Service levels: primary/secondary roads plowed at 5 cm accumulation, local roads at 7.5 cm, all roads within 24 h after snowfall ends; sidewalks at 5 cm, cleared within 48 h; off-road paths 72 h.
Winter services — Burlington, Ontario
What are the snow-clearing service standards?
The City of Burlington, Ontario has 1 adopted policy on file: Snow Removal Plan (City of Burlington), verified 2026-10-17.