| permit required for | Any development within the Planning Area unless otherwise provided; a separate building permit for each building proposed in a subdivision. | s. 7; s. 74 |
| authority | Council of the Town of Woody Point (the Authority); inspectors appointed by the Authority. | s. 5; s. 33; s. 34 |
scout note
Development Regulations require a development permit (Reg. 7 'Permit Required') for any development incl. erecting or altering buildings; permits must conform to the Building Code and any Building Regulations; Reg. on Building Permits Required for subdivisions. No separate building regulations found, so this is the operative building-permit instrument.