Consolidated Report
Prepared by Hemson for the Township of Brock
Development Charges Study
July 10, 2024
1000 - 30 St. Patrick Street, Toronto, ON M5T 3A3
416 593 5090 | [email protected] | www.hemson.com
Contents
Executive Summary
1
1.
Introduction
6
A.
Legislative Context
7
B.
Relevant Analysis
8
2.
The DC Methodology Aligns Development-Related Costs
and Benefits
9
A.
Township-wide Development Charges are Proposed
9
B.
Key Steps when Determining Development Charges for
Future Growth Related Projects
10
3.
Development Forecast
15
4.
Historical Capital Services Levels
17
5.
Development-Related Capital Forecast
19
A.
Development-Related Capital Program is Provided for
Council's Approval
19
B.
The Development-Related Capital Forecast for Township
Services
20
6.
Development Charges are Calculated in Accordance with
the DCA
23
A.
Development Charges Calculation
23
B.
Comparison of 2024 Newly Calculated Development
Charges with Charges Currently In-Force in Brock
28
7.
Long-Term Capital and Operating Costs
30
A.
Net Operating Costs for the Township's Services to
Increase 0ver the Forecast Period
30
B.
Long-Term Capital Financing from Non-Development
Charges Sources
31
C.
Asset Management Plan
32
D.
Annual Capital Provisions by 2034
32
8.
Development Charges Administration
34
A.
Development Charge Administration
34
B.
Township-wide vs. Area Specific Development Charges
35
C.
Draft Local Service Definitions
36
List of Appendices
Appendix A - Development Forecast
39
Appendix B - Township-wide Services Technical Appendix
54
B.1 Library, Parks & Recreation
60
B.2 Fire Services
72
B.3 By-law Enforcement
78
B.4 Development Related Studies
84
B.5 Services Related to a Highway: Public
Works - Building & Fleet
88
B.6 Services Related to a Highway: Roads
and Related
94
Appendix C - Reserve Fund Balances
100
Appendix D - Cost of Growth
103
Appendix E -2024 Development Charges By-Law
111
Executive Summary | 1
Executive Summary
A.
Purpose of Development Charges (DC) Background Study
Hemson Consulting Ltd. was retained by the Township of Brock to complete
a Development Charges Background Study (herein referred to as the "DC
Study"). This Background Study provides the basis and background required
to update the Township's development charges to accurately reflect the
future servicing needs of development.
i.
Study Consistent with Development Charges Legislation
This study calculates development charges for the Township of Brock in
compliance with the provisions of the Development Charges Act, 1997
(DCA) and its associated regulation Ontario Regulation 82/98 (O.Reg
82/98). This includes amendments to the DCA that came into force
through the More Homes, More Choice Act, the COVID-19 Economic
Recovery Act, and the More Homes Built Faster Act (Bill 23). During the
study process, the province proposed further changes to the DCA
through Bill 185, Cutting Red Tape to Build More Homes Act, 2024, which
received first reading in April 2024 before the public meeting. This
Background Study and associated by-law were prepared in anticipation
of the proposed changes and is in conformity with the current DCA as it
was the date this report was published.
The Township's current Development Charges By-Laws 2880-2019-PL
and 2881-2019-PL expire on June 18, 2019. Council must pass a new by-
law in order to continue to levy development charges.
The Township must continue implementing development charges to help
fund capital projects related to development throughout Brock so that
development continues to be serviced in a fiscally responsible manner.
The calculated changes to the development charges rates are required in
order to reflect the revised costs associated with new infrastructure
requirements.
Executive Summary | 2
ii.
Key Steps of the Development Charges Calculation
In accordance with the DCA and associated regulations, several key steps
are required to calculate development charges. This includes preparing a
development forecast, establishing historical service levels, determining the
increase in need for services arising from development and appropriate
shares of costs, attribution to development types (i.e. residential and non-
residential) and the final adjustment to the calculated rate of a cash flow
analysis.
iii.
DC Eligible and Ineligible Costs
Development charges are intended to pay for the initial round of capital
costs needed to service new development over an identified planning period.
This is based on the overarching principle that "growth pays for growth".
However, the DCA and associated regulation includes several statutory
adjustments and deductions that prevent these costs from fully being
recovered by growth. Such adjustments include but are not limited to:
ineligible costs including operating and maintenance costs; ineligible
services including tourism facilities parkland acquisition, etc.; deductions for
costs that exceed historical service level caps; and statutory exemptions for
specific uses (i.e. industrial expansions).
iv.
The Development-Related Capital Program is Subject to Change
It is recommended that Council adopt the development-related capital
program developed for the purposes of the 2024 DC Background Study.
However, it is recognized that the Background Study is a point-in-time
analysis and there may be changes to project timing, scope and costs
through the Township's normal annual budget process.
Executive Summary | 3
B.
Development Forecast
i.
Residential and Non-Residential
The table below provides a summary of the anticipated residential and non-
residential growth over the 2024 - 2033 planning period. The development
forecast is further discussed in Appendix A.
C.
Calculated Development Charges
The table below provides the Township-wide development charges for
residential and non-residential development based on the forecast.
2023
Estimate
Residential
Total Dwellings
4,937
812
5,748
Population in New Units
2,469
Census Population
12,952
2,113
15,065
Non-Residential
Employment
3,174
518
3,691
Non-Residential Building Space (sq.m.)
25,392
Growth
Total at
2033
Growth Forecast
General Services
Planning Period
2024 - 2033
Executive Summary | 4
Calculated Township-wide Development Charges
D.
Cost of Growth
An overview of the long-term capital and operating costs for the capital
facilities and infrastructure to be included in the DC by-law is provided in
the study. This examination is required as one of the provisions of the DCA.
Additional details on the long-term capital and operating impact analysis is
found in Appendix D. By 2033, the Township's net operating costs are
estimated to increase by about $2.6 million.
A key function of the Asset Management Plan is to demonstrate that all
assets proposed to be funded under the development charges by-law are
financially sustainable over their full life cycle.
By 2034, the Township will need to fund an additional $872,035 per annum
in order to properly fund the full life cycle costs of the new assets supported
under the 2024 Development Charges By-law.
E.
Key Recommendations
It is recommended that the Township's present practices regarding
collection of development charges and by-law administration continue to
the extent possible;
Non-Residential
Development Related Studies
$585
$455
$280
$3.48
Library, Parks & Recreation
$14,468
$11,241
$6,918
$0.00
Fire Services
$2,619
$2,035
$1,252
$15.58
By-Law Services
$212
$165
$101
$1.26
Public Works: Buildings & Fleet
$3,088
$2,400
$1,477
$18.38
Roads And Related
$10,410
$8,089
$4,978
$61.95
TOTAL CHARGE
$31,383
$24,385
$15,006
$100.65
Service
Single &
Semi-Detached
Row Dwellings
& Other
Multiples
Apartment
Charge per
Square Metre
Residential Charge By Unit Type
Executive Summary | 5
As required under the DCA, the Township should codify any rules
regarding application of the by-laws and any exemptions within the
development charges by-laws proposed for adoption;
It is recommended that Council adopt the development-related capital
forecast included in this background study, subject to annual review
through the Township's normal capital budget process; and
No substantial changes to the Township's prevailing local service
definitions and policies are being considered.
F.
Modifications to the Township's Development Charges
By-law are Proposed
Draft DC by-law(s) were made available, a minimum of two weeks in
advance of the statutory public meeting. The DC By-law reflects the latest
legislative changes including Additional Dwelling Units, Rental Housing
discounts, Non-profit Housing Exemptions and others.
Introduction | 6
1. Introduction
The Development Charges Act, 1997 (DCA) and its associated Ontario
Regulation 82/98 (O. Reg. 82/98) allow municipalities in Ontario to recover
growth-related capital costs from new development. The Township of Brock
Development Charges Background Study is presented as part of a process to
establish a development charges by-law that complies with this legislation.
The anticipated growth in Brock will increase the demand on all Township
services. The Township wishes to implement development charges to fund
capital projects related to growth in Brock so that development continues to
be serviced in a fiscally responsible manner.
When a development charges by-law is proposed, the DCA and O. Reg.
82/98 require that a development charges background study be prepared in
support of the proposed changes with reference to:
A forecast of the amount, type and location of development anticipated in
the Township;
The average capital service levels provided in the Township over the
fifteen-year period immediately preceding the preparation of the
background study;
A review of future capital projects, including an analysis of gross
expenditures, funding sources, and net expenditures incurred, or to be
incurred, by the Township or its local boards to provide for the expected
development, including the determination of the growth and non-growth-
related components of the capital projects; and
An examination of the long-term capital and operating costs for the
capital infrastructure required for each service to which the development
charges by-laws would relate.
Introduction | 7
This study identifies the development-related net capital costs attributable
to development that is forecast to occur in the Township. The costs are
apportioned to types of development (residential and non-residential) in a
manner that reflects the increase in the need for each service attributable to
each type of development.
The DCA provides for a period of public review and comment regarding the
calculated development charges. This process includes considering and
responding to comments received by members of the public about the
calculated charges. Following completion of this process, and in accordance
with the DCA and Council's review of this study, Council has passed a new
development charges by-law for the Township on June 10th, 2024.
The remainder of this study sets out the information and analysis upon
which the calculated development charges are based.
A.
Legislative Context
The study is prepared in accordance with the DCA and associated
regulations, including the amendments that came into force most recently on
November 28, 2022 as per Bill 23: More Homes Built Faster Act, 2022 and an
anticipation of passing Bill 185: Cutting Red Tape to Build More Homes Act,
2024. Bill 185 received Royal Assent on June 6, 2024, just before the passing
of the Town's DC By-law 3274-2024. Key legislative changes include:
Five-year mandatory phase-in of the calculated DC rates (beginning with
a 20% reduction in Year 1, decreasing by 5% annually until Year 5) has
been removed as of June 6, 2024 following Royal Assent of Bill 185;
Historical service level standards have been extended from a 10 to 15-
year planning period;
DC by-laws now expire every 10 years instead of 5 years;
Introduction | 8
The amount of interest paid on DC deferrals and freeze is capped at
prime plus 1%;
The length of time for freezing of DCs under Section 26.2 of the DCA is
reduced to 18 months from two years following Council approval;
Costs associated with affordable housing services are now ineligible for
recovery through DCs;
Costs associated with development related studies are now eligible again
for recovery from DCs. The DC Study anticipated this change as it was
announced in December 2023 by the Minister of MMAH;
Municipalities must spend or allocate 60% of available DC reserve funds
per year for roads, water and wastewater services;
Discounts for purpose built rentals based on the number of bedrooms;
and
Exemption for affordable housing was brought into force on June 1, 2024
by Proclamation by the Lieutenant Governor of Ontario.
The attainable housing developments exemption from the payment of DCs
have not yet been released and therefore, these changes are not yet in
force.
B.
Relevant Analysis
The underlying assumptions and calculation methodologies contained in the
DC Background Study have been informed by a range of inputs including the
Township's capital budget, existing master plans, and discussions with
Township staff.
The DC Methodology Aligns Development-Related Costs and Benefits | 9
2. The DC Methodology Aligns Development-
Related Costs and Benefits
Several key steps are required when calculating any development charge,
however, specific circumstances arise in each municipality which must be
reflected in the calculation. In this study, we have tailored our approach to the
Township of Brock's unique circumstances. The approach to the calculated
development charges is focused on providing a reasonable alignment of
growth-related costs with the development that necessitates them. This
study uses a Township-wide approach for all services provided by the
Township of Brock. The Background Study provides an update to the
historical service levels and the cost of providing future development-related
capital infrastructure.
A.
Township-wide Development Charges are Proposed
The DCA provides municipalities with flexibility to define services that will
be included in the development charges by-laws, provided that its other
provisions, as well as those of O. Reg. 82/98, are met. The DCA also requires
that Council give consideration to the use of area-specific development
charges. The development charges may apply to all lands in a municipality
or to other designated development areas as specified in the by-laws.
A range of capital infrastructure is available, and all Brock residents and
employees have access to this infrastructure throughout the Township. As
new development occurs, new infrastructure will be needed in order to
maintain overall service levels in the Township. A widely accepted method of
sharing the development-related capital costs for such Township services is
to apportion them over all anticipated growth.
The DC Methodology Aligns Development-Related Costs and Benefits | 10
The following services are included in the development charges calculations:
Development Related Studies
Library, Parks & Recreation
Fire Services
By-law Services
Services Related to a Highway: Public Works - Buildings & Fleet
Services Related to a Highway: Roads and Related
These services form a reasonable basis in which to plan and administer the
Township-wide development charges. It is noted that the analysis of each of
these services examines the individual capital facilities and equipment that
constitute it. The resulting development charges for these services would be
imposed against all development in the Township.
B.
Key Steps when Determining Development Charges for
Future Growth Related Projects
Several key steps are required in calculating development charges for future
development-related projects. These are summarized in Figure 1 and
discussed further in the following sections.
The DC Methodology Aligns Development-Related Costs and Benefits | 11
Figure 1: Overview of DC Background Study Process
The DC Methodology Aligns Development-Related Costs and Benefits | 12
i.
Development Forecast
The first step in the methodology requires that a development forecast be
prepared for the ten-year study period from 2024 to 2033. The forecast of
future residential and non-residential development used in this study are
largely based on the targets prepared by Hemson Consulting. It is noted that
the targets used are less than Durham Region's Official Plan targets for the
Township, however they are greater than recent building activity. Through
analysis and discussion with staff, the Official Plan targets were deemed to
not be achievable in the short-term based on current development trends.
For the residential portion of the forecast both the census population growth
and population growth in new units is estimated. Net population growth
determines the need for additional facilities and provides the foundation for
the development-related capital program.
The non-residential portion of the forecast estimates the amount of building
space to be developed in the Township over the planning period. The
forecast is based on the projected increase in employment levels and the
anticipated amount of new building space required to accommodate it.
ii.
Service Categories and Historical Service Levels
The DCA states that the increase in the need for service attributable to
anticipated development:
... must not include an increase that would result in the level of
service exceeding the average level of that service provided in the
Township over the 15-year period immediately preceding the
preparation of the background study...(s. 5. (1) 4.)
Historical fifteen-year average service levels thus form the basis for the
development charges calculation. A review of the Township's capital service
levels for buildings, land, vehicles, equipment and others has therefore been
prepared as a reference for the calculation so that the portion of future
capital projects that may be included in the development charges can be
The DC Methodology Aligns Development-Related Costs and Benefits | 13
determined. The historical service levels used in this study have been
calculated based on the period from 2009 to 2023.
iii.
Development-Related Capital Forecast and Analysis of Net Capital
Costs to be included in the Development Charges
A development-related capital forecast has been prepared by Township staff
as part of the study. The forecast identifies development-related projects
and their gross and net costs, after allowing for capital grants, subsidies or
other contributions as required by the DCA s.5.(2). The capital forecast
provides another cornerstone upon which development charges are based.
The DCA requires that the increase in the need for service attributable to
the anticipated development may include an increase:
... only if the council of the Township has indicated that it intends to
ensure that such an increase in need will be met. (s. 5. (1) 3.)
S. 5. (1) 4. and s. 5. (2). require that the development charges be calculated
on the lesser of the historical fifteen-year average service levels or the
service levels embodied in the future plans of the Township. The
development-related capital forecast prepared for this study ensures that
development charges are only imposed to help pay for projects that have
been or are intended to be purchased or built in order to accommodate future
anticipated development. It is not sufficient in the calculation of development
charges merely to have had the service in the past. There must also be a
demonstrated commitment to continue to emplace facilities or infrastructure
in the future. In this regard, Ontario Regulation 82/98, s. 3 states that:
For the purposes of paragraph 3 of subsection 5 (1) of the Act, the
council of a municipality has indicated that it intends to ensure that
an increase in the need for service will be met if the increase in
service forms part of an official plan, capital forecast or similar
expression of the intention of the council and the plan, forecast or
similar expression of the intention of the council has been approved
by the council.
The DC Methodology Aligns Development-Related Costs and Benefits | 14
For some projects in the development-related capital forecast, a portion of
the project may confer benefits to existing residents. As required by the
DCA, s. 5. (1) 6., these portions of projects and their associated net costs
are the funding responsibility of the Township from non-development
charges sources. The amount of financing for such non-growth shares of
projects is also identified as part of the preparation of the development-
related capital forecast.
There is also a requirement in the DCA to reduce the applicable
development charges by the amount of any "uncommitted excess capacity"
that is available for a service. Such capacity is available to partially meet
future servicing requirements. Adjustments are made in the analysis to meet
this requirement of the Act.
iv.
Attribution to Types of Development
The next step in the determination of development charges is the allocation
of the development-related net capital costs between the residential and the
non-residential sectors. In the Township of Brock, the allocation is based on
the projected changes in population and employment over the planning
periods, the anticipated demand for services and other relevant factors.
The residential component of the development charges is applied to
different housing types based on average occupancy factors. The non-
residential component is applied on the basis of gross building space in
square metres.
Development Forecast | 15
3. Development Forecast
The DCA requires the Township to estimate "the anticipated amount, type
and location of development" for which development charges may be
imposed. The development forecast must cover both residential and non-
residential development and be specific enough with regards to quantum,
type, location and timing of development to allow the Township to prepare a
reasonable development-related capital program.
A ten-year development forecast, from 2024 to 2033, has been used for all
development charge eligible services. From 2024 - 2033 it is anticipated that
the Township will add approximately 812 new residential private dwelling
units within the ten-year period, which can accommodate a population of
2,470. In the same planning horizon, it is anticipated that the Township will
see a total GFA growth of 25,392 square metres of new non-residential
building space with an accompanying employment growth of 518.
Table 1 provides a summary of the residential and non-residential
development forecast used in this analysis.
Development Forecast | 16
TOWNSHIP OF BROCK
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL
GROWTH FORECAST
2023
Estimate
Residential
Total Dwellings
4,937
812
5,748
Population in New Units
2,469
Census Population
12,952
2,113
15,065
Non-Residential
Employment
3,174
518
3,691
Non-Residential Building Space (sq.m.)
25,392
TABLE 1
Growth
Total at
2033
Growth Forecast
General Services
Planning Period
2024 - 2033
Historical Capital Services Levels | 17
4. Historical Capital Services Levels
The DCA and O. Reg. 82/98 require that the development charges be set at
a level no higher than the average service level provided in the Township
over the fifteen-year period immediately preceding the preparation of the
background study, on a service-by-service basis.
For all Township services, the legislative requirement is met by documenting
historical service levels for the preceding ten years, in this case, for the
period 2008 to 2023. Typically, service levels are measured as a ratio of
inputs per capita (or per population and employment).
O. Reg. 82/98 requires that when defining and determining historical service
levels, both the quantity and quality of service be taken into consideration.
In most cases, the service levels are initially established in quantitative
terms. For example, service levels for buildings are presented in terms of
square feet per unit. The qualitative aspect is introduced by considering the
monetary value of a facility or service. In the case of buildings, for example,
the cost would be shown in terms of dollars per square foot to replace or
construct a facility of the same quality. This approach helps to ensure that
the development-related capital facilities that are to be charged to new
growth reflect not only the quantity (number and size) but also the quality
(value or cost) of services provided by the Township in the past. Both the
quantitative and qualitative aspects of service levels used in the current
analysis are based on information provided by Township staff. This
information is generally based on historical records and the Township's and
surrounding municipalities' experience with costs to acquire or construct
similar facilities, equipment and infrastructure.
Table 2 summarizes service levels for all services included in the
development charges calculations. Appendix B provides detailed historical
inventory data upon which the calculation of service levels is based for all
applicable services.
Historical Capital Services Levels | 18
TABLE 2
TOWNSHIP OF BROCK
SUMMARY OF AVERAGE HISTORIC SERVICE LEVELS 2009 - 2023
Service
1.0
LIBRARY, PARKS & RECREATION
$7,695.87 per capita
Library Board
$657.42 per capita
Developed Parkland
$527.15 per capita
Indoor Recreation - Major Facilities
$5,967.59 per capita
Park Development & Facilities
$385.75 per capita
Equipment and Other Outdoor Facilities
$157.96 per capita
2.0
FIRE SERVICES
$1,421.92 per pop & emp
Buildings
$704.58 per pop & emp
Land
$40.20 per pop & emp
Vehicles
$540.40 per pop & emp
Furniture & Equipment
$136.74 per pop & emp
3.0
BY-LAW SERVICES
$71.58 per pop & emp
Buildings
$65.73 per pop & emp
Land
$0.67 per pop & emp
Vehicles
$2.73 per pop & emp
Furniture & Equipment
$2.45 per pop & emp
4.0
PUBLIC WORKS: BUILDINGS & FLEET
$1,043.47 per pop & emp
Buildings
$656.77 per pop & emp
Land
$175.30 per pop & emp
Furniture & Equipment
$32.15 per pop & emp
Rolling Stock & Related Equipment
$179.25 per pop & emp
5.0
ROADS AND RELATED
$17,006.00 per pop & emp
Roads And Related
$17,006.00 per pop & emp
2009 - 2023
Service Level
Indicator
Development-Related Capital Forecast | 19
5. Development-Related Capital Forecast
The DCA requires that the Council of the Township express its intent to provide
future capital facilities at the level incorporated in the development charges
calculation. As noted above, Ontario Regulation 82/98, s. 3 states that:
For the purposes of paragraph 3 of subsection 5 (1) of the Act, the
council of a Township has indicated that it intends to ensure that an
increase in the need for service will be met if the increase in service
forms part of an official plan, capital forecast or similar expression of
the intention of the council and the plan, forecast or similar
expression of the intention of the council has been approved by the
council.
A.
Development-Related Capital Program is Provided for
Council's Approval
Based on the development forecasts summarized in Section 3 and detailed
in Appendix A, Township staff, in collaboration with the consultant has
developed a development-related capital forecast which sets out those
projects that are required to service anticipated growth. For all services, the
capital plan covers the ten-year period from 2024 to 2033.
One of the recommendations contained in this Background Study is for
Council to adopt the development-related capital program developed for the
purposes of the development charges calculation. It is assumed that future
capital budgets and forecasts will continue to bring forward the capital
projects presented here as they will be needed to service the anticipated
growth in the Township. It is, however, acknowledged that changes to the
program presented here may occur through the Township's capital budget
process.
Development-Related Capital Forecast | 20
B.
The Development-Related Capital Forecast for Township
Services
A summary of the development-related capital forecast for Township-wide
services is presented in Table 3.
The table shows that the gross cost of the Township's capital program is
estimated to be $56.3 million. Approximately $5.7 million in grants have been
identified to subsidize the cost of the capital program, so $50.7 million is
identified as the net municipal cost brought forth for the development
charges consideration.
Of this $50.7 million net capital cost, 42%, or $21.1 million is related to
capital works for Roads and Related projects. Capital projects include
various road improvements in Sunderland and Beaverton and growth-related
share of annual road works in the Township.
The next largest capital program belongs to Library, Parks & Recreation at
37%. This capital program includes the provision for additional collection
materials, the expansion of arenas, additional park and trail developments and
other projects. These projects total $18.5 million of the total net capital cost.
The capital program for Fire is recovering for the debenture payments
related to Fire Station #1, vehicles, and other fire related equipment. These
projects total $5.0 million and represent 10% of the total capital program.
The capital program for Public Works: Buildings & Fleet is recovering for a
works yard expansion and various fleet equipment required to support new
development. These projects amount to $4.4 million of the total capital
program, which represents 9%.
The capital program for By-law Services is a provision of a building
expansion and various fleet equipment required to support new
development. These projects amount to $1.1 million of the total capital
program, which represents 2%.
Development-Related Capital Forecast | 21
Lastly, the capital program associated with Development Related Studies
relates to the provision of growth-related studies. It amounts to $605,000,
which represents 1%, and provides for necessary development-related
studies in the next ten years. These studies include additional development
charges studies, Official Plan Review, Fire Master Plan, and other growth-
related studies.
The capital program incorporates those projects identified to be related to
development anticipated in the next ten years. It is not implied that all these
costs are to be recovered from new development by way of development
charges. Portions of the capital program may be related to the replacement
of existing facilities, shares of projects that benefit the existing population or
growth anticipated to occur beyond the 2024 - 2033 planning period.
The remaining development-related capital costs are brought forward to the
development charges calculation. Further details on the capital plans for
each individual service category are available in Appendix B.
Development-Related Capital Forecast | 22
Gross
Grants/
Municipal
Service
Cost
Subsidies
Cost
1.0 LIBRARY, PARKS & RECREATION
$24,156.1
$5,660.1
$18,496.0
1.1 Library
$2,103.0
$0.0
$2,103.0
1.2 Indoor Recreation
$17,800.0
$5,485.1
$12,314.9
1.3 Parks
$4,253.1
$175.0
$4,078.1
2.0 FIRE SERVICES
$4,960.8
$0.0
$4,960.8
2.1 Buildings, Land, Furniture & Equipment
$4,870.8
$0.0
$4,870.8
2.2 Vehicles and Equipment
$90.0
$0.0
$90.0
3.0 BY-LAW SERVICES
$1,070.0
$0.0
$1,070.0
3.1 Buildings, Land, Furniture & Equipment
$910.0
$0.0
$910.0
3.2 Vehicles and Equipment
$160.0
$0.0
$160.0
4.0 DEVELOPMENT RELATED STUDIES
$605.0
$0.0
$605.0
4.1 Development-Related Studies
$605.0
$0.0
$605.0
5.0 PUBLIC WORKS: BUILDINGS & FLEET
$4,445.0
$0.0
$4,445.0
5.1 Buildings, Land & Furnishings
$2,830.0
$0.0
$2,830.0
5.2 Fleet & Equipment
$1,615.0
$0.0
$1,615.0
6.0 ROADS AND RELATED
$21,077.8
$0.0
$21,077.8
6.1 Road Works
$21,077.8
$0.0
$21,077.8
TOTAL - 10-YEAR SERVICES
$56,314.7
$5,660.1
$50,654.6
TABLE 3
TOWNSHIP OF BROCK
SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM
FOR TOWNSHIP-WIDE SERVICES 2024 - 2033
(in $000)
Development Charges are Calculated in Accordance with the DCA | 23
6. Development Charges are Calculated in
Accordance with the DCA
This section summarizes the calculation of development charges for each
service category and the resulting total development charge by type of
development. For all services, the calculation of the per capita (residential)
and per square metre (non-residential) charges is reviewed.
For residential development, a total per capita amount is applied to different
housing types based on average occupancy factors. For non-residential
development, the calculated development charge rates are based on gross
floor area (GFA) of building space.
It is noted that the calculation of the development charges does not include
any provision for exemptions required under the DCA, for example, the
exemption for enlargements of up to 50 per cent on existing industrial
buildings. Such legislated exemptions, or other exemptions which Council
may choose to provide, will result in a loss of development charges revenue
for the affected types of development. Any such revenue loss may not be
offset, however, by increasing other portions of the calculated charge.
A.
Development Charges Calculation
A summary of the calculated residential and non-residential development
charges is presented in Table 4. Further details of the calculation for each
individual service category are available in Appendix B.
i.
Development Charges Rates
The capital forecast incorporates those projects identified to be related to
growth anticipated in the next ten years. However, not all the capital costs are
to be recovered from new development by way of development charges. Table
4 shows that $17.1 million of the capital forecast relates to replacement of
existing capital or to shares of projects that provide benefit to the existing
community. These portions of capital costs would have to be funded from
property taxes and other non-development charges revenue sources.
10-Year Growth in Population
2,469
10-Year Growth in Square Metres
25,392
Total DC
Service
Replacement
Eligible
Gross
Grants &
Net
& Benefit to
Available
Post-2033
Costs for
Cost
Other Sub.
Cost
Existing
DC Reserves
Benefit
Recovery
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
($000)
%
($000)
1.0
DEVELOPMENT RELATED STUDIES
$605.0
$0.0
$605.0
$82.5
$2.1
$0.0
$520.4
83%
$431.9
17%
$88.47
Development Charge Per Capita
$174.97
Development Charge Per Sq.M
$3.48
2.0
LIBRARY, PARKS & RECREATION
$24,156.1
$5,660.1
$18,496.0
$4,575.2
$3,247.7
$0.0
$10,673.1
100%
$10,673.1
0%
$0.00
Development Charge Per Capita
$4,323.65
Development Charge Per Sq.M
$0.00
3.0
FIRE SERVICES
$4,960.8
$0.0
$4,960.8
$2,515.3
$117.9
$0.0
$2,327.6
83%
$1,931.9
17%
$395.69
Development Charge Per Capita
$782.61
Development Charge Per Sq.M
$15.58
4.0
BY-LAW SERVICES
$1,070.0
$0.0
$1,070.0
$0.0
$0.0
$881.7
$188.3
83%
$156.3
17%
$32.01
Development Charge Per Capita
$63.32
Development Charge Per Sq.M
$1.26
5.0
PUBLIC WORKS: BUILDINGS & FLEET
$4,445.0
$0.0
$4,445.0
$0.0
$47.8
$1,652.1
$2,745.1
83%
$2,278.4
17%
$466.67
Development Charge Per Capita
$922.99
Development Charge Per Sq.M
$18.38
6.0
ROADS AND RELATED
$21,077.8
$0.0
$21,077.8
$9,900.0
$1,924.7
$0.0
$9,253.1
83%
$7,680.0
17%
$1,573.02
Development Charge Per Capita
$3,111.16
Development Charge Per Sq.M
$61.95
TOTAL 10-YEAR SERVICES
$56,314.7
$5,660.1
$50,654.6
$17,073.1
$5,340.1
$2,533.8
$25,707.6
$23,151.7
$2,555.9
Development Charge Per Capita
$9,378.70
Development Charge Per Sq.M
$100.65
Share
Share
TABLE 4
TOWNSHIP OF BROCK
SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
10-YEAR CAPITAL PROGRAM FOR TOWNSHIP-WIDE SERVICES
Residential
Non-Residential
Development Charges are Calculated in Accordance with the DCA | 24
Development Charges are Calculated in Accordance with the DCA | 25
An additional share of $5.3 million has been identified as available DC
reserves and represents the revenues collected from previous development
charges. This portion has been netted out of the chargeable capital costs.
Another share of the forecast, $2.5 million is either attributable to growth
beyond 2033 (and can therefore only be recovered under future development
charges studies) or represents a service level increase in the Township.
The remaining $25.7 million is carried forward to the development charges
calculation as development-related costs. Of the development-related cost,
$23.2 million has been allocated to new residential development, and $2.6
million has been allocated to new non-residential development. This results
in a charge of $9,378.70 per capita and $100.65 per square metre.
ii.
Residential and Non-Residential Development Charge Rates
Table 5 summarizes the calculated rates by residential unit type with the
total charge per unit ranging from a high of $31,383 for a fully serviced
single- and semi-detached unit to a low of $15,006 for an apartment.
The non-residential charge is $100.65 per square metre as displayed on
Table 6.
Development Charges are Calculated in Accordance with the DCA | 26
Development Related Studies
$174.97
$585
$455
$280
1.9%
Library, Parks & Recreation
$4,323.65
$14,468
$11,241
$6,918
46.1%
Fire Services
$782.61
$2,619
$2,035
$1,252
8.3%
By-Law Services
$63.32
$212
$165
$101
0.7%
Public Works: Buildings & Fleet
$922.99
$3,088
$2,400
$1,477
9.8%
Roads And Related
$3,111.16
$10,410
$8,089
$4,978
33.2%
TOTAL CHARGE PER UNIT
$9,378.70
$31,383
$24,385
$15,006
100.0%
(1) Based on Persons Per Unit Of:
3.35
2.60
1.60
TOWNSHIP-WIDE DEVELOPMENT CHARGES
RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE
TABLE 5
TOWNSHIP OF BROCK
Service
Charge Per
Capita
Residential Charge By Unit Type
Percentage
of Charge
Row Dwellings
& Other
Multiples
Apartment
Single &
Semi-Detached
Development Charges are Calculated in Accordance with the DCA | 27
Development Related Studies
$3.48
3.5%
Library, Parks & Recreation
$0.00
0.0%
Fire Services
$15.58
15.5%
By-Law Services
$1.26
1.3%
Public Works: Buildings & Fleet
$18.38
18.3%
Roads And Related
$61.95
61.5%
TOTAL CHARGE PER SQUARE METRE
$100.65
100.0%
TABLE 6
TOWNSHIP OF BROCK
TOWNSHIP-WIDE DEVELOPMENT CHARGES
NON-RESIDENTIAL DEVELOPMENT CHARGES PER SQUARE METRE
Percentage of
Charge
Charge per
Square Metre
Non-Residential
Service
Development Charges are Calculated in Accordance with the DCA | 28
B.
Comparison of 2024 Newly Calculated Development
Charges with Charges Currently In-Force in Brock
Tables 7 and 8 present a comparison of the newly calculated residential and
non-residential development charges with currently imposed development
charge rates. It demonstrates that the residential development charge rate
for a single- or semi-detached unit increases by $3,433, from $27,950 to
$31,383 per unit.
The current development charges rate for non-residential development
increases by $42.73 per square metre, from $57.92 to $100.65 per square
metre.
Current
Calculated
Service
Residential
Residential
Charge / SDU
Charge / SDU
Development Related Studies
$407
$585
$178
43.9%
Library, Parks & Recreation
$12,125
$14,468
$2,343
19.3%
Fire Services
$2,809
$2,619
($190)
-6.8%
By-Law Services
$0
$212
$212
0.0%
Public Works: Buildings & Fleet
$3,126
$3,088
($38)
-1.2%
Roads And Related
$9,483
$10,410
$927
9.8%
TOTAL CHARGE PER UNIT
$27,950
$31,383
$3,433
12%
Current rates as of July 1, 2023
TABLE 7
COMPARISON OF CURRENT AND CALCULATED
RESIDENTIAL DEVELOPMENT CHARGES
TOWNSHIP OF BROCK
Difference in Charge
Development Charges are Calculated in Accordance with the DCA | 29
Current
Calculated
Service
Non-Residential Non-Residential
Charge
Charge
Development Related Studies
$1.93
$3.48
$1.55
80.5%
Library, Parks & Recreation
$0.00
$0.00
$0.00
0.0%
Fire Services
$10.20
$15.58
$5.38
52.8%
By-Law Services
$0.00
$1.26
$1.26
0.0%
Public Works: Buildings & Fleet
$11.35
$18.38
$7.03
61.9%
Roads And Related
$34.44
$61.95
$27.51
79.9%
TOTAL CHARGE PER SQUARE METRE
$57.92
$100.65
$42.73
73.8%
Current rates as of July 1, 2023
COMPARISON OF CURRENT AND CALCULATED
Difference in Charge
NON-RESIDENTIAL DEVELOPMENT CHARGES
TABLE 8
TOWNSHIP OF BROCK
Long-Term Capital and Operating Costs | 30
7. Long-Term Capital and Operating Costs
This section provides a brief examination of the long-term capital and
operating costs for the capital facilities and infrastructure to be included in
the development charges by-law. This examination is required as one of the
features of the DCA.
A.
Net Operating Costs for the Township's Services to
Increase 0ver the Forecast Period
Table 9 summarizes the estimated increase in net operating costs that the
Township will experience for additions associated with the planned capital
program. The estimated changes in net operating costs are based on the
financial information from the Township (additional details are included in
Appendix D).
As shown in Table 9, by 2033 the Township's net operating costs are
estimated to increase by about $2.6 million.
Long-Term Capital and Operating Costs | 31
B.
Long-Term Capital Financing from Non-Development
Charges Sources
As detailed in Appendix D, the components of the development-related
capital forecast that will require funding from non-development charges
sources. Of the $50.7 million net capital forecast, about $17.1 million will
need to be financed from non-development charges sources over the next
10 years.
TABLE 9
TOWNSHIP OF BROCK
COST OF GROWTH ANALYSIS ALL SERVICES
ESTIMATED NET OPERATING COST OF THE PROPOSED
2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM
(in constant 2024 dollars)
Additional
Category
Operating Costs
$
unit meaure
Quantity
at 2033
Development Related Studies
$0
No additional operating costs
No additional costs
-
$0
Library, Parks & Recreation
$1,846,454
Recreation Facilities
$0.15 per $1.00 new infrastructure
9,789,695
$
$1,468,454
Parks, Parkland and Trail Development
$0.10 per $1.00 value of asset
3,780,000
$
$378,000
Fire Services
$13,500
New ATV
$0.15 per $1.00 new vehicle
40,000
$
$6,000
New Fire Prevention Vehicle
$0.15 per $1.00 new vehicle
50,000
$
$7,500
By-Law Services
$136,500
Building Expansion
$0.15 per $1.00 new infrastructure
910,000
$
$136,500
Public Works: Buildings & Fleet
$373,350
- Buildings, Land and Fleet
$190 per $1,000 of total
1,965,000
$
$373,350
Roads And Related
$219,240
- Development-Related Roads Infrastructure
$270 per household
812
$219,240
TOTAL ESTIMATED OPERATING COSTS
$2,589,044
Cost Driver
(in 2024 $)
Long-Term Capital and Operating Costs | 32
C.
Asset Management Plan
The DCA requires that municipalities complete an Asset Management Plan
before the passing of a development charges by-law. A key function of the
Asset Management Plan is to demonstrate that all assets are proposed to be
funded under the development charges by-law are financially sustainable
over their full life cycle. Further details relating to the Asset Management
Plan are discussed in Appendix D.
D.
Annual Capital Provisions by 2034
Table 10 summarizes the annual capital provisions required to replace the
development eligible and ineligible costs associated with the capital
infrastructure identified in the DC Background Study. This estimate is based
on information obtained through discussions with municipal staff regarding
useful life assumptions and the capital cost of acquiring and/or emplacing
each asset.
Table 10 illustrates that, by 2034, the Township will need to fund an
additional $872,035 per annum to properly fund the full life cycle costs of
the new Township-wide assets supported under the proposed Development
Charges By-law.
The calculated annual funding provision should be considered within the
context of the Township's projected growth. Over the next ten years, the
Township is projected to increase by approximately 812 households, which
represents a 16% increase over the existing base. In addition, the Township
will also add roughly 518 new employees that will result in approximately
25,392 square metres of additional non-residential building space. This
growth will have the effect of increasing the overall assessment base and
additional user fee and charges revenues to offset the capital asset
provisions required to replace the infrastructure proposed to be funded
under the proposed Development Charges By-laws.
Long-Term Capital and Operating Costs | 33
The calculated annual provisions identified are financially sustainable as it
is expected that the increased capital asset management requirements can
be absorbed by the tax and user base over the long-term.
Service
DC Related
Non-DC Related*
DC Related
Non-DC Related*
Development Related Studies
$522,500
$82,500
$0
$0
Library, Parks & Recreation
$10,673,126
$13,482,959
$370,807
$384,319
Fire Services
$2,327,606
$2,633,234
$66,858
$56,399
By-Law Services
$188,309
$881,691
$16,777
$22,247
Public Works: Buildings & Fleet
$2,745,108
$1,699,892
$183,352
$0
Roads And Related
$11,177,800
$9,900,000
$234,241
$196,535
TOTAL
$27,634,450
$28,680,275
$872,035
$659,500
Capital Program
Provision by 2034
* Includes costs that will be recovered under future development charges studies (i.e. other development-related), ineligible shares and
shares of projects funded from available reserve funds.
TABLE 10
TOWNSHIP OF BROCK
ANNUAL ASSET MANAGEMENT PROVISION BY 2034
2024 - 2033
Calculated AMP Annual
Development Charges Administration | 34
8. Development Charges Administration
A.
Development Charge Administration
Many of the administrative requirements of the DCA will be similar to those
presently followed by the Township in terms of collection practices. In this
regard:
It is recommended that the present practices regarding collection of
development charges and by-law administration continue to the extent
possible;
As required under the DCA, the Township should codify any rules
regarding application of the by-laws and any exemptions within the
development charges by-laws proposed for adoption;
It is recommended that the Township continue to report policies
consistent with the requirements of the DCA;
It is recommended that the by-laws permit the payment of a
development charge in cash or through services-in-lieu agreements. The
municipality is not obligated to enter into services-in-lieu agreements;
It is recommended that Council, wherever appropriate, request that
grants, subsidies and other contributions be clearly designated by the
donor as being to the benefit of existing or new development, as
applicable; and
It is recommended that Council adopt the development-related capital
forecast included in this background study, subject to annual review
through the Township's normal capital budget process.
Development Charges Administration | 35
B.
Township-wide vs. Area Specific Development Charges
i.
Consideration for Area Rating
In accordance with the DCA, Council must give consideration to the use of
area rating, also known as area-specific development charges as part of the
DC Background Study. As part of the Township's 2024 DC Study update, the
appropriateness of implementing area-specific development charges for
various Township services was examined.
The DCA permits the Township to designate in its DC by-law, the areas
where development charges shall be imposed. The charges may apply to all
lands in the Township or to other designated development areas as
specified in the DC By-law.
The following was considered with respect to area-specific development
charges:
1. Is the use of area-specific charges appropriate for some or all
services?
2. Are there any data limitations with calculating an area-specific
development charge?
Area-specific development charges are typically considered when there is a
clear benefit to a particular area (including the population or population and
employment) and have been implemented mostly in stand alone green field
developments.
ii.
Consistent with Historical Practices, Township-wide DCs are
Proposed
Based on discussions with staff, and the analysis of the delivery of services,
it is proposed that the Township continue to calculate and collect DCs on a
uniform, Township-wide basis.
Development Charges Administration | 36
Services such as Library, Parks & Recreation are open and accessible to all
residents in the Township and are driven and planned for based on
Township-wide population growth.
Fire Protection, Public Works, By-law, and Development Related Studies are
provided to all residents and employees in the Township and are driven and
planned for based on Township-wide population or population and
employment growth.
Roads and Related services are provided through a Township-wide network
and is planned based on Township-wide population and employment growth.
C.
Draft Local Service Definitions
The following provides the definition of "local service", under the DCA, for
several services provided by the Township of Brock. The purpose in
establishing these definitions is to determine the eligible capital costs for
inclusion in the development charge calculation for the Township of Brock.
The functions or services deemed to be local in nature are not to be
included in the determination of the development charge rates. The
provision of local services is a direct developer responsibility under s.59 of
the DCA and will (or may) be recovered under other agreement(s) with the
landowner or developer. The issue of "local services" is being specifically
considered for the services of:
Roads
Stormwater Management Facilities
Parkland Development
Street Tree Planting
Development Charges Administration | 37
i.
Roads
Local Roads:
All roads and share of roads within a development plan (i.e. plan of
subdivision, lot created by consent, site plan etc.) and considered to
solely provide service to the subject lands are to be treated as a local
service under the DCA and the associated costs are not included in the
development charges calculation.
Road Oversizing:
If a local road is oversized to accommodate additional traffic needs
external to the subject lands, the oversized share of the roads is to be
included in the development charge calculation.
Note, oversizing of roads usually relates to collector roads, however it is
possible that a share of an arterial road may be local and would be
funded as a direct developer responsibility. It is noted that growth-
related arterial roads requirements are generally fully funded from
development charges.
ii.
Stormwater Management (SWM) Facilities
The costs of stormwater management facilities internal to a development
plan and related to a development plan are a local service under the DCA
and the associated costs are not included in the development charges
calculation. Local SWM facilities would typically include:
Stormwater management facilities servicing local drainage areas;
Storm sewer oversizing associated with local drainage areas; and
Storm sewer works on existing roads or roads within the development
plan.
Development Charges Administration | 38
iii.
Parkland Development
For parkland development, local service includes the requirement for the
owner to undertake preparation of the park plan to prepare design and
grading plans for the park, prior to development. In addition, the owner is
required to provide stripping and stockpiling, levelling, topsoiling, seeding
and stormwater servicing (consistent with the development plan), and
provide services to the lot line. These requirements are part of the
conditions of s.51 and 53 of the Planning Act agreements. The municipality
also requires the owner to dedicate parkland or provide cash-in-lieu,
consistent with the Planning Act provisions. All these costs are deemed a
direct responsibility of the developer and have not been included in the
development charge calculation.
With respect to other parkland development costs, the municipal policy is to
include all other components of parkland development in the development
charges calculation, including parking, park furniture, signage, landscaping,
and walkways/trails, in addition to the necessary fields, diamonds,
playground equipment, lighting, irrigation and field houses.
iv.
Street Tree Planting
Street tree planting and other landscaping work are considered a local area
service and a direct responsibility of the developer.
Appendix A
Development Forecast
Appendix A | 39
Appendix A - Development Forecast
This appendix provides the details of the development forecast used to
prepare the 2024 Development Charges (DC) Background Study for the
Township of Brock. The forecast method and key assumptions are
discussed. The results of the forecasts are presented in the following tables:
Historical Development
Table A.1
Historical Population, Occupied Dwellings & Employment
Summary
Table A.2
Historical Housing Completions by Unit Type (CMHC)
Table A.3
Historical Building Permits by Unit Type
Table A.4
Historical Households by Period of Construction Showing
Household Size
Forecast Development
Table A.5
Forecast Population, Household & Employment Growth
Summary
Table A.6
Growth in Households by Unit Type
Table A.7
Forecast Population in New Households by Unit Type
Table A.8
Forecast Non-Residential Floor Space
The forecasts were prepared by Hemson in consultation with Township staff
and are informed by a range of statistical data including Township Building
Permits, Statistics Canada Census and National Household Survey data, and
Canada Mortgage Housing Corporation (CMHC) housing market information.
The forecast of future residential and non-residential development used in
this study are largely based on the targets prepared for the Region of
Durham's 2022 Area Municipal Growth Allocations and Land Needs by 2051.
Prepared by Watson & Associates Economists. For this 2024 DC Background
Study, a ten-year planning horizon is used to 2033. The targets for 2033
have been adjusted by Hemson in discussion with Township staff based on
recent building activity and anticipated development trends.
Appendix A | 40
A.
Forecast Approach and Key Assumptions
The Development Charges Act (DCA) requires the Township to estimate "the
anticipated amount, type and location of development" for which
development charges may be imposed. The development forecast must cover
both residential and non-residential development and be specific enough with
regards to quantum, type, location and timing of development to allow the
Township to prepare a reasonable development-related capital program.
A "Census-based" definition of population is used for the purpose of the
development charges study. This definition does not include the Census net
undercoverage, which is typically included in the definition of "total"
population commonly used in municipal planning documents.
The forecast is based on Census years and is translated into the time
periods required for DC purposes, generally pro-rating the census periods to
the DC time period. A ten-year development forecast, from 2024 to 2033,
has been used for all services in the Township.
Employment figures used in DC studies utilize place of work employment
values. Place of work employment considers where people work irrespective
of their place of residence. The forecast is based on recent growth trends
and input form Township staff. For DC forecast purposes, the work at home
employment is excluded from the calculations since the increased need for
service is already captured in the residential forecast.
B.
Historical Development Activity
Growth in Brock has largely been driven by the Township's attractiveness as
a mixed urban-rural municipality. The Township contains several villages
that offer urban amenities, namely Cannington, Beaverton, and Sunderland.
However, the Township also offers prime agricultural opportunities, and
recreation opportunities along the east shore of Lake Simcoe.
Appendix A | 41
i.
Historical Growth Methodology
Historical growth numbers presented in this report are based on Statistics
Canada Census data. The forthcoming population numbers do not include
Census under coverage which typically understates actual population by 4
per cent.
The fifteen year historical period used in the Development Charges
Background Study is from 2009 - 2023. As 2021 was the date of the last
Census, values for 2022 and 2023 are estimated.
Total employment numbers used in the historical tables are based on
Statistics Canada Place of Work data. Place of Work employment numbers
exclude work at home and are premised on where someone works rather
than their place of residence.
ii.
Historical Growth in Population, Housing Units and Employment
Brock's housing growth has occurred at a modest pace over the last fifteen
years as shown in Table A.1. Between 2009 and 2023 the Township added
549 housing units and the Township's population increased by about 1,230
people. There was a decline within the fifteen-year period in the average
Persons per Unit (PPU) with recovery to 2011 levels by 2021. Both the
Region of Durham and Township are estimating that the population of the
Township will continue to increase at a similar rate during the forecast
period and beyond. The Township's Census population was 12,567 in 2021
net of the Census undercount.
The Township of Brock has experienced a growth in employment over the
past fifteen years. Between 2009 and 2023, employment in Brock increased
by 155 employees or about a 5 per cent increase. Brock's total employment in
2021 was about 3,080 excluding work at home employment. As employment
growth has been more substantial than population growth, the activity rate
(jobs to population ratio) has decreased from 27.7% in 2011 to 24.5% by 2021.
Appendix A | 42
Similar to the forecasted population growth by the Region and Township,
employment is also anticipated to increase during the growth forecast period
although at a more modest pace.
iii.
Growth in Occupied Households has Been Largely in Single
Detached Homes
Details on historical occupied households by unit type in the Township are
provided in Table A.2 and the building permits in Table A.3. Information in Table
A.2 is sourced from CMHC and Table A.3 from Township data on building
permits. Overall, the dominant type of housing in Brock constructed since 2009
has been single and semi-detached housing (90%). This is followed by
apartments (8%) and rows and other multiples (2%) in the last fifteen years.
iv.
Historical Households by Period of Construction Showing
Household Size
Historical occupancy levels for single and semi detached, rows and other
multiple and apartment units in Brock are provided in Table A.4. However,
the data for rows and other multiples and apartments is very limited for the
Township. As such, the single and semi detached PPU from the 2021
Census data was the only data point used in the 2024 DC Study. The
remaining unit occupancy patterns were estimated based on proportional
occupancy patterns relative to the single and semi detached PPU.
These ratios have been generally maintained from the 2014 DC Background
Study and are now estimated at 2.60 for rows and other multiples and 1.60
for apartment units.
C.
Forecast Results
The residential and non-residential growth forecasts used in this
development charges study are largely based on a continuation of historic
trends but at lower levels to reflect a more gradual increase in development
Appendix A | 43
as seen in recent years. Development charges are levied on residential
development as a charge per new unit and on non-residential development
as a charge per unit of gross floor area (GFA), respectively. This section
describes the 10-year development forecast, from 2024 - 2033, which has
been used for all services. Development charges are levied on residential
development as a charge per new unit. Therefore, for the residential
forecast, a projection of both the population growth1 as well as the
population in new housing is required.
The population growth determines the need for additional facilities
and provides the foundation for the development-related capital
program.
When calculating the development charge, however, the
development-related net capital costs are spread over the total
additional population that occupies new dwelling units. This
population in new units represents the population from which
development charges will be collected.
Development charges are levied on non-residential development as a charge
per unit of gross floor area (GFA). The non-residential forecast includes
both a projection of employment growth as well as a projection of the floor
space associated with employment growth in the Township.
i.
Forecast of Population and Households
Table A.5 provides details of the Township-wide census population forecast,
total occupied dwelling unit forecast and a place of work forecast. By 2033,
the Township's population is expected to increase to about 15,070 people.
The increase over the ten-year period of 2024-2033 is therefore
approximately 2,113 persons.
1 Commonly referred to as "net population growth" in the context of development charges.
Appendix A | 44
In the development charges forecast period from 2024-2033, the Township's
household forecast, is increasing in the number of occupied dwelling units
on average by approximately 80 units annually with the PPU remaining at
2.62 for all units in the Township. A breakdown of unit growth by type is
provided in Table A.6.
Forecasted growth in net population in new units of approximately 2,470 is
used for the calculation of DC rates in the Background Study and is shown
in Table A.7. It is anticipated that population in new units is going to roughly
equal overall census population growth.
ii.
Non-Residential Space Forecast Based on the Forecast of
Employment
Non-residential development charges are calculated on a per square metre
basis. Therefore, as required by the DCA, a forecast for non-residential
building space is provided. Consistent with the residential forecast, the non-
residential building space forecast covers a period from 2024 - 2033. The
non-residential building space used in this DC Background Study is based
on the employment forecast.
As demonstrated in Table A.8, in the 10-year development charges forecast
period from 2024 - 2033 the Township's employment is to increase at an
average of approximately 36 employees and 2,540 square meters annually.
Over the 10-year planning period 2024 - 2033, about 25,390 square metres
of building space is forecast to be added. The average square meters per
employee is 70 square metres per employee, which was used to derive the
floor space forecast.
Appendix A | 45
APPENDIX A - TABLE A.1
TOWNSHIP OF BROCK
HISTORICAL POPULATION, OCCUPIED DWELLINGS & EMPLOYMENT SUMMARY
Annual
Occupied
Annual
Av. Household
Place of Work
Annual
Mid-Year
Growth
Households
Growth
Size (PPU)
Employment
Growth
Activity Rate
2009
11,592
-128
4,371
-17
2.65
3,059
40
26.4%
2010
11,466
-126
4,354
-17
2.63
3,100
41
27.0%
2011
11,341
-125
4,336
-18
2.62
3,142
42
27.7%
2012
11,401
60
4,377
41
2.60
3,100
-42
27.2%
2013
11,461
60
4,418
41
2.59
3,058
-42
26.7%
2014
11,521
60
4,459
41
2.58
3,017
-41
26.2%
2015
11,582
61
4,501
42
2.57
2,976
-41
25.7%
2016
11,642
60
4,543
42
2.56
2,936
-40
25.2%
2017
11,821
179
4,591
48
2.57
2,964
28
25.1%
2018
12,003
182
4,639
48
2.59
2,992
28
24.9%
2019
12,188
185
4,688
49
2.60
3,021
29
24.8%
2020
12,376
188
4,738
50
2.61
3,050
29
24.6%
2021
12,567
191
4,788
50
2.62
3,079
29
24.5%
2022
12,758
191
4,862
74
2.62
3,126
47
24.5%
2023
12,952
194
4,937
75
2.62
3,174
48
24.5%
Growth 2009 - 2023
1,232
549
155
Source: Statistics Canada, Census of Canada
Note: Activity rate is the ratio of employment to population. Employment figures exclude work at home employees. Census population does not include an estimate of Census net-undercoverage.
Census
Population
Appendix A | 46
APPENDIX A - TABLE A.2
TOWNSHIP OF BROCK
HISTORICAL HOUSING COMPLETIONS BY UNIT TYPE (CMHC)
Occupied Households
Shares By Unit Type
Mid-Year
Singles/Semis
Rows
Apartments
Total
Singles/Semis
Rows
Apartments
Total
2009
43
8
0
51
84%
16%
0%
100%
2010
63
8
0
71
89%
11%
0%
100%
2011
7
0
0
7
100%
0%
0%
100%
2012
9
0
0
9
100%
0%
0%
100%
2013
11
0
0
11
100%
0%
0%
100%
2014
10
0
0
10
100%
0%
0%
100%
2015
7
0
0
7
100%
0%
0%
100%
2016
12
0
0
12
100%
0%
0%
100%
2017
52
0
0
52
100%
0%
0%
100%
2018
73
0
0
73
100%
0%
0%
100%
2019
57
0
0
57
100%
0%
0%
100%
2020
210
0
50
260
81%
0%
19%
100%
2021
21
0
0
21
100%
0%
0%
100%
2022
15
0
0
15
100%
0%
0%
100%
2023*
Total
590
16
50
656
90%
2%
8%
100%
Average 2009-2022
42
1
4
47
Source: Canada Mortage and Housing Corporation (CMHC), Housing Market Information
* Data not available for 2023
Appendix A | 47
APPENDIX A - TABLE A.3
TOWNSHIP OF BROCK
HISTORICAL BUILDING PERMITS BY UNIT TYPE
Occupied Households
Shares By Unit Type
Mid-Year
Singles/Semis
Rows
Apartments
Total
Singles/Semis
Rows
Apartments
Total
2009
38
8
0
46
83%
17%
0%
100%
2010
10
0
0
10
100%
0%
0%
100%
2011
15
0
0
15
100%
0%
0%
100%
2012
13
0
0
13
100%
0%
0%
100%
2013
19
0
0
19
100%
0%
0%
100%
2014
28
0
0
28
100%
0%
0%
100%
2015
24
0
0
24
100%
0%
0%
100%
2016
15
0
0
15
100%
0%
0%
100%
2017
132
0
18
150
88%
0%
12%
100%
2018
62
0
50
112
55%
0%
45%
100%
2019
203
0
0
203
100%
0%
0%
100%
2020
111
0
0
111
100%
0%
0%
100%
2021
20
0
0
20
100%
0%
0%
100%
2022
21
0
0
21
100%
0%
0%
100%
2023 ytd
8
0
0
8
100%
0%
0%
100%
Total
734
8
68
810
91%
1%
8%
100%
Average 2009-2023
48
1
5
53
Source: Township of Brock, 2023
Appendix A | 48
APPENDIX A - TABLE A.4
TOWNSHIP OF BROCK
HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE
Period of Construction
Period of Construction Summaries
Dwelling Unit Type
Pre 1945
1946-1960
1961-1970
1971-1980
1981-1990
1991-1995
1996-2000
2001-2005
2006-2010
2011-2016
2016-2021
Pre 2011
2011-2021
Total
Singles & Semis
Household Population
2,530
975
1,520
1,905
1,505
345
405
290
355
345
960
9,830
1,305
11,135
Households
990
420
585
720
560
135
160
120
140
100
290
3,830
390
4,220
Household Size
2.56
2.32
2.60
2.65
2.69
2.56
2.53
2.42
2.54
3.45
3.31
2.57
3.35
2.64
Rows
Household Population
0
0
0
55
90
0
0
0
0
0
0
145
0
145
Households
0
0
0
30
55
10
0
0
10
10
0
105
10
115
Household Size
0.00
0.00
0.00
1.83
1.64
0.00
0.00
0.00
0.00
0.00
0.00
1.38
0.00
1.26
Apartments (incl. duplex)
Household Population
175
45
90
110
60
0
25
0
0
0
120
505
120
625
Households
95
40
80
70
40
10
20
0
0
0
80
355
80
435
Household Size
1.84
1.13
1.13
1.57
1.50
0.00
1.25
0.00
0.00
0.00
1.50
1.42
1.50
1.44
All Units
Household Population
2,705
1,020
1,610
2,070
1,655
345
430
290
355
345
1,080
10,480
1,425
11,905
Households
1,085
460
665
820
655
155
180
120
150
110
370
4,290
480
4,770
Household Size
2.49
2.22
2.42
2.52
2.53
2.23
2.39
2.42
2.37
3.14
2.92
2.44
2.97
2.50
Source: Statistics Canada, 2021 Census Special Run
Appendix A | 49
APPENDIX A - TABLE A.5
TOWNSHIP OF BROCK
FORECAST POPULATION, HOUSEHOLD & EMPLOYMENT GROWTH SUMMARY
Census
Annual
Annual
Av. Household
Place of Work
Annual
Mid-Year
Population
Growth
Growth
Size (PPU)
Employment
Growth
Activity Rate
2024
13,149
197
5,012
75
2.62
3,222
48
24.5%
2025
13,349
200
5,090
78
2.62
3,271
49
24.5%
2026
13,550
201
5,170
80
2.62
3,320
49
24.5%
2027
13,759
209
5,250
80
2.62
3,371
51
24.5%
2028
13,972
213
5,331
81
2.62
3,424
52
24.5%
2029
14,188
216
5,413
82
2.62
3,476
53
24.5%
2030
14,407
219
5,496
83
2.62
3,530
54
24.5%
2031
14,630
223
5,580
84
2.62
3,585
55
24.5%
2032
14,846
216
5,663
83
2.62
3,638
53
24.5%
2033
15,065
219
5,748
85
2.62
3,691
54
24.5%
Growth 2024-2033
2,113
811
518
Source: Hemson Consulting, 2023
Note: Census population does not include an estimate of net under-coverage. Place of Work Employmetn does not include work at home employees.
Total Occupied
Dwellings
Appendix A | 50
APPENDIX A - TABLE A.6
TOWNSHIP OF BROCK
GROWTH IN HOUSEHOLDS BY UNIT TYPE
Occupied Households
Shares By Unit Type
Mid-Year
Singles/Semis
Rows
Apartments
Total
Singles/Semis
Rows
Apartments
Total
2024
59
6
10
75
79%
8%
13%
100%
2025
62
6
10
78
79%
8%
13%
100%
2026
63
6
11
80
79%
8%
13%
100%
2027
62
8
10
80
78%
10%
12%
100%
2028
63
8
10
81
78%
10%
12%
100%
2029
64
8
10
82
78%
10%
12%
100%
2030
65
8
10
83
78%
10%
12%
100%
2031
66
8
10
84
78%
10%
12%
100%
2032
60
10
14
84
72%
12%
16%
100%
2033
61
10
14
85
72%
12%
16%
100%
Growth 2024 - 2033
625
78
109
812
Source: Hemson Consulting, 2023
Appendix A | 51
APPENDIX A - TABLE A.7
TOWNSHIP OF BROCK
FORECAST POPULATION IN NEW HOUSEHOLD BY UNIT TYPE
Persons Per Unit
Population Forecast
Mid-Year
Singles/Semis
Rows
Apartments
Total
Singles/Semis
Rows
Apartments
Total
2024
3.35
2.60
1.60
3.05
197
16
16
229
2025
3.35
2.60
1.60
3.06
207
16
16
239
2026
3.35
2.60
1.60
3.05
211
16
18
244
2027
3.35
2.60
1.60
3.05
207
21
16
244
2028
3.35
2.60
1.60
3.06
211
21
16
248
2029
3.35
2.60
1.60
3.06
214
21
16
251
2030
3.35
2.60
1.60
3.06
218
21
16
254
2031
3.35
2.60
1.60
3.07
221
21
16
258
2032
3.35
2.60
1.60
2.97
201
26
22
249
2033
3.35
2.60
1.60
2.97
204
26
22
253
Growth 2024-2033
2,091
203
174
2,469
Source: Hemson Consulting Ltd., 2023
Appendix A | 52
APPENDIX A - TABLE A.8
TOWNSHIP OF BROCK
FORECAST NON-RESIDENTIAL SPACE
(SQUARE METRES OF GROSS FLOOR AREA)
Avg m2 per employee
70m2 per employee
Mid-Year
Employment
(excl. WAH)
Rural
Employment
Employment
Less WAH and
Rural
Emp Growth
Generating
Space Growth
Space (m2)
2024
3,222
1,322
1,900
34
2,399
2025
3,271
1,337
1,934
34
2,380
2026
3,320
1,352
1,968
34
2,366
2027
3,371
1,367
2,004
37
2,566
2028
3,424
1,382
2,042
37
2,603
2029
3,476
1,397
2,079
38
2,655
2030
3,530
1,412
2,118
39
2,706
2031
3,585
1,427
2,157
39
2,742
2032
3,638
1,445
2,193
35
2,478
2033
3,691
1,463
2,228
36
2,496
Growth 2024-2033
363
25,392
Source: Hemson Consulting Ltd., 2023
Appendix A | 53
Appendix B
Development Charge Calculations
Technical Appendix
Appendix B | 54
Appendix B - Development Charge
Calculations Technical Appendix
Introduction and Overview
This appendix provides the detailed analysis undertaken to establish the
development charge rates for each service in the Township of Brock.
The appendix is divided into six sub-sections, with one section for each
service:
B.1
Library, Parks & Recreation
B.2
Fire Services
B.3
By-law Services
B.4
Development Related Studies
B.5
Services Related to a Highway: Public Works - Building & Fleet
B.6
Services Related to a Highway: Roads and Related
Every sub-section, except for Development Related Studies, contain a set of
two tables. The tables provide the background data and analysis undertaken
to arrive at the calculated development charge rates for that service. An
overview of the content and purpose of each of the tables is given below.
Development Related Studies class of services has been included in this
report as permitted under the DCA as of June 6, 2024, following Royal
Assent of Bill 185, Cutting Red Tape to Build More Homes Act, 2024.
The benefits of all the services listed above are deemed to be Township-
wide for the purpose of calculating a development charge.
Appendix B | 55
Table 1
Historical Service Levels
Table 1 presents the data used to determine the fifteen-year historical
service level. The Development Charges Act (DCA) and Ontario Regulation
82/98 require that development charges be set at a level no higher than the
average service level provided in the Township over the fifteen-year period
immediately preceding the preparation of the background study, on a
service-by-service basis. For the purpose of this study, the historical
inventory period has been defined as 2009 to 2023.
O. Reg. 82/98 requires that when defining and determining historical service
levels, both the quantity and quality of service be taken into consideration.
In most cases, the service levels are initially established in quantitative
terms. For example, service levels for buildings are presented in terms of
square feet per unit. The qualitative aspect is introduced by considering the
monetary value of the facility or service. In the case of buildings, for
example, the cost would be shown in terms of dollars per square foot to
replace or construct a facility of the same quality. This approach helps to
ensure that the capital facilities that are to be charged to new development
reflect not only the quantity (number and size) but also the quality (value or
cost) of service provided by the Township in the past. Both the quantitative
and qualitative aspects of service levels used in the current analysis are
based on information provided by Township staff. This information is
generally based on historical records and experience with costs to acquire or
construct similar facilities, equipment, and infrastructure.
The final page of Table 1 shows the calculation of the "maximum allowable
funding envelope", net of uncommitted excess capacity. The maximum
allowable is defined as the fifteen-year historical service level (expressed as
$/capita or $/population and employment) multiplied by the forecast
increase in population or population and employment over the planning
period. The resulting figure is the value of capital infrastructure that must be
Appendix B | 56
constructed for that service so that the fifteen-year historical service level is
maintained.
There is also a requirement in the DCA to consider "excess capacity" within
the Township's existing infrastructure that may be available to partially meet
future servicing requirements. If Council has expressed its intent, before or
at the time the capacity was created, to recoup the cost of providing the
capacity from new development, it is considered "committed excess
capacity" under the DCA and the associated capital cost is eligible for
recovery. Should uncommitted excess capacity exist, it will be determined
whether this capacity will be available to service new development and, if
so, appropriate adjustments will be made to the calculations.
Table 2
2024 - 2033 Development-Related Capital Program
& Calculation of Development Charge
To impose a development charge, it is not sufficient to merely base the
charge on historical service levels. The DCA requires that Council express its
intent to provide future capital facilities to support future growth. Based on
the development forecasts presented in Appendix A, Township staff have
developed a development-related capital program which sets out the
projects required to service anticipated development for the ten-year period
from 2024 to 2033. The development-related capital program for each
service is shown as Table 2 of each sub-section.
The gross costs of projects shown in the capital programs are based on
costs in Township's 10-year capital forecast. To determine the share of the
program that is eligible for recovery through development charges, the gross
project costs are reduced by any anticipated grants or subsidies and the
"benefit to existing" shares.
Appendix B | 57
A replacement share occurs when a new facility will at least in part replace a
facility that is demolished, redeployed, or will otherwise not be available to
serve its former function. The replacement share of the capital program is
not deemed to be development-related and is therefore removed from the
development charge calculation. The capital cost for replacement will
require funding from non-development charge sources, typically property
taxes.
The capital program less any benefit to existing shares yields the
development-related costs. Although deemed development-related, not all
the net development-related capital program may be recoverable from
development charges in the period from 2024 to 2033. In some cases,
development charge monies already collected are available to fund a portion
of development-related capital costs (the "prior growth" share).
Additionally, for some of the services, a portion of the capital program will
service development that will not occur until after 2033. This portion of the
capital program is either deemed "pre-built" service capacity to be
considered as committed excess capacity to be recovered under future
development or represents a future service level increase that is ineligible
for development charge recovery.
The remaining portion of the net capital program represents the
development-related cost that may be included in the development charge
calculation. In all cases, this amount is equal to or less than the maximum
allowable funding envelope, that is calculated on the final page of Table 1.
The result is the discounted development-related net capital cost that is
eligible for recovery through development charges from 2024 to 2033.
Calculation of the Development Charge Rates
The section below the capital program displays the calculation of the
development charge rates.
Appendix B | 58
The first step when determining the development charge rate is to allocate
the development-related net capital cost between the residential and non-
residential sectors. For all services except Library, Parks & Recreation, the
development-related costs have been allocated 83% residential and 17%
non-residential.
The development-related costs associated with Library, Parks & Recreation
have been allocated wholly to residential development because the need for
service is driven entirely by residential development.
The residential share of the 2024-2033 DC eligible costs are then divided by
the forecast population growth in new units. This gives the residential
development charge per capita. The non-residential development-related
net capital costs are divided by the forecast increase in non-residential
gross floor area (GFA). This yields a charge per square metre of new non-
residential GFA.
Appendix B | 59
Appendix B.1
Library, Parks & Recreation
Appendix B | 60
Appendix B.1 - Library, Parks & Recreation
Brock Township Public Library Board is responsible for the delivery of library
services in the Township and the Parks and Recreation Division of the
Public Works Department is responsible for parks and recreation services.
Table B.1-1
Historical Service Levels
Table B.1-1 displays the Library Board's fifteen-year historical inventory for
buildings, land, materials, and furniture and equipment (excluding personal
computers). The current building area totals 10,615 sq ft and has a
replacement value of $5.3 million. There are 0.6 hectares of land associated
with the buildings valued at $322,500. Collection materials are valued at $2.4
million, and furniture and equipment is valued at $889,100.
The Township of Brock's inventory of parkland is separated into two
categories: neighborhood parks and community parks. Table B.1-1 shows
that the cost of developing Brock's total inventory of about 45 ha of parkland
is $6.7 million. The cost of parkland acquisition cannot be included in the
development charges inventory as per the DCA.
The combined area of the indoor recreation facilities is approximately
131,640 sq ft and has a replacement value of $65.8 million. This space
includes recreation centres, arenas, program rooms, and other space. The
land area associated with the buildings is 3.4 hectares and is valued at $1.7
million. The equipment associated with indoor recreation adds another $3.42
million to the inventory.
The Township also has an inventory of sports fields, playground equipment
and similar facilities. The total value of these facilities is $4.8 million in 2023.
The inventory of equipment and other outdoor facilities is valued at $2.3
million.
Appendix B | 61
The 2023 total replacement value of assets for Library, Parks & Recreation
amounts to $93.8 million, and the fifteen-year historical average service
level is $7,695.87 per capita. The historical service level, multiplied by the
forecasted ten-year growth in population, results in a maximum allowable
funding envelope of $16.3 million that can be considered for recovery
through development charges with no identifiable excess capacity.
Table B.1-2
2024 - 2033 Development-Related Capital Program
& Calculation of the Development Charges
The 2024 - 2033 development-related capital program for Library, Parks &
Recreation services net municipal cost totals $24.2 million and is largely
related to the construction of the expansion of the Sunderland Memorial
Arena. The 2024-2033 development-related capital program for the Library
component of Library, Parks & Recreation totals $2.1 million over the ten
years, all of which is new equipment to service residential development.
The Indoor Recreation component of the capital plan includes the expansion
of the Sunderland Memorial Arena Expansion, currently proposed for to
begin in 2024 with a gross cost of $10.2 million. Available DC reserves in the
amount of $1.1 million are committed against the expansion. Since the
previous DC Study, additional design work has been completed and the
benefit to existing share has been updated to 35% or $1.6 million which has
been netted off the DC eligible amount. This share is based on the amount
of the cost related to replacing existing infrastructure and new infrastructure
necessitated to service development in the Township. The Township is
anticipating a $5.5 million grant or subsidy for the project.
The Parks component of the capital plan includes items such as parks,
trails, playground equipment, and park facilities totalling $4.3 million in gross
costs of which $300,000, is identified as the benefit to existing share.
Appendix B | 62
Benefit to existing share of $300,000 or 75% has been identified for the
Harbour Infrastructure Expenditure project and has been removed from the
development charge calculation. The total DC eligible costs are deemed to
be $13.9 million with the available $3.2 million in reserve funds being
applied to the DC eligible cost. The net amount being recovered from growth
in the ten-year period is $10.7 million, well under the maximum funding
envelope of $16.3 million. No post-period benefit shares have been
identified for this service.
The DC eligible cost of $10.7 million is related to growth between 2024 and
2033 and is allocated entirely against future residential development in the
Township of Brock. This results in a development charge of $4,323.65 per
capita.
LIBRARY, PARKS & RECREATION SUMMARY
15-year Hist.
Service Level
per Capita
Total
Net DC Recoverable
$/capita
$/sq.m
$7,695.87
$24,156,085
$10,673,126
$4,323.65
$0.00
2024 - 2033
Calculated
Development Charge
Development-Related Capital Program
Appendix B | 63
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
LIBRARY BOARD
BUILDINGS
UNIT COST
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Beaverton Library
3,796
3,796
3,796
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
$500
Cannington Library - Old Location
1,600
1,600
1,600
-
-
-
-
-
-
-
-
-
-
-
-
$500
Cannington Library - New Location
-
-
-
3,700
3,700
3,700
3,700
3,700
3,700
3,700
3,700
3,700
3,700
3,700
3,700
$500
Sunderland Library
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
2,415
$500
Total (sq.ft.)
7,811
7,811
7,811
10,615
10,615
10,615
10,615
10,615
10,615
10,615
10,615
10,615
10,615
10,615
10,615
Total ($000)
$3,905.5
$3,905.5
$3,905.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
$5,307.5
LAND
UNIT COST
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Beaverton Library
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
$500,000
Cannington Library - Old Location
0.10
0.10
0.10
0.10
0.10
0.10
0.10
-
-
-
-
-
-
-
-
$500,000
Cannington Library - New Location
-
-
-
-
-
-
-
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
$500,000
Sunderland Library
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
$500,000
Total (ha)
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
Total ($000)
$290.0
$290.0
$290.0
$290.0
$290.0
$290.0
$290.0
$322.5
$322.5
$322.5
$322.5
$322.5
$322.5
$322.5
$322.5
MATERIALS
UNIT COST
Type of Collection
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/item)
Books
57,265
64,108
58,928
52,674
49,074
42,255
51,607
49,423
46,904
48,540
43,751
40,848
56,377
43,218
54,481
$35
Audiobooks
79
78
78
77
77
78
129
215
359
598
997
1,008
1,019
1,031
1,248
$50
Periodicals
74
-
-
-
-
-
169
337
506
674
843
852
862
871
1,673
$65
Hotspots
-
-
-
-
-
-
-
-
-
-
6
6
6
9
9
$300
Databases
-
-
-
12
14
16
18
7
10
16
11
12
6
6
7
$2,000
SportEq
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
$15
Parks Passes
-
-
-
-
-
-
-
-
-
-
-
-
6
6
9
$250
Music Instruments
-
-
-
-
-
-
-
-
-
-
-
-
9
9
9
$75
Laptops/Chromebooks
-
-
-
-
-
-
-
-
-
-
-
-
6
6
19
$400
E-Resources
-
-
-
1
1
1
1
1
1
1
1
1
1
1
1
$32,500
CDs, DVDs and Video Games
63
1,181
1,938
2,481
2,476
2,739
3,671
3,834
4,017
4,409
4,749
4,717
4,702
3,753
4,319
$60
Total (#)
57,491
65,377
60,954
55,255
51,652
45,099
55,605
53,828
51,807
54,249
50,368
47,454
63,004
48,920
61,785
Total ($000)
$2,017.0
$2,318.7
$2,182.8
$2,052.9
$1,930.7
$1,711.8
$2,112.6
$2,039.2
$1,986.1
$2,101.8
$1,977.3
$1,877.0
$2,413.3
$1,897.9
$2,397.0
FURNITURE AND EQUIPMENT
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Beaverton Library
$106,288
$106,288
$106,288
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$334,922
$334,922
$334,922
Cannington Library
$67,200
$67,200
$67,200
$155,400
$155,400
$155,400
$155,400
$155,400
$155,400
$155,400
$155,400
$155,400
$320,328
$320,328
$320,328
Sunderland Library
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$67,620
$233,814
$233,814
$233,814
Total ($000)
$241.1
$241.1
$241.1
$349.0
$349.0
$349.0
$349.0
$349.0
$349.0
$349.0
$349.0
$349.0
$889.1
$889.1
$889.1
Total Value of Furniture and Equipment ($)
APPENDIX B.1
TABLE B.1-1
# of Square Feet
# of Hectares
# of Collection Materials
Appendix B | 64
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
PARK DEVELOPMENT & FACILITIES - PARK DEVELOPMENT
DEVELOPED PARKLAND
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Neighborhood Parks
Maple Lane Parkette
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
$149,000
Public Square - Ethel Park
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
$149,000
Barkey Subn Parkland - Cannington
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
$149,000
Gamebridge Parkette
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
$149,000
Fairgate Subdivision Phase 1
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
$149,000
Fairgate Subdivision Phase 2
-
-
-
0.15
0.15
0.15
0.15
0.15
0.15
0.15
$149,000
Kaitlin (beside SWM pond)
-
-
-
-
0.28
0.28
0.28
0.28
0.28
0.28
$149,000
Marydel Parkette (beisde rail road)
-
-
-
-
-
0.50
0.50
0.50
0.50
0.50
$149,000
Community Parks
Beaverton Fairgrounds
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
6.88
$149,000
Mcleod Park/Clare Hardy Park - Cannington
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
15.60
$149,000
Sunderland Fairgrounds
6.90
6.90
6.90
6.90
6.90
6.90
6.90
6.90
6.90
8.77
8.77
8.77
8.77
8.77
8.77
$149,000
Manilla Park
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
$149,000
Port Bolster Park
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
$149,000
Beaverton Harbour Parkland
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
$149,000
King Street Park - Beaverton
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
$149,000
Centennial Park - Thorah
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
$149,000
Old Mill Gateway - Centennial/Beaverton
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
$149,000
Old Mill Gateway - Luft Property
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
$149,000
Marydel Subdivision
-
-
-
-
-
2.00
2.00
2.00
2.00
2.00
$149,000
Total (ha)
40.11
40.41
40.41
40.41
40.41
40.41
40.41
40.41
40.56
42.71
45.21
45.21
45.21
45.21
45.21
Total ($000)
5,976.39
6,021.09
6,021.09
6,021.09
6,021.09
6,021.09
$6,021.1
$6,021.1
$6,043.4
$6,363.8
$6,736.3
$6,736.3
$6,736.3
$6,736.3
$6,736.3
APPENDIX B.1
TABLE B.1-1
# of Hectares of Developed Parkland
Appendix B | 65
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
INDOOR RECREATION - MAJOR FACILITIES
BUILDINGS
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Beaverton Arena/Community Centre
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
25,300
$500
Beaverton Curling Rink
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
3,763
$500
Rick Macleish Memorial (Cannington Arena/CC)
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
23,640
$500
Cannington Curling Rink
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
17,220
$500
Sunderland Arena/Community Centre
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
25,800
$500
Manilla Hall
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
4,260
$500
Wilfrid Hall
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
3,950
$500
Lawn Bowling Facility - Cannington
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
1,546
$500
Old Town Hall - Sunderland*
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
7,510
$500
Beaverton Town Hall*
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
15,400
$500
Cannington Town Hall*
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
3,250
$500
Total (sq.ft.)
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
131,639
Total ($000)
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
$65,819.5
*NOTE: Space for non-DC eligible uses has been removed
LAND
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Beaverton Arena/Community Centre
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
$500,000
Beaverton Curling Rink
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
$500,000
Rick Macleish Memorial (Cannington Arena/CC)
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
$500,000
Cannington Curling Rink
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
$500,000
Sunderland Arena/Community Centre
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
0.19
$500,000
Manilla Hall
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
$500,000
Wilfrid Hall
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
$500,000
Lawn Bowling Facility - Cannington
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
$500,000
Old Town Hall - Sunderland*
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
$500,000
Beaverton Town Hall*
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
$500,000
Cannington Town Hall*
0.33
0.33
0.33
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
$500,000
$500,000
Dog Pound - New
-
-
-
-
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
$500,000
Total (ha)
3.54
3.54
3.54
3.38
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
Total ($000)
$1,770.0
$1,770.0
$1,770.0
$1,687.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
$1,697.5
*NOTE: Space for non-DC eligible uses has been removed
EQUIPMENT
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture and Equipment
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
$3,422,614
Total ($000)
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
$3,422.6
APPENDIX B.1
TABLE B.1-1
# of Square Feet
# of Hectares
Total Value of Furniture & Equipment ($)
Appendix B | 66
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
PARK DEVELOPMENT & FACILITIES
Senior Soccer - Unlit
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/field)
Brock Park - Port Bolster
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$50,000
Total (#)
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total ($000)
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
$100.0
Ball Diamonds - Unlit
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/field)
King Street - Beaverton
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$123,000
Cannington - Claire Hardy
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$123,000
Sunderland Fairground #3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$123,000
Manilla Park
-
-
-
-
-
-
-
-
-
-
-
1
1
1
1
$123,000
Total (#)
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4
Total ($000)
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$369.0
$492.0
$492.0
$492.0
$492.0
* Space for non-DC eligible uses has been removed
Ball Diamonds - Lit
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/field)
Beaverton Fairground #1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$296,000
Beaverton Fairground #2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$296,000
Cannington - Claire Hardy
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$296,000
Manilla Park
1
1
1
1
1
1
1
1
1
1
1
-
-
-
-
$296,000
Sunderland Fairground #1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$296,000
Sunderland Fairground #2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$296,000
Total (#)
6
6
6
6
6
6
6
6
6
6
6
5
5
5
5
Total ($000)
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,776.0
$1,480.0
$1,480.0
$1,480.0
$1,480.0
Basketball Courts
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/court)
Beaverton - Old Mill Gateway Full Court
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$30,000
Sunderland Fairgrounds Full Court
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$30,000
Cannington MacLeod Park Half Court
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$30,000
Total (#)
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Total ($000)
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
$90.0
Tennis Courts
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/court)
King Street Parkette
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$103,000
Sunderland Fairgrounds
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$103,000
Cannington MacLeod Park
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$103,000
Total (#)
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Total ($000)
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
$618.0
Lawn Bowling
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/facility)
Cannington MacLeod Lawn Bowl
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
$8,000
Total (#)
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Total ($000)
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
$32.0
# of Courts
# of Facilities
# of Courts
APPENDIX B.1
TABLE B.1-1
# of Fields
# of Fields
# of Fields
Appendix B | 67
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
PARK DEVELOPMENT & FACILITIES
APPENDIX B.1
TABLE B.1-1
Playgrounds
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Beaverton Fairgrounds
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Mcleod/Clare Hardy - Cannington
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$65,000
Sunderland Fairgrounds
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Port Bolster Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Manilla Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Harbour Park - Beaverton
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
King Street Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Old Mill Gateway Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Centennial Park - Thorah
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$65,000
Fairgate Park
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.5
$65,000
Total (#)
10
10
10
10
10
10
10
10
10
10
10
10
10
10
11
Total ($000)
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$650.0
$682.5
Splashpads
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Beaverton Splash Pad (Randy Skinner Family)
-
-
-
-
-
1
1
1
1
1
1
1
1
1
1
$322,000
Total (#)
-
-
-
-
-
1
1
1
1
1
1
1
1
1
1
Total ($000)
$0.0
$0.0
$0.0
$0.0
$0.0
$322.0
$322.0
$322.0
$322.0
$322.0
$322.0
$322.0
$322.0
$322.0
$322.0
Skateboard Parks
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/facility)
Beaverton - Old Mill Gateway
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$90,000
Cannington - McLeod Park - Old
1
1
1
1
-
-
-
-
-
-
-
-
-
-
$32,000
Cannington - McLeod Park - New
-
-
-
-
1
1
1
1
1
1
1
1
1
1
1
$901,000
Sunderland Fairgrounds
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$32,000
Total (#)
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Total ($000)
$154.0
$154.0
$154.0
$154.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
$1,023.0
# of Playgrounds
# of Spashpads
# of Facilities
Appendix B | 68
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
LIBRARY, PARKS & RECREATION
PARK DEVELOPMENT & FACILITIES - EQUIPMENT & OTHER OUTDOOR FACILITIES
Equipment and Other Outdoor Facilities
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Washroom/Changeroom - Harbour Park Cres.
$49,100
$69,500
$69,500
$69,500
$69,500
$69,500
$69,500
$69,500
$69,500
$69,500
$69,500
$78,900
$78,900
$78,900
$78,900
Picnic Shelters - Cannington
$28,000
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$36,800
$36,800
$36,800
$36,800
Washroom/Storage - Cannington
$42,100
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$55,300
$55,300
$55,300
$55,300
Picnic Shelter - Sunderland
$28,000
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$32,400
$36,800
$36,800
$36,800
$36,800
Grandstand - Sunderland
$210,300
$243,500
$243,500
$243,500
$243,500
$256,800
$256,800
$256,800
$256,800
$256,800
$256,800
$291,400
$291,400
$291,400
$291,400
Concession Booth - Sunderland
$21,000
$24,300
$24,300
$24,300
$24,300
$24,300
$24,300
$24,300
$24,300
$24,300
$24,300
$27,600
$27,600
$27,600
$27,600
Horse Stable - Sunderland
$98,100
$113,600
$113,600
$113,600
$113,600
$113,600
$113,600
$113,600
$113,600
$113,600
$113,600
$128,900
$128,900
$128,900
$128,900
Washroom/Storage/Booth - Beaverton
$35,000
$40,500
$40,500
$40,500
$40,500
$40,500
$40,500
$40,500
$40,500
$40,500
$40,500
$46,000
$46,000
$46,000
$46,000
Storage/Electrical Equipment
$5,600
$6,500
$6,500
$6,500
$6,500
$6,500
$6,500
$6,500
$6,500
$6,500
$6,500
$7,400
$7,400
$7,400
$7,400
Bleachers - All Locations
$42,100
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$48,700
$55,300
$55,300
$55,300
$55,300
Outdoor Equipment (Mowers, Weedwackers, etc.)
$163,500
$189,300
$189,300
$189,300
$189,300
$189,300
$189,300
$189,300
$189,300
$189,300
$189,300
$221,600
$221,600
$221,600
$227,600
Harbour Infrastructure
$120,000
$138,900
$138,900
$138,900
$138,900
$138,900
$138,900
$138,900
$138,900
$138,900
$138,900
$157,600
$157,600
$157,600
$157,600
Thorah Island Harbour (Owned by Twsp)
$0
$0
$0
$1,024,700
$1,024,700
$1,024,700
$1,024,700
$1,024,700
$1,024,700
$1,024,700
$1,024,700
$1,162,900
$1,162,900
$1,162,900
$1,162,900
Storage - Trail Sed
$0
$0
$0
$0
$0
$0
$0
$0
$0
$20,000
$20,000
$22,700
$22,700
$22,700
$22,700
Total ($000)
$842.8
$988.3
$988.3
$2,013.0
$2,013.0
$2,026.3
$2,026.3
$2,026.3
$2,026.3
$2,046.3
$2,046.3
$2,329.2
$2,329.2
$2,329.2
$2,335.2
Value ($)
APPENDIX B.1
TABLE B.1-1
Appendix B | 69
TOWNSHIP OF BROCK
CALCULATION OF SERVICE LEVELS
LIBRARY, PARKS & RECREATION
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
11,592
11,466
11,341
11,401
11,461
11,521
11,582
11,642
11,821
12,003
12,188
12,376
12,567
12,758
12,952
INVENTORY SUMMARY ($000)
Library Board
$6,453.6
$6,755.3
$6,619.4
$7,999.5
$7,877.2
$7,658.3
$8,059.1
$8,018.2
$7,965.2
$8,080.9
$7,956.3
$7,856.0
$8,932.4
$8,417.0
$8,916.1
Developed Parkland
$5,976.4
$6,021.1
$6,021.1
$6,021.1
$6,021.1
$6,021.1
$6,021.1
$6,021.1
$6,043.4
$6,363.8
$6,736.3
$6,736.3
$6,736.3
$6,736.3
$6,736.3
Indoor Recreation - Major Facilities
$71,012.1
$71,012.1
$71,012.1
$70,929.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
$70,939.6
Park Development & Facilities
$3,789.0
$3,789.0
$3,789.0
$3,789.0
$4,658.0
$4,980.0
$4,980.0
$4,980.0
$4,980.0
$4,980.0
$4,980.0
$4,807.0
$4,807.0
$4,807.0
$4,839.5
Equipment and Other Outdoor Facilities
$842.8
$988.3
$988.3
$2,013.0
$2,013.0
$2,026.3
$2,026.3
$2,026.3
$2,026.3
$2,046.3
$2,046.3
$2,329.2
$2,329.2
$2,329.2
$2,335.2
Total ($000)
$88,073.9
$88,565.8
$88,429.9
$90,752.2
$91,508.9
$91,625.3
$92,026.1
$91,985.2
$91,954.5
$92,410.6
$92,658.5
$92,668.1
$93,744.5
$93,229.1
$93,766.7
Average
SERVICE LEVEL ($/capita)
Service
Level
Library Board
$556.73
$589.16
$583.67
$701.65
$687.30
$664.73
$695.83
$688.73
$673.81
$673.24
$652.80
$634.77
$710.78
$659.74
$688.39
$657.42
Developed Parkland
$515.56
$525.13
$530.91
$528.12
$525.35
$522.62
$519.87
$517.19
$511.25
$530.18
$552.70
$544.30
$536.03
$528.01
$520.10
$527.15
Indoor Recreation - Major Facilities
$6,125.96
$6,193.28
$6,261.54
$6,221.35
$6,189.65
$6,157.42
$6,124.99
$6,093.42
$6,001.15
$5,910.16
$5,820.45
$5,732.03
$5,644.91
$5,560.40
$5,477.12
$5,967.59
Park Development & Facilities
$326.86
$330.46
$334.10
$332.34
$406.42
$432.25
$429.98
$427.76
$421.28
$414.90
$408.60
$388.41
$382.51
$376.78
$373.65
$385.75
Equipment and Other Outdoor Facilities
$72.71
$86.19
$87.14
$176.56
$175.64
$175.88
$174.95
$174.05
$171.42
$170.48
$167.89
$188.20
$185.34
$182.57
$180.30
$157.96
Total ($/capita)
$7,597.82
$7,724.21
$7,797.36
$7,960.02
$7,984.37
$7,952.90
$7,945.61
$7,901.15
$7,778.91
$7,698.96
$7,602.44
$7,487.72
$7,459.58
$7,307.50
$7,239.55
$7,695.87
15-Year Funding Envelope Calculation
15-Year Average Service Level 2009 - 2023
$7,695.87
Net Population Growth 2024 - 2033
2,113
Maximum Allowable Funding Envelope
$16,261,373
APPENDIX B.1
TABLE B.1-1
Appendix B | 70
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
1.0 LIBRARY, PARKS & RECREATION
1.1 Library
1.1.1
Provision for Additional Collection Materials
2024
-
2033
158,000
$
-
$
158,000
$
-
$
0%
158,000
$
158,000
$
-
$
-
$
1.1.2
Book Kiosks (Sunderland Arena)
2028
-
2030
54,000
$
-
$
54,000
$
-
$
0%
54,000
$
54,000
$
-
$
-
$
1.1.3
New Growth-Related Library Space (3,500 sq.ft.)
2028
-
2030
1,750,000
$
-
$
1,750,000
$
-
$
0%
1,750,000
$
1,750,000
$
-
$
-
$
1.1.4
RFID for Entire Book Collection
2024
-
2027
75,000
$
-
$
75,000
$
-
$
0%
75,000
$
75,000
$
-
$
-
$
1.1.5
Self-Checkouts
2030
-
2032
36,000
$
-
$
36,000
$
-
$
0%
36,000
$
36,000
$
-
$
-
$
1.1.6
Makerspace
2030
-
2034
30,000
$
-
$
30,000
$
-
$
0%
30,000
$
30,000
$
-
$
-
$
Subtotal Library
2,103,000
$
-
$
2,103,000
$
-
$
2,103,000
$
2,103,000
$
-
$
-
$
1.2 Indoor Recreation
1.2.1
Sunderland Memorial Arena Expansion (Township Share)
2024
-
2026
10,200,000
$
5,485,084
$
4,714,916
$
1,650,221
$
35%
3,064,695
$
1,144,654
$
1,920,041
$
-
$
1.2.2
Provision for Beaverton Arena Expansion
2027
-
2030
7,500,000
$
-
$
7,500,000
$
2,625,000
$
35%
4,875,000
$
-
$
4,875,000
$
-
$
1.2.3
Facility for Parks Equipment
2025
-
2027
100,000
$
-
$
100,000
$
-
$
0%
100,000
$
-
$
100,000
$
-
$
Subtotal Indoor Recreation
17,800,000
$
5,485,084
$
12,314,916
$
4,275,221
$
8,039,695
$
1,144,654
$
6,895,041
$
-
$
1.3 Parks
1.3.1
Harbour Infrastructure Expenditures
2024
-
2033
400,000
$
-
$
400,000
$
300,000
$
75%
100,000
$
-
$
100,000
$
-
$
1.3.2
New Playground Equipment
2024
-
2033
65,000
$
-
$
65,000
$
-
$
0%
65,000
$
-
$
65,000
$
-
$
1.3.3
New Playground Equipment
2024
-
2033
65,000
$
-
$
65,000
$
-
$
0%
65,000
$
-
$
65,000
$
-
$
1.3.4
New Playground Equipment
2024
-
2033
65,000
$
-
$
65,000
$
-
$
0%
65,000
$
-
$
65,000
$
-
$
1.3.5
New Playground Equipment
2024
-
2033
65,000
$
-
$
65,000
$
-
$
0%
65,000
$
-
$
65,000
$
-
$
1.3.6
Beaverton King Street Park Redevelopment
2024
-
2033
300,000
$
-
$
300,000
$
-
$
0%
300,000
$
-
$
300,000
$
-
$
1.3.7
Sunderland Park Construction (0.3355ha)
2024
-
2033
49,170
$
-
$
49,170
$
-
$
0%
49,170
$
-
$
49,170
$
-
$
1.3.8
Marydel Park Construction (1.97 hectares)
2024
-
2033
782,980
$
-
$
782,980
$
-
$
0%
782,980
$
-
$
782,980
$
-
$
1.3.9
Trail Development (1.5km per year)
2024
-
2033
530,000
$
-
$
530,000
$
-
$
0%
530,000
$
-
$
530,000
$
-
$
1.3.10
Cannington Claire Hardy Park
2024
-
2033
300,000
$
-
$
300,000
$
-
$
0%
300,000
$
-
$
300,000
$
-
$
1.3.11
Meadowlands Neighbourhood Park (1.00 hecatre) - Cannington
2024
-
2033
149,000
$
-
$
149,000
$
-
$
0%
149,000
$
-
$
149,000
$
-
$
1.3.12
Pickelball Courts (3 New)
2024
-
2033
85,100
$
-
$
85,100
$
-
$
0%
85,100
$
-
$
85,100
$
-
$
1.3.13
Additional Dog Park (x2)
2024
-
2033
50,000
$
-
$
50,000
$
-
$
0%
50,000
$
-
$
50,000
$
-
$
1.3.14
Provision for Additional Growth-Related Parks Infrastructure
2024
-
2033
1,146,835
$
-
$
1,146,835
$
-
$
0%
1,146,835
$
-
$
1,146,835
$
-
$
1.3.15
New Beaverton Outdoor Track
2024
-
2024
200,000
$
175,000
$
25,000
$
-
$
0%
25,000
$
-
$
25,000
$
-
$
Subtotal Parks
4,253,085
$
175,000
$
4,078,085
$
300,000
$
3,778,085
$
-
$
3,778,085
$
-
$
TOTAL LIBRARY, PARKS & RECREATION
24,156,085
$
5,660,084
$
18,496,001
$
4,575,221
$
13,920,780
$
3,247,654
$
10,673,126
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
100%
$10,673,126
2024 - 2033 Net Funding Envelope
$16,261,373
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$4,323.65
Current Reserve Fund Balance
$3,247,654
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
0%
$0
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$0.00
APPENDIX B.1
TABLE B.1-2
Replacement & BTE Share
Ineligible Costs
DC Eligible Costs
TOWNSHIP OF BROCK
DEVELOPMENT-RELATED CAPITAL PROGRAM
LIBRARY, PARKS & RECREATION
Timing
Appendix B | 71
Appendix B.2
Fire Protection
Appendix B | 72
Appendix B.2 - Fire Protection
The Brock Fire Department is responsible for the provision of fire protection
and emergency services across the Township. The Fire Protection and
Prevention Act defines fire protection services as "...fire suppression, fire
prevention, fire safety education, communication, training of persons
involved in the provision of fire protection services, rescue and emergency
services and the delivery of all those services." The department currently
operates three fire stations.
Table B.2-1
Historical Service Levels
The Fire fifteen-year historical inventory of capital assets includes three fire
stations. The combined area of the stations is 17,455 sq ft and the buildings
are valued at $9.9 million. The land area associated with the buildings is
1.51 hectares and is valued at $755,000. Fire vehicles add $9.4 million to the
value of the inventory. Finally, personal fire fighter equipment,
communications equipment, and other station equipment add another $2.0
million to the value of the inventory.
The current replacement value of the Fire capital infrastructure is $22.1
million and has provided the Township with a fifteen-year average service
level of $1,421.92 per population and employment. This service level, when
multiplied by the 2024-2033 growth in net population and employment,
results in a maximum allowable funding envelope of $3.7 million that can be
considered for recovery through development charges.
No excess capacity is identified for this service and as such, no reduction
has been made to the funding envelope. Therefore, the full $3.7 million can
be considered for recovery through development charges.
Appendix B | 73
Table B.2-2
Development-Related Capital Program &
Calculation of the Development Charge
The 2024-2033 development-related capital program for Fire includes the
remaining principal payments of about $692,840 related to Brock Fire
Station #1 located in Sunderland. A portion, 65%, of the payments is related
to benefit to existing and is netted off the costs eligible for recovery through
DCs.
The capital program also recovers the future replacement of Cannington Fire
Station at a total cost of $4.1 million. Of this cost, $2.1 million, or 50%, has
been deemed benefit to existing and is netted off the total cost for recovery
through DCs.
Altogether, the ten-year capital forecast for Fire Services amounts to $5.0
million. A deduction of $2.5 million is made to account for replacement
shares of projects, therefore, $2.4 million is considered to be related to
development in the Township. Existing reserve funds of $117,900 are netted
off the DC eligible costs and the amount of $2.3 million is carried forward to
the development charges calculation.
The development-related net capital cost of $2.3 million is allocated 83 per
cent against residential development, or $1.9 million, and 17 per cent against
non-residential development, or $395,693. The resulting development charge
rates are $782.61 per capita for new residential development and $15.58 per
square metre for new non-residential development.
FIRE SERVICES SUMMARY
15-year Hist.
Service Level
per pop & emp
Total
Net DC Recoverable
$/capita
$/sq.m
$1,421.92
$4,960,841
$2,327,606
$782.61
$15.58
Development Charge
2024 - 2033
Calculated
Development-Related Capital Program
Appendix B | 74
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
FIRE SERVICES
BUILDINGS
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Station #1 - Sunderland
4,531
4,531
4,531
4,531
4,531
-
-
-
-
-
-
-
-
-
-
$570
Station #1 - Sunderland - New Fire Hall
-
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
7,835
$570
Station #2 - Cannington
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
$570
Station #3 - Beaverton
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
5,120
$570
Total (sq.ft.)
14,151
21,986
21,986
21,986
21,986
17,455
17,455
17,455
17,455
17,455
17,455
17,455
17,455
17,455
17,455
Total ($000)
$8,066.1
$12,532.0
$12,532.0
$12,532.0
$12,532.0
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
LAND
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Station #1 - Sunderland
0.04
0.04
0.04
0.04
0.04
-
-
-
-
-
-
-
-
-
-
Station #1 - Sunderland - New Fire Hall
-
-
-
-
-
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
$500,000
Station #2 - Cannington
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
$500,000
Station #3 - Beaverton
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
$500,000
Total (ha)
0.65
0.65
0.65
0.65
0.65
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
Total ($000)
305.00
305.00
305.00
305.00
305.00
755.00
755.00
755.00
755.00
755.00
755.00
755.00
755.00
755.00
755.00
VEHICLES
UNIT COST
Vehicle Type
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/vehicle)
- Tankers
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$410,000
- Pumpers (heavy duty custom)
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
$1,100,000
- Rescue
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$700,000
Fire Rescue Boat
-
-
-
-
-
1
1
1
1
1
1
1
1
1
1
$200,000
Fire Prevention Vehicle (SUV)
-
-
-
1
1
1
1
1
1
1
1
1
1
1
1
$60,000
Fire Chief Vehicle (SUV)
-
-
-
-
-
1
1
1
1
1
1
1
1
1
1
$60,000
Aerial Truck
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
$2,400,000
Total (#)
11
10
10
11
11
13
13
13
13
13
13
13
13
13
13
Total ($000)
$8,430.0
$7,730.0
$7,730.0
$7,790.0
$7,790.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$9,350.0
FURNITURE & EQUIPMENT
Equipment
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
- Personal Fire Fighter Equipment
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
$730,584
- Communications Equipment
$358,297
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
$477,000
- Other Station Equipment
$291,857
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
$488,000
Additional Fire Station Equipment ($20/sq.ft.)
$283,020
$439,720
$439,720
$439,720
$439,720
$349,100
$349,100
$349,100
$349,100
$349,100
$349,100
$349,100
$349,100
$349,100
$349,100
Total ($000)
$1,663.8
$2,135.3
$2,135.3
$2,135.3
$2,135.3
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
# of Vehicles
APPENDIX B.2
TABLE B.2-1
# of Square Feet
Total Value of Furniture & Equipment ($)
# of Hectares
Appendix B | 75
TOWNSHIP OF BROCK
CALCULATION OF SERVICE LEVELS
FIRE SERVICES
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
11,592
11,466
11,341
11,401
11,461
11,521
11,582
11,642
11,821
12,003
12,188
12,376
12,567
12,758
12,952
Historical Employment
3,059
3,100
3,142
3,100
3,058
3,017
2,976
2,936
2,964
2,992
3,021
3,050
3,079
3,126
3,174
Total Historical Population & Employment
14,651
14,566
14,483
14,501
14,519
14,538
14,558
14,578
14,785
14,995
15,209
15,426
15,646
15,884
16,126
INVENTORY SUMMARY ($000)
Buildings
$8,066.1
$12,532.0
$12,532.0
$12,532.0
$12,532.0
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
$9,949.4
Land
$305.0
$305.0
$305.0
$305.0
$305.0
$755.0
$755.0
$755.0
$755.0
$755.0
$755.0
$755.0
$755.0
$755.0
$755.0
Vehicles
$8,430.0
$7,730.0
$7,730.0
$7,790.0
$7,790.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$8,050.0
$9,350.0
Furniture & Equipment
$1,663.8
$2,135.3
$2,135.3
$2,135.3
$2,135.3
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
$2,044.7
Total ($000)
$18,464.8
$22,702.3
$22,702.3
$22,762.3
$22,762.3
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$20,799.0
$22,099.0
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$550.55
$860.36
$865.29
$864.22
$863.15
$684.37
$683.43
$682.47
$672.94
$663.51
$654.18
$644.97
$635.89
$626.37
$616.99
$704.58
Land
$20.82
$20.94
$21.06
$21.03
$21.01
$51.93
$51.86
$51.79
$51.07
$50.35
$49.64
$48.94
$48.25
$47.53
$46.82
$40.20
Vehicles
$575.39
$530.69
$533.73
$537.20
$536.54
$553.72
$552.96
$552.18
$544.47
$536.85
$529.29
$521.85
$514.50
$506.80
$579.82
$540.40
Furniture & Equipment
$113.56
$146.60
$147.44
$147.25
$147.07
$140.64
$140.45
$140.25
$138.29
$136.36
$134.44
$132.55
$130.68
$128.73
$126.80
$136.74
Total ($/pop & emp)
$1,260.31
$1,558.58
$1,567.52
$1,569.71
$1,567.76
$1,430.67
$1,428.70
$1,426.69
$1,406.77
$1,387.06
$1,367.55
$1,348.31
$1,329.33
$1,309.42
$1,370.43
$1,421.92
15-Year Funding Envelope Calculation
15-Year Average Service Level 2009 - 2023
$1,421.92
Net Population & Employment Growth 2024 - 2033
2,631
Maximum Allowable Funding Envelope
$3,740,716
APPENDIX B.2
TABLE B.2-1
Appendix B | 76
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
2.0 FIRE SERVICES
2.1
Buildings, Land, Furniture & Equipment
2.1.1
Brock Fire Station #1 Debenture Annual Payment
2024
-
2024
99,341
$
-
$
99,341
$
64,571
$
65%
34,769
$
34,769
$
-
$
-
$
2.1.2
Brock Fire Station #1 Debenture Annual Payment
2025
-
2025
98,651
$
-
$
98,651
$
64,123
$
65%
34,528
$
34,528
$
-
$
-
$
2.1.3
Brock Fire Station #1 Debenture Annual Payment
2026
-
2026
98,869
$
-
$
98,869
$
64,265
$
65%
34,604
$
34,604
$
-
$
-
$
2.1.4
Brock Fire Station #1 Debenture Annual Payment
2027
-
2027
98,939
$
-
$
98,939
$
64,310
$
65%
34,628
$
13,987
$
20,641
$
-
$
2.1.5
Brock Fire Station #1 Debenture Annual Payment
2028
-
2028
98,905
$
-
$
98,905
$
64,288
$
65%
34,617
$
-
$
34,617
$
-
$
2.1.6
Brock Fire Station #1 Debenture Annual Payment
2029
-
2029
98,717
$
-
$
98,717
$
64,166
$
65%
34,551
$
-
$
34,551
$
-
$
2.1.7
Brock Fire Station #1 Debenture Annual Payment
2030
-
2030
99,421
$
-
$
99,421
$
64,624
$
65%
34,797
$
-
$
34,797
$
-
$
2.1.8
Cannington Fire Station (Replacement - 7,000 sq. ft.)
2028
-
2030
4,130,000
$
-
$
4,130,000
$
2,065,000
$
50%
2,065,000
$
-
$
2,065,000
$
-
$
2.1.9
Cannington Fire Station Extractor & Dryer
2025
-
2026
24,000
$
-
$
24,000
$
-
$
0%
24,000
$
-
$
24,000
$
-
$
2.1.10
Beaverton Fire Station Extractor & Dryer
2025
-
2026
24,000
$
-
$
24,000
$
-
$
0%
24,000
$
-
$
24,000
$
-
$
Subtotal Buildings, Land, Furniture & Equipment
4,870,841
$
-
$
4,870,841
$
2,515,346
$
2,355,494
$
117,888
$
2,237,606
$
-
$
2.2
Vehicles and Equipment
2.2.1
Additional ATV
2025
-
2027
40,000
$
-
$
40,000
$
-
$
0%
40,000
$
-
$
40,000
$
-
$
2.2.2
Fire Prevention Vehicle
2025
-
2027
50,000
$
-
$
50,000
$
-
$
0%
50,000
$
-
$
50,000
$
-
$
Subtotal Vehicles and Equipment
90,000
$
-
$
90,000
$
-
$
90,000
$
-
$
90,000
$
-
$
TOTAL FIRE SERVICES
4,960,841
$
-
$
4,960,841
$
2,515,346
$
2,445,494
$
117,888
$
2,327,606
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
83%
$1,931,913
2024 - 2033 Net Funding Envelope
$3,740,716
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$782.61
Current Reserve Fund Balance
$117,888
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
17%
$395,693
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$15.58
TABLE B.2-2
Timing
Replacement & BTE Share
Ineligible Costs
DC Eligible Costs
DEVELOPMENT-RELATED CAPITAL PROGRAM
FIRE SERVICES
TOWNSHIP OF BROCK
APPENDIX B.2
Appendix B | 77
Appendix B.3
By-Law Services
Appendix B | 78
Appendix B.3 - By-Law Services
The By-Law Services and Animal Control Division is responsible for
enforcing a range of Township by-laws. The capital program in this service
area falls under subsection 2(4) 18 of the DCA.
Table B.3-1
Historical Service Levels
The By-Law Services fifteen-year historical inventory of capital assets
includes buildings for the animal shelter. The area of this building is 2,500
sq ft and is valued at $1.1 million. The land area associated with this
building is 0.02 hectares and is valued at $10,000. By-Law Services vehicles
add $130,000 to the value of the inventory. Finally, furniture and equipment
add another $60,200 to the value of the inventory.
The current replacement value of the By-Law Services capital infrastructure
is $1.3 million and has provided the Township with a fifteen-year average
service level of $71.58 per population and employment. This service level,
when multiplied by the 2024-2033 growth in net population and employment,
results in a maximum allowable funding envelope of $188,309 that can be
considered for recovery through development charges.
No excess capacity is identified for this service and as such, no reduction
has been made to the funding envelope. Therefore, the full $188,309 can be
considered for recovery through development charges.
Table B.3-2
Development-Related Capital Program &
Calculation of the Development Charge
The 2024 - 2033 development-related capital program for By-Law Services
includes the provision for building expansion valued at $910,000 and
additional vehicles valued at $160,000.
Appendix B | 79
Altogether, the ten-year capital forecast for By-Law Services amounts to
$1.1 million. There are no replacement shares or available DC reserves,
therefore. Due to funding envelope restrictions, $881,700 is removed from
recovery in the ten-year program and anticipated to be considered for
funding from future DC Studies. The remaining $188,309 is recovered from
development over the 2024 to 2033 planning period.
The development-related net capital cost of $188,309 is allocated 83%
against residential development, or $156,297, and 17% against non-
residential development, or $32,013. The resulting development charge rates
are $63.32 per capita for new residential development and $1.26 per square
metre for new non-residential development.
BY-LAW SERVICES SUMMARY
15-year Hist.
Service Level
per Capita
Total
Net DC Recoverable
$/capita
$/sq.m
$71.58
$1,070,000
$188,309
$63.32
$1.26
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 80
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
BY-LAW SERVICES
BUILDINGS
UNIT COST
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Animal Shelter
-
-
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
$455
By-Law Space (Captured above & in Fire)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0
Total (sq.ft.)
-
-
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
Total ($000)
$0.0
$0.0
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
LAND
UNIT COST
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Animal Shelter
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
$500,000
By-Law Space (Captured above)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0
Total (ha)
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
Total ($000)
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
VEHICLES
UNIT COST
Vehicle Type
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/vehicle)
Cube Van
-
-
-
-
-
-
-
-
-
1
1
1
1
1
1
$60,000
Ford - Small Pick Up Truck
-
-
-
-
-
-
-
-
-
-
-
1
1
1
1
$70,000
Total (#)
-
0
0
0
0
0
0
0
0
1
1
2
2
2
2
Total ($000)
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$60.0
$60.0
$130.0
$130.0
$130.0
$130.0
FURNITURE & EQUIPMENT
Equipment
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture & Equipment ($15/sq.ft.)
$0
$0
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
$37,500
Additional F&E (Cat Cages)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$22,700
$22,700
$22,700
Total ($000)
$0.0
$0.0
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$60.2
$60.2
$60.2
APPENDIX B.3
TABLE B.3-1
# of Square Feet
# of Hectares
# of Vehicles
Total Value of Furniture & Equipment ($)
Appendix B | 81
TOWNSHIP OF BROCK
CALCULATION OF SERVICE LEVELS
BY-LAW SERVICES
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
11,592
11,466
11,341
11,401
11,461
11,521
11,582
11,642
11,821
12,003
12,188
12,376
12,567
12,758
12,952
Historical Employment
3,059
3,100
3,142
3,100
3,058
3,017
2,976
2,936
2,964
2,992
3,021
3,050
3,079
3,126
3,174
Total Historical Population & Employment
14,651
14,566
14,483
14,501
14,519
14,538
14,558
14,578
14,785
14,995
15,209
15,426
15,646
15,884
16,126
INVENTORY SUMMARY ($000)
Buildings
$0.0
$0.0
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
$1,137.5
Land
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
$10.0
Vehicles
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$60.0
$60.0
$130.0
$130.0
$130.0
$130.0
Furniture & Equipment
$0.0
$0.0
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$37.5
$60.2
$60.2
$60.2
Total ($000)
$10.0
$10.0
$1,185.0
$1,185.0
$1,185.0
$1,185.0
$1,185.0
$1,185.0
$1,185.0
$1,245.0
$1,245.0
$1,315.0
$1,337.7
$1,337.7
$1,337.7
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$0.00
$0.00
$78.54
$78.44
$78.35
$78.24
$78.14
$78.03
$76.94
$75.86
$74.79
$73.74
$72.70
$71.61
$70.54
$65.73
Land
$0.68
$0.69
$0.69
$0.69
$0.69
$0.69
$0.69
$0.69
$0.68
$0.67
$0.66
$0.65
$0.64
$0.63
$0.62
$0.67
Vehicles
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4.00
$3.95
$8.43
$8.31
$8.18
$8.06
$2.73
Furniture & Equipment
$0.00
$0.00
$2.59
$2.59
$2.58
$2.58
$2.58
$2.57
$2.54
$2.50
$2.47
$2.43
$3.85
$3.79
$3.73
$2.45
Total ($/pop & emp)
$0.68
$0.69
$81.82
$81.72
$81.62
$81.51
$81.40
$81.28
$80.15
$83.03
$81.86
$85.25
$85.50
$84.22
$82.95
$71.58
15-Year Funding Envelope Calculation
15-Year Average Service Level 2009 - 2023
$71.58
Net Population & Employment Growth 2024 - 2033
2,631
Maximum Allowable Funding Envelope
$188,309
APPENDIX B.3
TABLE B.3-1
Appendix B | 82
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
3.0 BY-LAW SERVICES
3.1
Buildings, Land, Furniture & Equipment
3.1.1
Provision for Buildling Expansion
2024
-
2033
910,000
$
-
$
910,000
$
-
$
0%
910,000
$
-
$
28,309
$
881,691
$
Subtotal Buildings, Land, Furniture & Equipment
910,000
$
-
$
910,000
$
-
$
910,000
$
-
$
28,309
$
881,691
$
3.2
Vehicles and Equipment
3.2.1
Additional Vehicles
2024
-
2027
160,000
$
-
$
160,000
$
-
$
0%
160,000
$
-
$
160,000
$
-
$
Subtotal Vehicles and Equipment
160,000
$
-
$
160,000
$
-
$
160,000
$
-
$
160,000
$
-
$
TOTAL BY-LAW SERVICES
1,070,000
$
-
$
1,070,000
$
-
$
1,070,000
$
-
$
188,309
$
881,691
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
83%
$156,297
2024 - 2033 Net Funding Envelope
$188,309
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$63.32
Current Reserve Fund Balance
$0
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
17%
$32,013
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$1.26
BY-LAW SERVICES
Ineligible Costs
DC Eligible Costs
Timing
Replacement & BTE Share
APPENDIX B.3
TABLE B.3-2
TOWNSHIP OF BROCK
DEVELOPMENT-RELATED CAPITAL PROGRAM
Appendix B | 83
Appendix B.4
Development Related Studies
Appendix B | 84
Appendix B.4 - Development Related Studies
As of December 13, 2023, the Minister of Municipal Affairs and Housing has
indicated a review of the removal of development related studies form
recovery under the DCA. At the time of publishing this DC Background
Study, studies have not yet been re-instated but in anticipation in the
change of legislation, a Development Related Studies capital program has
been included below.
Table B.4-1
2024 - 2033 Development-Related Capital Program
and Calculation of the Development Charges
Table B.4-1 provides a list of development-related studies the Township
anticipates undertaking during the 2024-2033 period. Included in the
program is a Zoning By-law Review, Official Plan Review, Fire Master Plan,
one DC Background Study and a provision for other development-related
studies.
As shown on Table B.4-1, the 2024-2033 net municipal cost of all
development-related studies is $605,000. An amount of $82,500 represents
a benefit to existing share. There are minimal available DC reserves of
$2,117 netted off the ten-year recoverable amount and therefore the total
DC eligible costs is $520,383.
The 2024 - 2033 DC costs eligible for recovery amount of $520,383 is
allocated 83%, or $431,918, against new residential development and
$88,465 or 17% allocated against non-residential development. The
calculated charges that result are $174.97 per capita for new residential
development and $3.48 per square metre for new non-residential
development.
Appendix B | 85
The following table summarizes the calculation of the Development Related
Studies development charges.
DEVELOPMENT RELATED STUDIES SUMMARY
Total
Net DC Recoverable
$/capita
$/sq.m
$605,000
$520,383
$174.97
$3.48
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 86
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
4.0 DEVELOPMENT RELATED STUDIES
4.1
Development-Related Studies
4.1.1
Zoning By-law Review
2025
-
2025
130,000
$
-
$
130,000
$
32,500
$
25%
97,500
$
2,117
$
95,383
$
-
$
4.1.2
Official Plan Review
2033
-
2033
200,000
$
-
$
200,000
$
50,000
$
25%
150,000
$
-
$
150,000
$
-
$
4.1.3
DC Background Study
2032
-
2033
35,000
$
-
$
35,000
$
-
$
0%
35,000
$
-
$
35,000
$
-
$
4.1.4
Fire Master Plan
2024
-
2033
40,000
$
-
$
40,000
$
-
$
0%
40,000
$
-
$
40,000
$
-
$
4.1.5
Provision for Additional Studies
2024
-
2033
200,000
$
-
$
200,000
$
-
$
0%
200,000
$
-
$
200,000
$
-
$
TOTAL DEVELOPMENT RELATED STUDIES
605,000
$
-
$
605,000
$
82,500
$
522,500
$
2,117
$
520,383
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
83%
$431,918
Current Reserve Fund Balance
$2,117
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$174.97
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
17%
$88,465
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$3.48
DEVELOPMENT RELATED STUDIES
Ineligible Costs
DC Eligible Costs
Timing
Replacement & BTE Share
APPENDIX B.4
TABLE B.4-1
TOWNSHIP OF BROCK
DEVELOPMENT-RELATED CAPITAL PROGRAM
Appendix B | 87
Appendix B.5
Services Related to a Highway:
Public Works - Buildings & Fleet
Appendix B | 88
Appendix B.5 - Public Works: Buildings &
Fleet
The Township's Public Works Operations department is responsible for the
maintenance of all roads, sidewalks, streetlights, culverts and curbs within
the Township boundaries. The capital costs associated with Services
Related to a Highway: Public Works functions are accounted for in this
section. Information regarding roads and related infrastructure can be found
in Appendix B.6.
Table B.5-1
Historical Service Levels
The fifteen-year historical inventory of capital assets for Public Works:
Buildings and Fleet includes about 31,970 square feet of building space with
a replacement value of $14.1 million. The 5.24 hectares of land associated
with the Public Works buildings is valued at $2.6 million. Furniture and
equipment add an additional $532,700 to the inventory. The fleet and
equipment associated with Public Works is valued at $2.7 million.
The total value of Public Works capital infrastructure is estimated to be
approximately $19.9 million. The fifteen-year historical average service level
is $1,043.47 per population and employment and this, multiplied by the ten-
year forecast of population and employment growth, results in a maximum
allowable funding envelope of $2.7 million that is brought forward to the
development charges calculation.
Appendix B | 89
Table B.5-2
Development-Related Capital Program &
Calculation of the Development Charge
The ten-year development-related capital program for Public Works includes
a building, land, and furnishings as well as additional fleet and equipment
totaling $4.4 million. No replacement share has been identified as all the
works identified are related and necessitated by development in the
Township.
The full $4.4 million is development-related DC eligible costs. $47,758 is
available in the Public Works DC reserve fund and is netted from the total
costs eligible for recovery. Approximately $2.7 million is related to
development between 2024 and 2033 and is included in the calculation of
DC rates. The remaining $1.6 million will be recovered post period (2033).
The in-period $2.7 million is allocated 83%, or $2.3 million, to the residential
sector and 17%, or $466,668, to the non-residential sector. This yields a
development charge of $922.99 per capita and $18.38 per square metre.
PUBLIC WORKS: BUILDINGS & FLEET SUMMARY
15-year Hist.
Service Level
per pop & emp
Total
Net DC Recoverable
$/capita
$/sq.m
$1,043.47
$4,445,000
$2,745,108
$922.99
$18.38
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 90
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
PUBLIC WORKS: BUILDINGS & FLEET
BUILDINGS
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Franklin Depot
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
2,633
$440
Beaverton Patrol Yard
9,268
9,268
9,268
9,268
9,268
9,268
9,268
9,268
9,268
9,268
9,268
9,268
21,168
21,168
21,168
$440
Cannington Equipment Yard
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
3,400
$440
Sunderland Equipment Yard
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
4,768
$440
Total (#)
20,069
20,069
20,069
20,069
20,069
20,069
20,069
20,069
20,069
20,069
20,069
20,069
31,969
31,969
31,969
Total ($000)
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$8,830
$14,066
$14,066
$14,066
LAND
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Franklin Depot
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
$500,000
Beaverton Patrol Yard
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
0.74
$500,000
Cannington Equipment Yard
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
$500,000
Sunderland Equipment Yard
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
$500,000
Total (ha)
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
Total ($000)
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
FURNITURE & EQUIPMENT
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
All Yards - Miscellaneous Equipment
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$462,773
$532,700
$532,700
$532,700
$532,700
Total ($000)
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$532.7
$532.7
$532.7
$532.7
ROLLING STOCK & RELATED EQUIPMENT
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Rolling Stock & Related Equipment
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
$2,679,000
Total ($000)
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
APPENDIX B.5
TABLE B.5-1
# of Square Feet
# of Hectares
Total Value of Furniture & Equipment ($)
# of Equipment and Fleet
Appendix B | 91
TOWNSHIP OF BROCK
CALCULATION OF SERVICE LEVELS
PUBLIC WORKS: BUILDINGS & FLEET
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
11,592
11,466
11,341
11,401
11,461
11,521
11,582
11,642
11,821
12,003
12,188
12,376
12,567
12,758
12,952
Historical Employment
3,059
3,100
3,142
3,100
3,058
3,017
2,976
2,936
2,964
2,992
3,021
3,050
3,079
3,126
3,174
Total Historical Population & Employment
14,651
14,566
14,483
14,501
14,519
14,538
14,558
14,578
14,785
14,995
15,209
15,426
15,646
15,884
16,126
INVENTORY SUMMARY ($000)
Buildings
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$8,830.4
$14,066.4
$14,066.4
$14,066.4
Land
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
$2,620.0
Furniture & Equipment
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$462.8
$532.7
$532.7
$532.7
$532.7
Rolling Stock & Related Equipment
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
$2,679.0
Total ($000)
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,592.1
$14,662.1
$19,898.1
$19,898.1
$19,898.1
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$602.71
$606.23
$609.71
$608.95
$608.19
$607.40
$606.56
$605.71
$597.25
$588.89
$580.60
$572.43
$899.02
$885.56
$872.30
$656.77
Land
$178.83
$179.87
$180.90
$180.68
$180.45
$180.22
$179.97
$179.72
$177.21
$174.72
$172.27
$169.84
$167.45
$164.94
$162.47
$175.30
Furniture & Equipment
$31.59
$31.77
$31.95
$31.91
$31.87
$31.83
$31.79
$31.74
$31.30
$30.86
$30.43
$34.53
$34.05
$33.54
$33.03
$32.15
Rolling Stock & Related Equipment
$182.85
$183.92
$184.98
$184.75
$184.52
$184.28
$184.02
$183.76
$181.20
$178.66
$176.15
$173.67
$171.22
$168.66
$166.13
$179.25
Total ($/pop & emp)
$995.98
$1,001.79
$1,007.54
$1,006.28
$1,005.04
$1,003.72
$1,002.34
$1,000.94
$986.96
$973.13
$959.44
$950.48
$1,271.74
$1,252.70
$1,233.94
$1,043.47
15-Year Funding Envelope Calculation
15-Year Average Service Level 2009 - 2023
$1,043.47
Net Population and Employment Growth 2024 - 2033
2,631
Maximum Allowable Funding Envelope
$2,745,108
APPENDIX B.5
TABLE B.5-1
Appendix B | 92
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
5.0 PUBLIC WORKS: BUILDINGS & FLEET
5.1
Buildings, Land & Furnishings
5.1.1
Salt Dome/ Shed
2028
-
2028
350,000
$
-
$
350,000
$
-
$
0%
350,000
$
-
$
350,000
$
-
$
5.1.2
Cost Recovery of Works Yard Expansion
2024
-
2024
2,480,000
$
-
$
2,480,000
$
-
$
0%
2,480,000
$
47,758
$
780,108
$
1,652,133
$
Subtotal Buildings, Land & Furnishings
2,830,000
$
-
$
2,830,000
$
-
$
2,830,000
$
47,758
$
1,130,108
$
1,652,133
$
5.2 Fleet & Equipment
5.2.1
3/4 Ton Pick-up - Parks
2028
-
2028
90,000
$
-
$
90,000
$
-
$
0%
90,000
$
-
$
90,000
$
-
$
5.2.2
Tandem
2025
-
2025
460,000
$
-
$
460,000
$
-
$
0%
460,000
$
-
$
460,000
$
-
$
5.2.3
S/W Machine (Winter)
2025
-
2025
60,000
$
-
$
60,000
$
-
$
0%
60,000
$
-
$
60,000
$
-
$
5.2.4
S/W Machine (Winter)
2027
-
2027
60,000
$
-
$
60,000
$
-
$
0%
60,000
$
-
$
60,000
$
-
$
5.2.5
Trailer Mounted Vacuum Unit
2029
-
2029
225,000
$
-
$
225,000
$
-
$
0%
225,000
$
-
$
225,000
$
-
$
5.2.6
Streetsweeper
2030
-
2030
500,000
$
-
$
500,000
$
-
$
0%
500,000
$
-
$
500,000
$
-
$
5.2.7
Mechanic Shop/Set-up/Lift
2025
-
2025
100,000
$
-
$
100,000
$
-
$
0%
100,000
$
-
$
100,000
$
-
$
5.2.8
Grass Mower
2026
-
2026
60,000
$
-
$
60,000
$
-
$
0%
60,000
$
-
$
60,000
$
-
$
5.2.9
Grass Mower
2027
-
2027
60,000
$
-
$
60,000
$
-
$
0%
60,000
$
-
$
60,000
$
-
$
Subtotal Fleet & Equipment
1,615,000
$
-
$
1,615,000
$
-
$
1,615,000
$
-
$
1,615,000
$
-
$
TOTAL PUBLIC WORKS: BUILDINGS & FLEET
4,445,000
$
-
$
4,445,000
$
-
$
4,445,000
$
47,758
$
2,745,108
$
1,652,133
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
83%
$2,278,440
2024 - 2033 Net Funding Envelope
$2,745,108
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$922.99
Current Reserve Fund Balance
$47,758
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
17%
$466,668
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$18.38
APPENDIX B.5
PUBLIC WORKS: BUILDINGS & FLEET
DEVELOPMENT-RELATED CAPITAL PROGRAM
TABLE B.5-2
TOWNSHIP OF BROCK
DC Eligible Costs
Ineligible Costs
Replacement & BTE Share
Timing
Appendix B | 93
Appendix B.6
Services Related to a Highway:
Roads and Related Infrastructure
Appendix B | 94
Appendix B.6 - Roads and Related
Infrastructure
The capital costs associated with roads and related infrastructure "services
related to a highway" are accounted for in this section. The capital planning
and management of all transportation infrastructure in the Township of
Brock is carried out by the Public Works Department.
Table B.6-1
Historical Service Levels
The Roads and Related fifteen-year historical inventory of capital assets
have a current value of $254.2 million which includes 363.2 km of roadway,
39 bridges, and 11 culverts. It has provided the Township with a fifteen-year
average service level of $17,006.00 per population and employment. This
service level, when multiplied by the ten-year population and employment
growth, results in a maximum allowable funding envelope of $44.7 million.
Table B.6-2
Development-Related Capital Program &
Calculation of the Development Charge
The gross cost of the Roads and Related development-related capital
program is $21.1 million. There are various projects required in Sunderland
and Beaverton to service future development which amounts to $7.8 million.
Of the $21.1 million, $5.5 million relates to HL2 surface treatments and $5.5
million relates to ultra thin surface treatments, both of which have a benefit
to existing share of 90%.
Of the net capital program of $21.1 million, $9.9 million represents a benefit
to existing share and is ineligible for DC funding. DC Reserves ($1.9 million)
are netted of the ten-year recoverable amount with the remaining $9.2
million brought forward to the development charge calculation. Of the total
Appendix B | 95
in-period eligible cost, 83%, or $7.7 million, is allocated against residential
development and 17%, or $1.6 million is allocated against non-residential
development. The calculated charges that result are $3,111.16 per capita for
new residential development and $61.95 per square metre for new non-
residential development.
The following table summarizes the calculation of the Roads and Related
development charges.
ROADS AND RELATED SUMMARY
15-year Hist.
Service Level
per pop & emp
Total
Net DC Recoverable
$/capita
$/sq.m
$17,006.00
$21,077,800
$9,253,072
$3,111.16
$61.95
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 96
TOWNSHIP OF BROCK
INVENTORY OF CAPITAL ASSETS
ROADS AND RELATED
ROADS AND RELATED
UNIT COST
Type of Road
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/km or unit)
HCB
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
64.4
$1,739,000
Gravel
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
268.7
$322,000
LCB
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
30.1
$515,000
Bridges
39.0
39
39
39
39
39
39
39
39
39
39
39
39
39
39
$811,000
Culverts
11.0
11
11
11
11
11
11
11
11
11
11
11
11
11
11
$773,000
Total (km/units)
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
413.2
Total ($000)
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
APPENDIX B.6
TABLE B.6-1
# of Kilometres or Units
Appendix B | 97
TOWNSHIP OF BROCK
CALCULATION OF SERVICE LEVELS
ROADS AND RELATED
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
11,592
11,466
11,341
11,401
11,461
11,521
11,582
11,642
11,821
12,003
12,188
12,376
12,567
12,758
12,952
Historical Employment
3,059
3,100
3,142
3,100
3,058
3,017
2,976
2,936
2,964
2,992
3,021
3,050
3,079
3,126
3,174
Total Historical Population & Employment
14,651
14,566
14,483
14,501
14,519
14,538
14,558
14,578
14,785
14,995
15,209
15,426
15,646
15,884
16,126
INVENTORY SUMMARY ($000)
Roads And Related
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
Total ($000)
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
$254,163.9
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Roads And Related
$17,347.89
$17,449.12
$17,549.12
$17,527.34
$17,505.61
$17,482.73
$17,458.71
$17,434.19
$17,190.66
$16,949.91
$16,711.41
$16,476.33
$16,244.35
$16,001.15
$15,761.48
$17,006.00
Total ($/pop & emp)
$17,347.89
$17,449.12
$17,549.12
$17,527.34
$17,505.61
$17,482.73
$17,458.71
$17,434.19
$17,190.66
$16,949.91
$16,711.41
$16,476.33
$16,244.35
$16,001.15
$15,761.48
$17,006.00
15-Year Funding Envelope Calculation
15-Year Average Service Level 2009 - 2023
$17,006.00
Net Population and Employment Growth 2024 - 203
2,631
Maximum Allowable Funding Envelope
$44,738,530
TABLE B.6-1
APPENDIX B.6
Appendix B | 98
Gross
Grants/
Net
Total
Project Description
Project
Subsidies/Other
Municipal
DC Eligible
Available
2024-
Post
Cost
Recoveries
Cost
$
%
Costs
DC Reserves
2033
2033
6.0 ROADS AND RELATED
6.1 Road Works
Sunderland
6.1.1
Albert Street South (Hwy 7 & 12 to Sunderland Limits)
2030
-
2030
860,000
$
-
$
860,000
$
-
$
0%
860,000
$
-
$
860,000
$
-
$
6.1.2
Albert Street North (River Street to Park Street)
2029
-
2029
172,000
$
-
$
172,000
$
-
$
0%
172,000
$
-
$
172,000
$
-
$
6.1.3
Albert Street North (Ida Street to North End)
2029
-
2029
498,800
$
-
$
498,800
$
-
$
0%
498,800
$
-
$
498,800
$
-
$
6.1.4
Albert Street North (Park Street to Ida Street)
2029
-
2029
189,200
$
-
$
189,200
$
-
$
0%
189,200
$
-
$
189,200
$
-
$
6.1.5
Jane Street (Ida Street to North End)
2029
-
2029
516,000
$
-
$
516,000
$
-
$
0%
516,000
$
-
$
516,000
$
-
$
Beaverton
6.1.6
Nine Mile Road (Main Stree to South End)
2027
-
2027
860,000
$
-
$
860,000
$
-
$
0%
860,000
$
860,000
$
-
$
-
$
6.1.7
Consession 5 Thorah
2027
-
2027
4,042,000
$
-
$
4,042,000
$
-
$
0%
4,042,000
$
1,064,728
$
2,977,272
$
-
$
6.1.8
Wood Street
2029
-
2029
309,600
$
-
$
309,600
$
-
$
0%
309,600
$
-
$
309,600
$
-
$
6.1.9
May Street
2029
-
2029
361,200
$
-
$
361,200
$
-
$
0%
361,200
$
-
$
361,200
$
-
$
Growth-Related Share of Annual Road Works
6.2.10
HL2 Surface Treatment ($550,000/year)
2024
-
2033
5,500,000
$
-
$
5,500,000
$
4,950,000
$
90%
550,000
$
-
$
550,000
$
-
$
6.2.11
Double Surface Treatment ($550,000/year)
2024
-
2033
5,500,000
$
-
$
5,500,000
$
4,950,000
$
90%
550,000
$
-
$
550,000
$
-
$
Township-wide Costs
6.2.12
Sidewalk Installation New
2024
-
2033
1,269,000
$
-
$
1,269,000
$
-
$
0%
1,269,000
$
-
$
1,269,000
$
-
$
6.2.13
Provison for Development Realted Roads Works
2024
-
2033
1,000,000
$
-
$
1,000,000
$
-
$
0%
1,000,000
$
-
$
1,000,000
$
-
$
Subtotal Road Works
21,077,800
$
-
$
21,077,800
$
9,900,000
$
11,177,800
$
1,924,728
$
9,253,072
$
-
$
TOTAL ROADS AND RELATED
21,077,800
$
-
$
21,077,800
$
9,900,000
$
11,177,800
$
1,924,728
$
9,253,072
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
83%
$7,680,050
2024 - 2033 Net Funding Envelope
$44,738,530
10-Year Growth in Population in New Units
2,469
Unadjusted Development Charge Per Capita
$3,111.16
Current Reserve Fund Balance
$1,924,728
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
17%
$1,573,022
10-Year Growth in Square Metres
25,392
Unadjusted Development Charge Per Square Metre
$61.95
Timing
TOWNSHIP OF BROCK
DEVELOPMENT-RELATED CAPITAL PROGRAM
Ineligible Costs
Replacement & BTE Share
APPENDIX B.6
DC Eligible Costs
ROADS AND RELATED
TABLE B.6-2
Appendix B | 99
Appendix C
Reserve Fund Balances
Appendix C | 100
Appendix C - Development Funds Reserve
Fund
The DCA requires that a reserve fund be established for each service for
which development charges are collected. Table C.1 presents the
uncommitted reserve fund balances that are available to help fund the
development-related net capital costs identified in this study. The opening
balances of the development charges reserve funds as of December 31,
2023 have been adjusted to account for current commitments to reserve
fund projects. All of the available reserve fund balances are accounted for in
this study.
As shown on Table C.1, the December 31, 2023 total reserve fund balance
was in a positive position of $5.3 million. The application of the available
uncommitted balance in each of the reserve funds is discussed in the
appendix section related to each service. The funds are assigned to projects
in the initial years of the capital program for each service and the actual
spend of the funds is subject to the DCA and Township's annual capital
budgeting process.
Appendix C | 101
Development Related Studies
$2,117
Library, Parks & Recreation
$3,247,654
Fire Services
$117,888
Public Works: Buildings & Fleet
$47,758
Roads And Related
$1,924,728
Total Development Charge Reserves
$5,338,028
APPENDIX C
TABLE C.1
Service
Reserve Balance
DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT
AS AT DECEMBER 31, 2023
Appendix C | 102
Appendix D
Cost of Growth Analysis
Appendix D | 103
Appendix D - Cost of Growth Analysis
A.
Asset Management Plan
The DCA requires that municipalities complete an Asset Management Plan
before passing a development charges by-law. A key function of the Asset
Management Plan is to demonstrate that all assets proposed to be funded
under the development charges by-law are financially sustainable over their
full life cycle.
Asset Types
A summary of the future municipal-owned assets and estimated useful life
assumptions for eligible DC services considered as part of the study are
outlined in Table D.1. Although all capital assets considered in the study
have been identified, not all assets necessitate future replacement or
ongoing maintenance activities. The exception and the justification is as
follows:
Some projects do not relate to the emplacement of a tangible capital
asset - some examples include the acquisition of land or the
undertaking of development-related studies. These projects/costs do
not necessarily require future replacement or ongoing maintenance.
Such projects have been excluded from the asset management
provision calculations.
It should be noted that the capital cost estimates prepared for each of the
projects identified in this section include grouped costs of various individual
elements, which, as a stand-alone item, may have its own useful life (ex.
New buildings include HVAC, structural elements, roof, etc.). Accordingly,
the average useful life assumptions noted below are applicable to all project
components.
Appendix D | 104
Table D.1 - Summary of Municipal Assets Considered Town-wide Services
Service and Amenities
Estimated Useful Life
Library, Parks and Recreation
Collection Materials
Buildings
Parks Equipment
7 to 10 years
40 years
20 years
Fire
Equipment and Vehicles
Buildings
10 to 20 years
40 years
By-Law Services
Buildings
Vehicles
40 years
10 years
Public Works: Buildings & Fleet
Buildings
Fleet and equipment
40 years
10 years
Development Related Studies
Studies
Not infrastructure
Roads and Related
Road Works
50 years
No annual provisions have been identified for Development Related Studies
as the plan updates and studies included in the Development Related
Studies development charge category are not infrastructure and therefore
have no long-term financial requirements.
Annual Provision
When assets require rehabilitation or are due for replacement, the source of
funds is limited to reserves or contributions from operating. Capital
expenditures to carry out the rehabilitation and replacement of aging
infrastructure are not development-related and are therefore not eligible for
funding through development charge revenues or other developer
contributions.
Appendix D | 105
Based on the information obtained from Township staff regarding useful life
assumptions and the capital cost of acquiring and/or emplacing each asset,
a provision for infrastructure replacement has been calculated for both the
general and engineered services. Provisions for infrastructure replacement
are initially calculated for each asset based on their useful life and the
anticipated cost of replacement. The aggregate of all individual provisions
form the required annual capital provision. In calculating the annual
provisions, a number of assumptions are made to account for inflation (2.0
per cent) and interest (3.5 per cent).
Consistent with the requirements of the DCA, assets that are proposed to be
funded under the development charges by-law have been included in the
analysis. As a result, the total calculated annual provision for development
charge related infrastructure has been netted down to consider the
replacement of existing infrastructure or benefit-to-existing development.
However, for reference, the annual replacement provisions associated with
the non-development charge funded costs, including costs related to the ten
per cent statutory discount, benefit-to-existing and post-period benefit have
also been calculated.
Table D.2 provides the calculated annual asset management contribution by
2034 as it relates to the non-DC funded and the DC recoverable portions for
all services. As shown in Table D.2, by 2034, the Township will need to fund
an additional $872,035 per year in order to properly fund the full life cycle
costs of the new assets related to the services under the development
charges by-law.
Appendix D | 106
Financial Sustainability of the Program
Future Revenue Growth
The calculated annual funding provision should be considered within the
context of the Township's projected growth. Over the next ten years, the
Township is projected to increase by approximately 2,113 people residing in
new units. In addition, the Township will also add 518 new employees that
will result in approximately 25,392 square metres of additional non-
residential building space.
This growth will have the effect of increasing the overall assessment base.
This leads to additional user fee and charge revenues to offset the capital
asset provisions required to replace the infrastructure proposed to be
funded under the development charges by-law. The collection of these
funds is intended to be allocated to the Township's reserves for future
replacement of these assets.
Asset Management Plan
In order to maintain, protect and manage the Township's infrastructure and
assets, staff monitor current levels of service and life cycle trends. These
assessments are used to schedule appropriate activities, such as road
Service
DC Related
Non-DC Related*
DC Related
Non-DC Related*
Development Related Studies
$522,500
$82,500
$0
$0
Library, Parks & Recreation
$10,673,126
$13,482,959
$370,807
$384,319
Fire Services
$2,327,606
$2,633,234
$66,858
$56,399
By-Law Services
$188,309
$881,691
$16,777
$22,247
Public Works: Buildings & Fleet
$2,745,108
$1,699,892
$183,352
$0
Roads And Related
$11,177,800
$9,900,000
$234,241
$196,535
TOTAL
$27,634,450
$28,680,275
$872,035
$659,500
Capital Program
Provision by 2034
* Includes costs that will be recovered under future development charges studies (i.e. other development-related), ineligible shares and
shares of projects funded from available reserve funds.
APPENDIX D
TABLE D.2
TOWNSHIP OF BROCK
ANNUAL ASSET MANAGEMENT PROVISION BY 2034
2024 - 2033
Calculated AMP Annual
Appendix D | 107
reconstruction, bridge replacement, and equipment and vehicle replacement.
Ongoing maintenance and repairs to community facilities will ensure that
they continue to meet the needs of a growing population into the future.
Overall, the Township will continue to invest, renew, and manage
infrastructure and assets through its Asset Management Plan. This plan is
crucial for forecasting capital budgetary needs both in the short and long
terms. The AMP process helps to improve financial sustainability to
maximize benefits, reduce risk and provide satisfactory levels of service to
the community in an environmentally and financially responsible manner.
The Program is Deemed Financially Sustainable
The calculated annual provisions identified in Table D.3 are considered to be
financially sustainable as it is expected that the increased capital asset
management requirements can be absorbed by the tax and user base over
the long-term. The Township's annual operating budget review will allow
staff to continue to monitor and implement mitigating measures should the
program become less sustainable.
B.
Long-Term Capital and Operating Impacts
As shown in Table D.3, by 2033, the Town's net operating costs are
estimated to increase by $2.6 million for property tax supported services.
Increases in net operating costs will be experienced as new facilities such
as community centres are opened.
Appendix D | 108
Table D.4 summarizes the components of the development-related capital
forecast that will require funding from non-DC sources. In total, $17.1 million
will need to be financed from non-DC sources over the 2024-2033. In
addition, $2.5 million in interim DC financing related to post-period shares of
projects may be required or these costs may be recovered from other growth
funding tools.
APPENDIX D
TABLE D.3
TOWNSHIP OF BROCK
COST OF GROWTH ANALYSIS ALL SERVICES
ESTIMATED NET OPERATING COST OF THE PROPOSED
2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM
(in constant 2024 dollars)
Additional
Category
Operating Costs
$
unit meaure
Quantity
at 2033
Development Related Studies
$0
No additional operating costs
No additional costs
-
$0
Library, Parks & Recreation
$1,846,454
Recreation Facilities
$0.15 per $1.00 new infrastructure
9,789,695
$
$1,468,454
Parks, Parkland and Trail Development
$0.10 per $1.00 value of asset
3,780,000
$
$378,000
Fire Services
$13,500
New ATV
$0.15 per $1.00 new vehicle
40,000
$
$6,000
New Fire Prevention Vehicle
$0.15 per $1.00 new vehicle
50,000
$
$7,500
By-Law Services
$136,500
Building Expansion
$0.15 per $1.00 new infrastructure
910,000
$
$136,500
Public Works: Buildings & Fleet
$373,350
- Buildings, Land and Fleet
$190 per $1,000 of total
1,965,000
$
$373,350
Roads And Related
$219,240
- Development-Related Roads Infrastructure
$270 per household
812
$219,240
TOTAL ESTIMATED OPERATING COSTS
$2,589,044
Cost Driver
(in 2024 $)
Appendix D | 109
Council is made aware of these factors so that they understand the
operating and capital costs that will not be covered by DCs as it adopts the
development-related capital forecast set out in the study.
Assets are Deemed to be Financially Sustainable
It is anticipated that new assets identified through the 2024 DC Background
Study process will be incorporated into the Town's ongoing asset
management plan analyses.
The calculated annual provisions identified are considered to be financially
sustainable as it is expected that the increased capital asset management
requirements can be absorbed by the tax and user base over the long-term.
Total DC
General and Engineered Services
Net
Replacement
Eligible
Municipal
& Benefit to
Available DC
Post-Period
Costs for
Cost
Existing
Reserves
Benefit*
Recovery
($000)
($000)
($000)
($000)
($000)
1
Development Related Studies
$605.0
$82.5
$2.1
$0.0
$520.4
2
Library, Parks & Recreation
$18,496.0
$4,575.2
$3,247.7
$0.0
$10,673.1
3
Fire Services
$4,960.8
$2,515.3
$117.9
$0.0
$2,327.6
4
By-Law Services
$1,070.0
$0.0
$0.0
$881.7
$188.3
5
Public Works: Buildings & Fleet
$4,445.0
$0.0
$47.8
$1,652.1
$2,745.1
6
Roads And Related
$21,077.8
$9,900.0
$1,924.7
$0.0
$9,253.1
TOTAL GENERAL & ENGINEERED SERVICES
$50,654.6
$17,073.1
$5,340.1
$2,533.8
$25,707.6
*Development related costs to be considered for funding from other tools and/or future DC Studies.
Development-Related Capital Program (2024 - 2033)
APPENDIX D
TABLE D.4
TOWNSHIP OF BROCK
SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
Appendix D | 110
Appendix E
2024 Development Charges By-Law
Appendix E | 111
The corporation of the Township of Brock
By-law Number 3274-2024
Being a By-law of the Corporation of the Township of Brock respecting
Development Charges
___________________________________________________________________
Whereas subsection 2(1) of the Development Charges act, 1997, c. 27 (hereinafter
called "the Act") provides that the council of a municipality may pass by-laws for the
imposition of development charges against land for increased capital costs required
because of the needs for services arising from development of the area to which the by-
law applies;
and whereas the Council of the Township of Brock has before it a report entitled
"Development Charges Background Study", the Township of Brock, dated March 28,
2024 (the "Study"), prepared by Hemson Consulting Ltd., wherein it was indicated that
the development of any land within the Township of Brock will increase the need for
services as defined herein;
and whereas the Council of The Corporation of the Township of Brock ("Township of
Brock") has given Notice in accordance with Section 12 of the Act of its intention to pass
a by-law under Section 2 of the said act;
and whereas copies of the Study were made available on March 28, 2024 and copies
of the proposed Development Charges by-law were made available on April 15, 2024 to
the public in accordance with Section 12 of the Act;
and whereas the study was made available to the public and Council gave notice to the
public and held a public meeting pursuant to Section 12 of the Act on the 27th day of
May 2024 and prior to which, the Study and the proposed development charge by-law
were made available to the public and Council heard comments and representations
from all persons who applied to be heard (the "Public Meeting");
and whereas the Council of the Township of Brock has heard all persons who applied
to be heard no matter whether in objection to, or in support of, the development charge
proposal at the Public Meeting, and the public was generally afforded the opportunity to
make written submissions relating to this proposed by-law and the Study;
and whereas the Council of the Township of Brock has given consideration of the use
of more than one development charge by-law to reflect different needs for services in
different areas, also known as area rating or area specific development charges, and
has determined that for the services and associated infrastructure proposed to be
funded by development charges under this by-law, that it is fair and reasonable that the
charges be calculated on a municipal-wide uniform basis;
and whereas the Study includes a Cost of Growth Analysis that deals with all assets
whose capital costs are intended to be funded under this by-law, and that such assets
are considered to be financially sustainable over their full life-cycle;
and whereas the Council of the Township of Brock approve the asset management
plan outlined in the Study and give consideration to incorporate the asset management
plan identified in the Study within the Township's ongoing practices and corporate asset
management strategy;
and whereas by Council Resolution No. C-2024-126 adopted by Council on the 10th
day of June 2024, Council has indicated that it intends to ensure that the increase in the
need for services attributable to the anticipated development will be met;
and whereas by Council Resolution No. C-2024-126 adopted by Council on the 10th
day of June 2024, Council has indicated its intent that the future excess capacity
identified in the Study shall be paid for by the development charges or other similar
charges;
2
and whereas by Council Resolution No. C-2024-126 adopted by Council on the 10th
day of June 2024, Council determined that no further public meetings were required
under section 12 of the Act.
Now therefore the Council of the Corporation of the Township of Brock enacts as
follows:
Definitions
1.
In this By-law,
"Act" means the Development Charges Act, 1997, S.O. 1997, c.27, as amended,
and all regulations enacted pursuant thereto;
"Affordable Housing" means as defined in the Act.
"Agricultural Use" means land, buildings or structures, eclosing any portion thereof
used as a dwelling unit or for a commercial use, used or designed or intended for
use for the purpose of a bona fide farming operation, including, but not limited to,
animal husbandry, dairying, livestock, fallow, field crops, removal of sod, forestry,
fruit farming, horticulture, market gardening, pasturage, poultry keeping, equestrian
facilities, and greenhouses;
"Air-supported Structure" means an air supported structure as defined in the
Building Code Act;
"Apartment Building" means a building containing more than four Dwelling Units
where the Dwelling Units have a common entrance and are connected by a
common corridor and where none of the Dwelling Units is a Single Detached
Dwelling, a Semi-Detached Dwelling or a Multiple Dwelling;
"Apartment" means a dwelling unit in an apartment building or a portion of a non-
residential building;
"Board of Education" means a board as defined in subsection 1(1) of the Education
Act, R.S.O. 1990, c. E.2, as amended or any successor thereto;
"Building or Structure" means a building as defined in the Building Code Act,
including, but is not limited to, an air-supported structure and an exterior storage
tank;
"Building Code Act" means the Building Code Act, S.O. 1992, chapter 23, as
amended and all Regulations thereto including the Ontario Building Code, 1997, as
amended;
"Development" means any activity or proposed activity in respect of land that
requires one or more of the approvals referred to in Section 7 of the By-law, and
includes the construction, erection or placing of one or more buildings or structures
on land or the making of an addition or alteration to a building or structure that has
the effect of increasing the Gross Floor Area, and includes redevelopment;
"Development Charge" means a charge imposed pursuant to this By-law;
"Dwelling Unit" means any part of a building or structure operated as a
housekeeping unit, used or intended for use by one or more persons, in which
sanitary and culinary facilities t are provided for the exclusive use of such person or
persons;
"Farm Building" means any part of a building or structure used as part of or in
connection with an agricultural use and includes barns, silos and other buildings or
structures ancillary to a bona fide farming operation, but excludes a Residential Use;
3
"Floor" includes a paved, concrete, wooden, gravel, or dirt floor;
"Grade" means the average level of proposed or finished ground adjoining a
building or structure at all exterior walls;
"Gross Floor Area" means the sum total of the total areas of the floors in a building
or structure, whether at, above, or below-grade, measured between the exterior
faces of the exterior walls of the building or structure or from the centre line of a
common wall separating two uses, or from the outside edge of a floor where the
outside edge of the floor does not meet an exterior or common wall, and:
(a) includes the floor area of a mezzanine and air-supported structure and the
space occupied by interior wall partitions; and
(b) in the case of non-residential uses, excludes any parts of the building or
structure used for mechanical equipment related to the operation or
maintenance of the building or structure, stairwells, elevators, wash-rooms, and
the parking and loading of vehicles, and;
(c) where a building does not have any walls, the Gross Floor Area shall be the
sum total of the area of land directly beneath the roof of the building and the
total areas of the floors in the building or structure.
"Industrial" shall mean manufacturing, assembling, processing, fabricating,
refining, research and development, storage of materials and products, truck
terminals, warehousing, and buildings and structures or portions thereof which are
designed, used or intended to be used for a purpose, other than retail service or
sales areas, storage or warehousing in connection with retail sales or service areas
and office areas, which are accessory to any of the foregoing uses, but the term
"industrial" does not include any other non-residential use and "industrial use",
"industrial building" and "industrial development" shall have similar meaning.
"Institutional" means as defined in the Act.
"Local Board" means a public utility commission, transportation commission, public
library board, board of park management, local board of health, police services
board, planning board, or any other board, commission, committee, body or local
authority established or exercising any power or authority under any general or
special Act with respect to any of the affairs or purposes of the Township or the
Region;
"Mezzanine" means a mezzanine as defined in the Building Code Act;
"Mixed-Use Development" means a Building used, designed or intended for
Residential and Non-Residential uses;
"Multiple Dwellings" means all dwellings other than Single Detached Dwellings,
Semi-Detached Dwellings and Apartment Buildings;
"Non-Profit Housing Development" means the development of a building or
structure intended for use as a residential premises and developed by;
(a) a corporation to which the Not-for-Profit Corporations Act, 2010 applies, that
is in good standing under that Act and whose primary object is to provide
housing,
(b) a corporation without share capital to which the Canada Not-for-profit
Corporations Act applies, that is in good standing under that Act and whose
primary object is to provide housing, or
(c) a non-profit housing co-operative that is in good standing under the Co-
operative Corporations Act. 2022, c. 21, Sched. 3, s. 4.
"Non-Residential Uses" means land, buildings or structures or portions thereof
4
used, or designed or intended to be used for a use other than for a residential use;
"Owner" means the owner of land or a person who has made application for an
approval for the development of land upon which a development charge is imposed;
"Place of Worship" means that part of a building or structure that is exempt from
taxation as a place of worship under the Assessment Act, R.S.O. 1980, c. 31 as
amended;
"Planning Act" means the Planning Act, R.S.O. 1990, c. P.13, as amended, and all
regulations enacted pursuant thereto;
"Protracted" means in relation to a temporary building or structure the persistence
of its construction, erection, placement on land, alteration or of an addition to it for a
continuous period exceeding a specified time period as outlined in Section 24;
"Rental Housing" means development of a building or structure with four or more
dwelling units all of which are intended for use as rented residential premises as
defined in the Act;
"Redevelopment" means the construction, erection or placing of one or more
buildings or structures on land where all or part of a building or structure has
previously been demolished on such land, or changing the use of a building or
structure from residential to non-residential or from non-residential to residential;
"Region" means the Corporation of the Regional Municipality of Durham;
"Residential Uses" means land, buildings or structures or portions thereof used,
designed, or intended to be used as living accommodation for one or more
individuals;
"Row Dwelling" means a residential building containing at least three (3) dwelling
units, with each dwelling unit separated vertically from the other units by a common
wall and with each dwelling unit having an independent entrance directly from the
outside;
"Semi-Detached Dwelling" means one of a pair of two attached single detached
dwellings with a common masonry wall dividing the pair of single detached
dwellings vertically or horizontally, each of which has an independent entrance
either directly or from the outside or through a common vestibule;
"Services" means services designated in this By-law including Schedule "A" to this
By-law or in an agreement under section 44 of the Act, or both;
"Single Detached Dwelling" means a residential building consisting of one Dwelling
Unit and not attached to another structure;
"Township" means The Corporation of the Township of Brock;
Rules
2.
For the purpose of complying with section 6 of the Act:
(a) the area to which this By-law applies shall be the area described in section 3 of
this By-law;
(b) the rules developed under paragraph 9 of subsection 5(1) of the Act for
determining if a development charge is payable in any particular case and for
determining the amount of the charge shall be as set forth in sections 4 through
18, inclusive and section 24 of this By-law;
5
(c) the exemptions provided for by such rules shall be the exemptions set forth in
sections 19 through 23, inclusive of this By-law, the indexing of charges shall
be in accordance with section 16 if this By-law and there shall be no phasing in
of residential and non-residential development charges as provided in
subsection 17(1) and 17(2) of this By-law.
(d) the redevelopment of land shall be in accordance with the rules set forth in
section 24 of this By-law.
Lands Affected
3.
This By-law applies to all lands in the geographic area of the Corporation of the
Township of Brock.
Designation of Services
4.
It is hereby declared by Council that all development land within the area to which
this By-law applies will increase the need for services.
5.
The development charge applicable to a development as determined under this By-
law shall apply without regard to the services required or used by an individual
development.
6.
Development charges shall be imposed and reserve funds established for the
following categories of services, as set out in Schedule "A", to pay for the increased
capital costs required because of increased needs for services arising from
development:
Approvals for Development
7.
Development charges shall be imposed against all lands, buildings or structures
within the area to which this By-law applies if the development of such lands,
buildings or structures requires any of the following approvals:
(a) the passing of a zoning by-law or of an amendment thereto under section 34 of
the Planning Act;
(b) the approval of a minor variance under section 45 of the Planning Act;
(c) a conveyance of land to which a by-law passed under subsection 50(7) of the
Planning Act applies;
(d) the approval of a plan of subdivision under section 51 of the Planning Act;
(e) a consent under section 53 of the Planning Act;
(f)
the approval of a description under section 50 of the Condominium Act, or;
(g) the issuing of a permit under the Building Code Act, 1992 in relation to a
building or structure.
8.
No more than one development charge for each service designated in section 6
shall be imposed upon any lands, buildings or structures to which this By-law
applies even though two or more of the actions described in section 7 are required
before the lands, buildings or structure can be developed.
9.
Notwithstanding section 13 if two or more of the actions described in section 7
occur at different times, additional development charges shall be imposed in
respect of any increased or additional development permitted by those actions.
10. Where a development requires an approval described in section 7 after the
issuance of a building permit and no development charge has been paid, then the
6
development charge shall be paid prior to the granting of the approval required
under section 7.
11. If a development does not require a building permit but does require one or more of
the approvals described in section 7, then the development charge shall
nonetheless be payable in respect of any increased or additional development
permitted by such approval required for the increased or additional development
being granted.
12. Nothing in this By-law prevents Council from requiring, as a condition of an
agreement under sections 51 or 53 of the Planning Act, that the owner, at his or her
own expense, install such local services related to a plan of subdivision or within
the area to which the plan relates, as council may require, or that the owner pay for
local connections to storm drainage facilities installed at the owner's expense, or
administrative, processing, or inspection fees.
7
Calculation of Development Charges
13. The development charge with respect to the use of any land, buildings or structures
shall be calculated as follows:
(a) in the case of residential development, or the residential portion of a mixed-use
development, based upon the number and type of dwelling units; or
(b) in the case on non-residential development, or the non-residential portion of a
mixed-use development, based upon the Gross Floor Area of such
development.
Amount of Charge - Residential
14. The development charges described in Schedules "B" to this By-law shall be
imposed on residential uses of lands, buildings or structures, including a dwelling
unit accessory to a non-residential use, and, in the case of a mixed use building or
structure, on the residential component of the mixed use building or structure,
according to the type of residential use.
Amount of Charge - Non-Residential
15. (1) The development charges described in Schedule "C" to this By-law shall be
imposed on non-residential uses of lands, buildings or structures and, in the
case of a mixed use building or structure, on the non-residential components of
the mixed use building or structure, and calculated with respect to each of the
services according to the Gross Floor Area of the non-residential use.
(2) Notwithstanding subsection (1) development charges shall not be imposed
upon non-residential development if the development does not have the effect
of creating Gross Floor Area of non-residential development or of increasing
existing Gross Floor Area of non-residential development.
Indexing of Development Charges
16. (1) The development charges set out in Schedule "B" hereto shall be adjusted
without amendment to this By-law annually on July 1st in each year,
commencing July 1st, 2025, and the development charges as set out in
Schedule "C" hereto shall be adjusted without amendment to this By-law
annually on July 1st in each year, commencing July 1st, 2025 in accordance
with the Statistics Canada Quarterly, Construction Price Statistics (catalogue
number 62-007) based on the 12 month period ending March 31.
Phasing, Timing of Calculation and Payment
17. (1) The residential development charges set out in Schedule "B" attached hereto
are not subject to phasing and are payable in full, subject to the exemptions
and credits herein from the effective date of this By-law.
(2) The non-residential development charges set out in Schedule "C" attached
hereto are not subject to phasing in and are payable in full, subject to the
exemptions and credits herein from the effective date of this By-law.
(3) Notwithstanding section 17(1) and 17(2) of this by-law, the amount of
development charge will be determined in accordance with Section 26, 26.1
and 26.2 of the Act, prior to issuance of the building permit or revision to
building permit;
(4) The Township may charge interest on the instalments required by subsection
26.1 (3) of the Act from the date the development charge would have been
payable in accordance with Section 26 of the Act to the date the instalment is
paid.
8
(5) Where subsections 26.2(1) (a) or (b) of the Act applies, the Township may
charge interest on the development charge from the date of the application
referred to in the applicable clause to the date the development charge is
payable under subsection 26.2(3) of the Act.
(6) The Township may determine, by Council resolution or policy external to this by-
law, interest rates in relation to subsections 17 (4) and (5) of this by-law subject
to the maximum interest rate in subsection 26.3 of the Act.
(7) Notwithstanding subsections 17(1), 17(2) and 17(3) of this by-law, development
charges for Rental Housing and Institutional Developments in accordance with
Section 26.1 of the Act, are due inclusive of interest established from the date
the development charge would have been payable in accordance with section
26 of the Act, in 6 equal annual payments beginning on the date that is the
earlier of:
i.
the date of the issuance of a permit under the Building Code Act, 1992
authorizing occupation of the building; and
ii.
the date the building is first occupied and continuing on the following five
anniversaries of that date.
(8) Subject to section 25 (with respect to redevelopment) and subsection (7), the
development charge shall be calculated as of, and shall be payable, on the
date the first building permit is issued in relation to a building or structure on
land to which the development charge applies.
(9) Notwithstanding subsections 17 (1), (2) and (3) the Township may require an
owner to enter into an agreement, including the provision of security for the
owner's obligations under agreement, pursuant to section 27 of the Act
providing for all or part of a development charge to be paid before or after it
otherwise would be payable. The terms of such agreement as they relate to the
timing of payments shall then prevail over the provision of this By-law.
(10) The Chief Building Official of the Township shall withhold the issuance of a
building permit in relation to a building or structure on land to which the
Development Charge applies unless the Development Charge has been paid.
Payment by Money or the Provision of Services
18. (1) Payment of development charges shall be by cash or by certified cheque.
(2) In the alternative to payment by the means provided in subsection (1), the
Township may, by an agreement entered into with the owner, accept the
provision of services in full or partial satisfaction of the development charge
otherwise payable provided that:
(a) if the Township and the owner cannot agree as to the reasonable cost of
doing the work under sub-section (2), the dispute shall be referred to
Council whose decision shall be final and binding.
(b) if the credit for the provision of service exceeds the amount of the
development charge for the service to which the work relates,
(i)
the excess amount shall not be credited against the development
charge for any other service, unless the Township has so agreed in an
agreement under Section 39 of the Act; and
(ii) in no event shall the Township be required to make a cash payment to
the credit holder.
(3) Nothing in this By-law prevents Council from requiring, as a condition of any
approval given under the Planning Act that the owner, at the owner's expense,
9
install such local services as Council may require in accordance with the
Township's local services' policies in effect at the time.
10
Rules with Respect to Exemptions for Intensification of Existing Housing
19. (1) Notwithstanding the provisions of this By-law, and in accordance with sections
2(3), 2(3.1), 2(3.2) and 2(3.3) of the Act and any amendments thereof,
development charges shall not be imposed with respect to:
(a) the enlargement of an existing dwelling unit;
(b) the creation of additional dwelling units equal to the greater of one or 1% of
the existing dwelling units in an existing residential rental building
containing four or more dwelling units or prescribed ancillary structure to
the existing residential building;
(c) the creation of the following as it relates to the creation of additional
residential dwelling units in existing residential buildings;
-
A second residential unit in an existing single-detached house, semi-
detached house or rowhouse on a parcel of land on which residential
use, other than ancillary residential use, is permitted, if all buildings
and structures ancillary to the existing single-detached house, semi-
detached house or rowhouse cumulatively contain no more than one
residential unit.
-
A third residential unit in an existing single-detached house, semi-
detached house or rowhouse on a parcel of land on which residential
use, other than ancillary residential use, is permitted, if no building or
structure ancillary to the existing detached house, semi-detached
house or rowhouse contains any residential units
-
One residential unit in a building or structure ancillary to an existing
single-detached house, semi-detached house or rowhouse on a
parcel of land, if the existing detached house, semi-detached house
or rowhouse contains no more than two residential units and no other
building or structure ancillary to the existing detached house, semi-
detached house or rowhouse contains any residential units
(d) the creation of the following as it relates to the creation of additional
residential dwelling units in new residential buildings;
-
A second residential unit in a new single-detached house, semi-
detached house or rowhouse on a parcel of land on which
residential use, other than ancillary residential use, is permitted, if all
buildings and structures ancillary to the new single-detached house,
semi-detached house or rowhouse cumulatively will contain no more
than one residential unit.
-
A third residential unit in a new single-detached house, semi-
detached house or rowhouse on a parcel of land on which
residential use, other than ancillary residential use, is permitted, if no
building or structure ancillary to the new single-detached house,
semi-detached house or rowhouse contains any residential units.
-
One residential unit in a building or structure ancillary to a new
single-detached house, semi-detached house or rowhouse on a
parcel of land, if the new detached house, semi-detached house or
rowhouse contains no more than two residential units and no other
building or structure ancillary to the new single-detached house,
semi-detached house or rowhouse contains any residential units.
11
Rules with Respect to Exemptions for Intensification of Existing Industrial
Buildings
20. (1) If a development includes the enlargement of the gross floor area of an existing
industrial building, the amount of the development charge that is payable in
respect of the enlargement is determined in accordance with this section.
(a) If the gross floor area is enlarged by 50 per cent or less, the amount of the
development charge in respect of the enlargement is zero
(b) If the gross floor area is enlarged by more than 50 per cent the amount of
the development charge in respect of the enlargement is the amount of the
development charge that would otherwise be payable multiplied by the
fraction determined as follows:
(i)
Determine the amount by which the enlargement exceeds 50 per
cent of the gross floor area before the enlargement.
(ii) Divide the amount determined under paragraph (i) by the amount
of the enlargement.
Categories of Exemptions
21. (1) The following categories of institutions are hereby designated as being exempt
from the payment of development charges:
(a) buildings or structures used as hospitals governed by the Public Hospitals
Act, R.S.O 1990, c. P.40;
(b) buildings or structures owned by and used for the purposes of the
Township, the Region, or their local boards;
(c) buildings or structures owned by a board of education and used for school
purposes;
(d) buildings or structures owned by and used for the purposes of a college of
applied arts and technology established pursuant to the Ministry of
Training, Colleges and Universities Act R.S.O 1990, c. M.19;
(e) buildings or structures owned by and used for the purposes of a university
established by an Act of the Legislative Assembly of Ontario;
(f)
Development in relation to lands to be used as a place of worship and land
used in connection therewith, a churchyard, cemetery or burying ground
exempt under the Assessment Act, R.S.O. 1980, c. 31, as amended, for
taxation purposes;
(g) Development of Farm Buildings;
(h) Affordable Housing as defined and identified in the Act; and
(i)
Non-Profit Housing as defined and identified in the Act.
Agricultural Uses
22. Agricultural uses as well as farm buildings and other ancillary development to an
agricultural use excluding any residential or commercial uses shall be exempt from
the provisions of this By-law.
Rental Housing
23. Rental housing as defined in the Act will be subject to discounts as included in
subsection 26.2 (1.1) of the Act as amended.
12
Temporary Buildings or Structures
24. (1) Temporary buildings or structures shall be exempt from the provisions of this
By-law. For the purposes of this By-law, a temporary building or structure shall
mean:
a)
a building or structure constructed or erected or placed on land for a
continuous period not exceeding one year or a specified time
period as outlined in a conditional building permit, or an addition or
alteration to a building or structure that has the effect of increasing
the Gross Floor Area thereof for a continuous period not
exceeding one year or a specified time period as outlined in a
conditional building permit; or
b)
a temporary use permitted under a zoning by-law enacted under
section 39 of the Planning Act, RSO 1990, c P.13.
(2) In the event that a temporary building or structure becomes protracted, it shall
be deemed not to be nor ever to have been a temporary building or structure,
and the development charges required to be paid under this By-law shall
become payable on the date the temporary building or structure becomes
protracted.
(3) Prior to the Township issuing a building permit for a temporary building or
structure, the Township may require an owner to enter into an agreement,
including the provision of security for the owner's obligation under the
agreement, pursuant to section 27 of the Act providing for all or part of the
development charge required by subsection 22(2) to be paid after it would
otherwise be payable. The terms of such agreement shall then prevail over the
provisions of this By-law, as it relates to the timing of payment.
Rules with Respect to the Redevelopment of Land
25. (1) Where there is a redevelopment of land on which there is a conversion of
space proposed, or on which there was formerly erected a building or structure
that has been demolished, a credit shall be allowed against the development
charge otherwise payable by the owner pursuant to this By-law for the portion
of the previous building or structure still in existence that is being converted or
for the portion of the building or structure that has been demolished, as the
case may be, calculated by multiplying the number and type of dwelling units
being converted or demolished or the non-residential Gross Floor Area being
converted or demolished by the relevant development charge in effect on the
date when the development charge is payable in accordance with this By-law.
(2) A credit in respect of any demolition under this section shall not be given unless
a building permit has been issued or a subdivision agreement has been
entered into with the Township for the development within 3 years from the
date the demolition permit was issued.
(3) The amount of any credit hereunder shall not exceed, in total, the amount of
the development charges otherwise payable with respect to the development.
Pre-Development Charge By-law Credits
26. Where an owner or former owner of land to which this By-law applies has paid to
the Township prior to October 28, 1991 a capital contribution as required by an
agreement between the Township and the owner or former owner, the Township
will, until the expiry of this By-law, recognize as a credit towards a development
charge imposed under this By-law, an amount equal to the capital contributions
previously paid (as indexed in accordance with the then capital contributions policy
of the Township to the date the development charge imposed under this By-law is
paid) expressed as a dollar amount per acre for the land to which the development
charge imposed under this By-law applies.
13
Interest
27. The Township shall pay interest on a refund under subsection 18(3), (5) and 25(2)
of the Development Charges Act, 1997 at a rate equal to the Bank of Canada rate
on the date this By-law comes into force.
Front Ending Agreements
28. The Township may enter into front ending agreement under Part III of the Act.
Schedules
29. The following Schedules to this By-law form an integral part of this By-law.
Schedule 'A'
Designated Services and Sub-Components
Schedule 'B'
Residential Development Charges
Schedule 'C'
Non-Residential Development Charges
By-law Registration
30. A certified copy of this By-law may be registered in the by-law register in the Land
Registry Office against all land in the Township and may be registered against title
to any land to which this By-law applies.
Date By-law Effective
31. This By-law comes into force and effect on the date of passage hereof.
Date By-law Expires
32. This By-law expires ten years after the date on which it comes into force and effect.
Repeal
33. By-law Number 2880-2019-PL and 2881-2019-PL is hereby repealed effective on
the date this By-law comes into force and effect.
Headings for Reference Only
34. The headings inserted in this By-law are for convenience of reference only and
shall not affect the construction or interpretation of this By-law.
Severability
35. If, for any reason, any provision, section, subsection or paragraph of this By-law is
held invalid, it is hereby declared to be the intention of Council that all the
remainder of this By-law shall continue in full force and effect until repealed, re--
enacted or amended, in whole or in part or dealt with in any other way.
Enacted and Passed This 10th Day of June, A.D., 2024.
_______________________
______________________
Mayor
Clerk/Deputy CAO
Walter Shummer
Fernando Lamanna
14
Schedule "A"
By-law Number 3274-2024
Service Categories
Service Categories
1) Development Related Studies
2) Library, Parks & Recreation
3) Fire Services
4) By-Law Services
5) Services Related to a Highway:
-
Public Works: Buildings & Fleet
-
Roads And Related
Note: Development Related Studies service category to be applicable immediately upon
amendment to the Act that permits the recovery of those capital costs.
15
Schedule "B"
By-law Number 3274-2024
Residential Development Charges (1)
Township-wide Uniform Charges (2)
Notes:
(1) The development charges described above may be indexed annually under
section 16 of this By-law.
(2) Township-wide rates to be applied uniformly to all development within the
Township, subject to the provisions of this By-law.
(3)
Note: Development Related Studies service category to be applicable
immediately upon amendment to the Act that permits the recovery of those
capital costs.
Development Related Studies
$585
$455
$280
Library, Parks & Recreation
$14,468
$11,241
$6,918
Fire Services
$2,619
$2,035
$1,252
By-Law Services
$212
$165
$101
Services Related to a Highway:
Public Works: Buildings & Fleet
$3,088
$2,400
$1,477
Roads And Related
$10,410
$8,089
$4,978
TOTAL CHARGE PER UNIT
$31,383
$24,385
$15,006
Service
Residential Charge By Unit Type
Row Dwellings
& Other
Multiples
Apartment
Single &
Semi-Detached
16
Schedule "C"
By-Law Number By-law Number 3274-2024
Non-Residential Development Charges (1)
Township-Wide Uniform Charges (2)
Notes:
(1) The development charges described above shall be indexed annually
under section 16 of this By-law.
(2)
Township-wide rates to be applied uniformly to all development within
the Township, subject to the provisions of this By-law.
(3) Note: Development Related Studies service category to be applicable
immediately upon amendment to the Act that permits the recovery of
those capital costs.
Development Related Studies
$3.48
Library, Parks & Recreation
$0.00
Fire Services
$15.58
By-Law Services
$1.26
Services Related to a Highway:
Public Works: Buildings & Fleet
$18.38
Roads And Related
$61.95
TOTAL CHARGE PER SQUARE METRE
$100.65
Charge per
Square Metre
Non-Residential
Service