Thompson-Nicola Regional District Building Regulations Bylaw No. 2066, 2005 (Consolidated to March 5, 2026)

Cache Creek, British Columbia · No. 2066 · summary & facts

This is the exact embedded text of the captured official document. Snapshot b21a3199e5e5 · verified 2026-09-24 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

THOMPSON-NICOLA REGIONAL DISTRICT BUILDING REGULATIONS BYLAW NO. 2066, 2005 Thompson-Nicola Regional District 300-465 Victoria Street Kamloops, BC V2C 2A9 Telephone: 1-250-377-8673 Toll Free in BC: 1-877-377-8673 Facsimile: 1-250-372-5048 CONSOLIDATED TO MARCH 5, 2026 CONSOLIDATED FOR CONVENIENCE ONLY This information has been prepared by the Thompson-Nicola Regional District (TNRD) for convenience only. The TNRD does not represent that this consolidated bylaw is up to date or complete and anyone using this material should confirm its content by reference to the original legislation, codes, bylaws and their amendments. . CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District CONTENTS Division Title Page Division One Preamble 1 Division Two Definitions 5 Division Three Prohibitions 8 Division Four Authority of Building Official 9 Division Five Duties and Responsibilities of the Owner 11 Division Six General Permit Regulations 14 Division Seven Plumbing 19 Division Eight Complex Buildings 21 Division Nine Standard Buildings 25 Division Ten Relocation of a Building or Structure 29 Division Eleven Demolition 31 Division Twelve Temporary Buildings 33 Division Thirteen Professional Design and Field Review 35 Division Fourteen Professional Plan Certification 36 Division Fifteen Inspections 37 Division Sixteen Occupancy Approval 40 Division Seventeen Fees and Charges 41 Division Eighteen Disclaimer of Warranty or Representation 43 Division Nineteen Penalties and Enforcement 44 Division Twenty Appendices 46 Appendix A Schedule of Fees 47 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District THOMPSON-NICOLA REGIONAL DISTRICT BYLAW NO. 2066 A BYLAW TO REGULATE THE CONSTRUCTION, ALTERATION, REPAIR, MOVING OR DEMOLITION OF BUILDINGS AND STRUCTURES WHEREAS the Board of Directors of the Thompson-Nicola Regional District has, by "Thompson-Nicola Regional District Building Inspection Service Bylaw No. 1161, 1989", established the service of building inspection; AND WHEREAS the Board may by bylaw, for the health, safety and protection of persons or property, regulate the construction, alteration, repair, or demolition of buildings and structures including the installation, alteration, and repair of plumbing; the conservation of energy or water; and the provision of access for a person with disabilities; AND WHEREAS Order in Council 295 was approved December 18, 1998, the Board is enacting this Bylaw to regulate construction and administer the British Columbia Building Code in the Regional District in accordance with the Local Government Act and the Building Act, both as amended from time to time; NOW THEREFORE, the Board of Directors of the Thompson-Nicola Regional District in open meeting assembled enacts as follows: 1. This Bylaw may be cited for all purposes as the "Thompson-Nicola Regional District Building Regulations Bylaw No. 2066, 2005". 2. Thompson-Nicola Regional District Building Regulations Bylaw No. 1947, 2003 and all amendments thereto are hereby repealed. DIVISION ONE - PREAMBLE 1.1 Purpose of Bylaw The bylaw, shall, notwithstanding any other provision herein, be interpreted in accordance with this section. 1.1.1 This bylaw has been enacted for the purpose of regulating construction within the Regional District in the general public interest. The activities undertaken by or on behalf of the Regional District pursuant to this bylaw are for the sole purpose of providing a limited and interim spot-checking and monitoring function for reason of health, safety and the protection of persons and property. It is not contemplated nor intended, nor does the purpose of this bylaw extend: 1.1.1.1 to the protection of owners, owner/builders, constructors or occupiers from bodily injury or economic loss; Bylaw No. 2661, 2018 Building Regulations Bylaw No. 2066 Page 2 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 1.1.1.2 to the assumption by the Regional District or any Building Official of any responsibility for ensuring the conformance by any owner, his or her agent or any employees, constructors or designers retained by him or her, with the Building Code, the requirements of this bylaw or other applicable enactments respecting safety; 1.1.1.3 to providing any person a warranty of design or workmanship with respect to any building or structure for which a building permit or occupancy certificate is issued under this bylaw; 1.1.1.4 to providing a warranty or assurance that construction undertaken pursuant to building permits issued by the Regional District is free from latent or any defects or complies with this bylaw; 1.1.1.5 to the assumption by the Regional District or any Building Official of any responsibility for ensuring that any construction will be geotechnically sound and will not be subject to flooding, mud flows, debris flows, debris torrents, erosion, land slip, rock falls, subsidence, avalanche or other geohazards. 1.2 Metric Units Metric units are used for all measurements in this bylaw. The approximate equivalent of those units in commonly used units of imperial measure (feet, inches, etc.) are shown in brackets following each metric measurement and such bracketed figures are included for convenience only and do not form part of this bylaw. 1.3 Scope and Exemptions 1.3.1 This bylaw shall apply to: 1.3.1.1 the design, construction and occupancy of a building when a building, or part thereof, is constructed on site or is assembled or placed on site as a factory-built unit or component; 1.3.1.2 the work involved in the demolition when the whole or any part of a building is demolished or removed; 1.3.1.3 all parts of the building when the whole or any part of a building is moved; 1.3.1.4 any alteration and to any part of a building affected by alterations to an extent which, in the opinion of the Building Official reduces the levels of public health and safety below the levels existing prior to the alteration; 1.3.1.5 all parts of the building affected by the change of use when occupancy and/or use of a building is changed; Building Regulations Bylaw No. 2066 Page 3 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 1.3.1.6 all such replacements and alterations when materials and equipment regulated are replaced or altered in a building; 1.3.1.7 any part remaining when a building is damaged or destroyed to the extent of seventy-five (75%) percent or more of its value above its foundations as determined by the Building Official; 1.3.1.8 the design and construction of retaining walls where the difference in finish grade elevation is greater than 1.2 m ( 4 ft) in height; 1.3.1.9 the design and installation of the entire system when a plumbing system is installed, repaired, renovated or altered; 1.3.1.10 the design and repair of the entire plumbing system where a condition exists that is, or may become dangerous or injurious to health, except where the portion of the system affected is completely independent from any other part of the system; 1.3.1.11 the design, construction, or installation of fireplaces and chimneys 1.3.2 This bylaw does not apply to: 1.3.2.1 Buildings or structures exempted by Division A - Part 1 of the Building Code except as expressly provided herein; 1.3.2.2 Single-storey accessory buildings less than 20 m² (215 ft²) in building area; 1.3.2.3 Single-storey accessory buildings less than 55 m² (592 ft²) in building area, when situated within the AF-1, RL-1, SH-1 and CR- 1 zones; 1.3.2.4 farm buildings, as defined in Division Two this Bylaw, of less than 600 m² (6458 ft²) in gross floor area, when situated on land used for a Bona Fide Agricultural Operation and provided support space such as a washroom, office, control room, and similar human occupancy is limited to 10% of gross floor area to a maximum of 20 m2; 1.3.2.5 Unroofed decks attached to or adjacent to single and two-family dwellings if the deck surface is 600 mm (24 in) or less above the adjacent ground level. Bylaw No. 2431, 2013 Bylaw No. 2734, 2021 Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 4 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 1.3.3 Limited Application to Existing Buildings: 1.3.3.1 Except as provided in the Building Code or to the extent an existing building is under construction or does not have an occupancy permit, when an existing building has been constructed before the enactment of this Bylaw or any prior building bylaw in effect at the time, the enactment of this Bylaw is not to be interpreted as requiring that the building must be reconstructed and altered, unless it is expressly so provided by this or another bylaw, regulation or statute. 1.3.3.2 This Bylaw applies if the whole or any part of an existing building is moved either within or into the Regional District, including relocation relative to parcel lines created by subdivision or consolidation. 1.3.3.3 If an alteration is made to an existing building, the alteration must comply with this Bylaw and the Building Code and the entire building must be made to comply with this Bylaw and the Building Code, but only to the extent necessary to addresses any new infractions introduced in the remainder of the building as a result of the alteration. 1.3.3.4 If an alteration creates an addition to an existing building, the alteration or addition must comply with this Bylaw and the Building Code and the entire building must be made to comply with this Bylaw and the Building Code, but only to the extent necessary to address any new infractions introduced in the remainder of the building as a result of the alteration or addition. 1.4 In relation to the conservation of energy, construction on or after May 1, 2023 may meet the prescriptive requirements of s. 9.36.2 to 9.36.4 of Division B of the Building Code. 1.5 Other Enactments Where any provincial act or regulation or any other Regional District bylaw may apply to any matter covered by this bylaw, conformance with this bylaw shall not relieve the owner or his or her agent from conforming with provisions of such other act, regulation or bylaw. 1.6 Severability If any provision of this bylaw is found invalid, such provision is severable and shall not affect the validity of the remainder of this bylaw. Bylaw No. 2661, 2018 Bylaw No. 2661, 2018 Bylaw No. 2661, 2018 Bylaw No. 2661, 2018 Bylaw No. 2813, 2023 Building Regulations Bylaw No. 2066 Page 5 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION TWO - DEFINITIONS All words and phrases shall have their normal or common meaning except where this is changed, modified, or expanded by the definitions set forth in this Division, or Part 1 of the British Columbia Building Code. 2.1 "Accepted" means accepted in writing. 2.2 "Addition" means an alteration to any building which will increase the total aggregate floor area or height and includes provision of two or more separate buildings with openings between each other. 2.3 "Agent" means a person, firm, or company representing the owner, by written designation or contract, and includes a hired tradesperson or contractor. 2.4 "Alteration" means a change, repair, or modification of the construction or arrangement of use of any building or structure, or to an occupancy regulated by this Bylaw. 2.5 "Board" means the Board of Directors of the Thompson-Nicola Regional District. 2.6 "Bona Fide Agricultural Operation" means an operation classified as a farm by the Assessor under the Assessment Act. 2.7 "Building Code" means the current edition of the British Columbia Building Code adopted by the Minister pursuant to Section 692 (1) of the Local Government Act, as amended or re-enacted from time to time. 2. 8 "Building Official" includes a person or persons designated by the Regional District as Chief Building Inspector, Building Inspectors, Plumbing Inspectors or Plan Checkers, and includes supervisors for these positions. 2.9 Combination Building means: a building composed of a factory-constructed finished living space in combination with site-built components to form one building. 2.10 "Complex Building" means: 2.10.1 all buildings used for major occupancies classified as: 2.10.1.1 assembly occupancies; 2.10.1.2 care or detention occupancies; or 2.10.1.3 high hazard industrial occupancies; and 2.10.2 all buildings exceeding 600 m² (6458 ft²) in building area or exceeding three storeys in building height used for major occupancies classified as: 2.10.2.1 residential occupancies; 2.10.2.2 business and personal services occupancies; Bylaw No. 2624, 2017 Bylaw No. 2661, 2018 Bylaw No. 2661, 2018 Bylaw No. 2661, 2018 Bylaw No. 2813, 2023 Building Regulations Bylaw No. 2066 Page 6 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 2.10.2.3 mercantile occupancies; 2.10.2.4 medium and low hazard industrial occupancies. 2.11. "Construction" includes erection, repair, alteration, enlargement, addition, installation, demolition, removal, replacement, renovation, reconstruction, or relocation of a building or structure. 2.12 "Farm Building" means a building which does not contain any residential or accessory residential occupancy but rather is devoted to livestock, poultry, and farm equipment; farm storage for items such as feed, produce, grain, hay, pesticides, fertilizers, and manure tanks; and for clarity includes structures such as silos, hay sheds, greenhouses, or barns but excludes buildings with farm retail, vehicle garages, workshops, processing facilities, or similar. 2.13 "Health and Safety Aspects of the Work" means design and construction regulated by Part 3, Part 4, Part 7 and sections 9.4, 9.6, 9.8, 9.9, 9.10, 9.12, 9.14, 9.15, 9.17, 9.18, 9.19, 9.20, 9.21, 9.22, 9.23, 9.24, 9.25, 9.31, 9.32, 9.35, 9.36 and subsections 9.13.4, 9.18.7 and articles 9.33.5.2, 9.33.5.3 and 9.33.10.2 of the Building Code. 2.14 "Monitor" means the method by which a Building Official reviews the process of field reviews as conducted by registered professionals pursuant to the Building Code and this bylaw. The Building Official's monitoring function is satisfied by the Building Official's receipt of the applicable letters of assurance submitted by the registered professionals and as referred to in subsection 2.2.7 of the Building Code. Although a Building Official may review registered professionals' field inspection reports to ascertain field review frequency, or visit a site from time-to-time to verify that registered professional field reviews are taking place, the Building Official is under no duty to do so. Monitoring does not include assessment of conformity with the Building Code, this bylaw or another enactments or the approval of any aspect of construction. 2.15 "Occupancy Certificate" means a certificate required or issued pursuant to this Bylaw and includes a provisional occupancy certificate or, for minor construction, a written occupancy approval otherwise provided by the Building Official. 2.16 "Owner" means any person, firm or company controlling the property under consideration. 2.17 "Permit" means a permit required or issued pursuant to this bylaw. 2.18 "Person" means in addition to its ordinary meaning, a partnership, association, company, society and body corporate. 2.19 "Regional District" means the Thompson-Nicola Regional District. Bylaw No. 2431, 2013 Bylaw No. 2431, 2013 Bylaw No. 2619, 2017 Bylaw No. 2624, 2017 Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 7 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 2.20 "Site" means a lot or lots upon which work regulated under this bylaw is undertaken or intended to be undertaken and includes the construction thereon. 2.21 "Standard Building" means a building of three storeys or less in building height, having a building area not exceeding 600 m² (6458 ft²) and used for major occupancies classified as: 2.21.1 residential occupancies, 2.21.2 business and personal services occupancies, 2.21.3 mercantile occupancies, or 2.21.4 medium and low hazard industrial occupancies. 2.22 "Structure" means a construction or portion thereof of any kind, whether fixed to, supported by or sunk into land or water, but specifically excludes landscaping, fences, paving and retaining structures less than 1.2 m (4 ft) in height. Building Regulations Bylaw No. 2066 Page 8 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION THREE - PROHIBITIONS 3.1 No person shall, unless exempted by this bylaw or any enactment: 3.1.1 commence or continue any construction or change the occupancy of any building or structure, or other work related to construction unless a Building Official has issued a valid permit for the work; No Permit 3.1.2 unless authorized in writing by a Building Official, reverse, alter, deface, cover, remove or in any way tamper with any notice, permit or certificate posted upon or affixed to any building, structure or site pursuant to this bylaw; Remove Notice 3.1.3 perform any construction that is substantially at variance with the reviewed design or plans and specifications for the building, structure or other construction for which a permit has been issued, unless that variance has been accepted by a Building Official; Deviation From Plans 3.1.4 occupy, use or allow the occupancy or use of any building or part thereof contrary to the terms of this bylaw or any permit, notice, certificate, or decision given or posted by the Building Official; Illegal Occupancy 3.1.5 knowingly or recklessly submit false or misleading information to a Building Official in relation to any permit application or construction undertaken pursuant to this bylaw. False or Misleading Information 3.1.6 interfere with or obstruct the entry of a Building Official or other authorized official of the Regional District on property in the administration of this bylaw. Obstruction of Entry 3.2 No person having authority for construction, on a site shall cause, allow, or maintain any unsafe condition. Unsafe Condition Building Regulations Bylaw No. 2066 Page 9 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION FOUR - AUTHORITY OF BUILDING OFFICIAL 4.1 The Building Official: Administration 4.1.1 may administer this bylaw; 4.1.2 may enter any land, building, structure, or premises at any reasonable time for the purpose of ascertaining that the terms of this or any other Regional District bylaw are being observed; Right of Entry 4.1.3 may keep records of permit applications, permits, notices and orders issued, inspections and tests made, and shall retain copies of all documents related to the administration of this bylaw; Record Keeping 4.1.4 may establish whether the construction of a building or structure for which a permit is sought or issued under this bylaw substantially conforms to the requirements of the Building Code; and Construction Conformance 4.1.5 shall carry proper credentials confirming his or her status as a Building Official. Proper Credentials 4.2 The Building Official may order: Empowered to Order 4.2.1 a person who contravenes this bylaw to conform with the bylaw in a specified time period; Conformance 4.2.2 the removal of any unauthorized encroachment on public property; Encroachment 4.2.3 the removal of any building or part thereof constructed in contravention of this bylaw; Illegal Construction 4.2.4 the termination of any occupancy, in contravention of this bylaw; and Terminate Occupancy 4.2.5 the termination of any occupancy if in the opinion of the Building Official an unsafe condition exists because of construction undertaken or not completed. Unsafe Condition 4.3 The Building Official may, before issuing an occupancy certificate, require the owner to provide a professional engineer's or other appropriate certification, at the expense of the owner, where in the opinion of the Building Official such evidence is necessary to determine that the requirements of this bylaw and other applicable enactments respecting safety have been substantially complied with. Certification Before Occupancy Building Regulations Bylaw No. 2066 Page 10 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 4.4 The Building Official may direct the immediate cessation or correction of all or any portion of the construction on any site, by attaching an order to that effect on such premises, when, in his or her opinion such work is not being performed substantially in accordance with the provi- sions of the Building Code or any relevant bylaws of the Regional District. Such order shall remain posted on the premises until all work that is not being performed in accordance with the Building Code or this or any other relevant bylaw has been remedied to the satisfaction of the Building Official. No work, other than the required remedial measures, shall be carried out on the portion of the work affected by the order until such order has been removed, and shall only be removed by the Building Official in writing. Stop Work Order 4.5 Upon expiration of a building permit, the Building Official may grant permit renewal for a period of one year each, up to three times, provided construction is progressing and inspections are being called and passing; notwithstanding the forgoing, if construction is impacted by a declaration of a provincial State of Emergency or a State of Local Emergency, then additional renewals may be approved. Renewal Permits 4.6 The Building Official may refuse to issue a permit: Permit Refused 4.6.1 if the information submitted is inadequate to determine substantial conformance with, or is contrary to the provisions of this bylaw or any other applicable enactment; 4.6.2 if the information submitted is incorrect; 4.6.3 if issuance is prohibited by or is contrary to a provision of this bylaw or any other enactment; 4.6.4 for the connection of a fireplace insert to an existing chimney if the existing chimney has not been previously inspected and accepted; or 4.6.5 for the connection of a wood heater or furnace to an existing chimney if the existing chimney has not been previously inspected and accepted. Bylaw No. 2813, 2023 Building Regulations Bylaw No. 2066 Page 11 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION FIVE - DUTIES AND RESPONSIBILITIES OF THE OWNER 5.1 It is the owner's responsibility, prior to commencing construction to: Before Construction 5.1.1 confirm that every building or structure or addition to a building or structure meets the siting requirements and any height limitations of the zoning bylaw in effect; 5.1.2 investigate the status of the construction site and ensure that any concerns relating to flooding, drainage, soil stability or other potential hazards are addressed; Investigate Status 5.1.3 obtain a current State of Title Certificate from the Land Title Office to determine whether there are encumbrances, which may affect the proposed construction; and State of Title 5.1.4 investigate the availability, location and capacity of utility services to determine whether the proposed construction can be accommodated and arrange the plumbing to suit the location of the connections provided for the lot in a manner satisfactory to the Building Official. Utilities 5.2 The owner shall, during construction: 5.2.1 allow the Building Official to enter the building or premises at any reasonable time for the purpose of administering and enforcing this or any other relevant Regional District bylaw; Right of Entry 5.2.2 keep posted in a conspicuous place on the property in respect of which the permit was issued, the placard provided by the Development Services Department; and Placard On Site 5.2.3 ensure that the reviewed plans and specifications on which the permit is based are continuously available at the site during working hours. Reviewed Plans On Site 5.3 The owner shall not continue building construction beyond the foundation stage until: Work Beyond Foundation Stage 5.3.1 the owner has provided a current certificate of location by a registered British Columbia Land Surveyor to certify that the building and/or structure Surveyors Certificate Bylaw No. 2661, 2018 Building Regulations Bylaw No. 2066 Page 12 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District under construction is located on the property in conformance with Regional District regulations. Notwithstanding the requirements of this Division, where: 5.3.1.1 the building or structure is located on a large parcel such that setback distances to the nearest property line are not a concern; 5.3.1.2 the building or structure is located greater than 300 mm (12 in) from a minimum setback as determined by exposing survey pins; or 5.3.2 the Building Official may accept a letter of certification from the Land Surveyor in lieu of a Certificate of Location, or may waive the requirement entirely if satisfied that no certification is necessary. 5.4 The owner, when required by the Building Official, shall uncover and replace at his or her own expense any work that has been covered contrary to an order issued by the Building Official. Uncover and Replace 5.5 The owner when requested by the Building Official shall provide at his or her expense, tests or inspections necessary to establish substantial conformance with this bylaw in a form satisfactory to the Building Official. Tests 5.6 The owner when requested by the Building Official shall provide, in a form satisfactory to the Building Official, evidence to certify substantial conformance with the requirements of this bylaw, other applicable enactments respecting health and safety and any permits issued. Certification 5.7 The owner shall ensure that all work is confined within the boundaries of the property and does not adversely affect adjacent properties for which the permit has been issued. Protect Adjacent Properties 5.8 The owner is responsible for the cost to repair any damage to Regional District property that may occur as a result of undertaking work for which a permit was required under this bylaw. Repair Damage to Regional District 5.9 When a site is in an unsafe condition, the owner shall promptly take all action necessary to put the site in a safe condition. Correct Unsafe Condition Building Regulations Bylaw No. 2066 Page 13 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 5.10 The owner shall: 5.10.1 prior to the occupancy or use of any building or structure or part thereof, after completion of construction of the building, or part thereof, including work required in connection with any change in classification of occupancy of any building, or part thereof, obtain from the Building Official an occupancy certificate. Notice of Intent to Occupy 5.11 Neither the issuance of a permit under this bylaw nor the acceptance or review of plans, drawings or supporting documents, nor any inspections made by or on behalf of the Regional District shall in any way relieve the owner and his or her agent from full and complete responsibility to perform the work in strict accordance with this bylaw, the Building Code and other applicable enactments respecting safety. Work in Accordance with Bylaws 5.12 Where, at the time of application for a building permit, works and services exist on the land to be developed or within that portion of a highway immediately adjacent to the land up to the highway centre line, and if such works and services do not meet the minimum standards established by the Regional District Subdivision and Development Servicing Bylaw, as amended from time to time, then as a condition of issuing a building permit, the owner may be required to improve the substandard works and services to at least the minimum standards as required by the Regional District Subdivision and Development Servicing Bylaw. Work and Services Adjacent to Property 5.13 Where work is being done subject to a permit under the provisions of this bylaw, the owner and his or her agent shall be completely responsible for any damage or cost to adjacent property arising out of or incidental to the work and shall save the Regional District harmless in this regard. Protection of Adjacent Properties Regional District Saved Harmless Building Regulations Bylaw No. 2066 Page 14 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION SIX - GENERAL PERMIT REGULATIONS 6.1 A permit is required whenever work regulated by this bylaw is to be undertaken. Permit Required 6.2 Each building or structure to be constructed on a site requires a separate building permit and shall be assessed a separate building permit fee as determined in accordance with Appendix "A" to this bylaw. Separate Building Permit 6. 3 The Chief Building Inspector shall prescribe, and may from time to time modify, the form of application for matters within the scope of this Bylaw; and in so doing, may prescribe different forms for different categories of applications. Such forms may require, but not be limited to, the following: 6.3.1 name and contact information of owner and any agents delegated on their behalf; 6.3.2 disclosures such as a condition upon lands, history of buildings, and the intended use of the lands and buildings; 6.3.3 copy of certificate of title, including applicable encumbrances thereupon; and 3.3.4 site or property plans, surveys, surveyor site certificates, geotechnical reports, building plans and specifications, utility information, engineering, site servicing information, photos, and related information. Application for Permit 6.4 No person shall rely upon any permit as establishing conformance with this bylaw or assume or conclude that this bylaw has been administered or enforced according to its terms. The person to whom the building permit is issued and his or her agents are responsible for making such determination. 6.5 The Building Official may require a registered professional to provide design and plan certification and field reviews supported by letters of assurance in the form of Schedules A, B, C-A and C-B as referred to in subsection 2.2.7 of the Building Code, if in the opinion of the Building Official: Registered Professional Required 6.5.1 the site conditions, soil types, contours or drainage require special foundation design; 6.5.2 the proposed building or structure is not standard construction; or Bylaw No. 2431, 2013 Bylaw No. 2624, 2017 Building Regulations Bylaw No. 2066 Page 15 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 6.5.3 the proposed building or structure is of a category requiring professional design. 6.5.4 work has been commenced or concealed prior to an inspection having been conducted by the Building Official in accordance with Section 15.4 of this Bylaw. 6.6 Sufficient information shall be filed with each application to clearly identify the property to be developed and to establish that the proposed work will substantially conform to this bylaw and other applicable enactments. Complete Description of Work and Occupancy 6.7 The Building Official may require any owner to submit an up-to-date plan of survey by a registered British Columbia Land Surveyor which shall contain sufficient information regarding the site and the location of any building or structure to: Survey 6.7.1 establish prior to construction that requirements of this bylaw and any other applicable enactments will be complied with. 6.8 No permit shall be issued until: Service Costs and Permit Fees 6.8.1 off-site utilities to service the subject property are completed to the approval of the authority having jurisdiction or the utility providing service and all appropriate connection fees or other construction costs have been paid; 6.8.2 the prescribed permit fee as detailed in Appendix "A" attached to this bylaw has been paid; and 6.8.3 where required, security has been posted. 6.9 In instances where sanitary sewer is not available, no permit will be issued until the Building Official is provided with written verification that the proposed sewage disposal system is accepted by the Interior Health Authority or other authority charged with enforcement of prevailing sanitary regulations. Sewage Disposal 6.10 When: Issue Permits 6.10.1 a completed application in conformance with Division 7, 8, 9, 10, 11 or 12 of this bylaw, including all required supporting documentation has been submitted and reviewed; Bylaw No. 2619, 2017 Building Regulations Bylaw No. 2066 Page 16 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 6.10.2 the owner or his or her agent has paid all applicable fees set out in this bylaw; 6.10.3 the owner or his or her agent has paid all charges and met all requirements imposed by any other applicable statute or bylaw; and 6.10.4 no covenant, agreement, or regulation of the Regional District authorizes the permit to be withheld; then 6.10.5 a Building Official shall issue the permit for which the application is made. 6.11 The Building Official may issue, at the risk of the owner, a permit for the construction of a portion of a building or structure prior to all required plans and specifications for the whole building or complex having been submitted or reviewed, provided: Phased Construction 6.11.1 plans and specifications for the portion in question have been submitted in sufficient detail to satisfy the Building Official that the work to be done will substantially conform with all requirements of the Building Code and any other applicable enactment; and 6.11.2 adequate information and detailed statements have been filed to the extent that the Building Official is satisfied the remainder of the building or structure will substantially conform with all applicable enactments. 6.13 Every permit is issued upon the condition that the permit shall expire and the rights of the owner under the permit shall terminate if the work authorized by the permit is not commenced within six (6) months or is not completed within three (3) years of the issuance of a permit. Permit Expiry 6.14 The Building Official may grant renewal permits for a further twelve (12) months each if he or she is satisfied the construction is progressing in accordance with the reviewed plans at a reasonable rate of progress. A permit renewal fee shall be paid in accordance with Appendix "A" attached to and forming part of this bylaw. Permit Renewal 6.15 The Building Official may revoke a permit where: Permit Revocation 6.15.1 there is a contravention of any term or condition under which the permit was issued; Building Regulations Bylaw No. 2066 Page 17 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 6.15.2 there is a contravention of any provision of the Building Code or other applicable enactment; or 6.15.3 the permit was issued on the basis of incorrect information supplied by or on behalf of the applicant; and 6.15.4 the permit holder shall be notified in writing of the revocation. 6.16 A registered professional shall undertake the design and conduct field reviews of the construction of a retaining structure greater than 1.2 m (4 ft) in height. Sealed copies of the design and plan certification and field reviews by means of letters of assurance in the form of Schedule B and C-B as referred to in subsection 2.2.7 of the Building Code shall be submitted to the Building Official. Retaining Wall Greater Than 1.2m High 6.17 As a condition of occupancy certificate issuance, every parcel of real property containing a building subject to a permit under this Bylaw must display a civic address meeting the following criteria: 6.17.1 a civic address sign must be posted on a property upon which a building or substantial addition to a building has been approved for construction under this Bylaw; 6.17.2 each numeral must be at least 9 cm (3.5 inches) in height on engineering grade or better reflective material on an aluminum sign plate; 6.17.3 the civic address sign must be double-sided with reflective green background and reflective white numerals; 6.17.4 the civic address sign must be permanently affixed to a signpost or fixed object adjacent to the driveway and perpendicular to the public access road so as to be clearly visible from the access road at all times; and 6.17.5 where a property is accessed via shared driveway or an easement, the civic address sign location is at the discretion of the Building Official. 6.17.6 Notwithstanding the requirements of Subsection 6.17, properties with street lighting subject to a statutory building scheme with design guidelines may post the civic address on the front of the building in a form prescribed by the design Bylaw No. 2431, 2013 Bylaw No. 2619, 2017 Building Regulations Bylaw No. 2066 Page 18 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District guidelines and properties in a semi-urban community with street lamps or other lighting may post a civic address on the front of a building where the address can be made completely visible and legible when viewed from the public road or street 6.18 Where the Regional District has caused a notice to be filed on the title of a property in accordance with Section 57 of the Community Charter, the notice may be removed provided: Notice Removal Fee 6.18.1 The owner has obtained a new permit for the correction of the construction; 6.18.2 The deficient construction has been corrected and completed so that the conditions which gave rise to the filing of the notice have been rectified; and 6.18.3 The owner has paid a title notice removal fee in accordance with Appendix "A" attached to this bylaw. Building Regulations Bylaw No. 2066 Page 19 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION SEVEN - PLUMBING 7.1 Application for a permit shall be in writing on the form avail- able from the Development Services Department, and shall: Application for Permit 7.1.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, his or her agent, or a signing officer if the owner is a company; 7.1.2 state the number of fixtures to be installed in the building; Number of Fixtures 7.1.3 include specifications and drawings made to a suitable scale, for the plumbing system with respect to multi-family, institutional, commercial and industrial buildings showing: Plans and Specifications 7.1.3.1 site services, including size and location of pipes; 7.1.3.2 site drainage, including size and location of pipes, catch basins and dry wells; 7.1.3.3 total fixture load on sanitary sewer and water supply systems; 7.1.3.4 sanitary riser diagram complete with fixture loads at the base of stacks; and 7.1.3.5 rainwater leaders, size of pipe and area of roof drained; 7.1.4 contain any and all other information necessary to establish substantial conformance with this bylaw; and Other Information 7.1.5 include drawings designed by a registered profes- sional, for complex buildings, and buildings with complex plumbing systems as determined by the Building Official. Registered Professional For Complex Plumbing 7.2 There shall be separate connections to utility services for each separate parcel of land within the Regional District connected to such utilities. Individual Services Building Regulations Bylaw No. 2066 Page 20 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 7.3 Except where specifically required by the Regional District and where a legal right-of-way has been obtained and such plans are accepted by the Utilities Department, no plumbing system, drainage system, house sewer, private sewage disposal system or parts thereof, shall be located in any lot other than the property which is the site of the building, structure, or premises serviced by such facilities. Connection On Property It Serves Building Regulations Bylaw No. 2066 Page 21 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION EIGHT - COMPLEX BUILDINGS 8.1 An application for a building permit with respect to a complex building shall: Application For Permit 8.1.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; 8.1.2 be accompanied by the owner's acknowledgment of responsibility and undertakings made in a form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 8.1.3 include a copy of a title search made within thirty (30) days of the date of the application; Title Search 8.1.4 include site plans drawn to suitable scale and referenced to the current registered legal survey for the subject property which shall show: Site Plans 8.1.4.1 the legal description and address of the site; 8.1.4.2 by dimensions from property lines, the location of any proposed building or structure; 8.1.4.3 means of access and egress to service the property and a detailed parking layout; 8.1.4.4 by dimension from property lines, the location of any other existing building or buildings on the site; 8.1.4.5 existing and finished ground levels to an established datum; 8.1.4.6 all easements and rights-of-way whether registered or not, and the setbacks to the natural boundary of any lake, swamp, pond or watercourse; 8.1.4.7 for other than single and two family dwellings, provisions for garage containers, proposed method of screening and a detailed landscape treatment for the site; and Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 22 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 8.1.4.8 the Building Official may waive the requirements for a site plan, in whole or in part, where the permit is sought for the repair or alteration of an existing building or structure. 8.1.5 include building plans drawn to suitable scale showing sufficient information to determine substantial conformance with this bylaw including but not limited to: Building Plans 8.1.5.1 foundation plans 8.1.5.2 floor plans showing the dimensions and uses of all areas; 8.1.5.3 the dimensions and height of crawl and roof spaces; 8.1.5.4 the location, size and swing of doors; 8.1.5.5 the location, size and opening of windows; 8.1.5.6 floor, wall, ceiling and roof finishes; 8.1.5.7 components of fire protection including; 8.1.5.7.1 firewalls 8.1.5.7.2 degree of fire separation of storeys, shafts and rooms 8.1.5.7.3 fire detection, suppression and alarm system 8.1.5.8 plumbing fixtures; 8.1.5.9 structural, mechanical, and electrical elements; 8.1.5.10 stair, handrail and guard dimensions; 8.1.5.11 a cross section, through the building or structure illustrating foundations, drainage, ceiling heights and construction systems; 8.1.5.12 elevations of all sides of the building or structure showing finishes, roof slopes, roof top equipment screening, windows, doors, and finished grade; and Building Regulations Bylaw No. 2066 Page 23 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 8.1.5.13 cross-sectional details drawn at sufficient locations to illustrate that the building or structure substantially conforms to the Building Code; 8.1.6 include copies of approvals required under any enactment relating to health or safety, including, without limitation, sewage disposal permits, highway access permits and Ministry of Health approval; Approvals From Other Agencies 8.1.7 include a letter of assurance in the form of Schedule A as referred to in subsection 2.2.7 of the Building Code, signed by the owner, or a signing officer of the owner if the owner is a company, and the Coordinating Registered Professional. Schedule A 8.1.8 include letters of assurance in the form of Schedule B as referred to in subsection 2.2.7 of the Building Code, each signed by such registered professionals as the Building Official or Building Code may require to prepare the design for and conduct field reviews of the construction of the building or structure. Schedule B 8.1.9 include one (1) copy of specifications and two (2) sets of drawings at a suitable scale of the design prepared by each registered professional and including the information set out in section 8.1.5 of this bylaw. Number of Plans 8.1.10 include any other information required by the Building Official or the Building Code to establish substantial conformance with this bylaw, the Building Code and other applicable enactments relating to the building or structure. Complete Description of Work and Occupancy 8.2 In addition to the requirements of section 8.1.4, the following may be required by a Building Official to be submitted with a building permit application for the construction of a complex building where in the opinion of the Building Official the complexity of the proposed building or structure or siting circumstances warrant: Other Information May Be Required 8.2.1 site servicing drawings, including sufficient detail of off-site services to indicate locations at the property line, prepared and sealed by a registered professional; 8.2.2 a section through the site showing grades, buildings, structures, parking areas and driveways; and Bylaw No. 2431, 2013 Bylaw No. 2431, 2013 Building Regulations Bylaw No. 2066 Page 24 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 8.2.3 any other information required by the Building Official or the Building Code to establish substantial conformance with this bylaw, the Building Code and other bylaws and applicable enactments relating to the building or structure. Building Regulations Bylaw No. 2066 Page 25 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION NINE - STANDARD BUILDINGS 9.1 An application for a building permit with respect to a standard building shall: Application For Permit 9.1.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; 9.1.2 be accompanied by the owner's acknowledgment of responsibility and undertakings made in a form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 9.1.3 include a copy of a title search made within thirty (30) days of the date of the application; Title Search 9.1.4 include site plans drawn to suitable scale and referenced to the current registered legal survey for the subject property which shall show: Site Plans 9.1.4.1 the legal description and address of the site; 9.1.4.2 by dimensions from property lines, the location of any proposed building or structure; 9.1.4.3 means of access and egress to service the property and a detailed parking layout; 9.1.4.4 by dimension from property lines, the location of any other existing building or buildings on the site; 9.1.4.5 existing and finished ground levels to an established datum; 9.1.4.6 all easements and rights-of-way whether registered or not, and the location of natural water courses; 9.1.4.7 for other than single and two family dwellings, lot coverage and floor area ratio calculation; 9.1.4.8 for other than single and two family dwellings, provision for garbage containers, proposed method of screening and a Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 26 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District detailed landscape treatment for the site; and 9.1.4.9 the Building Official may waive the requirements for a site plan, in whole or in part, where the permit is sought for the repair or alteration of an existing building or structure. 9.1.5 include building plans drawn to suitable scale showing sufficient information to determine substantial conformance with this bylaw including but not limited to: Building Plans 9.1.5.1 foundation plans 9.1.5.2 floor plans showing the dimensions and uses of all areas: 9.1.5.3 the dimensions and height of crawl and roof spaces; 9.1.5.4 the location, size and swing of doors; 9.1.5.5 the location, size and opening of windows; 9.1.5.6 floor, wall, ceiling and roof finishes; 9.1.5.7 components of fire protection including; 9.1.5.7.1 firewalls; 9.1.5.7.2 degree of fire separation of storeys, shafts and rooms; and 9.1.5.7.3 fire detection, suppression and alarm system. 9.1.5.8 plumbing fixtures; 9.1.5.9 structural, mechanical and electrical elements; 9.1.5.10 stair, handrail and guard dimensions; 9.1.5.11 a cross section, through the building or structure illustrating foundations, drainage, ceiling heights and construction systems; Building Regulations Bylaw No. 2066 Page 27 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 9.1.5.12 elevations of all sides of the building or structure showing finishes, roof slopes, roof top equipment screening, windows, doors, and finished grade; and 9.1.5.13 cross-sectional details drawn at sufficient locations to illustrate that the building or structure substantially conforms to the Building Code. 9.1.6 include copies of approvals required under any enactment relating to health or safety, including, without limitation, sewerage disposal permits, and Ministry of Health approvals. Approvals From Other Agencies 9.1.7 include two (2) sets of drawings at a suitable scale including the information set out in sections 9.1.5 of this bylaw. Complete Description of Work and Occupancy 9.1.8 include any other information required by the Building Official or the Building Code to establish substantial conformance with this bylaw, the Building Code, and any other bylaw or enactments relating to the building or structure. 9.2 In addition to the requirements of section 9.1.4, the following may be required by a Building Official to be submitted with a building permit application for the construction of a Standard building where in the opinion of the Building Official the complexity of the proposed building or structure or siting circumstances warrant: Other Information May Be Required 9.2.1 site servicing drawings, including sufficient detail of off-site services to indicate locations at the property line, prepared and sealed by a registered professional; 9.2.2 a section through the site showing grades, buildings, structures, parking areas and driveways; 9.2.3 a roof plan and roof height calculations; 9.2.4 structural, electrical, mechanical or fire suppression drawings prepared and sealed by a registered professional; 9.2.5 letters of assurance in the form of Schedule B as referred to in subsection 2.2.7 of the Building Code, signed by the registered professional; and Bylaw No. 2431, 2013 Bylaw No. 2431, 2013 Building Regulations Bylaw No. 2066 Page 28 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 9.2.6 any other information required by the Building Official or the Building Code to establish substantial conformance with this bylaw, the Building Code, and other bylaws and any other bylaw or enactments relating to the building or structure. Other Information May Be Required Building Regulations Bylaw No. 2066 Page 29 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION TEN - RELOCATION OF A BUILDING OR STRUCTURE 10.1 An application for a permit with respect to the relocation of a building other than a factory built building shall: Application For Permit 10.1.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; 10.1.2 be accompanied by the owner's acknowledgment of responsibility and undertakings made in a form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 10.1.3 include a copy of a title search made within thirty (30) days of the date of the application; Title Search 10.1.4 include site plans drawn to suitable scale and referenced to the current registered legal survey for the subject property and shall show: Site Plans 10.1.4.1 the legal description and civic address of the parcel; 10.1.4.2 by dimensions from property lines, the location of any proposed building or structure; 10.1.4.3 means of access and egress to service the property and a detailed parking layout; 10.1.4.4 by dimension from property lines, the location of any other existing building or structure on the site; 10.1.4.5 existing and finished ground levels to an established datum; 10.1.4.6 all easements and rights-of-way whether registered or not, and the location of natural water courses; 10.1.4.7 for other than single and two family dwellings, lot coverage and floor area ratio calculation; and 10.1.4.8 for other than single and two family dwellings, provision for garbage containers, proposed method of screening Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 30 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District and a detailed landscape treatment for the site. 10.1.5 identify the existing location of the building or structure and proposed location to which the building or structure is to be moved; and 10.1.6 provide written verification by the appropriate utility authorities that all utility services have been disconnected and/or sealed as required. 10.2 Every application for a permit to relocate a building or structure shall be accompanied by security in a form acceptable to the Building Official, and in an amount equal to the estimated cost of completing the building or structure in its new location. The amount so estimated shall be acceptable to the Building Official, but in no case shall the security be less than Five Thousand Dollars ($5,000.00). Security 10.3 Should a building or structure which has been relocated subject to the provisions of this Division not be completed within one year from the date of issuance of the permit, the Building Official may send a written notice to the owner stating that the building does not conform with this bylaw or other enactment and direct the owner to remedy the non- conformance within thirty (30) days from the date of service of the notice. If the non-conformance is not remedied within the period of thirty (30) days, the Building Official may draw upon the security on deposit and take whatever action is necessary to effect completion of the building and site. Action to Complete Building Regulations Bylaw No. 2066 Page 31 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION ELEVEN - DEMOLITIONS 11.1 An application for a permit with respect to a demolition shall: Permit Required 11.1.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; 11.1.2 be accompanied by the owner's acknowledgment of responsibility and undertakings made in a form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 11.1.3 include a copy of a title search made within thirty (30) days of the date of the application; and 11.1.4 include site plans drawn to a suitable scale and referenced to the current registered legal survey for the subject property which shall show: Site Plan 11.1.4.1 the legal description and civic address of the parcel; 11.1.4.2 location of any existing buildings or structures on the site; and 11.1.4.3 identify the building or buildings to be demolished. 11.2 Every person making application for a permit to demolish a building or structure shall, as part of his or her application, provide the Building Official with satisfactory evidence that: 11.2.1 no unsafe condition will be created or permitted; and 11.2.2 provide written verification by the appropriate utility authorities that all utility services have been disconnected and/or sealed as required. Disconnect Services 11.3 Before issuing a permit to demolish any building or structure, the Building Official may demand, as a condition of issuance that security be provided in a form satisfactory to the Building Official to ensure that the site of the demolition will be left in a safe, neat condition, free from debris or dust, and compatible with neighbouring properties. The amount of the security shall be equal to the estimated cost of site restoration and shall be acceptable to Security Required Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 32 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District the Building Official. In the event that the site is not properly restored to a standard satisfactory to the Building Official, the Building Official may send written notice to the owner requiring that the site be properly restored within thirty (30) days from the date of service of the notice. If the restoration is not carried out within the period of thirty (30) days the Building Official may draw upon the security and take whatever action is necessary to effect restoration of the site. Building Regulations Bylaw No. 2066 Page 33 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION TWELVE - TEMPORARY BUILDINGS 12.1 The word "temporary" as cited in this Division shall mean a period not exceeding two (2) years. 12.2 An application for a permit with respect to a temporary building or structure shall: Application for Permit 12.2.1 be submitted to the Building Official in the form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 12.2.2 be accompanied by the owner's acknowledgment of responsibility and undertakings made in a form provided by the Building Official and signed by the owner, or a signing officer if the owner is a company; Owner's Undertaking 12.2.3 include a copy of a title search made within thirty (30) days of the date of the application; Title Search 12.2.4 include site plans drawn to suitable scale and referenced to the current registered legal survey for the subject property which shall show: Site Plans 12.2.4.1 the legal description and civic address of the parcel; 12.2.4.2 by dimensions from property lines, the location of proposed building or structure; 12.2.4.3 means of access and egress to service the property and a detailed parking layout; 12.2.4.4 by dimension from property lines, the location of any other existing building or structure on the site; 12.2.4.5 existing and finished ground levels to an established datum; 12.2.4.6 all easements and rights-of-way whether registered or not, and the location of natural water courses; 12.2.4.7 for other than single and two family dwellings, lot coverage and floor area ratio calculation; and Bylaw No. 2734, 2021 Bylaw No. 2813, 2023 Building Regulations Bylaw No. 2066 Page 34 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 12.2.4.8 for other than single and two family dwellings, provision for garbage containers, proposed method of screening and a detailed landscape treatment for the site; and 12.2.5 include security in a form and amount satisfactory to the Building Official but in any event not less than Two Thousand Dollars ($2,000.00) in value, to guarantee that the building or structure will be removed from the site within the time limit indicated. Security 12.3 Temporary buildings shall conform to the requirements of this bylaw and the siting requirements of the Thompson- Nicola Regional District Zoning Bylaw No. 2400 as amended from time to time. Conformance With Zoning Bylaw Bylaw No. 2431, 2013 Building Regulations Bylaw No. 2066 Page 35 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION THIRTEEN - PROFESSIONAL DESIGN AND FIELD REVIEW 13.1 When a Building Official considers that the site conditions, size or complexity of a development or an aspect of a development warrant, he or she may require a registered professional to provide design and plan certification and field review supported by letters of assurance in the form of Schedules B and C-B referred to in subsection 2.2.7 of the Building Code. Certification of Plans 13.2 Prior to the approval of a final inspection for a complex building, or standard building in circumstances where letters of assurance have been required in accordance with sections 6.5, 6.16, 8.1.7, 8.1.8, 9.2.5 or 13.1 of this bylaw, the owner shall provide the Regional District with letters of assurance in the form of Schedules C-A or C-B, as is appropriate, referred to in subsection 2.2.7 of the Building Code. Schedule C 13.3 When a registered professional provides letters of assurance in accordance with s. 6.5, 6.16, 8.1.7, 8.1.8, 9.2.5, 13.1 or 13.2 of this bylaw, he or she shall also provide proof of professional liability insurance in a form provided by the Building Official. Liability Insurance Bylaw No. 2431, 2013 Bylaw No. 2431, 2013 Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 36 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION FOURTEEN - PROFESSIONAL PLAN CERTIFICATION 14.1 The letters of assurance in the form of Schedule B referred to in subsection 2.2.7 of the Building Code and provided pursuant to sections 6.5, 6.16, 8.1.7, 8.1.8, 9.2.5, and 13.1 of this bylaw are relied upon by the Regional District and its Building Officials as certification that the design and plans to which the letters of assurance relate substantially conform to the Building Code and other applicable enactments relating to health and safety. Letters of Assurance 14.2 A building permit issued pursuant to the requirements of this bylaw shall include a notice to the owner that the building permit is issued in reliance upon the certification of the registered professionals that the design and plans submitted in support of the application for the building permit conform with the Building Code and other applicable enactments relating to safety. Notice of Reliance to the Owner 14.3 When a building permit is issued in accordance with the requirements of this Division the permit fee shall be reduced pursuant to Appendix "A" to this bylaw. Fee Reduction Bylaw No. 2431, 2013 Building Regulations Bylaw No. 2066 Page 37 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION FIFTEEN - INSPECTIONS 15.1 When a registered professional provides letters of assurance in accordance with sections 6.5, 6.16, 8.1.7, 8.1.8, 9.2.5, 13.1 or 13.2 of this bylaw, the Regional District will rely solely on the letters of assurance submitted pursuant to section 13.2 of this bylaw as certification that the construction substantially conform to the design, plans and specifications and that the construction complies with the Building Code, this bylaw and other applicable enactments. Rely Solely on Letters of Assurance 15.2 Notwithstanding section 15.1 of this bylaw, a Building Official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professionals. Monitor Field Reviews 15.3 A Building Official may attend periodically at the site of the construction of standard buildings or structures to ascertain whether the Health And Safety Aspects Of The Work are being carried out in substantial conformance with those portions of the Building Code, this bylaw and any other applicable enactment concerning safety. Site Visits 15.4 The owner, or his or her agent, shall give a minimum of one working day's notice to the Regional District of the following aspects of the work and, in the case of a Standard Building, shall obtain an inspection and receive a Building Official's acceptance of the following aspects of the work prior to concealing it: Notice of Construction Stages 15.4.1 of intent to do work that has been ordered by the Building Official inspected during construction; 15.4.2 of intent to cover work that has been ordered by the Building Official to be inspected prior to covering; 15.4.3 when work has been completed so that a final inspection can be made; 15.4.4 and, while not limiting the generality of the foregoing, at the following stages of construction: 15.4.4.1 when the forms for footings are complete, but prior to placing of any concrete therein; 15.4.4.2 when concrete slab dampproofing or soil gas control measures have been installed, but prior to pouring a concrete slab; Building Regulations Bylaw No. 2066 Page 38 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 15.4.4.3 when foundation concrete damp-proofing, waterproofing and perimeter drains are complete, or after framing of a preserved wood foundation wall and floor assembly and application of damp-proofing, but prior to any backfill being placed; 15.4.4.4 when framing and sheathing of the building are complete, including the installation of roof membrane, all exterior doors and windows, fire-stopping, bracing, chimneys, duct work, plumbing, gas venting and wiring, but before any insulation, drywall or other interior or exterior finish is applied which would conceal such work; 15.4.4.5 when the rough-in plumbing system, including interior water supply and drain waste and vent piping are complete, but before any such plumbing is covered; 15.4.4.6 when exterior stucco wire and flashing is complete but prior to placement of any scratch coat thereon; 15.4.4.7 when insulation and vapour barrier are complete but prior to placement of any finish thereon; and, in the case where performance based criteria supported by a blower-door test result is required, an intermediate test must be undertaken at this inspection stage; 15.4.4.8 during the construction of any masonry fireplace, when cantilevered hearth forms are in place but prior to pouring concrete; at the smoke chamber stage; for a free- standing masonry chimney, at the thimble stage; before any factory-built or site constructed fireplace or chimney is enclosed by combustible material; and before the chimney cap is placed on a masonry chimney; and 15.4.4.9 when all work is complete but prior to occupancy. Bylaw No. 2813, 2023 Building Regulations Bylaw No. 2066 Page 39 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 15.5. Notwithstanding the requirement for inspection under section 15.4. of this Bylaw, a Building Official may, when unable to attend a construction site on the date of a required inspection due to travel distance or time constraint, alternatively determine on the basis of information provided by the owner or contractor the acceptability of work shown or described within that information. The Building Official may require that photographs, electronic data or transmissions or written reports from certified persons be provided for review prior to authorizing the concealment of that work. 15.6 For greater certainty, in the case of Complex Buildings, the requirement under 15.4 to notify the Regional District of the listed stages of construction does not oblige the Regional District to attend the site for inspections, monitoring or any other purpose. No Inspection Obligation For Complex Building Bylaw No. 2619, 2017 Building Regulations Bylaw No. 2066 Page 40 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION SIXTEEN - OCCUPANCY CERTIFICATE 16.1 No person shall occupy or use a building or structure or part of a building or structure until an occupancy certificate has been issued. Occupancy Prohibited 16.2. An occupancy certificate shall not be issued unless: Occupancy Certificate 16.2.1 all letters of assurance have been submitted when required in accordance with sections 6.5, 6.16, 8.1.7, 8.1.8, 9.2.5, 13.1 and 13.2 of this bylaw; and 16.2.2 all aspects of the work requiring inspection and acceptance pursuant to section 15.4 of this bylaw have been inspected and accepted. 16.3 A Building Official may issue a provisional occupancy certificate valid for the term of the issued building permit, where construction of a building or structure has been substantially completed and the health and safety requirements of this Bylaw and the Building Code have been met. Occupancy may be revoked and an order may be posted if the outstanding conditions have not been met. The owner shall pay the provisional occupancy certificate fee as specified in Appendix "A" to this Bylaw prior to issuance of the certificate. Provisional Occupancy Bylaw No. 2917, 2026 Building Regulations Bylaw No. 2066 Page 41 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION SEVENTEEN - FEES AND CHARGES 17.1 In addition to applicable fees and charges required under other bylaws, a permit fee, calculated in accordance with Appendix "A" to this bylaw, shall be paid in full prior to issuance of any permit under this bylaw. Permit Fee Calculation 17.2 The application fee as set out in Appendix "A" shall accompany an application made for a building permit to this bylaw. Application Fee 17.2.1 The permit application fee is non-refundable. Non-refundable Application Fee 17.2.2 An application shall be cancelled and the permit application fee forfeited if the permit has not been issued and the permit fee paid within six (6) months of the date of notification to the owner that the permit is ready to be issued. Permit Cancellation 17.2.3 When an application is cancelled the plans and related documents submitted with the application may be destroyed. Plans and Documents may be destroyed 17.3 The owner may obtain a refund of the permit fees set out in Appendix "A" to this bylaw when a permit is surrendered and cancelled before any construction begins, provided: Refund of Permit Fee 17.3.1 the refund shall not include the permit application fee paid pursuant to section 17.2 of this bylaw. 17.4 Where, due to non-conformance with this bylaw, more than two inspections are necessary when one inspection is normally required, for each inspection after the second inspection, a re-inspection charge as set out in Appendix "A" to this bylaw shall be paid prior to additional inspections being performed. Re-inspection Fee 17.5 Where a required inspection is requested to be done after the hours during which the offices of the Regional District are normally open, an inspection charge shall be payable based on the time actually spent in making such inspection, including travel time. After Hours Inspection 17.6 Notwithstanding any clause in this Bylaw or Schedules attached hereto, the reconstruction of buildings or structures destroyed or damaged by an event that was the subject of a declaration of a Provincial State of Emergency or State of Local Emergency, pursuant to the authority of the Emergency Program Act, shall be granted a 50% reduction to the applicable fees prescribed in Bylaw No. 2639, 2017 Building Regulations Bylaw No. 2066 Page 42 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District this bylaw except that there shall be no reduction to any refundable surcharge fee or security. Such fee reduction shall be subject to the following conditions: (a) limited to documented damage as per damage assessment and no greater; (b) limited to restoration of structure or building and plumbing prior to the event; (c) limited in time to two years from date of the applicable declaration; and (d) limited to application by owners who owned the property at the time of the declaration. Building Regulations Bylaw No. 2066 Page 43 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION EIGHTEEN - DISCLAIMER OF WARRANTY OR REPRESENTATION 18.1 Neither the issuance of a permit under this bylaw nor the acceptance or review of plans, drawings or specifications or supporting documents, nor any inspections made by or on behalf of the Regional District constitute in any way a representation, warranty, assurance or statement that the Building Code, this bylaw or other applicable enactments have been complied with. Disclaimer Building Regulations Bylaw No. 2066 Page 44 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION NINETEEN - PENALTIES AND ENFORCEMENT 19. 1 Any person who violates or who causes or permits a violation of any provision of this Bylaw or who fails to do any act or thing required to be undertaken pursuant to this Bylaw, commits an offence against this Bylaw and is liable to the penalties imposed herein; whereby, each day that a new contravention of or failure to comply continues constitutes a separate offence of this Bylaw. Penalties 19.2 Every person who fails to conform with any order or notice issued by a Building Official, or who allows a violation of this bylaw to continue, contravenes this bylaw. 19.3 A Building Official may order the cessation of any work that is proceeding in contravention of the Building Code or this bylaw, or other applicable enactments by posting a Stop Work Order. Stop Work Order 19.4 The owner of property on which a Stop Work Order has been posted, and every other person, shall cease all construction work immediately and shall not do any work until all applicable provisions of this bylaw have been substantially complied with and the Stop Work Order has been rescinded in writing by a Building Official. Stop Work Order Cease All Work 19.5 Where a person occupies a building or structure or part of a Building or structure in contravention of section 3.1.4 of this bylaw a Building Official may post a "Do Not Occupy" notice on the affected part of the building or structure. Do Not Occupy Portion of the Building 19.6 The owner of property on which a "Do Not Occupy" notice has been posted, and every person, shall cease occupancy of the building or structure immediately and shall refrain from further occupancy until all applicable provisions of the Building Code and this bylaw have been substantially complied with and the Do Not Occupy notice has been rescinded in writing by a Building Official. Do Not Occupy Notice 19. 7 Any person who contravenes any provision of this Bylaw, or who suffers or permits any act or thing to be done in contravention of any provision of this Bylaw, or who neglects to do or refrains from doing anything required to be done by any provision of this Bylaw, commits an offence against this Bylaw and is subject to: 19.7.1 a fine under the Regional District Municipal Ticket Information Bylaw if any information respecting the contravention is laid by means of a ticket; Bylaw No. 2624, 2017 Bylaw No. 2624, 2017 Building Regulations Bylaw No. 2066 Page 45 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District 19.7.2 upon summary conviction, a fine not exceeding $10,000 and costs of prosecution; 19.7.3 a fine not exceeding $500 in accordance with the Local Government Bylaw Notice Enforcement Act if a bylaw notice is issued respecting the contravention; or 19.7.4 any combination of the above. 19.8 Any penalty imposed pursuant to this Bylaw shall be in addition to, and not in substitution for, any other penalty or remedy imposed pursuant to any other applicable statute, law, or regulation. 19.9 Where there is a violation of this Bylaw or Div. 19 of this Bylaw, whether a notice has been registered on the property title or not, the Building Official may refuse to issue a building permit for an addition to or alternation of any offending, unsafe, or unpermitted building or structure until it has been brought into substantial Bylaw and Building Code compliance; qualifying, building permits may be issued for any other detached building or structure on the property. Bylaw No. 2624, 2017 Bylaw No. 2734, 2021 Building Regulations Bylaw No. 2066 Page 46 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District DIVISION TWENTY - APPENDICES 20.1 The Appendices attached to this bylaw form part of and are enforceable in the same manner as this bylaw. READ A FIRST TIME this 22nd day of September, 2005. READ A SECOND TIME this 22nd day of September, 2005. READ A THIRD TIME this 22nd day of September, 2005. RECONSIDERED AND ADOPTED this 22nd day of September, 2005. Clerk Chair Building Regulations Bylaw No. 2066 Page 47 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District APPENDIX "A": SCHEDULE OF PERMIT FEES A. For the purpose of calculating the fee for permits under this bylaw, the value of construction shall be the total contract price for the work including all subcontracts or the value of construction as determined by the Building Official on the basis of plans, specifications and information available to him or her, whatever value shall be greater. B. BUILDING PERMIT APPLICATION FEES A non-refundable permit application fee of $200 shall be charged for all permits. C. BUILDING PERMIT FEE - based on construction value (1) Construction Value Fee (a) For each $1,000 up to a maximum of $1,000,000; and $10 (b) each additional $1,000 or part thereof by which the value exceeds $1,000,000 as additional fees $6 D. PLUMBING PERMIT FEE (1) Minimum fee for any plumbing permit or first fixture $75 (2) Permit fee for each fixture after the first fixture $10 (3) Permit fee for an interceptor or catch basin $15 (4) Permit fee for the installation of a backflow prevention device in any plumbing system. $15 (5) Permit fee for any fire sprinkler system (a) First 25 sprinkler heads $50 (b) Each additional sprinkler head after the first 25 $1 E. PERMIT FEE SURCHARGE In addition to other fees payable in accordance with this Appendix at the time of permit issuance, a surcharge will apply to all building permits as follows: (a) $500 where the construction value is less than $50,000; or (b) $1500 where the construction value exceeds $50,000; and if work associated with a building permit is completed and the permit closed within three years of the date of issue, the Regional District shall rebate the surcharge fee to the original payee. Bylaw No. 2661, 2018 Bylaw No. 2813, 2023 Bylaw No. 2917, 2026 Bylaw No. 2917, 2026 Building Regulations Bylaw No. 2066 Page 48 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District F. SPECIAL INSPECTION Additional inspections such as those for ICF construction and voluntary inspections such as those to establish compliance, status, or notice on title release. $200 G. MANUFACTURED HOMES AND COMBINATION OR RELOCATED BUILDINGS (1) Permit fee for manufactured homes including skirting, blocking, landing and stairs up to 2m2 (21 ft2), water and service connections $500 . (2) Permit fee for manufactured homes, combination or relocated buildings on permanent foundations will be $500 plus an additional fee based on the value of the foundation and site-constructed components, as determined by the Building Official but shall total no less than $200 per required inspection H. RENEWAL PERMIT FEE The fee for a renewal permit shall be $200 each renewal period of one year. I. PROVISIONAL OCCUPANCY CERTIFICATE FEE The fee for a provisional occupancy certificate shall be $500. J. LAND TITLE DOCUMENT SEARCH - COST RECOVERY The fee for a land title search or covenant retrieval shall be at Land Title and Survey Authority published rate (including applicable taxes). K. TEMPORARY BUILDING Fee for a permit to construct, place or occupy a temporary building for up to two years or part thereof . $400 L. CHIMNEY Fee for the installation of a chimney or masonry fireplace $100 M. REMOVAL OF NOTICE ON LAND TITLE Fee for the removal of a land title notice. $200 N. DEMOLITION OR RELOCATION The fee for a permit to demolish a building. $50 O. REINSPECTION FEE Where any re-inspection carried out pursuant to this Bylaw discloses faulty work and a subsequent inspection is thereby made necessary, the fee for each subsequent inspection shall be $100. Bylaw No. 2734, 2021 Bylaw No. 2917, 2026 Bylaw No. 2917, 2026 Bylaw No. 2813, 2023 Bylaw No. 2917, 2026 Bylaw No. 2917, 2026 Bylaw No. 2917, 2026 Building Regulations Bylaw No. 2066 Page 49 CONSOLIDATED FOR CONVENIENCE ONLY TO MARCH 5, 2026 Thompson-Nicola Regional District P. DOUBLE PERMIT FEE Where work for which a permit is required by this bylaw has been commenced prior to issuance of a permit, the applicant shall pay to the Regional District double the fee prescribed in this Schedule, up to an additional $2,000. Q. PERMIT FEE REFUND Where no construction has commenced within six (6) months of building permit issuance, should the permit holder apply in writing to cancel the application or permit, the Building Official shall refund 75% of the original permit fee. R. FEE REDUCTION FOR PROFESSIONAL SUPERVISION Where a professional engineer or architect is retained by the owner and an undertaking is provided to coordinate design and field reviews on the project, the building permit fee will be reduced by 5%. S. BUILDING INFORMATION REQUEST The fee for researching building permit files. $75 T. PERMIT APPLICATION LEGAL CHANGE The fee for any legal change on title, such as ownership or subdivision, requiring revisions to the permit application records. $75 W. PERMIT DESIGN AND CONSTRUCTION MAJOR MODIFICATION If an issued permit is active or application plans have been reviewed and the owner proposes significant modifications to the building whereby the design changes and the value of the work changes, regardless whether the value increases or decreases, a fee of $100 per hour will be charged based on the hours, or portions thereof, expended for modified plan review. Bylaw No. 2813, 2023