| billing basis | metered | Water |
| water rate | $3.50/cube (15.1 to 50 cubes); $4.50/cube (over 50 cubes), 2026 | Water |
| water fixed charge | $35.00 for the first 15 cubes | residential water is $35.00 for the first 15 cubes |
| sewer rate | 40% of water cost; minimum $23.00 (residential) | Sewer |
| billing period | monthly | Each month you will receive a bill |
scout note
rates page: 2026 residential water base $35.00 for first 15 m3, $3.50/m3 for 15.1-50, $4.50/m3 over 50; sewer minimum $23.00, billed at 40% of water cost; infrastructure replacement fees phased in from 2026 (water $14.79, sewer $9.25, drainage $9.35 at full phase); garbage $23.00/month.