Building permits — Small Point-Adam's Cove-Blackhead-Broad Cove, Newfoundland and Labrador
Do I need a building permit? What does it cost?
In the Town of Small Point-Adam's Cove-Blackhead-Broad Cove, Newfoundland and Labrador, building permit rules are set by Small Point-Broad Cove-Blackhead-Adam's Cove Development Regulations 2011, verified 2026-10-18. Permit required for: Any development within the Planning Area unless otherwise provided; a separate building permit for each building proposed in a subdivision. Exemptions: Ordinary landscaping of a property or creation of a garden and similar activity, unless likely to affect adjacent properties or a water body. Administered by: Town (Council); Inspector appointed by the Town or federal/provincial authority.
Small Point-Broad Cove-Blackhead-Adam's Cove Development Regulations 2011
adopted bylaw
permit required for
Any development within the Planning Area unless otherwise provided; a separate building permit for each building proposed in a subdivision.
s. 8; s. 80
exemptions
Ordinary landscaping of a property or creation of a garden and similar activity, unless likely to affect adjacent properties or a water body.
s. 58(1)
authority
Town (Council); Inspector appointed by the Town or federal/provincial authority.
s. 6; s. 8; Schedule "A"
scout note
No separate building by-law found; the Development Regulations define development to include erecting buildings and require a council permit before any development, so they act as the building permit instrument (NL rule). Reg. 80 building permit per subdivision lot.