Building permits — Doaktown, New Brunswick

Do I need a building permit? What does it cost?

In the Village of Doaktown, New Brunswick, building permit rules are set by By-Law No. 2017-2 Village of Doaktown Building By-law, verified 2026-10-18. Permit required for: No owner shall undertake or continue any work unless a permit has been issued for the work. Fees set in: Rural Plan. Administered by: Building Inspector.

By-Law No. 2017-2 Village of Doaktown Building By-law adopted bylaw
permit required for No owner shall undertake or continue any work unless a permit has been issued for the work. s. 5.1(c)
exemptions Electrical work; maintenance; re-roofing; painting; floor covering; doors/windows; fences; pools; signage; accessory buildings serving one dwelling unit or under 56.1 m2; decks under 56.1 m2 and 600 mm s. 6.1
fees location Rural Plan s. 15.9
authority Building Inspector s. 13.2
scout note

Caveat: enacted before New Brunswick's Building Code Administration Act regime; building by-laws that do not conform ceased to have effect on 2023-01-01, when the provincial General Regulation began to apply, so this by-law may no longer be fully in force. Building by-law under the Community Planning Act adopting the National Building Code; permit required for building/structure work, building inspector, per-square-foot permit fee schedule (e.g. first storey, decks, sheds). 14 pages, scanned.

Village of Doaktown Municipal By-laws index

Village by-law listing; links 2017-02 Building By-law.

Machine-readable: building-permits.json · Official website: http://www.doaktown.com/ · Last verified 2026-10-18 · Building permits across New Brunswick · Building permits in other municipalities