This is the exact embedded text of the captured official document.
Snapshot d0dce8716358 · verified 2026-09-27 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Bylaw No. 1017/2025, Schedule 'G' Safety Codes Services Fees
Page 18
SCHEDULE 'G'
SAFETY CODES SERVICES FEES
Security Deposits
1.
Security deposits refunded upon completion of final inspections and
corrections of any deficiencies to ensure compliance with the Safety
Codes Act and applicable regulations
2.
All New Residential Dwellings
Renovations / Additions over $100,000 in construction value
$1,000.00
3.
New Commercial and Industrial Developments over $500,000
construction value
$3,000.00
Building Permit Fees
4.
Add 4% Safety Codes Council fee for each permit issued with a
minimum of $4.50 and a maximum of $560.00
5.
Minimum building permit fee for Residential $125.00 and for
Commercial $250.00, unless otherwise stated below
Residential
6.
New Single Detached, Cottage, Duplex, Semi-detached, Multi-attached
Dwelling, (Total of Main, Second and Additional Floors)
$0.50/ft²
7.
Basement Development
$0.25/ft²
8.
Garden Suites in accessory buildings
$0.50/ft2
9.
Secondary Suites (primary building), additions, renovations
$0.35/ft2
10.
Manufactured Home or Single Detached Dwelling Relocation on
Foundation, Basement or Crawlspace
$0.30/ft²
11.
Manufactured Home (on blocking or piles), no deck
$200.00
12.
Manufactured Home (on blocking or piles) & deck
$300.00
13.
Decks, Fireplaces, Demolition, Wood Burning Stoves, Sheds less than
360 ft², Swimming Pool, Hot Tubs on a Deck
$125.00
14.
Attached/Detached Garages, Shops, Sheds greater than 360 ft²
$0.30/ft² to a
maximum
$300.00
15.
Demolition
$125.00
16.
Hot Tubs (ground level)
$15.50
Institutional, Commercial and Industrial
17.
Change of use or occupancy (no renovation)
$250.00
18.
Apartments, Institutional, Commercial, Industrial construction, and
Fabric covered structures
$7.50/$1,000 of
construction cost
up to
$5,000,000.00;
$3.75/$1000 for
$5,000,000.00
or greater of
construction cost
19.
Riding Arenas
$4.00/$1,000 of
construction cost
20.
Geothermal Heating
$6.00/$1,000 of
construction cost
21.
Demolition Permit
$250.00
Bylaw No. 1017/2025, Schedule 'G' Safety Codes Services Fees
Page 19
22.
Swimming Pool/Hot Tub/Work Camp
$250.00
23.
Tents (temporary structures, special events)
$0.10/ft²
24.
Stages
$125.00/stage
25.
Bleachers
$125.00/50 ft
26.
Penalty for construction without permit
Double
Calculated Fee
Electrical Permit Fees
27.
Add 4% Safety Codes Council fee for each permit issued with a
minimum of $4.50 and a maximum of $560.00
Homeowner Rates - Residential New Construction, Garages, Basements and Additions
28.
0 to 500 ft2
$230.00
29.
501 ft2 to 1,000 ft2
$290.00
30.
1,001 ft2 to 1,500 ft2
$350.00
31.
1,501 ft2 to 2,000 ft2
$400.00
32.
2,001 ft2 to 2,500 ft2
$460.00
33.
Greater than 2,500 ft2
$460.00 +
$0. 12/ft² over
2,500 ft²
Homeowner Rates - Minor Renovations
34.
0 to 500 ft2
$170.50
35.
501 ft2 to 1,000 ft2
$230.00
36.
1,001 ft2 to 1,500 ft2
$290.00
37.
1,501 ft2 to 2,000 ft2
$350.00
38.
2,001 ft2 to 2,500 ft2
$400.00
39.
Greater than 2,500 ft2
$400.00 +
$0. 12/ft2
over 2,500 ft²
40.
Manufactured Home not on a Permanent Foundation (add $55.00 for
homeowner)
$200.00
41.
Temporary Service (add $55.00 for homeowner)
$145.00
42.
Farm buildings, add $55.00 to the Contractor Rates using Electrical
Work Value table below
Contractor Rates for Residential, Farm Buildings, Institutional, Commercial and Industrial
Construction - Includes material and labour (electrical drawings may be required on any
installation)
Electrical Work Value
43.
$0 to $1,000
$115.50
44.
$1,001 to $2,000
$132.80
45.
$2,001 to $3,000
$150.10
46.
$3,001 to $4,000
$167.40
47.
$4,001 to $5,000
$184.70
48.
$5,001 to $6,000
$200.00
49.
$6,001 to $7,000
$219.30
50.
$7,001 to $8,000
$236.60
51.
$8,001 to $9,000
$253.90
52.
$9,001 to $10,000
$271.20
Bylaw No. 1017/2025, Schedule 'G' Safety Codes Services Fees
Page 20
53.
$10,001 to $11,000
$288.50
54.
$11,001 to $12,000
$305.80
55.
$12,001 to $13,000
$323.10
56.
$13,001 to $14,000
$340.40
57.
$14,001 to $15,000
$357.10
58.
$15,001 to $16,000
$375.00
59.
$16,001 to $18,000
$392.30
60.
$18,001 to $20,000
$409.60
61.
$20,001 to $25,000
$426.90
62.
$25,001 to $30,000
$444.20
63.
$30,001 to $35,000
$461.50
64.
$35,001 to $40,000
$478.80
65.
$40,001 to $50,000
$515.00
66.
$50,001 to $60,000
$550.00
67.
$60,001 to $80,000
$620.00
68.
$80,001 to $100,000
$695.00
69.
$100,001 to $120,000
$810.00
70.
$120,001 to $140,000
$925.00
71.
$140,001 to $160,000
$1,040.00
72.
$160,001 to $180,000
$1,155.00
73.
$180,001 to $200,000
$1,270.50
74.
More than $200,000
$6.35/$1,000.00
75.
Annual Electrical Permit
$250.00
76.
Generator & A/C installations
$175.00
77.
Solar Panels
$225.00
78.
Penalty for electrical work done without permit
Double
Calculated Fee
Plumbing & Private Sewage Permit Fees
79.
Add 4% Safety Codes Council fee for each permit issued with a minimum of $4.50 and a
maximum of $560.00
80.
Homeowner fee of $55 in addition to the schedule outlined below
All Plumbing (Except Private Sewage)
81.
1 to 19 fixtures
81.a.
First 2 Fixtures
$145.00
81.b.
Each Additional Fixture
$17.30
82.
20+ Fixtures
82.a.
First 20 Fixtures
$346.25
82.b.
Each Additional Fixture
$5.75
83.
Manufactured Home not on a permanent foundation
$145.00
84.
Force Main Connection
$170.00
Private Sewage
85.
Installation of private sewage disposal field, treatment mound or open
discharge, or any other effluent treatment system
$345.00
86.
Installation of holding tanks
$170.00
87.
Penalty for plumbing work done without permit
Double
Calculated Fee
Bylaw No. 1017/2025, Schedule 'G' Safety Codes Services Fees
Page 21
Gas Permit Fees
88.
Add 4% Safety Codes Council fee for each permit issued with a
minimum of $4.50 and a maximum of $560.00
89.
Homeowner fee of $55 in addition to the schedule outlined below
Residential
90.
1 to 2 outlets (new furnace, water heater, boiler, fireplace, secondary
line, etc.)
90.a.
First 2 Outlets
$145.00
90.b.
Each Additional Outlet
$17.30
91.
Propane Tank Installation
$85.50
92.
Propane Tank Installation & Connection (all on one permit)
$85.50 +
$145.00
(first 2 outlets +
$ 17.30 for
additional outlet)
93.
Temporary Propane/Natural Gas
$115.50
94.
Penalty for installation done without a permit
Double
Calculated Fee
Institutional, Commercial and Industrial, Multi-attached Dwellings, Apartments and
Applicable Farm Buildings
95.
Propane Tank Installation
$145.00
96.
Propane/Gas Re-fill Centers
$230.00
97.
Propane Tank Grain Dryer
$266.00
98.
Temporary Heat
98.a.
0 - 250,000 BTU
$145.00
98.b.
250,001 to 500,000 BTU
$230.00
98.c.
500,001 to 1,000,000 BTU
$285.00
99.
New Installations
99.a
0 to 100,000 BTU
$145.00
99.b.
100,001 to 200,000 BTU
$170.00
99.c.
200,001 to 400,000 BTU
$200.00
99.d.
400,001 to 1,000,000 BTU
$285.00
99.e.
1,000,001 to 2,000,000 BTU
$400.00
99.f
Over 2,000,000 BTU
$400.00 +
$5.75/100,000
BTU
100.
Penalty for gas work done without permit
Double
Calculated Fee
Fee for Service (subject to GST)
101.
Inspection required for an existing installation not associated with a
specific permit (i.e., an existing building inspection or an existing private
septic system inspection)
$125 per hour
(minimum 2
hours)
Other Fees (for all disciplines)
102.
Re-Inspection/Additional Inspection
$165.00
103.
Building Variance (subject to GST)
$100.00
Fee Reduction.
Bylaw No. 1017/2025, Schedule 'G' Safety Codes Services Fees
Page 22
103.
Council delegates to the Chief Administrative Officer the authority to render a decision
relative to a written request for a reduction of the Safety Codes Services fees charged for
an application received from a non-profit organization provided the fee charged covers all
third-party costs incurred by the County for that respective application