This is the exact embedded text of the captured official document. Snapshot b89be77d1e69 · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

MD of Bighorn BUILDING PERMIT FEE SCHEDULE Residential Installations New Dwellings, Additions, Renovations, $6.50 per $1000 of Project Value ** Decks, Accessory Buildings, Reconstruction $150.00 minimum permit fee Manufactured / Mobile Home $150.00 (on blocking or piles) Relocation of a Building $0.35 per square foot of main floor (on crawlspace or basement) $150.00 minimum permit fee Roof Mounted Solar Installations $175.00 Solid Fuel Burning Appliances, Hot Tubs, oe «a: $150.00 Swimming Pools, Demolition Multi-Family, Commercial, Industrial, Institutional Installations Description of Work Permit fee ("SCC Levy not included) New, Addition, Renovation, . + Alteration, Demolition $6.50 per $1000 of Project Value Minimum Building Permit Fee $300.00 Project Value is based on the actual cost of material and labour. Use the Project Value Calculator to ensure fair market value. * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn ELECTRICAL PERMIT FEE SCHEDULE Residential Installations Single Family Dwellings, Additions Up to 1000 $165.00 $6.60 $171.60 1001 -- 1200 $190.00 $7.60 $197.60 1201 --- 1500 $215.00 $8.60 $223.60 1501 -- 2000 $240.00 $9.60 $249.60 2001 -- 2500 $265.00 $10.60 $275.60 Over 2500 $265.00 plus $0.10 per square foot plus SCC Levy Residential Connections Permanent Service Connection Only $165.00 $6.60 $171.60 Temporary Power/Underground $165.00 $6.60 $171.60 Service Alternative Energy (Solar, Wind) $225.00 $9.00 $234.00 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn ELECTRICAL PERMIT FEE SCHEDULE Other than New Single Family Dwellings and Additions and Residential Connections $0.00 - $2,500.00 $165.00 $6.60 $171.60 $2,501.00 - $5,000.00 $200.00 $208.00 $5,001.00 - $7,500.00 $265.00 $10.60 $275.60 $7,501.00 - $10,000.00 s350.00 | si400 | $364.00 $10,001.00 - $20,000.00 $450.00 $18.00 $468.00 $20,001.00 - $30,000.00 $575.00 $23.00 $598.00 $30,001.00 - $40,000.00 $700.00 $28.00 $728.00 $40,001.00 - $50,000.00 $825.00 $858.00 $350,001.00 - $500,000.00 $1,750.00 $70.00 $1,820.00 $500,001.00 - $750,000.00 $2,250.00 $90.00 $2,340.00 $750,001.00 - $1,000,000.00 $2,750.00 $110.00 $2,860.00 For projects over $1,000,000 divide the total installation cost by Greater than $1,000,000.00 $1,000 and then multiply by 3.000 plus SC Levy * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn ELECTRICAL PERMIT FEE SCHEDULE Annual Electrical Permits Annual Electrical Maintenance $375.00 $15.00 $390.00 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn GAS PERMIT FEE SCHEDULE Residential Installations 16 - 20 $325.00 $13.00 $338.00 Over 20 Outlets $325.00 plus $10.00 per outlet over 20 Propane Tank Set (if doing a connection, also add the $165.00 $6.60 $171.60 permit fee for the number of outlets) Temporary Heat $165.00 $6.60 $171.60 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn GAS PERMIT FEE SCHEDULE Multi-Family, Commercial, Industrial, Institutional, Oil & Gas New and Replacement Installations 0 - 400,000 $165.00 $6.60 $171.60 400,001 - 750,000 $215.00 $223.60 750,001 - 1,000,000 $265.00 $10.60 $275.60 1,000,001 - 2,000,000 $315.00 $12.60 $327.60 $315.00 plus $6.50 per 100,000 Over 2,000,000 (or portion of) over 2,000,000 BTU Propane Installations Tank Set Only (if doing a connection, also add the $165.00 $6.60 $171.60 permit fee for the BTU Input) Propane Cylinder Refill Centre $250.00 $10.00 $260.00 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn PLUMBING PERMIT FEE SCHEDULE Residential & Non-Residential Installations 16 - 20 $270.00 $10.80 $280.80 $270.00 plus $6.50 per fixture over 20 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn PRIVATE SEWAGE PERMIT FEE SCHEDULE Holding Tanks and Septic Tanks Only $275.00 $11.00 $286.00 Open Discharge, Fields, Mounds, Lagoons, Treatment Plants $450.00 $18.00 $468.00 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 MD of Bighorn MISCELLANEOUS FEE SCHEDULE Additional Inspections $125.00 / inspection (beyond QMP requirements (SCO Discretion) subject to 4% SC Levy 6 months -- no charge Another 6 months -- 10% of permit fee Request for Extension minimum $125.00 subject to 4% SC Levy New permit required beyond one year Altemative Solutions / Variances $150.00/hour minimum 2-hour charge - . . Double Permit Fee Additional work found during inspection $75.00 not on the onginal permit subject to 4% SC Levy Building & Private Sewage Issued Permits $150.00 Change to Drawings or Design subject to 4% SC Levy Private Sewage Inspection for $150.00/hour minimum 2-hour charge Subdivision Approval plus GST * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560