Development Charges Background Study

Brant, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 57c3b2658e1e · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 May 24, 2024 [email protected] Development Charges Background Study County of Brant Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 ............................... 1-3 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters ............................................ 1-3 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 ..................... 1-4 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 .................... 1-4 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 ....... 1-7 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 ..... 1-7 1.4.1 Additional Residential Unit Exemption ....................................... 1-7 1.4.2 Removal of Housing as an Eligible D.C. Service ....................... 1-8 1.4.3 New Statutory Exemption for Non-Profit Housing ...................... 1-8 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units ........................ 1-8 1.4.5 Historical Level of Service Extended to Previous 15-Year Period ........................................................................................ 1-9 1.4.6 Revised Definition of Capital Costs ............................................ 1-9 1.4.7 Mandatory Phase-in of a D.C. .................................................... 1-9 1.4.8 D.C. By-law Expiry ..................................................................... 1-9 1.4.9 Installment Payments ................................................................. 1-9 1.4.10 Rental Housing Discount.......................................................... 1-10 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications ......................................................... 1-10 1.4.12 Requirement to Allocate Funds Received ................................ 1-10 1.4.13 Bill 134: Affordable Homes and Good Jobs Act, 2023 ............. 1-10 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx 1.5 Proposed Changes to the D.C.A. - Bill 185: Cutting Red Tape to Build More Homes Act, 2024 ................................................................ 1-13 1.5.1 Revised Definition of Capital Costs .......................................... 1-13 1.5.2 Removal of the Mandatory Phase-in ........................................ 1-13 1.5.3 Process for Minor Amendments to D.C. By-laws ..................... 1-14 1.5.4 Reduction of D.C. Rate Freeze Timeframe .............................. 1-14 1.5.5 Modernizing Public Notice Requirements ................................ 1-15 2. Current County of Brant D.C. Policies ........................................................... 2-1 2.1 Schedule of Charges .............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-2 2.4 Indexing .................................................................................................. 2-2 2.5 Redevelopment Allowance ..................................................................... 2-2 2.6 Exemptions ............................................................................................. 2-3 3. Anticipated Development in the County of Brant ......................................... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-7 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Classes of Services ................................................................................ 4-8 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ...................... 4-10 4.9.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.9.3 Reduction for Benefit to Existing Development ........................ 4-11 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-12 4.10 Municipal-wide vs. Area Rating ............................................................. 4-12 4.11 Allocation of Development .................................................................... 4-12 4.12 Asset Management ............................................................................... 4-13 4.13 Transit ................................................................................................... 4-13 4.14 Mandatory Phase-in of a D.C. ............................................................... 4-14 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and 10-Year Capital Costs for the County of Brant's D.C. Calculation ...................................................................................... 5-1 5.2.1 Parks and Recreation Services .................................................. 5-1 5.2.2 Library Services ......................................................................... 5-7 5.2.3 Ambulance Services .................................................................. 5-9 5.2.4 Long-term Care Services ......................................................... 5-11 5.2.5 Child Care and Early Years Programs Services ...................... 5-13 5.2.6 Waste Diversion Services ........................................................ 5-14 5.3 Service Levels and Long-term Capital Costs for the County of Brant's D.C. Calculation ........................................................................ 5-16 5.3.1 Services Related to a Highway ................................................ 5-16 5.3.2 Fire Services ............................................................................ 5-22 5.3.3 Policing Services ...................................................................... 5-26 5.4 Service Levels and Urban Long-term Capital Costs for the County of Brant's D.C. Calculation .................................................................... 5-28 5.4.1 Water Services ......................................................................... 5-28 5.4.2 Wastewater Services ............................................................... 5-32 5.4.3 Stormwater Services ................................................................ 5-36 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Phasing in .................................................................................. 7-5 7.3.6 Timing of Collection ................................................................... 7-5 7.3.7 The Applicable Areas ................................................................. 7-6 7.3.8 Indexing ..................................................................................... 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-7 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx 7.4.4 Area Rating ................................................................................ 7-7 7.5 Other Recommendations ........................................................................ 7-9 8. By-law Implementation ................................................................................... 8-1 8.1 Public Consultation Process ................................................................... 8-1 8.1.1 Introduction ................................................................................ 8-1 8.1.2 Public Meeting of Council........................................................... 8-1 8.1.3 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy ................................................................... D-1 Appendix E Local Service Policy .............................................................................E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Proposed D.C. By-Law ........................................................................ G-1 Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx List of Acronyms and Abbreviations A.M.P. Asset management plan C.B.C. Community Benefits Charge D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area LPAT Local Planning Appeal Tribunal N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.M.B. Ontario Municipal Board O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit S.W.M. Stormwater management sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\Brant\2023 DC\Report\Final Report.docx Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the County of Brant (County) required by the Development Charges Act, 1997, as amended (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Overview of the legislative requirements of the Act; - Chapter 2 - Review of present D.C. policies of the County; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the County; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of future capital requirements to service growth and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below. 1) Identify amount, type and location of growth. 2) Identify servicing needs to accommodate growth. 3) Identify capital costs to provide services to meet the needs. 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Amounts in excess of 15-year historical service calculation; and - D.C. reserve funds (where applicable); 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. Watson & Associates Economists Ltd. PAGE ii H:\Brant\2023 DC\Report\Final Report.docx 3. Subsequent to the passage of the County's 2019 D.C. By-law, the County undertook a D.C. Update Study in 2021 to pass an amending D.C. By-law to incorporate a number of capital revisions and changes to the D.C.A. as a result of the following Acts (details of each Act are provided in Chapter 1 of this report): - Bill 108: More Homes, More Choice Act, 2019 - Bill 138: Plan to Build Ontario Together Act, 2019 - Bill 197: COVID-19 Economic Recovery Act, 2020 - Bill 213: Better for People, Smarter for Business Act, 2020 Since that time, the Province introduced another set of revisions to the D.C.A. through Bill 23: More Homes Built Faster Act, 2022. Bill 23 was first introduced on October 25, 2022, and received Royal Assent on November 28, 2022. A summary of the changes provided from Bill 23 are outlined below (further details are provided in Chapter 1 of this report): - Additional Residential Unit Exemption: Allowance of a third unit as-of-right; - Removal of Housing as an Eligible D.C. Service; - New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units (currently not in force); Note: Bill 134: Affordable Homes and Good Jobs Act, 2023 was released on September 28, 2023 which proposes a new definition of "affordable" under the D.C.A. and is anticipated to receive Royal Assent on December 4, 2023: o Owned unit (lesser of): cost is less than 30% of the 60th percentile of income for households in the municipality or 90% of the average purchase price as defined in a new Bulletin. o Rental unit (lesser of): rent is less than 30% of the 60th percentile of income for rental households or average market rent set out in a new Bulletin. - New Statutory Exemption: Non-Profit Housing; - Historical Level of Service extended to previous 15-year period instead of the previous 10-year period; - Capital Cost definition revised to remove studies and prescribe services for which land or an interest in land will be restricted (nothing prescribed to date); - Mandatory Phase-in of a D.C. passed after January 1, 2022, as follows: Watson & Associates Economists Ltd. PAGE iii H:\Brant\2023 DC\Report\Final Report.docx o Year 1 - 80% of the maximum charge; o Year 2 - 85% of the maximum charge; o Year 3 - 90% of the maximum charge; o Year 4 - 95% of the maximum charge; and o Year 5 to expiry - 100% of the maximum charge. - D.C. By-law expiry will be a maximum of 10 years after the date the by-law comes into force; - D.C. for Rental Housing developments to receive a discount as follows: o Three or more bedrooms - 25% reduction; o Two bedrooms - 20% reduction; and o All other bedroom quantities - 15% reduction. - Maximum Interest Rate for Installments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications to be set at the average prime rate plus 1%; and - Requirement to Allocate Funds Received - municipalities are required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway. On April 10, 2024, the Province proposed further changes to the Development Charges Act under Bill 185: Cutting Red Tape to Build More Homes Act. A summary of the changes provided from Bill 185 are outlined below (further details are provided in Chapter 1 of this report): - The definition of eligible capital costs (to include certain studies); - The removal of the mandatory phase-in of charges; - The process for minor amendments to D.C. by-laws; - A reduction of time for the D.C. rate freeze related to site plan and zoning by- law amendment planning applications; - Modernizing public notice requirements; and - Implementation of the Affordable Residential Unit exemptions: Bill 185 has not been enacted at the time of writing this D.C. Background Study. As such, the changes proposed have not been reflected in the D.C. calculations or draft by-laws contained herein. However, Watson will continue to monitor the progress of this Bill and will work with the County to incorporate any required revisions to the D.C. calculations and D.C. by-law. Watson & Associates Economists Ltd. PAGE iv H:\Brant\2023 DC\Report\Final Report.docx 4. The growth forecast (Chapter 3) on which the D.C. study is based, projects the following population, housing, and non-residential floor area for the 10-year (2024 to 2034), long-term (2024 to 2051), and urban long-term (2024 to 2051 for areas with full services or water services only) periods. Table ES-1 Summary of Growth Forecast by Planning Period County of Brant 5. On September 1, 2019, the County of Brant's D.C. By-law 100-19 came into effect under the D.C.A. The by-law imposes D.C.s on residential and non- residential uses. This By-law was amended on December 21, 2021 via By-law 121-21. The County is undertaking a D.C. public process and anticipates passing a new by-law on July 23, 2024. The mandatory public meeting has been scheduled for June 25, 2024. 6. The County's D.C. currently in effect (as of September 1, 2023) is $44,917 for single detached dwelling units for full services. The non-residential charge is $10.73 per sq.ft of gross floor area for full services. 7. This report has undertaken a recalculation of the charges based on future identified needs (presented in Schedule ES-3 for residential and non-residential). Charges have been provided on a County-wide basis for all services excluding water, wastewater, and stormwater services, which have been provided on an urban-wide basis. The corresponding single-detached unit charge for full services is $75,683. The corresponding non-residential charges (based on a per sq.ft. of building area) for full services is $17.93 per sq.ft. These rates are submitted to Council for their consideration. 10 Year Long Term Urban Long Term Urban Long Term 2024-2034 2024-2051 2024-2051 (Full Services) 2024-2051 (Water Only) (Net) Population Increase 5,477 15,620 11,475 12,475 Residential Unit Increase 2,491 6,922 5,152 5,524 Non-Residential Gross Floor Area Increase (sq.ft.) 2,526,400 8,230,100 6,953,500 7,662,600 Source: Watson & Associates Economists Ltd. Forecast 2024 Measure Watson & Associates Economists Ltd. PAGE v H:\Brant\2023 DC\Report\Final Report.docx 8. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-law. This calculation is provided by service and is presented in Table 6-6. A summary of these costs is provided below: Table ES-2 Summary of Expenditures Anticipated Over the Life of the By-law Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total gross expenditures planned over the next ten years $895,778,871 Less: Benefit to existing development $194,920,718 Less: Post planning period benefit $207,988,570 Less: Other Deductions $6,327,024 Less: Grants, subsidies and other contributions $70,111,725 Net costs to be recovered from development charges $416,430,825 This suggests that for the non-D.C. cost over the ten-year D.C. by-law (benefit to existing development, and grants, subsidies and other contributions), $271.36 million (or an annual amount of $27.14 million) will need to be contributed from taxes and rates, or other sources. With respect to the post period benefit amount of $207.99 million, it will be included in subsequent D.C. study updates to reflect the portion of capital that benefits growth in the post period D.C. forecasts. Based on the above table, the County plans to spend $895.78 million over the life of the by-law, of which $416.43 million (46%) is recoverable from D.C.s. Of this net amount, $293.89 million is recoverable from residential development and $122.54 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. 9. Considerations by Council - The background study represents the service needs arising from residential and non-residential growth over the forecast periods. The following services are calculated based on a 10-year forecast: - Parks and Recreation Services; - Library Services; Watson & Associates Economists Ltd. PAGE vi H:\Brant\2023 DC\Report\Final Report.docx - Long-term Care Services; - Ambulance Services; and - Waste Diversion Services. The following services are calculated based on a long-term forecast: - Services Related to a Highway - Roads and Related and Public Works (Facilities and Fleet); - Fire Protection Services; and - Policing Services. The following services are calculated based on an urban long-term forecast (with full urban services): - Wastewater Services; and - Stormwater Drainage and Control Services. The following services are calculated based on an urban long-term forecast (for areas with water only services): - Water Services. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix G. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; and - considering reductions in the charge by class of development (obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Watson & Associates Economists Ltd. PAGE vii H:\Brant\2023 DC\Report\Final Report.docx Table ES-3 Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) County-Wide Services: Services Related to a Highway 14,521 9,497 9,991 6,573 5,179 4.62 Fire Protection Services 2,645 1,730 1,820 1,197 943 0.84 Policing Services 297 194 204 134 106 0.09 Parks and Recreation Services 16,022 10,479 11,024 7,253 5,715 0.70 Library Services 2,570 1,681 1,768 1,163 917 0.12 Long-term Care Services 1,008 659 694 456 360 0.10 Ambulance 318 208 219 144 113 0.03 Waste Diversion 255 167 175 115 91 0.01 Total County-Wide Services 37,636 24,615 25,895 17,035 13,424 6.51 Urban Services: Stormwater Drainage and Control Services 445 291 306 201 159 0.13 Wastewater Services 23,601 15,436 16,239 10,683 8,418 7.12 Water Services 14,001 9,157 9,634 6,338 4,994 4.17 Total Urban Services 38,047 24,884 26,179 17,222 13,571 11.42 Total County-Wide and Urban Services 75,683 49,499 52,074 34,257 26,995 17.93 Service RESIDENTIAL Report Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\Brant\2023 DC\Report\Final Report.docx 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the D.C.A., as amended, (D.C.A.) (section 10) and, accordingly, recommends new development charges (D.C.s) and policies for the County of Brant. The County retained Watson & Associates Economists Ltd. (Watson), to undertake the D.C. study process throughout 2023 and 2024. Watson worked with County staff in preparing the D.C. analysis and policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the County's D.C. background study, as summarized in Chapter 4. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-law to be made available as part of the approval process (included as Appendix G). In addition, the report is designed to set out sufficient background on the legislation (Chapter 4), Brant's current D.C. policies (Chapter 2) and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. Finally, it addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 H:\Brant\2023 DC\Report\Final Report.docx 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A. is scheduled for June 25, 2024. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed modifications to the County's D.C.s. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review on May 24, 2024. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Figure 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Figure 1-1 Schedule of Key D.C. Process Dates for the County of Brant Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work May 2023 to May 2024 2. Council Workshop April 30, 2024 3. Stakeholder Meeting May 9, 2024 4. Public release of final D.C. Background study and proposed by-law May 24, 2024 5. Public meeting advertisement placed in newspaper(s) No later than June 4, 2024 6. Public meeting of Council June 25, 2024 7. Council considers adoption of background study and passage of by-law July 23, 2024 8. Newspaper notice given of by-law passage By 20 days after passage 9. Last day for by-law appeal 40 days after passage 10. County makes pamphlet available (where by-law not appealed) By 60 days after in force date Watson & Associates Economists Ltd. PAGE 1-3 H:\Brant\2023 DC\Report\Final Report.docx 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters On May 2, 2019, the Province introduced Bill 108, which proposed changes to the D.C.A. The Bill was introduced as part of the Province's "More Homes, More Choice: Ontario's Housing Supply Action Plan." The Bill received Royal Assent on June 6, 2019. While having received Royal Assent, many of the amendments to the D.C.A. would not come into effect until they are proclaimed by the Lieutenant Governor (many of these changes were revised through Bill 197). At the time of writing, the following provisions have been proclaimed: - Effective January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Interest may be charged on the instalments, and any unpaid amounts may be added to the property and collected as taxes. As per Bill 23, non-profit housing developments are now exempt from paying D.C.s, however, prior to Bill 23, and as a result of Bill 108, non-profit housing developments paid D.C.s in 21 equal annual payments. Effective January 1, 2020, the D.C. amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning approval (for application submitted after this section is proclaimed), shall be determined based on the D.C. in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined as of the date of issuance of a building permit. On February 28, 2020, the Province released updated draft regulations related to the D.C.A. and the Planning Act. A summary of the changes that were to take effect upon proclamation by the Lieutenant Governor is provided below: Changes to Eligible Services - Prior to Bill 108, the D.C.A. provided a list of ineligible services whereby municipalities could include growth related costs for any service that was not listed. With Bill 108, the changes to the D.C.A. would now specifically list the Watson & Associates Economists Ltd. PAGE 1-4 H:\Brant\2023 DC\Report\Final Report.docx services that are eligible for inclusion in the by-law. Further, the initial list of eligible services under Bill 108 was limited to "hard services", with the "soft services" being removed from the D.C.A. These services would be considered as part of a new community benefits charge (discussed below) imposed under the Planning Act. As noted in the next section this list of services has been amended through Bill 197. Mandatory 10% deduction - The amending legislation would have removed the mandatory 10% deduction for all services that remain eligible under the D.C.A. Remaining Services to be Included in a New Community Benefits Charge (C.B.C.) Under the Planning Act - It was proposed that a municipality may, by by-law, impose a C.B.C. against land to pay for the capital costs of facilities, services and matters required because of development or redevelopment in the area to which the by-law applies. The C.B.C. was proposed to include formerly eligible D.C. services that are not included in the above listing, in addition to parkland dedication and bonus zoning contributions. 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 On November 6, 2019, the Province released Bill 138 which provided further amendments to the D.C.A. and Planning Act. This Bill received Royal Assent on December 10, 2019, and was proclaimed which resulted in sections related to the D.C.A. (schedule 10) becoming effective on January 1, 2020. The amendments to the D.C.A. included removal of instalment payments for commercial and industrial developments that were originally included in Bill 108. 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 In response to the global pandemic that began affecting Ontario in early 2020, the Province released Bill 197 which provided amendments to a number of Acts, including the D.C.A. and Planning Act. This Bill also revised some of the proposed changes identified in Bill 108. Bill 197 was tabled on July 8, 2020, received Royal Assent on July 21, 2020, and was proclaimed on September 18, 2020. The following provides a summary of the changes: Watson & Associates Economists Ltd. PAGE 1-5 H:\Brant\2023 DC\Report\Final Report.docx 1.3.3.1 D.C. Related Changes List of D.C. Eligible Services - As noted above, under Bill 108 some services were to be included under the D.C.A. and some would be included under the C.B.C. authority. Bill 197, however, revised this proposed change and has included all services (with some exceptions) under the D.C.A. These services are as follows: o Water supply services, including distribution and treatment services; o Wastewater services, including sewers and treatment services. o Storm water drainage and control services. o Services related to a highway. o Electrical power services. o Toronto-York subway extension. o Transit services. o Waste diversion services. o Policing services. o Fire protection services. o Ambulance services. o Library services. o Long-term Care services. o Parks and Recreation services, but not the acquisition of land for parks. o Public Health services. o Childcare and early years services. o Housing services (no longer eligible as per Bill 23). o Provincial Offences Act services. o Services related to emergency preparedness. o Services related to airports, but only in the Regional Municipality of Waterloo. o Additional services as prescribed. Classes of Services - D.C. Pre-Bill 108/197 legislation (i.e., D.C.A., 1997) allowed for categories of services to be grouped together into a minimum of two categories (90% and 100% services). Watson & Associates Economists Ltd. PAGE 1-6 H:\Brant\2023 DC\Report\Final Report.docx The Act (as amended) repeals and replaces the above with the four following subsections: - A D.C. by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class, set out in the by-law. - A class may be composed of any number or combination of services and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. - A D.C. by-law may provide for a class consisting of studies in respect of any eligible service whose capital costs are described in paragraphs 5 and 6 of s. 5 of the D.C.A. - A class of service set out in the D.C. by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. Note: An initial consideration of "class" appears to mean any group of services. Mandatory 10% Deduction As well, the removal of the 10% deduction for soft services under Bill 108 has been maintained. As a result of the passage of Bill 197, and subsequent proclamation on September 18, 2020, this report has provided the D.C. calculations without the 10% mandatory deduction. 1.3.3.2 C.B.C. Related Changes C.B.C. Eligibility The C.B.C. is limited to lower-tier and single-tier municipalities; upper-tier municipalities will not be allowed to impose this charge. 1.3.3.3 Combined D.C. and C.B.C. Impacts D.C. vs. C.B.C. Capital Cost - A C.B.C. may be imposed with respect to the services listed in s. 2 (4) of the D.C.A. (eligible services), "provided that the capital costs that are intended to be Watson & Associates Economists Ltd. PAGE 1-7 H:\Brant\2023 DC\Report\Final Report.docx funded by the community benefits charge are not capital costs that are intended to be funded under a development charge by-law." 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amends a number of pieces of legislation including the Planning Act and the D.C.A. The following provides a summary of the changes to the D.C.A. 1.4.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the creation of the greater of one unit or 1% of the existing residential units will be exempt from a D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- Watson & Associates Economists Ltd. PAGE 1-8 H:\Brant\2023 DC\Report\Final Report.docx detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. 1.4.2 Removal of Housing as an Eligible D.C. Service Housing services are removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.4.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Note: Section 1.4.13 provides further details of the Affordable Rental Unit and Affordable Owned Unit definitions, which have been modified through Bill 134 - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Note: the above exemptions are not currently in force, however, the Province has noted that the Affordable Owned and Rental Unit exemptions will come into force as of June 1, Watson & Associates Economists Ltd. PAGE 1-9 H:\Brant\2023 DC\Report\Final Report.docx 2024. At the time of writing, it is not known when the exemption for Attainable Units will be in force. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.4.5 Historical Level of Service Extended to Previous 15-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. 1.4.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Furthermore, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed. 1.4.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. 1.4.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five years, prior to Bill 23. 1.4.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (subsection 26.1), as these units are now exempt from the payment of a D.C. Watson & Associates Economists Ltd. PAGE 1-10 H:\Brant\2023 DC\Report\Final Report.docx 1.4.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. 1.4.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation . 1.4.13 Bill 134: Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions is based on the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin" published by the Minister of Municipal Affairs and Housing. This bulletin informs the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. This bulletin was published on April 5, 2024. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: Watson & Associates Economists Ltd. PAGE 1-11 H:\Brant\2023 DC\Report\Final Report.docx - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). The following table provides a comparison of the definitions provided through Bill 23 and those provided through Bill 134 (underlining added for emphasis). Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than 80 per cent of the average market rent, as determined in accordance with subsection (5). The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The average market rent for the year in which the residential unit is occupied by a tenant, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes Watson & Associates Economists Ltd. PAGE 1-12 H:\Brant\2023 DC\Report\Final Report.docx Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) the Development Charges Act, 1997 Bulletin." for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is equal to 30 per cent of the income of the household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than 80 per cent of the average purchase price, as determined in accordance with subsection (6). The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The average purchase price for the year in which the residential unit is sold, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin," as it is amended from time to time, that is published by the Minister of Municipal Affairs and Housing on a website of the Government of Ontario. The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the Watson & Associates Economists Ltd. PAGE 1-13 H:\Brant\2023 DC\Report\Final Report.docx Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) household referred to in clause (a) Note: the Province has indicated that it intends for the Affordable Unit exemption to come into force on June 1, 2024. 1.5 Proposed Changes to the D.C.A. - Bill 185: Cutting Red Tape to Build More Homes Act, 2024 On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. If implemented, this Bill will reverse many of the key changes that were implemented through Bill 23. The following sections provide a summary of the changes being recommended. 1.5.1 Revised Definition of Capital Costs Bill 185 proposes to reverse the capital cost amendments of Bill 23 by reinstating studies as an eligible capital cost. The following paragraphs are proposed to be added to subsection 5(3) of the D.C.A.: 5. Costs to undertake studies in connection with any of the matters referred to in paragraphs 1 to 4. 6. Costs of the development charge background study required under section 10. 1.5.2 Removal of the Mandatory Phase-in As noted in Section 1.5.7 above, Bill 23 required the phase-in of charges imposed in a D.C. by-law over a five-year term for any by-laws passed after January 1, 2022. Bill 185 proposes to remove this mandatory phase-in. This change would be effective for any D.C. by-laws passed after Bill 185 comes into effect. For site plan and zoning by-law amendment applications that were made prior to Bill 185 receiving Royal Assent, the charges payable will be the charges that were in place on the day the planning application was made (i.e., including the mandatory phase-in). Watson & Associates Economists Ltd. PAGE 1-14 H:\Brant\2023 DC\Report\Final Report.docx 1.5.3 Process for Minor Amendments to D.C. By-laws Section 19 of the D.C.A. requires that a municipality must follow sections 10 through 18 of the D.C.A. (with necessary modifications) when amending D.C. by-laws. Sections 10 through 18 of the D.C.A. generally require the following: - Completion of a D.C. background study, including the requirement to post the background study 60 days prior to passage of the D.C. by-law; - Passage of a D.C. by-law within one year of the completion of the D.C. background study; - A public meeting, including notice requirements; and - The ability to appeal the by-law to the Ontario Land Tribunal. Bill 185 proposes to allow municipalities to undertake minor amendments to D.C. by- laws for the following purposes without adherence to the requirements noted above (with the exception of the notice requirements): 1. To repeal a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date (subject to the 10-year limitations provided in the D.C.A.); 2. To impose D.C.s for studies, including the D.C. background study; and 3. To remove the provisions related to the mandatory phase-in of D.C.s. Minor amendments related to items 2 and 3 noted above may be undertaken only if the D.C. by-law being amended was passed after November 28, 2022, and before Bill 185 takes effect. Moreover, the amending by-law must be passed within six months of Bill 185 taking effect. Notice requirements for these minor amending by-laws are similar to the typical notice requirements, with the exception of the requirement to identify the last day for appealing the by-law (as these provisions do not apply). 1.5.4 Reduction of D.C. Rate Freeze Timeframe Bill 108 (see Section 1.3.1 above) provides for the requirement to freeze the D.C.s imposed on developments subject to a site plan and/or a zoning by-law amendment application. The D.C. rate for these developments is "frozen" at the rates that were in Watson & Associates Economists Ltd. PAGE 1-15 H:\Brant\2023 DC\Report\Final Report.docx effect at the time the site plan and/or zoning by-law amendment application was submitted (subject to applicable interest). Once the application is approved by the municipality, if the date the D.C. is payable is more than two years from the approval date, the D.C. rate freeze would no longer apply. Bill 185 proposes to reduce the two- year timeframe to 18 months. 1.5.5 Modernizing Public Notice Requirements The D.C.A. sets out the requirements for municipalities to give notice of public meetings and of by-law passage. These requirements are prescribed in sections 9 and 10 of O. Reg. 82/98 and include giving notice in a newspaper of sufficiently general circulation in the area to which the by-law would apply. The proposed regulatory changes would modernize public notice requirements by allowing municipalities to provide notice on a municipal website if a local newspaper is not available. Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 2 Current County of Brant D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 H:\Brant\2023 DC\Report\Final Report.docx 2. Current County of Brant D.C. Policies 2.1 Schedule of Charges On September 1, 2019, the County of Brant's D.C. By-law 100-19 came into effect. This by-law was amended via By-law 121-21 to incorporate a number of capital revisions and to adhere to the legislative changes to the D.C.A. By-law 100-19 (as amended) imposes D.C.s for residential and non-residential uses. The table below provides the rates currently in effect, as of September 1, 2023. Table 2-1 County of Brant Current D.C. Rates September 1, 2023 2.2 Services Covered The following services are covered under By-law 100-19, as amended: - Services Related to a Highway; - Fire Protection Services; - Police Services; - Parks and Recreation Services; - Library Services; - Ambulance Services; - Waste Diversion Services; Service Single & Semi Detached Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms Special Care/Special Dwelling Units per sq.ft. of Gross Floor Area per sq.m of Gross Floor Area County-Wide Services: Services Related to a Highway 12,569 8,097 8,340 4,879 4,465 4.10 44.13 Fire Protection Services 1,624 1,047 1,078 630 577 0.53 5.70 Policing Services 252 162 165 97 90 0.09 0.97 Parks and Recreation Services 9,350 6,023 6,204 3,630 3,320 0.28 3.01 Library Services 1,476 950 980 573 523 0.04 0.43 Administration Studies 372 239 248 144 132 0.13 1.40 Ambulance 208 133 136 80 75 0.01 0.11 Waste Diversion 184 118 121 71 66 0.01 0.11 Total County-Wide Services 26,035 16,769 17,272 10,104 9,248 5.19 55.86 Urban Services: Stormwater Drainage and Control Services 203 132 135 80 72 0.05 0.54 Wastewater Services 8,158 5,255 5,414 3,166 2,897 2.41 25.94 Water Services 10,521 6,778 6,981 4,084 3,737 3.08 33.15 Total Urban Services 18,882 12,165 12,530 7,330 6,706 5.54 59.63 Total County-Wide and Urban Services 44,917 28,934 29,802 17,434 15,954 10.73 115.49 Residential Non-Residential Watson & Associates Economists Ltd. PAGE 2-2 H:\Brant\2023 DC\Report\Final Report.docx - Administration Studies; - Stormwater Drainage and Control Services; - Wastewater Services; and - Water Services. 2.3 Timing of D.C. Calculation and Payment Development charges shall be calculated and payable in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies, or in a manner or at a time otherwise lawfully agreed upon. 2.4 Indexing Rates shall be adjusted, without amendment to the By-law, annually on September 1, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).1 2.5 Redevelopment Allowance In the case of the re-development involving the demolition and replacement of all or part of a building or structure: 1) a redevelopment credit shall be allowed, provided that the singular and certain parcel of land was improved by occupied structures within the last five years prior to the issuance of the building permit required by the development, and the building permit for the development has been issued within five years from the date the demolition permit has been issued; and 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 2-3 H:\Brant\2023 DC\Report\Final Report.docx 2) if a development on a singular and certain parcel of land involves the demolition and replacement of a building or structure, or the conversion from one principal use to another, a redevelopment credit shall be allowed equivalent to: a. the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable, and/or b. the gross floor area of the building demolished/ converted multiplied by the current non-residential development charge in place at the time the development charge is payable. The demolition credit is allowed only if the land was improved by occupied structures immediately prior to the demolition. Provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 2.6 Exemptions The following non-statutory exemptions are provided under By-law 100-19, as amended: - Non-residential farm buildings; and - farm bunk houses. Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 3 Anticipated Development in the County of Brant Watson & Associates Economists Ltd. PAGE 3-1 H:\Brant\2023 DC\Report\Final Report.docx 3. Anticipated Development in the County of Brant 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the County will be required to provide services over a 10-year (2024 to 2034) and a longer-term (2024 to 2051) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the County of Brant. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the County over the forecast period, including: - The Official Plan for the County of Brant, May 2023, Provincial Submission; - County of Brant Addendum to the Municipal Comprehensive Review Final Report, May 2023, by Watson & Associates Economists Ltd.; - County of Brant 2019 Development Charges Background Study Report, May 23, 2019, and 2021 Development Charges Update Study, September 24, 2021, by Watson & Associates Economists Ltd. - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2014 to September 2023 year- to-date period; - Residential and non-residential supply opportunities as identified by County of Brant staff; and - Discussions with County staff regarding anticipated residential and non- residential development in the County of Brant. Watson & Associates Economists Ltd. PAGE 3-2 H:\Brant\2023 DC\Report\Final Report.docx 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the County and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, population in the County of Brant (excluding census undercount) is anticipated to reach approximately 47,150 by early-2034 and 57,293 by mid-2051, resulting in an increase of approximately 5,480 and 15,620 persons, respectively. [1] Figure 3-1 Population and Household Forecast Model [1] The population figures used in the calculation of the 2024 D.C. exclude the net Census undercount, which is estimated at approximately 3.0%. Population figures presented herein have been rounded. Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-3 H:\Brant\2023 DC\Report\Final Report.docx Table 3-1 County of Brant Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.5% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from the County of Brant Addendum to the Municipal Comprehensive Review Final Report, May 2023, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 36,700 35,638 578 35,060 11,637 595 605 95 12,932 525 2.756 37,800 36,707 847 35,860 11,895 725 590 105 13,315 770 2.757 40,650 39,474 734 38,740 12,555 965 725 85 14,330 667 2.755 42,910 41,673 780 40,893 13,158 1,271 813 85 15,327 709 2.719 48,560 47,150 879 46,271 14,800 1,610 1,233 85 17,728 799 2.660 59,000 57,293 1,065 56,228 17,385 1,970 2,550 85 21,990 968 2.605 1,100 1,069 269 800 258 130 -15 10 383 245 2,850 2,767 -113 2,880 660 240 135 -20 1,015 -103 2,260 2,199 46 2,153 603 306 88 0 997 42 5,650 5,477 99 5,378 1,642 339 420 0 2,401 90 16,090 15,620 285 15,335 4,227 699 1,737 0 6,663 259 Early 2024 - Mid 2051 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Forecast Mid 2021 - Early 2024 Incremental Early 2024 - Early 2034 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Early 2024 Early 2034 Mid 2051 Watson & Associates Economists Ltd. PAGE 3-4 H:\Brant\2023 DC\Report\Final Report.docx Figure 3-2 County of Brant Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Source: Historical housing activity derived from County of Brant building permit data, 2014 to 2022, and 2023 estimated based on September year-to-date data by Watson & Associates Economists Ltd. 141 185 118 141 456 251 713 330 509 316 238 237 232 232 232 232 232 243 243 243 243 243 243 243 243 243 243 246 246 246 246 246 242 242 242 242 242 0 100 200 300 400 500 600 700 800 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-5 H:\Brant\2023 DC\Report\Final Report.docx Provided below is a summary of the key assumptions and findings regarding the County of Brant D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1 and 6) - The housing unit mix for the County was derived from a detailed review of historical development activity (as per Schedule 6), as well as active residential development applications and discussions with County staff regarding anticipated development trends for the County of Brant. - Based on the above indicators, the 2024 to 2051 household growth forecast for the County is comprised of a unit mix of 63% low density units (single detached and semi-detached), 10% medium density (multiples except apartments) and 26% high density (bachelor, 1-bedroom and 2- bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the County of Brant - In accordance with forecast demand and available land supply, the amount and percentage of forecast housing growth between 2024 and 2051 by development location is summarized below. Watson & Associates Economists Ltd. PAGE 3-6 H:\Brant\2023 DC\Report\Final Report.docx Table 3-2 County of Brant Geographic Location of Residential Development Development Location Amount of Housing Growth, 2024 to 2051 Percentage of Housing Growth, 2024 to 2051 Full Services 4,910 74% Burford 260 4% Partial Services (Water Only) 350 5% Private Services (Rural Settlement) 700 10% Remaining Rural 440 7% County of Brant 6,660 100% Note: Figures may not sum precisely due to rounding. Watson & Associates Economists Ltd. PAGE 3-7 H:\Brant\2023 DC\Report\Final Report.docx 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2051 in the County of Brant over the forecast period is presented in Table 3-1. Over the 2024 to 2051 forecast period, the County is anticipated to average approximately 242 new housing units per year. - Institutional population [1] is anticipated to increase by approximately 290 people between 2024 to 2051. - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 7a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the County of Brant. Due to data limitations high density P.P.U. data was derived from the County of Brant Census Division which includes the County of Brant, and is outlined in Schedule 7b . The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 3.084 o Medium density: 2.017 o High density: 1.873 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-8 H:\Brant\2023 DC\Report\Final Report.docx 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for early-2024 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[1] The forecast population change in existing households over the 2024 to 2051 forecast period is forecast to decline by approximately 2,360. 6. Employment (Appendix A - Schedules 9a, 9b and 9c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the County divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [2],[3] (place of work) for the County of Brant is outlined in Schedule 9a. The 2016 employment base is comprised of the following sectors: o 535 primary (4%); o 1,925 work at home employment (15%); o 4,810 industrial (38%); o 3,805 commercial/population-related (30%); and o 1,680 institutional (13%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-9 H:\Brant\2023 DC\Report\Final Report.docx - The 2016 employment by usual place of work, including work at home, is 12,755. An additional 2,150 employees have been identified for the County of Brant in 2016 that have no fixed place of work (N.F.P.O.W.).[1] - Total employment, including work at home and N.F.P.O.W. for the County of Brant is anticipated to reach approximately 19,790 by 2034 and 26,000 by 2051. This represents an employment increase of approximately 2,850 for the 10-year forecast period and 9,060 for the longer-term forecast period. - Schedule 9b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the County of Brant (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 14,180 by 2034 and 19,080 by 2051. This represents an employment increase of approximately 2,160 for the 10-year forecast period and 7,060 for the longer-term forecast period. [2] [1] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." [2] G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 9a and 9b. Total employment growth in Schedule 9b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Total employment in Schedule 9b is anticipated to reach approximately 14,130 by 2034 and 18,950 by 2051. Watson & Associates Economists Ltd. PAGE 3-10 H:\Brant\2023 DC\Report\Final Report.docx 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 9b) - Square footage estimates were calculated in Schedule 9b based on the following employee density assumptions: o 1,700 sq.ft. per employee for industrial; o 500 sq.ft. per employee for commercial/population-related; and o 680 sq.ft. per employee for institutional employment. - The County-wide incremental G.F.A. is anticipated to increase by 2.53 million sq.ft. over the 10-year forecast period and 8.23 million sq.ft. over the longer-term forecast period. - In terms of percentage growth, the 2024 to 2051 incremental G.F.A. forecast by sector is broken down as follows: o industrial - 79%; o commercial/population-related - 13%; and o institutional - 9%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 9c) - Schedule 9c summarizes the anticipated amount, type and location of non-residential development by servicing area for the County of Brant by area. - The amount and percentage of forecast total non-residential growth between 2024 and 2051 by development location is summarized below. Watson & Associates Economists Ltd. PAGE 3-11 H:\Brant\2023 DC\Report\Final Report.docx Table 3-3 County of Brant Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2024 to 2051 Percentage of Non- Residential G.F.A., 2024 to 2051 Full Services 6.95 million 84% Partial Services (Water Only - St. George) 0.71 million 9% Remaining Areas 0.57 million 7% County of Brant 8.23 million 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\Brant\2023 DC\Report\Final Report.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the County. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the County's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that County Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\Brant\2023 DC\Report\Final Report.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 H:\Brant\2023 DC\Report\Final Report.docx Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 1. Services Related to a Highway Yes 1.1 Arterial roads 100 Yes 1.2 Collector roads 100 Yes 1.3 Bridges, culverts and roundabouts 100 No 1.4 Local municipal roads 0 Yes 1.5 Traffic signals 100 Yes 1.6 Sidewalks and streetlights 100 Yes 1.7 Active transportation 100 2. Other Transportation Services No 2.1 Transit vehicles1 & facilities 100 No 2.2 Other transit infrastructure 100 Ineligible 2.3 Municipal parking spaces - indoor 0 Ineligible 2.4 Municipal parking spaces - outdoor 0 Yes 2.5 Works yards 100 Yes 2.6 Rolling stock1 100 n/a 2.7 Ferries 100 n/a 2.8 Airport 100 3. Stormwater Drainage and Control Services Yes 3.1 Main channels and drainage trunks 100 Yes 3.2 Channel connections 100 Yes 3.3 Retention/detention ponds 100 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-4 H:\Brant\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 4. Fire Protection Services Yes 4.1 Fire stations 100 Yes 4.2 Fire pumpers, aerials and rescue vehicles1 100 Yes 4.3 Small equipment and gear 100 5. Park Services (i.e., Parks and Open Space) Ineligible 5.1 Acquisition of land for parks, woodlots and E.S.A.s 0 Yes 5.2 Development of area municipal parks 100 Yes 5.3 Development of district parks 100 Yes 5.4 Development of municipal- wide parks 100 Yes 5.5 Development of special purpose parks 100 Yes 5.6 Parks rolling stock1 and yards 100 6. Recreation Services Yes 6.1 Arenas, indoor pools, fitness facilities, community centres, etc. (including land) 100 Yes 6.2 Recreation vehicles and equipment1 100 7. Library Services Yes 7.1 Public library space (incl. furniture and equipment) 100 Yes 7.2 Library vehicles1 100 Yes 7.3 Library materials 100 8. Emergency Preparedness Services No 8.1 Facility space (incl. furniture and equipment) 100 No 8.2 Vehicles1 100 No 8.3 Equipment 100 9. Electrical Power Services Ineligible 9.1 Electrical substations 0 Ineligible 9.2 Electrical distribution system 0 Ineligible 9.3 Electrical system rolling stock 0 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-5 H:\Brant\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 10. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible 10.1 Cultural space (e.g., art galleries, museums and theatres) 0 Ineligible 10.2 Tourism facilities and convention centres 0 11. Wastewater Services Yes 11.1 Treatment plants 100 Yes 11.2 Sewage trunks 100 n/a 11.3 Local systems 0 Yes 11.4 Vehicles and equipment1 100 12. Water Supply Services Yes 12.1 Treatment plants 100 Yes 12.2 Distribution systems 100 n/a 12.3 Local systems 0 Yes 12.4 Vehicles and equipment1 100 13. Waste Management Services Ineligible 13.1 Landfill collection, transfer vehicles and equipment 0 Ineligible 13.2 Landfills and other disposal facilities 0 Yes 13.3 Waste diversion facilities 100 Yes 13.4 Waste diversion vehicles and equipment1 100 14. Policing Services Yes 14.1 Policing detachments 100 n/a 14.2 Policing rolling stock1 100 n/a 14.3 Small equipment and gear 100 15. Homes for the Aged Yes 15.1 Homes for the aged space 100 No 15.2 Vehicles1 100 16. Child Care Yes 16.1 Child-care space 100 No 16.2 Vehicles1 100 17. Health n/a 17.1 Health department space 100 n/a 17.2 Health department vehicles1 100 18. Social Housing Ineligible 18.1 Social housing space 0 19. Provincial Offences Act (P.O.A.) No 19.1 P.O.A. space 100 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-6 H:\Brant\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 20. Social Services Ineligible 20.1 Social service space 0 21. Ambulance Yes 21.1 Ambulance station space 100 Yes 21.2 Vehicles1 100 22. Hospital Provision Ineligible 22.1 Hospital capital contributions 0 23. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible 23.1 Office space 0 Ineligible 23.2 Office furniture 0 Ineligible 23.3 Computer equipment 0 24. Other Services Ineligible 24.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land and facilities, including the D.C. background study cost 0 Yes 24.2 Interest on money borrowed to pay for growth-related capital 0-100 1 with a 7+ year lifetime 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The County's detailed Local Service Policy is provided in Appendix E. Watson & Associates Economists Ltd. PAGE 4-7 H:\Brant\2023 DC\Report\Final Report.docx 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; and e) interest on money borrowed to pay for the above-referenced costs; In order for an increase in need for service to be included in the D.C. calculation, County Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the County's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value Watson & Associates Economists Ltd. PAGE 4-8 H:\Brant\2023 DC\Report\Final Report.docx of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. There are no current outstanding credits for inclusion in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the County spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the County will use these reserve funds for the County's cost share of applicable Watson & Associates Economists Ltd. PAGE 4-9 H:\Brant\2023 DC\Report\Final Report.docx development-related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The County's D.C. Reserve Fund balances by service as of December 31, 2023 are shown below: Table 4-2 Summary of Development Charges Reserve Fund Balances As of December 31, 2023 Note: Amounts in brackets are deficit balances. 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. Service Balance Services Related to a Highway 9,289,759 Fire Protection Services (466,715) Policing Services (219,277) Parks and Recreation Services 9,811,092 Library Services 1,970,254 Ambulance 132,391 Waste Diversion (420,856) Stormwater Drainage and Control Services 129,263 Wastewater Services 5,222,809 Water Services (518,340) Total 24,930,379 Watson & Associates Economists Ltd. PAGE 4-10 H:\Brant\2023 DC\Report\Final Report.docx 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the County's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is Watson & Associates Economists Ltd. PAGE 4-11 H:\Brant\2023 DC\Report\Final Report.docx already available, then widening would not be included as an increase in need, in the first instance. 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a County-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access Watson & Associates Economists Ltd. PAGE 4-12 H:\Brant\2023 DC\Report\Final Report.docx the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.4.4 of this report. 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. Watson & Associates Economists Ltd. PAGE 4-13 H:\Brant\2023 DC\Report\Final Report.docx 4.12 Asset Management The legislation now requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on the asset management planning. This examination has been included in Appendix F. 4.13 Transit The D.C.A. provides for the following matters for Transit: - The Background Study requires the following in regard to transit costs (as per subsection 8 (2) of the Regulations): o The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. i. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, ii. the anticipated development over the 10-year period immediately following the preparation of the background study, or iii. the anticipated development after the 10-year period immediately following the preparation of the background study. o An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. o An assessment of ridership forecasts for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. Watson & Associates Economists Ltd. PAGE 4-14 H:\Brant\2023 DC\Report\Final Report.docx o An assessment of the ridership capacity for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study. - A forward-looking service standard (as per 6.1(2) of the Regulations): o The service is a discrete service. o No portion of the service that is intended to benefit anticipated development after the 10-year period immediately following the preparation of the background study may be included in the estimate. o No portion of the service that is anticipated to exist as excess capacity at the end of the 10-year period immediately following the preparation of the background study may be included in the estimate. - A detailed asset management strategy and reporting requirements (subsection 6.1 (3) of the Regulation) that includes lifecycle costs, action plans that will enable the assets to be sustainable, summary of how to achieve the proposed level of service, discussion on procurement measures and risk. The County currently has a local transit service called Via Transportation to provide residents with transportation options. The County has not included these costs in the D.C. calculations. Therefore, the above calculations and reporting requirements are not required. 4.14 Mandatory Phase-in of a D.C. As described in Chapter 1, all D.C. by-laws passed after January 1, 2022, the charge must be phased-in relative to the maximum charge that could be imposed under the by- law. The phase-in for the first 5-years that the by-law is in force, is as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. Note: as part of the changes proposed by the Province through Bill 185, this mandatory phase-in is proposed to be removed for any D.C. by-laws passed after Bill 185 receives Royal Assent. Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 H:\Brant\2023 DC\Report\Final Report.docx 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - the service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts (note that this is not required for water, wastewater, or stormwater); and - the infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the chapter reflects Council's current intention. Over time, however, County projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and 10-Year Capital Costs for the County of Brant's D.C. Calculation This section evaluates the development-related capital requirements for parks and recreation services, library services, ambulance services, long-term care services, child care and early years programs services, and waste diversion services over a County- wide 10-year planning period from 2024 to 2034. 5.2.1 Parks and Recreation Services The County currently has 471.51 acres of parkland within its jurisdiction. These parks consist of various sized community, destination, neighbourhood, open space, parkettes, commons, and linear parks. The County has increased its level of service over the historical 15-year period from 2009 to 2023, with an average of 9.8 acres of parkland 1,000 population, or an investment of $2,308 per capita. Over the forecast period, the Watson & Associates Economists Ltd. PAGE 5-2 H:\Brant\2023 DC\Report\Final Report.docx County would be eligible to collect approximately $12.64 million from D.C.s for parkland development. The County currently provides 84 parkland amenities, including various types of fields, courts, playground equipment, a pool and splashpad facility, storage buildings, etc. Over the historical 15-year period the County provided an average of 1.5 amenities per 1,000 population, or an investment of $467 per capita. Over the forecast period to 2034, the County would be eligible to collect approximately $2.56 million from D.C.s for parkland amenities. In addition to parkland development and amenities, the County currently has 28 kilometers of parkland trails. Over the historical 15-year period the County provided an average of 0.6 kilometers of parkland trails per 1,000 population, or an investment of $91 per capita. Over the forecast period to 2034, the County would be eligible to collect approximately $0.50 million from D.C.s for parkland trails. With respect to recreation facilities, the County has programmable space totaling a combined 288,441 sq.ft. This consists of arenas, community centres, an indoor turf facility, and rented spaces in school gyms and other privately owned facilities. Based on the inventory of space over the historical 15-year period (2009 to 2023), the County has provided an average of approximately 7.31 sq.ft. of space per capita or an investment of $4,724 per capita. Over the forecast period the County would be eligible to collect approximately $25.87 million from D.C.s for recreation facility space. The County also maintains and operates a fleet of 63 vehicles and equipment, which has an estimated replacement value of approximately $3.25 million. This results in a calculated average level of service for the historical 15-year period of $63 per capita, providing a D.C. eligible amount over the forecast period of approximately $0.34 million. In total, the County is eligible to collect approximately $41.91 million for parks and recreation services. Based on the projected growth over the 2024 to 2034 forecast period, the County has identified future capital needs totaling approximately $162.64 million. These capital needs include various parkland development projects, park trails, an addition to the Brant Sports Complex, an indoor pool, various vehicles and equipment, etc. Through a review of the proposed capital works, the following deductions have been made: Watson & Associates Economists Ltd. PAGE 5-3 H:\Brant\2023 DC\Report\Final Report.docx - $93.57 million for post period benefit; - $9.81 million for the existing reserve fund balance; - $22.98 million for benefit to the existing community; and - $50,000 in grant funding. Therefore, the total net growth capital cost included in the D.C. for parks and recreation services is approximately $36.23 million. As the predominant users of parks and recreation tend to be residents of the County, the forecast growth-related costs have been allocated 95% to residential development and 5% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-4 H:\Brant\2023 DC\Report\Final Report.docx Table 5-1 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2024-2034 95% 5% 1 Empire (St. George) 2026 900,000 - 900,000 90,000 810,000 769,500 40,500 2 Golf North (Paris) 2026 600,000 - 600,000 60,000 540,000 513,000 27,000 3 Nith Peninsula (Paris) 2024 250,000 - 250,000 25,000 225,000 213,750 11,250 4 Grandville - Arlington Meadows 2025 2,150,000 - 2,150,000 215,000 1,935,000 1,838,250 96,750 5 TCA Lands 2028 650,000 - 650,000 65,000 585,000 555,750 29,250 6 Losani (St. George) (Formerly Activa (German School Rd.)) 2027 2,850,000 - 2,850,000 285,000 2,565,000 2,436,750 128,250 7 Elm Street Lane/Park Redesign 2025 250,000 - 250,000 187,500 62,500 59,375 3,125 8 Paris Skatepark 2024 350,000 - 350,000 87,500 262,500 249,375 13,125 9 Cleaver Road Park (Sifton) 2027 725,000 - 725,000 72,500 652,500 619,875 32,625 10 Victoria Park Expansion 2024 300,000 - 300,000 180,000 120,000 114,000 6,000 11 Green Lane Sports Complex Expansion 2027 1,625,000 - 1,625,000 975,000 650,000 617,500 32,500 12 Gurney Sports Park 2025 4,000,000 - 4,000,000 1,000,000 3,000,000 2,850,000 150,000 13 Lions Art Cadman Park Expansion 2027 975,000 - 975,000 731,300 50,000 193,700 184,015 9,685 14 Brookfield Phase 2 - Passive Park - Watt's Pond Rd 2024 135,800 - 135,800 - 135,800 129,010 6,790 15 Stremma (Oaks of St. George) 2027 1,026,750 - 1,026,750 - 1,026,750 975,413 51,338 16 Cordon 2027 1,600,000 - 1,600,000 - 1,600,000 1,520,000 80,000 17 Memorial Forest Park 2024 300,000 - 300,000 - 300,000 285,000 15,000 18 Mt. Pleasant Park Expansion 2035 750,000 - 750,000 - 750,000 712,500 37,500 Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-5 H:\Brant\2023 DC\Report\Final Report.docx Table 5-1 (Continued) Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2024-2034 95% 5% 19 Scotland HWY 24 area 2030 450,000 - 450,000 - 450,000 427,500 22,500 20 Burford 4 Corners (Farkas) 2024 255,000 - 255,000 191,300 63,700 60,515 3,185 21 Burford near Fairgrounds 2035 750,000 750,000 - - - - - 22 Royal Estates West (Burford) 2025 350,000 - 350,000 - 350,000 332,500 17,500 23 Refrigerated Skating/Splash Pad 2030 2,000,000 1,000,000 1,000,000 - 1,000,000 950,000 50,000 24 Dog Park 2030 300,000 150,000 150,000 - 150,000 142,500 7,500 25 Washroom Facility - Mt. Pleasant 2025 200,000 - 200,000 - 200,000 190,000 10,000 26 Newport River Access 2024 400,000 - 400,000 320,000 80,000 76,000 4,000 27 Grandville - Trail 2026 175,000 - 175,000 - 175,000 166,250 8,750 28 Activa Trail (St. George) 2027 437,500 - 437,500 - 437,500 415,625 21,875 29 Brookfield Phase 2 (Watts Pond Trail) 2024 120,000 - 120,000 12,000 108,000 102,600 5,400 30 New Development Phase 3 (Watts Pond Trail) 2026 120,000 - 120,000 - 120,000 114,000 6,000 31 Bike Pathways ($50,000 per yr) 2024-2028 500,000 - 500,000 250,000 250,000 237,500 12,500 32 Mountain Bike Trails 2025 753,000 - 753,000 301,200 451,800 429,210 22,590 33 Capron Street Trail (Market Street and Grand River Street North) 2027 131,250 - 131,250 - 131,250 124,688 6,563 34 Burford Walking Trails 2024 262,500 - 262,500 210,000 52,500 49,875 2,625 35 Paris Grand Trails - Phase 2 2024 250,000 - 250,000 37,500 212,500 201,875 10,625 36 North of the Nith 2024-2033 715,000 - 715,000 - 715,000 679,250 35,750 37 Watts Pond Trail - Phase 1 2024 180,000 - 180,000 - 180,000 171,000 9,000 Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-6 H:\Brant\2023 DC\Report\Final Report.docx Table 5-1 (Continued) Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2024-2034 95% 5% 38 Oakland Trail 2025 200,000 - 200,000 - 200,000 190,000 10,000 39 Brant Sports Complex Growth Related Principal 2024-2032 1,272,689 - 1,272,689 - 1,272,689 1,209,055 63,634 40 Brant Sports Complex Growth Related Discounted Interest 2024-2032 99,624 - 99,624 - 99,624 94,643 4,981 41 Brant Sports Complex Addition/Needs Assessment 2030 25,000,000 10,000,000 15,000,000 5,000,000 10,000,000 9,500,000 500,000 42 Brant Sports Complex Addition/Needs Assessment Discounted Growth Related Interest 2030-2050 5,810,603 - 5,810,603 - 5,810,603 5,520,073 290,530 43 Field House and Event Facility (Indoor Soccer) (45,000 sq.ft.) 2030 20,000,000 4,869,100 15,130,900 10,261,800 4,869,100 4,625,645 243,455 44 SDCC Arena Twinning 2033 25,000,000 25,000,000 - - - - - 45 Paris Community Centre Refresh/Repurpose (30,000 sqft) 2033 25,000,000 25,000,000 - - - - - 46 Indoor Pool (Location TBD) 2033 25,000,000 25,000,000 - - - - - 47 St. George Community School 2030 6,000,000 1,800,000 4,200,000 2,400,000 1,800,000 1,710,000 90,000 48 Provision for Additional Recreation Vehicles and Equipment 2024-2033 466,000 - 466,000 20,000 446,000 423,700 22,300 49 EV Equipment - Mowers, Trucks etc 2024-2033 1,000,000 - 1,000,000 - 1,000,000 950,000 50,000 Reserve Fund Adjustment - - 9,811,092 (9,811,092) (9,320,538) (490,555) Total 162,635,716 93,569,100 - 69,066,616 32,788,692 50,000 36,227,924 34,416,528 1,811,396 Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-7 H:\Brant\2023 DC\Report\Final Report.docx 5.2.2 Library Services The County currently operates its library services out of five (5) library facilities totalling 29,229 sq.ft of space. The County also utilizes a library van, valued at approximately $75,000, and maintains collection materials valued at approximately $7.58 million. Including facilities, vehicles, and collection materials (e.g., books, kits, electronic collections, etc.), the level of service provided is $878 per capita. When applied over the forecast period to 2034, this average level of service translates into a D.C.-eligible amount of approximately $4.81 million from D.C.s for library services. With respect to capital needs to accommodate growth over the forecast period, the County has identified a new St. George Library branch, a new Main Library branch (along with estimated financing costs), various materials and equipment, a new library van, and book kiosks. In total, the gross capital cost estimate is approximately $58.25 million. Of this amount, approximately $25.10 million is deducted for the amount that is attributable to growth post-2034, approximately $20.37 million is deducted for the amount that benefits existing development, $5.00 million is deducted for a grant related to the New Main Library branch, and approximately $1.97 million is deducted to reflect the existing balance in the reserve fund. The net growth-related capital cost included in the D.C. calculations is $5.81 million. It is noted that this amount is higher than the $4.81 million D.C. eligible amount as the financing costs for the main library branch ($1.17 million) is not subject to the service standard celining. While library usage is predominately residential based, there is some use of the facilities by non-residential users, for the purpose of research. To acknowledge this use of the growth-related capital costs have been allocated 95% residential development and 5% non-residential development. Watson & Associates Economists Ltd. PAGE 5-8 H:\Brant\2023 DC\Report\Final Report.docx Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Library Services Prj.No Residential Share Non- Residential Share 2024-2034 95% 5% 1 New St George Library Branch (10,000sqft) 2025-2026 7,000,000 3,363,900 3,636,100 2,795,100 841,000 798,950 42,050 2 New Main Library Branch (28,000sqft) 2024-2026 37,700,000 12,295,200 25,404,800 17,331,000 5,000,000 3,073,800 2,920,110 153,690 3 New Main Library Branch Discounted Growth-Related Interest 2028-2048 5,860,281 4,688,200 1,172,081 - - 1,172,081 1,113,477 58,604 4 Integrated Library System 2026 250,000 - 250,000 89,400 160,600 152,570 8,030 5 Additional Materials 2024-2033 290,000 145,000 145,000 - 145,000 137,750 7,250 6 St George Equipment 2025-2026 500,000 235,000 265,000 30,000 235,000 223,250 11,750 7 Paris Branch Equipment 2024-2026 1,500,000 705,000 795,000 90,000 705,000 669,750 35,250 8 Onondaga (new/retrofit) 2025-2026 800,000 400,000 400,000 - 400,000 380,000 20,000 9 New Glen Morris Branch 2025-2027 4,000,000 3,200,000 800,000 - 800,000 760,000 40,000 10 Outreach Van (new) 2028 100,000 70,000 30,000 30,000 - - - 11 Additional Equipment (non-print) 2024-2033 100,000 - 100,000 - 100,000 95,000 5,000 12 Book Kiosk North Paris 2024 75,000 - 75,000 - 75,000 71,250 3,750 13 Book Kiosk Mt Pleasant 2026 75,000 - 75,000 - 75,000 71,250 3,750 Reserve Fund Adjustment - - 1,970,254 (1,970,254) (1,871,741) (98,513) Total 58,250,281 25,102,300 - 33,147,981 22,335,754 5,000,000 5,812,227 5,521,616 290,611 Grants, Subsidies and Other Contribution s Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Timing (year) Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Watson & Associates Economists Ltd. PAGE 5-9 H:\Brant\2023 DC\Report\Final Report.docx 5.2.3 Ambulance Services With respect to ambulance services, the County shares responsibility with the City of Brantford. The County's current share of the service is approximately 28%. Ambulance services are currently provided out of six (6) facilities and based on Brant's share of the service, the County's portion of facility space equates to 7,742 sq.ft. Over the previous 15 years, the average level of service has been approximately 0.14 sq.ft. of space per capita, which equates to an investment of $104 per capita. Over the forecast period, the D.C.-eligible amount for recovery is approximately $0.57 million. In addition to facility space, the County's share of ambulances, emergency response vehicles, community paramedicine vehicles, and other support vehicles is approximately 7.76 vehicles. The average level of service over the past 15 years equates to an investment of $40 per capita. This level of service provides for a D.C.-eligible amount for recovery of approximately $0.22 million. In total, the County would be eligible to collect approximately $0.79 million from D.C.s for ambulance services. With respect to growth-related capital needs, a 50,000 sq.ft. paramedic headquarters, and various vehicles and equipment have been identified totalling approximately $26.63 million. Deductions have been made based on the following: - $3.80 million to account for the benefit to existing development; - $5.43 million to account for the benefit to growth beyond the forecast period. - $16.50 million to account for Brantford's share of the capital (72%); and - $0.13 million to reflect the balance in the D.C. reserve fund. Therefore, the net growth-related amount of approximately $0.76 million has been included in the D.C. calculation for recovery from future growth. The growth costs have been allocated 90% to residential development and 10% to non- residential development, to acknowledge that while paramedics services are predominately residential based, there is some use of the service by non-residential users. Watson & Associates Economists Ltd. PAGE 5-10 H:\Brant\2023 DC\Report\Final Report.docx Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Ambulance Services Prj.No Residential Share Non- Residential Share 2024-2034 90% 10% 1 Paramedic Headquarters (Shared with City) 50,000 sq.ft. (20 Year Lease) 2024 24,000,000 5,430,000 18,570,000 3,799,200 14,605,200 165,600 149,040 16,560 2 Provision for Additional Vehicle 2025 450,000 - 450,000 - 325,400 124,600 112,140 12,460 3 Provision for Additional Vehicle 2027 450,000 - 450,000 - 325,400 124,600 112,140 12,460 4 Provision for Additional Vehicle 2029 450,000 - 450,000 - 325,400 124,600 112,140 12,460 5 Provision for Additional Vehicle 2031 450,000 - 450,000 - 325,400 124,600 112,140 12,460 6 Provision for Additional Vehicle 2033 450,000 - 450,000 - 325,400 124,600 112,140 12,460 7 Emergency Response Vehicle 2024 325,000 - 325,000 - 235,000 90,000 81,000 9,000 8 Staff Equipment 2024-2033 50,000 - 50,000 - 36,200 13,800 12,420 1,380 Reserve Fund Adjustment - - 132,391 (132,391) (119,152) (13,239) Total 26,625,000 5,430,000 - 21,195,000 3,931,591 16,503,400 760,009 684,008 76,001 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-11 H:\Brant\2023 DC\Report\Final Report.docx 5.2.4 Long-term Care Services With respect to long-term care facilities, the County shares responsibility of the John Noble Home with the City of Brantford. The County's current share of the service is approximately 28%. Based on Brant's share of the service, the County's portion of the long-term care home equates to 54,512 sq.ft., providing for a per capita average level of service of 1.42 sq.ft. per capita or $936 per capita. This level of service provides the County with a maximum D.C.-eligible amount for recovery over the forecast period of approximately $5.12 million. With respect to future capital needs, there is a planned 40 bed addition to the John Noble Home totalling approximately $27.87 million. Of this cost, a deduction of approximately $19.28 million has been made to account for the provincial funding to be received, and approximately $6.18 million for the City of Brantford's share of the project. After deductions, the total amount included in the D.C. calculation is approximately $2.41 million. An allocation of 90% to residential development and 10% to non-residential development has been attributed to services related to long-term care facilities to acknowledge there is some use of the service by non-residential users. Watson & Associates Economists Ltd. PAGE 5-12 H:\Brant\2023 DC\Report\Final Report.docx Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Long-term Care Services Prj.No Residential Share Non- Residential Share 2024-2034 90% 10% 1 40 Bed Addition to John Noble Home 2023-2025 27,870,000 - 6,184,534 21,685,466 - 19,280,370 2,405,096 2,164,587 240,510 Total 27,870,000 - 6,184,534 21,685,466 - 19,280,370 2,405,096 2,164,587 240,510 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-13 H:\Brant\2023 DC\Report\Final Report.docx 5.2.5 Child Care and Early Years Programs Services With respect to child care and early years programs, the County shares responsibility with the City of Brantford. The County's current share of the service is approximately 28%. Based on Brant's share of the service, the County's portion of child care and early years programs equates to 1,183 spaces, providing for a per capita average level of service of approximately 24.30 spaces per 1,000 population, or $1,091 per capita. This level of service provides the County with a maximum D.C.-eligible amount for recovery over the forecast period of approximately $5.98 million. Growth-related capital needs for child care and early years programs have not been identified for the 10-year forecast period at this time. Watson & Associates Economists Ltd. PAGE 5-14 H:\Brant\2023 DC\Report\Final Report.docx 5.2.6 Waste Diversion Services With respect to Waste Diversion, the County currently operates out of three facilities. The portions of the facilities that are used to service other municipalities and any space relating to ineligible material have been excluded. Over the past fifteen years, the average level of service provided an investment of $51 per capita. Based on the service standard over the past fifteen years, the County would be eligible to collect a total of approximately $0.28 million from D.C.s for waste diversion facilities. The County has an eligible waste diversion inventory of vehicles and equipment totaling 19.70 items (which excludes any portion that are related to landfill). These items include yard bins, roll off trucks, scale houses, loaders, and other various equipment, all of which have a total value of approximately $1.79 million. Over the past fifteen years, the average level of service was 0.50 items per 1,000 population, or an average level of investment of $55 per capita. Based on this service standard, the County would be eligible to collect approximately $0.30 million from D.C.s for waste diversion vehicles and equipment. Therefore, the total D.C.-eligible amount for waste diversion services is approximately $0.58 million. Based on the projected growth over the 10-year forecast period (2024 to 2034) the County has identified the need to expand the diversion area within the Biggars Lane Landfill, and an additional telehandler loader with a total gross capital cost of approximately $1.43 million. In addition to the capital works, approximately $0.42 million has been included in the calculations to reflect the existing reserve fund deficit. Deductions of approximately $0.65 million and $0.50 million have been made to account for the portion of the works benefiting growth beyond the forecast period, and benefitting existing development, respectively. Additionally, a deduction of $142,500 has been made for the portion of the works that are ineligible due to being related to landfill. After deductions, the net growth-related capital cost to be included in the calculation is approximately $0.55 million. The growth costs have been allocated 99% to residential development and 1% to non- residential development based on the allocation of waste diversion tonnage. Watson & Associates Economists Ltd. PAGE 5-15 H:\Brant\2023 DC\Report\Final Report.docx Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Waste Diversion Services Prj. No Residential Share Non- Residential Share 2024-2034 99% 1% 1 Biggars Lane Landfill Expansion - Diversion Area Construction 2027 1,143,600 654,000 489,600 408,800 80,800 80,234 566 2 Telehandler Loader 2024 285,000 - 142,500 142,500 92,500 50,000 49,650 350 Reserve Fund Adjustment 420,856 - 420,856 - 420,856 417,910 2,946 Total 1,849,456 654,000 142,500 1,052,956 501,300 - 551,656 547,795 3,862 Increased Service Needs Attributable to Anticipated Development Timing (year) Net Capital Cost Benefit to Existing Developmen t Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-16 H:\Brant\2023 DC\Report\Final Report.docx 5.3 Service Levels and Long-term Capital Costs for the County of Brant's D.C. Calculation This section evaluates the development-related capital requirements for services related to a highway - roads and related, public works (facilities and fleet), fire services, and policing services over a County-wide long-term planning period from 2024 to 2051. 5.3.1 Services Related to a Highway Roads and Related Brant County owns and maintains 1,123 km of rural, semi-urban, and urban roads within the County. These roads have a total replacement value of approximately $3.25 billion. Over the historical 15-year period the County has provided an average level of service of 29.80 km of roads per 1,000 population. The level of service provided results in a D.C. eligible amount over the forecast period of approximately $1.33 billion for roads. With respect to future needs, the County has identified capital projects for road works totalling approximately $172.52 million. The capital projects identified include intersection improvements, sidewalks, road widenings, reconstructions, and existing/approved debt (principal and discounted interest) costs. Of this amount, approximately $29.28 million is deducted for the amount that benefits existing development, and approximately $9.29 million is deducted to reflect the balance in the reserve fund. Additionally, a deduction of approximately $14.58 million has been made to reflect contributions from other parties. The net growth-related capital cost included in the D.C. calculations is approximately $119.38 million. The residential/non-residential allocation for services related to a highway is based on the ratio of anticipated population and employment growth over the forecast period to 2051. This results in a 69% allocation to residential development and 31% allocation to non-residential development. Watson & Associates Economists Ltd. PAGE 5-17 H:\Brant\2023 DC\Report\Final Report.docx Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% 1 Powerline Road Reconstruction Principal 2024-2039 4,819,130 - 4,819,130 - 4,819,130 3,325,200 1,493,930 2 Powerline Road Reconstruction Discounted Interest 2024-2039 329,911 - 329,911 - 329,911 227,638 102,272 3 Provision for Growth-Related Road Works 2024-2051 10,000,000 - 10,000,000 - 10,000,000 6,900,000 3,100,000 4 Grand River St. N Reconstruction and Expansion 2024-2030 43,000,000 - 43,000,000 12,040,000 30,960,000 21,362,400 9,597,600 5 Grand River St. N Reconstruction and Expansion Discounted Growth Related Interest 2028-2048 3,187,921 - 3,187,921 - 3,187,921 2,199,665 988,255 6 Hwy403/Rest Acres Road Ramp Interchanges 2025-2026 10,000,000 - 10,000,000 1,000,000 2,000,000 7,000,000 4,830,000 2,170,000 7 Intersection improvements at Forced Road and Colborne Street West 2030 2,500,000 - 2,500,000 200,000 2,300,000 1,587,000 713,000 8 Intersection improvements at Rest Acres Rd and Bethel Rd 2028-2029 6,000,000 - 6,000,000 900,000 1,000,000 4,100,000 2,829,000 1,271,000 9 Bishopsgate Road Improvements and Interchange 2029-2032 22,000,000 - 22,000,000 4,162,500 5,350,000 12,487,500 8,616,375 3,871,125 10 Paris Western Link RDS267 21 Watts Pond Road - Ayr Road to Brant-Oxford Road 2024-2030 8,000,000 - 8,000,000 400,000 7,600,000 5,244,000 2,356,000 11 Dundas St W King Edward Traffic Signals and Streetlights 2024-2030 775,000 - 775,000 75,000 25,000 675,000 465,750 209,250 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-18 H:\Brant\2023 DC\Report\Final Report.docx Table 5-6 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% 12 St. George Road Capacity Improvements 2025-2030 4,300,000 - 4,300,000 430,000 3,870,000 2,670,300 1,199,700 13 Powerline Road Improvements 2024-2028 8,600,000 - 8,600,000 1,290,000 7,310,000 5,043,900 2,266,100 14 Oak Park/Paris Road Intersection Improvements - Roundabout 2024-2027 2,500,000 - 2,500,000 375,000 2,125,000 1,466,250 658,750 15 Bethel Road - Folsetter Drive to Cleaver Road 2034 2,500,000 - 2,500,000 1,250,000 1,250,000 862,500 387,500 16 Bethel Road - Cleaver Road to Bishopsgate Road 2034 2,500,000 - 2,500,000 1,250,000 1,250,000 862,500 387,500 17 Bendemere Road (Includes Intersection with Grand River St N) 2024-2026 4,700,000 - 4,700,000 127,700 3,200,000 1,372,300 946,887 425,413 18 Iarocci Blvd (Green Ln to Consolidated Dr) 2024 1,500,000 - 1,500,000 750,000 750,000 517,500 232,500 19 Curtis Ave South Reconstruction 2024-2030 1,500,000 - 1,500,000 375,000 1,125,000 776,250 348,750 20 Oak Park/Powerline Road Intersection (County Portion of City of Brantford Project) 2024-2028 2,500,000 - 2,500,000 375,000 2,125,000 1,466,250 658,750 21 Phelps Rd/Cockshutt/County Rd 18 - intersection improvement 2024-2030 2,500,000 - 2,500,000 1,250,000 1,250,000 862,500 387,500 22 Powerline Rd/Bishopsgate Rd - intersection improvement 2024-2029 2,500,000 - 2,500,000 375,000 2,125,000 1,466,250 658,750 23 Dundas St E/Paris Rd - intersection improvement 2024-2030 3,000,000 - 3,000,000 450,000 2,550,000 1,759,500 790,500 24 Cockshutt Rd/Burtch Rd - intersection improvement 2024-2032 1,500,000 - 1,500,000 750,000 750,000 517,500 232,500 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-19 H:\Brant\2023 DC\Report\Final Report.docx Table 5-6 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% 25 Cainsville Intersection Improvement (18 & Colbourne) 2024-2027 4,000,000 - 4,000,000 1,000,000 3,000,000 2,070,000 930,000 26 Hwy 24 & German School Rd. Intersection Improvements 2029-2039 2,000,000 - 2,000,000 150,000 1,000,000 850,000 586,500 263,500 27 Hwy 5 and 24 Intersection Improvements 2031 4,000,000 - 4,000,000 300,000 2,000,000 1,700,000 1,173,000 527,000 28 Provision for Additional Sidewalks/Multi-Use Paths 2024-2030 1,000,000 - 1,000,000 - 1,000,000 690,000 310,000 29 Rest Acres Road Widening Growth Related Principal 2025-2045 5,759,405 - 5,759,405 - 5,759,405 3,973,989 1,785,416 30 Rest Acres Road Widening Discounted Growth Related Interest 2025-2045 1,468,219 - 1,468,219 - 1,468,219 1,013,071 455,148 31 Rest Acres Rd/Hutchings Roundabout Growth Related Principal 2025-2045 1,392,768 - 1,392,768 - 1,392,768 961,010 431,758 32 Rest Acres Rd/Hutchings Roundabout Discounted Growth Related Interest 2025-2045 355,052 - 355,052 - 355,052 244,986 110,066 33 King Edward St Improvements at Falkland Growth Related Principal 2025-2045 1,459,459 - 1,459,459 - 1,459,459 1,007,027 452,432 34 King Edward St Improvements at Falkland Discounted Growth Related Interest 2025-2045 372,053 - 372,053 - 372,053 256,717 115,336 Reserve Fund Adjustment - - 9,289,759 (9,289,759) (6,409,934) (2,879,825) Total 172,518,917 - - 172,518,917 38,564,959 14,575,000 119,378,958 82,371,481 37,007,477 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-20 H:\Brant\2023 DC\Report\Final Report.docx Public Works (Facilities and Fleet) The County's Public Works service is operated out of seven locations and provides a combined 87,464 sq.ft. of facility space. This provides an average level of service of 2.31 sq.ft. per capita or $330 per capita. This level of service provides the County with a maximum D.C.-eligible amount for recovery over the forecast period of approximately $5.15 million. The Public Works Department has a variety of vehicles and major equipment with a replacement cost totalling approximately $21.71 million. The inventory provided over the historical 15-year period results in an average level of service of 3.10 vehicles and equipment per 1,000 population or an average level of investment of $627 per capita. Over the forecast period, the D.C.-eligible amount for vehicles and equipment is approximately $9.80 million. In total, the County is eligible to collect approximately $14.95 million for public works infrastructure. Based on the anticipated growth over the forecast period to 2051, the capital works identified include an expansion to the works building, two additional plows and sidewalk clearing machines, and a provision for new maintenance equipment. The total gross capital cost identified is approximately $3.53 million. Of this amount, a deduction of approximately $0.36 million has been made to account for the benefit to existing development. Therefore, the net growth-related capital cost included for recovery is approximately $3.17 million. The residential/non-residential allocation for services related to a highway - public works (facilities and fleet) is based on the ratio of anticipated population and employment growth over the forecast period. This results in a 69% allocation to residential development and 31% allocation to non-residential development. Watson & Associates Economists Ltd. PAGE 5-21 H:\Brant\2023 DC\Report\Final Report.docx Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Public Works (Facilities and Fleet) Less: Potential D.C. Recoverable Cost Prj. No. Residential Share Non- Residential Share 2024-2051 69% 31% 1 Expansion to Works Buildings 2024-2034 1,430,000 - 1,430,000 357,500 1,072,500 740,025 332,475 2 Provision for new maintenance equipment 2024-2034 858,000 - 858,000 - 858,000 592,020 265,980 3 Plow 2029 400,000 - 400,000 - 400,000 276,000 124,000 4 Sidewalk Clearning Machine 2029 220,000 - 220,000 - 220,000 151,800 68,200 5 Plow 2039 400,000 - 400,000 - 400,000 276,000 124,000 6 Sidewalk Clearing Machine 2039 220,000 - 220,000 - 220,000 151,800 68,200 Total 3,528,000 - - 3,528,000 357,500 - 3,170,500 2,187,645 982,855 Post Period Benefit Other Deductions Net Capital Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-22 H:\Brant\2023 DC\Report\Final Report.docx 5.3.2 Fire Services The County currently operates its fire services from several locations, which equates to a combined total of 62,839 sq.ft. of facility space. Over the historical 15-year period the County provided 1.43 sq.ft. of facility space per capita, which equates to an investment of $1,134 per capita. Based on the anticipated growth over the forecast period, this level of service provides the County with a maximum D.C.-eligible amount for recovery of $17.71 million related to fire facility space. The fire department has a current inventory of 42 vehicles. Over the historical 15-year period the County has provided an average level of investment of $496 per capita. Based on the average level of service the total D.C.-eligible amount for fire vehicles over the forecast period is approximately $7.74 million. The fire department utilizes fire equipment and gear with a total replacement cost of approximately $7.52 million. Over the historical 15-year period the County provided an average level of investment of $154 per capita. This results in a D.C.-eligible amount of approximately $2.41 million for small equipment and gear over the forecast period to 2051. In total, the County is eligible to collect approximately $27.86 million for fire services. The County has identified the need for additional facility space including three (3) stations, a provision for upgrading the existing facilities, various new vehicles and equipment for the new facilities, and the outstanding growth-related principal and interest costs related to the Cainsville Fire Hall construction. The total gross capital cost of these projects is estimated to be approximately $38.86 million. The existing reserve fund deficit of approximately $0.47 million has also been included for recovery. Of the total gross capital cost, approximately $17.01 million is deducted for the amount that benefits existing development. The resulting total net growth-related capital costs included in the D.C. calculations is approximately $22.32 million. These costs are shared between residential and non-residential growth based on the population to employment ratio over the forecast period to 2051. This results in 69% of the costs being allocated to residential development and 31% being allocated to non- residential development. Watson & Associates Economists Ltd. PAGE 5-23 H:\Brant\2023 DC\Report\Final Report.docx Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% Facilities 1 Paris North Station 2024-2025 5,300,000 - 5,300,000 - 5,300,000 3,657,000 1,643,000 2 Paris South Station 2033-2035 15,800,000 - 15,800,000 13,544,100 2,255,900 1,556,571 699,329 3 New Airport Fire Station 2026-2027 4,300,000 - 4,300,000 2,082,700 2,217,300 1,529,937 687,363 4 Provision for Upgrading Current Facilities 2024-2051 2,000,000 - 2,000,000 - 2,000,000 1,380,000 620,000 Vehicles 5 Provision for Additional Vehicles 2024-2031 1,070,000 - 1,070,000 - 1,070,000 738,300 331,700 6 Aerial - Cainsville 2028 1,400,000 - 1,400,000 - 1,400,000 966,000 434,000 7 Fire Administration Van 2024 57,000 - 57,000 - 57,000 39,330 17,670 8 Passenger Van / Light Rescue 2024 229,000 - 229,000 - 229,000 158,010 70,990 9 Pumper 2024 800,000 - 800,000 - 800,000 552,000 248,000 10 Pumper Tanker 2024 600,000 - 600,000 - 600,000 414,000 186,000 11 Pumper 2031-2040 800,000 - 800,000 - 800,000 552,000 248,000 12 Tanker 2031-2040 600,000 - 600,000 - 600,000 414,000 186,000 13 Aerial - Paris North/ St. George 2031-2040 2,600,000 - 2,600,000 - 2,600,000 1,794,000 806,000 14 Pick up 2041 80,000 - 80,000 - 80,000 55,200 24,800 15 SUV 2041 80,000 - 80,000 - 80,000 55,200 24,800 16 Pumper / Tanker - Paris South 2024 600,000 - 600,000 460,000 140,000 96,600 43,400 17 Pumper / Tanker - Burford 2024 600,000 - 600,000 460,000 140,000 96,600 43,400 18 Pumper / Tanker - St George 2027 600,000 - 600,000 460,000 140,000 96,600 43,400 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-24 H:\Brant\2023 DC\Report\Final Report.docx Table 5-8 (Continued) Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% Equipment 19 Provision for Additional Equipment 2024-2031 214,000 - 214,000 - 214,000 147,660 66,340 20 RIT Pack 2025 4,800 - 4,800 - 4,800 3,312 1,488 21 Bunker Gear 2024-2025 198,000 - 198,000 - 198,000 136,620 61,380 22 SCBA Packs 2024-2025 142,500 - 142,500 - 142,500 98,325 44,175 23 SCBA Masks 2024-2025 12,000 - 12,000 - 12,000 8,280 3,720 24 SCBA Bottles 2024-2025 54,000 - 54,000 - 54,000 37,260 16,740 25 2 Defib 2024-2051 8,200 - 8,200 - 8,200 5,658 2,542 26 1 Auto Ex - eDraulics - set tools 2024-2051 75,000 - 75,000 - 75,000 51,750 23,250 27 2 Thermal Camera - NFPA Compliant 2024-2051 29,200 - 29,200 - 29,200 20,148 9,052 28 1 Thermal Camera - FLIR 2024-2051 2,500 - 2,500 - 2,500 1,725 775 29 2 PPv Fans 2024-2051 12,000 - 12,000 - 12,000 8,280 3,720 30 2 Gas Monitors - CO, HCN, Multigas 2024-2051 2,800 - 2,800 - 2,800 1,932 868 31 2 Large Generators 2024-2051 8,000 - 8,000 - 8,000 5,520 2,480 32 1 Small Generators 2024-2051 3,400 - 3,400 - 3,400 2,346 1,054 33 1 Chain Saw 2024-2051 1,300 - 1,300 - 1,300 897 403 34 2 Ventilation Saws/Rotary Saws 2024-2051 7,000 - 7,000 - 7,000 4,830 2,170 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-25 H:\Brant\2023 DC\Report\Final Report.docx Table 5-8 (Continued) Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% 35 12 Nozzles 2024-2051 19,200 - 19,200 - 19,200 13,248 5,952 36 Fire Hose - 100 mm (25 lengths) 2024-2051 25,000 - 25,000 - 25,000 17,250 7,750 37 Fire Hose - 65 mm (15 lengths) 2024-2051 9,000 - 9,000 - 9,000 6,210 2,790 38 Fire Hose - 38/45 mm (36 lengths) 2024-2051 10,800 - 10,800 - 10,800 7,452 3,348 39 1 Portable Pump 2024-2051 10,000 - 10,000 - 10,000 6,900 3,100 40 Communications - 12 pagers 2024-2051 11,760 - 11,760 - 11,760 8,114 3,646 41 Communications - 22 radios and mics 2024-2051 41,800 - 41,800 - 41,800 28,842 12,958 Debt 42 Fire Hall Construction Cainsville Debenture - Principal 2024-2048 341,432 - 341,432 - 341,432 235,588 105,844 43 Fire Hall Construction Cainsville Debenture - Interest 2024-2048 105,123 - 105,123 - 105,123 72,535 32,588 Reserve Fund Adjustment 466,715 - 466,715 - 466,715 322,034 144,682 Total 39,331,530 - - 39,331,530 17,006,800 - 22,324,730 15,404,064 6,920,666 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-26 H:\Brant\2023 DC\Report\Final Report.docx 5.3.3 Policing Services The County is serviced by the Ontario Provincial Police (O.P.P.) service. The County provides 23,110 sq.ft. of facility space for the O.P.P. officers, providing for an average level of service of 0.37 sq.ft. per capita or an average investment of $237 per capita. This level of service provides the County with a maximum D.C.-eligible amount for recovery of $3.71 million related to policing facility space over the forecast period to 2051. Based on the growth forecast, the County has identified the need expand the current facility, as well as the recovery of the existing police station debt. The total gross capital cost of these projects is estimated to be approximately $4.83 million. Additionally, the reserve fund deficit of approximately $0.22 million has been included for recovery. Of the total gross capital cost, $2.55 million has been deducted to account for portion of the capital that will benefit growth beyond the forecast period. The resulting total net growth-related capital cost included in the D.C. calculation is approximately $2.50 million. These costs for police services are shared between residential and non-residential growth based on the population to employment ratio over the forecast period to 2051. This results in 69% of the costs being allocated to residential development and 31% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-27 H:\Brant\2023 DC\Report\Final Report.docx Table 5-9 Infrastructure Cost Included in the Development Charges Calculation Policing Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2051 69% 31% 1 Police Station Debenture - Principal 2024-2048 1,401,691 - 1,401,691 - 1,401,691 967,167 434,524 2 Police Station Debenture - Discounted Interest 2024-2048 431,563 - 431,563 - 431,563 297,778 133,784 3 Provision for Facility Expansion 2040 3,000,000 2,550,000 450,000 - 450,000 310,500 139,500 Reserve Fund Adjustment 219,277 219,277 - 219,277 151,301 67,976 Total 5,052,531 2,550,000 - 2,502,531 - - 2,502,531 1,726,746 775,785 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-28 H:\Brant\2023 DC\Report\Final Report.docx 5.4 Service Levels and Urban Long-term Capital Costs for the County of Brant's D.C. Calculation This section evaluates the development-related capital requirements for water services, wastewater services, and stormwater services over a County-wide urban long-term planning period from 2024 to 2051. 5.4.1 Water Services Based on the anticipated growth forecast, a number of water projects have been identified to service developments throughout the County. For water services, the capital program identified by the County includes updated carryover projects from the 2019 D.C. study, and other projects identified by staff (e.g. watermain expansions and upgrades, etc.). The total gross capital cost for capital projects is approximately $110.61 million. Additionally, the existing reserve fund deficit of approximately $0.52 million has also been included for recovery. With respect to deductions, the following adjustments have been made: - $15.37 million to recognize the benefit to the existing community; and - $1.8 million related to grants, subsidies and other contributions. Therefore, the net growth-related capital cost of $93.96 million is being included in the D.C. calculations. These costs for water services are shared between residential and non-residential growth based on the population to employment ratio over the urban long-term 2051 forecast period for water serviced developments. This results in 66% of the costs being allocated to residential development and 34% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-29 H:\Brant\2023 DC\Report\Final Report.docx Table 5-10 Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2024-2051 (Water Only) 66% 34% 1 Upgrade watermain Grand River St. North (Paris Links Road to Woodslee Ave.) 2024 2,500,000 - 2,500,000 875,000 1,625,000 1,072,500 552,500 2 Additional Water source for Paris 2035 10,000,000 - 10,000,000 - 10,000,000 6,600,000 3,400,000 3 Gilbert Well Field Increased Capacity 2025-2028 850,000 - 850,000 85,000 765,000 504,900 260,100 4 Gilbert Well Field Debenture (Principal) 2024-2031 2,085,291 - 2,085,291 - 2,085,291 1,376,292 708,999 5 Gilbert Well Field Debenture (Discounted Interest) 2024-2031 233,843 - 233,843 - 233,843 154,336 79,507 6 Bethel Well Supply and Elevated Storage Paris Zone 1 Debt (Principal) 2024-2037 1,129,465 - 1,129,465 - 1,129,465 745,447 384,018 7 Bethel Well Supply and Elevated Storage Paris Zone 1 Debt (Discounted Interest) 2024-2037 130,880 - 130,880 - 130,880 86,381 44,499 St George 8 New source of water / increase PTTW for existing wells, St. George & Additional Storage 2027 9,600,000 - 9,600,000 960,000 8,640,000 5,702,400 2,937,600 9 Hwy 5 transmission watermain 2024 4,500,000 - 4,500,000 225,000 4,275,000 2,821,500 1,453,500 10 Zone 1 Looping to German School Road (PRVs) 2029 1,000,000 - 1,000,000 50,000 950,000 627,000 323,000 Other 11 Willow St. Watermain Principal 2024-2039 508,709 - 508,709 - 508,709 335,748 172,961 12 Willow St. Watermain Discounted Interest 2024-2039 34,826 - 34,826 - 34,826 22,985 11,841 12 Airport Water Upgrades Debenture - Principal 2024-2048 2,056,764 - 2,056,764 - 2,056,764 1,357,464 699,300 13 Airport Water Upgrades Debenture - Interest 2024-2048 633,251 - 633,251 - 633,251 417,946 215,305 Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-30 H:\Brant\2023 DC\Report\Final Report.docx Table 5-10 (Continued) Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2024-2051 (Water Only) 66% 34% 14 Cainsville Watermain Upgrade, Phase 1, WM-001 2025 2,700,000 - 2,700,000 1,026,000 1,674,000 - - - 15 Cainsville Watermain Upgrade, Phase 2, WM-002 and WM-003 2027 4,900,000 - 4,900,000 1,862,000 3,038,000 2,005,080 1,032,920 16 Cainsville Watermain Upgrade, Phase 3, WM-004, WM-005, WM-006 2028 4,000,000 - 4,000,000 1,520,000 2,480,000 1,636,800 843,200 17 Cainsville Standpipe and Booster Pumping Station 2026 3,400,000 - 3,400,000 - 3,400,000 2,244,000 1,156,000 18 Equipment for New Staff 2024-2051 140,000 - 140,000 - 140,000 92,400 47,600 19 Zone 1 to 3 Transmission Watermain (Broadway/West River) 2024 5,000,000 - 5,000,000 750,000 4,250,000 2,805,000 1,445,000 20 Bethel Road Extension from 150m East of Rest Acres to Pottruff 2024 1,500,000 - 1,500,000 - 1,500,000 990,000 510,000 21 Upgrades Grand River Street North from Paris Links Road to PRV 2025 2,000,000 - 2,000,000 300,000 1,700,000 1,122,000 578,000 22 Upgrades Grand River Street North from PRV to William Street 2025 4,000,000 - 4,000,000 600,000 3,400,000 2,244,000 1,156,000 23 Upgrades Grand River Street North from William Street to Dundas Street/Ball) 2026 6,000,000 - 6,000,000 900,000 5,100,000 3,366,000 1,734,000 24 Green Lane Watermain from Dundas East to 370m south of East River Rd 2026 2,790,000 - 2,790,000 279,000 2,511,000 1,657,260 853,740 25 King Edward Street Watermain Upsizing/Upgrade - Hanlon to Rest Acres 2028 890,000 - 890,000 89,000 801,000 528,660 272,340 Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-31 H:\Brant\2023 DC\Report\Final Report.docx Table 5-10 (Continued) Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2024-2051 (Water Only) 66% 34% 26 403 Crossing (Pottruff Road Area) 2025 4,500,000 - 4,500,000 1,125,000 3,375,000 2,227,500 1,147,500 27 Zone 3 Trunk Watermain upgrades (Dundas St W from M. Sharpe Res. To King Edward) 2024 800,000 - 800,000 120,000 680,000 448,800 231,200 28 Zone 1 to 3 Transmission Watermain upgrades on Laurel Street, Dundas St W 2024 850,000 - 850,000 127,500 722,500 476,850 245,650 29 Other Trunk Main Upgrades (exact details depend on Brantford or North Paris Source) 2035 12,065,000 - 12,065,000 1,809,800 10,255,200 6,768,432 3,486,768 30 Zone 1 to 3 Transmission Watermain (Main St, M. Sharpe to Grand River St S) 2024-2026 3,000,000 - 3,000,000 450,000 2,550,000 1,683,000 867,000 31 Dundas St. E Transmission Watermain (CN to Paris Rd) 2024 1,500,000 - 1,500,000 750,000 750,000 495,000 255,000 32 Iarocci Blvd (Green Ln to Consolidated Dr) 2024 600,000 - 600,000 - 600,000 396,000 204,000 33 Airport Water Distribution System Upgrades 2025-2028 2,500,000 - 2,500,000 625,000 1,875,000 1,237,500 637,500 34 Forced Rd Reconstruction (Oakhill to Colborne St W) 2024-2026 500,000 - 500,000 125,000 125,000 250,000 165,000 85,000 35 Silver Street Reconstruction - Market to GRSN 2027-2030 2,060,000 - 2,060,000 721,000 1,339,000 883,740 455,260 36 Zone 3 Elevated Tank Growth Related Principal 2025-2045 5,595,050 - 5,595,050 - 5,595,050 3,692,733 1,902,317 37 Zone 3 Elevated Tank Discounted Growth Related Interest 2025-2045 1,426,320 - 1,426,320 - 1,426,320 941,372 484,949 38 Grand River St N - Watermain Upgrades Discounted Growth-Related Interest 2028-2048 2,634,206 - 2,634,206 - 2,634,206 1,738,576 895,630 Reserve Fund Adjustment 518,340 - 518,340 - 518,340 342,105 176,236 Total 111,131,946 - - 111,131,946 15,374,300 1,799,000 93,958,646 62,012,706 31,945,940 Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-32 H:\Brant\2023 DC\Report\Final Report.docx 5.4.2 Wastewater Services The wastewater capital program is primarily based on carryover projects from the 2019 D.C. study, with a few additions identified by staff. These projects include the St. George and Paris wastewater treatment plant expansions, sewer upgrades, new sewer mains, debt recovery, etc. The total gross capital cost for the capital projects is approximately $337.75 million. With respect to deductions, the following adjustments have been made: - $86.63 million to recognize the benefit to existing developments; - $87.03 million for post period benefit; - $5.22 million to recognize the reserve fund surplus balance; and - $13.36 million for grants, subsidies and other contributions. Therefore, the net growth-related capital cost of $145.51 million is being included in the D.C. calculations. These costs for wastewater services are shared between residential and non-residential growth based on the population to employment ratio over the urban long-term 2051 forecast period. This results in 66% of the costs being allocated to residential development and 34% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-33 H:\Brant\2023 DC\Report\Final Report.docx Table 5-11 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2024-2051 (Full Services) 66% 34% 1 New & upgrades to sanitary sewers on Grand River Street North(Grand River Street North Pumping Station to Hartley Ave) 2024 3,100,000 - 3,100,000 1,085,000 351,000 1,664,000 1,098,240 565,760 2 Grand River St N - New & Upgrades to Sanitary Sewer Discounted Growth-Related Interest 2028-2048 720,037 - 720,037 - 720,037 475,224 244,813 3 Willow St. SPS Debenture (Principal) 2024-2030 535,520 - 535,520 - 535,520 353,443 182,077 4 Willow St. SPS Debenture (Discounted Interest) 2024-2030 62,206 - 62,206 - 62,206 41,056 21,150 5 Upgrades sanitary sewer conveyance (Mile Hill Road Easement to WPCP) 2024 1,500,000 - 1,500,000 225,000 1,275,000 841,500 433,500 6 Upsizing on Race Street from Ball to WPCP 2024 1,500,000 - 1,500,000 150,000 1,350,000 891,000 459,000 7 Paris Wastewater Treatment Plant Expansion 2028 220,000,000 62,571,300 157,428,700 66,000,000 91,428,700 60,342,942 31,085,758 8 St. George Water Pollution Control Plant Expansion 2025-2028 57,700,000 23,834,200 33,865,800 11,540,000 22,325,800 14,735,028 7,590,772 9 Upgrades sanitary sewer conveyance system St. George - Treatment plant to Hawk St. 2025-2026 4,300,000 - 4,300,000 645,000 3,655,000 2,412,300 1,242,700 0 Upgrades sanitary sewer conveyance system St. George - Through Losani Development 2025-2026 900,000 - 900,000 30,000 700,000 170,000 112,200 57,800 Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Prj.No Increased Service Needs Attributable to Anticipated Development Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Watson & Associates Economists Ltd. PAGE 5-34 H:\Brant\2023 DC\Report\Final Report.docx Table 5-11 (Continued) Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2024-2051 (Full Services) 66% 34% 11 Upgrades sanitary sewer conveyance system St. George - Beverly St. from Losani to Industrial Blvd. 2025-2026 1,800,000 - 1,800,000 270,000 1,530,000 1,009,800 520,200 12 St. George, South SPS, Forcemain and trunk sewers 2032 9,700,000 - 9,700,000 - 9,700,000 - - - 13 St. George, Hwy 24 Servicing 2033-2040 600,000 - 600,000 90,000 510,000 336,600 173,400 14 Airport Sewage Treatment debt (Principal) 2024-2027 220,982 - 220,982 - 220,982 145,848 75,134 15 Airport Sewage Treatment debt (Discounted Interest) 2024-2027 8,020 - 8,020 - 8,020 5,293 2,727 16 Sanitary PS - Pottruff Rd/Bethel Rd 2025 7,330,000 - 7,330,000 1,832,500 1,832,500 3,665,000 2,418,900 1,246,100 17 Willow Street SPS Upgrades 2030 3,225,000 - 3,225,000 322,500 2,902,500 1,915,650 986,850 18 Cainsville Sanitary Servicing Upgrades/Extensions 2025-2030 2,500,000 - 2,500,000 375,000 2,125,000 1,402,500 722,500 19 Cainsville Main SPS, Forcemain and Lagoon Decommissioning/Re-purposing 2025 6,900,000 - 6,900,000 1,725,000 5,175,000 3,415,500 1,759,500 20 Cainsville South SPS and Forcemain 2026 5,400,000 - 5,400,000 270,000 5,130,000 3,385,800 1,744,200 21 Upgrades sanitary sewer conveyance (Creeden St/Main Street Area) 2024 640,000 - 640,000 64,000 576,000 380,160 195,840 22 Sewer from Existing Business Park SPS to New Business Park SPS 2025 3,263,600 - 3,263,600 1,631,800 1,631,800 1,076,988 554,812 23 King Edward Street Upsizing (Rest Acres to Hanlon) 2027 910,000 - 910,000 91,000 819,000 540,540 278,460 Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Prj.No Increased Service Needs Attributable to Anticipated Development Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Watson & Associates Economists Ltd. PAGE 5-35 H:\Brant\2023 DC\Report\Final Report.docx Table 5-11 (Continued) Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2024-2051 (Full Services) 66% 34% 24 Nith River Siphon (Principal) 2024-2039 535,469 - 535,469 - 535,469 353,409 182,059 25 Nith River Siphon (Discounted Interest) 2024-2039 26,723 - 26,723 - 26,723 17,637 9,086 26 Iarocci Blvd (Green Ln to Consolidated Dr) 2024-2026 300,000 - 300,000 - 150,000 150,000 99,000 51,000 27 King Edward/Cleaver Road SPS & Forcemain 2029 2,500,000 625,000 1,875,000 - 625,000 1,250,000 825,000 425,000 28 Reconstruction parts of Ball St. and King Edward St. 2024 1,434,000 - 1,434,000 286,800 1,147,200 757,152 390,048 29 Equipment for New Staff 2024-2051 140,000 - 140,000 - 140,000 92,400 47,600 Reserve Fund Adjustment - - 5,222,809 (5,222,809) (3,447,054) (1,775,755) Total 337,751,557 87,030,500 - 250,721,057 91,856,409 13,358,500 145,506,148 96,034,058 49,472,090 Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Prj.No Increased Service Needs Attributable to Anticipated Development Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Watson & Associates Economists Ltd. PAGE 5-36 H:\Brant\2023 DC\Report\Final Report.docx 5.4.3 Stormwater Services The County has identified a number of stormwater related capital items to service the growth to 2051. The capital cost of these works is approximately $6.15 million. Approximately $0.13 million and $3.28 million have been deducted to reflect the balance in the reserve fund, and the amount that benefits existing developments, respectively. The resulting net growth capital cost included in development charge is approximately $2.74 million. These costs for stormwater services are shared between residential and non-residential growth based on the population to employment ratio over the urban long-term 2051 forecast period. This results in 66% of the costs being allocated to residential development and 34% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-37 H:\Brant\2023 DC\Report\Final Report.docx Table 5-12 Infrastructure Cost Included in the Development Charges Calculation Stormwater Services Residential Share Non- Residential Share 2024-2051 (Full Services) 66% 34% 1 Storm Management (Gurney Outlet) 2024-2025 602,000 - 602,000 30,100 571,900 377,454 194,446 2 King Edward Reconstruction - Dundas to RAR 2024-2027 175,000 - 175,000 - 175,000 115,500 59,500 3 Cainsville Stormwater Management Improvements 2026-2030 3,000,000 - 3,000,000 2,250,000 750,000 495,000 255,000 4 Burford Stormwater Management Improvements 2026-2030 2,000,000 - 2,000,000 1,000,000 1,000,000 660,000 340,000 5 Grand River St N - New & Upgrades to Storm Sewer Discounted Growth Related Interest 2028-2048 376,973 - 376,973 - 376,973 248,802 128,171 Reserve Fund Asjustment - - - 129,263 (129,263) (85,313) (43,949) Total 6,153,973 - - 6,153,973 3,409,363 - 2,744,610 1,811,443 933,168 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Developmen t Grants, Subsidies and Other Contributions Attributable to New Development Total Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\Brant\2023 DC\Report\Final Report.docx 6. D.C. Calculation Table 6-1 calculates the proposed urban area D.C.s to be imposed for infrastructure services based upon an urban long-term forecast period (stormwater and wastewater). Table 6-2 calculates the proposed urban area D.C.s to be imposed for infrastructure services based upon an urban long-term forecast period for developments that are serviced with water only. Table 6-3 calculates the proposed uniform D.C.s to be imposed on anticipated development in the County for County-wide services over a long-term planning horizon (services related to a highway, fire services, and policing services). Table 6-4 calculates the proposed uniform D.C.s to be imposed on anticipated development in the County for County-wide services over a 10-year planning horizon (parks and recreation services, library services, long-term care services, ambulance services, and waste diversion services). The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (singles and semi-detached, multiples, apartments 2+ bedrooms, apartments studio and 1 bedroom, and special care/special dwelling units). The non-residential D.C. has been calculated on a per sq.ft. of G.F.A. basis for all types of non-residential development (industrial, commercial, and institutional). The D.C.-eligible costs for each service component were developed in Chapter 5 for all County services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The eligible-D.C. cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 7) to calculate the charge in Tables 6-1 to 6-4. With respect to non-residential development, the total costs associated with non- residential development have been allocated to primary development, commercial development, industrial development, and institutional development based on the relative share of employment (for the forecast period) anticipated for each category. These costs have then been divided by the anticipated primary, commercial, industrial, Watson & Associates Economists Ltd. PAGE 6-2 H:\Brant\2023 DC\Report\Final Report.docx and institutional development respectfully, over the planning period to calculate a cost per sq.ft. of gross floor area. Table 6-5 summarizes the total D.C. that is applicable for County-wide services and Table 6-6 summarizes the gross capital expenditures and sources of revenue for works to be undertaken during the life of the by-law. Watson & Associates Economists Ltd. PAGE 6-3 H:\Brant\2023 DC\Report\Final Report.docx Table 6-1 County of Brant Development Charge Calculation Urban area Services Long-Term (2024 to 2051) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 1,811,443 933,168 445 0.13 1,811,443 933,168 445 0.13 2. Wastewater Services 2.1 Treatment plants & Sewers 96,034,058 49,472,090 23,601 7.12 96,034,058 49,472,090 23,601 7.12 TOTAL 97,845,500 50,405,258 24,046 7.25 D.C.-Eligible Capital Cost 97,845,500 $50,405,258 Urban Long-Term Gross Population/GFA Growth (sq.ft.) 12,549 6,953,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $7,797.13 $7.25 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.084 $24,046 Multiples 2.017 $15,727 Apartments - 2 Bedrooms + 2.122 $16,546 Apartments - Studio and 1 Bedroom 1.396 $10,885 Special Care/Special Dwelling Units 1.100 $8,577 Watson & Associates Economists Ltd. PAGE 6-4 H:\Brant\2023 DC\Report\Final Report.docx Table 6-2 County of Brant Development Charge Calculation Urban area Services - Water Long-Term (2024 to 2051) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 3. Water Services 3.1 Treatment, storage and distribution systems 62,012,706 31,945,940 14,001 4.17 62,012,706 31,945,940 14,001 4.17 TOTAL 62,012,706 31,945,940 14,001 4.17 D.C.-Eligible Capital Cost $62,012,706 $31,945,940 Urban Long-Term (Water Only) Gross Population/GFA Growth (sq.ft.) 13,659 7,662,600 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,540.03 $4.17 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.084 $14,001 Multiples 2.017 $9,157 Apartments - 2 Bedrooms + 2.122 $9,634 Apartments - Studio and 1 Bedroom 1.396 $6,338 Special Care/Special Dwelling Units 1.100 $4,994 Watson & Associates Economists Ltd. PAGE 6-5 H:\Brant\2023 DC\Report\Final Report.docx Table 6-3 County of Brant Development Charge Calculation County-wide Services Long-Term (2024 to 2051) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 4. Services Related to a Highway 4.1 Roads and Related 82,371,481 37,007,477 14,145 4.50 4.2 Public Works (Facilities and Fleet) 2,187,645 982,855 376 0.12 84,559,126 37,990,332 14,521 4.62 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 15,404,064 6,920,666 2,645 0.84 15,404,064 6,920,666 2,645 0.84 6. Policing Services 6.1 Facilities, vehicles and equipment, small equpment and gear 1,726,746 775,785 297 0.09 1,726,746 775,785 297 0.09 TOTAL 101,689,936 45,686,783 17,463 5.55 D.C.-Eligible Capital Cost $101,689,936 $45,686,783 Long-Term Gross Population/GFA Growth (sq.ft.) 17,959 8,230,100 Cost Per Capita/Non-Residential GFA (sq.ft.) $5,662.31 $5.55 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.084 $17,463 Multiples 2.017 $11,421 Apartments - 2 Bedrooms + 2.122 $12,015 Apartments - Studio and 1 Bedroom 1.396 $7,905 Special Care/Special Dwelling Units 1.100 $6,229 Watson & Associates Economists Ltd. PAGE 6-6 H:\Brant\2023 DC\Report\Final Report.docx Table 6-4 County of Brant Development Charge Calculation County-wide Services 10-Year (2024 to 2034) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 7. Parks and Recreation Services 7.1 Park development, amenities, vehicles, equipment and recreation facilities 34,416,528 1,811,396 16,022 0.70 34,416,528 1,811,396 16,022 0.70 8. Library Services 8.1 Library facilities, materials and vehicles 5,521,616 290,611 2,570 0.12 5,521,616 290,611 2,570 0.12 9. Long-term Care Services 9.1 Facilities, vehicles and equipment 2,164,587 240,510 1,008 0.10 2,164,587 240,510 1,008 0.10 10. Ambulance 10.1 Ambulance facilities, vehicles and equipment 684,008 76,001 318 0.03 684,008 76,001 318 0.03 11. Waste Diversion 11.1 Waste diversion facilites, vehicles, equipment and other 547,795 3,862 255 0.01 547,795 3,862 255 0.01 TOTAL 43,334,533 2,422,380 20,173 $0.96 D.C.-Eligible Capital Cost 43,334,533 2,422,380 10-Year Gross Population/GFA Growth (sq.ft.) 6,625 2,526,400 Cost Per Capita/Non-Residential GFA (sq.ft.) $6,541 $0.96 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.084 $20,173 Multiples 2.017 $13,193 Apartments - 2 Bedrooms + 2.122 $13,880 Apartments - Studio and 1 Bedroom 1.396 $9,131 Special Care/Special Dwelling Units 1.100 $7,195 Watson & Associates Economists Ltd. PAGE 6-7 H:\Brant\2023 DC\Report\Final Report.docx Table 6-5 County of Brant Development Charge Calculation Total All Services 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ Urban-wide Services Long-Term 97,845,500 50,405,258 24,046 7.25 Urban-wide (Water) Services Long-Term 62,012,706 31,945,940 14,001 4.17 County-wide Services Long-Term 101,689,936 45,686,783 17,463 5.55 County-wide Services 10-Year 43,334,533 2,422,380 20,173 0.96 TOTAL 304,882,676 130,460,360 75,683 17.93 Watson & Associates Economists Ltd. PAGE 6-8 H:\Brant\2023 DC\Report\Final Report.docx Table 6-6 County of Brant Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the Life of the By-law Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Residential Non-Residential 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 5,908,941 0 3,280,100 0 0 1,735,035 893,806 2. Wastewater Services 2.1 Treatment plants & Sewers 336,556,136 0 86,566,100 13,358,500 87,030,500 98,736,683 50,864,352 3. Water Services 3.1 Treatment, storage and distribution systems 92,908,415 0 15,374,300 1,799,000 0 49,985,176 25,749,939 4. Services Related to a Highway 4.1 Roads and Related 158,508,445 0 29,207,018 14,120,455 0 79,474,871 35,706,101 4.2 Public Works (Facilities and Fleet) 3,528,000 0 357,500 0 0 2,187,645 982,855 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 29,484,233 0 12,492,100 0 0 11,724,572 5,267,561 6. Policing Services 6.1 Facilities, vehicles and equipment, small equpment and gear 992,239 0 0 0 0 684,645 307,594 7. Parks and Recreation Services 7.1 Park development, amenities, vehicles, equipment and recreation facilities 157,527,764 0 22,977,600 50,000 92,819,100 39,597,011 2,084,053 8. Library Services 8.1 Library facilities, materials and vehicles 54,441,098 0 20,365,500 5,000,000 22,054,970 6,669,597 351,031 9. Long-term Care Services 9.1 Facilities, vehicles and equipment 27,870,000 6,184,534 0 19,280,370 0 2,164,587 240,510 10. Ambulance 10.1 Ambulance facilities, vehicles and equipment 26,625,000 0 3,799,200 16,503,400 5,430,000 803,160 89,240 11. Waste Diversion 11.1 Waste diversion facilites, vehicles, equipment and other 1,428,600 142,500 501,300 0 654,000 129,884 916 Total Expenditures & Revenues $895,778,871 $6,327,034 $194,920,718 $70,111,725 $207,988,570 $293,892,866 $122,537,959 Post D.C. Period Benefit Total Gross Cost Service/Class Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\Brant\2023 DC\Report\Final Report.docx 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided are based on the County's existing policies; with some modifications and consideration for the changes to the D.C.A. resulting from Bills 108, 197, 213 and 23. Watson & Associates Economists Ltd. PAGE 7-2 H:\Brant\2023 DC\Report\Final Report.docx 7.2 D.C. By-law Structure It is recommended that: - the County uses a uniform County-wide D.C. calculation for all County-wide services; - D.C.s for water, wastewater, and stormwater services be imposed on the urban service areas of the County; and - One D.C. by-law be used for all of the above noted services. 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." Watson & Associates Economists Ltd. PAGE 7-3 H:\Brant\2023 DC\Report\Final Report.docx 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the number of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, e.g. - for parks and recreation services and library services, a 5% non-residential attribution has been made to recognize use by the non-residential sector; - for ambulance services and long-term care services, a 90% residential/10% non-residential allocation has been made to recognize use by the non-residential sector; - for waste diversion services, a 99% residential/1% non-residential allocation has been made based on the allocation of waste diversion tonnage; - for services related to a highway - roads and related, public works (facilities and fleet), fire protection services, police services a 69% residential/31% non-residential attribution has been made based on a population vs. employment growth ratio over the long-term (2024 to 2051) forecast period; and - for water services, wastewater services, and stormwater services a 66% residential/34% non-residential attribution has been made based on a population vs. employment growth ratio over the urban long-term (2024 to 2051) forecast period. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) In the case of the re-development involving the demolition and replacement of all or part of a building or structure: Watson & Associates Economists Ltd. PAGE 7-4 H:\Brant\2023 DC\Report\Final Report.docx 1) a redevelopment credit shall be allowed, provided that the singular and certain parcel of land was improved by occupied structures within the last five years prior to the issuance of the building permit required by the development, and the building permit for the development has been issued within five years from the date the demolition permit has been issued; and 2) if a development on a singular and certain parcel of land involves the demolition and replacement of a building or structure, or the conversion from one principal use to another, a redevelopment credit shall be allowed equivalent to: a. the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable, and/or b. the gross floor area of the building demolished/ converted multiplied by the current non-residential development charge in place at the time the development charge is payable. The demolition credit is allowed only if the land was improved by occupied structures immediately prior to the demolition. Provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 7.3.4 Exemptions (full or partial) a) Statutory exemptions: - industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education (section 3); - may add up to 2 apartments in an existing or new detached, semi-detached, or rowhouse (including in an ancillary structure); - add one additional unit or 1% of existing units in an existing rental residential building; Watson & Associates Economists Ltd. PAGE 7-5 H:\Brant\2023 DC\Report\Final Report.docx - a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - affordable units, attainable units, and affordable inclusionary zoning units (to be in force at a later date); - non-profit housing; and - discount for rental housing units based on bedroom size (i.e., three or more bedrooms - 25% reduction, two bedrooms - 20% reduction, and all others - 15% reduction). b) Non-statutory exemptions for Council consideration: - non-residential farm buildings; and - farm bunk houses. 7.3.5 Phasing in As required by Section 5(6) paragraph 4 of the D.C.A., the calculated D.C. will be phased-in over a five-year period as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. It is noted that this phase-in is proposed to be removed for all D.C. by-laws that are passed after Bill 185 receives Royal Assent. Should the County's by-law pass after these changes come into effect, no mandatory phase-in will be included in the by-law. 7.3.6 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the County and an owner under s. 27 of the D.C.A. Rental housing and institutional developments will pay D.C.s in 6 equal annual payments commencing at occupancy. Watson & Associates Economists Ltd. PAGE 7-6 H:\Brant\2023 DC\Report\Final Report.docx Moreover, the D.C. amount for all developments occurring within two (2) years of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the D.C. in effect on the day the applicable Site Plan or Zoning By-law Amendment application was submitted (as a complete application). Note, the Province has proposed to change the rate freeze period from two (2) years to 18 months through Bill 185. Instalment payments and payments determined at the time of Site Plan or Zoning By- law Amendment application are subject to annual interest charges. The maximum interest rate the County can impose is the average prime rate plus 1%. 7.3.7 The Applicable Areas The charges developed herein provide for varying charges within the County, as follows: - All County-wide services - the full residential and non-residential charge will be imposed on all lands within the County; and - Water - the full residential and non-residential charge will be imposed on the urban water service areas of the County; and - Wastewater and Stormwater - the full residential and non-residential charge will be imposed on the urban service areas of the County. 7.3.8 Indexing Rates shall be adjusted, without amendment to the By-law, annually on September 1, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).1 7.4 Other D.C. By-law Provisions It is recommended that: 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 H:\Brant\2023 DC\Report\Final Report.docx 7.4.1 Categories of Services for Reserve Fund and Credit Purposes The County's D.C. collections are currently reserved in 10 separate reserve funds: Services Related to a Highway, Fire Protection Services, Policing Services, Parks and Recreation Services, Library Services, Ambulance, Waste Diversion, Stormwater Drainage and Control Services, Wastewater Services, and Water Services. Appendix D outlines the reserve fund policies that the County is required to follow as per the D.C.A. 7.4.2 By-law In-force Date A by-law under the D.C.A. comes into force either on the day after which the by-law is passed or at a later date determined by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day the by-law comes into force updated on the first business day pf every January, April, July and October (as per section 11 of O. Reg. 82/98). 7.4.4 Area Rating The D.C.A. required that Council must consider the use of area specific charges: 1. Section 2 (9) of the D.C.A. now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated (note that at this time, no municipalities or services are prescribed by the regulations). 2. Section 10 (2) c.1 of the D.C.A. requires that "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area rated. The second item requires Council to consider the use of area rating. Watson & Associates Economists Ltd. PAGE 7-8 H:\Brant\2023 DC\Report\Final Report.docx Currently the County's by-law does provide for area rating for water, wastewater, and stormwater services. All other County services are recovered based on a uniform, County-wide basis. There have been several reasons why they have not been imposed including: 1. All County services, with the exception of water, wastewater and stormwater require that the average 15-year service standard be calculated. This average service standard multiplied by growth in the County, establishes an upper ceiling on the amount of funds that can be collected from all developing landowners. Section 4 (4) of O. Reg. 82/98 provides that "if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by-law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area would establish an area-specific ceiling which would significantly reduce the total revenue recoverable for the County hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. Expanding on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a County-wide approach to an area-specific approach. For example, if all services were now built (and funded) within Area A (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area-rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The D.C.s would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 3. Many services provided (roads, parks and recreation facilities, etc.) are not restricted to one specific area and are often used by all residents. For example, arenas located in different parts of the County will be used by residents from all areas depending on the programing of the facility (i.e., a public skate is available each night, but at a different arena; hence usage of any one facility at any given time is based on programming availability). Watson & Associates Economists Ltd. PAGE 7-9 H:\Brant\2023 DC\Report\Final Report.docx For the reasons noted above, it is recommended that Council continue the D.C. approach to calculate the charges on an urban area basis for water, wastewater, and stormwater, and on a uniform County-wide basis for all other services. 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Continue the D.C. approach to calculate the charges on a uniform County-wide basis for all services except water, wastewater, and stormwater;" "Continue the D.C. approach to calculate the charges on an urban-area basis for water, wastewater, and stormwater services;" "Approve the capital project listing set out in Chapter 5 of the D.C.s Background Study dated May 24 2024, subject to further annual review during the capital budget process;" "Approve the D.C.s Background Study dated May 24, 2024;" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix G." Watson & Associates Economists Ltd. H:\Brant\2023 DC\Report\Final Report.docx Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 H:\Brant\2023 DC\Report\Final Report.docx 8. By-law Implementation 8.1 Public Consultation Process 8.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT) (formerly the Local Planning Appeal Tribunal (LPAT)). 8.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. PAGE 8-2 H:\Brant\2023 DC\Report\Final Report.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 H:\Brant\2023 DC\Report\Final Report.docx 8.3 Implementation Requirements 8.3.1 Introduction Once the County has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the County Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by- law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the County must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; Watson & Associates Economists Ltd. PAGE 8-4 H:\Brant\2023 DC\Report\Final Report.docx - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The County must give one copy of the most recent pamphlet without charge, to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the County Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The County is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the County Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of County Council to the OLT. Watson & Associates Economists Ltd. PAGE 8-5 H:\Brant\2023 DC\Report\Final Report.docx 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The County and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the County to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the County assesses whether this mechanism is appropriate for its use, as part of funding projects prior to County funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 8-6 H:\Brant\2023 DC\Report\Final Report.docx It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the County is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\Brant\2023 DC\Report\Final Report.docx Schedule 1 County of Brant Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 3.0% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from the County of Brant Addendum to the Municipal Comprehensive Review Final Report, May 2023, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 36,700 35,638 578 35,060 11,637 595 605 95 12,932 525 2.756 37,800 36,707 847 35,860 11,895 725 590 105 13,315 770 2.757 40,650 39,474 734 38,740 12,555 965 725 85 14,330 667 2.755 42,910 41,673 780 40,893 13,158 1,271 813 85 15,327 709 2.719 48,560 47,150 879 46,271 14,800 1,610 1,233 85 17,728 799 2.660 59,000 57,293 1,065 56,228 17,385 1,970 2,550 85 21,990 968 2.605 1,100 1,069 269 800 258 130 -15 10 383 245 2,850 2,767 -113 2,880 660 240 135 -20 1,015 -103 2,260 2,199 46 2,153 603 306 88 0 997 42 5,650 5,477 99 5,378 1,642 339 420 0 2,401 90 16,090 15,620 285 15,335 4,227 699 1,737 0 6,663 259 Early 2024 - Mid 2051 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Forecast Mid 2021 - Early 2024 Incremental Early 2024 - Early 2034 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Early 2024 Early 2034 Mid 2051 Watson & Associates Economists Ltd. PAGE A-3 H:\Brant\2023 DC\Report\Final Report.docx Figure 1 County of Brant Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from County of Brant building permit data, 2014 to 2022, and 2023 estimated based on September year-to-date data by Watson & Associates Economists Ltd. 141 185 118 141 456 251 713 330 509 316 238 237 232 232 232 232 232 243 243 243 243 243 243 243 243 243 243 246 246 246 246 246 242 242 242 242 242 0 100 200 300 400 500 600 700 800 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\Brant\2023 DC\Report\Final Report.docx Schedule 2 County of Brant Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Watson & Associates Economists Ltd. 2024 - 2034 1,012 339 410 1,761 4,573 -537 4,036 92 4,128 2024 - 2051 2,485 699 1,727 4,911 12,308 -1,098 11,210 265 11,475 2024 - 2034 61 0 0 61 188 -51 137 0 137 2024 - 2051 255 0 0 255 786 -105 682 0 682 2024 - 2034 136 0 0 136 419 -55 365 7 372 2024 - 2051 354 0 0 354 1,092 -112 980 20 1,000 2024 - 2034 265 0 10 275 836 -93 743 0 743 2024 - 2051 694 0 10 704 2,159 -190 1,969 0 1,969 2024 - 2034 168 0 0 168 518 -421 97 0 97 2024 - 2051 439 0 0 439 1,354 -860 494 0 494 2024 - 2034 1,642 339 420 2,401 6,535 -1,157 5,378 99 5,477 2024 - 2051 4,227 699 1,737 6,663 17,700 -2,364 15,335 285 15,620 Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Burford Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Full Services Partial Services (Water Only) Private Services (Rural Settlement) Remaining Rural County of Brant Watson & Associates Economists Ltd. PAGE A-5 H:\Brant\2023 DC\Report\Final Report.docx Schedule 3 County of Brant Current Year Growth Forecast Mid-2021 to Early-2024 Mid 2021 Population 39,474 Occupants of Units (2) 997 New Housing Units, multiplied by P.P.U. (3) 2.989 Mid 2021 to Early 2024 gross population increase 2,980 2,980 Occupants of New Units 42 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Early 2024 gross population increase 46 46 Decline in Housing Units (4) 14,330 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.058 Mid 2021 to Early 2024 total decline in population -827 -827 Population Estimate to Early 2024 41,673 Net Population Increase, Mid 2021 to Early 2024 2,199 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.259 60% 1.971 Multiples (6) 2.727 31% 0.837 Apartments (7) 2.044 9% 0.180 Total 100% 2.989 ¹ Based on 2021 Census custom database ² Based on Building permit/completion activity (4) 2021 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 H:\Brant\2023 DC\Report\Final Report.docx Schedule 4 County of Brant 10-Year Growth Forecast Early-2024 to Early-2034 Early 2024 Population 41,673 Occupants of Units (2) 2,401 New Housing Units, multiplied by P.P.U. (3) 2.722 Early 2024 to Early 2034 gross population increase 6,535 6,535 Occupants of New Units 90 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2024 to Early 2034 gross population increase 99 99 Decline in Housing Units (4) 15,327 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.075 Early 2024 to Early 2034 total decline in population -1,157 -1,157 Population Estimate to Early 2034 47,150 Net Population Increase, Early 2024 to Early 2034 5,477 (1) Early 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.084 68% 2.109 Multiples (6) 2.017 14% 0.285 Apartments (7) 1.873 17% 0.328 one bedroom or less 1.396 two bedrooms or more 2.122 Total 100% 2.722 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2024 households based upon 2021 Census (14,330 units) + Mid 2021 to Early 2024 unit estimate (997 units) = 15,327 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2021 Population (39,474) + Mid 2021 to Early 2024 estimated housing units to beginning of forecast period (997 x 2.989 = 2,980) + (42 x 1.1 = 46) + (14,330 x -0.058 = -827) = 41,673 Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 H:\Brant\2023 DC\Report\Final Report.docx Schedule 5 County of Brant Long-Term Growth Forecast Early-2024 to Mid-2051 Early 2024 Population 41,673 Occupants of Units (2) 6,663 New Housing Units, multiplied by P.P.U. (3) 2.656 Early 2024 to Mid 2051 gross population increase 17,700 17,700 Occupants of New Units 259 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2024 to Mid 2051 gross population increase 285 285 Decline in Housing Units (4) 15,327 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.154 Early 2024 to Mid 2051 total decline in population -2,364 -2,364 Population Estimate to Mid 2051 57,293 Net Population Increase, Early 2024 to Mid 2051 15,620 (1) Early 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.084 63% 1.957 Multiples (6) 2.017 10% 0.212 Apartments (7) 1.873 26% 0.488 one bedroom or less 1.396 two bedrooms or more 2.122 Total 100% 2.656 ¹ Persons per unit based on Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2024 households based upon 2021 Census (14,330 units) + Mid 2021 to Early 2024 unit estimate (997 units) = 15,327 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. 2021 Population (39,474) + Mid 2021 to Early 2024 estimated housing units to beginning of forecast period (997 x 2.989 = 2,980) + (42 x 1.1 = 46) + (14,330 x -0.058 = -827) = 41,673 Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-8 H:\Brant\2023 DC\Report\Final Report.docx Schedule 6 County of Brant Historical Residential Building Permits Years 2014 to 2023 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from County of Brant building permit data, 2014 to 2022, and 2023 estimated based on September year-to-date data by Watson & Associates Economists Ltd. Residential Building Permits Total 2014 112 29 0 141 2015 109 66 10 185 2016 114 3 1 118 2017 132 9 0 141 2018 299 153 4 456 Sub-total 766 260 15 1,041 Average (2014 - 2018) 153 52 3 208 % Breakdown 73.6% 25.0% 1.4% 100.0% 2019 164 87 0 251 2020 503 200 10 713 2021 202 115 13 330 2022 336 153 20 509 2023 130 76 110 316 Sub-total 1,335 631 153 2,119 Average (2019 - 2023) 267 126 31 424 % Breakdown 63.0% 29.8% 7.2% 100.0% 2014 - 2023 Total 2,101 891 168 3,160 Average 210 89 17 316 % Breakdown 66.5% 28.2% 5.3% 100.0% Singles & Semi Detached Multiples[1] Apartments[2] Year Watson & Associates Economists Ltd. PAGE A-9 H:\Brant\2023 DC\Report\Final Report.docx Schedule 7a County of Brant Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - - 2.118 3.218 4.286 3.259 6-10 - - - 2.924 4.320 3.130 3.195 0.059 11-15 - - 1.909 3.082 4.290 3.189 3.193 3.084 16-20 - - 1.900 2.813 3.412 2.778 3.089 3.084 20-25 - - - 2.758 3.769 2.747 3.021 3.084 25-35 - - 2.182 2.853 4.083 2.980 35+ - 1.514 1.908 2.745 3.692 2.675 2.965 3.084 Total 0.563 1.610 1.925 2.828 3.883 2.806 Age of Multiples[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - - - 2.630 - 2.727 6-10 - - - 2.143 - 1.963 2.345 (0.215) 11-15 - - - - - 2.063 2.251 2.017 16-20 - - 1.462 1.933 - 1.667 2.105 2.017 20-25 - - 1.583 - - 1.789 2.042 2.017 25-35 - - - - - - 35+ - - 2.455 3.100 - 2.414 2.104 2.017 Total 0.917 1.143 1.727 2.565 - 2.176 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - - 2.000 3.121 4.524 3.079 6-10 - - 1.706 2.752 4.320 2.871 11-15 - - 1.737 2.963 4.188 3.049 16-20 - - 1.714 2.744 3.625 2.630 20-25 - 1.091 1.652 2.674 3.769 2.554 25-35 - - 2.077 2.847 4.083 2.925 35+ - 1.240 1.873 2.754 3.736 2.597 Total 1.100 1.258 1.850 2.804 3.927 2.702 Watson & Associates Economists Ltd. PAGE A-10 H:\Brant\2023 DC\Report\Final Report.docx Schedule 7b County of Brant Census Division Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Apartments[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - 1.417 1.806 2.714 - 2.044 6-10 - 1.765 1.500 3.667 - 2.100 11-15 - 1.261 1.867 - - 1.476 1.873 1.873 16-20 - 1.500 1.895 - - 1.927 1.887 1.873 20-25 - 1.273 1.773 - - 1.765 1.862 1.873 25-35 - 1.294 2.027 3.000 - 2.000 35+ 1.045 1.176 1.740 2.649 - 1.616 Total 1.179 1.216 1.758 2.731 - 1.685 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.744 1.976 3.322 4.811 3.043 6-10 - 1.926 1.983 3.129 4.532 3.065 11-15 - 1.333 1.768 3.168 4.536 3.038 16-20 - 1.464 1.788 2.929 3.867 2.731 20-25 - 1.278 1.902 2.785 4.075 2.598 25-35 - 1.250 1.980 2.845 3.911 2.703 35+ 1.464 1.236 1.838 2.706 3.832 2.393 Total 1.810 1.284 1.853 2.816 4.032 2.536 Watson & Associates Economists Ltd. PAGE A-11 H:\Brant\2023 DC\Report\Final Report.docx Schedule 8 County of Brant Person Per Unit Structural Type and Age of Dwelling (2021 Census) 3.26 3.13 3.19 2.78 2.75 2.98 2.67 2.73 1.96 2.06 1.67 1.79 0.00 2.41 2.04 2.10 1.48 1.93 1.76 2.00 1.62 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Apartment P.P.U.s are based on County of Brant Census Division. Watson & Associates Economists Ltd. PAGE A-12 H:\Brant\2023 DC\Report\Final Report.docx Schedule 9a County of Brant Employment Forecast, 2024 to 2051 [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source Derived from the County of Brant Addendum to the Municipal Comprehensive Review Final Report, May 2023, by Watson & Associates Economists Ltd. Employment Mid 2011 35,638 0.013 0.050 0.123 0.091 0.042 0.319 0.053 0.372 475 1,795 4,373 3,233 1,495 11,370 1,885 13,255 9,575 Mid 2016 36,707 0.015 0.052 0.131 0.104 0.046 0.347 0.059 0.406 535 1,925 4,810 3,805 1,680 12,755 2,154 14,909 10,830 Early 2024 41,673 0.013 0.055 0.128 0.097 0.051 0.344 0.063 0.406 546 2,311 5,325 4,035 2,114 14,331 2,605 16,936 12,020 Early 2034 47,150 0.012 0.057 0.138 0.098 0.054 0.357 0.063 0.420 546 2,664 6,495 4,611 2,526 16,842 2,948 19,790 14,178 # Mid 2051 57,293 0.010 0.058 0.159 0.106 0.058 0.391 0.063 0.454 546 3,335 9,137 6,096 3,304 22,418 3,582 26,000 19,083 # Mid 2011 - Mid 2016 1,069 0.0012 0.0021 0.0083 0.0130 0.0038 0.0284 0.0058 0.0342 60 130 438 573 185 1,385 269 1,654 1,255 Mid 2016 - Early 2024 4,966 -0.0015 0.0030 -0.0033 -0.0068 0.0050 -0.0036 0.0038 0.0003 11 386 515 230 434 1,576 451 2,027 1,190 Early 2024 - Early 2034 5,477 -0.0015 0.0010 0.0100 0.0010 0.0028 0.0133 0.0000 0.0133 0 353 1,170 576 412 2,511 343 2,854 2,158 Early 2024 - Mid 2051 15,620 -0.0036 0.0027 0.0317 0.0096 0.0069 0.0474 0.0000 0.0474 0 1,024 3,812 2,061 1,190 8,087 977 9,064 7,063 Mid 2011 - Mid 2016 214 0.0002 0.0004 0.0017 0.0026 0.0008 0.0057 0.0012 0.0068 12 26 88 115 37 277 54 331 251 Mid 2016 - Early 2024 662 -0.00020 0.00040 -0.00044 -0.00091 0.00066 -0.00048 0.00051 0.00003 1 52 69 31 58 210 60 270 159 Early 2024 - Early 2034 548 -0.00015 0.00010 0.00100 0.00010 0.00028 0.00133 0.00000 0.00133 0 35 117 58 41 251 34 285 216 Early 2024 - Mid 2051 568 -0.00013 0.00010 0.00115 0.00035 0.00025 0.00172 0.00000 0.00172 0 37 139 75 43 294 36 330 257 N.F.P.O.W.[1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Total Employment (Including N.F.P.O.W.) Institutional Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W.[1] Work at Home Industrial Commercial/ Population Related Watson & Associates Economists Ltd. PAGE A-13 H:\Brant\2023 DC\Report\Final Report.docx Schedule 9b County of Brant Employment and Gross Floor Area (G.F.A.) Forecast, 2024 to 2051 [1] Square Foot Per Employee Assumptions Industrial 1,700 Commercial/Population-Related 500 Institutional 680 [2] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. *Reflects Early-2024 to Mid-2051 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 35,638 475 4,373 3,233 1,495 9,575 7,433,300 1,616,300 1,103,300 11,577,900 Mid 2016 36,707 535 4,810 3,805 1,680 10,830 8,177,000 1,902,500 1,239,800 12,924,300 Early 2024 41,673 546 5,325 4,035 2,114 12,020 9,052,000 2,017,500 1,560,100 14,267,600 Early 2034 47,150 546 6,495 4,611 2,480 14,132 11,041,500 2,305,500 1,809,000 16,794,000 Mid 2051 57,293 546 9,137 6,096 3,171 18,950 15,532,900 3,048,000 2,278,800 22,497,700 Mid 2011 - Mid 2016 1,069 60 438 573 185 1,255 Mid 2016 - Early 2024 4,966 11 515 230 434 1,190 875,000 115,000 320,300 1,343,300 Early 2024 - Early 2034 5,477 0 1,170 576 366 2,112 1,989,500 288,000 248,900 2,526,400 Early 2024 - Mid 2051 15,620 0 3,812 2,061 1,057 6,930 6,480,900 1,030,500 718,700 8,230,100 Mid 2011 - Mid 2016 214 12 88 115 37 251 Mid 2016 - Early 2024 662 1 69 31 58 159 116,667 15,333 42,707 179,107 Early 2024 - Early 2034 548 0 117 58 37 211 198,950 28,800 24,890 252,640 Early 2024 - Mid 2051 521 0 127 69 35 231 216,030 34,350 23,957 274,337 Annual Average Incremental Change Industrial Commercial/ Population Related Institutional[2] Total Industrial Commercial/ Population Related Institutional[2] Total Period Population Employment Gross Floor Area in Square Feet (Estimated)[¹] Primary Watson & Associates Economists Ltd. PAGE A-14 H:\Brant\2023 DC\Report\Final Report.docx Schedule 9c County of Brant Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square Foot Per Employee Assumptions Industrial 1,700 Commercial/Population-Related 500 Institutional 680 [2] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. [3] Employment Increase does not include No Fixed Place of Work. *Reflects Early-2024 to Mid-2051 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2024 - 2034 1,676,200 251,300 248,900 2,176,400 1,855 2024 - 2051 5,365,200 869,600 718,700 6,953,500 5,952 2024 - 2034 144,500 5,800 - 150,300 97 2024 - 2051 688,500 20,600 - 709,100 446 2024 - 2034 168,800 30,900 - 199,700 161 2024 - 2051 427,200 140,300 - 567,500 532 2024 - 2034 1,989,500 288,000 248,900 2,526,400 2,112 2024 - 2051 6,480,900 1,030,500 718,700 8,230,100 6,930 Remaining Areas County of Brant Partial Services (Water Only - St. George) Full Services Institutional G.F.A. S.F.[1],[2] Total Non- Residential G.F.A. S.F. Employment Increase[3] Development Location Timing Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Watson & Associates Economists Ltd. PAGE A-15 H:\Brant\2023 DC\Report\Final Report.docx Schedule 10 County of Brant Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\Brant\2023 DC\Report\Final Report.docx Appendix B: Level of Service Cost (per capita) Services Related to a Highway - Roads $84,901.40 0.0298 km of roadways 2,849,040 per km 1,326,159,868 Public Works - Facilities $329.84 2.3062 sq.ft. of building area 143 per sq.ft. 5,152,101 Public Works - Vehicles & Equipment $627.25 0.0031 No. of vehicles and equipment 202,339 per vehicle 9,797,645 Fire Protection Services - Facilities $1,133.67 1.4256 sq.ft. of building area 795 per sq.ft. 17,707,925 Fire Protection Services - Vehicles & Equipment $495.70 0.0010 No. of vehicles 495,700 per vehicle 7,742,834 Fire Protection Services - Small Equipment and Gear $154.41 0.0604 No. of equipment and gear 2,556 per item 2,411,884 Policing Policing Services - Facilities $237.32 0.3692 sq.ft. of building area 643 per sq.ft. 3,706,938 Parkland Development $2,307.80 0.0098 Acres of Parkland 235,490 per acre 12,639,821 Parkland Amenities $467.12 0.0015 No. of parkland amenities 311,413 per amenity 2,558,416 Parkland Trails $90.72 0.0006 Kilometres of Paths and Trails 151,200 per linear m 496,873 Recreation Facilities $4,724.14 7.3050 sq.ft. of building area 647 per sq.ft. 25,874,115 Parks & Recreation Vehicles and Equipment $62.95 0.0013 No. of vehicles and equipment 48,423 per vehicle 344,777 Library Services - Facilities $697.00 0.7884 sq.ft. of building area 884 per sq.ft. 3,817,469 Library Services - Collection Materials $180.43 4.9362 No. of library collection items 37 per collection item 988,215 Library Services - Vehicles $0.91 0.00001 No. of vehicles and equipment 74,985 per vehicle 4,984 Ambulance Facilities $104.20 0.1444 sq.ft. of building area 722 per sq.ft. 570,703 Ambulance Vehicles $39.77 0.0001 No. of vehicles and equipment 397,700 per vehicle 217,820 Long-term Care Long-term Care Facilities $935.52 1.4218 sq.ft. of building area 658 per sq.ft. 5,123,843 Childcare and Early Years Programs Child Care and Early Years Programs - Facilities $1,091.25 0.0243 sq.ft. of building area 44,907 per sq.ft. 5,976,776 Waste Diversion - Facilities - Stations/Depots $51.05 0.5855 sq.m of building area 87 per sq.ft. 279,601 Waste Diversion - Vehicles & Equipment $54.80 0.0005 No. of vehicles and equipment 109,600 per vehicle 300,140 SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Service Category Sub-Component Maximum Ceiling LOS 15 Year Average Service Standard Quality (per capita) Quantity (per capita) Waste Diversion Library Parks & Recreation Service Related to a Highway Fire Protection Ambulance Watson & Associates Economists Ltd. PAGE B-3 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: km of roadways Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/km) Rural 974 974 974 888 888 888 888 885 856 863 870 877 884 891 899 $2,570,000 Semi-urban 83 83 83 102 102 102 102 99 96 96 97 97 97 98 98 $3,000,000 Urban 100 100 100 102 102 102 102 106 100 104 109 113 118 122 126 $5,120,000 Total km of Roads 1,157 1,157 1,157 1,092 1,092 1,092 1,092 1,090 1,052 1,064 1,076 1,087 1,099 1,111 1,123 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.033 0.033 0.033 0.031 0.030 0.030 0.030 0.030 0.029 0.029 0.029 0.029 0.028 0.028 0.027 15 Year Average 2009-2023 Quantity Standard 0.0298 Quality Standard $2,849,040 Service Standard $84,901 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $84,901 Eligible Amount $1,326,159,868 Watson & Associates Economists Ltd. PAGE B-4 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Mt.Vernon Works Yard - 1249 Colborne St. W. Brantford Salt Storage Shed - Mt. Vernon 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 6,480 $100 $132 Truck Bays - Mt. Vernon 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 13,112 $125 $160 Coverall Building - Mt. Vernon 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 6,820 $75 $104 Storage Shed - Mt. Vernon 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 1,015 $100 $132 Mt.Pleasant Works Yard - 281 Pleasant Ridge Rd. Brantford Coverall Building - Mt. Pleasant 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 7,200 $75 $104 Truck Bays - Mt. Pleasant 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 7,786 $125 $160 Storage/Truck Bays - Mt. Pleasant 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 3,080 $100 $132 Paris Works Yard - 60 Consolidated Dr. Paris Truck Bays - Paris 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 13,403 $125 $160 Salt Storage Shed - Paris 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 3,136 $100 $132 Brine Storage - Paris - - - - - - - - - - - - - - 1,680 $100 $132 South Dumfries Works Yard - 525 Scenic Dr. St. George Truck Bays - South Dumfries 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 $125 $160 Salt Shed - South Dumfries 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 $100 $132 Sand Shed - South Dumfries 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 4,368 $100 $132 Equipment Storage Shed - South Dumfries 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $100 $132 Onondaga Works Yard - 734 Hwy #54 Brantford Truck Bays -Original Structure (shared with Fire) - Onondaga 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 2,024 $125 $160 Truck Bays - 1975 Addition (shared with Fire) - Onondaga 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 $125 $160 Lion's Centennial Park - 78 Maple Ave. N. Burford Salt Shed - Burford 78 Maple Ave 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 $100 $132 57 Painter Rd. Onondaga Storage Barn - Painter Road - - - - - 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 $100 $132 Total 84,684 84,684 84,684 84,684 84,684 85,784 85,784 85,784 85,784 85,784 85,784 85,784 85,784 85,784 87,464 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 2.3972 2.3882 2.3762 2.3625 2.3500 2.3701 2.3559 2.3369 2.3413 2.3412 2.2860 2.2688 2.1731 2.1363 2.1097 15 Year Average 2009-2023 Quantity Standard 2.3062 Quality Standard $143 Service Standard $330 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $330 Eligible Amount $5,152,101 Watson & Associates Economists Ltd. PAGE B-5 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2000 Champion 740 Articulated Grader 1 - - - - - - - - - - - - - - $675,000 2000 Caterpillar 928G Articulated Wheel Loader 1 1 1 1 1 1 1 1 1 1 - - - - - $480,000 2001 Chev Crew Cab Pickup 1 1 1 1 1 1 - - - - - - - - - $85,000 2002 Chev C3500HD 1 1 - - - - - - - - - - - - - $125,000 2002 Chev Astro Van 1 1 1 1 1 1 - - - - - - - - - $80,000 2001 Western Star 58644SS Tandem 1 1 1 - - - - - - - - - - - - $400,000 2001 Western Star 58644SS Tandem 1 1 1 1 1 1 - - - - - - - - - $400,000 2002 Western Star 58644SS Tandem 1 1 1 1 1 - - - - - - - - - - $400,000 2002 Aluminum Dump Body & Hoist 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $34,000 2001 Chev Pickup 1 1 1 - - - - - - - - - - - - $63,000 2001 Chev Silverado Pickup 1 1 1 1 - - - - - - - - - - - $63,000 2002 Western Star 5864SS Tandem 1 1 1 1 1 1 1 1 - - - - - - - $400,000 2002 Western Star 5864SS Tandem 1 1 1 1 1 1 - - - - - - - - - $400,000 2002 Western Star 5864SS Tandem 1 1 1 - - - - - - - - - - - - $400,000 2002 Western Star 5864SS Tandem 1 1 1 1 1 1 1 - - - - - - - - $400,000 2005 Vermeer VC1400XL Brush Chipper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $130,000 2006 Western Star 4900SA Tandem 1 1 1 1 1 1 1 1 1 1 - - - - - $400,000 2007 Western Star 4900SA Tandem 1 1 1 1 1 1 1 1 1 1 - - - - - $400,000 2006 Western Star 4900SA Tandem 1 1 1 1 1 1 1 1 1 - - - - - - $400,000 2006 Western Star 4900SA Tandem 1 1 1 1 1 1 1 1 1 - - - - - - $400,000 2006 Ford F450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 2005 Chev Silverado 1 1 1 1 1 1 - - - - - - - - - $70,000 Pride PBA132C Truck Box 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $35,000 2004 Ford F450 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $90,000 2003 Chev Cargo Van 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $80,000 2005 JD 410G 4WD Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $325,000 2004 Vermeer SC502 Stump Grinder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $121,000 2004 Chev Cargo Van 1 1 1 1 1 1 1 1 - - - - - - - $76,000 2004 Caterpillar 140H Articulated Grader 1 1 1 1 1 - - - - - - - - - - $630,000 2004 Peterbilt 330 Single Axle 1 1 1 - - - - - - - - - - - - $375,000 2004 Western Star 4900SA Tandem 1 1 1 1 1 1 1 1 - - - - - - - $400,000 2003 Chev Cargo Van 1 1 1 - - - - - - - - - - - - $77,000 2003 Chev Extended Cab 1 1 1 1 - - - - - - - - - - - $69,000 2002 Trackless MT5 Sidewalk Maintenance Tractor 1 1 1 - - - - - - - - - - - - $195,000 2002 Ford F450 Diesel 1 1 - - - - - - - - - - - - - $107,000 2003 Peterbilt 330 Single Axle 1 1 1 1 1 1 - - - - - - - - - $375,000 2003 Western Star 4900SA Tandem 1 1 1 1 1 1 1 - - - - - - - - $400,000 2006 Chev Ext Cab 1 1 1 1 1 1 1 1 1 - - - - - - $65,000 2006 Chev Ext Cab 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $63,000 Watson & Associates Economists Ltd. PAGE B-6 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2006 JD 644J Articulated Wheel Loader 1 1 1 1 1 1 1 1 1 1 - - - - - $469,000 2006 JD 6420 Tractor 1 - - - - - - - - - - - - - - $245,000 2006 Chev Silverado 1 - - - - - - - - - - - - - - $70,000 1994 GMC Pickup 1 1 - - - - - - - - - - - - - $70,000 1981 GMC 1 1 1 - - - - - - - - - - - - $375,000 1994 GMC Topkick Single Axle 1 1 1 - - - - - - - - - - - - $375,000 2000 Dodge 1 1 1 - - - - - - - - - - - - $61,000 1997 Ford 1 1 - - - - - - - - - - - - - $70,000 1999 Chev Crew Cab 1 1 - - - - - - - - - - - - - $120,000 1999 International 2574 Tandem 1 1 1 1 - - - - - - - - - - - $400,000 2000 Eager Beaver Trailer 1 1 1 1 1 - - - - - - - - - - $74,000 1994 Ford LTS9000 Tandem 1 1 - - - - - - - - - - - - - $400,000 1989 GMC Double Bucket Boom 1 1 1 1 - - - - - - - - - - - $545,000 2003 Chev 2500 HD Crew Cab 1 1 1 1 1 1 1 - - - - - - - - $850,000 1998 Chev C3500 1 1 1 - - - - - - - - - - - - $125,000 2004 Western Star 4900SA Tandem 1 1 1 1 1 1 - - - - - - - - - $400,000 1985 JD401 Industrial Loader 1 1 1 1 1 1 - - - - - - - - - $240,000 1998 JD 544H Articulated Wheel Loader 1 1 1 1 1 - - - - - - - - - - $398,000 1997 Ford Elgin Sweeper 1 1 1 - - - - - - - - - - - - $535,000 1993 Kubota G200 Tractor 1 1 1 1 1 - - - - - - - - - - $36,000 Kubota T1600H Tractor 1 1 1 - - - - - - - - - - - - $28,000 1991 JD 410 4WD Backhoe 1 1 1 - - - - - - - - - - - - $275,000 2003 Woods HS106 Ditchbank Mower 1 1 1 1 - - - - - - - - - - - $36,000 1997 Champion 710 Grader 1 - - - - - - - - - - - - - - $630,000 1995 Champion 740 Grader 1 - - - - - - - - - - - - - - $630,000 2006 JD 410G 4WD Backhoe 1 1 1 1 1 1 1 1 - - - - - - - $325,000 2006 Seppi SMO-AVS Mower 1 1 1 1 1 1 1 1 - - - - - - - $36,000 2005 ODB LCT650 Vacuum Leaf Loader 1 - - - - - - - - - - - - - - $80,000 2003 Woods HS106 Ditchbank Mower 1 1 - - - - - - - - - - - - - $36,000 2007 Chev 2500HD Crew Cab 1 1 1 1 1 1 1 1 - - - - - - - $85,000 2007 Tymco DST-6 Street Sweeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $518,000 2005 Eloquip Aluminum Dump Body & Hoist 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $28,000 2006 San Jose GPS Units 1 1 1 1 - - - - - - - - - - - $145,000 2007 Chev 2500 Express Cargo Van 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $80,000 2006 United 7-16 Vee Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $16,000 Watson & Associates Economists Ltd. PAGE B-7 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2007 Duratrail Dump Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 2007 Sterling LT9513 Tandem 1 1 1 1 1 1 1 1 1 1 1 - - - - $400,000 2007 Sterling LT9513 Tandem 1 1 1 1 1 1 1 1 1 - - - - - - $400,000 2007 Sterling LT9513 Tandem 1 1 1 1 1 1 1 1 1 - - - - - - $400,000 2007 Chev 2500 Express Cargo 1 1 1 1 1 1 1 1 - - - - - - - $80,000 2007 International 7500 Vacuum Truck 1 1 1 1 1 1 1 - - - - - - - - $657,000 2007 Giraffa 210 Roadside Mower 1 1 1 1 - - - - - - - - - - - $36,000 2007 Giraffa 210 Roadside Mower 1 1 1 - - - - - - - - - - - - $36,000 2008 JD 870D Motor Articulated Grader 1 1 1 1 1 1 1 1 1 1 - - - - - $630,000 1995 Ford L8000 Single Bucket Aerial 1 1 1 1 1 1 1 1 - - - - - - - $175,000 2007 Chev 1500 Pickup 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $70,000 2008 Chev 2500 HD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $85,000 2008 Caterpillar 140M Shoulder Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $630,000 2008 Chev 1500 Pickup 1 1 1 1 - - - - - - - - - - - $70,000 2008 Chev 1500 Pickup 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $70,000 2009 Ford F450 Pickup with plow/sander 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 2009 Ford F450 Pickup with plow 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $90,000 Eloquip Aluminum Dump Body 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $35,000 2009 Western Star 4900FA Tandem Dump 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $400,000 2009 Western Star 4900FA Tandem Dump 1 1 1 1 1 1 1 1 1 1 1 - - - - $400,000 2009 Chev 2500 Crew Cab 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $85,000 2009 Chev 1500 Pickup 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $70,000 2010 Ford F450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 2009 Chev 2500 Express Cargo 1 1 1 1 1 1 1 1 1 1 - - - - - $80,000 2009 Chev 2500HD 4X4 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $85,000 Eloquip Aluminum Dump Body 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $35,000 2009 Vermeer BC1500 Brush Chipper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $130,000 2009 JD 6230S Tractor 1 - - - - - - - - - - - - - - $240,000 2009 JD 710J Backhoe Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $367,000 2009 JD 644K Articulated Wheel Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $447,000 2009 JD 370 Snow Blower 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 2009 Chev 1500 WT 1 1 1 1 1 1 1 1 1 1 - - - - - $70,000 2002 Chev Cargo Van 1 1 1 1 1 1 1 1 - - - - - - - $80,000 2006 Chev 2500HD 4X4 1 1 1 1 1 1 1 1 - - - - - - - $85,000 2010 Mack GU713 Tandem Dump 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 2010 Mack GU713 Tandem Dump 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $400,000 2010 Mack GU713 Tandem Dump 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $400,000 2009 JD 6230 Roadside Tractor 1 1 - - - - - - - - - - - - - $240,000 Watson & Associates Economists Ltd. PAGE B-8 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2008 Chev 2500 HD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $85,000 2010 JD 772GP Motor Grader & Wing - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $572,000 2010 JD 6330S Roadside Tractor - 1 1 - - - - - - - - - - - - $240,000 2010 JD 6430S Roadside Tractor - 1 1 1 - - - - - - - - - - - $240,000 2011 Chev Silverado W/T - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 2010 Seppi Roadside Mower - 1 1 1 1 1 1 1 - - - - - - - $36,000 2010 Seppi Roadside Mower - 1 1 1 1 1 1 1 - - - - - - - $36,000 2011 AVS 225 Roadside Mower - - 1 1 1 1 1 1 - - - - - - - $36,000 2011 Chev 1500 Pickup Truck - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 2011 Chev Silverado W/T - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $85,000 2011 Ford F450 - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $85,000 2010 Cimline Asphalt Hot Box - - 1 1 1 1 1 1 1 1 1 1 1 - - $80,000 2011 JD6230 Roadside Tractor - - 1 1 1 - - - - - - - - - - $240,000 2001 GMC Pickup - - 1 1 - - - - - - - - - - - $70,000 2012 Chev Silverado Extended Cab - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $75,000 Sign Insert Platform - - - 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 2012 Mack GU813 Tandem with plowing & sanding equipment - - - 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 2012 Mack GU813 Tandem with plowing & sanding equipment - - - 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 2012 JD6330 Tractor with Loader - - - 1 1 1 - - - - - - - - - $240,000 2009 Maclean MV1 Sidewalk Unit - - - 1 1 1 1 1 1 1 - - - - - $195,000 2009 Maclean MV1 Sidewalk Unit - - - 1 1 1 1 1 1 1 - - - - - $195,000 2007 Sterling Bucket Truck - - - - 1 1 1 1 1 1 1 1 1 1 - $500,000 2013 Chev Express Cargo Van - - - - 1 1 1 1 1 1 1 1 1 1 1 $80,000 2011 VMT2 Valve Maintenance Trailer - - - - 1 1 1 1 1 1 1 1 1 1 1 $109,000 2013 Diamond Roadside Mower - - - - 1 1 1 1 1 1 - - - - - $36,000 2013 Mack Plow/Sand/Wing Truck - - - - 1 1 1 1 1 1 1 1 1 1 1 $400,000 2013 GMC Pickup Truck - - - - 1 1 1 1 1 1 1 1 1 1 1 $70,000 2013 RD16-100 Asphalt Roller - - - - 1 1 1 1 1 1 1 1 1 1 1 $48,000 AVL & Salt Management System Hardware - - - - 1 1 1 1 1 1 1 1 1 1 1 $210,000 2013 JD6125M Tractor w/Loader - - - - 1 1 1 1 1 - - - - - - $240,000 2003 Chev Extended Cab - - - - 1 - - - - - - - - - - $75,000 2014 GMC Sierra 1500 - - - - - 1 1 1 1 1 1 1 1 1 1 $70,000 2013 Vermeer Brush Chipper - - - - - 1 1 1 1 1 1 1 1 1 1 $130,000 2008 JD 544J - - - - - 1 1 1 1 1 1 1 1 1 - $500,000 2014 GMC Sierra 1500 - - - - - 1 1 1 1 1 1 1 1 1 1 $70,000 2014 Rear Swing Mower - - - - - 1 1 1 1 1 - - - - - $36,000 2006 Wheel Loader Boom Mower - - - - - 1 1 - - - - - - - - $103,000 Watson & Associates Economists Ltd. PAGE B-9 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2014 Tandem Dump Trailer - - - - - 1 1 1 1 1 1 1 1 1 1 $12,000 2014 Portable Digital Radios - - - - - 1 1 1 1 1 1 1 1 1 1 $90,000 2014 JD 6125 Tractor - - - - - 1 1 1 1 1 1 1 1 1 1 $240,000 2014 Agrimaxx 9015 Snow Blower - - - - - 1 1 1 1 1 1 1 1 1 1 $26,000 2015 Western Star Plow/Sand/Wing Truck - - - - - 1 1 1 1 1 1 1 1 1 1 $400,000 2012 JD 770G Grader - - - - - 1 1 1 1 1 1 1 1 1 1 $630,000 2015 Western Star Plow/Sand/Wing Truck - - - - - 1 1 1 1 1 1 1 1 1 1 $400,000 2015 GMC 1/2 Ton Ext Cab Pickup - - - - - 1 1 1 1 1 1 1 1 1 1 $70,000 2015 Chev Crew Cab Pickup Truck - - - - - 1 1 1 1 1 1 1 1 1 1 $70,000 2014 Dodge Ram Mini Van - - - - - 1 1 1 1 1 1 1 1 1 1 $50,000 2014 JD5055E Utility Tractor - - - - - - 1 1 1 1 1 1 1 1 1 $150,000 2015 Chev 1500 Pickup Truck - - - - - - 1 1 1 1 1 1 1 1 1 $70,000 2015 Chev 1500 Pickup Truck - - - - - - 1 1 1 1 1 - - - - $70,000 2015 JD 6105R Tractor with Loader - - - - - - 1 1 1 1 1 1 1 1 1 $226,000 2016 Ford F450 w/plow & sanding equipment - - - - - - 1 1 1 1 1 1 1 1 1 $126,000 2016 Freightliner 144SD Plow Truck - - - - - - 1 1 1 1 1 1 1 1 1 $400,000 2016 Freightliner 144SD Plow Truck - - - - - - 1 1 1 1 1 1 1 1 1 $400,000 2015 Johnston VT651 Vacuum Sweeper - - - - - - - 1 1 1 1 1 1 1 1 $600,000 2016 Ford F450 Dump Truck - - - - - - - 1 1 1 1 1 1 1 1 $125,000 2016 Freightliner 114SD Plow Truck - - - - - - - 1 1 1 1 1 1 1 1 $400,000 2017 Freightliner 114SD Plow Truck - - - - - - - 1 1 1 1 1 1 1 1 $400,000 2016 Votex Jumbo Flail Mower - - - - - - - 1 1 1 1 1 1 1 1 $36,000 2017 Ford 3/4 Ton Transit Van - - - - - - - 1 1 1 1 1 1 1 1 $80,000 2016 Chev 1500 4dr Pickup - - - - - - - 1 1 1 1 1 1 1 1 $75,000 2017 Ford 3/4 Ton Transit Van - - - - - - - 1 1 1 1 1 1 1 1 $85,000 2017 Bomford Mower - - - - - - - - 1 1 1 1 1 1 1 $50,000 2017 Chev Equinox - - - - - - - - 1 1 1 1 1 1 1 $35,000 2017 Chev 3/4 Ton Crew Cab Pickup - - - - - - - - 1 1 1 1 1 1 1 $85,000 2017 Chev 3/4 Ton 4X4 Pickup - - - - - - - - 1 1 1 1 1 1 1 $85,000 2016 Case IH Maxxum Tractor - - - - - - - - 1 1 1 1 1 1 1 $240,000 2017 Vortex Jumbo Flail Mower - - - - - - - - 1 1 1 1 1 1 1 $36,000 2017 Ford Cargo Van - - - - - - - - 1 1 1 1 1 1 1 $80,000 2017 Chev 1/2 Ton Pickup - - - - - - - - 1 1 1 1 1 1 1 $70,000 2018 Freightliner 114SD Plow Truck - - - - - - - - 1 1 1 1 1 1 1 $400,000 2018 Freightliner 114SD Plow Truck - - - - - - - - 1 1 1 1 1 1 1 $400,000 2016 Falcon Asphalt Recycler & Hot Box - - - - - - - - 1 1 1 1 1 1 1 $80,000 2017 Falcon Asphalt Recycler & Hot Box - - - - - - - - 1 1 1 1 1 1 1 $80,000 2017 Cat 420F2 ST Backhoe - - - - - - - - 1 1 1 1 1 1 1 $325,000 2017 HL Town Behind Shoulder Grader - - - - - - - - 1 1 1 1 1 1 1 $8,000 Watson & Associates Economists Ltd. PAGE B-10 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) JD6120R w/Loader - - - - - - - - - 1 1 1 1 1 1 $240,000 2018 Bomford Boom Mower - - - - - - - - - 1 1 1 1 1 1 $110,000 2018 Ford F250 Pickup - - - - - - - - - 1 1 1 1 1 1 $70,000 2018 Ford T250 Pickup - - - - - - - - - 1 1 1 1 1 1 $70,000 2019 Freightlinter Plow Truck - - - - - - - - - 1 1 1 1 1 1 $400,000 2018 Merlo Telehandler Loader - - - - - - - - - 1 1 1 1 1 1 $325,000 2019 Freightlinter Plow Truck - - - - - - - - - 1 1 1 1 1 1 $400,000 2018 Agrimaxx 9-15 Plow - - - - - - - - - 1 1 1 1 1 1 $29,000 2019 Freightliner Plow Truck - - - - - - - - - - 1 1 1 1 1 $400,000 2019 Freightliner Plow Truck - - - - - - - - - - 1 1 1 1 1 $400,000 2019 Flail Mower - - - - - - - - - - 1 1 1 1 1 $36,000 2019 Freightliner Plow Truck - - - - - - - - - - 1 1 1 1 1 $400,000 2020 Freightliner Plow Truck - - - - - - - - - - 1 1 1 1 1 $400,000 2019 Chev 1/2 Ton - - - - - - - - - - 1 1 1 1 1 $70,000 2019 Chev 1/2 Ton - - - - - - - - - - 1 1 1 1 1 $70,000 2019 JD 624K-11 - - - - - - - - - - 1 1 1 1 1 $330,000 2019 Trackless MT7-1451 - - - - - - - - - - 1 1 1 1 1 $172,000 2020 Trackless MT7-1452 - - - - - - - - - - 1 1 1 1 1 $172,000 2020 Duratrail Dump Trailer - - - - - - - - - - - 1 1 1 1 $10,000 2020 Freightliner 114SD - - - - - - - - - - - 1 1 1 1 $400,000 2020 Dodge Caravan - - - - - - - - - - - 1 1 1 1 $45,000 2020 Ford Transit - - - - - - - - - - - 1 1 1 1 $80,000 2020 Freightliner 114SD - - - - - - - - - - - 1 1 1 1 $400,000 2020 Ford Transit - - - - - - - - - - - 1 1 1 1 $80,000 2021 Series MT7 Off Road Vehicle - - - - - - - - - - - - 1 1 1 $19,500 2021 Towable Bulk Salter - - - - - - - - - - - - 1 1 1 $14,000 2021 Chev Silverado 3500 plow/dump - - - - - - - - - - - - 1 1 1 $104,000 2016 Kubota ZD1011 Tractor w/mower - - - - - - - - - - - - 1 1 1 $19,000 2021 Ford Transit Cargo Van - - - - - - - - - - - - - 1 1 $80,000 2022 Freightliner 114SD - - - - - - - - - - - - - 1 1 $400,000 2022 Freightliner 108SD - - - - - - - - - - - - - 1 1 $400,000 2022 Chevrolet Silverado 1500 - - - - - - - - - - - - - 1 1 $70,000 Watson & Associates Economists Ltd. PAGE B-11 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2022 Chevrolet Silverado 1500 - - - - - - - - - - - - - 1 1 $70,000 2022 John Deere 722G - - - - - - - - - - - - - 1 1 $325,000 Trailer - - - - - - - - - - - - - 1 1 $6,000 2022 Ford F-550 - - - - - - - - - - - - - - 1 $174,000 2023 Freightliner 108SD - - - - - - - - - - - - - - 1 $375,000 2023 Freightliner 114SC - - - - - - - - - - - - - - 1 $400,000 2023 Ford F-250 - - - - - - - - - - - - - - 1 $75,000 2023 Ford F-150 - - - - - - - - - - - - - - 1 $85,000 2023 Ford F-450 - - - - - - - - - - - - - - 1 $125,000 2023 Ford F-450 - - - - - - - - - - - - - - 1 $125,000 2023 JCB 427HT - - - - - - - - - - - - - - 1 $245,000 2023 Dodge Ram 1500 - - - - - - - - - - - - - - 1 $85,000 2023 Dodge Ram 1500 - - - - - - - - - - - - - - 1 $85,000 2023 Dodge Ram 1500 - - - - - - - - - - - - - - 1 $70,000 Total 113 112 112 103 103 112 110 113 114 116 115 118 122 121 123 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0032 0.0032 0.0031 0.0029 0.0029 0.0031 0.0030 0.0031 0.0031 0.0032 0.0031 0.0031 0.0031 0.0030 0.0030 15 Year Average 2009-2023 Quantity Standard 0.0031 Quality Standard $202,339 Service Standard $627 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $627 Eligible Amount $9,797,645 Watson & Associates Economists Ltd. PAGE B-12 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Burford Fire Hall 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 8,284 $650 $772 Old Scotland Fire Hall 3,237 3,237 3,237 3,237 3,237 3,237 3,237 3,237 3,237 3,237 3,237 - - - - $650 $772 New Scotland Fire Hall - - - - - - - - - - - 4,635 4,635 4,635 4,635 $700 $830 St. George Fire Hall 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 11,952 $700 $830 Mount Pleasant 2,240 2,240 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $650 $772 Training Centre 3,146 3,146 3,146 3,146 3,146 3,146 - - - - - - - - - $650 $772 Paris 2 Bay Fire Storage - - - - - - 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 $500 $599 Paris Fire Hall 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 12,630 $700 $830 Airport Fire Hall/Community Centre 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 2,228 $650 $772 Old Cainsville Fire Hall/Community Centre 1,336 1,336 1,336 1,336 1,336 1,336 1,336 1,336 1,336 1,336 1,336 1,336 - - - $650 $772 New Cainsville Fire Hall - - - - - - - - - - - - 5,315 5,315 5,315 $700 $830 Old Onondaga Fire Hall and Roads Garage 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 3,017 $650 $772 New Onondaga Fire Hall - - - - - - - - - - - 5,378 5,378 5,378 5,378 $700 $830 Training Tower - - - - - - - - - - - - - 1,600 1,600 $125 $166 Total 48,070 48,070 50,830 50,830 50,830 50,830 50,484 50,484 50,484 50,484 50,484 57,260 61,239 62,839 62,839 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 1.3608 1.3556 1.4263 1.4180 1.4106 1.4043 1.3864 1.3753 1.3779 1.3778 1.3453 1.5144 1.5513 1.5649 1.5157 15 Year Average 2009-2023 Quantity Standard 1.4256 Quality Standard $795 Service Standard $1,134 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $1,134 Eligible Amount $17,707,925 Watson & Associates Economists Ltd. PAGE B-13 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Pumper 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 $800,000 Tanker 9 8 8 7 7 6 5 5 5 5 5 3 3 3 3 $460,000 Light Rescue 2 2 2 3 3 3 3 3 4 4 4 4 4 4 4 $270,000 Rescue Truck 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $300,000 Pumper/Aerial 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,600,000 Pumper Tanker 2 3 3 4 4 5 6 6 6 6 6 6 6 6 7 $600,000 Support Unit - - - - - - - - - - - 1 1 1 1 $400,000 Boats & Trailers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $45,000 Rapid Deployment Craft Boats 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $10,000 UTVs & Trailers - - - - 2 2 2 2 2 3 3 3 3 3 3 $60,000 Fire Admin Vehicles 2 3 4 4 4 4 4 5 5 6 6 6 6 6 6 $80,000 Total 32 33 34 35 37 37 37 38 39 41 41 40 40 40 42 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0009 0.0009 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0011 0.0011 0.0011 0.0011 0.0010 0.0010 0.0010 15 Year Average 2009-2023 Quantity Standard 0.0010 Quality Standard $495,700 Service Standard $496 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $496 Eligible Amount $7,742,834 Watson & Associates Economists Ltd. PAGE B-14 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) SCBA 97 97 97 97 97 110 110 110 126 126 126 126 126 126 126 $9,500 Air Cylinders - Aluminum 320 329 320 320 320 250 230 230 210 120 120 120 120 120 120 $900 Air Cylinders - composite 2.2 - - 17 38 45 130 130 125 125 120 120 120 120 120 120 $1,300 Air Cylinders - composite 4.5 - - - - - - - 70 140 210 210 210 210 210 210 $1,800 SCBA Masks 200 200 200 200 200 200 245 245 245 245 245 245 245 245 245 $500 Defib (non-Public Assess Defib) 8 8 8 13 13 13 13 13 16 16 16 16 16 16 16 $4,100 Auto Ex - eDraulics - set tools - - - - - 3 3 3 3 5 5 5 5 5 5 $75,000 Auto Ex - hydraulic - set tools 10 10 10 10 10 10 8 8 5 5 5 5 5 5 5 $55,000 Auto Ex - hydraulic hose 30 30 30 30 30 24 24 24 18 18 18 18 18 18 18 $2,700 Auto ex - pump 10 10 10 10 10 10 8 8 5 5 5 5 5 5 5 $25,000 Thermal Camera - NFPA Compliant 9 9 9 9 9 9 8 8 8 8 8 8 8 8 8 $14,600 Thermal Camera - FLIR - - - - - - - - - 8 8 8 8 8 8 $2,500 PPv Fans 2 2 2 2 2 9 9 9 9 9 9 9 9 9 9 $6,000 Ejector Fans 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $5,000 PPE (bunker gear, helmets, boots) 210 210 210 210 225 225 225 225 225 225 225 225 225 225 410 $5,500 Gas Monitors - CO, HCN, Multigas 12 12 12 12 20 28 28 28 28 36 36 36 36 36 36 $1,400 Large Generators 10 10 10 10 10 10 10 9 9 9 9 9 9 9 9 $4,000 Small Generators - - 2 4 4 6 6 6 6 6 6 6 6 6 6 $3,400 Chain Saws 3 3 3 3 4 4 4 12 12 12 12 12 12 12 12 $1,300 Ventilation Saws/Rotary Saws 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 $3,500 Nozzles 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 $1,600 Fire Hose - 100 mm 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115 $1,000 Fire Hose - 65 mm 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 $600 Fire Hose - 38/45 mm 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $300 Portable Pumps 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $10,000 Communications - repeaters 1 1 1 3 3 3 3 3 3 7 7 7 7 7 7 $70,000 Communications - Software CAD - - - - - - 1 1 1 1 1 1 1 1 1 $120,000 Communications - pagers 113 113 113 156 156 156 156 156 156 178 178 178 178 178 240 $980 Communications - radios & mics 122 122 122 169 169 169 169 169 169 192 192 192 192 192 260 $1,900 RIT Packs 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 $4,800 Total 1,968 1,977 1,987 2,107 2,139 2,181 2,202 2,274 2,331 2,373 2,373 2,373 2,373 2,373 2,689 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0557 0.0558 0.0558 0.0588 0.0594 0.0603 0.0605 0.0619 0.0636 0.0648 0.0632 0.0628 0.0601 0.0591 0.0649 15 Year Average 2009-2023 Quantity Standard 0.0604 Quality Standard $2,556 Service Standard $154 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $154 Eligible Amount $2,411,884 Watson & Associates Economists Ltd. PAGE B-15 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Policing Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Mechanic St Station 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 - - - $500 $599 67 Bethel Road, Paris - - - - - - - - - - - - 23,110 23,110 23,110 $600 $740 Total 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 11,568 23,110 23,110 23,110 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.3275 0.3262 0.3246 0.3227 0.3210 0.3196 0.3177 0.3151 0.3157 0.3157 0.3083 0.3059 0.5854 0.5755 0.5574 15 Year Average 2009-2023 Quantity Standard 0.3692 Quality Standard 643 Service Standard $237 D.C. Amount (before deductions) 2051 Forecast Population 15,620 $ per Capita $237 Eligible Amount $3,706,938 Watson & Associates Economists Ltd. PAGE B-16 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Community Parks Two Rivers Park 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 $320,000 King William Park 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 6.9 $320,000 Sunnyhill Park 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 $320,000 St. George Arena Park 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 $380,000 Lion Centennial Park - Art Cadman 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 54.7 $122,900 Mount Pleasant Nature Park 22.8 22.8 22.8 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 $200,000 Charlton Park 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 $138,700 Paris Optimist Park 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 7.3 $320,000 Brant Onondaga Park (Soccer) 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 $138,700 Scotland Optimist Park 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 12.7 12.7 12.7 12.7 12.7 12.7 12.7 $320,000 Destination Parks Paris Lions Park 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 22.8 $380,000 Penmans Dam Park 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 $138,700 Green Lane Sports Complex 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 $380,000 Burford Community Centre/Optimist Park 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 $380,000 Neighbourhood Parks Janice Hunt Memorial Park 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 $200,000 Forest Drive Park 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 $200,000 Foxhill Park - - - - - - - 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 $200,000 Glen Morris Ball Park 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 $200,000 Harrisburg Ball Park 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 $200,000 Mount Pleasant Park 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 8.6 $245,900 Oakhill Heights Park 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $200,000 Oakland Community Park 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 $200,000 Park Ave. Soccer - Burford 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 4.27 $200,000 Poplar Hills Park 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 $277,500 Rest Acres Ridge Park 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 $277,500 Bean Park 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 $200,000 Victoria Park 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 $200,000 Axton Park 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $200,000 Elliot Field (owned by Lions Club) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 $200,000 Summit Park - - - - - - - - 1.2 1.2 1.2 1.2 1.2 1.2 1.2 $200,000 South Brant Lions Park (Oakland Owned by Lions Club) 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 $200,000 Dawdy Park - - - - - - - - - - - - 3.1 3.1 3.1 $320,000 Jay Wells Park - - - - - - - - - - - - - 3.2 3.2 $320,000 Mile Hill Meadows - - - - - - - - - - - - - - 1.4 $277,500 Open Space/Green Space Harrisburg Church Park 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 $122,900 Onondaga Ball Park 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $122,900 Paris Lawn Bowling Greens 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $164,000 St. George Lawn Bowling Greens 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $164,000 Centennial Park 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $100,000 Gilston Park 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 $100,000 Jacob's Wood 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 $100,000 Broadview Park (Maple Gardens) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 $100,000 New Durham Park 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 $100,000 Watson & Associates Economists Ltd. PAGE B-17 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Wray and Marilyn Cline Park 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $100,000 Scotland Rentention Area and Walkway 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 $100,000 Barkers Bush - - - - - - - - - - - - 100.0 100.0 100.0 $100,000 Pearson Bush - - - - - - - - - - - 17.0 17.0 17.0 17.0 $100,000 Parkettes (under 1 acre) John St. Park (Wilson) 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 $160,000 Willow Street Park 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 $160,000 Jury Street Park 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 $160,000 Bemrose Park 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 $160,000 Glen Morris Centennial Hall 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $160,000 King Street Parkette 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 $160,000 Juliet Wolverton Park - - - - - - - - - - - - - 1.1 1.1 $160,000 Commons / Urban Green Cenotaph War Memorial - Paris 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $160,000 Cenotaph War Memorial - South Dumphries 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $160,000 Cobblestone Common 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 $160,000 Garden of Hope 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 $160,000 Kings Ward Park 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 $100,000 Snowball Park 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $100,000 Linear Parks Woodslee Linear Park - - - - - - - - - - - - - 1.18 1.18 $160,000 Watts Pond Greenway - - - - - - - - - - - - - 0.93 1.76 $100,000 Not in Service Farringdon Park 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 - - - - - - - $164,000 Total 335.28 335.28 335.32 337.62 337.64 337.64 337.64 339.44 342.82 342.82 342.82 359.82 462.92 469.33 471.51 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0095 0.0095 0.0094 0.0094 0.0094 0.0093 0.0093 0.0092 0.0094 0.0094 0.0091 0.0095 0.0117 0.0117 0.0114 15 Year Average 2009-2023 Quantity Standard 0.0098 Quality Standard $235,490 Service Standard $2,308 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $2,308 Eligible Amount $12,639,821 Watson & Associates Economists Ltd. PAGE B-18 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Pool and Splashpad Facility - Paris - outdoors - - - - 1 1 1 1 1 1 1 1 1 1 1 $9,000,000 Mechanical Building Lions Park - - - - 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Paris Lawn Bowling Clubhouse 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,650,000 St. George Lawn Bowling Clubhouse 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700,000 Walter Williams Bandshell 1975 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Little League Ball Diamond building and washrooms 1 1 1 1 1 1 1 1 1 1 - 1 1 1 1 $500,000 Electrical Building - Little League Ball Diamond - - - - - - - - - 1 1 1 1 1 1 $40,000 Quonset Hut - Little League Ball Diamond - - - - - - - - - 1 1 1 1 1 1 $200,000 Ball Diamond Building with Washrooms - Little League Ball Diamond 1 1 1 1 1 1 1 1 1 - - - - - - $250,000 Skateboard Equipment Paris 2002 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $75,000 Trellis Cobblestone Common - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 Solar Lamp Cobblestone Common - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Fountain Cobblestone Common - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Paris Canoe Portage Dock - - - 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 Paris Canoe Portage Signs - - - 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Lions Park Picnic Shelter 1985 (Updated 2019) - Paris 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Green Lane Fieldhouse (washrooms & Storage) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700,000 Pole Barn Green Lane Storage Building - - - - - - - - - - - - - - 1 $100,000 Green Lane Ball Diamond and Irrigation control Building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Lions Park Ball Diamond Lighting 1985 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Green Lane Park Main Hydro Service/Irrigation Building 2000 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Green Lane Pavillion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $300,000 Simply Grand Dog Park Fencing - - - 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Paris Cenotaph 1980 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $350,000 Exterior Pedestal Sign BSC - - - 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 BSC Scissor Lift - - - 1 1 1 1 1 1 1 1 1 1 1 1 $29,600 Brant Sports Complex Signs - - - 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Harris Time Scoreclock St. George 1996 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Skateboard Equipment St. George 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Skateboard Equipment Mt. Pleasant 2003 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Watson & Associates Economists Ltd. PAGE B-19 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Pavilion Mt. Pleasant 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Floodlight Building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $35,000 Picnic Shelter Mt. Pleasant Nature Park 2003 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Nature Park storage building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $350,000 Fencing & Gates - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Single Panel Kiosks - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Oakland Double Panel Kiosk - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,700 Mt. Pleasant Double Panel Kiosk - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Burtch Road Quad Panel Kiosk - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Picnic Tables/Benches/Garbage Containers - TH & B Trail - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $107,200 TH & B Trail Signs - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $170,000 Mt Pleasant Nature/Fish Park Washrooms - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 LE & N Trail -Fencing & Gates - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Mt. Pleasant (Optimist) Nature/Fish Park Kiosk - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $14,000 Lions Park Ball Diamond Lighting - Mt. Pleasant - - - - - - - - - 1 1 1 1 1 1 $150,000 Paris Skatepark - - - 1 1 1 1 1 1 1 1 1 1 1 1 $360,000 Burford Ball Diamond Dugouts and Soccer Shelters - - - - - - 6 6 6 6 6 6 6 6 6 $10,000 St, George Backstop A and B - - - - - - - - 1 2 2 2 2 2 2 $90,000 Tennis Court Lighting St. George - - - - - - - - - 1 1 1 1 1 1 $40,000 SC Johnson Trail Signs and Kiosk - - 1 1 1 1 1 1 $25,000 Foxhill Picnic Shelter and - - - - - - - 1 1 1 1 1 1 1 1 $90,000 Burford Accessible Playground - - - - - - 1 1 1 1 1 1 1 $350,000 Rising Park Playground - - - - - 1 1 1 1 1 1 1 1 1 1 $100,000 Sunnyhill Splashpad and Washroom - - - - - - - 1 1 1 1 1 1 1 1 $1,000,000 Harley Playground - - - - - - - 1 1 1 1 1 1 1 1 $60,000 Lions Park Accessible Playground - Paris - - - - - - - 1 1 1 1 1 1 1 1 $500,000 Beach Volleyball Courts Green Lane - - - - - - 1 1 1 1 1 1 1 1 1 $40,000 Paris Lions Park Scoreboard - - - - - - - - - 1 1 1 1 1 1 $40,000 Paris Diamond A Fencing and Dugouts - Little League - - - - - - - - - 1 1 1 1 1 1 $150,000 Paris Diamond B Fencing and Dugouts - Little League - - - - - - - - - 1 1 1 1 1 1 $110,000 Lions Bleachers and Benches - Little League - - - - - - - - - 1 1 1 1 1 1 $40,000 Watson & Associates Economists Ltd. PAGE B-20 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Green Lane Sports Field Lighting #2 - - - - - - - - - - 1 1 1 1 1 $350,000 Burford Splashpad 2007 and Update 2020 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $570,000 Eric Thomlison River Access - - - - - - - - - - 1 1 1 1 1 $30,000 Scotland Optimist Playground - - - - - - - - - - 1 1 1 1 1 $86,000 Lions Park Washrooms - Ampitheatre - - - - - 1 1 1 1 1 1 1 1 1 1 $140,000 Burford Tennis Court Reno - - - - - - - - - - - 1 1 1 1 $86,000 Poplar Hills Playground - - - - - - - - - - 1 1 1 1 1 $54,000 Mt.Pleasant Backstop - - - - - - - - - - 1 1 1 1 1 $40,000 PDHS Tennis Court Lights - - - - - - - - - - - 1 1 1 1 $43,000 Row Lane Playground - - - - - - - - - - - - 1 1 1 $60,000 Summit Park Playground - - - - - - - - - - - - 1 1 1 $60,000 Jay Wells Park Playground - - - - - - - - - - - - 1 1 1 $75,000 Dawdy Park Playground - - - - - - - - - - - - 1 1 1 $75,000 Oakland Playground - - - - - - - - - - - - 1 1 1 $60,000 Oakhill Heights Playground - - - - - - - - - - - - 1 1 1 $40,000 Nith River Trail Solar Lighting - - - - - - - - - - - - - 1 1 $75,000 Mechanic St. Pedestrian Bridge Solar Lighting - - - - - - - - - - - - - 1 1 $7,000 Woodslee Linear Park Playground Equip - - - - - - - - - - - - - 1 1 $40,000 Total 21 32 34 42 43 45 52 56 58 67 71 74 80 83 84 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0006 0.0009 0.0010 0.0012 0.0012 0.0012 0.0014 0.0015 0.0016 0.0018 0.0019 0.0020 0.0020 0.0021 0.0020 15 Year Average 2009-2023 Quantity Standard 0.0015 Quality Standard $311,413 Service Standard $467 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $467 Eligible Amount $2,558,416 Watson & Associates Economists Ltd. PAGE B-21 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parkland Trails Unit Measure: Kilometres of Paths and Trails Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/ km) Paris Nith Pathway 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $175,000 L E & N 3 of 8 km maintained 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 $120,000 TH & B Trail - 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 $175,000 Distillery Lane - - 1.0 1.0 1.0 1.0 1.0 1.0 - - - 1.0 1.0 1.0 1.0 $75,300 Brooks Mill - Phase 1 - - - - 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 $75,300 SC Johnson - Willow to Powerline - - - - - - - - 3.7 3.7 3.7 3.7 3.7 3.7 3.7 $120,000 Lions Way Burford (Trail & Bridge) - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $600,000 Green Lane Trail - - - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $75,300 Barkers Bush - - - - - - - - - 1.5 1.5 1.5 1.5 1.5 1.5 $75,300 Jacobs Wood - - - - - - - - - 1.2 1.2 1.2 1.2 1.2 1.2 $75,300 Rest Acres Rd West Side - - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 $175,000 Rest Acres Rd East Side 1.0 1.0 1.0 $175,000 Total 4.0 16.0 17.0 17.0 17.5 18.5 18.5 19.5 22.2 25.0 26.0 27.0 28.0 28.0 28.0 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0001 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0006 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 15 Year Average 2009-2023 Quantity Standard 0.0006 Quality Standard $151,200 Service Standard $91 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $91 Eligible Amount $496,873 Watson & Associates Economists Ltd. PAGE B-22 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Arena - Burford 23,500 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 $600 $683 Arena - South Dumfries 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 45,311 $600 $683 Syl Apps Indoor Turf Facility - Paris 44,500 44,500 44,500 44,500 40,906 40,906 40,906 40,906 40,906 40,906 40,906 40,906 40,906 40,906 40,906 $500 $573 Brant Sports Complex 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 84,000 $600 $699 Curtis Ave Building - Community Services Admin Building - - 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 - - $400 $463 Scotland Community Centre - - - - - - - - 17,669 17,669 17,669 17,669 17,669 17,669 17,669 $600 $683 Community Centres Mt Pleasant Com Ctr 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 5,024 $500 $573 Oakland 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 $500 $573 Onondaga 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 $500 $573 Pinegrove/Howell 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 $500 $573 Harley Hall 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 $500 $573 Airport CC 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 $500 $573 Bethel CC 1,310 1,310 1,310 1,310 1,310 1,310 1,310 - - - - - - - - $500 $573 Cainsville CC 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 3,592 - $500 $573 Glen Morris Centennial Hall 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 2,926 $500 $573 TF Warren Group Cainsville Community Centre - - - - - - - - - - - - - - 9,256 $648 $711 Gyms Rented within Schools Burford Elementary School 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 $500 $573 Cobblestone Elementary School 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 3,233 $500 $573 Glen Morris Public School 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 $500 $573 Northward Elementary School 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 2,694 $500 $573 Paris Central School 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 1,796 $500 $573 Paris District High School 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 4,872 $500 $573 Holy Family 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 1,693 $500 $573 Blessed Sacrament 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 1,739 $500 $573 Sacred Heart 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 4,731 $500 $573 Onondaga-Brant 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 2,016 $500 $573 Mt. Pleasant Public School 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 2,640 $500 $573 Programmed Gyms from Other Privately Owned Facilities Sojourn Church - Gymnasium (Paris) - - - - - - - - - - - - - 4,700 4,700 $500 $573 Royal Canadian Legion Branch 29 (Paris) - - - - - - - - - - - - - 800 800 $400 $463 St. George United Church - Gymnasium - - - - - - - - - - - - - 1,089 1,089 $500 $573 Total 252,403 263,423 266,623 266,623 263,029 263,029 263,029 261,719 279,388 279,388 279,388 279,388 279,388 282,777 288,441 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 7.1450 7.4287 7.4814 7.4382 7.2993 7.2670 7.2235 7.1298 7.6254 7.6250 7.4454 7.3891 7.0776 7.0421 6.9573 15 Year Average 2009-2023 Quantity Standard 7.3050 Quality Standard $647 Service Standard $4,724 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $4,724 Eligible Amount $25,874,115 Watson & Associates Economists Ltd. PAGE B-23 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Brant Sports Complex #260 Light Truck (2008 Chev Van) - BSC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $56,000 #298 2018 Chev 1/2 ton - BSC - - - - - - - - - 1 1 1 1 1 1 $58,000 #526 2018 Zamboni - BSC - - - - - - - - - 1 1 1 1 1 1 $120,000 #525 2010 Zamboni - BSC - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 2018 Kubota Zero turn ZD1011 - - - - - - - - - 1 1 1 1 1 1 $33,000 Riding Mower (2017 Kubota F2690) BSC Front Mount - - - - - - - - 1 1 1 1 1 1 1 $27,000 Syl Apps Community Centre #265 Light Truck (2003 Chev) 2w Syl Apps 1 1 1 1 1 1 1 - - - - - - - - $55,000 #507 2020 Ford F250 3/4 4x4 ton plow Syl Apps - - - - - - - - - - - 1 1 1 1 $100,000 #510 2020 Chev 1/2 ton - - - - - - - - - - - 1 1 1 1 $58,000 # 296 Heavy Truck (2018 Ford) - Syl Apps - - - - - - - 1 1 1 1 1 1 1 1 $100,000 Riding Mower (2007 JD1545 Mower) Syl Apps 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,100 2003 JD Loader 4410 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $37,000 2020 JD Zero Turn - SDCC - - - - - - - - - - - 1 1 1 1 $36,000 2021 JD Z993 - Syl Apps - - - - - - - - - - - - 1 1 1 $29,000 2010 JD Gator - Syl Apps - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $21,000 2006 JD 1545 Agroturf 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 2018 Bobcat Walkbehind Hydrostat Mower - - - - - - - - - 1 1 1 1 1 1 $8,000 2021 Cubcadet Push Mower - - - - - - - - - - - - - 1 1 $1,000 2021 Trail/Diamond Groomer - - - - - - - - - - - - - 1 1 $15,000 Burford Community Centre #267 2013 Chev 1/2 ton - Burford - - - - - - 1 1 1 1 1 1 1 1 1 $56,000 #297 2018 3/4 ton Ford Plow- Burford - - - - - - - 1 1 1 1 1 1 1 1 $100,000 #153 1 Ton Dump - Burford - - - - - - 1 1 1 1 1 1 1 1 1 $100,000 2009 Z-Track Mower - Burford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $56,000 2015 Kubota UTV - Burford - - - - - - 1 1 1 1 1 1 1 1 1 $24,000 Ice Resurfacer (2008 Zamboni Ice Resurfacer) Burford 1 1 1 1 1 1 1 1 1 1 1 - - - - $120,000 Tractor (2015 Kubota F3990) Burford - - - - - - 1 1 1 1 1 1 1 1 1 $52,000 Tractor (2012 JD1445) Burford - - - 1 1 1 1 1 1 1 1 1 1 1 1 $61,000 2013 Duramax Trailer 18' - Burford - - - - 1 1 1 1 1 1 1 1 1 1 1 $12,000 Kioti Tractor 2017 - Burford - - - - - - - - 1 1 1 1 1 1 1 $81,000 Gaukel Memorial Community Centre #286 Light Truck (2017 Chev) SDCC - - - - 1 1 1 1 1 1 1 1 1 1 1 $68,000 #276 2015 Dodge Ram - SDCC - - - - - - 1 1 1 1 1 1 1 1 1 $75,000 #501 2020 Ford - - - - - - - - - - - 1 1 1 1 $75,000 2020 Dumpbox Trailer - SDCC - - - - - - - - - - - 1 1 1 1 $14,000 2018 Olympia Millenium - SDCC - - - - - - - - - 1 1 1 1 1 1 $120,000 2011 Kubota 4240 - SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 $41,000 2020 JD Zero Turn - SDCC - - - - - - - - - - - 1 1 1 1 $36,000 2008 JD 1445 - SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Watson & Associates Economists Ltd. PAGE B-24 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) 2015 Kubota - SDCC - - - - - - 1 1 1 1 1 1 1 1 1 $26,000 2006 Kubota 2880 - SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 2017 Kubota UTV - SDCC - - - - - - - 1 1 1 1 1 1 1 1 $32,000 2018 Kubota Zero Turn - SDCC - - - - - - - - - 1 1 1 1 1 1 $32,000 2011 Kubota Tractor - SDCC - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 2007 Tractor JD 2520 -SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $61,000 Riding Mower (2008 JD 1440) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $35,000 Riding Mower (2008 JD 2520) SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $31,000 Paris #172 2023 F450 dump - Paris Parks - - - - - - - - - - - - - - 1 $120,000 #268 Light Truck (2013 Chev) Lions Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 #282 2017 Chev - - - - - - - 1 1 1 1 1 1 1 $75,000 #515 2022 F250 3/4 ton 4WD Lions Park - - - - - - - - - - - - 1 1 1 $75,000 #504 2019 Ford truck - Syl Apps - - - - - - - - - - 1 1 1 1 1 $75,000 #522 2022 F250 3/4 ton 4WD - - - - - - - - - - - - - - 1 $75,000 2003 Groomer -Lions Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $28,000 2020 Kioti Tractor - Lions Park - - - - - - - - - - - 1 1 1 1 $73,000 2012 Duramax Trailer - Lions 1 1 1 1 1 1 1 1 1 1 1 1 $16,000 2020 JD 1570- 1 1 1 1 $37,000 2020 Dumpbox Trailer - Green Lane - - - - - - - - - - - 1 1 1 1 $14,000 Groomer (Infielder D72 Ball Diamond)Green Lane 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $14,000 2020 JD Z994 - Green Lane - - - - - - - - - - - 1 1 1 1 $29,000 Groomer (Infielder D72 Ball Diamond)Green Lane - - - - - - 1 1 1 1 1 1 1 1 1 $20,000 2019 Ferris Zero Turn - - - - - - - - - - 1 1 1 1 1 $29,000 Recreation & Community #249 2016 Rec SUV Equinox - - - - - - - - - 1 1 1 1 1 1 $42,000 #294 F2018 Ford 3/4 ton van - REC - - - - - - - - - - 1 1 1 1 1 $65,000 #505 2019 Chev 1/2 ton - - - - - - - - - - 1 1 1 1 1 $58,000 #511 2021 1/2 Ton Transit Connect - - - - - - - - - - - - - 1 1 $64,000 Not in Service Tractor (2010 JD 23720) - 1 1 1 1 1 1 1 1 1 1 1 1 - - $74,700 Mower (2015 JD ORSI) - - - - - - 1 1 1 1 1 1 1 - - $10,600 Sweeper (2017 Kubota) - - - - - - - - 1 1 1 1 1 - - $9,000 2015 Reese Ball Diamond Groomer - - - - - - 1 1 1 1 1 1 1 - - $24,200 2014 Kubota Tractor F3900 - - - - - 1 1 1 1 1 1 1 1 - - $48,400 Light Truck (2000 Dodge) 1 1 1 1 1 - - - - - - - - - - $31,000 Watson & Associates Economists Ltd. PAGE B-25 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Rotary Broom (2007 JD Rotary Broom) 1 1 1 1 1 1 1 1 1 1 - - - - - $14,000 Ice Resurfacer (2004 Olympia Millenium Ice Resurfacer) 1 1 1 1 1 1 1 - - - - - - - - $155,400 Light Truck (2002 Chev) Green Lane 1 1 1 1 1 1 1 1 1 1 1 - - - - $33,600 Tractor (1996 JD 1070 Tractor) 1 1 - - - - - - - - - - - - - $51,900 Ice Resurfacer (2003) 1 1 1 - - - - - - - - - - - - $155,400 Light Truck (2003 Chev) 1 1 1 1 1 1 1 - - - - - - - - $37,800 Light Truck (2004 Chev) 1 1 1 1 1 1 1 1 - - - - - - - $28,900 Riding Mower (2008 JD 1445) 1 1 1 1 - - - - - - - - - - - $61,100 Tractor (2006 JD) Burford 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $31,300 Tractor (2003 Kubota) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $54,000 Riding Mower (2006 Kubota) Lions Park 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $45,800 1988 - Landscape Trailer -SDCC 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $16,100 Rotary Broom (2020 JD 60") - SDCC - - - - - - - - - - - 1 1 1 - $8,100 Riding Mower (1996 Kubota Front Mount Cutter) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $41,300 Rotary Broom (2008 JD 60") SDCC 1 1 1 1 1 1 1 1 1 1 1 - - - - $10,800 #250 Light Truck (2003 Chev) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $34,000 Total 31 34 35 36 37 37 46 46 49 56 59 67 69 63 63 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0009 0.0010 0.0010 0.0010 0.0010 0.0010 0.0013 0.0013 0.0013 0.0015 0.0016 0.0018 0.0017 0.0016 0.0015 15 Year Average 2009-2023 Quantity Standard 0.0013 Quality Standard $48,423 Service Standard $63 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $63 Eligible Amount $344,777 Watson & Associates Economists Ltd. PAGE B-26 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Glen Morris Library 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 1,851 $650 $807 St. George Library 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 3,993 $750 $927 Oakland-Scotland Library 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 $650 $807 Paris Library 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 14,785 $750 $927 Burford Library 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 $650 $807 Total 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 29,229 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.8274 0.8243 0.8202 0.8154 0.8111 0.8075 0.8027 0.7963 0.7978 0.7977 0.7789 0.7730 0.7404 0.7279 0.7050 15 Year Average 2009-2023 Quantity Standard 0.7884 Quality Standard $884 Service Standard $697 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $697 Eligible Amount $3,817,469 Watson & Associates Economists Ltd. PAGE B-27 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Print Material (Adult) 35,896 39,750 44,630 49,696 55,213 48,529 49,746 48,951 52,850 52,711 50,169 52,237 52,954 51,045 50,016 $50 Print Material (Youth) 57,125 57,468 65,176 73,981 84,153 59,313 60,800 59,828 64,595 65,567 61,316 63,845 68,547 69,601 69,458 $40 CDs/Sound Recordings 1,721 2,169 2,364 2,394 2,477 1,369 1,595 1,558 1,476 1,098 1,074 - - - - $40 DVD 2,594 4,332 5,259 6,219 7,312 11,076 12,904 12,609 11,943 8,427 11,106 11,509 12,722 12,533 13,115 $50 Audio Books 1,168 3,245 3,561 3,958 4,432 4,316 4,359 4,298 4,231 4,073 4,154 4,220 4,478 4,632 4,825 $90 eBooks - - 703 2,915 3,160 7,711 23,526 8,706 5,927 10,423 8,843 9,195 9,412 9,519 10,562 $90 eSubscriptions (Value) 20,000 20,000 35,808 40,270 63,100 35,000 35,000 35,000 35,000 35,000 40,000 68,059 85,345 84,356 78,000 $1 Tech Kits - - - 25 25 25 51 52 27 29 34 41 49 63 72 $280 Maker Kits - - - - - - - 39 56 57 57 62 71 92 132 $90 Tablets (Launchpads) - - - - - - - 71 89 99 101 84 67 43 31 $230 Non-Print (Gear & Gadgets) - - - - - - - - - 40 360 432 662 827 965 $70 Kiosk - - - - - - - - - - - - 1 1 1 $75,000 3D Printer - - - - - - - - - 1 1 1 1 1 1 $2,400 Total 118,504 126,964 157,501 179,458 219,872 167,339 187,981 171,112 176,194 177,525 177,215 209,685 234,309 232,713 227,178 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 3.35 3.58 4.42 5.01 6.10 4.62 5.16 4.66 4.81 4.85 4.72 5.55 5.94 5.80 5.48 15 Year Average 2009-2023 Quantity Standard 4.9362 Quality Standard $37 Service Standard $180 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $180 Eligible Amount $988,215 Watson & Associates Economists Ltd. PAGE B-28 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Library Services - Vehicles Unit Measure: No. of library vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Van - - - - - - - - 1 1 1 1 1 1 1 $75,000 Total - - - - - - - - 1 1 1 1 1 1 1 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard - - - - - - - - 0.00003 0.00003 0.00003 0.00003 0.00003 0.00002 0.00002 15 Year Average 2009-2023 Quantity Standard 0.000012 Quality Standard $74,985 Service Standard $0.91 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $0.91 Eligible Amount $4,984 Watson & Associates Economists Ltd. PAGE B-29 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Ambulance Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Henry Street Brantford (Leased) 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 1,396 $600 $702 Alexander Street (Leased) 776 776 776 776 776 776 776 776 776 776 776 776 776 776 776 $600 $697 Colbourne Street (Leased) 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 $600 $748 Francis Street (Leased) 885 885 885 885 885 885 885 885 885 885 885 885 885 885 885 $600 $699 353 Elgin Street (Leased) - - - - - - - - 776 776 776 776 776 - - $600 $791 12 Garnet (Cainsville) (Leased) - - - - - - - - - - - 1,306 1,306 1,306 1,306 $600 $739 355 Henry St (Community Paramedicine) (Leased) - - - - - - - - - - - 2,216 2,216 2,216 2,216 $600 $745 Total 4,220 4,220 4,220 4,220 4,220 4,220 4,220 4,220 4,996 4,996 4,996 8,518 8,518 7,742 7,742 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.1195 0.1190 0.1184 0.1177 0.1171 0.1166 0.1159 0.1150 0.1364 0.1364 0.1331 0.2253 0.2158 0.1928 0.1867 15 Year Average 2009-2023 Quantity Standard 0.1444 Quality Standard $722 Service Standard $104 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $104 Eligible Amount $570,703 Watson & Associates Economists Ltd. PAGE B-30 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Ambulance Vehicles Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Type 3 Modular (with Autoload) 1.94 1.94 1.94 1.94 1.94 2.22 2.22 2.22 3.05 3.05 3.05 3.60 3.60 4.16 4.16 $450,000 Emergency Response Vehicle 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.55 0.55 1.66 1.66 1.66 $325,000 Logistics - Ambulance - - - - - - - - 0.55 0.28 0.28 0.28 0.28 0.28 0.28 $450,000 Logistics - Dodge Caravan - Community Paramedicine Expanded Services (Leased) - - - - - - - - - 0.28 0.28 0.28 0.28 0.28 0.28 $47,000 Community Paramedicine Admin - Equinox (Leased) - - - - - - - - - - - - 0.28 0.28 0.28 $40,000 Support/Admin - 4 Rav4s (Leased) - - - - - - - - - - - - - - 1.11 $40,000 Total 2.22 2.22 2.22 2.22 2.22 2.50 2.50 2.50 3.88 3.88 4.15 4.70 6.09 6.65 7.76 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0002 0.0002 0.0002 15 Year Average 2009-2023 Quantity Standard 0.0001 Quality Standard $397,700 Service Standard $40 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $40 Eligible Amount $217,820 Watson & Associates Economists Ltd. PAGE B-31 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Long-term Care Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. John Noble Home 172,352 172,352 172,352 172,352 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 $560 $658 Total 172,352 172,352 172,352 172,352 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 194,587 County of Brant's Percentage Share 28.3% 28.3% 28.3% 28.3% 28.3% 28.7% 28.7% 28.7% 27.3% 27.0% 27.0% 27.3% 27.5% 27.9% 28.0% Total County of Brant 48,776 48,776 48,776 48,776 55,068 55,846 55,846 55,846 53,122 52,538 52,538 53,164 53,527 54,365 54,512 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 1.3807 1.3755 1.3686 1.3607 1.5282 1.5429 1.5337 1.5214 1.4499 1.4339 1.4001 1.4061 1.3560 1.3539 1.3148 15 Year Average 2009-2023 Quantity Standard 1.4218 Quality Standard $658 Service Standard $936 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $936 Eligible Amount $5,123,843 Watson & Associates Economists Ltd. PAGE B-32 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Child Care and Early Years Programs - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/space) Value/space with land, site works, etc. Infant 56 58 62 66 88 88 99 99 105 127 117 117 117 127 127 $45,000 $45,000 Toddler 180 215 205 270 335 320 323 328 335 330 360 385 370 390 390 $45,000 $45,000 Preschool 724 758 699 720 741 789 763 779 742 781 826 890 978 1,034 1,034 $45,000 $45,000 JK/SK 250 234 214 314 494 809 911 973 1,127 1,086 1,092 1,092 1,092 1,094 1,094 $45,000 $45,000 School Age 406 623 783 943 1,085 1,242 1,323 1,329 1,510 1,514 1,549 1,549 1,489 1,557 1,577 $45,000 $45,000 Total 1,616 1,888 1,963 2,313 2,743 3,248 3,419 3,508 3,819 3,838 3,944 4,033 4,046 4,202 4,222 County of Brant's Percentage Share 28.3% 28.3% 28.3% 28.3% 28.3% 28.7% 28.7% 28.7% 27.3% 27.0% 27.0% 27.3% 27.5% 27.9% 28.0% Total County of Brant 457 534 556 655 776 932 981 1,007 1,043 1,036 1,065 1,102 1,113 1,174 1,183 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0129 0.0151 0.0156 0.0183 0.0215 0.0258 0.0269 0.0274 0.0285 0.0283 0.0284 0.0291 0.0282 0.0292 0.0285 15 Year Average 2009-2023 Quantity Standard 0.0243 Quality Standard $44,907 Service Standard $1,091 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $1,091 Eligible Amount $5,976,776 Watson & Associates Economists Ltd. PAGE B-33 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Waste Diversion - Facilities - Stations/Depots Unit Measure: sq.m of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.m) Value/sq.ft. with land, site works, etc. Facility 1 - Paris Transfer Station Diversion-Related Land (80% of 18,600 sq.m) 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 14,880 $50 $50 Facility 2 - Biggars Lane Landfill Diversion Area Land Value (6,200 sq.m) 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 $50 $50 Joint Use Area Lane Value (1,250 sq.m - 50% Diversion) 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 $50 $50 Facility 3 - Emterra Burlington MRF Facilty Value (Max yr capacity 90K MT, Brant = 2K MT) 1 1 1 1 1 1 1 1 1 1 1 - - - - $790,000 $790,000 Facility 4 - HGC Cainsville MRF Facilty Value (Max yr capacity 30K MT, Brant = 2K MT) - - - - - - - - - - - 1 1 1 1 $860,000 $860,000 Total 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 Percentage attributable to Eligible Portion 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Total Eligible Portion of Facilities 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 21,706 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.6144 0.6121 0.6091 0.6056 0.6024 0.5997 0.5961 0.5913 0.5924 0.5924 0.5784 0.5741 0.5499 0.5406 0.5236 15 Year Average 2009-2023 Quantity Standard 0.5855 Quality Standard $87 Service Standard $51 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $51 Eligible Amount $279,601 Watson & Associates Economists Ltd. PAGE B-34 H:\Brant\2023 DC\Report\Final Report.docx County of Brant Service Standard Calculation Sheet Service: Waste Diversion - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Biggars Lane Landfill Diversion Contractor Equipment 40 Yard Bins 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $9,000 20 Yard Bins 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $7,000 Excavator (50% Diversion Activities) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $400,000 Roll Off Truck (30% Diversion Activities, 2 sites) 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $290,000 Bulldozer (30% Diversion Activities) 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 - - - - - $300,000 County Owned Equipment Scale House Trailer (15% Diversion based on weigh) 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $60,000 Scale - 1 (15% Diversion based on weigh) 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $180,000 Paris Transfer Station Contractor Equipment 40 Yard Bins 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 $9,000 Roll Off Truck (200K - 60% Diversion Activities, 2 sites) 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $290,000 County Owned Equipment Loader (250K - 50% Diversion) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 - - - - - - $250,000 Telehandler Loader (175K - 50% Diversion) - - - - - - - - - 0.5 0.5 0.50 0.50 0.50 0.50 $185,000 Pick Up Truck (30K - 25% Diversion Use) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 $90,000 Scale House Trailer (35K 2012 tender - 57% Diversion based on weigh) 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 $60,000 Scale - 1 (125K 2018 Tender - 57% diversion) 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 $180,000 Kiosk (30K 2018 tender - 57% diversion) - - - - - - - - - - 0.57 0.57 0.57 0.57 0.57 $40,000 Scale - 2 (125K 2018 Tender - 57% diversion) - - - - - - - - - - 0.57 0.57 0.57 0.57 0.57 $190,000 Curbside Collection (Contractor Owned) Recycling Trucks 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 - - - - - - $400,000 5 Co Collection Trucks (200K - 40% capcity for diversion material) - - - - - - - - - 2.0 2.00 2.00 2.00 2.00 2.00 $400,000 Total 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 18.9 19.7 19.7 19.7 19.7 19.7 Percentage attributable to Eligible Portion 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Total Eligible Portion of Facilities 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 18.9 19.7 19.7 19.7 19.7 19.7 Population 35,326 35,460 35,638 35,845 36,035 36,195 36,413 36,708 36,639 36,641 37,525 37,811 39,475 40,155 41,459 Per Capita Standard 0.0006 0.0006 0.0006 0.0006 0.0006 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 15 Year Average 2009-2023 Quantity Standard 0.0005 Quality Standard $109,600 Service Standard $55 D.C. Amount (before deductions) 10 year Forecast Population 5,477 $ per Capita $55 Eligible Amount $300,140 Watson & Associates Economists Ltd. PAGE C-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\Brant\2023 DC\Report\Final Report.docx Appendix C: Long-Term Capital and Operating Cost Examination County of Brant Annual Capital and Operating Cost Impact As a requirement of the Development Charges Act, 1997, as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e. sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the County's approved 2022 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. The following factors were utilized to calculate the annual replacement cost of the capital projects (annual contribution = factor X capital asset cost) and are based on an annual growth rate of 2% (net of inflation) over the average useful life of the asset: Watson & Associates Economists Ltd. PAGE C-3 H:\Brant\2023 DC\Report\Final Report.docx Table C-1 County of Brant Lifecycle Cost Factors and Average Useful Lives Table C-2 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while County program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e. facilities) would be delayed until the time these works are in place. Average Useful Life Factor Water and Wastewater Infrastructure 75 0.005855083 Facilities 50 0.01182321 Services Related to a Highway 50 0.01182321 Parkland Development 40 0.016555748 Vehicles 15 0.057825472 Small Equipment & Gear 10 0.091326528 Library Materials 10 0.091326528 Lifecycle Cost Factors Asset Watson & Associates Economists Ltd. PAGE C-4 H:\Brant\2023 DC\Report\Final Report.docx Table C-2 County of Brant Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE/CLASS OF SERVICE GROSS COST LESS BENEFIT TO EXISTING ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 2,744,610 135,354 242,182 377,536 2. Wastewater Services 2.1 Treatment plants & Sewers 245,895,148 13,436,500 1,112,337 14,548,837 3. Water Services 3.1 Treatment, storage and distribution systems 95,757,646 4,274,650 2,251,722 6,526,372 4. Services Related to a Highway 4.1 Roads and Related 133,953,958 6,528,485 5,406,641 11,935,126 4.2 Public Works (Facilities and Fleet) 3,170,500 285,083 3,333,745 3,618,828 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 22,324,730 1,401,816 1,637,621 3,039,437 6. Policing Services 6.1 Facilities, vehicles and equipment, small equpment and gear 5,052,531 155,496 2,564,999 2,720,495 7. Parks and Recreation Services 7.1 Park development, amenities, vehicles, equipment and recreation facilities 129,847,024 9,415,777 1,355,401 10,771,178 8. Library Services 8.1 Library facilities, materials and vehicles 35,914,527 1,815,004 333,997 2,149,001 9. Long-term Care Services 9.1 Facilities, vehicles and equipment 27,870,000 1,214,550 571,971 1,786,521 10. Ambulance 10.1 Ambulance facilities, vehicles and equipment 22,693,409 1,481,306 2,357,973 3,839,279 11. Waste Diversion 11.1 Waste diversion facilites, vehicles, equipment and other 1,348,156 67,591 164,253 231,844 Total 726,572,239 40,211,612 21,332,842 61,544,454 Watson & Associates Economists Ltd. PAGE D-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 H:\Brant\2023 DC\Report\Final Report.docx Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997, as amended (D.C.A.) requires development charge (D.C.) collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the D.C.A. provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes and for classes of services to be established. - The municipality shall pay each D.C. it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2 to 8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be used as an interim financing source for capital undertakings for which D.C.s may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law(s) and reserve funds. This statement must be made available to the public and may be requested to be forwarded to the Minister of Municipal Affairs and Housing. Subsection 43 (2) and O. Reg. 82/98 prescribe the information that must be included in the Treasurer's statement, as follows: - opening balance; - closing balance; Watson & Associates Economists Ltd. PAGE D-3 H:\Brant\2023 DC\Report\Final Report.docx - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g. collections, draws) including each asset's capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e. non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by D.C.s, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project; - amounts borrowed, purpose of the borrowing, and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at the beginning of the year, given in the year, and outstanding at the end of the year by the holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Recent changes arising from Bill 109 (More Homes for Everyone Act, 2022) provide that the Council shall make the statement available to the public by posting the statement on the website or, if there is no such website, in the municipal office. In addition, Bill 109 introduced the following requirements which shall be included in the treasurer's statement. - For each service for which a development charge is collected during the year o whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law, and o if the answer to subparagraph i is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; Watson & Associates Economists Ltd. PAGE D-4 H:\Brant\2023 DC\Report\Final Report.docx - For any service for which a development charge was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Additionally, as per subsection 35(3) of the D.C.A.: 35(3) If a service is prescribed for the purposes of this subsection, beginning in the first calendar year that commences after the service is prescribed and in each calendar year thereafter, a municipality shall spend or allocate at least 60 per cent of the monies that are in a reserve fund for the prescribed service at the beginning of the year. The services currently prescribed are water, wastewater, and services related to a highway. Therefore, as of 2023, a municipality shall spend or allocate at least 60 percent of the monies in the reserve fund at the beginning of the year. There are generally two (2) ways in which a municipality may approach this requirement: a) Include a schedule are part of the annual treasurer's statement; or b) Incorporate the information into the annual budgeting process. Based upon the above, Figure 1 and Attachments 1 and 2, set out the format for which annual reporting to Council should be provided. Attachment 3 provides for the schedule for allocating reserve fund balances to projects. D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a D.C. may be spent. Watson & Associates Economists Ltd. PAGE D-5 H:\Brant\2023 DC\Report\Final Report.docx Figure D-1 County of Brant Annual Treasurer's Statement of Development Charge Reserve Funds Services to which the Development Charge Relates Description Services Related to a Highway Water Services Wastewater Services Stormwater Drainage and Control Services Policing Services Fire Protection Services Parks and Recreation Services Library Services Long-term Care Services Child Care and Early Years Programs Ambulance Waste Diversion Opening Balance, January 1, ________ 0 Plus: Development Charge Collections 0 Accrued Interest 0 Repayment of Monies Borrowed from Fund and Associated Interest1 0 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 0 Amounts Refunded 0 Amounts Loaned to Other D.C. Service Category for Interim Financing 0 Credits3 0 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Total Watson & Associates Economists Ltd. PAGE D-6 H:\Brant\2023 DC\Report\Final Report.docx Figure D-2a County of Brant Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period Capital Fund Transactions Gross Capital Cost D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reserv e Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-7 H:\Brant\2023 DC\Report\Final Report.docx Figure D-2b County of Brant Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Operating Fund Transactions D.C. Reserve Fund Draw Post D.C. Forecast Period Non-D.C. Recoverable Cost Share Operating Fund Transactions Principal Interest Principal Interest Source Principal Interest Source Services Related to a Highway Capital Cost J Capita Cost K Capital Cost L Sub-Total - Services Related to a Highway $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost M Capita Cost N Capital Cost O Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost P Capita Cost Q Capital Cost R Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 Annual Debt Repayment Amount Watson & Associates Economists Ltd. PAGE D-8 H:\Brant\2023 DC\Report\Final Report.docx Figure D-3 County of Brant Attachment 2 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE D-9 H:\Brant\2023 DC\Report\Final Report.docx Figure D-4 County of Brant Attachment 3 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Reserve Fund Balance Allocations Service: Water Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Wastewater Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Services Related to a Highway Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Watson & Associates Economists Ltd. PAGE E-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 H:\Brant\2023 DC\Report\Final Report.docx Appendix E: Local Service Policy County of Brant General Policy Guidelines on Development Charges and Local Service Funding This Appendix sets out the municipality's General Policy Guidelines on Development Charges (D.C.) and local service funding for Services Related to a Highway, Stormwater Management, Transit Bus Stops and Amenities, Parkland Development, and Underground Linear Services. The guidelines outline, in general terms, the size and nature of engineered infrastructure that is included in the study as a development charge project, versus infrastructure that is considered as a local service, to be emplaced separately by landowners, pursuant to a development agreement. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered, in the context of these policy guidelines as subsection 59 (2) of the Development Charges Act, 1997 (D.C.A.) on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, as well as the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area. E.1 Services Related to a Highway A highway and services related to a highway are intended for the transportation of people and goods via many different modes including, but not limited to passenger automobiles, commercial vehicles, transit vehicles, bicycles and pedestrians. The highway shall consist of all land and associated infrastructure built to support (or service) this movement of people and goods regardless of the mode of transportation employed. The associated infrastructure to achieve this concept shall include, but is not limited to: road pavement structure and curbs; grade separation/bridge structures (for any vehicles, railways and/or pedestrians); grading, drainage and retaining wall features; culvert structures; stormwater drainage systems; utilities; traffic control systems; signage; gateway features; street furniture; active transportation facilities (e.g. sidewalks, bike lanes, multi-use trails which interconnect the transportation network, Watson & Associates Economists Ltd. PAGE E-3 H:\Brant\2023 DC\Report\Final Report.docx etc.); transit lanes & lay-bys; roadway illumination systems; boulevard and median surfaces (e.g. sod & topsoil, paving, etc.); street trees and landscaping; parking lanes & lay-bys; (excluding on-street parking in the downd driveway entrances; noise attenuation systems; railings and safety barriers. E.1.1 Local and Collector Roads (including land) The costs of the following items shall be direct developer responsibilities as a local service: a. Collector Roads Internal to Development, inclusive of all land and associated infrastructure - direct developer responsibility under s. 59 of the D.C.A. as a local service. b. Collector Roads External to Development, inclusive of all land and associated infrastructure - if needed to support a specific development or required to link with the area to which the plan relates, direct developer responsibility under s. 59 of the D.C.A. c. All local roads - considered to be the developer's responsibility. The costs of the following items shall be paid through D.C.s: d. Collector Roads External to Development, inclusive of all land and associated infrastructure - included in D.C. calculation to the extent permitted under s. 5 (1) of the D.C.A. (dependent on local circumstances) to the extent identified in the study. E.1.2 Arterial Roads The costs of the following items shall be paid through D.C.s: a. New, widened, extended or upgraded arterial roads, inclusive of all associated infrastructure - included as part of road costing funded through the D.C.A., s. 5 (1). b. Land acquisition for arterial roads on existing rights-of-way (R.O.W.) to complete proposed projects - dedication under the Planning Act provisions (s. Watson & Associates Economists Ltd. PAGE E-4 H:\Brant\2023 DC\Report\Final Report.docx 41, 51 and s. 53) through development lands; in area with limited development - included in the D.C. calculation. c. Land acquisition for arterial roads on new R.O.W. to complete proposed projects - dedication, where possible, under the Planning Act provisions (s. 51 and s. 53) through development lands up to the R.O.W. specified in the Official Plan. d. Land acquisition beyond normal dedication requirements to achieve transportation corridors as services related to highways including grade separation infrastructure for the movement of pedestrians, cyclists, public transit and/or railway vehicles - included in the D.C. calculation. E.1.3 Traffic Control Systems, Signals and Intersection Improvements The costs of the following items shall be direct developer responsibilities as a local service: a. All of these requirements which are not identified as part of projects in the D.C. background study and are within 500 metres of the development - considered to be a local service and funded by the developer(s). b. The developer will be required to pay for any road or intersection improvements deemed necessary through the TIS completed for their development. This may involve cost sharing from the County or others. If the project is not identified in the County's capital plan or DC Background study, it may be necessary for the developer to front-end finance the project(s). The costs of the following items shall be paid through D.C.s: b. Works external to a development and identified in the D.C. background study - funded through D.C.s to the extent identified in the study. c. Works external to the development(s) (more than 500 metres) and not identified in the D.C. background study - may be funded through the intersection improvement contingency identified in the study. Watson & Associates Economists Ltd. PAGE E-5 H:\Brant\2023 DC\Report\Final Report.docx E.1.4 Streetlights The costs of the following items shall be direct developer responsibilities as a local service: a. Streetlights on new arterial roads and arterial road improvements, if needed to support a specific development or required to link with the area to which the plan relates - may be direct developer responsibility through local service provisions (s. 59 of D.C.A.). b. Streetlights on non-arterial roads internal to development - considered part of the proposed project and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). c. Streetlights on non-arterial roads external to development, needed to support a specific development or required to link with the area to which the plan relates - considered part of the proposed project and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). The costs of the following items shall be paid through D.C.s: d. Streetlights on new arterial roads and arterial road improvements - considered part of the proposed project and included as part of the road costing funded through D.C.s. E.1.5 Transportation Related Pedestrian and Cycling Facilities The costs of the following items shall be direct developer responsibilities as a local service: a. Sidewalks, multi-use trails, and bike lanes, inclusive of all required infrastructure, located within arterial roads, County roads and provincial highway corridors - if needed to support a specific development or required to link with the area to which the plan relates, may be direct developer responsibility through local service provisions (s. 59 of the D.C.A.). b. Sidewalks, multi-use trails, and bike lanes, inclusive of all required infrastructure, located within or linking to non-arterial road corridors internal to Watson & Associates Economists Ltd. PAGE E-6 H:\Brant\2023 DC\Report\Final Report.docx development - considered part of the proposed project and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). c. Other sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates, up to 500 metres - direct developer responsibility under s. 59 of the D.C.A. (as a local service). The costs of the following items shall be paid through D.C.s: d. Sidewalks, multi-use trails, and bike lanes, inclusive of all required infrastructure, located within arterial roads, County roads and provincial highway corridors - if considered part of a proposed municipal project shall be included in the D.C. calculation. e. Multi-purposed trail systems connecting the County's Urban Settlement Areas and other population centres, natural amenities, the Grand River, and other significant natural features (not associated with a road), inclusive of all land and required infrastructure and form part of the municipality's active transportation network for cycling and/or walking - included in the D.C. calculation. E.1.6 Noise Abatement Measures The costs of the following items shall be direct developer responsibilities as a local service: a. Noise abatement measures external and internal to development where it is related to, or a requirement of a specific development - direct developer responsibility under s. 59 of the D.C.A. (as a local service). The costs of the following items shall be paid through D.C.s: b. Noise abatement measures on new arterial roads and arterial road improvements abutting an existing community and unrelated to a specific development - included as part of road costing funded through D.C.s. Watson & Associates Economists Ltd. PAGE E-7 H:\Brant\2023 DC\Report\Final Report.docx E.2 Stormwater Management The costs of the following items shall be direct developer responsibilities as a local service: a. Stormwater facilities for quality and/or quantity management, including downstream erosion works, inclusive of land and all associated infrastructure, such as landscaping and perimeter fencing - direct developer responsibility under s. 59 of the D.C.A. (as a local service). The County may be involved in some cost sharing agreements. b. Erosion works, inclusive of all restoration requirements, related to a development application - direct developer responsibility under s. 59 of the D.C.A. (as a local service). c. Storm sewer systems and drainage works that are required for a specific development, either internal or external to the area to which the plan relates - direct developer responsibility under s. 59 of the D.C.A. (as a local service). The costs of the following items shall be paid through D.C.s: d. Monitoring works and over-sizing cost of stormwater facilities only for projects identified as County projects in the background study - included in the D.C. calculation consistent with the D.C.A., s. 5 (1). e. Note: for stormwater minimum pipe sizes, refer to section E. E.3 Parkland Development E.3.1 Recreational Trails a. Recreational trails (primary, secondary, and tertiary as defined in the Trails Master Plan) that do not form part of the municipality's active transportation network, and their associated infrastructure (landscaping, bridges, trail surface, etc.) - included in the area municipal parkland D.C. calculation. b. Brant County should, where possible, consider agreements providing for D.C. credits in exchange for developer-build parks and trails as a strategy to support the earlier development of parks and trails in new development areas. The Watson & Associates Economists Ltd. PAGE E-8 H:\Brant\2023 DC\Report\Final Report.docx recommended guidelines, standards and procedures for park design and development in the Recreation Master Plan should be applied. E.3.2 Parkland a. Parkland Development for Community Parks, Destination Parks, Neighbourhood Parks - direct developer responsibility to provide at base condition, as follows: - Clearing and grubbing. Tree removals as per any required tree preservation and removals plan; - Installation of required municipal services and utilities; - Rough grading (pre-grading) to allow for positive drainage of the park, with minimum slopes of 2%. If necessary, this may include some minor drainage tile work and grading as per the overall subdivision grading design complete with any required swales or catch basins. Runoff from the development property shall not drain into the park unless approved by the County; - Spreading of topsoil to a minimum 150 mm depth (import topsoil if existing on-site is insufficient to reach required depth); - Seeding of site with municipality-approved seed mix. Maintenance of seed until acceptance by the municipality; - Parks shall be free of any contaminated soil or subsoil as defined in Part XV.1 of the Environmental Protection Act; - Parks shall not be mined for fill; - Parks shall be conveyed free and clear of all encumbrances; - 100% of 1.5 m black vinyl chain link perimeter fencing to the municipal standard to separate the development lands from the municipal lands or lands to be dedicated to the municipality, unless the perimeter fencing is on land that will be dedicated to the municipality to fulfil the requirement of parkland dedication under the Planning Act, in which case the cost shall be shared 50/50; - The park block shall not be used for topsoil or other construction material, equipment storage, or sales pavilions; and - Required heritage features within the park as set out within the Planning Act approval conditions. Watson & Associates Economists Ltd. PAGE E-9 H:\Brant\2023 DC\Report\Final Report.docx b. Program facilities, amenities, and furniture, within parkland - included in the D.C. calculation. E.3.3 Landscape Buffer Blocks, Features, Berms, Grade Transition Areas, Walkway Connections to Adjacent Arterial Roads, Open Space, etc. a. The cost of developing all landscape buffer blocks, landscape features, berms, grade transition areas, walkway connections to adjacent arterial roads, open space and other remnant pieces of land conveyed to the municipality - direct developer responsibility as a local service. Such costs include but are not limited to: - Pre-grading, sodding or seeding, supply and installation of amended topsoil (to the municipality's required depth), landscape features, perimeter fencing and amenities and all planting; and - Perimeter fencing to the municipal standard located on the public property side of the property line adjacent land uses as directed by the municipality. E.4 Natural Heritage System (N.H.S.) N.H.S. includes engineered and in situ stream corridors, natural buffers for woodlots, wetland remnants, etc., as well as subwatersheds or other pertinent study within the boundaries of the municipality. Direct developer responsibility as a local service provision, including but not limited to the following: a. Riparian planting and landscaping requirements (as required by the municipality, Conservation Authority or other authorities having jurisdiction) as a result of creation of, or construction within in the N.H.S. and associated buffers. b. Perimeter fencing of the N.H.S. to the municipal standard located on the public property side of the property line adjacent land uses (residential, industrial, commercial) as required by the municipality. c. All works to be in conformance with the approvals granted for stream corridors, natural buffers and subwatersheds areas as directed by the approvals granted. Watson & Associates Economists Ltd. PAGE E-10 H:\Brant\2023 DC\Report\Final Report.docx E.4.1 Infrastructure Assets Constructed by Developers a. All infrastructure assets constructed by developers must be designed in accordance with the municipality's standards as revised. b. All infrastructure assets shall be conveyed in accordance with the municipality's standards as revised. c. Any parks and open space infrastructure assets approved to be built by the developer on behalf of the municipality shall be in accordance with the municipality's policies as revised. E.5 Underground Services (Stormwater, Water and Sanitary Sewers) Underground services (linear infrastructure for stormwater, water, and sanitary services) within the road allowance are not included in the cost of road infrastructure and are treated separately. The responsibility for such services as well as stormwater management ponds and pumping stations, which are undertaken as part of new developments or redevelopments, will be determined by the following principles: The costs of the following items shall be direct developer responsibilities as a local service: a. Providing all underground services internal to the development, including storm, water, sanitary services and appurtenances. b. Providing service connections from existing underground services to the development. c. Providing new underground services or upgrading existing underground services external to the development if the services are required to service the development, and if the pipe sizes do not exceed 300 mm for water and sanitary services and 900 mm for stormwater services. If external services are required by two or more developments, the developer for the first development will be responsible for the cost of the external services and may enter into front- ending/cost-sharing agreements with other developers independent of the municipality. Watson & Associates Economists Ltd. PAGE E-11 H:\Brant\2023 DC\Report\Final Report.docx d. Providing stormwater management ponds and other facilities required by the development including all associated features such as landscaping and fencing. e. Water booster pumping stations, reservoir pumping stations and/or sanitary pumping stations serving individual developments or areas that may include more than one development and local cost sharing may be applied. Cost sharing may include a combination of Development Charges, developer contributions, and benefit to existing users. This may involve cost sharing from the County or others. If the project is not identified in the County's capital plan or DC Background study, it may be necessary for the developer to front-end finance the project. The costs of the following items shall be paid through D.C.s: f. External underground services involving trunk infrastructure and pipe sizes exceeding 300 mm for water and sanitary services and 900 mm for stormwater services when upsizing is required by more than one development. g. Water treatment, storage facilities, re-chlorination/sampling stations and wells not required for an individual development. h. Wastewater treatment plants. Watson & Associates Economists Ltd. PAGE F-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 H:\Brant\2023 DC\Report\Final Report.docx Appendix F: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which are to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 H:\Brant\2023 DC\Report\Final Report.docx Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE F-4 H:\Brant\2023 DC\Report\Final Report.docx made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the County prepared an A.M.P. in 2023 for its existing assets; however, it did not take into account future growth-related assets for all services included in the D.C. calculations. As a result, the asset management requirement for the D.C. must be undertaken in the absence of this information. In recognition to the schematic above, the following table (presented in 2024 $) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C.-eligible capital costs are not included in the County's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that will require financing from municipal financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2024 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $98.90 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are approximately $38.79 million. This amount, totalled with the existing operating revenues of approximately $139.88 million, provides annual revenues of approximately $178.67 million by the end of the period. Watson & Associates Economists Ltd. PAGE F-5 H:\Brant\2023 DC\Report\Final Report.docx 6. In consideration of the above, the capital plan is deemed to be financially sustainable. County of Brant Asset Management - Future Expenditures and Associated Revenues 2024$ Asset Management - Future Expenditures and Associated Revenues 20 Year Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 $14,695,276 Annual Debt Payment on Post Period Capital2 $15,426,245 Annual Lifecycle $47,462,021 Incremental Operating Costs (for D.C. Services) $21,332,842 Total Expenditures $98,916,384 Revenue (Annualized) Total Existing Revenue3 $139,878,317 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $38,786,708 Total Revenues $178,665,025 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix G Proposed D.C. By-Law Watson & Associates Economists Ltd. PAGE G-1 H:\Brant\2023 DC\Report\Final Report.docx Appendix G: Proposed D.C. By-Law By-law Number _____ - of - The Corporation of the County of Brant Being a by-law of the Corporation of the County of Brant with respect to development charges. WHEREAS section 2(1) of the Development Charges Act, 1997 (hereinafter called "the Act") enables the Council of a municipality to pass by-laws for the imposition of development charges against land located in the municipality for increased capital costs required because of the need for services arising from development in the area to which the by-law applies; AND WHEREAS the Council of the Corporation of the County of Brant (hereinafter called "the Council"), at its public meeting of June 25, 2024, approved a report dated May 24, 2024 entitled "County of Brant, 2024 Development Charge Background Study", which report was prepared by Watson & Associates Economists Ltd.; AND WHEREAS the Council has given Notice in accordance with Section 12 of the Development Charges Act, 1997 of its development charge proposal and held a public meeting on June 25, 2024; AND WHEREAS the Council has heard all persons who applied to be heard in objection to, or in support of, the development charge proposal at such public meeting; NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE COUNTY OF BRANT HEREBY enacts as follows: 1. In this by-law, DEFINITIONS (1) "Act" means the Development Charges Act, 1997, c.27; DRAFT Watson & Associates Economists Ltd. PAGE G-2 H:\Brant\2023 DC\Report\Final Report.docx (2) "accessory" use means a use of land, building or structures, which is incidental and subordinate to the principal use of the lands, buildings or structures; (3) "affordable residential unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1 (2) or 4.1(3) of the Act. (4) "apartment dwelling" means any residential dwelling unit within a building containing five or more dwelling units where the residential units are connected by an interior corridor, and includes a stacked townhouse; (5) "attainable residential unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1(4) of the Act. (6) "back-to-back townhouse" means a building where each dwelling unit is divided vertically by common walls, including a common rear wall and common side wall, and has an independent entrance to the dwelling unit from the outside accessed through the front year, side yard or exterior side yard and does not have a rear yard; (7) "bedroom" means a habitable room larger than seven square metres, including a den, study or other similar area, but does not include a living room, dining room or kitchen; (8) "board of education" means a board defined in s.s.1(1) of the Education Act; (9) "Building Code Act" means the Building Code Act, S.O. 1992, ch.23, amended; (10) "cannabis" Shall mean a genus of flowering plants in the family Cannabaceae. Synonyms include, but are not limited to, marijuana and marihuana. This definition does not include the industrial or agricultural production of hemp (a source of foodstuffs (hemp milk, hemp seed, hemp oil), fiber and biofuels); (11) "cannabis production and processing" Shall mean lands, buildings, or structures used for the production, processing, testing, destroying, packaging, storage and/or shipping of cannabis authorized by an issued DRAFT Watson & Associates Economists Ltd. PAGE G-3 H:\Brant\2023 DC\Report\Final Report.docx license or registration by the federal Minister of Health, pursuant to the Access to Cannabis for Medical Purposes Regulations, SOR/2016-230, to the Controlled Drugs and Substances Act, SC 1996, c 19, and the Cannabis Act, S.C. 2018, c. 16, as amended from time to time, or any successors thereto; (12) "capital cost" shall have the same meaning as described in Section 5 of the Development Charges Act, 1997, as amended; (13) "class" means a grouping of services combined to create a single service for the purposes of this by-law and as provided in section 7 of the Act; (14) "council" means the Council of the Corporation of the County of Brant; (15) "development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of increasing the size or usability thereof, and includes redevelopment; (16) "development charge" means a charge imposed against land in the municipality under this by-law; (17) "duplex dwelling" means a building other than a converted dwelling that is divided horizontally into two (2) separate dwelling units each of which has an independent entrance either directly from the outside or through a common entrance; (18) "dwelling unit" means any part of a building or structure used, designed or intended to be used as a domestic establishment in which one or more persons may sleep and are provided with culinary and sanitary facilities for their exclusive use; (19) "existing industrial building" means a building or structure in existence for the purpose of industrial use as per the County of Brant zoning by-law and or which occupancy has been granted for such building; (20) "farm building" means that part of a bona fide farming operation encompassing barns, silos and other ancillary development to an agricultural use, but excluding a residential use; DRAFT Watson & Associates Economists Ltd. PAGE G-4 H:\Brant\2023 DC\Report\Final Report.docx (21) "farm bunk house" means a temporary dwelling used for the housing of seasonal farm workers which is intended not to be used year-round and not used as a permanent residence and includes a communal kitchen, bathrooms and sleeping facilities and may include a mobile home. (22) "garden suite" means a one-unit detached residential structure containing bathroom and kitchen facilities that is ancillary to an existing residential structure and that is designed to be portable; (23) "grade" means the average level of finished ground adjoining a building or structure at all exterior walls; (24) "gross floor area" means the total area of all floors above grade measured between the outside surfaces of the exterior walls or between the outside surfaces of exterior walls and the centre line of firewalls, this also includes the floor areas of covered roofs, canopies, decks, walkways and thoroughfares; (25) "heavy industrial" means employment uses associated with significant land use impacts such as odour, noise, dust, smoke, vibration, the potential for fire and explosive hazards, etc. Development includes manufacturing facilities, the storage, processing, refinement or production of hazardous, toxic or substances, etc. (26) "industrial building means a building used for or in connection with, (a) manufacturing, producing, processing, storing or distributing goods; (b) research or development in connection with manufacturing, producing, or processing goods, (c) retail sales by a manufacturer, producer or processor of goods they manufactured, produced or processed, if the retail sales are at the site where the manufacturing, production or processing takes place, (d) cannabis production and processing; (e) office or administrative purposes, if they are, DRAFT Watson & Associates Economists Ltd. PAGE G-5 H:\Brant\2023 DC\Report\Final Report.docx a. carried out with respect to manufacturing, producing, processing, storage or distribution of goods, and b. in or attached to the building or structure used for that manufacturing, producing, processing, storage or distribution; (27) "Institutional development" means development of a building or structure that meets the criteria set out in section 11.1(2) of O.Reg. 82/98 to the Act; (28) "Interest rate" means the annual rate of interest calculated at the County's D.C. Interest Policy; (29) "local board" means a public library board, local board of health, or any other board, commission, committee or body or local authority established or exercising any power or authority under any general or special Act with respect to any of the affairs or purposes of the municipality or any part or parts thereof; (30) "local services" means those services, facilities or things which are under the jurisdiction of the municipality and are related to a plan of subdivision or within the area to which the plan relates required as a condition of approval under s.51 of the Planning Act, or as a condition of approval under s.53 of the Planning Act; (31) "multiple dwellings" means all dwellings other than single-family dwellings, semi-detached dwellings, apartment dwellings and garden suite dwellings, but includes a back-to-back townhouse. (32) "municipality" means the Corporation of the County of Brant; (33) "mobile home" means a prefabricated building designed to be made mobile whether the running gear is removed or not and manufactured to provide cooking, eating, living, sleeping and sanitary facilities constructed to Canadian Standards Association (CSA) and which is designed to be used as a place of residence; (34) "non-profit housing development" means Development of a building or structure that meets the criteria set out in section 4.2 of the Act. DRAFT Watson & Associates Economists Ltd. PAGE G-6 H:\Brant\2023 DC\Report\Final Report.docx (35) "non-residential use" means a building or structure used for other than a residential use and includes a long-term care facility; (36) "Official Plan" means the Official Plan of the Corporation of the County of Brant and any amendments thereto; (37) "owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed; (38) "place of worship" means that part of a building or structure that is exempt from taxation as a place of worship under paragraph 3 of Section 3 of the Assessment Act, R.S.O. 1990, c.A.31, as amended; (39) "Planning Act" means the Planning Act, 1990, c.P.-13, as amended; (40) "regulation" means any regulation made pursuant to the Act; (41) "rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; (42) "residential use" means land or buildings or structures of any kind whatsoever used, designed or intended to be used as living accommodations for one or more individuals; (43) "retirement home" or an "assisted living facility" means a residential building which provides accommodation primarily for retired persons or couples where each private living accommodation has a separate private bathroom and separate entrance from a common hall and which may or may not provide in-unit partial or full culinary facilities but where common facilities for the preparation and consumption of food are provided, and common lounges, recreation rooms and medical care facilities may also be provided; (44) "semi-detached dwelling" means two (2) single dwellings attached with a common wall, dividing the pair of single dwellings vertically, each of which has an independent entrance either directly from the outside or through a common vestibule; DRAFT Watson & Associates Economists Ltd. PAGE G-7 H:\Brant\2023 DC\Report\Final Report.docx (45) "services" (or "service") means those services set out in Schedule A to this by-law; (46) "services in lieu" means those services specified in an agreement made under section 7 of this by-law; (47) "servicing agreement" means an agreement between a landowner and the municipality relative to the provision of municipal services to specified lands within the municipality; (48) "single detached dwelling" means a residential building consisting of one dwelling unit and not attached to another structure; (49) "Special care facilities" means lands, buildings or structures used or designed or intended for uses for the purpose of providing supervision, nursing care or medical treatment, which do not comprise dwelling units, that are licensed, approved or supervised under any special or general statute, and excludes the special care/special dwelling portions of the building. (50) "Special care/special dwelling" means a residential portion of a special care facilities building containing two or more dwelling units, which units have a common entrance from street level: (a) Where the occupants have the right to use in common, halls, stairs, yards, common rooms, and accessory buildings; (b) Which may or may not have exclusive sanitary and/or culinary facilities; (c) That is designed to accommodate persons with specific needs, including, but not limited to, independent permanent living arrangements; (d) Where support services such as meal preparation, grocery shopping, laundry, housekeeping, nursing, respite care and attendant services are provided at various levels; and DRAFT Watson & Associates Economists Ltd. PAGE G-8 H:\Brant\2023 DC\Report\Final Report.docx (e) Includes, but is not limited to, retirement homes, assisted living facilities, nursing homes, group homes and hospices. (51) "stacked townhouse" means one (1) building or structure containing two (2) townhouses divided horizontally, one atop the other, in a building that is divided into three (3) or more separate dwelling units; (52) "total floor area" means the total area of all floors above grade of a dwelling unit measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of party walls dividing the dwelling unit from another dwelling unit or other portion of a building; In the case of a non-residential building or structure, or in the case of a mixed-use building or structure in respect of the non-residential portion thereof, the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or between the outside surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: - a room or enclosed area within the building or structure above or below grade that is used exclusively for the accommodation of - heating, cooling, ventilating, electrical, mechanical or telecommunications equipment that service the building; - loading facilities above or below grade; and - a part of the building or structure below grade that is used for the parking of motor vehicles or for storage or other accessory use. 2. SCHEDULE OF DEVELOPMENT CHARGES (1) Subject to the provisions of this by-law, development charges against land shall be calculated and collected in accordance with the base rates set out in Schedule B, which relate to the service set out in Schedule A of this by- law. (2) The development charge with respect to the use of any land, buildings or structures shall be calculated, based on the charges in Schedule B, as follows: DRAFT Watson & Associates Economists Ltd. PAGE G-9 H:\Brant\2023 DC\Report\Final Report.docx (a) in the case of residential development, or the residential portion of a mixed-use development, based upon the number and type of dwelling units; (b) in the case of non-residential development, the non-residential portion of a mixed-use development which includes residential, based upon the total floor area of such development; (3) Council hereby determines that the development of land, buildings or structures for residential and non-residential uses have required or will require the provision, enlargement, expansion or improvement of the service referenced in Schedule A. (4) Notwithstanding subsection (1), the development of a residential or non- residential building is exempt from that portion of the development charges calculated for water and/or sewer service, if it is located outside of the area where one or both of these services are available and a tender has not been issued for the provision of such service as of the date of building permit issuance. 3. APPLICABLE LANDS (1) Subject to subsections (2), (3), (6) and (8), this by-law applies to all lands in the municipality, whether or not the lands or use is exempt from taxation under section 3 of the Assessment Act, 1990, c.A..31. (2) This by-law shall not apply to land that is owned by and used for the purposes of: (a) a board of education; (b) any municipality or local board thereof; (c) a non-residential farm building; (d) a farm bunk house; (e) Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of DRAFT Watson & Associates Economists Ltd. PAGE G-10 H:\Brant\2023 DC\Report\Final Report.docx post-secondary education is exempt from development charges imposed under the Development Charges Act, 1997 if the development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university; (f) Non-profit Residential Development; (g) Affordable Residential Units required pursuant to section 34 and 16(4) of the Planning Act (Inclusionary Zoning). (h) As of the date on which section 4.1 of the Act is proclaimed into force, the following shall be exempt from Development Charges: i. Affordable Residential Units; and ii. Attainable Residential Units (i) Notwithstanding any other provision of this By-law, the Development Charges payable for Residential Developments, where the Dwelling Units are intended as Rental Housing, will be reduced based on the number of bedrooms in each Dwelling Unit in accordance with section 26.2(1.1) of the Development Charges Act, as follows: i. Three (3) or more Bedrooms - 25% reduction; ii. (ii) Two (2) Bedrooms - 20% reduction; and iii. (iii) Fewer than two (2) Bedrooms - 15% reduction. Rules with Respect to Exemptions for Intensification of Existing or New Housing (3) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to: (a) an enlargement to an existing Dwelling Unit; (b) the creation of additional Dwelling Units equal to the greater of one (1) or 1% of the existing Dwelling Units in an existing Residential DRAFT Watson & Associates Economists Ltd. PAGE G-11 H:\Brant\2023 DC\Report\Final Report.docx rental building containing four (4) or more Dwelling Units or prescribed ancillary structure to the existing Residential building; (4) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to the creation of any of the following within existing Single Detached Dwellings, Semi-Detached Dwellings, Back-to-back Townhouse Dwellings or Stacked Townhouse Dwellings: (a) A second Dwelling Unit on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if all buildings and structures ancillary to the existing Residential structure cumulatively contain no more than one (1) Dwelling Unit. (b) A third Dwelling Unit on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if no building or structure ancillary to the existing Residential structure contains any Dwelling Units. (c) One Dwelling Unit on a parcel of urban Residential land, if the existing structure contains no more than two (2) Dwelling Units and no other building or structure ancillary to the existing Residential structure contains any Dwelling Units. (5) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to the creation of any of the following in new Single Detached Dwellings, Semi-Detached Dwellings, Back-to-back Townhouse Dwellings or Stacked Townhouse Dwellings: (a) A second Dwelling Unit on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if all buildings and structures ancillary to the new Residential structure cumulatively will contain no more than one (1) Dwelling Unit. (b) A third Dwelling Unit on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if no building or structure ancillary to the new Residential structure contains any Dwelling Units. DRAFT Watson & Associates Economists Ltd. PAGE G-12 H:\Brant\2023 DC\Report\Final Report.docx (c) One (1) Dwelling Unit in a building or structure ancillary to a new Residential structure on a parcel of urban Residential land, if the new Residential structure contains no more than two (2) Dwelling Units and no other building or structure ancillary to the new Residential structure contains any Dwelling Units. Rules with Respect to an Industrial Expansion Exemptions (6) If a development includes the enlargement of the gross floor area of an existing industrial building, the amount of the development charge that is payable in respect of the enlargement is determined in accordance with the following: (a) Subject to subsection 6 (c), if the gross floor area is enlarged by 50 percent or less of the lesser: (A) the gross floor area of the existing industrial building, or (B) the gross floor area of the existing industrial building before the first enlargement for which: i. an exemption from the payment of development charges was granted, or ii. a lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to Section 4 of the Act and this subsection, the amount of the development charge in respect of the enlargement is zero; (b) Subject to subsection 6 (c), if the gross floor area is enlarged by more than 50 per cent or less of the lesser of: (A) the gross floor area of the existing industrial building, or (B) the gross floor area of the existing industrial building before the first enlargement for which: DRAFT Watson & Associates Economists Ltd. PAGE G-13 H:\Brant\2023 DC\Report\Final Report.docx i. an exemption from the payment of development charges was granted, or ii. a lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to Section 4 of the Act and this subsection, the amount of the development charge in respect of the enlargement is the amount of the development charge that would otherwise be payable multiplied by the fraction determined as follows: (A) determine the amount by which the enlargement exceeds 50 per cent of the gross floor area before the first enlargement, and (B) divide the amount determined under subsection (A) by the amount of the enlargement (c) For the purpose of calculating the extent to which the gross floor area of an existing industrial building is enlarged in subsection 6 (a) and 6 (b), the cumulative gross floor area of any previous enlargement for which: (A) An exemption from the payment of development charges was granted, or (B) A lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to section 4 of the Act and this subsection, shall be added to the calculation of the gross floor area of the proposed enlargement. (d) For the purpose of this subsection, the enlargement must not be attached to the existing industrial building by means only of a DRAFT Watson & Associates Economists Ltd. PAGE G-14 H:\Brant\2023 DC\Report\Final Report.docx tunnel, bridge, passageway, canopy, shared below grade connection, such as a service tunnel, foundation, footing or parking facility. (7) That where a conflict exists between the provisions of this by-law and any other agreement between the County and the owner, with respect to land to be charged under this policy, the provisions of such agreement prevail to the extent of the conflict. 4. APPLICATION OF CHARGES (1) Subject to subsection (2), development charges shall apply to, and shall be calculated and collected in accordance with the provisions of this bylaw on land to be developed for residential and non-residential use, where, (a) the development requires, a. the passing of a zoning by-law or an amendment thereto under section 34 of the Planning Act, 1983, R.S.O. 1990, c.1; b. a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act, R.S.O. 1990, c.P.13 applies; c. the approval of a plan of subdivision under section 51 of the Planning Act, R.S.O. 1990, c.P.13; d. a consent under section 53 of the Planning Act, R.S.O. 1990, c. P. 13; e. the approval of a description under Section 50 of the Condominium Act, R.S.O. 1980, c.84; or f. the issuing of a permit under the Building Code Act, in relation to a building or structure. (2) Subsection (1) shall not apply in respect of: DRAFT Watson & Associates Economists Ltd. PAGE G-15 H:\Brant\2023 DC\Report\Final Report.docx (a) local services installed at the expense of the owner within a plan of subdivision or within the area to which the plan relates, as a condition of approval under section 51 of the Planning Act, R.S.O. 1990, c.P.13; (b) local services installed at the expense of the owner as a condition of approval under section 53 of the Planning Act, R.S.O. 1990, c.P.13. 5. LOCAL SERVICE INSTALLATION Nothing in this by-law prevents Council from requiring, as a condition of an agreement under sections 40, 51 or 53 of the Planning Act, that the owner, at his or her own expense, shall install such local services within the plan of subdivision, and otherwise, as Council may require, that the owner pay for, or install local services within the area to which the plan relates. 6. MULTIPLE CHARGES (1) Where two or more of the actions described in subsection 4 (1) are required before land to which a development charge applies can be developed, only one development charge shall be calculated and collected in accordance with the provisions of this by-law. (2) Notwithstanding subsection (1), if two or more of the actions described in subsection 4 (1) occur at different times, and if the subsequent action has the effect of increasing the need for the municipal service as set out in Schedule A, an additional development charge on the additional residential units and/or non-residential floor area, shall be calculated and collected in accordance with the provisions of this by-law. 7. SERVICES IN LIEU (1) Council may authorize an owner, through an agreement under section 38 of the Act, to substitute such part of the development charge applicable to the owner's development as may be specified in the agreement, by the provision at the sole expense of the owner, of services in lieu. Such agreement shall further specify that where the owner provides services in DRAFT Watson & Associates Economists Ltd. PAGE G-16 H:\Brant\2023 DC\Report\Final Report.docx lieu in accordance with the agreement, Council shall give to the owner a credit against the development charge in accordance with the agreement provisions and the provisions of section 39 of the Act, equal to the reasonable cost to the owner of providing the services in lieu. In no case shall the agreement provide for a credit which exceeds the total development charge payable by an owner to the municipality in respect of the development to which the agreement relates. (2) In any agreement under section 7 (1), Council may also give a further credit to the owner equal to the reasonable cost of providing services in addition to, or of a greater size or capacity, than would be required under this by-law. (3) The credit provided for in subsection (2) shall not be charged to any development charge reserve fund prescribed in this by-law. 8. DEVELOPMENT CHARGE CREDITS (1) In the case of the demolition or conversion of all or part of a residential or non-residential building, a credit shall be allowed, provided that the building permit for the development or redevelopment is issued within five (5) years of the demolition permit that has been issued. The owner shall be allowed a credit equivalent to: (a) the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable; and/or (b) the total floor area of the building demolished/converted multiplied by the applicable non-residential development charge in place at the time the development charge is payable. The demolition credit is allowed only if the land was improved by occupied structures immediately prior to the demolition. (2) The credit can, in no case, exceed the amount of development charges that would otherwise be payable by the owner. 9. TIMING OF CALCULATION AND PAYMENT DRAFT Watson & Associates Economists Ltd. PAGE G-17 H:\Brant\2023 DC\Report\Final Report.docx (1) Development charges shall be calculated and payable in full in money or by provision of services as may be agreed upon, or by credit granted by the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies, or in a manner or at a time otherwise lawfully agreed upon. (2) Where development charges apply to land in relation to which a building permit is required, the building permit shall not be issued until the development charge has been paid in full. (3) Notwithstanding subsections (1) and (2), an owner may enter into an agreement with the municipality to provide for the payment in full of a development charge before building permit issuance or later than the issuing of a building permit. (4) Notwithstanding subsections 9(1) and 9(2), development charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of first occupancy certificate issued, and each subsequent installment, including interest (calculated in accordance with section 26.3 of the Act), payable on the anniversary date each year thereafter. (5) Where the development of land results from the approval of a site plan or zoning by-law amendment application received on or after January 1, 2020, and the approval of the application occurred within two years of building permit issuance, the development charges under section 4 of this by-law shall be calculated on the rates set out in Schedule "B" on the date of the receipt of a complete planning application, including interest. Where both planning applications apply development charges under section 4 of this by-law shall be calculated on the rates payable on the anniversary date each year thereafter, set out in Schedule "B" on the date of the later planning application, including interest (calculated in accordance with section 26.3 of the Act). 10. BY-LAW REGISTRATION A certified copy of this by-law may be registered on title to any land to which this by-law applies. DRAFT Watson & Associates Economists Ltd. PAGE G-18 H:\Brant\2023 DC\Report\Final Report.docx 11. RESERVE FUNDS (1) Monies received from payment of development charges shall be maintained in a separate reserve funds for each of the services in Schedule "A". (2) Monies received for the payment of development charges shall be used only in accordance with the provisions of section 35 of the Act. (3) Council directs the Municipal Treasurer to divide the reserve funds created hereunder into the separate sub-accounts in accordance with the service categories set out in Schedule "A" to which the development charge payments shall be credited in accordance with the amounts shown, plus interest earned thereon. (4) Where any development charge, or part thereof, remains unpaid after the due date, the amount unpaid shall be added to the tax roll and shall be collected as taxes. (5) Where any unpaid development charges are collected as taxes under subsection (3), the monies so collected shall be credited to the development charge reserve fund referred to in subsection (1). (6) The Treasurer of the Municipality shall, commencing in 2020 for the 2019 year, furnish to Council a statement in respect of the reserve fund established hereunder for the prior year, containing the information set out in sections 12 and 13 of O.Reg. 82/98. 12. BY-LAW AMENDMENT OR REPEAL (1) Where this by-law or any development charge prescribed thereunder is amended or repealed by order of the Ontario Municipal Board or by resolution of the Municipal Council, the Municipal Treasurer shall calculate forthwith the amount of any overpayment to be refunded as a result of said amendment or repeal. (2) Refunds that are required to be paid under subsection (1) shall be paid to the registered owner of the land on the date on which the refund is paid. DRAFT Watson & Associates Economists Ltd. PAGE G-19 H:\Brant\2023 DC\Report\Final Report.docx (3) Refunds that are required to be paid under subsection (1) shall be paid with interest to be calculated as follows: (a) interest shall be calculated from the date on which the overpayment was collected to the day on which the refund is paid; (b) the refund shall include the interest owed under this section; (c) interest shall be paid at the Bank of Canada rate in effect on the date of enactment of this by-law. 13. DEVELOPMENT CHARGE SCHEDULE INDEXING The development charges referred to in Schedule B shall be adjusted annually, without amendment to this by-law, commencing September 1, 2025, and annually thereafter in each September while this by-law is in force, in accordance with the Act. 14. BY-LAW ADMINISTRATION This by-law shall be administered by the Municipal Treasurer. 15. SCHEDULES TO THE BY-LAW The following schedules to this by-law form an integral part of this by-law: Schedule A - Designated Municipal Services/Classes of Services Schedule B - Schedule of Development Charges 16. DATE BY-LAW EFFECTIVE This by-law shall come into force and effect on ________, 2024. 17. DATE BY-LAW EXPIRES This by-law will expire on _________, 2034 which is ten years from the passage of By-law _____. 18. EXISTING DEVELOPMENT CHARGE BY-LAW REPEAL DRAFT Watson & Associates Economists Ltd. PAGE G-20 H:\Brant\2023 DC\Report\Final Report.docx By-law 100-19, as amended is repealed effective _______, 2024. 19. SEVERABILITY If, for any reason, any provision, section, subsection or paragraph of this by-law is held to be invalid, it is hereby declared to be the intention of Council that all of the remainder of this by-law shall continue in full force and effect until repealed, re-enacted or amended, in whole or in part or dealt with in any other way. 20. SHORT TITLE This by-law may be cited as the "Brant County-wide Development Charge By- law." READ a first and second time, this 23rd day of July, 2024. READ a third time and finally passed in Council, this 23rd day of July, 2024. THE CORPORATION OF THE COUNTY OF BRANT ______________________________________ David Bailey, Mayor _______________________________________ Alysha Dyjach, Clerk DRAFT Watson & Associates Economists Ltd. PAGE G-21 H:\Brant\2023 DC\Report\Final Report.docx BY-LAW NUMBER ____ SCHEDULE "A" DESIGNATED MUNICIPAL SERVICE UNDER THIS BY-LAW County-wide Services 1. Services Related to a Highway: Roads and Related Public Works (Facilities and Fleet) 2. Fire Protection Services: Facilities Vehicles and Equipment Small Equipment and Gear 3. Policing Services: Facilities 4. Parks and Recreation Services: Parkland Development Parkland Amenities Parkland Trails Recreation Facilities Parks and Recreation Vehicles and Equipment 5. Library Services: Facilities Collection Materials Vehicles 6. Ambulance Services: Ambulance Facilities Ambulance Vehicles 7. Long-Term Care: Facilities 8. Waste Diversion: DRAFT Watson & Associates Economists Ltd. PAGE G-22 H:\Brant\2023 DC\Report\Final Report.docx Facilities - Stations/Depots Vehicles and Equipment Urban Area Services 9. Stormwater Drainage and Control Services 10. Wastewater Services: Treatment Collection 11. Water Services Treatment Distribution DRAFT Watson & Associates Economists Ltd. PAGE G-23 H:\Brant\2023 DC\Report\Final Report.docx SCHEDULE "B" TO BY-LAW _____ OF BRANT COUNTY SCHEDULE OF DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) County-Wide Services: Services Related to a Highway 14,521 9,497 9,991 6,573 5,179 4.62 Fire Protection Services 2,645 1,730 1,820 1,197 943 0.84 Policing Services 297 194 204 134 106 0.09 Parks and Recreation Services 16,022 10,479 11,024 7,253 5,715 0.70 Library Services 2,570 1,681 1,768 1,163 917 0.12 Long-term Care Services 1,008 659 694 456 360 0.10 Ambulance 318 208 219 144 113 0.03 Waste Diversion 255 167 175 115 91 0.01 Total County-Wide Services 37,636 24,615 25,895 17,035 13,424 6.51 Urban Services: Stormwater Drainage and Control Services 445 291 306 201 159 0.13 Wastewater Services 23,601 15,436 16,239 10,683 8,418 7.12 Water Services 14,001 9,157 9,634 6,338 4,994 4.17 Total Urban Services 38,047 24,884 26,179 17,222 13,571 11.42 Total County-Wide and Urban Services 75,683 49,499 52,074 34,257 26,995 17.93 Service RESIDENTIAL DRAFT