Building permits — Red Deer, Alberta

Do I need a building permit? What does it cost?

In the City of Red Deer, Alberta, building permit rules are set by Safety Codes Permit Bylaw No. 3551/2015, verified 2026-09-27. Fees set in: Schedule "A". Administered by: Permit Issuer (Safety Codes Officer or designated person); Safety Codes Officer conducts inspections.

Safety Codes Permit Bylaw No. 3551/2015 adopted bylaw
permit required for Construction, demolition, installation, alteration, repair, removal, occupancy or change in occupancy of regulated buildings; installation, alteration or repair of electrical, plumbing and gas equipment and systems. s. 4(a)-(b)
exemptions Emergency work where imminent serious danger; minor HVAC repairs/alterations that do not hinder operation, replace single-family ducting, and do not impact health/safety. s. 6; s. 27(a)-(d)
fee basis Charges based on "Construction Cost" or "Installation Cost" include materials and labour; minimum fee $115.04; non-residential $9.83 per $1,000.00 construction costs; residential rates per m2 (e.g., $7.48/m2 main/upper, $3.09/m2 basement, $2.96/m2 garages/carports, $115.04 decks). Schedule "A"; s. 31
fees location Schedule "A" s. 31
authority Permit Issuer (Safety Codes Officer or designated person); Safety Codes Officer conducts inspections. s. 3(e); s. 24; s. 30
fine range Specified penalties in Schedule "B" for first/second/third offences; when not specified, fine not exceeding $10,000.00; continuing offence $100 per day; default imprisonment up to six months. s. 45-49; Schedule "B"
scout note

City of Red Deer bylaw under s.66 of the Safety Codes Act establishing the application procedure and fees for Safety Codes permits (building, electrical, gas, plumbing) issued by the accredited City itself; sets permit fee structure and administrative process.

Machine-readable: building-permits.json · Official website: http://reddeer.ca · Last verified 2026-09-27 · Building permits across Alberta · Building permits in other municipalities