Building permits — Milltown-Head of Bay d'Espoir, Newfoundland and Labrador
Do I need a building permit? What does it cost?
In the Town of Milltown-Head of Bay d'Espoir, Newfoundland and Labrador, building permit rules are set by Town of Milltown-Head of Bay d'Espoir (2017-2027) Development Regulations, verified 2026-10-18. Permit required for: A separate building permit shall be obtained for each building proposed to be erected in the area of the subdivision. Administered by: Council of the Town of Milltown Head of Bay d'Espoir; inspector appointed by Council.
Town of Milltown-Head of Bay d'Espoir (2017-2027) Development Regulations
adopted bylaw
permit required for
A separate building permit shall be obtained for each building proposed to be erected in the area of the subdivision.
s. 74
authority
Council of the Town of Milltown Head of Bay d'Espoir; inspector appointed by Council.
s. 5; Schedule "A" (INSPECTOR)
scout note
No separate building by-law found; the Development Regulations require a council permit before any development (including erecting or altering a building) and require a separate building permit per building in approved subdivisions.