# Off-Site Levies
Off-site levies are charges collected by municipalities from developers to help fund the capital cost of infrastructure required to support new growth in accordance with Section 648 of the Municipal Government Act (*R.S.A. 2000, Chapter M-26, as amended*). Off-site levies help ensure that a fair share of the cost of new and expanded infrastructure is paid by development, supporting the principle that "growth pays for growth" and maintain service levels for existing residents.
As communities grow, new and expanded infrastructure is required to support new development. Off-site levies are collected at the time of subdivision or development and must be used for eligible growth-related infrastructure. Eligible projects may include water, wastewater and stormwater systems, roads, and certain community facilities such as recreation facilities, fire halls, police stations, and libraries.
## More Information
* Off-Site Levy Bylaw 21-26 was passed at the September 28 Town Council meeting. Click the button below to review the bylaw.
Off-Site Levy Bylaw 21-26
* Click the buttons below to review.
Off-site Levy Bylaw Model - Community Amenities
Off-site Levy Bylaw Model - Sanitary
Off-site Levy Bylaw Model - Transportation
Off-site Levy Bylaw Model - Water
* Click the buttons below to review stakeholder consultation presentations.
| |
| --- |
| Nov 21, 2024 Stakeholder Consultation Presentation |
| Mar 13, 2025 Stakeholder Consultation Presentation |
| May 15, 2025 Stakeholder Consultation Presentation |
| June 2025 Stakeholder Consultation Presentation |
| July 30, 2025 Stakeholder Consultation Presentation |
| December 11, 2025 Stakeholder Consultation Presentation |
| April 23 , 2026 Stakeholder Consultation Presentation |
* Click the buttons below to review feedback and related Town response.
June 2025
January/February 2026
May 2026
Town Response May 2026
July 2026
Town Response August 2026
August 2026
* Click the buttons below to review the annual off-site levy reports:
| |
| --- |
| **Report** |
| 2025 Off-Site Levy Annual Report |
| 2024 Off-Site Levy Annual Report |
| 2023 Off-Site Levy Annual Report |
| 2022 Off-Site Levy Annual Report |
| 2021 Off-Site Levy Annual Report |
| 2020 Off-Site Levy Annual Report |
## Supporting Technical Information
* Click the buttons below to learn more.
Town of Okotoks Growth Strategy
* Click the buttons below to review technical documents.
Recreation Levy Cost Adjustment Memo
Recreation, Parks and Leisure Master Plan
The State of Recreation, Parks and Leisure Research Report
Defining a Potential New Community Recreation Centre
Community Amenities Off-Site Levy Study
2023 Recreation, Parks and Leisure Master Plan Update
* Click the buttons below to review technical documents.
2016 Sanitary Master Plan - Part 1
2016 Sanitary Master Plan - Part 2
2016 Sanitary Master Plan - Part 3
2016 Sanitary Master Plan - Part 4
2020 Sanitary Master Plan Update
2024 Sanitary Master Plan Update - Amendment
2024 Sanitary Master Plan Update
* Click the buttons below to review technical documents.
Waste Water Treatment Plan Capacity Expansion Off-Site Levy Allocation Memo
Waste Water Treatment Plant Capacity & Upgrades Deferral Study
* Click the buttons below to review technical documents.
2020 Okotoks Transportation Master Plan
Highway 2 and 338 Avenue Interchange Functional Planning Study
Okotoks Transportation Master Plan Network Analysis Update Memo
338 Avenue Upgrades Functional Study
338 Avenue Upgrades OPC East
338 Avenue Upgrades OPC West
338 Avenue Upgrades Landscape Drawings
338 Avenue Upgrades Civil Drawings
32nd Street and 338 Avenue Roundabout Concept Design and OPC
338 Avenue Cost Allocation Memo
* Click the buttons below to review technical documents.
2020 Water Master Plan
2024 Zone 4N Secondary Dedicated Main Design Basis Memo
* Click the buttons below to review technical documents.
South Reservoir Feasibility Study Phase 1
South Reservoir Feasibility Study Phase 2
South Reservoir Off-Site Levy Clarification Memo
* Okotoks' Capacity and Cost Allocation Summary Memorandum
* Regional Water Pipeline Phase 1 Final RFP
Appendices
Addendum 3 Revised Pricing Form
Corrected Addendum 3
Bid Item 13 - Access Crossing Locations
Design Drawings
Design Drawings Sheep River HDD Crossing
Design Drawings Sheep River HDD Crossing Revisions
Design Drawings Slope HDD Crossing
Design Drawings Slope HDD Crossing Revisions
Map of Land Acquisition Status and Working Space Availability
Measurement & Payment Based on 50% Schedule of Quantities
Preliminary Geotechnical Report
Sample CCDC-05A Contract
Sample Unit Price Construction Contract
* Regional Water Pipeline MCC Pre-Purchase RFP
Submission Forms
Schedule A - General Description of Equipment & Specifications
Schedule B - Ancillary Services
Schedule C - Payment Schedule
Schedule D - Performance Schedule
* Regional Water Generator Pre-Purchase RFP
Appendices
Schedule A - Specifications Combined
Schedule B - Ancillary Services
Schedule C - Payment Schedule
Schedule D - Performance Schedule
Proposal
* Regional Water Pipeline Phases 2, 3 & 5 RFP
Appendices
Design Drawings Phase 2
Design Drawings Phase 3
Design Drawings Phase 5
Preliminary Geotechnical Report
Sample Construction Management Contract (CCDC 5A)
Sample Unit Price Construction Contract
Updated Geotechnical Report
* Regional Water Pipeline Phase 4 RFP
Revised Appendix C
Submission Forms
Design Drawings Phase 4
Sample Construction Management Contract CCDC-5A
Sample Unite Price Construction Contract
Updated Geotechnical Report
* Midline Pump Station & Water Treatment Plant Tie-Ins RFP
Additional Specifications (per Addendum 3)
Appendices
Part E - Midline Pump Station 75% Drawing for RFP
Part E - Midline Pump Station Reference Information
Part E - Midline Pump Station Specifications
Part F - WTP Tie-In 75% Drawing for RFP
Part F - WTP Tie-In Reference Information
Part F - WTP Tie-In Specifications
* Intake Pump Station RFP
Appendices
Part E - Regional Water Intake Pump Station 75% Drawings
Part E - Intake Pump Station Specifications
Part E - Intake Pump Station Reference Information
* Raw Water Reservoir Construction RFP
Appendices
Attachment 1 - Design Drawings
Attachment 2 - Technical Specifications
Attachment 3 - Wetland Assessment and Impact Report
Attachment 4 - Water Act Approval
Attachment 5 - Reservoir Phase 1 Consequence Classification
Attachment 6 - Geotechnical Design Report
CCDC - Supplementary General Conditions
CCDC - Unit Price Contract
Contractor Orientation Document
Schedule of Prices
*Last Updated: October 5, 2026*