Building permits — Casselman, Ontario

Do I need a building permit? What does it cost?

In the Village of Casselman, Ontario, building permit rules are set by Casselman Building By-law 2020-013, with fee amendment 2022-017, verified 2026-10-26. Permit required for: Construction, demolition, change of use or plumbing for a building regulated by the Act and/or Building Code. Permit fees: Minimum fee plus per-square-foot rate on area exceeding the Schedule "A" area; only minimum if below. Fees set in: Schedule "A" to By-law 2020-013.

Casselman Building By-law 2020-013, with fee amendment 2022-017 adopted bylaw
permit required for Construction, demolition, change of use or plumbing for a building regulated by the Act and/or Building Code. s. 2.17; s. 2.22
fee basis Minimum fee plus per-square-foot rate on area exceeding the Schedule "A" area; only minimum if below. s. 6.3
fees location Schedule "A" to By-law 2020-013 s. 6.1
authority Chief Building Official; Inspectors conduct site inspections. s. 2.6; s. 12.2
scout note

Casselman's Building By-law requires permits for construction, demolition and change of use. Schedule A: single house $1,800 minimum plus $0.75/ft² over 2,500 ft²; additions $625 minimum plus $0.88/ft² over 600 ft²; multi-residential $1,600 per unit. Amendment 2022-017 adds a large industrial rate ($0.28/ft² over 350,000 ft²). Check current schedule; newer fee by-laws may apply.

Municipality of Casselman Development Services Review – Final Report (Jan 26, 2022)

Municipal report confirming Casselman has a "Building By-law No. 2020-013" administered by its Chief Building Official under the Building Code Act; the by-law's own page/PDF could not be located on casselman.ca.

Machine-readable: building-permits.json · Official website: http://www.casselman.ca/ · Last verified 2026-10-26 · Building permits across Ontario · Building permits in other municipalities