| billing basis | metered | s. 2 |
| water rate | $3.00/m3 (2024); $3.25/m3 (2025); $3.50/m3 (2026); $3.76/m3 (2027) | Schedule "A", s. 1 |
| water fixed charge | $8.15/quarter (2024); $8.30/quarter (2025); $8.45/quarter (2026); $8.58/quarter (2027) | Schedule "A", s. 1 |
| sewer rate | $1.21/m3 (2024); $1.12/m3 (2025); $1.03/m3 (2026); $0.94/m3 (2027) | Schedule "A", s. 1 |
| billing period | quarterly | s. 5 |
scout note
Quarterly billing. 2026 rates (Jan 1, 2026): service charge $8.45/quarter; water $3.50 + wastewater $1.03 = $4.53 per m3; 14 m3 allowance on 5/8 in meter. 2025: $8.30, $3.25+$1.12. 2027: $8.58, $3.76+$0.94.