| connection mandatory | yes | s. 5A(1) |
| billing basis | metered | s. 27(2) |
| sewer rate | Sanitary sewer use charge: $1.96/unit (June–September) and $2.81/unit (other months); CRD sewer consumption charge: $4.42/unit (June–September) and $6.31/unit (other months); 1 unit = 2.832 m3 | s. 27(2); s. 27A(1); Schedule "A", s. 1; s. 2 (definition of "Unit") |
| billing period | annual | s. 28(12) |
scout note
Regulates connections to and use of the sanitary sewer and stormwater utility systems in Victoria.