| permit required for | Construction, demolition and change of use of buildings. | s. 3 |
| fee basis | Permit Fee = SI x A, where SI = Service Index for Classification and A = Floor area in square meters; minimum $225 Part 9 residential, $400 other. | Schedule "A", s. 1(a); Schedule "A", Minimum Permit Fee |
| authority | Chief Building Official | s. 18.1 |
scout note
Town's own Building By-law under the Building Code Act, 1992, enacted May 5, 2020, published as full consolidated HTML text. Permit fees are adjusted annually per s.8.7 and published on the town's separate Permit Fees and Payment Methods page rather than in a distinct numbered fees bylaw found online.