WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
1
2025
Winter
Maintenance
Policy
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
2
1
Objective and Goals
The Public Works Department will strive, as is reasonably practical, to provide safe
and passable winter road and sidewalk conditions for pedestrians and motorists
within the City of Brockville. Public Works winter operations will be guided by the
level of service requirements defined in this policy, utilizing the resources provided
by the City of Brockville Council.
The standards set out in this document are based on the current version of Ontario
Regulation 239/02, Minimum Maintenance Standards for Municipal Highways and are
supported by procedures outlined in the Public Works Winter Maintenance Policy.
2
Policy
The Winter Maintenance Policy assumes that not all infrastructure need be
maintained to the same level of service depending on its role in the total
transportation network and on other various services the City provides, be they
emergency or non-emergency. To simplify the determination of levels of service,
the various infrastructures listed below have been designated classes and priorities.
These are fully explained later in this Policy.
3
Responsibility
The responsibility for providing snow clearing, ice control and snow removal from
the City's infrastructure of 137.63 km of roadways (local classes only),112.55 km of
sidewalks, 16.1 km of walkways (includes the Brock Trail but excludes portions that
are sidewalk), 9 parking lots serving city buildings, 19 municipal operated public
parking lots and the Brockville Transit bus stops, rests entirely with the Public
Works Division.
Snow and ice operations may be conducted on a 24-hour basis, 7 days a week. The
Public Works Supervisor will coordinate the overall snow and ice control clearing and
removal operations and determine the most effective operation to be undertaken
from the procedures as developed by the Public Works Division. The Public Works
Division is prepared to shift from normal work procedures any time it becomes
necessary to institute snow and ice operations.
4
Definitions
Ice: means all kinds of ice however formed.
Representative Roadways: means roadways within the City of Brockville
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
3
that have been identified as representative of the area's various road
weather conditions.
Road Condition: means the condition of the roadway surface before,
during, and after a winter storm event:
Condition
Description
Bare and Dry
Most of the road surface is dry
Bare and Wet
Most of the road surface is moist
Partially Snow Covered
Two wheels of a vehicle are on bare surface and the
other wheels are likely to be on loose snow
Partially Snow Packed
Two wheels of a vehicle are on bare surface and the
other wheels are likely to be on snow bonded to the
road
Partially Ice Covered
Two wheels of a vehicle are on bare surface and the
other wheels are likely to be on ice
Snow Covered
All wheels of a vehicle are on loose snow
Snow Packed
All wheels of a vehicle are on snow bonded to the
road
Ice Covered
All wheels of a vehicle are on ice
Roadway Designation: means the classification or designation assigned to
the City of Brockville's various roads, streets or highways. The roadway
designation defines the winter operations level of service provision. The
City's roadways fall under the four designations, as presented in section 5.1.
Significant Weather Event: means an approaching or occurring weather
hazard with the potential to pose a significant danger to sidewalk, bicycle
lane, and roadway users.
Snow Accumulation: means the natural accumulation of any of the
following that, alone or together, covers more than half a lane width of a
roadway:
1. Newly fallen snow
2. Wind-blown snow
3. Slush
Substantial Probability: means a significant likelihood considerably more than 51%.
Weather Hazard: means the weather hazards determined by Environment
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
4
Canada as meeting the criteria for the issuance of an alert under its Public
Weather Alerting Program.
Winter Event: means the weather condition affecting roads such as
snowfall, blowing snow, sleet, freezing rain, frost, or ice, to which a winter
event response is required.
Winter Event Response: means a series of winter activities performed in
response to a winter event.
Winter Patrol: means the field observation of weather and road conditions.
Winter Season: means the season when the Public Works normally perform
winter roadway and sidewalk maintenance as identified in the Winter
Maintenance Policy.
5
Patrol & Monitoring
5.1 Weather Monitoring
From October 1 to April 30, the current and forecasted weather will be
monitored once every shift or three times per calendar day, whichever is
more frequent, at the intervals identified in the Winter Maintenance Policy.
5.2 Road Patrol
The representative roadways identified in the Winter Maintenance Policy
will be patrolled a minimum of twice per day separated by at least eight
hours during weekdays and weekends. When roadways are icy or there is a
substantial probability of snow accumulation or ice formation, the patrol
frequency may increase.
5.3 Sidewalk Patrol
Where there are icy sidewalks or a substantial probability of snow
accumulation or ice formation on sidewalks, the representative sidewalks
identified in the Winter Maintenance Policy will be patrolled a minimum of
once per day.
6
Declaration of a Significant Weather Event
Public Works may declare a significant weather event for an approaching or
occurring weather hazard with the potential to pose a significant danger to
sidewalk, bicycle lane, and roadway users.
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
5
A weather hazard that would warrant the declaration of a significant weather
event is determined by Environment Canada as meeting the criteria for the
issuance of an alert under its Public Weather Alerting Program.
When a significant weather event is declared, the notice will be announced on
the City of Brockville website, and on Facebook. Similarly, an announcement to
declare the end of a significant weather event will also take place through the
same social media platforms.
7
Winter Parking Prohibition
7.1 On-Street Parking
Parking is prohibited on all streets between the hours of 2:00 a.m. and 7:00 a.m.
during the months of November through March inclusive with the following
exceptions:
1) Parking will be permitted between the hours of 2:00 a.m. and 7:00 a.m. until
the first significant snowfall occurs. At that time a notice will inform the
general public that the Winter Maintenance Parking By-law is in effect.
2) The City will inform the public by 6:00 p.m. on the day that Public Works
Division crews will be doing evening ice and snow clearing/removal operations
in specific areas of the City. Parking prohibitions will be changed in the
announced areas listed below to 11:00 p.m. to 7:00 a.m. on the evening that
the work is to be undertaken:
A - City Wide
B - Area south of CNR
C - Area between CNR and 401
D - Area north of 401
The public will be informed prior to 6:00 p.m. via the City of Brockville website,
Facebook and other platforms.
The City has also established a winter maintenance bulletin telephone
number (342-8772 extension 600 #) to provide the public with up-to-date
information on our winter maintenance activities.
7.2 Parking Lots
Overnight parking is also prohibited in all city public parking lots, with the
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
6
exception of the George Street lot, Henry Street lot, the south side of Water Street
lot, and the east side of John St. lot from 11:00 p.m. to 7:00 a.m. from November
1st to March 31st of each year
8
By-Laws
Applicable By-laws passed for the purposes of supporting snow and ice control
efforts and other related By-laws which could be enforced during all out
emergencies are listed below:
By-Law 119-89 - Winter Parking Prohibitions - On Street and Parking Lots
By-Law 024-2022 - Care & Use of Streets
By-Law 127-85 - Lease Agreement - Arvic Realty (Loeb Lot)
By-Law 210-83 - Emergency Plan
By-Law 078-2015 Property Standards
9
Property Damage
During the course of operations through any given winter, a certain amount of
damage to City and private property may be incurred by snow clearing forces. In the
event that sod damage is sustained it will be restored by the Public Works Division
using topsoil and seed at the earliest availability of material (usually April). Any
damage sustained due to salt brine inadvertently splashed onto a boulevard or lawn
during the course of the winter will not be treated or repaired by the City.
If a City plow or truck damages a mailbox either through direct contact or due to the
force of the snow rolling off the plow, the mailbox will be repaired or replaced by
Public Works personnel with a standard type of mailbox as established by the Public
Works Division. The City cannot replace decorative mailboxes. A property owner
who installs decorative materials on the city right-of-way does so at his own risk.
10
Driveway Entrance Clearing
It can be expected that snow will be plowed into driveways and pathways as a normal
part of roadway and sidewalk snow clearing operations. Owners of properties which
the driveways and pathways service will be responsible for removal of the snow
deposited in those entrances by city snow clearing operations, under the By-law 078-
2015 Property Standards.
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
7
11
Assistance to Private Property
Under no circumstances will a City employee be allowed to use a city owned vehicle
to push, pull, or tow a stranded private vehicle from a roadway or parking lot. The
employee may, if a hazard exists, use his radio to notify the Dispatcher of the
hazardous condition. Likewise, under no circumstances will a City employee use a
City owned vehicle to perform any snow removal or ice control operation on private
or commercial property and the employee will not be allowed to use personal
equipment during working hours.
12
Roadways
12.1
Parking Lots
Designation
Class 1
There are presently no Class 1 Roadways that the City of
Brockville is responsible for maintaining.
Class 2
Are the arterial roadways which carry traffic to and through the City,
as well as emergency routes for hospital and fire services. These
Class 2 roadways carry large volumes of traffic. Except for
emergency route roadways, these roadways are identified as Arterial
in Part 5, Section 5.2.2.2 of the City of Brockville's Official Plan
2023. Dead end stub portions of these roadways will be assigned a
lower priority level for Winter Maintenance operations in accordance
with the classification table of the Regulation.
Class 3
Are the Collector Roadways which carry both through and local
traffic. These Class 3 roadways are identified as Collector roadways
in Part 5, Section 5.2.2.3 of the City of Brockville's Official Plan
2023. Dead end stub portions of these roadways will be assigned a
lower priority level for Winter Maintenance operations in accordance
with the Classification Table of the Regulation. Public Transit bus
routes are also included in this second priority classification.
Class 4
Are local roadways which carry local traffic to a specific address. Any
roadway that publicly funded schools are located on, has main
driveway entrance onto, or connect the street that the school fronts
onto, to the closest arterial or collector roadway, would automatically
qualify for this classification. These Class 4 roadways are identified as
Local roadways in Part 5, Section 5.2.2.4 of the City of Brockville's
Official Plan 2023.
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
8
Class 5
Are all remaining roadways including City maintained laneways and
specific dead end stub roadways/cul de sacs. These Class 5
roadways may service residential, industrial or commercial
addresses depending on the property zoning on them, and are
identified as Local roadways in Part 5, Section 5.2.2.4 of the City of
Brockville's Official Plan 2023.
12.2
Level of Service Standards
Snow Accumulation
When snow begins to accumulate, resources to clear the snow from roadways
should be deployed as soon as practicable after becoming aware of the snow
accumulation and in accordance with the snow depth defined in the following
table.
Designation
Snow Depth
for
Accumulation
Response
Treatment
Used
Objective
During
Storm
*Objective
After Storm
Timeframe
to Achieve
Objective
After End
of Winter
Event
Class 2
5 cm
Plow/Sand
De-ice as
required
Safe and
passable
Bare and wet
6 hours
Class 3
8 cm
Plow/Sand
De-ice as
required
Safe and
passable
Bare and wet
12 hours
Class 4
8 cm
Plow/Sand
De-ice as
required
Safe and
passable
Bare and wet
16 hours
Class 5
10 cm
Plow/Sand
De-ice as
required
Safe and
passable
Bare and wet
24 hours
The after-storm objective is to be reached as soon as possible and normally
within the timeframe indicated in the table, weather conditions permitting.
It is inevitable that the City's snowplows will create a windrow of snow across
driveways in the normal course of plowing operations. The resident, business
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
9
owner or property owner is responsible for clearing driveway snow that
accumulates as a result of roadway or sidewalk snow plowing operations.
When a significant weather event is declared related to snow accumulation,
weather forecasts will be monitored and when deemed practicable, resources will
be deployed to address the snow accumulation on roadways. When the end of the
significant weather event is declared, the winter event response will continue until
the snow accumulation objectives in the above table are met.
Ice Formation Prevention and Treatment
Resources to prevent or treat ice formation should be deployed as soon as practicable
after:
- Weather monitoring or patrolling indicates a substantial probability of
ice forming on a roadway, due to a pending winter weather event.
- Becoming aware that a roadway is icy.
Designation
Preventative
Treatment
Used
Objective
During and
After Storm
Reactive
Treatment Used
Timeframe to
Achieve
Objective After
End of Winter
Event
Class 2
De-ice / Anti-ice Safe and
passable
Sand/Salt/De-ice
/ Plow as
required
4 hours
Class 3
De-ice / Anti-ice Safe and
passable
Sand/Salt/De-ice
/ Plow as
required
8 hours
Class 4
De-ice
Safe and
passable
Sand/Salt/De-ice
/ Plow as
required
12 hours
Class 5
Sand/salt mix to
help de-ice and
add traction
Safe and
passable
Sand/Salt/De-ice
/ Plow as
required
16 hours
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
10
13
Bicycle Lanes
This section applies to treating ice formation on bicycle lanes on a roadway only and
does not apply to other types of bicycle facilities.
When a significant weather event is declared relating to ice, weather forecasts will be
monitored and, when deemed practicable, resources will be deployed to treat icy
roadways. When the end of the significant weather event is declared, the winter
event response will continue until objectives in the above table are met.
13.1
Designations
Winter priority bicycle routes have been established for winter maintenance during
a winter event. Priority bicycle routes may include a portion of the roadway
designated as a bicycle lane or roadways without designated bicycle lanes or a
combination of both. These routes are maintained as part of the roadway, such as
the shared bike lane on Water Street.
All other on-road bicycle lanes are maintained in the winter in conjunction with the
priority of the adjacent roadway. Level of service for on-road bicycle lanes follows
the roadway designation unless the bike lane has been deemed "unmaintained"
during the winter months.
The bicycle lane of King Street West from 90m east of Rivers Avenue (bike lane
start) to the West City limits will be closed from November 1 - March 31. Winter
maintenance operations will not be prioritized during or after a storm for the
bicycle lane.
Designation
Description
Class 2
Bicycle lanes on Class 2 roadways
Class 3
Bicycle lanes on Class 3 roadways
Class 4
Bicycle lanes on Class 4 roadways
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
11
13.2
Designations
Snow accumulation
When snow begins to accumulate, resources to clear snow from bicycle
lanes should be deployed as soon as practicable after becoming aware of the
snow accumulation and in accordance with the snow depth defined in the
following table.
Designation
Snow Depth
for
Accumulation
Response
Treatment Used
*Objective
After
Storm
Timeframe to
Achieve
Objective After End
of Winter Event
Class 2
≤ 2.5 cm
Plow / Sand / De-
ice as required
Bare and wet
8 hours
Class 3
≤ 5 cm
Plow / Sand / De-
ice as required
Bare and wet
12 hours
Class 4
≤ 8cm
Plow / Sand / De-
ice as required
Partially snow
packed
24 hours
UN
Unmaintained
in the Winter
Unmaintained in
the Winter
Unmaintained
in the Winter
Unmaintained in the
Winter
The after-storm condition is the objective to be reached to at least 1 meter width, as
soon as possible and normally within the timeframe indicated in the table, weather
condition permitting.
When a significant weather event is declared relating to snow accumulation,
weather forecasts will be monitored and when deemed practicable, resources
will be deployed to address the snow accumulation on roadways. When the end
of the significant weather event is declared the winter event response will
continue until the snow accumulation objectives in the above table are met.
14
Sidewalks and Walkways
14.1
Designations
Public Works designates sidewalks and walkways into four sidewalk
designations according to their associated pedestrian traffic and proximity
to high volume roadways, in addition to the ease with which they can be
cleared.
WINTER MAINTENANCE POLICY
Winter Maintenance Policy - October 2025
12
Designation
Description
1
Sidewalks / walkways with high pedestrian volumes and / or
sidewalks
adjacent to high volume roadways, as well as designated
sidewalks in the downtown core area
2
Sidewalks designated for access routes for public funded
schools, and bus transit ways
3
Balance of sidewalks, normally residential areas that can be
cleared with mechanized plow equipment
4
Sidewalks / walkways that will not be cleared due to the
destination until
such time as time, equipment, and labor permits
4UN
Trails /Sidewalks / walkways that will not be maintained during
the winter and have posted signage.
14.2
Level of Service Standards
When snow begins to accumulate, resources to clear snow from sidewalks
and walkways should be deployed as soon as practicable after becoming
aware of the snow accumulation and in accordance with the snow defined in
the following table.
Sidewalk/Walkway- Snow Treatment
Designation
Snow Depth for
Accumulation
Response
Treatment Used
Objective
After
Winter
Event
Timeframe to
Achieve Objective
After End of
Winter Event
1
≤ 8cm
Plow / Sand / De-
ice as required
Safe and passable
for pedestrians
48 hours
2
≤ 8cm
Plow / Sand /De-ice
as required
Safe and passable
for pedestrians
48 hours
3
≤ 8cm
Plow / Sand / De-
ice
as required
Safe and
passable
for pedestrians
48 hours
4
≤ 8cm
Plow / Sand / De-
ice as required
Safe and passable
for pedestrians
48 hours
4UN
N/A
Unmaintained
N/A
N/A
Winter Maintenance Policy - October 2025
13
WINTER MAINTENANCE POLICY
14.3
Sidewalk/Walkway - Ice Formation and Treatment
Resources to prevent or treat ice formation should be deployed as soon as
practicable after:
14.3.1
Weather monitoring or patrolling indicates a substantial
probability of ice forming on a roadway, due to a pending
winter weather event.
14.3.2
Becoming aware that a sidewalk/walkway is icy.
Designation
Preventative
Treatment Used
Reactive
Treatment Used
Sidewalk Objection
During and After
Storm
Timeframe to Achieve
Objective After End of
Winter Event
1
Sand / De-ice
Sand / De-ice /
Plow as
required
Safe and passable
48 hours
2
Sand / De-ice
Sand / De-ice /
Plow as
required
Safe and passable
48 hours
3
Sand / De-ice
Sand / De-ice /
Plow as
required
Safe and passable
48 hours
4
Sand / De-ice
Sand / De-ice /
Plow as
required
Safe and passable
48 hours
4UN
Unmaintained
Unmaintained
Unmaintained
Unmaintained
15
Bus Shelters and Stops
15.1
Designation
Public Works has only 1 classification of Bus Shelters and Stop based on the
City's current level of service.
Designation
Description
Local
Bus shelters and stops on local bus
routes.
15.2
Level of Service Standards
Winter Maintenance Policy - October 2025
14
WINTER MAINTENANCE POLICY
When snow begins to accumulate, resources to clear snow from bus shelters
and stops should be deployed as soon as practicable after becoming aware of
the snow accumulation and in accordance with the snow depth defined in the
following table.
Designation
Snow Depth for
Accumulation
Response
Treatment
Used
Objective After
Winter Event
Timeframe to
Achieve
Objective After End
of Winter Event
Local
≤ 8cm
Plow / Sand /
De-ice / as
required
Safe and
passable
48 hours
Snow removal on roadways, parking lots and Transit bus stops will be carried
out when required, by the Public Works Division. Depending on the area and
number of locations to be undertaken, a decision will be made to implement
a specific operation to carry out the removal process. The different
operations employed would vary in the amount of service performed and the
manpower and equipment required to perform them. The Public Works
Supervisor will determine if removal is required, and if so, which type of
removal will be utilized.
Class Designation
For snow removal operations, the City infrastructure has been divided into
three classes which determine the priority for servicing.
Designation
Description
Class 1
Roadway including transit stops
Class 2
Municipal public parking lots
Class 3
Parking lots serving City buildings
Roadways
Roadway snow storage conditions and intersection sight line requirements
will be assessed by the Public Works Supervisor following the completion of
the post storm snow clearing operations.
Winter Maintenance Policy - October 2025
15
WINTER MAINTENANCE POLICY
The qualifying factors for consideration for removal will be:
1. If snow storage at the sides of roadway impedes normal traffic flow.
2. If snow storage at intersections restricts required visibility sight lines.
3. If snow storage restricts parking meter accessibility or significantly
hampers occupants of the vehicle from safely accessing the sidewalk
(not applicable for areas with boulevard greater than 1 meter wide)
from the metered parking location.
4. If additional snow storage required for:
a. sidewalk clearing operations.
b. cull-de-sacs/indented corners/dead end
Types of Removal
1. Areas to be considered for full length removal are shown on Schedule J.
2. All remaining urban areas to have snow blown back onto boulevard/lawn area
of city right-of-way.
3. All intersections will be eligible for removal if qualifying factors are met.
4. Rural areas will have snow winged back to provide additional snow storage
capacity.
5. Cul-de-sacs/indented corners/dead ends will be eligible for removal if
additional snow storage capacity is determined to be required. These areas are
shown on Schedule K.
Priority for Servicing
Priority Between Types of Removal
Priority between types of removal operations to carry out the 4 listed removal
area types would be separate but overlap in the time frame that they were
ongoing, i.e.:
Winter Maintenance Policy - October 2025
16
WINTER MAINTENANCE POLICY
1. Full length removal is usually carried out between 11:00 p.m. and 7:30 a.m.
2. Areas to be blown onto lawns and winging back snow on rural road sections
are usually carried out between 7:00 a.m. and 3:30 p.m.
3. Removal at intersections could be carried out any time of the day or night.
4. Removal at cull-de-sacs/indented corners/dead ends is usually carried out
between 7:00 a.m. and 11:00 p.m.
Therefore, all 4 operations may be ongoing in a 24-hour period.
Priority Within Types Of Removal
1)
Full length removal,
if all areas starting at zero snow storage
base, would be undertaken in the following order:
Area 1 - King St. - Orchard to Edward
Area 2 - Remainder of on street metered areas
Area 3 - Remainder of areas south of CNR from Perth to North Augusta
Road Area 4 - Areas south of CNR and west of Perth
Area 5 - Areas south of CNR and east of North Augusta
Road Area 6 - Areas north of CNR
Severe weather conditions/storms may necessitate removal by roadway class.
2)
Areas to be blown back onto lawns or boulevards would be
undertaken in the following order:
Area 1 - South CNR
Area 2 - North of CNR and south of
401 Area 3 - North of 401
3)
Intersection Removal would be undertaken in the
following order:
Area 1 - Intersections of Class 2 Streets
Area 2 - Intersections of Class 2 & Class 3 Streets
Area 3 - Intersections of Class 2 & Class 4 Streets
Area 4 - Intersections of Class 2 & Class 5 & 6 Streets
Area 5 - Intersections of Class 3 & Class 3 Streets
Area 6 - Intersections of Class 3 & Class 4 Streets
Winter Maintenance Policy - October 2025
17
WINTER MAINTENANCE POLICY
Area 7 - Intersections of Class 3 & Class 5 & 6 Streets
Area 8 - Intersections of Class 4 & Class 4 Streets
Area 9 - Intersections of Class 4 & Class 5 & 6 Streets
Area10 - Intersections of Class 5 & 6 & Class 5 & 6 Streets
Traffic volumes and time of removal operations may necessitate deviations
from the priority order.
4)
Winging back of snowbanks on roads with rural cross section would be
carried out as per roadway classification for snow clearing and ice
control operations.
5)
Removal at cul-de-sacs/indented corners/dead ends priority would be
undertaken in the following order:
Area #1 - south of CNR
Area #2 - north of CNR and south of
Area #3 - north of 401
Commencement of roadway removal operations will normally not commence
until 24 hours after post storm plowing operations are completed.
Weekend removal operations will be kept to a minimum and be carried out
for severe conditions only.
Municipal Public Parking Lots
Removal of snow piled at designated locations within these lots will not
normally begin until 24 hours after post storm plowing operations have been
completed. Removal operations will only be carried out Monday to
Friday/Statutory Holidays excluded.
Parking Lots Serving City Buildings
Snow piled at these lots will not normally be removed. Extreme conditions
may necessitate limited removal operations to be carried out.
Winter Maintenance Policy - October 2025
18
WINTER MAINTENANCE POLICY
Public Transit Stops
Snow removal at bus stops will only be commenced if the snow storage area
of the stop is exceeded, or if accumulated snow obstructs sight lines at
intersections. Removal operations will not normally commence until 24
hours after post storm plowing operations have been completed. Removal
operations will only be carried out Monday to Friday/Statutory Holidays
excluded.
Priority for Servicing (Roadways, Transit Stops, Parking Lots)
Snow removal from City roadways and municipal public parking lots will
normally be undertaken during the same time period. In severe weather,
however, the following prioritization of service would be initiated.
Class 1
- Roadways
- Transit Stops
Class 2
- Municipal Public Parking Lots
Class 3 - Parking lots serving City buildings.
Removal will not normally be carried out at parking lots serving city
buildings unless emergency conditions dictate.
16 Annual Monitoring
Winter storm analysis will be undertaken at the end of each winter season to
provide a basis for continuous improvement of the winter operations
practices and procedures as outlined in the current Winter Maintenance
Policy.
17 Overall Priority for Snow Clearing Ice Control Operations During or After
Storm
The Public Works Division has developed a priority list to be followed during a
storm with the overall efforts for snow clearing and ice control based on the
following:
Winter Maintenance Policy - October 2025
19
WINTER MAINTENANCE POLICY
Overall Priority for Snow Clearing Ice Control Operations During a Storm
Priority
Class
Operation
Infrastructure
1 (a)
2
Snow
Clearing/Ice
Control
Roadways
1 (b)
1
Snow
Clearing/Ice
Control
Fire Hall - 2 main bays front
entrance
1
Snow
Clearing/Ice
Control
Metro driving lanes and defined
roadways between Perth & King
1 (c)
3
Snow
Clearing/Ice
Control
Roadways
2
4
Snow
Clearing/Ice
Control
Roadways
3 (a)
1
Snow
Clearing/Ice
Control
Sidewalks
3 (b)
5 & 6
Snow
Clearing/Ice
Control
Roadways
4
2
Snow
Clearing/Ice
Control
City Public Parking Lots
5
3
Snow
Clearing/Ice
Control
Parking Lots servicing City
Buildings
For severe weather conditions, manpower shortages or equipment
breakdowns, lower priority servicing will be dropped until level of service is
achieved on higher priority levels. Note:
Individual Class designations only determine the priority of snow and
ice control operations within their applicable grouping.
-
Overall priority designations determine the sequence of snow and
ice control operations of all combined infrastructure groupings.
-
Infrastructure groupings are: roads, sidewalks, and parking lots.
Winter Maintenance Policy - October 2025
20
WINTER MAINTENANCE POLICY
Overall Priority for Snow Clearing Ice Control Operations After a Storm
Priority
Class
Operation
Infrastructure
1
2
Snow
Clearing/Ice
Control
Roadways (including shoulders)
2
3
Snow
Clearing/Ice
Control
Roadways (including shoulders)
3
4
Snow
Clearing/Ice
Control
Roadways (including shoulders)
4
5,6
Snow
Clearing/Ice
Control
Roadways
5
1
Snow
Clearing/Ice
Control
Sidewalks
6
1
Snow
Clearing/Ice
Control
Fire Station #2
7
1
Snow
Clearing/Ice
Control
Metro Roadway & Parking Lot
8
2
Snow
Clearing/Ice
Control
City Public Parking Lots
9
3
Snow
Clearing/Ice
Control
Parking Lots servicing City
Buildings
10
2
Snow
Clearing/Ice
Control
Sidewalks
11
4
Snow
Clearing/Ice
Control
Transit Stops
12
3
Snow
Clearing/Ice
Control
Residential Sidewalks
13
4
Snow
Clearing/Ice
Control
Brock Trail
Priority Items 1 through 10 are normally serviced concurrently. For severe
weather, equipment breakdowns, or manpower shortages, operations
through priority sequence would be consecutive.
Winter Maintenance Policy - October 2025
21
WINTER MAINTENANCE POLICY
Note:
Individual Class designations only determine the priority of snow and
ice control operations within their applicable grouping.
-
Overall priority designations determine the sequence of snow and
ice control operations of all combined infrastructure groupings.
-
Infrastructure groupings are roads, sidewalks,
and parking lots/ transit stops
Overall Priority or Snow Removal Operations after a Storm following
Completion of Snow Clearing & ice Control Operations
Priority
Class
Operation
Infrastructure
1
1
snow removal
roadways
2
2
snow removal
municipal public parking lots
3
3
snow removal
parking lots servicing city
buildings
Priority items 1 through 3 are normally serviced concurrently. For severe
weather, equipment breakdowns, or manpower shortages, operations
through priority sequence would be consecutive
Winter Maintenance Policy - October 2025
22
WINTER MAINTENANCE POLICY
Snow Clearing Ice Control & Removal System - Procedure
Schedule G Winter Storm Guidelines - Salt Application Rates
Type of
Precipitation
Temperature
Pavement
Condition
Action Required
Wet snow with
freezing rain
Holding near -
1˚C (30˚F)
Wet
Salt application of 50kg-130kg/ 2 lane
km as specified by supervisory
personnel in charge of operation
Reapply as necessary.
Plow as necessary
Sleet
Holding near -
1˚C (30˚F)
Wet
Salt application of 50kg-130kg/ 2 lane
km as specified by supervisory
personnel in charge of operation.
Plow as necessary
Accumulating
snow
Holding near -
1˚C (30˚F)
Wet
Salt application of 50kg-130kg/ 2 lane
km as specified by supervisory
personnel in charge of operation.
Plow as necessary
Freezing rain
Below freezing
and falling
Wet or sticky
Salt application of 50kg-130kg/ 2 lane
km as specified by supervisory
personnel in charge of operation.
Plow as necessary
Sleet or snow
Below -1˚C
(30˚F) and
falling
Wet or sticky
Salt application of 50kg-130kg/ 2 lane
km as specified by supervisory
personnel in charge of operation.
Repeat until sleet or snow stops.
Plow as necessary
Dry snow
Below -6˚C
(20˚F) and
falling
Dry
Plow immediately
Apply salt only to wet, packed or icy
50kg-130kg/2 lane km as specified by
supervisory personnel in charge of
operation.
Frequent plowing
Packed snow
and ice on
pavement
-1˚C (30˚F)
down to -
17˚C (0˚F)
Packed snow
and ice
buildup
Salt application of 50 kg-130 kg as
specified by supervisory personnel in
charge of operation
Note: 1) Action required as listed for various conditions shown on this chart should be used
in most cases. However, unusual circumstances may necessitate departure from
the recommendations.
Winter Maintenance Policy - October 2025
23
WINTER MAINTENANCE POLICY
2) When pre-wetting is employed, recommended salt application rates may be reduced by 10%.
3) For multiple lane roads, i.e. North Augusta Rd., Stewart Blvd., Parkedale Ave., the
salt distribution rate has to be increased proportionately to number of additional
two lanes or extra passes have to be made.
MIX/SAND APPLICATION RATES
Sand/mix when used is to be spread at a rate of 150-200 kg/2 lane kl
*Mix is stockpiled at 50% salt 50% sand mix ratio. Additional salt will not be added unless
authorized by Public Works Supervisor
Salt Brine Application Rates
Event Type
Temp
Action
Anti-ice prior to
snow/freezing rain event
Min. - 9° C steady or rising 80 - 100 L/lane/km. As
specified by supervisory
personnel in charge of
operations.
Anti-ice at beginning of
light snow event
Min. - 9° steady or rising
80 - 100 L/lane/km. As specified
by supervisory personnel in
charge of operations
Anti-ice upon termination
of rain event
Temp. projected to fall
to or below 0° C
80 - 100 L/lane/km. As specified
by supervisory personnel in
charge of operation.
Anti-ice frost event
(bridge decks)
80 - 100 L/lane/km. As specified
by supervisory personnel in
charge of operations.
Deice following storm event
To bare off ice in
conjunction with granular
application.
Min. - 9° C steady or rising 80 - 100 L/lane/km
Brine Concentration 23.5%
Winter Maintenance Policy - October 2025
24
WINTER MAINTENANCE POLICY
LIST OF SCHEDULES
Schedule A - Roadway Classification for Winter Snow and Ice Control
Purposes
Schedule B - Sidewalk Classification for Winter Snow and Ice Control
Purposes Priority 1, 2, 3, 4 & 4 no winter maintenance.
Schedule D - Municipal Public Parking Lots to be Serviced for Snow
and Ice Control
Schedule E - Parking Lots Servicing City Buildings to be Serviced for
Snow and Ice Control
Schedule F - Servicing Treatment Guidelines for Class 2, Class 3 and
Class 4 Roadways
Schedule G - Salt and Sand Application Rates for Class 2, Class 3, Class
4 and Class 5 & 6 Roadways and Class 2 and Class 3 Parking Lots
Schedule H - Servicing Treatment for Class 5 & 6
Schedule I - Roadways Servicing Treatment for Parking Lots
Schedule J - Areas to be Considered for Full Length Snow Removal
Operations
Schedule K - Cul-de-sacs/Indented Corners/Dead End Areas to be
Considered for Snow Removal Operations
Schedule L - Winter Patrol Record
Schedule M - Sidewalk Hand List
Winter Maintenance Policy - August 2025
34
WINTER MAINTENANCE POLICY
Schedule D
Municipal Public Parking Lots to be Serviced for
Snow and Ice Control
1. Metro Lot
2. Reliable Lot
3. Henry Street Lot
4. Home Street Lot and Stalls
5. Buell Street Lot
6. George Street Lot
7. George St Stalls at ODR
8. Water Street Lot
9. West Market Lot
10. Park Street Lot
11. Ferry Street Lot
12. Kincaid Street Stalls
13. Block House Island Parkway Stalls
14. Rivers Avenue Lot
15. Ernie Fox Quay (parking stalls on south side of street)
16. Aquatarium (5 stalls on east side of St. Andrew St.)
17. Reynolds Park St. Lot
18. St. Andrew St. Lot
19. Market St. West Lot Extension
20. Prince of Wales Lot W
Winter Maintenance Policy - August 2025
35
WINTER MAINTENANCE POLICY
Schedule E
Parking Lots Servicing City Buildings to
be Serviced for Snow and Ice Control
1. Memorial Centre
2. Youth Arena
3. Gord Watts Municipal Centre
4. Arts Centre
5. Fire Hall #1
6. Fire Hall #2
7. Brockville Police
8. Rotary Field House
9. St. Lawrence Park
10. Rotary Park (Gilmour St.)
Schedule F
Recommended Treatments - for Class 2, 3 & 4 Roadways
Schedule F
Temperature
Type of Precipitation
Road Condition
Temp.
Activity
Beginning Of Storm
During Storm
After Storm
Below -18°C
Dry Snow
No packing
Dry
pavement
Rising
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
Follow after plowing if
slippery No
Bare pavement (wing
shoulders/clean up Slippery
sections only
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
Follow after plowing if
slippery No
Bare pavement/wing shoulders/clean
up Slippery sections only
No
-18°to -12°C
Dry Snow
No packing
Dry
Pavement
Rising
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
No
No
Bare pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
No
No
Bare pavement/wing shoulders/clean
up Slippery Sections only
No
-18°to -12°C
Dry Snow
Packing
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Bare pavement/wing shoulders/clean
up Slippery sections only
To bare or assist is baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 2 cm of snow
accumulation Follow after
plowing if slippery No
Continuously
Follow after plowing if
slippery No
Bare pavement/wing shoulders/clean
up Slippery sections only
No
-12° to -7°C
Dry Snow
No Packing
Dry
Pavement
Rising
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
Follow after plowing if
slippery No
Bare pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation Follow after
plowing if slippery No
Continuously
Follow after plowing if
slippery No
Bare pavement/wing shoulders/clean
up Slippery sections only
No
-12° to -7°C
Dry Snow
Packing
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm accumulation
Continuously
Follow after plowing if slippery
As necessary after plowing to assist plowing
Bare pavement/wing shoulders/clean
up No
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 2cm of snow
accumulation No
No
Continuously
Follow after plowing if
slippery No
Bare pavement/wing shoulders/clean
up Slippery sections only
No
Above -7°C
Wet Snow
Packing
Wet Pavement
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm of snow accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Bare pavement/wing shoulders/clean
up No
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
.5 hr after
salting No
Before .5cm of snow accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Bare pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement
Above -7°C
Sleet or Freezing Rain
Possible Icing, Wet
pavement
Rising
Plowin
g
Sandin
g
Salting
No
No
When icing starts
No
Yes
Yes
Remove slush
Slippery sections
only Slippery
sections only
Falling
Plowin
g
Sandin
g
Salting
No
No
When icing starts
No
Yes
Yes
Remove slush
Slippery sections
only
To bare or assist in baring pavement
After Storm - any
temperature
No precipitation
Road snow packed
or icy
Rising
Plowin
g
Sandin
g
Salting
Continuously to bare
pavement As necessary
When above --18°C
Falling
Plowin
g
Sandin
g
Salting
Continuously to bare
pavement As necessary
No
After Storm - any
temperature
No precipitation
Drifting
Rising
Plowin
g
Sandin
g
Salting
Continuously to bare
pavement No
Slippery sections only
Falling
Plowin
g
Sandin
g
Salting
Continuously to bare pavement
Slippery sections only
No
NOTE: Recommended treatment for various conditions shown on this chart should be used in MOST cases. However, unusual circumstances may necessitate departure from the recommended treatment. Temp. rising means temp to remain in or rise above temperature range. Temp. falling means
temp. to remain in or fall below temp. range
Schedule H
Recommended Treatments - For Class 5 & 6 Roadways
Temperature
Type of Precipitation
Road Condition
Temp.
Activity
Beginning Of Storm - Following Completion of Class 2, 3, &
4 roads
During Storm - Following Completion of Class 2,3 & 4
roads
After Storm
Below -18°C
Dry Snow
No packing
Dry
pavement
Rising
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement if required
Falling
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
No
-18°to -12°C
Dry Snow
No packing
Dry
Pavement
Rising
Plowin
g
Sandin
g
Salting
After 3.75 cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
No
No
Plow pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement if required
Falling
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
No
No
Plow pavement/wing shoulders/clean
up Slippery Sections only
No
-18°to -12°C
Dry Snow
Packing
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Plow pavement/wing shoulders/clean
up Slippery sections only
To bare or assist is baring pavement if required
Falling
Plowin
g
Sandin
g
Salting
After 3.75 cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
No
-12° to -7°C
Dry Snow
No Packing
Dry
Pavement
Rising
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement
Falling
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation Follow after
plowing if slippery
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
No
-12° to -7°C
Dry Snow
Packing
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm accumulation
Continuously
Follow after plowing if slippery
As necessary after plowing to assist plowing
Plow pavement/wing shoulders/clean
up No
To bare or assist in baring pavement if required
Falling
Plowin
g
Sandin
g
Salting
After 3.75cm of snow
accumulation No
No
Continuously
Follow after plowing if
slippery No
Plow pavement/wing shoulders/clean
up Slippery sections only
No
Above -7°C
Wet Snow
Packing
Wet Pavement
Rising
Plowin
g
Sandin
g
Salting
.5 hrs after
salting No
Before .5cm of snow accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Plow pavement/wing shoulders/clean
up No
To bare or assist in baring pavement if required
Falling
Plowin
g
Sandin
g
Salting
.5 hr after
salting No
Before .5cm of snow accumulation
Continuously
Follow after plowing if
slippery As necessary after
plowing
Plow pavement/wing shoulders/clean
up Slippery sections only
To bare or assist in baring pavement if required
Above -7°C
Sleet or Freezing Rain
Possible Icing, Wet
pavement
Rising
Plowin
g
Sandin
g
No
No
When icing starts
No
Yes
Yes
Remove slush
Slippery sections
only Slippery
sections only
Salting
Falling
Plowin
g
Sandin
g
Salting
No
No
When icing starts
No
Yes
Yes
Remove slush
Slippery sections
only
To bare or assist in baring pavement
After Storm - any
temperature
No precipitation
Road snow packed
or icy
Rising
Plowin
g
Sandin
g
Salting
No
As necessary
When above --
18°C
Falling
Plowin
g
Sandin
g
Salting
No
As
necessary
No
After Storm - any
temperature
No precipitation
Drifting
Rising
Plowin
g
Sandin
g
Salting
Plow
drifts No
Slippery sections only
Falling
Plowin
g
Sandin
g
Salting
Plow drifts
Slippery sections
only No
NOTE: Recommended treatment for various conditions shown on this chart should be used in MOST cases. However, unusual circumstances may necessitate departure from the recommended treatment. Temp. rising means temp to remain in or rise above temperature range. Temp. falling means
temp. to remain in or fall below temp. range
Schedule I - Recommended Treatments - All Parking Lots
Temperature
Type of Precipitation
Road Condition
Temp.
Activity
During Storm
After Storm
Below -18°C
Dry Snow
No packing
Dry
pavement
Rising
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections only
To bare or assist in baring pavement if required
Falling
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections
only No
-18°to -12°C
Dry Snow
No packing
Dry
Pavement
Rising
Sandin
g
Salting
No
No
Slippery sections only
To bare or assist in baring pavement if required
Falling
Sandin
g
Salting
No
No
Slippery Sections
only No
-18°to -12°C
Dry Snow
Packing
Rising
Sandin
g
Salting
Follow after plowing if
slippery As necessary after
plowing
Slippery sections only
To bare or assist is baring pavement if required
Falling
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections
only No
-12° to -7°C
Dry Snow
No Packing
Dry
Pavement
Rising
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections only
To bare or assist in baring pavement if required
Falling
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections
only No
-12° to -7°C
Dry Snow
Packing
Rising
Sandin
g
Salting
Follow after plowing if slippery
As necessary after plowing to assist plowing
No
To bare or assist in baring pavement if required
Falling
Sandin
g
Salting
Follow after plowing if
slippery No
Slippery sections
only No
Above -7°C
Wet Snow
Packing
Wet Pavement
Rising
Sandin
g
Salting
Follow after plowing if
slippery As necessary after
plowing
No
To bare or assist in baring pavement if required
Falling
Sandin
g
Salting
Follow after plowing if
slippery As necessary after
plowing
Slippery sections only
To bare or assist in baring pavement if required
Above -7°C
Sleet or Freezing Rain
Possible Icing, Wet
pavement
Rising
Sandin
g
Salting
Yes
Yes
Slippery sections
only Slippery
sections only
Falling
Sandin
g
Salting
Yes
Yes
Slippery sections only
To bare or assist in baring pavement if required
After Storm - any
temperature
No precipitation
snow packed or icy
Rising
Sandin
g
Salting
As necessary
When above --18°C to bare or assist in baring pavement if required
Falling
Sandin
g
Salting
As
necessary
No
NOTE: Recommended treatment for various conditions shown on this chart should be used in MOST cases. However, unusual circumstances may necessitate departure from the recommended treatment. Temp. rising means temp to remain in or rise above temperature range. Temp. falling means
temp. to remain in or fall below temp. range
Winter Maintenance Policy & Schedules\Winter Maintenance Policy 1999\Schedule F H I - rf chart
Risk Management Centre of Excellence®
Winter Patrol Record - Schedule L
WEATHER
Clear
Time:
Wind
Light
Moderate Strong
Partly Cloudy
Time:
Direction
Overcast
Time:
Visability
Good
Time
Rain
Time:
Fair
Time
Snow
Time:
Poor
Time
Freezing Rain
Time:
Weather
Comment:
Fog
Time:
WINTER PATROL RECORD FOR
Date of Patrol:
Start of Patrol (Time):
End of Patrol (Time):
Patrolled by:
Signature:
CONDITION CODES
ACTION REQUIRED
ü
Observed Condition requiring a
Winter Event Response
Schedule operations to comply with MMS or LOS
X
Observed Condition
No Response Required
No action required
N/A
Not applicable
No action required
SIGN
While Intact Public Entities Inc. does its best to provide useful general information and guidance on matters of interest to its clients, statutes, regulations and the common law continually change and
evolve, vary from jurisdiction to jurisdiction, and are subject to differing interpretations and opinions. The information provided by Intact Public Entities Inc. is not intended to replace legal or other
professional advice or services. The information provided by Intact Public Entities Inc. herein is provided "as is" and without any warranty, either express or implied, as to its fitness, quality, accuracy,
applicability or timeliness. Before taking any action, consult an appropriate professional and satisfy yourself about the fitness, accuracy, applicability or timeliness of any information or opinions
contained herein. Intact Public Entities Inc. assumes no liability whatsoever for any errors or omissions associated with the information provided herein and furthermore assumes no liability for any
decision or action taken in reliance on the information contained in these materials or for any damages, losses, costs or expenses in a way connected to it. Intact Public Entities Inc. is operated by
a wholly owned subsidiary of Intact Financial Corporation. Intact Design® and Risk Management Centre of Excellence® are registered trademark of Intact Financial Corporation or its affiliates.
All other trademarks are properties of their respective owners. TM & © 2021 Intact Public Entities Inc. and/or its affiliates. All Rights Reserved.
LOCATION
ROAD SURFACE, BICYCLE LANES, SIDEWALK CONDITION
Road Name
From
To
Comments
Results of the Patrol of Representative Roads
Maintenance Class
Pavement Temperature
Air Temperature
Bare & Dry
Bare & Wet
Partially Snow Covered
Partially Snow Packed
Partially Ice Covered
Snow Covered
Snow Packed
Ice Covered
Drifting
Black Ice
Are there bike lanes on
this road section?
(yes/no)
Does the sidewalk
require service?
(yes/no)
Frost
Sush
Are there sidewalks on
this road section?
(yes/no)
Does the bike lane
require service?
(yes/no)
Stewart Blvd
Parkdale Ave
Windsor Dr
Centennial Rd
Orchard St
Parkdale Ave
Windor Dr
Centennial Rd
Windsor Dr
King St
King St
NorthAugusta N
Laurier Blvd
North Augusta
Pearl St
2
2
3
3
4
Alwington St
Sidewalks
1361 Millwood
46 William St
32 Cedar St
Tupper St
-------------------
Tupper St
---------------------
---------------------------
--------
--------
--------
---------
5
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
WINTER MAINTENANCE POLICY
Schedule M
Areas Requiring Hand Shoveling/Sanding
Priority 1 Sidewalks
1. City Hall sidewalks to be bare King St & south. to Water St. - day
shift
2. GWMC steps and entrances, gate at the brine tanks, transit entrance
and around oil tank at fleet.
3. Brockville Arts Centre around the entire facility
4. Bus stop top of Courthouse - remove snow from between street
and sidewalk and push with 4 x 4 plow
5. North side of King St. from Court House to Buell St.
6. Crosswalks, corners and around parking meters on King St.
7. Steps on William St. overpass
8. Steps on Kingston Bridge
9. Steps at Home St. Parking Lot
10. Court House Green, all walkways across the green into United
Counties Building.
WINTER MAINTENANCE POLICY
Schedule M
Areas Requiring Hand Shoveling/Sanding
Sidewalk/Pathways
Priority 2 School Crossings
1. North Augusta Rd. at Reynolds
2. Bartholomew St. at Train Tracks
3. Ormond St. at Train Tracks
4. Park St. at Train Tracks
5. William St. at Pearl St. West
6. Buell St. at James St. West
7. Church St. at Perth St.
8. Church St. at Cedar St.
9. Perth St. at Train Tracks
10. Perth St. at Central Ave. West
11. Stewart Blvd. at Central Ave. (All Three Corners)
12. Balmoral Pl. at Central Ave. Crosswalks
13. Laurier Blvd. at Kensington Pkwy
14. Pedan Blvd. at Bowie St.
15. Pedan Blvd. at Durham St.
16. Vanier Dr. at Durham St.
17. Durham St. at Windsor Dr.
18. Windsor Dr. at Laurier Blvd
19. Dana St. at Laurier Blvd
20. Cuthbertson Ave at Windsor Dr.
21. Beecher at King St.
22. King St at Rivers Ave
WINTER MAINTENANCE POLICY
Schedule M
Areas Requiring Hand Shoveling/Sanding
Sidewalk/Pathways
Priority 3 Sidewalks
1. Bennett St. at King St. east along white house
2. Bartholomew St. at creek bridge
3. 16 Gilmour St. between pole and guy wire
4. Pole at southeast corner of Church St. bridge
5. Elm St. Bridge
6. Havelock St. - North sidewalk from Perth 51 westerly to first
driveway entrance
7. St. Andrew St. top of street, east side at hydro pole
8. 27 St. Andrew St., yellow house, east side
9. Apple St. West side at fire escape
10. Kincaid St. West side at Colonial Flowers at hydro pole
11. 58 Perth St. at hydro poles
12. Orchard St. Pine & Orchard SW Corner - from corner to first
driveway going south (to avoid Hydro Meter)
13. Orchard St. East side from King to 1st driveway (fence)
14. James St. South side, St. Francis School, hydro poles
15. Cedar St. west side between Pearl St. & Abbott St. at hydro pole
16. John St. around both Hydro Poles between King and George
17. Kincade St. west side around pole and porch 20-22 Kincaid
18. Park St. Bridge at Buell's Creek East Side
19. Water St. North side around steps 34 Water St.
20. George St South side by FM Hunt office
WINTER MAINTENANCE POLICY
Schedule M
Areas Requiring Hand Shoveling/Sanding
Sidewalk/Pathways
Priority 4 Sidewalks
Do not plow over bridges with wooden decks.
Lift your attachment and drive over - to be hand shoveled.
7 Bridges over creeks on pathway system
Ensure that the 7 pedestrian crosswalks are shoveled and access to
the push button has been established.
1. Centennial Road @ Brock Trail
2. Laurier Blvd. @ Brock Trail (lights)
3. Ormond St. @ Bramshot Ave. (lights)
4. Perth Street @ Brock Trail
5. Cedar St. @ Brock Trail
6. St. Paul St. @ Brock Trail
7. King St. West @ Brock Trail (lights)
7 Bridges over creeks are:
1. The Mill Bridge
2. Beacher St Bridge
3. Elm St Bridge
4. Front Ave. Bridge between Steward Blvd and Perth St
5. Front Ave. Bridge just north of Front Ave. east of Steward
6. Rotary Field House
7. Aspen Trail Bridge