In the City of Burlington, Ontario, building permit rules are set by Burlington Building Permit By-law 30-2026, verified 2026-10-28. Permit required for: Construction, demolition, sewage systems, change of use, and other classes listed in Schedule "A". Permit fees: Permit Fee = SI × A; minimum $377.00; if cannot calculate, 1% of construction value or as determined by Chief Building Official. Fees set in: Schedule "A" to this By-law.
Burlington Building Permit By-law 30-2026
adopted bylaw
permit required for
Construction, demolition, sewage systems, change of use, and other classes listed in Schedule "A".
Part 3 (Construction, Demolition, Sewage System, Change of Use Permits); Schedule "A"
fee basis
Permit Fee = SI × A; minimum $377.00; if cannot calculate, 1% of construction value or as determined by Chief Building Official.
Schedule "A", s. 1.1; s. 2.1; s. 6.1 note 6
fees location
Schedule "A" to this By-law
s. 5.1
authority
Chief Building Official and Inspectors
s. 2.10
scout note
Burlington's Building By-law requires permits for construction, demolition and change of use and sets fees in Schedule A: e.g. houses/additions $23.18/m² up to 300 m² ($29.90/m² above), apartments 1–3 storeys $21.35/m², minimum permit fee $377, fees indexed annually. Schedule B sets refunds. Repeals By-law 66-2019.