| permit required for | Any work (construct or demolish a building or material part) unless a permit is issued; change of use requires a building permit. | s. 3.1; s. 5.4 |
| exemptions | Non-material work: maintenance of heating/ventilation/electrical, painting, baseboards/window casings, flooring, built-in furniture; certain single/two-unit dwelling repairs; buildings exempt under Regulation 2021-2. | s. 4.1 |
| fee basis | Building permit: $25 plus $5 per $1,000 estimated construction cost (Southeast Regional Service Commission calculator); demolition: $25; double if work begun before permit. | s. 7.1; s. 7.3 |
| authority | Building inspector | s. 15.1 |
scout note
Building By-law enacted by Strait Shores under the Building Code Administration Act and Community Planning Act. PDF opened; OCR confirms 'BUILDING BY-LAW No 2023-07, BE IT ENACTED by Strait Shores'.