| permit required for | All development, including subdivision/severance, must have a permit issued by Council; development includes building, engineering, mining, material change, access, signs, construction, parking trailers. | s. 2.1 |
| exemptions | Works affecting only interior or not materially affecting external appearance/use; soil removal affecting less than 125 m3; residential market/home gardening without permanent structures, sales, animals. | s. 2.1; s. 4.1.8; s. 4.2.2 |
| fees location | annual schedule of fees adopted by Council | s. 2.5.10 |
| authority | Council or its designated employee/staff; inspectors/officers | s. 2.0; s. 2.5.6; s. 2.8.2; s. 2.8.3 |
scout note
Adopted by council July 16, 2020. Section 2.1 When Is a Permit Required; separate building permit per building in a subdivision. Recorded as building_permits because no separate building instrument was found: the Development Regulations require a permit for any development (including erecting or altering buildings) and a separate building permit per lot in a subdivision.