| permit required for | Erection/construction, addition, extension, improvement, alteration, conversion, repair of buildings/structures; signs; excavation; permanent pools, hot tubs, fish ponds minimum depth 2 feet. | s. 8.1 |
| exemptions | Replacement stucco/siding/shingles, doors/windows same opening, fences inside property line, patching/painting/decorating, cabinets/shelves, sidewalks, accessory buildings/sheds <10 m², non-structural alterations/repairs. | s. 8.4 |
| fees location | Schedule of Fees | s. 7.2 |
| authority | South Central Planning District and Development Officer/Building Inspector | s. 2.3 |
| fine range | Fine not exceeding $5,000.00; imprisonment not exceeding six months, or both. | s. 24.1 |
scout note
Municipality of Louise's own Building Bylaw adopting the Manitoba Building Code under The Buildings and Mobile Homes Act. Requires building, plumbing, occupancy, demolition/removal/relocation, electrical, temporary-building and sign permits; South Central Planning District (SCPD) is authority having jurisdiction; repeals prior RM of Louise, Crystal City and Pilot Mound building/plumbing bylaws; max fine $5,000.