District of Sechelt Development Cost Charges Bylaw No. 554, 2016
Sechelt, British Columbia
· No. 554
· adopted 2017-02-01
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 76672169f313 · verified 2026-10-26 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
DISTRICT OF SECHELT
BYLAW NO. 554, 2016
A bylaw to Impose Development Cost Charges
WHEREAS the Local Government Act provides, that Council may, by Bylaw, impose
development cost charges on every person who obtains;
(a) approval of a Subdivision; or
(b) a Building Permit authorizing the construction, alteration or extension of a building
or structure;
for the purpose of providing funds to assist the District to pay the capital costs of
providing, constructing, altering or expanding sewer, drainage and highway (road)
facilities, and providing and improving parkland to service, directly or indirectly, the
development for which the charge is being imposed;
AND WHEREAS the Council considers that the charges imposed by this Bylaw:
(a) are not excessive in relation to the capital cost of prevailing standards of service in
the District;
(b) will not deter development in the District; and
(c) will not discourage the construction of reasonably priced housing or the provision of
reasonably priced serviced land in the District;
AND WHEREAS, in the opinion of the Council, the charges imposed by this Bylaw are:
(a) related to capital costs attributable to projects included in the Financial Plan of the
District; and
(b) related to capital projects consistent with the Official Community Plan of the District;
NOW THEREFORE the Council of the District of Sechelt in open meeting assembled hereby
enacts as follows:
Page 2
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
CITATION:
1.
This Bylaw may be cited as "District of Sechelt Development Cost Charges Bylaw
No.554, 2016".
DEFINITIONS:
2.
(1) In this Bylaw,
"Apartment Dwelling Unit" means a Dwelling Unit in a building that contains three or
more dwelling units to which access is provided from the exterior of the building by means
of a common lobby and stairways or elevators.
"Building Permit" means a permit issued by the District that authorizes the construction,
alteration or extension of a building or structure;
"Commercial" means a building predominantly serving a business, office, retail sales or
service function and generally as described in Part 6 of the Zoning Bylaw;
"Congregate Care" means a building that is used or intended to be used as a seniors
residence, in which cooking appliances are not provided within accommodation units, and
common dining areas are provided within the building;
"District" means the District of Sechelt;
"Duplex Dwelling" means a building that contains two Dwelling Units, whether or not
either of the Dwelling Units contains a Secondary Suite;
"Dwelling Unit" means a room or group of rooms that are used or intended to be used as a
self-contained private residence, and for the purposes of this Bylaw does not include any
Secondary Suite;
"Gross Floor Area" means the total of the horizontal areas of all floors in a building,
excluding any basement area used only for storage or vehicle parking purposes, measured
to the outside of the exterior walls of the building;
"Industrial" means a building predominantly providing an industrial, business park or
related function and generally as described in Parts 7 and 8 of the Zoning
Bylaw;
"Institutional" means a building predominantly providing a governmental or public
service or related function and generally as described in Part 10 of the Zoning Bylaw;
Page 3
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
"Not-for-profit Rental Housing" means housing that is the subject of a housing
agreement with the District that secures rental tenure in perpetuity, and in respect of which
the applicant for a building permit has provided evidence satisfactory to the Director of
Planning and Development Services that:
a) the housing will be occupied only by persons or families with household incomes that
are lower than the median household income in the District, and
b) rents for the housing will be subsidized by the Province of British Columbia or another
subsidy provider such that rents will not exceed 30% of the household income of the
occupant or occupant family;
"Sanitary Sewer Specified Area" means the lands described within the "District of
Sechelt Merged Sewer Specified Area Extension Bylaw No. 393, 2001";
"Secondary Suite" has the meaning prescribed by the Zoning Bylaw;
"Single Family Dwelling" means a building, including a mobile or modular home, that
contains a single Dwelling Unit, whether or not the building also contains a Secondary
Suite;
"Subdivision" means a subdivision of land into two or more parcels under the Land Title
Act or the Strata Property Act;
"Townhouse" means a building containing three or more Dwelling Units, arranged such
that each Dwelling Unit has an independent entrance to the exterior, and includes triplexes
and fourplexes; and
"Zoning Bylaw" means Bylaw No. 25, 1987.
3.
DEVELOPMENT COST CHARGES:
(1) Every person who obtains a building permit, including a permit authorizing the
construction of a building containing fewer than four dwelling units, shall have paid
to the District, at the time of issuing of the Building Permit, the applicable
development cost charges set out in Schedule 'A', according to the location of the
building in relation to the Sanitary Sewer Specified Area, except to the extent that
development cost charges were paid in relation to the subdivision of the parcel in
respect of which the building permit was issued.
(2) The charges specified in Schedule 'A' shall be based on the proposed use of the
building indicated in the building permit application. Where there is more than one
such use, each use is subject to the applicable charge specified in Schedule 'A'.
(3) Every person who obtains approval of a Subdivision creating parcels on which Single
Family Dwellings and Duplex Dwellings are permitted by the Zoning Bylaw shall
have paid to the District in respect of each additional parcel being created, at the time
Page 4
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
of approval of the Subdivision, the applicable development cost charges set out in
Schedule A, according to the location of the subdivision in relation to the Sanitary
Sewer Specified Area.
(4) No development cost charge is payable where the building permit authorizes the
construction of a building or part of a building described in s. 561(1) of the Local
Government Act.
(5) The Director of Planning and Development Services may waive or reduce the
development cost charges payable in respect of a building permit authorizing the
construction of Not-for-profit Rental Housing, and in the case of a reduction may
determine the extent of the reduction, and the permit applicant may request the
Council to reconsider a decision of the Director.
(6) If a building permit is issued to authorize the construction of Not-for-profit Rental
Housing on the basis of a waiver or reduction under Subsection (5), no Dwelling Unit
authorized by the permit may be occupied otherwise than in accordance with the
applicable housing agreement and the definition of Not-for-profit Rental Housing in
this Bylaw unless the development cost charge that is, but for the waiver or reduction,
applicable to the Dwelling Unit under this bylaw or any successor bylaw has been
paid to the District.
(7) For Commercial, Industrial and Institutional uses the calculation of floor area is based
on the Gross Floor Area of the proposed building indicated in the building permit
application.
(8) The calculations used to determine the amount of the development cost charges
imposed by this Bylaw are based on the capital projects listed in Schedule 'B'.
4. REMAINDER OF BYLAW TO BE MAINTAINED INTACT:
In the event that any portion of this Bylaw is declared ultra vires, such portion shall be
severed from this Bylaw with the intent that the remainder of this Bylaw shall continue in
full force and effect.
5. REPEAL OF PREVIOUS BYLAWS:
West Sechelt Sewer Collection System Development Cost Charge Bylaw No. 146, 1991,
West Porpoise Bay Sewer Collection System Development Cost Charge Bylaw No. 147,
1991, Development Cost Charge (Drainage) Bylaw No. 206, 1993, Development Cost
Charge (Roads) Bylaw No. 229, 1994, Development Cost Charge (Parks) Bylaw No. 301,
1996 and Sechelt Sewage Treatment Plant Development Cost Charge Bylaw No. 363,
1991, Amendment Bylaw No. 432, 2004 are hereby repealed, effective on the date that
this Bylaw is adopted.
Page 5
District of Sechelt Development Cost Charges Bylaw No.554, 2016
READ A FIRST TIME THIS
READ A SECOND TIME THIS
READ A THIRD TIME THiS
THIRD READING RESCINDED THIS
READ A THIRD TIME THIS
Certified a true and correct copy of "District
of Sechelt Development Cost Charges Bylaw
No. 554, 2016" as read a third time bi the
District of Sechelt Council on the 16
h day of
November, 2016
at District of'
DAY OF
DAY OF
DAY OF
DAY OF
DAY OF
August
August
August
November
November
2016
2016
2016
2016
2016
3rd
3rd
3rd
l6t1
I 6'
2016
APPROVED BY THE INSPECTOR OF MUNICIPALITIES
THIS
21st
DAY OF
ADOPTED THIS
1st
DAY OF
Mayor
December 2016
February
2017
e
Officer
Page 6
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
SCHEDULE A to Bylaw No. 554, 2016
Schedule of Development Cost Charges Applicable to Lots within the
Sanitary Sewer Specified Area
Use
Drainage
Sewer
Roads
Parks
Total
Single Family /unit
$3,088
$844
$14,222
$4,295
$22,449
Townhouse or Duplex / unit
$1,667
$700
$9,245
$3,565
$15,177
(Apartment) / unit
$1,019
$565
$5,547
$2,878
$10,009
Congregate Care / unit
$618
$354
$4,125
$1,289
$6,386
Commercial /m² gross floor
area
$6.18
$1.69
$42.67
-
$50.54
Industrial /m² gross floor area
$6.18
$1.69
$14.22
-
$22.09
Institutional /m² gross floor
area
$6.18
$1.69
$42.67
-
$50.54
Schedule of Development Cost Charges Applicable to Lots outside the Sanitary Sewer
Specified Area
Use
Drainage
Roads
Parks
Total
Single Family /unit
$3,088
$14,222
$4,295
$21,605
Townhouse or Duplex / unit
$1,667
$9,245
$3,565
$14,477
(Apartment) / unit
$1,019
$5,547
$2,878
$9,444
Congregate Care / unit
$618
$4,125
$1,289
$6,032
Commercial /m² gross floor
area
$6.18
$42.67
-
$48.85
Industrial /m² gross floor area
$6.18
$14.22
-
$20.40
Institutional /m² gross floor
area
$6.18
$42.67
-
$48.85
Page 7
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
Schedule 'B'
DCC Project List
2016 DCC Program - Drainage Projects
Projects
Estimated
timing
Project Cost
DCC
Portion
Assist
Factor
Net DCC
Recovery
Trail Ave (TRA P5)
2017
148,000
100%
1%
146,520
Trail Ave (TRA P3)
2017
182,000
100%
1%
180,180
Drainage Study - Ocean Ave
and Inlet Ave
2017
160,000
25%
1%
39,600
Trail Ave - Marine Way to
Ebbtide
2017
250,000
100%
1%
247,500
Trail Ave (TRA P4)
2017
262,000
100%
1%
259,380
WT Outfall
2018
250,000
50%
1%
123,750
Trail Ave - Ebbtide to Pebble
Cres
2018
250,000
100%
1%
247,500
Gale Ave (BG C1)
2020
97,000
50%
1%
48,015
Medusa St (MED L9:12)
2020
99,000
50%
1%
49,005
Fairway Duck Pond (BG C2)
2020
200,000
50%
1%
99,000
Wakefield Ck (WAK C5)
2020
354,000
50%
1%
175,230
Bay Rd (Bay C3)
2025
39,000
50%
1%
19,305
Highway 101 (Hwy C-8)
2025
56,000
50%
1%
27,720
Wharf Ave - Hwy 101 to East
Porpoise Bay Road (WT L5:)
2025
81,000
50%
1%
40,095
Wharf Ave - Hwy 101 to East
Porpoise Bay Road (WT L6)
2025
85,000
50%
1%
42,075
Wharf Ave (TBDIV 3)
2025
90,000
50%
1%
44,550
Page 8
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
Wharf Ave - Hwy 101 to East
Porpoise Bay Road (WT L4)
2025
137,000
50%
1%
67,815
Teredo St (TER L1)
2025
175,000
75%
1%
129,938
Teredo St (TER L2)
2025
175,000
75%
1%
129,938
Salmon Dr (SAL P1)
2025
178,000
75%
1%
132,165
Trail to Marsh (WT L20)
2025
250,000
75%
1%
185,625
Trail to Marsh (WT L21)
2025
250,000
75%
1%
185,625
Wharf Ave (TBDIV 1)
2025
380,000
50%
1%
188,100
Wharf Ave (TBDIV 2)
2025
443,000
50%
1%
219,285
Shornecliffe Storm Outfall -
Teredo St to Georgia St
2025
500,000
100%
1%
495,000
Sandy Hook Rd (DHN C1)
2029
43,000
50%
1%
21,285
Field Rd (FLD C6)
2030
38,000
75%
1%
28,215
Marmot Rd (MAR C2)
2030
48,000
50%
1%
23,760
Chapman Rd (CHP C3)
2030
56,000
50%
1%
27,720
Carmel Place (CAR C1)
2030
56,000
50%
1%
27,720
Sechelt Inlet Rd (SIR C6)
2030
63,000
50%
1%
31,185
Chapman Rd (CHP C2)
2030
70,000
50%
1%
34,650
Reed Rd (REE C3)
2030
108,000
50%
1%
53,460
Heritage Rd (GAL C1A)
2030
150,000
50%
1%
74,250
Ebbtide St (SMDIV 1)
2030
189,000
50%
1%
93,555
Harbour Rd (HBR C1)
2035
62,000
50%
1%
30,690
Page 9
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
Allan Rd (ALL P1)
2035
418,000
50%
1%
206,910
Shoreline Protection
2024 -
2025
1,080,000
25%
1%
267,300
Total Drainage
$7,472,000
$4,443,616
2016 DCC Program - Sewer Projects
Projects
Estimated
timing
Project Cost
DCC
Portion
Assist
Factor
Net DCC
Recovery
Upsize main - MH 4095 -
Wakefield L.S.
2017
125,000
75%
1%
92,813
Upgrade Wakefield Lift Station
2018
450,000
50%
1%
222,750
Upsize main - MH 4730 to MH
4720
2020
125,000
100%
1%
123,750
Upsize main - MH 4720 to MH
4710
2020
225,000
100%
1%
222,750
Replace Pumps - Mackenzie
Marina Lift Station
2020
310,000
50%
1%
153,450
Replace Norwest Bay Lift
Station
2020
450,000
75%
1%
334,125
Upgrade Gravity Main Trunk
Sewer - Shornecliffe and
Highway 101 and Ocean Ave
2020
507,000
100%
1%
501,930
Upsize Shoreline Siphon
2022
110,000
100%
1%
108,900
Trunk Expansion - Trail Ave.
and Mermaid
2022
550,000
100%
1%
544,500
Replace Pipe - Gale Ave. N
2025
25,000
100%
1%
24,750
Upsize main - MH 4770 - MH
4745
2025
140,000
100%
1%
138,600
UF Membrane Upgrade -
Water Resource Centre
2024
240,000
100%
1%
237,600
Total Wastewater Projects
$3,257,000
$2,705,918
Page 10
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
2016 DCC Program - Road Projects
Projects
Estimated
timing
Project Cost
DCC
Portion
Assist
Factor
Net DCC
Recovery
Upgrade Field Road to Arterial
- Hwy 101 to Airport
2026 -
2028
6,600,000
50%
1%
3,267,000
Upgrade Trail Ave to Arterial -
Teredo to Turnstone Drive
2017 -
2018
4,500,000
100%
1%
4,455,000
Sidewalk and lift on Sechelt
Inlet Road - Dusty Road to
northern end of Provincial
park
2028 -
2030
6,900,000
75%
1%
5,123,250
Neptune Connector (new
collector) - eastern boundary
of Clayton to Trail
2023 -
2025
3,200,000
100%
1%
3,168,000
Upgrade Reef Road to
Collector - Trail Ave to Shoal
Way
2024 -
2025
1,750,000
75%
1%
1,299,375
Upgrade Fairway Road to
Collector - Shoal Way to
Beacon St.
2027 -
2028
1,500,000
75%
1%
1,113,750
Upgrade Mason Road to
Collector - Norwest Bay Road
to Highway 101
2023 -
2025
2,125,000
75%
1%
1,577,813
Intersection Upgrades on
Highway 101 - Left turn lane at
Selma Park Road
2017
200,000
100%
1%
198,000
Intersection Upgrades on
Highway 101 - Left turn lane at
Bay Road
2017
200,000
100%
1%
198,000
Upgrade Derby Road to
Collector - Norwest Bay Road
to Baillie Road
2017
330,000
100%
1%
326,700
Upgrade Trail Ave to Arterial -
Turnstone Drive to Reef Road
2018
140,000
100%
1%
138,600
Sidewalk and Streetlights on
Sechelt Inlet Road - Saltgrass
Lane to Dusty Road
2020
190,000
75%
1%
141,075
Upgrade Tyler Road to Arterial
- Tower Road to Emmerson
Road
2020
225,000
100%
1%
222,750
Page 11
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
Intersection Upgrades on
Wharf Avenue and East
Porpoise Bay Road
2020
500,000
100%
1%
495,000
Upgrade 1/2 of Nickerson
Road to Collector - Oracle
Road to Norwest Bay Road
2022
412,500
100%
1%
408,375
Upgrade 1/2 of Nickerson
Road to Collector - Tyler Road
to Tower Road
2025
412,500
100%
1%
408,375
Upgrade Shoal Way to
Collector - Reef Road to
Fairway Ave
2026
750,000
75%
1%
556,875
Upgrade 1/2 of Tyler Road to
Arterial - Nickerson Road to
Page Road
2030
600,000
100%
1%
594,000
Total Roads
$30,535,000
$23,691,938
2016 DCC Program - Park Projects
Project
Estimated
timing
Net Project
Cost
DCC
Portion
Assist
Factor
Net DCC
Recovery
Dog Park - location TBD
2018
100,000
100%
1%
99,000
Trail Bay Waterfront - Trail to
Ocean (New community park)
2018
174,000
100%
1%
172,260
Suncoaster Trail - Roberts
Creek to Airport (Expanded
trail)
2018
250,000
50%
1%
123,750
Acquisition of lots 25, 26 & 27
(New trail)
2018
600,000
100%
1%
594,000
Ebbtide Park (New community
park)
2019
429,000
100%
1%
424,710
Kinnikinnick Park (Improved
community park)
2019
611,000
25%
1%
151,223
Chapman Creek Trails
(Expanded trail)
2020
353,000
50%
1%
174,735
Quarry Park (New community
park)
2021
350,000
100%
1%
346,500
Esplanade Trail - Burnett to
Allan (New trail)
2021
436,000
100%
1%
431,640
Page 12
District of Sechelt Development Cost Charges Bylaw No.554, 2016
_________________________________________________________________________
West Sechelt Soccer Field
(New community park)
2022
1,999,000
100%
1%
1,979,010
Duck Pond (New
neighbourhood park)
2025
50,000
100%
1%
49,500
Mission Point Park - Phase #2
(Expanded community park)
2025
608,000
50%
1%
300,960
The Trails (New community
park)
2025
609,000
100%
1%
602,910
Sandy Hook Shoreline Parks
(New neighbourhood park)
2030
671,000
100%
1%
664,290
Tuwanek - Former Log-sort
Esplanade (New trail)
2035
259,000
100%
1%
256,410
Total Parks
$7,549,000
$6,370,898