| permit required for | location, placement, erection or construction of any building, structure or portion; addition, extension, improvement, alteration or conversion; repair, rehabilitation or renovation; underpinning; moving; removal; excavation; mechanical system installation; sign alteration | s. 4.2.1.1 |
| exemptions | Accessory buildings not greater than 10 square meters; patching, painting or decorating; replacement of shingles; non-structural alterations or repairs under $20,000; fabric buildings smaller than 25 square meters. | s. 3.3.1(e); s. 4.2.1.2 |
| fees location | current Town of Swan River Fee Schedule | Schedule "A" |
| authority | Town of Swan River and, where the context requires, such building inspector, fire inspector, or other authority lawfully appointed by the Town of Swan River | s. 2.2.3 |
| fine range | not exceeding $5,000.00; permit not obtained: 10% of permit fees, then remaining 90% totaling twice the original prescribed fee | s. 7.1; s. 4.2.6.2 |
scout note
Town of Swan River's Building By-Law 12/2024 requires building/plumbing/development/occupancy/demolition permits, sets a permit fee schedule (Schedule A), exemptions, and duties of owner/constructor/Authority Having Jurisdiction; OCR-confirmed cover and table of contents.