Building permits — Enderby, British Columbia

Do I need a building permit? What does it cost?

In the City of Enderby, British Columbia, building permit rules are set by Bylaw No. 1582, 2015 Building Bylaw (Consolidated), verified 2026-09-27. Fees set in: City of Enderby Fees and Charges Bylaw No. 1479, 2010, as amended from time to time. Administered by: The Chief Administrative Officer and the Chief Building Inspector administer the bylaw; permits are issued by a Building Official.

Bylaw No. 1582, 2015 Building Bylaw (Consolidated) adopted bylaw
permit required for Any construction, alteration, reconstruction, demolition, removal or relocation of any building or structure, or other work related to construction; also installing a manufactured home or park model recreational unit, changing the Class of Occupancy, moving or demolishing a building or structure, and erecting a sign structure. s. 301 "No person shall commence or continue any construction, alteration, reconstruction, demolition, removal or relocation of any building or structure, or other work related to construction, unless a Building Official has issued a permit"
exemptions Buildings or structures exempted by Part 1 of the Building Code; accessory buildings less than 10 square metres in building area that do not create a hazard; accessory and agricultural buildings in Country Residential Zones less than 55 m2, one storey (6 metres), no plumbing; retaining structures 1.2 metres in height or less; fences; non-structural repairs or alterations; bridges (with exceptions); docks or wharves; decks where the elevation difference is less than 0.6 metres; polyethylene-covered greenhouses (not cannabis production facilities); travel trailers in commercial campgrounds; certain site services. s. 105 "As a general exemption to all regulations of this Bylaw, this Bylaw does not apply to"; "accessory buildings less than 10 square metres in building area"; "retaining structures 1.2 metres in height or less"
fees location City of Enderby Fees and Charges Bylaw No. 1479, 2010, as amended from time to time "FEES AND CHARGES BYLAW means the City of Enderby Fees and Charges Bylaw No. 1479, 2010, as amended from time to time"; s. 802 "Building Permit Fees shall be determined in accordance with the Fees and Charges Bylaw"
authority The Chief Administrative Officer and the Chief Building Inspector administer the bylaw; permits are issued by a Building Official. s. 401 "The Chief Administrative Officer and the Chief Building Inspector shall administer this Bylaw"
fine range Fine of not more than $10,000.00 or imprisonment for not more than six months. Work started without a permit where a Stop Work Order is issued: penalty equal to double the permit fee (not to exceed $1,500) for construction valued up to $1,000,000; 15% of the Building Permit fee (not to exceed $15,000) for construction valued at $1,000,000 or more. s. 302 "liable to a fine of not more than $10,000.00 or to imprisonment for not more than six months"; s. 303 "such penalty not to exceed $15,000 (fifteen thousand dollars)"
scout note

City of Enderby's building bylaw (originally adopted 2015), consolidated for convenience with amendment index showing 6 amendment bylaws through Bylaw 1782 (Dec 4, 2023, adding BC Energy Step Code definitions). Covers permits, applications, sewerage certification requirements. 38 pages.

Bylaw No. 1582, 2015 – Building Bylaw (Consolidated)

Regulates building construction, alterations, and demolitions within the city. (Landing page; the bylaw file itself is recorded separately.)

Machine-readable: building-permits.json · Official website: https://cityofenderby.com/ · Last verified 2026-09-27 · Building permits across British Columbia · Building permits in other municipalities