| permit required for | Construct, demolish, or cause construction/demolition of a building or swimming pool; occupancy, change of use, sewage system, conditional permits. | s. 6.1; s. 4; s. 8.1 |
| exemptions | Inflatable pools with maximum depth capacity of 1.2 metres or less; hot tubs with lockable covers. | s. 7.3.3 |
| fees location | Municipality's in force Fees By-law | s. 13.1 |
| authority | Chief Building Official and Inspectors | s. 3.1.8; s. 3.1.11 |
| fine range | Part I set fines $300–$1,000; Part III maximum $50,000/$100,000 persons, $500,000/$1,500,000 corporations; continuing up to $10,000/day. | Schedule "E"; s. 22.2; s. 22.3 |
scout note
Township's Building Code Act, 1992 by-law: permits required for construction, demolition, occupancy, change of use, on-site sewage systems, conditional permits; sets required inspections, permit fees (Schedule A), and refunds.