| permit required for | Commencing any construction work for any building or structure; demolishing; moving; occupying or changing use; installing mechanical or electrical equipment; constructing masonry fireplace or installing wood-burning appliance or chimney. | s. 10.2 |
| exemptions | Storage and garden sheds and other accessory buildings not exceeding ten (10) square metres in floor area may be erected without a permit. | s. 10.6(e) |
| fee basis | Application fee is a percentage of building permit fee based on declared construction value; construction value determined by City. | s. 20.1; s. 20.2 |
| fees location | Fees and Charges Bylaw No. 7575-2019 | s. 2.2 |
| authority | Building Official | s. 7 |
| fine range | Fine not exceeding $10,000.00, or imprisonment not exceeding six (6) months, or both; each day separate offence. | s. 22.1 |
scout note
Regulates construction, alteration, repair, demolition, and moving of buildings per the BC Building Code; a valid permit is required before work begins. Repeals prior Building Bylaw No. 6925-2012. Permit, plan-review, and plumbing/electrical/gas fees are set in the City's separate Fees and Charges Bylaw.