City of Belleville Development Charges Background Study, office consolidation Sept 2026

Belleville, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 7b492981a002 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 September 9, 2026 [email protected] Development Charges Background Study City of Belleville ________________________ This report consolidates the July 6, 2026 D.C. Background Study and the September 9, 2026 Addendum Report Watson & Associates Economists Ltd. Table of Contents Page 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the Development Charges Act, 1997 ................................... 1-3 1.3.1 Bill 213: Better for People, Smarter for Business Act, 2020 ....... 1-4 1.3.2 Bill 109: More Homes for Everyone Act, 2022 ........................... 1-4 1.3.3 Bill 23: More Homes Built Faster Act, 2022................................ 1-5 1.3.4 Bill 134: Affordable Homes and Good Jobs Act, 2023 ............... 1-8 1.3.5 Bill 185: Cutting Red Tape to Build More Homes Act ............... 1-12 1.3.6 Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 ......................................................................................... 1-14 1.3.7 Bill 60: Fighting Delays, Building Faster Act, 2025 ................... 1-15 1.3.8 Bill 98: Building Homes and Improving Transportation Act, 2026 ......................................................................................... 1-19 2. Current City of Belleville D.C. Policies .......................................................... 2-1 2.1 By-law Enactment ................................................................................... 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Current Development Charges Rates ..................................................... 2-1 2.4 Timing of D.C. Calculation and Payment ................................................ 2-2 2.5 Indexing .................................................................................................. 2-3 2.6 Redevelopment Credit ............................................................................ 2-3 2.7 Exemptions ............................................................................................. 2-4 3. Anticipated Development in the City of Belleville ........................................ 3-1 3.1 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.2 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Classes of Services ................................................................................ 4-7 4.8 Eligible Debt and Committed Excess Capacity ....................................... 4-7 4.9 Existing Reserve Funds .......................................................................... 4-8 4.10 Deductions .............................................................................................. 4-9 4.10.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.10.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.10.3 Reduction for Benefit to Existing Development ........................ 4-10 4.10.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-11 4.11 Municipal-wide vs. Area Rating ............................................................. 4-12 4.12 Allocation by Type of Development ...................................................... 4-12 4.13 Asset Management ............................................................................... 4-12 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and 10-Year Capital Costs for the D.C. Calculation ........ 5-3 5.2.1 Fire Protection Services ............................................................. 5-3 5.2.2 Policing Services ........................................................................ 5-4 5.2.3 Library Services ......................................................................... 5-4 5.2.4 Ambulance Services .................................................................. 5-5 5.2.5 Parks and Recreation Services .................................................. 5-6 5.2.6 Transit Services ......................................................................... 5-7 5.2.7 Growth-related Studies .............................................................. 5-8 5.3 Service Levels and 20-Year Capital Costs for D.C. Calculation ............ 5-16 5.3.1 Services Related to a Highway ................................................ 5-16 5.4 26-Year Capital Costs for D.C. Calculation ........................................... 5-20 5.4.1 Water Services ......................................................................... 5-20 5.4.2 Wastewater Services ............................................................... 5-20 6. D.C. Calculation and Comparison .................................................................. 6-1 6.1 D.C. Calculation ...................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-1 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Timing of Collection ................................................................... 7-5 7.3.6 Indexing ..................................................................................... 7-6 7.3.7 D.C. Spatial Applicability ............................................................ 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-6 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 7.5 Other Recommendations ........................................................................ 7-7 8. By-law Implementation ................................................................................... 8-1 8.1 Introduction ............................................................................................. 8-1 8.1.1 Public Meeting of Council........................................................... 8-1 8.1.2 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D Local Service Policy ............................................................................ D-1 Appendix E Asset Management Plan ......................................................................E-1 Appendix F Draft Development Charges By-law .................................................... F-1 Watson & Associates Economists Ltd. List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.P. Asset management plan B.T.E. Benefit to existing D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross Floor Area N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit sq.ft. square foot sq.m square metre Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the Development Charges Act, 1997, as amended, (D.C.A.) (section 10) and, accordingly, recommends new development charges (D.C.s) and policies for the City of Belleville (City). The City retained Watson & Associates Economists Ltd. (Watson) in 2025, to undertake the D.C. study process and update the current City-wide D.C. by-law (By-law 2021- 201). Watson worked with City staff in preparing the D.C. analysis and policy recommendations. This D.C. background study will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the City's D.C. background study, as summarized in Chapter 4. The forecast amount, type, and location of development is summarized in Chapter 3, with technical details provided in Appendix A. Chapters 5 and 6 identify the increase in need by service, calculate the D.C. recoverable capital costs and schedule of charges by type of development. The requirement for "rules" governing the imposition of the D.C. is provided in Chapter 7. The proposed D.C. by-law, to be made available to the public as part of the approval process, is included as Appendix F. The D.C. background study is designed to set out sufficient background on the legislation, the City's current D.C. policies (Chapter 2), and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. The D.C. background study addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by appendices containing the data required to explain and substantiate the calculation of the charge. Watson & Associates Economists Ltd. PAGE 1-2 1.2 Summary of the Process The public meeting required under Section 12 of the D.C.A. is planned for July 27, 2026. Its purpose is to present the D.C. background study and draft D.C. by-law(s) to the public and to solicit public input on the matter. The public meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed policies contained within the draft D.C. by-laws. In accordance with the legislation requiring that the D.C. background study and draft by-law be made available the public at least two weeks prior to the public meeting, the D.C. Background Study and proposed D.C. By-law will be available for public review on July 6, 2026. This timing of release also complies with the legislative requirement for the background study to be available for public review at least 60 days prior to by-law passage. The City anticipates Council consideration of the D.C. By-law for adoption on September 14, 2026. The process to be followed in finalizing the report and recommendations includes: - City's consideration of responses received prior to, at, or immediately following the public meeting; - Finalization of the D.C. background study and draft by-law(s) to address any required changes; and - Council consideration of the D.C. by-law(s), anticipated to occur on September 14, 2026. Table 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Watson & Associates Economists Ltd. PAGE 1-3 Figure 1-1 Schedule of Key D.C. Process Dates for the City of Belleville Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work January 2025 to April 2026 2. Development industry engagement session I March 12, 2026 3. Council information session March 23, 2026 4. Development industry engagement session II June 10, 2026 5. Public release of the D.C. Background study and proposed D.C. by-law July 6, 2026 6. Public meeting advertisement posted to the City's website At least 21 days prior to the Public Meeting 7. Public meeting of Council July 27, 2026 8. Public release of D.C. Addendum Study September 9, 2026 9. Council considers adoption of background study and passage of by-law September 14, 2026 10. Notice given of by-law passage By 20 days after passage 11. Last day for by-law appeal 40 days after passage 12. City makes pamphlet available (where by-law has not been appealed) By 60 days after the in-force date 1.3 Changes to the Development Charges Act, 1997 Over the past several years, a number of changes to the D.C.A. have been introduced through various legislation, including the following: - More Homes for Everyone Act, 2022 - More Homes Built Faster Act, 2022 - Affordable Homes and Good Jobs Act, 2023 - Cutting Red Tape to Build More Homes Act, 2024 - Protect Ontario by Building Faster and Smarter Act, 2025 - Fighting Delays, Building Faster Act, 2025 and Regulatory Changes - Building Homes and Improving Transportation Act, 2026 The following provides an overview of the amendments to the D.C.A. that each of these pieces of legislation provided. Watson & Associates Economists Ltd. PAGE 1-4 1.3.1 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. 1.3.2 Bill 109: More Homes for Everyone Act, 2022 On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. - The following additional information must be provided for each D.C. service being collected for during the year: a. whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; and b. if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and - For any service for which a D.C. was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. The D.C.A. has also been amended to now require that the annual Treasurer's statement be made available to the public on the website of the municipality or, if there is no such website, in the municipal office. Watson & Associates Economists Ltd. PAGE 1-5 1.3.3 Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amended a number of pieces of legislation including the Planning Act and D.C.A. The following provides a summary of the changes to the D.C.A.: 1.3.3.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. 1.3.3.2 Removal of Housing as an Eligible D.C. Service Housing is removed as an eligible service as of November 28, 2022. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. It is noted that the charge for housing services is still applicable where rates have been frozen for the purposes of instalment payments under the D.C.A. 1.3.3.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. Watson & Associates Economists Ltd. PAGE 1-6 1.3.3.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Note: The definitions above of an Affordable Rental Unit and Affordable Owned Unit have been modified through Bill 134. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Note: the above Affordable Owned and Rental Unit exemptions came into force as of June 1, 2024. At the time of writing, it is not known when the exemption for Attainable Units will be in force. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.3.3.5 Historical Level of Service Extended to 15-Year Period Instead of the Historical 10-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. Watson & Associates Economists Ltd. PAGE 1-7 1.3.3.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. Note: the definition of capital costs was revised to reverse the change related to studies through Bill 185. 1.3.3.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. Note: this change was reversed by Bill 185 (discussed in section 1.3.5). 1.3.3.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five (5) years, prior to Bill 23. 1.3.3.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of a D.C. 1.3.3.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; Watson & Associates Economists Ltd. PAGE 1-8 - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.3.3.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. 1.3.3.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities are required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation. 1.3.4 Bill 134: Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions is based on the "Affordable Residential Units for the Purposes of the Development Charges Act, Bulletin" published by the Minister of Municipal Affairs and Housing. This bulletin informs the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. This bulletin was published on April 5, 2024. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: Watson & Associates Economists Ltd. PAGE 1-9 - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). The following table provides a comparison of the definitions provided through Bill 23 and those provided through Bill 134 (underlining added for emphasis). Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than 80 per cent of the average market rent, as determined in accordance with subsection (5). The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The average market rent for the year in which the residential unit is occupied by a tenant, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin." The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is equal to 30 per cent of the income of the Watson & Associates Economists Ltd. PAGE 1-10 Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than 80 per cent of the average purchase price, as determined in accordance with subsection (6). The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The average purchase price for the year in which the residential unit is sold, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin," as it is amended from time to time, that is published by the Minister of Municipal Affairs and Housing on a website of the Government of Ontario. The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the household referred to in clause (a) As noted above, the bulletin came into effect on June 1, 2024, which provides the information for the City to measure against for determining the applicability of the exemption from the D.C. (as well as Community Benefits Charges and Parkland Watson & Associates Economists Ltd. PAGE 1-11 requirements). The bulletin provides the following information for the City (it is noted that the bulletin will be updated annually): - For Affordable Ownership Units: the income-based affordable purchase price provides the relevant threshold for the affordable residential units exemption, as it is lower than 90% of the average market purchase price for all unit types. The income-based affordable purchase prices and 90% of average market purchase prices for the City, as established through the most recent bulletin, are summarized by unit type in the table below: Unit Type Income-based Affordable Purchase Price 90% of Average Market Purchase Price Detached House $341,500 $522,000 Semi-Detached House $341,500 $396,000 Row/townhouse $341,500 $459,000 Condominium Apartment $341,500 $369,000 - For Affordable Rental Units: the average market rent provides the relevant threshold for the affordable residential units exemption for all units with 2 or less bedrooms, as it is lower than the income-based affordable rent. For units with 3 or more bedrooms, the relevant threshold is based upon the income-based affordable rent. The income-based affordable rents and average market rents for the City, as established through the most recent bulletin, are summarized in the table below: Unit Type Income-based Affordable Rent Average Market Rent Bachelor unit $1,680 $1,081 1-Bedroom unit $1,680 $1,328 2-Bedroom unit $1,680 $1,513 3 or more Bedrooms $1,680 $1,877 Watson & Associates Economists Ltd. PAGE 1-12 1.3.5 Bill 185: Cutting Red Tape to Build More Homes Act On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. The Bill received Royal Assent on June 6, 2024. This Bill reversed many of the key changes that were implemented through Bill 23. The following sections provide a summary of the changes. 1.3.5.1 Revised Definition of Capital Costs Bill 185 reversed the capital cost amendments of Bill 23 by reinstating studies as an eligible capital cost. The following paragraphs were added to subsection 5(3) of the D.C.A.: 5. Costs to undertake studies in connection with any of the matters referred to in paragraphs 1 to 4. 6. Costs of the development charge background study required under section 10. 1.3.5.2 Removal of the Mandatory Phase-in Bill 23 required the phase-in of charges imposed in a D.C. by-law over a five-year term for any by-laws passed after January 1, 2022. Bill 185 removed this mandatory phase- in. This change is effective for any D.C. by-laws passed after Bill 185 came into effect. For site plan and zoning by-law amendment applications that were made prior to Bill 185 receiving Royal Assent, the charges payable will be the charges that were in place on the day the planning application was made (i.e., including the mandatory phase-in). 1.3.5.3 Process for Minor Amendments to D.C. By-laws Section 19 of the D.C.A. requires that a municipality must follow sections 10 through 18 of the D.C.A. (with necessary modifications) when amending D.C. by-laws. Sections 10 through 18 of the D.C.A. generally require the following: - Completion of a D.C. background study, including the requirement to post the background study 60 days prior to passage of the D.C. by-law; - Passage of a D.C. by-law within one year of the completion of the D.C. background study; - A public meeting, including notice requirements; and - The ability to appeal the by-law to the Ontario Land Tribunal. Watson & Associates Economists Ltd. PAGE 1-13 Bill 185 allows municipalities to undertake minor amendments to D.C. by-laws for the following purposes without adherence to the requirements noted above (with the exception of the notice requirements): 1. To repeal a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date (subject to the 10-year limitations provided in the D.C.A.); 2. To impose D.C.s for studies, including the D.C. background study; and 3. To remove the provisions related to the mandatory phase-in of D.C.s. Minor amendments related to items 2 and 3 noted above may be undertaken only if the D.C. by-law being amended was passed after November 28, 2022, and before Bill 185 took effect. Moreover, the amending by-law must be passed within six months of Bill 185 coming into effect. Notice requirements for these minor amending by-laws are similar to the typical notice requirements, with the exception of the requirement to identify the last day for appealing the by-law (as these provisions do not apply). 1.3.5.4 Reduction of D.C. Rate Freeze Timeframe Bill 108 provided for the requirement to freeze the D.C.s imposed on developments subject to a site plan and/or a zoning by-law amendment application. The D.C. rate for these developments is "frozen" at the rates that were in effect at the time the site plan and/or zoning by-law amendment application was submitted (subject to applicable interest). Once the application is approved by the municipality, if the date the D.C. is payable is more than two years from the approval date, the D.C. rate freeze would no longer apply. Bill 185 reduced the two-year timeframe to 18 months. 1.3.5.5 Modernizing Public Notice Requirements The D.C.A. sets out the requirements for municipalities to give notice of public meetings and of by-law passage. These requirements are prescribed in sections 9 and 10 of O. Reg. 82/98 and include giving notice in a newspaper of sufficiently general circulation in the area to which the by-law would apply. The regulatory changes modernized public notice requirements by allowing municipalities to provide notice on a municipal website if a local newspaper is not available. Watson & Associates Economists Ltd. PAGE 1-14 1.3.6 Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 On May 12, 2025, the Province released Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025. The Bill received Royal Assent on June 5, 2025. This Bill introduces some additional exemptions, changes to the timing of payment for residential D.C.s, and provides regulatory authority to make future changes. The following subsections provide a summary of the changes: 1.3.6.1 Deferral of Residential D.C. Payments to Occupancy Changes to section 26.1 of the D.C.A. provide that a D.C. payable for residential development (other than rental housing developments, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Only under circumstances prescribed in the regulations may the municipality require a financial security. As such, the prescribed circumstances may allow for securities when no occupancy permit is required. Municipalities shall not impose interest on the deferral of D.C. payment to occupancy. 1.3.6.2 Removal of Interest for Legislated Instalments Changes to section 26.1 of the Act remove the ability to charge interest on instalments for rental housing and institutional development. This also applies to future instalments for existing deferrals. 1.3.6.3 Early Payment for Residential/Institutional Changes provide that a person required to pay a D.C. for residential or institutional development (i.e. instalments or at occupancy), can pay earlier without the requirement to enter into an early payment agreement. 1.3.6.4 Exemption for Long-term Care Homes Before this change, long-term care homes were subject to the instalment payment provisions of the D.C.A. As of June 5, 2025, Long-term care homes are exempt from D.C.s, as well as all future instalment payments, where applicable. Watson & Associates Economists Ltd. PAGE 1-15 1.3.6.5 Revised Definition of Capital Costs Section 5(3) of the D.C.A. provides for a definition of capital costs that are eligible for inclusion in the D.C. calculations. The changes introduced by Bill 17 added the following wording to the beginning of the section: "Subject to the regulations". As such, the Province may make changes to limit the definition of capital costs via changes to the D.C. regulations. 1.3.6.6 Expanded Simplified D.C. By-law Amendment Process In addition to the reason for the simplified process set out in Section 1.3.5.3, a D.C. by- law may now also be amended through the simplified amendment process to repeal the indexing provision or decrease the D.C. for one or more types of development. 1.3.6.7 Lower Charge - Current vs. Rate Freeze This change provides that the municipality must charge the lower of the D.C. calculated with the rate freeze (including interest) and the D.C. at current rates at the time the D.C. is payable. This change assists where municipalities reduce their D.C. and therefore can impose the reduced D.C. in cases where the rate freeze applies. 1.3.6.8 Grouping of Services for the Purposes of Using Credits This change provides the Province with the ability to make changes through the regulations to group D.C. services together for the purposes of applying D.C. credits. 1.3.7 Bill 60: Fighting Delays, Building Faster Act, 2025 The Provincial government introduced Bill 60, Fighting Delays, Building Faster Act, 2025 and Regulatory Proposals on October 23, 2025. The Bill received Royal Assent on November 27, 2025. The following subsections provide a summary of the changes: 1.3.7.1 Addition of Class of Service for Land Acquisition The legislative change provides for land acquisition as a separate class of service1. Anticipated land acquisition capital needs are to be grouped together for the purposes 1 Section 7 of the D.C.A. states that a class of service may be established for the purposes of a D.C. by-law that is a combination of D.C. eligible services or a subset of a D.C. eligible service. Watson & Associates Economists Ltd. PAGE 1-16 of the D.C. calculations. Land acquisition capital needs are also to be excluded from the historical Level of Service calculations. The anticipated capital costs for land are restricted to 10 years for all services except the following: - Water; - Wastewater; - Stormwater; - Service related to a Highway; - Electrical; - Transit; - Police; and - Fire. As land acquisition is considered a class of service, municipalities are required to establish a separate reserve fund for these capital costs. As such, funds are to be segregated for this purpose only and used solely for land costs. Similar to other reserve funds, monies in this reserve fund can be borrowed and repaid, with interest. With respect to credits, municipalities need to ensure appropriate accounting of credits for land separately from credits for other applicable services. Section 35 of the D.C.A. is amended to add an exception to the use of monies in established reserve funds. This section states that monies in a reserve fund can be used for land acquisition, however, they cannot be used for land acquisition if those costs are to be paid for with the reserve fund established for land acquisition. 1.3.7.2 Required Timelines for the Annual Treasurer's Statement Section 43(1) of the Act has been amended to require the Treasurer's statements to be completed by June 30 of each year (previously based on a date determined by Council). Further, Section 43(3) of the Act is amended to require a copy of the Treasurer's statement to be submitted to the Minister by July 15 of each year. 1.3.7.3 Addition of Requirements for Local Service Policies Subsections 59(2.2) through 59(2.11) of the Act generally set out the following: Watson & Associates Economists Ltd. PAGE 1-17 - A Local Service Policy is required for all D.C. eligible services to which a D.C. by- law imposes a charge and where some part of the service will be provided as a local service; - A Local Service Policy is required to impose a condition of local services on development and only to the extent it has been identified in the Local Service Policy. That is, a municipality could not require a work or classes of work to be provided as a local service if it is not identified as such in the Local Service Policy; o This does not apply where a municipality does not impose a D.C. for that service; o This applies the day a municipality establishes the Local Services Policy or 18 months after Bill 60 received Royal Assent; - Required content for a Local Service Policy: o Works or classes of works related to development that are intended to be required as a Local Service - Optional content for a Local Service Policy: o Works or classes of works that are not intended to be required as a Local Service; o Works or classes of works that are partially required as a Local Service; - The municipality shall give a copy of the Local Service Policy to the Minister of Municipal Affairs and Housing upon request, by the date requested; and - The Local Service Policy must be reviewed, requiring a resolution of Council declaring if a revision is needed. The Resolution shall be passed at the time of passing any D.C. by-law or when a revision to the policy is required. 1.3.7.4 Requirement to Provide Documents to the Minister Changes to Section 10 and Section 13 of the D.C.A. require municipalities to provide copies of documents to the Minister upon request, by the date requested. In addition, section 59(2.8) of the Act requires a copy of the Local Service Policy to be provided to the Minister upon request, by the date requested. 1.3.7.5 Regulatory Changes Bill 60 also provided for regulatory changes to Ontario Regulation 82/98. These changes are with respect to the following matters: Watson & Associates Economists Ltd. PAGE 1-18 Merging of Credits This change merges water supply services and wastewater services for the purposes of credits. As provided in subsection 2 (4) of the D.C.A., the D.C.-eligible services of water supply and wastewater include distribution and treatment, and sewers and treatment, respectively. Transparency of B.T.E. Calculations Regulatory changes require municipalities to provide greater details with respect to how capital costs are determined and how the growth-related and non-growth-related shares of the costs are determined. This appears to be required for each service, rather than on a project-by-project basis. Details of Land Acquisition Section 8 of Ontario Regulation 82/98 has been amended to require land acquisition costs to be included in the D.C. background presentation of: - The total of the estimated capital costs relating to the service; - The allocation of the total of the estimated costs between costs that would benefit new development and costs that would benefit existing development; - The total of the estimated capital costs relating to the service that will be incurred during the term of the proposed development charge by-law; - The allocation of the costs incurred during the term of the proposed by-law between costs that would benefit new development and costs that would benefit existing development; and - The estimated and actual value of credits that are being carried forward relating to the service. Information Accessibility The changes increase reporting requirements for the Annual Treasurer's Statements to include: - The amount from each reserve fund that was committed to a project, but had not been spent, as of the end of the year; - The amount of debt that had been issued for a project as of the end of the year; and Watson & Associates Economists Ltd. PAGE 1-19 - Identify where in the D.C. background study the project's capital costs were estimated. This does not apply in circumstances where a municipality uses a unique identifier in both background studies and treasurer's statements to identify each project. 1.3.8 Bill 98: Building Homes and Improving Transportation Act, 2026 On June 2, 2026, Bill 98 received Royal Assent. The most notable change included the exemption of non-profit retirement homes from the payment of D.C.s. As a result, this mandatory exemption will be included in the D.C. by-law. Watson & Associates Economists Ltd. Chapter 2 Current City of Belleville's D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 2. Current City of Belleville D.C. Policies 2.1 By-law Enactment City Council enacted the By-law 2021-021 (City-wide D.C. By-law) on December 13, 2021. It is noted that this by-law was amended by By-law 2025-123. The City-wide D.C. By-law came into effect on January 26, 2022, and is set to expire on January 26, 2027. Additionally, the City imposes area-specific D.C.s for the Stanley Park area through By- law 2020-030. 2.2 Services Covered The following services/classes of service are covered under the City-wide D.C. By-law: - Services Related to a Highway; - Fire Protection; - Policing Services; - Parks and Recreation Service; - Library Services; - Ambulance Services; - Social Housing Services[1]; - Growth-related studies (class of service); - Water Services; and - Wastewater Services. 2.3 Current Development Charges Rates Table 2-1 provides the City-wide D.C.s currently in effect, for residential and non- residential development types, as well as the breakdown of the charges by service. It is noted that the non-residential rates currently in effect were adopted at levels lower than those fully calculated. Please see section 6.1 for further details. [1] Note: Social Housing became an ineligible service as of November 28, 2022 (as a result of the More Homes Built Faster Act). The City has not been collecting D.C.s related to Social Housing services since that time. Watson & Associates Economists Ltd. PAGE 2-2 Table 2-1 City of Belleville Current City-wide D.C. Rates 2.4 Timing of D.C. Calculation and Payment D.C.s are calculated and generally payable on the date that the first building permit is issued in relation to a building or structure on land to which the D.C. relates. For non- rental residential, D.C.s are payable on the earlier of occupancy or the issuance of an occupancy permit. Where D.C.s apply to land in relation to which a building permit is required, the building permit shall not be issued until the D.C. has been paid in full. D.C.s for developments proceeding through Site Plan or Zoning By-law Amendment application are frozen at the time the application is submitted. Once the application is approved, the applicant has 18 months to obtain the building permits related to the development, otherwise, the current D.C. is applicable. D.C.s for rental housing and institutional development shall be paid in 6 equal annual instalments, with the first payment due upon occupancy or occupancy permit. Each subsequent installment, including interest, is payable on the anniversary date thereafter. Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable, in accordance with section 27 of the D.C.A. Non-Residential Service Single & Semi Detached Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms per sq.ft. City-Wide Services/Class of Service: Services Related to a Highway 12,007 7,841 8,494 4,902 5.35 Fire Protection Services 596 390 422 244 0.27 Policing Services 302 197 213 124 0.14 Parks and Recreation Services 8,169 5,336 5,778 3,334 0.24 Library Servuces - - - - - Ambulance 152 99 107 63 0.05 Growth Studies 1,018 664 720 417 0.39 Total City -Wide Services $22,244 $14,527 $15,734 $9,084 $6.44 Urban Services: Wastewater Services 8,722 5,695 6,170 3,561 2.52 Water Services 1,217 793 860 498 0.88 Total Urban Services $9,939 $6,488 $7,030 $4,059 $3.40 Grand Total Rural Area $22,244 $14,527 $15,734 $9,084 $6.44 Grand Total Urban Area $32,183 $21,015 $22,764 $13,143 $9.84 Residential Watson & Associates Economists Ltd. PAGE 2-3 2.5 Indexing Indexing of the D.C.s shall occur annually on January 1st, in accordance with the most recent twelve-month change in the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).[1] 2.6 Redevelopment Credit As a result of the redevelopment of land, a building or structure existing on the same land within five (5) years prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. [1] Ontario Regulation (O. Reg.) 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 2-4 2.7 Exemptions The City's existing by-law provides for the following statutory and non-statutory exemptions: - Industrial additions of up to and including 50% of the existing gross floor area of the building - for industrial additions which exceed 50% of the existing gross floor area, only the portion of the addition in excess of 50% is subject to development charges; - Land used for Municipal or Board of Education purposes; - Residential development that results in only the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (as specified by O. Reg. 82/98); - Private schools as defined in the Education Act; - Development of land, buildings or structures owned by a College of applied arts and technology established pursuant to the Ministry of Training, Colleges and Universities Act, and used for teaching-related purposes on lands owned by and used for the purposes of the College but not including student residences; - A place of worship classified as exempt from taxation under Section 3 of the Assessment Act; - Hospitals under the Public Hospitals Act; - Non-residential farm buildings; - Non-residential (other than industrial) land uses located within the Belleville Downtown Improvement Area (B.D.I.A.); - Development creating or adding an accessory use or structure not exceeding ten square meters of non-residential floor area; - May exempt lands that are designated in the City's Official Plan as part of a Community Improvement Area and the City implements a Community Improvement Plan that includes these specific lands. Watson & Associates Economists Ltd. Chapter 3 Anticipated Development in the City of Belleville Watson & Associates Economists Ltd. PAGE 3-1 3. Anticipated Development in the City of Belleville The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the City will be required to provide services over a 10-year (mid-2026 to mid-2036), 20-year (mid-2026 to mid-2046) and a longer-term (mid-2026 to mid-2051) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.1 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the City. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the City over the forecast period, including: - City of Belleville Housing Needs Assessment Final Report, May 29, 2025, by Watson & Associate Economists Ltd. - City of Belleville 2024 Employment Lands Strategy Update, August 29, 2024, by Watson & Associates Economists Ltd; - City of Belleville 2022 Population, Housing and Employment Growth Forecast Update, December 21, 2022, by Watson & Associates Economists Ltd; - City of Belleville 2021 Development Charges Background Study Report, October 6, 2021, by Watson & Associates Economists Ltd. - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential and non-residential building permit data over the 2016 to 2025 period; - Residential and non-residential supply opportunities as identified by City staff; and - Discussions with City staff regarding anticipated residential and non-residential development in the City of Belleville. Watson & Associates Economists Ltd. PAGE 3-2 3.2 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A, and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the City and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, the population in the City of Belleville (excluding census undercount) is anticipated to reach approximately 66,190 by mid-2036, 71,140 by mid-2046 and 72,440 by mid-2051, resulting in an increase of approximately 6,800, 11,750 and 13,050 persons, respectively. [1] [1] The population figures used in the calculation of the 2026 D.C. exclude the net Census undercount, which is estimated at approximately 3.8%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 Figure 3-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 Table 3-1 City of Belleville Residential Growth Forecast Summary [1] Census undercount estimated at approximately 3.8%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add due to rounding. Source: Derived from City of Belleville 2022 Population, Housing and Employment Growth Forecast Update, December 21, 2022, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 51,330 49,454 1,344 48,110 13,044 2,083 5,829 109 21,065 1,222 2.348 52,640 50,716 1,366 49,350 13,600 2,225 5,800 110 21,735 1,242 2.333 57,160 55,071 1,276 53,795 14,685 2,475 6,260 120 23,540 1,160 2.339 61,640 59,391 1,371 58,020 15,203 2,946 7,057 120 25,326 1,246 2.345 68,700 66,188 1,508 64,680 17,224 3,867 8,334 120 29,545 1,371 2.240 73,840 71,140 1,641 69,499 18,912 4,519 9,169 120 32,720 1,492 2.174 75,190 72,441 1,719 70,722 19,388 4,858 9,659 120 34,025 1,563 2.129 1,310 1,262 22 1,240 556 142 -29 1 670 20 4,520 4,355 -90 4,445 1,085 250 460 10 1,805 -82 4,480 4,320 95 4,225 518 471 797 0 1,786 86 7,060 6,797 137 6,660 2,021 921 1,277 0 4,219 125 12,200 11,749 270 11,479 3,709 1,573 2,112 0 7,394 246 13,550 13,050 348 12,702 4,185 1,912 2,602 0 8,699 317 Mid 2026 - Mid 2036 Mid 2046 Mid 2051 Mid 2026 - Mid 2051 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Forecast Incremental Mid 2026 - Mid 2046 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2026 Mid 2036 Mid 2021 - Mid 2026 Watson & Associates Economists Ltd. PAGE 3-5 Provided below is a summary of the key assumptions and findings regarding the City's D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 6 and 7) - The housing unit mix for the City was derived from a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications (as per Schedule 6), and discussions with City staff regarding anticipated development trends for the City of Belleville. - Based on the above indicators, the 2026 to 2051 household growth forecast for the City is comprised of a unit mix of 48% low density units (single detached and semi-detached), 22% medium density (row and townhouses, and apartments in duplexes) and 30% high density (bachelor, 1-bedroom and 2-bedroom apartments, and secondary suites). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the City. - In accordance with forecast demand and available land supply, the amount and percentage of forecast permanent housing growth between 2026 and 2051 by development location is summarized below. Table 3-2 City of Belleville Geographic Location of Residential Development Development Location Amount of Housing Growth, 2026 to 2051 Percentage of Housing Growth, 2026 to 2051 Urban 8,510 98% Rural 190 2% City of Belleville 8,700 100% Watson & Associates Economists Ltd. PAGE 3-6 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services and land for certain services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth- related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2051 in the City over the forecast period is presented in Table 3-1. Over the 2026 to 2051 forecast period, the City is anticipated to average 348 new housing units per year. - Institutional population is anticipated to increase by approximately 350 people between 2026 to 2051.[1] - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the City. Due to data limitations, high-density P.P.U. data was derived from the Hastings County Census Division, which includes the City of Belleville, and is outlined in Schedule 8b. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.845 o Medium density: 1.877 o High density: 1.749 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more-bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-7 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for mid-2026 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[1] The forecast population change in existing households over the 2026 to 2051 forecast period is forecast to decline by approximately 7,340. 6. Employment (Appendix A - Schedules 10a, 10b and 10c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the City divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [2],[3] (place of work) for the City is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 40 primary (<1%); o 1,065 work at home employment (4%); o 8,445 industrial (29%); o 11,335 commercial/population-related (39%); and o 8,330 institutional (28%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-8 - The 2016 employment by usual place of work, including work at home, is 29,185. An additional 3,630 employees have been identified for the City in 2016 who have no fixed place of work (N.F.P.O.W.).[1] - Total employment, including work at home and N.F.P.O.W. for the City is anticipated to reach approximately 39,440 by mid-2036, 40,260 by mid- 2026, and 41,000 by 2051. This represents an employment increase of approximately 2,940 for the 10-year forecast period, 3,770 for the 20-year forecast period, and 4,510 for the longer-term forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the City (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 32,990 by mid-2036, 33,640 by mid-2046, and 34,220 by mid-2051. This represents an employment increase of approximately 2,280 for the 10-year forecast period, 2,920 for the 20-year forecast period and 3,510 for the longer-term forecast period.[2] [1] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." [2] G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 10a and 10b and 10c. Total employment growth in Schedule 10b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Total employment in Schedule 10b is anticipated to reach approximately 32,920 by mid-2036, 33,510 by mid-2046 and 34,050 by mid-2051. Watson & Associates Economists Ltd. PAGE 3-9 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 10b based on the following employee density assumptions: o 3,000 sq.ft. per employee for primary; o 1,700 sq.ft. per employee for industrial; o 500 sq.ft. per employee for commercial / population related; o 675 sq.ft. per employee for institutional employment. - The City-wide incremental G.F.A. is anticipated to increase by approximately 2.02 million sq.ft. over the 10-year forecast period, 2.58 million sq.ft over the 20-year forecast period, and 3.08 million sq.ft. over the longer-term forecast period. - In terms of percentage growth, the mid-2026 to mid-2051 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 2% o Industrial - 57%; o Commercial/ population related - 27%; and o Institutional - 14%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 10c) - Schedule 10c summarizes the anticipated amount, type and location of non-residential development by area for the City. - The amount and percentage of forecast total non-residential growth between 2026 and 2051 by development location is summarized below. Watson & Associates Economists Ltd. PAGE 3-10 Table 3-3 City of Belleville Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2026 to 2051 Percentage of Non- Residential G.F.A., 2026 to 2051 Urban 3,009,100 98% Rural 75,000 2% City of Belleville 3,084,100 100% Watson & Associates Economists Ltd. Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service, which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the City. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the City's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development" for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that City Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 1. Water supply services, including distribution and treatment services Yes Yes No Yes 1.1 Treatment plants 1.2 Distribution systems 1.3 Local systems 1.4 Vehicles and equipment1 2. Wastewater services, including sewers and treatment services Yes Yes No Yes 2.1 Treatment plants 2.2 Sewage trunks 2.3 Local systems 2.4 Vehicles and equipment1 3. Stormwater Drainage and Control Services Yes No No 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 4. Services Related to a Highway Yes Yes Yes No Yes Yes Yes Yes Yes 4.1 Arterial roads 4.2 Collector roads 4.3 Bridges, Culverts and Roundabouts 4.4 Local roads 4.5 Traffic signals 4.6 Sidewalks and streetlights 4.7 Active Transportation 4.8 Works Yard 4.9 Rolling stock1 5. Electrical Power Services n/a n/a n/a 5.1 Electrical substations 5.2 Electrical distribution system 5.3 Electrical system rolling stock1 6. Transit Services Yes Yes 6.1 Transit vehicles1 & facilities 6.2 Other transit infrastructure 7. Waste Diversion Services n/a n/a 7.1 Waste diversion facilities 7.2 Waste diversion vehicles and equipment1 8. Policing Services Yes Yes Yes 8.1 Police detachments 8.2 Police rolling stock1 8.3 Small equipment and gear 9. Fire Protection Services Yes Yes Yes 9.1 Fire stations 9.2 Fire Vehicles1 9.3 Fire Equipment and gear 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 10. Ambulance Services Yes Yes 10.1 Ambulance station space 10.2 Vehicles1 11. Services provided by a board within the meaning of the Public Libraries Act Yes Yes Yes 11.1 Public library space (incl. furniture and equipment) 11.2 Library vehicles1 11.3 Library materials 12. Services Related to Long- Term Care n/a n/a 12.1 Long-Term Care space 12.2 Vehicles1 13. Parks and Recreation Services Ineligible Yes Yes Yes Yes 13.1 Acquisition of land for parks, woodlots, and E.S.A.s 13.2 Development of municipal parks 13.3 Parks rolling stock1 and yards 13.4 Facilities, such as arenas, indoor pools, fitness facilities, community centres, etc. 13.5 Recreation vehicles and equipment1 14. Services Related to Public Health n/a n/a 14.1 Public Health department space 14.2 Public Health department vehicles1 15. Child Care and Early Years Programs and Services within the meaning of Part VI of the Child Care and Early Years Act, 2014 and any related services. No 15.1 Childcare space 16. Services related to proceedings under the Provincial Offences Act, including by-law enforcement services and municipally administered court services No No 16.1 P.O.A. space, including by-law enforcement and municipally administered court services 16.2 Vehicles1 17. Services Related to Emergency Preparedness No No 17.1 Emergency Preparedness Space 17.2 Equipment 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 18. Services Related to Airports n/a Ineligible 18.1 Airports (in the Regional Municipality of Waterloo) 18.2 Other Airports 19. Other Yes Yes 19.1 Interest on money borrowed to pay for growth-related capital 19.2 Growth Studies, including the D.C. background study cost Table 4-2 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes City provides the service - service has been included in the D.C. calculation. No City provides the service - service has not been included in the D.C. calculation. n/a City does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Watson & Associates Economists Ltd. PAGE 4-6 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision (e.g., capital works located internally to subdivision lands). As such, they will be required as a condition of subdivision agreements or consent conditions. The City's detailed Local Service Policy is provided in Appendix D. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions, and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; e) Costs to undertake studies in connection with any of the matters referred to in paragraphs a to d; f) Costs of the development charge background study required under section 10; and g) interest on money borrowed to pay for the above-referenced costs. Watson & Associates Economists Ltd. PAGE 4-7 In order for an increase in need for service to be included in the D.C. calculation, City Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the City's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. The City has no outstanding D.C. credit obligations to include in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and by-law provided herein have identified growth-related studies as a class of service. 4.8 Eligible Debt and Committed Excess Capacity Section 66 of the D.C.A. states that for the purposes of developing a D.C. by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the Act. Watson & Associates Economists Ltd. PAGE 4-8 In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, either before or at the time it was created, Council must have expressed a clear intention that it would be paid for by D.C.s or other similar charges. For example, this may have been done as part of previous D.C. processes. 4.9 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the City spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the City will use these reserve funds for the City's cost share of applicable development- related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The City's adjusted D.C. Reserve Fund balances by service as of December 31, 2025, are shown below in Table 4-3. Watson & Associates Economists Ltd. PAGE 4-9 Table 4-3 Summary of Development Charges Reserve Fund Balances As of December 31, 2025 4.10 Deductions The D.C.A. requires that four potential deductions be considered against the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. 4.10.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the DC Reserve Fund Adjusted Dec. 31, 2025 Balance Roads & Related 35,104,437 $ Fire & Police 934,572 $ Parks and Recreation 7,066,991 $ Library 28,952 $ Ambulance 358,996 $ Transit - $ Growth-Related Studies 1,354,382 $ Wastewater 25,938,961 $ Water 10,173,844 $ Total 80,961,135 $ Watson & Associates Economists Ltd. PAGE 4-10 average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.10.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the City's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.10.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); Watson & Associates Economists Ltd. PAGE 4-11 - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a City-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.10.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related Watson & Associates Economists Ltd. PAGE 4-12 to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.11 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.3.7 of this report. 4.12 Allocation by Type of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. 4.13 Asset Management The legislation requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on asset management planning. This examination has been included in Appendix E. Watson & Associates Economists Ltd. Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - The service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and - The infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the chapter reflects Council's current intention. Over time, however, City projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. Note that due to recent legislative amendments to the D.C.A. and O. Reg. 82/98, the value of land has been excluded from the 15-year level of service analysis. In addition, Table 5-1 details the methodology for determining the benefit to existing deductions (B.T.E.s) for all capital projects included in the calculation of D.C.s. Notes included in this table are referenced in the "BTE Note" column of each service's listing of capital infrastructure. Table 5-1 Benefit to Existing (B.T.E.) Methodology For All Services/Class of Services Note Methodology 1 No B.T.E. calculated for incremental new assets to service growth 2 B.T.E. based on existing population relative to forecasted population by end of service's planning horizon 3 B.T.E. based on facility's existing gross floor area relative to planned gross floor area Watson & Associates Economists Ltd. PAGE 5-2 Note Methodology 4 B.T.E. based on marginal cost of rural cross-section relative to urban cross- section 5 B.T.E. based on existing number of lanes relative to planned number of lanes 6 B.T.E. based on calculated share of total ridership growth attributable to existing population 7 B.T.E. based on share of calculated flows attributable to existing unserviced development relative to total flows for all existing & potential development 8 B.T.E. based on flow capacity of existing pumping stations relative to flow capacity of planned new pumping stations 9 B.T.E. based on marginal cost of existing pipe relative to upsized pipe 10 B.T.E. based on share of calculated peak secondary flows attributable to existing deficiencies relative to planned total peak secondary flow capacity 11 B.T.E. based on share of total project cost attributable to replacement of existing mains relative to total project cost 12 No B.T.E. identified for water or wastewater specific master plans or fully growth-related studies 13 B.T.E. of 25% identified for other master plans or similar studies that are primarily needed to understand future infrastructure requirements as the City grows 14 B.T.E. of 50% identified for studies that generally address growth-related needs, but also have a considerable benefit to the existing community 15 B.T.E. as determined through prior D.C. Studies 16 B.T.E. for debt repayments based on underlying project's B.T.E. as determined through prior D.C. Studies 17 B.T.E. based on share of water storage requirements attributable to existing equivalent population relative to planned water storage capacity (within Zone 2) 18 B.T.E. based on share of existing pump's capacity relative to planned pump's capacity Watson & Associates Economists Ltd. PAGE 5-3 5.2 Service Levels and 10-Year Capital Costs for the D.C. Calculation This section evaluates the development-related capital requirements for all of the City - wide services/class of services assessed over a 10-year planning period (mid-2026 to mid-2036). 5.2.1 Fire Protection Services The City currently operates five fire stations, totalling 46,037 sq.ft. of building space. The fire department also has a current inventory of 33 vehicles. These vehicles include various trucks, rescue boats, and other support vehicles. Furthermore, the fire department has 380 items of small equipment and gear, sufficient to outfit 81 full-time and 47 volunteer firefighters. In total, the inventory of fire protection assets provides a historical average level of service of $1,091 per capita. The historical level of investment in fire protection services provides for a D.C. eligible amount over the forecast period of approximately $7.4 million. The capital program for fire protection services is presented in Table 5-2. Based on the anticipated growth over the forecast period, the City has identified the need for the expansion of fire halls #2 and #4. Furthermore, debt repayments related to previously completed works and previously unfunded amounts have been included in the capital program. In total, the gross estimated capital cost of these works is approximately $23.88 million. A deduction recognizing the benefit to existing development of approximately $9.44 million has been made. Additionally, approximately $6.09 million has been deducted related to post-period benefits. Finally, an adjustment related to the existing reserve fund balance of $934,572 has been made. The resulting net growth- related capital cost included in the D.C. calculations is approximately $7.41 million. These costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 75% (approximately $5.56 million) of costs have been allocated to residential development and 25% (approximately $1.85 million) of costs have been allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-4 5.2.2 Policing Services The City currently operates one police station, along with an emergency dispatch location and a downtown satellite location, totalling approximately 68,196 sq.ft. of building space related to policing services. The police department also has an inventory of 51 vehicles, which include various police fleet along with prisoner transportation vehicles. The police department also has a variety of gear and equipment to outfit 108 police officers, 20 volunteer constables, and 15 auxiliary members, as well as communication equipment. In total, the inventory of police assets provides a historical average level of service of $656 per capita. The historical level of investment in policing services provides for a D.C. eligible amount over the forecast period of approximately $4.46 million. The capital program for policing services is presented in Table 5-3. Based on the anticipated growth over the 10-year forecast period, the City has identified the need for additional police officers and police vehicles. Additionally, a provision for an expansion to the police station has also been included, along with debt repayments for the existing police station. Finally, previously unfunded amounts related to the existing police station have been included in the capital program. In total, the gross estimated capital cost of these works is approximately $23.27 million. A deduction of approximately $8.87 million has been made to reflect the benefit to the existing community. Further, approximately $9.94 million has been deducted related to the post-period benefits of the capital works. The resulting net growth-related capital cost included in the D.C. calculations is approximately $4.46 million. These costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 75% (approximately $3.34 million) of costs have been allocated to residential development and 25% (approximately $1.11 million) of costs have been allocated to non-residential development. 5.2.3 Library Services The Belleville Public Library is currently the City's only library, and provides 31,636 sq.ft. of facility space. The library houses a variety of items such as books, periodicals, CDs and audiovisuals, along with electronic collections. These assets amount to a total of 88,693 collection materials. In total, the inventory of library assets provides a historical Watson & Associates Economists Ltd. PAGE 5-5 average level of service of $696 per capita. The historical level of investment in library services provides for a D.C. eligible amount over the forecast period of approximately $4.73 million. Table 5-4 provides the capital program for library services. Based on the anticipated growth over the forecast period, the City has identified the need for additional collection materials, book vending machines, and a bookmobile. In total, the gross estimated capital cost of these works is approximately $960,400. A benefit to existing deduction of $358,500 has been made in the calculations. To reflect the existing reserve fund balance, an adjustment of $28,952 has been made. The resulting net growth-related capital cost included in the D.C. calculations is approximately $573,000. As the predominant users of library services tend to be residents of the City, the D.C. recoverable costs have been allocated 95% to residential development and 5% to non- residential development. Therefore, approximately $544,300, and $28,700 have been allocated to residential and non-residential developments, respectively. 5.2.4 Ambulance Services Ambulance services are provided in the City by Hastings-Quinte Paramedic Services. The City's share of the service and its assets has varied over the past 15 years, from 40.7% to 41.5%. In total, the historical average level of service within the City is $182 per capita. Applying this per capita level of service to the 10-year growth in population results in a maximum D.C.-eligible amount of approximately $1.24 million. Table 5-5 provides the capital program for ambulance services included in the D.C. calculations. Based on the anticipated growth in the 10-year forecast period, capital projects related to additional ambulances and an ambulance facility master plan have been included in the capital program. The debt repayments for the Stirling EMS Base and previously unfunded amounts have also been included. In total, the gross estimated capital cost of these works is approximately $9.72 million. A deduction related to the funding share from other municipalities of approximately $5.63 million has been made, along with a deduction of $10,500 for the benefit to the existing community. Additionally, a deduction of approximately $2.49 million has been made related to the post-period benefit. Finally, $358,996 has been deducted to reflect the existing reserve fund balance. The resulting net growth-related capital cost included in the D.C. calculations is $1.24 million. Watson & Associates Economists Ltd. PAGE 5-6 The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 75% (approximately $930,000) of costs have been allocated to residential development and 25% (approximately $310,000) of costs have been allocated to non- residential development. 5.2.5 Parks and Recreation Services The City has a variety of park spaces, including regional, community, and neighbourhood parks, along with specialized areas and trail systems. In total, these provide 645 acres of parkland space. The City also has 388,793 sq.ft. of recreational space and 65,876 sq.ft. of parks facilities. Additionally, the City owns a variety of vehicles and equipment that support parks and recreation services. In total, the inventory of parks and recreation assets provides a historical average level of service of $6,538 per capita. The historical level of investment provides for a D.C. eligible amount over the forecast period of approximately $44.43 million. The capital forecast for parks and recreation services is presented in Table 5-6. Based on the anticipated growth over the forecast period, the City has identified several capital costs such as outdoor facilities, equipment, and trails. The need for fleet and equipment along with studies specific to parks and recreation have also been included. Further, the debt payments related to the Multiplex Recreation Facility have also been included in the calculations. In total, the gross estimated capital cost of these works is approximately $31.02 million. A benefit to the existing community of approximately $7.48 million has been deducted from the calculations along with an anticipated grant of approximately $806,600. To reflect the existing reserve balance, an adjustment of approximately $7.06 million has been made. The resulting net growth-related capital cost included in the D.C. calculations is $15.67 million. Similar to library services, the predominant users of parks and recreation services tend to be residents of the City. Therefore, the D.C. recoverable costs have been allocated 95% to residential development and 5% to future non-residential development. Therefore, approximately $14.89 million, and $783,500 have been allocated to residential and non-residential developments, respectively. Watson & Associates Economists Ltd. PAGE 5-7 5.2.6 Transit Services Ontario Regulation 82/98 sets forth the requirements for transit services and the available capacity of capital costs to provide for the increase in need. Subsection 8 (2) of the regulation states that for transit services the background study shall set out: 1. "The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. 2. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, i. the anticipated development over the 10-year period immediately following the preparation of the background study, or ii. the anticipated development after the 10-year period immediately following the preparation of the background study. 3. An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. 4. An assessment of ridership forecasts for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. 5. An assessment of the ridership capacity for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study." Transit ridership has increased 5.8% annually from 2019 to 2024. Based on this historical growth, annual ridership is forecasted to increase by approximately 1.27 million trips by the end of the 10-year forecast period. Based on the forecast ridership and the fact that transit improvements will be used by both new and existing residents, approximately 10% of the incremental ridership is attributed to new development (i.e., incremental population growth represents 10% of the anticipated 2036 population). Watson & Associates Economists Ltd. PAGE 5-8 Table 5-7 presents the capital program included in the D.C. calculations. Based on the anticipated growth over the forecast period, the City identified the need of 40 new bus shelters. The gross estimated capital cost of capital program is $432,600. A benefit to the existing community of $387,700 has been deducted from the calculations. The resulting net growth-related capital cost included in the D.C. calculations is $44,900. The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 75% (approximately $33,700) of costs have been allocated to residential development and 25% (approximately $11,200) of costs have been allocated to non- residential development. 5.2.7 Growth-related Studies Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, subsection 7 (3) of the D.C.A. states that: "For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3)". These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and draft by- law provided herein include a class for growth-related studies. All studies included in the D.C. calculations have been allocated across the different services that impose D.C.s, based on the proportion of the total net growth-related capital costs. The following provides a breakdown of these allocations: - Services Related to a Highway - 40% - Fire Protection Services - 6% - Policing Services - 3% - Parks and Recreation Services - 12% - Ambulance Services - 1% - Wastewater Services - 24% - Water Services - 14% Watson & Associates Economists Ltd. PAGE 5-9 The list of growth-related studies, as provided in Table 5-8 has an estimated gross capital cost of approximately $2.09 million. A deduction of $375,300, recognizing the benefit to existing development, has been made, along with a deduction of $41,900 reflecting the benefiting portion related to non-D.C. services. Lastly, an adjustment related to the existing reserve fund of approximately $1.35 million has been made. As a result, approximately $319,200 in growth-related study costs has been included in the D.C. calculation. Costs relating to studies that benefit multiple services have been allocated 75% residential and 25% non-residential, based on the incremental growth in population relative to employment for the 10-year forecast period. Costs of any studies that benefit specific services have been allocated based on each respective service's allocation. As a result, approximately $239,400 and $79,800 have been allocated to residential and non-residential development, respectively. Watson & Associates Economists Ltd. PAGE 5-10 Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Fire Protection Services Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2036 75% 25% Facilities 1 New Fire Hall #2 3 2030-2032 8,750,000 5,968,700 2,781,300 2,781,300 - - - 2 New Fire Hall #4 (incl. Training Facility) 3 2027-2029 12,400,000 2,244,100 10,155,900 3,308,345 6,847,555 5,135,666 1,711,889 Debt Repayments 3 Fire Hall #1 - Bettis Rd 16 2,379,114 1,230,700 1,148,414 - 1,148,414 861,311 287,104 4 Satellite Fire Station #5 - Plainfield 16 294,417 - 294,417 - 294,417 220,813 73,604 Previously Unfunded 5 Fire Hall #1 - Bettis Rd (debt repayment) 58,693 - 58,693 - 58,693 44,020 14,673 Reserve Fund Adjustment (934,572) (700,929) (233,643) Total 23,882,224 9,443,500 - 14,438,724 6,089,645 - 7,414,507 5,560,881 1,853,627 Net Capital Cost Gross Capital Cost Estimate (2026$) Benefit to Existing Development Grants, Subsidies and Other Contributions Total Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Less: Watson & Associates Economists Ltd. PAGE 5-11 Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Policing Services Less: Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2036 75% 25% Facilities 1 Expansion of Police Station (Provision) 1 2026-2035 3,090,000 - 3,090,000 3,090,000 - - - Fleet and Equipment 2 Outfit Police Officers (14) 1 2026-2035 201,600 - 201,600 - 201,600 151,200 50,400 3 New Police Vehicles (8) 1 2028-2035 1,029,600 - 1,029,600 - 1,029,600 772,200 257,400 Debt Repayments 4 New Police Station 16 17,733,640 8,866,800 8,866,840 6,853,031 2,013,809 1,510,357 503,452 Previously Unfunded 5 New Police Station 33,027 - 33,027 - 33,027 24,770 8,257 6 New Police Station (debt repayment) 1,179,708 - 1,179,708 - 1,179,708 884,781 294,927 Reserve Fund Adjustment - - - Total 23,267,575 8,866,800 - 14,400,775 9,943,031 - 4,457,744 3,343,308 1,114,436 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Total Other Deductions Watson & Associates Economists Ltd. PAGE 5-12 Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Library Services Proj. No. BTE Note Post Period Benefit Residential Share Non- Residential Share 2026 to 2036 95% 5% Collection Materials 1 Additional Collection Materials 1 2026-2035 560,413 - 560,413 - 560,413 532,392 28,021 Fleet and Equipment 2 Hold Lockers/Vending Machines (3) 2 2026-2035 150,000 134,400 15,600 - 15,600 14,820 780 3 Bookmobile (1) 2 2030 250,000 224,100 25,900 - 25,900 24,605 1,295 Reserve Fund Adjustment (28,952) (27,504) (1,448) Total 960,413 358,500 - 601,913 - - 572,961 544,313 28,648 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Total Less: Potential D.C. Recoverable Cost Less: Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Watson & Associates Economists Ltd. PAGE 5-13 Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Ambulance Services Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2036 75% 25% Fleet and Equipment Additional Ambulances (3) 1 2026-2035 1,266,900 752,000 - 514,900 - 514,900 386,175 128,725 Studies Ambulance Facility Master Plan 13 2026 103,000 61,000 10,500 31,500 - 31,500 23,625 7,875 Debt Repayments Stirling EMS Base 16 8,115,025 4,815,000 - 3,300,025 2,485,654 814,371 610,778 203,593 Previously Unfunded Stirling EMS Base (City's Share - debt repayment) 143,150 - 143,150 - 143,150 107,363 35,788 New Ambulance (City's Share) 95,120 - 95,120 - 95,120 71,340 23,780 Reserve Fund Adjustment (358,996) (269,247) (89,749) Total 9,723,195 5,628,000 10,500 - 4,084,695 2,485,654 - 1,240,045 930,034 310,011 A Other Deductions reflect other municipalities' funding share of Ambulance Services. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Total Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Less: Other DeductionA Less: Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Watson & Associates Economists Ltd. PAGE 5-14 Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2036 95% 5% Trails 1 Hydro Trail (Phase 1) - Sidney St to Harris Cres 15 2026-2027 1,100,000 146,700 806,630 146,670 - 146,670 139,337 7,334 2 Hydro Trail (Phase 2) - Harris Cres to Moira River (incl. North Front St Crossing) 15 2035 1,250,000 625,000 625,000 - 625,000 593,750 31,250 3 North River Front Trail Extension 15 2026 6,300,000 3,150,000 3,150,000 - 3,150,000 2,992,500 157,500 Fleet and Equipment 4 Wide-area Mower 1 2027-2034 191,000 - 191,000 - 191,000 181,450 9,550 Outdoor Facilities 5 New Diamonds (3) 1 2027-2028 1,538,000 - 1,538,000 - 1,538,000 1,461,100 76,900 6 New Rectangular Fields (4) 1 2029 1,858,000 - 1,858,000 - 1,858,000 1,765,100 92,900 7 New Playground (Lion's Park) 1 2036 518,000 - 518,000 - 518,000 492,100 25,900 8 New Playground (Former YMCA Site) 1 2030 257,000 - 257,000 - 257,000 244,150 12,850 9 New Outdoor Mechanical Ice Rink 1 2031 3,112,000 - 3,112,000 - 3,112,000 2,956,400 155,600 10 Bird Park Phase 2 1 2026 800,000 - 800,000 - 800,000 760,000 40,000 11 New Basketball Courts 1 2027 311,000 - 311,000 - 311,000 295,450 15,550 12 New Tennis Courts & Pickleball Courts 1 2030 2,650,000 - 2,650,000 - 2,650,000 2,517,500 132,500 13 New Emerging Sports Fields 1 2027-2031 617,000 - 617,000 - 617,000 586,150 30,850 Studies 14 Parks and Recreation Master Plan 13 2032 350,000 87,500 262,500 - 262,500 249,375 13,125 15 Waterfront Master Plan 14 2027 180,000 90,000 90,000 - 90,000 85,500 4,500 16 Meyers Pier EA 14 2026-2027 750,000 375,000 375,000 - 375,000 356,250 18,750 Debt Repayments 17 Multiplex Recreation Facility 16 8,697,753 3,007,700 5,690,053 - 5,690,053 5,405,550 284,503 Previously Unfunded 18 Off-Road Cycling/Multi-Purpose Trails 546,190 - 546,190 - 546,190 518,881 27,310 Reserve Fund Adjustment (7,066,991) (6,713,641) (353,350) Total 31,025,943 7,481,900 806,630 22,737,413 - - 15,670,422 14,886,901 783,521 Grants, Subsidies and Other Contributions Total Post Period Benefit Other Deductions Net Capital Cost Less: Gross Capital Cost Estimate (2026$) Potential D.C. Recoverable Cost Benefit to Existing Development Less: Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-15 Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Transit Services Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Growth-Related Class of Services Less: Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2036 75% 25% 1 New Bus Shelters (40) 6 2026-2036 432,600 387,700 44,900 - 44,900 33,675 11,225 Total 432,600 387,700 - 44,900 - - 44,900 33,675 11,225 Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Post Period Benefit Total BTE Note Residential Share Non- Residential Share 2026 to 2036 1 Development Charges Study 12 2026 81,600 - 81,600 - 2,000 79,600 59,700 19,900 2 Development Charges Study 12 2035 140,000 - 140,000 - 3,400 136,600 102,450 34,150 3 Official Plan 14 2027 220,700 110,400 110,300 - 2,700 107,600 80,700 26,900 4 Waterfront Master Plan and Servicing Study 13 2027-2036 400,000 100,000 - 300,000 - 7,300 292,700 219,525 73,175 5 Stormwater Master Plan 13 2027-2036 349,100 87,300 261,800 - 6,400 255,400 191,550 63,850 6 Loyalist Secondary Plan Update 15 2026 231,700 23,200 208,500 - 5,100 203,400 152,550 50,850 7 Cannifton Development Strategy 12 2027 492,700 - 492,700 - 12,100 480,600 360,450 120,150 8 Natural Heritage Study 15 2027-2036 125,000 29,400 - 95,600 - 2,300 93,300 69,975 23,325 9 Cannifton Official Plan Amendment 14 2028 50,000 25,000 - 25,000 - 600 24,400 18,300 6,100 Reserve Fund Adjustment (1,354,382) (1,015,787) (338,596) Total 2,090,800 375,300 - 1,715,500 - 41,900 319,218 239,414 79,805 Post Period Benefit Other Deductions (to recognize benefit to non- D.C. services) Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Total Less: Potential D.C. Recoverable Cost Less: Watson & Associates Economists Ltd. PAGE 5-16 5.3 Service Levels and 20-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for those services with capital costs associated with the 2046 forecast period. 5.3.1 Services Related to a Highway The City owns and maintains approximately 393.7 lane kilometers of rural, urban, and semi-urban collector and arterial roads, as well as 66 bridges and culverts. Furthermore, the City also operates 78,172 sq.ft. of public work facility space along with 137 vehicles and equipment. In total, the inventory of assets provides a historical average level of service of $10,435 per capita. The historical level of investment in ambulance services provides for a D.C. eligible amount over the forecast period of approximately $122.6 million. Table 5-9 provides the capital program for services related to a highway. Based on the anticipated growth in the 20-year forecast period, capital projects such as road urbanizations, widenings, and upgrades have been identified, along with new roads, major crossings, and on-road cycling infrastructure. Additionally, provisions for additional facilities, fleet, and equipment have been included. Lastly, several studies and previously unfunded amounts have been included. In total, the estimated gross capital cost of these works totals approximately $384.02 million. A deduction of approximately $217.76 million has been made reflecting the benefit to the existing community. Further deductions of approximately $3.01 million and $30.30 million have been made for anticipated grant funding and contributions from neighbouring municipalities, respectively. Additionally, approximately $35.1 million has been deducted to reflect the existing reserve fund balance. The resulting net growth-related capital costs included in the D.C. calculations are $97.86 million. The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 81% (approximately $79.27 million) of costs have been allocated to residential development and 19% (approximately $18.59 million) of costs have been allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-17 Table 5-9 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Other Deduction Residential Share Non- Residential Share 2026 to 2046 81% 19% Road Urbanization 1 Farnham Rd Phase 2 - Kipling Dr to Scott Dr 4 2027 5,000,000 2,750,000 2,250,000 - 2,250,000 1,822,500 427,500 2 Farnham Rd Phase 3 - Scott Dr to Hwy 62 4 2036-2046 5,000,000 2,750,000 2,250,000 - 2,250,000 1,822,500 427,500 3 Avonlough Rd - Dundas St W to Moira St W 4 2031-2035 16,250,000 10,833,300 5,416,700 - 5,416,700 4,387,527 1,029,173 4 Tracey St and Fahey St 4 2027-2032 11,000,000 8,300,000 2,700,000 - 2,700,000 2,187,000 513,000 5 Bridge St W & Marshall Rd - Palmer Rd to Moira St W (incl. On-road Cycling) 4 2036-2046 6,000,000 3,235,000 2,765,000 - 2,765,000 2,239,650 525,350 6 Moira St W - Palmer Rd to Marshall Rd (incl. On-road Cycling) 4 2036-2046 4,000,000 2,160,000 1,840,000 - 1,840,000 1,490,400 349,600 7 Moira St W - Marshall Rd to Wallbridge Loyalist Rd (incl. On-road Cycling) 4 2036-2046 8,000,000 4,360,000 3,640,000 - 3,640,000 2,948,400 691,600 8 Tank Farm Rd - Cannifton Rd to Hwy 37 (incl. On-road Cycling) 4 2036-2046 6,000,000 3,265,000 2,735,000 - 2,735,000 2,215,350 519,650 Road Widenings - 9 Sidney St - Over Hwy 401 (City's Share) 5 2035 18,500,000 9,250,000 9,250,000 - 9,250,000 7,492,500 1,757,500 10 Wallbridge Loyalist Rd (Widening, Intersection Improvement, & Structure Widening) - Loyalist College to Hwy 401 5 2031-2046 40,600,000 20,300,000 10,150,000 10,150,000 - 10,150,000 8,221,500 1,928,500 11 Adam St and University Ave (Widening & Upgrade) 5 2036-2046 14,800,000 7,400,000 7,400,000 - 7,400,000 5,994,000 1,406,000 12 Bell Blvd - Jenland Way to Wallbridge Loyalist Rd 5 2036-2046 20,300,000 10,150,000 10,150,000 - 10,150,000 8,221,500 1,928,500 13 Avonlough SPS Phase 1 (Roads Portion, incl. Second Northbound Lane & Intersection Improvement) 5 2027 21,822,535 17,621,300 1,905,240 2,295,995 - 2,295,995 1,859,756 436,239 Road Upgrades - 14 North Front St - Bell Blvd to College St 2 2029-2034 13,000,000 10,832,300 2,167,700 - 2,167,700 1,755,837 411,863 New Road Construction - 15 Belleville East Arterial Road (incl. Interchange) - Hwy 401 to Airport Pkwy 15 2028-2046 53,800,000 26,900,000 26,900,000 - 26,900,000 21,789,000 5,111,000 16 Belleville East Arterial Road - Hwy 401 to Hwy 37 15 2036-2046 8,300,000 4,150,000 4,150,000 - 4,150,000 3,361,500 788,500 Intersection Improvements - 17 Sidney St and College St W 15 2026-2030 6,707,104 5,030,300 1,676,804 - 1,676,804 1,358,211 318,593 Increased Service Needs Attributable to Anticipated Development Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Total Other Deductions Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-18 Table 5-9 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Other Deduction Residential Share Non- Residential Share 2026 to 2046 81% 19% Major Crossings - - 18 Dundas St E CPKC Grade Separation 15 2036-2046 23,500,000 11,750,000 11,750,000 - 11,750,000 9,517,500 2,232,500 19 Wallbridge Loyalist Rd CPKC Grade Separation 15 2036-2046 20,000,000 10,000,000 5,000,000 5,000,000 - 5,000,000 4,050,000 950,000 On-Road Cycling Infrastructure Old Hwy 2 - Haig Rd to Point Anne Rd 20 Phase 1 15 2028 13,000,000 12,500,000 500,000 - 500,000 405,000 95,000 21 Phase 2 15 2030 13,000,000 12,500,000 500,000 - 500,000 405,000 95,000 22 Phase 3 15 2033 13,500,000 13,000,000 500,000 - 500,000 405,000 95,000 23 Dundas St Bridge (Moira River) Rehabilitation 15 2028 9,750,000 8,162,100 1,099,950 487,950 - 487,950 395,240 92,711 24 Pinnacle St 15 2031-2032 8,050,000 7,350,000 700,000 - 700,000 567,000 133,000 25 Coleman St - Moira St W to Dundas St W 15 2036-2046 5,000,000 4,550,000 450,000 - 450,000 364,500 85,500 26 Moira St - Coleman St to St. Charles St 15 2036-2046 4,000,000 3,650,000 350,000 - 350,000 283,500 66,500 Facilities 27 Provision for Facilities 1 5,640,000 - 5,640,000 - 5,640,000 4,568,400 1,071,600 Fleet and Equipment - 28 Provision for Vehicles and Equipment 1 4,924,000 - 4,924,000 - 4,924,000 3,988,440 935,560 Studies - 29 Transportation Master Plan Review 13 2026 113,900 28,500 85,400 - 85,400 69,174 16,226 30 Transportation Master Plan Update 13 2030 515,000 128,800 386,200 - 386,200 312,822 73,378 Previously Unfunded - 31 Avondale Road, Harder Drive to Dundas West 270,353 - 270,353 - 270,353 218,986 51,367 32 Farnham Road (Maitland Dr to Kipling Dr) 141,719 - 141,719 - 141,719 114,792 26,927 33 Tracey-Sidney Intersection Improvements/ Bell-Sidney Intersection Improvements/ Sidney St Widening - Tracey St to Bell Blvd 614,763 - 614,763 - 614,763 497,958 116,805 34 Bell Blvd Widening (Sidney St to Jenland Way) 2,336,516 - 2,336,516 - 2,336,516 1,892,578 443,938 35 Maitland Dr Paved Shoulder (Sidney St to Hwy 62) 72,626 - 72,626 - 72,626 58,827 13,799 36 Bike Lanes (Bridge St W to Loyalist College) 300,487 - 300,487 - 300,487 243,394 57,093 Increased Service Needs Attributable to Anticipated Development Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Total Other Deductions Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-19 Table 5-9 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. BTE Note Other Deduction Residential Share Non- Residential Share 2026 to 2046 81% 19% 37 Additional Plow Truck 101,490 - 101,490 - 101,490 82,207 19,283 38 Additional Sidewalk Plow 90,245 - 90,245 - 90,245 73,098 17,147 39 Additional Vehicles and Equipment 23,569 - 23,569 - 23,569 19,091 4,478 Reserve Fund Adjustment (35,104,437) (28,434,594) (6,669,843) Total 384,024,307 30,300,000 217,756,600 3,005,190 132,962,517 - - 97,858,080 79,265,045 18,593,035 Increased Service Needs Attributable to Anticipated Development Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Total Other Deductions Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-20 5.4 26-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for those services with capital costs associated with the 2051 forecast period. 5.4.1 Water Services The City has identified the need for various capital investments related to water services through the City's 10-year capital forecast and various planning studies, including the Wet Weather Master Plan, Infrastructure Phasing Strategy, and Black Bear Ridge Master Servicing Study. These projects, as presented in Table 5-10, will effectively increase water servicing for new development, and in some cases, benefit the existing population as well. Capital works such as new watermains, facilities, and studies related to water services have been identified. Ongoing debt repayment costs and previously unfunded amounts have also been included in the calculations. In total, the gross estimated capital cost of these works is approximately $149.60 million. A deduction reflecting benefits to the existing community of approximately $29.79 million has been included. Further, a deduction related to the post-period benefit of approximately $72.87 million has been made to benefit future growth. Lastly, an adjustment to reflect the current reserve fund balance of approximately $10.17 million has been made. As a result, the resulting net growth-related capital cost included in the D.C. calculations is approximately $36.78 million. These costs are shared between residential and non-residential growth based on projected flows (consistent with assumptions contained within the Infrastructure Phasing Strategy). As a result, 49% of costs (approximately $18.02 million) have been allocated to residential development and 51% of costs (approximately $18.76 million) have been allocated to non-residential development. 5.4.2 Wastewater Services The City has identified the need for various capital investments related to wastewater services through the City's 10-year capital forecast and various planning studies, including the Wet Weather Master Plan, Infrastructure Phasing Strategy, and Black Bear Ridge Master Servicing Study. These projects, as presented in Table 5-11, include new and upgraded gravity mains, additional facilities, and studies related to wastewater services. Ongoing debt repayment costs and previously unfunded amounts have also been included in the calculations. In total, the gross estimated capital cost of these Watson & Associates Economists Ltd. PAGE 5-21 works is approximately $404.74 million. A benefit to the existing community of approximately $182.94 million has been deducted from the calculations. Grants, subsidies, and other contributions totalling approximately $27.58 million have also been deducted. Furthermore, a post-period deduction of approximately $105.00 million has been made, accounting for the benefit to future development. Lastly, an adjustment reflecting the current reserve fund balance of approximately $25.94 million has been made. As a result, the resulting net growth-related capital cost included in the D.C. calculations is approximately $63.28 million. These costs are shared between residential and non-residential growth based on projected flows (consistent with assumptions contained within the Infrastructure Phasing Strategy). As a result, 53% of costs have been allocated to residential development and 47% of costs have been allocated to non-residential development, or $33.54 million and $29.74 million, respectively. Watson & Associates Economists Ltd. PAGE 5-22 Table 5-10 Infrastructure Cost Included in the Development Charges Calculation Water Services Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2051 (Urban) 49% 51% Watermains 1 Moira St W - Wallbridge Loyalist Rd to Marshall Rd 1 2036-2051 4,000,000 - 4,000,000 2,184,200 1,815,800 889,742 926,058 2 Avonlough Rd - Dundas St W to Moira St W 11 2031-2035 8,125,000 5,666,100 2,458,900 - 2,458,900 1,204,861 1,254,039 3 Bridge St W/ Marshall St - Haslett Ct to Moira St W 1 2036-2051 3,000,000 - 3,000,000 1,638,200 1,361,800 667,282 694,518 4 Moira St W - Marshall Rd to Palmer Rd 1 2036-2051 2,000,000 - 2,000,000 1,092,100 907,900 444,871 463,029 5 Wallbridge Loyalist Rd - Extension to Bell Blvd 1 2036-2051 17,000,000 - 17,000,000 9,283,100 7,716,900 3,781,281 3,935,619 6 Farnham Rd - Kipling Dr to Scott Dr (Phase 2) 7 2027 2,500,000 761,800 1,738,200 - 1,738,200 851,718 886,482 7 Farnham Rd - Scott Dr to Hwy 62 (Phase 3) 7 2036-2051 2,500,000 761,800 1,738,200 949,200 789,000 386,610 402,390 8 Hwy 62 - Extension to Farnham Rd 7 2036-2051 4,000,000 1,218,900 2,781,100 1,518,700 1,262,400 618,576 643,824 9 Parks Dr 7 2036-2051 3,250,000 2,853,700 396,300 216,400 179,900 88,151 91,749 10 Tank Farm Rd - Cannifton Rd N to Hwy 37 1 2036-2051 3,000,000 - 3,000,000 1,638,200 1,361,800 667,282 694,518 11 Short St - Tank Farm Rd to Cannifton Rd N 1 2036-2051 4,000,000 - 4,000,000 2,184,200 1,815,800 889,742 926,058 12 Cannifton Rd N & River Rd 1 2036-2051 4,125,000 - 4,125,000 2,252,500 1,872,500 917,525 954,975 13 Putman Industrial Rd - Hwy 37 to Black Diamond Rd 1 2036-2051 3,250,000 - 3,250,000 1,774,700 1,475,300 722,897 752,403 14 Scott Dr - Essex Dr to River Rd (incl. River Crossing) 1 2036-2051 6,000,000 6,000,000 3,276,300 2,723,700 1,334,613 1,389,087 Facilities 15 New Elevated Tank (Cannifton Planning Area) 17 2027-2031 15,650,000 12,880,000 2,770,000 - 2,770,000 1,357,300 1,412,700 16 New BPS (Bell Blvd Area) 1 2036-2051 2,500,000 - 2,500,000 1,365,200 1,134,800 556,052 578,748 17 Treatment Plant Second Feed 2 2027 1,971,000 1,642,300 328,700 - 328,700 161,063 167,637 18 BPS Upgrade (North Park Area) 1 2036-2051 161,200 - 161,200 88,000 73,200 35,868 37,332 19 New In-ground Storage in Pressure Zone 2 (10 ML) 1 2036-2051 32,960,000 - 32,960,000 20,714,700 12,245,300 6,000,197 6,245,103 20 Upgrade to Adam St BPS 18 2036-2051 2,575,000 643,800 1,931,200 1,050,900 880,300 431,347 448,953 21 Treament Plant Expansion (77 ML MDD) 1 2036-2051 5,150,000 - 5,150,000 5,150,000 - - - 22 New Water Storage (6ML) and BPS in Pressure Zone 1 1 2036-2051 16,480,000 - 16,480,000 16,480,000 - - - Studies 23 Water Master Plan 12 2027-2029 500,000 - 500,000 - 500,000 245,000 255,000 Debt Repayments 24 North East Feedermain 16 4,480,850 3,360,600 1,120,250 - 1,120,250 548,923 571,328 Previously Unfunded 25 212 - Water Main (Farnham Rd - Maitland Dr to Kipling Dr) 107,949 - 107,949 - 107,949 52,895 55,054 26 215 - Water Main Oversizing (Riverstone Way - Farnham Rd to Essex Dr) 310,660 - 310,660 - 310,660 152,223 158,437 Reserve Fund Adjustment (10,173,844) (4,985,184) (5,188,660) Total 149,596,659 29,789,000 - 119,807,659 72,856,600 - 36,777,215 18,020,835 18,756,380 Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Total Potential D.C. Recoverable Cost Other Deductions Less: Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-23 Table 5-11 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2051 (Urban) 53% 47% New Gravity Mains 1 Avonlough Rd - Dundas St W to Moira St W 1 2031-2035 8,125,000 - 8,125,000 - 8,125,000 4,306,250 3,818,750 2 Dundas St W - Avonlough Rd to Wallbridge Loyalist Rd 1 2036-2051 8,000,000 - 8,000,000 5,725,700 2,274,300 1,205,379 1,068,921 3 Farnham Rd - Kipling Dr to Scott Dr (Phase 2) 7 2027 2,500,000 725,600 1,774,400 - 1,774,400 940,432 833,968 4 Farnham Rd - Scott Dr to Hwy 62 (Phase 3) 7 2036-2051 2,500,000 725,600 1,774,400 1,269,900 504,500 267,385 237,115 5 Parks Dr - Moira Lea SPS Easement to South End of Parks Dr 7 2036-2051 3,250,000 2,853,700 396,300 283,600 112,700 59,731 52,969 Trunk Mains (Loyalist Secondary Plan) 6 Avonlough Rd SPS to Bridge St W/ Marshall Rd 1 2036-2051 5,500,000 - 4,488,100 1,011,900 724,300 287,600 152,428 135,172 7 CNR to Cascade SPS 1 2036-2051 2,750,000 - 2,244,000 506,000 362,100 143,900 76,267 67,633 8 Sheerwood SPS to Trunk Main 8 2036-2051 1,800,000 91,800 1,350,000 358,200 256,300 101,900 54,007 47,893 9 Moira St W - Moira St W/ Butler Ln SPS 8 2036-2051 2,000,000 408,200 1,591,800 1,139,300 452,500 239,825 212,675 10 Bridge St W and Marshall St - Haslett Ct to Moira St W 8 2036-2051 3,000,000 612,200 2,387,800 1,709,000 678,800 359,764 319,036 11 Cannifton SP 1 2036-2051 3,404,000 - 3,345,000 59,000 42,200 16,800 8,904 7,896 11 Tank Farm Rd - Cannifton Rd N to Hwy 37 1 2036-2051 3,000,000 - 3,000,000 2,147,000 853,000 452,090 400,910 13 Cannifton Rd N & River Rd 1 2036-2051 4,125,000 - 4,125,000 2,952,200 1,172,800 621,584 551,216 14 Putnam Industrial Rd - Hwy 37 to Black Diamond Rd 1 2036-2051 3,250,000 - 3,250,000 2,326,000 924,000 489,720 434,280 15 Moira St W - Wallbridge Loyalist Rd to Marshall Rd 1 2036-2051 4,000,000 - 4,000,000 2,862,800 1,137,200 602,716 534,484 Gravity Main Upgrades 16 Millennium Pkwy - Mineral Rd to Moira River 9 2036-2051 2,500,000 1,831,600 668,400 478,400 190,000 100,700 89,300 17 Dundas St E - Foster Ave to Newberry St 9 2036-2051 750,000 720,200 29,800 21,400 8,400 4,452 3,948 18 Dundas St W - Sidney St to Coleman St 9 2036-2051 10,000,000 8,966,400 1,033,600 739,800 293,800 155,714 138,086 19 Coleman St - Moira St W to Dundas St W 9 2036-2051 2,500,000 2,013,700 486,300 348,000 138,300 73,299 65,001 20 Moira St E - Coleman St to St Charles St 9 2036-2051 2,000,000 1,641,600 358,400 256,500 101,900 54,007 47,893 21 Catherine St - Coleman St to Sidney St 9 2027-2030 2,725,000 2,687,200 37,800 - 37,800 20,034 17,766 22 Tracey St & Fahey St 9 2027-2032 5,500,000 5,126,600 373,400 - 373,400 197,902 175,498 23 Haig Rd - Freemont Rd to CPKC 9 2036-2051 5,500,000 5,288,500 211,500 151,400 60,100 31,853 28,247 24 Hwy 37 - Hwy 401 Crossing 9 2036-2051 4,000,000 2,600,000 1,400,000 1,002,000 398,000 210,940 187,060 25 Cannifton Rd N - Maitland Dr to Bell Blvd 9 2036-2051 11,679,000 9,435,500 2,243,500 1,605,700 637,800 338,034 299,766 26 Cannifton Rd - North of McFarland Dr to College St E 9 2036-2051 4,614,000 3,954,900 659,100 471,700 187,400 99,322 88,078 Sewage Pumping Stations 27 Moira Lea Ct SPS Upgrade 1 2030 436,400 - 436,400 - 436,400 231,292 205,108 28 Front St SPS (incl. River Crossing & Forcemain Upgrade) 15 2036-2051 44,800,000 34,332,800 10,467,200 7,491,400 2,975,800 1,577,174 1,398,626 Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-24 Table 5-11 (Continued) Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Proj. No. BTE Note Residential Share Non- Residential Share 2026 to 2051 (Urban) 53% 47% Avonlough Rd SPS 29 Phase 1 - SPS, Forcemain, Gravity and Pressure Sewer to Coleman St 8 2026-2027 54,922,138 7,911,500 16,155,576 30,855,062 - 30,855,062 16,353,183 14,501,879 30 Phase 2 - River Crossing 8 2036-2051 12,500,000 2,551,000 9,949,000 7,319,100 2,629,900 1,393,847 1,236,053 31 Phase 3 - Pressure Main to Plant 8 2036-2051 20,000,000 4,081,600 15,918,400 11,710,300 4,208,100 2,230,293 1,977,807 32 Decommission Cascade Blvd SPS 8 2036-2051 2,000,000 408,200 1,591,800 1,171,100 420,700 222,971 197,729 33 Decommission Moira St W/ Butler Ln SPS 8 2036-2051 2,000,000 408,200 1,591,800 1,171,100 420,700 222,971 197,729 34 Decommission Sheerwood Cres SPS 8 2036-2051 2,000,000 408,200 1,591,800 1,171,100 420,700 222,971 197,729 35 Decommission Haslett Ct/ Bridge St W SPS 8 2036-2051 2,000,000 408,200 1,591,800 1,171,100 420,700 222,971 197,729 Treatment Plant 36 Belleville WWTP Upgrades 10 2026-2032 93,625,100 71,750,200 21,874,900 - 21,874,900 11,593,697 10,281,203 37 Belleville WWTP Biosolids Expansion 10 2040 13,530,900 10,369,500 3,161,400 - 3,161,400 1,675,542 1,485,858 38 Belleville WWTP Upgrade (64,000 m³ ADF) 1 2041-2051 45,958,000 - 45,958,000 45,958,000 - - - Studies 39 Trunk Route Master Plan Update 12 2027-2029 450,000 - 450,000 - 450,000 238,500 211,500 Debt Repayments 40 Dundas St W Extension - Palmer to Avonlough 16 1,379,886 629,700 750,186 - 750,186 397,599 352,588 Previously Unfunded 41 420 - Gravity Mains (Farnham Rd - Maitland Dr to Kipling Dr) 164,029 - 164,029 - 164,029 86,935 77,094 Reserve Fund Adjustment (25,938,961) (13,747,649) (12,191,312) Total 404,738,453 182,942,400 27,582,676 194,213,377 104,996,400 - 63,278,016 33,537,349 29,740,668 Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 6. D.C. Calculation and Comparison 6.1 D.C. Calculation This chapter presents the D.C. calculations for the growth-related capital costs identified in Chapter 5. Table 6-1 calculates the proposed City-wide D.C.s to be imposed on anticipated development in the City over the 10-year forecast period. Table 6-2 calculates the proposed City-wide D.C.s to be imposed on anticipated development in the City over the 20-year forecast period. Table 6-3 calculates the proposed urban area D.C.s to be imposed on anticipated development in the City over the urban 26-year forecast period. The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (single and semi-detached, apartments 2+ bedrooms, bachelor and 1-bedroom apartments, all other multiples, and special care/special dwelling units). The non-residential D.C.s have been calculated on a per square foot of gross floor area basis for non-residential development. The D.C. eligible costs for each service component are provided in Chapter 5 for all City services/class of services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the population associated with new units to determine the per capita amount. The eligible-D.C. cost calculations set out in Chapter 5 are based on the forecast new unit population less any decline in the existing population, where applicable. The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 4) to calculate the charges in Table 6-1, Table 6-2, and Table 6-3. With respect to non-residential development, the total costs in the uniform charge allocated to non-residential development (based on need for service) have been divided by the anticipated development over the respective planning periods to calculate a cost per sq.ft. of G.F.A. Table 6-4 summarizes the calculated schedule of charges for services updated in this study, reflecting the maximum D.C.s by residential dwelling unit type and non-residential G.F.A. for City-wide and urban services. Watson & Associates Economists Ltd. PAGE 6-2 Table 6-5 and Table 6-6 compare the total existing charges, including D.C.s for services not updated within this study, to the charges proposed for a single detached residential dwelling unit and per square foot of G.F.A. for non-residential development, respectively. In total, the proposed charge for a single detached dwelling unit would decrease by 9% (-$1,955) in the rural area and would decrease by 14% (-$4,375) in the urban area. For non-residential development, the proposed D.C. in the rural area would increase by 44% (+$2.84 per sq.ft. of G.F.A.) relative to the current charge. In the urban area, the proposed D.C. would increase by 158% (+$15.56 per sq.ft. of G.F.A.) relative to the current charge. However, it should be noted that as a result of Council direction in 2021, the non-residential D.C.s currently in effect include a substantial discount. Relative to the full non-residential D.C.s (as calculated in 2021, without any policy discounts, and indexed to 2026$), the proposed D.C.s would result in a decrease of 20% (-$2.37 per sq.ft.) in the rural area and a decrease of 4% (-$1.13 per sq.ft.) in the urban area. Watson & Associates Economists Ltd. PAGE 6-3 Table 6-1 City of Belleville Development Charge Calculation 2026-2036 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1. Fire Protection Services 5,560,881 1,853,627 1,607 0.92 2. Policing Services 3,343,308 1,114,436 966 0.55 3. Parks and Recreation Services 14,886,901 783,521 4,301 0.39 4. Library Services 544,313 28,648 157 0.01 5. Ambulance 930,034 310,011 269 0.15 6. Transit Services 33,675 11,225 10 0.01 7. Growth-related Studies 7.1 Wastewater Services 57,459 19,153 16 0.01 7.2 Water Services 33,518 11,173 10 0.01 7.3 Services Related to a Highway 95,765 31,922 27 0.02 7.4 Fire Protection Services 14,365 4,788 4 - 7.5 Policing Services 7,182 2,394 2 - 7.6 Parks and Recreation Services 28,730 9,577 8 - 7.7 Library Services - - - - 7.8 Ambulance 2,394 798 1 - 7.9 Transit Services - - - - TOTAL $25,538,524 $4,181,273 $7,378 $2.07 D.C.-Eligible Capital Cost $25,538,524 $4,181,273 10-Year Gross Population/GFA Growth (sq.ft.) 9,848 2,020,900 Cost Per Capita/Non-Residential GFA (sq.ft.) $2,593.27 $2.07 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.845 $7,378 Other Multiples 1.877 $4,868 Apartments - 2 Bedrooms + 2.150 $5,576 Apartments - Bachelor and 1 Bedroom 1.133 $2,938 Special Care/Special Dwelling Units 1.100 $2,853 Watson & Associates Economists Ltd. PAGE 6-4 Table 6-2 City of Belleville Development Charge Calculation 2026-2046 Table 6-3 City of Belleville Development Charge Calculation 2026-2051 (Urban) 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 8. Services Related to a Highway 79,265,045 18,593,035 12,911 7.21 TOTAL $79,265,045 $18,593,035 $12,911 $7.21 D.C.-Eligible Capital Cost $79,265,045 $18,593,035 20-Year Gross Population/GFA Growth (sq.ft.) 17,467 2,579,400 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,537.99 $7.21 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.845 $12,911 Other Multiples 1.877 $8,518 Apartments - 2 Bedrooms + 2.150 $9,757 Apartments - Bachelor and 1 Bedroom 1.133 $5,142 Special Care/Special Dwelling Units 1.100 $4,992 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 9. Wastewater Services 33,537,349 29,740,668 4,891 9.89 10. Water Services 18,020,835 18,756,380 2,628 6.23 TOTAL $51,558,184 $48,497,047 $7,519 $16.12 D.C.-Eligible Capital Cost $51,558,184 $48,497,047 Urban Buildout Gross Population/GFA Growth (sq.ft.) 19,509 3,009,100 Cost Per Capita/Non-Residential GFA (sq.ft.) $2,642.79 $16.12 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.845 $7,519 Other Multiples 1.877 $4,961 Apartments - 2 Bedrooms + 2.150 $5,682 Apartments - Bachelor and 1 Bedroom 1.133 $2,994 Special Care/Special Dwelling Units 1.100 $2,907 Watson & Associates Economists Ltd. PAGE 6-5 Table 6-4 City of Belleville Calculated Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) City-Wide Services/Class of Service: Services Related to a Highway 12,911 $ 8,518 $ 9,757 $ 5,142 $ 4,992 $ 7.21 $ Fire Protection Services 1,607 $ 1,060 $ 1,214 $ 640 $ 621 $ 0.92 $ Policing Services 966 $ 637 $ 730 $ 385 $ 373 $ 0.55 $ Parks and Recreation Services 4,301 $ 2,838 $ 3,250 $ 1,713 $ 1,663 $ 0.39 $ Library Services 157 $ 104 $ 119 $ 63 $ 61 $ 0.01 $ Ambulance 269 $ 177 $ 203 $ 107 $ 104 $ 0.15 $ Transit Services 10 $ 7 $ 8 $ 4 $ 4 $ 0.01 $ Growth-related Studies 68 $ 45 $ 51 $ 27 $ 26 $ 0.04 $ Total City-Wide Services/Class of Services 20,289 $ 13,386 $ 15,332 $ 8,081 $ 7,844 $ 9.28 $ Urban Services: Wastewater Services 4,891 $ 3,227 $ 3,696 $ 1,948 $ 1,891 $ 9.89 $ Water Services 2,628 $ 1,734 $ 1,986 $ 1,047 $ 1,016 $ 6.23 $ Total Urban Services 7,519 $ 4,961 $ 5,682 $ 2,995 $ 2,907 $ 16.12 $ GRAND TOTAL RURAL AREA 20,289 $ 13,386 $ 15,332 $ 8,081 $ 7,844 $ 9.28 $ GRAND TOTAL URBAN AREA 27,808 $ 18,347 $ 21,014 $ 11,076 $ 10,751 $ 25.40 $ RESIDENTIAL Service/Class of Service Watson & Associates Economists Ltd. PAGE 6-6 Table 6-5 City of Belleville Comparison of Current and Proposed Residential (Single Detached) D.C.s Service/Class of Service Current Calculated Difference ($) Difference (%) City-Wide Services/Classes: Services Related to a Highway 12,007 $ 12,911 $ 904 $ 8% Fire Protection Services 596 $ 1,607 $ 1,011 $ 170% Policing Services 302 $ 966 $ 664 $ 220% Parks and Recreation Services 8,169 $ 4,301 $ (3,868) $ -47% Library Services - $ 157 $ 157 $ n/a Ambulance 152 $ 269 $ 117 $ 77% Transit Services - $ 10 $ 10 $ n/a Growth-related Studies 1,018 $ 68 $ (950) $ -93% Total City-Wide Services/Classes 22,244 $ 20,289 $ (1,955) $ -9% Urban Services: Wastewater Services 8,722 $ 4,891 $ (3,831) $ -44% Water Services 1,217 $ 2,628 $ 1,411 $ 116% Total Urban Services 9,939 $ 7,519 $ (2,420) $ -24% Grand Total - Rural Area 22,244 $ 20,289 $ (1,955) $ -9% Grand Total - Urban Area 32,183 $ 27,808 $ (4,375) $ -14% Watson & Associates Economists Ltd. PAGE 6-7 Table 6-6 City of Belleville Comparison of Current and Proposed Non-Residential D.C. (per sq.ft. of G.F.A.) Service/Class of Service Current Calculated Difference ($) Difference (%) 2021 Calculated (indexed) Difference ($) Difference (%) City-Wide Services/Classes: Services Related to a Highway 5.35 $ 7.21 $ 1.86 $ 35% 9.70 $ (2.49) $ -26% Fire Protection Services 0.27 $ 0.92 $ 0.65 $ 241% 0.48 $ 0.44 $ 93% Policing Services 0.14 $ 0.55 $ 0.41 $ 293% 0.24 $ 0.31 $ 131% Parks and Recreation Services 0.24 $ 0.39 $ 0.15 $ 63% 0.44 $ (0.05) $ -11% Library Services - $ 0.01 $ 0.01 $ n/a - $ 0.01 $ n/a Ambulance 0.05 $ 0.15 $ 0.10 $ 200% 0.11 $ 0.04 $ 42% Transit Services - $ 0.01 $ 0.01 $ n/a - $ 0.01 $ n/a Growth-related Studies 0.39 $ 0.04 $ (0.35) $ -90% 0.69 $ (0.65) $ -94% Total City-Wide Services/Classes 6.44 $ 9.28 $ 2.84 $ 44% 11.65 $ (2.37) $ -20% Urban Services: Wastewater Services 2.52 $ 9.89 $ 7.37 $ 292% 11.07 $ (1.18) $ -11% Water Services 0.88 $ 6.23 $ 5.35 $ 608% 3.81 $ 2.42 $ 63% Total Area Specific Services 3.40 $ 16.12 $ 12.72 $ 374% 14.88 $ 1.24 $ 8% Grand Total - Rural Area 6.44 $ 9.28 $ 2.84 $ 44% 11.65 $ (2.37) $ -20% Grand Total - Urban Area 9.84 $ 25.40 $ 15.56 $ 158% 26.53 $ (1.13) $ -4% Watson & Associates Economists Ltd. Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above regarding subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. 7.2 D.C. By-law Structure It is recommended that: - The City imposes a City-wide D.C. calculations for the following services and class of services: Watson & Associates Economists Ltd. PAGE 7-2 o Services Related to a Highway; o Fire Protection Services; o Policing Services; o Parks and Recreation Services; o Library Services; o Ambulance Services; o Transit Services; and o Growth-related Studies. - The City imposes urban area D.C. calculations for the following services: o Water Services; and o Wastewater Services 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or Watson & Associates Economists Ltd. PAGE 7-3 (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." 7.3.2 Determination of the Amount of the Charge The following conventions were utilized in the calculation of the charge: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the amount of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance and are summarized in Chapter 5. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) As a result of the redevelopment of land, a building or structure existing on the same land within five (5) years prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the gross floor area that has been or will be demolished or converted to another principal use; Watson & Associates Economists Ltd. PAGE 7-4 provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 7.3.4 Exemptions (full or partial) Statutory exemptions: - Partial exemption for industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - Full exemption for buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education; - Full exemption for additional residential development within or ancillary to existing buildings: development that results only in the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.2) of the Act); - Full exemption for additional residential development within or ancillary to new dwellings: development that includes the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.3) of the Act); - Full exemption for the creation of the greater of one residential unit or 1% of the existing residential units in an existing rental residential building; - Full exemption for a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - Full exemption for affordable units; - Full exemption for attainable units, (not yet in force); - Full exemption for affordable inclusionary zoning units; - Full exemption for non-profit housing developments; - Full exemption for non-profit retirement home developments; - Full exemption for long-term care homes; and - Partial exemption through a discount for rental housing units based on bedroom size as prescribed (i.e., three or more bedrooms - 25% discount, two bedrooms - 20% discount, and all others - 15% discount). Watson & Associates Economists Ltd. PAGE 7-5 Discretionary exemptions: - Private schools as defined in the Education Act; - development of land, buildings or structures owned by a College of applied arts and technology established pursuant to the Ministry of Training, Colleges and Universities Act, and used for teaching-related purposes on lands owned by and used for the purposes of the College but does not include student residences; - Place of worship classified as exempt from taxation under Section 3 of the Assessment Act; - Non-residential farm buildings; - Hospital under the Public Hospital Act; and - Development creating or adding an accessory use or structure not exceeding ten square metres of non-residential floor area. 7.3.5 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the City and an owner under s. 27 of the D.C.A. or as subsequently noted. D.C.s payable for residential development (other than rental housing, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Rental housing and institutional developments will pay D.C.s in six (6) equal annual payments commencing at occupancy. The D.C. amount for all developments occurring within 18 months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the lower of the D.C. in effect on the day the applicable Site Plan or Zoning By-law Amendment application was submitted (as a complete application), including interest, and the D.C. at current rates at the time the D.C. is calculated. Payments determined at the time of Site Plan or Zoning By-law Amendment application are subject to annual interest charges. The maximum interest rate the Municipality can impose is the average prime rate plus 1%. Watson & Associates Economists Ltd. PAGE 7-6 7.3.6 Indexing Rates shall be adjusted, without amendment to the By-law, annually on January 1, in accordance with the most recent twelve-month change for the Toronto series in the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).1 7.3.7 D.C. Spatial Applicability The D.C.A. historically has provided the opportunity for a municipality to impose municipal-wide charges or area specific charges. Subsections 2 (7) and 2 (8) of the D.C.A. provide that a D.C. by-law may apply to the entire municipality or only part of it and more than one D.C. by-law may apply to the same area. The D.C.A. now requires municipalities to consider the application of municipal-wide and area-specific D.C.s. Subsection 10 (2), clause (c.1) requires Council to consider the use of more than one D.C. by-law to reflect different needs from services in different areas. Most municipalities in Ontario have established uniform, municipal-wide D.C.s. When area- specific charges are used, it is generally to underpin master servicing and front-end financing arrangements for more localized capital costs. Based on the foregoing, it is proposed that uniform City-wide D.C.s be imposed for all services except water and wastewater services. D.C.s related to water and wastewater services will be imposed on an urban area basis, or to developments that will connect to water and wastewater services. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes It is recommended that the City's D.C. collections be contributed into ten (10) separate reserve funds, including: 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 - Services Related to a Highway; - Fire Protection Services; - Policing Services; - Library Services; - Ambulance Services; - Parks and Recreation Services; - Transit Services - Growth-related Studies; - Water Services; and - Wastewater Services. 7.4.2 By-law In-force Date The D.C. by-law is anticipated to be passed by Council on September 14, 2026, and to come into force on the following day, unless Council determines an alternative date for enactment. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-laws come into force (as per section 11 of O. Reg. 82/98). 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Adopt the D.C. approach to calculate the charges on a uniform municipal-wide basis for all services, except for water and wastewater services which will be imposed in the urban serviced area;" Watson & Associates Economists Ltd. PAGE 7-8 "Approve the capital project listing set out in Chapter 5 of the D.C. Background Study dated July 6, 2026, as amended, subject to further annual review during the capital budget process;" "Approve the D.C. Background Study dated July 6, 2026, as amended;" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix F." Watson & Associates Economists Ltd. Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 8. By-law Implementation 8.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.1 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution). It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT). 8.1.2 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the Watson & Associates Economists Ltd. PAGE 8-2 timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. Taxpayers in particular may have an interest, as any growth-related cost that is incurred that cannot be recovered from development charges (or other legislatively allowed cost recovery mechanisms) requires a separate funding source, which may often be the property tax base. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 8.3 Implementation Requirements 8.3.1 Introduction Once the City has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the City Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given in one of the following ways: o by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice; o if in the clerk's opinion, a newspaper of sufficient circulation does not exist, by posting on the City's website; or o by personal service, fax, or mail to every owner of land in the area to which the by-law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the City must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: Watson & Associates Economists Ltd. PAGE 8-4 - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The City must give one copy of the most recent pamphlet without charge to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the City Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The City is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the City Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of City Council to the OLT. Watson & Associates Economists Ltd. PAGE 8-5 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which may apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work, which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The City and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the City to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use, which were contained in the Development Charges Act, 1989. Accordingly, the City assesses whether this mechanism is appropriate for its use, as part of funding projects prior to City funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 8-6 It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the City is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 Schedule 1 City of Belleville Residential Growth Forecast Summary [1] Census undercount estimated at approximately 3.8%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add due to rounding. Source: Derived from City of Belleville 2022 Population, Housing and Employment Growth Forecast Update, December 21, 2022, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 51,330 49,454 1,344 48,110 13,044 2,083 5,829 109 21,065 1,222 2.348 52,640 50,716 1,366 49,350 13,600 2,225 5,800 110 21,735 1,242 2.333 57,160 55,071 1,276 53,795 14,685 2,475 6,260 120 23,540 1,160 2.339 61,640 59,391 1,371 58,020 15,203 2,946 7,057 120 25,326 1,246 2.345 68,700 66,188 1,508 64,680 17,224 3,867 8,334 120 29,545 1,371 2.240 73,840 71,140 1,641 69,499 18,912 4,519 9,169 120 32,720 1,492 2.174 75,190 72,441 1,719 70,722 19,388 4,858 9,659 120 34,025 1,563 2.129 1,310 1,262 22 1,240 556 142 -29 1 670 20 4,520 4,355 -90 4,445 1,085 250 460 10 1,805 -82 4,480 4,320 95 4,225 518 471 797 0 1,786 86 7,060 6,797 137 6,660 2,021 921 1,277 0 4,219 125 12,200 11,749 270 11,479 3,709 1,573 2,112 0 7,394 246 13,550 13,050 348 12,702 4,185 1,912 2,602 0 8,699 317 Mid 2026 - Mid 2036 Mid 2046 Mid 2051 Mid 2026 - Mid 2051 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Forecast Incremental Mid 2026 - Mid 2046 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2026 Mid 2036 Mid 2021 - Mid 2026 Watson & Associates Economists Ltd. PAGE A-3 Schedule 2 City of Belleville Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Source: Watson & Associates Economists Ltd. 2026 - 2036 1,930 921 1,277 4,128 9,452 -2,629 6,823 137 6,960 2026 - 2046 3,542 1,573 2,112 7,227 16,722 -4,928 11,794 270 12,064 2026 - 2051 3,997 1,912 2,602 8,511 19,509 -6,327 13,182 348 13,530 2026 - 2036 91 0 0 91 259 -422 -163 0 -163 2026 - 2046 167 0 0 167 475 -790 -315 0 -315 2026 - 2051 188 0 0 188 535 -1,015 -480 0 -480 2026 - 2036 2,021 921 1,277 4,219 9,711 -3,051 6,660 137 6,797 2026 - 2046 3,709 1,573 2,112 7,394 17,197 -5,718 11,479 270 11,749 2026 - 2051 4,185 1,912 2,602 8,699 20,044 -7,342 12,702 348 13,050 Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Urban Rural City of Belleville Watson & Associates Economists Ltd. PAGE A-4 Schedule 3 City of Belleville Current Year Growth Forecast Mid-2021 to Mid-2026 Mid 2021 Population 55,071 Occupants of Units (2) 1,786 New Housing Units, multiplied by P.P.U. (3) 2.208 Mid 2021 to Mid 2026 gross population increase 3,944 3,944 Occupants of New Units 86 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2026 gross population increase 95 95 Change in Housing Units (4) 23,540 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.012 Mid 2021 to Mid 2026 total change in population 281 281 Population Estimate to Mid 2026 59,391 Net Population Increase, Mid 2021 to Mid 2026 4,320 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.695 29% 0.782 Multiples (6) 2.352 26% 0.620 Apartments (7) 1.807 45% 0.806 Total 100% 2.208 [1] Based on 2021 Census custom database. [2] Based on Building permit/completion activity. (4) 2021 households taken from Statistics Canada Census. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-5 Schedule 4a City of Belleville 10-Year Growth Forecast Mid-2026 to Mid-2036 Mid 2026 Population 59,391 Occupants of Units (2) 4,219 New Housing Units, multiplied by P.P.U. (3) 2.302 Mid 2026 to Mid 2036 gross population increase 9,711 9,711 Occupants of New Units 125 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2026 to Mid 2036 gross population increase 137 137 Change in Housing Units (4) 25,326 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.120 Mid 2026 to Mid 2036 total change in population -3,051 -3,051 Population Estimate to Mid 2036 66,188 Net Population Increase, Mid 2026 to Mid 2036 6,797 (1) Mid 2026 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.845 48% 1.363 Multiples (6) 1.877 22% 0.410 Apartments (7) 1.749 30% 0.529 one bedroom or less 1.133 two bedrooms or more 2.150 Total 100% 2.302 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2026 households based upon 2021 Census (23,540 units) + Mid 2021 to Mid 2026 unit estimate (1,786 units) = 25,326 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2021 Population (55,071) + Mid 2021 to Mid 2026 estimated housing units to beginning of forecast period (1,786 x 2.208 = 3,944) + (86 x 1.1 = 95) + (23,540 x 0.012 = 281) = 59,391 Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 Schedule 4b City of Belleville 20-Year Growth Forecast Mid-2026 to Mid-2046 Mid 2026 Population 59,391 Occupants of Units (2) 7,394 New Housing Units, multiplied by P.P.U. (3) 2.326 Mid 2026 to Mid 2046 gross population increase 17,197 17,197 Occupants of New Units 246 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2026 to Mid 2046 gross population increase 270 270 Change in Housing Units (4) 25,326 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.226 Mid 2026 to Mid 2046 total change in population -5,718 -5,718 Population Estimate to Mid 2046 71,140 Net Population Increase, Mid 2026 to Mid 2046 11,749 (1) Mid 2026 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.845 50% 1.427 Multiples (6) 1.877 21% 0.399 Apartments (7) 1.749 29% 0.500 one bedroom or less 1.133 two bedrooms or more 2.150 Total 100% 2.326 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2026 households based upon 2021 Census (23,540 units) + Mid 2021 to Mid 2026 unit estimate (1,786 units) = 25,326 units. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. 2021 Population (55,071) + Mid 2021 to Mid 2026 estimated housing units to beginning of forecast period (1,786 x 2.208 = 3,944) + (86 x 1.1 = 95) + (23,540 x 0.012 = 281) = 59,391 Population Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 Schedule 5 City of Belleville Long-Term Growth Forecast Mid-2026 to Mid-2051 Mid 2026 Population 59,391 Occupants of Units (2) 8,699 New Housing Units, multiplied by P.P.U. (3) 2.304 Mid 2026 to Mid 2051 gross population increase 20,044 20,044 Occupants of New Units 317 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2026 to Mid 2051 gross population increase 348 348 Change in Housing Units (4) 25,326 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.290 Mid 2026 to Mid 2051 total change in population -7,342 -7,342 Population Estimate to Mid 2051 72,441 Net Population Increase, Mid 2026 to Mid 2051 13,050 (1) Mid 2026 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.845 48% 1.369 Multiples (6) 1.877 22% 0.413 Apartments (7) 1.749 30% 0.523 one bedroom or less 1.133 two bedrooms or more 2.150 Total 100% 2.304 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2026 households based upon 2021 Census (23,540 units) + Mid 2021 to Mid 2026 unit estimate (1,786 units) = 25,326 units. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Population 2021 Population (55,071) + Mid 2021 to Mid 2026 estimated housing units to beginning of forecast period (1,786 x 2.208 = 3,944) + (86 x 1.1 = 95) + (23,540 x 0.012 = 281) = 59,391 Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-8 Schedule 6 City of Belleville (Urban Area) Summary of Housing Units in Active Development Applications [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Derived from City of Belleville active development application data, as of January 2026, by Watson & Associates Economists Ltd. Singles & Semi- Detached Multiples [1] Apartments [2] Total Registered Not Built 973 573 116 1,662 % Breakdown 59% 34% 7% 100% Draft Plans Approved 643 396 462 1,501 % Breakdown 43% 26% 31% 100% Total 1,616 969 578 3,163 % Breakdown 51% 31% 18% 100% Stage of Development Density Type Watson & Associates Economists Ltd. PAGE A-9 Schedule 7 City of Belleville Historical Residential Building Permits Years 2016 to 2025 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from building permit data for the City of Belleville, by Watson & Associates Economists Ltd. Residential Building Permits Total 2016 218 66 34 318 2017 217 64 185 466 2018 188 63 9 260 2019 202 64 150 416 2020 218 48 72 338 Sub-total 1,043 305 450 1,798 Average (2016 - 2020) 209 61 90 360 % Breakdown 58.0% 17.0% 25.0% 100.0% 2021 161 150 53 364 2022 127 148 141 416 2023 59 50 216 325 2024 56 46 323 425 2025 65 28 82 175 Sub-total 468 422 815 1,705 Average (2021 - 2025) 94 84 163 341 % Breakdown 27.4% 24.8% 47.8% 100.0% 2016 - 2025 Total 1,511 727 1,265 3,503 Average 151 73 127 350 % Breakdown 43.1% 20.8% 36.1% 100.0% Year Singles & Semi Detached Multiples [1] Apartments [2] Watson & Associates Economists Ltd. PAGE A-10 Schedule 8a City of Belleville Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted[2] 1-5 - - 2.000 2.676 4.591 2.695 6-10 - - - 2.855 3.760 2.958 0.034 11-15 - - 2.000 2.869 4.417 3.029 2.845 16-20 - - - 2.648 3.588 2.770 2.845 21-25 - - - 2.836 3.882 2.935 2.845 26-30 - - - 3.038 3.636 2.889 30+ - 1.529 1.893 2.516 4.007 2.486 2.845 Total 1.273 1.644 1.914 2.586 3.993 2.586 Age of Multiples [1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted[2] 1-5 - - 1.737 2.588 - 2.352 6-10 - - 1.917 2.286 - 2.057 (0.125) 11-15 - - 1.500 - - 1.609 1.877 16-20 - - 1.789 2.467 - 1.829 1.877 21-25 - - 1.615 - - 1.783 1.877 26-30 - - 1.750 2.688 - 2.000 30+ - 1.333 2.059 2.804 - 2.334 1.877 Total 0.154 1.327 1.886 2.655 - 2.195 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.435 1.980 2.679 4.280 2.530 6-10 - - 1.880 2.733 3.800 2.704 11-15 - 1.250 1.892 2.780 4.240 2.685 16-20 - 1.316 1.860 2.577 3.514 2.460 21-25 - 1.333 1.875 2.700 3.882 2.471 25-30 - 1.448 1.829 2.766 3.636 2.325 30+ 1.400 1.232 1.878 2.545 3.813 2.199 Total 1.588 1.254 1.884 2.587 3.850 2.285 Watson & Associates Economists Ltd. PAGE A-11 Schedule 7b Hastings County Census Division Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Apartments [1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted [2] 1-5 - 1.095 2.067 - - 1.807 6-10 - - - - - 1.769 11-15 - 1.273 1.842 - - 1.697 1.749 16-20 - 1.267 2.077 - - 1.818 1.749 21-25 - 1.261 1.690 - - 1.557 1.749 26-30 - 1.378 1.763 - - 1.643 30+ 0.900 1.186 1.835 3.079 - 1.601 Total 0.810 1.198 1.843 3.043 - 1.615 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.625 1.882 2.701 4.063 2.534 6-10 - 1.762 1.837 2.833 3.965 2.758 11-15 - 1.407 1.878 2.776 3.961 2.713 16-20 - 1.281 1.865 2.622 3.488 2.519 21-25 - 1.233 1.836 2.630 3.729 2.444 26-30 - 1.304 1.841 2.714 3.385 2.473 30+ 1.324 1.258 1.846 2.522 3.670 2.256 Total 1.333 1.285 1.849 2.577 3.714 2.342 Watson & Associates Economists Ltd. PAGE A-12 Schedule 8 City of Belleville Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.69 2.96 3.03 2.77 2.94 2.89 2.49 2.35 2.06 1.61 1.83 1.78 2.00 2.33 1.81 1.77 1.70 1.82 1.56 1.64 1.60 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Apartment P.P.U.s are based on Hastings County Census Division. Watson & Associates Economists Ltd. PAGE A-13 Schedule 10a City of Belleville Employment Forecast, 2026 to 2051 [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Watson & Associates Economists Ltd. Employment Mid 2011 49,454 0.002 0.023 0.165 0.259 0.171 0.621 0.075 0.695 110 1,150 8,170 12,820 8,445 30,695 3,692 34,387 29,545 Mid 2016 50,716 0.001 0.021 0.167 0.223 0.164 0.575 0.071 0.647 40 1,065 8,445 11,335 8,300 29,185 3,626 32,811 28,120 Mid 2026 59,391 0.001 0.026 0.161 0.206 0.149 0.543 0.072 0.614 50 1,528 9,571 12,220 8,865 32,234 4,258 36,492 30,706 Mid 2036 66,188 0.001 0.029 0.155 0.201 0.142 0.527 0.069 0.596 60 1,892 10,245 13,307 9,376 34,880 4,555 39,435 32,988 Mid 2046 71,140 0.001 0.028 0.147 0.191 0.134 0.501 0.065 0.566 70 1,994 10,434 13,612 9,519 35,629 4,631 40,260 33,635 Mid 2051 72,441 0.001 0.029 0.146 0.192 0.133 0.501 0.065 0.566 75 2,086 10,604 13,888 9,649 36,302 4,698 41,000 34,216 Mid 2011 - Mid 2016 1,262 -0.0014 -0.0023 0.0013 -0.0357 -0.0071 -0.0452 -0.0032 -0.0484 -70 -85 275 -1,485 -145 -1,510 -66 -1,576 -1,425 Mid 2016 - Mid 2021 4,355 0.0017 0.0429 -0.0343 -0.0792 -0.0405 -0.1095 0.0043 -0.1052 95 2,455 -1,165 -3,390 -1,520 -3,525 550 -2,975 -5,980 Mid 2016 - Mid 2026 8,675 0.0001 0.0047 -0.0054 -0.0177 -0.0144 -0.0327 0.0002 -0.0325 10 463 1,126 885 565 3,049 632 3,681 2,586 Mid 2026 - Mid 2036 6,797 0.0001 0.0029 -0.0064 -0.0047 -0.0076 -0.0158 -0.0029 -0.0186 10 364 674 1,087 511 2,646 297 2,943 2,282 Mid 2026 - Mid 2046 11,749 0.0001 0.0023 -0.0145 -0.0144 -0.0155 -0.0419 -0.0066 -0.0485 20 466 863 1,392 654 3,395 380 3,768 2,922 Mid 2026 - Mid 2051 13,050 0.0002 0.0031 -0.0148 -0.0140 -0.0161 -0.0416 -0.0068 -0.0485 25 558 1,033 1,668 784 4,068 440 4,508 3,510 Mid 2011 - Mid 2016 252 0.000 0.000 0.000 -0.007 -0.001 -0.009 -0.001 -0.010 -14 -17 55 -297 -29 -302 -13 -315 -285 Mid 2016 - Mid 2026 868 0.000 0.000 -0.001 -0.002 -0.001 -0.003 0.000 -0.003 1 46 113 89 57 305 63 368 259 Mid 2026 - Mid 2036 680 0.000 0.000 -0.001 0.000 -0.001 -0.002 0.000 -0.002 1 36 67 109 51 265 30 294 228 Mid 2026 - Mid 2046 587 0.000 0.000 -0.001 -0.001 -0.001 -0.002 0.000 -0.002 1 23 43 70 33 170 19 188 146 Mid 2026 - Mid 2051 502 0.000 0.000 -0.001 -0.001 -0.001 -0.002 0.000 -0.002 1 21 40 64 30 156 17 173 135 N.F.P.O.W. [1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Total Employment (Including N.F.P.O.W.) Institutional Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W. [1] Work at Home Industrial Commercial/ Population Related Watson & Associates Economists Ltd. PAGE A-14 Schedule 10b City of Belleville Employment and Gross Floor Area (G.F.A.) Forecast, 2026 to 2051 [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,700 Commercial / Population Related 500 Institutional 675 [2] Primary industry includes agriculture and resource related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. * Reflects Mid-2026 to 2051 forecast period Note: Numbers may not add to totals due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 49,454 110 8,170 12,820 8,445 29,545 330,000 13,889,000 6,410,000 6,620,900 27,249,900 Mid 2016 50,716 40 8,445 11,335 8,300 28,120 120,000 14,356,500 5,667,500 6,507,200 26,651,200 Mid 2026 59,391 50 9,571 12,220 8,865 30,706 150,000 16,270,700 6,110,000 6,950,200 29,480,900 Mid 2036 66,188 60 10,245 13,307 9,312 32,924 180,000 17,416,500 6,653,500 7,274,000 31,524,000 Mid 2046 71,140 70 10,434 13,612 9,393 33,509 210,000 17,737,800 6,806,000 7,311,700 32,065,500 Mid 2051 72,441 75 10,604 13,888 9,486 34,053 225,000 18,026,800 6,944,000 7,369,200 32,565,000 Mid 2011 - Mid 2016 1,262 -70 275 -1,485 -145 -1,425 Mid 2016 - Mid 2026 8,675 10 1,126 885 565 2,586 30,000 1,914,200 442,500 443,000 2,829,700 Mid 2026 - Mid 2036 6,797 10 674 1,087 447 2,218 30,000 1,145,800 543,500 301,600 2,020,900 Mid 2026 - Mid 2046 11,749 20 863 1,392 528 2,803 60,000 1,467,100 696,000 356,300 2,579,400 Mid 2026 - Mid 2051 13,050 25 1,033 1,668 621 3,347 75,000 1,756,100 834,000 419,000 3,084,100 Mid 2011 - Mid 2016 252 -14 55 -297 -29 -285 Mid 2016 - Mid 2026 868 1 113 89 57 259 3,000 191,420 44,250 44,300 282,970 Mid 2026 - Mid 2036 680 1 67 109 45 222 3,000 114,580 54,350 30,160 202,090 Mid 2026 - Mid 2046 587 1 43 70 26 140 3,000 73,355 34,800 17,815 128,970 Mid 2026 - Mid 2051 502 1 40 64 24 129 2,885 67,542 32,077 16,115 118,619 Annual Average Incremental Change Industrial Commercial/ Population Related Institutional [3] Total Primary [2] Industrial Commercial/ Population Related Institutional [3] Total Period Population Employment Gross Floor Area in Square Feet (Estimated)[1] Primary Watson & Associates Economists Ltd. PAGE A-15 Schedule 10c City of Belleville Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square feet per employee assumptions: Primary 3,000 Industrial 1,700 Commercial / Population Related 500 Institutional 675 [2] Primary industry includes agriculture and resource related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. [4] Employment Increase does not include No Fixed Place of Work. *Reflects 2026 to 2051 forecast period Note: Numbers may not add to totals due to rounding. Source: Watson & Associates Economists Ltd. 2026 - 2036 - 1,145,800 543,500 301,600 1,990,900 2,208 2026 - 2046 - 1,467,100 696,000 356,300 2,519,400 2,783 2026 - 2051 - 1,756,100 834,000 419,000 3,009,100 3,322 2026 - 2036 30,000 - - - 30,000 10 2026 - 2046 60,000 - - - 60,000 20 2026 - 2051 75,000 - - - 75,000 25 2026 - 2036 30,000 1,145,800 543,500 301,600 2,020,900 2,218 2026 - 2046 60,000 1,467,100 696,000 356,300 2,579,400 2,803 2026 - 2051 75,000 1,756,100 834,000 419,000 3,084,100 3,347 City of Belleville Rural Urban Institutional G.F.A. S.F.[1],[3] Total Non- Residential G.F.A. S.F. Employment Increase[4] Development Location Timing Primary G.F.A. S.F.[1],[2] Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Watson & Associates Economists Ltd. PAGE A-16 Schedule 11 City of Belleville Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 Table B-1 Historical Level of Service Calculation Fire Protection Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Fire Hall #1 - Bettis Rd - - - - 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 $576 $665 Fire Hall #2 - Moira Street 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 10,232 $576 $665 Old Fire Hall #2 - Dundas St 9,208 9,208 9,208 9,208 - - - - - - - - - - - $576 $665 Fire Hall #3 - Old Highway 2 - - - - - - 8,105 8,105 8,105 8,105 8,105 8,105 8,105 8,105 8,105 $576 $665 Old Fire Hall #3 - Point Anne Rd 4,195 4,195 4,195 6,000 6,000 6,000 - - - - - - - - - $576 $665 Fire Hall #4 - Harmony Rd (Corbyville) 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 $576 $665 Fire Hall #5 - Hoskin Rd. - - - - - - 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 $576 $665 Substation #6 - Building Services - - - 680 680 680 680 680 680 680 680 680 680 - - $576 $665 Training Centre at Fairgrounds 11,250 11,250 11,250 11,250 11,250 11,250 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 - $576 $665 Total 37,385 37,385 37,385 39,870 53,162 53,162 57,717 57,717 57,717 57,717 57,717 57,717 57,717 57,037 46,037 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.7560 0.7528 0.7490 0.7952 1.0552 1.0482 1.1201 1.0974 1.0836 1.0644 1.0480 1.0301 1.0117 0.9869 0.7841 15 Year Average 2011 to 2025 Quantity Standard 0.9588 Quality Standard $665 Service Standard $638 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $638 Eligible Amount $4,334,039 Watson & Associates Economists Ltd. PAGE B-3 Table B-2 Historical Level of Service Calculation Fire Protection Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Pumper Trucks 7 7 7 7 7 7 7 7 7 7 9 9 9 9 9 $1,030,000 Aerial Trucks - quint 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,884,000 Tanker Trucks 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 $875,500 Aerial Truck - platform 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,090,000 Rescue Vans 3 4 4 4 4 4 4 4 4 4 3 3 3 3 3 $360,500 Pickup Trucks 10 10 11 11 11 10 10 10 10 10 13 13 13 13 13 $85,600 Water Rescue Boats 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 $61,800 Urban Rescue Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,442,000 Total 30 31 32 32 32 30 30 30 30 30 33 33 33 33 33 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 15 Year Average 2011 to 2025 Quantity Standard 0.0006 Quality Standard $632,483 Service Standard $379 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $379 Eligible Amount $2,579,394 Watson & Associates Economists Ltd. PAGE B-4 Table B-3 Historical Level of Service Calculation Fire Protection Services - Small Equipment and Gear Number of Small Equipment and Gear Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) # of Firefighters - Full-time 63 63 63 63 63 63 63 63 63 63 66 66 66 81 81 $18,000 # of Firefighters - Volunteers 50 50 50 50 50 50 50 50 50 50 50 50 50 47 47 $16,000 Breathing Air Compressor 25 25 25 25 25 25 25 25 25 25 25 25 25 2 2 $46,300 SCBA - Air packs and Masks 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 $9,800 SCBA - Cylinders 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 $1,000 Auto Extrication Equipment - Cutter 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $8,200 Auto Extrication Equipment - Spreader 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $9,800 Auto Extrication Equipment - Ram 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $9,800 Auto Extrication Equipment - Combination 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $8,200 Total 388 388 388 388 388 388 388 388 388 388 391 391 391 380 380 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 15 Year Average 2011 to 2025 Quantity Standard 0.0073 Quality Standard $10,099 Service Standard $74 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $74 Eligible Amount $501,075 Watson & Associates Economists Ltd. PAGE B-5 Table B-4 Historical Level of Service Calculation Policing Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Old Police Station 33,500 33,500 33,500 33,500 33,500 33,500 33,500 33,500 33,500 33,500 - - - - - $508 $587 New Police Station - - - - - - - - - - 67,500 67,500 67,500 67,500 67,500 $508 $587 Downtown Satellite Police Station - - - - - - - - - - - - - 408 408 $508 $587 Emergency Dispatch Location 288 288 288 288 288 288 288 288 288 288 288 288 288 288 288 $508 $587 Total 33,788 33,788 33,788 33,788 33,788 33,788 33,788 33,788 33,788 33,788 67,788 67,788 67,788 68,196 68,196 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.6832 0.6804 0.6770 0.6739 0.6706 0.6662 0.6557 0.6424 0.6343 0.6231 1.2309 1.2099 1.1882 1.1800 1.1615 15 Year Average 2011 to 2025 Quantity Standard 0.8385 Quality Standard 587 Service Standard $492 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $492 Eligible Amount $3,345,483 Watson & Associates Economists Ltd. PAGE B-6 Table B-5 Historical Level of Service Calculation Policing Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Prisoner transport 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Police Fleet 39 39 39 34 35 33 39 41 38 41 40 39 41 45 45 $128,700 Police Other - ATV and Motorcycles 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $56,600 Total 45 45 45 40 41 39 45 47 44 47 46 45 47 51 51 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0009 0.0009 0.0009 0.0008 0.0008 0.0008 0.0009 0.0009 0.0008 0.0009 0.0008 0.0008 0.0008 0.0009 0.0009 15 Year Average 2011 to 2025 Quantity Standard 0.0009 Quality Standard $115,678 Service Standard $104 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $104 Eligible Amount $707,636 Watson & Associates Economists Ltd. PAGE B-7 Table B-6 Historical Level of Service Calculation Policing Services - Small Equipment and Gear Number of Small Equipment and Gear Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) # Police Officers 88 88 88 88 88 88 90 92 92 92 95 99 99 108 108 $14,400 Communication Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,697,200 Volunteer Constables (Special Constables) 10 10 10 11 13 12 14 15 18 17 18 18 20 20 20 $6,200 Auxiliary Members 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 $1,300 Total 114 114 114 115 117 116 120 123 126 125 129 133 135 144 144 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0024 0.0023 0.0023 0.0024 0.0024 0.0025 0.0025 15 Year Average 2011 to 2025 Quantity Standard 0.0023 Quality Standard $25,883 Service Standard $60 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $60 Eligible Amount $404,625 Watson & Associates Economists Ltd. PAGE B-8 Table B-7 Historical Level of Service Calculation Library Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Belleville Public Library 36,500 36,500 36,500 36,500 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 $814 $983 Total 36,500 36,500 36,500 36,500 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 31,636 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.7381 0.7350 0.7313 0.7279 0.6279 0.6238 0.6140 0.6015 0.5939 0.5834 0.5745 0.5646 0.5545 0.5474 0.5388 15 Year Average 2011 to 2025 Quantity Standard 0.6238 Quality Standard $983 Service Standard $613 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $613 Eligible Amount $4,167,784 Watson & Associates Economists Ltd. PAGE B-9 Table B-8 Historical Level of Service Calculation Library Services - Collection Materials Number of Collection Materials Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Book Collection 104,528 90,745 94,200 101,127 91,897 91,121 89,310 81,351 79,129 77,938 78,544 77,606 79,183 77,956 77,956 $43 Periodicals 152 152 102 120 127 89 85 82 78 68 63 42 30 25 25 $27 Audiovisual & CDs 7,234 6,930 8,711 9,345 10,109 9,323 9,731 10,124 10,962 10,824 10,179 8,203 10,810 10,700 10,700 $53 Electronic collection holdings - number of subscription to e-content platforms 12 14 14 18 18 11 9 9 5 5 4 5 9 12 12 $12,400 Total 111,926 97,841 103,027 110,610 102,151 100,544 99,135 91,566 90,174 88,835 88,790 85,856 90,032 88,693 88,693 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 2.26 1.97 2.06 2.21 2.03 1.98 1.92 1.74 1.69 1.64 1.61 1.53 1.58 1.53 1.51 15 Year Average 2011 to 2025 Quantity Standard 1.8185 Quality Standard $45 Service Standard $82 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $82 Eligible Amount $560,413 Watson & Associates Economists Ltd. PAGE B-10 Table B-9 Historical Level of Service Calculation Ambulance Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. 111 Millennium Drive, Belleville 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $442 $487 25 Frankford Crescent, Trenton 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 $442 $487 244 St. Lawrence St West, Madoc 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 $442 $487 33 Chemaushgon Road, Bancroft 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 $955 $1,053 38 Farley Avenue, Belleville 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $442 $487 127 River Street, Tweed 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 $442 $487 2547 Stirling Marmora Rd, Stirling - - - - - - - - - - - - - 15,000 15,000 $364 $401 Total 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 40,398 40,398 Percentage attributable to Belleville 41.5% 41.1% 41.1% 41.1% 41.1% 41.0% 40.9% 41.3% 40.9% 40.9% 40.7% 40.7% 40.6% 40.7% 40.7% Total Belleville Share of Facilities 10,528 10,441 10,431 10,428 10,443 10,420 10,388 10,496 10,397 10,386 10,344 10,337 10,317 16,426 16,426 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.2129 0.2103 0.2090 0.2080 0.2073 0.2055 0.2016 0.1996 0.1952 0.1915 0.1878 0.1845 0.1808 0.2842 0.2798 15 Year Average 2011 to 2025 Quantity Standard 0.2105 Quality Standard $529 Service Standard $111 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $111 Eligible Amount $757,186 Watson & Associates Economists Ltd. PAGE B-11 Table B-10 Historical Level of Service Calculation Ambulance Services - Vehicles and Equipment No. of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Ambulances 19 20 22 22 21 16 16 17 16 19 19 20 20 18 19 $422,300 Supervisor Emergency Vehicles 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $144,200 Ford Escape - - - - - - - 2 2 2 2 2 2 2 2 $92,700 Cargo Van 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $92,700 Emergency Support Unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $103,000 Diagnostic Testing Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $309,000 Total 26 27 29 29 28 23 23 26 25 28 28 29 29 27 28 Percentage attributable to Belleville 41.5% 41.1% 41.1% 41.1% 41.1% 41.0% 40.9% 41.3% 40.9% 40.9% 40.7% 40.7% 40.6% 40.7% 40.7% Total Belleville Share of Facilities 11 11 12 12 12 9 9 11 10 11 11 12 12 11 11 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 15 Year Average 2011 to 2025 Quantity Standard 0.0002 Quality Standard $355,200 Service Standard $71 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $71 Eligible Amount $482,859 Watson & Associates Economists Ltd. PAGE B-12 Table B-11 Historical Level of Service Calculation Parks and Recreation Services - Parkland Development Acres of Parkland Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Acre) Regional Parks 270 270 270 270 270 270 270 270 270 270 270 288 288 288 288 $80,200 Community Parks 126 126 126 138 138 138 138 138 138 138 138 138 138 138 138 $80,200 Neighbourhood Parks 98 112 116 121 124 128 128 128 128 128 129 129 131 131 131 $80,200 Specialized Area 33 33 33 33 33 49 49 54 54 54 55 55 58 58 58 $80,200 Parks Trail System 8 8 8 8 8 8 8 12 12 12 12 30 30 30 30 $80,200 Total 536 549 553 570 573 593 593 602 602 602 605 641 645 645 645 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0108 0.0111 0.0111 0.0114 0.0114 0.0117 0.0115 0.0114 0.0113 0.0111 0.0110 0.0114 0.0113 0.0112 0.0110 15 Year Average 2011 to 2025 Quantity Standard 0.0112 Quality Standard $80,512 Service Standard $902 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $902 Eligible Amount $6,129,059 Watson & Associates Economists Ltd. PAGE B-13 Table B-12 Historical Level of Service Calculation Parks and Recreation Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Pickup Trucks 7 7 8 8 9 9 9 9 10 10 10 10 10 10 10 $98,700 Refuse Vehicle 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $246,700 Dump Truck 6 6 6 6 6 6 6 6 7 7 7 7 7 7 7 $153,400 Toro Mowers 3 4 4 4 4 4 5 5 5 5 5 5 5 5 5 $123,400 Tractors 4 4 6 6 6 6 5 5 5 5 6 6 6 6 6 $118,000 Chipper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $93,900 Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $211,500 Mower 5 7 7 7 7 9 10 10 10 10 10 10 10 10 10 $35,300 Flailbot Mower - - - - - - - - - - 1 1 1 1 1 $103,000 Ploughs 5 5 7 7 7 7 7 7 7 7 7 7 7 7 7 $13,200 Other equipment 30 32 38 38 39 39 42 42 43 43 43 43 43 43 43 $21,200 Bleacher 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 $112,800 Track Sweeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $81,000 Trailers 7 7 7 7 8 8 8 9 9 9 9 9 9 10 10 $21,200 Enclosed Trailer - - - - - - - - - - - 1 1 1 1 $20,600 Trail Groomer & RTV - - - - - - - - - - - 1 1 1 1 $8,200 Sander - - - - 1 1 1 1 1 1 1 1 1 1 1 $10,400 Snow blower attachment - - - - 1 1 1 1 1 1 1 1 1 1 1 $14,000 Stand-On Spreader - - - - - - - - 1 1 1 1 1 1 1 $11,100 Spider Slope Mower - - - - - - 1 1 1 1 1 1 1 1 1 $77,200 Towable Arrowboard - - - - - - 1 1 1 1 1 1 1 1 1 $20,600 Bucket Truck - - - - - 1 1 1 1 1 1 1 1 1 1 $386,200 Sweeper Vacuum 1 1 1 1 1 1 1 1 1 1 $161,800 Trash Drone - - - - - - - - - - - - 1 1 1 $117,200 Floor Scrubbing Machine 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $30,700 Forklift 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $72,600 Man Lift - - - - - - - - - 1 1 1 1 1 1 $19,100 Zamboni 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 $99,400 Harbour Weed Harvester 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $33,400 Watson & Associates Economists Ltd. PAGE B-14 Table B-12 (continued) Historical Level of Service Calculation Parks and Recreation Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Scissor Lift 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,700 Weed Boat 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 $139,300 Rec Pickup Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $36,000 Rec Plow 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $6,800 Rec Trailer 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 $4,100 Total 88 93 104 104 109 113 120 122 126 127 130 133 136 137 137 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.0018 0.0019 0.0021 0.0021 0.0022 0.0022 0.0023 0.0023 0.0024 0.0023 0.0024 0.0024 0.0024 0.0024 0.0023 15 Year Average 2011 to 2025 Quantity Standard 0.0022 Quality Standard $60,059 Service Standard $132 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $132 Eligible Amount $898,088 Watson & Associates Economists Ltd. PAGE B-15 Table B-13 Historical Level of Service Calculation Parks and Recreation Services - Recreation Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Quinte Sports & Wellness Centre (Multiplex) 127,665 283,920 283,920 283,920 283,920 283,920 330,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 $591 $652 Dick Ellis Rink 29,070 - - - - - - - - - - - - - - $415 $458 Foster Ward Community Centre 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 5,000 5,000 5,000 5,000 5,000 $914 $1,008 D.L. Storey Centre 4,864 4,864 4,864 4,864 4,864 4,864 4,864 4,864 4,864 4,864 5,813 5,813 5,813 5,813 5,813 $667 $735 Hillcrest Community Centre 2,380 2,380 2,380 2,380 2,380 2,380 2,380 2,380 2,380 2,380 1,152 1,152 1,152 1,152 1,152 $1,012 $1,116 Quinte Tennis Club 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,125 1,125 1,125 1,125 1,125 $881 $971 Parkdale Community Centre 2,780 2,780 2,780 2,780 2,780 2,780 2,780 2,780 2,780 2,780 2,800 2,800 2,800 2,800 2,800 $977 $1,077 Gilead Community Hall 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,800 2,800 2,800 2,800 2,800 $709 $782 Queen Mary School Community Centre 28,450 28,450 28,450 28,450 28,450 28,450 28,450 28,450 28,450 - - - - - - $353 $389 Thurlow Community Centre 7,240 7,240 7,240 7,240 7,240 7,240 7,240 7,240 7,240 7,240 7,804 7,804 7,804 7,804 7,804 $691 $762 Bethany Community Centre 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 800 800 800 800 800 $912 $1,005 Kinsmen including pool - 7,502 7,502 7,502 7,502 7,502 7,502 7,502 7,502 7,502 4,553 4,553 4,553 4,553 4,553 $1,135 $1,251 Quinte Exhibition & Grandstand 13,760 13,760 13,760 13,760 13,760 13,760 13,760 13,760 13,760 13,760 14,880 14,880 14,880 14,880 14,880 $629 $693 Rowing Club 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,066 $595 $656 Belleville Lawn Bowling Club 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 - - - - $353 $389 Memorial Arena 31,100 - - - - - - - - - - - - - - $415 $458 Total 269,443 373,030 373,030 373,030 373,030 373,030 419,110 419,110 419,110 390,660 390,293 388,793 388,793 388,793 388,793 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 5.4484 7.5117 7.4738 7.4396 7.4039 7.3553 8.1336 7.9689 7.8684 7.2047 7.0871 6.9391 6.8150 6.7273 6.6220 15 Year Average 2011 to 2025 Quantity Standard 7.1999 Quality Standard $663 Service Standard $4,777 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $4,777 Eligible Amount $32,467,094 Watson & Associates Economists Ltd. PAGE B-16 Table B-14 Historical Level of Service Calculation Parks and Recreation Services - Parks Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Sidney Smith Signs Building 2,478 2,478 2,478 2,478 2,478 2,478 2,478 2,478 2,478 2,478 2,523 2,523 2,523 2,523 2,523 $633 $698 Park Services Building - Main Building 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 8,513 8,513 8,513 8,513 8,513 $554 $611 Park Services Building - Carpenter Shop & Storage 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 $420 $463 Park Services Building (Wood Framed bldg No. 2) 390 390 390 390 390 390 390 390 390 390 - - - - - $134 $148 Park Services Building - Chemical Storage 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 $729 $804 Park Services Building - Green House #1 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,300 2,300 2,300 2,300 2,300 $176 $194 Park Services Building - Green House #2 2,185 2,185 2,185 2,185 2,185 2,185 2,185 2,185 2,185 2,185 1,800 1,800 1,800 1,800 1,800 $143 $158 Park Services Building - Green House #3 2,545 2,545 2,545 2,545 2,545 2,545 2,545 2,545 2,545 2,545 2,300 2,300 2,300 2,300 2,300 $123 $136 Thurlow Community Center - Washrooms & Storage 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $780 $860 Parkdale Community Center 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 $977 $1,077 Meyers Pier 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910 11,216 11,216 11,216 11,216 11,216 $1,068 $1,177 West Zwicks Island - Hilltop Pavillion 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 2,442 2,442 2,442 2,442 2,442 $190 $209 West Zwicks Island - Washrooms #1 1,070 1,070 1,070 1,070 1,070 1,070 1,070 1,070 1,070 1,070 2,500 2,500 2,500 2,500 2,500 $1,021 $1,126 Centennial Rotary Park Washrooms 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,800 1,800 1,800 1,800 1,800 $1,348 $1,486 Alemite Park Washrooms 1,564 1,564 1,564 1,564 1,564 1,564 1,564 1,564 1,564 1,564 1,624 1,624 1,624 1,624 1,624 $776 $856 Victoria Harbour Washrooms 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,189 1,189 1,189 1,189 1,189 $1,953 $2,153 Riverside Park Washrooms 1,560 1,560 1,560 1,560 1,560 1,560 1,560 1,560 1,560 1,560 1,614 1,614 1,614 1,614 1,614 $928 $1,023 South George St Canteen 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,500 1,500 1,500 1,500 1,500 $1,308 $1,442 MA Sills Park - Field House - 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,000 1,000 1,000 1,000 1,000 $8,717 $9,610 West Zwicks Island - Lion's Pavillion 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 7,000 7,000 7,000 7,000 7,000 $402 $443 West Zwicks Island - Tom Gavey Pavillion 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 2,500 2,500 2,500 2,500 2,500 $86 $95 Elgin Street Garage 675 675 675 675 675 675 675 675 675 675 1,000 1,000 1,000 1,000 1,000 $221 $244 Thurlow Park Washrooms - - 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 $663 $731 West Zwicks Island - Washrooms #2 - - - - - - - 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 $609 $671 Sonny Belch Park Washrooms - - - - - - - - - - - - - 1,300 1,300 $846 $933 Corby Park Storage 215 215 215 215 215 215 215 215 215 215 215 215 215 215 215 $588 $648 MA Sills Park - Timing Tower - - - - - - 200 200 200 200 200 200 200 200 200 $518 $571 MA Sills Park - Parks Storage #2 - - - - - - 800 800 800 800 800 800 800 800 800 $351 $387 MA Sills Park - Parks Storage #3 - - - - - - 800 800 800 800 800 800 800 800 800 $303 $334 Total 43,930 45,430 46,870 46,870 46,870 46,870 48,670 51,170 51,170 51,170 64,576 64,576 64,576 65,876 65,876 Population 49,454 49,660 49,912 50,141 50,383 50,716 51,528 52,593 53,265 54,223 55,071 56,029 57,050 57,793 58,712 Per Capita Standard 0.8883 0.9148 0.9391 0.9348 0.9303 0.9242 0.9445 0.9729 0.9607 0.9437 1.1726 1.1525 1.1319 1.1399 1.1220 15 Year Average 2011 to 2025 Quantity Standard 1.0048 Quality Standard $931 Service Standard $936 D.C. Amount (before deductions) 10 Year Forecast Population 6,797 $ per Capita $936 Eligible Amount $6,360,361 Watson & Associates Economists Ltd. PAGE C-1 Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 Appendix C: Long-Term Capital and Operating Cost Examination As a requirement of the D.C.A., as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the City's 2024 Financial Information Return. In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method, which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. Table C-1 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while City program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Watson & Associates Economists Ltd. PAGE C-3 Table C-1 City of Belleville Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE ANNUAL OPERATING EXPENDITURES ANNUAL LIFECYCLE EXPENDITURES TOTAL ANNUAL EXPENDITURES Services Related to a Highway 554,509 2,655,507 3,210,015 Fire Protection Services 397,048 258,744 655,792 Policing Services 266,238 184,920 451,158 Parks and Recreation Services 81,363 1,013,815 1,095,178 Library Services 293 2,590 2,883 Ambulance - 73,557 73,557 Wastewater Services 599,142 3,573,237 4,172,379 Water Services 293,482 1,524,011 1,817,493 Total $2,192,073 $9,286,381 $11,478,454 Watson & Associates Economists Ltd. PAGE D-1 Appendix D Local Service Policy Watson & Associates Economists Ltd. PAGE D-2 Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The following local service guidelines are proposed to delineate the jurisdiction for capital cost recovery (i.e. local service or D.C.s). Roads and Related Services 1. For the purpose of interpreting this guideline the following meanings will be used: 1.1. Major collectors refer to a collector road with a right-of-way width of at least 26 metres, with no permitted lot frontage and restricted access. 1.2. Minor collectors are collector roads with a right-of-way of less than 26 metres, with permitted lot frontage and direct access other than at major intersections where approved urban design guidelines, traffic or safety concerns require restrictions within thirty-five (35) metres of the intersection. 2. Arterial and Collector Roads (including Structures) 2.1. New minor collector roads constructed internal to a development are the direct responsibility of the developer. 2.2. New minor collector roads constructed external to a development, but serving primarily to connect a development to the main road network, are the direct responsibility of the developer. 2.3. New, widened, extended or upgraded, major collector roads external to the development, and oversizing of major collector roads internal to the development are considered to be eligible development charge projects. 2.4. New, widened, extended or upgraded, arterial roads are considered to be eligible development charge projects. 2.5. All other new roads are considered to be the direct responsibility of the developer. Watson & Associates Economists Ltd. PAGE D-3 3. Traffic Signals and Intersection Improvements 3.1. New signalization or intersection improvements located at the intersection of two arterial roads, or at the intersection of a major collector road with an arterial road, or at the intersection of two major collector roads and located external to a development, are considered to be eligible development charge projects. 3.2. New signalization or intersection improvements located at the intersection of an arterial road and external to a development, the work will be cost shared by a Benefiting Owners' Agreement and best efforts of the municipality as Development Agreements come forward. 3.3. New signalization or intersection improvements that serve primarily as private site entrances or as entrances to developments, are the direct responsibility of the developer. 3.4. Intersection improvements, new or modified signalization, signal timing, optimization plans, area traffic studies for highways attributed to growth and unrelated to specific development are considered to be eligible development charge projects. 3.5. All other traffic signalization and Intersection improvements required by a new development are the direct responsibility of the developer. 4. Streetlights 4.1. Streetlights located on arterial or major collector roads are considered to be eligible development charge projects, and are included in the roads construction cost estimate of the related development charges project. 4.2. Streetlights on non-arterial roads, external to development but needed to support a specific development or required to link the area are the direct responsibility of the developer. 4.3. Streetlights on all other new roads are the direct responsibility of the developer. Watson & Associates Economists Ltd. PAGE D-4 5. Sidewalks 5.1. Construction of sidewalks on newly constructed development charge eligible roads will be considered to be part of the capital cost of the related development charge project. 5.2. Construction of new sidewalks on existing roads, including sidewalks external to a development that are required to connect the new area to public spaces, are the direct responsibility of the developer. 5.3. Sidewalks on all other new roads are the direct responsibility of the developer. 6. Cycling Routes and Trails 6.1. Cycling routes, bike lanes, and active transportation paths (on road) within the road allowance, external to development are considered to be eligible development charge projects, and are included in the capital cost of the related development charge project within the Services Related to a Highway area. 6.2. Recreational multi-use trails (off road)/naturalized walkways external to development are considered to be eligible development charge projects, and are included in the capital cost of the related development charge project within the Parks and Recreation Services area. 6.3. Cycling Routes/Bike Lanes/Active Transportation Paths (on road)/Recreational Multi-Use Trails (off road)/Naturalized Walkways internal to development are the direct responsibility of the developer. 6.4. Cycling Routes/Bike Lanes/Active Transportation Paths (on road)/Recreational Multi-Use Trails (off road)/Naturalized Walkways on all other new roads are the direct responsibility of the developer. 7. Noise Abatement Measures 7.1. Noise abatement measures external and internal to development where it is related to, or a requirement of a specific development are the direct responsibility of the developer. Watson & Associates Economists Ltd. PAGE D-5 7.2. Noise abatement measures on new arterial roads or arterial road improvements abutting existing community and unrelated to specific development are considered to be eligible development charge projects, and are included in the capital cost of the related development charge project. 8. Transit Lanes and Lay-Bys 8.1. Transit lanes and lay-bys located within municipal arterial roads are considered part of the complete street are considered to be eligible development charge projects, and are included in the capital cost of the related development charge project. 8.2. Transit lanes and lay-bys located within non-arterial road corridors internal to development are the direct responsibility of the developer. 8.3. Transit lanes and lay-bys located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates are the direct responsibility of the developer. 9. Transit Bus Stops and Amenities 9.1. Transit bus stops and amenities internal to development are the direct responsibility of the developer. 9.2. Transit bus stops and amenities on arterial roads are considered to be eligible development charge projects, and are included in the capital cost of the related development charge project. Storm Water Management 10. Storm Sewers, Diversion Channels and Outfalls 10.1. Storm sewers constructed internal to a development are the direct responsibility of the developer, unless the City requests sewers to be oversized over 900mm, in which case the incremental cost of oversizing is considered to be an eligible development charge project, based on an Watson & Associates Economists Ltd. PAGE D-6 area stormwater master drainage plan, and with the prior agreement and approval of the City. 10.2. Storm sewers, diversion channels and storm sewer outfalls constructed external to a development and greater in size than determined by engineering standards to be necessary to drain the owner's lands will be financed by area-specific development charges or through a joint service agreement to be developed by the parties, and with the facilitation of the City through its best efforts, based on an area stormwater master drainage plan, and with the prior agreement and approval of the City. 10.3. Storm sewers of any size required by a development to connect to an existing local trunk storm sewer or outlet are the direct responsibility of the developer. 11. Stormwater Management Facilities 11.1. Stormwater management facilities shall include all stormwater quantity/quality control structures, safety fencing, signage, easements and right-of-way to access facilities. 11.2. Stormwater quality and quantity control works are the direct responsibility of the developer, except as noted in 12.3 and 12.4 below. 11.3. Where the size of the development prevents on-site stormwater management facilities and when such facilities are deemed impractical in the sole opinion of the City, the City may elect to apply a financial contribution policy based on the area of impervious surfaces. Funds acquired in this fashion shall be placed in a reserve fund to be used in the construction of future centralized facilities or other watershed improvements. 11.4. If a stormwater management project benefits a broad area of development and the work provides service to lands owned by two or more unrelated parties, then the project may be considered to be financed: 11.4.1. through area-specific development charges, based on an area stormwater master drainage plan, and with the prior approval of the City; or Watson & Associates Economists Ltd. PAGE D-7 11.4.2. through a joint service agreement to be developed by the parties, and with the facilitation of the City through its best efforts. 12. Erosion Control Measures 12.1. Erosion works required to mitigate the impact of a development are the direct responsibility of the developer. Land Acquisition/Easements 13. For Roads 13.1. Land acquisition for arterial or collector roads according to the City's Official Plan, is primarily achieved through dedications under the Planning Act. 13.2. In areas where limited or no development is anticipated, and direct dedication is unlikely, the land acquisition is considered to be an eligible development charge project under a class of service for land acquisition. 13.3. Land acquisition for the purchase of associated easements required for arterial or major collector roads is considered to be an eligible development charge project under a class of service for land acquisition. 14. For Grade Separations 14.1. Land acquisition for grade separations (beyond normal dedication requirements) is considered to be an eligible development charge project under a class of service for land acquisition. 15. Land Acquisition for Stormwater Management Facilities 15.1. Land acquisition for centralized Stormwater Management Facilities, to the size required according to the approved engineering standards, is primarily provided by dedications under the Planning Act. 15.2. In areas where limited or no development is anticipated, and direct dedication is unlikely, the land acquisition is considered to be an eligible development charge project under a class of service for land acquisition. Watson & Associates Economists Ltd. PAGE D-8 16. For Parkland 16.1. The cost of land acquisition for parkland will not be financed by development charges. Parkland Development 17. Clean Land 17.1. The City expects parkland deeded to the municipality to be environmentally clean with all natural hazards removed. 17.2. The park site shall meet the requirements of the Environmental Protection Act to limit the risk of liability and provide a safe environment for interim and future leisure and active recreational use. 17.3. The park site shall have been subject to an Environmental Assessment (Class 1) and associated clean-up (if noted as a requirement of draft plan or subdivision agreement). 17.4. The clean-up of all litter, garbage, construction debris, and environmental hazards as identified under Environmental Assessment and by Community Services and Transportation and Operations Services is required. 18. Servicing 18.1. The developer is responsible to install an electrical service and a 50mm water service from the street right-of-way to the park property line, unless the City requests the water service to be oversized over 50mm, in which case the incremental cost of oversizing is considered to be an eligible development charge project. 18.2. If requested by the City, the developer may install other services, such as a sanitary connection, and the works are considered to be eligible development charge projects. Watson & Associates Economists Ltd. PAGE D-9 19. Park Design and Construction 19.1. In the event the City requests the developer to assist in the design and/or construction of the park, the work is considered to be an eligible development charge project. 20. Grading 20.1. The parkland is to be provided graded and seeded to be in a state that can be maintained by the City. 20.2. Where permitted by the City, the existing grades may be altered by the developer in accordance with the overall surface drainage plan. 20.3. Where grades are altered, such as when site filling or drainage improvements are proposed, the developer is required to rough grade the site to provide good site drainage, to provide access from surrounding streets and to establish grass seed to prevent erosion. 20.4. Where the site is left in a rough graded condition, a topsoil stockpile is required to be provided. 21. Recreational Trails 21.1. Recreational trails and their associated infrastructure (landscaping, bridges, trail surface, etc.), not otherwise captured as active transportation works, are considered to be eligible development charge projects. 22. Landscape Buffer Blocks, Features, Cul-de-sac Islands, Berms, Grade Transition Areas, Walkway Connections to Adjacent Arterial Roads, Open Space, Etc. 22.1. The cost of developing all landscape buffer blocks, landscape features, cul-de-sac islands, berms, grade transition areas, walkway connections to adjacent arterial roads, open space and other remnant pieces of land conveyed to the municipality are the direct responsibility of the developer. Such costs include but are not limited to: 22.1.1. pre-grading, sodding or seeding, supply and installation of amended topsoil, (to the City's required depth), landscape features, perimeter fencing and amenities and all planting. Watson & Associates Economists Ltd. PAGE D-10 22.1.2. Perimeter fencing to the City standard located on the public property side of the property line adjacent land uses (such as but limited to arterial roads) as directed by the City. Water and Wastewater 23. For the purpose of interpreting this guideline the following meanings will be used: 23.1. Facilities refer to non-linear infrastructure (i.e., other than watermains and wastewater mains). 24. The charge is utilized to fund future capacity in the respective systems (water and wastewater), including treatment plant expansions, pumping or booster stations, and reservoirs, etc. Water and Wastewater services constructed internal to a development are a direct responsibility of the developer, unless the City requests water and wastewater services to be oversized over 300mm, in which case the incremental cost of oversizing is considered to be an eligible development charge project, and with the prior agreement and approval of the City. 25. Water 25.1. Booster Stations & Reservoirs: 25.1.1. Facilities identified as being required in a City approved Master Servicing Plan(s) to accommodate growth are considered to be eligible development charge projects. 25.1.2. Facilities required to service only a proposed development or subsequent phases of the same development are the direct responsibility of the developer. 25.2. Facilities not identified in a City approved Master Servicing Plan but are subsequently identified by the City as being required in order to facilitate two or more developments, and where the potential benefiting lands are owned by two or more unrelated parties, are considered to be eligible development charge projects. Watson & Associates Economists Ltd. PAGE D-11 25.3. Water treatment, storage facilities, transmission mains, re- chlorination/sampling stations and Wells are considered to be eligible development charge projects. 25.4. External underground services involving trunk infrastructure and pipe sizes exceeding 300mm for water are considered to be eligible development charge projects. 25.5. Facilities not required for the individual development are considered to be eligible development charge projects. 26. Wastewater 26.1. Lift Stations: 26.1.1. Facilities identified as being required in a City approved Master Servicing Plan(s) to accommodate growth are considered to be eligible development charge projects. 26.1.2. Facilities required to service only the proposed development or subsequent phases of the same development are the direct responsibility of the developer. 26.1.3. Any facility not identified in the applicable Development Charges schedule of projects is ineligible for funding. 26.2. Facilities not identified in a City approved Master Servicing Plan but are subsequently identified by the City as being required in order to facilitate two or more developments and where the potential benefiting lands are owned by two or more unrelated parties, are considered to be eligible development charge projects. 26.3. Wastewater treatment plants and transmission mains are considered to be eligible development charge projects. 26.4. External underground services involving trunk infrastructure and pipe sizes exceeding 300mm for sanitary services are considered to be eligible development charge projects. Watson & Associates Economists Ltd. PAGE D-12 26.5. Facilities not required for the individual development are considered to be eligible development charge projects. Watson & Associates Economists Ltd. PAGE E-1 Appendix E Asset Management Plan Watson & Associates Economists Ltd. PAGE E-2 Appendix E: Asset Management Plan The Development Charges Act, 1997, as amended (D.C.A.) (clause (c.2) of subsection 10 (2)) requires that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of initial capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which were to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE E-3 Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE E-4 made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Non-Transit Services Commensurate with the above, the City prepared an A.M.P. in 2025 for its existing assets; with a high level consideration of future growth-related assets for services included in the D.C. calculations. To ensure legislative compliance and complement the existing A.M.P. review, the asset management requirement for the D.C. is separately provided below. In recognition of the schematic above, the following table (presented in 2026$) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, the present infrastructure gap and associated funding plan have not been considered in the analysis below. Therefore, the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that may require financing from municipal financial resources (i.e., taxation, rates, fees, etc.) has been presented as an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2026 D.C. capital works have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $59.60 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are estimated at approximately $12.59 million. This amount, combined with the existing operating revenues of $217.72 million, will provide annual revenues of $230.31 million by the end of the period. Watson & Associates Economists Ltd. PAGE E-5 6. In consideration of the above, the capital plan is deemed to be financially sustainable, as shown in Table E-1. Table E-1 City of Belleville Asset Management - Future Expenditures and Associated Revenues 2026$ Transit Services In regard to the D.C.A. requirements for asset management related to transit services, Ontario Regulation (O. Reg.) 82/98 (as amended) references O. Reg. 588/17 made under the I.J.P.A., which at a high-level requires the following be addressed: - State of local infrastructure; - Current and Proposed Levels of Service; - Lifecycle Management Strategy; and Asset Management - Future Expenditures and Associated Revenues 2051 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 34,707,832 Annual Debt Payment on Post Period Capital2 13,417,503 Annual Lifecycle - Municipal-wide Services 4,189,133 Annual Lifecycle - Urban Services 5,097,248 Incremental Operating Costs (for D.C. Services) $2,192,073 Total Expenditures 59,603,789 Revenue (Annualized) Total Existing Revenue3 $217,724,366 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $12,585,920 Total Revenues $230,310,286 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE E-6 - Financial Strategy. The City has recently prepared a 2025 A.M.P. that details its transit assets. Therefore, much of the information presented herein is reproduced from this 2025 A.M.P. State of Local Infrastructure As detailed in the City's 2025 A.M.P., Table E-2 presents the average age compared to service life of transit assets. Table E-3 presents a high-level summary of the City's transit assets, including assessed condition and replacement cost, as detailed in the City's 2025 A.M.P. In total, transit assets within the City have a replacement value of approximately $38.9 million in 2024 dollars. Current and Proposed Levels of Service As detailed in the City's 2025 A.M.P., Table E-4 presents the current and proposed levels of service for transit services. Lifecycle Management Strategy The asset management strategy provides the recommended course of actions required to deliver the proposed L.O.S. discussed in the previous section in a sustainable fashion. The proposed levels of service primarily includes renewal and replacement activities, as well as additional transit shelters. A summary of the anticipated lifecycle activities over the next 10-years is presented in Table E-5, and further detailed in the financial strategy. Financial Strategy The financing strategy outlines the suggested financial approach to fund the recommended lifecycle management. This forecast expands on the City's 2026 operating and capital budgets. The financial forecast within this section of the asset management plan includes: - Annual expenditure forecasts broken down by: Watson & Associates Economists Ltd. PAGE E-7 o Maintenance/non-infrastructure solutions; o Renewal/rehabilitation activities; o Replacement/disposal activities; and o Expansion activities. - A breakdown of annual funding/revenue by source. The financing strategy forecast, presented in Table E-6, assumes that operating costs have been forecast to increase by 5.8% over the forecast period, based on the anticipated increase in ridership. Transit passenger revenues have been forecast such that the relationship of fare revenue to ridership is maintained. No changes to other revenue sources have been assumed beyond those identified in the 2026 budget. Tax-based support to fund operating and capital costs not funded from other sources (i.e., fares, grants, advertising revenue, and D.C.s) is forecast to fluctuate over the forecast period, beginning at approximately $10.32 million in 2026 and ending at approximately $9.54 million by 2035. Watson & Associates Economists Ltd. PAGE E-8 Table E-2 City of Belleville Average Age Compared to Service Life of Transit Assets Table E-3 City of Belleville Transit Services Asset Inventory and Valuation Watson & Associates Economists Ltd. PAGE E-9 Table E-4 City of Belleville Transit Services Current and Proposed Levels of Service Watson & Associates Economists Ltd. PAGE E-10 Table E-5 City of Belleville Transit Service Asset Replacement/Disposal, Renewal/Rehabilitation, and Expansionary Capital (2026$) Description Total Cost (2026$) Replacement/Disposal Mobility Buses 1,642,400 $ Conventional Buses 23,094,200 $ Renewal/Rehabilitation Transit Garage & Mechanic Shop 3,324,500 $ Transit Terminal 1,216,800 $ Expansion Activities New Bus Shelters 432,600 $ Total 29,710,500 $ Watson & Associates Economists Ltd. PAGE E-11 Table E-6 City of Belleville Transit Service Financing Strategy (2026$) Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Maintenance / Non-Infrastructure Solutions Base Operating Costs1 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 8,454,200 Incremental Operating Costs2 486,813 973,626 1,460,439 1,947,252 2,434,065 2,920,878 3,407,691 3,894,504 4,381,317 4,868,130 Replacement/Disposal3 Mobility Buses 939,800 171,600 - - - - 265,500 265,500 - - Conventional Buses 2,853,000 - 2,891,600 2,891,600 2,891,600 2,891,600 2,891,600 2,891,600 2,891,600 - Renewal/Rehabilitation3 Transit Garage & Mechanic Shop 295,300 307,700 862,800 324,000 412,500 263,500 609,800 - 163,100 85,800 Transit Terminal - 15,600 - 213,800 - - 883,900 - 95,400 8,100 Expansion Activities4 D.C. Funded New Bus Shelters 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 Non-growth Related New Bus Shelters 38,770 38,770 38,770 38,770 38,770 38,770 38,770 38,770 38,770 38,770 Total 13,072,373 9,965,986 13,712,299 13,874,112 14,235,625 14,573,438 16,555,951 15,549,064 16,028,877 13,459,490 1 2026 Operating Budget 2 Forecast based on ridership increase 3 2026 10-year Capital Forecast 4 Estimated timing of expansion activities Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Operating Fares1 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 2,254,500 Incremental Fares2 129,819 259,638 389,457 519,276 649,095 778,914 908,733 1,038,552 1,168,371 1,298,190 Other (Advertising & Provincial Grants) 325,000 325,000 325,000 325,000 325,000 325,000 325,000 325,000 325,000 325,000 Capital D.C. Revenue 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 Municipal Contribution (incl. reserve fund transfers) 10,358,564 7,122,358 10,738,852 10,770,846 11,002,540 11,210,534 13,063,228 11,926,522 12,276,516 9,577,310 Total 13,072,373 9,965,986 13,712,299 13,874,112 14,235,625 14,573,438 16,555,951 15,549,064 16,028,877 13,459,490 1 2026 Operating Budget 2 Forecast based on ridership increase Expenditure Forecast Revenue Forecast Watson & Associates Economists Ltd. PAGE F-1 Appendix F Draft Development Charges By-law Watson & Associates Economists Ltd. PAGE F-2 THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER 2026-XX A by-law to establish development charges for the Corporation of the City of Belleville WHEREAS subsection 2(1) of the Development Charges Act, 1997 c. 27, as amended (hereinafter called "the Act") provides that the council of a municipality may pass By-laws for the imposition of development charges against land for increased capital costs required because of the need for services arising from development in the area to which the by-law applies; AND WHEREAS the Council of The Corporation of the City of Belleville ("City of Belleville") has given Notice in accordance with Section 12 of the Development Charges Act, 1997, of its intention to pass a by-law under Section 2 of the said Act; AND WHEREAS in accordance with the Act, a report entitled "Development Charges Background Study" dated July 6, 2026, as amended, prepared by Watson & Associates Economists Ltd. (the "Background Study"), has been completed; AND WHEREAS the Council of the City of Belleville has considered the Background Study, as amended, has considered all written submissions, and has heard all persons who applied to be heard no matter whether in objection to, or in support of, the development charge proposal at a public meeting held on July 27, 2026; AND WHEREAS the Council of the City of Belleville has determined that a further public meeting is not necessary pursuant to subsection 12(3) of the Act. NOW THEREFORE THE COUNCIL OF THE CITY OF BELLEVILLE ENACTS AS FOLLOWS: Watson & Associates Economists Ltd. PAGE F-3 DEFINITIONS 1. In this by-law, (1) "Accessory building or structure" shall mean a detached building or structure that is not used for human habitation and the use of which is customarily incidental and subordinate to a principal use, building or structure and is located on the same lot therewith. (2) "Accessory use" shall mean a use customarily incidental and subordinate to, and exclusively devoted to the principal or main use of the lot, building or structure and located on the same lot as such principal or main use. (3) "Act" means the Development Charges Act, S.O. 1997, c. 27, as amended, or any successor thereof. (4) "Additional dwelling unit" means a dwelling unit, whether contained within a proposed single detached dwelling, semi-detached dwelling or row dwelling, or ancillary to a single detached dwelling, a semi-detached dwelling, or a row dwelling including but not limited to a coach house, laneway suite or structure constructed above an existing garage or other structure separate from the primary dwelling unit, and which is not capable of being legally conveyed as a separate parcel of land from the primary dwelling unit. (5) "Affordable Residential Unit" means a residential unit that meets the criteria set out in section 4.1 of the Act. (6) "Agricultural use" means the use of land and/or buildings for the cultivation or foraging of crops, livestock or poultry production, raising or training of horses, and orchards, market gardening, maple sugar bushes, tobacco crops or other forms of specialized crop production. (7) "Apartment dwelling" means any dwelling unit within a building containing three or more dwelling units where the units are connected by an interior corridor. (8) "Attainable Residential Unit" means a residential unit that meets the criteria set out in section 4.1 of the Act. Watson & Associates Economists Ltd. PAGE F-4 (9) "Bedroom" means a habitable room larger than seven square metres, including a den, study, or other similar area, but does not include a living room, dining room or kitchen. (10) "Board of Education" means a board defined in subsection 1 (1) of the Education Act. (11) "Bona fide farm operation" means the proposed development is for agricultural use where the yearly income from the agricultural use is substantial and the owner holds a valid Farm Business Registration Number issued by the Ontario Ministry of Agriculture, Food and Rural Affairs. For purposes of determining bona fide farm uses reference may be made to the owner's membership in a legitimate farm organization. (12) "Building Code Act" means the Building Code Act, 1992, S.O. 1992, c.23. (13) "Capital cost" means capital costs as defined in subsection 5 (3) of the Act. (14) "Council" means the Council of The Corporation of the City of Belleville. (15) "Development" means any activity or proposed activity in respect of land that requires one or more of the actions referred to in section 14 of this by- law and including the redevelopment of land or the redevelopment, expansion, extension or alteration of a use, building or structure except interior alterations to an existing building or structure which do not change or intensify the use of land. (16) "Development charge" means a charge imposed pursuant to this By-law. (17) "Dwelling unit" means a suite operated as a housekeeping unit, used or intended to be used as a domicile by 1 or more persons and usually containing cooking, eating, living, sleeping and sanitary facilities, and includes: (a) a park model home; (b) a bedroom in a students' or seniors' residence; Watson & Associates Economists Ltd. PAGE F-5 (c) a building, or portion of a building, used for residential purposes as set out in the Planning Act. (18) "Farm building" means that part of a bona fide farm operation encompassing barns, silos and other ancillary development to an agricultural use, but excluding a residential use. (19) "Grade" means the average level of finished ground adjoining a building or structure at all exterior walls. (20) "Gross floor area" means the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or in the case of a mixed use building or structure, between the outside surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: (a) a room or enclosed area within the building or structure above or below that is used exclusively for the accommodation of heating, cooling, ventilating, electrical, mechanical or telecommunications equipment that service the building; (b) loading facilities above or below grade; and (c) a part of the building or structure below grade that is used for the parking of motor vehicles or for storage or other accessory use. (21) "Inclusionary zoning residential unit" means residential units that are affordable housing units required to be included in a development or redevelopment pursuant to a by-law passed under section 34 of the Planning Act to give effect to the policies described in subsection 16 (4) of that Act. (22) "Industrial use" means lands, buildings or structures used or designed or intended for use for manufacturing, processing, fabricating or assembly of raw goods, warehousing or bulk storage of goods, and includes office uses and the sale of commodities to the general public where such uses are accessory to an industrial use, but does not include the sale of commodities to the general public through a warehouse club or an agricultural use. Watson & Associates Economists Ltd. PAGE F-6 (23) "Institutional use", for the purposes of subsection 20 (3), means a building used for or in connection with: (a) as a long-term care home within the meaning of subsection 2 (1) of the Long Term Care Homes Act, 2007; (b) as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010; (c) by any institution of the following post-secondary institutions for the objects of the institution: (i) a university in Ontario that receives direct, regular and ongoing operation funding from the Government of Ontario; (ii) a college or university federated or affiliated with a university described in subclause (i); or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institute Act, 2017; (d) as a memorial home, clubhouse or athletic grounds by an Ontario branch of the Royal Canadian Legion; or (e) as a hospice to provide end of life care. (24) "Local Board" means a school board, public utility, commission, transportation commission, public library board, board of park management, local board of health, board of commissioners of police, planning board, or any other board, commission, committee, body or local authority established or exercising any power or authority under any general or special Act with respect to any of the affairs or purposes, including school purposes, of the Municipality or any part or parts thereof. (25) "Local services" means those services or facilities which are under the jurisdiction of the Municipality and are related to a plan of subdivision or within the area to which the plan relates, required as a condition of approval under section 51 of the Planning Act, or as a condition of approval under section 53 of the Planning Act. Watson & Associates Economists Ltd. PAGE F-7 (26) "Mixed use" means a building, structure or development with portions which are to be used for residential development and other portions which are to be used for non-residential development. (27) "Multiple dwelling" means all dwellings other than single detached dwellings, semi-detached dwellings, apartment dwellings and special care dwelling units. (28) "Municipality" means The Corporation of the City of Belleville. (29) "Non-profit housing" means development that meets the criteria set out in subsection 4.2 (1) of the Act. (30) "Non-residential use" means a building or structure used for purposes other than a residential use. (31) "Official Plan" means the Official Plan of the City of Belleville and any amendments thereto. (32) "Other Multiple" means the same as multiple dwelling as defined in this by- law. (33) "Owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed. (34) "Place of worship" means that part of a building or structure that is exempt from taxation as a place of worship under the Assessment Act, R. S.O. 1990, Chap. A.31, as amended, or any successor thereof. (35) "Planning Act" means the Planning Act, R.S.O. 1990, c.P.-13, as amended, or any successor thereof. (36) "Regulation" means any regulation made pursuant to the Act. (37) "Rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises. Watson & Associates Economists Ltd. PAGE F-8 (38) "Residential unit" means the same as dwelling unit as defined in this by- law. (39) "Residential use" means lands, buildings or structures or portions thereof used, or designed or intended to be used as a home or residence of one or more individuals who reside or dwell there permanently or for a considerable period of time, and includes a single detached dwelling, a semi-detached dwelling, a multiple dwelling, an apartment dwelling, special care dwelling units, and the residential portion of a mixed-use building or structure, but does not include a place of worship, student residence, military barracks, hotel, motel, or bed and breakfast where individuals typically stay for less than one week. (40) "Row dwelling" means a residential building containing not less than three dwelling units with each unit separated by a common or party wall or walls with a separate outside entrance to each unit. For the purposes of this definition, a row dwelling with up to two additional dwelling units as defined in this by-law is deemed to be a row dwelling. (41) "Semi-detached dwelling" means a building divided vertically into two dwelling units each of which has a separate entrance and access to grade. For the purposes of this definition, a semi-detached dwelling with up to two additional dwelling units as defined in this by-law is deemed to be a semi-detached dwelling. (42) "Services" means services set out in Schedule "A" to this By-law. (43) "Single detached dwelling" means a completely detached building containing only one dwelling unit. For the purposes of this definition, a single detached dwelling with up to two additional dwelling units as defined in this by-law is deemed to be a single detached dwelling. (44) "Special Care Dwelling Unit" means a unit within a building containing more than six dwelling units or dwelling rooms that are designed to accommodate individuals with specific support needs, including independent permanent living arrangements, where support services such as meal preparation, grocery shopping, housekeeping, nursing, respite care and attendant services are provided at various levels, and: Watson & Associates Economists Ltd. PAGE F-9 (a) the units have a common entrance from street level; (b) the occupants have the right to use common halls, stairs, yards, rooms, and accessory buildings; and (c) the units or rooms may or may not have exclusive sanitary or culinary facilities or both. (45) "Special Dwelling Unit" means the same as special care dwelling unit as defined in this by-law. (46) "Urban Service Area" means the urban serviced area as defined in the Municipality's Official Plan. CALCULATION OF DEVELOPMENT CHARGES 2. (1) Subject to the provisions of this by-law, development charges against land shall be imposed, calculated and collected in accordance with the base rates set out in Schedule "B", which relate to the services set out in Schedule "A". (2) The development charge with respect to the use of any land, buildings or structures shall be calculated as follows: (a) in the case of residential development or redevelopment, or the residential portion of a mixed-use development or redevelopment, the sum of the product of the number of dwelling units of each type multiplied by the corresponding total amount for such dwelling unit type, as set out in Schedule "B"; (b) in the case of non-residential development or redevelopment, or the non-residential portion of a mixed-use development or redevelopment, the product of the gross floor area of such development multiplied by the corresponding total amount for such gross floor area, as set out in Schedule "B"; and (c) in the case of a student residence, the applicable charge, per room, is as established for "Apartments - Bachelor and 1 Bedroom" as set out in Schedule "B". Watson & Associates Economists Ltd. PAGE F-10 (3) The development charges for water and wastewater services are applicable to lands within the Urban Service Area and to other lands connecting to the Municipality's water and wastewater services. (4) Council hereby determines that the development or redevelopment of land, buildings or structures for residential and non-residential uses will require the provision, enlargement or expansion of the services referenced in Schedule "A". APPLICABLE LANDS 3. (1) Subject to subsection (2), charges payable under Schedule "B" of this by- law apply to all lands in the Municipality, whether or not the land or use is exempt from taxation under Section 3 of the Assessment Act, R.S.O. 1990, c.A.-31. (2) This by-law shall not apply to land that is owned by and used for the purposes of: (a) a board of education; (b) any municipality or local board thereof; or (c) a University that receives regular and ongoing operating funds from the government for the purposes of post-secondary education. (3) The Municipality may exempt lands from this by-law where the lands are designated in the Municipality's Official Plan as part of a Community Improvement Area and the Municipality implements a Community Improvement Plan which includes the said lands. EXEMPTIONS AND REDUCTIONS Residential Units in Existing Residential 4. Development charges shall not be imposed with respect to that category of exempt development described in subsections 2 (3), 2 (3.1), and 2 (3.2) of the Act, namely: (1) An enlargement to an existing dwelling unit; Watson & Associates Economists Ltd. PAGE F-11 (2) A second residential unit in an existing detached house, semi-detached house, or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing detached house, semi-detached house or rowhouse cumulatively contain no more than one residential unit; (3) A third residential unit in an existing detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing detached house, semi-detached house or rowhouse contains any residential units; (4) One residential unit in a building or structure ancillary to an existing detached house, semi-detached house or rowhouse on a parcel of residential land, if the existing detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the existing detached house, semi- detached house or rowhouse contains any residential units; or (5) In an existing rental residential building, which contains four or more residential units, the creation of the greater of one residential unit or one per cent of the existing residential units. Residential Units in New Residential 5. Development charges shall not be imposed with respect to that category of exempt development described in subsection 2 (3.3) of the Act, namely: (1) A second residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the new detached house, semi-detached house or rowhouse cumulatively will contain no more than one residential unit; (2) A third residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the new Watson & Associates Economists Ltd. PAGE F-12 detached house, semi-detached house or rowhouse contains any residential units; or (3) One residential unit in a building or structure ancillary to a new detached house, semi-detached house or rowhouse on a parcel of residential land, if the new detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units. Enlargement of an Existing Industrial Development 6. (1) Development charges shall not be imposed with respect to that category of exempt development described in section 4 of the Act, namely the enlargement of the gross floor area of an existing industrial building, if the gross floor area is enlarged by 50 percent or less. (2) For the purpose of subsection (1) the terms "gross floor area" and "existing industrial building" shall have the same meaning as those terms have in Ontario Regulation 82/98 made under the Act. (3) Notwithstanding subsection (1), if the gross floor area of an existing industrial building is enlarged by more than 50 percent, development charges shall be calculated and collected in accordance with Schedule "B" on the amount by which the enlargement exceeds 50 percent of the gross floor area before the enlargement. (4) For the purpose of the application of section 4 of the Act to the operation of this by-law: (a) the gross floor area of an existing industrial building shall be calculated as it existed at the time of this by-law's effective date; and (b) the enlargement of the gross floor area of the existing building must: (i) be attached to the existing industrial building; Watson & Associates Economists Ltd. PAGE F-13 (ii) not be attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor or other passageway, shared below-grade connection, foundation, footing, parking facility, service tunnel or service pipe; (iii) be for use or in connection with an industrial purpose as set out in this by-law; and (iv) constitute a bona fide increase in the size of the existing building. Other Statutory Exemptions 7. Development charges shall not be imposed with respect to that category of exempt development described in section 4.1 of the Act, namely, an affordable residential unit or attainable residential unit. 8. Development charges shall not be imposed with respect to that category of exempt development described in section 4.2 of the Act, namely, a non-profit housing development. 9. Development charges shall not be imposed with respect to that category of exempt development described in section 4.3 of the Act, namely, an inclusionary zoning residential unit development. 10. Development charges shall not be imposed with respect to that category of exempt development described in section 4.4 of the Act, namely, a long-term care home. 11. Development charges shall not be imposed with respect to that category of exempt development described in section 4.5 of the Act, namely, a non-profit retirement housing development. Other Exemptions 12. Notwithstanding the provisions of this by-law, development charges shall not be imposed with respect to: (1) private schools as defined in the Education Act; Watson & Associates Economists Ltd. PAGE F-14 (2) development of land, buildings or structures owned by a College of applied arts and technology established pursuant to the Ministry of Training, Colleges and Universities Act, and used for teaching-related purposes on lands owned by and used for the purposes of the College but does not include student residences; (3) a place of worship classified as exempt from taxation under section 3 of the Assessment Act; (4) hospitals under the Public Hospitals Act; (5) a non-residential farm building; or (6) development creating or adding an accessory use or structure not exceeding ten square metres of non-residential floor area. Reductions 13. Notwithstanding the provisions of this by-law, development charges for rental housing developments will be reduced based on the number of bedrooms in each unit, as follows: (1) Three or more bedrooms - 25% reduction; (2) Two bedrooms - 20% reduction; and (3) All other bedroom quantities - 15% reduction. DEVELOPMENT CHARGES IMPOSED 14. (1) Subject to subsection (2), development charges shall be calculated and collected in accordance with the provisions of this by-law and be imposed on land to be developed for residential and non-residential use, where the development requires: (a) the passing of a zoning by-law or an amendment thereto under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; Watson & Associates Economists Ltd. PAGE F-15 (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 50 of the Condominium Act, R.S.O. 1990, c.C.-26; or (g) the issuing of a permit under the Building Code Act, in relation to a building or structure. (2) Subsection (1) shall not apply in respect to: (a) local services installed or paid for by the owner within a plan of subdivision or within the area to which the plan relates, as a condition of approval under section 51 of the Planning Act; or (b) local services installed or paid for by the owner as a condition of approval under section 53 of the Planning Act. LOCAL SERVICE INSTALLATION 15. Nothing in this by-law prevents Council from requiring, as a condition of an agreement under sections 51 or 53 of the Planning Act, that the owner, at his or her own expense, shall install or pay for such local services, within the Plan of Subdivision or within the area to which the plan relates, as Council may require. MULTIPLE CHARGES 16. (1) Where two or more of the actions described in subsection 14 (1) are required before land to which a development charge applies can be developed, only one development charge shall be calculated and collected in accordance with the provisions of this by-law. (2) Notwithstanding subsection (1), if two or more of the actions described in subsection 14 (1) occur at different times, and if the subsequent action has the effect of increasing the need for municipal services as set out in Watson & Associates Economists Ltd. PAGE F-16 Schedule "A", an additional development charge on the additional residential units and non-residential gross floor area shall be calculated and collected in accordance with the provisions of this by-law. SERVICES IN LIEU 17. (1) Council may authorize an owner, through an agreement under section 38 of the Act, to substitute such part of the development charge applicable to the owner's development as may be specified in the agreement, by the provision at the sole expense of the owner, of services in lieu. Such agreement shall further specify that where the owner provides services in lieu in accordance with the agreement, Council shall give to the owner a credit against the development charge in accordance with the agreement provisions and the provisions of section 39 of the Act, equal to the reasonable cost to the owner of providing the services in lieu. In no case shall the agreement provide for a credit that exceeds the total development charge payable by an owner to the Municipality in respect of the development to which the agreement relates. (2) In any agreement under subsection (1), Council may also give a further credit to the owner equal to the reasonable cost of providing services in addition to, or of a greater size or capacity, than would be required under this by-law. (3) The credit provided for in subsection (2) shall not be charged to any development charge reserve fund. RULES WITH RESPECT TO REDEVELOPMENT 18. Despite any other provisions of this by-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within five years prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: Watson & Associates Economists Ltd. PAGE F-17 (1) In the case of a residential building or structure, or in the case of a mixed use building or structure, the residential uses in the mixed use building or structure, an amount calculated by multiplying the applicable development charges as set out in Schedule "B", by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (2) In the case of a non-residential building or structure or, in the case of mixed use building or structure, the non-residential uses in the mixed use building or structure, an amount calculated by multiplying the applicable development charges as set out in Schedule "B", by the gross floor area that has been or will be demolished or converted to another principal use. 19. A credit provided for in section 18 shall not exceed the amount of the development charge that would otherwise be payable, and no existing land use that is exempt under this by-law shall be eligible for a credit within 5 years of the date that an Occupancy Permit was issued for the gross floor area that has been or will be demolished or converted to another principal use. TIMING OF CALCULATION AND PAYMENT 20. (1) Development charges shall be calculated, payable and collected in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies. (2) Where development charges apply to land in relation to which a building permit is required, the building permit shall not be issued until the development charge has been paid in full. (3) Notwithstanding subsections (1) and (2), development charges for rental housing and institutional developments are due and payable in 6 instalments commencing with the first instalment payable on the earlier of the date of first occupancy or the date of occupancy permit issuance, and each subsequent installment, including interest accrued prior to June 5, 2025, payable on the anniversary date each year thereafter. Watson & Associates Economists Ltd. PAGE F-18 (4) Notwithstanding subsections (1) and (2), development charges for non-rental residential developments are due and payable in full on the earlier of: (a) The day a permit is issued under the Building Code Act authorizing occupation of the building; or (b) The day the building is first occupied. (5) Where the development of land results from the approval of a Site Plan or Zoning By-law Amendment that was: (a) received and approved between January 1, 2020, and June 5, 2024, and the approval of the application occurred within 2 years of building permit issuance, the development charges under section 2 shall be calculated based on the lower of the rates set out in Schedule "B" on the date the planning application was made, including interest, or the rate currently in effect. Where both planning applications apply, development charges under section 2 shall be calculated based on the rates, including interest, set out in Schedule "B" on the date of the later planning application; or (b) received on or after June 6, 2024, and the approval of the application occurred within 18 months of building permit issuance, the development charges under section 2 shall be calculated based on the lower of the rates set out in Schedule "B" on the date the planning application was made, including interest, or the rate currently in effect. Where both planning applications apply, development charges under section 2 shall be calculated based on the rates, including interest, set out in Schedule "B" on the date of the later planning application. (6) Interest for the purposes of subsections (3) and (5) shall be determined as the maximum interest rate as defined in section 26.3 of the Act. (7) Notwithstanding subsections (1) to (5), Council from time to time, and at any time, may enter into agreements providing for all or any part of a Watson & Associates Economists Ltd. PAGE F-19 development charge to be paid before or after it would otherwise be payable, in accordance with section 27 of the Act. (8) If development charges are paid and the applicable building permit is cancelled or revoked before construction begins, the development charges will be refunded to the registered owner of the land. RESERVE FUNDS 21. (1) Monies received from payment of development charges under this by-law shall be maintained in separate reserve funds for each of the services and classes of service set out in Schedule "A". (2) Monies received for the payment of development charges shall be used only in accordance with the provisions of section 35 of the Act. (3) Council directs the Municipal Treasurer to divide the reserve funds created hereunder into separate subaccounts in accordance with the service sub- categories set out in Schedule "A" to which the development charge payments shall be credited in accordance with the amounts shown, plus interest earned thereon. (4) Where any development charge, or part thereof, remains unpaid after the due date, the amount unpaid shall be added to the tax roll and shall be collected as taxes. (5) Where any unpaid development charges are collected as taxes under subsection (4), the monies so collected shall be credited to the development charge reserve funds referred to in subsection (1). (6) The Treasurer of the Municipality shall prepare an annual financial statement for the development charge reserve funds as prescribed under section 12 of Ontario Regulation 82/98 made under the Act and shall submit the statement for Council's consideration on or before June 30th each year, and provide a copy of the financial statement to the Minister no later than July 15th each year in which the statement is provided to Council. Watson & Associates Economists Ltd. PAGE F-20 BY-LAW AMENDMENT OR APPEAL 22. (1) Where this by-law or any development charge prescribed there under is amended or repealed by order of the Ontario Land Tribunal or by resolution of the Municipal Council, the Municipal Treasurer shall calculate forthwith the amount of any overpayment to be refunded as a result of said amendment or repeal. (2) Refunds that are required to be paid under subsection (1) shall be paid to the registered owner of the land on the date on which the refund is paid. (3) Refunds that are required to be paid under subsection (1) shall be paid with interest, at the minimum interest rate as defined in subsection 11 (1) of Ontario Regulation 82/98 made under the Act. BY-LAW INDEXING 23. The development charges imposed pursuant to this by-law shall be adjusted annually on January 1st, without amendment to this by-law, in accordance with the most recent available twelve-month change in the Toronto series of the prescribed index, as detailed in section 7 of Ontario Regulation 82/98 made under the Act (currently Statistics Canada Table 18-10-0289-01). SEVERABILITY 24. In the event any provision, or part thereof, of this by-law is found by a court of competent jurisdiction to be ultra vires, such provision, or part thereof, shall be deemed to be severed, and the remaining portion of such provision and all other provisions of this by-law shall remain in full force and effect. HEADINGS FOR REFERENCE ONLY 25. The headings inserted in this by-law are for convenience of reference only and shall not affect the construction of or interpretation of this by-law. BY-LAW REGISTRATION 26. A certified copy of this by-law may be registered on title to any land to which this by-law applies. Watson & Associates Economists Ltd. PAGE F-21 BY-LAW ADMINISTRATION 27. This by-law shall be administered by the Municipal Treasurer. SCHEDULES TO THE BY-LAW 28. The following Schedules to this by-law form an integral part of this by-law: Schedule "A" - Designated Municipal Services and Classes of Service Schedule "B" - Schedule of Development Charges DATE BY-LAW EFFECTIVE 29. This by-law shall come into force and effect at 12:01 AM on September 15, 2026. DATE BY-LAW EXPIRES 30. This by-law will expire ten years after the day it comes into force unless it is repealed at an earlier date. EXISTING BY-LAW REPEALED 31. By-law No. 2021-201 and By-law No. 2025-123 are hereby repealed as of the date and time of this by-law coming into effect. SHORT TITLE 32. This by-law may be cited as the "City of Belleville Development Charge By-law, 2026." Watson & Associates Economists Ltd. PAGE F-22 Read a first time this 14th day of September, 2026. Read a second time this 14th day of September, 2026. Read a third time and finally passed this 14th day of September, 2026. _____________________ Mayor _____________________ Clerk Watson & Associates Economists Ltd. PAGE F-23 SCHEDULE "A" TO BY-LAW NUMBER 2026-XX Municipal-wide Services - Services Related to a Highway - Fire Services - Police Services - Parks and Recreation Services - Library Services - Ambulance Services - Transit Services Municipal-wide Classes of Service - Growth-related Studies Urban Serviced Area-specific Services - Water Services - Wastewater Services Watson & Associates Economists Ltd. PAGE F-24 SCHEDULE "B" TO BY-LAW NUMBER 2026-XX SCHEDULE OF DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) City-Wide Services/Class of Service: Services Related to a Highway 12,911 $ 8,518 $ 9,757 $ 5,142 $ 4,992 $ 7.21 $ Fire Protection Services 1,607 $ 1,060 $ 1,214 $ 640 $ 621 $ 0.92 $ Policing Services 966 $ 637 $ 730 $ 385 $ 373 $ 0.55 $ Parks and Recreation Services 4,301 $ 2,838 $ 3,250 $ 1,713 $ 1,663 $ 0.39 $ Library Services 157 $ 104 $ 119 $ 63 $ 61 $ 0.01 $ Ambulance 269 $ 177 $ 203 $ 107 $ 104 $ 0.15 $ Transit Services 10 $ 7 $ 8 $ 4 $ 4 $ 0.01 $ Growth-related Studies 68 $ 45 $ 51 $ 27 $ 26 $ 0.04 $ Total City-Wide Services/Class of Services 20,289 $ 13,386 $ 15,332 $ 8,081 $ 7,844 $ 9.28 $ Urban Services: Wastewater Services 4,891 $ 3,227 $ 3,696 $ 1,948 $ 1,891 $ 9.89 $ Water Services 2,628 $ 1,734 $ 1,986 $ 1,047 $ 1,016 $ 6.23 $ Total Urban Services 7,519 $ 4,961 $ 5,682 $ 2,995 $ 2,907 $ 16.12 $ GRAND TOTAL RURAL AREA 20,289 $ 13,386 $ 15,332 $ 8,081 $ 7,844 $ 9.28 $ GRAND TOTAL URBAN AREA 27,808 $ 18,347 $ 21,014 $ 11,076 $ 10,751 $ 25.40 $ RESIDENTIAL Service/Class of Service