allocation to the new reserves is provided in Appendix G. The City also needs to establish a set of "sub-ledgers" to track the amounts due to front- ending parties, including interest impacts in accordance with the interest rates underpinning the bylaw. Water Offsite Levy Reserve Balance Description Dr Cr Balance Offsite Levy Expenditures to December 31, 2015 $ 2,784,798.82 $ (2,784,798.82) Offsite Levy Receipt Allocations to December 31, 2015 $ 3,169,899.86 $ 385,101.04 Interest Accrued to December 31, 2015 $ 122,115.76 $ 507,216.80 Unallocated Receipts to December 31, 2015 $ 507,216.80 Opening Balance $ 507,216.80 B9. Development and Water Infrastructure Staging Impacts Water offsite infrastructure will be constructed in staged fashion over the 25-year review period. We have reviewed the availability of offsite levy funds to meet these construction requirements and found that offsite levy reserve funds will not be sufficient to pay for construction of water infrastructure from time to time--front ending of infrastructure will be required. A front-ender is the party that constructs and pays up front for infrastructure that benefits other parties. In order to compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.9%3 interest allowance has been charged to the reserve when it is forecast to be in a negative balance. Further, a 1% interest credit has been provided to the reserve when it is forecast to be in a positive balance. The graph and table below outline the forecast water levy reserve balances over the 25-year development period. 3 The 20-year debenture rate at the Alberta Capital Finance Authority is currently ~2.9%. Item Project Description Developer Cost 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 1 400mm Watermain Along 118 St. $ 487,503 1 1 2 450mm Watermain to Area 2 $ 1,414,179 1 1 1 1 1 1 1 3 450mm watermain along Josephburg Road to Area 5 $ 305,083 1 1 1 1 1 4 450mm watermain along Josephburg Road to 125 St. $ 76,024 1 1 1 1 1 5 450mm Watermain Area 3 $ 285,549 1 1 1 6 450mm Watermain Area 3 to DOW $ 275,188 1 1 1 7 450mm Watermain Dow to 125 St. $ 415,649 1 1 1 8 400mm Watermain Along 125 St. $ (8,446) 1 1 1 3,250,730 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors If necessary, an interest staging adjustment has been applied to rates (slightly positive or slightly negative) to ensure that the forecast reserve balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). Anticipated Water Offsite Levy Reserve Balances City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Anticipated Water Offsite Levy Reserve Balances Opening Balance 507,217 $ Year Receipts Expenditure Interest Balance 2019 464,986 $ - $ 9,722 $ 981,925 $ 2020 108,651 $ 477,437 $ 6,131 $ 619,270 $ 2021 110,824 $ - $ 7,301 $ 737,395 $ 2022 154,854 $ 506,875 $ 3,854 $ 389,227 $ 2023 172,167 $ 1,509,164 $ (27,485) $ (975,255) $ 2024 102,600 $ - $ (25,307) $ (897,962) $ 2025 359,879 $ - $ (15,604) $ (553,688) $ 2026 274,891 $ - $ (8,085) $ (286,882) $ 2027 167,554 $ - $ (3,461) $ (122,789) $ 2028 324,360 $ 1,020,191 $ (23,740) $ (842,359) $ 2029 174,323 $ - $ (19,373) $ (687,410) $ 2030 137,895 $ - $ (15,936) $ (565,450) $ 2031 201,444 $ - $ (10,556) $ (374,563) $ 2032 205,473 $ - $ (4,904) $ (173,993) $ 2033 115,027 $ - $ (1,710) $ (60,677) $ 2034 127,874 $ - $ 672 $ 67,869 $ 2035 162,705 $ - $ 2,306 $ 232,880 $ 2036 110,788 $ - $ 3,437 $ 347,104 $ 2037 113,003 $ 582,338 $ (3,545) $ (125,776) $ 2038 115,263 $ - $ (305) $ (10,817) $ 2039 117,569 $ 741,338 $ (18,403) $ (652,990) $ 2040 119,920 $ - $ (15,459) $ (548,529) $ 2041 122,318 $ - $ (12,360) $ (438,571) $ 2042 124,765 $ - $ (9,100) $ (322,906) $ 2043 127,260 $ - $ (5,674) $ (201,320) $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 3 - March 22, 2019 CORVUS Business Advisors / 19 APPENDIX C: SANITARY OFFSITE INFRASTRUCTURE C1. Sanitary Offsite Infrastructure Costs In order to support future growth, sanitary offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $9.28 million as outlined in the table below. Actual costs, debenture interest (if any), and cost estimates were provided by City engineering staff. It is important to note that these costs represent "gross" costs, of which only a portion will go to support future development during the 25-year review period. The remainder of this section outlines how the "net" costs for future development are determined. Summary of Sanitary Offsite Infrastructure *Costs are based on 2015/16 estimates. **Estimates include engineering (10%) and contingencies (10%). Item Project Description Cost of Completed Work Debenture Interest Estimated Cost of Work Yet to be Completed Total Project Estimated Cost 1 450mm Forcemain Along CNR Right of Way to 119 St Intersection $ - - $ 1,541,610 $ 1,541,610 $ 2 900mm Sanitary Trunk Along Josephburg Rd $ - - $ 2,056,483 $ 2,056,483 $ 3 Ross Creek Trunk Twinning $ - - $ 998,426 $ 998,426 $ 4 Sanitary Lift Station at 119 St $ - - $ 4,680,000 $ 4,680,000 $ - $ - $ 9,276,519 $ 9,276,519 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors A map showing the location of this infrastructure is shown below. Location of Sanitary Offsite Infrastructure City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors C2. Sanitary Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to future development, other than those costs that have been provided by way of special grant or contribution (i.e., contributed infrastructure). The City of Fort Saskatchewan has not received any special grants or contributions for sanitary offsite levy infrastructure as shown in the table below (note, if the City receives additional grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $9.28 million. Special Grants and Contributions for Sanitary Offsite Infrastructure Item Project Description Total Project Estimated Cost Special Grants Developer Agreement Contributions Reduced Project Estimated Cost 1 450mm Forcemain Along CNR Right of Way to 119 St Intersection $ 1,541,610 $ - $ - $ 1,541,610 2 900mm Sanitary Trunk Along Josephburg Rd $ 2,056,483 $ - $ - $ 2,056,483 3 Ross Creek Trunk Twinning $ 998,426 $ - $ - $ 998,426 4 Sanitary Lift Station at 119 St $ 4,680,000 $ - $ - $ 4,680,000 $ 9,276,519 $ - $ - $ 9,276,519 C3. Sanitary Infrastructure Staging The timing of construction is used to determine the impact of inflation on cost, the impact of forecast reserve balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Sanitary Infrastructure Staging Item Project Description Year of Construction 1 450mm Forcemain Along CNR Right of Way to 119 St Intersection 2028 2 900mm Sanitary Trunk Along Josephburg Rd 2030 3 Ross Creek Trunk Twinning 2028 4 Sanitary Lift Station at 119 St 2028 *The share of projects constructed beyond the 25-year review period (2043) are not included in rates today (see financial oversizing in next Section). C4. Sanitary Offsite Infrastructure Benefiting Parties The sanitary offsite infrastructure previously outlined will benefit various parties to varying degrees. During this review three potential benefiting parties were identified including:  City of Fort Saskatchewan - a portion of the sanitary infrastructure which is required to service existing residents. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors  Other Stakeholders and Financial Oversizing - other parties (such as neighboring municipalities) that benefit from the infrastructure, as well as that portion of cost which benefits future development beyond the 25-year review period ("financial oversizing").  City of Fort Saskatchewan Future Development - all growth related infrastructure (i.e., levyable sanitary infrastructure costs) during the 25-year rate planning period. The table below outlines the allocation of sanitary offsite levy infrastructure costs to benefiting parties. Project allocations were determined by City engineering staff. Allocation of Sanitary Infrastructure to Benefiting Parties *Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. Oversizing shown as 100% reflects projects constructed entirely beyond the 25-year review period. C5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $5.77 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. The City has collected $1.38 million in offsite levies to date. This results in an adjusted offsite levy cost of approximately $4.40 million. Offsite Levy Funds Collected to Date & Adjusted Levy Cost *Offsite levies collected to Dec. 31st, 2015 were allocated to projects based on the pro rata proportion of total estimated project cost. Item Project Description Reduced Project Estimated Cost Muni Share % Other Stakeholder Share & Financial Oversizing % OSL / Developer Share % 1 450mm Forcemain Along CNR Right of Way to 119 St Intersection 1,541,610 $ 36.0% 64.0% 2 900mm Sanitary Trunk Along Josephburg Rd 2,056,483 $ 44.0% 56.0% 3 Ross Creek Trunk Twinning 998,426 $ 36.0% 64.0% 4 Sanitary Lift Station at 119 St 4,680,000 $ 36.0% 64.0% 9,276,519 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors C6. Summary of Sanitary Offsite Levy Cost Flow-through As shown in the figure below, the total costs for sanitary infrastructure that forms the basis of the rate is approximately $4.40 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in Section C4. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). Total Sanitary Offsite Levy Costs C7. Sanitary Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Benefiting areas were determined by the City engineering staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Benefiting Areas for Sanitary Offsite Infrastructure C8. Reserve Balance In accordance with the MGA, 4 reserves/accounts need to be created (one each for transportation, water, sanitary, and stormwater). At December 31st, 2015, the balance of the City's Light/Medium industrial Area sanitary reserve is $1,375,607.78, as shown in the table below. A reconciliation of activities from the exiting reserve and allocation to the new Project Costs $9.28M = Project Balance $9.28M = Future Development (OSL Share) $5.77M = Future Development "Financial Oversizing" $3.50M Less: Special Grants & Contributions $0.00M = Other Share $0.00M = Existing Development (City Share) $0.00M Less: Levy Receipts Collected $1.38M = Off-site Balance* $4.40M City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors reserves is provided in Appendix G. The City also needs to establish a set of "sub-ledgers" to track the amounts due to front- ending parties, including interest impacts in accordance with the interest rates underpinning the bylaw. Sanitary Offsite Levy Reserve Balance C9. Development and Sanitary Infrastructure Staging Impacts Sanitary offsite infrastructure will be constructed in staged fashion over the 25-year development period. We have reviewed the availability of offsite levy funds to meet these construction requirements and found that offsite lvy reserve funds will not be sufficient to pay for construction of sanitary infrastructure from time to time--front ending of infrastructure will be required. A front-ender is the party that constructs and pays up front for infrastructure that benefits other parties. In order to compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.9%4 interest allowance has been charged to the reserve when it is forecast to be in a negative balance. Further, a 1% interest credit has been provided to the reserve when it is forecast to be in a positive balance. The graph and table below outline the forecast water levy reserve balances over the 25-year development period. If necessary, an interest staging adjustment has been applied to rates (slightly positive or slightly negative) to ensure that the forecast reserve balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). 4 The 20-year debenture rate at the Alberta Capital Finance Authority is currently ~2.9%. Description Dr Cr Balance Offsite Levy Expenditures to December 31, 2015 - $ - $ Offsite Levy Receipt Allocations to December 31, 2015 1,324,567.64 $ 1,324,567.64 $ Interest Accrued to December 31, 2015 51,040.14 $ 1,375,607.78 $ Unallocated Receipts to December 31, 2015 1,375,607.78 $ Opening Balance 1,375,607.78 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / 26 Anticipated Sanitary Offsite Levy Reserve Balances Anticipated Sanitary Offsite Levy Reserve Balances Opening Balance 1,375,608 $ Year Receipts Expenditure Interest Balance 2019 57,547 $ - $ 14,332 $ 1,447,486 $ 2020 14,183 $ - $ 14,617 $ 1,476,286 $ 2021 14,467 $ 664,808 $ 8,259 $ 834,204 $ 2022 21,080 $ 4,225,550 $ (97,738) $ (3,468,003) $ 2023 23,652 $ 1,246,562 $ (136,036) $ (4,826,950) $ 2024 15,089 $ - $ (139,544) $ (4,951,405) $ 2025 492,466 $ - $ (129,309) $ (4,588,249) $ 2026 339,440 $ - $ (123,215) $ (4,372,024) $ 2027 146,870 $ - $ (122,529) $ (4,347,683) $ 2028 416,188 $ - $ (114,013) $ (4,045,508) $ 2029 145,540 $ - $ (113,099) $ (4,013,068) $ 2030 77,930 $ - $ (114,119) $ (4,049,257) $ 2031 359,654 $ - $ (106,998) $ (3,796,602) $ 2032 366,847 $ - $ (99,463) $ (3,529,218) $ 2033 149,674 $ - $ (98,007) $ (3,477,551) $ 2034 190,834 $ - $ (95,315) $ (3,382,032) $ 2035 311,441 $ - $ (89,047) $ (3,159,638) $ 2036 317,670 $ - $ (82,417) $ (2,924,386) $ 2037 324,023 $ - $ (75,411) $ (2,675,774) $ 2038 330,503 $ - $ (68,013) $ (2,413,283) $ 2039 337,113 $ - $ (60,209) $ (2,136,379) $ 2040 343,856 $ - $ (51,983) $ (1,844,506) $ 2041 350,733 $ - $ (43,319) $ (1,537,093) $ 2042 357,747 $ - $ (34,201) $ (1,213,546) $ 2043 364,902 $ - $ (24,611) $ (873,254) $ $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors / 26 APPENDIX D: TRANSPORTATION OFFSITE INFRASTRUCTURE D1. Transportation Offsite Infrastructure Costs In order to support future growth, transportation offsite infrastructure is required. The estimated cost of this infrastructure is based upon: (a) actual construction costs to the cut-off date, (b) debenture interest associated with financing, and (c) future cost estimates. Total cost is approximately $7.68 million as outlined in the table below. Actual costs, debenture interest (if any), and cost estimates were provided by City engineering staff. It is important to note that these costs represent "gross" costs, of which only a portion will go to support future development during the 25-year review period. The remainder of this section outlines how the "net" costs for future development are determined. Summary of Transportation Offsite Infrastructure *Costs are based on 2015/16 estimates. **Estimates include engineering (10%) and contingencies (10%). Item Project Description Cost of Completed Work Debenture Interest Estimated Cost of Work Yet to be Completed Total Project Estimated Cost 1 119 St & Hwy 15 Intersection $ - - $ 1,800,000 $ 1,800,000 $ 2 Dow Main Gate & Hwy 15 Intersection $ - - $ 1,620,000 $ 1,620,000 $ 3 Josephburg Road and 1st Road Intersection $ - - $ 360,000 $ 360,000 $ 4 Josephburg Road and Unamed Road Intersection $ - - $ 360,000 $ 360,000 $ 5 Josephburg Road and RR 221 Intersection $ - - $ 360,000 $ 360,000 $ 6 Josephburg Road from Highway to 1st Intersection $ - - $ 795,605 $ 795,605 $ 7 Josephburg Road from 1st Intersection to 2nd Intersection $ - - $ 1,332,927 $ 1,332,927 $ 8 Josephburg Road-Finish up to RR 221 $ - - $ 929,359 $ 929,359 $ 9 Josephburg Road North ASP $ 118,301 - $ - $ 118,301 $ 118,301 $ - $ 7,557,892 $ 7,676,193 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors A map showing the location of this infrastructure is shown below. Location of Transportation Offsite Infrastructure City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors D2. Transportation Offsite Infrastructure Grants & Contributions to Date The MGA enables the City to allocate the costs of offsite infrastructure to future development, other than those costs that have been provided by way of special grant or contribution (i.e., contributed infrastructure). The City of Fort Saskatchewan has not received any special grants or contributions for transportation offsite levy infrastructure as shown in the table below (note, if the City receives other grants or contributions in the future, it will be reflected in one of the annual updates and rates adjusted accordingly). The result is that the total reduced project estimated cost is $7.68 million. Special Grants and Contributions for Transportation Offsite Infrastructure D3. Transportation Infrastructure Staging The timing of construction is used to determine the impact of inflation on cost, the impact of forecast reserve balances, and the estimate of financial oversizing (described in the Section that follows). The City anticipates construction of offsite infrastructure as outlined in the table below. Note, if this schedule is adjusted in the future, it will be reflected in one of the City's annual rate/bylaw updates. Transportation Infrastructure Staging 1 119 St & Hwy 15 Intersection 2019 2 Dow Main Gate & Hwy 15 Intersection 2023 3 Josephburg Road and 1st Road Intersection 2025 4 Josephburg Road and Unamed Road Intersection 2027 5 Josephburg Road and RR 221 Intersection 2045 6 Josephburg Road from Highway to 1st Intersection 2019 7 Josephburg Road from 1st Intersection to 2nd Intersection 2023 8 Josephburg Road-Finish up to RR 221 2045 9 Josephburg Road North ASP 2010 *The share of projects constructed beyond the 25-year review period (2040) are not included in rates today (see financial oversizing in next Section). Item Project Description Total Project Estimated Cost Special Provincial Grants Developer Agreement Contributions Reduced Project Estimated Cost 1 119 St & Hwy 15 Intersection 1,800,000 $ - $ - $ 1,800,000 $ 2 Dow Main Gate & Hwy 15 Intersection 1,620,000 $ - $ - $ 1,620,000 $ 3 Josephburg Road and 1st Road Intersection 360,000 $ - $ - $ 360,000 $ 4 Josephburg Road and Unamed Road Intersection 360,000 $ - $ - $ 360,000 $ 5 Josephburg Road and RR 221 Intersection 360,000 $ - $ - $ 360,000 $ 6 Josephburg Road from Highway to 1st Intersection 795,605 $ - $ - $ 795,605 $ 7 Josephburg Road from 1st Intersection to 2nd Intersection 1,332,927 $ - $ - $ 1,332,927 $ 8 Josephburg Road-Finish up to RR 221 929,359 $ - $ - $ 929,359 $ 9 Josephburg Road North ASP 118,301 $ - $ - $ 118,301 $ 7,676,193 $ - $ - $ 7,676,193 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors D4. Transportation Offsite Infrastructure Benefiting Parties The transportation offsite infrastructure previously outlined will benefit various parties to varying degrees. During this review three potential benefiting parties were identified including:  City of Fort Saskatchewan - a portion of the transportation infrastructure which is required to service existing residents.  Other Stakeholders and Financial Oversizing - other parties (such as neighboring municipalities) that benefit from the infrastructure, as well as that portion of cost which benefits future development beyond the 25-year review period ("financial oversizing").  City of Fort Saskatchewan Future Development - all growth related infrastructure (i.e., levyable transportation infrastructure costs) during the 25-year rate planning period. The table below outlines the allocation of transportation offsite levy infrastructure costs to benefiting parties. Project allocations were determined by City engineering staff. Allocation of Transportation Infrastructure to Benefiting Parties *Municipal share of Project #1 established by City staff utilizing TIA traffic volumes. **Financial oversizing is determined by separating out the pro rata portion of developer cost beyond the 25-year review period, in comparison with the anticipated year of construction. As the years move forward and rates are updated, these additional developer costs will be included in rate calculations. Oversizing shown as 100% reflects projects constructed entirely beyond the 25-year review period. D5. Existing Receipts & Adjusted Levy Cost Using the offsite levy share percentages shown in the previous section and applying those percentages to project costs results in an offsite levy cost of approximately $5.51 million. However, prior to allocating these costs to benefiting areas, existing offsite levy receipts collected from developers need to be considered in determining the residual/net costs to developers. The City has collected $0.91 million in offsite levies to date. This results in an adjusted offsite levy cost of approximately $4.59 million. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Offsite Levy Funds Collected to Date & Adjusted Levy Cost *Offsite levies collected to Dec. 31st, 2015 were allocated to projects based on the pro rata proportion of total estimated project cost. D6. Summary of Transportation Offsite Levy Cost Flow-through As shown in the figure below, the total cost for transportation infrastructure that forms the basis of the rate is approximately $4.59 million. The cost allocations to each benefitting party are based on the benefitting percentages shown in Section D4. The offsite levy balance (due from developers) is allocated to various benefitting areas (as described in the next section). Total Transportation Offsite Levy Costs D7. Transportation Infrastructure Benefiting Areas Net developer costs for each project have been allocated to multiple benefiting offsite levy area (see tables below). Allocations are denoted with a "1" below applicable area numbers. Project Costs $7.68M = Project Balance $7.68M = Future Development (OSL Share) $5.51M = Future Development "Financial Oversizing" $1.96M Less: Special Grants & Contributions $0.00M = Other Share $0.00M = Existing Development (City Share) $0.21M Less: Levy Receipts Collected $0.91 = Off-site Balance* $4.59M City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Benefiting areas were determined by the City engineering staff. The lands anticipated to develop over the 25-years in each offsite levy benefitting area are used to determine rates. Benefiting Areas for Transportation Offsite Infrastructure D8. Reserve Balance In accordance with the MGA, 4 reserves/accounts need to be created (one each for transportation, water, sanitary, and stormwater). At December 31st, 2015, the balance of the City's Light/Medium industrial Area transportation reserve is $916,292.88, as shown in the table below. A reconciliation of activities from the exiting reserve and allocation to the new reserves is provided in Appendix G. The City also needs to establish a set of "sub-ledgers" to track the amounts due to front- ending parties, including interest impacts in accordance with the interest rates underpinning the bylaw. Transportation Offsite Levy Reserve Balance D9. Development and Transportation Infrastructure Staging Impacts Transportation offsite infrastructure will be constructed in staged fashion over the 25-year review period. We have reviewed the availability of offsite levy funds to meet these construction requirements and found that offsite levy reserve funds will not be sufficient to pay for construction of transportation infrastructure from time to time--front ending of infrastructure will be required. A front-ender is the party that constructs and pays up front for infrastructure that benefits other parties. In order to compensate parties for capital they provide in front-ending offsite infrastructure construction, a 2.9%5 interest allowance has been charged to the reserve when it is forecast to be in a negative balance. Further, a 1% interest credit has been provided to the reserve 5 The 20-year debenture rate at the Alberta Capital Finance Authority is currently ~2.9%. Description Dr Cr Balance Offsite Levy Expenditures to December 31, 2015 118,301.24 $ (118,301.24) $ Offsite Levy Receipt Allocations to December 31, 2015 996,216.71 $ 877,915.47 $ Interest Accrued to December 31, 2015 38,377.41 $ 916,292.88 $ Unallocated Receipts to December 31, 2015 - $ 916,292.88 $ Opening Balance 916,292.88 $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors when it is forecast to be in a positive balance. The graph and table below outline the forecast transportation levy reserve balances over the 25-year development period. If necessary, an interest staging adjustment has been applied to rates (slightly positive or slightly negative) to ensure that the forecast reserve balance at the end of the 25-year review period always returns to break-even (i.e., developers are not charged too much thereby providing a windfall to the City, nor are they charged too little thereby placing an unequitable burden on taxpayers). Anticipated Transportation Offsite Levy Reserve Balances $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors Anticipated Transportation Offsite Levy Reserve Balances Reserve Balance 916,293 $ Year Receipts Expenditure Interest Balance 2019 578,948 $ - $ 14,952 $ 1,510,194 $ 2020 142,689 $ 2,436,377 $ (22,721) $ (806,216) $ 2021 145,542 $ - $ (19,160) $ (679,833) $ 2022 212,076 $ - $ (13,565) $ (481,322) $ 2023 237,949 $ 3,442,578 $ (106,893) $ (3,792,843) $ 2024 151,803 $ - $ (105,590) $ (3,746,630) $ 2025 472,620 $ - $ (94,946) $ (3,368,957) $ 2026 367,293 $ 347,363 $ (97,122) $ (3,446,148) $ 2027 234,149 $ - $ (93,148) $ (3,305,147) $ 2028 429,898 $ - $ (83,382) $ (2,958,631) $ 2029 243,609 $ - $ (78,736) $ (2,793,758) $ 2030 198,785 $ - $ (75,254) $ (2,670,227) $ 2031 329,486 $ - $ (67,882) $ (2,408,623) $ 2032 336,076 $ - $ (60,104) $ (2,132,651) $ 2033 184,583 $ - $ (56,494) $ (2,004,562) $ 2034 215,171 $ - $ (51,892) $ (1,841,283) $ 2035 301,777 $ - $ (44,646) $ (1,584,152) $ 2036 223,864 $ - $ (39,448) $ (1,399,736) $ 2037 228,341 $ 530,942 $ (49,368) $ (1,751,704) $ 2038 232,908 $ - $ (44,045) $ (1,562,841) $ 2039 237,566 $ - $ (38,433) $ (1,363,708) $ 2040 242,318 $ 152,779 $ (36,951) $ (1,311,120) $ 2041 247,164 $ - $ (30,855) $ (1,094,811) $ 2042 252,107 $ - $ (24,438) $ (867,142) $ 2043 257,149 $ - $ (17,690) $ (627,682) $ City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Offsite Levy Review Version 4 - March 22, 2019 CORVUS Business Advisors APPENDIX E: STORMWATER OFFSITE INFRASTRUCTURE E1. Stormwater Offsite Infrastructure Costs There are no anticipated stormwater projects within the off-site levy areas. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 APPENDIX F: BENCHMARK COMPARISONS The table below compares the weighted average offsite levy rate in the City's Light/Medium Industrial Area to rates in other municipalities (2016). Municipality / Area Average Rate Per Net Ha. Parkland County* (Acheson) $42,169 MD of Peace (Westhill) $63,378 City of Fort Saskatchewan (LMIA Current) $72,739 City of Fort Saskatchewan* (LMIA Updated) $46,046 Sturgeon County Industrial Park* $80,668 Town of Peace River* $83,355 Town of Rocky Mountain House* $90,716 Red Deer County (Gasoline Alley) $96,458 Leduc County* $106,255 Town of Devon* $116,178 City of Leduc* $117,509 Town of Beaumont* $160,900 City of Lacombe* (in process) $149,401 Strathcona County* (N of Yellowhead) $181,022 City of Medicine Hat +$250,000 City of St Albert* +$250,000 City of Edmonton +$300,000 *CORVUS Clients City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Report City of Fort Saskatchewan Southfort Levy Report Report City of Fort Saskatchewan Future Urban Area Levy Report Schedule "E" to Bylaw C14-17 August 2025 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 REPORT i Table of Contents SECTION PAGE NO. Table of Contents i 1 Introduction 1-0 1.1 GENERAL 1-0 1.2 LOCATION 1-0 1.3 DEVELOPMENT LEVIES 1-0 1.4 CRITERIA 1-1 1.5 FIGURE 1.1 - FUTURE URBAN AREA BOUNDARY AND GEOGRAPHIES 1-3 2 Waterworks System 2-0 2.1 GENERAL 2-0 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM 2-0 2.3 WATER SYSTEM DEVELOPMENT LEVIES 2-0 2.4 TABLE 2.1 - WATER INFRASTRUCTURE LEVY AREAS 2-2 2.5 TABLE 2.2 - WATER INFRASTRUCTURE COSTS 2-3 2.6 FIGURE 2.1 - WATERWORKS SYSTEM IMPROVEMENTS 2-4 3 Sanitary Sewer System 3-0 3.1 GENERAL 3-0 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS 3-0 3.3 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES 3-0 3.4 TABLE 3.1 - SANITARY INFRASTRUCTURE LEVY AREAS 3-2 3.5 TABLE 3.2 - SANITARY INFRASTRUCTURE COSTS 3-3 3.6 FIGURE 3.1 - SANITARY SYSTEM IMPROVEMENTS 3-4 4 Transportation System 4-0 4.1 GENERAL 4-0 4.2 ROADWAY DEVELOPMENT LEVIES 4-0 4.3 TABLE 4.1 - TRANSPORTATION LEVY AREAS 4-2 4.4 TABLE 4.2 - TRANSPORTATION INFRASTRUCTURE COSTS 4-3 4.5 FIGURE 4.1 - TRANSPORTATION IMPROVEMENTS 4-4 4.6 FIGURE 4.2 - TRANSPORTATION BASINS 4-5 5 Stormwater Drainage System 5-0 5.1 GENERAL 5-0 5.2 FUTURE URBAN AREA STORMWATER MANAGEMENT PLAN 5-0 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Table of Contents ii 5.3 STORMWATER DEVELOPMENT LEVIES 5-0 5.4 TABLE 5.1 - STORM MANAGEMENT LEVY AREAS 5-2 5.5 TABLE 5.2 - STORM MANAGEMENT INFRASTRUCTURE COSTS 5-3 5.6 FIGURE 5.1 - STORM SYSTEM IMPROVEMENTS 5-2 6 Recommendations 6-0 6.1 TABLE 6.1 - OFF-SITE LEVIES 6-1 7 Appendix 7-0 7.1 PROJECT LIST PERCENTAGE ASSIGNED TO LEVY 7-1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-0 1 Introduction 1.1 GENERAL The City of Fort Saskatchewan has identified the Future Urban Area as being a prime location for development and is currently seeing continued growth within the area. The Servicing Design Brief - Annexed Land has been developed to assist the City in properly planning and staging this development. The growth and development of a community will generally create some impact on the municipal infrastructure systems. Minimally, development requires an extension of municipal services such as water, sewer, roadways, etc. More extensive and continued growth and development of a community will require the municipal infrastructure systems to be expanded to satisfactorily accommodate such growth. It is the philosophy of the City of Fort Saskatchewan that development will be responsible for its own municipal infrastructure as well as for its proportionate share of the off-site infrastructure from which it will benefit. This is achieved through the assessment of Development Levies against the benefitting lands. 1.2 LOCATION The Future Urban Area is generally located south of Wilshire and Southridge Boulevards, north of Township Road 542 and east of Range Road 224, bounded on the south and east by Strathcona County and the west by the North Saskatchewan River. Figure 1.1 shows the Future Urban Area boundary. 1.3 DEVELOPMENT LEVIES In the context of this report, Development Levies are defined as capital costs, assessed by the City of Fort Saskatchewan, against developing lands for their proportionate share of the costs of municipal infrastructure systems, constructed by the City or other developers, which benefit the development areas. 1.3.1 Off-Site Levies Under authority of the Municipal Government Act, the City is permitted to impose Off-Site Levies against development to cover the costs of any or all of the following: a) New or expanded facilities for the storage, transmission, treatment or supplying of water. b) New or expanded facilities for the treatment, movement and disposal of sanitary sewage. c) New or expanded storm sewer drainage facilities. d) New or expanded roads required for or impacted by a subdivision or development. e) New or expanded community recreation facilities. f) New or expanded firehalls. g) Lands required for or in connection with any facilities described in (a) to (f) above. 1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-1 1.4 CRITERIA In this study, lands dedicated as Environmental Reserve and Municipal Reserve (MR) are excluded as a Development Levy contributing area. Traditionally, the City has required the Developer to develop the MR lands in accordance with the City's needs, as negotiated through the Development Agreement. Hence, Development Levies are not applied against such lands, thereby reducing the contributing lands area accordingly. It was also necessary to establish some general assumptions as Development Levy calculation criteria: - The City will continue to assume responsibility for the provision of those infrastructure systems and facilities which they deem to be a benefit to the City at large and/or a single development parcel. - The Development Levies are generally based on constructing municipal improvements consistent with the requirements identified in the Servicing Design Brief - Annexed Land to serve the lands within the plan area. - The Development Levy rates are expressed on a per hectare basis. - Gross Area is defined as the total area of a parcel(s) of land irrespective of their potential for development or land use. - Gross Developable Area is defined as the gross area less lands for Municipal Reserve and Environmental Reserve. The Development Levy and charge rates contained in this document are based on Gross Developable Area. - All costs are estimated in 2025 dollars. These cost estimates should be reviewed annually or no later than every three years, to reflect current year construction costs. - An inflation factor has been applied to all estimates, to more accurately estimate the construction costs for the projected year of construction. An inflation rate of 2.5% per annum was used. - Where conditional grants or donations have been secured by the City, towards a specific project, the project cost has been reduced by the amount of the grant. - Unconditional grants, even though they may have been utilized by the City for financing a project, are not deducted from the final project costs, as it can be rationalized that such funding could have been used for other projects. Assumptions and/or calculation criteria specific to each Development Levy are further highlighted, in more detail, within each respective section of this report. The Future Urban Area is split into 14 Geographies (Figure 1.1) which generally follow the quarter lines. These Geographies are then assigned to specific Levies Areas based on their benefit from a particular levy project. Project costs are then assigned to each Levy Area and ultimately to the benefitting Geography on a per hectare basis. It must be clarified what is intended, when it is stated that the City will continue to assume the responsibility for certain infrastructure systems and facilities. Historically the City has designed and constructed sanitary trunk sewer facilities, arterial roadways, water reservoirs, trunk watermains and stormwater management City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-2 facilities, which serve more than a single development area. Although the City accepts this responsibility, each development agreement can define whether the City or the developer designs and constructs these major facilities. If the development agreement establishes that the developer will undertake this work, then presumably it will also establish the formula and schedule for recovery from the Levy Reserves. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 te ux rr RT SASK GURE ale: HEWAN UTUR AA EA B IT NAR RY GS UNDP ate: 2 DG OGRA GE 202 AA TC ENTI Dw 2-13 Y ID CATIC No. ד City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-0 2 Waterworks System 2.1 GENERAL The City's water supply is treated water, purchased from the City of Edmonton (EPCOR) through the Capital Region Northeast Water Services Commission (CRNWSC). The treated water is distributed by the City, to its customers, through its waterworks system consisting of water storage reservoirs and pumping facilities, primary feeder mains and distribution mains. 2.2 EXPANSION AND FINANCING OF WATERWORKS SYSTEM Traditionally, the City's philosophy regarding its waterworks system expansion has been that development is responsible, at their entire cost, for the construction of all new distribution mains up to a specified diameter. Primary feeder mains, treated water storage reservoirs and pumping facilities benefit the entire water distribution system and thus, the City has assumed responsibility for their construction. The costs of such facilities are then assessed proportionately against lands through a Water Off-Site Levy. 2.3 WATER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions, namely: - An upgraded water supply from EPCOR will be required to service the growth of the City. This will be provided through either a new supply line direct from EPCOR or an upgraded line through the CRNWSC. The capital cost for a new supply line direct to EPCOR, when applied across the entire City is less than the upgraded line required for growth only, the new supply line cost is included in the Levy. - Development will continue to be responsible, at its entire cost, for the construction of all distribution mains, up to and including 400 mm diameter in size, to serve the Southfort area. - The City will continue to be responsible for the construction of all primary feeder mains, treated water storage reservoirs and pumping facilities. These expenditures will be included as off-site levies to the development of the Future Urban Area. - Conditional grants will be applied to the specific projects, thereby reducing the overall project cost used in calculating the Water Off-site Levy Rate. - Unconditional grants, even if applied against waterworks system improvements, will not be considered when calculating the Water Off-Site Levy Rate. Figure 2.1 represents the Future Urban Area water system as envisioned in the Servicing Design Brief - Annexed Land and City of Fort Saskatchewan Water Distribution System Master Plan. As per the assumptions previously outlined, the City assumes the responsibility for constructing all watermains greater than 400 mm in diameter. The cost of this construction will be included in the calculation for Water System Development Levies. Table 2.1 defines the benefitting Geographies for each Levy Area. 2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-1 Table 2.2 outlines a cost estimate for each improvement based on 2025 dollars and future construction costs, with an inflation rate as indicated. For future waterworks system improvements, it has been assumed that there will be no grant funding available for such projects. This assumption is based on the fact that the amount of grant funding available to a municipality is typically inversely proportional to its population. The need for constructing the future reservoir storage capacities will, to a large degree, be directly related to increases in the population of the City. Such increased population, however, will decrease the amount of grant funding available. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-2 2.4 TABLE 2.1 - WATER INFRASTRUCTURE LEVY AREAS Geography Name AA Water Water - Alternate Supply Annex Undeveloped N 0 0 Annex Undeveloped S 0 0 Point Aux Pins 1 1 AA 10 1 1 AA 6 1 1 AA 7 1 1 Roseburn NE 1 1 AA 8 1 1 AA 4 1 1 AA 9 1 1 AA 12 1 1 AA 1 1 1 AA 13 1 1 AA 2 1 1 Annex 15 1 1 AA 3 1 1 Area Serviced 628.9 5778 Entire City City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Waterworks System 2-3 2.5 TABLE 2.2 - WATER INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 $+ #* !( !( 350mm 450mm 300mm 400mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 450mm 450mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 450mm 300mm 300mm 400mm 300mm 450mm 300mm 450mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 400mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 450mm 300mm 400mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 350mm 350mm 300mm 300mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 450mm 450mm 450mm 300mm 450mm 300mm 300mm 300mm 300mm 300mm 300mm 400mm 300mm 350mm 300mm 300mm 300mm 450mm Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community FORT SASKATCHEWAN ANNEXATION AREA SERVICING DESIGN BRIEF FIGURE 6.6 Potential Transmission Line Alignment 1:30,000 0 330 660 990 1,320 165 Meters ± Legend Municipal Boundary Southfort Development Area Annexation Area Potentially Crown Claimable Wetland Environmental Reserve !( Reservoirs #* Water Tower $+ Meter Vaults Water Main Diameter (mm) Existing System, Less than 150 mm Existing System, 150 mm Existing System, 200 mm Existing System, 250 mm Existing System, 300 mm Existing System, 350 mm Existing System, 400 mm Existing System, 450 mm Pre-Annexation Ultimate System, 200 mm Pre-Annexation Ultimate System, 250 mm Pre-Annexation Ultimate System, 300 mm Annexation Area Ultimate System, 300 mm Annexation Area Ultimate System, 400 mm Proposed Road Network Coordinate System: NAD 1983 CSRS 3TM 114 Projection: Transverse Mercator Datum: North American 1983 CSRS Rail Crossing Rail Crossing 7.3 km 7.5 km Proposed Annexation Area Reservoir 1.2 km Potential Alignment from EPCOR to Proposed Annexation Reservoir Potential Alignment from CRNWSC to Proposed Annexation Reservoir Potential Alignment from EPCOR to Main Reservoir VETERANS WAY / HIGHWAY 21 VETERANS WAY / HIGHWAY 21 86 AVENEUE SOUTHFORT DRIVE TOWNSHIP ROAD 542 TOWNSHIP ROAD 542 RANGE ROAD 225 / 92 STREET TOWNSHIP ROAD 544 PIPELINE ROW RANGE ROAD 224 RANGE ROAD 224 SIENNA BLVD Potential Alignment from EPCOR to Proposed Annexation Reservoir (and extending to Bremner) CRNWSC Transmission Line EPCOR Transmission Line Potential Transmission Connection Note: On January 12, 2023, Alberta Environment and Protected Areas indicated that the wetland 2 does not meet the criteria for a Crown ownership claim. 2 1 71 72 71 Levy Project # 73 74 Final alignment to be verified Figure 2.1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-0 3 Sanitary Sewer System 3.1 GENERAL The sanitary sewage collection system in the Future Urban Area will be comprised of a series of lateral (local), collector and trunk sewers, intercepting wastewater from the various individual contributors and conveying this wastewater to an existing 1050 mm diameter main in the northeast corner of the Future Urban Area boundary. The point of discharge for the City sanitary sewage is the Arrow Utilities Regional Trunk Sewer, which conveys the wastewater to the Arrow Utilities Sewage Treatment Plant. Capital improvements to the regional trunk line are the responsibility of the Arrow Utilities of which the City of Fort Saskatchewan is a member. The costs of such capital improvements are assessed proportionately against the City through the Commission's sewage utility rate structure. Therefore, they are not included in the City's Sanitary Sewer Off-Site Levy calculations. The Sanitary Servicing Plan, as identified in the Servicing Design Brief - Annexed Land, indicates that the majority of the lands within the Future Urban area boundary generally slope toward the northeast and that a gravity system will service the area. 3.2 EXPANSION AND FINANCING OF SANITARY SEWER SYSTEMS Traditionally, the City's philosophy regarding sanitary sewer systems has been that development shall be responsible for the entire cost of constructing laterals and collectors. The City assumes the responsibility for constructing all trunk mains 525 mm in diameter and larger. The cost of this construction will be included in the calculation for Sanitary Sewer System Development Levies. 3.3 SANITARY SEWER SYSTEM DEVELOPMENT LEVIES In conducting this study, it was necessary to make some basic assumptions: - The Developer will continue to be responsible for the construction of lateral and collector sanitary sewer systems. - The City of Fort Saskatchewan will continue to be a member of Arrow Utilities. Any expansion or improvement costs, related to the Commission System, will be assessed against the City by the Commission, through its sewer utility rate structure. Therefore, costs related to the Commission System have not been included in the City's Sanitary Sewer Off-Site Levy calculations. - Sanitary Sewers 525 mm diameter and larger are considered to be Trunk Sanitary Sewers. - No grant funding will be available towards the construction of trunk sewer systems. - The cost of all leviable projects will be applied against benefitting geographies within the Future Urban Area boundary. Figure 3.1 shows the sanitary servicing plan, as developed in the Servicing Design Brief - Annexed Land. 3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-1 Table 3.1 defines the benefitting Geographies for each Levy Area. Table 3.2 outlines a cost estimate for each improvement based on 2025 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-2 3.4 TABLE 3.1 - SANITARY INFRASTRUCTURE LEVY AREAS Geography Name AA Sanitary 1 AA Sanitary 2 AA Sanitary 3 AA Sanitary 4 AA Sanitary 5 Annex Undeveloped N 0 0 0 0 0 Annex Undeveloped S 0 0 0 0 0 Point Aux Pins 1 1 1 1 1 AA 10 1 1 1 1 1 AA 6 1 1 1 1 1 AA 7 1 1 1 1 1 Roseburn NE 1 1 1 1 1 AA 8 1 1 1 1 1 AA 4 1 1 1 1 1 AA 9 1 1 1 1 1 AA 12 1 1 1 1 1 AA 1 1 0 0 0 0 AA 13 1 0 0 0 0 AA 2 1 1 0 0 0 Annex 15 1 1 1 0 0 AA 3 1 1 1 1 0 Area Serviced 628.9 582.4 530.3 499.3 457.5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Sanitary Sewer System 3-3 3.5 TABLE 3.2 - SANITARY INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 610m 630m 615m 620m 625m 605m 612.5m 617.5m 622.5m 627.5m 607.5m 600m 632.5m 602.5m 635m 630m 625m 632.5m 602.5m 622.5m 607.5m 630m 630m 630m 630m 630m 625m 607.5m 625m 622.5m 622.5m 630m 612.5m 630m 625m 627.5m 605m 625m 605m 627.5m 630m 607.5m 622.5m 622.5m 627.5m 605m 625m 630m 625m 625m 622.5m 607.5m 625m 630m 625m 627.5m 630m 622.5m 625m 605m 622.5m 625m 612.5m 627.5m 627.5m 627.5m 622.5m 627.5m 630m 625m 607.5m 607.5m 630m 625m 605m 630m 605m 627.5m 625m 630m 627.5m 630m 630m 750 mm 450 mm 600 mm 1050 mm 675 mm 525 mm 600 mm 450 mm 450 mm 750 mm 450 mm 750 mm 450 mm 450 mm 450 mm 450 mm 450 mm 675 mm 450 mm 525 mm 450 mm 675 mm 525 mm 675 mm 450 mm 450 mm 450 mm 450 mm 450 mm 675 mm 450 mm 450 mm 450 mm W estpark Lift Statio n W in dso r Po in te Lift Statio n So urce: Esri, Maxar, Geo Eye, Earthstar Geo graphics, CNES/Airbus DS, USDA, USGS, Aero GRID, IGN, an d the GIS User Co m m un ity FORT SASKATCHEWAN ANNEXATION AREA SERVICING DESIGN BRIEF FIGURE 7.5 Ultim ate On -Site W astew ater Servicin g Co n cept Optio n 1b - Gravity Servicin g to the No rtheast 1:20,000 0 220 440 660 880 110 Meters ± Legend So uthfo rt Develo pm en t Area An n exatio n Area Po ten tially Cro w n Claim able W etlan d En viro n m en tal Reserve Lift Station #* River Ro ad Lift Statio n !( Sypho n #* W estpark Lift Statio n #* W in dso r Po in te Lift Statio n Sanitary Sewers Diameter 150 m m 200 m m 250 m m 300 m m 375 m m 450 m m 500 m m 525 m m 600 m m 675 m m 750 m m 900 m m 1050 m m 1200 m m Pro po sed Ro ad Co o rdi n ate System : NAD 1983 CSRS 3TM 114 Pro jectio n : Tran sverse Mercato r Datum : No rth Am eri can 1983 CSRS SMH-C-67 VETERANS WAY / HIGHWAY 21 VETERANS WAY / HIGHWAY 21 VETERANS WAY / HIGHWAY 21 86 AVENEUE SOUTHFORT DRIVE TOWNSHIP ROAD 542 RANGE ROAD 225 / 92 STREET TOWNSHIP ROAD 544 RANGE ROAD 224 PIPELINE ROW RANGE ROAD 224 Raise ground in pink shaded area to 630-630.5 m elevation or Lift Station required at indicated node. 1 2 17 18 6 5 19 3 4 20 11 12 21 8 9 22 10 13 15 14 24 16 25 26 27 29 30 31 32 34 33 35 36 38 37 23 7 2 Note: On January 12, 2023, Alberta Environment and Protected Areas indicated that the wetland 2 does not meet the criteria for a Crown ownership claim. 2 1 Ultimate Gravity Approximate Node Location 77 78 79 37 36 35 34 38 - Sanitary Twin - Turner Park Levy Project # 34 Figure 3.1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-0 4 Transportation System 4.1 GENERAL The City of Fort Saskatchewan maintains a roadway classification system generally consistent with the definitions for arterial, collector and local roads contained in the "Geometric Design Standards for Canadian Roads and Streets," a manual published by the Transportation Association of Canada. In the hierarchy of roadway classifications, the principle function of arterial roads is to provide for the efficient movement of people, goods and services between the primary traffic generation areas of a community. Typically, arterial roadways are designed as relatively free-flowing facilities, intersected by other arterial or major collector type roadways but provide no direct access to individual properties. Arterial roadways are generally considered to be a greater benefit to the City at large rather than directly to individual developers. However, this does not negate developers' responsibility to contribute their proportionate share towards the cost of these arterials, since to a large degree development generates the need for these arterial roadways. The transportation plan for the Future Urban Area was developed as part of the Servicing Design Brief - Annexed Land. 4.2 ROADWAY DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions: - Arterial roadways included in the Transportation Off-Site Levy calculations are those highlighted in Figure 4.1. - Where arterial roadways are to be constructed to an ultimate 4-lane, divided, paved urban structure will typically be constructed in two stages with the first or initial stage constructed by the developer being a two-laned urban roadway complete with street lighting and the ultimate stormwater drainage system. The second stage is all works remaining to complete the arterial roadway which will be constructed by the City. Additional improvements may be required depending on pace of growth and need. - Where arterial roadways are to be constructed to a 2 lane standard, the ultimate roadway will be constructed in one stage by developer with full costs of the construction and ROW being reimbursed by the levy. - Three Transportation Basins (Figure 4.2) have been created to share the costs of levy projects that benefit each of the basins. - Rights-of-way to facilitate construction of arterial roadways will be acquired as a cost to the project. Table 4.1 defines the benefitting Geographies for each Levy Area. 4 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-1 Table 4.2 outlines a cost estimate for each improvement based on 2025 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-2 4.3 TABLE 4.1 - TRANSPORTATION LEVY AREAS Geography Name AA Transportation 1 AA Transportation 2 AA Transportation 3 AA Transportation 4 Annex Undeveloped N 0 0 0 0 Annex Undeveloped S 0 0 0 0 Point Aux Pins 1 0 1 0 AA 10 1 0 1 0 AA 6 0 1 1 0 AA 7 0 1 1 0 Roseburn NE 0 1 1 0 AA 8 0 1 1 0 AA 4 0 1 1 0 AA 9 0 1 1 0 AA 12 0 0 0 0 AA 1 0 0 0 1 AA 13 0 0 0 1 AA 2 0 0 0 1 Annex 15 0 0 0 1 AA 3 0 1 1 0 Area Serviced 127.7 364.2 492.0 129.7 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 4 - Transportation System 4-3 4.4 TABLE 4.2 - TRANSPORTATION INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community FORT SASKATCHEWAN ANNEXATION SERVICING DESIGN BRIEF FIGURE 4.11 1:17,000 0 180 360 540 720 90 Meters ± Coordinate System: NAD 1983 CSRS 3TM 114 Projection: Transverse Mercator Datum: North American 1983 CSRS Veternas Way 101 Street Township Road 542 92 Street 94 Street Allard Way Legend Annexation Area Arterial Road Collector Road Existing Road Traffic Signals Roundabout PROPOSED ANNEXATION AREA INTERSECTION CONTROLS Arterial B Arterial A Willow Link Westpark Drive Southview Way Collector A Collector B Sienna Boulevard Collector C Collector D Southridge Blvd Levy Project # 50 55 54 60 59 58 53 50 63 62 61 64 66 65 69 68 67 70 Figure 4.1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 AA -A inte LAN าร 10 Pi A -7 TR sebu Ros BA -4 AA A-3 RT SASK ale: D HEV TRA RTA ULY GS SPO SIN NBA 2025 ure 6 Π City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-0 5 Stormwater Drainage System 5.1 GENERAL Management of stormwater is an important component in the development of a community. It must be handled effectively, to preserve and promote the general health, welfare, security and economic well-being of the public. Traditionally, in urban centres, stormwater is handled in keeping with the minor/major drainage concept wherein: - Minor systems are designed and implemented to accommodate drainage to avoid property damage and flooding and to minimize inconvenience to the public from 1 in 5 year rainfall events. - Major systems are designed and implemented for flood control to avoid loss of life, injuries and significant damage to property, from events greater than 1 in 5 year return, producing unusual, high intensity rainfall and/or large volume runoff. Minor systems are typically comprised of underground piping, manholes, catch basins and outfall structures but can also be designed as a rural-type drainage system consisting of ditches and culverts. Major systems can be large diameter underground piping, open channels, stormwater detention/retention ponds, natural streams or any combination thereof, capable of conveying runoff from events up to and including a 1 in 100 year return period, to the ultimate receiving stream or water body. 5.2 FUTURE URBAN AREA STORMWATER MANAGEMENT PLAN The Servicing Design Brief - Annexed Land identified several stormwater ponds and trunk sewers within the Future Urban Area boundary. Geographies located west of Highway 21 drain through a series of trunk sewers and stormwater ponds and outfall to Pointe Aux Pins Creek. Geographies east of Highway 21 drain through a series of trunk sewers and stormwater ponds towards the northeast and outfall to Ross Creek. 5.3 STORMWATER DEVELOPMENT LEVIES In conducting this study, it was necessary to make certain assumptions: - The Developer will be responsible for the construction of catch basins and storm sewers that serve and benefit their Geography. - Storm trunks that connect stormwater management ponds and benefit more than one Geography will be included in the Stormwater Development Levies for the benefitting Geographies. - There is no grant funding available towards the construction of trunk sewer systems. - All stormwater management ponds will be the responsibility of the developer. - The Yorkville Ditch realignment and TWP 542 Ditch will be levied against the Geographies benefitting from the projects. 5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-1 Figure 5.1 shows the stormwater infrastructure projects included in the Future Urban Area Off-site Levy. Table 5.1 defines the benefitting Geographies for each Levy Area. Table 5.2 outlines a cost estimate for each improvement based on 2025 dollars and future construction costs, with an inflation rate as indicated. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-2 5.4 TABLE 5.1 - STORM MANAGEMENT LEVY AREAS Geography Name AA Storm 1 AA Storm 2 AA Storm 3 AA Storm 4 AA Storm 5 AA Storm 6 AA Storm 7 AA Storm 8 AA Storm 9 Annex Undeveloped N 0 0 0 0 0 0 0 0 0 Annex Undeveloped S 0 0 0 0 0 0 0 0 0 Point Aux Pins 1 0 0 0 0 0 0 0 0 AA 10 1 0 0 0 0 0 0 0 0 AA 6 0 1 1 1 1 1 1 0 0 AA 7 0 1 1 1 1 1 1 0 0 Roseburn NE 0 1 1 1 1 1 0 0 0 AA 8 0 1 1 1 1 0 0 1 1 AA 4 0 1 1 1 1 0 0 0 0 AA 9 0 1 1 1 1 0 0 1 0 AA 12 0 0 0 0 0 0 0 0 0 AA 1 0 1 0 0 0 0 0 0 0 AA 13 0 0 0 0 0 0 0 0 0 AA 2 0 1 1 0 0 0 0 0 0 Annex 15 0 1 1 0 0 0 0 0 0 AA 3 0 1 1 1 0 0 0 0 0 Area Serviced 127.7 480.2 447.4 364.2 322.5 165.9 107.6 109.0 53.8 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Stormwater Drainage System 5-3 5.5 TABLE 5.2 - STORM MANAGEMENT INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Pond 9 Pond 8 Pond 6 Pond 7 Pond 10 Pond 3 Pond 2 Pond 5 Pond 11 Pond 4 Pond 1 610m 630m 615m 620m 625m 605m 612.5m 617.5m 622.5m 627.5m 607.5m 600m 632.5m 602.5m 635m 630m 625m 632.5m 602.5m 622.5m 607.5m 630m 630m 630m 630m 630m 625m 630m 607.5m 625m 622.5m 622.5m 612.5m 630m 605m 625m 605m 627.5m 632.5m 630m 607.5m 630m 622.5m 627.5m 605m 625m 630m 625m 625m 625m 622.5m 630m 607.5m 605m 625m 627.5m 630m 610m 625m 627.5m 630m 622.5m 625m 625m 605m 622.5m 625m 610m 612.5m 627.5m 627.5m 627.5m 632.5m 630m 622.5m 625m 627.5m 630m 625m 607.5m 607.5m 622.5m 607.5m 625m 630m 625m 605m 627.5m 605m 627.5m 625m 630m 627.5m 630m 630m 630m 605m 622.5m Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community FORT SASKATCHEWAN ANNEXATION AREA SERVICING DESIGN BRIEF FIGURE 5.5 Proposed Stormwater Servicing Concept 1:17,000 0 180 360 540 720 90 Meters ± Legend Southfort Development Area Annexation Area Potentially Crown Claimable Wetland Environmental Reserve Waterbody Watercourse Proposed SWMFs Catchment Pond Area at NWL Pond PUL D D D Section of Yorkville Ditch to be Realigned Proposed Boundary Ditch and Realigned Yorkville Ditch Coordinate System: NAD 1983 CSRS 3TM 114 Projection: Transverse Mercator Datum: North American 1983 CSRS VETERANS WAY / HIGHWAY 21 VETERANS WAY / HIGHWAY 21 VETERANS WAY / HIGHWAY 21 86 AVENEUE SOUTHFORT DRIVE TOWNSHIP ROAD 542 TOWNSHIP ROAD 542 RANGE ROAD 225 / 92 STREET TOWNSHIP ROAD 544 RANGE ROAD 224 PIPELINE ROW RANGE ROAD 224 101 STREET SOUTHRIDGE BOULEVARD 94 STREET ALLARD WAY Outlet invert of 620.4m at Ross Creek BRIDGE CULVERT BF00806 Note: On January 12, 2023, Alberta Environment and Protected Areas indicated that the wetland 2 does not meet the criteria for a Crown ownership claim. 2 1 46 45 44 43 42 41 40 39 49 48 47 Levy Project # 43 Figure 5.1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 6 - Recommendations 6-0 6 Recommendations Based on the findings of this study, it is recommended that: - The City of Fort Saskatchewan continues to assume responsibility for the construction of the municipal infrastructure systems which they deem to be of benefit to the City at large. - The City maintains its current philosophy that development will be responsible for its proportionate share of the cost of municipal infrastructure systems expansion through the assessment of development levies against all benefiting lands. - The City maintain its existing philosophy regarding storm water drainage systems, wherein the development industry is required to manage stormwater in accordance with the Alberta Environmental Protection guidelines respecting stormwater release rates and the City of Fort Saskatchewan Municipal Engineering Standards requirements. - The City periodically reviews the Development Levies to ensure that the rates are consistent with the overall City funding requirements. Table 6.1 is a summary of the combined Future Urban Area Levy in 2025 dollars. 6 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 6 - Recommendations 6-1 6.1 TABLE 6.1 - OFF-SITE LEVIES Geography Water Levy Sanitary Levy Storm Levy Transportation Levy Total AA-1 $50,749.31 $11,351.27 $2,177.39 $88,240.01 $152,517.99 AA-2 $50,749.31 $12,845.18 $7,537.79 $88,240.01 $159,372.30 AA-3 $50,749.31 $22,910.45 $27,596.35 $181,610.94 $282,867.05 AA-4 $50,749.31 $26,646.60 $30,851.44 $181,610.94 $289,858.30 Roseburn NE $50,749.31 $26,646.60 $41,586.67 $181,610.94 $300,593.52 AA-6 $50,749.31 $26,646.60 $61,364.97 $181,610.94 $320,371.82 AA-7 $50,749.31 $26,646.60 $61,364.97 $181,610.94 $320,371.82 AA-8 $50,749.31 $26,646.60 $56,953.63 $181,610.94 $315,960.48 AA-9 $50,749.31 $26,646.60 $45,069.03 $181,610.94 $304,075.88 AA-10 $50,749.31 $26,646.60 $9,040.41 $37,175.63 $123,611.96 Pointe Aux Pins $50,749.31 $26,646.60 $9,040.41 $37,175.63 $123,611.96 AA-12 $50,749.31 $26,646.60 $0.00 $0.00 $77,395.91 AA-13 $50,749.31 $11,351.27 $0.00 $88,240.01 $150,340.60 AA-15 $50,749.31 $18,610.88 $7,537.79 $88,240.01 $165,138.00 High $320,371.82 Low $77,395.91 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 7 - Recommendations 7-0 7 Appendix 7 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 7 - Recommendations 7-1 7.1 PROJECT LIST PERCENTAGE ASSIGNED TO LEVY City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 Report City of Fort Saskatchewan Southfort Levy Report Report City of Fort Saskatchewan Community Recreation and Fire Services Levy Report Schedule "F" to Bylaw C14-17 December 2025 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 REPORT i Table of Contents SECTION PAGE NO. Table of Contents i 1 Introduction 1-2 1.1 GENERAL 1-2 1.2 LOCATION 1-2 1.3 DEVELOPMENT LEVIES 1-2 1.4 CRITERIA 1-2 2 Fire Services Infrastructure 2-0 2.1 GENERAL 2-0 2.2 FIRE SERVICES DEVELOPMENT LEVIES 2-0 2.3 TABLE 2.1 - FIRE SERVICES INFRASTRUCTURE COSTS 2-1 2.4 FIGURE 2.1 - FIRE SERVICES SERVICE AREA 2-2 3 Community Recreation Infrastructure 3-0 3.1 GENERAL 3-0 3.2 COMMUNITY RECREATION DEVELOPMENT LEVIES 3-0 3.3 TABLE 3.1 - COMMUNITY RECREATION INFRASTRUCTURE COSTS 3-1 4 Recommendations 4-0 4.1 TABLE 8.1 - FIRE SERVICES AND COMMUNITY RECREATION OFF-SITE LEVIES 4-1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-2 1 Introduction 1.1 GENERAL The growth and development of a community will generally create some impact on the municipal infrastructure systems. In addition to the traditional water, sewer, storm and roadway infrastructure, growth of Community Recreation and Fire Services Infrastructure is also required. It is the philosophy of the City of Fort Saskatchewan that development will be responsible for its own municipal infrastructure as well as for its proportionate share of the off-site infrastructure from which it will benefit. This is achieved through the assessment of Development Levies against the benefitting lands. 1.2 LOCATION The expansion of Community Recreation and Fire Services has varying impacts on the growth areas of the City. For example, Industrial areas do not require Community Recreation Infrastructure and different areas will benefit to different amounts from the construction new Fire Services Infrastructure. 1.3 DEVELOPMENT LEVIES In the context of this report, Development Levies are defined as capital costs, assessed by the City of Fort Saskatchewan, against developing lands for their proportionate share of the costs of municipal infrastructure systems, constructed by the City or other developers, which benefit the development areas. 1.3.1 Off-Site Levies Under authority of the Municipal Government Act, the City is permitted to impose Off-Site Levies against development to cover the costs of any or all of the following: a) New or expanded facilities for the storage, transmission, treatment or supplying of water. b) New or expanded facilities for the treatment, movement and disposal of sanitary sewage. c) New or expanded storm sewer drainage facilities. d) New or expanded roads required for or impacted by a subdivision or development. e) New or expanded community recreation facilities. f) New or expanded firehalls. g) Lands required for or in connection with any facilities described in (a) to (f) above. 1.4 CRITERIA In this study, lands dedicated as Environmental Reserve and Municipal Reserve (MR) are excluded as a Development Levy contributing area. Traditionally, the City has required the Developer to develop the MR 1 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 1 - Introduction 1-3 lands in accordance with the City's needs, as negotiated through the Development Agreement. Hence, Development Levies are not applied against such lands, thereby reducing the contributing lands area accordingly. It was also necessary to establish some general assumptions as Development Levy calculation criteria: - The City will continue to assume responsibility for the provision of those infrastructure systems and facilities which they deem to be a benefit to the City at large and/or a single development parcel. - The Development Levy rates are expressed on a per hectare basis. - Gross Area is defined as the total area of a parcel(s) of land irrespective of their potential for development or land use. - Gross Developable Area is defined as the gross area less lands for Municipal Reserve and Environmental Reserve. The Development Levy and charge rates contained in this document are based on Gross Developable Area. - All costs are estimated in 2025 dollars. These cost estimates should be reviewed annually or no later than every three years, to reflect current year construction costs. - An inflation factor has been applied to all estimates, to more accurately estimate the construction costs for the projected year of construction. An inflation rate of 2.5% per annum was used. - Where conditional grants or donations have been secured by the City, towards a specific project, the project cost has been reduced by the amount of the grant. - Unconditional grants, even though they may have been utilized by the City for financing a project, are not deducted from the final project costs, as it can be rationalized that such funding could have been used for other projects. Assumptions and/or calculation criteria specific to each Development Levy are further highlighted, in more detail, within each respective section of this report. City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Fire Services Infrastructure 2-0 2 Fire Services Infrastructure 2.1 GENERAL The Alberta Building Code has long incorporated fire department response time as a factor in construction requirements. Buildings located outside the 10-minute response area may need additional fire protection measures, such as non-combustible cladding, limited windows, or sprinkler systems, to compensate for the potentially longer response time. A 10-minute fire response refers to the goal of having the first fire truck arrive at the scene of a fire within 10 minutes of the initial call for help, at least 90% of the time. This timeframe is often a key consideration in building codes and fire protection planning, impacting construction requirements for new developments. The 10-minute response time is crucial because it directly affects the severity and potential spread of a fire. A faster response allows firefighters to contain the fire more effectively, minimizing damage and risk to life. 2.2 FIRE SERVICES DEVELOPMENT LEVIES To meet the 10-minute response time requirement within developing neighbourhoods a second Firehall is required. The second firehall response area is shown in Figure 6.1. The cost of the Firehall will be split on a per hectare basis to all lands within the response area and assigned to the benefitting Geographies (1665 ha). Table 2.1 outlines a cost estimate for each improvement based on 2025 dollars and future construction costs, with an inflation rate as indicated. 2 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 2 - Fire Services Infrastructure 2-1 2.3 TABLE 2.1 - FIRE SERVICES INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Community Recreation Infrastructure 3-0 3 Community Recreation Infrastructure 3.1 GENERAL Community Recreation Infrastructure, encompassing facilities like parks, recreation centers, and sports complexes, is crucial for fostering healthy, vibrant, and inclusive communities. These spaces provide opportunities for physical activity, social interaction, and cultural engagement, leading to numerous individual and community-wide benefits. 3.2 COMMUNITY RECREATION DEVELOPMENT LEVIES The City has identified one Community Recreation Infrastructure Project that is required as a result of growth within Fort Saskatchewan. A new Aquatics Facility is required to meet the growing demands of aquatics programming in the City. This facility will benefit the entire community, as such the costs are shared proportionately on a per hectare basis across the City's non-industrial lands. Table 3.1 outlines a cost estimate for the improvement based on 2025 dollar, with an inflation rate as indicated. 3 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 3 - Community Recreation Infrastructure 3-1 3.3 TABLE 3.1 - COMMUNITY RECREATION INFRASTRUCTURE COSTS City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 8 - Recommendations 4-0 4 Recommendations Based on the findings of this study, it is recommended that: - The City of Fort Saskatchewan continues to assume responsibility for the construction of the municipal infrastructure systems which they deem to be of benefit to the City at large. - The City maintains its current philosophy that development will be responsible for its proportionate share of the cost of municipal infrastructure systems expansion through the assessment of development levies against all benefiting lands. - The City periodically reviews the Development Levies to ensure that the rates are consistent with the overall City funding requirements. Table 8.1 is a summary of the Fire Services and Community Recreation Levy in 2025 dollars. 4 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 8 - Recommendations 4-1 4.1 TABLE 4.1 - FIRE SERVICES AND COMMUNITY RECREATION OFF-SITE LEVIES Community Recreation Levies Levy / Ha Non-Industrial Development $46,706.17 Southfort, Westpark, Future Urban Area Fire Services Levies 2nd Firestation - 10 minute response area $12,069.21 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 5 - Appendix 5-1 5 Appendix 5 City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025 City of Fort Saskatchewan 8 - Recommendations 5-2 5.1 TABLE 5.1 - PROJECT LIST PERCENTAGE ASSIGNED TO LEVY *Costs above do not include borrowing City of Fort Saskatchewan Off-Site Levy Bylaw C14-17 Office Consolidation 2025