Building permits — Aurora, Ontario

Do I need a building permit? What does it cost?

In the Town of Aurora, Ontario, building permit rules are set by By-law Number 6096-18 (Building By-law) and 1 other bylaw, verified 2026-09-25. Permit required for: Construction, demolition, change of use, and occupancy of buildings or parts thereof, as set out in Schedule "A". Permit fees: Determined in accordance with Schedule "A"; additional fees based on scope of work and floor area for class of permit. Administered by: Chief Building Official and inspectors; Registered Code Agencies may perform specified functions.

By-law Number 6096-18 (Building By-law) adopted bylaw
permit required for Construction, demolition, change of use, and occupancy of buildings or parts thereof, as set out in Schedule "A". s. 3.1
fee basis Determined in accordance with Schedule "A"; additional fees based on scope of work and floor area for class of permit. s. 19.1, s. 19.2
authority Chief Building Official and inspectors; Registered Code Agencies may perform specified functions. s. 1.1(g), s. 1.1(l), s. 18.1
fine range First conviction: not more than $50,000; subsequent: not more than $100,000. Corporation: $100,000 first, $200,000 subsequent. s. 24.1, s. 24.2
scout note

Town of Aurora's Building By-law respecting construction, demolition, change of use, and other building permits under the Building Code Act, 1992; enacted June 25, 2018, since amended.

Permit Fee Handout 2026 (Schedule "G" to By-law 6737-25, Building Division) adopted bylaw

Town of Aurora's current building permit fee schedule (effective January 1, 2026), e.g. minimum $342 for Part 9 residential permits and per-square-metre rates by occupancy class.

Machine-readable: building-permits.json · Official website: http://www.Aurora.ca/ · Last verified 2026-09-25 · Building permits across Ontario · Building permits in other municipalities