The Corporation of the Township of Adjala-Tosorontio
By-law 23-43
(Consolidated - as amended)
BUILDING BY-LAW
A By-law under the Building Code Act respecting Permits and Related Matters.
Consolidation
Amendment No. 1
By-law 2023-101
December 13, 2023
Disclaimer:
The following consolidation is an electronic reproduction made available for information only.
It is not an official version of the By-law. The format may be different, and plans, pictures,
other graphics or text may be missing or altered. The Township of Adjala-Tosorontio does
not warrant the accuracy of this electronic version.
This consolidation cannot be distributed or used for commercial purposes. It may be used
for other purposes, only if you repeat this disclaimer. Official versions of all By-laws can be
obtained from the Township Clerk's Department 705-434-5055.
Page 1 of 32
1.
SHORT TITLE:
This By-Law may be cited as the "Building By-Law".
2.
DEFINITIONS:
(1)
In this By-law;
(a)
"Act" means the Building Code Act, S.O. 1992, including amendments
thereto
(b)
"Applicant" means the owner of a building or property who applies for
a permit or the person authorized in writing by the owner to apply for a
permit on the owner's behalf.
(c)
"As Constructed Plans" means as constructed plans as defined in
the Building Code.
(d)
"Base Model" means plans for the basic design of a detached, semi-
detached, townhouse, row-house, duplex or 'live/work' residential
building that includes one elevation and no optional features
(d)
"Building" means a building as defined in Section 1(1) of the Act.
(e)
"Building Code" means the regulations made under Section 34 of the
Act.
OFFICE CONSOLIDATION
Current to Amendment No. 1
By-law 2023-101, December 13, 2023
THE TOWNSHIP OF ADJALA-TOSORONTIO
By-law No. 2023-43
A By-law under the Building Code Act respecting Permits and Related Matters.
WHEREAS the Council of the Township of Adjala-Tosorontio deems it advisable to
enact a new by-law and repeal By-law 22-54 in order to comply with Bill 124;
AND WHEREAS Section 7.1 of the Building Code Act, requires the Township of
Adjala-Tosorontio to establish and enforce a code of conduct for the Chief
Building Official and Inspectors;
AND WHEREAS Section 11 of the Municipal Act allows the Council of the Township of
Adjala-Tosorontio to pass By-laws respecting matters within the spheres of jurisdiction,
hereby repeal any By-laws provided temporary use or replacement dwelling
agreements, as amended;
NOW THEREFORE, the Township of Adjala-Tosorontio hereby enacts as follows:
Page 2 of 32
(f)
"Building Envelope" means the area within a 20 meter (approx. 65
feet) radius of the proposed structure, unless otherwise identified in a
required study.
(g)
"Certified Model" means a unique building design for a detached or
semi- detached unit that has been reviewed by the chief building official
for compliance with the Building Code and is intended for construction
pursuant to a permit issued under the Act
(h)
"Chief Building Official" means the Chief Building Official appointed
by the by-law of The Township of Adjala-Tosorontio for the purposes
of enforcement of the Act.
(i)
"Farm Building" means a farm building as defined in the Building
Code.
(j)
"Inspector" means an inspector appointed under section 3.6.1 or
Section 3.6.2 of the Act.
(k)
"Optional Feature" means are variations to the basic design of the
base model and includes additional elevations, alternate floor layouts,
upgrades and other design elements that require additional review for
building code compliance for the building, the HVAC system, or the
plumbing.
(l)
"Owner" means registered owner of the land and includes a lessee,
mortgagee in possession, and the person in charge of the property.
(m)
"Permit" means written permission or written authority from the chief
building official to perform work regulated by this by-law and the Act.
(n)
"Permit Holder" means the person to whom the permit has been
issued.
(o)
"Plumbing" means plumbing as defined in Section 1(1) of the Act.
(p)
"Sewage System" means a sewage system as defined by the
Building Code.
(q)
"Township" means the Township of Adjala Tosorontio
(2) Terms not defined in this By-law shall have the meaning ascribed to them in the
Act or the Building Code.
3.
CLASSES OF PERMITS:
(1)
For the purposes of the Act and the Building Code, there shall be eight classes
of permits as set forth in Schedule "A" appended to and forming part of this
By-law, namely:
Page 3 of 32
(a)
building permit, respecting the complete construction of a building
including farm buildings or a part of a building;
(b)
partial building permit, respecting the partial construction of a building
or part of a building;
(c)
conditional building permit, respecting the construction of a building
subject to conditions imposed pursuant to subsection 8(3) of the Act;
(d)
demolition permit, respecting the demolition of a building or part of a
building;
(e)
change of use permit, respecting a change in use of a building or part
of a building which results in an increase in hazard as determined
under the Building Code;
(f)
on-site sewage system, respecting the exterior underground services
on a property servicing one or more buildings that does not exceed
10,000L per day;
(g)
sign permit; and
(h)
plumbing permit.
4.
PERMIT APPLICATIONS:
(1)
(a)
To obtain a permit, the applicant shall file an application through the
CloudPermit portal by accessing the Township website or in writing by
completing a prescribed form available from the Chief Building Official
or from the Building Code website www.obc.mah.gov.ca. Forms
prescribed by the Township under clause 7(f) of the Act shall be as
set out in Schedule "D" to this By-law. Every application or any of the
permits set out in this By-law shall be submitted to the Chief Building
Official.
(b)
Every type of permit application shall state the name, address,
telephone number, e-mail address and facsimile number of the owner,
applicant, architect, engineer or other designer, and the constructor or
person hired to conduct the construction or demolition, as the case
may be.
(c)
Incomplete permit applications will only be held for a maximum of eight
weeks where no progress or updates have been provided on the file.
Where work has commenced on the application and fees have been
paid refunds will be governed by Schedule "B" to this By-law.
Page 4 of 32
(d)
The $25.00 administrative fee is non-refundable. The fee does not
apply to structures under 50sqm, plumbing and septic permit
applications.
Building Permits
(2)
Every building permit application shall:
(a)
identify and describe in detail the work, use and occupancy to be
covered by the permit for which the application is made;
(b)
identify and describe in detail the existing uses and the proposed
use(s) for which the premises are intended;
(c)
describe the land on which the work is to be done, by a description that
will readily identify and locate the site on which the building
construction or demolition is to occur;
(d)
be accompanied by plans and specifications in addition to the
requirements set out in section 5;
(e)
be accompanied by the required fees in accordance with Schedule "A";
(f)
when Division C, 1.2.1 of the Building Code applies, be accompanied
by a signed Letter of Undertaking from the owner on a form prescribed
by the Chief Building Official that an architect or professional engineer,
or both, have been retained to conduct the general review of the
construction or demolition of the building;
(g)
when Division C, 1.2.1 of the Building Code applies, be accompanied
by a signed statement of the architect or professional engineer retained
under (f), or both, on the form prescribed by the Chief Building Official,
undertaking to provide general review of the construction or demolition
of the building;
(h)
include, where applicable, the registration number of the builder or
vendor as provided in the Ontario New Home Warranties Plan Act;
(i)
state estimated valuation of the proposed work including consulting
fees, material, and labour;
(j)
be signed by the applicant who shall certify as to the truth of the
contents of the application; and
(k)
be accompanied by the applicable administration fee as per Schedule
'A' Part 'B' which applies to all new applications
Page 5 of 32
Demolition Permits
(3)
Where application is made for a demolition permit under subsection 8(1) of
the Act, the application shall:
(a)
Be accompanied by a site plan indicating the location and size of
building to be demolished;
(b)
be accompanied by satisfactory proof that arrangements have been
made with the proper authorities for the termination and capping of all
water, sewer, gas, electric, telephone or other utilities and services and
that Division C, 1.2.2.3 of the Building Code has been complied with
where applicable; and
(c)
Upon final inspection, be accompanied by a Form 357 filled out in its
entirety.
Conditional Permits
(4)
Where application is made for a conditional permit under subsection 8(3) of
the Act, the application shall:
(a)
contain such information, plans and specifications concerning
the complete project as the Chief Building Official may require;
(b)
state the reasons why the applicant believes that unreasonable delays
in construction would occur if a conditional permit is not granted;
(c)
state the necessary approvals which must be obtained in respect of the
proposed building and the time in which such approvals will be
obtained;
(d)
state the time in which plans and specifications of the complete building
will be filed with the Chief Building Official;
(e)
At the discretion of the Chief Building Official, require an agreement
between the applicant and/or owner, and the municipality upon issuing
a conditional permit; and
(f)
At the discretion of the Chief Building Official, require a replacement
dwelling agreement between the applicant and/or owner, and the
municipality together with a deposit of $10,000. Where an existing
dwelling has not been demolished and site restored within' 30 days of
occupancy of the new dwelling, the Chief Building Official may cause
the deposit to be forfeited to the Township.
Page 6 of 32
Change of Use Permits
(5)
Every application for a change of use permit issued under subsection 10(1) of
the Act shall be submitted to the Chief Building Official and shall:
(a)
describe the building in which the occupancy is to be changed, by a
description that will readily identify and locate the building;
(b)
identify and describe in detail the current and proposed occupancies of
the building or part of a building for which the application is made;
(c)
include plans and specifications which show the current and proposed
occupancy of all parts of the building, and which contain sufficient
information to establish compliance with the requirements of the
building code, including: floor plans, detail of wall, ceiling and roof
assemblies identifying required fire resistance ratings and load bearing
capacities, and details of the existing "sewage system", if any;
(d)
be accompanied by the required fee; and
(e)
be signed by the owner or authorized agent who shall certify
the truth of the contents of the application.
Sewage System Permits
(6)
Every application for a sewage system permit shall be submitted to the Chief
Building Official in conformance with Section 4(1) above and shall:
(a)
contain the information required by Section 4(2) (a) to (f) of this By-law
in respect to building permits;
(b)
state the name, address, telephone number and registration number of
the person installing the sewage system;
(c)
provide a site evaluation which shall include all of the following items,
unless otherwise specified by the Chief Building Official:
(i) the date the evaluation was done; and
(ii) the name, address, telephone number and signature of the person
who prepared the evaluation.
(d)
provide a scaled drawing of the site showing:
(i) the design of the sewage system including plan and elevation
views; and
(ii) the legal description, lot size, property dimensions, existing right-
of-way, easements or municipal/utility corridors, and the property
identification number.
Page 7 of 32
(e)
show the location of items listed in column 1 of Tables 8.2.1.5.A.,
8.2.1.6.B. and 8.2.1.6.C., of the Building Code, as applicable;
(f)
show the location of the proposed sewage system;
(g)
show the location of any unsuitable, disturbed or compacted areas;
(h)
show the proposed access routes for system maintenance;
(i)
show the depth to bedrock, and/or high-water table;
(j)
show the depth to zones of soil saturation;
(k)
show the soil properties, including a unified soils sample;
(l)
show the soil conditions, including the potential for flooding; and
(m)
show the design of the sewage system including plan and elevation
views.
Equivalents
(7)
Where an application for a permit or for authorization to make a material
change to a specific document or other information on the basis of which a
permit was issued, contains an equivalent material, system or building design
for which authorization under section 8 of the Act is requested, the following
information shall be provided:
(a)
A description of the proposed material, system or building design for
which authorization under section 8(v) of the Act is requested;
(b)
Any applicable provisions the Building Code; and
(c)
Evidence that the proposed material, system or building design will
provide the level of performance, as required by the Building Code
Division C, part 2.
Plumbing Permit
(8)
Plumbing Permits are required for any new construction that involves
plumbing works. Alterations or extensions to existing plumbing systems
require a permit. Every application for a Plumbing Permit shall comply with
the requirements of Section 4(2).
Sign Permit
(9)
Every Application for a Sign Permit shall comply with the requirements of
Section 4(2).
Page 8 of 32
Building Permit
(10)
Every Application for a Building Permit shall comply with the requirements of
Section 4(2).
5.
PERMIT ISSUANCE:
(1)
No person shall construct or demolish a building unless a permit has been
issued under Section 8 of the Act.
(2)
The Chief Building Official shall issue a permit once the requirements of
Section 8(2) of the Act are satisfied.
6.
REVISION TO PERMITS:
(1)
After the issuance of a permit under the Act, notice of any material change to
a plan, specification, document, or other information on the basis of which the
permit was issued, must be given in writing, to the Chief Building Official
together with the details of such change, which is not to be made without
written authorization of the Chief Building Official. Determination of a material
change will be within the sole discretion and jurisdiction of the Chief Building
Official.
7.
REVOCATION OF PERMITS:
(1)
Pursuant to section 8(10) of the Act, the Chief Building Official may revoke a
permit if after six (6) months of its issuance, the construction or demolition in
respect of which it was issued has not, in the opinion of the Chief Building
Official, been seriously commenced. The Chief Building Official may also
revoke a permit due to additional reasons as stipulated in Section 8(10) of
the Act.
(2)
Prior to revoking a permit under Section 8(10) of the Act, the Chief Building
Official may serve a notice by personal service or registered mail at the last
known address to the permit holder and following a thirty (30) day period
from the date of service, the Chief Building Official may revoke the permit if
grounds to revoke still exist, without any further notice.
(3)
A permit holder may within thirty (30) days from the date of service of a
notice under this Part, request in writing that the Chief Building Official defer
the revocation by stating reasons why the permit should not be revoked. The
Chief Building Official having regard to any changes to the Act, Building
Page 9 of 32
Code or other applicable law may allow the one-time deferral, applicable to a
period of no later than twelve (12) months from the date the permit was
issued, in writing. In the event where a permit was issued as a result of an
Order issued under the Building Code Act, no deferral of revocation shall be
granted.
(4)
A request for deferral shall be made in writing to the Chief Building Official
and shall be accompanied by the non-refundable fee as set out in Schedule
"A" of this By-law.
8.
MODEL HOME CERTIFICATION:
(1)
All condominium developments, detached, semi-detached, townhouse, row-
house, duplex or 'live/work' residential building located in an assumed or
new subdivision are subject to Site Plan Approval and Certificate of Basic
Servicing prior to the submission of any application, unless otherwise
approved by the Chief Building Official. It is preferred that certified model
applications are submitted prior to registration of the subdivision plan.
(2)
All models to be constructed in a plan of subdivision must be reviewed
through the model certification process. A Certified Model includes a Base
Model (plans for the basic design of a detached, semi-detached, townhouse,
row-house, duplex or 'live/work' residential building that includes one
elevation and no optional features) and all Optional Features.
(3)
The total fee for a Certified Model includes a flat rate of $500 with each
elevation or optional plan being an additional $250.
(4)
A complete Certified Model submission includes:
(a)
a completed a Certified Model Application attached in Schedule D
(only fully and accurately completed applications will be accepted);
(b)
payment of applicable Certified Model fees;
(c)
Two (2) complete set of plans and specifications for each model
including
details for optional features (all elevations, options, upgrades,
alternate floor layouts and special corner treatments offered for that
model, walkout or lookout condition, etc.) including:
i.
Two (2) copies of architectural plans on a size no larger than 11x17
(scaled and legible) all elevations stamped approved by the control
architect for the subdivision;
ii.
Two (2) copies of engineer's stamped truss specifications for each
elevation;
iii.
Two (2) of HVAC layout and 1 set of calculations per other floor
layouts and other optional features which influence HVAC design and
Page 10 of 32
calculations;
iv.
Plans must include designer qualification and/or registration BCIN as
applicable in conformance with OBC Division C, Section 3.2; and
v.
Design elements outside of the scope of the Ontario Building Code
must be stamped by a professional engineer.
(d)
A PDF copy of all plans and specifications identified in (c) shall also
be included.
(5)
Building Permit Applications cannot be accepted until the plan of subdivision
is registered and shall include:
(a) The first submission in a plan of subdivision must include a letter
provided by the "owner's" solicitor verifying the name of the registered
owner of the lots for which applications are being submitted and the
TARION registered "builder / vendor" company name and registration
number. The owner and TARION registered builder/vendor must be
accurately represented on the permit application form.
(b) Provide certification from the subdivision engineer of all lots and blocks
in the plan of subdivision with engineered fill together with the soils
engineer's compaction report.
(c) Provide certification from the acoustical engineer that the builder's plans
for dwelling units shows all of the noise attenuation works required by
the approved acoustical report and approved plans, including locating
the air conditioning units on the sitings.
(d) Identify fire break lots on the subdivision plan.
(e) If models have not been 'pre-certified' a certified model submission, as
per this By-law must be submitted.
(f) Site plans prepared before registration must be updated to include
reference to the registered plan number.
(6)
A complete building permit application for a detached, semi-detached,
townhouse, row-house, duplex or 'live/work' residential building located in an
assumed subdivision must include:
(a) Completed building permit application forms, schedules and addenda.
The description of work proposed on the application form must include
the model's name (base model and elevation) and all optional features
such as other elevation, basement finish, basement rough-in and
walkout condition, as examples.
(b) The applicable building permit fees as outlined in Schedule A and B of
this bylaw. A lot grading deposit of $3500 or as determined by the
Page 11 of 32
subdivision agreement will be charged on each detached, semi-
detached, townhouse, row-house, duplex or 'live/work' residential
building. The deposit will be fully refundable upon lot grading
certification of each property.
(c) Two (2) copies of a site plan of the lot (siting) and the adjacent lots on
three sides for each property. The site plan must be stamped by the
developer's grading consultant, the subdivision control architect and the
acoustic engineer (noise consultant), where applicable, and must
include the designer qualification and/or registration BCIN as
applicable. Please note a new requirement: The siting must also be
stamped as reviewed by the Township's planning department. If the site
plan submitted incorporates lots (sitings) for several applications all of
those applications must be reviewed and issued together as a "batch".
9.
PLANS AND SPECIFICATIONS:
(1)
Every applicant shall submit sufficient plans, specifications, documents, and
other information to enable the Chief Building Official to determine whether
the proposed construction, demolition, or change of use conforms to the Act,
the Building Code, and any other applicable law.
(2)
Lot grading plans are required for permit applications, unless this requirement
is waived because the Chief Building Official is able, without having a current
plan of survey, to determine whether the proposed work conforms, to the Act,
the Building Code, and any other applicable law;
(a)
For all residential development constructing a dwelling;
(b)
For all accessory structures or buildings greater than or equal to 50
square meters (approx. 538 square feet) on lots that are 1 hectare
(approx. 2.47 acres) or less in size (see design manual for changes)
(c)
A lot grading plan must include;
(i) the elevations of the dwelling, all existing and proposed structures
of the land within the building envelope of the proposed dwelling;
(ii) lot description including registered plan/lot number and address;
(iii) all lot dimensions and setbacks;
(iv) show (%) percent grades on driveway;
(v) show proposed ground elevation adjacent to the buildings and at
the house corners;
(vi) show proposed elevations on the swales where the grade
changes and elevations adjacent to the building corners;
(vii) show finished first floor elevations, top of foundation wall,
basement slab grade and underside of footing;
(viii) show finished garage floor elevation;
(ix) show proposed elevations at lot corners;
(x) show driveway location, width, elevation at property line for
Page 12 of 32
driveway and grade of driveway
(xi)
show locations of house entrances, and number of risers
required
(xii)
grass surfaces shall have a minimum of 2%, maximum of 10%
(xiii) maximum embankment slope to be 3:1 (4:1 preferred)
(xiv) grading around houses and buildings shall direct the water
away from the structure
(xv)
the minimum flat area (2% to 5% slope) immediately adjacent
to the building shall be 5 metres at the back and 0.6m on the sides,
with the slope directing drainage away from the building
(xvi) all swale grades shall be at least 2%
(xvii) grades swales will have a maximum side slipe of 3:1, and a
minimum depth of 0.15 metres or 2%
(xviii) show locations of sanitary and water services and sidewalks
(xix) show above ground electrical equipment and hydrants to
ensure clearance from driveway
(xx)
show any trees to be preserved
(xxi) culvert shall be indicated on the plans showing material, length,
diameter, gauge, and specific end wall treatment, if applicable
(xxii) show any porches, decks, terracing or retaining walls
(3)
Site Plans submitted shall refer to a current plan of survey certified by a
registered Ontario Land Surveyor and a copy of such a survey shall be filed
with the Township unless this requirement is waived if the Chief Building
Official is able, without having a current plan of survey, to determine whether
the proposed work conforms, to the Act, the Building Code, and any other
applicable law. A Site plan will include:
(a)
lot size and dimensions of the property;
(b)
setbacks from property boundaries for existing and proposed
buildings, septic systems, wells and water courses, including distance
separation from each of these features;
(c)
existing and proposed finished ground levels or grades; and
(d)
existing rights of way, easements, and municipal services.
(4)
Plans submitted shall be legible and drawn upon paper or other suitable and
durable material along with a digital copy.
(5)
The Chief Building Official shall determine the number of copies of plans,
specifications, documents, and other information required to be furnished with
an application for permit having regard for the requirements of any Act,
regulation or by-law respecting the examination or circulation of the
application.
(6)
On completion of the construction of a building, or part thereof, the Chief
Page 13 of 32
Building Official may require a set of as constructed plans, including a plan of
survey showing the location of the building.
(7)
The Chief Building Official may refuse an application if any of the above is
deemed to be incomplete or insufficient at the time of the application or during
the review process
(8)
Plans and specifications furnished according to this By-law or otherwise
required by the Act become the property of the Township and will be disposed
of or retained in accordance with relevant legislation and the Township's
retention policy.
(9)
(a) Plumbing plans are not required for a house that has no more than two (2)
dwelling units. Fixtures are required to be noted on construction plans.
(b) Plumbing plans are required for any other Building or Occupancy that is
not listed in (8)(a).
(10)
Where a building permit for an addition is applied for, if the square footage
of the proposed addition is 50% or more the size of the original space, a
revised heat loss calculation and duct layout will be required unless
otherwise determined by the Chief Building Official.
(11)
Where a new house or building is being proposed, heat loss calculations
and a duct layout completed by a qualified person shall be submitted with
the permit application, along with the required energy efficency design
summary form.
(12)
Where a building permit for a secondary suite within' a house is applied
for, HVAC caculations and duct layouts may be required at the discretion
of the Chief Building Official.
10.
FEES AND REFUNDS:
(1)
The Chief Building Official shall determine the required fees in accordance
with Schedule "A" and the applicant shall pay the fees so calculated. Fees are
due at the time of submission or when fees have been calculated. The
applicant will be notified of any required fees due. No permit application will
be considered complete or reviewed until such time as the fees calculated are
paid in full.
(2)
In the case of withdrawal, or abandonment of an application, or refusal for
issuance of a permit, upon written request, the Chief Building Official shall
determine the amount of fees, if any, that may be refunded, in accordance
with Subsection (4) below.
(3)
There shall be no refund of permit fees where a permit has been revoked,
Page 14 of 32
except where the permit was issued in error, or where the applicant requests
revocation no more than six months after the permit is issued. In such cases,
the amount of refund shall be calculated in accordance with Subsection (4)
below.
(4)
Subject to Sections 6(2) and 6(3) the fees that may be refunded shall be
in accordance with Schedule "B".
(5)
Fees are subject to an increase of 2% annually unless otherwise determined.
11.
TRANSFERS:
(1) Permits are transferable only upon the new owner or their authorized agent
completing a permit application and paying the administration fee prescribed in
Schedule A. The new owner shall then be the permit holder for the purpose of the
Act and the Building Code and any other applicable law.
12.
INSPECTION REQUIREMENTS AND NOTICE:
(1) The permit holder shall notify the Chief Building Official or a Registered Code
Agency where one is appointed, of each stage of construction for which a
mandatory notice is required under Article 1.3.5.1 -Division C of the Building
Code. These inspections are listed as:
(a) readiness to construct footings;
(b) substantial completion of footings and foundations prior to
commencement of backfilling;
(c) substantial completion of structural framing and ductwork and piping for
heating and air-conditioning systems, if the building is within the scope of
Part 9 of Division B;
(d) substantial completion of structural framing and roughing-in of heating,
ventilation, air-conditioning and air-contaminant extraction equipment, if
the building is not a building to which Clause (c) applies;
(e) substantial completion of insulation and vapour barriers;
(f) substantial completion of air barrier systems;
(g) substantial completion of all required fire separations and closures and all
fire protection systems including standpipe, sprinkler, fire alarm and
emergency lighting systems;
(h) substantial completion of fire access routes;
(i) readiness for inspection and testing of:
(i) building sewers and building drains;
Page 15 of 32
(ii) water service pipes;
(iii) fire service mains;
(iv) drainage systems and venting systems;
(v) the water distribution system; and
(vi) plumbing fixtures and plumbing appliances.
NOTE: A licenced plumber can provide a certificate in place of test taking
place on an underground plumbing or rough-in plumbing inspection.
(j) readiness for inspection of suction and gravity outlets, covers and suction
piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j)
of Division A, a public pool or a public spa;
(k) substantial completion of the circulation / recirculation system of
an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public
pool or public spa and substantial completion of the pool before it is first
filled with water;
(l)
readiness to construct the sewage system;
(m) substantial completion of the installation of the sewage system before the
commencement of backfilling;
(n) substantial completion of installation of plumbing not located in a structure,
before the commencement of backfilling;
(o) completion of construction and installation of components required to
permit the issue of an occupancy permit under Sentence 1.3.3.1.(3) or to
permit occupancy under Sentence 1.3.3.2.(1), if the building or part of
the building to be occupied is not fully completed; and
(p) completion of construction and installation of components required to
permit the issue of an occupancy permit under Sentence 1.3.3.4.(4) or
1.3.3.5.(3).
(2) In addition to the inspections listed above, the permit holder shall notify the
Chief Building Official or a Registered Code Agency where one is appointed,
of the additional notices that may be required under section 1.3.5.2:
(a) commencement of construction of the building;
(b) substantial completion of structural framing for each storey, if
the building is a type of building that is within the scope of Division B,
other than Part 9;
(c) commencement of construction of:
(i) masonry fireplaces and masonry chimneys;
(ii) factory-built fireplaces and allied chimneys; or
Page 16 of 32
(iii) stoves, ranges, space heaters and add-on furnaces using solid
fuels and allied chimneys;
(d)
substantial completion of interior finishes;
(e) substantial completion of heating, ventilating, air-conditioning and air-
contaminant extraction equipment;
(f) substantial completion of exterior cladding;
(g) substantial completion of site grading;
(h) substantial completion of the pool deck and dressing rooms for a public
pool or public spa and readiness for inspection of the emergency stop
system for a public pool or public spa;
(i) completion and availability of drawings of the building as constructed;
and
(j) completion of a building for which an occupancy permit is required
under Article 1.3.3.4. or 1.3.3.5.
(3) In addition to the notice of completion as prescribed by Section 11 of the Act,
the permit holder shall provide another mandatory notice after the completion
of demolition work to ensure the completion of site grading and other works.
(4) Upon receipt of proper notice, the inspector or a Registered Code Agency, if
one is appointed, shall, no later than two days as per article 1.3.5.3-Division C
of the Building Code, after receipt of the notice, undertake a site inspection for
notices to which articles 1.3.5.1. and 1.3.5.2. - Division C of the Building Code
apply, except where the notice relates to matters described in clauses
1.3.5.1.(2)(k) or (l), the site inspection shall be conducted no later than five (5)
days after the receipt of notice.
(5) A notice pursuant to this section is not effective until written or oral notice is
received by the Chief Building Official, by a Building Inspector or designate.
(6) An additional inspection fee of $75.00 shall be charged for each additional
inspection requested outside of the prescribed and mandatory listed in articles
1.3.5.1. and 1.3.5.2. - Division C of the Building Code.
(7) An additional inspection fee of $150.00 shall be charged for each additional
inspection after two inspections have occurred per stage of inspection. Fees
are required to be paid in full prior to an inspection being conducted.
(8) In the event of an inspection being booked prematurely and the requested
stage is not substantially completed at the time of inspection, a fee of $150.00
is applicable at the discretion of the Chief Building Official.
Page 17 of 32
13.
LOT GRADING CERTIFICATES AND DEPOSITS:
Where lot grading plans are required, the permit holder shall:
(1) Prior to giving notice for final inspection, provide to the Chief Building Official, or a
Registered Code Agency where one is appointed, a lot grading certificate bearing
the signature and seal of a Professional Engineer, or an Ontario Land Surveyor
certifying that the grading is in conformity with the approved lot grading plan.
(2) Provide to the Chief Building Official, or a Registered Code Agency where one is
appointed, within twelve (12) months from the date an occupancy permit has been
issued, a final grading certificate:
(a) bearing the signature and seal of the subdivider's Professional Engineer
certifying that the finished elevations and grading of the land conforms with the
accepted area or subdivision grading plans and the lot grading plan; or
(b) where no accepted area or subdivision grading plan exists, bearing the
signature and seal of a Professional Engineer, or an Ontario Land Surveyor
certifying that the finished elevations and grading of the land conforms to the lot
grading plan.
(3) Lot grading deposits are required as per Schedule "A" Part "B" or as per the
established subdivision agreement if applicable, whichever is greater. Deposits will
be refunded once a lot grading certificate is received from the qualified person and
an inspection has been passed by the Township Building Department. Where a lot
grading remains incomplete and uncertified after twenty-four (24) months of permit
issuance or twelve (12) months after an occupancy has been permitted, whichever
is sooner, the Township may cause the deposit to be forfeited. All fees associated
with this task will be deducted from the deposit amount. Where another deposit
system is established by means of a subdivision agreement or any other
agreement and the property remains uncertified after twenty-four (24) months of the
permit issued or twelve (12) months after occupancy, whichever is sooner, the fees
may be forfeited from the deposit in the same manner.
14.
ENFORCEMENT
(1) No person shall;
(a) Construct a building or sewage system without a permit contrary to subsection
8.(1) of the Building Code Act;
(b) Cause construction of building or sewage system without a permit contrary to
Page 18 of 32
subsection 8.(1) of the Building Code Act;
(c) Demolish a building without a permit contrary to subsection 8.(1) of the Building
Code Act;
(d) Cause demolition of a building without a permit contrary to subsection 8.(1) of
the Building Code Act;
(e) Change plans without authorization contrary to subsection 8.(12) of the Building
Code Act;
(f) Construct a building not in accordance with plans contrary to subsection 8.(13)
of the Building Code Act;
(g) Change the use of a building without a permit contrary to subsection 10.(1) of
the Building Code Act
(h) Occupy a building newly erected without notice or inspection contrary to section
11.(1) of the Building Code Act;
(i) Obstruct or remove a posted order with authorization contrary to section 20 of
the Building Code Act;
(j) Furnish false information on an application for a permit contrary to clause
36.(1)(a) of the Building Code Act
(k) Commence demolition before a building has been vacated contrary to Division
C, sentence 1.3.1.1.(4) of the Building Code;
(l) Fail to post a permit on the construction site contrary to Division C, article
1.3.2.1 of the Building Code;
(m) Fail to post a permit on the demolition site contrary to Division C, article 1.3.2.1
of the Building Code;
(n) Occupy an unfinished building without a permit contrary to Division C, sentence
1.3.3.1.(1) of the Building Code;
(o) Fail to provide notification of construction phase contrary to Division C, sentence
1.3.5.1.(1) of the Building Code; and
(p) Hinder or obstruct a person lawfully carrying out the enforcement of this By-
Law.
(2) No person shall fail to comply with;
(a) An order to comply made by an inspector under subsection 12.(2) of the
Building Code Act;
(b) An order to not cover made by an inspector under subsection 13.(1) of the
Building Code Act;
(c) An order to uncover made by the Chief Building Official under subsection 13.(6)
of the Building Code Act;
(d) A stop work order made by the Chief Building Official under subsection 14.(1) of
the Building Code Act;
(e) An order to remedy an unsafe building made by an inspector under subsection
15.9(4) of the Building Code Act;
(f) An order prohibit use or occupancy of an unsafe building made by the Chief
Building Official under subsection 15.9(6) of the Building Code Act; and
Page 19 of 32
(g) An order to repair a dangerous building made by the Chief Building Official
under subsection 15.10(1) of the Building Code Act
15.
PENALITIES
(1) Every person who contravenes any provision of this By-Law or the Building Code
Act or is party to such contravention is guilty of an offence and upon conviction is
liable to a fine, in accordance with section 36 of the Building Code Act with
respect to offences arising from section 14 of this By-Law; or otherwise as
provided for in the Provincial Offences Act R.S.O. 1990, c. P.33;
(2) Every person who is guilty of an offence under this by-law may, if permitted under
the Provincial Offences Act, R.S.O. c 1990, c. P33 as amended, pay a set fine, and
the Chief Judge of the Ontario Court of Justice shall be requested to establish set
fines as set out in Schedule "E";
(3) In addition to the penalties prescribed in this By-law, the Chief Building Official may
apply under subsection 36(1) and or 38(1) of the Building Code Act for additional
penalties and/or fine up to Five Thousand Dollars ($5,000.00) or the maximum fine
applicable pursuant to the provisions of the Provincial Offences Act, R.S.O. 1990,
Chapter P33.; and
(4) No part of this By-law shall come into force and take effect until Schedule "E" is
approved and filed by the Regional Senior Justice, pursuant to Provincial Offences
Act Part 1. A copy of this approval is attached and forms part of this By-law.
16.
CODE OF CONDUCT
The Township shall enforce a Code of Conduct for the Chief Building Official and
inspectors, as set out in Schedule "C". The code of conduct as prescribed in the
Building Code Act will be strictly adhered to.
17.
SCHEDULES
Schedules "A", "B", "C", "D" and "E" are incorporated into and form part of this
By-law.
18.
SEVERABILITY:
Should any section, subsection, clause, or provision of this By-law be declared by a
court of competent jurisdiction to be invalid, the same shall not affect the validity of
this By-law as a whole or any part thereof, other than the part so declared to be
invalid.
19.
THAT By-law 22-54 shall be deemed to be repealed upon the coming into force of
Schedule "E" as set out in Section 15(4). Upon coming into force, this By-law shall
Page 20 of 32
supersede any corresponding By-laws of the Township of Adjala-Tosorontio which,
through inadvertence, may not have been repealed;
20.
THAT this By-law shall come into force and take effect on and from the date of passage
hereof;
21.
THAT, notwithstanding anything contrary to the rules of procedure, this By-law, be
introduced and read a first and second time and be considered read a third time and
finally passed this 10th day of May, 2023.
Scott W. Anderson, Mayor
Robin Reid, Clerk
OFFICE CONSOLIDATION
Page 21 of 32
SCHEDULE "A" TO BY-LAW NO. 2023-43
CLASSES OF PERMITS AND PERMIT FEES
1.
Except where a minimum flat fee is indicated for the Occupancy
Classification or Type of Construction, the fee per ft² of floor area set out in
Schedule "A" shall be used by the Chief Building Official in determining the
permit fee.
2.
For the purpose of this Schedule the occupancy classification and floor
area shall be determined on the following basis;
a)
The occupancy classification shall be established in accordance
with the occupancy definitions of the Ontario Building Code and its
appendices.
b)
The floor area shall be measured to the outer face of exterior walls
and to the centre line of party walls or demising walls. No
deductions shall be made for openings within the floor area (e.g.
stairs and stair openings, ducts, elevators, escalators). Floor area
shall include all habitable areas, including mezzanines, finished
attics and enclosed balconies. The following shall apply to Part B of
Schedule A in determining the fee payable for a given building type:
-
Assembly Occupancies - The "Assembly Occupancies" rate shall apply to
the total floor area of floors which are principally of assembly use. Other
rates shall be applied to other floors based on the principal use of the total
floor area.
-
Institutional Occupancies - The "Institutional Occupancies" rate shall
apply to the floor areas of floors which are principally of institutional use.
Other rates shall be applied to other floors based on the principal use of
these areas.
-
Residential Occupancies - For detached, semi-detached and townhouses
dwellings , the floor areas of unfinished basements shall not be included in
the area calculations, but the fee is inclusive of these areas. For walkout
basements, 50% of the basement area shall be considered as living space
and fees calculated accordingly.
For other residential occupancies, the "Residential Occupancies" rate shall
apply to the floor areas of floors which are pricipally of residential use.
Other rates shall be applied to other floors based on the principal use of
Page 22 of 32
the total floor area.
-
Business and Personal Services Occupancies - The applicable "shell"
rate shall be applied to the floor areas of a speculative structure, where
the only finished floor areas are to be the common areas (e.g. lobby,
corridors, washrooms).
The "Interior Partitioning and Finishing" rate shall be applied where
finished floor areas are to be provided in other than common areas. Other
rates shall be applied to other floors based on the principal use of the total
floor area.
-
Mercantile Occupancies - The "Mercantile Occupancies" rate shall be
applied to the floor areas of a speculative structure, where the only
finished floor areas are to be the common areas (e.g. lobby, corridors,
washrooms). The "Interior Partitioning and Finishing" rate shall be applied
where finished floor areas are to be provided in other than common areas.
Other rates shall be applied to other floors based on the principal use of
the total floor area.
-
Industrial Occupancies - Each "Industrial Occupancies" rate includes
incidental finished office space to a maximum of 10% of the total floor
area. The "Interior Partitioning and Finishing" rate shall be applied where
additional finished space is provided. Other rates shall be applied to other
floors based on the principal use of the total floor area.
3.
"Construction Value", as used in Item 12 of Schedule 'A' Part 'B', means
the value of the proposed construction as determined by the Chief Building
Official, whose determination of that value shall be final.
4.
No additional fee applies for sprinklers, fire alarms, electromagnetic locks,
or other mechanical systems or equipment proposed and installed at the
same time as the construction they serve.
5.
Where a building permit is submitted for foundation only, there should be a
minimum fee of $224 unless otherwise stated in Schedule 'A' Part 'B'
6.
A lot grading deposit for an inground pool shall be charged pursuant to
Schedule 'A' of Fees and Charges Bylaw 2021-19 (as amended), at the
discretion of the Chief Building Official
7.
A minimum fee of $224 shall be charged for all work unless otherwise
stated in this schedule.
8.
The $25.00 administrative fee does not apply to structures under 50sqm,
plumbing and septic permit applications.
9.
Where an order to comply, a stop work order or any Order under the
requirements of the Building Code Act (as amended) has been issued with
respect to construction and demolition where works have commenced prior
Page 23 of 32
to issuance of permit, the permit fee prescribed in Schedule "A" shall be
doubled. Where an Inspector leaves notice on site in regards to
construction and or demolition where work has commenced without the
benefit of permit, the permit fee prescribed in Schedule 'A' shall be
doubled.
10.
With respect to partial permits, the fee shall be the normal fee for the
proposed construction.
11.
With respect to conditional permits, the fee shall be the normal fee for the
proposed construction.
12.
With respect to transferring a permit from one permit holder to another, the
fee shall be $250.00.
13.
With respect to revisions of plans already examined a fee of:
-
$125.00 for residential plans with no more than
4 dwelling units and where not more than 1
hour of review is required. $125.00 review fee
per hour of review thereafter.
-
Minimum fee of $500.00 for resdiential buildings
not noted above and where no more than 4
hours of review is required. A rate of $125.00
per hour of review required after 4 hours in
addition to the minimum fee.
-
Minimum fee of $500.00 for
commercial/industrial and other occupancies
where no more than 4 hours of review is
required. A rate of $125.00 per hour of review
required after 4 hours in addition to the
minimum fee.
14. With respect to revocation of permits, a deferral fee of $150.00 shall be
applied
Page 24 of 32
SCHEDULE 'A'
FEES PAYABLE FOR SPECIFIC CLASSES OF PERMITS
Item
Class of Permit
Fee Payable
1.
Building Permit
See Schedule 'A' Part 'B'
2.
Partial Building Permit
See Schedule 'A' (10) plus applicable
administrative fees
3.
Conditional Building Permit
See Schedule 'A' (11) plus applicable
administrative fees
$250 per Agreement plus any additional
cost
$250 per Replacement Dwelling Agreement
plus a $10,000.00 deposit
4.
Demolition Permit
$224.00 flat rate for residential &
agricultural
$500.00 per building flat rate for
commercial, industrial & institutional
5.
Change of Use Permit
$224 flat rate
6.
Site Servicing
$300 flat rate
7.
Plumbing Permit
See Schedule 'A' Part 'B'
8.
Sign Permit
See Schedule 'A' Part 'B' and By-Law
no.10-18 as amended
Page 25 of 32
SCHEDULE 'A' Part 'B'
FEES PAYABLE FOR BUILDING PERMITS
Per sq. ft.
Minimum
Fee
Group A & B Occupancies
(Assembly / Institutional
Use)
New or Additions
$1.01
$224.00
Renovations / Floor Layout
$0.55
$224.00
Group C Occupancies
(Residential Use)
New or Additions
$1.71
$224.00
Interior Renovations / Floor Layout
Excluding Basements
$0.55
$224.00
Attached Garage(s)
$0.86
$224.00
Car Port Attached to House
$0.86
$224.00
Accessory Buildings
$0.86
$224.00
Decks/Landings/Ramps/Covered
Porches
-
$224.00
Unfinished Basements
$0.44
N/A
Finished Basements
$0.66
N/A
Creation of New Living Space
Within a Single-Family Dwelling
$1.71
$224.00
Foundation Permits
N/A
$224.00
New Roof (structural)
$0.55
$224.00
Lot Grading Deposits
Accessory buildings greater than
15m2 up to 50m2
N/A
$250.00
Accessory buildings greater than
50m2
N/A
$1000.00
Additions to residential
N/A
$1000.00
New single family dwelling,
townhouses, duplexes
N/A
$3500.00
Residential buildings with more than
2 dwelling units - 1% of the building
permit fee subject to the minimum
N/A
$5000.00
Industrial/commercial - 1% of the
building permit fee subject to the
minimum
N/A
$5000.00
Group D & E Occupancies
(Commercial/Office Use)
New or Additions
$0.87
$224.00
Renovations
$0.49
$224.00
Group F Occupancies
Shell
$0.85
$224.00
Internal Fit up
$0.85
$224.00
Parking Garages
$0.85
$224.00
Farm Buildings
New or Addition
$0.28
$224.00
Page 26 of 32
Tarp / Tent Structures
$0.15
$224.00
Transfer Permit
To be applied where ownership
changes prior to the completion of a
permit
N/A
$250.00
File Opening Fee
Administrative Fee - not applicable
to structures under 50sqm,
plumbing or septic permits
$25.00
ADDITIONAL REQUIREMENTS AND SPECIALTY STRUCTURES
Retaining Walls
Exceeding 1000mm in exposed height
adjacent to public property, access to a
building, or private property to which the
public is admitted
$224.00 plus $1.98 per
linear foot
Storage Tanks
Above or below ground
$224.00 per tank
New Foundation other
than residential
Per project
$224.00 plus $1.98 per
linear foot
Signs (Ontario Building
Code)
a) A ground sign that exceeds 7.5m in
height above adjacent ground, or
b) A projecting sign that weighs more
than 115kg, or
c) A roof sign that has a face area of
more than 10 square metres
$224.00 per sign
Signs (not listed
above)
See By-Law no. 10-18
See Bylaw no. 10-18
Temporary Structures
Tents occupying an area greater than
60m2
$224.00 each per year
Construction and Sales Trailers
$224.00 each per year
Exhaust Ventilation
Hood
Commercial Equipment
$224.00
Wind Turbine
Having a rated output up to 10k/w
$350.00
Having a rated output more than 10k/w
$1750.00
Solar Collector
a) Mounted on a building and has a
face area greater than or equal to
5m2
b) Ground mounted solar collectors
with a foundation area greater than
10m2
$224.00
Communication Tower
Exceeding 16.2m above ground level
$224.00 plus 1% of
construction value
Crane Runway
$224.00
Page 27 of 32
Dish Antennae
Mounted on a building and has a face area
grater than or equal to 5m2
$224.00
Outdoor Pool (Ontario
Building Code)
With a depth equal to or > 3.5m at any
point or other pool with OBC requirements
$224.00
Pool Enclosure (for
pools not listed above)
As per By-Law no. 05-27 as amended
$250.00
Pedestrian Bridge
Appurtenant to a building
$224.00
Shipping Container
that is occupying an
area more than 10m2
when placed on the
ground.
A minimum of two (2)
vents are to be
installed to allow for
cross ventilation.
Where a shipping container is removed
from a trailer and placed on the ground
and used as a storage building (anchorage
required)
$224.00 each
Where a shipping container is removed
from a trailer and placed on a new
foundation (anchorage required)
$224.00 each plus
applicable foundation
fee
Where two (2) or more shipping containers
are placed on the ground or foundation
and a roof is to be constructed over
(anchorage required)
The greater of $224.00
or
$0.86 per sq ft
ON SITE SEWAGE (SEPTIC) AND PLUMBING SYSTEMS
New Installation
Class 4 Sewage System (per system)
$612.00
Class 2,3 or 5 Sewage System (per
system)
$375.00
Change of Use
to Property
"Type 1"
A detailed
review required
Where NO alteration to existing sewage
system is required
$224.00
Alteration to existing sewage
$306.00
Where a new sewage system is required
$612.00
"Type 2"
Simple confirmation via file records
$50.00
Mandatory On-Site Sewage
Maintenance Inspection Program
(O/reg 315/10)
Administration Fee and Inspection
$150.00
Alteration or Repair
Where no change of use is proposed
$306.00
Plumbing Permit
(To be used to ensure
compliance with Part 7 of the
Ontario Building Code)
Basic Fee
$300.00
Fixtures
$13.00 each
Water service connection fee
$300.00
Drains/Sewer connection fee
$300.00
Conversion from septic
$300.00
Private servicing sanitary line
$300.00
Private servicing storm drain
$300.00
Manhole
$25.00 each
Catch Basin
$25.00 each
Fire main/Suppression Tanks
$224.00
Page 28 of 32
Fire Hydrant
$25.00 each
Backflow preventer (Commercial)
$150.00
Septic Records
Compliance search (not applicable to
residents)
$25.00
Compliance letter
$150.00
Page 29 of 32
SCHEDULE "B" TO BY-LAW NO. 2023-43
REFUNDS
PURPOSE
To govern the refunds of building and demolition permits.
PERMIT APPLICATION PERCENT REFUND ELIGIBILITY
1.
Application filed, administrative function has been performed - 75%.
2.
Administrative and planning functions have been performed - 60%.
3.
Administrative, planning and plan review functions have been performed - 40%.
4. Permit issued, no field inspections have been performed - 30%.
5.
Permit issued, minimum one field inspection has been performed - 0%.
6.
Administrative fee of $25.00 is non-refundable.
Notwithstanding the above, no refund shall be made for an amount less than $224.00.
Interpretation of this schedule will be at the sole discretion of the Chief Building Official.
Page 30 of 32
SCHEDULE "C" TO BY-LAW NO. 2023-43
CODE OF CONDUCT
CODE OF CONDUCT FOR BUILDING OFFICIALS
PURPOSE:
The Township of Adjala-Tosorontio Building Department maintains this Code of
Conduct in accordance with the provisions of the Building Code Act. In addition to
Article 5: "Code of Conduct" in the Township's Personnel Policy Manual, which applies
to all Township staff, this Code of Conduct for Building Officials applies to the Chief
Building Official and all Building Officials appointed under the Building Code Act in the
performance of their duties under the Building Code Act and the Building Code.
This Code of Conduct promotes the appropriate standards of behaviour by Building
Officials in the exercise of their powers and the performance of their duties. It prevents
practices which may constitute an abuse of power including unethical or illegal practices
and promotes appropriate standards of honesty and integrity.
STATEMENT:
Building Officials are exposed to potential conflicts of interest because of the special
powers conferred on them. The Township of Adjala-Tosorontio Building Department
is committed to the highest standards of professionalism, technical competence, skill,
honesty, fairness, and independence. The Township's Building Officials observe both
the letter and the spirit of this Code of Conduct as it pertains to situations that arise in
the performance of their duties.
PROCEDURES:
Township of Adjala-Tosorontio Building Officials always undertake to:
1. Act in the public interest, particularly regarding the safety of building works and
structures;
2. Avoid situations where there may be, or where there may appear to be, a conflict
between their duties to their clients, their profession, their peers, and the public at
large and their personal interests;
Page 31 of 32
3. Avoid any conduct that could bring the Building Officials, the Township of Adjala-
Tosorontio or any of the Township's Local Municipalities into disrepute;
4. Extend professional courtesy to all;
5. Not divulge any confidential or sensitive information or material that they become
privy to in the performance of their duties, except in accordance with the laws
governing the Municipal Freedom of Information and Protection of Privacy Act. Any
requests for information that is not considered public information will be referred to
the Township Clerk;
6. Apply all relevant building laws, regulations, and standards strictly and without
favour and independent of the influence of interested parties;
7. Comply with the provisions of the Building Code Act, the Building Code and any
other Act, Law or By-Law that regulates or governs Building Officials or their
functions;
8. Maintain their knowledge and understanding of the best current building practices,
building laws and regulations by committing to a process of continuous education;
9. Perform their inspections and certifying duties impartially and in accordance with
the highest professional standards; and
10. Not act beyond their level of competence or outside their area of expertise.
Responding to Allegations of Misconduct
The Building Code Act provides that the performance of Building Officials will be
measured against this Code of Conduct. In response to any allegation of a breach of this
Code, the Chief Building Official shall direct an investigation and, where appropriate,
recommend disciplinary action against any Building Official who fails to comply with this
Code of Conduct. Where an allegation is made against the Chief Building Official, the
Chief Administrative Officer will direct the investigation and make such recommendations
as are reasonable.
Disciplinary action arising from violations of this Code of Conduct will be based on the
severity and frequency of the violation in accordance with Township Policies, and relevant
employment laws and standards.
Page 32 of 32
SCHEDULE "D" TO BY-LAW NO. 2023-43
APPLICATIONS AND FORMS PRESCRIBED BY REGULATION UNDER THE
BUILDING CODE ACT AND THE TOWNSHIP OF ADJALA-TOSORONTIO
1.
Application for a Permit to Construct or Demolish.
2.
Application for a Permit to Construct an Onsite Sewage System (Septic).
3.
Schedule One Designer Form.
4.
Schedule Two Designer Form.
5.
Energy Efficiency Design Summary Form (Residential).
6.
Energy Efficiency Design Summary Form (Commercial).
7.
Commitment to General Review.
8.
Model Home Certification Form.
9.
Agent Authorization Form.
10.
Application for Building Permit Extension
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 1 of 4
Application for a Permit to Construct or Demolish
This form is authorized under subsection 8(1.1) of the Building Code Act,1992
For use by Principal Authority
Application number:
Permit number (if different):
Date received:
Roll number:
Application submitted to:
(Name of municipality, upper-tier municipality, board of health or conservation authority)
A.
Project information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/other description
Project value est. $
Area of work (m2)
B. Purpose of application
New construction
Addition to an
existing building
Alteration/repair
Demolition
Conditional
Permit
Proposed use of building
Current use of building
Description of proposed work
C.
Applicant
Applicant is:
Owner or
Authorized agent of owner
Last name
First name
Corporation or partnership
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D. Owner (if different from applicant)
Last name
First name
Corporation or partnership
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 2 of 4
E.
Builder (optional)
Last name
First name
Corporation or partnership (if applicable)
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
F.
Tarion Warranty Corporation (Ontario New Home Warranty Program)
i.
Is proposed construction for a new home as defined in the Ontario New Home Warranties
Plan Act? If no, go to section G.
Yes
No
ii.
Is registration required under the Ontario New Home Warranties Plan Act?
Yes
No
iii. If yes to (ii) provide registration number(s):
G. Required Schedules
i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities.
ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system.
H.
Completeness and compliance with applicable law
i)
This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the
Building Code (the application is made in the correct form and by the owner or authorized agent, all
applicable fields have been completed on the application and required schedules, and all required
schedules are submitted).
Payment has been made of all fees that are required, under the applicable by-law, resolution or
regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the
application is made.
Yes
Yes
No
No
ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law,
resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992.
Yes
No
iii) This application is accompanied by the information and documents prescribed by the applicable by-
law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable
the chief building official to determine whether the proposed building, construction or demolition will
contravene any applicable law.
Yes
No
iv) The proposed building, construction or demolition will not contravene any applicable law.
Yes
No
I.
Declaration of applicant
I
declare that:
(print name)
1.
The information contained in this application, attached schedules, attached plans and specifications, and other attached
documentation is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be
used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a)
the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and
duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom
this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G
2E5 (416) 585-6666.
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 3 of 4
Schedule 1: Designer Information
Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.
A.
Project Information
Building number, street name
Unit no.
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Individual who reviews and takes responsibility for design activities
Name
Firm
Street address
Unit no.
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax number
Cell number
C.
Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of
Division C]
House
Small Buildings
Large Buildings
Complex Buildings
HVAC - House
Building Services
Detection, Lighting and Power
Fire Protection
Building Structural
Plumbing - House
Plumbing - All Buildings
On-site Sewage Systems
Description of designer's work
D.
Declaration of Designer
I
declare that (choose one as appropriate):
(print name)
I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division
C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.
Individual BCIN: __________________________________________
Firm BCIN:
__________________________________________
I review and take responsibility for the design and am qualified in the appropriate category as an "other designer"
under subsection 3.2.5.of Division C, of the Building Code.
Individual BCIN: __________________________________________
Basis for exemption from registration: ________________________________________________________
The design work is exempt from the registration and qualification requirements of the Building Code.
Basis for exemption from registration and qualification: ___________________________________________
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
I have submitted this application with the knowledge and consent of the firm.
Date
Signature of Designer
NOTE:
1.
For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of
Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.
2.
Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario
Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise,
or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 4 of 4
Schedule 2: Sewage System Installer Information
A.
Project Information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Sewage system installer
Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or
emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C?
Yes (Continue to Section C)
No (Continue to Section E)
Installer unknown at time of
application (Continue to Section E)
C.
Registered installer information (where answer to B is "Yes")
Name
BCIN
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D.
Qualified supervisor information (where answer to section B is "Yes")
Name of qualified supervisor(s)
Building Code Identification Number (BCIN)
E.
Declaration of Applicant:
I
declare that:
(print name)
I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall
submit a new Schedule 2 prior to construction when the installer is known;
OR
I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is
known.
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 1 of 8
Application for a Permit to Construct or Demolish
This form is authorized under subsection 8(1.1) of the Building Code Act,1992
For use by Principal Authority
Application number:
Permit number (if different):
Date received:
Roll number:
Application submitted to:
(Name of municipality, upper-tier municipality, board of health or conservation authority)
A.
Project information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/other description
Project value est. $
Area of work (m2)
B. Purpose of application
New construction
Addition to an
existing building
Alteration/repair
Demolition
Conditional
Permit
Proposed use of building
Current use of building
Description of proposed work
C.
Applicant
Applicant is:
Owner or
Authorized agent of owner
Last name
First name
Corporation or partnership
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D. Owner (if different from applicant)
Last name
First name
Corporation or partnership
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 2 of 8
E.
Builder (optional)
Last name
First name
Corporation or partnership (if applicable)
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
F.
Tarion Warranty Corporation (Ontario New Home Warranty Program)
i.
Is proposed construction for a new home as defined in the Ontario New Home Warranties
Plan Act? If no, go to section G.
Yes
No
ii.
Is registration required under the Ontario New Home Warranties Plan Act?
Yes
No
iii. If yes to (ii) provide registration number(s):
G. Required Schedules
i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities.
ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system.
H.
Completeness and compliance with applicable law
i)
This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the
Building Code (the application is made in the correct form and by the owner or authorized agent, all
applicable fields have been completed on the application and required schedules, and all required
schedules are submitted).
Payment has been made of all fees that are required, under the applicable by-law, resolution or
regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the
application is made.
Yes
Yes
No
No
ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law,
resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992.
Yes
No
iii) This application is accompanied by the information and documents prescribed by the applicable by-
law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable
the chief building official to determine whether the proposed building, construction or demolition will
contravene any applicable law.
Yes
No
iv) The proposed building, construction or demolition will not contravene any applicable law.
Yes
No
I.
Declaration of applicant
I
declare that:
(print name)
1.
The information contained in this application, attached schedules, attached plans and specifications, and other attached
documentation is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be
used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a)
the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and
duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom
this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G
2E5 (416) 585-6666.
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 3 of 8
Schedule 1: Designer Information
Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.
A.
Project Information
Building number, street name
Unit no.
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Individual who reviews and takes responsibility for design activities
Name
Firm
Street address
Unit no.
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax number
Cell number
C.
Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of
Division C]
House
Small Buildings
Large Buildings
Complex Buildings
HVAC - House
Building Services
Detection, Lighting and Power
Fire Protection
Building Structural
Plumbing - House
Plumbing - All Buildings
On-site Sewage Systems
Description of designer's work
D.
Declaration of Designer
I
declare that (choose one as appropriate):
(print name)
I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division
C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.
Individual BCIN: __________________________________________
Firm BCIN:
__________________________________________
I review and take responsibility for the design and am qualified in the appropriate category as an "other designer"
under subsection 3.2.5.of Division C, of the Building Code.
Individual BCIN: __________________________________________
Basis for exemption from registration: ________________________________________________________
The design work is exempt from the registration and qualification requirements of the Building Code.
Basis for exemption from registration and qualification: ___________________________________________
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
I have submitted this application with the knowledge and consent of the firm.
Date
Signature of Designer
NOTE:
1.
For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of
Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.
2.
Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario
Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise,
or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 4 of 8
Schedule 2: Sewage System Installer Information
A.
Project Information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Sewage system installer
Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or
emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C?
Yes (Continue to Section C)
No (Continue to Section E)
Installer unknown at time of
application (Continue to Section E)
C.
Registered installer information (where answer to B is "Yes")
Name
BCIN
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D.
Qualified supervisor information (where answer to section B is "Yes")
Name of qualified supervisor(s)
Building Code Identification Number (BCIN)
E.
Declaration of Applicant:
I
declare that:
(print name)
I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall
submit a new Schedule 2 prior to construction when the installer is known;
OR
I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is
known.
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
SIGN
Design of On-Site Sewage System Schedule D to Bylaw No. 2011.21
Class of System 2 or 3 4 5
New Install Alter/Repair
Water Supply Existing or Proposed
Drilled Well
Dug Well
Lake/ River
Other: _____________
Fixture Unit Type
# of
Fixtures
Fixture Unit Value
Total
3pc Bathroom Group
6
Flush Tank Toilet
4
Lavatory
1
Bathtub
1.5
Shower (1 head)
1.5
Bidet
1
Urinal
1.5
Kitchen Sinks (dbl)
1.5
Laundry Tub
1.5
Clothes Washer
1.5
Dishwasher
(0 if connected to sink drain)
1.5
Floor Drain 4"
4
Other
Total Fixture Units:
Number of Bedrooms
Volume (L)
1 Bedroom
750
2 Bedrooms
1100
3 Bedrooms
1600
4 Bedrooms
2000
5 Bedrooms
2500
Daily Design Sanitary Sewage Flow Calculations (Q)
A. Base Flow from Number of Bedrooms: _______ L (max 5)
B. Additional Bedrooms over 5: _______ x 500 = _______ L
C. Each Additional Fixture over 20: _______x 50 = _______ L
D. Additional Living Space over 200sqm
i.
Each 10sqm over 200sqm up to 400sqm: _______ x 100 = _______ L
ii.
Each 10sqm over 400sqm up to 600sqm: _______ x 75 = _______ L
iii.
Each 10sqm greater than 600sqm: _______ x 50 = _______ L
Daily Sewage Flow (Q) = A plus the greater of B or C or D = _______ L/day
Page 5 of 8
Tank(s)
Minimum Size Septic Tank 3600L
Minimum Size Holding Tank 9000L
Septic Tank Size (residential) Q x 2 = _______ L, Proposed: _______ L
Septic Tank Size (non-residential) Q x 3 = _______ L, Proposed: _______ L
Holding Tank Size Q x 7 = _______ L, Proposed: _______ L
Sewage Bed Design
Conventional Trench
Trench Bed Sizing (native soil percolation time = T)
QT/200
______ x ______ /200 = ______m; Proposed: ______m
Raised Trench Bed
Trench Bed Sizing (imported soil percolation time = T)
QT/200
______ x ______ /200 = ______m; Proposed: ______m
Daily Loading Area (native soil percolation time = T)
Q/Loading Rate Factor (chart below)
_______ / _______ = _______ sqm, Proposed: _______ sqm
Receiving Soil Percolation Rate
Loading Rate Factor
1 ≤ 20
10
20 ≤ 35
8
35 ≤ 50
6
greater than 50
4
Filter Bed
Filter Bed Area
3000L/day or less = Q/75, or
3000L/day or more = Q/50
_______ / _______ = _______ sqm, Proposed: _______ sqm
Contact Area (native soil percolation time = T)
QT/850
_______ x _______/850 = _______ sqm, Proposed: _______ sqm
Daily Loading Area (native soil percolation time = T)
Q/Loading Rate Factor (chart above)
_______ / _______ = _______ sqm, Proposed: _______ sqm
Page 6 of 8
Copy of Maintenance agreement if using any of the below is required
Alternative Treatment Unit
Manufacturer: ____________ Model: ____________
BMEC/BNQ#: ____________ No. of Units (if applicable): _______
Type A Dispersal Bed/ BMEC Area Bed
Stone Area
3000L/day or less = Q/75, or
3000L/day or more = Q/50
_______ / _______ = _______ sqm, Proposed: _______ sqm
Sand Area (native soil percolation time = T)
T less than 15 = QT/850
T greater than 15 = QT/400
_______ x _______/_______ = _______ sqm, Proposed: _______ sqm
Type B Dispersal Bed
Dispersal Area (native soil percolation time = T)
QT/400 or
Q/Loading Rate (using table 2-8 o BCMOH)
_______ / _______ = _______ sqm, Proposed: _______ sqm
Linear Loading Rate (native soil percolation time = T)
T less than 24 = Q/40 or
T greater than 24 = Q/50 or
From Table 2-11 of BCMOH where required
_______ / _______ = _______ m, Proposed: _______ sqm
Class 2 or 3 Systems
Size _______ sqm;
Configured as Length _______ m x Width _______ m x Height _______ m
Wall Structure____________; Type of Cover ____________
Lot Diagram
As part of the application a lot diagram is required, this must indicate north and show
the following required information with proposed or existing setbacks:
Sewage System Components (tank, bed, loading area, mantle area)
Existing Sewage Systems
Structures (proposed or existing, incl. pools)
Property Lines
Topographical Features (steep slopes, low lands)
Water Supplies (incl. neighbours) and other water features (lakes, streams, etc.)
Driveways
Direction of Slope
Page 7 of 8
Date:____________________________
Project:__________________________
Page 8 of 8
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 3 of 8
Schedule 1: Designer Information
Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.
A.
Project Information
Building number, street name
Unit no.
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Individual who reviews and takes responsibility for design activities
Name
Firm
Street address
Unit no.
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax number
Cell number
C.
Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of
Division C]
House
Small Buildings
Large Buildings
Complex Buildings
HVAC - House
Building Services
Detection, Lighting and Power
Fire Protection
Building Structural
Plumbing - House
Plumbing - All Buildings
On-site Sewage Systems
Description of designer's work
D.
Declaration of Designer
I
declare that (choose one as appropriate):
(print name)
I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division
C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.
Individual BCIN: __________________________________________
Firm BCIN:
__________________________________________
I review and take responsibility for the design and am qualified in the appropriate category as an "other designer"
under subsection 3.2.5.of Division C, of the Building Code.
Individual BCIN: __________________________________________
Basis for exemption from registration: ________________________________________________________
The design work is exempt from the registration and qualification requirements of the Building Code.
Basis for exemption from registration and qualification: ___________________________________________
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
I have submitted this application with the knowledge and consent of the firm.
Date
Signature of Designer
NOTE:
1.
For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of
Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.
2.
Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario
Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise,
or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.
SIGN
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 4 of 8
Schedule 2: Sewage System Installer Information
A.
Project Information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/ other description
B.
Sewage system installer
Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or
emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C?
Yes (Continue to Section C)
No (Continue to Section E)
Installer unknown at time of
application (Continue to Section E)
C.
Registered installer information (where answer to B is "Yes")
Name
BCIN
Street address
Unit number
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D.
Qualified supervisor information (where answer to section B is "Yes")
Name of qualified supervisor(s)
Building Code Identification Number (BCIN)
E.
Declaration of Applicant:
I
declare that:
(print name)
I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall
submit a new Schedule 2 prior to construction when the installer is known;
OR
I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is
known.
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
SIGN
Energy Efficiency Design Summary: Prescriptive Method
(Building Code Part 9, Residential)
This form is used by a designer to demonstrate that the energy efficiency design of a house complies with the building code using the
prescriptive method described in Subsection 3.1.1. of SB-12. This form is applicable where the ratio of gross area of
windows/sidelights/skylights/glazing in doors and sliding glass doors to the gross area of peripheral walls is not more than 22%.
For use by Principal Authority
Application No:
Model/Certification Number
A. Project Information
Building number, street name
Unit number
Lot/Con
Municipality
Postal code
Reg. Plan number / other description
B. Prescriptive Compliance [indicate the building code compliance package being employed in this house design]
SB-12 Prescriptive (input design package):
Package: _____________
Table:_____________
C. Project Design Conditions
Climatic Zone (SB-1):
Heating Equipment Efficiency
Space Heating Fuel Source
Zone 1 (< 5000 degree days)
92% AFUE
84% < 92% AFUE
Gas
Propane
Solid Fuel
Oil
Electric
Earth Energy
Zone 2
5000 degree days)
Ratio of Windows, Skylights & Glass (W, S & G) to Wall Area
Other Building Characteristics
Area of walls = ______m2 or______ft2
W, S & G % =
Utilize window averaging:
Yes
No
Log/Post&Beam
ICF Above Grade
ICF Basement
Slab-on-ground
Walkout Basement
Air Conditioning
Combo Unit
Air Sourced Heat Pump (ASHP)
Ground Sourced Heat Pump (GSHP)
Area of W, S & G = _____m2 or_____ft2
D. Building Specifications [provide values and ratings of the energy efficiency components proposed]
Energy Efficiency Substitutions
ICF (3.1.1.2.(5) & (6) / 3.1.1.3.(5) & (6))
Combined space heating and domestic water heating systems (3.1.1.2.(7) / 3.1.1.3.(7))
Airtightness substitution(s)
Airtightness test required
(Refer to Design Guide Attached)
Table 3.1.1.4.B Required:
Permitted Substitution:
Table 3.1.1.4.C Required:
Permitted Substitution:
Required:
Permitted Substitution:
Building Component
Minimum RSI / R values
or Maximum U-Value(1)
Building Component
Efficiency Ratings
Thermal Insulation
Nominal
Effective
Windows & Doors Provide U-Value(1) or ER rating
Ceiling with Attic Space
Windows/Sliding Glass Doors
Ceiling without Attic Space
Skylights/Glazed Roofs
Exposed Floor
Mechanicals
Walls Above Grade
Heating Equip.(AFUE)
Basement Walls
HRV Efficiency (SRE% at 0o C)
Slab (all >600mm below grade)
DHW Heater (EF)
Slab (edge only
600mm below grade)
DWHR (CSA B55.1 (min. 42% efficiency))
# Showers___
Slab (all
600mm below grade, or heated)
Combined Heating System
(1) U value to be provided in either W/(m2 K) or Btu/(h ft2 F) but not both.
E. Designer(s) [name(s) & BCIN(s), if applicable, of person(s) providing information herein to substantiate that design meets the building code]
Qualified Designer Declaration of designer to have reviewed and take responsibility for the design work.
Name
BCIN
Signature
Form authorized by OHBA, OBOA, LMCBO. Revised December 1, 2016.
Guide to the Prescriptive Energy Efficiency Design Summary Form
This form must accurately reflect the information contained on the drawings and specifications being submitted.
Refer to Supplementary Standard SB-12 for details about building code compliance requirements. Further
information about energy efficiency requirements for new buildings is available from the provincial building code
website or the municipal building department.
The building code permits a house designer to use one of four energy efficiency compliance options:
1. Comply with the SB-12 Prescriptive design tables (this form is for this option (Option 1)),
2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards,
3. Design to Energy Star, or
4. Design to R2000 standards.
COMPLETING THE FORM
B. Compliance Options
Indicate the compliance option being used.
SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and
mechanical system efficiency requirements set out in Subsection 3.1.1. of SB-12. Energy efficiency design
modeling and testing of the building is not required under this option. Certain substitutions are permitted. In
which case, the applicable airtightness targets in Table 3.1.1.4.A must be met.
C. Project Design Conditions
Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1
Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights, glazing
in doors and sliding glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is
required. If the ratio is more than 22%, the SB-12 Prescriptive option may not be used. The total area is the sum of all
the structural rough openings. Some exceptions apply. Refer to 3.1.1.1. of SB-12 for further details.
Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating
equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies.
Other Building Conditions: These construction conditions affect SB-12 Prescriptive compliance requirements.
D. Building Specifications
Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under
the SB-12 Prescriptive option, alternative ICF wall insulation is permitted in certain conditions where other
design elements meet higher standards. Refer to SB-12 for further details. Where effective insulation values
are being used, the Authority Having Jurisdiction may require supporting documentation.
BUILDING CODE REQUIREMENTS FOR AIRTIGHTNESS IN NEW HOUSES
All houses must comply with increased air barrier requirements in the building code. Notice of air barrier
completion must be provided and an inspection conducted prior to it being covered.
The air leakage rates in Table 3.1.1.4.A are not requirements. This provision is a voluntary provision for when
credits for airtightness are claimed. Credit for air tightness allows the designer to substitute the requirements of
compliance packages as set out in Table 3.1.1.4.B or 3.1.1.4.C. Neither the air leakage test nor compliance with
airtightness targets given in Table 3.1.1.4.A are required, unless credit for airtightness is claimed. Table
3.1.1.4.A provides airtightness targets in three different metrics; ACH, NLA, NLR. Any one of them can be used.
OBC Reference Default Air Leakage Rates (Table 3.1.1.4.A)
Building Type
Airtightness Targets
ACH @ 50 Pa
NLA @ 10 Pa
NLR @ 50 Pa
Detached dwelling
2.5
1.26 cm2/m2
1.81 in2/100ft2
0.93 L/s/m2
0.18 cfm50/ft2
Attached dwelling
3.0
2.12 cm2/m2
3.06 in2/100ft2
1.32 L/s/m2
0.26 cfm50/ft2
The building code requires that a blower door test be conducted to verify the air tightness of the house during
construction if the SB-12 Prescriptive option with airtightness credit being applied. Results of the airtightness
test may need to be submitted to the Authority Having Jurisdiction. Airtightness of less than 2.5 ACH @ 50 Pa
(or NLA or NLR equivalent) in the case of detached houses, or 3.0 ACH @ 50 Pa (or NLA or NLR equivalent) in
the case of attached houses is necessary to meet the required energy efficiency standard.
E. House Designer
The building code requires designers providing information about whether a building complies with the building
code to have a BCIN. Exemptions apply to architects, engineers and owners designing their own house.
Form authorized by OHBA, OBOA, LMCBO. Revised November 30, 2016.
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ONTARIO BUILDING CODE SUPPLEMENTARY STANDARD SB-10
PROJECT INFORMATION
Project:
Location:
Building Permit Application No.:
Date:
Architectural Designer
Information*
Mechanical Designer
Information*
Electrical Designer
Information*
Name
Name
Name
Address
Address
Address
City
Province
City
Province
City
Province
Signature
Date(YY/MM/DD)
Signature
Date(YY/MM/DD)
Signature
Date(YY/MM/DD)
*IF MORE DESIGNERS ARE INVOLVED, PROVIDE ADDITIONAL COPIES OF THIS FORM.
THIS CHECKLIST IS A CONVENIENCE DOCUMENT ONLY AND IS BASED ON THE ENERGY EFFICIENCY REQUIREMENTS DESCRIBED IN THE ONTARIO
BUILDING CODE SUPPLEMENTARY STANDARD SB-10 DIVISION 3. THIS CHECKLIST IS NOT A SUBSTITUTE FOR COMPLYING WITH THE REQUIREMENTS OF
THE ONTARIO BUILDING CODE. WHILE CARE HAS BEEN TAKEN TO ENSURE ACCURACY OF THIS CHECKLIST, DESIGNERS AND BUILDING OFFICIALS MUST
REFER TO THE ACTUAL WORDING AND REQUIREMENTS OF THE ONTARIO BUILDING CODE (O.REG. 350/06 AND AMENDMENTS UP TO AMENDING
O.REG. 315/12).
THIS CHECKLIST IS MADE AVAILABLE FOR CODE USERS BY THE MINISTRY OF MUNICIPAL AFFAIRS AND HOUSING. USERS SHOULD ALWAYS CONSULT
WITH THE AUTHORITY HAVING JURISDICTION, IF THE CHECKLIST IS GOING TO BE SUBMITTED TO THAT AUTHORITY. THE MINISTRY OF MUNICIPAL
AFFAIRS AND HOUSING DOES NOT ASSUME RESPONSIBILITY FOR ERRORS OR OVERSIGHTS RESULTING FROM THE INFORMATION CONTAINED HEREIN.
PLEASE FILL IN THE ACTUAL VALUES INSTALLED AND CHECK BOXES AS THEY APPLY.
OBC SB-10 COMPLIANCE SUMMARY
Energy Efficiency Design:
There are three energy compliance options to meet the requirements of OBC SB-10 Division 3. Please select the
compliance option selected for this project. The energy efficiency of all buildings must be designed to:
Compliance Path
Forms to
Complete
(A) Achieve the energy efficiency levels attained by conforming to the ASHRAE 90.1-2013, "Energy Standard
for Buildings Except Low-Rise Residential Buildings" and Chapter 2 of SB-10 (Division 3).
This compliance path includes both prescriptive and performance path options. Please proceed to Form A.
YES
FORM A
(B) Achieve the energy efficiency levels attained by conforming to the National Energy Code of Canada for
Buildings 2015 and Chapter 3 of SB-10 (Division 3).
This compliance path includes both prescriptive and performance path options. Please proceed to Form B.
YES
NECB
(C) Section 7 "Energy Efficiency" of 2014 ANSI/ASHRAE/USGBC/IES 189.1, excluding Sections 7.2.b, 7.4.7.3,
7.4.8 and 7.5
YES
SIGN
SIGN
SIGN
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ONTARIO BUILDING CODE SUPPLEMENTARY STANDARD SB-10
PROJECT INFORMATION - ADDITIONAL DESIGNER SIGNATURES
Project:
Location:
Building Permit Application No.:
Date:
Designer Information (Other)*:
Designer Information (Other)*:
Designer Information (Other)*:
Specialty
Specialty
Specialty
Name
Name
Name
Address
Address
Address
City
Province
City
Province
City
Province
Signature
Date(YY/MM/DD)
Signature
Date(YY/MM/DD)
Signature
Date(YY/MM/DD)
*AS APPLICABLE TO SB-10 2017 PROVISIONS AND REQUIREMENTS.
THIS CHECKLIST IS A CONVENIENCE DOCUMENT ONLY AND IS BASED ON THE ENERGY EFFICIENCY REQUIREMENTS DESCRIBED IN THE ONTARIO
BUILDING CODE SUPPLEMENTARY STANDARD SB-10 DIVISION 3. THIS CHECKLIST IS NOT A SUBSTITUTE FOR COMPLYING WITH THE REQUIREMENTS OF
THE ONTARIO BUILDING CODE. WHILE CARE HAS BEEN TAKEN TO ENSURE ACCURACY OF THIS CHECKLIST, DESIGNERS AND BUILDING OFFICIALS MUST
REFER TO THE ACTUAL WORDING AND REQUIREMENTS OF THE ONTARIO BUILDING CODE (O.REG. 332/12 AND AMENDMENTS UP TO AMENDING
O.REG. 194/14 AND MINISTER RULING M-16-S-27.).
THIS CHECKLIST IS MADE AVAILABLE FOR CODE USERS BY THE MINISTRY OF MUNICIPAL AFFAIRS AND HOUSING. USERS SHOULD ALWAYS CONSULT
WITH THE AUTHORITY HAVING JURISDICTION, IF THE CHECKLIST IS GOING TO BE SUBMITTED TO THAT AUTHORITY. THE MINISTRY OF MUNICIPAL
AFFAIRS AND HOUSING DOES NOT ASSUME RESPONSIBILITY FOR ERRORS OR OVERSIGHTS RESULTING FROM THE INFORMATION CONTAINED HEREIN.
SIGN
SIGN
SIGN
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
OBC SB-10 AND ASHRAE 90.1 - 2013 - COMPLIANCE SUMMARY
Form A
Project:
Location of Project:
Building Permit Application No.:
Climatic Zone (SB-10 Division 3 Section 1.3):
ASHRAE 90.1 - 2013 COMPLIANCE AS MODIFIED BY OBC SB-10 DIVISION 3
The building design complies with the mandatory provisions of the following sections regardless of the compliance path:
ASHRAE 90.1-2013 Standard Section
Compliance
Column
Form
5.4 BUILDING ENVELOPE AND SB-10 DIVISION 3
YES
FORM 5.4
6.4 HEATING, VENTILATING AND AIR CONDITIONING
YES
FORM 6.3 or
FORM 6.4
7.4 SERVICE WATER HEATING SYSTEMS AND EQUIPMENT
YES
FORM 7.4
8.4 POWER
YES
FORM 8.4
9.4 LIGHTING
YES
FORM 9.4
10.4 OTHER EQUIPMENT AND SB-10 DIVISION 3
YES
FORM 10.4
METHOD OF COMPLIANCE
Building Design must comply with either the Prescriptive Requirements or the Energy Cost Budget Method. Indicate which method was
selected.
Compliance Method
Compliance
Column
Form
PRESCRIPTIVE COMPLIANCE
YES
COMPLETE SECTION A-1
ENERGY COST BUDGET METHOD
YES
COMPLETE SECTION A-2
A-1: PRESCRIPTIVE COMPLIANCE - ASHRAE 90.1-2013 AND OBC SB-10
The building design complies with the Prescriptive Compliance requirements of the following sections:
Standard Section
Reference
Compliance
Column
Form
Sec 5 BUILDING ENVELOPE
Prescriptive Requirements (5.5 of 90.1)
Building Envelope Trade-Off (5.6 of 90.1)
YES
YES
FORM 5.5 or
FORM 5.6
Sec 6 HVAC SYSTEMS
Simplified Approach for HVAC Systems
Mandatory + Prescriptive Path Option
YES
YES
FORM 6.3 or
FORM 6.4
Sec 7 SERVICE WATER HEATING Prescriptive Path Option
YES
FORM 7.4
Sec 9 LIGHTING
Prescriptive Requirements
YES
FORM 9.5
A-2: ENERGY COST BUDGET METHOD - ASHRAE 90.1-2013 AND OBC SB-10
Compliance
Column
Form
The building design complies with the provisions of Section 11 of ASHRAE 90.1-2013,
based on Division 3 of SB-10.
YES
FORM 11
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
SECTION 5.4 MANDATORY PROVISIONS
Building insulation has been designed to comply with section 5.4.1 of ASHRAE 90.1-2013 as
modified by Chapter 2 of OBC SB-10.
YES
Building fenestration and doors have been designed to comply with section 5.4.2 of ASHRAE
90.1-2013 as modified by Chapter 2 of OBC SB-10.
YES
Building air leakage has been designed to comply with section 5.4.3 of ASHRAE 90.1-2013 as
modified by Chapter 2 of OBC SB-10.
YES
ASHRAE 90.1-2013 AND OBC SB-10 DIVISION 3- MANDATORY PROVISIONS
Form 5.4
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
Section 5.5 Overall Building Design Requirements
The building design must comply with the following general requirements. If any of these requirements are not met, the prescriptive
path cannot be pursued. Consider the building envelope trade-off compliance or the Energy Cost Budget Method Described in
Chapter 11 of ASHRAE 90.1-2013:
Gross Wall Area:
_________ m²
Vertical Fenestration Area: _________ m²
Vertical fenestration area is less than 40% of the gross wall area
YES
Gross Roof Area:
_________ m²
Skylight Area:
_________ m²
Total skylight area does not exceed 3% of the gross roof area
YES
Where the main entrance is located on the south orientation and the south-oriented wall area
is larger than west-oriented wall area, and where the south-oriented wall area is larger than
east-oriented wall area, per ASHRAE 90.1-2013 5.5.4.5, either:
(a) total east and west vertical fenestration areas are each less than 25% of total vertical
fenestration area for the whole building, or
(b) east and west area-weighted SHGC is less than area-weighted SHGC for total
fenestration
Exception (from ASHRAE 90.1-2013 Section 5.5.4.5): ______________________________
YES N/A
YES N/A
Where electric space heating provides more than 10 per cent of the heating capacity, the
building envelope shall comply with the requirements of Table SB 5.5-7 of SB-10, regardless of
its climatic location
YES N/A
For Climate Zone 5, minimum skylight fenestration area conforms to the requirements of
ASHRAE 90.1-2013 5.5.4.2.3.
YES N/A
Identify SB-10 Table used for maximum U-Factors or minimum RSI-Values : _____________
Complete the table on Form 5.5-2 to show compliance for all envelope components. Attach as many copies of this form as required
to ensure that all envelope components are represented.
For all opaque surfaces, compliance must be demonstrated by meeting either:
1.
The minimum R-values of insulation added in framing cavities and continuous insulation as specified in Tables SB5.5-5 to
SB5.5-7.
2.
The maximum U-factor, C-factor, or F-factor for the entire assembly as specified in Tables SB5.5-5 to SB5.5-7. U-factor is to be
determined from tables in Appendix A of ASHRAE 90.1-2013 or through calculation methods described in ASHRAE 90.1-2013
Appendix Section A9.
For all fenestration products, compliance with U-factors, SHGC and VT must be determined for the overall fenestration product.
1.
Fenestration shall have a U-factor and SHGC not greater than those specified in SB-10 Tables SB5.5-5 to SB5.5-7.
2.
Where automatic daylighting controls are required in accordance with Section 9.4.1.1(e) or (f), fenestration shall have a ratio
of VT divided by SHGC not less than that specified in Tables SB5.5-5 through SB5.5-7 for the appropriate fenestration area.
3.
U-factor to be determined through CSA or NFRC rating or by using ASHRAE 90.1-2013 Appendix A default values.
ASHRAE 90.1-2013 & SB-10 - SECTION 5.5 - PRESCRIPTIVE ENVELOPE OPTION
Form 5.5-1
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
Please complete the following table to include information on all walls, roofs, doors, and floors used in the design.
OPAQUE BUILDING ENVELOPE COMPONENTS
Opaque Element -
Description(1)
Space
Conditioning
Category (2)
Class of Construction (3)
Criteria Max. U-
Value(4) or Min
RSI
Design U-Value(4)
or RSI
Area Weighted
Avg. Used(5)?
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
Please complete the following table to include information on all fenestration products used in the design.
FENESTRATION ENVELOPE COMPONENTS
Fenestration -
Description(1)
Space
Conditioning
Category (2)
Class of Construction
(3)
U-Value(4)
SHGC(6)
VT/SHGC
Area Weighted
Average Used(5)?
Crit.
Des.
Crit.
Des.
Crit.
Des.
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
NR R SH
Y N
(1)
Indicate if Element is a Wall, Roof, Floor, Door, Window or Skylight and a Tag or Description (eg Wall - W1).
(2)
Select from Non-residential (NR), Residential (R), or Semiheated (SH).
(3)
Select from the subclasses of roofs, walls, floors, doors and fenestration provided in Tables SB5.5-5 to SB5.5-7 (eg. Steel
Framed for walls). Note that curtain wall systems are considered a steel framed wall.
(4)
F-Factors can be used for floors and C-Factors for below Grade Walls as applicable.
(5)
Elements of the same type, space category, and class of construction can be averaged using area weighting to show
compliance only if U-Values are used.
(6)
Design SHGC may be higher than the criteria if one of the exceptions from ASHRAE 90.1-2013 5.5.4.4.1 or 5.5.4.4.2 is
applicable. Please use the space below to identify the fenestration elements (if any) which an exception for SHGC is being
claimed.
(7)
Design VT/SHGC ratio may be lower than the criteria if one of the exceptions from ASHRAE 90.1-2013 5.5.4.6 is applicable.
Please use the space below to identify the fenestration elements (if any) which an exception for VT/SHGC is being claimed.
SHGC and VT/SHGC EXCEPTIONS
Fenestration Element
SHGC or VT/SHGC exception from ASHRAE 90.1-2013 5.5.4.4.1, 5.5.4.4.2, or 5.5.4.6
ASHRAE 90.1-2013 & SB-10 - SECTION 5.5 - PRESCRIPTIVE ENVELOPE OPTION
Form 5.5-2
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1-2013 & SB-10 - SECTION 5.5 -BUILDING ENVELOPE TRADE-OFF OPTION
Form 5.6
Note that this option may only be pursued using the procedure described in ASHRAE 90.1-2013 Section 5.6 as modified
by the requirements of Chapter 2 of SB-10
Calculated EPF for proposed building*: ______
Calculated EPF for budget building*: ______
Envelope performance factor (EPF) for proposed building is less than or equal to the envelope performance
factor of the budget building.
YES
All components of the building envelope shown on architectural drawings or installed in existing buildings have
been separately described and modeled in the proposed building design, with exception for envelope
assemblies that cover less than 5% of the total area of its corresponding assembly type, and whose area can be
included with another similar assembly (based on thermal properties and orientation) as noted in Section
5.6.1.1.
YES
A software program* incorporating the requirements of ASHRAE 90.1-2013 as modified by SB-10 has been used
to calculate the EPF. A report from this software is attached.
Name of software: _____________________
YES
*Note that the EPF must be calculated by a simulation program which includes the requirements of ASHRAE 90.1-2013 as
modified by SB-10.
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1-2013 & SB-10- SECTION 6.3 HVAC SIMPLIFIED APPROACH
Form 6.3
If simplified HVAC method is used complete this form, otherwise proceed to Form 6.4.
Number of Stories:
Gross floor area:
m²
Reference
Standard Compliance
6.3.1
The building is 2 stories or less in height and has a gross floor area less than 2,300 m².
YES
6.3.2
All of the requirements in Section 6.3 as outlined below must be met by each HVAC system in the
facility.
6.3.2.a
System serves a single HVAC zone.
YES
6.3.2.b
The equipment meets the variable flow requirements of Section 6.5.3.2.1.
YES N/A
6.3.2.c
If a cooling is installed, it is provided by a unitary packaged or split-system air conditioner that is
either air-cooled or evaporatively cooled and meets the efficiency requirements shown in Tables
6.8.1-1, 6.8.1-2, and 6.8.1-4.
YES N/A
6.3.2.d
The system has an air economizer with outside airflow capacity and controls as required per
Section 6.5.1., unless exempt.
YES N/A
6.3.2.e
Heating is provided by a unitary packaged or split-system heat pump, a fuel-fired furnace, an
electric resistance heater or a baseboard system connected to a boiler. All heating equipment
meets the efficiency requirements shown in Table 6.8.1-2, 6.8.1-4, 6.8.1-5, and 6.8.1-6 as
modified by SB-10 Table SB 6.8.1-2017.
YES N/A
6.3.2.f
System meets the exhaust air energy recovery requirements of Section 6.5.6.1 as modified by SB-
10, unless exempt.
YES N/A
6.3.2.g
The system is controlled by a manual changeover or dual setpoint thermostat.
YES
6.3.2.h
Heat pumps equipped with auxiliary internal electric resistance heaters (if any) have controls to
prevent supplemental heater operation when the heating load can be met by the heat pump
alone, unless exempt.
YES N/A
6.3.2.i
The system controls do not permit reheat or any other form of simultaneous heating and cooling
for humidity control.
YES N/A
6.3.2.j
Systems are provided with a time switch that (1) can start and stop the system under different
schedules for seven different day-types per week; (2) is capable of retaining programming and
time setting during a loss of power for a period of at least 10 h; (3) includes an accessible manual
override that allows temporary operation of the system for up to 2 h; (4) is capable of
temperature setback down to 13° C during off hours; and (5) is capable of temperature setup to
32° C during off hours unless exempt.
YES N/A
6.3.2.k
Piping is insulated in accordance with values given in Table 6.8.3A and 6.8.3B. Insulation exposed
to weather is suitable for outdoor service (i.e. protected by aluminum, sheet metal, etc. or
painted with a coating that is water retardant and provides shielding from solar radiation).
YES N/A
6.3.2.l
Ductwork and plenums are insulated in accordance with Tables 6.8.2A and 6.8.2B and sealed in
accordance with Section 6.4.4.2.1.
YES N/A
6.3.2.m
Specifications call for ducted air systems to be balanced.
YES N/A
6.3.2.n
Outdoor air intake and exhaust systems meet the controls requirements of Section 6.4.3.4.
YES N/A
6.3.2.o
Where separate heating and cooling equipment serve the same temperature zone, thermostats
are interlocked to prevent simultaneous heating and cooling.
YES N/A
6.3.2.p
Systems with a design supply air capacity greater than 5,000 L/s have optimum start controls.
YES N/A
6.3.2.q
In spaces larger than 50m² and with design occupancy ≥ 25 people per 100m², the system
complies with the demand control ventilation requirements in Section 6.4.3.8, unless exempt.
YES N/A
6.3.2.r
The system complies with the door switch requirements of Section 6.5.10.
YES N/A
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
SECTION 6 HVAC - 6.4 MANDATORY PROVISIONS AND 6.5 PRESCRIPTIVE REQUIREMENTS Form 6.4
Reference
Standard Compliance
Mandatory Provisions - Complete only if simplified HVAC method is not used.
6.4.1
Equipment shown in 6.8.1-1 through 6.8.1-13 meets the minimum performance (as modified by
SB-10 Table SB 6.8.1-2017) at the specified rating conditions in accordance with the test
procedures in the tables or those in SB-10 Section 6.4.1.A.
YES
6.4.2.1
Load calculations for heating and cooling systems are done as per ASHRAE Standard 183-2007 for
selection of all equipment and systems.
YES
6.4.2.2
Pressure drop through each device and pipe segment in the critical circuit at design conditions has
been calculated in accordance with generally accepted engineering standards and handbooks.
YES
6.4.3
Mandatory controls requirements are met by all the equipment in the building as outlined in
Section 6.4.3.
YES
6.4.4.1
Ductwork, piping, and equipment insulation meets the requirements of Section 6.4.4.1.
YES
6.4.4.2
Construction documents specify sealing and pressure testing of ductworks and plenums as per
Section 6.4.4.2.
YES
6.4.5
Site-assembled or site-constructed walk-in coolers and freezers shall conform to the requirements
of Section 6.4.5.
YES
6.4.6
All refrigerated display cases shall conform to the requirements of Section 6.4.6., including Section
6.4.1.1 and Tables 6.8.1-1 through 6.8.1-13 as modified by SB-10.
YES
Prescriptive Requirements - Complete this section if not using Energy Cost Budget Method.
6.5.1
Each cooling system that has a fan employs either airside or waterside economizer unless exempt.
YES N/A
6.5.1.1
Airside economizers are capable of modulating outdoor air dampers to provide up to 100% design
airflow for cooling and the system provides relief capacity for such airflow.
YES N/A
6.5.1.2.1
Waterside economizers are capable of cooling supply air up to 100% of the expected system
cooling load at the conditions listed under Section 6.5.1.2.1, unless exempt.
YES N/A
6.5.1.2.2
Waterside economizer systems with pressure drop greater than 45kPa are isolated from main
cooling loop to reduce pumping input in the normal cooling mode.
YES N/A
6.5.1.3
Economizer systems incorporate integrated economizer controls per ASHRAE 90.1-2013 6.5.1.3
YES N/A
6.5.1.4
Economizer operation does not increase the building heating energy use during normal operation,
except as allowed under ASHRAE 90.1-2013 6.5.1.4
YES N/A
6.5.1.5
Systems with hydronic cooling and humidification systems designed to maintain inside humidity at
a dew-point temperature greater than 2°C use a water economizer if required by ASHRAE 90.1-
2013 6.5.1.
YES N/A
6.5.2
Simultaneous heating and cooling is limited with compliant zone, hydronic system,
dehumidification, and humidification controls as per Section 6.5.2.
YES N/A
6.5.3
Cooling system fan controls comply with the requirements of 6.5.3.2 and 6.5.3.3.
YES N/A
6.5.3.1
Fan systems exceeding 4kW nameplate power have fan power limitations 10% below limitations
specified in ASHRAE 90.1-2013 Table 6.5.3.1.1-1 and Section 6.5.3.1.2.
YES N/A
6.5.4.1
Boiler systems with design input of ≥ 293 kW comply with the turndown ratio specified in Table
6.5.4.1.
YES N/A
6.5.4.2
Pumping systems greater than 7.5 kW employ compliant variable flow controls, unless exempt
6.5.4.3
Chilled water plants with more than one chiller and boiler plants with more than one boiler
reduce loop water flow automatically whenever a chiller or boiler is shut down and isolated.
YES N/A
6.5.4.4
Hydronic systems exceeding design capacity of 88 kW include controls to reset supply water
temperature based on building loads or outdoor air temperature, unless exempt.
YES N/A
6.5.4.5
Hydronic heat pumps and unitary air-conditioners include automatic water shutoff when the
compressor is off (unless units are employing water economizer) and those having total pump
system power greater than 3.7 kW have variable speed control.
YES N/A
6.5.4.6
Chilled water and condenser water pipe is sized according to Table 6.5.4.6.
YES N/A
6.5.5
Open-circuit cooling towers have fans meeting the energy efficiency requirements of Section
6.5.5.3 and have flow turndown in compliance with 6.5.5.4.
YES N/A
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
SECTION 6 HVAC - 6.4 MANDATORY PROVISIONS AND 6.5 PRESCRIPTIVE REQUIREMENTS Form 6.4
6.5.5.2
All heat rejection equipment provide fan controls that comply with Section 6.5.5.2, with variable
speed drives on fan motors ≥ 5.6 kW.
YES N/A
6.5.6.1
Exhaust air energy recovery is provided for fan systems meeting the conditions listed on Table
6.5.6.1. Energy recovery is at least 55% effective and bypass is available to permit air economizer
operation as per Section 6.5.1.1.
YES N/A
6.5.6.2
Condenser heat recovery system for heating or preheating hot water is provided, unless exempt.
YES N/A
6.5.7.1
Kitchen exhaust systems are designed as per Section 6.5.7.1.
YES N/A
6.5.7.1.5
Specifications call for performance testing of kitchen exhaust systems.
YES N/A
6.5.7.2
Laboratory fume hoods with a total exhaust system flow > 2,360 L/S comply with the variable air
volume control requirements of 6.5.7.2.
YES N/A
6.5.8.1
Heating of unenclosed spaces is done by radiant heating, except loading docks with air curtains.
YES N/A
6.5.9
Cooling equipment with hot-gas bypass controls is designed with multiple steps of unloading or
continuous capacity modulation, with capacity limits as indicated in Table 6.5.9 for VAV systems.
Constant volume units do not have hot gas bypass.
YES N/A
6.5.10
All conditioned spaces with a door to the exterior have door switches interlocked with heating
and cooling controls per Section 6.5.10, unless exempt.
YES N/A
6.5.11
Refrigeration systems that are comprised of refrigerated display cases, walk-in coolers, or walk-in
freezers connected to remote compressors, remote condensers, or remote condensing units meet
the requirements of Sections 6.5.11.1 through 6.5.11.2.
YES N/A
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1-2013 & SB-10- SECTION 7 SERVICE WATER HEATING
Form 7.4
SECTION 7 SERVICE WATER HEATING - 7.4 MANDATORY PROVISIONS AND 7.5 PRESCRIPTIVE REQUIREMENTS
Reference
Item
Standard Compliance
7.4.1
Load calculations for heating and cooling systems are done in accordance with manufacturer's
published sizing guidelines or generally accepted engineering standards and handbooks for
selection of all equipment and systems.
YES
7.4.2
All equipment used solely for the following purposes meets or exceeds the efficiency
requirements and testing criteria of Table 7.8, as modified by SB-10 7.4.2.A, unless exempt.:
heating potable water
pool heaters
hot water storage tanks
Exemptions:
YES N/A
7.4.3
The following service hot water piping is insulated to levels shown in Table 6.8.3-1:
a.
Recirculating system piping, including piping of a circulating tank type water heater.
b.
The first 2.4m of outlet piping for a constant temperature non-recirculating storage
system.
c.
Inlet pipe between storage tank and heat trap in a non-recirculating storage system.
d.
Pipes that are externally heated (e.g. heat tracing).
YES N/A
7.4.4.1
All water-heating systems have temperature controls that are adjustable down to 49oC or lower.
Exception: Equipment that must be protected from corrosion, as per manufacturer's
installation instructions.
YES N/A
7.4.4.2
Systems designed with pipe heating systems such as heat trace have temperature or time
controls to disable during extended periods without hot water demand.
YES N/A
7.4.4.3
Public lavatories have outlet temperature controls that limit the discharge temperature to 43oC.
YES N/A
7.4.4.4
Tanks with remote heaters have circulation pump controls to limit operation of circulation pumps
to a maximum of five minutes after the end of the heating cycle.
YES N/A
7.4.5.1
Pool heaters have readily accessible ON/OFF switch without adjusting the thermostat setting.
Gas-fired heaters do not have standing pilot lights.
YES N/A
7.4.5.2
Per SB-10 7.4.5.2, heated exterior public pools and public spas shall be equipped with pool
covers, unless over 60% of their energy for heating (computed over an annual operating season)
is derived from site-recovered or site-solar energy.
YES N/A
7.4.5.3
Pool heaters and circulation pumps have time switches, unless exempt.
YES N/A
7.4.6
Heat traps are provided to all vertical risers serving storage water heaters and storage tanks.
YES N/A
Prescriptive Requirement - Complete this section if not using Energy Cost Budget Method.
7.5
Boiler systems that provide space heating as well as service water heating meet the conditions of
Sections 7.5.1 and 7.5.2.
YES N/A
7.5.3
Gas service hot-water systems with a total installed gas water-heating input capacity of 293 kW
or greater, shall have a minimum input capacity-weighted average thermal efficiency of 90%,
unless exempt.
YES N/A
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1 & SB-10- SECTION 8,9 &10 POWER, LIGHTING AND OTHER EQUIPMENT
SECTION 8 POWER - 8.4 MANDATORY PROVISIONS
Form 8.4
Reference
Item
Standard Compliance
8.4.1
Feeder conductors and branch conductors are sized as per Section 8.4.1.
YES
8.4.2
At least 50% of all 125 volt 15- and 20-Ampere receptacles (installed in conference rooms, rooms
used primarily for printing and/or copying functions, breakrooms, classrooms, and individual
workstations), and at least 25% of branch circuit feeders (installed for modular furniture not
shown on the construction documents), are provided with automatic receptacle controls that
function on a) time-of-day schedule or b) occupant sensor or c) occupancy signal from another
control or alarm system, with exceptions as listed, as modified by SB-10.
YES N/A
8.4.3
Unless exempted, measurement devices are shown in design documents to monitor the total
electrical energy, as well as the electrical energy use separately for HVAC systems, interior
lighting, exterior lighting, and receptacle circuits. For buildings with tenants, these systems are
separately monitored for the total building and (excluding shared systems) for each individual
tenant. Data recording and storage capabilities meet the requirements of 8.4.3.2.
YES N/A
8.4.4
Low Voltage Dry-Type Distribution Transformers meet nominal efficiencies shown in Table 8.4.4,
unless exempt.
YES N/A
SECTION 9 LIGHTING- MANDATORY PROVISIONS CHECKLIST
Detailed Form 9.4-1
Reference
Item
Standard Compliance
9.4.1.1
For each space in the building, all of the lighting control functions indicated in ASHRAE 90.1-2013
Table 9.6.1, for the appropriate space type in column A, have been implemented, as described by
Section 9.4.1.1:
a.
Local Control
b.
Restricted to manual ON
c.
Restricted to partial automatic ON
d.
Bilevel lighting control
e.
Automatic daylight responsive controls for sidelighting
f.
Automatic daylight responsive controls for toplighting
g.
Automatic partial OFF (full OFF complies)
h.
Automatic full OFF
i.
Scheduled shutoff
YES
9.4.1.2
Lighting for parking garages is controlled by automatic shutoff controls meeting the
requirements outlined in Section 9.4.1.2.
YES N/A
Lighting for parking garages is controlled by one or more devices that reduce lighting power of
each luminaire by at least 30% when there is no activity within a zone for at most 30 minutes.
Each lighting zone for this requirement cannot exceed 334 m², except daylight transition zones
and ramps without parking.
YES N/A
Daylight transition zones in parking garages are controlled separately. These are automatically
controlled to reduce by at least 50% from sunset to sunrise.
YES N/A
Parking garage luminaires within 6m of perimeter walls that have a net opening-to-wall ratio of
at least 40% automatically reduce power in response to daylight, except daylight transition zones
and ramps without parking.
YES N/A
9.4.1.3
Additional control is provided to the special applications listed in Section 9.4.1.3
YES N/A
9.4.1.4
Exterior lights are shut off by an automatic photosensor when available daylight is sufficient,
unless exempt.
YES N/A
All building façade and landscape lighting is automatically shut off overnight as per 9.4.1.4.
YES
Exterior lighting not for façade or landscape, including for signage, is automatically controlled to
reduce lighting power by at least 30% overnight or during inactive periods as per 9.4.1.4.
(Uncovered parking areas are exempt per SB-10)
YES
9.4.2
Exterior building lighting power complies with ASHRAE 90.1-2013 9.4.2 as modified by SB-10.
Form 9.4.2 may be used to demonstrate compliance.
YES
9.4.3
Third party functional testing of all lighting control devices and systems is specified in the
construction documents.
YES
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
SECTION 9.4 LIGHTING - EXTERIOR LIGHTING POWER MANDATORY COMPLIANCE
Form 9.4-2
Reference
Standard Compliance
9.4.3
Exterior Lighting Zone _______________ (Table SB 9.4.2-2-2017)
Total Installed Exterior Lighting Power ______________ W ≤ value of
exterior LPA __________W *
List any exemptions that apply:
YES N/A
* Calculation worksheet (FORM 9.4-3) is required.
SECTION 9.5 LIGHTING - INSTALLED LIGHTING POWER PRESCRIPTIVE COMPLIANCE
Form 9.5-1
Prescriptive Requirements - Complete if not using Energy Cost Budget Method
Reference
Standard Compliance
9.5
9.6
9.5 INTERIOR LIGHTING POWER ALLOWANCE BY BUILDING TYPE
Calculation of Interior Lighting Power Allowance (ILPA) by Building Type based on Table SB 9.5.1-
2017 *
Building Type
______________________
Gross Lighted Area
______________ m²
Lighting Power Density
______________ W/m²
Total Installed Interior Lighting Power ______________ W ≤ value of
Interior LPA ______________ W *
YES N/A
9.6 INTERIOR LIGHTING POWER ALLOWANCE BY SPACE FUNCTION
Calculation of Interior Lighting Power Allowance (ILPA) for each space based on Table SB 9.6.1-
2017 *
Total Installed Interior Lighting Power ______________ W ≤ value of
Interior LPA ______________ W *
List any exemptions that apply:
YES N/A
* Calculation worksheet (FORM 9.5-2) is required.
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1 & SB-10 - SECTION 9 - LIGHTING COMPLIANCE WORKSHEET
FORM 9.4-3
Project:
Designer Name:
Exterior Building Lighting Power Allowance - refer to Table SB 9.4.2-2-2017
Location / Application
Allowance
Area or Length (m² or m)
Tradable
Power
Allowance
Exterior Lighting Zone
Base Site Allowance
Tradable Power Allowance
Exterior Installed Lighting Power
ID
Luminaire description (including number of lamps per fixture, watts per
lamp, type of ballast, type of fixture)
Number of
Luminaires
Watts/
Luminaire
Total
Watts
Total Exterior Lighting Power
* If additional space is required to provide further information, please attach a separate sheet(s) of paper.
** If trade-offs or exceptions are used attach calculations.
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1 & SB-10 - SECTION 9 - LIGHTING COMPLIANCE WORKSHEET
FORM 9.5-2
Project:
Designer Name:
Interior Power Allowance (Building Area Method) -refer to Table SB 9.5.1-2017
Building
Type
Lighting Power Density
Allowance (W/m²)
Gross Lighted Floor Area
(m²)
Lighting Power Allowance
(W) (LPDxGLFA)
Total Power Allowance
Interior Lighting Power Allowance (Space by Space Method) - refer to Table SB 9.6.1-2017
Building
Type
Common/Specific
Space Type
Lighting Power Density
Allowance (W/m²)
Space Area
(m²)
Lighting Power Allowance
(W)
Total Power Allowance
Interior Connected Lighting Power
Space
ID
Luminaire Description
(including number of lamps per fixture, watts
per lamp, type of ballast, type of fixture)
Number of
Luminaires
Watts/
Luminaire
Total
Watts
Total Interior Lighting Power
* If additional space is required to provide further information, please attach a separate sheet(s) of paper.
** If additional interior lighting power, trade-offs or exceptions are used attach calculations.
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
SECTION 10 OTHER EQUIPMENT - MANDATORY PROVISIONS
Form 10.4
Reference
Item
Standard Compliance
10.4.1
Electric motors are in compliance with Table SB-10 Table 10.4.1.A where applicable; otherwise,
they comply with ASHRAE 90.1-2013 Tables 10.8-1, 10.8-2, 10.8-3 and 10.8-6, as applicable.
YES
10.4.2
Service water pressure booster pumps have pressure sensors to vary pump speed and/or start
and stop pumps.
YES
N/A
No devices are installed to reduce the pressure of all of the water supplied by any booster
system or pump, except for safety devices.
YES
N/A
Booster pumps shut off when there is no service water flow.
YES
N/A
10.4.3
All elevator cab lighting systems have efficacy of not less than 35 lumens per Watt.
YES
N/A
Elevator cab ventilation fans for elevators without air conditioning consume less than 0.7 W·s/L
at maximum speed.
YES
N/A
Cab interior light and ventilation is de-energized when elevators are stopped and unoccupied
with doors closed for over 15 minutes.
YES
N/A
10.4.4
Escalators and moving walks automatically slow to the minimum permitted speed in accordance
with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
YES
N/A
10.4.5
The building is designed to facilitate future installation of means to measure and monitor energy
use by each energy type described in Section 10.4.5.1, per SB-10 10.4.5.3.
YES
N/A
Note: Numbering is based on SI edition of ASHRAE 90.1-2013.
Version 1 - May, 2017
ASHRAE 90.1-2013 & SB-10 ENERGY COST BUDGET (ECB) COMPLIANCE REPORT
FORM 11
Project:
Designer Name:
Occupancies
Floor Area
Annual Consumption Summary(1)
Reference
Building Energy
Proposed Building
Energy
Units
Assembly
____________
Space Heating
_____________
______________
________
Health/Institutional
____________
Space Cooling
_____________
______________
________
Hotel/Motel
____________
HVAC Fans
_____________
______________
________
Light Manufacturing
____________
Pumps
_____________
______________
________
Multifamily
____________
Service Hot Water
_____________
______________
________
Office
____________
Interior Lighting
_____________
______________
________
Restaurant
____________
Other __________
_____________
______________
________
Retail
____________
Other __________
_____________
______________
________
School
____________
Warehouse
____________
Total Annual Energy
________
Other
____________
Total Annual Energy Cost
$
>
$
Total
____________
Total Annual CO2e Emissions
>
________
Proposed Building Description
Peak Electric Demand*
>
________
__________________________________
*OR Building components specified in SB-10 Division 3 Chapter 1 Clause
1.1.2.3(5) comply with the prescriptive requirements of ASHRAE 90.1-2013
YES
__________________________________
__________________________________
__________________________________
Reference and Proposed Building Energy Consumptions are calculated by:
__________________________________
Please specify modelling software: ___________________________________
__________________________________
HVAC System Descriptions
Energy Efficiency Features in Proposed Building Design(2)
Reference Building Design
______________________________________________________
______________________________________________
______________________________________________________
______________________________________________
______________________________________________________
______________________________________________
______________________________________________________
______________________________________________
______________________________________________
Proposed Building Design
______________________________________________
______________________________________________________
______________________________________________
______________________________________________________
______________________________________________
______________________________________________________
______________________________________________________
______________________________________________
______________________________________________
Building is in compliance with mandatory requirements of sections
5.4, 6.4, 7.4, 8.4, 9.4, and 10.4.
YES
Compliance Result
The design detailed in the above referenced plans complies with the mandatory requirements of the ASHRAE 90.1-2013 Standard and
the additional requirements of Supplementary Standard SB-10. The calculated proposed building energy cost (design energy cost), CO2
emissions and peak electric demand do not exceed the calculated reference building energy cost (energy cost budget) CO2 emissions
and peak electric demand. Therefore, this design DOES COMPLY with the ASHRAE 90.1-2013 ECB compliance methodology and the
additional requirements of Supplementary Standard SB-10.
Individual certifying authenticity of the data provided in this analysis:
Signature:
Name/Title:
Notes:
(1) Verify with building official whether full modelling report is required to be submitted
(2) Explain major energy saving features utilized to achieve modelled savings
STANDARD FORM EABO1/2000 APPROVED BY OAA, PEO and OBOA
White Copy-FILE Yellow Copy-OWNER
COMMITMENT TO GENERAL REVIEW BY ARCHITECT AND ENGINEERS
Ontario Building Code, s.2.3.2.
Part A: Owner's Undertaking
(This part must be completed by Owner or agent authorized by Owner)
Project Description:
Address of Project:
Permit Application No.:
WHEREAS the Ontario Building Code requires that the project described above be designed and reviewed during construction by an architect,
professional engineer or both that are licensed to practice in Ontario; (see overleaf)
NOW THEREFORE the Owner, being the person who intends to construct or have the building constructed hereby warrants that:
1.
An architect and/or professional engineers have been retained to provide general review of the construction of the building to determine
whether the construction is in general conformity with the plans and other documents that form the basis for the issuance of a building
permit, in accordance with the performance standards of the Ontario Association of Architects and/or Professional Engineers of Ontario;
2.
All general review reports by the architect and/or professional engineers will be forwarded promptly to the Chief Building Official, and
3.
Should any retained architect or professional engineer cease to provide general review for any reason during construction, the Chief
Building Official will be notified in writing immediately, and another architect or engineer will be appointed so that general review continues
without interruption during construction.
The undersigned hereby certifies that he/she has read and agrees to the above
Name of Owner:
Date:
Address of Owner:
Telephone:
Signature of Owner:
Print Name:
Fax:
(or officer of corporation)
Name of Prime Consultant:
Telephone:
(person coordinating work of all consultants)
Address:
Fax:
Part B: Confirmation by Consultants
(This part must be completed by all consultants retained for general review)
The undersigned architect and/or professional engineer(s) hereby certify that he/she has been retained to provide general review of the parts of
construction of the building indicated, to determine whether the construction is in general conformity with the plans and other documents that
form the basis for the issuance of a building permit, in accordance with the performance standards of the Ontario Association of Architects
and/or Professional Engineers of Ontario. (see overleaf)
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
The undersigned hereby certifies that he/she has been retained to provide general review of the following parts of construction:
❏ ARCHITECTURAL
❏ STRUCTURAL
❏ SITE SERVICES
❏ MECHANICAL
❏ ELECTRICAL
❏ OTHER (SPECIFY):
Consultant Name:
Signature:
Print Name:
Address:
Telephone:
Fax:
Date:
An owner who constructs or arranges to have constructed certain buildings specified in the Ontario Building Code must by law retain an
architect and/or professional engineers to carry out reviews during construction to determine whether the construction is in general conformity
with the building permit documents. The consultants are obliged to carry out these field reviews, including their scope and frequency, in
accordance with the performance standards of the Ontario Association of Architects and/or Professional Engineers of Ontario, and must forward
written reports arising out of these reviews to the Chief Building Official of the municipality.
Professional design and review requirements in the Ontario Building Code, O.Reg. 403/97*
Building Classification by Major Occupancy*
Building Description
Design and General Review by**
Assembly occupancy only
Every building
Architect and engineer
Assembly occupancy and any other major occupancy except
industrial
Every building
Architect and engineer
Care or detention occupancy only
Every building
Architect and engineer
Care or detention occupancy and any other major occupancy
except industrial
Every building
Architect and engineer
Residential occupancy only
Every building that exceeds 3 storeys in building height
Architect and engineer
Residential occupancy only
Every building that exceeds 600 m2 (6460 ft2) in gross area and
that contains a residential occupancy other than a dwelling unit or
dwelling units
Architect
Residential occupancy only
Every building that exceeds 600 m2 (6460 ft2) in gross area and
contains a dwelling unit above another dwelling unit
Architect
Residential occupancy only
Every building that exceeds 600 m2 (6460 ft2) in building area
contains 3 or more dwelling units and has no dwelling unit above
another dwelling unit
Architect
Residential occupancy and any other major occupancy except
industrial, assembly or care or detention occupancy
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Business and personal services occupancy only
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Business and personal services occupancy and any other major
occupancy except industrial, assembly or care or detention
occupancy
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Mercantile occupancy only
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Mercantile occupancy and any other major occupancy except
industrial, assembly or care or detention occupancy
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Industrial occupancy only and where there are no subsidiary
occupancies
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect and engineer
Industrial occupancy and one or more other major occupancies
where the portion of the area occupied by one of the other major or
subsidiary occupancies exceeds 600 m2 (6460 ft2)
The non-industrial portion of every building
The industrial portion of every building
Architect and engineer
Architect or engineer
Industrial occupancy and one or more other major occupancies
where no portion of the area occupied by one of the other major or
subsidiary occupancies exceed 600 m2 (6460 ft2)
Every building that exceeds 600 m2 (6460 ft2) in gross area or 3
storeys in building height
Architect or engineer
*
This table is provided for general information only. Refer to the Ontario Building Code for definitions, occupancy classifications, design and general review
requirements for alterations, demolition and other projects, and other general review regulations.
**
Architect means an architect who holds a license in Ontario. Engineer means a professional engineer who holds a license in Ontario.
Performance standards for review in the Architects Act (Section 50 of Ontario Regulation 27)
50.
The following are prescribed as performance standards with respect to the general review of the construction, enlargement or alteration of a building by a member or
holder (of a Certificate of Practice) as provided for in the building code prescribed under the Building Code Act:
1. The member or holder, with respect to the matters that are governed by the building code, shall,
i. make periodic visits to the site to determine whether the work is in general conformity with design documents that were prepared by a member or holder,
ii. inform the client and contractor, in writing, as to the progress and quality of the work that the member or holder has observed during the visits to the site not to be in
conformity with the design documents,
iii. review all changes to the design documents to determine whether the changes conform to the building code,
iv. review and comment on all shop drawings and samples for general conformity with the design concept of the work, and
v. if the member or holder is specifically engaged to coordinate the general review of the professional engineers and reports of the inspection and testing companies,
coordinate the general review of the professional engineers and the reports of the inspection and testing companies that pertain directly to the work being reviewed
and arrange for the distribution of such reports to the client and the contractor, or
vi. if the member or holder is not engaged to perform any or all of the services listed in subparagraph v., cooperate with the professional engineer responsible for the
coordination of the general review in order to assist the professional engineer in the carrying out of the functions described in the subparagraph.
2. In paragraph 1, design document means a design or other document which form the basis for the issuance of a building permit and includes all changes thereto that were
authorized by the Chief Building Official as defined in the Building Code Act.
Performance standards for review in the Professional Engineers Act (Section 91a of Ontario Regulation 914/90)
91a
The following are prescribed as performance standards with respect to the general review of the construction, enlargement or alteration of a building by a professional
engineer (or holder of a Certificate of Authorization) as provided for in the building code prescribed under the Building Code Act:
1. The professional engineer, with respect to the matters that are governed by the building code, shall,
i. make periodic visits to the site to determine, on a random sampling basis, whether the work is in general conformity with the plans and specifications for the building,
ii. record deficiencies found during site visits and provide the client, the contractor and the owner with written reports of the deficiencies and the actions that must be
taken to rectify the deficiencies,
iii. review the reports of independent inspection and testing companies called for in the plans and specifications and which pertain directly to the work being reviewed,
iv. interpret plans and specifications when requested to do so by their clients, contractor or owner and
v. review shop drawings and samples submitted by the contractor for consistency with the intent of the plans and specifications.
2. The professional engineer shall not review work in disciplines for which he or she is not qualified.
3. The professional engineer may delegate one or more of the functions described in paragraph 1 to another person where it is consistent with prudent engineering practice
to do so and the functions are performed under the supervision of the professional engineer.
4. In paragraph a, "plans and specifications" means a plan or other document which formed the basis for the issuance of the building permit and includes all changes thereto
that were authorized by the Chief Building Official as defined in the Building Code Act.
www.adjtos.ca
7855 30th Sideroad
Alliston, Ontario
L9R 1V1 Canada
Phone: 705-434-5055
Extension 242
Building Department
Updated: Sept. 9, 2021
Page 1 of 2
Date Received:
Applicant Information
Model:
Owner or
Authorized Agent
If corporation or partnership, provide name of contact applying on its behalf.
Last Name:
First Name:
Corporation or Partnership (if applicable)
Address:
City/Province
Phone:
Ext:
Cell:
Fax:
E-mail:
Schedulel 1 - Building Designer
Schedulel 1 - HVAC Designer
SB12 Energy Efficiency Design Summary
Project and Model Plumbing Information
Model Name:
Dwelling to be:
Detached
Semi-detached
Townhouse
Plumbing
Description
Fixture Type
Basement
Deck
Porch
Deck
Porch
Other
Other
Basement (Unfinished)
Model Name:
Elevation:
Plumbing
Description
Fixture Type
Basement
Deck
Porch
Deck
Porch
Other
Other
Basement (Unfinished)
Total all fixtures:
0
0
Total fixtures per floor:
0
0
0
0
0
Identify here
0
0
0
0
0
0
0
Identify here
0
Total:
0
0
0
0
0
0
0
Architectural Plans/Specifications/Details/Engineering
Required Documentation generally includes 2 copies of each of the following:
Area
Number of Fixtures (include rough-ins)
1st Flr
2nd Flr
3rd Flr
Finished Basement
0
Bathtubs or showers
0
0
0
0
Total fixtures per floor:
Wash basin
Toilets
0
0
Identify here
Identify here
Garage (attached)
0
0
0
Total all fixtures:
0
Toilets
0
Wash basin
0
Engineered Floor (Layout Members)
0
0
0
0
2nd Floor
0
Kitchen/bar sinks/DW
0
0
0
0
2nd Floor
2nd Flr
3rd Flr
Number of Fixtures (include rough-ins)
Number of bedrooms:
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3rd Floor
0
Laundry/utility sinks
0
0
1st Floor
Garage (attached)
0
Total:
APPLICATION FOR CERTIFIED MODEL APPROVAL
Certified Model Number:
3rd Floor
0
0
Laundry/utility sinks
Kitchen/bar sinks/DW
Floor drains
0
0
0
0
0
0
0
0
Bathtubs or showers
Applicant is the
Area
1st Flr
0
0
0
0
0
0
Engineered Truss (Layout and individual trusses)
Heat Loss/Gain Design/Layout/Ventilation Summary
0
0
Finished Basement
0
Floor drains
Elevation:
(in square feet)
(in square feet)
0
0
0
0
0
0
0
1st Floor
0
www.adjtos.ca
7855 30th Sideroad
Alliston, Ontario
L9R 1V1 Canada
Phone: 705-434-5055
Extension 242
Building Department
Updated: Sept. 9, 2021
Page 2 of 2
Alternate garage configuration
Basement walkout or walkup
Deck (when not included on plans)
Solid Fuel Burning Appliances (eg. Wood stove)
1.
2.
3.
I,
, certify that:
1.
2.
I have the authority to bind the corporation or partnership (if applicable).
require a separate application or a site specific permit application.
options that do not increase floor area.
If your project includes any of the following "alternate options", a separate certified model will be required.
Production house models are generally distinguished by a unique model name assigned by the builder along with
varying elevation options. The following results apply in the establishment of each certified model application.
Each certified model must be consistent in gross floor area. Deviations in floor area, even minor in nature,
Optional variations within each model (eg. bedroom layouts) are permitted but must be limited to elevation
Building Services will assign each certified model a unique alphanumeric reference number. This
number will be provided to the builder and referenced on all future permits issued for the same model.
Planning Department:
Chief Building Official/Designate:
Signature
Approval date:
Approval by
Signature
Date
Comments:
For Office Use Only
Approved for use as a Certified Model.
Date:
Declaration of Applicant
The information contained in this application and the attached drawings and other documentation is
true to the best of my ability.
NOTE: Changes to regulations may result in requirement for re-review of existing certified models.
TOWNSHIP: Township of Adjala Tosorontio
LEGAL DESCRIPTION: LOT: _______________________ PLAN/ CONC: _____________
STREET ADDRESS:_________________________________________________
The undersigned, registered property owner(s) of the above noted proper, do herby
authorize____________________________________________________, to make
applications and amendments to application on our behalf, as well as act as our agent
for the property. It is understood that we will abide by all by-laws and acts of the
Township of Adjala- Tosorontio and that any approvals granted by any applicable
application will be carried out in accordance with the municipal requirements.
Property Owner's Signature: _______________________________________________
Print Name: ____________________________________________________________
Date: _________________________________________________________________
Property Owner's Address (if different than property above):
_____________________________________________
_____________________________________________
Telephone: _____________________________________________
TOWNSHIP OF ADJALA-TOSORONTIO
7855 Sideroad 30
Alliston, ON L9R 1V1
705-434-5055 FAX: 705-434-5051
www.adjtos.on.ca
PERMIT EXTENSION
APPLICATION
*For use when; 1. Construction not commenced within 6 months of permit issuance, or,
2. Construction discontinued for over one year after construction commenced
Property Owner's Name:
Phone : (Day)
911 Property Address:
Phone: (Evening)
Lot: _____________________ Conc: _____________ Part Lot:___________________
Fax:
Type of Construction:__________________________________________________
Building Permit #: _________________
Reason construction not commenced or discontinued: _______________________________________________
___________________________________________________________________________________________________
__________________________________________________________________________________
OFFICE USE ONLY
Extension Approved
Approved with conditions
Not Approved
More Information Required
Notes:___________________________
CHARGES:
Permit Extension
$
Other:
$
TOTAL:
$
RECEIPT #
All the statements and representations contained in the attached documents filed in
support of this application shall be deemed part of this application for all purposes.
Sufficient information shall be submitted with each application to enable the Chief
Building Official to determine whether or not the proposed work will conform with
the Ontario Building Code Act and regulations thereunder and any other applicable
law.
I, the undersigned,
am the authorized
owner/agent of owner named in the application and I certify the truth of all the
statements or representations contained therein.
_______________________________, Ontario ________________________________
Location
Date
__________________________________________________
Signature of Owner or Authorized Agent
Have updated plans been submitted: Yes No
Who designed the updates:___________________________________
Designer form attached: Yes No
SCHEDULE E TO BY-LAW 23-43
(As Amended by By-law 2023-101)
PART 1 PROVINCIAL OFFENCES ACT
PAGE 1
TOWNSHIP OF ADJALA-TOSORONTIO
BY-LAW 23-43 - "BUILDING BY-LAW"
A BY-LAW UNDER THE BUILDING CODE ACT RESPECTING PERMITS AND RELATED MATTERS
Column 2
Column 3
Column 1
Provision Creating
Set Fine
Item
Short Form Wording
or Defining Offence
1.
Construct building or sewage system without permit
14.1(a)
$300
2.
Cause construction of building or sewage system without permit
14.1(b)
$300
3.
Demolish building without permit
14.1(c)
$300
4.
Cause demolition of building without permit
14.1(d)
$300
5.
Change plans without authorization
14.1(e)
$150
6.
Construct building not in accordance with plans
14.1(f)
$150
7.
Change the use of building without permit
14.1(g)
$300
8.
Occupy newly erected building without notice or inspection
14.1(h)
$300
9.
Obstruct or remove posted order without authorization
14.1(i)
$300
10.
Furnish false information on permit application
14.1(j)
$300
11.
Commence demolition before building vacated
14.1(k)
$300
NOTE: The penalty provisions for offences listed above are Section 15 of By-law 23-43, as amended, certified copy of which has
been filed.
PART 1 PROVINCIAL OFFENCES ACT
PAGE 2
TOWNSHIP OF ADJALA-TOSORONTIO
BY-LAW 23-43 - "BUILDING BY-LAW"
A BY-LAW UNDER THE BUILDING CODE ACT RESPECTING PERMITS AND RELATED MATTERS
Column 2
Column 3
Column 1
Provision Creating
Set Fine
Item
Short Form Wording
or Defining Offence
12.
Fail to post permit on construction site
14.1(l)
$150
13.
Fail to post permit on demolition site
14.1(m)
$150
14.
Occupy unfinished building without permit
14.1(n)
$300
15.
Fail to provide notification of construction phase
14.1(o)
$150
16.
Hinder or obstruct person lawfully carrying out enforcement of
Building By-law
14.1 (p)
$500
17.
Fail to comply with order to comply
14.2(a)
$500
18.
Fail to comply with order to not cover
14.2(b)
$500
19.
Fail to comply with order to uncover
14.2(c)
$500
20.
Fail to comply with stop work order
14.2(d)
$500
21.
Fail to comply with order to remedy unsafe building
14.2(e)
$500
NOTE: The penalty provisions for offences listed above are Section 15 of By-law 23-43, as amended, certified copy of which has
been filed.
PART 1 PROVINCIAL OFFENCES ACT
SCHEDULE E TO BY-LAW 23-43
(As Amended by By-law 2023-101)
PART 1 PROVINCIAL OFFENCES ACT
PAGE 3
TOWNSHIP OF ADJALA-TOSORONTIO
BY-LAW 23-43 - "BUILDING BY-LAW"
A BY-LAW UNDER THE BUILDING CODE ACT RESPECTING PERMITS AND RELATED MATTERS
_________________________________________________________________________________________________________
Column 2
Column 3
Column 1
Provision Creating
Set Fine
Item
Short Form Wording
or Defining Offence
22.
Fail to comply with an order prohibiting use or occupancy of
unsafe building
14.2(f)
$500
23.
Fail to comply with order to repair dangerous building
14.2(g)
$500
NOTE: The penalty provisions for offences listed above are Section 15 of By-law 23-43, as amended, certified copy of which has
been filed.
SCHEDULE E TO BY-LAW 23-43
(As Amended by By-law 2023-101)
PART 1 PROVINCIAL OFFENCES ACT