Town of Snow Lake Schedule B to By-law 879/08 – Equipment Rental/Custom Work Rates (November 2017)

Snow Lake, Manitoba · No. 879/08 · summary & facts

This is the exact embedded text of the captured official document. Snapshot c4f945b50db0 · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

SCHEDULE "B" of By-Law No. 879/08 Equipment Rental/Custom Work Rates November, 2017 1. Rental rates exclude labour. Equipment will be operated by a Town Employee at $50/hr extra unless the renter is a qualified operator.(skill and familiarity must be verified) 2. An equipment rental agreement must be signed prior to work commencing. 3. Custom Work is one hour minimum rental and minimum overtime (after 4:00 pm or before 7:30 am) callout is 4 hours. 4. Labour without machine $50.00 per hour 5. Labour after regular work hours or on an overtime callout $75/hr 6. "Rental of Heavy Equipment and Trucks does not include fuel; fuel extra at town rate Equipment/machine Hourly Rate Daily Rate 1/2 day rate (machines without (machines without (machines without een | entices | metamtn | ete saw |Excavator,mini | a | BTA Komatsu Tractor and brush $90.0 $468.0 $306.00 euter | |S S08 n/a $270.0 $150.00 double axle Portable Generator, n/a $150.0 $90.00 fooowar | | SEG S00 Services: Grass Cutting... = 72/hr SNOW REMOVAI......ceeeeeeeeeeeeeeee = 114.00/hr TOWING FOC... eects $138.00 / hr (includes operator and fuel, travel time extra) Fridge/Freezer disposal.................. $ 60.00 /ea Unless tagged Septic Service... eee. § 155.00/load Materials: LIMESTONE... eee ceeeseeeeeeseneneees $ 36.80 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Fines from Limestoneé.............. $ 34.50 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Cement Gravel........ccccesseseess $ 46.00 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Winter road Sand.(no sallt).......... $ 25.30 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Screened Sand ........cceeeseceeefeeee $ 32.00 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Non-screened sand ...........:008 $ 15.30 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Mine Waste... § 32.00 /cu. yd. + $50/hr hauling, minimum 0.5 hrs TOD SOil.... cece eeeeteesetseeesesseeeees $ 38.00 /cu. yd. + $50/hr hauling, minimum 0.5 hrs Unscreened Sand ........ccccceeeee $ 8.00 /cu.yd + $50/hr hauling, minimum 0.5 hrs Culverts and lines: ca 0) (ee at cost +15% BY PVG... eeeceeeec eee eeeeeeeesneetsceseeeneaees at cost +15% 5 Al 0) Cee at cost +15% 5 sd 0) at cost +15% TB PVC... cc ccccceeceeeeeaeeeeessteeenseesnenaes ai cost +15% Vo" COPPEN NINE... eee eecec eee e eee eneeeee at cost +15% 1/2" steel FING... cece cece ee etenees at cost +15% 3/4" COPPEr NINE... cece ec ee eens eee eees at cost +15% 3/4" steel liN@....... eee cece eeeecees at cost +15% 1" Copper lINC........ ce ceeee eee eee eee enaeaees at cost +15% 1" steel liN€..... 2... eee cee cece eeeeee ees at cost +15% Polyethylene service line..................... at cost +15% MVEIVES. ...eeeceneteenseterereeeessteeeeesenenenenpes at cost +15% Curb Stop, %" copper flare........... $ 300.00 plus labour per man hour (see top of page) All other private WOrkS...........cceeeeeeeee at cost + 15% for parts + labour (see top of page) Office: Per Page: Photocopies............cesseseeeeseseeee- 90.25 for black and white pesteseneeesesteeesenteeseseresee 1 -OO for color FAXES... .cccccescccsssescsseceessseeeecseseeessreecesseeeeseneeep 1.00 Garage: | 1. Garage rental by service providers only if operation of that service is required by Town for equipment storage or repair and maintenance of fleet or equipment. 2. Garage rental only if local commercial rental establishments are unsatisfactory. 3. Rental rate to be approved by Council. Airport: . TelOphone..........:seceesssseeeesessseeeeeee 2.00 per minute