Outdoor watering June 1 to Sept 30 on municipal water: even/odd address days, 7-10 p.m. only; includes Plantagenet.
Water & sewer — Alfred and Plantagenet, Ontario
What are the water and sewer rules and rates?
In the Township of Alfred and Plantagenet, Ontario, water & sewer rules are set by Summer Watering By-law 2011-58 (amends 2009-39) and 3 other bylaws, verified 2026-10-18. Billing basis: flat plus metered.
| billing basis | flat plus metered | s. 2.1; s. 4 |
scout note
Regulates supply of water and its price from the Alfred/Lefaivre waterworks and Alfred sewer system; sets user charges. Page labels it 2024-14, PDF text says 2025-11 (passed 5 March 2024 per text).
| billing basis | flat and metered | basic rate of $317.40 per year shall be charged per unit | plus a fee of $2.20 per cubic metre |
scout note
Regulates supply of water and price from the Plantagenet waterworks and sewer system; sets user charges.
Regulates supply of water and price from the Wendover waterworks and sewer system; passed 4 Feb 2025 per text.
Index listing the township's by-laws.