Utilities - Municipality of Brockton

Brockton, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot bdce21cda95f · verified 2026-10-18 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

# Utilities Notice of Study Commencement - New Water Storage Facility The 2024 Master Servicing Plan for the Town of Walkerton identified the need for a Municipal Class Environmental Assessment (MCEA) to investigate options for improving fire flows and pressures in the South Pressure Zone of the community of Walkerton. The Master Plan recommended evaluating the Wallace Street Standpipe and existing booster station and the potential for a new standpipe in Development Areas. Notice of Study Commencement- Water Storage Facility Veolia Water Canada Services Agreement The Municipality of Brockton and Veolia Water Canada entered into a five (5) year fixed fee Services Agreement which details the responsibilities of both parties for the operation, maintenance and management of the municipality's water and wastewater facilities. The agreement was extended on November 26, 2024 as per By-Law 2024-099 until June 30, 2031. * Summary of Service Agreement with Veolia Water Canada Inc. * By-Law 2016-025 - Service Agreement with Veolia Water Canada Inc. View the 2025 Drinking Water Quality Management System Operational Plan/QMS Manual for the Municipality of Brockton prepared by Veolia. Thermal Expansion If you are on a Brockton municipal water system, you may experience water releasing from the T&P (temperature and pressure) relief valve on your hot water tank. This can be caused by either high water temperature or high water pressure. The Municipality of Brockton has a program to provide some assistance with this problem. The criteria for this program is outlined in By-Law 2015-043 - Amendment to By-Law 2011-08: * The owner contacts a plumber to install the tank * The owner covers the cost for the materials and labour for the installation * The installing plumber is approved by the Municipality * The installing plumber invoices the Municipality directly for the Thermal Expansion Tank The Municipality will only cover the initial cost for a PH5 Thermal expansion tank up to $50. Any subsequent replacements, or repairs, to the initial Thermal Expansion Tank will be at the expense of the owner. Any replacement, or repairs, to the Pressure Reducing Valves installed by the Municipality during the initial installation of water meters, is to be at the expense of the owner. Policies and By-Laws The following by-laws and policies guide us in our work: * Water Meters and Rates - By-Law 2011-08 * + By-Law 2015-043 - Amendment to By-Law 2011-08 + By-Law 2026-013 - Water Service Rates and Charges By-Law Frostline Properties There are a number of properties on Brockton Water Services that are identified as frostline properties. This means that water service lines are laying within the frostline and are prone to freezing in the winter months. Every year frostline property owners are asked to leave a tap running with a slow stream of water at all times from December 1 to March 31 to avoid freezing. Frostline properties are not billed for this extra water consumption from December 1 to March 31 and are instead billed based on average consumption in October and November. Financial Plan Reports Brockton's Water and Wastewater System Financial Plan meets the requirements of Ontario Regulation 453/07 Financial Plans, under the Safe Drinking Water Act (2002): * Water Works System Financial Plan - 2026-2031 * Wastewater System Financial Plan - 2026-2031 This Plan is a third party sourced document. If you require it in an accessible format please call 519-881-2223 or email the Municipality and we will attempt to obtain the report in an accessible format. On October 14, 2025 Municipality of Brockton Resolution 25-21-04 approved a 4% increase every year from 2026 to 2031 for water rates and a 3% increase every year from 2026 to 2031 for waste water rates as part of Brockton's Five Year Water and Wastewater System Financial Plan to allow for long term cost recovery and capital planning. Contact Us Municipality of Brockton 100 Scott Street, P.O. Box 68, Walkerton, Ontario N0G 2V0, Canada Phone: 519-881-2223, Toll Free: 1-877-885-8084, Fax: 519-881-2991 Email the Municipality Sign up to our Newsletter Stay up to date on the Municipality's activities, events, programs and operations by subscribing to our eNewsletters. Sign Up Today!