Fee schedule for building/structure permits, additions/alterations, change of use, demolition, occupancy and partial permits, listing 2014 base fees escalated year-by-year through 2026 (e.g. new buildings $17/$1,000 project value in 2026).
Building permits — Central Frontenac, Ontario
Do I need a building permit? What does it cost?
In the Township of Central Frontenac, Ontario, building permit rules are set by 2026 Building Permit Fees (Table 1 – Permits) and 1 other bylaw, verified 2026-09-25. Permit required for: Construction, demolition or change of use of a building; all types of construction governed by the Act and Building Code. Permit fees: Minimum fee $71.00; total permit fee is summation of all applicable fees in Tables 1 to 3. Administered by: Chief Building Official.
| permit required for | Construction, demolition or change of use of a building; all types of construction governed by the Act and Building Code. | s. 3.1; Schedule "A" |
| fee basis | Minimum fee $71.00; total permit fee is summation of all applicable fees in Tables 1 to 3. | Schedule "C", Part 2.1-2.2 |
| authority | Chief Building Official | s. 4.3; s. 7.1; s. 9.3 |
scout note
Township of Central Frontenac's Building Code Act by-law regulating construction, demolition and change-of-use permits; sets classes of permits (Schedule A), complete-application requirements (Schedule B) and Chief Building Official authority. Repeals By-law 2008-269.