| permit required for | A Permit is required for all Construction. | s. 5.1 |
| exemptions | No permit is required for clearing of stoppages, replacing a hot water tank, or repairing of leaks | s. 5.9 |
| fees location | Township of Langley Fees and Charges Bylaw 2007 No. 4616 | s. 5.2(d) |
| authority | Building Inspector | s. 5.2 |
| fine range | not exceeding $10,000.00 | s. 18.2 |
scout note
A building permit is required before construction, alteration, reconstruction, demolition, removal or relocation of a building/structure; administers the BC Building Code, Energy/Zero Carbon Step Code requirements, and a Green Building Permit Rebate Program. Permit fees are set out in the Township's Fees and Charges Bylaw 2007 No. 4616, Schedule 18.