Development Charges Background Study July 2022

Central Elgin, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 148b74da19f0 · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 March 25, 2020 [email protected] Development Charges Background Study Municipality of Central Elgin Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the D.C.A.: Bill 73 - Smart Growth for our Communities Act, 2015 ........................................................................... 1-3 1.3.1 Area Rating ................................................................................ 1-3 1.3.2 Asset Management Plan for New Infrastructure ......................... 1-3 1.3.3 60-Day Circulation of D.C. Background Study ........................... 1-4 1.3.4 Timing of Collection of D.C.s ...................................................... 1-4 1.3.5 Other Changes ........................................................................... 1-4 1.4 Proposed Changes to the D.C.A.: Bill 108 - An Act to Amend Various Statutes with Respect to Housing, Other Development and Various Other Matters ............................................................................. 1-5 2. Current Municipality of Central Elgin Policy ................................................. 2-1 2.1 Schedule of Charges .............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-2 2.3 Timing of D.C. Calculation and Payment ................................................ 2-3 2.4 Indexing .................................................................................................. 2-3 2.5 Redevelopment Allowance ..................................................................... 2-3 2.6 Exemptions ............................................................................................. 2-4 3. Anticipated Development in the Municipality of Central Elgin .................... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Existing Reserve Funds .......................................................................... 4-8 4.8 Deductions .............................................................................................. 4-9 4.8.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.8.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.8.3 Reduction for Benefit to Existing Development ........................ 4-10 4.8.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-12 4.8.5 The 10% Reduction ................................................................. 4-12 4.9 Municipal-wide vs. Area Rating ............................................................. 4-12 4.10 Allocation of Development .................................................................... 4-12 4.11 Asset Management ............................................................................... 4-13 4.12 Transit ................................................................................................... 4-13 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-2 5.1 Introduction ............................................................................................. 5-2 5.2 Service Levels and 10-Year Capital Costs for D.C. Calculation .............. 5-2 5.2.1 Parking Services ........................................................................ 5-2 5.2.2 Parks & Recreation Services ..................................................... 5-4 5.2.3 Library Services ......................................................................... 5-6 5.2.4 Administration Studies (Municipal-Wide) ................................... 5-8 5.2.5 Administration Studies (Urban Services) ................................. 5-10 5.3 Service Levels and Capital Costs to 2036 for Central Elgin's D.C. Calculation ............................................................................................ 5-12 5.3.1 Services Related to a Highway ................................................ 5-12 5.3.2 Fire Protection Services ........................................................... 5-16 5.4 Service Levels and Urban Build-out Capital Costs for Central Elgin's D.C. Calculation ........................................................................ 5-18 5.4.1 Water Services ......................................................................... 5-18 5.4.2 Wastewater Services ............................................................... 5-20 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-4 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Phasing in .................................................................................. 7-5 7.3.6 Timing of Collection ................................................................... 7-5 7.3.7 Indexing ..................................................................................... 7-6 7.3.8 The Applicable Areas ................................................................. 7-7 7.4 Other D.C. By-law Provisions ................................................................. 7-7 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-7 7.4.2 By-law In-force Date .................................................................. 7-8 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-8 7.4.4 Area Rating ................................................................................ 7-8 7.5 Other Recommendations ...................................................................... 7-10 8. By-law Implementation ................................................................................... 8-1 8.1 Public Consultation Process ................................................................... 8-1 8.1.1 Introduction ................................................................................ 8-1 8.1.2 Public Meeting of Council........................................................... 8-1 8.1.3 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service .................................................................................. B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy .................................................................. D-1 Appendix E Local Service Policy ............................................................................E-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Appendix F Asset Management Plan ...................................................................... F-1 Appendix G Proposed D.C. By-law ......................................................................... G-1 Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.P. Asset management plan CANSIM Canadian Socio-Economic Information Management System (Statistics Canada) D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area LPAT Local Planning Appeal Tribunal M.O.E.C.P. Ministry of the Environment, Conservation and Parks N.F.P.O.W. No Fixed Place of Work O.M.B. Ontario Municipal Board O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit S.W.M. Stormwater management sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\Central Elgin\2020 DC\Report\Report.docx Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the Municipality of Central Elgin required by the Development Charges Act, 1997 (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Overview of the legislative requirements of the Act; - Chapter 2 - Review of present D.C. policies of the Municipality; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the Municipality; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of future capital requirements to service growth and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below: 1) Identify amount, type and location of growth; 2) Identify servicing needs to accommodate growth; 3) Identify capital costs to provide services to meet the needs; 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Statutory 10% deduction (soft services); - Amounts in excess of 10-year historical service calculation; - D.C. reserve funds (where applicable); Watson & Associates Economists Ltd. PAGE ii H:\Central Elgin\2020 DC\Report\Report.docx 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. charge. 3. A number of changes to the D.C. process need to be addressed as a result of the Smart Growth for our Communities Act, 2015 (Bill 73). These changes have been incorporated throughout the report and in the updated draft by-law, as necessary. These items include: a. Area-rating: Council must consider the use of area-specific charges. b. Asset Management Plan for New Infrastructure: The D.C. background study must include an asset management plan that deals with all assets proposed to be funded, in whole or in part, by D.C.s. The asset management plan must show that the assets are financially sustainable over their full lifecycle. c. 60-day Circulation Period: The D.C. background study must be released to the public at least 60-days prior to passage of the D.C. by-law. d. Timing of Collection of Development Charges: The D.C.A. now requires D.C.s to be collected at the time of the first building permit. 4. Another change to the D.C.A. was introduced on May 2, 2019 through Bill 108, More Homes, More Choice Act. While having received royal asset on June 6, 2019, many of the amendments to the D.C.A. do not come into effect until they are proclaimed by the Lieutenant Governor. The changes that have come into effect are incorporated throughout the report and in the updated draft by-law. These items include: a. Effective January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Non-profit housing developments will pay D.C.s in 21 equal annual payments. Interest may be charged on the installments, and any unpaid amounts may be added to the property and collected as taxes. b. Effective January 1, 2020 the D.C. amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning Watson & Associates Economists Ltd. PAGE iii H:\Central Elgin\2020 DC\Report\Report.docx approval (for application submitted after this section is proclaimed), shall be determined based on the D.C. charge in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined the earlier of the date of issuance of a building permit or occupancy. Further changes are suggested by the province through Bill 108 and the draft regulations. Most significant is the removal of certain services from D.C. eligibility which will be included within a newly created charge under the Planning Act called a Community Benefit Charge. This is described in more detail in section 1.4. It should be noted that this report only addresses the D.C. as provided by current legislation and does not include the proposed Community Benefit Charges as proposed by draft legislation. 5. The growth forecast (Chapter 3) on which the Municipal-wide D.C. is based, projects the following population, housing and non-residential floor area for the 10-year (2020 to 2029), Long-Term (2020 to 2036) and urban build out periods. The urban service area calculations are forecasted by buildout area. 6. On May 25, 2015, the Municipality of Central Elgin passed By-law 1880 under the D.C.A. The by-law imposes D.C.s on residential and non-residential uses. This by-law was amended on March 12, 2018 via By-law 2241. This by-law will expire on May 26, 2020. The Municipality is undertaking a D.C. public process and anticipates passing a new by-law in advance of the expiry date. The 10 Year Long-Term Urban Build Out 2020-2029 2020-2036 2020-Total Urban Build Out (Net) Population Increase 2,010 3,145 12,128 Residential Unit Increase 895 1,422 5,119 Non-Residential Gross Floor Area Increase (ft²) 365,100 511,600 1,303,900 Measure Port Stanley Lynhurst Belmont Norman/Lyndale Union Yarmouth 2020 - Urban Build Out 2020 - Urban Build Out 2020 - Urban Build Out 2020 - Urban Build Out 2020 - Urban Build Out 2020 - Urban Build Out (Net) Population Increase 2,213 84 659 5,754 3,518 - Residential Unit Increase 1,134 147 325 2,224 1,264 - Non-Residential Gross Floor Area Increase (ft²) 129,600 13,300 488,600 159,900 90,200 322,300 Measure Watson & Associates Economists Ltd. PAGE iv H:\Central Elgin\2020 DC\Report\Report.docx mandatory public meeting has been set for April 27, 2020 with adoption of the by- law on May 25, 2020. 7. The Municipality charges Municipal-wide D.C.s as well as urban area specific D.C.s. The urban services areas are subject to charges for water, wastewater and administration studies services in addition to the Municipal-wide D.C.s. Each area identified is subject to the D.C.s based on its own mix of urban services. The following tables shows the current charges for both Municipal-wide and urban services D.C.s. Non-Residential Municipal Wide Services Single & Semi Detached Multiples Apartments per sq.ft. Services Related to a Highway 1,045 913 635 0.78 Fire Protection Services 1,842 1,610 1,119 0.88 Parks & Recreation 1,580 1,380 959 0.15 Library Services 59 51 36 0.01 Administration 253 221 153 0.20 Total 4,780 4,177 2,902 2.02 Non-Residential Urban Area Services Single & Semi Detached Multiples Apartments per sq.ft. Belmont Water Services 474 414 288 0.46 Wastewater Services 9,741 8,512 5,914 3.84 Administration - - - - Sub-Total Belmont 10,215 8,926 6,202 4.30 Norman Water Services - - - - Wastewater Services 9,741 8,512 5,914 3.84 Administration - - - Sub-Total Norman 9,741 8,512 5,914 3.84 Port Stanley Water Services 474 414 288 0.46 Wastewater Services 9,741 8,512 5,914 3.84 Administration 195 171 119 0.18 Sub-Total Port Stanley 10,410 9,097 6,320 4.48 Lynhurst and South Block Water Services 474 414 288 - Wastewater Services 9,741 8,512 5,914 - Administration 195 171 119 - Sub-Total Lynhurst and South Block 10,410 9,097 6,320 - Meadow Green Subdivision Water Services 474 414 288 - Wastewater Services - - - - Administration 195 171 118 - Sub-Total Meadow Green Subdivision 669 585 406 - Residential Residential Watson & Associates Economists Ltd. PAGE v H:\Central Elgin\2020 DC\Report\Report.docx 8. The Municipal-wide D.C.s currently in effect are $4,780 for single detached dwelling units and non-residential charges are $2.02 per square foot. This report has undertaken a recalculation of the charge based on future identified needs (presented in Schedule ES-1 for residential and non-residential). Charges have been provided on a Municipal-wide basis for all services except water services, wastewater services and administration studies related to the urban areas, which are provided on an urban area specific basis. The municipal-wide single detached unit charge is $6,291 for residential development and the non- residential charge is $2.37 per square foot of building area. The current urban area specific D.C.s for water, wastewater and urban related administration studies are imposed based on the specific services provided in each service area. The identifed areas and their calculated charges are listed in Schedule ES-2. These charges, along with the municipal-wide charges are submitted to Council for its consideration. 9. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-law. This calculation is provided by service and is presented in Table 6-7. A summary of these costs is provided below: This suggests that for the non-D.C. cost over the five-year D.C. by-law (benefit to existing development, mandatory 10% deduction, and the grants, subsidies and other contributions), $1.98 million (or an annual amount of $0.40 million) will need to be contributed from taxes and rates, or other sources. With respect to the post period benefit amount of approximately $41,000, it will be included in subsequent D.C. study updates to reflect the portion of capital that benefits growth in the post period D.C. forecasts. Total gross expenditures planned over the next five years 18,836,497 $ Less: Benefit to existing development 1,732,900 $ Post planning period benefit 41,250 $ Ineligible re: Level of Service - $ Mandatory 10% deduction for certain services 243,375 $ Grants, subsidies and other contributions - $ Net Costs to be recovered from development charges 16,818,972 $ Watson & Associates Economists Ltd. PAGE vi H:\Central Elgin\2020 DC\Report\Report.docx Based on the above table, the Municipality plans to spend $18.84 million over the next five years, of which $16.82 million (89%) is recoverable from D.C.s. Of this net amount, $14.74 million is recoverable from residential development and $2.08 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. 10. Considerations by Council - The background study represents the service needs arising from residential and non-residential growth over the forecast periods. The following services are calculated based on an urban build-out forecast for Belmont, Port Stanley, Union, and Southblock: - Wastewater Services; The following services are calculated based on an urban build-out forecast for Belmont, Port Stanley, and Southblock: - Water Services; The following services are calculated based on an urban 10-year forecast for all urban areas: - Administration Studies - Urban Services; The following services are calculated based on an long-term (2020-2036) forecast: - Services Related to a Highway; and - Fire Protection Services. All other services are calculated based on a 10-year forecast. These include: - Parks & Recreation Services; - Library Services; and - Administration Studies. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems Watson & Associates Economists Ltd. PAGE vii H:\Central Elgin\2020 DC\Report\Report.docx appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix G. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; and - considering reductions in the charge by class of development (obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Watson & Associates Economists Ltd. PAGE i H:\Central Elgin\2020 DC\Report\Report.docx Schedule ES-1 Municipality of Central Elgin Schedule of Municipal Wide D.C.s NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services: Services Related to a Highway 958 568 364 727 367 0.52 Fire Protection Services 2,187 1,296 830 1,659 839 1.19 Parks and Recreation Services 2,276 1,349 864 1,727 873 0.26 Library Services 133 79 51 101 51 0.02 Administration 737 437 280 559 283 0.38 Total Municipal Wide Services 6,291 3,729 2,389 4,773 2,413 2.37 RESIDENTIAL Service Watson & Associates Economists Ltd. PAGE ii H:\Central Elgin\2020 DC\Report\Report.docx Schedule ES-2 Municipality of Central Elgin Schedule of Urban Area D.C.s NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Urban Area Services Administration Studies - Urban 229 136 87 174 88 0.10 Total Urban Area Services 229 136 87 174 88 0.10 Note: Urban Areas are municipally serviced with water and/or wastewater NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Belmont Area Specific Services: Water Services 512 303 194 388 196 0.25 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Belmont Area Specific Services 6,237 3,696 2,368 4,732 2,392 3.64 Port Stanley Area Specific Services: Water Services 512 303 194 388 196 0.25 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Port Stanley Area Specific Services 6,237 3,696 2,368 4,732 2,392 3.64 Union Area Specific Services: Water Services - - - - - 0.00 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Union Area Specific Services 5,725 3,393 2,174 4,344 2,196 3.39 Southblock Area Specific Services: Water Services 512 303 194 388 196 0.00 Wastewater Services 5,725 3,393 2,174 4,344 2,196 0.00 Total Southblock Area Specific Services 6,237 3,696 2,368 4,732 2,392 0.00 RESIDENTIAL Service Service RESIDENTIAL Report Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\Central Elgin\2020 DC\Report\Report.docx 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the D.C.A. (section 10) and, accordingly, recommends new D.C.s and policies for the Municipality of Central Elgin. The Municipality retained Watson & Associates Economists Ltd. (Watson), to undertake the D.C.s (D.C.) study process throughout 2020. Watson worked with Municipal staff preparing the D.C. analysis and policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the Municipality's D.C. background study, as summarized in Chapter 4. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-law to be made available as part of the approval process (included as Appendix G). In addition, the report is designed to set out sufficient background on the legislation (Chapter 4), Central Elgin's current D.C. policies (Chapter 2) and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. Finally, it addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The Chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 H:\Central Elgin\2020 DC\Report\Report.docx 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A., has been scheduled for April 27, 2020. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology and the proposed modifications to the Municipality's D.C.s. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review on March 25, 2020. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the Public Meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Figure 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Figure 1-1 Schedule of Key D.C. Process Dates for the Municipality of Central Elgin 1. Data collection, staff review, engineering work, D.C. calculations and policy work January 2020 to March 2020 2. Background study and proposed by- law available to public March 25, 2020 3. Public meeting advertisement placed in newspaper(s) No later than April 6, 2020 4. Public meeting of Council April 27, 2020 5. Council considers adoption of background study and passage of by- law May 25, 2020 6. Newspaper notice given of by-law passage By 20 days after passage 7. Last day for by-law appeal 40 days after passage 8. Municipality makes pamphlet available (where by-law not appealed) By 60 days after in force date Watson & Associates Economists Ltd. PAGE 1-3 H:\Central Elgin\2020 DC\Report\Report.docx 1.3 Changes to the D.C.A.: Bill 73 - Smart Growth for our Communities Act, 2015 With the amendment of the D.C.A. (as a result of Bill 73 and O. Reg. 428/15), there are a number of areas that must be addressed to ensure that the Municipality is in compliance with the D.C.A., as amended. The following provides an explanation of the changes to the Act that affect the Municipality's background study and how they have been dealt with to ensure compliance with the amended legislation. 1.3.1 Area Rating Bill 73 has introduced two new sections where Council must consider the use of area- specific charges: 1) Section 2 (9) of the Act now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated. (Note that at this time, no municipalities or services are prescribed by the Regulations.) 2) Section 10 (2) c.1 of the D.C.A. requires that, "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area-rated. The second item requires Council to consider the use of area rating. 1.3.2 Asset Management Plan for New Infrastructure The new legislation now requires that a D.C. background study must include an Asset Management Plan (subsection 10 (2) (c.2)). The asset management plan must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the asset management plan related to transit services; however, they are silent with respect to how the asset management plan is to be provided for all other services. As part of any asset management plan, the examination should be consistent with the municipality's existing assumptions, approaches and policies on asset management planning. This Watson & Associates Economists Ltd. PAGE 1-4 H:\Central Elgin\2020 DC\Report\Report.docx examination may include both qualitative and quantitative measures such as examining the annual future lifecycle contributions needs (discussed further in Appendix F of this report). 1.3.3 60-Day Circulation of D.C. Background Study Previously the legislation required that a D.C. background study be made available to the public at least two weeks prior to the public meeting. The amended legislation now provides that the D.C. background study must be made available to the public (including posting on the municipal website) at least 60 days prior to passage of the D.C. by-law. No other changes were made to timing requirements for such things as notice of the public meeting and notice of by-law passage. This D.C. study is being provided to the public on March 25, 2020 to ensure the new requirements for release of the study is met. 1.3.4 Timing of Collection of D.C.s The D.C.A. has been refined by Bill 73 to require that D.C.s are collected at the time of the first building permit. For the majority of development, this will not impact the Municipality's present process. There may be instances, however, where several building permits are to be issued and either the size of the development or the uses will not be definable at the time of the first building permit. In these instances, the Municipality may enter into a delayed payment agreement in order to capture the full development. 1.3.5 Other Changes It is also noted that a number of other changes were made through Bill 73 and O. Reg. 428/15, including changes to the way in which transit D.C. service standards are calculated, the inclusion of waste diversion and the ability for collection of additional levies; however, these sections do not impact the Municipality's D.C. Watson & Associates Economists Ltd. PAGE 1-5 H:\Central Elgin\2020 DC\Report\Report.docx 1.4 Proposed Changes to the D.C.A.: Bill 108 - An Act to Amend Various Statutes with Respect to Housing, Other Development and Various Other Matters On May 2, 2019, the Province introduced Bill 108, which proposes changes to the D.C.A. The Bill has been introduced as part of the Province's "More Homes, More Choice: Ontario's Housing Supply Action Plan." The Bill received Royal Assent on June 6, 2019 While having received royal assent, many of the amendments to the D.C.A. do not come into effect until they are proclaimed by the Lieutenant Governor. At the time of writing, the following provisions have been proclaimed: - Transitional provisions with respect to services that are no longer eligible under the D.C.A., as well as other provisions clarifying definitions and administrative powers to make regulations, are in effect as of the date of royal assent. Regarding the transitional provisions for soft services, as noted below, services not identified under the new subsection 2 (4) will no longer be eligible to be included in D.C. by-law once proclaimed. These D.C.-ineligible services within an existing D.C. by-law can remain in effect, even if the by-law expires, until the earlier of the prescribed date (one year from the date the C.B.C. authority is in effect), the date a community benefits charge by-law is passed, or the date when the existing D.C. by-law is repealed. - Effective January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Non-profit housing developments will pay D.C.s in 21 equal annual payments. Interest may be charged on the installments, and any unpaid amounts may be added to the property and collected as taxes. - Effective January 1, 2020 the D.C. amount for all developments occurring within two years of a site plan or zoning by-law amendment planning approval (for application submitted after this section is proclaimed), shall be determined based on the D.C. charge in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined the earlier of the date of issuance of a building permit or occupancy. Watson & Associates Economists Ltd. PAGE 1-6 H:\Central Elgin\2020 DC\Report\Report.docx On February 28, 2020, the Province released updated draft regulations related to the D.C.A. and the Planning Act. A summary of these changes to take effect upon proclamation by the Lieutenant Governor is provided below: Changes to Eligible Services - The initial draft regulations allowed for the following services to remain within the D.C.A with the remaining "soft services" to be removed from the D.C.A. These services would be considered as part of a new community benefits charge (discussed below) imposed under the Planning Act. The initial eligible services were as follows: - Water supply services, including distribution and treatment services; - Wastewater services, including sewers and treatment services; - Stormwater drainage and control services; - Services related to a highway as defined in subsection 1 (1) of the Municipal Act, 2001 or subsection 3 (1) of the City of Toronto Act, 2006, as the case may be; - Electrical power services; - Policing services; - Fire protection services; - Toronto-York subway extension, as defined in subsection 5.1 (1) of the D.C.A.; - Transit services other than the Toronto-York subway extension; - Waste diversion services; - Ambulance services; and - Other services as prescribed. The new draft regulation will also allow the following services to continue with the D.C. - Parks development (not including land); - Recreation; - Public libraries; - Long-term care; and - Public health. Mandatory 10% deduction - The new draft regulation will remove the mandatory 10% deduction for all services that remain eligible under the D.C.A. Remaining Services to be Included in a New Community Benefits Charge (C.B.C.) Under the Planning Act - It is proposed that a municipality may, by by-law, impose a Watson & Associates Economists Ltd. PAGE 1-7 H:\Central Elgin\2020 DC\Report\Report.docx C.B.C. against land to pay for the capital costs of facilities, services and matters required because of development or redevelopment in the area to which the by-law applies. The C.B.C. is proposed to include formerly eligible D.C. services that are not included in the above listing, in addition to parkland dedication and bonus zoning contributions. Various provisions are proposed as follows: - The C.B.C. will be imposed as a percentage based on the market value of the land the day before building permit issuance. The maximum percentages for the C.B.C. are as follows: o Single-tier municipalities: 15% o Lower-tier municipalities: 10% o Upper-tier municipalities: 5% - A C.B.C strategy must be prepared to support the percentage to be imposed. Elements of the strategy include: o The C.B.C. strategy will have to set out the amount, type and location of growth; o There will need to be a parks plan included which would identify the amount of parkland needed for growth; o The strategy will need to identify the amount of parkland per person currently being provided in the municipality; o The strategy will need to identify the anticipated increase in need for the service; o There will need to be deductions for excess capacity; o The strategy will need to consider benefit to existing development; o Grants, subsidies & other contributions will need to be deducted. - Public notice of C.B.C by-law passage will be required (same requirements for D.C. by-law passage notice); - The interest rate for C.B.C. refunds upon successful LPAT appeal will be the Bank of Canada rate on the date the by-law comes into force or quarterly; - Municipalities will have one year from the date the C.B.C authority is in effect to remove ineligible services from the D.C. and implement a C.B.C. strategy; and - Also removes the 10% deduction. Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 2 Current Municipality of Central Elgin Policy Watson & Associates Economists Ltd. PAGE 2-1 H:\Central Elgin\2020 DC\Report\Report.docx 2. Current Municipality of Central Elgin Policy 2.1 Schedule of Charges On May 25, 2015, the Municipality of Central Elgin passed By-law 1880 under the D.C.A. This by-law was amended on March 12, 2018 via By-law 2241. This by-law (as amended) imposes D.C.s for residential and non-residential uses. The table below provides the rates currently in effect, as at May 1, 2019. Table 2-1 Municipality of Central Elgin Current D.C. Rates Non-Residential Service Single & Semi Detached Multiples Apartments per sq.ft. Services Related to a Highway 1,045 913 635 0.78 Fire Protection Services 1,842 1,610 1,119 0.88 Parks & Recreation 1,580 1,380 959 0.15 Library Services 59 51 36 0.01 Administration 253 221 153 0.20 Total 4,780 4,177 2,902 2.02 Non-Residential Service Single & Semi Detached Multiples Apartments per sq.ft. Belmont Water Services 474 414 288 0.46 Wastewater Services 9,741 8,512 5,914 3.84 Administration - - - - Sub-Total Belmont 10,215 8,926 6,202 4.30 Norman Water Services - - - - Wastewater Services 9,741 8,512 5,914 3.84 Administration - - - Sub-Total Norman 9,741 8,512 5,914 3.84 Port Stanley Water Services 474 414 288 0.46 Wastewater Services 9,741 8,512 5,914 3.84 Administration 195 171 119 0.18 Sub-Total Port Stanley 10,410 9,097 6,320 4.48 Lynhurst and South Block Water Services 474 414 288 - Wastewater Services 9,741 8,512 5,914 - Administration 195 171 119 - Sub-Total Lynhurst and South Block 10,410 9,097 6,320 - Meadow Green Subdivision Water Services 474 414 288 Wastewater Services - - - Administration 195 171 118 Sub-Total Meadow Green Subdivision 669 585 406 - Residential Residential Watson & Associates Economists Ltd. PAGE 2-2 H:\Central Elgin\2020 DC\Report\Report.docx 2.2 Services Covered The following services are covered under By-law 1880 (as amended): Municipal-wide services: - Roads & related; - Fire Protection Services; - Parks and Recreation; - Library Services; and - Administration Studies. Area-specific services: - Belmont: o Water Services; and o Wastewater Services. - Norman: o Wastewater Services. - Port Stanley: o Water Services; o Wastewater Services; and o Administration Studies. - Lynhurst Sewage Area: o Water Services; o Wastewater Services; and o Administration Studies. - Lynhurst Secondary Sewage Area: o Water Services; o Wastewater Services; and o Administration Studies. - Meadowgreen Subdivision: o Water Services; and o Administration Studies. - South Block (Lyndale & Southdale): o Water Services; Watson & Associates Economists Ltd. PAGE 2-3 H:\Central Elgin\2020 DC\Report\Report.docx o Wastewater Services; and o Administration Studies. 2.3 Timing of D.C. Calculation and Payment D.C.s are payable on the date the first permit is issued under the Building Code Act, 1992 in relation to a building or structure on land to which the D.C. applies. 2.4 Indexing Rates shall be indexed annually every May 1st, in accordance with the most recent twelve month change in the Statistics Canada Quarterly, "Construction Price Statistics." 2.5 Redevelopment Allowance As a result of the redevelopment of land, a building or structure existing on the same land within five years prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C. under subsections 2.2(a) of the by-law by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed- use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s under subsection 2.2(b) of the by-law by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. Watson & Associates Economists Ltd. PAGE 2-4 H:\Central Elgin\2020 DC\Report\Report.docx 2.6 Exemptions The following non-statutory exemptions are provided under By-law 1880 (as amended). - Land that is used for the purposes of industrial uses; - Non-residential farm buildings constructed for bona fide farm uses; and - Lands or buildings used or to be used for a place of worship of for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act. Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 3 Anticipated Development in the Municipality of Central Elgin Watson & Associates Economists Ltd. PAGE 3-1 H:\Central Elgin\2020 DC\Report\Report.docx 3. Anticipated Development in the Municipality of Central Elgin 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the Municipality of Central Elgin will be required to provide services, over a 10-year (early 2020 to early 2030), and a buildout horizon (early 2020 to buildout). Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 3-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of section 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the Municipality of Central Elgin over the forecast period, including: - Municipality of Central Elgin Population, Housing & Employment Projections, 2011-2036, Medium Growth Scenario, Revised Draft, prepared by Lapointe Consulting; - 2006, 2011 and 2016 population, household, and employment Census data; - Historical residential and non-residential building permit data over the 2010 to 2019 period; - Residential wastewater servicing capacity as provided by the Municipality of Central Elgin; - Residential supply opportunities as provided by the Municipality of Central Elgin; and Watson & Associates Economists Ltd. PAGE 3-2 H:\Central Elgin\2020 DC\Report\Report.docx - Discussions with Municipality staff regarding anticipated residential and non- residential development in the Municipality of Central Elgin. We would note that the growth forecast provided herein does not include the Port Stanley Secondary Plan (i.e. Harbour Lands). 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the Municipality and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A, Schedule 1, population in Central Elgin is anticipated to reach approximately 15,900 by early-2030 and 26,500 by buildout, resulting in an increase of approximately 2,100 and 12,700 persons, respectively.1 1 The population figures used in the calculation of the 2020 D.C. including the net Census undercount, which staff have estimated at approximately 2.7%. Watson & Associates Economists Ltd. PAGE 3-3 H:\Central Elgin\2020 DC\Report\Report.docx Figure 3-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 H:\Central Elgin\2020 DC\Report\Report.docx Table 3-1 Municipality of Central Elgin Residential Growth Forecast Summary Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings2 Apartments3 Other Total Households Equivalent Institutional Households 13,070 12,723 183 12,540 4,430 170 145 40 4,785 166 2.659 13,090 12,743 193 12,550 4,513 140 113 15 4,781 175 2.665 12,950 12,607 72 12,535 4,640 155 105 25 4,925 65 2.560 13,820 13,461 77 13,384 5,001 159 114 25 5,299 70 2.540 15,890 15,471 89 15,382 5,659 243 267 25 6,195 81 2.498 16,190 15,763 95 15,668 5,751 254 292 25 6,322 86 2.493 17,050 16,607 98 16,509 6,038 290 368 25 6,721 89 2.471 26,485 25,789 151 25,638 9,436 515 801 25 10,777 137 2.393 20 20 10 10 83 -30 -32 -25 -4 9 -140 -136 -121 -15 127 15 -8 10 144 -110 870 854 5 849 361 4 9 0 374 5 2,070 2,010 12 1,998 658 84 153 0 895 11 2,370 2,302 18 2,284 750 95 178 0 1,023 16 3,230 3,146 21 3,125 1,037 131 254 0 1,422 19 12,665 12,328 74 12,254 4,435 356 687 0 5,478 67 ¹ Census undercount estimated at approximately 2.7%. Note: Population including the undercount has been rounded. ² Includes townhouses and apartments in duplexes. ³ Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Early 2020 - Mid 2036 Mid 2006 - Mid 2011 Mid 2011 - Mid 2016 Mid 2006 Mid 2011 Mid 2016 Early 2020 Early 2030 Mid 2016 - Early 2020 Historical Forecast Early 2020 - Early 2030 Mid 2031 Early 2020 - Mid 2031 Buildout Mid 2036 Incremental Population (Including Census Undercount)¹ Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Early 2020 - Buildout Source: From Municipality of Central Elgin Population, Housing & Employment Projections, 2011-2036, Medium Growth Scenario, Revised Draft, prepared by Lapointe Consulting, February 5, 2015. Derived by Watson & Associates Economists Ltd., 2020. Watson & Associates Economists Ltd. PAGE 3-5 H:\Central Elgin\2020 DC\Report\Report.docx Figure 3-2 Municipality of Central Elgin Annual Housing Forecast Source: Historical housing activity derived from Statistics Canada building permit data for the Municipality of Central Elgin , 2007-2019. 1 Growth forecast represents calendar year. 67 44 35 18 32 48 29 50 33 48 95 119 100 88 95 95 95 95 95 95 85 85 85 85 85 80 80 80 80 80 0 20 40 60 80 100 120 140 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-6 H:\Central Elgin\2020 DC\Report\Report.docx Provided below is a summary of the key assumptions and findings regarding the Municipality of Central Elgin D.C. growth forecast. 1. Housing Unit Mix (Appendix A - Schedules 1 and 6) - The housing unit mix for the Municipality was derived from a detailed review of residential supply data for the Municipality (as per Schedule 6), and historical development activity (as per Schedule 7). - Based on the above indicators, the 10-year household growth forecast for the Municipality is comprised of a unit mix of 74% low density units (single detached and semi-detached), 9% medium density (multiples except apartments) and 17% high density (bachelor, 1-bedroom and 2-bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by servicing area for the Municipality of Central Elgin. - In accordance with forecast demand, wastewater capacity and available land supply, the amount and percentage of forecast housing growth between 2020 and 2030 by development location is summarized below. Development Location Approximate Amount of Housing Growth, 2020 to 2030 Percentage of Housing Growth, 2020 to 2030 Port Stanley 400 44% Lynhurst 70 8% Belmont 220 24% Norman/Lyndale Union Rural 40 100 70 5% 11% 8% Municipality Total 900 100% Watson & Associates Economists Ltd. PAGE 3-7 H:\Central Elgin\2020 DC\Report\Report.docx 3. Planning Period - Short and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for certain services, such as parks, recreation and libraries, to a 10-year planning horizon. Services related to a highway, public works, fire, police, stormwater, water and wastewater services can utilize a longer planning period. 4. Population in New Housing Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2030 in the Municipality of Central Elgin over the forecast period is presented in Figure 3-2. Over the 2020 to 2030 forecast period, the Municipality is anticipated to approximately average 90 new housing units per year. - Institutional population1 is anticipated to increase by 12 people between 2020 to 2030. - Population in new units is derived from Schedules 3, 4, and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8 summarizes the P.P.U. for the new housing units by age and type of dwelling based on a 2016 custom Census data for Central Elgin. The total calculated 20-year average P.P.U.s by dwelling type are as follows: o Low density: 2.868 o Medium density: 2.176 o High density2: 1.491 5. Existing Units and Population Change (Appendix A - Schedules 3, 4 and 5) - Existing households for early-2020 are based on the 2016 Census households, plus estimated residential units constructed between mid-2016 and mid-2019 assuming a 6-month lag between construction and occupancy (see Schedule 3). - The decline in average occupancy levels for existing housing units is calculated in Schedules 3 through 5, by aging the existing population over the forecast 1 Institutional includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2- or more bedroom units in these special care facilities. 2 Includes bachelor, 1-bedroom and 2- or more bedroom apartments. Watson & Associates Economists Ltd. PAGE 3-8 H:\Central Elgin\2020 DC\Report\Report.docx period. The forecast population decline in existing households over the 2020 to 2030 forecast period is 300. 6. Employment (Appendix A - Schedules 10a, 10b, 10c, 11 and 12) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in a municipality divided by the number of residents. Key employment sectors include primary, industrial, commercial/ population-related, institutional, and work at home, which are considered individually below. - 2016 employment data1 (place of work) for the Municipality of Central Elgin is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 255 primary (8%); o 590 work at home employment (19%); o 585 industrial (18%); o 1,025 commercial/population related (33%); and o 680 institutional (22%). - The 2016 employment by usual place of work, including work at home, is 3,135. An additional 710 employees have been identified for the Municipality in 2016 that have no fixed place of work (N.F.P.O.W.).2 - Total employment, including work at home and N.F.P.O.W. for the Municipality is anticipated to reach approximately 4,650 by early-2030 and 7,790 by buildout. This represents an employment increase of approximately 640 for the 10-year forecast period and 3,780 for the longer-term forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been 1 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. 2 No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same work place location at the beginning of each shift". Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc. Watson & Associates Economists Ltd. PAGE 3-9 H:\Central Elgin\2020 DC\Report\Report.docx included in the employment forecast by usual place of work (i.e. employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential gross floor area (G.F.A.) calculation. - Total employment for the Municipality of Central Elgin (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 3,110 by early-2030 and 5,070 by buildout.1 This represents an employment increase of approximately 460 and 2,420 over the 10-year and buildout forecast periods, respectively. 7. Non-Residential Sq.ft. Estimates (G.F.A., Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 10b based on the following employee density assumptions: o 4,000 sq.ft. per employee for primary - non-bona fide farming;2 o 1,000 sq.ft. per employee for industrial; o 400 sq.ft. per employee for commercial/population-related; and o 685 sq.ft. per employee for institutional employment. - The Municipal-wide incremental G.F.A. is anticipated to increase by 365,200 sq.ft. over the 10-year forecast period and 1,571,500 sq.ft. over the buildout forecast period. - In terms of percentage growth, the 2020 to 2030 incremental G.F.A. forecast by sector is broken down as follows: o primary - non-bona fide farming - 27% o industrial - 31%; o commercial/population-related - 27%; and o institutional - 15%. 8. Geography of Non-Residential Development (Appendix A - Schedule 10c) 1 G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 10a and 10b. Total employment growth in Schedule 10b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. 2 Non-bona fide farming is defined as cannabis growing operation related employment for G.F.A. purposes in Schedules 10b and 10c. Watson & Associates Economists Ltd. PAGE 3-10 H:\Central Elgin\2020 DC\Report\Report.docx - Schedule 10c summarizes the anticipated amount, type and location of non- residential development by servicing area for Municipality of Central Elgin by area. - In accordance with forecast demand and available land supply, the amount and percentage of forecast total non-residential growth between 2020 and 2030 by development location is summarized below. Development Location Amount of Non- Residential G.F.A., 2020 to 2030 Percentage of Non-Residential G.F.A., 2020 to 2030 Port Stanley Lynhurst Belmont 36,100 5,000 102,200 10% 1% 28% Norman/Lyndale 2,700 1% Union 6,700 2% Yarmouth Industrial & Commercial Lands Rural Unallocated 161,500 28,900 22,000 44% 8% 6% Municipality Total 365,100 100% Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\Central Elgin\2020 DC\Report\Report.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal service categories which are provided within the Municipality. A number of these services are defined in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years..." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services which are potentially eligible for inclusion in the Municipality's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that Municipal Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\Central Elgin\2020 DC\Report\Report.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that must be followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service 2. Ineligible Services Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions Less: 10% Where Applicable D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 13. 16. 17. 14. 15. 9. Tax Base, User Rates, etc. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 4 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services "Financially Sustainable" 7a. Transit Services "Detailed Requirements" 7b. 10. Watson & Associates Economists Ltd. PAGE 4-3 H:\Central Elgin\2020 DC\Report\Report.docx Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 1. Services Related to a Highway Yes Yes Yes No Yes Yes n/a 1.1 Arterial roads 1.2 Collector roads 1.3 Bridges, Culverts and Roundabouts 1.4 Local municipal roads 1.5 Traffic signals 1.6 Sidewalks and streetlights 1.7 Active Transportation 100 100 100 0 100 100 100 2. Other Transportation Services n/a n/a n/a Yes Yes Yes n/a n/a 2.1 Transit vehicles1 & facilities 2.2 Other transit infrastructure 2.3 Municipal parking spaces - indoor 2.4 Municipal parking spaces - outdoor 2.5 Works Yards 2.6 Rolling stock1 2.7 Ferries 2.8 Airport 100 100 90 90 100 100 90 90 1with 7+ year life time *same percentage as service component to which it pertains computer equipment excluded throughout Watson & Associates Economists Ltd. PAGE 4-4 H:\Central Elgin\2020 DC\Report\Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 3. Stormwater Drainage and Control Services No No No 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 100 100 100 4. Fire Protection Services Yes Yes Yes 4.1 Fire stations 4.2 Fire pumpers, aerials and rescue vehicles1 4.3 Small equipment and gear 100 100 100 5. Outdoor Recreation Services (i.e. Parks and Open Space) Ineligible Yes Yes Yes Yes Yes 5.1 Acquisition of land for parks, woodlots and E.S.A.s 5.2 Development of area municipal parks 5.3 Development of district parks 5.4 Development of municipal- wide parks 5.5 Development of special purpose parks 5.6 Parks rolling stock1 and yards 0 90 90 90 90 90 6. Indoor Recreation Services Yes Yes 6.1 Arenas, indoor pools, fitness facilities, community centres, etc. (including land) 6.2 Recreation vehicles and equipment1 90 90 7. Library Services Yes n/a n/a 7.1 Public library space (incl. furniture and equipment) 7.2 Library vehicles¹ 7.3 Library materials 90 90 90 8. Electrical Power Services Ineligible Ineligible Ineligible 8.1 Electrical substations 8.2 Electrical distribution system 8.3 Electrical system rolling stock 0 0 0 1with 7+ year life time Watson & Associates Economists Ltd. PAGE 4-5 H:\Central Elgin\2020 DC\Report\Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 9. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible Ineligible 9.1 Cultural space (e.g. art galleries, museums and theatres) 9.2 Tourism facilities and convention centres 0 0 10. Wastewater Services Yes Yes n/a Yes 10.1 Treatment plants 10.2 Sewage trunks 10.3 Local systems 10.4 Vehicles and equipment1 100 100 0 100 11. Water Supply Services Yes Yes n/a Yes 11.1 Treatment plants 11.2 Distribution systems 11.3 Local systems 11.4 Vehicles and equipment1 100 100 0 100 12. Waste Management Services Ineligible Ineligible No No 12.1 Landfill collection, transfer vehicles and equipment 12.2 Landfills and other disposal facilities 12.3 Waste diversion facilities 12.4 Waste diversion vehicles and equipment1 0 0 90 90 13. Police Services n/a n/a n/a 13.1 Police detachments 13.2 Police rolling stock1 13.3 Small equipment and gear 100 100 100 14. Homes for the Aged n/a n/a 14.1 Homes for the aged space 14.2 Vehicles1 90 90 15. Child Care n/a n/a 15.1 Child care space 15.2 Vehicles1 90 90 16. Health n/a n/a 16.1 Health department space 16.2 Health department vehicles¹ 90 90 17. Social Housing n/a 17.1 Social Housing space 90 18. Provincial Offences Act (P.O.A.) n/a 18.1 P.O.A. space 90 19. Social Services n/a 19.1 Social service space 90 1with 7+ year life time Watson & Associates Economists Ltd. PAGE 4-6 H:\Central Elgin\2020 DC\Report\Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 20. Ambulance n/a n/a 20.1 Ambulance station space 20.2 Vehicles1 90 90 21. Hospital Provision Ineligible 21.1 Hospital capital contributions 0 22. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible Ineligible Ineligible 22.1 Office space 22.2 Office furniture 22.3 Computer equipment 0 0 0 23. Other Services Yes Yes 23.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land2 and facilities, including the D.C. background study cost 23.2 Interest on money borrowed to pay for growth-related capital 0-100 0-100 1with a 7+ year life 2same percentage as service component to which it pertains 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two Watson & Associates Economists Ltd. PAGE 4-7 H:\Central Elgin\2020 DC\Report\Report.docx potential cost reductions and the Regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference or information purposes; e) interest on money borrowed to pay for the above-referenced costs; f) costs to undertake studies in connection with the above-referenced matters; and g) costs of the D.C. background study. In order for an increase in need for service to be included in the D.C. calculation, Municipal Council must indicate "...that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the Municipality's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same Regulation indicates that "the value of the credit cannot be recovered from future development charges," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the Watson & Associates Economists Ltd. PAGE 4-8 H:\Central Elgin\2020 DC\Report\Report.docx calculation, in order to avoid a funding shortfall with respect to future service needs. Outstanding credit obligations have been included in the D.C. calculations. 4.7 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 8 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in future. For services which are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e. the needs of recent growth). This cost component is distinct from the development-related costs for the next 10-year period, which underlie the D.C. calculation herein. The alternative would involve the Municipality spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the Municipality will use these reserve funds for the Municipality's cost share of applicable development-related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development which contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The Municipality's D.C. Reserve Fund Balance by service at December 31, 2019 (adjusted) is shown below: Watson & Associates Economists Ltd. PAGE 4-9 H:\Central Elgin\2020 DC\Report\Report.docx Note: Amounts in brackets are Deficit balances. 4.8 Deductions The D.C.A. potentially requires that five deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; - anticipated grants, subsidies and other contributions; and - 10% reduction for certain services. The requirements behind each of these reductions are addressed as follows: 4.8.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service (for the additional development increment) exceeding the average level of the service provided in the municipality over the 10-year period immediately preceding the preparation of the background study." O. Reg. 82.98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering Service Balance Commitments Adjusted Balance Services Related to a Highway $701,684 $7,035 $694,649 Fire Protection Services $425,750 $743,575 ($317,825) Parks and Recreation Services $183,733 $240,282 ($56,549) Library Services $63,124 $175,409 ($112,285) Administration $136,747 $86,545 $50,202 Administration - Urban $58,808 $0 $58,808 Wastewater Services $1,513,297 $2,297,139 ($783,841) Water Services $51,657 $0 $51,657 Total $3,134,799 $3,549,985 ($415,186) Watson & Associates Economists Ltd. PAGE 4-10 H:\Central Elgin\2020 DC\Report\Report.docx standards or recognized performance measurement systems, depending on circumstances. When the quantity and quality factor are multiplied together, they produce a measure of the level of service, which meets the requirements of the Act, i.e. cost per unit. With respect to transit services, the changes to the Act as a result of Bill 73 have provided for an alternative method for calculating the services standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.8.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the Municipality's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g. if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.8.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; Watson & Associates Economists Ltd. PAGE 4-11 H:\Central Elgin\2020 DC\Report\Report.docx - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of services cap in section 4.4 is related but is not the identical requirement. Sanitary, storm and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. On the other hand, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a Municipal-wide system basis. For example, facilities of the same type may provide different services (i.e. leisure pool vs. competitive pool), different programs (i.e. hockey vs. figure skating) and different time availability for the same service (i.e. leisure skating available on Wednesday in one arena and Thursday in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. Watson & Associates Economists Ltd. PAGE 4-12 H:\Central Elgin\2020 DC\Report\Report.docx 4.8.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98 section 6). 4.8.5 The 10% Reduction Paragraph 8 of subsection 5 (1) of the D.C.A. requires that, "the capital costs must be reduced by 10 per cent." This paragraph does not apply to water supply services, wastewater services, stormwater drainage and control services, services related to a highway, police and fire protection services. The primary services to which the 10% reduction does apply include services such as parks, recreation, libraries, childcare/ social services, the Provincial Offences Act, ambulance, homes for the aged, and health. The 10% is to be netted from the capital costs necessary to provide the increased services, once the other deductions have been made, as per the infrastructure costs sheets in Chapter 5. 4.9 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area-rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area-rating. Further discussion is provided in section 7.4.4. 4.10 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential Watson & Associates Economists Ltd. PAGE 4-13 H:\Central Elgin\2020 DC\Report\Report.docx development and between one type of development and another, to arrive at a schedule of charges. 4.11 Asset Management The new legislation now requires that a D.C. background study must include an asset management plan (subsection 10 (2) c. 2). The asset management plan (A.M.P.) must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches and policies on the asset management planning. This examination has been included in Appendix F. 4.12 Transit The most significant changes to the Act relate to the transit service. These changes relate to four areas of the calculations, as follows: A. Transit no longer requires the statutory 10% mandatory deduction from the net capital cost (subsection 5.2 (i) of the D.C.A.). B. The background study requires the following in regard to transit costs (as per subsection 8 (2) of the Regulations): 1. The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. 2. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, i. the anticipated development over the 10-year period immediately following the preparation of the background study, or ii. the anticipated development after the 10-year period immediately following the preparation of the background study. Watson & Associates Economists Ltd. PAGE 4-14 H:\Central Elgin\2020 DC\Report\Report.docx 3. An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. 4. An assessment of ridership forecasts for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. 5. An assessment of the ridership capacity for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study. C. A new forward-looking service standard (as per subsection 6.1 (2) of the Regulations): 1. The service is a discrete service. 2. No portion of the service that is intended to benefit anticipated development after the 10-year period immediately following the preparation of the background study may be included in the estimate. 3. No portion of the service that is anticipated to exist as excess capacity at the end of the 10-year period immediately following the preparation of the background study may be included in the estimate. D. A very detailed asset management strategy and reporting requirements (subsection 6.1 (3) of the Regulation) that includes lifecycle costs, action plans that will enable the assets to be sustainable, summary of how to achieve the proposed level of service, discussion on procurement measures and risk. The Municipality does not currently plan to have undertake any transit related capital in the future. Therefore, the above calculations and reporting requirements are not required. Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-2 H:\Central Elgin\2020 DC\Report\Report.docx 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 8 in the D.C.A. and described in Chapter 4, was followed in determining D.C.-eligible costs. The nature of the capital projects and timing identified in the Chapter reflects Council's current intention. Over time, however, Municipal projects and Council priorities change and accordingly, Council's intentions may alter and different capital projects (and timing) may be required to meet the need for services required by new growth. 5.2 Service Levels and 10-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for all of the "softer" services over a 10-year planning period. Each service component is evaluated on two format sheets: the average historical 10-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and, the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.2.1 Parking Services The Municipality currently provides 586 parking spaces, made up of a mix of gravel and hard surface spaces. This equates to $280/capita in parking services which provides $563,765 in D.C.-eligible funding over the 10-year forecast period. The Municipality has identified the need for 100 parking spots at East Headland with a gross capital cost of $400,000. However, as this is planned for 2030, this is outside of the forecast period and has been allocated as 100% attributable to growth beyond 2029. Therefore, there are no capital costs for inclusion in the D.C. calculation related to parking services. Watson & Associates Economists Ltd. PAGE 5-3 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service Parking Spaces Less: Prj.No Residential Share Non- Residential Share 2020-2029 81% 19% 1 Parking on East Headland (100 spots) 2030 400,000 400,000 - - - - - - - Total 400,000 400,000 - - - - - - - - - Net Capital Cost Subtotal Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Other (e.g. 10% Statutory Deduction) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-4 H:\Central Elgin\2020 DC\Report\Report.docx 5.2.2 Parks & Recreation Services The Municipality currently provides 102.8 acres of parkland and 55 parks-related amenities (e.g. baseball diamonds, skate parks, splash pads, etc.) to service the community. Based on the current level of service over the historical 10-year period, the Municipality' has provided an average of 7.7 acres of parkland and 4.4 parkland amenities items per 1,000 population. In addition to the parks, the Municipality also provides 24,947 sq.ft. of recreation facility space and 7 recreation-related vehicles. Therefore, the level of service provided from parkland development, parkland amenities, recreation facilities, and recreation vehicles and equipment equal $1,171 per capita. When applied over the forecast period, this average level of service translates into a D.C.-eligible amount of $2,353,308. Based on the projected growth over the 10-year forecast period, the Municipality has identified $4,970,000 in future growth capital costs for parkland development. These projects include, the development of additional parks, amenities and trails, as well as the East Headland waterfront development. The reserve fund deficit of $56,549 has also been included for recovery. Deductions have been made to recognize the amount that will benefit the post 10-year period of $2.3 million and a benefit to existing development of $600,000. Therefore, the net growth capital cost after the mandatory 10% deduction is $1,919,549 which is the amount for inclusion in the D.C. As the predominant users of outdoor recreation tend to be residents of the Municipality, the forecast growth-related costs have been allocated 95% to residential and 5% to non-residential. Watson & Associates Economists Ltd. PAGE 5-5 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service:Parks & Recreation Less: Prj.No Residential Share Non- Residential Share 2020-2029 95% 5% 1 Trail Development 2025-2032 1,200,000 300,000 900,000 600,000 300,000 30,000 270,000 256,500 13,500 2 Eastwood Park 2020-2021 650,000 - 650,000 - 650,000 65,000 585,000 555,750 29,250 3 Parkland (Kokomo) 2.86 acres 2023 700,000 - 700,000 - 700,000 70,000 630,000 598,500 31,500 4 Parkland (Eagles Nest) 1.8 acres 2023 420,000 - 420,000 - 420,000 42,000 378,000 359,100 18,900 5 East Headland waterfront development 2030 2,000,000 2,000,000 - - - - - - - 6 Reserve Fund Adjustment Reserve 56,549 - 56,549 - 56,549 - 56,549 53,721 2,827 Total 5,026,549 2,300,000 - 2,726,549 600,000 - 2,126,549 207,000 1,919,549 1,823,571 95,977 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Other (e.g. 10% Statutory Deduction) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Net Capital Cost Subtotal Gross Capital Cost Estimate (2020$) Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-6 H:\Central Elgin\2020 DC\Report\Report.docx 5.2.3 Library Services The Municipality currently operates out of the Belmont Library which totals 4,428 sq.ft. Over the past ten years, the average level of service was 0.23 sq.ft. of space per capita or an investment of $61 per capita. Based on the service standard over the past 10 years, the Municipality would be eligible to collect a total of $122,389 from D.C.s for library services. The Municipality has not identified any additional growth-related needs related to library services over the forecast period, however, the reserve fund deficit of $112,285 has been included in the D.C. calculations to recovery the costs associated to the recent library expansion. While library usage is predominately residential based, there is some use of the facilities by non-residential users, for the purpose of research. To acknowledge this use, the growth-related capital costs have been allocated 95% residential and 5% non- residential. Watson & Associates Economists Ltd. PAGE 5-7 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service Library Facilities Less: Prj.No Residential Share Non- Residential Share 2020-2029 95% 5% 1 Reserve Fund Adjustment Reserve 112,285 - 112,285 - 112,285 - 112,285 106,671 5,614 (To complete funding of recent expansion) Total 112,285 - - 112,285 - - 112,285 - 112,285 106,671 5,614 Net Capital Cost Subtotal Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Other (e.g. 10% Statutory Deduction) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-8 H:\Central Elgin\2020 DC\Report\Report.docx 5.2.4 Administration Studies (Municipal-Wide) The D.C.A. permits the inclusion of studies undertaken to facilitate the completion of the Municipality's capital works program. The Municipality has made provision for the inclusion of new studies undertaken to facilitate this D.C. process, as well as other studies which benefit growth (in whole or in part). The list of studies includes such studies as the following: - D.C. studies; - Official plan updates; - Zoning by-law updates; - Fire master plan; - Trails master plan; - Parking study; - Parks and recreation master plan; - Harbour waterfront open public space master plan; - Long term financial plan; and - Harbour secondary plan. The cost of these studies is $1,230,000, of which $330,000 is attributable to existing benefit and $41,250 is attributable to growth beyond the forecast period. An additional $50,202 has been deducted to account for the existing reserve fund balance. Therefore, the net growth-related capital cost, after the mandatory 10% deduction, is $728,673 and has been included in the D.C. These costs have been allocated 81% residential and 19% non-residential based on the incremental growth in population to employment for the 10-year forecast period. Watson & Associates Economists Ltd. PAGE 5-9 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service Administration Studies Less: Prj.No Residential Share Non- Residential Share 2020-2029 81% 19% 1 DC Study 2020 45,000 - 45,000 - 45,000 4,500 40,500 32,805 7,695 2 DC Study 2025 45,000 - 45,000 - 45,000 4,500 40,500 32,805 7,695 3 Official Plan Update 2020 50,000 - 50,000 12,500 37,500 3,750 33,750 27,338 6,413 4 Official Plan Update 2025 50,000 - 50,000 12,500 37,500 3,750 33,750 27,338 6,413 5 Zoning By-law Update 2022 50,000 - 50,000 12,500 37,500 3,750 33,750 27,338 6,413 6 Zoning By-law Update 2027 50,000 - 50,000 12,500 37,500 3,750 33,750 27,338 6,413 7 Fire Master Plan 2025 60,000 - 60,000 - 60,000 - 60,000 48,600 11,400 8 Trails Master Plan 2026 60,000 - 60,000 45,000 15,000 1,500 13,500 10,935 2,565 9 Parking Study 2023 35,000 - 35,000 26,250 8,750 875 7,875 6,379 1,496 10 Parks and Recreation Master Plan 2024 35,000 - 35,000 17,500 17,500 1,750 15,750 12,758 2,993 11 Harbour Waterfront Open Public Space Master Plan 2020 125,000 41,250 83,750 41,250 42,500 4,250 38,250 30,983 7,268 12 Long Term Financial Plan 2022 200,000 - 200,000 150,000 50,000 5,000 45,000 36,450 8,550 13 Harbour Secondary Plan 2020 425,000 - 425,000 - 425,000 42,500 382,500 309,825 72,675 14 Reserve Fund Adjustment Reserve - - - 50,202 (50,202) - (50,202) (40,663) (9,538) Total 1,230,000 41,250 - 1,188,750 380,202 - 808,548 79,875 728,673 590,225 138,448 Net Capital Cost Subtotal Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Other (e.g. 10% Statutory Deduction) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-10 H:\Central Elgin\2020 DC\Report\Report.docx 5.2.5 Administration Studies (Urban Services) The Municipality has provided for a capital provision to undertake studies related to roads, water, and wastewater in the urban areas of the Municipality. The total cost of this provision is $200,000 and has been included in the D.C. calculations. The allocation between residential and non-residential growth is calculated based on incremental growth in population to employment, for the 10-year urban forecast period. This results in an 84% residential/16% non-residential split. Watson & Associates Economists Ltd. PAGE 5-11 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service Administration Studies - Urban Prj.No Location Residential Share Non- Residential Share 2020-2029 84% 16% 1 Provision for Related Studies 2020 Urban Area 200,000 - 200,000 - 200,000 168,000 32,000 Total 200,000 - - 200,000 - - 200,000 168,000 32,000 Gross Capital Cost Estimate (2020$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-12 H:\Central Elgin\2020 DC\Report\Report.docx 5.3 Service Levels and Capital Costs to 2036 for Central Elgin's D.C. Calculation This section evaluates the development-related capital requirements for those services with capital costs in the long-term (2020-2036). 5.3.1 Services Related to a Highway 5.3.1.1 Roads and Related Central Elgin owns and maintains 162 km of gravel surfaced and hard surfaced roads. This provides an average level of investment of $10,479 per capita, resulting in a D.C.- eligible recovery amount of $32.96 million over the long-term forecast period. In addition to the roads, the Municipality also maintains bridges, culverts, sidewalks and streetlights which have an estimated value of $14.2 million. This equates to $1,074 per capita and a D.C.-eligible amount of $3.4 million. In total, the D.C. recoverable amount for roads services over the forecast period equals to $36,334,185. With respect to future needs, the identified capital projects include various works related to urbanization of streets and sidewalk additions. These projects total $2,295,900. A deduction for existing benefit of $489,000 has been made along with a deduction of the existing reserve fund balance of $694,649, resulting in a D.C. eligible amount of $1,112,251 to be recovered over the current forecast period (2020-2036). The residential/non-residential allocation for all services related to a highway is based on the ratio of population to employment over the 2036 forecast period. The split for the Municipality is 82% residential and 18% non-residential. Watson & Associates Economists Ltd. PAGE 5-13 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service: Roads Less: Potential D.C. Recoverable Cost Prj .No Location Residential Share Non- Residential Share 2020-2036 82% 18% 1 Seventh Ave - Kettle Creek Drive west 590 m - Belmont Upgrade from Rural to Urban Standard Belmont 2022 1,154,000 - 1,154,000 489,000 665,000 545,300 119,700 2 Seventh Ave Sidewalk-Kettle Creek West 590 m Belmont 2022 70,000 - 70,000 - 70,000 57,400 12,600 3 East Road Sidewalk - Erie Heights Way to Hill St. - Port Stanley Port Stanley 2021 152,900 - 152,900 - 152,900 125,378 27,522 4 R3 - Railway Crossing Protection / Signals (City-wide DC) South Block 2020 75,000 - 75,000 - 75,000 61,500 13,500 5 R4 - Southdale Minor Collector from Sunset to Shawside (City-wide DC) South Block 2020 545,000 - 545,000 - 545,000 446,900 98,100 6 Sidewalk - George St. from Front St westerly 220m Port Stanley 2021 33,000 - 33,000 - 33,000 27,060 5,940 7 Sidewalk-Sparta Line Sunset Drive westerly 475m Union 2024 72,000 - 72,000 - 72,000 59,040 12,960 8 Sidewalk Elm St. to St.Thomas Boundary (680 m) Eastwood 2020 110,000 - 110,000 - 110,000 90,200 19,800 9 Sidewalk to James Glover Development - (160 m) Port Stanley 2023 24,000 - 24,000 - 24,000 19,680 4,320 10 Sidewalk on East Road Hill Street to Dexter Line (225 m) Port Stanley 2025 34,000 - 34,000 - 34,000 27,880 6,120 11 Wellington Road Sidewalk - Cresent to St. George (200m) Lynhurst 2021 26,000 - 26,000 - 26,000 21,320 4,680 12 Reserve Fund Adjustment Reserve - - - 694,649 (694,649) (569,612) (125,037) Total 2,295,900 - - 2,295,900 1,183,649 - 1,112,251 912,046 200,205 Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-14 H:\Central Elgin\2020 DC\Report\Report.docx 5.3.1.2 Public Works Facilities, Fleet & Equipment The Municipality operates their Public Works services out of five facilities, totalling 44,850 sq.ft. of building area. This provides for an average level of service of 3.5 sq.ft. per capita or $596 per capita. Based on the current level of service, the Municipality can recover a maximum D.C. eligible amount of $1,873,665 over the long-term forecast period. In addition to the facilities, the Public Works Department has a variety of vehicles and major equipment to service the Municipality, totalling approximately $10.71 million. The inventory provides for a per capita standard of $682. Over the forecast period, the D.C.- eligible amount for vehicles and equipment is $2,146,054. In total, the maximum D.C. eligible amount for Public Works is $4,019,719. The Municipality has identified a need for an additional tandem dump truck/snow plow, amounting to $370,000. This cost has been included in the D.C. calculations. Similar to roads, the residential/non-residential allocation for all services related to a highway is based on the ratio of population to employment over the 2036 forecast period. The split for the Municipality is 82% residential and 18% non-residential. Watson & Associates Economists Ltd. PAGE 5-15 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service: Roads and Related Vehicles Less: Potential D.C. Recoverable Cost Prj .No Residential Share Non- Residential Share 2020-2036 82% 18% 1 Tandem Dump Truck/Snow Plow 2020 370,000 - 370,000 - 370,000 303,400 66,600 Total 370,000 - - 370,000 - - 370,000 303,400 66,600 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-16 H:\Central Elgin\2020 DC\Report\Report.docx 5.3.2 Fire Protection Services The Central Elgin Fire Department currently operates its fire services from 18,774 sq.ft. of facility space, providing for a per capita average level of service of 1.17 sq.ft. per capita or $340 per capita. This level of service provides the Municipality with a maximum D.C.-eligible amount for recovery over the forecast period of $1,067,979 for fire facilities. The Fire Department currently has 16 fire vehicles in operation to service its citizens. Based on the historical 10-year (2010-2019) forecast period, this amounts to a per capita level of service of $511 and a maximum D.C. eligible amount of recoverable over the forecast period of $1,607,661 for fire vehicles. In addition to the vehicles, the Fire Department maintains an inventory of 1,048 items of equipment and gear (e.g. hoses, bunker gear, thermal cameras, etc.). This results in a calculated average level of service for the historical 10-year period of $164 per capita, providing for a D.C.-eligible amount over the forecast period of $516,346 for small equipment and gear. Based on the above, the D.C. eligible amount related to fire services over the forecast period is $3,191,986. Staff have identified growth-related capital costs for a flashover simulator, a sea doo lift, the outstanding amount related to the Port Stanley Fire Station land, and growth-related debt for the Port Stanley Fire Station (principal and discounted interest). The gross capital cost for these items is $3,087,466. In addition, the existing reserve fund deficit of $317,825 has been added to the D.C. calculation for recovery. A deduction in the amount of $22,400 has been made to account for the benefit to existing development resulting in a D.C. eligible amount of $3,382,891 to be included in the calculations. Note, although the service standard ceiling is $3,191,986, the D.C. calculations have included $3,382,891 because the discounted interest related to the Port Stanley Fire Station debt ($222,433) is not counted towards the service standard ceiling. These costs are shared between residential and non-residential based on the population to employment ratio over the forecast period, resulting in 82% being allocated to residential development and 18% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-17 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service: Fire Services Less: Potential D.C. Recoverable Cost Prj .No Residential Share Non- Residential Share 2020-2036 82% 18% 1 New Port Stanley Fire Station - Growth Related Principal 2020-2029 2,814,433 - 2,814,433 - 2,814,433 2,307,835 506,598 2 New Port Stanley Fire Station - Growth Related Discounted Interest 2020-2029 222,433 - 222,433 - 222,433 182,395 40,038 3 New Port Stanley Fire Station Land (Outstanding Amount) 2020 7,400 - 7,400 2,400 5,000 4,100 900 4 Flashover Simulator 2020 40,000 - 40,000 20,000 20,000 16,400 3,600 5 Sea Doo Lift 2020 3,200 - 3,200 - 3,200 2,624 576 6 Reserve Fund Adjustment Reserve 317,825 - 317,825 - 317,825 260,617 57,209 Total 3,405,291 0 0 3,405,291 22,400 0 3,382,891 2,773,971 608,920 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2020$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-18 H:\Central Elgin\2020 DC\Report\Report.docx 5.4 Service Levels and Urban Build-out Capital Costs for Central Elgin's D.C. Calculation This section evaluates the development-related capital requirements for water, wastewater and related administration services over the build-out planning period for each urban service area. Staff have reviewed and updated the outstanding needs for water and wastewater to service growth in the Belmont, Port Stanley, Union and Southblock areas. The Municipality has undertaken a combined approach to the calculation of these services. 5.4.1 Water Services For this D.C. study, staff have identified that the capital works provided in this section are attributable to the areas of Belmont, Port Stanley, and Southblock. Therefore, the capital provided herein will be recovered on an area specific basis for those aforementioned areas. Based on the identified needs in the Belmont, Port Stanley, and Southblock areas, the total cost of the identified projects is $1,307,171. A deduction to account for benefit to existing development related to the Port Stanley projects in the amount of $325,000 has been made. A further deduction in the amount of $51,657 has been made to account for the reserve fund surplus. Therefore, the net D.C. recoverable amount is $1,033,827. The allocation between residential and non-residential growth is calculated based on incremental growth in population to employment for the urban build-out forecast period in the serviced areas of Belmont, Port Stanley, and Southblock. This results in the following residential/non-residential splits: - Belmont - 52% residential, 48% non-residential; - Port Stanley - 90% residential, 10% non-residential; and - Southblock - 100% residential, 0% non-residential. Watson & Associates Economists Ltd. PAGE 5-19 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service: Water Services Summary Location Residential Share Non- Residential Share 2020-Total - Urban Build Out 1 Belmont Elevated Storage Debt Principal (Growth Share) Belmont 2020-2025 213,809 - - 213,809 - - 213,809 111,181 102,628 2 Belmont Elevated Storage Debt Interest (Discounted) (Growth Share) Belmont 2020-2025 23,462 - - 23,462 - - 23,462 12,200 11,262 3 Water Supply - Sunset East Road to Warren (Unfunded Growth Amount) Port Stanley 2020 123,100 - - 123,100 - - 123,100 110,790 12,310 4 Elgin Primary Booster Station Connection - PS Port Stanley 2021 400,000 - - 400,000 300,000 - 100,000 90,000 10,000 5 Pressure Reducing Valve Relocation - PS Port Stanley 2022 100,000 - - 100,000 25,000 - 75,000 67,500 7,500 6 W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) Southblock 2020+ 12,900 - - 12,900 - - 12,900 12,900 - 7 W2 - 300 dia Bill Martyn from Sauve to Southdale Southblock 2020+ 25,800 - - 25,800 - - 25,800 25,800 - 8 W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. Southblock 2020+ 107,900 - - 107,900 - - 107,900 107,900 - 9 W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive Southblock 2020+ 110,200 - - 110,200 - - 110,200 110,200 - 10 W6 - 400 dia Southdale from Fairview east to City Limit Southblock 2020+ 51,600 - - 51,600 - - 51,600 51,600 - 11 W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive Southblock 2020+ 42,200 - - 42,200 - - 42,200 42,200 - 12 Financing Costs Southblock 2020+ 96,200 - - 96,200 - - 96,200 96,200 - 13 Reserve Fund Adjustment Urban Area Reserve - - - (51,657) 51,657 42,875 8,782 Total 1,307,171 - - 1,307,171 273,343 - 1,033,827 881,346 152,481 Note: Reserve Fund has been allocated to Residential and Non-Residential shares based on the population and employment of Belmont, Port Stanley, and Southblock Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Potential D.C. Recoverable Cost Total Watson & Associates Economists Ltd. PAGE 5-20 H:\Central Elgin\2020 DC\Report\Report.docx 5.4.2 Wastewater Services Similar to water, staff have identified that the wastewater capital works provided in this section are attributable to the areas of Belmont, Port Stanley, Union, and Southblock. Therefore, the capital provided herein will be recovered on an area specific basis for those aforementioned areas. The Municipality has provided capital projects totalling $19.84 million for wastewater work. Of this amount, the growth-related debentures for the Belmont Sewage Plant ($1.36 million principal and discounted interest) and the Port Stanley Wastewater Treatment Plant ($8.56 million principal and discounted interest) have been included for recovery. In addition, $783,841 has been included for recovery to account for the reserve fund deficit. After a reduction to recognize the benefit to existing development of $1.14 million, the total amount of D.C. eligible costs for recovery is $19,486,373. The allocation between residential and non-residential growth is calculated based on incremental growth in population to employment for the urban build-out forecast period in the serviced areas of Belmont, Port Stanley, Union, and Southblock. For wastewater, these allocations result in the following residential/non-residential splits: - Belmont - 52% Residential, 48% Non-residential; - Port Stanley - 90% Residential, 10% Non-residential; - Union - 96% Residential, 4% Non-residential; and - Southblock - 100% Residential, 0% Non-residential. Watson & Associates Economists Ltd. PAGE 5-21 H:\Central Elgin\2020 DC\Report\Report.docx Infrastructure Costs Included in the Development Charges Calculation Municipality of Central Elgin Service: Wastewater Services Summary Location Residential Share Non- Residential Share 2020-Total - Urban Build Out 1 Belmont Sewage Plant Debt Principal (Growth Share) Belmont 2020-2025 1,227,352 - - 1,227,352 - - 1,227,352 638,223 589,129 2 Belmont Sewage Plant Debt Interest (Discounted) (Growth Share) Belmont 2020-2025 134,679 - - 134,679 - - 134,679 70,033 64,646 3 Sewage Forcemain (Belmont) Belmont 2025 780,000 - - 780,000 - - 780,000 405,600 374,400 4 Pumping Station 71 (pump install) Belmont 2022 75,000 - - 75,000 - - 75,000 39,000 36,000 5 New Trunk Sanitary Sewers (Colborne Stanley Sewer Upgrades) - Port Stanley Port Stanley 2025 1,500,000 - - 1,500,000 500,000 - 1,000,000 900,000 100,000 6 Debt - Growth Related Principal of Port Stanley WWTP Port Stanley 2020-2042 7,472,653 - - 7,472,653 - - 7,472,653 6,725,387 747,265 7 Debt - Growth Related Discounted Interest of Port Stanley WWTP Port Stanley 2020-2042 1,092,147 - - 1,092,147 - - 1,092,147 982,933 109,215 8 Sunset Road Sanitary Sewer Extension - Port Stanley. East Road Southerly Port Stanley 2020 450,000 - - 450,000 - - 450,000 405,000 45,000 9 Port Stanley Sanitary Sewer lining Port Stanley 2020 350,000 - - 350,000 - - 350,000 315,000 35,000 10 Union Area Pumping Station & Forcemain Union 2023 3,500,000 - - 3,500,000 371,300 - 3,128,700 3,003,552 125,148 11 Union Area Sanitary Trunk Mains Union 2024 2,500,000 - - 2,500,000 265,200 - 2,234,800 2,145,408 89,392 11 Outstanding Credits related to S2 - Shaw Valley P.S. and Forcemain South Block 2021+ 369,400 - - 369,400 - - 369,400 369,400 - 12 S4 - Trunk sewer from P.S. to Southdale Road - Developer to build South Block 2020 191,600 - - 191,600 - - 191,600 191,600 - 13 Financing Costs South Block Future 196,200 - - 196,200 - - 196,200 196,200 - 14 Reserve Fund Adjustment Urban Area Reserve 783,841 - 783,841 - 783,841 697,619 86,223 Total 20,622,873 - - 20,622,873 1,136,500 - 19,486,373 17,084,955 2,401,418 Note: Reserve Fund has been allocated to Residential and Non-Residential shares based on the population and employment of Belmont, Port Stanley, Union, and Southblock Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2020$) Post Period Benefit Other Deductions Net Capital Cost Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\Central Elgin\2020 DC\Report\Report.docx 6. D.C. Calculation The following tables provide for the D.C. calculations based on different service areas and growth forecasts: - Table 6-1 calculates the D.C.s in the urban serviced areas of Belmont, Port Stanley, and Southblock for water services over there respective buildout forecasts. - Table 6-2 calculates the D.C.s in the urban serviced areas of Belmont, Port Stanley, Union, and Southblock for wastewater services over there respective buildout forecasts. - Table 6-3 calculates the D.C.s for urban-related administration studies over a 10- year planning horizon of urban areas. - Table 6-4 calculates the D.C.s for services related to a highway and fire protection services over the long-term (2036) planning horizon. - Table 6-5 calculates the uniform D.C.s to be imposed on anticipated development for parks and recreation services, library services and administration (municipal-wide) services over a 10-year planning horizon. The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (singles and semi-detached, multiples, apartments 2+ bedrooms, apartments bachelor and 1 bedroom, and special care/ special dwelling units). The non-residential D.C. has been calculated on a per sq.ft. of gross floor area basis for all types of non-residential development (industrial, commercial and institutional). The D.C.-eligible costs for each service component were developed in Chapter 5 for all Municipality services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The eligible D.C. cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 5) to calculate the charge in Tables 6-1 through 6-5. Watson & Associates Economists Ltd. PAGE 6-2 H:\Central Elgin\2020 DC\Report\Report.docx With respect to non-residential development, the total costs in the uniform charge allocated to non-residential development (based on need for service) have been divided by the anticipated development over the planning period to calculate a cost per sq.ft. of gross floor area. Table 6-6 summarizes the total D.C. that is applicable for the Municipality and Table 6-7 summarizes the gross capital expenditures and sources of revenue for works to be undertaken during the 5-year life of the by-law. Watson & Associates Economists Ltd. PAGE 6-3 H:\Central Elgin\2020 DC\Report\Report.docx Table 6-1 Municipality of Central Elgin D.C. Calculation Water Area Specific Services (Belmont, Port Stanley, and Southblock) 2020-Total Urban Build Out Table 6-2 Municipality of Central Elgin D.C. Calculation Wastewater Area Specific Services (Belmont, Port Stanley, Union, and Southblock) 2020-Total Urban Build Out 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost SERVICE Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1. Water Services 1.1 Treatment, storage and distribution systems 881,346 152,481 512 0.25 881,346 152,481 512 0.25 TOTAL $881,346 $152,481 $512 $0.25 D.C.-Eligible Capital Cost $881,346 $152,481 4,933 618,200 Cost Per Capita/Non-Residential GFA (sq.ft.) $178.66 $0.25 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.868 $512 Apartments - 2 Bedrooms + 1.700 $304 Apartments - Bachelor and 1 Bedroom 1.089 $195 Multiples 2.176 $389 Special Care/Special Dwelling Units 1.100 $197 Buildout of Belmont, Port Stanley, and Southblock Gross Population/GFA Growth (sq,ft,) 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost SERVICE Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 2. Wastewater Services 2.1 Treatment plants & Sewers 17,084,955 2,401,418 5,725 3.39 17,084,955 2,401,418 5,725 3.39 TOTAL $17,084,955 $2,401,418 $5,725 $3.39 D.C.-Eligible Capital Cost $17,084,955 $2,401,418 8,559 708,400 Cost Per Capita/Non-Residential GFA (sq.ft.) $1,996.14 $3.39 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.868 $5,725 Apartments - 2 Bedrooms + 1.700 $3,393 Apartments - Bachelor and 1 Bedroom 1.089 $2,174 Multiples 2.176 $4,344 Special Care/Special Dwelling Units 1.100 $2,196 Buildout of Belmont, Port Stanley, Union, and Southblock Gross Population/GFA Growth (sq,ft,) Watson & Associates Economists Ltd. PAGE 6-4 H:\Central Elgin\2020 DC\Report\Report.docx Table 6-3 Municipality of Central Elgin D.C. Calculation Urban Area Specific Services 2020-2029 Table 6-4 Municipality of Central Elgin D.C. Calculation Municipal-wide Services 2020-2036 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost SERVICE Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 3. Administration Studies - Urban 3.1 Urban Area Related Studies 168,000 32,000 229 0.10 168,000 32,000 229 0.10 TOTAL $168,000 $32,000 $229 $0.10 D.C.-Eligible Capital Cost $168,000 $32,000 2,103 314,200 Cost Per Capita/Non-Residential GFA (sq.ft.) $79.89 $0.10 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.868 $229 Apartments - 2 Bedrooms + 1.700 $136 Apartments - Bachelor and 1 Bedroom 1.089 $87 Multiples 2.176 $174 Special Care/Special Dwelling Units 1.100 $88 10-Year Urban Areas Gross Population/GFA Growth (sq,ft,) 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost SERVICE Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 4. Services Related to a Highway 4.1 PW Rolling Stock 303,400 66,600 239 0.13 4.2 Roads and Related 912,046 200,205 719 0.39 1,215,446 266,805 958 0.52 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 2,773,971 608,920 2,187 1.19 2,773,971 608,920 2,187 1.19 TOTAL $3,989,417 $875,726 $3,145 $1.71 D.C.-Eligible Capital Cost $3,989,417 $875,726 2036-Year Gross Population/GFA Growth (sq,ft,) 3,638 511,600 Cost Per Capita/Non-Residential GFA (sq.ft.) $1,096.60 $1.71 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.868 $3,145 Apartments - 2 Bedrooms + 1.700 $1,864 Apartments - Bachelor and 1 Bedroom 1.089 $1,194 Multiples 2.176 $2,386 Special Care/Special Dwelling Units 1.100 $1,206 Watson & Associates Economists Ltd. PAGE 6-5 H:\Central Elgin\2020 DC\Report\Report.docx Table 6-5 Municipality of Central Elgin D.C. Calculation Municipal-wide Services 2020-2029 Table 6-6 Municipality of Central Elgin D.C. Calculation Total All Services 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost SERVICE Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 6. Parks and Recreation Services 6.1 Recreation facilities, vehicles and equipment 1,823,571 95,977 2,276 0.26 1,823,571 95,977 2,276 0.26 7. Library Services 7.1 Library facilities 106,671 5,614 133 0.02 106,671 5,614 133 0.02 8. Administration 8.1 Studies 590,225 138,448 737 0.38 TOTAL $2,520,468 $240,040 $3,146 $0.66 D.C.-Eligible Capital Cost $2,520,468 $240,040 10-Year Gross Population/GFA Growth (sq,ft,) 2,298 365,100 Cost Per Capita/Non-Residential GFA (sq.ft.) $1,096.81 $0.66 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.868 $3,146 Apartments - 2 Bedrooms + 1.700 $1,865 Apartments - Bachelor and 1 Bedroom 1.089 $1,194 Multiples 2.176 $2,387 Special Care/Special Dwelling Units 1.100 $1,206 2020$ D.C.-Eligible Cost 2020$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ Municipal-wide Services 2036 Year 3,989,417 875,726 3,145 1.71 Municipal-wide Services 10 Year 2,520,468 240,040 3,146 0.66 TOTAL MUNICIPAL WIDE 6,509,885 1,115,765 6,291 2.37 Urban-wide Studies 10 Year 168,000 32,000 229 0.10 TOTAL URBAN AREA 168,000 32,000 229 0.10 Water Area Specific - Build out 881,346 152,481 512 0.25 Wastewater Area Specific - Build out 17,084,955 2,401,418 5,725 3.39 TOTAL URBAN AREA - AREA SPECIFIC 17,966,301 2,553,899 6,237 3.64 Watson & Associates Economists Ltd. PAGE 6-6 H:\Central Elgin\2020 DC\Report\Report.docx Table 6-7 Municipality of Central Elgin Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the Life of the By-law Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Legislated Reduction Residential Non-Residential 1. Water Services 1.1 Treatment, storage and distribution systems 1,267,625 0 325,000 0 0 0 817,907 124,718 2. Wastewater Services 2.1 Treatment plants & Sewers 10,432,939 0 636,500 0 0 0 8,734,895 1,061,544 3. Administration Studies - Urban 3.1 Urban Area Related Studies 200,000 0 0 0 0 0 168,000 32,000 4. Services Related to a Highway 4.1 PW Rolling Stock 370,000 0 0 0 0 0 303,400 66,600 4.2 Roads and Related 2,261,900 0 489,000 0 0 0 1,453,778 319,122 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 1,569,033 0 22,400 0 0 0 1,268,239 278,394 6. Parks and Recreation Services 6.1 Recreation facilities, vehicles and equipment 1,770,000 0 0 0 177,000 0 1,513,350 79,650 7. Library Services 7.1 Library facilities 0 0 0 0 0 0 0 0 8. Administration 8.1 Studies 965,000 0 260,000 0 66,375 41,250 483,874 113,501 Total Expenditures & Revenues $18,836,497 $0 $1,732,900 $0 $243,375 $41,250 $14,743,443 $2,075,529 Post D.C. Period Benefit Total Gross Cost Service Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\Central Elgin\2020 DC\Report\Report.docx 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "...to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection 6." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under 5(1) 2-8 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided are based on the Municipality's existing policies; with consideration for the updates from Bill 108. However, there are items under consideration at this time and these may be refined prior to adoption of the by-law. Watson & Associates Economists Ltd. PAGE 7-2 H:\Central Elgin\2020 DC\Report\Report.docx 7.2 D.C. By-law Structure It is recommended that: - the Municipality uses a uniform Municipal-wide development charge calculation for all Municipal services except water, wastewater and urban-related administration studies; - urban-related administration studies be imposed on the urban area of the Municipality; - water and wastewater services be imposed on an urban area-specific basis; and - one Municipal D.C. by-law be used for all services. 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or Watson & Associates Economists Ltd. PAGE 7-3 H:\Central Elgin\2020 DC\Report\Report.docx (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the amount of square feet of gross floor area constructed for eligible uses (i.e. industrial, commercial and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, e.g. - for municipal wide administration studies, the costs have been based on a population vs. employment growth ratio (81%/19%) for residential and non-residential, respectively) over the 10-year forecast period; - for urban-related administration studies, the costs have been based on a population vs. employment growth ratio (84%/16%) for residential and non-residential, respectively) over the 10-year urban-area forecast period; - for parks and recreation and library services, a 5% non-residential attribution has been made to recognize use by the non-residential sector; - for services related to a highway and fire protection services, an 82% residential/18% non-residential attribution has been made based on a population vs. employment growth ratio over the long-term (2036) forecast period; and - for water and wastewater services, the residential/non-residential splits are based on the population vs. employment ratio for the urban buildout of the following areas: - Belmont: 52% residential / 48% non-residential - Port Stanley: 90% residential / 10% non-residential - Union: 96% residential / 4% non-residential - Southblock: 100% residential / 0% non-residential Watson & Associates Economists Ltd. PAGE 7-4 H:\Central Elgin\2020 DC\Report\Report.docx 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) If a development involves the demolition of and replacement of a building or structure on the same site, or the conversion from one principal use to another, the developer shall be allowed a credit equivalent to: 1) the number of dwelling units demolished/converted multiplied by the applicable residential D.C. in place at the time the D.C. is payable; and/or 2) the gross floor area of the building demolished/converted multiplied by the current non-residential D.C. in place at the time the D.C. is payable. The demolition credit is allowed only if the land was improved by occupied structures and if the demolition permit related to the site was issued less than 5 years prior to the issuance of a building permit. The credit can, in no case, exceed the amount of D.C.s that would otherwise be payable. 7.3.4 Exemptions (full or partial) a) Statutory exemptions: - industrial building additions of up to and including 50% of the existing gross floor area (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions which exceed 50% of the existing gross floor area, only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - buildings or structures owned by and used for the purposes of any municipality, local board or Board of Education (section 3); - residential development that results only in the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (based on prescribed limits set out in section 2 of O. Reg. 82/98). b) Non-statutory exemptions (for Council's consideration): - Land that is used for the purposes of industrial uses; - Non-residential farm buildings constructed for bona fide farm uses; and Watson & Associates Economists Ltd. PAGE 7-5 H:\Central Elgin\2020 DC\Report\Report.docx - Lands or buildings used or to be used for a place of worship of for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act. 7.3.5 Phasing in No provisions for phasing in the D.C. are provided in the D.C. by-law. 7.3.6 Timing of Collection The D.C.s for all services are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the Municipality and an owner under s.27 of the D.C.A., 1997. Commencing January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Non-profit housing developments will pay D.C.s in 21 equal annual payments. Moreover, the D.C. amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the D.C. charge in effect on the day of the Site Plan or Zoning By-law Amendment application. Installment payments and payments determined at the time of Site Plan or Zoning By- law Amendment application are subject to annual interest charges. The setting of the interest rate was presented to Council in a staff report (AMDS-05-20) dated February 5, 2020. The report recommended that the interest rate be set at 1.25% per month. For the purposes of administering the By-law, the following definitions are provided as per O. Reg. 454-19: "Rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises. "Institutional development" means development of a building or structure intended for use, a) as a long-term care home within the meaning of subsection 2 (1) of the Long- Term Care Homes Act, 2007; Watson & Associates Economists Ltd. PAGE 7-6 H:\Central Elgin\2020 DC\Report\Report.docx b) as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010; c) by any of the following post-secondary institutions for the objects of the institution: i. a university in Ontario that receives direct, regular and ongoing operating funding from the Government of Ontario, ii. a college or university federated or affiliated with a university described in subclause (i), or iii. an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institutes Act, 2017; d) as a memorial home, clubhouse or athletic grounds by an Ontario branch of the Royal Canadian Legion; or e) as a hospice to provide end of life care. "Non-profit housing development" means development of a building or structure intended for use as residential premises by, a) a corporation without share capital to which the Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; b) a corporation without share capital to which the Canada Not-for-profit Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; or c) a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act. Despite the above, Council, from time to time and at any time, may enter into agreements providing for all or any part of a D.C. to be paid before or after it would otherwise be payable. 7.3.7 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually commencing on May 1st 2021 and each May 1st thereafter, in accordance with the Statistics Canada Watson & Associates Economists Ltd. PAGE 7-7 H:\Central Elgin\2020 DC\Report\Report.docx Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0135-01)1 for the most recent year-over-year period. 7.3.8 The Applicable Areas The charges developed herein provide for varying charges within the Municipality, as follows: - All Municipal-wide Services - the full residential and non-residential charge will be imposed on all lands within the Municipality. - Urban Area Services - the full administration studies related to urban services be imposed on all urban serviced areas of the Municipality. - Area Specific - Urban Services: o Belmont - the full water and wastewater residential and non-residential D.C.s will be imposed on all lands within Belmont; o Port Stanley - the full water and wastewater residential and non- residential D.C.s will be imposed on all lands within Port Stanley; o Union - the full wastewater residential and non-residential D.C.s will be imposed on all lands within the Union Area; and o Southblock - the full water and wastewater residential D.C.s will be imposed within the Southblock area. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes The Municipality's D.C. collections are currently reserved in eight separate reserve funds: water services, wastewater services, administration studies (municipal-wide), administration studies (urban), services related to a highway, fire protections services, 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-8 H:\Central Elgin\2020 DC\Report\Report.docx parks and recreation services, and library services. Appendix D outlines the reserve fund policies that the Municipality is required to follow as per the D.C.A. 7.4.2 By-law In-force Date A by-law under the D.C.A. comes into force on the day after which the by-law is passed by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-law comes into force (as per section 11 of O. Reg. 82/98). 7.4.4 Area Rating As noted earlier, Bill 73 has introduced two new sections where Council must consider the use of area specific charges: 1. Section 2 (9) of the Act now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated (note that at this time, no municipalities or services are prescribed by the Regulations). 2. Section 10 (2) c.1 of the D.C.A. requires that "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area-rated. The second item requires Council to consider the use of area-rating. At present, the Municipality's by-law provides for area rating for water, wastewater and urban related administration studies. All other Municipal services are recovered based on a uniform, Municipal-wide basis. There have been several reasons why they have not been imposed for these services including: Watson & Associates Economists Ltd. PAGE 7-9 H:\Central Elgin\2020 DC\Report\Report.docx 1. All Municipal services, with the exception of water, wastewater and stormwater, require that the average 10-year service standard be calculated. This average service standard multiplied by growth in the Municipality, establishes an upper ceiling on the amount of funds which can be collected from all developing landowners. Section 4 (4) of O. Reg. 82/98 provides that "...if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by- law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area, would establish an area specific ceiling which would significantly reduce the total revenue recoverable for the Municipality hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. Extending on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a Municipal-wide approach to an area specific approach. For example, if all services were now built (and funded) within Area A (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The development charges would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 3. Many services which are provided (roads, parks, recreation facilities, library) are not restricted to one specific area and are often used by all residents. For example, arenas located in different parts of the Municipality will be used by residents from all areas depending on the programing of the facility (i.e. a public skate is available each night, but at a different arena; hence usage of any one facility at any given time is based on programing availability). For the reasons noted above, it is recommended that Council continue the D.C. approach to calculate the charges on a uniform Municipal-wide basis for all services other than water, wastewater and urban related administration studies. Watson & Associates Economists Ltd. PAGE 7-10 H:\Central Elgin\2020 DC\Report\Report.docx 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Continue the D.C. approach to calculate the charges on a uniform Municipal- wide basis for all services (except urban related studies, water, and wastewater), a uniform urban-area basis for urban related administration studies, and on an area-specific basis for water and wastewater services;" "Approve the capital project listing set out in Chapter 5 of the D.C.s Background Study dated March 25, 2020, subject to further annual review during the capital budget process;" "Approve the D.C.s Background Study dated March 25, 2020, as amended (if applicable);" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix G." Watson & Associates Economists Ltd. H:\Central Elgin\2020 DC\Report\Report.docx Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 H:\Central Elgin\2020 DC\Report\Report.docx 8. By-law Implementation 8.1 Public Consultation Process 8.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.1.4 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e. if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Local Planning Appeal Tribunal (LPAT) (formerly the Ontario Municipal Board (O.M.B.)). 8.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with Municipality D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. PAGE 8-2 H:\Central Elgin\2020 DC\Report\Report.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and Municipality policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade and the Economic Development Agencies, who are all potentially interested in Municipality D.C. policy. Their primary concern is frequently with the quantum of the charge, gross floor area exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via higher housing prices and can impact project feasibility in some cases (e.g. rental apartments). On the other hand, D.C.s or other Municipality capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 H:\Central Elgin\2020 DC\Report\Report.docx 8.3 Implementation Requirements 8.3.1 Introduction Once the Municipality has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections which follow overview the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the Municipality clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e. as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax or mail to every owner of land in the area to which the by- law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items which the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the Municipality must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; Watson & Associates Economists Ltd. PAGE 8-4 H:\Central Elgin\2020 DC\Report\Report.docx - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the LPAT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The Municipality must give one copy of the most recent pamphlet without charge, to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and LPAT Hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the LPAT by filing a notice of appeal with the Municipality clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The Municipality is carrying out a public consultation process, in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the Municipality Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of Municipality Council to the LPAT Watson & Associates Economists Ltd. PAGE 8-5 H:\Central Elgin\2020 DC\Report\Report.docx 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a Municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates, unless the Municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The Municipality and one or more landowners may enter into a front-ending agreement which provides for the costs of a project which will benefit an area in the Municipality to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the D.C.A., 1989. Accordingly, the Municipality assesses whether this mechanism is appropriate for its use, as part of funding projects prior to Municipality funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 8-6 H:\Central Elgin\2020 DC\Report\Report.docx It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the Municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority, information regarding the applicable Municipality D.C.s related to the site. If the Municipality is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities which can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix A: Background Information on Residential and Non- Residential Growth Forecast Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings2 Apartments3 Other Total Households Equivalent Institutional Households 13,070 12,723 183 12,540 4,430 170 145 40 4,785 166 2.659 13,090 12,743 193 12,550 4,513 140 113 15 4,781 175 2.665 12,950 12,607 72 12,535 4,640 155 105 25 4,925 65 2.560 13,820 13,461 77 13,384 5,001 159 114 25 5,299 70 2.540 15,890 15,471 89 15,382 5,659 243 267 25 6,195 81 2.498 16,190 15,763 95 15,668 5,751 254 292 25 6,322 86 2.493 17,050 16,607 98 16,509 6,038 290 368 25 6,721 89 2.471 26,485 25,789 151 25,638 9,436 515 801 25 10,777 137 2.393 20 20 10 10 83 -30 -32 -25 -4 9 -140 -136 -121 -15 127 15 -8 10 144 -110 870 854 5 849 361 4 9 0 374 5 2,070 2,010 12 1,998 658 84 153 0 895 11 2,370 2,302 18 2,284 750 95 178 0 1,023 16 3,230 3,146 21 3,125 1,037 131 254 0 1,422 19 12,665 12,328 74 12,254 4,435 356 687 0 5,478 67 ¹ Census undercount estimated at approximately 2.7%. Note: Population including the undercount has been rounded. ² Includes townhouses and apartments in duplexes. ³ Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Early 2020 - Mid 2036 Mid 2006 - Mid 2011 Mid 2011 - Mid 2016 Mid 2006 Mid 2011 Mid 2016 Early 2020 Early 2030 Mid 2016 - Early 2020 Historical Forecast Early 2020 - Early 2030 Mid 2031 Early 2020 - Mid 2031 Buildout Mid 2036 Incremental Schedule 1 Municipality of Central Elgin Residential Growth Forecast Summary Population (Including Census Undercount)¹ Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Early 2020 - Buildout Source: From Municipality of Central Elgin Population, Housing & Employment Projections, 2011-2036, Medium Growth Scenario, Revised Draft, prepared by Lapointe Consulting, February 5, 2015. Derived by Watson & Associates Economists Ltd., 2020. Watson & Associates Economists Ltd. PAGE A-3 H:\Central Elgin\2020 DC\Report\Report.docx Source: Historical housing activity derived from Statistics Canada building permit data for the Municipality of Central Elgin , 2007-2019. 1 Growth forecast represents calendar year. 67 44 35 18 32 48 29 50 33 48 95 119 100 88 95 95 95 95 95 95 85 85 85 85 85 80 80 80 80 80 0 20 40 60 80 100 120 140 Housing Units Years Figure A-1 Annual Housing Forecast¹ Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\Central Elgin\2020 DC\Report\Report.docx Early 2020 - Early 2030 159 84 153 396 867 (65) 802 12 814 Early 2020 - Mid 2031 172 95 178 445 966 (74) 892 18 910 Early 2020 - Mid 2036 194 131 254 579 1,220 (112) 1,109 21 1,130 Early 2020 - Buildout 601 164 369 1,134 2,631 (492) 2,139 74 2,213 Early 2020 - Early 2030 74 0 0 74 212 (45) 168 0 168 Early 2020 - Mid 2031 89 0 0 89 255 (51) 205 0 205 Early 2020 - Mid 2036 147 0 0 147 422 (77) 345 0 345 Early 2020 - Buildout 147 0 0 147 422 (338) 84 0 84 Early 2020 - Early 2030 217 0 0 217 622 (36) 586 0 586 Early 2020 - Mid 2031 235 0 0 235 674 (41) 633 0 633 Early 2020 - Mid 2036 265 0 0 265 760 (62) 698 0 698 Early 2020 - Buildout 325 0 0 325 932 (273) 659 0 659 Early 2020 - Early 2030 40 0 0 40 115 (7) 108 0 108 Early 2020 - Mid 2031 43 0 0 43 123 (8) 115 0 115 Early 2020 - Mid 2036 48 0 0 48 138 (12) 125 0 125 Early 2020 - Buildout 1,714 192 318 2,224 5,809 (55) 5,754 0 5,754 Early 2020 - Early 2030 100 0 0 100 287 (14) 273 0 273 Early 2020 - Mid 2031 138 0 0 138 396 (16) 380 0 380 Early 2020 - Mid 2036 300 0 0 300 861 (24) 836 0 836 Early 2020 - Buildout 1,264 0 0 1,264 3,626 (108) 3,518 0 3,518 Early 2020 - Early 2030 0 0 0 0 0 (21) (21) 0 (21) Early 2020 - Mid 2031 0 0 0 0 0 (24) (24) 0 (24) Early 2020 - Mid 2036 0 0 0 0 0 (37) (37) 0 (37) Early 2020 - Buildout 25 0 0 25 72 (161) (89) 0 (89) Early 2020 - Early 2030 0 0 0 0 0 (1) (1) 0 (1) Early 2020 - Mid 2031 0 0 0 0 0 (2) (2) 0 (2) Early 2020 - Mid 2036 0 0 0 0 0 (2) (2) 0 (2) Early 2020 - Buildout 0 0 0 0 0 (11) (11) 0 (11) Early 2020 - Early 2030 590 84 153 827 2,103 (190) 1,913 12 1,925 Early 2020 - Mid 2031 677 95 178 950 2,414 (215) 2,199 18 2,217 Early 2020 - Mid 2036 954 131 254 1,339 3,400 (326) 3,074 21 3,095 Early 2020 - Buildout 4,076 356 687 5,119 13,491 (1,437) 12,054 74 12,128 Early 2020 - Early 2030 68 0 0 68 195 (110) 85 0 85 Early 2020 - Mid 2031 73 0 0 73 209 (124) 85 0 85 Early 2020 - Mid 2036 83 0 0 83 238 (188) 50 0 50 Early 2020 - Buildout 359 0 0 359 1,030 (830) 200 0 200 Early 2020 - Early 2030 658 84 153 895 2,298 (300) 1,998 12 2,010 Early 2020 - Mid 2031 750 95 178 1,023 2,624 (339) 2,285 18 2,303 Early 2020 - Mid 2036 1,037 131 254 1,422 3,638 (514) 3,124 21 3,145 Early 2020 - Buildout 4,435 356 687 5,478 14,521 (2,267) 12,254 74 12,328 1 Includes townhouses and apartments in duplexes. 2 Includes accessory apartments, bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Eastwood Subdivision Yarmouth Industrial & Commercial Lands Rural Total Urban Municipality of Central Elgin Source: Discussions with Municipal staff regarding land supply and servicing capacity, by Watson & Associates Economists Ltd., 2020. Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Union Port Stanley Lynhurst 3 Belmont Norman/Lyndale 4 Municipality of Central Elgin Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed Development Timing Single & Semi- Detached Multiples1 Apartments2 Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Schedule 2 Watson & Associates Economists Ltd. PAGE A-5 H:\Central Elgin\2020 DC\Report\Report.docx Mid 2016 Population 12,607 Occupants of Units (2) 374 New Housing Units, multiplied by P.P.U. (3) 2.920 Mid 2016 to Early 2020 gross population increase 1,093 1,093 Occupants of New Units 5 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2016 to Early 2020 gross population increase 5 5 Decline in Housing Units (4) 4,925 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.050 Mid 2016 to Early 2020 total decline in population -244 -244 Population Estimate to Early 2020 13,461 Net Population Increase, Mid 2016 to Early 2020 854 (1) 2016 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.963 97% 2.860 Multiples (6) 2.176 1% 0.023 Apartments (7) 1.542 2% 0.037 Total 100% 2.920 ¹ Based on 2016 Census custom database ² Based on Building permit/completion activity (4) 2016 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Municipality of Central Elgin Current Year Growth Forecast Mid 2016 to Early 2020 Estimated residential units constructed, Mid-2016 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Schedule 3 Watson & Associates Economists Ltd. PAGE A-6 H:\Central Elgin\2020 DC\Report\Report.docx Early 2020 Population 13,461 Occupants of Units (2) 895 New Housing Units, multiplied by P.P.U. (3) 2.568 Mid 2020 to Early 2030 gross population increase 2,298 2,298 Occupants of New Units 11 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2020 to Early 2030 gross population increase 12 12 Decline in Housing Units (4) 5,299 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.057 Mid 2020 to Early 2030 total decline in population -300 -300 Population Estimate to Early 2030 15,471 Net Population Increase, Mid 2020 to Early 2030 2,010 (1) Early 2020 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.868 74% 2.108 Multiples (6) 2.176 9% 0.204 Apartments (7) 1.491 17% 0.256 one bedroom or less 1.089 two bedrooms or more 1.700 Total 100% 2.568 ¹ Persons per unit based on adjusted Statistics Canada Custom 2016 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2020 households based upon 2016 Census (4,925 units) + Mid 2016 to Early 2020 unit estimate (374 units) = 5,299 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Schedule 4a Mid 2020 to Early 2030 Municipality of Central Elgin Ten Year Growth Forecast Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2016 Population (12,607) + Mid 2016 to Early 2020 estimated housing units to beginning of forecast period (374 x 2.92 = 1,093) + (5 x 1.1 = 5) + (4,925 x -0.05 = -244) = 13,461 Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 H:\Central Elgin\2020 DC\Report\Report.docx Early 2020 Population 13,461 Occupants of Units (2) 1,023 New Housing Units, multiplied by P.P.U. (3) 2.565 Early 2020 to Mid 2031 gross population increase 2,624 2,624 Occupants of New Units 16 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2020 to Mid 2031 gross population increase 18 18 Decline in Housing Units (4) 5,299 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.064 Early 2020 to Mid 2031 total decline in population -339 -339 Population Estimate to Mid 2031 15,763 Net Population Increase, Early 2020 to Mid 2031 2,302 (1) Early 2020 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.868 73% 2.103 Multiples (6) 2.176 9% 0.203 Apartments (7) 1.491 17% 0.259 one bedroom or less 1.089 two bedrooms or more 1.700 Total 100% 2.565 ¹ Persons per unit based on Statistics Canada Custom 2016 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2020 households based upon 4,925 (2016 Census) + 374 (Mid 2016 to Early 2020 unit estimate) = 5,299 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Weighted Persons Per Unit Average Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² 2016 Population (12,607) + Mid 2016 to Early 2020 estimated housing units to beginning of forecast period (374 x = 1,085) + (4,925 x - 0.0469 = -231) = 13,461 Schedule 4b Municipality of Central Elgin Early 2020 to Mid 2031 Population Watson & Associates Economists Ltd. PAGE A-8 H:\Central Elgin\2020 DC\Report\Report.docx Early 2020 Population 13,461 Occupants of Units (2) 1,422 New Housing Units, multiplied by P.P.U. (3) 2.559 Early 2020 to Mid 2036 gross population increase 3,639 3,639 Occupants of New Units 19 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2020 to Mid 2036 gross population increase 21 21 Decline in Housing Units (4) 5,299 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.097 Early 2020 to Mid 2036 total decline in population -514 -514 Population Estimate to Mid 2036 16,607 Net Population Increase, Early 2020 to Mid 2036 3,146 (1) Early 2020 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. 0 (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.868 73% 2.092 Multiples (6) 2.176 9% 0.201 Apartments (7) 1.491 18% 0.266 one bedroom or less 1.089 two bedrooms or more 1.700 Total 100% 2.559 ¹ Persons per unit based on Statistics Canada Custom 2016 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2020 households based upon 4,925 (2016 Census) + 374 (Mid 2016 to Early 2020 unit estimate) = 5,299 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Population 2016 Population (12,607) + Mid 2016 to Early 2020 estimated housing units to beginning of forecast period (374 x = 1,085) + (4,925 x - 0.0469 = -231) = 13,461 Schedule 4c Municipality of Central Elgin Early 2020 to Mid 2036 Watson & Associates Economists Ltd. PAGE A-9 H:\Central Elgin\2020 DC\Report\Report.docx Early 2020 Population 13,461 Occupants of Units (2) 5,478 New Housing Units, multiplied by P.P.U. (3) 2.651 Early 2020 to Buildout gross population increase 14,522 14,522 Occupants of New Units 67 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2020 to Buildout gross population increase 74 74 Decline in Housing Units (4) 5,299 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.428 Early 2020 to Buildout total decline in population -2,267 -2,267 Population Estimate to Buildout 25,790 Net Population Increase, Early 2020 to Buildout 12,329 (1) Early 2020 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.868 81% 2.322 Multiples (6) 2.176 6% 0.141 Apartments (7) 1.491 13% 0.187 one bedroom or less 1.089 two bedrooms or more 1.700 Total 100% 2.651 ¹ Persons per unit based on Statistics Canada Custom 2016 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2020 households based upon 4,925 (2016 Census) + 374 (Mid 2016 to Early 2020 unit estimate) = 5,299 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average 2016 Population (12,607) + Mid 2016 to Early 2020 estimated housing units to beginning of forecast period (374 x = 1,085) + (4,925 x - 0.0469 = -231) = 13,461 Municipality of Central Elgin Early 2020 to Buildout Population Schedule 5 Watson & Associates Economists Ltd. PAGE A-10 H:\Central Elgin\2020 DC\Report\Report.docx Registered Not Built 74 0 0 74 Draft Plans Approved 203 88 428 719 Application Pending 0 0 120 120 Total 277 88 548 913 Share 30% 10% 60% 100% Registered Not Built 147 0 0 147 Draft Plans Approved 0 0 0 0 Application Pending 0 0 0 0 Total 147 0 0 147 Share 100% 0% 0% 100% Registered Not Built 45 0 0 45 Draft Plans Approved 349 0 0 349 Application Pending 0 0 0 0 Total 394 0 0 394 Share 100% 0% 0% 100% Registered Not Built 0 0 0 0 Draft Plans Approved 65 0 0 65 Application Pending 0 0 0 0 Total 65 0 0 65 Share 100% 0% 0% 100% Registered Not Built 0 0 0 0 Draft Plans Approved 0 0 0 0 Application Pending 0 0 0 0 Total 0 0 0 0 Share 0% 0% 0% 0% Registered Not Built 0 0 0 0 Draft Plans Approved 0 0 0 0 Application Pending 0 0 0 0 Total 0 0 0 0 Share 0% 0% 0% 0% Registered Not Built 0 0 0 0 Draft Plans Approved 0 0 0 0 Application Pending 0 0 0 0 Total 0 0 0 0 Share 0% 0% 0% 0% Registered Not Built 266 0 0 266 Draft Plans Approved 617 88 428 1,133 Application Pending 0 0 120 120 Total 883 88 548 1,519 Share 58% 6% 36% 100% 1 Municipality of Central Elgin Land Supply, as of February 2019. 2 Includes townhomes and apartments in duplexes. 3 Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Rural Development Location Municipality of Central Elgin Stage of Development Density Type Singles & Semi- Detached Multiples2 Apartments3 Total Schedule 6 Summary of Residential Housing Supply Port Stanley Lynhurst Belmont Norman/Lyndale Union Eastwood Subdivision Watson & Associates Economists Ltd. PAGE A-11 H:\Central Elgin\2020 DC\Report\Report.docx Residential Building Permits Total 2007 43 0 1 44 2008 35 0 0 35 2009 18 0 0 18 2010 31 0 1 32 2011 47 0 1 48 Average (2007 - 2011) 35 0 1 35 % Breakdown 98.3% 0.0% 1.7% 100.0% 2012 29 0 0 29 2013 50 0 0 50 2014 33 0 0 33 2015 48 0 0 48 2016 86 0 9 95 Sub-total 246 0 9 255 Average (2012 - 2016) 49 0 2 51 % Breakdown 96.5% 0.0% 3.5% 100.0% 2017 115 4 0 119 2018 100 0 0 100 2019 88 0 0 88 Sub-total 303 4 0 307 Average (2017 - 2019) 101 1 0 102 % Breakdown 98.7% 1.3% 0.0% 100.0% 2007 - 2019 Total 723 4 12 739 Average 56 0 1 57 % Breakdown 97.8% 0.5% 1.6% 100.0% 1 Includes townhouses and apartments in duplexes. 2 Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Source: Statistics Canada Publication, 64-001XIB & Municipality Building Permits. Schedule 7 Singles & Semi Detached Multiples1 Apartments2 Municipality of Central Elgin Historical Residential Building Permits Years 2007 to 2019 Year Watson & Associates Economists Ltd. PAGE A-12 H:\Central Elgin\2020 DC\Report\Report.docx Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 20 Year Average 1-5 - - - 3.041 - 2.963 6-10 - - - 3.333 - 3.415 3.189 11-15 - - - 2.582 - 2.388 2.922 16-20 - - - 2.750 - 2.708 2.868 20-25 - - - 2.270 - 2.469 2.789 25-35 - - - 3.104 3.727 3.156 35+ - - 1.953 2.533 3.273 2.450 2.793 Total - 1.714 1.977 2.666 3.365 2.601 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - - - 2.941 - 2.893 6-10 - - - 3.194 - 3.415 11-15 - - - 2.500 - 2.412 16-20 - - - 2.773 - 2.640 20-25 - - - 2.325 - 2.418 25-35 - - - 2.941 3.636 2.889 35+ - 1.368 1.910 2.545 3.273 2.414 Total - 1.300 1.891 2.643 3.403 2.546 2 Includes bachelor, 1 bedroom and 2 bedroom+ apartments. 3 Adjusted based on 2001-2016 historical trends. Note: Does not include Statistics Canada data classified as 'Other' P.P.U. Not calculated for samples less than or equal to 50 dwelling units, and does not include institutional population. Schedule 8a - 20 Year Average Municipality of Central Elgin Persons Per Unit By Age and Type of Dwelling (2016 Census) 1 Includes townhouses and apartments in duplexes. Watson & Associates Economists Ltd. PAGE A-13 H:\Central Elgin\2020 DC\Report\Report.docx Age of Multiples1 Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 20 Year Average 1-5 - - - - - - 6-10 - - - - - - 11-15 - - - - - - #DIV/0! 16-20 - - - 2.308 - 2.176 2.176 20-25 - - - 3.583 - 2.720 2.448 25-35 - - 1.962 3.071 - 2.597 35+ - 1.282 2.072 2.916 - 2.286 Total - 1.292 2.008 2.955 - 2.393 Age of Apartments2 Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 20 Year Average 1-5 - - 1.583 - - 1.542 6-10 - - 1.600 - - 1.381 11-15 - - - - - - 1.461 16-20 - - 1.846 - - 1.550 1.491 20-25 - 1.077 1.708 - - 1.545 1.505 25-35 - 1.193 1.645 - - 1.448 35+ - 1.133 1.723 2.833 - 1.480 Total 1.250 1.144 1.705 2.833 - 1.487 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.273 1.957 2.962 5.000 2.779 6-10 - - 1.857 3.006 5.057 2.928 11-15 - - 1.864 2.839 3.971 2.753 16-20 - 1.167 1.780 2.920 4.556 2.838 20-25 - 1.286 1.800 2.647 3.581 2.468 25-35 - 1.242 1.801 2.923 4.034 2.630 35+ 0.900 1.218 1.840 2.658 3.739 2.368 Total 0.857 1.231 1.840 2.752 4.021 2.503 2 Includes bachelor, 1 bedroom and 2 bedroom+ apartments. 3 Adjusted based on 2001-2016 historical trends. Note: Does not include Statistics Canada data classified as 'Other' P.P.U. Not calculated for samples less than or equal to 50 dwelling units, and does not include institutional population. Schedule 8b Elgin County Persons Per Unit By Age and Type of Dwelling (2016 Census) 1 Includes townhouses and apartments in duplexes. Watson & Associates Economists Ltd. PAGE A-14 H:\Central Elgin\2020 DC\Report\Report.docx 2.96 3.41 2.39 2.71 2.47 3.16 2.45 0.00 0.00 0.00 2.18 2.72 2.60 2.29 1.54 1.38 0.00 1.55 1.55 1.45 1.48 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Schedule 9 Persons Per Unit By Structural Type and Age of Dwelling (2016 Census) Singles and Semi-Detached Multiples Apartments Municipality of Central Elgin Multiple and Apartment P.P.U.s are based on Elgin County. Watson & Associates Economists Ltd. PAGE A-15 H:\Central Elgin\2020 DC\Report\Report.docx Employment Mid 2006 12,723 0.020 0.055 0.049 0.063 0.065 0.252 0.049 0.301 255 700 623 803 825 3,205 625 3,830 2,505 Mid 2011 12,743 0.022 0.035 0.031 0.068 0.052 0.208 0.064 0.271 285 445 390 865 660 2,645 810 3,455 2,200 Mid 2016 12,607 0.020 0.047 0.046 0.081 0.054 0.249 0.056 0.305 255 590 585 1,025 680 3,135 710 3,845 2,545 Early 2020 13,461 0.019 0.045 0.046 0.081 0.051 0.241 0.056 0.298 255 601 614 1,088 690 3,248 758 4,006 2,647 Early 2030 15,471 0.018 0.041 0.047 0.086 0.050 0.242 0.058 0.300 280 637 727 1,329 778 3,751 897 4,648 3,114 Mid 2031 15,758 0.018 0.041 0.047 0.087 0.050 0.243 0.058 0.301 280 645 735 1,374 789 3,823 914 4,737 3,178 Mid 2036 16,616 0.017 0.042 0.047 0.088 0.050 0.244 0.059 0.303 280 691 778 1,466 838 4,053 980 5,033 3,362 Buildout 25,788 0.011 0.043 0.047 0.091 0.049 0.241 0.061 0.302 280 1,109 1,212 2,347 1,264 6,212 1,573 7,785 5,103 Mid 2006 - Mid 2011 20 0.002 -0.020 -0.018 0.005 -0.013 -0.044 0.014 -0.030 30 -255 -233 63 -165 -560 185 -375 -305 Mid 2011 - Mid 2016 -136 -0.0021 0.0119 0.0158 0.0134 0.0021 0.0411 -0.0072 0.0339 -30 145 195 160 20 490 -100 390 345 Mid 2016 - Early 2020 854 -0.0013 -0.0022 -0.0008 -0.0005 -0.0027 -0.0074 0.0000 -0.0074 0 11 29 63 10 113 48 161 102 Early 2020 - Early 2030 2,010 -0.0008 -0.0035 0.0014 0.0051 -0.0010 0.0012 0.0017 0.0028 25 36 113 241 88 503 139 642 467 Early 2020 - Mid 2031 2,297 -0.0012 -0.0037 0.0010 0.0064 -0.0012 0.0013 0.0017 0.0030 25 44 121 286 99 575 156 731 531 Early 2020 - Mid 2036 3,155 -0.0021 -0.0031 0.0012 0.0074 -0.0008 0.0026 0.0027 0.0053 25 90 164 378 148 805 222 1,027 715 Early 2020 - Buildout 12,327 -0.0081 -0.0016 0.0014 0.0102 -0.0023 -0.0004 0.0047 0.0043 25 508 598 1,259 574 2,964 815 3,779 2,456 Mid 2006 - Mid 2011 4 0.00046 -0.00402 -0.00366 0.00096 -0.00261 -0.00887 0.00289 -0.00598 6 -51 -47 13 -33 -112 37 -75 -61 Mid 2011 - Mid 2016 -27 -0.0004 0.0024 0.0032 0.0027 0.0004 0.0082 -0.0014 0.0068 -6 29 39 32 4 98 -20 78 69 Mid 2016 - Early 2020 244 -0.0004 -0.0006 -0.0002 -0.0001 -0.0008 -0.0021 0.0000 -0.0021 0 3 8 18 3 32 14 46 29 Early 2020 - Early 2030 201 -0.00008 -0.00035 0.00014 0.00051 -0.00010 0.00012 0.00017 0.00028 3 4 11 24 9 50 14 64 47 Early 2020 - Mid 2031 200 -0.00010 -0.00032 0.00009 0.00055 -0.00010 0.00011 0.00015 0.00026 2 4 11 25 9 50 14 64 46 Early 2020 - Mid 2036 191 -0.00013 -0.00019 0.00007 0.00045 -0.00005 0.00016 0.00016 0.00032 2 5 10 23 9 49 13 62 43 Early 2020 - Buildout 176 -0.00012 -0.00002 0.00002 0.00015 -0.00003 -0.00001 0.00007 0.00006 0 7 9 18 8 42 12 54 35 Source: From Municipality of Central Elgin Population, Housing & Employment Projections, 2011-2036, Medium Growth Scenario, Revised Draft, prepared by Lapointe Consulting, February 5, 2015. Derived by Watson & Associates Economists Ltd., 2020. 1 Primary industry includes cannabis growing operation related employment. 2 Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same work place location at the beginning of each shift". Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc. Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including NFPOW N.F.P.O.W.2 Work at Home Industrial Commercial/ Population Related Municipality of Central Elgin Total Employment (Including N.F.P.O.W.) Institutional Schedule 10a N.F.P.O.W.2 2020 Employment Forcecast Activity Rate Period Population Primary1 Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary1 Total Watson & Associates Economists Ltd. PAGE A-16 H:\Central Elgin\2020 DC\Report\Report.docx Mid 2006 12,723 255 623 803 825 2,505 Mid 2011 12,743 285 390 865 660 2,200 Mid 2016 12,607 255 585 1,025 680 2,545 Early 2020 13,461 255 614 1,088 687 2,644 Early 2030 15,471 280 727 1,329 769 3,105 Mid 2031 15,758 280 735 1,374 780 3,169 Mid 2036 16,616 280 778 1,466 827 3,351 Buildout 25,788 280 1,212 2,347 1,227 5,066 Mid 2006 - Mid 2011 20 30 -233 63 -165 -305 Mid 2011 - Mid 2016 -136 -30 195 160 20 345 Mid 2016 - Early 2020 854 0 29 63 7 99 Early 2020 - Early 2030 2,010 25 113 241 82 461 100,000 113,000 96,400 55,800 365,200 Early 2020 - Mid 2031 2,297 25 121 286 93 525 100,000 121,000 114,400 63,600 399,000 Early 2020 - Mid 2036 3,155 25 164 378 140 707 100,000 164,000 151,200 96,300 511,500 Early 2020 - Buildout 12,327 25 598 1,259 540 2,422 100,000 598,000 503,600 369,900 1,571,500 Mid 2006 - Mid 2011 4 6 -47 13 -33 -61 Mid 2011 - Mid 2016 -27 -6 39 32 4 69 Mid 2016 - Early 2020 244 0 8 18 2 28 Early 2020 - Early 2030 201 3 11 24 8 46 10,000 11,300 9,640 5,580 36,520 Early 2020 - Mid 2031 200 2 11 25 8 46 8,696 10,522 9,948 5,530 34,696 Early 2020 - Mid 2036 191 2 10 23 8 43 6,061 9,939 9,164 5,836 31,000 Early 2020 - Buildout 176 0 9 18 8 35 1,429 8,543 7,194 5,284 22,450 1 Square Foot Per Employee Assumptions Primary - Non-Bona Fide Farming 4,000 Industrial 1,000 Commercial/ Population Related 400 Institutional 685 2 Primary industry includes cannabis growing operation related employment. 3 Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. 4 Non-bona fide farming is defined as cannabis growing operation related employment for G.F.A. purposes in Schedules 10b and 10c. Note: Numbers may not add to totals due to rounding. Source: From Municipality of Central Elgin Population, Housing & Employment Projections, 2011-2036, Medium Growth Scenario, Revised Draft, prepared by Lapointe Consulting, February 5, 2015. Derived by Watson & Associates Economists Ltd., 2020. Annual Average Industrial Commercial/ Population Related Institutional3 Total Industrial Commercial/ Population Related Institutional Total Incremental Change Primary - Non- Bona Fide Farming4 Schedule 10b Municipality of Central Elgin Employment & Gross Floor Area (G.F.A) Forecast, 2020 to Buildout Period Population Employment Primary2 Gross Floor Area in Square Feet (Estimated)¹ Watson & Associates Economists Ltd. PAGE A-17 H:\Central Elgin\2020 DC\Report\Report.docx table summa r y Watson & Associates Economists Ltd. PAGE A-18 H:\Central Elgin\2020 DC\Report\Report.docx New Improve Additions Total New Improve Additions Total New Improve Additions Total New Improve Additions Total 2007 1,012 169 0 1,180 901 944 0 1,845 29 582 0 611 1,942 1,695 0 3,636 2008 5,407 163 0 5,570 661 482 0 1,143 0 213 0 213 6,068 858 0 6,927 2009 1,175 62 0 1,237 514 122 0 636 0 525 0 525 1,689 710 0 2,399 2010 943 68 0 1,011 1,477 1,092 0 2,569 0 0 0 0 2,421 1,160 0 3,580 2012 1,327 467 0 1,795 643 115 0 758 0 88 461 549 1,970 670 461 3,101 2013 692 279 631 1,602 405 116 1,557 2,078 0 487 0 487 1,097 882 2,188 4,167 2014 10,434 208 282 10,924 6 155 0 161 0 0 0 0 10,440 363 282 11,085 2015 220 162 0 382 0 381 0 381 0 17 225 243 220 560 225 1,005 2016 804 60 0 864 421 76 0 497 0 2 0 2 1,224 138 0 1,362 Subtotal 23,382 1,880 913 26,175 5,954 3,701 1,557 11,211 151,765 1,929 686 154,380 181,101 7,510 3,156 191,767 Percent of Total 89% 7% 3% 100% 53% 33% 14% 100% 98% 1% 0% 100% 94% 4% 2% 100% Average 2,338 188 456 2,618 662 370 1,557 1,121 75,882 241 343 19,297 18,110 751 789 19,177 2007 - 2011 Period Total 10,609 7,337 153,100 171,046 2007 - 2011 Average 2,122 1,467 30,620 34,209 % Breakdown 6.2% 4.3% 89.5% 100.0% 2012 - 2016 Period Total 15,566 3,874 1,280 20,721 2012 - 2016 Average 3,113 775 256 4,144 % Breakdown 75.1% 18.7% 6.2% 100.0% 2007 - 2016 Period Total 26,175 11,211 154,380 191,767 2007 - 2016 Average 2,618 1,121 15,438 19,177 % Breakdown 13.6% 5.8% 80.5% 100.0% Source: Statistics Canada Publication, 64-001-XIB Note: Inflated to year-end 2017 (January, 2018) dollars using Reed Construction Cost Index Schedule 11 Municipality of Central Elgin Non-Residential Construction Value Years 2007 to 2016 (000's 2018 $) YEAR Industrial Commercial Institutional Total Watson & Associates Economists Ltd. PAGE A-19 H:\Central Elgin\2020 DC\Report\Report.docx 2006 2011 2016 06-11 11-16 Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 460 455 365 -5 -90 21 Mining and oil and gas extraction 0 0 0 0 0 Sub-total 460 455 365 -5 -90 Industrial and Other Employment 22 Utilities 25 15 30 -10 15 23 Construction 135 145 250 10 105 31-33 Manufacturing 320 125 220 -195 95 41 Wholesale trade 135 125 115 -10 -10 48-49 Transportation and warehousing 150 45 65 -105 20 56 Administrative and support 40 20 40 -20 20 Sub-total 805 475 720 -330 245 Population Related Employment 44-45 Retail trade 280 280 350 0 70 51 Information and cultural industries 15 40 30 25 -10 52 Finance and insurance 25 80 65 55 -15 53 Real estate and rental and leasing 30 10 30 -20 20 54 Professional, scientific and technical services 135 150 210 15 60 55 Management of companies and enterprises 0 0 10 0 10 56 Administrative and support 40 20 40 -20 20 71 Arts, entertainment and recreation 165 120 150 -45 30 72 Accommodation and food services 245 215 270 -30 55 81 Other services (except public administration) 100 85 150 -15 65 Sub-total 1,035 1,000 1,305 -35 305 Institutional 61 Educational services 150 90 85 -60 -5 62 Health care and social assistance 625 515 485 -110 -30 91 Public administration 130 110 175 -20 65 Sub-total 905 715 745 -190 30 Total Employment 3,205 2,645 3,135 -560 490 Population 12,723 12,743 12,607 20 -136 Employment to Population Ratio Industrial and Other Employment 0.06 0.04 0.06 -0.03 0.02 Population Related Employment 0.08 0.08 0.10 0.00 0.03 Institutional Employment 0.07 0.06 0.06 -0.02 0.00 Primary Industry Employment 0.04 0.04 0.03 0.00 -0.01 Total 0.25 0.21 0.25 -0.04 0.04 Source: Statistics Canada Employment by Place of Work Note: 2006-2016 employment figures are classified by North American Industry Classification System (NAICS) Code Schedule 12 Municipality of Central Elgin Employment to Population Ratio by Major Employment Sector, 2006 to 2016 NAICS Year Employment by industry Change Watson & Associates Economists Ltd. PAGE B-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix B: Level of Service Cost (per capita) Roads $10,478.70 0.0126 km of roadways 831,643 per lane km 32,955,512 Bridges & Culverts $905.40 0.0454 Number of Bridges, Culverts & Structures 19,943 per item 2,847,483 Sidewalks $144.30 0.9630 lin.m of sidewalks 150 per km 453,824 Streetlights $24.60 0.0244 No. of Streetlights 1,008 per signal 77,367 Depots and Domes $595.76 3.5018 ft² of building area 170 per sq.ft. 1,873,665 Roads and Related Vehicles $682.37 0.0060 No. of vehicles and equipment 113,728 per vehicle 2,146,054 Fire Facilities $339.58 1.1686 sq.ft. of building area 291 per sq.ft. 1,067,979 Fire Vehicles $511.18 0.0011 No. of vehicles 464,709 per vehicle 1,607,661 Fire Small Equipment and Gear $164.18 0.0693 No. of equipment and gear 2,369 per Firefighter 516,346 Parking Parking Spaces $280.48 0.0432 No. of spaces 6,493 per space 563,765 Parkland Development $348.56 0.0077 Acres of Parkland 45,268 per acre 700,606 Parkland Amenities $301.53 0.0044 No. of parkland amenities 68,530 per amenity 606,075 Indoor Recreation Facilities $490.09 1.9649 ft² of building area 249 per sq.ft. 985,081 Recreation Vehicles and Equipment $30.62 0.0005 No. of vehicles and equipment 61,240 per vehicle 61,546 Library Library Facilities $60.89 0.2333 ft² of building area 261 per sq.ft. 122,389 Fire Parks & Recreation Services Related to a Highway 10 Year Average Service Standard Quality (per capita) Quantity (per capita) Service Category Sub-Component Maximum Ceiling LOS SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Watson & Associates Economists Ltd. PAGE B-3 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads Unit Measure: km of roadways Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/km) Gravel Surface 61 61 59 51 50 49 46 46 46 46 $746,000 Rural Hard Surfaced 95 95 97 105 106 107 110 110 110 110 $829,000 Urban Hard Surfaced 6 6 6 6 6 6 6 6 6 6 $1,528,000 Total 162 162 162 162 162 162 162 162 162 162 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0127 0.0127 0.0127 0.0128 0.0128 0.0128 0.0128 0.0126 0.0123 0.0121 10 Year Average 2010-2019 Quantity Standard 0.0126 Quality Standard $831,643 Service Standard $10,479 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $10,479 Eligible Amount $32,955,512 Watson & Associates Economists Ltd. PAGE B-4 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Bridges & Culverts Unit Measure: Number of Bridges, Culverts & Structures Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/item) Bridges (m) 278.2 278.2 278.2 278.2 278.2 278.2 278.2 278.2 278.2 278.2 $25,300 Culverts (m) 303.9 303.9 303.9 303.9 303.9 303.9 303.9 303.9 303.9 303.9 $15,000 Total 582 582 582 582 582 582 582 582 582 582 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0456 0.0457 0.0457 0.0459 0.0459 0.0461 0.0462 0.0454 0.0444 0.0435 10 Year Average 2010-2019 Quantity Standard 0.0454 Quality Standard $19,943 Service Standard $905 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $905 Eligible Amount $2,847,483 Watson & Associates Economists Ltd. PAGE B-5 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Sidewalks Unit Measure: lin.m of sidewalks Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/m) Sidewalks (m) 11,356 11,356 11,356 11,356 11,356 11,356 12,356 13,356 14,356 15,356 $150 Total 11,356 11,356 11,356 11,356 11,356 11,356 12,356 13,356 14,356 15,356 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.89 0.89 0.89 0.90 0.90 0.90 0.98 1.04 1.09 1.15 10 Year Average 2010-2019 Quantity Standard 0.9630 Quality Standard $150 Service Standard $144 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $144 Eligible Amount $453,824 Watson & Associates Economists Ltd. PAGE B-6 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Streetlights Unit Measure: No. of Streetlights Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/item) Streetlights 313 313 313 313 313 313 313 313 313 313 $1,000 Total 313 313 313 313 313 313 313 313 313 313 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 10 Year Average 2010-2019 Quantity Standard 0.0244 Quality Standard $1,008 Service Standard $25 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $25 Eligible Amount $77,367 Watson & Associates Economists Ltd. PAGE B-7 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Depots and Domes Unit Measure: ft² of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Whites Station Works Yard - Building #1 Main Building 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600 $191 $218 Whites Station Works Yard - Building #2 Vehicles Storage 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $156 $179 Whites Station Works Yard - Building #3 Vehicles Storage 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 $156 $179 Whites Station Works Yard - Building #4 Salt Storage 3,250 3,250 3,250 3,250 3,250 3,250 3,250 3,250 3,250 3,250 $102 $120 Whites Station Works Yard - Building #5 Salt/Sand Storage 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 $102 $120 Total 44,850 44,850 44,850 44,850 44,850 44,850 44,850 44,850 44,850 44,850 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 3.5149 3.5196 3.5223 3.5396 3.5404 3.5547 3.5573 3.4971 3.4174 3.3545 10 Year Average 2010-2019 Quantity Standard 3.5018 Quality Standard $170 Service Standard $596 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $596 Eligible Amount $1,873,665 Watson & Associates Economists Ltd. PAGE B-8 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Pick-ups: Ford Ranger Supercab (1/36) 1 1 1 1 1 - - - - - $34,000 Truck #36 - 2014 Chevrolet Silverado - - - - - 1 1 1 1 1 $35,300 Dodge Dakota 4x4 Crew Cab (20) 1 1 1 1 1 1 1 - - - $43,300 Truck #20 - 2017 Dodge Ram 1500 4x4 - - - - - - - 1 1 1 $52,000 Chrysler Dakota Clubcab (2) 1 1 1 1 1 1 1 1 1 - $47,400 Truck #2 - 2019 Dodge Ram - - - - - - - - - 1 $41,800 Chevrolet Silverado (2) - - - - 1 1 1 1 1 - $33,400 Truck #13 - 2019 Ford Ranger XL - - - - - - - - - 1 $64,300 Truck #50 - Dodge Ram 1500 Crew Cab 4x4 - 1 1 1 1 1 1 1 1 $31,000 Truck #50 - 2019 Ford Ranger XL - - - - - - - - - 1 $64,300 Truck #45 - Dodge Ram 2x4 (Crew Cab) - - 1 1 1 1 1 1 1 1 $69,500 Chrysler Ram 2X4 Crewcab (3) 1 1 - - - - - - - - $69,400 Truck #53 - 2017 Dodge Ram 1500 4x4 - - - - - - 1 1 1 1 $52,000 Truck #51 - 2017 Dodge Ram 1500 4x4 - - - - - - 1 1 1 1 $35,800 Truck #3 - 2012 Dodge Ram 3500 4x4 Crew Cab - - 1 1 1 1 1 1 1 1 $65,300 Ford F250 Pickup (10) 1 1 1 1 1 1 1 1 1 1 $75,200 Chrysler Dakota Extndcab (4) 1 - - - - - - - - - $46,400 Truck #4 - Dodge Ram 1500 Crew Cab 4x4 - 1 1 1 1 1 1 1 1 1 $31,200 Ford F250 Pickup (44) 1 1 1 1 1 1 1 1 1 1 $54,200 Watson & Associates Economists Ltd. PAGE B-9 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Chrysler Ram4X4 Crewcab (16) 1 1 1 1 1 1 1 - - - $52,200 Truck #16 - 2017 Dodge Ram 1500 - - - - - - - 1 1 1 $34,800 Chrysler Dakota Crewcab (5) 1 1 1 1 1 1 - - - - $52,200 Truck #5 - 2016 Ford F250 - - - - - - 1 1 1 1 $44,500 Dodge Ram1500 Quadcab (30) 1 1 1 1 1 1 1 1 1 - $47,500 Truck #30 - 2019 Ford F250 - - - - - - - - - 1 $43,000 Ford Ranger Extndcab (6) 1 1 1 1 - - - - - - $46,100 Truck #6 Chevrolet Silverado - - - - 1 1 1 1 1 1 $38,400 Truck #9 Dodge Dakota 4x4 Crew Cab 1 1 1 1 1 1 1 - - - $36,800 Truck #9 - 2017 Dodge Ram 1500 - - - - - - - 1 1 1 $38,100 Ford Ranger Pickup (7) 1 1 1 1 - - - - - - $34,000 Truck #7 - Chevroloet Silverado - - - - 1 1 1 1 1 1 $38,200 Dodge Rpc Pickup (39) 1 - - - - - - - - - $44,800 Truck 39 - Dodge Ram 1500 Reg Cab 4x2 - 1 1 1 1 1 1 1 1 1 $25,800 Ford F450 Superduty (34) 1 1 1 - - - - - - - $66,000 Truck #34 - Ford F550 Boom Truck - - - 1 1 1 1 1 1 1 $144,900 Dodge Ram3500 1Ton (10) 1 1 1 1 1 - - - - - $62,500 Truck #10 - 2015 Ford F350 - - - - - 1 1 1 1 1 $49,400 Ford F350 Supercab (8) 1 1 1 1 1 1 - - - - $68,100 Truck #8 - 2016 Ford F250 - - - - - - 1 1 1 1 $23,000 Truck 12 - Dodge 3500 4x2 1 1 1 1 - - - - - - $50,100 Truck #12 - 2019 Dodge Ram RTR - - - - - - - - - 1 $47,400 Truck #49 - Ford F350 (1 ton Dual) 1 1 1 1 1 1 - - - - $66,300 Truck # 49 - 2017 Dodge Ram 1500 4x4 - - - - - - 1 1 1 1 $33,700 Ford F350 1 Ton dual (14) 1 1 1 - - - - - - - $66,800 Watson & Associates Economists Ltd. PAGE B-10 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Truck #14 - Ford F550 4x2 Super Crew - - - 1 1 1 1 1 1 1 $72,900 Ford Econoline Van (38) 1 1 1 1 1 - - - - - $53,000 Truck #38 - 2015 Ford F250 4x4 - - - - - 1 1 1 1 1 $64,700 Ford Escape Hybrid (1) 1 1 1 1 - - - - - - $53,800 Truck #1 - GMC Terrain - - - - 1 1 1 1 1 1 $34,200 Truck #46 - 2013 Ford F150 4x4 S - - - 1 1 1 1 1 1 1 $31,600 Truck #48 - 2013 Ford F150 4x4 S - - - 1 1 1 1 1 1 1 $30,700 Truck #54 - 2016 Ford F250 - - - - - - 1 1 1 1 $36,900 Dumps and Trucks: Freightliner 5 Ton Single Axle, "U" body Box 1 1 1 1 1 1 1 1 1 1 $287,300 International Tandem 1 1 1 1 1 1 1 1 1 1 $317,800 Sterling Tandem Axle Dump, "U" body Box 1 1 1 1 1 1 1 1 1 1 $363,500 Sterling Tandem Axle Dump, "U" body Box 1 1 1 1 1 1 1 1 1 1 $345,900 Freightliner 5 Ton Single Axle, "U" body Box 1 1 1 1 1 1 1 1 1 1 $296,700 Sterling Tandem Axle Dump, "U" body Box 1 1 1 1 1 1 1 1 1 1 $378,800 Sterling Tandem Axle Dump, "U" body Box 1 1 1 1 1 1 1 1 1 1 $363,500 Sterling Single Actera 1 1 1 1 1 1 1 1 1 1 $266,200 Volvo Tandem 1 1 1 1 1 1 1 1 1 1 $317,800 Truck #11 - 2015 International P - - - - - - 1 1 1 1 $182,200 Truck #15 - 2012 Freightliner M2 - - - 1 1 1 1 1 1 1 $247,300 Truck #17 - 2004 Sterling LT 950 1 1 1 1 1 1 1 1 1 1 $346,000 Watson & Associates Economists Ltd. PAGE B-11 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Truck #18 - 2010 International 7 - 1 1 1 1 1 1 1 1 1 $338,500 Truck #19 - 2009 Volvo VHD 64F20 1 1 1 1 1 1 1 1 1 1 $305,900 Truck #33 - 2014 International - - - - 1 1 1 1 1 1 $235,300 Truck #35 - 2016 International - - - - - - 1 1 1 1 $234,400 Truck #37 - 2018 International 7 - - - - - - 1 1 1 $336,400 Truck #40 - 2015 International 7 - - - - - - 1 1 1 1 $288,600 Truck #56 - 1996 Ford/Elgin Sweeper - - - - - - - 1 1 1 $22,500 Graders: Champion Model 740 Grader 1993 1 1 1 1 1 1 1 1 1 1 $253,300 Caterpillar Model 140H Grader 1 1 1 1 1 1 1 1 1 1 $483,200 Tractor/Backhoes/Loaders: Tractor #26 Ford 5610 4x4 Tractor 1 1 1 1 1 1 1 1 1 1 $89,100 Case 590SN Backhoe (23) 1 1 1 1 1 1 1 1 1 1 $133,700 Tiger Flail Mower 1 1 1 1 1 1 1 1 1 1 $12,900 Bomford Mower - - - - - - 1 1 1 1 $49,600 Tractor #55 - 2016 John Deere 61 - - - - - - 1 1 1 1 $31,700 $0 John Deere 1070 Tractor (Parks) 1 1 1 1 1 1 1 1 1 1 $31,700 Tractor # 31 2018 Kubota 37 HP L - - - - - - - - 1 1 $44,900 New Idea Disc Mower 1 1 1 1 1 1 1 1 1 1 $5,200 Mott Knife Mower 1 1 1 1 1 1 1 1 1 1 $6,400 New Holland TC 30 1 1 1 1 1 1 1 1 1 1 $6,300 John Deere LT 155 1 1 1 1 1 1 1 1 1 1 $46,900 John Deere 2510 1 1 1 1 1 1 1 1 1 1 $44,600 John Deere 410 L 1 1 1 1 1 1 1 1 1 1 $171,400 Watson & Associates Economists Ltd. PAGE B-12 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) John Deere 430 (Loader) $8,200 Loader: John Deere 544K 1 1 1 1 1 1 1 1 1 1 $182,700 Varmeer Vac Unit 1 1 1 1 1 1 1 1 1 1 $156,000 Salt and Sand Spreader 1 1 1 1 1 1 1 1 1 1 $8,100 Miscellaneous: Trackless Sidewalk Plow (28) (snow blower, broom, sander) 1 1 1 1 1 1 1 1 1 1 $151,300 Trackless #28 2018 MT7 Off-Road Vehic - - - - - - - - 1 1 $147,900 Trackless Sidewalk Plow (47) (snow blower, broom, sander) 1 1 1 1 1 1 1 1 1 1 $191,800 Bomag BW 212D-2 - 10.5 Vibratory Packer 1 1 1 1 1 1 1 1 1 1 $139,600 Ingersoll Rand Compressor 1 1 1 1 1 1 1 1 1 1 $31,700 Beach Cleaner 1 1 1 1 1 1 1 1 1 1 $116,100 Vermeer Brush Chipper 1 1 1 1 1 1 1 1 1 1 $82,100 Vermeer Brush Chipper 1 1 1 1 1 1 1 1 1 1 $66,800 Arctic Snowplow 1 - - - - - - - - - $9,500 Walco Scraper Blade - 1 1 1 1 1 1 1 1 1 $1,200 Champion Windrow Eliminator 1 1 1 1 1 $16,400 Champion Windrow Eliminator 1 1 1 1 1 1 1 1 1 1 $16,400 Zodiak 14ft Life Boat w 50hp Merc Engine 1 1 1 1 1 1 1 1 1 1 $31,700 2TINGA Rescue boat with 60hp Engine 1 1 1 1 1 1 1 1 1 1 $29,300 Zodiac RIB 24 Foot Rescue Boat 1 1 1 1 1 1 1 1 1 1 $62,100 Honda 5000w Generator 1 1 1 1 1 1 1 1 1 1 $5,000 Watson & Associates Economists Ltd. PAGE B-13 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Roads and Related Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Trailking TK40LP Float Trailer 1 1 1 1 1 1 1 1 1 1 $31,700 Trailer # 41-2015 20T Tag Trailer 1 1 1 1 1 1 1 1 1 1 $29,200 Trailer #70, 2015 Miska 5 Tonne - - - - - 1 1 1 1 1 $6,200 Intruder Road Clipper Trailer - - - - - 1 1 1 1 1 $2,300 Intruder Competition Trailer 1 1 1 1 1 1 1 1 1 1 $3,700 John Deere HPX Gator - - - - 1 1 1 1 1 1 $17,300 Water Valve Exercising Trailer - 1 1 1 1 1 1 1 1 1 $72,400 Truck #57 - 2019 Freightliner EX WASTE - - - - - - - - - 1 $420,400 Truck #58 - 2019 FREIGHTLINER EX WASTE - - - - - - - - - 1 $420,400 Total 64 67 68 71 73 76 84 86 88 91 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0050 0.0053 0.0053 0.0056 0.0058 0.0060 0.0067 0.0067 0.0067 0.0068 10 Year Average 2010-2019 Quantity Standard 0.0060 Quality Standard $113,728 Service Standard $682 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $682 Eligible Amount $2,146,054 Watson & Associates Economists Ltd. PAGE B-14 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Fire Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Belmont Firehall 2,800 2,800 2,800 2,800 2,800 4,270 4,270 4,270 4,270 4,270 $250 $296 Port Stanley Firehall 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 $250 $296 Union Firehall 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 $250 $296 Yarmouth Centre Firehall 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012 $250 $296 Yarmouth Training Room - - - - - - - - - 3,392 $47 $47 Total 13,912 13,912 13,912 13,912 13,912 15,382 15,382 15,382 15,382 18,774 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 1.0903 1.0917 1.0926 1.0979 1.0982 1.2191 1.2200 1.1994 1.1721 1.4042 10 Year Average 2010-2019 Quantity Standard 1.1686 Quality Standard $291 Service Standard $340 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $340 Eligible Amount $1,067,979 Watson & Associates Economists Ltd. PAGE B-15 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Fire Vehicles Unit Measure: No. of vehicles Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Port Stanley Pump 11 1 1 1 1 1 1 1 1 1 1 $683,000 Pump 12 1 1 1 1 1 1 1 1 1 - $492,000 Rescue 14 1 1 1 1 1 1 1 1 1 1 $276,000 E-One Cyclone Aerial 1 - - - - - - - - - 1 $1,700,000 Zodiak MR1 - - - - - - 1 1 1 1 $300,000 Sea Doo MR2 - - - - - - - 1 1 1 $12,000 Union Pump 21 1 1 1 1 1 1 1 1 1 1 $683,000 Pumper/Tanker 22 1 1 1 1 1 1 1 1 1 1 $442,000 Rescue 23 1 1 1 1 1 1 1 1 1 1 $442,000 Yarmouth Centre Pump 31 - - - - - - - - - 1 $683,000 Pumper/Tanker 32 1 1 1 1 1 1 1 1 1 1 $369,000 Rescue 33 1 1 1 1 1 1 1 1 1 1 $591,000 Belmont Station Pump 41 1 1 1 1 1 1 1 1 1 1 $683,000 Pumper/Tanker 42 1 1 1 1 1 1 1 1 1 1 $497,000 Rescue 43 1 1 1 1 1 1 1 1 1 1 $353,000 FPO'S Truck (Car - 2) 1 1 1 1 1 1 1 1 1 1 $50,000 Other Spare (Old Pump 31) 1 1 1 1 1 1 1 1 1 1 $683,000 Total 13 13 13 13 13 13 14 15 15 16 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0011 0.0012 0.0011 0.0012 10 Year Average 2010-2019 Quantity Standard 0.0011 Quality Standard $464,709 Service Standard $511 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $511 Eligible Amount $1,607,661 Watson & Associates Economists Ltd. PAGE B-16 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Fire Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/item) Firefighter Bunker Gear (Pants/Coat) 100 100 100 100 100 100 100 100 100 120 $2,500 Boots 100 100 100 100 100 100 100 100 120 120 $300 Helmets 100 100 100 100 100 100 100 100 120 120 $300 Gloves 100 100 100 100 100 100 100 100 120 120 $100 Nomex Balaclava 100 100 100 100 100 100 100 100 120 120 $100 Pass Alarms 40 40 40 40 40 40 40 40 40 40 $1,100 Pagers 120 120 120 120 120 120 120 120 120 120 $600 Portable Radios 10 10 10 10 10 10 10 10 10 55 $4,600 Mobile Radios 17 17 17 17 17 17 17 17 17 17 $2,900 Carbon Monoxide Detectors 4 4 4 4 4 4 4 4 4 4 $1,600 Multi Gas Detectors 1 1 1 1 1 1 1 1 1 5 $5,800 Chainsaws 4 4 4 4 4 4 4 4 4 4 $800 Cut Off Saws 4 4 4 4 4 4 4 4 4 4 $800 Defib Units 4 4 4 4 4 4 4 4 4 5 $11,100 Medical Kits 5 5 5 5 5 5 5 5 5 6 $3,700 Extrication Set 3 3 3 3 3 3 3 3 3 5 $37,400 Generators 5 5 5 5 5 5 5 5 5 5 $4,200 Portable Pumps 5 5 5 5 5 5 5 5 5 5 $5,100 Positive Pressure Fan 4 4 4 4 4 4 4 4 4 4 $3,800 SCBA 47 47 47 47 47 47 47 47 47 47 $11,000 SCBA Bottles 43 43 43 43 43 43 43 60 60 60 $1,100 Water Rescue Equipment 2 2 2 2 2 2 2 2 2 2 $8,200 Tower Site - Bellmont 1 1 1 1 1 1 1 1 1 1 $49,200 Tower Site - Port Stanley 1 1 1 1 1 1 1 1 1 1 $49,200 Tower Sites - Union 1 1 1 1 1 1 1 1 1 1 $49,200 Tower Site - Yarmouth 1 1 1 1 1 1 1 1 1 1 $49,200 Tower Site Repeaters - Bellmont 1 1 1 1 1 1 1 1 1 1 $16,400 Tower Site Repeaters - Fruitridge Line 1 1 1 1 1 1 1 1 1 1 $16,400 Tower Site Repeaters - on Port Stanley Water Tower 1 1 1 1 1 1 1 1 1 1 $16,400 Watson & Associates Economists Ltd. PAGE B-17 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Fire Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/item) Thermal Cameras 4 4 4 4 4 4 4 4 4 4 $9,900 Porta Tanks 5 5 5 5 5 5 5 5 5 5 $2,500 Gas Monitors 5 5 5 5 5 5 5 5 5 5 $6,500 Water Rescue Kit 1 1 1 1 1 1 1 1 1 1 $37,400 Confined Space Equipment 1 1 1 1 1 1 1 1 1 1 $1,100 Boat Lift MR1 1 1 1 $6,600 Stretcher basket - - - - - 1 1 1 1 1 $1,800 Ball valve w/ pressure relief - - - - - 2 2 2 2 2 $2,900 Camera and Kit - - - - - 1 1 1 1 1 $18,900 Key proflow - - - - - 14 14 14 14 14 $7,400 Pump/house couplings - - - - - 1 1 1 1 1 $4,100 Dry Hydrant - - - - - 1 1 1 1 1 $10,600 Hose - - - - - 1 1 1 1 1 $200 Sure grip wrench - - - - - 1 1 1 1 1 $1,100 Imperial Ice Suits - - - - - 8 8 8 8 8 $8,300 Auto Crib Set - - - - - 2 2 2 2 3 $5,300 Cascade 2 2 2 2 2 2 3 3 3 3 $83,100 Total 843 843 843 843 843 875 876 894 974 1,048 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0661 0.0662 0.0662 0.0665 0.0665 0.0694 0.0695 0.0697 0.0742 0.0784 10 Year Average 2010-2019 Quantity Standard 0.0693 Quality Standard $2,369 Service Standard $164 D.C. Amount (before deductions) 2036 Forecast Population 3,145 $ per Capita $164 Eligible Amount $516,346 Watson & Associates Economists Ltd. PAGE B-18 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Parking Spaces Unit Measure: No. of spaces Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/space) Gravel Surface 450 450 450 450 450 450 450 450 450 450 $6,300 Hard Surface 96 96 96 96 96 96 96 96 136 136 $7,300 Total 546 546 546 546 546 546 546 546 586 586 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 10 Year Average 2010-2019 Quantity Standard 0.0432 Quality Standard $6,493 Service Standard $280 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $280 Eligible Amount $563,765 Watson & Associates Economists Ltd. PAGE B-19 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Acre) Union Ball Diamond (Millpond Lane) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 $45,000 Sparta Ball Diamond (Sparta Ln) 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 $45,000 Belmont Arena (Belmont Rd) 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 $45,000 Recreational Sports Club (Elizabeth St.) 0.1 0.1 0.1 0.1 0.1 - - - - - $45,000 Municipal Park (Colborne W/S) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 $45,000 Municipal Park (Bridge S/S) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $45,000 Municipal Park (Carlow Rd) Lions Landing 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 $45,000 Stanley Park 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $45,000 Erie Rest Beach (Edith Cavell S/S) 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 $45,000 Main Beach (Edith Cavell S/S) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 $45,000 Pumphouse Beach (Edith Cavell S/S) 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 $45,000 Little Beach (Edith Cavell S/S) 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 $45,000 Vacant land (William W/S) 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 $45,000 Beamish St. Park 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $45,000 Eastwood Park 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 $45,000 Lawton Park 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 $45,000 Stone Church Parkette 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 $45,000 Turvey Park 24.2 24.2 24.2 25.7 25.7 25.7 25.7 25.7 25.7 25.7 $45,000 Union St. Park 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 $45,000 Craigeholme Park 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 $45,000 Little Creek Park - - 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 $45,000 Hofhuis Park - - - - - 6.0 6.0 6.0 6.0 6.0 $50,000 Whittle Beach 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 $45,000 Total 93.1 93.1 95.3 96.8 96.8 102.8 102.8 102.8 102.8 102.8 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0073 0.0073 0.0075 0.0076 0.0076 0.0081 0.0082 0.0080 0.0078 0.0077 10 Year Average 2010-2019 Quantity Standard 0.0077 Quality Standard $45,268 Service Standard $349 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $349 Eligible Amount $700,606 Watson & Associates Economists Ltd. PAGE B-20 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/item) Ball Diamond Lights 21 21 21 21 21 21 21 21 21 21 $7,500 Ball Diamond Backstops 5 5 5 5 5 5 5 5 5 5 $6,300 Ball Diamond Fence (5 parks - 14,560 ft) 5 5 5 5 5 5 5 5 5 5 $33,400 Creative Playground 11 11 12 12 13 13 13 13 13 14 $60,000 Multi Purpose Courts 2 2 3 3 4 4 4 4 4 5 $79,400 Skate Park 1 1 1 1 2 2 2 2 2 2 $117,300 Splash Pads - - - - 1 1 1 1 1 1 $293,800 Soccer Pitches (Full Size Unlit) 8 8 8 8 8 8 8 8 8 2 $285,000 Total 53 53 55 55 59 59 59 59 59 55 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0042 0.0042 0.0043 0.0043 0.0047 0.0047 0.0047 0.0046 0.0045 0.0041 10 Year Average 2010-2019 Quantity Standard 0.0044 Quality Standard $68,530 Service Standard $302 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $302 Eligible Amount $606,075 Watson & Associates Economists Ltd. PAGE B-21 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Indoor Recreation Facilities Unit Measure: ft² of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Belmont Ball Park Concession Building 2,320 2,320 2,320 2,320 2,320 2,320 2,320 2,320 2,320 2,320 $252 $285 Selbourne Park Concession Building 668 668 668 668 668 668 668 668 668 668 $293 $330 Union Park Concession Building 544 544 544 544 - - - - - - $293 $330 Sparta Park Concession Building 495 495 495 495 495 495 495 495 495 495 $294 $331 Belmont Community Centre and Arena 10,544 10,544 10,544 10,544 10,544 10,544 10,544 10,544 10,544 10,544 $226 $256 Port Stanley Arena 8,320 8,320 8,320 8,320 8,320 8,320 8,320 8,320 8,320 8,320 $226 $256 Main Beach Washrooms and Changehouse 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 $127 $127 Total 25,491 25,491 25,491 25,491 24,947 24,947 24,947 24,947 24,947 24,947 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 1.9977 2.0004 2.0020 2.0118 1.9693 1.9773 1.9787 1.9452 1.9009 1.8659 10 Year Average 2010-2019 Quantity Standard 1.9649 Quality Standard $249 Service Standard $490 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $490 Eligible Amount $985,081 Watson & Associates Economists Ltd. PAGE B-22 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Value ($/Vehicle) Belmont Arena Ice Resurfacer 1 1 1 1 1 1 1 1 1 1 $100,000 Port Stanley Arena Ice Resurfacer 1 1 1 1 1 1 1 1 1 1 $100,000 Floor Scrubber 2 2 2 2 2 2 2 2 2 2 $6,700 3/4 Tonne Pickup 2 2 2 2 2 2 2 2 2 2 $46,900 Beach Cleaner 1 1 1 1 1 1 1 1 1 1 $85,000 Total 7 7 7 7 7 7 7 7 7 7 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.0005 0.0005 0.0005 0.0006 0.0006 0.0006 0.0006 0.0005 0.0005 0.0005 10 Year Average 2010-2019 Quantity Standard 0.0005 Quality Standard $61,240 Service Standard $31 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $31 Eligible Amount $61,546 Watson & Associates Economists Ltd. PAGE B-23 H:\Central Elgin\2020 DC\Report\Report.docx Municipality of Central Elgin Service Standard Calculation Sheet Service: Library Facilities Unit Measure: ft² of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Bld'g Value ($/sq.ft.) Value/sq.ft . with land, site works, etc. Belmont Library 2,048 2,048 2,048 2,048 2,048 2,048 4,428 4,428 4,428 4,428 $230 $261 Total 2,048 2,048 2,048 2,048 2,048 2,048 4,428 4,428 4,428 4,428 Population 12,760 12,743 12,733 12,671 12,668 12,617 12,608 12,825 13,124 13,370 Per Capita Standard 0.1605 0.1607 0.1608 0.1616 0.1617 0.1623 0.3512 0.3453 0.3374 0.3312 10 Year Average 2010-2019 Quantity Standard 0.2333 Quality Standard $261 Service Standard $61 D.C. Amount (before deductions) 10 Year Forecast Population 2,010 $ per Capita $61 Eligible Amount $122,389 Watson & Associates Economists Ltd. PAGE C-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix C: Long-Term Capital and Operating Cost Examination Municipality of Central Elgin Annual Capital and Operating Cost Impact As a requirement of the D.C.A. under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the D.C. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost saving attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e. sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the Municipality's approved 2018 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as life cycle cost. By definition, life cycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for life cycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. The following factors were utilized to calculate the annual replacement cost of the capital projects (annual contribution = factor X capital asset cost) and are based on an annual growth rate of 2% (net of inflation) over the average useful life of the asset: Table C-1 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while Municipality Average Useful Life Factor Water and Wastewater Infrastructure 80 0.00516071 Facilities 40 0.01655575 Roads 20 0.04115672 Parkland Development 30 0.02464992 Vehicles 10 0.09132653 Fire Vehicles 15 0.05782547 Small Equipment and Gear 10 0.09132653 Asset Lifecycle Cost Factors Watson & Associates Economists Ltd. PAGE C-3 H:\Central Elgin\2020 DC\Report\Report.docx program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e. facilities) would be delayed until the time these works are in place. Table C-1 Municipality of Central Elgin Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE GROSS COST LESS BENEFIT TO EXISTING ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Water Services 1.1 Treatment, storage and distribution systems 1,033,827 34,703 11,666 46,369 2. Wastewater Services 2.1 Treatment plants & Sewers 19,486,373 438,574 11,514 450,088 3. Administration Studies - Urban 3.1 Urban Area Related Studies 200,000 - - 4. Services Related to a Highway 4.1 PW Rolling Stock 370,000 33,333 290,895 324,228 4.2 Roads and Related 1,112,251 97,581 1,189,666 1,287,247 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 3,382,891 1,775 512,602 514,377 6. Parks and Recreation Services 6.1 Recreation facilities, vehicles and equipment 4,426,549 226,501 219,713 446,214 7. Library Services 7.1 Library facilities 112,285 5,144 5,144 8. Administration 8.1 Studies 849,798 - - Total 30,973,975 832,467 2,241,198 3,073,665 Watson & Associates Economists Ltd. PAGE D-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997 (D.C.A.) requires development charge collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the Act provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes, although only 100% eligible and 90% eligible services may be combined (minimum of two reserve funds). - The municipality shall pay each development charge it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2-8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be as an interim financing source for capital undertakings for which development charges may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law(s) and reserve funds. This statement must be made available to the public and may be requested to be forwarded to the Minister of Municipal Affairs and Housing. The D.C.A. does not prescribe how the statement is to be made available to the public. We would recommend that a resolution of Council make the statement available on the municipality's website or upon request. Subsection 43 (2) and O. Reg. 82/98 prescribes the information that must be included in the Treasurer's statement, as follows: - opening balance; Watson & Associates Economists Ltd. PAGE D-3 H:\Central Elgin\2020 DC\Report\Report.docx - closing balance; - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g. collections, draws) including each assets capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e. non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by development charges, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project. - amounts borrowed, purpose of the borrowing and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at beginning of the year, given in the year and outstanding at the end of the year by holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Based upon the above, Figure 1, and Attachments 1 and 2, set out the format for which annual reporting to Council should be provided. D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 8 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a development charge may be spent. Watson & Associates Economists Ltd. PAGE D-4 H:\Central Elgin\2020 DC\Report\Report.docx Figure 1 Municipality of Central Elgin Annual Treasurer's Statement of D.C. Reserve Funds Services to which the Development Charge Relates Description Services Related to a Highway Fire Protection Services Wastewater Water Administration Studies (urban) Parks and Recreation Services Library Services Administration Opening Balance, January 1, ________ 0 Plus: Development Charge Collections 0 Accrued Interest 0 Repayment of Monies Borrowed from Fund and Associated Interest1 0 Sub-Total 0 0 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 0 Amounts Refunded 0 Amounts Loaned to Other D.C. Service Category for Interim Financing 0 Credits3 0 Sub-Total 0 0 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Total Non-Discounted Services - Municipal Wide Non-Discounted Services - Urban Area Discounted Services Watson & Associates Economists Ltd. PAGE D-5 H:\Central Elgin\2020 DC\Report\Report.docx Attachment 1 Municipality of Central Elgin Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period Capital Fund Transactions Gross Capital Cost D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reser ve Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-6 H:\Central Elgin\2020 DC\Report\Report.docx Attachment 2 Municipality of Central Elgin Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE E-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix E: Local Service Policy Municipality of Central Elgin General policy guidelines on development charge and local service funding for road related, stormwater management, water and sanitary sewer works 1. Collector Roads 1.1 Collector roads internal to development - Direct developer responsibility under s. 59 of the D.C.A. (as a local service). 1.2 Collector roads external to development - Include in D.C. calculation to the extent permitted under s. 5 (1) of the D.C.A. (dependent on local circumstances). 1.3 Stream crossing and rail crossing road works, excluding underground utilities but including all other works within lands to be dedicated to the Central Elgin or rail corridors - Include in D.C. calculation to the extent permitted under s. 5 (1) of the D.C.A. (dependent on local circumstances). 2. Traffic Signals 2.1 Traffic signalization, including control systems, within or external to development - Direct developer responsibility under s. 59 of D.C.A. (as a local service). 3. Intersection Improvements 3.1 New roads (collector and arterial) and road (collector and arterial) improvements - Include as part of road costing noted in item 1, to limits of right-of-way. 3.2 Intersections improvements within specific developments and all works necessary to connect to entrances (private and specific subdivision) to the roadway - Direct developer responsibility under s. 59 of D.C.A. (as a local service). Watson & Associates Economists Ltd. PAGE E-3 H:\Central Elgin\2020 DC\Report\Report.docx 3.3 Intersection improvements on other roads due to development growth increasing traffic - Include in D.C. calculation. 4. Streetlights 4.1 Streetlights on external roads - Include in area municipal D.C. calculations (linked to collector road funding source in item 1). 4.2 Streetlights within specific developments - Direct developer responsibility under s. 59 of D.C.A. (as a local service). 5. Sidewalks 5.1 Sidewalks on MTO and county roads - Include in area municipal D.C. or, in exceptional circumstances, may be local improvement or direct developer responsibility through local service provisions (s. 59 of D.C.A.). 5.2 Sidewalks on area municipal roads - Linked to collector road funding source in item 1. 5.3 Other sidewalks external to development (which are a local service within the area to which the plan relates) - Direct developer responsibility as a local service provision (under s. 59 of D.C.A.). 6. Bike Routes/Bike Lanes/Bike Paths/Multi-Use Trails/Naturalized Walkways 6.1 Bike routes and bike lanes, within road allowance, external to development - Include in D.C. road costs (county and area municipal), consistent with the service standard provisions of the D.C.A., s. 5 (1). 6.2 Bike paths/multi-use trails/naturalized walkways external to development - Include in area municipal D.C.s consistent with the service standard provisions of the D.C.A., s. 5 (1). 6.3 Bike lanes, within road allowance, internal to development - Direct developer responsibility under s. 59 of the D.C.A. (as a local service). 6.4 Bike paths/multi-use trails/naturalized walkways internal to development - Direct developer responsibility under s. 59 of the D.C.A. (as a local service). Watson & Associates Economists Ltd. PAGE E-4 H:\Central Elgin\2020 DC\Report\Report.docx 6.5 Trail Bridges/Underpasses and associated works - Include in area municipal D.C. calculations consistent with the service standard provisions of the D.C.A., s. 5 (1). 7. Noise Abatement Measures 7.1 Internal to Development - Direct developer responsibility though local service provisions (s. 59 of D.C.A.). 8. Traffic Control Systems 8.1 Include in the D.C. calculation 9. Land Acquisition for Road Allowances 9.1 Land acquisition for arterial roads - Dedication under the Planning Act subdivision provisions (s. 51) through development lands; in areas with limited or no development, include in county or area municipal D.C. calculations (to the extent eligible). 9.2 Land acquisition for collector roads - Dedication under the Planning Act subdivision provision (s. 51) through development lands (up to 27 metre right-of-way); in areas with limited or no development, include in area municipal D.C. calculations (to the extent eligible). 9.3 Land acquisition for grade separations (beyond normal dedication). 10. Land Acquisition for Easements 10.1 Easement costs external to subdivisions - Included in the D.C. calculation. 11. Storm Water Management 11.1 Quality and quantity works - Direct developer responsibility through local service provisions (s. 59 of the D.C.A.). 12. Water 12.1 Pumping stations and reservoirs - Included in the D.C. calculations. Watson & Associates Economists Ltd. PAGE E-5 H:\Central Elgin\2020 DC\Report\Report.docx 12.2 Water transmission mains with limited service connections and external to subdivisions - Included in the D.C. calculations. 12.3 Marginal costs of waterworks within the subdivision - Included in the D.C. calculations 250 mm and above nominal diameter. 12.4 Connections to trunk mains and pumping stations to service specific areas - Direct developer responsibility. 13. Sanitary Sewer 13.1 Pumping stations and forcemains - Included in the D.C. calculations. 13.2 Sanitary sewer trunk mains upstream from pump stations and external to subdivisions - Included in the D.C. calculations. 13.3 Connections to trunk mains and pumping stations to service specific areas - Direct developer responsibility. 13.4 Marginal costs of sanitary sewer works within the subdivision, which benefits upstream developers - Included in the D.C. calculations from 300 mm and above Watson & Associates Economists Ltd. PAGE F-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix F: Asset Management Plan The recent changes to the D.C.A. (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the Regulations was amended to include subsections (2), (3) and (4) which set out for specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time thus requiring the municipality to define the approach to include within the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset through its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which are to be completed by 2021 for core municipal services and 2023 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 H:\Central Elgin\2020 DC\Report\Report.docx Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE F-4 H:\Central Elgin\2020 DC\Report\Report.docx made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the Municipality prepared an A.M.P. in 2013 for its existing assets, however, did not take into account future growth-related assets. As a result, the asset management requirement for the D.C. must be undertaken in the absence of this information. In recognition to the schematic above, the following table (presented in 2020 $) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C.-eligible capital costs are not included in the Municipality's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects which will require financing from municipal financial resources (i.e. taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2020 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are $3.28 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are $3.28 million. This amount, totalled with the existing operating revenues of $29.49 million, provide annual revenues of $32.77 million by the end of the period. Watson & Associates Economists Ltd. PAGE F-5 H:\Central Elgin\2020 DC\Report\Report.docx 6. In consideration of the above, the capital plan is deemed to be financially sustainable. Municipality of Central Elgin Asset Management - Future Expenditures and Associated Revenues 2020$ 2036 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 204,373 Annual Debt Payment on Post Period Capital2 198,671 Lifecycle: Annual Lifecycle - Town Wide Services $359,190 Annual Lifecycle - Area Specific Services3 $473,277 Sub-Total - Annual Lifecycle $832,467 Incremental Operating Costs (for D.C. Services) $2,241,198 Total Expenditures $3,278,038 Revenue (Annualized) Total Existing Revenue4 $29,494,460 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $3,279,637 Total Revenues $32,774,097 4 As per Sch. 10 of FIR 3 All infastructure costs included in Area Specifc by-laws have been included 1 Non-Growth Related component of Projects including 10% mandatory deduction on soft services 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 H:\Central Elgin\2020 DC\Report\Report.docx Appendix G Proposed D.C. By-law Watson & Associates Economists Ltd. PAGE G-2 H:\Central Elgin\2020 DC\Report\Report.docx Appendix G: Proposed D.C. By-law THE CORPORATION OF THE MUNICIPALITY OF CENTRAL ELGIN BY-LAW NUMBER ____ A by-law to establish development charges for the Corporation of the Municipality of Central Elgin WHEREAS subsection 2(1) of the Development Charges Act, 1997 c. 27 (hereinafter called "the Act") provides that the council of a municipality may pass by-laws for the imposition of development charges against land for increased capital costs required because of the need for services arising from development in the area to which the by- law applies; AND WHEREAS the Council of The Corporation of the Municipality of Central Elgin ("the Municipality") has given Notice in accordance with section 12 of the Development Charges Act, 1997, of its intention to pass a by-law under section 2 of the said Act; AND WHEREAS the Council of the Municipality has heard all persons who applied to be heard no matter whether in objection to, or in support of, the development charge proposal at a public meeting held on April 27, 2020; AND WHEREAS the Council of the Municipality had before it a report entitled Development Charges Background Study, dated March 25, 2020 prepared by Watson & Associates Economists Ltd., wherein it is indicated that the development of any land within the Municipality will increase the need for services as defined herein; AND WHEREAS the Council of the Municipality on May 25, 2020 approved the applicable Development Charges Background Study, dated March 25, 2020, in which certain recommendations were made relating to the establishment of a development charge policy for the Municipality of Central Elgin pursuant to the Development Charges Act, 1997; AND WHEREAS the Council of the Municipality on May 25, 2020 determined that no additional public meeting was required. NOW THEREFORE THE COUNCIL OF THE MUNICIPALITY OF CENTRAL ELGIN ENACTS AS FOLLOWS: DEFINITIONS 1. In this by-law, (1) "Act" means the Development Charges Act, S.O. 1997, c. 27; Watson & Associates Economists Ltd. PAGE G-3 H:\Central Elgin\2020 DC\Report\Report.docx (2) "Administration Service" means any and all studies carried out by the municipality that are with respect to eligible services for which a development charge by-law may be imposed under the Development Charges Act, 1997; (3) "Apartment dwelling" means a building containing three or more dwelling units, each of which has an entrance through a common hall, common vestibule or other common entrance. This includes a stacked townhouse; (4) "Back-to-back townhouse" means a building containing more than two dwelling units separated vertically by a common wall, including a rear common wall, that do not have rear yards; (5) "Bedroom" means a habitable room larger than seven square metres, including a den, study, or other similar area, but does not include a living room, dining room or kitchen; (6) "Board of education" means a board defined in s.s. 1(1) of the Education Act; (7) "Bona fide farm uses" means the proposed development will qualify as a farm business operating with a valid Farm Business Registration Number issued by the Ontario Ministry of Agriculture, Food and Rural Affairs and be assessed in the Farmland Realty Tax Class by the Ontario Property Assessment Corporation, but excludes uses related to marijuana; (8) "Building Code Act" means the Building Cade Act, R.S.O. 1990, c.B.-13, as amended; (9) "Capital cost" means costs incurred or proposed to be incurred by the municipality or a local board thereof directly or by others on behalf of, and as authorized by, the municipality or local board, (a) to acquire land or an interest in land, including a leasehold interest; (b) to improve land; (c) to acquire, lease, construct or improve buildings and structures; (d) to acquire, lease, construct or improve facilities, (e) to undertake studies in connection with any of the matters referred to in clauses (a) to (d); (f) to complete the development charge background study under section 10 of the Act; Watson & Associates Economists Ltd. PAGE G-4 H:\Central Elgin\2020 DC\Report\Report.docx (g) interest on money borrowed to pay for costs in (a) to (d); required for provision of services designated in this by-law within or outside the municipality. (9) "Council" means the Council of The Corporation of the Municipality of Central Elgin; (10) "Corporation" means The Corporation of the Municipality of Central Elgin; (11) "Development" means any activity or proposed activity in respect of land that requires one or more of the actions referred to in section 6 of this by- law and including the redevelopment of land or the redevelopment, expansion, extension or alteration of a use, building or structure except interior alterations to an existing building or structure which do not change or intensify the use of land; (12) "Development charge" or "Development charges" means a charge imposed against land to pay for increased capital costs required because of increased needs for services arising from development of the area to which this by-law; (13) "Dwelling unit" means one or more habitable rooms occupied or designed to be occupied by one or more persons as an independent and separate housekeeping establishment in which separate kitchen and sanitary facilities are provided for the use of such person or persons; (14) "Existing industrial building" means a building or buildings existing on a site in the Municipality of Central Elgin on May 26, 2010 or the buildings or structures constructed and occupied on a vacant site pursuant to site plan approval under section 41 of the Planning Act, R.S.O. 1990, c. P. 13 (the "Planning Act") subsequent to May 26, 2010 for which full development charges were paid, and is used for or in connection with, (a) the production, compounding, processing, packaging, crating, bottling, packaging or assembling of raw or semi-processed goods or materials ("manufacturing") in not less than seventy-five per cent of the total gross floor area of the building or buildings on a site ("manufacturing") or warehousing related to the manufacturing use carried on in the building or buildings, (b) research or development in connection with manufacturing in not less than seventy-five per cent of the total gross floor area of the building or buildings on a site, Watson & Associates Economists Ltd. PAGE G-5 H:\Central Elgin\2020 DC\Report\Report.docx (c) retail sales by a manufacturer, if the retail sales are at the site where the manufacturing is carried out, such retail sales are restricted to goods manufactured at the site, and the building or part of a building where such retail sales are carried out does not constitute greater than twenty-five per cent of the total gross floor area of the building or buildings on the site, or (d) office or administrative purposes, if they are, (i) carried out with respect to the manufacturing or warehousing; and, (ii) in or attached to the building or structure used for such manufacturing or warehousing; (15) "farm building" means that part of a bona fide farming operation that is located upon land which is assessed and used for farm purposes encompassing barns, silos and other ancillary development to an agricultural use, but excluding a residential use and marijuana facilities; (16) "Grade" means the average level of finished ground adjoining a building or structure at all exterior walls; (17) "Gross floor area" means the total floor area measured between the outside of exterior walls, or between the outside of exterior walls and the centre line of party walls dividing the building from another building, of all floors above the average level of finished ground adjoining the building at its exterior walls. (18) "High density residential unit" means a dwelling unit in an apartment dwelling of five or more storeys; (19) "Industrial" means a building or structure, or that part of a building or structure, used for industrial uses; (20) "Institutional" means the development of a building or structure intended for use, (a) as a long-term care home within the meaning of subsection 2 (1) of the Long-Term Care Homes Act, 2007; (b) as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010; (c) by any of the following post-secondary institutions for the objects of the institution: Watson & Associates Economists Ltd. PAGE G-6 H:\Central Elgin\2020 DC\Report\Report.docx (i) a university in Ontario that receives direct, regular and ongoing operating funding from the Government of Ontario, (ii) a college or university federated or affiliated with a university described in subclause (i), or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institutes Act, 2017; (d) as a memorial home, clubhouse or athletic grounds by an Ontario branch of the Royal Canadian Legion; or (e) as a hospice to provide end of life care. (21) "Interest rate" means the rate of interest determined by Council, which is 1.25% per month; (22) "Local board" means a local board as defined in section 1 of the Municipal Affairs Act, other than a board of education; (23) "Local services" means those services or facilities which are under the jurisdiction of the municipality and are related to a plan of subdivision or within the area to which the plan relates, required as a condition of approval under s.51 of the Planning Act, or as a condition of approval under s.53 of the Planning Act; (24) "Low and medium density residential unit" means a dwelling unit in a single detached, semi-detached, townhouse, duplex, triplex or multiple dwelling, or in an apartment dwelling of four storeys or less; (25) "Marijuana facilities" means a building used, designed or intended for growth, producing, testing, destroying, storing or distribution, excluding retail sales, of medical marijuana or cannabis authorized by a license issued by the federal Minister of Health pursuant to section 25 of the Marihuana for Medical Purposes Regulations, SOR/2013-119, under the Controlled Drugs and Substances Act, S.C. 1996, c.19 (26) "Multiple dwelling" means a building containing three or more attached dwelling units not in a single row, each of which dwelling units has an independent entrance from the outside and a masonry wall or walls vertically separating it from any abutting dwelling; (27) "Municipality" means The Corporation of the Municipality of Central Elgin; Watson & Associates Economists Ltd. PAGE G-7 H:\Central Elgin\2020 DC\Report\Report.docx (28) "Non-Profit Housing" means development of a building or structure intended for use as residential premises by, (a) a corporation without share capital to which the Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; (b) a corporation without share capital to which the Canada Not-for- profit Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; or (c) a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act. (29) "Non-residential uses" means commercial, industrial, institutional uses, and includes all other non-residential uses; (30) "Owner" means the owner(s) of land or a person(s) who has made application for an approval for the development of land upon which a development charge is imposed; (31) "Place of Worship" means that part of a building that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, Chap. A.31, as amended, or any successor thereof; (32) "Planning Act" means the Planning Act, R.S.O. 1990, c.P.-13, as amended; (33) "Regulation" means any regulation made pursuant to the Act; (34) "Rental Housing" means the development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; (35) "Residential uses" means lands, buildings or structures or portions thereof used, or designed or intended for use as a home or residence of one or more individuals, and shall include a single detached dwelling, a semi- detached dwelling, a multiple dwelling, an apartment dwelling, and the residential portion of a mixed-use building or structure; (36) "Semi-detached dwelling" means a building containing two dwelling units that are separated vertically, each of which has an independent entrance either directly or through a common vestibule; (37) "Service" or "Services" means services set out in Schedule "A" to this By- law; Watson & Associates Economists Ltd. PAGE G-8 H:\Central Elgin\2020 DC\Report\Report.docx (38) "Single detached dwelling" means a building containing one dwelling unit used, designated or intended to be used for occupancy as one dwelling unit; (39) "Special care/special dwelling" means a residential portion of special care facilities containing rooms or suites of rooms designed or intended to be used for sleeping and living accommodation that have a common entrance from street level: (a) Where the occupants have the right to use in common, halls, stairs, yards, common rooms and accessory buildings; (b) Which may or may not have exclusive sanitary and/or culinary facilities; (c) That is designed to accommodate persons with specific needs, including, but not limited to, independent permanent living arrangements; and (d) Where support services such as meal preparation, grocery shopping, laundry, housekeeping, nursing, respite care and attendant services may be provided at various levels (40) "Stacked townhouse" means a building containing two or more dwelling units where each dwelling unit is separated horizontally and/or vertically from another dwelling unit by a common wall or floor; (41) "Storey" means that portion of a building above grade between the surface of any floor and the ceiling immediately above it which portion has a height of not less than 2.25 meters and includes an attic having not less than 2.25 meters head room for at least fifty percent (50%) of the attic floor area; (42) "Townhouse or row dwelling" means a building containing three or more attached dwelling units in a single row, each of which dwelling units has an independent entrance from the outside and is vertically separated from any abutting dwelling unit. This includes back-to-back townhouses; (43) "Triplex dwelling" means a building containing three dwelling units that are separated horizontally, each of which dwelling units has an independent entrance or an entrance through a common vestibule. CALCULATION OF DEVELOPMENT CHARGES 2. (1) Subject to the provisions of this by-law, development charges against land shall be imposed, calculated and collected in accordance with the charges Watson & Associates Economists Ltd. PAGE G-9 H:\Central Elgin\2020 DC\Report\Report.docx set out in Schedule "B-1" and "B-2", which relate to the services set out in Schedule "A." (2) The development charge with respect to the uses of any land, building or structure shall be calculated as follows: (a) in the case of residential development or redevelopment or the residential portion of a mixed use development or redevelopment, as the sum of the product of the number of dwelling units of each type multiplied by the corresponding total amount for such dwelling unit type, as set out in Schedule "B-1" and "B-2"; (b) in the case of non-residential development or redevelopment, or the non-residential portion of a mixed use development or redevelopment, as the sum of the product of the gross floor area multiplied by the corresponding total amount for such gross floor area as set out in Schedule "B-1" and "B-2". (3) Council hereby determines that the development or redevelopment of land, buildings or structures for residential and non-residential uses will require the provision, enlargement or expansion of the services referenced in Schedule "A". APPLICABLE LANDS 3. (1) Subject to sections 5 and 6, this by-law applies to all lands in the Central Elgin, whether or not the land or use is exempt from taxation under section 3 of the Assessment Act, R.S.O. 1990, c.A.-31. (2) This by-law shall not apply to land that is owned by and used for the purposes of: (a) a board of education; (b) any municipality or local board thereof; (c) land that is used for the purposes of industrial uses; (d) non-residential farm buildings constructed for bona fide farm uses; (e) lands or buildings used or to be used for a place of worship or for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act; (3) Notwithstanding subsection (1), in Port Stanley any residential unit or non-residential use which exists before October 27, 2008, and which is Watson & Associates Economists Ltd. PAGE G-10 H:\Central Elgin\2020 DC\Report\Report.docx connected to the municipal water supply and distribution system but is not connected to the municipal wastewater collection and treatment system, shall pay the applicable development charge for wastewater collection and treatment upon receiving a plumbing permit for connection to the municipal wastewater collection and treatment system, but shall be exempt from the payment of development charges for water supply and distribution, highway construction, related studies, and the development charge background study. RULES WITH RESPECT TO EXEMPTIONS FOR INTENSIFICATION OF EXISTING HOUSING 5. (1) Notwithstanding section 4 above, no development charge shall be imposed with respect to developments or portions of developments as follows: (a) the enlargement of an existing residential dwelling unit; (b) the creation of one or two additional residential dwelling units in an existing single detached dwelling where the total gross floor area of the additional unit(s) does not exceed the gross floor area of the existing dwelling unit; (c) the creation of one additional dwelling unit in any other existing residential building provided the gross floor area of the additional unit does not exceed the smallest existing dwelling unit already in the building. (2) Notwithstanding subsection 5 (1) (b), development charges shall be calculated and collected in accordance with Schedule "B-1" and "B-2" where the total residential gross floor area of the additional one or two dwelling units is greater than the total gross floor area of the existing single detached dwelling unit. (3) Notwithstanding subsection 5 (1) (c), development charges shall be calculated and collected in accordance with Schedule "B-1" and "B-2" where the additional dwelling unit has a residential gross floor area greater than, (a) in the case of semi-detached house or multiple dwelling, the gross floor area of the existing dwelling unit, and (b) in the case of any other residential building, the residential gross floor area of the smallest existing dwelling unit. Watson & Associates Economists Ltd. PAGE G-11 H:\Central Elgin\2020 DC\Report\Report.docx EXEMPTION FOR INDUSTRIAL DEVELOPMENT 6. (1) Notwithstanding any other provision of this by-law, there shall be an exemption from the payment of development charges for one or more enlargements of an existing industrial building on its site, whether attached or separate from the existing industrial building, up to a maximum of fifty per cent of the gross floor area before the first enlargement for which an exemption from the payment of development charges was granted pursuant to the Development Charges Act or this section. Development charges shall be imposed in accordance with this by-law with respect to the amount of the floor area of an enlargement that results in the gross floor area of the industrial building being increased by greater than fifty per cent of the gross floor area of the existing industrial building. (2) If the gross floor area of an existing industrial building is enlarged by greater than 50 percent, the amount of the development charge payable in respect of the enlargement is the amount of the development charge that would otherwise be payable multiplied by the fraction determined as follows: (a) determine the amount by which the enlargement exceeds 50 percent of the gross floor area before the enlargement; (b) divide the amount determined under subsection (1) by the amount of the enlargement DEVELOPMENT CHARGES IMPOSED 7. (1) Subject to subsection (2), development charges shall be calculated and collected in accordance with the provisions of this by-law and be imposed on land to be developed for residential and non-residential uses, where, the development requires, (a) the passing of a zoning by-law or an amendment thereto under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act, (e) a consent under section 53 of the Planning Act; Watson & Associates Economists Ltd. PAGE G-12 H:\Central Elgin\2020 DC\Report\Report.docx (f) the approval of a description under section 50 of the Condominium Act, R.S.O. 1990, c.C.-26; or (g) the issuing of a permit under the Building Code Act, in relation to a building or structure. (2) Subsection (1) shall not apply in respect to: (a) local services installed or paid for by the owner within a plan of subdivision or within the area to which the plan relates, as a condition of approval under section 51 of the Planning Act, (b) local services installed or paid for by the owner as a condition of approval under section 53 of the Planning Act. LOCAL SERVICE INSTALLATION 8. Nothing in this by-law prevents Council from requiring, as a condition of an agreement under section 51 or 53 of the Planning Act that the owner, at his or her own expense, shall install or pay for such local services, within the Plan of Subdivision or within the area to which the plan relates, as Council may require. MULTIPLE CHARGES 9. (1) Where two or more of the actions described in subsection 6 (1) are required before land to which a development charge applies can be developed, only one development charge shall be calculated and collected in accordance with the provisions of this by-law. (2) Notwithstanding subsection (1), if two or more of the actions described in subsection 6 (1) occur at different times, and if the subsequent action has the effect of increasing the need for municipal services as set out in Schedule "A", an additional development charge on the additional residential units and additional gross floor area shall be calculated and collected in accordance with the provisions of this by-law. SERVICES IN LIEU 10. (1) Council may authorize an owner, through an agreement under section 38 of the Act, to substitute such part of the development charge applicable to the owner's development as may be specified in the agreement, by the provision at the sole expense of the owner, of services in lieu. Such agreement shall further specify that where the owner provides services in lieu in accordance with the agreement, Council shall give to the owner a credit against the development charge in accordance with the agreement Watson & Associates Economists Ltd. PAGE G-13 H:\Central Elgin\2020 DC\Report\Report.docx provisions and the provisions of section 39 of the Act, equal to the reasonable cost to the owner of providing the services in lieu. In no case shall the agreement provide for a credit that exceeds the total development charge payable by an owner to the municipality in respect of the development to which the agreement relates. (2) In any agreement under subsection (1), Council may also give a further credit to the owner equal to the reasonable cost of providing services in addition to, or of a greater size or capacity, than would be required under this by-law. (3) The credit provided for in subsection (2) shall not be charged to any development charge reserve fund. RULES WITH RESPECT TO RE-DEVELOPMENT 11. Despite any other provisions of this by-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within five years prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (1) in the case of a residential building or structure, or in the case of a mixed- use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charge under subsection 2 (2) a) by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (2) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the greater of the applicable development charges under subsection 2(2)b) by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. Watson & Associates Economists Ltd. PAGE G-14 H:\Central Elgin\2020 DC\Report\Report.docx TIMING OF CALCULATION AND PAYMENT 12. (1) The development charges shall be payable on the date a building permit is issued under the Building Code Act, 1992 in relation to a building or structure on land to which the development charge applies. (2) Notwithstanding Subsection 12(1), Development Charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. (3) Notwithstanding Subsection 12(1), Development Charges for non-profit housing developments are due and payable in 21 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. (4) Where the development of land results from the approval of a Site Plan or Zoning Bylaw Amendment received on or after January 1, 2020, and the approval of the application occurred within 2 years of building permit issuance, the Development Charges under Subsections 12(1), 12(2) and 12(3) shall be calculated on the rates set out in Schedules "B" and "C" on the date of the planning application, including interest. Where both planning applications apply Development Charges under Subsections 12(1), 12(2) and 12(3) shall be calculated on the rates, including interest, set out in Schedules "B-1" and "B-2" on the date of the later planning application, including interest. (5) Notwithstanding subsection 12(1), the Corporation may, by agreement, allow a person to perform work that relates to a service to which this by- law relates, and give the person a credit towards the payment of development charges in accordance with the agreement, the amount of the credit to be determined in accordance with the Act. (6) Notwithstanding subsection 12(1), the Corporation may enter into an agreement for payment of the development charges under Section 27 of the Act, that relates to the services that are imposed in this by-law. RESERVE FUNDS 13. (1) Monies received from payment of development charges under this by-law shall be maintained in eight separate reserve funds as follows: roads, fire, parks and recreation, library, administration (municipal wide), water, wastewater and administration (urban). Watson & Associates Economists Ltd. PAGE G-15 H:\Central Elgin\2020 DC\Report\Report.docx (2) Monies received for the payment of development charges shall be used only in accordance with the provisions of section 35 of the Act. (3) Where any development charge, or part thereof, remains unpaid after the due date, the amount unpaid shall be added to the tax roll and shall be collected as taxes. (4) Where any unpaid development charges are collected as taxes under subsection (4), the monies so collected shall be credited to the development charge reserve funds referred to in subsection (1). (5) The Treasurer of the Municipality shall, in each year, furnish to Council a statement in respect of the reserve funds established hereunder for the prior year, containing the information set out in section 12 of O. Reg. 82/98. BY-LAW AMENDMENT OR APPEAL 14. (1) Where this by-law or any development charge prescribed there under is amended or repealed either by order of the Ontario Municipal Board or by resolution of the Municipal Council, the Municipal Treasurer shall calculate forthwith the amount of any overpayment to be refunded as a result of said amendment or repeal. (2) Refunds that are required to be paid under subsection (1) shall be paid with interest to be calculated as follows: (a) Interest shall be calculated from the date on which the overpayment was collected to the date on which the refund is paid; (b) The Bank of Canada interest rate in effect on the date of enactment of this by-law shall be used. (3) Refunds that are required to be paid under subsection (1) shall include the interest owed under this section. BY-LAW INDEXING 15. The development charges set out in Schedule B-1" and "B-2" to this by-law shall be adjusted annually as of May 1 of each year commencing May 1, 2021, without amendment to the by-law, in accordance with the most recent twelve month change in the Statistics Canada Quarterly, "Construction Price Statistics". Watson & Associates Economists Ltd. PAGE G-16 H:\Central Elgin\2020 DC\Report\Report.docx SEVERABILITY 16. In the event any provision, or part thereof, of this by-law is found by a court of competent jurisdiction to be ultra vires, such provision, or part thereof, shall be deemed to be severed, and the remaining portion of such provision and all other provisions of this by-law shall remain in full force and effect. HEADINGS FOR REFERENCE ONLY 17. The headings inserted in this by-law are for convenience of reference only and shall not affect the construction of interpretation of this by-law. BY-LAW REGISTRATION 18. A certified copy of this by-law may be registered on title to any land to which this by-law applies. BY-LAW ADMINISTRATION 19. This by-law shall be administered by the Municipal Treasurer. SCHEDULES TO THE BY-LAW 20. The following Schedules to this by-law form an integral part of this by-law: Schedule A - Schedule of Designated Municipal Services Schedule B-1 - Schedule of Municipal Wide Development Charges Schedule B-2 - Schedule of Urban Area and Area Specific Development Charges Schedules C-1 to C-6 - Map denoting the Urban Areas of the Municipality REPEAL OF BY-LAWS 21. By-law 1880 is hereby repealed on the date this by-law comes into effect. DATE BY-LAW EFFECTIVE 22. This by-law shall come into force and effect on the day following the day of its approval by Council. READ A FIRST AND A SECOND TIME THIS 25th DAY OF MAY, 2020. Watson & Associates Economists Ltd. PAGE G-17 H:\Central Elgin\2020 DC\Report\Report.docx READ A THIRD TIME AND FINALLY PASSED THIS 25th DAY OF MAY, 2020. _______________________________ ______________________________ Mayor Clerk Watson & Associates Economists Ltd. PAGE G-18 H:\Central Elgin\2020 DC\Report\Report.docx SCHEDULE "A" TO BY-LAW NO. ____ DESIGNATED MUNICIPAL SERVICES UNDER THIS BY-LAW Municipal Wide Services 100% Eligible Services - Services Related to a Highway o Depots and Domes o Public Works Rolling Stock - Fire Protection Services o Fire Facilities o Fire Vehicles o Fire Equipment and Gear 90% Eligible Services - Parks and Recreation Services o Parkland Development, Amenities & Trails o Recreation Facilities o Recreation Vehicle - Library Services o Library Facilities - Administration (Municipal Wide) o Studies Urban Services 100% Eligible Services - Administration (Urban) o Studies - Water o Water Distribution - Wastewater o Wastewater Treatment o Wastewater Collection Watson & Associates Economists Ltd. PAGE G-19 H:\Central Elgin\2020 DC\Report\Report.docx SCHEDULE B-1 SCHEDULE OF MUNICIPAL WIDE DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services: Services Related to a Highway 958 568 364 727 367 0.52 Fire Protection Services 2,187 1,296 830 1,659 839 1.19 Parks and Recreation Services 2,276 1,349 864 1,727 873 0.26 Library Services 133 79 51 101 51 0.02 Administration 737 437 280 559 283 0.38 Total Municipal Wide Services 6,291 3,729 2,389 4,773 2,413 2.37 RESIDENTIAL Service Watson & Associates Economists Ltd. PAGE G-20 H:\Central Elgin\2020 DC\Report\Report.docx SCHEDULE B-2 SCHEDULE OF URBAN AREA DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Urban Area Services Administration Studies - Urban 229 136 87 174 88 0.10 Total Urban Area Services 229 136 87 174 88 0.10 Note: Urban Areas are municipally serviced with water and/or wastewater NON-RESIDENTIAL Single and Semi- Detached Dwelling Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Multiples Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Belmont Area Specific Services: Water Services 512 303 194 388 196 0.25 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Belmont Area Specific Services 6,237 3,696 2,368 4,732 2,392 3.64 Port Stanley Area Specific Services: Water Services 512 303 194 388 196 0.25 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Port Stanley Area Specific Services 6,237 3,696 2,368 4,732 2,392 3.64 Union Area Specific Services: Water Services - - - - - 0.00 Wastewater Services 5,725 3,393 2,174 4,344 2,196 3.39 Total Union Area Specific Services 5,725 3,393 2,174 4,344 2,196 3.39 Southblock Area Specific Services: Water Services 512 303 194 388 196 0.00 Wastewater Services 5,725 3,393 2,174 4,344 2,196 0.00 Total Southblock Area Specific Services 6,237 3,696 2,368 4,732 2,392 0.00 RESIDENTIAL Service Service RESIDENTIAL Watson & Associates Economists Ltd. PAGE G-21 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-1" Map of the Port Stanley Area Watson & Associates Economists Ltd. PAGE G-22 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-2" Map of the Union Area Watson & Associates Economists Ltd. PAGE G-23 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-3" Map of the Belmont Area Watson & Associates Economists Ltd. PAGE G-24 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-4" Map of the Norman & Lyndale Area Watson & Associates Economists Ltd. PAGE G-25 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-5" Map of the North Lynhurst Area Watson & Associates Economists Ltd. PAGE G-26 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-6" Map of the Lynhurst Area Watson & Associates Economists Ltd. PAGE G-27 H:\Central Elgin\2020 DC\Report\Report.docx Schedule "C-7" Map of the Southblock Area