Development charges & levies — Kelowna, British Columbia

What development charges or levies apply to new construction? How much per new home?

In the City of Kelowna, British Columbia, development charges & levies rules are set by Kelowna Development Cost Charge Bylaw No. 12420 (consolidated to Bylaw No. 12746), verified 2026-10-25. Payable: Subdivision DCCs paid before approval of the subdivision plan; building permit DCCs paid before the building permit is issued. Services covered: Roads (highways), water, wastewater trunks, wastewater treatment, drainage, parkland acquisition, and park development.

Kelowna Development Cost Charge Bylaw No. 12420 (consolidated to Bylaw No. 12746) adopted bylaw
single detached charge Residential 1 (single-detached, ≤15 units/ha) per lot/unit — Roads: $12,201 (Main City/Common), $20,109 (North of Inner City), $28,036 (South Mission); Water: $1,023; Wastewater Trunks: $1,956; Wastewater Treatment: $4,892; Drainage: $720; Parkland Acquisition: $8,545; Park Development: $6,623 Schedule A — Residential 1, Single-detached Units/Ha <=15 ($/Lot or Unit)
apartment charge Density-based residential per unit (no 'apartment' label used) — Residential 2 (15–35 units/ha): Roads $11,029–$25,344, Water $925, WW Trunks $1,768, WW Treatment $4,422, Drainage $504, P-A $8,545, P-D $6,623. Residential 3 (35–85 units/ha): Roads $8,198–$18,837, Water $688, WW Trunks $1,314, WW Treatment $3,287, Drainage $288, P-A $8,545, P-D $6,623. Residential 4 (>85 units/ha): Roads $7,469–$17,163, Water $626, WW Trunks $1,197, WW Treatment $2,995, Drainage $216, P-A $8,545, P-D $6,623 Schedule A — Residential 2, Residential 3, Residential 4 ($/Lot or Unit)
non residential charge Commercial ($/m2 Floor Area): Roads $40.40–$92.83 (by sector), Water $3.39, WW Trunks $6.48, WW Treatment $16.20, Drainage $2.88, P-A $14.15, P-D $10.97. Light Industrial ($/m2 Floor Area): Roads $20.20–$46.42, Water $1.69, WW Trunks $3.24, WW Treatment $8.10, Drainage $2.16, P-A $7.07, P-D $5.48. Heavy Industrial ($/Hectare Site Area): Roads $30,137–$69,249, Water $5,675, WW Trunks $10,844, WW Treatment $27,125, Drainage $5,399, P-A $10,554, P-D $8,180 Schedule A — Commercial ($/m2 Floor Area), Light Industrial ($/m2 Floor Area), Heavy Industrial ($/Hectare Site Area)
area levy Heavy Industrial charged per hectare of Site Area (Roads $30,137–$69,249/ha by sector; all services in Schedule A). Seasonal Agricultural Industrial also charged per hectare (Roads $15,069–$34,625/ha; all services in Schedule A). Minimum site area charge applies at 0.405 hectare per s. 4.3 s. 3.1(c); s. 4.1(c); s. 4.3; Schedule A — Heavy Industrial and Seasonal Agricultural Industrial ($/Hectare Site Area)
parkland rate Parkland Acquisition (P-A) and Park Development (P-D) charged as DCC components: all Residential categories $8,545 + $6,623 per unit; Commercial $14.15 + $10.97 per m2; Light Industrial $7.07 + $5.48 per m2; Heavy Industrial $10,554 + $8,180 per hectare; Institutional A and B: Exempt Schedule A — Parkland Acquisition P-A and Park Development P-D rows
services covered Roads (highways), water, wastewater trunks, wastewater treatment, drainage, parkland acquisition, and park development WHEREAS clause: 'sewage, water, drainage and highway facilities … providing parkland and improving parkland'; Schedule A service rows
exemptions Institutional B exempt from Roads; Institutional A and B exempt from Parkland Acquisition and Park Development; Secondary Suites excluded from Residential Dwelling Unit definition; existing land use contract areas may be exempt Schedule A — Institutional B Roads 'Exempt'; Institutional A and B P-A and P-D 'Exempt'; s. 2.2 'does not include a Secondary Suite'; Schedule B map notes: 'EXISTING LAND USE CONTRACT AREAS … MAY BE EXEMPT'
payment timing Subdivision DCCs paid before approval of the subdivision plan; building permit DCCs paid before the building permit is issued s. 3.2: 'must be paid before the approval of the subdivision plan … before the building permit is issued'
scout note

Kelowna DCC bylaw. Schedule A (pre-2026 reduction): Residential 1 single-detached $/lot in Main City roads $12,201 + water $1,023 + wastewater trunk $1,956 + treatment $4,892 + drainage $720 + parkland acq. $8,545 + park dev. $6,623; South Mission roads $28,036. Commercial roads $40.40/m2 (Main City).

Machine-readable: development-charges.json · Official website: https://kelowna.ca · Last verified 2026-10-25 · Development charges & levies across British Columbia · Development charges & levies in other municipalities