| permit required for | Work (building, altering, structurally altering, locating/relocating, repairing/replacing, changing occupancy) requires a valid building permit or phased building permit. | s. 9(1) |
| exemptions | In buildings with max two dwellings/accessory buildings: non-structural repairs ≤$1,000; re-roofing; gutters/downspouts/storm doors/windows/shutters; same-type interior/overhead doors; painting/plaster/drywall; interior floor/wall coverings; cosmetic trim; kitchen/bath cabinets; existing chimney repair. | s. 10(1); Schedule "D" |
| fee basis | Application fees listed in Schedule B; construction estimate based on rates in Schedule A; administrative fee added to applicable permit category fee. | s. 14(1); s. 14(2); Schedule "B" |
| authority | Building Inspector administers/enforces; municipal inspectors inspect. | s. 24(6); s. 16(1) |
scout note
Grand Falls By-Law Z-1 regulating construction, repair and demolition of buildings and structures, adopting the National Building Code 2020 per NB Reg 2021-2. Reading dates not extractable.