Development Charges Background Study consolidated report (March 24, 2026)

Centre Wellington, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 95f456b5afcd · verified 2026-10-22 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 March 24, 2026 [email protected] Development Charges Background Study - Consolidated Report Township of Centre Wellington Office Consolidation of the December 19, 2025 Background Study, the February 6, 2026 Addendum #1 Report and the March 13, 2026 Addendum #2 Report Watson & Associates Economists Ltd. Consolidated Report This report consolidates the December 19, 2025 Background Study, the February 6, 2026 Addendum #1 Report, and the March 13, 2026 Addendum #2 Report. The purpose of the Addendum #1 Report is to provide for changes to the December 19, 2025 D.C background study as follows: - Revise the Local Service Policy (L.S.P.) to remove the policy related to developer-initiated urban boundary expansions; - Move land acquisition costs related to water and wastewater services to a land acquisition D.C. calculation for urban 2051 services; - Update deductions for water distribution and wastewater collection projects; - Remove duplicate projects from services related to a highway project listing (note: these projects are direct developer responsibility as per the local service policy and as such, there is no impact to the D.C. calculations); - Adjust the classification of deductions in the Active Transportation capital listing from 'Other Deductions' to 'Grants, Subsidies and Other Contributions Attributable to New Development'; - Revise level of service calculations for Recreation Facilities; and - Amend the timeline for the D.C. process to change Council consideration of the D.C. by-law from February 23, 2026 to March 23, 2026. The purpose of the Addendum #2 Report is to provide for changes to the December 19, 2025 D.C background study as follows: - Remove land acquisition costs related to outdoor recreation facilities; and - Update the funding allocation for a wastewater project. Watson & Associates Economists Ltd. Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the D.C.A. ............................................................................ 1-3 2. Current Township of Centre Wellington D.C. Policies ................................. 2-1 2.1 Schedule of Changes.............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-2 2.4 Indexing .................................................................................................. 2-3 2.5 Redevelopment Allowance ..................................................................... 2-3 2.6 Exemptions ............................................................................................. 2-4 3. Anticipated Development in the Township of Centre Wellington ............... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-7 4.6 Treatment of Credits ............................................................................... 4-8 4.7 Classes of Services ................................................................................ 4-8 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ...................... 4-10 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 4.9.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.9.3 Reduction for Benefit to Existing Development ........................ 4-11 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-12 4.10 Municipal-wide vs. Area Rating ............................................................. 4-12 4.11 Allocation of Development .................................................................... 4-13 4.12 Asset Management ............................................................................... 4-13 4.13 Transit ................................................................................................... 4-13 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and Urban 2051 Capital Costs for Centre Wellington's D.C. Calculation .................................................................. 5-1 5.2.1 Wastewater Services ................................................................. 5-2 5.2.2 Water Services ........................................................................... 5-7 5.2.3 Land - Urban 2051 Forecast Period ........................................ 5-12 5.3 Service Levels and Township-wide 2051 Capital Costs for Centre Wellington's D.C. Calculation ................................................................ 5-12 5.3.1 Services Related to a Highway ................................................ 5-12 5.3.2 Public Works - Facilities and Fleet .......................................... 5-17 5.3.3 Fire Protection Services ........................................................... 5-19 5.3.4 Parks and Recreation Services ................................................ 5-21 5.3.5 Land - 2051 Forecast Period ................................................... 5-26 5.4 Service Levels and 10-Year Capital Costs for Centre Wellington's D.C. Calculation .................................................................................... 5-28 5.4.1 Growth Studies ........................................................................ 5-28 5.4.2 Land - 10 Year Forecast Period .............................................. 5-30 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Timing of Collection ................................................................... 7-5 7.3.6 The Applicable Areas ................................................................. 7-6 7.3.7 Indexing ..................................................................................... 7-6 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-6 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 7.4.4 Area Rating ................................................................................ 7-7 7.5 Other Recommendations ........................................................................ 7-9 8. By-law Implementation ................................................................................... 8-1 8.1 Introduction ............................................................................................. 8-1 8.1.1 Public Meeting of Council........................................................... 8-1 8.1.2 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy ................................................................... D-1 Appendix E Local Service Policy .............................................................................E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Capital Cost and Benefit to Existing Methodology .......................... G-1 Appendix H Changes to the D.C.A. ......................................................................... H-1 Appendix I Listing of Active Transportation Projects ............................................. I-1 Appendix J Proposed D.C. By-law ........................................................................... J-1 Watson & Associates Economists Ltd. List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.P. Asset management plan C.B.C. Community Benefits Charge D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area L.P.A.T. Local Planning Appeal Tribunal N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.M.B. Ontario Municipal Board O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit S.W.M. Stormwater management sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the Township of Centre Wellington required by the Development Charges Act, 1997, as amended (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Overview of the legislative requirements of the Act; - Chapter 2 - Review of present D.C. policies of the Township; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the Township; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of future capital requirements to service growth and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below. 1) Identify amount, type and location of growth. 2) Identify servicing needs to accommodate growth. 3) Identify capital costs to provide services to meet the needs. 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Amounts in excess of 15-year historical service calculation; and - D.C. reserve funds (where applicable); 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs are divided by the growth to provide the D.C. Watson & Associates Economists Ltd. PAGE ii 3. Several changes to the D.C.A. have occurred since the passage of the Township's 2021 D.C. By-law. These changes include additional mandatory exemptions, discounts, and limitations of imposing D.C.s. Further discussion is provided in Chapter 1, and a detailed summary of the changes is provided in Appendix H. 4. The growth forecast (Chapter 3) on which the D.C. study is based, projects the following population, housing, and non-residential floor area for the 10-year (2025 to 2034), 2051 (2025 to 2051), and urban 2051 (2025 to 2051) periods. Table ES-1 Summary of Growth Forecast by Planning Period Township of Centre Wellington 5. On March 29, 2021, the Township of Centre Wellington passed By-law 2021-11 under the D.C.A. The by-law imposes D.C.s on residential and non-residential uses. The Township is undertaking a D.C. public process and anticipates passing a new by-law March 23, 2026, with the mandatory public meeting on February 9, 2026. 6. The Township's D.C.s currently in effect (as of January 1, 2025) for single detached dwelling units for Township-wide services are $22,006. Non-residential charges per sq.ft. for Township-wide services are $6.70. Additionally, the Township charges D.C.s for water and wastewater services on an urban serviced-area basis. The D.C. for a single detached unit is $13,997 for water and wastewater services for a total of $36,003 for full urban-area services. The non- residential charge is $5.01 per sq.ft for water and wastewater services, for a total of $11.71 per sq.ft. for full urban services. 7. This report has undertaken a recalculation of the charges based on future identified needs (presented in Table ES-3 for residential and non-residential 10 Year 2051 Urban 2051 2025 to 2034 2025 to 2051 Urban 2025 to 2051 (Net) Population Increase 7,439 20,559 20,168 Residential Unit Increase 3,249 8,794 8,564 Non-Residential Gross Floor Area Increase (sq.ft.) 2,699,700 7,037,600 6,836,400 Source: Watson & Associates Economists Ltd. Forecast 2025 Measure Watson & Associates Economists Ltd. PAGE iii development). The corresponding single detached unit charge is $29,117 for Township-wide services and $17,228 for water and wastewater services, for a total of $46,345 for full urban-area services. The non-residential charge per sq.ft is $6.58 for Township-wide services and $7.70 for water and wastewater services, for a total of $14.28 for full urban-area services. These rates are submitted to Council for its consideration. 8. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-law. This calculation is provided by service and is presented in Table 6-5. A summary of these costs is provided below: Table ES-2 Summary of Expenditures Anticipated Over the Life of the By-law Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total gross expenditures planned over the next ten $550,679,419 Less: Benefit to existing development $67,078,328 Less: Post planning period benefit $88,536,200 Less: Other Deductions $133,200 Less: Grants, subsidies and other contributions $71,401,583 Net costs to be recovered from development h $323,530,108 This suggests that for the non-D.C. cost over the ten-year D.C. by-law (benefit to existing development, other deductions), approximately $67.21 million (or an annual amount of $6.72 million) will need to be contributed from taxes and rates, or other sources. Note, $71.40 million of the costs are anticipated to be paid for by grants, subsidies, and other contributions. Based on the above table, the Township plans to spend approximately $550.68 million over the life of the by-law, of which $323.53 million (59%) is recoverable from D.C.s. Of this net amount, $261.81 million is recoverable from residential development and $61.72 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. Watson & Associates Economists Ltd. PAGE iv 9. Considerations by Council - The background study represents the service needs arising from residential and non-residential growth over the forecast period. The following services are calculated based on an urban 2051 forecast: - Wastewater Services - Treatment; - Wastewater Services - Sewers; - Water Services - Wells, Treatment and Storage; - Water Services - Distribution; and - Land - Urban 2051 Forecast. The following services are calculated based on a Township-wide 2051 forecast: - Services Related to a Highway (including Active Transportation); - Public Works (Facilities and Fleet); - Fire Protection Services; - Parks and Recreation Services; and - Land - 2051 Year Forecast. The following services are calculated based on a 10-year forecast: - Growth Studies; and - Land - 10 Year Forecast. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-laws, which are provided under separate cover. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; - considering if any changes are required to the Local Service Policy; and - considering reductions in the charge by class of development (obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Watson & Associates Economists Ltd. PAGE v Table ES-3 Township of Centre Wellington Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services/Class of Service: Services Related to a Highway 6,952 5,672 4,703 3,430 2,618 3.10 Public Works (Facilities and Fleet) 3,265 2,664 2,209 1,611 1,230 1.46 Fire Protection Services 987 805 668 487 372 0.44 Parks and Recreation Services 16,552 13,503 11,197 8,166 6,233 0.95 Growth Studies 978 798 662 482 368 0.46 Land - 2051 Forecast 383 312 259 189 144 0.17 Land - 10 Year Forecast - - - - - 0.00 Total Municipal Wide Services/Class of Services 29,117 23,754 19,698 14,365 10,965 6.58 Urban Services Wastewater Treatment 7,784 6,350 5,266 3,840 2,931 3.47 Wastewater Sewers 889 725 601 439 335 0.40 Water Treatment plants and storage 3,398 2,772 2,299 1,676 1,280 1.52 Water Distribution 4,718 3,849 3,192 2,328 1,777 2.11 Land - Urban 2051 Forecast 439 358 297 217 165 0.20 Total Urban Services 17,228 14,054 11,655 8,500 6,488 7.70 GRAND TOTAL RURAL AREA 29,117 23,754 19,698 14,365 10,965 6.58 GRAND TOTAL URBAN AREA 46,345 37,808 31,353 22,865 17,453 14.28 Service/Class of Service RESIDENTIAL Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the Development Charges Act, as amended, (D.C.A.) (section 10) and, accordingly, recommends new development charges (D.C.s) and policies for the Township of Centre Wellington. The Township retained Watson & Associates Economists Ltd. (Watson), to undertake the D.C. study process throughout 2025 and early 2026. Watson worked with Township staff in preparing the D.C. analysis and policy recommendations. This D.C. background study, and the proposed D.C. by-law, will be distributed to members of the public and development community in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the Township's D.C. background study, as summarized in Chapter 4. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-law to be made available as part of the approval process (included as Appendix J). In addition, the report is designed to provide sufficient background on the legislation (Chapter 4), Centre Wellington's current D.C. policies (Chapter 2), and the policies underlying the proposed by-law, to make the exercise understandable to those involved. Finally, it addresses post-adoption implementation requirements (Chapter 8), which are critical to the successful application of the new policy. The chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A. has been scheduled for February 9, 2026. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed modifications to the Township's D.C.s. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review on December 19, 2025. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Figure 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Figure 1-1 Schedule of Key D.C. Process Dates for the Township of Centre Wellington Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work April 2025 to November 2025 2. Public release of final D.C. Background study and proposed by-law December 19, 2025 3. Public meeting advertisement placed in newspaper At least 21 days prior to the Public Meeting 4. Stakeholder Meeting January 21, 2026 5. Release of Addendum Report #1 February 6, 2026 6. Public meeting of Council February 9, 2026 7. Release of Addendum Report #2 March 13, 2026 8. Council considers adoption of background study and passage of by-law March 23, 2026 9. Newspaper notice given of by-law passage By 20 days after passage 10. Last day for by-law appeal 40 days after passage 11. Township makes pamphlet available (where by- law not appealed) By 60 days after in force date Watson & Associates Economists Ltd. PAGE 1-3 1.3 Changes to the D.C.A. Since the passage of the Township's previous by-law, there have been a number of changes to the D.C.A. These changes include various additional mandatory exemptions, discounts, and limitations of imposing D.C.s. A high-level summary is provided below, and a detailed summary of the changes is provided in Appendix H. - Bill 213: Better for People, Smarter for Business Act, 2020 - new mandatory exemption for universities that receive operating funds from the Government; - Bill 109: More Homes for Everyone Act, 2022 - additional reporting requirements for the Annual Treasurer's statement on D.C. reserve funds; - Bill 23: More Homes Built Faster Act, 2022 - additional mandatory exemptions, discounts, and other changes: o Additional Residential Unit Exemption - add up to 2 units in a detached, semi-detached, or rowhouse within certain parameters and the units are exempt; o Housing was removed as a D.C. eligible service; o New exemption for Non-profit Housing; o New exemption for Affordable and Attainable Units; o New exemption for affordable units required through Inclusionary Zoning; o Extension of the historical level of service calculations from 10 years to 15 years; o Revised definition of capital costs and a mandatory phase-in (later reversed by Bill 185); o Extension of the by-law expiry requirements from 5 years to 10 years; o Discount for rental housing based on the number of bedrooms (15% to 25%); o Maximum interest rate for instalment payments and the rate freeze; and o Requirement to spend or allocate at least 60% of reserve funds for water, wastewater, and services related to a highway; - Bill 134: Affordable Homes and Good Jobs Act, 2023 - refinement to the definition of affordable housing for the purposes of the exemption; - Bill 185: Cutting Red Tape to Build More Homes Act, 2024 - reversal of changes from Bill 23 and public process changes: o Revised definition of capital costs to reinclude growth-related studies; o Removed the mandatory phase-in from Bill 23; Watson & Associates Economists Ltd. PAGE 1-4 o Introduced a streamlined process for minor by-law amendments; o Reduced the rate freeze timing from 2 years to 18 months; and o Modernized public notice requirements in certain instances. - Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 - additional exemptions, changes to timing of payment, and other changes: o Exemption for long-term care homes; o Change in definition of capital costs to allow changes via regulation; o Expansion of the simplified by-law amendment process to include scenarios where D.C.s are reduced; o Requirement to impose the lower of the current D.C. or the rate freeze (with interest); o Allowance for regulation to group services together for the purposes of D.C. credits; o Deferral of D.C.s to occupancy for all residential development; o Removal of interest for legislated amendments; and o The ability to waive the requirement for instalments or payment at occupancy without the need for an early payment agreement. o Ontario Regulation 164/25 - Introduction of London Series for the purposes of indexing a D.C. by-law and expansion of the requirement to spend or allocate 60% of reserve fund balances to all services. - Bill 60: Fighting Delays, Building Faster Act, 2025 and Regulatory Changes - introduces class of service for land acquisition and other reporting requirements; o Addition of class of service for land acquisition (with removal of land costs from level of service calculations); o Additional requirements related to providing a local service policy; o Merging of credits for water supply services and wastewater services; o Requirement to provide greater details in background study with respect to how capital costs are determined and how growth-related and non-growth- related shares of costs are determined; o Additional requirements to provide documents to the Minister; o Deadlines provided for Treasurer's Statement completion and submission to the Minister of Municipal Affairs and Housing; and o Additional reporting requirements for the Treasurer's Statement. Watson & Associates Economists Ltd. Chapter 2 Current Township of Centre Wellington D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 2. Current Township of Centre Wellington D.C. Policies 2.1 Schedule of Changes On March 29, 2021, the Township of Centre Wellington passed By-law 2021-11 under the D.C.A. This by-law will expire on March 30, 2026. The Township is undertaking a D.C. public process and anticipates passing a new by-law in advance of the date the existing by-law expires. The by-law imposes D.C.s for residential and non-residential uses. The table below provides the rates currently in effect, as of January 1, 2025 (note: see section 2.4 below on indexing). Table 2-1 Township of Centre Wellington Current D.C. Rates January 1, 2025 2.2 Services Covered The following services are covered under By-law 2021-11: Township-wide Services: Non-Residential Service Single & Semi Detached Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms Special Care/Special Dwelling Units per sq.ft. Municipal Wide Services/Class of Service: Services Related to a Highway 12,050 9,391 6,524 5,546 4,285 4.95 Public Works (Facilities and Fleet) 2,219 1,729 1,201 1,021 788 0.89 Fire Protection Services 953 744 515 439 338 0.39 Parks and Recreation Services 6,146 4,791 3,329 2,830 2,187 0.23 Growth Studies 638 499 345 295 228 0.24 Total Municipal Wide Services/Class of Services 22,006 17,154 11,914 10,131 7,826 6.70 Urban Services Wastewater 6,862 5,350 3,715 3,158 2,440 2.46 Water 7,135 5,559 3,861 3,283 2,536 2.55 Total Urban Services 13,997 10,909 7,576 6,441 4,976 5.01 GRAND TOTAL RURAL AREA 22,006 17,154 11,914 10,131 7,826 6.70 GRAND TOTAL URBAN AREA 36,003 28,063 19,490 16,572 12,802 11.71 Residential Watson & Associates Economists Ltd. PAGE 2-2 - Services Related to a Highway; - Public Works; - Fire Protection Services - Parks and Recreation Services; and - Growth Studies. Urban Area Services: - Wastewater Services; and - Water Services. 2.3 Timing of D.C. Calculation and Payment D.C.s are calculated and payable on the date that the first building permit is issued in relation to a building or structure on land to which the D.C. relates. The services related to a highway component of D.C.s with respect to an approval of a Plan of Subdivision under section 51 of the Planning Act, shall be addressed in the subdivision agreement. D.C.s for developments proceeding through Site Plan or Zoning By-law Amendment application are frozen at the time the application is submitted. Once the application is approved, the applicant has 18 months to obtain the building permits related to the development, otherwise, the current D.C. is applicable. D.C.s for rental housing and institutional development shall be paid in 6 equal annual instalments, with the first payment due upon occupancy or occupancy permit. Note: additional legislative changes have been provided with respect to timing of payment (e.g. residential D.C.s are now payable at occupancy). Further details are provided in Appendix H. The draft by-law provided in Appendix J incorporates these legislative changes to align the policies with current legislation. Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable, in accordance with section 27 of the D.C.A. Watson & Associates Economists Ltd. PAGE 2-3 2.4 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually each January 1st, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).[ 0F1] Note: the D.C.s will be indexed on January 1, 2026. Based on the most recent Statistics Canada Non-Residential Building Construction Price Index, it is anticipated that the rates presented in Table 2-1 will increase by 4.2%. 2.5 Redevelopment Allowance As a result of the redevelopment of land, a building or structure existing on the same land within 60 months prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the gross floor area that has been or will be demolished or converted to another principal use; [1] Ontario Regulation (O. Reg.) 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 2-4 provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. Note: with respect to brownfield development, the timeline for eligibility for a redevelopment allowance is 300 months (25 years) from the time of demolition to the date of payment of D.C.s. 2.6 Exemptions The following non-statutory exemptions are provided under By-law 2021-11: - A place of worship or buildings for purposes of a churchyard or cemetery; - Non-residential farm buildings constructed for bona fide farm uses; - Exemption of the water and wastewater residential charges for apartment units located within commercial buildings and an exemption of the non-residential water and wastewater charges for non-residential development, located within the Fergus and Elora Downtown Cores, as defined by the Central Business District designation in the County and/or Municipal Official Plan; - Silos for use for industrial, commercial and/or institutional; and - Shipping containers used for industrial, commercial and/or institutional uses. Watson & Associates Economists Ltd. Chapter 3 Anticipated Development in the Township of Centre Wellington Watson & Associates Economists Ltd. PAGE 3-1 3. Anticipated Development in the Township of Centre Wellington 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the Township will be required to provide services over a 10-year (2025 to 2035) and a longer-term (2025 to 2051) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that, in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the Township of Centre Wellington. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the Township over the forecast period, including: - County of Wellington Official Plan, Office Consolidation, May 2025, and Official Plan Amendment 126; - Township of Centre Wellington Housing Needs Assessment, July 4, 2025, Watson & Associates Economists Ltd.; - Township of Centre Wellington 2024 Land Needs Assessment by Urban Centre, Watson & Associates Economists Ltd.; - County of Wellington Phase 1 Municipal Comprehensive Review Report: Urban Structure and Growth, as amended January 31, 2022, and Phase 2 Report: Urban Land Needs Assessment, August 29, 2022, Watson & Associates Economists Ltd; Watson & Associates Economists Ltd. PAGE 3-2 - Township of Centre Wellington Development Charges Background Study, consolidated April 16, 2021, Addendum 1 Report, January 27, 2021, Addendum 2 Report and Approved Development Charges By-law #2021-11, February 8, 2021, by Watson & Associates Economists Ltd. - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2015 to 2024 period; - Residential and non-residential supply opportunities as identified by Township of Centre Wellington staff; and - Discussions with Township staff regarding anticipated residential and non- residential development in the Township of Centre Wellington. 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the Township and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, population in the Township of Centre Wellington (excluding census undercount) is anticipated to reach approximately 42,670 by late-2035 and 55,790 by mid-2051, resulting in an increase of approximately 7,440 and 20,560 persons, respectively. [ 1F1] [1] The population figures used in the calculation of the 2025 D.C. exclude the net Census undercount, which is estimated at approximately 4.3%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 Figure 3-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 Table 3-1 Township of Centre Wellington Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 4.3% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from the County of Wellington Official Plan (including Official Plan Amendment 126), Township of Centre Wellington 2024 Land Needs Assessment, and County of Wellington Municipal Comprehensive Review forecast for the Township of Centre Wellington by Watson & Associates Economists Ltd., and discussions with Township of Centre Wellington staff regarding servicing and land supply by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 27,840 26,693 483 26,210 7,924 450 1,350 221 9,945 439 2.684 29,410 28,191 556 27,635 8,470 660 1,540 160 10,830 505 2.603 32,430 31,093 448 30,645 9,260 920 1,680 120 11,980 407 2.595 36,750 35,233 510 34,723 10,042 1,385 2,064 120 13,611 464 2.589 44,510 42,672 620 42,052 12,323 1,795 2,522 120 16,760 564 2.546 58,200 55,792 812 54,981 15,175 3,175 3,660 120 22,130 738 2.521 1,570 1,498 73 1,425 546 210 190 -61 885 66 3,020 2,902 -108 3,010 790 260 140 -40 1,150 -98 4,320 4,140 62 4,078 782 465 384 0 1,631 57 7,760 7,439 110 7,329 2,281 410 458 0 3,149 100 21,450 20,559 302 20,258 5,133 1,790 1,596 0 8,519 274 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Late 2025 Late 2035 Mid 2021 - Late 2025 Late 2025 - Late 2035 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Late 2025 - Mid 2051 Forecast Incremental Mid 2051 Watson & Associates Economists Ltd. PAGE 3-5 Provided below is a summary of the key assumptions and findings regarding the Township of Centre Wellington D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 6 and 7) - The housing unit mix for the Township was derived from a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications (as per Schedule 6) and discussions with Township staff regarding anticipated development trends for the Township of Centre Wellington. - Based on the above indicators, the 2025 to 2051 household growth forecast for the Township is comprised of a unit mix of 60% low density units (single detached and semi-detached), 21% medium density (multiples except apartments) and 19% high density (bachelor, 1-bedroom and 2-bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the Township of Centre Wellington - In accordance with forecast demand and available land supply, the amount and percentage of forecast housing growth between 2025 and 2051 by development location is summarized below. Table 3-2 Township of Centre Wellington Geographic Location of Residential Development Development Location Amount of Housing Growth, 2025 to 2051 Percentage of Housing Growth, 2025 to 2051 Fergus 6,500 76% Elora-Salem 1,800 21% Rural 220 3% Township of Centre Wellington 8,520 100% Note: Figures may not sum precisely due to rounding. Watson & Associates Economists Ltd. PAGE 3-6 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services and certain services with respect to land to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2051 in the Township of Centre Wellington over the forecast period is presented in Table 3-1. Over the 2025 to 2051 forecast period, the Township is anticipated to average approximately 344 new housing units per year. - Institutional population [ 2F1] is anticipated to increase by approximately 300 people between 2025 to 2051. - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the Township of Centre Wellington. Due to data limitations, medium and high-density P.P.U. data was derived from the County of Wellington Census Division, which includes the Township of Centre Wellington and is outlined in Schedule 8b. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which have recently been observed in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.921 o Medium density: 2.383 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-7 o High density: 1.810 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for late-2025 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[ 3F1] The forecast population change in existing households over the 2025 to 2051 forecast period is forecast to decline by approximately 1,890. 6. Employment (Appendix A - Schedules 10a, 10b and 10c) - The employment forecast provided herein are largely based on the activity rate method, which is defined as the number of jobs in the Township divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [ 4F2],[ 5F3] (place of work) for the Township of Centre Wellington is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 175 primary (2%); o 1,470 work at home employment (16%); o 2,272 industrial (24%); o 3,388 commercial/population-related (36%); and o 2,115 institutional (22%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-8 - The 2016 employment by usual place of work, including work at home, is 9,420. An additional 1,010 employees have been identified for the Township of Centre Wellington in 2016 that have no fixed place of work (N.F.P.O.W.).[ 6F1] - Total employment, including work at home and N.F.P.O.W. for the Township of Centre Wellington is anticipated to reach approximately 17,360 by late-2035 and 25,080 by mid-2051. This represents an employment increase of approximately 4,860 for the 10-year forecast period and 12,580 for the longer-term forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the Township of Centre Wellington (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 12,530 by late-2035 and 17,850 by mid-2051. This represents an employment increase of approximately 3,290 for the 10- year forecast period and 8,600 for the longer-term forecast period. [ 7F2] [2] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." [2] G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 10a and 10b. Total employment growth in Schedule 10b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Total employment in Schedule 10b is anticipated to reach approximately 12,480 by late-2035 and 17,700 by mid-2051. Watson & Associates Economists Ltd. PAGE 3-9 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 10b based on the following employee density assumptions: o 3,000 sq.ft. per employee for primary; o 1,300 sq.ft. per employee for industrial; o 450 sq.ft. per employee for commercial/population-related; and o 680 sq.ft. per employee for institutional employment. - The Township-wide incremental G.F.A. is anticipated to increase by 2.70 million sq.ft. over the 10-year forecast period and 7.04 million sq.ft. over the longer-term forecast period. - In terms of percentage growth, the 2025 to 2051 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 3% o industrial - 58%; o commercial/population-related - 22%; and o institutional - 17%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 10c) - Schedule 10c summarizes the anticipated amount, type and location of non-residential development by area for the Township of Centre Wellington. - The amount and percentage of forecast total non-residential growth between 2025 and 2051 by development location is summarized below. Watson & Associates Economists Ltd. PAGE 3-10 Table 3-3 Township of Centre Wellington Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2025 to 2051 Percentage of Non- Residential G.F.A., 2025 to 2051 Fergus 4,694,900 67% Elora-Salem 2,141,500 30% Rural 201,200 3% Township of Centre Wellington 7,037,600 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the Township. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the Township's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that Township Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 1. Services Related to a Highway Yes 1.1 Arterial roads 100 Yes 1.2 Collector roads 100 Yes 1.3 Bridges, culverts and roundabouts 100 No 1.4 Local municipal roads 0 Yes 1.5 Traffic signals 100 Yes 1.6 Sidewalks and streetlights 100 Yes 1.7 Active transportation 100 2. Other Transportation Services n/a 2.1 Transit vehicles[1] & facilities 100 n/a 2.2 Other transit infrastructure 100 Ineligible 2.3 Municipal parking spaces/parking lots - indoor 0 Ineligible 2.4 Municipal parking spaces/parking lots - outdoor 0 Yes 2.5 Works yards 100 Yes 2.6 Rolling stock8F1 100 n/a 2.7 Ferries 100 n/a 2.8 Airport 100 3. Stormwater Drainage and Control Services No 3.1 Main channels and drainage trunks 100 No 3.2 Channel connections 100 No 3.3 Retention/detention ponds 100 [1] with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-4 Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 4. Fire Protection Services Yes 4.1 Fire stations 100 Yes 4.2 Fire pumpers, aerials and rescue vehicles[1] 100 Yes 4.3 Small equipment and gear 100 5. Park Services (i.e., Parks and Open Space) Ineligible 5.1 Acquisition of land for parks, woodlots and E.S.A.s 0 Yes 5.2 Development of area municipal parks 100 Yes 5.3 Development of district parks 100 Yes 5.4 Development of municipal- wide parks 100 Yes 5.5 Development of special purpose parks 100 Yes 5.6 Parks rolling stock[1] and yards 100 6. Recreation Services Yes Yes 6.1 Arenas, indoor pools, fitness facilities, community centres, multi-use recreational facilities etc. (including land) 6.2 Recreation amenities 100 100 Yes 6.3 Recreation vehicles and equipment[ 9F1] 100 7. Library Services n/a 7.1 Public library space (incl. furniture and equipment) 100 n/a 7.2 Library vehicles[1] 100 n/a 7.3 Library materials 100 8. Emergency Preparedness Services No 8.1 Facility space (incl. furniture and equipment) 100 No 8.2 Vehicles[1] 100 No 8.3 Equipment 100 9. Electrical Power Services Ineligible 9.1 Electrical substations 0 Ineligible 9.2 Electrical distribution system 0 Ineligible 9.3 Electrical system rolling stock 0 [1] with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-5 Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 10. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible 10.1 Cultural space (e.g., art galleries, museums and theatres) 0 Ineligible 10.2 Tourism facilities and convention centres 0 11. Wastewater Services Yes 11.1 Treatment plants 100 Yes 11.2 Sewage trunks 100 No 11.3 Local systems 0 Yes 11.4 Vehicles and equipment[1] 100 12. Water Supply Services Yes 12.1 Treatment plants 100 Yes 12.2 Distribution systems 100 No 12.3 Local systems 0 Yes 12.4 Vehicles and equipment[1] 100 13. Waste Management Services Ineligible 13.1 Landfill collection, transfer vehicles and equipment 0 Ineligible 13.2 Landfills and other disposal facilities 0 n/a 13.3 Waste diversion facilities 100 n/a 13.4 Waste diversion vehicles and equipment[1] 100 14. Policing Services n/a 14.1 Policing detachments 100 n/a 14.2 Policing rolling stock[ 10F1] 100 n/a 14.3 Small equipment and gear 100 15. Long-term Care n/a 15.1 Long-term Care space 100 n/a 15.2 Vehicles[1] 100 16. Child Care and Early Years n/a 16.1 Childcare space 100 n/a 16.2 Vehicles[1] 100 17. Public Health n/a 17.1 Health department space 100 n/a 17.2 Health department vehicles[1] 100 18. Social Services Ineligible 18.1 Social service space 0 19. Provincial Offences Act (P.O.A.) n/a n/a 19.1 P.O.A. space 19.2 Vehicles and equipment[1] 100 100 [1] with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-6 Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 20. Housing n/a 20.1 Social Housing space 100 21. Ambulance n/a 21.1 Ambulance station space 100 n/a n/a 21.2 Vehicles[1] 21.3 Equipment and Gear 100 100 22. Hospital Provision Ineligible 22.1 Hospital capital contributions 0 23. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible 23.1 Office space 0 Ineligible 23.2 Office furniture 0 Ineligible 23.3 Computer equipment 0 24. Other Services Yes Yes 24.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land and facilities, including the D.C. background study cost 24.2 Land costs related to D.C.- eligible services 0-100 100 Yes 24.2 Interest on money borrowed to pay for growth-related capital 0-100 [1] with a 7+ year lifetime 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The Township's detailed Local Service Policy is provided in Appendix E. Watson & Associates Economists Ltd. PAGE 4-7 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions, and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; e) Costs to undertake studies in connection with any of the matters referred to in paragraphs a to d; f) Costs of the development charge background study required under section 10; and g) interest on money borrowed to pay for the above-referenced costs; In order for an increase in need for service to be included in the D.C. calculation, Township Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the Township's approved and proposed capital budgets and master servicing/needs studies. Watson & Associates Economists Ltd. PAGE 4-8 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. Credit obligations have been included in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and by-law provided herein have identified Public Works (Facilities and Fleet), Growth Studies, and Land Acquisition as classes of service. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge Watson & Associates Economists Ltd. PAGE 4-9 was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the Township spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the Township will use these reserve funds for the Township's cost share of applicable development-related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The Township's D.C. Reserve Fund balances by service as of December 31, 2024, are shown below: Table 4-2 Summary of Development Charges Reserve Fund Balances As of December 31, 2024 Note: Amounts in brackets are deficit balances. 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; Service Balance as of December 31, 2024 Less: Funding for projects not Reflected in Capital Project Listings Adjusted Balance as of December 31, 2024 Services Related to a Highway $10,451,908 $3,665,000 $6,786,908 Fire Protection Services $2,047,316 $2,047,316 Public Works $666,561 $666,561 Parks and Recreation $6,092,151 $825,000 $5,267,151 Growth Studies ($817,054) $140,000 ($957,054) Wastewater Services $4,724,413 $182,550 $4,541,863 Water Services $5,674,589 $467,600 $5,206,989 Total $28,839,884 $5,280,150 $23,559,734 Watson & Associates Economists Ltd. PAGE 4-10 - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. Note, to align with recent legislative changes introduced by Bill 60, land values have been removed from the historical level of service calculations. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the Township's "excess capacity," other than excess capacity which is "committed." Watson & Associates Economists Ltd. PAGE 4-11 "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. Watson & Associates Economists Ltd. PAGE 4-12 In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a Township-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. As per recent legislative changes introduced by Bill 60, further details regarding the approach to calculating the benefit to existing deductions by service are provided in Appendix G. 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.4.4 of this report. Watson & Associates Economists Ltd. PAGE 4-13 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. 4.12 Asset Management The legislation now requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on the asset management planning. This examination has been included in Appendix F. 4.13 Transit The D.C.A. provides for the following matters for Transit: - The Background Study requires the following in regard to transit costs (as per subsection 8 (2) of the Regulations): o The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. i. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, ii. the anticipated development over the 10-year period immediately following the preparation of the background study, or iii. the anticipated development after the 10-year period immediately following the preparation of the background study. Watson & Associates Economists Ltd. PAGE 4-14 o An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. o An assessment of ridership forecasts for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. o An assessment of the ridership capacity for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study. - A forward-looking service standard (as per 6.1(2) of the Regulations): o The service is a discrete service. o No portion of the service that is intended to benefit anticipated development after the 10-year period immediately following the preparation of the background study may be included in the estimate. o No portion of the service that is anticipated to exist as excess capacity at the end of the 10-year period immediately following the preparation of the background study may be included in the estimate. - A detailed asset management strategy and reporting requirements (subsection 6.1 (3) of the Regulation) that includes lifecycle costs, action plans that will enable the assets to be sustainable, summary of how to achieve the proposed level of service, discussion on procurement measures and risk. The Township does not currently provide transit services therefore, the above calculations and reporting requirements are not required. Watson & Associates Economists Ltd. Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - The service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and - The infrastructure cost calculation, which determines the potential D.C. recoverable cost. Note that due to recent legislative amendments to the D.C.A. and O.Reg. 82/98, the value of land has been excluded from the 15-year level of service analysis. In addition, further explanation as to the methodology for determining the capital costs and the benefit to existing deductions are provided in Appendix G. The nature of the capital projects and timing identified in the chapter reflects Council's current intention. Over time, however, Township projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and Urban 2051 Capital Costs for Centre Wellington's D.C. Calculation This section evaluates the development-related capital requirements for water and wastewater services in the urban service areas of the Township. Watson & Associates Economists Ltd. PAGE 5-2 5.2.1 Wastewater Services Wastewater Treatment Based on the Township's recently completed Water and Wastewater Servicing Master Plan, the need for a future expansion of the Fergus wastewater treatment plant has been identified at a gross capital cost estimate of $71.28 million. A deduction of $7.13 million has been applied to recognize the benefit to existing development. In addition, $28.66 million has been deducted from the calculations to recognize the amount that benefits growth post-2051. In addition to the expansion of the Fergus Wastewater Treatment Plant, the Township has also identified other capital needs such as a new sewage pumping station in South Elora and a new lift station at the Elora Wastewater Treatment Plant. Growth-related principal and discounted interest costs related to the expansion to the Elora Wastewater Treatment Plant have also been included in the calculations in the amount of approximately $11.11 million. Based on the above, the gross capital costs for all wastewater facility-related works are $121.73 million. In addition to the reductions noted above for the Fergus plant, additional deductions of $1.26 million have been made for the portion of the capital works that benefit existing development. In addition, $2.63 million has been deducted to reflect the balance in the reserve fund. The resultant net growth-related capital costs of approximately $82.05 million have been included in the D.C. calculations. The growth-related costs have been allocated between residential and non-residential development based on the population to employment growth ratio in the urban area to 2051. This results in a 71% allocation to residential development and a 29% allocation to non-residential development. Wastewater Collection System The total gross capital cost estimated for linear infrastructure associated with the wastewater collection system is approximately $35.63 million. These works include new wastewater mains, forcemains, extensions, and upgrades. In addition, outstanding debt and credit obligations of $827,000 have been included for a total gross capital cost of Watson & Associates Economists Ltd. PAGE 5-3 $36.45 million. A deduction of $3.73 million has been made to account for the benefit to existing development. In addition, a deduction of $21.44 million has been made to account for the portion of works to be funded by the developing landowner, as per the requirements of the Local Service Policy. An additional $1.91 million has been deducted from the calculations to reflect the balance in the reserve fund. The resultant net growth- related capital cost of approximately $9.37 million has been included in the D.C. calculations. These costs are allocated between residential (71%) and non-residential (29%) development based on the population to employment growth ratio to 2051 in the Township's urban area. Watson & Associates Economists Ltd. PAGE 5-4 Table 5-1 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services - Treatment and Biosolids Facilities Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 Future Expansion of Fergus WPCP 2036-2042 71,280,000 28,663,100 42,616,900 7,128,000 35,488,900 25,197,119 10,291,781 2 Elora WWTP & Clyde St. Pump Station & BioSolids Debt - Principal 2025-2034 10,346,912 - 10,346,912 - 10,346,912 7,346,307 3,000,604 3 Elora WWTP & Clyde St. Pump Station & BioSolids Debt - Interest (Discounted) 2025-2034 765,090 - 765,090 - 765,090 543,214 221,876 4 New South Elora Sewage Pumping Station 2034 7,675,000 - 7,675,000 - 7,675,000 5,449,250 2,225,750 5 New Lift Station at the Elora WWTP 2034 5,805,000 - 5,805,000 - 5,805,000 4,121,550 1,683,450 6 New Sewage Pumping Station in South Fergus Secondary Plan Area 2034 19,045,000 - 19,045,000 427,500 18,617,500 13,218,425 5,399,075 7 New South Fergus Sewage Pumping Station in Area Identifed as FE3 in the WWSMP 2034 5,810,000 - 5,810,000 130,400 5,679,600 4,032,516 1,647,084 8 Fergus WWTP Headworks Bar Screen 2026-2027 1,000,000 - 1,000,000 700,000 300,000 213,000 87,000 Reserve Fund Adjustment 2,629,596 (2,629,596) (1,867,013) (762,583) Total 121,727,002 28,663,100 - 93,063,902 11,015,496 - 82,048,406 58,254,368 23,794,038 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-5 Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services - Collection System Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 McQueen Sanitary Extension - Fergus/Nichol Boundary to Guelph St. 2034 435,000 - 435,000 - 435,000 - - - 2 New Forcemain on Union St. - Guelph Rd. to Athol St. to Tower St. to Fergus WWTP 2034 2,024,200 - 2,024,200 10,900 1,477,700 535,600 380,276 155,324 3 New Forcemain on Wellington Rd. 7 - SPS in Area ER1 to First Line 2034 2,120,000 - 2,120,000 - 2,120,000 1,505,200 614,800 4 New sanitary sewer on Wellington Rd. 7 - First Line to Elora WWTP 2034 3,140,000 - 3,140,000 - 3,140,000 2,229,400 910,600 5 Upgrading Geddes St. Sanitary Sewer 2034 800,000 - 800,000 552,000 248,000 176,080 71,920 6 Upgrading sanitary sewer on East Mill St. - Melville St to Irvine 2034 1,190,000 - 1,190,000 718,500 471,500 334,765 136,735 7 New Forcemain on Guelph St - South Fergus SPS to Union St 2034 1,908,300 - 1,908,300 11,600 1,393,100 503,600 357,556 146,044 8 New sanitary sewer connecting areas identifed as FE3 and FE4 in the WWSMP through the South Fergus Secondary Plan Area 2034 4,810,000 - 4,810,000 - 4,422,530 387,470 275,104 112,366 9 New Forcemain from Sewage Pumping Station in Area FE3 to gravity connection 2034 300,000 - 300,000 - 300,000 213,000 87,000 10 Upgrading sanitary sewer on Beatty Ln. - St. Andrew St. W to Colquhoun St. 2034 280,000 - 280,000 181,400 98,600 70,006 28,594 11 Upgrading sanitary sewer on Colquhoun St - Beatty Ln. to St. Andrew St. W 2034 1,640,000 - 1,640,000 1,148,000 492,000 349,320 142,680 12 Upgrading sanitary sewer on Holman Cres. and Perry St. 2034 770,000 - 770,000 407,100 362,900 257,659 105,241 13 New sanitary sewers on Barnett Crescent north and south to Guelph Street 2034 775,000 - 775,000 232,500 542,500 - - - 14 New sanitary sewers on Chambers Crescent north and south to Guelph Street 2034 775,000 - 775,000 232,500 542,500 - - - Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-6 Table 5-2 (cont'd) Infrastructure Cost Included in the Development Charges Calculation Wastewater Services - Collection System Residential Share Non- Residential Share 2025 to 2051 71% 29% 15 New sanitary sewers on Cummings Crescent north and south to Guelph Street 2034 775,000 - 775,000 232,500 542,500 - - - 16 New sanitary sewer on Guelph Street to new South Fergus SPS 2034 1,085,000 - 1,085,000 - 1,085,000 770,350 314,650 17 New sanitary sewer for 290 Chambers, 340 Cummings and 391 Cummings Crescent 2034 715,000 - 715,000 - 715,000 507,650 207,350 18 Local Servicing for Water and Wastewater Servicing Master Plan Area FE1 2034 710,000 - 710,000 - 710,000 - - - 19 Local Servicing for Water and Wastewater Servicing Master Plan Area FE2 2034 515,000 - 515,000 - 515,000 - - - 20 Local Servicing for Water and Wastewater Servicing Master Plan Area FE3 2034 2,825,000 - 2,825,000 - 2,825,000 - - - 21 Local Servicing for Water and Wastewater Servicing Master Plan Area FE4 2034 1,260,000 - 1,260,000 - 1,260,000 - - - 22 Local Servicing for Water and Wastewater Servicing Master Plan Area FE5 2034 1,730,000 - 1,730,000 - 1,730,000 - - - 23 Local Servicing for Water and Wastewater Servicing Master Plan Area ER1 2034 4,100,000 - 4,100,000 - 4,100,000 - - - 24 Local Servicing for Water and Wastewater Servicing Master Plan Area ER2 2034 945,000 - 945,000 - 945,000 - - - Outstanding Debt & Credits 25 Elora WWTP & Clyde St. Pump Station & BioSolids Debt - Principal 2025-2034 544,574 - 544,574 - 544,574 386,648 157,927 26 Elora WWTP & Clyde St. Pump Station & BioSolids Debt - Interest (Discounted) 2025-2034 40,268 - 40,268 - 40,268 28,590 11,678 27 Developer Credits - Ainley 77,000 - 77,000 - 77,000 54,670 22,330 28 Developer Credits - Haylock 165,300 - 165,300 - 165,300 117,363 47,937 Reserve Fund Adjustment 1,912,267 (1,912,267) (1,357,710) (554,557) Total 36,454,642 - - 36,454,642 5,639,267 21,440,830 9,374,545 6,655,927 2,718,618 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-7 5.2.2 Water Services Water Treatment, Supply, and Storage Facilities Based on the anticipated growth in the Township, additional wells and related works have been identified for inclusion in the D.C. calculations. In addition to these works, costs related to existing debt and future financing costs have been included. The total gross costs included on the capital listing is $48.20 million. Of this amount, $5.85 million has been deducted to account for growth outside of the forecast period and $3.80 million has been deducted to account for the benefit to existing development. Furthermore, the existing reserve fund balance of $2.73 million has also been deducted from the calculations. As a result, the net growth-related capital cost included in the D.C. calculation is $35.82 million. The growth costs have been allocated 71% to residential development and 29% to non- residential development based on the incremental growth in population to employment, for the urban 2051 forecast period. Water Distribution System Water distribution works related to new watermains, extensions, and upgrades have been identified to accommodate new development. The total gross capital cost estimated for this water linear infrastructure is $73.53 million. In addition, outstanding debt principal, discounted interest, and credits of approximately $2.50 million have been included in the D.C. calculations. Deductions from the calculations have been made in the amounts of $2.83 million and $16.98 million for the portion of the works that benefit existing development and the portion that is to be funded by developing landowners based on the local service policy. In addition, a deduction of $2.48 million has been made to reflect the existing D.C. reserve fund balance. The resultant net growth-related capital cost of approximately $49.74 million has been included in the D.C. calculations. The growth costs have been allocated 71% to residential development and 29% to non- residential development based on the incremental growth in population to employment, for the urban 2051 forecast period. Watson & Associates Economists Ltd. PAGE 5-8 Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Water Services - Treatment, Supply and Storage Facilities Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 New Well - Area #3 2029-2030 4,100,000 - 4,100,000 - 4,100,000 2,911,000 1,189,000 2 New Well - Area #5 2040 5,850,000 5,850,000 - - - - - 3 Replacement of F2 Well with additional capacity expanded 2026 2,800,000 - 2,800,000 700,000 2,100,000 1,491,000 609,000 4 Well F2 - Growth Related Interest (Discounted) 2025-2034 189,226 - 189,226 - 189,226 134,351 54,876 5 Replacement and expansion of F5 Well and Generators 2028 3,650,000 - 3,650,000 3,102,500 547,500 388,725 158,775 6 Well F5 - Growth Related Interest (Discounted) 2025-2034 24,970 - 24,970 - 24,970 17,728 7,241 7 New Well - Area 7 2026-2027 4,100,000 - 4,100,000 - 4,100,000 2,911,000 1,189,000 8 New Water Reservoir in Fergus 2030-2031 15,060,000 - 15,060,000 - 15,060,000 10,692,600 4,367,400 9 Middlebrook Well Site 2036 8,800,000 - 8,800,000 - 8,800,000 6,248,000 2,552,000 Outstanding Debt, Estimated Future Financing and Reserve Fund Adjustment 10 Fergus Water Tower - Debt Prinicpal 2025 191,145 - 191,145 - 191,145 135,713 55,432 11 Fergus Water Tower - Debt Interest (Discounted) 2025 6,862 - 6,862 - 6,862 4,872 1,990 12 LT Water Supply Implementation - Groundwater Investigation Study - Principal 2025-2044 2,420,000 - 2,420,000 - 2,420,000 1,718,200 701,800 13 LT Water Supply Implementation - Groundwater Investigation Study - Discounted Interest 2025-2044 631,991 - 631,991 - 631,991 448,714 183,278 14 Growth-Related Financing Costs for New Well - Area #3 - Interest (Discounted) 2031-2050 253,821 - 253,821 - 253,821 180,213 73,608 15 Growth-Related Financing Costs for New Well - Area #7 - Interest (Discounted) 2034-2053 117,049 - 117,049 - 117,049 83,105 33,944 Reserve Fund Adjustment - 2,726,975 (2,726,975) (1,936,152) (790,823) Total 48,195,064 5,850,000 - 42,345,064 6,529,475 - 35,815,589 25,429,068 10,386,521 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-9 Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Water Services - Distribution System Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 Irvine Watermain Extension - Bricker to SR 15 2034 910,000 - 910,000 - 910,000 646,100 263,900 2 McQueen Watermain Extension - Fergus/Nichol Boundary to Guelph St 2034 880,000 - 880,000 - 880,000 624,800 255,200 3 Guelph St. - Watermain Extension - South of Cummings Cres (South Fergus SPS). to Union St. 2034 1,202,800 - 1,202,800 6,500 878,100 318,200 225,922 92,278 4 Guelph St. Watermain Extension - South of Cummings Cres. (South Fergus SPS) to Second Line 2034 2,660,000 - 2,660,000 - 2,660,000 1,888,600 771,400 5 McQueen Blvd - Millburn Blvd to McTavish St 2034 675,000 - 675,000 - 675,000 - - - 6 Garafraxa St - 175M west of Maiden Lane to Beatty 2034 400,000 - 400,000 - 400,000 - - - 7 Second Line Watermain Extension - HWY 6 to Jones Baseline 2034 2,190,000 - 2,190,000 - 2,190,000 1,554,900 635,100 8 Second Line Watermain Extension - HWY 6 to Guelph St 2034 1,530,000 - 1,530,000 - 1,530,000 1,086,300 443,700 9 Scotland Watermain Extension - Exsiting Limit to Second Line 2034 1,590,000 - 1,590,000 - 1,590,000 1,128,900 461,100 10 HWY 6 Watermain Extension - Existing Limit to Second Line 2034 1,430,000 - 1,430,000 - 1,430,000 1,015,300 414,700 11 Woolwich Watermain Extension - Irvine to James 2034 1,620,000 - 1,620,000 - 1,620,000 1,150,200 469,800 12 W.R.7 Watermain Extension - David St. to Woolwich 2034 2,090,000 - 2,090,000 41,800 2,048,200 1,454,222 593,978 13 Woolwich Watermain Extension - W.R.7 to New Well 3 2034 6,510,000 - 6,510,000 130,200 6,379,800 4,529,658 1,850,142 14 3rd Line Watermain Extension - W.R.18 to Middlebrook Road Well 2034 4,510,000 - 4,510,000 90,200 4,419,800 3,138,058 1,281,742 15 W.R.7 Watermain Extension - Woolwich to Well Area 5 2034 4,090,000 4,008,200 81,800 81,800 - - - 16 Sideroad 10(11) Watermain Extension - W.R.7 to Well Area 5 2034 830,000 - 830,000 - 830,000 589,300 240,700 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-10 Table 5-4 (cont'd) Infrastructure Cost Included in the Development Charges Calculation Water Services - Distribution System Residential Share Non- Residential Share 2025 to 2051 71% 29% 17 First Line Watermain Extension - Existing Stub to ER5 (East Limit) 2034 1,040,000 - 1,040,000 20,800 1,019,200 723,632 295,568 18 Carlton Place Watermain Replacement - Victoria to W.R.7 2034 1,400,000 - 1,400,000 980,000 420,000 298,200 121,800 19 Beatty Line Watermain Extension - Farley to SDRD 15 2028 2,250,000 - 2,250,000 45,000 2,205,000 1,565,550 639,450 20 SDRD 15 Watermain Extension - Beatty Line to Well Area 7 2028 2,090,000 - 2,090,000 41,800 2,048,200 1,454,222 593,978 21 Upsize Existing Watermain on Union Street - Guelph Street to Tower Street 2034 1,276,000 - 1,276,000 253,200 931,500 91,300 64,823 26,477 22 Replace Existing 150mm Watermain with 300mm Watermain on WR 7 from 105m north of Ross to WR21 2034 612,000 - 612,000 289,200 322,800 229,188 93,612 23 Connection of New Reservoir to Low Pressure Zone in Fergus 2033 1,620,000 - 1,620,000 - 1,620,000 1,150,200 469,800 24 Connection of New Reservoir to High Pressure Zone in Fergus 2033 1,620,000 - 1,620,000 - 1,620,000 1,150,200 469,800 25 Watermain Extension on First Line at Wellington Rd. 7 2034 570,000 - 570,000 - 570,000 404,700 165,300 26 Watermain Extension on Wellington Rd. 7 - Area ER1 in WWSMP to First Line 2034 1,950,000 - 1,950,000 - 1,950,000 1,384,500 565,500 27 Watermain Extension on Wellington Rd. 7 - First Line to Existing Main South of York St. 2034 2,210,000 - 2,210,000 - 2,210,000 1,569,100 640,900 28 Watermain Extension on Middlebrook Rd. - Third Ln W to Middlebrook Well Location 2034 2,400,000 - 2,400,000 - 2,400,000 1,704,000 696,000 29 Watermain Extension on HWY 6 - Area FE3 to Second Line 2034 1,470,000 - 1,470,000 - 1,470,000 1,043,700 426,300 30 Watermain Extension on Jones Baseline - FE3 to Second Line 2034 1,470,000 - 1,470,000 - 1,470,000 1,043,700 426,300 31 Watermain Extension on St. George St. W - Maple Street to Beatty Ln 2034 520,000 - 520,000 - 520,000 369,200 150,800 32 Watermain Extension on Garafraxa St. - east limits to FE5 2034 1,430,000 - 1,430,000 - 1,430,000 1,015,300 414,700 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-11 Table 5-4 (cont'd) Infrastructure Cost Included in the Development Charges Calculation Water Services - Distribution System Residential Share Non- Residential Share 2025 to 2051 71% 29% 33 Watermain Extension on Sideroad 18 - Vincent St to Steele St. 2036 1,540,000 - 1,540,000 - 1,540,000 1,093,400 446,600 34 Watermain Extension on Barnett Crescent to Guelph Road 2034 935,000 - 935,000 280,500 654,500 - - - 35 Watermain Extension on Chambers Crescent to Guelph Road 2034 945,000 - 945,000 283,500 661,500 - - - 36 Watermain Extension on Cummings Crescent to Guelph Road 2034 945,000 - 945,000 283,500 661,500 - - - 37 Local Servicing for Water and Wastewater Servicing Master Plan Area FE1 2034 900,000 - 900,000 - 900,000 - - - 38 Local Servicing for Water and Wastewater Servicing Master Plan Area FE2 2034 1,850,000 - 1,850,000 - 1,850,000 - - - 39 Local Servicing for Water and Wastewater Servicing Master Plan Area FE3 2034 1,625,000 - 1,625,000 - 1,625,000 - - - 40 Local Servicing for Water and Wastewater Servicing Master Plan Area FE4 2034 1,500,000 - 1,500,000 - 1,500,000 - - - 41 Local Servicing for Water and Wastewater Servicing Master Plan Area FE5 2034 960,000 - 960,000 - 960,000 - - - 42 Local Servicing for Water and Wastewater Servicing Master Plan Area ER1 2034 4,335,000 - 4,335,000 - 4,335,000 - - - 43 Local Servicing for Water and Wastewater Servicing Master Plan Area ER2 2034 945,000 - 945,000 - 945,000 - - - Outstanding Debt & Credits 44 Existing 2025 Growth Related Debt Costs - Principal and Discounted Interest 59,273 - 59,273 - 59,273 42,084 17,189 45 Salem Bridge - WR18 and James Street Watermain Exentension - Principal 2025-2041 720,538 - 720,538 - 720,538 511,582 208,956 46 Salem Bridge - WR18 and James Street Watermain Exentension - Interest (Discounted) 2025-2041 88,755 - 88,755 - 88,755 63,016 25,739 47 Developer Credits - Ainley Credits 2025+ 1,435,000 - 1,435,000 - 1,435,000 1,018,850 416,150 48 Developer Credits - Storybrook 2025+ 200,000 - 200,000 - 200,000 142,000 58,000 49 Reserve Fund Adjustment 2,480,014 (2,480,014) (1,760,810) (719,204) Total 76,029,366 4,008,200 - 72,021,166 5,308,014 16,977,100 49,736,052 35,312,597 14,423,455 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-11a 5.2.3 Land - Urban 2051 Forecast Period Land costs are considered a class of service under the D.C.A. and comprises land acquisition costs related to D.C. eligible services. The land costs in this subsection are related to D.C.-eligible services which are not restricted to a 10-year forecast period. The land costs included herein are related to water and wastewater services, which are based on an urban 2051 forecast period. Land costs related to new water and wastewater facilities have been identified for inclusion in the D.C. Further, debt principal and discounted interest related to the Middlebrook Well Site land acquisition have also been included in the calculations. The total cost related to these items is $4.64 million. A deduction of $14,000 has been made to account for the benefit to existing development, resulting in a total D.C.-recoverable cost of $4.63 million to be included in the calculations. The residential/non-residential capital cost allocation for land is 71% residential and 29% non-residential based on the incremental growth in population to employment for the urban 2051 forecast period. This share is consistent with the allocation utilized for water and wastewater services. Watson & Associates Economists Ltd. PAGE 5-11b Table 5-4a Township of Centre Wellington Infrastructure Cost Included in the Development Charges Calculation Land - Urban 2051 Forecast Period Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% Water Services 1 Land for new Water Reservoir in Fergus 2030 400,000 - 400,000 - 400,000 284,000 116,000 2 Middlebrook Well Site - Land Acquisition - Principal 2025-2044 1,875,000 - 1,875,000 - 1,875,000 1,331,250 543,750 3 Middlebrook Well Site - Land Acquisition - Discounted Interest 2025-2044 489,663 - 489,663 - 489,663 347,661 142,002 Wastewater Services 4 Land Acquisition - New South Elora Sewage Pumping Station 2034 625,000 - 625,000 - 625,000 443,750 181,250 5 Land Acquisition - New Lift Station at the Elora WWTP 2034 625,000 - 625,000 - 625,000 443,750 181,250 6 Land Acquisition - New Sewage Pumping Station in South Fergus Secondary Plan Area 2034 625,000 - 625,000 14,000 611,000 433,810 177,190 Total 4,639,663 - - 4,639,663 14,000 - 4,625,663 3,284,221 1,341,442 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2025$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-12 5.3 Service Levels and Township-wide 2051 Capital Costs for Centre Wellington's D.C. Calculation This section evaluates the development-related capital requirements for services with capital costs forecast on a Township-wide 2051 basis (i.e. for all areas of the Township). 5.3.1 Services Related to a Highway Centre Wellington owns and maintains 472 km of roads. Based on the level of service provided over the historical 15-year period, the average level of service is 16 km of roads per 1,000 population, which equates to an investment of $40,597 per capita. This results in a D.C.-eligible recovery amount of approximately $834.63 million over the 2051-year forecast period. In addition to roads, the Township also maintains 129,246 linear metres of active transportation, including multi-use paths, sidewalks, trails, and on-road cycling lanes. The inventory provided over the previous 15-year period equates to a per capita standard of $594. Over the forecast period, the D.C.-eligible amount for active transportation is approximately $12.21 million. The maximum D.C.-eligible amount for recovery over the 2051 forecast period for services related to a highway is approximately $846.84 million With respect to future needs, the identified services related to highway program was reviewed with staff and totals $193.33 million. These capital projects include various works related to adding capacity to the transportation system including road improvements/expansions, intersection improvements, bridge expansions, additional active transportation projects and outstanding debt and credits. Note: the detailed active transportation project listing is provided in Appendix I. The growth-related share of the works was determined through a review of the scope of works on a project specific basis. Based on this review, the total deductions related to the benefit to existing development is $54.70 million. In addition, deductions of $56.57 million have been made to account for the portion of works to be funded through grants, subsidies, and other contributions. An additional deduction of $6.79 million has been made to recognize the existing balance in the D.C. reserve fund. Based on these deductions, the total net growth-related capital costs are $75.26 million and have been Watson & Associates Economists Ltd. PAGE 5-13 included in the D.C. calculations to be recovered over the forecast period (2025 to 2051). The residential/non-residential capital cost allocation for all services related to a highway is 71% residential and 29% non-residential based on the incremental growth in population to employment for the 2051 forecast period. Watson & Associates Economists Ltd. PAGE 5-14 Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% Roads 1 Sideroad 15, Beatty Line N to Highway 6 2034 2,884,700 - 2,884,700 1,730,800 1,153,900 819,269 334,631 2 Beatty Line N, Nichol Road 15 to Sideroad 18 2034 4,837,400 - 4,837,400 2,902,400 1,935,000 1,373,850 561,150 3 York Street, Waterloo Street (Hamilton) to Wellington Rd 7 2034 235,000 - 235,000 70,500 164,500 116,795 47,705 4 Carlton Place, Metcalfe Street to Victoria St 2034 1,100,000 - 1,100,000 132,000 968,000 - - - 5 Carlton Place, Victoria Street to Wellington Rd 7 2034 1,400,000 - 1,400,000 196,000 560,000 644,000 457,240 186,760 6 Short-term improvement - Provision for design, approvals, permits 2034 383,100 - 383,100 - 383,100 272,001 111,099 7 McQueen Blvd Extension towards West , McQueen Blvd to Guelph Street 2034 1,040,000 - 1,040,000 52,000 988,000 - - - 8 Sideroad 15, Gerrie Road to Beatty Line N 2034 4,330,000 - 4,330,000 2,598,000 1,732,000 1,229,720 502,280 9 Sideroad 15, James Street to Irvine Street 2034 1,400,000 - 1,400,000 840,000 234,000 326,000 231,460 94,540 10 First Line (NI), Wellington Road 7 to Bridge Street 2034 4,300,000 - 4,300,000 1,290,000 3,010,000 2,137,100 872,900 11 Gerrie Road, Sideroad 15 to Walser Street Ext East 2034 2,150,000 - 2,150,000 1,290,000 860,000 610,600 249,400 12 Guelph Street, south of Cummings Crescent (South Fergus SPS) to Union Street 2034 3,585,200 - 3,585,200 766,600 1,029,900 1,788,700 1,269,977 518,723 13 McQueen Blvd Extension towards East, Millburn Blvd to McTavish Street 2034 2,250,000 - 2,250,000 - 2,250,000 - - - 14 Gilkison Street, South River Road to Trestle Bridge Trail Crossing 2034 1,600,000 - 1,600,000 480,000 1,120,000 795,200 324,800 15 St Andrew St E, Lamond Street to Anderson Street 2034 2,250,000 - 2,250,000 675,000 1,575,000 1,118,250 456,750 16 Scotland Street, McQueen Blvd to Second Line 2034 3,452,000 - 3,452,000 1,035,600 2,416,400 - - - 17 Garafraxa Street, Beatty Line N to Maiden Line 2034 1,790,000 - 1,790,000 537,000 859,200 393,800 279,598 114,202 18 Sideroad 15, Gerrie Road to Irvine Street 2034 2,495,000 - 2,495,000 1,497,000 998,000 708,580 289,420 19 Guelph Street, South of Cummings Cres. to Second Line (South Fergus SPS to Second Line) 2026-2031 3,450,000 - 3,450,000 1,035,000 2,415,000 - - - 20 Second Line, Guelph Street to Highway 6 2034 3,000,000 - 3,000,000 900,000 2,100,000 - - - 21 David Street, Geddes Street to Aqua Street 2034 1,040,000 - 1,040,000 312,000 728,000 516,880 211,120 22 David Street, Aqua Street to John Street 2034 749,000 - 749,000 224,700 524,300 372,253 152,047 23 David Street, John Street to Irvine Street 2034 385,000 - 385,000 115,500 269,500 191,345 78,155 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-15 Table 5-5 (cont'd) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% 24 David Street, Geddes Street to Aqua Street 2034 1,040,000 - 1,040,000 312,000 728,000 516,880 211,120 25 David Street, Aqua Street to John Street 2034 749,000 - 749,000 224,700 524,300 372,253 152,047 26 David Street, John Street to Irvine Street 2034 385,000 - 385,000 115,500 269,500 191,345 78,155 27 South River Road, Haylock Avenue to Gilkison Road 2034 2,000,000 - 2,000,000 600,000 1,400,000 994,000 406,000 28 Union Street W, Tower Street to Guelph Road 2034 3,275,300 - 3,275,300 654,800 1,092,500 1,528,000 1,084,880 443,120 29 Second Line, Highway 6 to Jones Baseline 2026-2031 4,500,000 - 4,500,000 450,000 4,050,000 - - - 30 McQueen Blvd Extension towards West, Beatty Line N Ext to First Line 2032-2041 6,750,000 - 6,750,000 337,500 6,412,500 4,552,875 1,859,625 31 Gilkison Street, Trestle Bridge Trail Crossing to First Line 2034-2041 1,270,000 - 1,270,000 381,000 889,000 631,190 257,810 32 First Line, McGowan St SWM Pond to South River Road 2034-2041 4,000,000 - 4,000,000 2,400,000 1,600,000 1,136,000 464,000 33 New Roads as identified in the South Fergus MESP, east of Highway 6 2034-2041 3,000,000 - 3,000,000 - 3,000,000 - - - 34 New Roads as identified in the South Fergus MESP, west of Highway 6 2034-2041 3,000,000 - 3,000,000 - 3,000,000 - - - 35 Second Line Ext, Scotland Street to Wellington Road 29 2034-2041 3,270,000 - 3,270,000 163,500 3,106,500 2,205,615 900,885 38 Sideroad 18, Vincent Street to Steele Street 2036 2,120,000 - 2,120,000 636,000 1,484,000 1,053,640 430,360 39 Hamilton Street, York St to south end. 2030-2041 1,270,000 - 1,270,000 381,000 889,000 631,190 257,810 40 Jones Baseline, Second Line to South of Second Line 2030-2041 3,800,000 - 3,800,000 - 3,800,000 - - - 41 Irvine Street, Bricker to Sideroad 15 2030-2041 1,700,000 - 1,700,000 - 1,700,000 - - - 42 Gravel to Asphalt Road Conversion - Eramosa - West Garafraxa Townline (5th Line to WR26) 2026 300,000 - 300,000 270,000 30,000 21,300 8,700 43 Gravel Road Conversion - SR20 from Second Line to Fifth Line 2031 450,000 - 450,000 405,000 45,000 31,950 13,050 44 Gravel Road Conversion - Second Line from SR20 to SR25 2031 310,000 - 310,000 279,000 31,000 22,010 8,990 45 Gravel Road Conversion - Sixth Line from SR20 to SR25 2032 310,000 - 310,000 279,000 31,000 22,010 8,990 Intersection Improvements 46 Wellington Road 7 and York Street W 2026-2031 869,900 - 869,900 - 869,900 - - - 47 Highway 6 and Nichol Road 15 2026-2031 1,575,500 - 1,575,500 - 1,575,500 - - - 48 Beatty Line N and Millage Lane 2026 310,700 - 310,700 15,500 295,200 209,592 85,608 49 Beatty Line N and Sideroad 18 2026 300,000 - 300,000 15,000 285,000 202,350 82,650 50 Guelph Street and McQueen Blvd Ext 2026-2031 2,486,800 - 2,486,800 124,300 2,362,500 1,677,375 685,125 51 South River Road and Gilkison Street 2026-2031 517,800 - 517,800 25,900 491,900 349,249 142,651 52 Gerrie Road and Colborne Street 2026-2031 517,800 - 517,800 25,900 491,900 349,249 142,651 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-16 Table 5-5 (cont'd) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% Bridge Expansions 53 Sideroad 15 - Queen Mary Bridge - Structure - 30-WG 2026-2031 4,145,100 - 4,145,100 3,730,600 414,500 294,295 120,205 54 Sideroad 15 - Structure - 29-WG 2026-2027 3,600,000 - 3,600,000 3,240,000 360,000 255,600 104,400 55 Structure 32-P & 33-P (Noah Road) 2026 3,350,000 - 3,350,000 3,015,000 335,000 237,850 97,150 56 Structure 29-WG (Sideroad 15) 2026-2027 3,590,000 - 3,590,000 3,231,000 359,000 254,890 104,110 57 Structure 28-P (Sideroad 11) 2026-2028 2,200,000 - 2,200,000 1,980,000 220,000 156,200 63,800 58 Structure 5-E (Fourth Line) 2027-2028 1,800,000 - 1,800,000 1,620,000 180,000 127,800 52,200 59 Structure 5-P (Weisenberg Boundary Road) 2029 1,100,000 - 1,100,000 990,000 110,000 78,100 31,900 60 Structure 2-WG (Third Line) 2029-2030 2,000,000 - 2,000,000 1,800,000 200,000 142,000 58,000 61 Structure 7-E (Third Line) 2030-2031 1,700,000 - 1,700,000 1,530,000 170,000 120,700 49,300 62 Structure 21-WG (First Line) 2033 2,800,000 - 2,800,000 2,520,000 280,000 198,800 81,200 63 Structure 30-WG (Sideroad 15 - Queen Mary) 2034 3,000,000 - 3,000,000 2,700,000 300,000 213,000 87,000 Active Transportation Projects 64 Active Transportation Projects 2025-2051 54,000,000 - - 54,000,000 2,146,620 20,350,470 31,498,010 22,363,587 9,134,423 Outstanding Debt, Credits and Reserve Adjustment 65 David St. Reconstruction - Geddes St. to County Rd 7 - Debt Costs - Principal 2025 4,044 - 4,044 - 4,044 2,872 1,173 66 David St. Reconstruction - Geddes St. to County Rd 7 - Debt Costs - Interest (Discounted) 2025 43 - 43 - 43 31 13 67 Developer Credits - Granwood Gate Phase 3 2025+ 31,649 - 31,649 - 31,649 22,471 9,178 68 Developer Credits - Ainley 2025+ 2,165,000 - 2,165,000 - 2,165,000 1,537,150 627,850 69 Developer Credits - Storybrook 2025+ 3,661,000 - 3,661,000 - 3,661,000 2,599,310 1,061,690 70 Reserve Fund Adjustment 6,786,908 (6,786,908) (4,818,705) (1,968,203) Total 193,325,637 - - 193,325,637 61,491,328 56,574,070 75,255,339 53,431,291 21,824,048 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-17 5.3.2 Public Works - Facilities and Fleet As noted in Section 4.7, a D.C. by-law may provide for any D.C.-eligible service to be included in a class set out in the by-law. Public Works is proposed as a class of service comprised of Services Related to a Highway, Water Services, and Wastewater Services. The Public Works Department has a variety of vehicles and major equipment providing for a total investment of $18.55 million. The inventory provided over the previous 15- year period equates to a per capita standard of $565. Over the forecast period, the D.C.-eligible amount for vehicles and equipment is approximately $11.61 million. The Township currently operates its Public Works service out of thirteen facilities totalling 58,139 sq.ft. of building area. The average level of service provided over the historical 15-year period is 1.85 sq.ft. per capita, which equates to an investment of $891 per capita. This level of service provides the Township with a maximum D.C.- eligible amount for recovery over the 26-year forecast period of approximately $18.32 million. In total, the D.C.-eligible amount for recovery for Public Works services is approximately $29.94 million. With respect to future growth needs, the Township has identified the need for additional facility space as well as new fleet and equipment. In addition to the capital needs, outstanding debt related to the operations centre and interest costs related to phase 2 of the operations centre have been included in the D.C. calculations. As a result, the total gross capital cost related to public works is $48.89 million. A deduction of $200,000 has been made with respect to the benefit to existing development related to the new snow storage and treatment facility. In addition, $12.68 million has been deducted from the calculations related to the benefit to growth beyond the 2051 forecast period. An adjustment of approximately $667,000 has been made to account for the existing balance in the D.C. reserve fund. As a result, the net growth-related cost included in the D.C. is approximately $35.35 million. The residential/non-residential capital cost allocation for public works is based on a 71% residential/29% non-residential split, which is based on the ratio of incremental growth in population to employment for the 2051 forecast period. Watson & Associates Economists Ltd. PAGE 5-18 Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Public Works Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 Snow Storage and Treatment Facility Services Related to a Highway 2028 2,000,000 - 2,000,000 200,000 1,800,000 1,278,000 522,000 2 Operations Centre Principal Services Related to a Highway, Water Services, Wastewater Services 2025-2044 21,687,000 - 21,687,000 - 21,687,000 15,397,770 6,289,230 3 Operations Centre Discounted Interest Services Related to a Highway, Water Services, Wastewater Services 2025-2044 5,235,221 - 5,235,221 - 5,235,221 3,717,007 1,518,214 4 Operations Centre - Sand-Salt Dome Services Related to a Highway 2035 7,600,000 5,548,000 2,052,000 - 2,052,000 1,456,920 595,080 5 Operations Centre - Additional Garage Bays & Indoor Storage Services Related to a Highway 2035 9,100,000 6,643,000 2,457,000 - 2,457,000 1,744,470 712,530 6 Discounted Interest for Phase 2 Operations Centre Services Related to a Highway 2036-2055 670,697 489,600 181,097 - 181,097 128,579 52,518 7 Provision for Additional Sidewalk Plows Services Related to a Highway 2026-2035 450,000 - 450,000 - 450,000 319,500 130,500 8 Provision for Additional Single Axle Trucks, with Plow, Sander, Wing Services Related to a Highway 2026-2035 450,000 - 450,000 - 450,000 319,500 130,500 9 Provision for Additional Tandem Axle Trucks with Plow, Sander, Wing Services Related to a Highway 2026-2035 500,000 - 500,000 - 500,000 355,000 145,000 10 Provision for Additional Vehicles and Heavy Equipment Services Related to a Highway, Water Services, Wastewater Services 2026-2035 1,200,000 - 1,200,000 - 1,200,000 852,000 348,000 Reserve Fund Adjustment - - - 666,561 (666,561) (473,258) (193,303) Total 48,892,918 12,680,600 - 36,212,318 866,561 - 35,345,757 25,095,487 10,250,270 Gross Capital Cost Estimate (2025$) Service to Which Project Relates Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-19 5.3.3 Fire Protection Services The Township currently operates its fire services from two stations and two storage facilities, totalling 16,893 sq.ft. of facility space. The facility space provided over the historical 15-year period provides for an average level of service of 562 sq.ft. per 1,000 population or an investment of $361 per capita. With respect to fire facilities, this level of service provides the Township with a maximum D.C.-eligible amount for recovery over the forecast period of approximately $7.42 million. The fire department has a current inventory of 18 vehicles. The total D.C.-eligible amount calculated for fire vehicles over the forecast period is approximately $6.96 million, based on an average level of service of $339 per capita. In addition, the fire department provides 211 items of equipment and gear for use in fire services. Based on the level of service provided over the historical 15-year period, the calculated average level of service is $82 per capita, providing for a D.C.-eligible amount over the forecast period of $1.69 million for small equipment and gear. In total, the D.C.-eligible amount for fire services is approximately $16.07 million. Based on the anticipated growth over the forecast period, the Township has identified the need for a new fire hall, additional vehicles, and additional equipment for new firefighters. In total, the gross estimated cost of these works is $12.73 million. Given that these projects are providing for new facility space, vehicles and gear to service growth within the forecast period, no deductions have been made for benefit to existing development and development beyond the forecast period. A deduction of $2.05 million has been made to reflect the existing balance in the reserve fund. The resulting net growth-related capital cost included in the D.C. calculations is $10.68 million. These costs are shared between residential and non-residential growth based on the population to employment growth ratio over the forecast period, resulting in a 71% allocation to residential development and 29% allocation to non-residential development. Watson & Associates Economists Ltd. PAGE 5-20 Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Fire Protection Services Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% Fire Facilities 1 New Fire Hall 2026-2032 9,300,000 - 9,300,000 - 9,300,000 6,603,000 2,697,000 Fire Vehicles 2 Tanker 2032 1,000,000 - 1,000,000 - 1,000,000 710,000 290,000 3 Pumper 2032 1,400,000 - 1,400,000 - 1,400,000 994,000 406,000 4 Provision for Additional Vehicles & Equipment 2032 620,000 - 620,000 - 620,000 440,200 179,800 Fire Small Equipment & Gear 5 Additional Volunteer Firefighters (6) 2031 55,400 - 55,400 - 55,400 39,334 16,066 6 Additional Volunteer Firefighters (19) 2032 175,300 - 175,300 - 175,300 124,463 50,837 7 Additional SCBA & Cylinders 2031-2032 130,300 - 130,300 - 130,300 92,513 37,787 8 Portable Radios and Chargers 2031-2032 48,800 - 48,800 - 48,800 34,648 14,152 Reserve Fund Adjustment 2,047,316 (2,047,316) (1,453,594) (593,722) Total 12,729,800 - - 12,729,800 2,047,316 - 10,682,484 7,584,564 3,097,920 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-21 5.3.4 Parks and Recreation Services The Township currently has 276 acres of parkland within its jurisdiction. This inventory consists of active parkland, passive parkland, and natural open space. The inventory provided over the previous 15-year period results in a calculated average level of service of 8.4 acres of parkland per 1,000 population. The Township also provides 123 parkland amenities (e.g. playground equipment, picnic shelters, gazebos, etc.) and 22 recreation amenities (e.g. soccer fields, softball diamonds, sports fields, etc.). Over the historical 15-year period, the Township provided an average of 3.3 parkland amenities and 0.7 recreation amenities per 1,000 population. In addition to the above, the Township has 4,818 linear metres of paths and trails related to parks, which have provided an average level of service of 151 linear meters per 1,000 population over the past 15-years. With respect to recreation facilities, there are a number of facilities that provide the Township with 177,923 sq.ft. of recreation facility space. Based on the inventory of space over the historical 15 year period (2010 to 2024), the Township has provided an average of 6.07 sq.ft. of space per capita, or an investment of $4,838 per capita. The Township utilizes 53 vehicles and pieces of equipment to service the aforementioned parks and recreation facilities. Over the historical 15-year period, the Township has provided an average level of service of 1.3 vehicles per 1,000 population. This level of service translates to an average investment of $66 per capita. Based on the average levels of service noted above, the Township's total D.C. eligible amount related to parks and recreation is $134.20 million. Based on the projected growth over the 2051 forecast period and the capital needs identified in the Township's recently adopted Parks & Recreation Plan, the Township has identified $223.74 million in capital costs related to new parks and recreation infrastructure. These costs include new recreation facilities, parkland development, additional recreation and park amenities, in addition to costs related to outstanding debt payments and D.C. credits. To account for the benefit to growth beyond the forecast period, a deduction of $84.41 million has been made from the gross capital costs. In Watson & Associates Economists Ltd. PAGE 5-22 addition, $153,000 has been deducted to account for the benefit to existing development. A deduction of $5.27 million has been made to account for the existing balance in the reserve fund, resulting in a net growth capital cost of $133.91 million. This amount has been included in the D.C. calculations. As the predominant users of outdoor recreation tend to be residents of the Township, the forecast growth-related costs have been allocated 95% to residential and 5% to non-residential. Watson & Associates Economists Ltd. PAGE 5-23 Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2025 to 2051 95% 5% Existing Debt 1 Recreation Facility - Debt Costs - Growth Related Principal 2025 93,917 - 93,917 - 93,917 89,221 4,696 2 Recreation Facility - Debt Costs - Growth Related Interest (Discounted) 2025 1,007 - 1,007 - 1,007 957 50 3 Victoria Park Seniors Centre Expansion - Loan from Reserves - Growth-related Principal 2025 296,998 - 296,998 - 296,998 282,148 14,850 4 Victoria Park Seniors Centre Expansion - Loan from Reserves - Discounted Growth-related Interest 2025 11,391 - 11,391 - 11,391 10,821 570 Indoor Recreation 5 JECC Ice Pad 2035-2038 34,600,000 7,958,000 26,642,000 - 26,642,000 25,309,900 1,332,100 6 New Ice Pad 2038-2039 29,700,000 29,700,000 - - - - - 7 New Ice Pad 2047-2048 29,700,000 29,700,000 - - - - - 8 MURF - Double Gym, indoor turf, multipurpose space, admin space and storage, walking track, youth space 2026-2029 55,100,000 - 55,100,000 - 55,100,000 52,345,000 2,755,000 9 Double Gymnasium 2049-2050 13,750,000 13,750,000 - - - - - 10 Addition to Senior Centre 2040-2041 3,300,000 3,300,000 0 - 0 0 0 11 Aquatics Centre Expansion 2038-2039 9,444,000 - 9,444,000 - 9,444,000 8,971,800 472,200 Parkland 12 Sportsplex Lands Grading 2026-2046 3,740,000 - 3,740,000 - 3,740,000 3,553,000 187,000 13 Outdoor Fitness Equipment 2030-2040 172,000 - 172,000 - 172,000 163,400 8,600 14 Rectangular Pitches Class A (5) 2030-2036 3,770,000 - 3,770,000 - 3,770,000 3,581,500 188,500 15 Rectangular Pitches Class A (4) 2040-2050 2,900,000 - 2,900,000 - 2,900,000 2,755,000 145,000 16 Rectangular Pitches Class B (5) 2030-2036 1,555,000 - 1,555,000 - 1,555,000 1,477,250 77,750 17 Rectangular Pitches Class B (4) 2040-2050 1,220,000 1,220,000 1,220,000 1,159,000 61,000 18 Pitch's Washroom and Water Fill Stations 2031-2049 680,000 - 680,000 - 680,000 646,000 34,000 19 2 Class B Ball Diamonds 2036-2037 1,126,400 - 1,126,400 - 1,126,400 1,070,080 56,320 20 2 Class B Ball Diamonds 2044-2045 1,126,400 - 1,126,400 - 1,126,400 1,070,080 56,320 21 Diamond Washroom and Water Fill Stations 2031-2032 242,000 - 242,000 - 242,000 229,900 12,100 Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-24 Table 5-8 (Cont'd) Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2025 to 2051 95% 5% 22 Multi-Use Pad with Fencing 2026-2049 350,000 - 350,000 - 350,000 332,500 17,500 23 North Fergus Splashpad 2029-2030 363,000 - 363,000 - 363,000 344,850 18,150 24 Splashpad Washroom 2029-2030 220,000 - 220,000 - 220,000 209,000 11,000 25 Pave Victoria Park Track 82,500 - 82,500 48,000 34,500 32,775 1,725 26 New Tennis Courts (Multi-Use) 2029-2044 1,600,000 - 1,600,000 - 1,600,000 1,520,000 80,000 27 Outdoor Pickleball Courts 2031 356,400 - 356,400 - 356,400 338,580 17,820 28 Fergus Skatepark 2032 825,000 - 825,000 - 825,000 783,750 41,250 29 Elora Dog Park 2031 123,200 - 123,200 - 123,200 117,040 6,160 30 Millburn Park - New Playground and Washroom 2027 375,000 - 375,000 - 375,000 356,250 18,750 31 Upgrade to Grandwood Gate Park 2026 90,000 - 90,000 - 90,000 85,500 4,500 32 Confederation Park - Additional Amenities 2026-2027 150,000 - 150,000 105,000 45,000 42,750 2,250 33 Webster Park - Additional Amenities 2026-2027 120,000 - 120,000 - 120,000 114,000 6,000 34 New Playgrounds 2026-2051 7,287,500 - 7,287,500 - 7,287,500 6,923,125 364,375 35 New Neighbourhood Parks 2026-2051 5,583,000 - 5,583,000 - 5,583,000 5,303,850 279,150 36 New Community parks 2026-2051 6,980,000 - 6,980,000 - 6,980,000 6,631,000 349,000 37 New Township-Wide Parks 2026-2051 4,189,000 - 4,189,000 - 4,189,000 3,979,550 209,450 Facility Vehicles & Equipment 38 Maintenance Groomer/brush 2028 20,000 - 20,000 - 20,000 19,000 1,000 39 Pickup Truck 2028 65,000 - 65,000 - 65,000 61,750 3,250 40 Indoor Utility Vehicle 2028 22,000 - 22,000 - 22,000 20,900 1,100 41 Tractor 2028 80,000 - 80,000 - 80,000 76,000 4,000 42 Ice Resurfacers (1) 2039-2048 190,000 - 190,000 - 190,000 180,500 9,500 43 Ice Edgers (3) 2032-2048 21,000 - 21,000 - 21,000 19,950 1,050 44 Floor Scrubber 2028-2048 63,000 - 63,000 - 63,000 59,850 3,150 45 Snow Blower 2028 2,000 - 2,000 - 2,000 1,900 100 46 Scissor Lift 2028-2050 50,000 - 50,000 - 50,000 47,500 2,500 47 Facility Vehicle (Truck) (2) 2025-2034 130,000 - 130,000 - 130,000 123,500 6,500 Parks Vehicles & equipment 48 Crew Cab Pickup Truck (grass) (4) 2030-2049 260,000 - 260,000 - 260,000 247,000 13,000 Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-25 Table 5-8 (Cont'd) Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2025 to 2051 95% 5% 49 Mower Trailer (3) 2031-2049 90,000 - 90,000 - 90,000 85,500 4,500 50 4x4 Landscape Truck 2026 160,000 - 160,000 - 160,000 152,000 8,000 51 Utility vehicle (2) 2026-2035 60,000 - 60,000 - 60,000 57,000 3,000 52 Large mower (2) 2029-2040 200,000 - 200,000 - 200,000 190,000 10,000 53 Zero Turn Mower (3) 2031-2039 180,000 - 180,000 - 180,000 171,000 9,000 54 Trail Groomer 2026 30,000 - 30,000 - 30,000 28,500 1,500 55 Lawn Roller 2030 5,000 - 5,000 - 5,000 4,750 250 56 Aerator 2030 5,000 - 5,000 - 5,000 4,750 250 57 Overseeder 2030 20,000 - 20,000 - 20,000 19,000 1,000 58 Ball diamond groomer 2036 15,000 - 15,000 - 15,000 14,250 750 Credits & Reserve Fund Adjustment 59 DC Credits - Harrison Park 755,587 - 755,587 - 755,587 717,808 37,779 60 DC Credits - South river Road (trails) 94,756 - 94,756 - 94,756 90,018 4,738 61 Reserve Fund Adjustment 5,267,151 (5,267,151) (5,003,793) (263,358) Total 223,742,056 84,408,000 - 139,334,056 5,420,151 - 133,913,905 127,218,210 6,695,695 Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-26 5.3.5 Land - 2051 Forecast Period Land costs are considered a class of service under the D.C.A. and comprises land acquisition costs related to D.C. eligible services. The land costs in this subsection are related to D.C.-eligible services which are not restricted to a 10-year forecast period. The land costs included herein are related to fire protection and public works. Land costs related to the new fire hall have been identified in the capital listing in Table 5-9. Further, debt principal and discounted interest related to the Operations Centre land acquisition has also been included in the calculations. The total land acquisition costs for the aforementioned services are $4.15 million. Given that the facilities associated with these land costs are fully related to growth within the forecast period, deductions related to the benefit beyond the forecast period or benefit to the existing development have not been made. As a result, the total D.C.-recoverable cost to be included in the calculations is $4.15 million. The residential/non-residential capital cost allocation for land is 71% residential and 29% non-residential based on the incremental growth in population to employment for the 2051 forecast period. This share is consistent with the allocation utilized for public works, and fire protection services. Watson & Associates Economists Ltd. PAGE 5-27 Table 5-9 Infrastructure Cost Included in the Development Charges Calculation Land - 2051 Capital Costs Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 71% 29% Fire Protection Services 1 Land for new Fire Hall 2026-2032 500,000 - 500,000 - 500,000 355,000 145,000 Public Works (Services Related to a Highway, Water Services, and Wastewater Services) 2 Existing Debt (Operations Centre Land) - Growth-Related Principal 2025-2041 3,327,363 - 3,327,363 - 3,327,363 2,362,428 964,935 3 Existing Debt (Operations Centre Land) - Growth-Related Interest (Discounted) 2025-2041 321,456 - 321,456 - 321,456 228,234 93,222 Total 4,148,820 - - 4,148,820 - - 4,148,820 2,945,662 1,203,158 Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2025$) Watson & Associates Economists Ltd. PAGE 5-28 5.4 Service Levels and 10-Year Capital Costs for Centre Wellington's D.C. Calculation This section evaluates the development-related capital requirements for those services with 10-year capital costs. 5.4.1 Growth Studies Growth studies would be considered a class of service under the D.C.A. and is comprised of studies related to D.C. eligible services. The Township has identified the need for various studies over the forecast period such as a water supply master plan, active transportation plan, parks and recreation master plan, etc. The total capital costs of these studies are approximately $4.52 million. Deductions of $120,000 and $133,000 have been made to account for the share of the studies that benefit growth beyond the forecast period and benefit non-D.C.-eligible services, respectively. In addition, a deduction of $165,000 was made for the share of the studies that benefit existing development. To recognize the existing deficit in the D.C. reserve fund, an adjustment of $957,000 was made to the D.C. calculations. As a result, the net D.C.-recoverable cost to be included in the calculations is $4.10 million. These costs are shared between residential and non-residential growth based on the following shares, which align with the shares utilized for the respective service categories: - Parks and Recreation studies: 95% residential development/5% non-residential development (allocation to recognize minor benefit to the non-residential sector); and - All other studies: 70% residential development/30% non-residential development (population to employment growth ratio over 10-year forecast period). Watson & Associates Economists Ltd. PAGE 5-29 Table 5-10 Infrastructure Cost Included in the Development Charges Calculation Growth Studies Residential Share Non- Residential Share 2025 to 2034 1 Development Charges Study 2030 All D.C. Eligible Services 40,000 - 40,000 - 40,000 28,000 12,000 2 Active Transportation and Mobility Plan Update 2034 Services Related to a Highway 300,000 - 300,000 75,000 225,000 157,500 67,500 3 Water /Wastewater Servicing Plan Update for Growth Areas 2034 Water & Wastewater Services 400,000 - 400,000 - 400,000 280,000 120,000 4 Stormwater Master Plan Update 2033 Stormwater Services 300,000 - 300,000 60,000 240,000 168,000 72,000 5 Transportation Master Plan Update 2029 Services Related to a Highway 400,000 - 400,000 - 400,000 280,000 120,000 6 Parks and Recreation Plan Update 2036 Parks and Recreation 150,000 120,000 30,000 30,000 - - - 7 Water Supply Master Plan Update 2029 Water Services 200,000 - 200,000 - 200,000 140,000 60,000 8 Wastewater System Hydraulic Model Updates 2029-2034 Wastewater Services 150,000 - 150,000 - 150,000 105,000 45,000 9 Water System Hydraulic Model Updates 2029-2034 Water Services 150,000 - 150,000 - 150,000 105,000 45,000 10 South Elora Secondary Plan and Master Environmental Servicing Plan 2030 All D.C. Eligible Services 776,600 - 77,700 698,900 - 698,900 489,230 209,670 11 South Fergus Secondary Plan Amendment 2030-2034 All D.C. Eligible Services 500,000 - 50,000 450,000 - 450,000 315,000 135,000 12 Official Plan Update For New Growth Areas 2026 All D.C. Eligible Services 135,000 - 135,000 - 135,000 94,500 40,500 13 Commercial Lands Study 2025-2026 All D.C. Eligible Services 11,000 - 5,500 5,500 - 5,500 3,850 1,650 14 Parks and Roads Enhancement strategy 2028 Parks and Services Related to a Highway 50,000 - 50,000 - 50,000 35,000 15,000 Reserve Fund Adjustment 957,054 - 957,054 - 957,054 669,938 287,116 Total 4,519,654 120,000 133,200 4,266,454 165,000 - 4,101,454 2,871,018 1,230,436 Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions (to recognize benefit to non-D.C. services) Service to Which Project Relates Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-30 5.4.2 Land - 10 Year Forecast Period Land related to D.C. eligible services is considered a class of service under the D.C.A., similar to growth-related studies. The land costs included in this subsection are related to the anticipated capital costs for services that are restricted to 10 years (i.e. parks and recreation services). Note: recreation land can be included in the capital listing for recovery through D.C.s. The Township has identified the need for land acquisition related to recreation facilities, however, these facilities are identified in the Parks and Recreation Services capital listing as 100% post-period benefit. As such, no capital costs are included in the D.C. calculations. To acknowledge that there is some use of parks and recreation services by the non- residential sector, the growth-related capital costs have been allocated 95% to the residential sector and 5% to the non-residential sector. This aligns with the shares utilized for the respective service categories. Watson & Associates Economists Ltd. PAGE 5-31 Table 5-11 Infrastructure Cost Included in the Development Charges Calculation Land Capital Costs - 10-year Forecast Period Proj. No. Residential Share Non- Residential Share 2025 to 2034 95% 5% Parks and Recreation Services 1 New Ice Pad - Land 2037 1,239,000 1,239,000 - - - - - 2 New Ice Pad - Land 2046 1,239,000 1,239,000 - - - - - 3 Removed 4 Removed 5 Removed 6 Removed Total 2,478,000 2,478,000 - - - - - - - Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 6. D.C. Calculation Table 6-1 calculates the proposed uniform D.C.s to be imposed on anticipated development in the Township for water and wastewater services over the 2051 forecast period in the urban area. Table 6-2 calculates the proposed uniform D.C.s for services over the Township-wide 2051 forecast period. Table 6-3 calculates the proposed uniform D.C. to be imposed on an anticipated development for Township-wide services over a 10-year planning horizon. The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (singles and semi-detached, multiples, apartments 2+ bedrooms, apartments studio and 1 bedroom, and special care/special dwelling units). The non-residential D.C. has been calculated on a per sq.ft. of G.F.A. basis for all types of non-residential development (industrial, commercial, and institutional). The D.C.-eligible costs for each service component were developed in Chapter 5 for all Township services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The eligible-D.C. cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 4) to calculate the charge in Tables 6-1 through 6-3. With respect to non-residential development, the total costs in the uniform charge allocated to non-residential development (based on need for service) have been divided by the anticipated development over the planning period to calculate a cost per sq.ft. of gross floor area. Table 6-4 summarizes the total D.C. that is applicable for all services and Table 6-5 summarizes the gross capital expenditures and sources of revenue for works to be undertaken during the life of the by-law. Watson & Associates Economists Ltd. PAGE 6-2 Table 6-1 Township of Centre Wellington Development Charge Calculation Urban Area Services Urban 2025-2051 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1 Wastewater Services 1.1 Wastewater Treatment 58,254,368 23,794,038 7,784 3.47 1.2 Wastewater Sewers 6,655,927 2,718,618 889 0.40 64,910,295 26,512,656 8,673 3.87 2. Water Services 2.1 Water Treatment plants and storage 25,429,068 10,386,521 3,398 1.52 2.2 Water Distribution 35,312,597 14,423,455 4,718 2.11 60,741,665 24,809,976 8,116 3.63 3. Land - Urban 2051 Forecast 3.1 Land Acquisition for D.C. Eligible Services 3,284,221 1,341,442 439 0.20 3,284,221 1,341,442 439 0.20 TOTAL 128,936,181 52,664,074 $17,228 7.70 D.C.-Eligible Capital Cost $128,936,181 $52,664,074 Urban 2051 Gross Population/GFA Growth (sq.ft.) 21,861 6,836,400 Cost Per Capita/Non-Residential GFA (sq.ft.) $5,898 $7.70 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.921 $17,228 Other Multiples 2.383 $14,055 Apartments - 2 Bedrooms + 1.976 $11,654 Apartments - Bachelor and 1 Bedroom 1.441 $8,499 Special Care/Special Dwelling Units 1.100 $6,488 Watson & Associates Economists Ltd. PAGE 6-3 Table 6-2 Township of Centre Wellington Development Charge Calculation Township-wide Services 2025-2051 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 4. Services Related to a Highway 4.1 Roads and Related 53,431,291 21,824,048 6,952 3.10 53,431,291 21,824,048 6,952 3.10 5. Public Works (Facilities and Fleet) 5.1 Public Works (Facilities and Fleet) 25,095,487 10,250,270 3,265 1.46 25,095,487 10,250,270 3,265 1.46 6. Fire Protection Services 6.1 Fire facilities, vehicles & equipment 7,584,564 3,097,920 987 0.44 7,584,564 3,097,920 987 0.44 7. Parks and Recreation Services 7.1 Park development, amenities, trails, recreation facilities, vehicles, and equipment 127,218,210 6,695,695 16,552 0.95 127,218,210 6,695,695 16,552 0.95 8. Land - 2051 Forecast 8.1 Land Acquisition for D.C. Eligible Services 2,945,662 1,203,158 383 0.17 2,945,662 1,203,158 383 0.17 TOTAL 216,275,213 $43,071,091 $28,139 $6.12 D.C.-Eligible Capital Cost $216,275,213 $43,071,091 2051 Gross Population/GFA Growth (sq.ft.) 22,451 7,037,600 Cost Per Capita/Non-Residential GFA (sq.ft.) $9,633.21 $6.12 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.921 $28,139 Other Multiples 2.383 $22,956 Apartments - 2 Bedrooms + 1.976 $19,035 Apartments - Bachelor and 1 Bedroom 1.441 $13,881 Special Care/Special Dwelling Units 1.100 $10,597 Watson & Associates Economists Ltd. PAGE 6-4 Table 6-3 Township of Centre Wellington Development Charge Calculation Township-wide Services and Classes 2025-2034 Table 6-4 Township of Centre Wellington Development Charge Calculation Total All Services and Classes 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 9. Growth Studies 9.1 Studies for D.C. Eligible Services 2,871,018 1,230,436 978 0.46 2,871,018 1,230,436 978 0.46 10. Land - 10 Year Forecast 10.1 Land Acquisition for D.C. Eligible Services - - - - - - - - TOTAL 2,871,018 1,230,436 $978 $0.46 D.C.-Eligible Capital Cost $2,871,018 $1,230,436 10-Year Gross Population/GFA Growth (sq.ft.) 8,579 2,699,700 Cost Per Capita/Non-Residential GFA (sq.ft.) $334.66 $0.46 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.921 $978 Other Multiples 2.383 $797 Apartments - 2 Bedrooms + 1.976 $661 Apartments - Bachelor and 1 Bedroom 1.441 $482 Special Care/Special Dwelling Units 1.100 $368 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ Urban-wide Services/Classes 2051 128,936,181 52,664,074 17,228 7.70 Township-wide Services/Classes 2051 216,275,213 43,071,091 28,139 6.12 Township-wide Services/Classes 10 Year 2,871,018 1,230,436 978 0.46 TOTAL 348,082,412 96,965,601 46,345 14.28 Watson & Associates Economists Ltd. PAGE 6-5 Table 6-5 Township of Centre Wellington Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the Life of the By-law Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Residential Non-Residential 1. Wastewater Services 1.1 Wastewater Treatment 39,335,000 - 1,257,900 - - 27,034,741 11,042,359 1.2 Wastewater Sewers 35,627,500 - 3,727,000 21,440,830 - 7,426,366 3,033,304 2. Water Services 2.1 Water Treatment plants and storage 29,924,196 - 3,802,500 - - 18,546,404 7,575,292 2.2 Water Distribution 71,985,800 - 2,828,000 16,977,100 4,008,200 34,202,475 13,970,025 3. Land - Urban 2051 Forecast 3.1 Land Acquisition for D.C. Eligible Services 2,275,000 - 14,000 - - 1,605,310 655,690 4. Services Related to a Highway 4.1 Roads and Related 126,397,467 - 49,663,777 32,983,653 - 31,062,526 12,687,511 5. Public Works (Facilities and Fleet) 5.1 Public Works (Facilities and Fleet) 4,600,000 - 200,000 - - 3,124,000 1,276,000 6. Fire Protection Services 6.1 Fire facilities, vehicles & equipment 12,729,800 - - - - 9,038,158 3,691,642 7. Parks and Recreation Services 7.1 Park development, amenities, trails, recreation facilities, vehicles, and equipment 223,742,056 - 5,420,151 - 84,408,000 127,218,210 6,695,695 8. Land - 2051 Forecast 8.1 Land Acquisition for D.C. Eligible Services 500,000 - 0 - 0 355,000 145,000 9. Growth Studies 9.1 Studies for D.C. Eligible Services 3,562,600 133,200 165,000 - 120,000 2,201,080 943,320 10. Land - 10 Year Forecast 10.1 Land Acquisition for D.C. Eligible Services - - - - - - - Total Expenditures & Revenues $550,679,419 $133,200 $67,078,328 $71,401,583 $88,536,200 $261,814,270 $61,715,838 Post D.C. Period Benefit Total Gross Cost Service/Class Watson & Associates Economists Ltd. Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided are based on the Township's existing policies; with some modifications and consideration for the changes to the D.C.A. resulting from Bills 108, 138, 109, 197, 213, 23, 134, 185, 17, and 60. Watson & Associates Economists Ltd. PAGE 7-2 7.2 D.C. By-law Structure It is recommended that: - the Township uses a uniform Township-wide D.C. calculation for all municipal services, except for water and wastewater services; - water and wastewater services be imposed on the urban service areas of the Township; and - one municipal D.C. by-law be used for all services. 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." Watson & Associates Economists Ltd. PAGE 7-3 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the number of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, e.g. - For water and wastewater services, a 71% residential/29% non-residential allocation has been made based on the ratio of population vs. employment growth over the urban 2051 forecast period; - For services related to a highway, public works services, and fire protection services, a 71% residential/29% non-residential allocation has been made based on the ratio of population vs. employment growth ratio over 2051 forecast period; - For parks and recreation, a 5% non-residential attribution has been made to recognize use by the non-residential sector; and - With respect to growth studies and land (i.e. class of D.C.-eligible services), the residential/non-residential allocation is based on the allocation identified above for the D.C.-eligible service (e.g. land acquisition costs related to recreation would be based on a 95% residential/5% non-residential allocation based on the above). 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) As a result of the redevelopment of land, a building or structure existing on the same land within 60 months (300 months for redevelopment of brownfield sites) prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: Watson & Associates Economists Ltd. PAGE 7-4 a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C. in the by-law by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s in the by-law by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 7.3.4 Exemptions (full or partial) a) Statutory exemptions: - industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education (section 3); - may add up to 2 apartments in an existing or new detached, semi-detached, or rowhouse (including in an ancillary structure); - add one additional unit or 1% of existing units in an existing rental residential building; - a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - affordable units; - attainable units (to be in force at a later date); - affordable inclusionary zoning units; - non-profit housing; - long-term care homes; and Watson & Associates Economists Ltd. PAGE 7-5 - discount for rental housing units based on bedroom size (i.e. three or more bedrooms - 25% reduction, two bedrooms - 20% reduction, and all others - 15% reduction). b) Discretionary exemptions: - A place of worship or buildings for purposes of a churchyard or cemetery; - Non-residential farm buildings constructed for bona fide farm uses and/or agricultural research buildings constructed for the use of a university or owned/operated by a university; - Public hospitals; - Hospices; - Silos for use for industrial, commercial and/or institutional; and - Shipping containers used for industrial, commercial and/or institutional uses, only when these are an accessory use, as defined in the Township's Zoning By-law. 7.3.5 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the Township and an owner under s. 27 of the D.C.A. D.C.s payable for residential development (other than rental housing, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Rental housing and institutional developments will pay D.C.s in six (6) equal annual payments commencing at occupancy. The D.C. amount for all developments occurring within 18 months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the lower of the D.C. in effect on the day the applicable Site Plan or Zoning By-law Amendment application was submitted (as a complete application), including interest, and the D.C. at current rates at the time the D.C. is payable. Watson & Associates Economists Ltd. PAGE 7-6 Payments determined at the time of Site Plan or Zoning By-law Amendment application are subject to annual interest charges. The maximum interest rate the Township can impose is the average prime rate plus 1%. 7.3.6 The Applicable Areas The charges developed herein provide for varying charges within the Township, as follows: - All municipal-wide services/classes - the full residential and non-residential charges will be imposed on all lands within the Township; and - Water and wastewater - the full residential and non-residential charge will be imposed on the urban service areas of the Township. 7.3.7 Indexing Rates shall be adjusted, without amendment to the By-law, annually on January 1, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).1F1 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes The Township's D.C. collections are currently separated into 7 reserve funds: Services Related to a Highway, Public Works, Fire Protection Services, Parks and Recreation Services, Water Services, Wastewater Services and Growth Studies. It is recommended that these reserve funds be maintained. In addition, separate reserve funds will need to be established for land as a class of service. 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 Appendix D outlines the reserve fund policies that the Township is required to follow as per the D.C.A. 7.4.2 By-law In-force Date A by-law under the D.C.A. comes into force on the day after which the by-law is passed by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is what the Bank of Canada rate is on the day the by-law comes into force updated on the first business day of every January, April, July and October (as per section 11 of O. Reg. 82/98). 7.4.4 Area Rating The D.C.A. requires that Council must consider the use of area specific charges: 1. Section 2 (9) of the D.C.A. now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated (note that at this time, no municipalities or services are prescribed by the regulations). 2. Section 10 (2) c.1 of the D.C.A. requires that "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area rated. The second item requires Council to consider the use of area rating. Currently, the Township's by-law provides for water and wastewater services on an urban area basis. All other Township services are recovered based on a uniform, Township-wide basis. There have been several reasons why area-rating has not been imposed on these services, including: Watson & Associates Economists Ltd. PAGE 7-8 1. All Township services, with the exception of water and wastewater, require that the average 15-year service standard be calculated. This average service standard multiplied by growth in the Township, establishes an upper ceiling on the amount of funds that can be collected from all developing landowners. Section 4 (4) of O. Reg. 82/98 provides that "if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by-law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area would establish an area-specific ceiling which would significantly reduce the total revenue recoverable for the Township hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. Expanding on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a Township-wide approach to an area-specific approach. For example, if all services were now built (and funded) within Area A (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area-rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The D.C.s would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 3. Many services provided (roads, parks and recreation facilities, etc.) are not restricted to one specific area and are often used by all residents. For example, arenas located in different parts of the Township will be used by residents from all areas depending on the programing of the facility (i.e., a public skate is available each night, but at a different arena; hence usage of any one facility at any given time is based on programming availability). For the reasons noted above, it is recommended that Council continue the D.C. approach to calculate the charges on an urban area basis for wastewater while all other services be charged on a uniform Township-wide basis. Watson & Associates Economists Ltd. PAGE 7-9 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Continue the D.C. approach to calculate water and wastewater services on a uniform urban-area basis and all other services be calculated on a uniform Township-wide basis;" "Approve the capital project listing set out in Chapter 5 of the D.C.s Background Study dated December 19, 2025, subject to further annual review during the capital budget process;" "Approve the D.C. Background Study dated December 19, 2025, as amended;" "Approve the Local Service Policy set out in Appendix E;" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix J". Watson & Associates Economists Ltd. Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 8. By-law Implementation 8.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.1 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT). 8.1.2 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the Watson & Associates Economists Ltd. PAGE 8-2 timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 8.3 Implementation Requirements 8.3.1 Introduction Once the Township has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the Township Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements, which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by- law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the Township must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; Watson & Associates Economists Ltd. PAGE 8-4 - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The Township must give one copy of the most recent pamphlet without charge to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the Township Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The Township is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the Township Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of Township Council to the OLT. Watson & Associates Economists Ltd. PAGE 8-5 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work, which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable, except in the case of water and wastewater services which are grouped together as a result of recent changes to Ontario Regulation 82/98. 8.3.7 Front-Ending Agreements The Township and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the Township to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use, which were contained in the Development Charges Act, 1989. Accordingly, the Township assesses whether this mechanism is appropriate for its use, as part of funding projects prior to Township funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and Watson & Associates Economists Ltd. PAGE 8-6 - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the Township is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 Schedule 1 Township of Centre Wellington Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 4.3% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from the County of Wellington Official Plan (including Official Plan Amendment 126), Township of Centre Wellington 2024 Land Needs Assessment, and County of Wellington Municipal Comprehensive Review forecast for the Township of Centre Wellington by Watson & Associates Economists Ltd., and discussions with Township of Centre Wellington staff regarding servicing and land supply by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 27,840 26,693 483 26,210 7,924 450 1,350 221 9,945 439 2.684 29,410 28,191 556 27,635 8,470 660 1,540 160 10,830 505 2.603 32,430 31,093 448 30,645 9,260 920 1,680 120 11,980 407 2.595 36,750 35,233 510 34,723 10,042 1,385 2,064 120 13,611 464 2.589 44,510 42,672 620 42,052 12,323 1,795 2,522 120 16,760 564 2.546 58,200 55,792 812 54,981 15,175 3,175 3,660 120 22,130 738 2.521 1,570 1,498 73 1,425 546 210 190 -61 885 66 3,020 2,902 -108 3,010 790 260 140 -40 1,150 -98 4,320 4,140 62 4,078 782 465 384 0 1,631 57 7,760 7,439 110 7,329 2,281 410 458 0 3,149 100 21,450 20,559 302 20,258 5,133 1,790 1,596 0 8,519 274 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Late 2025 Late 2035 Mid 2021 - Late 2025 Late 2025 - Late 2035 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Late 2025 - Mid 2051 Forecast Incremental Mid 2051 Watson & Associates Economists Ltd. PAGE A-3 Schedule 2 Township of Centre Wellington Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Watson & Associates Economists Ltd. 2025 - 2035 1,595 315 403 2,313 6,139 (949) 5,190 79 5,269 2025 - 2051 3,772 1,401 1,323 6,496 16,752 (1,574) 15,179 230 15,409 2025 - 2035 617 95 44 756 2,108 (72) 2,036 31 2,067 2025 - 2051 1,191 389 222 1,802 4,808 (120) 4,688 71 4,759 2025 - 2035 69 0 11 80 221 (119) 102 0 102 2025 - 2051 170 0 51 221 589 (198) 391 0 391 2025 - 2035 2,281 410 458 3,149 8,469 (1,140) 7,329 110 7,439 2025 - 2051 5,133 1,790 1,596 8,519 22,149 (1,892) 20,258 302 20,559 Rural Township of Centre Wellington Institutional Population Net Population Including Institutional Fergus Elora-Salem Development Location Timing Existing Unit Population Change Total Residential Units Gross Population in New Units Single & Semi- Detached Multiples[1] Apartments[2] Net Population Increase, Excluding Institutional Watson & Associates Economists Ltd. PAGE A-4 Schedule 3 Township of Centre Wellington Current Year Growth Forecast Mid-2021 to Late-2025 Mid 2021 Population 31,093 Occupants of Units (2) 1,631 New Housing Units, multiplied by P.P.U. (3) 2.675 Mid 2021 to Late 2025 gross population increase 4,362 4,362 Occupants of New Units 57 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Late 2025 gross population increase 62 62 Change in Housing Units (4) 11,980 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.024 Mid 2021 to Late 2025 total change in population -284 -284 Population Estimate to Mid 2025 35,233 Net Population Increase, Mid 2021 to Late 2025 4,140 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.278 48% 1.572 Multiples (6) 2.351 29% 0.670 Apartments (7) 1.837 24% 0.432 Total 100% 2.675 [1] Based on 2021 Census custom database. [2] Based on Building permit/completion activity. (4) 2021 households taken from Statistics Canada Census. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-5 Schedule 4 Township of Centre Wellington 10-Year Growth Forecast Late-2025 to Late-2035 Late 2025 Population 35,233 Occupants of Units (2) 3,149 New Housing Units, multiplied by P.P.U. (3) 2.690 Late 2025 to Late 2035 gross population increase 8,469 8,469 Occupants of New Units 100 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Late 2025 to Late 2035 gross population increase 110 110 Change in Housing Units (4) 13,611 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.084 Late 2025 to Late 2035 total change in population -1,140 -1,140 Population Estimate to Late 2035 42,672 Net Population Increase, Late 2025 to Late 2035 7,439 (1) Late 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.921 72% 2.116 Multiples (6) 2.383 13% 0.310 Apartments (7) 1.810 15% 0.263 one bedroom or less 1.441 two bedrooms or more 1.976 Total 100% 2.690 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Late 2025 households based upon 2021 Census (11,980 units) + Mid 2021 to Late 2025 unit estimate (1,631 units) = 13,611 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2021 Population (31,093) + Mid 2021 to Late 2025 estimated housing units to beginning of forecast period (1,631 x 2.675 = 4,362) + (57 x 1.1 = 62) + (11,980 x -0.024 = -284) = 35,233 Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 Schedule 5 Township of Centre Wellington Long-Term Growth Forecast Late-2025 to Mid-2051 Late 2025 Population 35,233 Occupants of Units (2) 8,519 New Housing Units, multiplied by P.P.U. (3) 2.600 Late 2025 to Mid 2051 gross population increase 22,149 22,149 Occupants of New Units 274 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Late 2025 to Mid 2051 gross population increase 302 302 Change in Housing Units (4) 13,611 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.139 Late 2025 to Mid 2051 total change in population -1,892 -1,892 Population Estimate to Mid 2051 55,792 Net Population Increase, Late 2025 to Mid 2051 20,559 (1) Late 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.921 60% 1.760 Multiples (6) 2.383 21% 0.501 Apartments (7) 1.810 19% 0.339 one bedroom or less 1.441 two bedrooms or more 1.976 Total 100% 2.600 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Late 2025 households based upon 2021 Census (11,980 units) + Mid 2021 to Late 2025 unit estimate (1,631 units) = 13,611 units. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Weighted Persons Per Unit Average Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] 2021 Population (31,093) + Mid 2021 to Late 2025 estimated housing units to beginning of forecast period (1,631 x 2.675 = 4,362) + (57 x 1.1 = 62) + (11,980 x -0.024 = -284) = 35,233 Population Watson & Associates Economists Ltd. PAGE A-7 Schedule 6 Township of Centre Wellington Summary of Active Development Applications [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Source: Derived from Township of Centre Wellington Planning Department data, by Watson & Associates Economists Ltd. Singles & Semi- Detached Multiples [1] Apartments [2] Total Registered Not Built 538 105 617 1,260 % Breakdown 43% 8% 49% 100% Draft Plans Approved 593 430 325 1,348 % Breakdown 44% 32% 24% 100% Application Under Review 154 148 98 400 % Breakdown 39% 37% 25% 100% Total 1,285 683 1,040 3,008 % Breakdown 43% 23% 35% 100% Stage of Development Density Type Watson & Associates Economists Ltd. PAGE A-8 Schedule 7 Township of Centre Wellington Historical Residential Building Permits Years 2015 to 2024 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from Township of Centre Wellington Planning Department, by Watson & Associates Economists Ltd. Residential Building Permits Total 2015 114 26 1 141 2016 222 0 0 222 2017 222 0 0 222 2018 86 25 36 147 2019 314 136 8 458 Sub-total 958 187 45 1,190 Average (2015 - 2019) 192 37 9 238 % Breakdown 80.5% 15.7% 3.8% 100.0% 2020 172 36 75 283 2021 187 96 220 503 2022 328 114 40 482 2023 179 94 46 319 2024 62 135 46 243 Sub-total 928 475 427 1,830 Average (2020 - 2024) 186 95 85 366 % Breakdown 50.7% 26.0% 23.3% 100.0% 2015 - 2024 Total 1,886 662 472 3,020 Average 189 66 47 302 % Breakdown 62.5% 21.9% 15.6% 100.0% Year Singles & Semi Detached Multiples [1] Apartments [2] Watson & Associates Economists Ltd. PAGE A-9 Schedule 8a Township of Centre Wellington Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted [1] 1-5 - - 1.947 3.257 4.522 3.278 6-10 - - - 3.083 - 3.122 (0.162) 11-15 - - 1.667 3.200 4.818 3.000 2.921 16-20 - - 1.864 2.930 3.818 2.807 2.921 21-25 - - 1.676 2.812 3.917 2.692 2.921 26-30 - - 1.737 2.901 - 2.605 30+ - 1.429 1.854 2.745 3.867 2.673 2.921 Total 2.000 1.325 1.806 2.861 4.040 2.777 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.368 1.883 3.254 4.522 2.935 6-10 - 1.545 1.560 2.976 - 2.513 11-15 - 1.091 1.727 2.965 4.818 2.660 16-20 - - 1.750 2.835 3.750 2.558 21-25 - - 1.667 2.777 3.769 2.578 25-30 - 1.091 1.679 2.899 - 2.532 30+ - 1.333 1.791 2.730 3.846 2.478 Total 1.846 1.312 1.756 2.836 4.006 2.559 Watson & Associates Economists Ltd. PAGE A-10 Schedule 8b County of Wellington Census Division Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments [3] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Multiples [1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted [3] 1-5 - 1.413 2.000 2.814 - 2.351 6-10 - 1.526 1.811 2.577 - 2.388 11-15 - 1.370 1.980 2.743 - 2.468 2.383 16-20 - 1.278 1.701 2.691 3.167 2.423 2.383 21-25 - 1.000 1.766 2.516 - 2.278 2.383 26-30 - - 1.810 2.421 - 2.176 30+ - 1.439 1.903 2.754 3.138 2.418 Total 1.071 1.398 1.880 2.687 3.179 2.386 Age of Apartments [2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted [3] 1-5 - 1.407 1.863 2.537 - 1.837 6-10 - 1.339 1.767 2.121 - 1.710 11-15 - 1.255 1.629 - - 1.575 1.810 16-20 - 1.703 1.914 2.813 - 2.040 1.810 21-25 - 1.508 2.000 2.750 - 1.864 1.810 26-30 - 1.419 1.976 2.688 - 1.867 30+ 0.951 1.256 1.942 2.654 4.083 1.710 Total 1.151 1.305 1.910 2.592 4.857 1.747 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.503 1.947 3.113 5.055 2.693 6-10 - 1.538 1.848 2.997 4.325 2.705 11-15 - 1.386 1.817 3.135 4.313 2.928 16-20 - 1.773 1.866 3.041 4.180 2.910 21-25 - 1.540 1.867 2.895 4.169 2.733 26-30 - 1.463 1.899 2.761 3.986 2.552 30+ 1.367 1.308 1.929 2.729 3.924 2.468 Total 2.110 1.377 1.910 2.844 4.110 2.591 Watson & Associates Economists Ltd. PAGE A-11 Schedule 9 Township of Centre Wellington Person Per Unit Structural Type and Age of Dwelling (2021 Census) 3.28 3.12 3.00 2.81 2.69 2.60 2.67 2.35 2.39 2.47 2.42 2.28 2.18 2.42 1.84 1.71 1.58 2.04 1.86 1.87 1.71 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 21-25 26-30 30+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Multiple and Apartment P.P.U.s are based on County of Wellington Census Division. Watson & Associates Economists Ltd. PAGE A-12 Schedule 10a Township of Centre Wellington Employment Forecast, 2025 to 2051 [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Derived from the County of Wellington Official Plan (including Official Plan Amendment 126), Township of Centre Wellington 2024 Land Needs Assessment, and County of Wellington Municipal Comprehensive Review forecast for the Township of Centre Wellington by Watson & Associates Economists Ltd., and discussions with Township of Centre Wellington staff regarding servicing and land supply by Watson & Associates Economists Ltd. Employment Mid 2011 26,693 0.009 0.061 0.098 0.109 0.076 0.353 0.036 0.390 240 1,635 2,617 2,908 2,030 9,430 973 10,403 7,795 Mid 2016 28,191 0.006 0.052 0.081 0.120 0.075 0.334 0.036 0.370 175 1,470 2,272 3,388 2,115 9,420 1,006 10,426 7,950 Late 2025 35,233 0.007 0.058 0.081 0.106 0.069 0.320 0.035 0.355 237 2,028 2,842 3,745 2,423 11,275 1,218 12,493 9,247 Late 2035 42,672 0.006 0.068 0.095 0.118 0.074 0.362 0.045 0.407 260 2,892 4,045 5,055 3,174 15,426 1,929 17,355 12,534 Mid 2051 55,792 0.005 0.076 0.107 0.129 0.079 0.395 0.054 0.449 300 4,213 5,965 7,200 4,380 22,058 3,017 25,075 17,845 Mid 2011 - Mid 2016 1,498 -0.003 -0.009 -0.017 0.011 -0.001 -0.019 -0.001 -0.020 -65 -165 -345 480 85 -10 33 23 155 Mid 2016 - Late 2025 7,042 0.001 0.005 0.000 -0.014 -0.006 -0.014 -0.001 -0.015 62 558 570 357 308 1,855 212 2,067 1,297 Late 2025 - Late 2035 7,439 -0.001 0.010 0.014 0.012 0.006 0.041 0.011 0.052 23 864 1,203 1,310 751 4,151 711 4,862 3,287 Late 2025 - Mid 2051 20,559 -0.001 0.018 0.026 0.023 0.010 0.075 0.020 0.095 63 2,185 3,123 3,455 1,957 10,783 1,799 12,582 8,598 Mid 2011 - Mid 2016 300 -0.001 -0.002 -0.003 0.002 0.000 -0.004 0.000 -0.004 -13 -33 -69 96 17 -2 7 5 31 Mid 2016 - Late 2025 741 0.000 0.001 0.000 -0.001 -0.001 -0.001 0.000 -0.002 7 59 60 38 32 195 22 218 137 Late 2025 - Late 2035 744 0.000 0.001 0.001 0.001 0.001 0.004 0.001 0.005 2 86 120 131 75 415 71 486 329 Late 2025 - Mid 2051 806 0.000 0.001 0.001 0.001 0.000 0.003 0.001 0.004 2.5 86 122 135 77 423 71 493 337 Total (Excluding Work at Home and N F P O W ) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W. [1] Work at Home Industrial Commercial/ Population Related Total Employment (Including N.F.P.O.W.) Institutional N.F.P.O.W. [1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Watson & Associates Economists Ltd. PAGE A-13 Schedule 10b Township of Centre Wellington Employment and Gross Floor Area (G.F.A.) Forecast, 2025 to 2051 [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,300 Commercial/Population-Related 450 Institutional 680 [2] Primary industry includes agriculture and resource related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. *Reflects Late-2025 to Mid-2051 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 26,693 240 2,617 2,908 2,030 7,795 720,000 3,402,100 1,308,600 1,455,500 6,886,200 Mid 2016 28,191 175 2,272 3,388 2,115 7,950 525,000 2,953,600 1,524,600 1,516,500 6,519,700 Late 2025 35,233 237 2,842 3,745 2,423 9,247 711,000 3,694,600 1,685,300 1,737,300 7,828,200 Late 2035 42,672 260 4,045 5,055 3,123 12,483 780,000 5,258,500 2,274,800 2,214,600 10,527,900 Mid 2051 55,792 300 5,965 7,200 4,239 17,704 900,000 7,754,500 3,240,000 2,971,300 14,865,800 Mid 2011 - Mid 2016 1,498 -65 -345 480 85 155 Mid 2016 - Late 2025 7,042 62 570 357 308 1,297 186,000 741,000 160,700 220,800 1,308,500 Late 2025 - Late 2035 7,439 23 1,203 1,310 700 3,236 69,000 1,563,900 589,500 477,300 2,699,700 Late 2025 - Mid 2051 20,559 63 3,123 3,455 1,816 8,457 189,000 4,059,900 1,554,700 1,234,000 7,037,600 Mid 2011 - Mid 2016 300 -13 -69 96 17 31 Mid 2016 - Late 2025 741 7 60 38 32 137 19,579 78,000 16,916 23,242 137,737 Late 2025 - Late 2035 744 2 120 131 70 324 6,900 156,390 58,950 47,730 269,970 Late 2025 - Mid 2051 806 2 122 135 71 332 7,412 159,212 60,969 48,392 275,984 Period Population Employment Gross Floor Area in Square Feet (Estimated)[1] Primary Incremental Change Industrial Commercial/ Population Related Institutional [3] Total Primary [2] Industrial Commercial/ Population Related Institutional [3] Total Annual Average Watson & Associates Economists Ltd. PAGE A-14 Schedule 10c Township of Centre Wellington Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,300 Commercial/Population-Related 450 Institutional 680 [2] Primary industry includes agriculture and resource related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. [4] Employment Increase does not include No Fixed Place of Work. *Reflects Late-2025 to Mid-2051 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2025 - 2035 - 1,255,800 421,600 341,700 2,019,100 2,404 2025 - 2051 - 2,574,000 1,182,500 938,400 4,694,900 5,989 2025 - 2035 - 308,100 165,200 133,600 606,900 800 2025 - 2051 - 1,485,900 365,400 290,200 2,141,500 2,382 2025 - 2035 69,000 - 2,700 2,000 73,700 32 2025 - 2051 189,000 - 6,800 5,400 201,200 86 2025 - 2035 69,000 1,563,900 589,500 477,300 2,699,700 3,236 2025 - 2051 189,000 4,059,900 1,554,700 1,234,000 7,037,600 8,457 Township of Centre Wellington Rural Elora-Salem Fergus Institutional G.F.A. S.F.[1] Total Non- Residential G.F.A. S.F. Employment Increase [3] Development Location Timing Primary G.F.A. S.F. [1],[2] Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Watson & Associates Economists Ltd. PAGE A-15 Schedule 11 Township of Centre Wellington Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 Appendix B: Level of Service Cost (per capita) Services Related to a Highway - Roads $40,596.73 0.0160 km of roadways 2,537,296 per km 834,628,172 Services Related to a Highway - Active Transportation $594.04 3.7803 Linear Meters of Active Transportation Facilities 157 per linear m 12,212,868 Public Works - Facilities $891.21 1.8526 sq.ft. of building area 481 per sq.ft. 18,322,386 Public Works - Vehicles & Equipment $564.90 0.0043 No. of vehicles and equipment 131,372 per vehicle 11,613,779 Fire Protection Services - Facilities $360.70 0.5618 sq.ft. of building area 642 per sq.ft. 7,415,631 Fire Protection Services - Vehicles & Equipment $338.61 0.0006 No. of vehicles 564,350 per vehicle 6,961,483 Fire Protection Services - Small Equipment and Gear $82.43 0.0070 No. of equipment and gear 11,776 per item 1,694,678 Parkland Development $698.35 0.0084 Acres of Parkland 83,137 per acre 14,357,378 Parkland Amenities - Recreation $400.51 0.0007 No. of parkland amenities 572,157 per amenity 8,234,085 Parkland Amenities - Parks $516.90 0.0033 No. of parkland amenities 156,636 per amenity 10,626,947 Parkland Trails $8.18 0.1510 Linear Metres of Paths and Trails 54 per linear m 168,173 Recreation Facilities $4,838.01 6.0685 sq.ft. of building area 797 per sq.ft. 99,464,648 Parks & Recreation Vehicles and Equipment $65.68 0.0013 No. of vehicles and equipment 50,523 per vehicle 1,350,315 Parks & Recreation Fire Protection Maximum Ceiling LOS 15 Year Average Service Standard Quality (per capita) Quantity (per capita) SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Service Related to a Highway Public Works Service Category Sub-Component Watson & Associates Economists Ltd. PAGE B-3 Township of Centre Wellington Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: km of roadways Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/km) Urban Collectors 26 26 26 26 26 26 26 26 26 26 27 27 27 31 31 $3,460,000 Rural Local 436 436 436 436 436 436 436 436 436 436 436 436 436 436 436 $2,460,000 Urban Arterial 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $4,060,000 Total 467 467 467 467 467 467 467 467 467 467 468 468 468 472 472 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0176 0.0175 0.0173 0.0171 0.0170 0.0167 0.0166 0.0163 0.0160 0.0159 0.0153 0.0150 0.0145 0.0140 0.0137 15 Year Average 2010 to 2024 Quantity Standard 0.0160 Quality Standard $2,537,296 Service Standard $40,597 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $40,597 Eligible Amount $834,628,172 Watson & Associates Economists Ltd. PAGE B-4 Township of Centre Wellington Service Standard Calculation Sheet Service: Services Related to a Highway - Active Transportation Unit Measure: Linear Meters of Active Transportation Facilities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/ Linear Metre) Multi-Use Paths - - - - - 196 196 390 390 993 1,035 1,035 1,503 4,174 4,772 $300 Sidewalks 95,382 95,946 95,292 95,983 96,965 99,834 99,992 104,891 110,040 110,404 111,130 111,409 112,942 113,914 117,048 $160 Trails (Stone Dust) 2,958 2,958 2,958 2,958 2,958 3,410 6,021 6,021 6,563 6,563 6,563 6,563 6,563 6,563 6,563 $75 On-Road Cycling Lane - - - - - - - - - - 863 863 863 863 863 $100 Total 98,340 98,904 98,250 98,941 99,923 103,440 106,209 111,302 116,993 117,960 119,591 119,870 121,871 125,514 129,246 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 3.7114 3.7052 3.6435 3.6193 3.6312 3.7115 3.7675 3.8774 4.0040 4.0127 3.9154 3.8552 3.7746 3.7295 3.7466 15 Year Average 2010 to 2024 Quantity Standard 3.7803 Quality Standard $157 Service Standard $594 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $594 Eligible Amount $12,212,868 Watson & Associates Economists Ltd. PAGE B-5 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with site works, landscaping, etc. Equipment Depot/Office 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 $500 $551 Sand/Salt Shed 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 6,144 $224 $247 Storage Shed 334 334 334 334 334 334 334 334 334 334 334 334 334 334 334 $200 $221 Equipment Depot/Office 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 6,743 $500 $551 Sand/Salt Shed 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 4,544 $224 $247 Public Works Office 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 3,032 $500 $551 Equipment Depot/Office 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 $500 $551 Equipment Depot/Office 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 5,503 $500 $551 Equipment Depot/Office 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 $500 $551 Storage 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $200 $221 Storage Shed - - - - - - 420 420 420 420 420 420 420 420 420 $200 $221 Office (Engineering) 860 860 860 860 860 860 860 860 860 860 860 860 860 860 860 $500 $551 Storage - - - - - - - - - - - - - - 4,151 $200 $221 Total 53,568 53,568 53,568 53,568 53,568 53,568 53,988 53,988 53,988 53,988 53,988 53,988 53,988 53,988 58,139 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 2.0217 2.0068 1.9865 1.9595 1.9467 1.9221 1.9151 1.8808 1.8477 1.8365 1.7675 1.7363 1.6721 1.6042 1.6853 15 Year Average 2010 to 2024 Quantity Standard 1.8526 Quality Standard $481 Service Standard $891 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $891 Eligible Amount $18,322,386 Watson & Associates Economists Ltd. PAGE B-6 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Small Trucks: 12-31 Dodge Ram Pick-up (Elora) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 16-03 Chev Silverado Pick-up (Rosso) - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 19 -05 Chev Silverado Pick-up (Swift) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 19-06 Chevrolet Equinox (Baker) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 15-04 Chev Pick-up (Heseltine) - 2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 16-27 Chev Silverado Pick-up (Fergus) - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 12-37 Ford F350 1 1/2 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $111,000 11-83 Chev 4X4 1 1/2 ton (Elora Shop Truck) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $111,000 12-36 Ford F350 1 1/2 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $111,000 11-75 4x4 Chev 1 1/2 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $111,000 16-47 Chev Silverado (Fergus) - 2016 - - - - - - 1 1 1 1 1 1 1 - - $65,000 E19-26 Chevrolet Equinox 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 E14-28 2014 Jeep Cherokee - - - - - - - - - - - - - 1 1 $50,000 PW20-73 2020 Ford F550 XLT Utility Truck - - - - - - - - - - 1 1 1 1 1 $120,000 PW21-31 Ford 1500 Pick-up (Elora) - - - - - - - - - - - 1 1 1 1 $65,000 PW23-704 Chevrolet Silverado - - - - - - - - - - - - - 1 1 $65,000 24-712 2023 Chevrolet Bolt - - - - - - - - - - - - - - 1 $45,000 24-727 2024 Chevrolet Silverado 1500 - - - - - - - - - - - - - - 1 $65,000 24-703 2024 Chevrolet Silverado 1500 - - - - - - - - - - - - - - 1 $65,000 24-747 2024 Chevrolet Silverado 1500 - - - - - - - - - - - - - - 1 $65,000 24-783 Ford F550 with dump, plow (Elora) - - - - - - - - - - - - - - 1 $150,000 24-775 Ford F550 with dump, plow - - - - - - - - - - - - - - 1 $150,000 24-736 Chev Silverado 3500HD with dump - - - - - - - - - - - - - - 1 $150,000 24-737 Chev Silverado 3500HD with dump - - - - - - - - - - - - - - 1 $150,000 Heavy Equipment: 18-10 John Deere Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $680,500 11-15 John Deere 870G Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $680,500 08-32 Volvo 960 Grader - retire 1 1 1 1 1 1 1 1 1 1 - - - - - $680,500 17-77 John Deere Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $680,500 12-35 John Deere Rubber Tire Loader 1 1 1 1 1 1 1 1 1 1 1 1 - - - $295,900 17-81 Case 580 Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $221,900 18-16 Case 450 Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $221,900 15-38 Case Backhoe 4WD - 2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $221,900 08-30 John Deere SJ 4WD Backhoe - retire 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $221,900 13-56 Elgin Pelican Street Sweeper (Elora) - 2013 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $325,500 05-19 Broombear Sweeper (Fergus) 1 1 1 1 1 1 1 1 1 1 - - - - - $554,800 09-20 Pelican Sweeper (Elora) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $325,500 PW19-32 CAT 140 Grader - - - - - - - - - - 1 1 1 1 1 $680,500 Watson & Associates Economists Ltd. PAGE B-7 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) PW22-35 John Deere 524P Wheel Loader - - - - - - - - - - - - 1 1 1 $295,900 23-720 Sweeprite Street Sweeper - - - - - - - - - - - - - 1 1 $325,500 23-715 John Deere 772GP Grader - - - - - - - - - - - - - 1 1 $680,500 24-730 Case Loader Backhoe - - - - - - - - - - - - - - 1 $221,900 Dump Trucks & Snow Plows: 05-98 International Single Axle - retire 1 1 1 1 1 1 1 1 1 1 1 - - - - $384,600 12-33 International Single Axle - 1 1 1 1 1 1 1 1 1 1 1 1 1 - $384,600 15-68 International Single Axle - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $384,600 15-79 International Single Axle - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $384,600 16-85 International Single Axle - 2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $384,600 17-82 International Single Axle - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $384,600 17-42 International 7600 Tandem - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $473,400 10-63 International 7300 Tandem 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $473,400 14-71 International 7600 Tandem - 2013 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $473,400 14-72 International 7600 Tandem - 2013 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $473,400 17-99 International 7600 Tandem -2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $473,400 11-66 International 7600 Tandem 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $473,400 PW21-63 Freightliner 114SD Tandem - - - - - - - - - - - 1 1 1 1 $473,400 PW21-98 Freightliner 114SD Tandem - - - - - - - - - - - 1 1 1 1 $473,400 24-733 Freightliner Single Axle - - - - - - - - - - - - - - 1 $384,600 24-766 Freightliner Single Axle - - - - - - - - - - - - - 1 $384,600 24-772 Freightliner SD Tandem - - - - - - - - - - - - - 1 $473,400 25-771 Freightliner SD Tandem - 2025 - - - - - - - - - - - - - 1 $473,400 One way replacement snow plow blades 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $37,000 Sidewalk & Grass: 09-64 Trackless (Fergus) 1 1 1 1 1 1 1 1 1 1 - - - - - $74,000 10-51 Kubota 3080 (Fergus) - retire 1 1 1 1 1 1 1 1 1 1 1 1 - - - $59,200 09-62 Kubota (Elora) - retire 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $59,200 12-34 Kubota 3080 Mower (Fergus) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $59,200 16-29 Kubota Zero Turn Mower (Fergus) - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $30,000 12-07 3748 Kubota Tractor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 17-25 Kubota - 2018 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $74,000 14-40 Trackless - 2014 - - - - 1 1 1 1 1 1 1 1 1 1 1 $74,000 18-22 Kubota Zero Turn Mower (Fergus) - 2018 - - - - - - - - 1 1 1 1 1 1 1 $34,000 18-88 Kubota Zero Turn Mower (Elora) - 2018 - - - - - - - - 1 1 1 1 1 1 1 $34,000 18-52 Kubota Sidewalk Machine - 2018 - - - - - - - - 1 1 1 1 1 1 1 $74,000 PW20-62 Kubota Zero Turn Mower - - - - - - - - - - 1 1 1 1 1 $30,000 PW20-64 Kubota sidewalk machine - - - - - - - - - - 1 1 1 1 1 $210,000 PW21-74 Compact Tractor - Kubota - - - - - - - - - - - 1 1 1 1 $90,000 23-752 Compact Tractor - John Deere - - - - - - - - - - - - - 1 1 $90,000 23-725 2023 Articulated Sidewalk Tractor - - - - - - - - - - - - - 1 1 $210,000 24-729 2024 Kubota ZD1211R-3-60R - - - - - - - - - - - - - - 1 $26,000 Watson & Associates Economists Ltd. PAGE B-8 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Small Equipment: Hydraulic Water Pump (2) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 - $14,800 Roadside Mower - Colvoy (1) - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $29,600 Water Tanks (2) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $32,500 Compactor (Jumping Jack) (1) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,400 Sidewalk Sanders (1) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,400 2008 Bandit Wood Chipper - retire 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $74,000 Linemarker Paint Machine - retire 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,800 Linemarker Paint Machine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,800 Plate Tamper (1) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,900 Pressure Washer (2) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $22,200 Utility Trailers (4) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 - $7,400 Grader Packers (4) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $37,000 Kubota Tractor Snow Blower (2016) - - - - - - 1 1 1 1 1 1 1 1 1 $29,600 Asphalt Hot Box (2016) - - - - - - 1 1 1 1 1 1 1 1 1 $74,000 Paving Roller - - - - - - 1 1 1 1 1 1 1 1 1 $74,000 Soil Screener 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $74,000 Chain Saws Pool 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $1,800 Hedge Trimmer Pool 2 2 2 2 2 2 2 2 2 2 2 2 2 2 8 $925 Pilkington Office Portable Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,600 Push Mowers Pool 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $600 Quick Cut Saws Pool 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $2,200 Weed Eaters Pool 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $900 23-724 200UC Bandit Wood Chipper - 2023 - - - - - - - - - - - - - 1 1 $60,000 Trailers: United Express Van Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $19,400 Float Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,700 Webe Trailer - - - - - - - - - - 1 1 1 1 1 $8,000 RHI Aluminum Trailer - - - - - - - - - - - - 1 1 1 $8,000 ENBE - Trailer - - - - - - - - - - - - 1 1 1 $8,000 Small Trucks (Environmental): 14-44 Dodge 2500 Pick-up with snow blade - Water - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 16-09 Chev 4X4 Crew Pick-up - Waste Water - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 19-02 Chev Silverado (Chilton) - Water - 2019 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 10-14 Dodge Ram 3500 1 1/2 Ton - Water - 2010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $111,000 11-86 Chev Pick-up - Water - 2011 1 1 1 1 1 1 1 1 1 1 - - - - - $65,000 16-87 Chev 4X4 Crew Pick-up - Water - 2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 13-06 Dodge Grand Caravan - Water - 2013 1 1 1 1 1 1 1 1 1 1 1 1 - - - $50,000 13-46 Chev Pick-up - Waste Water - 2012 1 1 1 1 1 1 1 1 1 1 - - - - - $65,000 11-08 GMC Pick-up with snow blade - Waste Water - 2010 1 1 1 1 1 1 1 1 1 1 - - - - - $65,000 15-41 Chev Silverado WT 1500 Pick-up - Water - 2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 Watson & Associates Economists Ltd. PAGE B-9 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) 19-11 Chev Pick up (Masiero) - Waste Water - 2018 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 19-23 Chev Pick-up (Mullin) - Waste waer - 2018 - - - - - - - - - 1 1 1 1 1 1 $65,000 E20-86 Chevrolet Silverado Pick-up - - - - - - - - - - 1 1 1 1 1 $65,000 E20-46 Chev Silverado 1/2 Ton - - - - - - - - - - - 1 1 1 1 $65,000 E20-08 Chev Silverado 3/4 Ton with plow - - - - - - - - - - - 1 1 1 1 $70,000 E22-06 2022 Chevrolet Silverado 1500 - - - - - - - - - - - - 1 1 1 $65,000 E22-55 2022 Chevrolet Silverado 1500 1 1 1 $65,000 23-541 Chevrolet Silverado - - - - - - - - - - - - - 1 1 $65,000 23-428 Chev Bolt EUV LT - - - - - - - - - - - - - 1 1 $40,000 24-687 2024 Chevrolet Silverado 1500 - - - - - - - - - - - - - - 1 $65,000 24-509 2024 Chevrolet Silverado 1500 - - - - - - - - - - - - - - 1 $65,000 24-514 Ford F350 with dump box - - - - - - - - - - - - - - 1 $100,000 Other (Environmental): 14-80 Vactor Flusher Truck - Water/Waste Water - 2013 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $858,000 10-17 Vactor Flusher Truck - Water/Waste Water - 2010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $858,000 04-28 GMC Camera Truck - Waste Water - 2004 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $81,400 14-61 Kubota Mower - Waste Water - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $44,400 14-60 Kubota Mower and Snowblower - Water - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $66,600 E78-100 3600 Ford Tractor with Cab & Loader - retire 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $118,300 25-517 International HV6 Vactor Flusher Truck - Water - - - - - - - - - - - - - - 1 $650,000 Waterworks Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $337,100 Wastewater Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,200 Wastewater Treatment Plants Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $122,800 Trailer with Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $94,800 Trailer with Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $94,800 Watson & Associates Economists Ltd. PAGE B-10 Township of Centre Wellington Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Kohler 30 Portable Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $47,500 United Express Spills Trailer & Equip 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $19,400 7'x16' American Hauler Cargo Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $19,400 Nicholls Trailer - - - - - - - - - - 1 1 1 1 1 $10,000 Vale Maintenance Trailer - - - - - - - - - - 1 1 1 1 1 $10,000 Kubota East F2560 4x4 with 72" deck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $66,700 Kubota - Fergus F2880 4x4 with cab, 60" blade, 48" snowblower, 60" mower, & 60" sweeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $68,500 Total 117 118 118 118 119 119 123 123 126 127 129 134 135 137 143 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0044 0.0044 0.0044 0.0043 0.0043 0.0043 0.0044 0.0043 0.0043 0.0043 0.0042 0.0043 0.0042 0.0041 0.0041 15 Year Average 2010 to 2024 Quantity Standard 0.0043 Quality Standard $131,372 Service Standard $565 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $565 Eligible Amount $11,613,779 Watson & Associates Economists Ltd. PAGE B-11 Township of Centre Wellington Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with site works, landscaping, etc. Fire Hall - 250 Queen Street West, Fergus 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 8,152 $620 $716 Fire Hall - 72 Guelph Road, Elora 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 6,241 6,241 6,241 6,241 6,241 $620 $716 Storage Shed - 250 Queen Street West, Fergus 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 $200 $231 Storage Shed - 250 Queen Street West, Fergus 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 $200 $231 Total 16,172 16,172 16,172 16,172 16,172 16,172 16,172 16,172 16,172 16,172 16,893 16,893 16,893 16,893 16,893 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.6103 0.6059 0.5997 0.5916 0.5877 0.5803 0.5737 0.5634 0.5535 0.5501 0.5531 0.5433 0.5232 0.5020 0.4897 15 Year Average 2010 to 2024 Quantity Standard 0.5618 Quality Standard $642 Service Standard $361 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $361 Eligible Amount $7,415,631 Watson & Associates Economists Ltd. PAGE B-12 Township of Centre Wellington Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Fergus Station E1 Pumper Rescue - 2005 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,400,000 PUMP41 - 24 Spartan Pumper - - - - - - - - - - - - - - 1 $1,400,000 Timberwolf Mini Pumper - 2007 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $800,000 Tanker-47 (Freightliner FL-80) - 1997 1 1 1 1 1 1 1 1 1 1 - - - - - $1,000,000 New Tanker - 47 - - - - - - - - - - 1 1 1 1 1 $1,000,000 Rescue-45 (KME) - 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000,000 Boat - B49 - 2012 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,600 Argo 750HDI 8x8 ATV (E48) and Trailer (E48T) - 2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,800 Truck-45B (2003 Silverado) 1 1 1 1 1 1 1 1 1 1 1 - - - - $80,000 Truck-45B (2021 Silverado) - - - - - - - - - - - 1 1 1 1 $80,000 Emergency Prep Trailer with generator 1 1 1 1 1 1 1 1 - - - - - - - $85,800 Elora Station Pump-61 (KME) - 2011 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,400,000 Aerial-64 (E-One Custom Cab) - 2001 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,627,300 Tanker-67 (International 7500) KME - 2014 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000,000 Rescue-65 (KME) - 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000,000 Boat - B69 - 2013 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,600 Truck-65B (2007 Dodge Ram) 1 1 1 1 1 1 1 1 1 1 1 - - - - $80,000 Truck - 65B (2021 Silverado) - - - - - - - - - - - 1 1 1 1 $80,000 Administration 2012 Dodge Ram (T. Mulvey) - 2012 1 1 1 1 1 1 1 1 1 1 1 1 - - - $80,000 ECAR3 2022 Ford F150 - - - - - - - - - - - - 1 1 1 $80,000 2013 Expedition (B. Patton) - 2012 1 1 1 1 1 1 1 1 1 1 1 1 - - - $80,000 ECAR1 2022 Ford Explorer - - - - - - - - - - - - 1 1 1 $80,000 2012 Dodge Caravan (C. Paluch) - 2012 - - 1 1 1 1 1 1 1 1 1 1 - - - $80,000 ECAR4 2022 F150 - - - - - - - - - - - - 1 1 1 $80,000 2019 Chevrolet Tahoe (J. Karn) - 2019 - - - - - - - - - 1 1 1 1 1 1 $80,000 Total 16 16 17 17 17 17 17 17 16 17 17 17 17 17 18 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0005 0.0006 0.0006 0.0005 0.0005 0.0005 0.0005 15 Year Average 2010 to 2024 Quantity Standard 0.0006 Quality Standard $564,350 Service Standard $339 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $339 Eligible Amount $6,961,483 Watson & Associates Economists Ltd. PAGE B-13 Township of Centre Wellington Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Fire Fighters - Equipment 60 60 60 60 60 60 60 60 63 69 69 69 69 69 69 $9,200 Rescue & Medical Gas Resuscitators & Detectors 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $38,800 Hydraulic Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $227,800 Rescue Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $103,000 Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $161,000 Suppression Equipment Portable Pumps 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $41,600 Exhaust Fans 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $7,000 Hoses 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $132,000 Nozzles 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $80,500 Generators 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,800 Ladders 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $24,400 Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $165,400 Station Supplies 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $71,000 Other Portable Radios 46 46 46 46 46 46 46 46 46 46 46 46 46 46 46 $2,200 S.C.B.A. Compressor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,300 S.C.B.A. Fill Station 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $17,800 S.C.B.A. Cascade 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $17,800 S.C.B.A. 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 $11,200 S.C.B.A. Cylinders 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 $1,800 Total 202 202 202 202 202 202 202 202 205 211 211 211 211 211 211 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0076 0.0076 0.0075 0.0074 0.0073 0.0072 0.0072 0.0070 0.0070 0.0072 0.0069 0.0068 0.0065 0.0063 0.0061 15 Year Average 2010 to 2024 Quantity Standard 0.0070 Quality Standard $11,776 Service Standard $82 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $82 Eligible Amount $1,694,678 Watson & Associates Economists Ltd. PAGE B-14 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Acre) Active Parkland 62.39 68.41 68.41 68.41 68.41 68.41 68.41 68.41 68.41 68.41 68.41 68.41 70.66 70.66 70.66 $104,700 Passive Parkland 119.46 120.96 120.96 120.96 120.96 120.96 120.96 125.48 125.48 125.26 125.26 125.26 127.51 127.51 127.51 $104,700 Natural Open Space 29.57 46.34 46.34 46.34 46.34 49.54 49.54 49.54 51.50 53.70 53.70 53.70 69.26 69.26 77.86 $5,600 Total 211.42 235.71 235.71 235.71 235.71 238.91 238.91 243.43 245.39 247.37 247.37 247.37 267.43 267.43 276.03 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0080 0.0088 0.0087 0.0086 0.0086 0.0086 0.0085 0.0085 0.0084 0.0084 0.0081 0.0080 0.0083 0.0079 0.0080 15 Year Average 2010 to 2024 Quantity Standard 0.0084 Quality Standard $83,137 Service Standard $698 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $698 Eligible Amount $14,357,378 Watson & Associates Economists Ltd. PAGE B-15 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Parks Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) FERGUS PARKS BT Corner Seating area, paths, lighting 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Beatty Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Rock wall climber & swing set 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $28,100 Outdoor natural ice rink (water supply & light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 CW Community Sportsplex Large Community Medium Children's play structure & swing set 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 Skateboard Park ( fence, equip, surface) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $282,600 Large Picnic Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $124,300 9 Hole Disc Golf course - - - - - - - - 1 $10,000 Campground 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Aluminum Bleachers - - - - - 4 4 4 4 4 4 4 4 4 4 $50,000 12 Steel Bleachers - - - - - 12 12 12 12 12 12 12 12 12 12 $6,700 Confederation Park Small picnic shelter (teepee) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $78,400 Gravel parking lots (1,225 sq.m) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $57,700 Ferrier Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Forfar Park Small sports field 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 Gravel parking lots (350 sq.m) 1 1 1 1 1 1 1 - - - - - - - - $16,450 Asphalt parking lots (1300 sq.m) - - - - - - - 1 1 1 1 1 1 1 1 $61,100 Pavillion - - - - - - - - - - - 1 1 1 1 $80,000 Outdoor fitness equipment - - - - - - - - - - - 1 1 1 1 $20,000 Neighbourhood Children's Play structure & swings - - - - - - - - - - - 1 1 1 1 $151,000 Accessible Washroom - - - - - - - - - 1 1 1 1 1 1 $220,000 Gibbons Dr Park Neighbourhood Children's Play structure - - - - - - - - - 1 1 1 1 1 1 $151,000 Gow Park benches 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Graham Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Watson & Associates Economists Ltd. PAGE B-16 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Parks Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Highland Park Washroom/concession building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $309,200 Gravel parking lot (200 sq.m.) 1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 $9,400 Outdoor natural ice rink (water supply & Light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Harper Crescent BMX Trail 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 Holman Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Kirvan Park Neighbourhood Children's Play structure & swings - - - - - - - - - - - - - 1 1 $151,000 Pavillion - - - - - - - - - - - - - 1 1 $80,000 Milligan Park Neighbourhood Children's Play structure 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Millburn Blvd Park Splash Pad - - - - 1 1 1 1 1 1 1 1 1 1 1 $330,000 Medium Picnic Shelter - - - - 1 1 1 1 1 1 1 1 1 1 1 $80,000 Asphalt parking lot with curbing (553 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,000 Pattison Park Neighbourhood Children's Play structure 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Revell Park Neighbourhood Children's Play structure - - - - - - - - - 1 1 1 1 1 1 $151,000 Ryan Park Neighbourhood Children's Play structure & swings - - - - - - - - 1 1 1 1 1 1 1 $151,000 Outdoor natural ice rink (water supply & Light) - - - - - - - - 1 1 1 1 1 1 1 $22,200 Stait Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Barrier Free Children's Play Structure - - - 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 St. James Square Park Benches 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 Strathallan Park Gravel parking lot (911 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,000 Community children's play structure 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 Outdoor natural ice rink (water supply & Light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $22,200 Tait Cresc. Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Templin Gardens benches 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Terry Fox Park gazebo 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Watson & Associates Economists Ltd. PAGE B-17 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Parks Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Webster Park Small sports field 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Outdoor natural ice rink (water supply & Light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Wilkie Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Victoria Park Asphalt parking lot Fergus (400 sq.m.) 1 1 1 1 1 - - - - - - - - - - $48,800 Asphalt Parking Lot Elora (2,500 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $116,900 Gravel parking lot (800 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $37,000 Community children's play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 Stonedust track (410 lm.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $69,500 Pierpoint Nature Reserve Gravel parking lot (360 sq.m.) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $16,300 Bench 1 1 1 1 1 $2,500 Fergus Dog Park Dog agility equipment - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $37,000 Westminster Highland Park Community children's play structure & swings - - - - - - - 1 1 1 1 1 1 1 1 $566,500 Shade Structure - - - - - - - 1 1 1 1 1 1 1 1 $62,100 Multi Use Asphalt Court - - - - - - - 1 1 1 1 1 1 1 1 $65,100 ELORA PARKS Bissell Park Medium Picnic Shelter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $235,200 Gravel Parking Lot (3,457 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $162,700 Steel Pedestrain Bridge 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,199,800 Mulit-use asphalt play surface (676 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $63,600 Outdoor natural ice rink (water supply & Light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Accessible Washroom - - - - - 1 1 1 1 1 1 1 1 1 1 $650,000 Drimmie Park Community children's play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 Outdoor natural ice rink (water supply & Light) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $22,200 Elora Community Centre Large Community children's play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $566,500 multi-use asphalt court (sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $63,600 Medium Picnic Shelter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $155,300 Fencing Along Gorge - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $550,300 Skatepark - - - - - - - - - 1 1 1 1 1 1 $750,000 Elora Lion's Park Gravel Parking Lot (967 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $45,900 Watson & Associates Economists Ltd. PAGE B-18 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Parks Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Elora Meadows Park Neighbourhood Children's Play structure & swings - - - - - - - 1 1 1 1 1 1 1 1 $151,000 Outdoor natural ice rink (water supply & Light) - - - - - - - 1 1 1 1 1 1 1 1 $60,000 Foote Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Hoffer Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Asphalt Parking Lot (500 sq.m.) - - - - - - - 1 1 1 1 1 1 1 1 $59,200 Gravel Parking Lot (117 sq.m.) 1 1 1 1 1 1 1 - - - - - - - - $5,900 Small Picnic Shelter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $78,400 Accessible Washroom - - - - - - - - - - - - - 1 1 $250,000 Granwood Memorial Park K-8 playground - - - - - - - - - - - 1 1 1 1 $151,000 Pavillion - - - - - - - - - - - 1 1 1 1 $80,000 Games Table - - - - - - - - - - - 1 1 1 1 $5,000 Haylock Park Stone amphitheatre - - - - - - - - - - - - - - 1 $50,000 Games Table - - - - - - - - - - - - - - 1 $5,000 Keating Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 O'Brien Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Small Children's Splash Area 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $495,600 Asphalt parking area (585 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $63,600 Bike Repair Station - - - - - - - - - - 1 1 1 1 1 $15,000 Accessible Washroom - - - - - - - - - - - 1 1 1 1 $220,000 Station Square Park Wood Gazebo 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Veterans Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Medium Picnic Shelter 1 1 1 1 1 1 1 - - - - - - - - $155,300 Gravel parking area (963 sq.m) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $44,400 Watson & Associates Economists Ltd. PAGE B-19 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Parks Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Victoria Park Gravel Parking Lot (2,500 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $116,900 Fencing Along Gorge 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,700 South Ridge Park Gravel parking lot (918 sq.m.) - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,900 Neighbourhood Children's Play structure, swings & rubber surface - - - - - 1 1 1 1 1 1 1 1 1 1 $151,000 Accessible Washroom 1 1 1 1 1 $220,000 BELWOOD PARKS Belwood Sports Fields Asphalt parking area (1,328 sq.m) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $145,000 Douglas Park Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Mulit-use asphalt play surface 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $19,200 Ennotville Park gravel parking lot 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Maple Park Medium Picnic Shelter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $155,300 Neighbourhood Children's Play structure & swings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,000 Total 71 73 75 76 78 95 95 101 103 107 110 117 117 120 123 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0027 0.0027 0.0028 0.0028 0.0028 0.0034 0.0034 0.0035 0.0035 0.0036 0.0036 0.0038 0.0036 0.0036 0.0036 15 Year Average 2010 to 2024 Quantity Standard 0.0033 Quality Standard $156,636 Service Standard $517 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $517 Eligible Amount $10,626,947 Watson & Associates Economists Ltd. PAGE B-20 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Amenities - Recreation Unit Measure: No. of parkland amenities Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) FERGUS PARKS CW Community Sportsplex Rugby Field (unlit) 1 1 1 1 1 - - - - - - - - - - $27,200 Soccer Field (unlit) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 Hardball Diamond (lit & fenced) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,025,000 Tennis Courts (2 lit & fenced) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Highland Park Softball diamond (lit & fenced) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $930,000 Class D Ball Diamonds 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $195,000 Kirvan Park 3/4 soccer field (unlit) - - - - - - - - - - - - - 1 1 $120,000 Strathallan Park Sports field 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 Tower Street Tennis Court Tennis Courts (lit & fenced) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $600,000 Clubhouse (75 sq.m.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Victoria Parks Soccer field (lit & irrigated) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $725,000 Soccer/Rugby Field (1/2 lit) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $725,000 Soccer field 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $295,000 ELORA PARKS Elora Community Centre Softball diamond (lit & fenced) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $928,700 Elora Lion's Park Softball diamond (lit & fenced) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $928,700 South Ridge Park Sports Fields (irrigated) - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $725,000 Small Sports Field (irrigate) - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $295,000 BELWOOD PARKS Belwood Sports Fields Softball diamond (lit & fenced) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $928,700 Total 19 22 22 22 22 21 21 21 21 21 21 21 21 22 22 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0007 0.0008 0.0008 0.0008 0.0008 0.0008 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0006 15 Year Average 2010 to 2024 Quantity Standard 0.0007 Quality Standard $572,157 Service Standard $401 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $401 Eligible Amount $8,234,085 Watson & Associates Economists Ltd. PAGE B-21 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Trails Contact : Unit Measure: Linear Metres of Paths and Trails Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/ Linear Metre) FERGUS PARKS: Gibbons Park Stone dust trail - - - - - - - - 249 249 249 249 249 249 249 $46 Templin Gardens Stone dust trail 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 $46 Concrete stairs to river 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 $150 CW Community Sportsplex Stone dust trail 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $46 Confederation Park Stone dust trail 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 $46 Millburn Park Stone dust path 161 161 161 161 30 30 30 30 30 30 30 30 30 30 30 $46 Pattison Place Park Stone dust trail 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 $46 Kirvan Park Stone dust trail - - - - - - - - - - - - 108 108 108 $46 Glencoe Park Stone dust trail 154 154 154 154 154 154 154 154 154 154 154 154 154 154 154 $46 Terry Fox Park Stone dust path 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105 $46 Victoria Park Stone Dust running track 410 410 410 410 410 410 410 410 410 410 410 410 410 410 410 $46 Fergus Dog Park Stone dust trail - 490 490 490 490 490 490 490 490 490 490 490 490 490 490 $46 Revell Park Stone dust trail - - - - - 150 150 150 150 150 150 150 150 150 150 $46 Ryan Park Stone dust trail - - - - - - - - 400 400 400 400 400 400 400 $46 Watson & Associates Economists Ltd. PAGE B-22 Township of Centre Wellington Service Standard Calculation Sheet Service: Parkland Trails Contact : Unit Measure: Linear Metres of Paths and Trails Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/ Linear Metre) ELORA PARKS: O'Brien Park Stone dust path - - - - - - - - 22 22 22 22 22 22 22 $46 Bissell Park Stone dust path 185 - - - - - - - - - - - - - - $46 Boardwalk 240 240 240 240 240 240 240 240 240 240 240 240 240 240 240 $150 Foote Park Stone dust trail 477 477 477 477 397 397 397 219 219 219 219 219 219 219 219 $46 Station Square Park Stone dust trail 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 $46 South Ridge Park Stone dust trail - 222 222 222 222 222 222 222 222 222 222 222 222 222 222 $46 BELWOOD PARKS: Douglas park Stone dust path 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 $150 Total 3,751 4,278 4,278 4,278 4,067 4,217 4,217 4,039 4,710 4,710 4,710 4,710 4,818 4,818 4,818 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.1416 0.1603 0.1586 0.1565 0.1478 0.1513 0.1496 0.1407 0.1612 0.1602 0.1542 0.1515 0.1492 0.1432 0.1397 15 Year Average 2010 to 2024 Quantity Standard 0.1510 Quality Standard $54 Service Standard $8 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $8 Eligible Amount $168,173 Watson & Associates Economists Ltd. PAGE B-23 Township of Centre Wellington Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with site works, landscaping, etc. Centre Wellington Community Sportsplex 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 111,523 $775 $854 Park Washrooms & Showers at CW Community Sportsplex Park 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 1,181 $351 $387 Storage Shed 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 $200 $221 Stone House (2 Storey - built in late 1800's) 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 2,217 $500 $551 Tennis Change Rooms (Fergus) 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 $207 $228 Victoria Park Seniors Centre 9,500 9,500 9,500 9,500 9,500 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 $700 $772 Rugby Building (1 storey bldg with washrooms, meeting rooms, etc.) 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 4,827 $361 $398 Belwood Hall 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227 $700 $772 Elora Community Centre 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 35,726 $750 $827 Green House #1 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 $20 $22 Green House #2 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 1,440 $20 $22 Weigh Scale Washroom 342 342 342 342 342 342 342 342 342 342 342 342 342 342 342 $500 $525 Total 175,423 175,423 175,423 175,423 175,423 177,923 177,923 177,923 177,923 177,923 177,923 177,923 177,923 177,923 177,923 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 6.6205 6.5719 6.5053 6.4171 6.3748 6.3840 6.3113 6.1983 6.0893 6.0524 5.8251 5.7223 5.5107 5.2868 5.1576 15 Year Average 2010 to 2024 Quantity Standard 6.0685 Quality Standard $797 Service Standard $4,838 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $4,838 Eligible Amount $99,464,648 Watson & Associates Economists Ltd. PAGE B-24 Township of Centre Wellington Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Small Trucks Blue Dodge 4X4 truck (2006 - Parks & Watering) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $65,000 Chevrolet Silverado (2022 - Parks) - - - - - - - - - - - - - 1 1 $65,000 Blue Chev truck (2013 - Mgr P&FO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $65,000 White Chevrolet Silverado Crew - Z71 (Horticulture) - - - - - - - - - - - - - - 1 $65,000 Chev Duel Wheel With Box (2004 - Parks) 1 1 1 1 1 1 1 1 1 1 - - - - - $160,000 Ford Landscape Truck with Box (2020 - Parks) - - - - - - - - - - 1 1 1 1 1 $160,000 Blue Dodge truck with cap (2006 - Horticulturist) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $65,000 Chev Silverado 1500 (2022 - Watering Crew) 1 1 1 $65,000 Blue Ford truck (2002 - Parks) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Blue Ford Ranger 4X4 truck (2011 - Sportsplex) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $65,000 Ford 550 Multipurpose (2017) 1 1 1 1 1 1 1 1 $264,800 Ford Landscape Truck with Box (2020 - Horticulture) - - - - - - - - - - 1 1 1 1 1 $100,000 Chevrolet Silverado (2023 - Parks Manager) - - - - - - - - - - - - - 1 1 $65,000 White Chevrolet Silverado Crew - - - - - - - - - - - - - 1 1 $65,000 Chevrolet Silverado (2023 - Parks Coordinator) - - - - - - - - - - - - - 1 1 $65,000 Chevrolet Silverado (2023 - Forestry Coordinator) - - - - - - - - - - - - - 1 1 $65,000 Ford Transit Van - - - - - - - - - - - - - - 1 $70,000 Chevrolet Silverado 4x4 - Transferred (Recreation Facilities) - - - - - - - - - - - - 1 1 1 $65,000 Dodge Ram Pick-up (Parks) - - - - - - - - - - - - 1 1 1 $65,000 Dodge Pickup - - - - - - - - - - - - 1 1 1 $65,000 Tractors & Mowers Kubota Tractor/Mower (2002) 1 1 1 1 1 1 1 1 1 - - - - - - $30,000 Kubota Tractor/Mower (2019) - JECC - - - - - - - - - 1 1 1 1 1 1 $30,000 Kubota Tractor FE Loader (1999) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $75,000 Kubota Tractor FE Loader M5030 (2023 - JECC) - - - - - - - - - - - - 1 1 1 $75,000 Gang Turf Mower (2016) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $119,800 John Deere 1600 Mower (2024) - - - - - - - - - - - - - - 1 $100,000 John Deere Tractor FE Loader (2009) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $75,000 Kubota MX5400 HSTCC Utility Tractor (2024) - - - - - - - - - - - - - - 1 $75,000 Kubota Tractor (4WD) Mower (2002) 1 1 1 1 1 1 1 - - - - - - - - $39,900 Gang Turf Mower (2009) 1 1 1 1 1 1 1 1 1 1 1 - - - - $100,000 Gang Turf Mower (2021) - - - - - - - - - - - 1 1 1 1 $100,000 Watson & Associates Economists Ltd. PAGE B-25 Township of Centre Wellington Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Kubota Mower (2001) 1 1 1 1 1 1 1 - - - - - - - - $30,000 Kubota F3080 60" Riding Mower (2013) - - - 1 1 1 1 1 1 1 1 1 1 1 1 $30,000 Kubota Mower (2017) - - - - - - - 1 1 1 1 1 1 1 1 $30,000 Kubota Mower (2017) - - - - - - - 1 1 1 1 1 1 1 1 $30,000 Kubota Mower (2019) 1 1 1 1 1 1 $30,000 Kubota MX5400 Utility Tractor with Pallet Fork (2022) - - - - - - - - - - - - 1 1 1 $70,000 Kubota ZD1211 Zero Turn Mower (2023) - - - - - - - - - - - - - 1 1 $30,000 Ice Resurfacers CWCS Olympia (2002 & 2012) 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $142,000 Elora Olympia (2001 & 2016) 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 $142,000 Other Equipment 1999 Miska Prowler Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,500 TM-0146 Miska Landscape Trailer (2023) - - - - - - - - - - - - - 1 1 $15,000 Ice Surface Edger 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $9,500 Floor Scrubber 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $22,200 Snow Blower 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $1,600 Floor Polisher 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $3,100 Paint Liner 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,000 Aerator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Large Aerator (2015) - - - - - 1 1 1 1 1 1 1 1 1 1 $12,000 Lawn Roller (2024) - - - - - - - - - - - - - - 1 $5,000 Ball Groomer (Sportsplex/Parks) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Ball Groomer (JECC) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Watering Tank (2021) 1 1 1 1 $10,000 Grove Lift (Sportsplex) (1998) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $29,600 Scissor Lift (JECC) (2017) 1 1 1 1 1 1 1 1 $25,000 MS Gregson Trailer Type Lawn Care Sprayer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $17,800 Total 31 32 33 34 34 35 35 38 38 39 40 41 45 50 53 Population 26,497 26,693 26,966 27,337 27,518 27,870 28,191 28,705 29,219 29,397 30,544 31,093 32,287 33,654 34,497 Per Capita Standard 0.0012 0.0012 0.0012 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 0.0013 0.0013 0.0013 0.0014 0.0015 0.0015 15 Year Average 2010 to 2024 Quantity Standard 0.0013 Quality Standard $50,523 Service Standard $66 D.C. Amount (before deductions) 2051 Forecast Population 20,559 $ per Capita $66 Eligible Amount $1,350,315 Watson & Associates Economists Ltd. PAGE C-1 Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 Appendix C: Long-Term Capital and Operating Cost Examination Township of Centre Wellington Annual Capital and Operating Cost Impact As a requirement of the Development Charges Act, 1997, as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the Township's approved 2024 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method, which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. The following factors were utilized to calculate the annual replacement cost of the capital projects (annual contribution = factor X capital asset cost) and are based on an annual growth rate of 2% (net of inflation) over the average useful life of the asset: Watson & Associates Economists Ltd. PAGE C-3 Table C-1 Township of Centre Wellington Lifecycle Cost Factors and Average Useful Lives Table C-2 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while Township program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Average Useful Life Factor Water and Wastewater Facilities 50 0.01182321 Water and Wastewater Linear Infrastructure 80 0.005160705 Facilities 50 0.01182321 Services Related to a Highway 40 0.016555748 Parkland Development 40 0.016555748 Vehicles 10 0.091326528 Small Equipment & Gear 10 0.091326528 Lifecycle Cost Factors Asset Watson & Associates Economists Ltd. PAGE C-4 Table C-2 Township of Centre Wellington Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE/CLASS OF SERVICE VALUE OF EXISTING INFRASTRUCTURE GROSS COST LESS BENEFIT TO EXISTING SHARE OF GROWTH RELATED CAPITAL TO ASSETS IN PLACE CURRENT OPERATING EXPENDITURE ANNUAL OPERATING EXPENDITURES ANNUAL LIFECYCLE EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Wastewater Services 1.1 Treatment plants 110,711,506 63% 2,220,887 1,405,311 5,298,725 6,704,036 1.2 Sewers 30,815,375 18% 2,435,153 428,891 1,751,798 2,180,689 2. Water Services 2.1 Treatment plant & Storage 41,665,589 31% 2,729,164 842,964 2,102,169 2,945,133 2.2 Distribution 70,721,352 52% 1,560,472 818,104 3,882,333 4,700,437 3. Land - Urban 2051 Forecast 3.1 Land Acquisition for D.C. Eligible Services 4,625,663 - - - 4. Services Related to a Highway 4.1 Roads and Related 1,219,534,005 131,834,309 11% 6,848,922 740,384 6,329,695 7,070,079 5. Public Works (Facilities and Fleet) 5.1 Public Works (Facilities and Fleet) 45,456,587 48,026,357 106% 2,093,926 2,212,301 1,289,186 3,501,487 6. Fire Protection Services 6.1 Fire facilities, vehicles & equipment 24,550,388 10,682,484 44% 2,343,715 1,019,809 797,375 1,817,184 7. Parks and Recreation Services 7.1 Park development, amenities, trails, recreation facilities, vehicles, and equipment 196,324,685 218,321,905 111% 7,163,237 7,965,843 9,178,477 17,144,320 8. Land - 2051 Forecast 8.1 Land Acquisition for D.C. Eligible Services 4,148,820 - - - 9. Growth Studies 9.1 Growth Studies 4,354,654 - - - 10. Land - 10 Year Forecast 10.1 Land Acquisition for D.C. Eligible Services 2,478,000 - - - Total 1,795,724,630 678,386,013 27,395,476 15,433,605 30,629,758 46,063,363 174,963,246 134,895,719 Watson & Associates Economists Ltd. PAGE D-1 Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997, as amended (D.C.A.) requires development charge (D.C.) collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the D.C.A. provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes and for classes of services to be established. - The municipality shall pay each D.C. it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2 to 8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be used as an interim financing source for capital undertakings for which D.C.s may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law and reserve funds by June 30. This statement must be made available to the public and be submitted to the Minister of Municipal Affairs and Housing by July 15. Subsection 43 (2) and O. Reg. 82/98 prescribe the information that must be included in the Treasurer's statement, as follows: - opening balance; - closing balance; Watson & Associates Economists Ltd. PAGE D-3 - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g. collections, draws) including each asset's capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e. non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by D.C.s, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project; - amounts borrowed, purpose of the borrowing, and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at the beginning of the year, given in the year, and outstanding at the end of the year by the holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Recent changes arising from Bill 109 (More Homes for Everyone Act, 2022) provide that Council shall make the statement available to the public by posting the statement on the website or, if there is no such website, in the municipal office. In addition, Bill 109 introduced the following requirements, which shall be included in the treasurer's statement. - For each service for which a development charge is collected during the year o whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law, and o if the answer to subparagraph i is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; Watson & Associates Economists Ltd. PAGE D-4 - For any service for which a development charge was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Additionally, as per subsection 35(3) of the D.C.A.: 35(3) If a service is prescribed for the purposes of this subsection, beginning in the first calendar year that commences after the service is prescribed and in each calendar year thereafter, a municipality shall spend or allocate at least 60 per cent of the monies that are in a reserve fund for the prescribed service at the beginning of the year. All D.C.-eligible services are prescribed for the purposes of this section. Therefore, a municipality shall spend or allocate at least 60 percent of the monies in the reserve fund at the beginning of the year. There are generally two (2) ways in which a municipality may approach this requirement: a) Include a schedule as part of the annual treasurer's statement; or b) Incorporate the information into the annual budgeting process. Recent regulatory changes to Ontario Regulation 82/98 also require the following with respect to the Treasurer's Statement: - The amount from each reserve fund that was committed to a project, but had not been spent, as of the end of the year; - The amount of debt that had been issued for a project as of the end of the year; and - Identify where in the D.C. background study the project's capital costs were estimated. This would not apply in circumstances where a municipality uses a unique identifier in both the background study and treasurer's statement to identify each project. Based upon the above, Figure 1 and Attachments 1 and 2, set out the format for which annual reporting to Council should be provided. Attachment 3 provides for the schedule for allocating reserve fund balances to projects. Watson & Associates Economists Ltd. PAGE D-5 D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a D.C. may be spent. Watson & Associates Economists Ltd. PAGE D-6 Figure D-1 Township of Centre Wellington Annual Treasurer's Statement of Development Charge Reserve Funds Services to which the Development Charge Relates Description Services Related to a Highway Public Works (Facilities and Fleet) Fire Protection Services Parks and Recreation Services Growth Studies Land Wastewater Treatment Wastewater Sewers Water Treatment plants and storage Water Distribution Opening Balance, January 1, ________ Plus: Development Charge Collections Accrued Interest Repayment of Monies Borrowed from Fund and Associated Interest1 Sub-Total 0 0 0 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 Amounts Refunded Amounts Loaned to Other D.C. Service Category for Interim Financing Credits3 Sub-Total 0 0 0 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Watson & Associates Economists Ltd. PAGE D-7 Figure D-2a Township of Centre Wellington Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period Capital Fund Transactions D.C. Project Number Gross Capital Cost D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reserv e Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-8 Figure D-2b Township of Centre Wellington Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Operating Fund Transactions D.C. Reserve Fund Draw Post D.C. Forecast Period Non-D.C. Recoverable Cost Share Operating Fund Transactions Principal Interest Principal Interest Source Principal Interest Source Services Related to a Highway Capital Cost J Capita Cost K Capital Cost L Sub-Total - Services Related to a Highway $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost M Capita Cost N Capital Cost O Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost P Capita Cost Q Capital Cost R Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 Annual Debt Repayment Amount Watson & Associates Economists Ltd. PAGE D-9 Figure D-3 Township of Centre Wellington Attachment 2 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE D-10 Figure D-4 Township of Centre Wellington Attachment 3 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Reserve Fund Balance Allocations Service: Water Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total Debt Issuance Amount Committed but Not Spent D.C. Project Number Total $0 $0 $0 $0 $0 Service: Wastewater Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total Debt Issuance Amount Committed but Not Spent D.C. Project Number Total $0 $0 $0 $0 $0 Service: Services Related to a Highway Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total Debt Issuance Amount Committed but Not Spent D.C. Project Number Total $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE E-1 Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 Appendix E: Local Service Policy Township of Centre Wellington Recommended General Policy Guidelines on Development Charge and Local Service Funding for Road-related, Stormwater Management, Parkland Development, Water, and Sanitary Sewer Works This Appendix sets out the Township's General Policy Guidelines on Development Charges (D.C.) and local service funding for Services Related to a Highway (road), Parkland Development, Water and Wastewater Works and Stormwater Management. The guidelines outline, in general terms, the size and nature of engineered infrastructure that is included in the study as a development charge project, versus infrastructure that is considered as a local service, to be provided separately by landowners, pursuant to a development agreement. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered, in the context of these policy guidelines as subsection 59(2) of the Development Charges Act, 1997, on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, as well as the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area. Definitions Developer-initiated Urban Boundary Expansion is an urban boundary expansion proposed via application to the Township by a private developer, builder, or group of private companies. The developer-initiated urban boundary expansion will require infrastructure not contemplated in the Township's Master Plans and D.C. Background Study, at the time of application. Development Frontage is the length of a property's boundary that directly abuts a public road. Direct Access refers to new or upgraded infrastructure required to provide access from the external road to the area of a Development. Watson & Associates Economists Ltd. PAGE E-3 Development refers to the construction, erection or placing of one or more buildings or structures on land. Road is defined as a thoroughfare, route, or way on land between two places that has been surfaced or otherwise improved to allow travel by motor vehicle. 1. Services Related to a Highway - Roads A complete street is the concept whereby a highway is planned, designed, operated, and maintained to enable pedestrians, cyclists, mobility device and public transit users, and motorists to safely and comfortably move throughout the Township, thereby allowing for the efficient movement of persons and goods. The associated infrastructure to achieve this concept shall include, but is not limited to: road pavement structure and curbs; grade separation/bridge structures (for any vehicles, railways and/or pedestrians); grading, drainage and retaining wall features; culverts structures; storm water drainage systems; utilities; roundabouts, traffic control systems; signage; gateway features; street furniture; active transportation facilities (e.g., sidewalks, bike lanes, multi-use trails which interconnect the transportation network, etc.); pedestrian crossings, transit lanes and lay-bys; roadway illumination systems; boulevard and median surfaces (e.g., sod and topsoil, paving, etc.); street trees and landscaping; parking lanes and lay-bys; (excluding on-street parking in the downtown) and driveway entrances; noise attenuation systems; accessibility features; railings and safety barriers; and utility relocations. The cost of the following items shall be direct developer responsibilities as a local service or included in the D.C. calculation as identified below: 1.1 Local and rural roads internal to development or fronting a development inclusive of all land and associated infrastructure - direct developer responsibility through local service provisions (s.59 of D.C.A.). 1.2 Local and rural roads external to development and not required to provide Direct Access - Include in Township D.C. to the extent permitted under s.5(1) of the D.C.A. The length and location of road(s) that require reconstruction will be determined by the Township at the time of Draft Approval and will reflect those roads external to the development that, in the opinion of the municipality will be Watson & Associates Economists Ltd. PAGE E-4 directly impacted by the development and require reconstruction to a higher service level. 1.3 Collector roads internal to development or fronting a development inclusive of all land and associated infrastructure - direct developer responsibility through local service provisions (s.59 of D.C.A.). 1.4 Urbanization of collector roads internal to development or fronting a development, inclusive of all land and associated infrastructure - direct developer responsibility through local service provisions (s.59 of D.C.A.). 1.5 Collector roads external to development and not required to provide Direct Access - Include in Township D.C. to the extent permitted under s.5(1) of the D.C.A. The length and location of road(s) that require reconstruction will be the determined by the Township at the time of Draft Approval and will reflect those roads external to the development that, in the opinion of the Township will be directly impacted by the development and require reconstruction to a higher service level. 1.6. Arterial roads: a) New, widened, extended, or upgraded arterial roads, inclusive of all associated infrastructure: included as part of road costing funded through D.C.A., s.5(1); b) Land acquisition for arterial roads on existing rights-of-way to achieve a complete street: dedication under the Planning Act provisions (s. 41, 51 and s.53) through development lands; in area with limited development: include in Township D.C.; c) Land acquisition for arterial roads on new rights-of-way to achieve a complete street: dedication, where possible, under the Planning Act provisions (s.51 and s.53) through development lands up to the right-of- way specified in the Official Plan; d) Land acquisition beyond normal dedication requirements to achieve transportation corridors as services related to highways including grade Watson & Associates Economists Ltd. PAGE E-5 separation infrastructure for the movement of pedestrians, cyclists, public transit and/or railway vehicles: include in Township D.C. 1.7. Improvements to existing external roads that are required to provide Direct Access - direct developer responsibility through local service provisions (s.59 of D.C.A.). 2. Bridges and Culverts 2.1 Bridges and culverts internal to development - All structures that service local and collector roads are direct developer responsibility under s.59 of the D.C.A. 2.2 Bridges and culverts external to development: - Local and Rural Roads - Include in Township D.C. (Refer to Item 1) - Collector Road - Include in Township D.C. (Refer to Item 1) - Arterial Road - Include in Township D.C. (Refer to Item 1) 3. Traffic Control Systems, Signals, and Intersection Improvements 3.1 On new arterial roads and arterial road improvements unrelated to a specific development: included as part of road costing funded through D.C.'s. 3.2 On non-arterial roads, or for any Direct Access such as private site entrances or entrances to specific development; direct developer responsibility through local service provisions (s.59 of D.C.A.). 3.3 On arterial or collector road intersections with County roads: include in County D.C.s or, may be a direct developer responsibility as per the requirements of the County's local service policy. 3.4 Intersection improvements, roundabouts, new or modified signalization, signal timing and optimization plans, area traffic studies for highways attributed to growth and unrelated to a specific development: include in Township D.C. as permitted under s.5(1) of the D.C.A. Watson & Associates Economists Ltd. PAGE E-6 4. Streetlights 4.1 Streetlights on new arterial roads and arterial road improvements: considered part of the complete street and included as part of the road costing funded through D.C.s. 4.2 Streetlights on arterial roads fronting a development: considered part of the complete street and included as a direct developer responsibility through local service provisions (s.59 of D.C.A.). 4.3 Streetlights on non-arterial roads internal to development: considered part of the complete street and included as a direct developer responsibility through local service provisions (s.59 of D.C.A.). 4.4 Streetlights on non-arterial roads fronting a development: considered part of the complete street and included as a direct developer responsibility through local service provisions (s.59 of D.C.A.). 4.5 Streetlights on non-arterial roads external to development, needed to support a specific development or required to link with the area to which the plan relates: considered part of the complete street and direct developer responsibility through local service provisions (s.59 of D.C.A.). 5. Sidewalks 5.1 Sidewalks on Provincial highways and County roads external to a development - Include in Township D.C. or direct developer responsibility through local service provisions (s.59 of D.C.A.) if required to connect the development to the existing sidewalk network and/or fronting a development. 5.2 Sidewalks on Township roads - Linked to road funding source in Item 1. 5.3 Other sidewalks on Township roads external to development and/or fronting a development (which are a local service within the area to which the plan relates) - direct developer responsibility through local service provisions (s.59 of D.C.A.). Watson & Associates Economists Ltd. PAGE E-7 6. Bike Routes/Bike Lanes/Bike Paths/Multi-Use Paths/Naturalized Walkways 6.1 Bike routes and bike lanes, within road allowance, external to development - Include in Township D.C. (consistent with the service standard provisions of the D.C.A., s.5(1)). 6.2 Bike paths/multi-use paths/naturalized walkways external to development - Include in Township D.C. (consistent with the service standard provisions of the D.C.A., s.5(1)) or direct developer responsibility through local service provisions (s.59 of D.C.A.) where required to connect the development to the existing active transportation networks and/or fronting a development. 6.3 Bike lanes, within road allowance, internal to development - direct developer responsibility through local service provisions (s.59 of D.C.A.). 6.4 Bike paths/multi-use paths/naturalized walkways internal to development - direct developer responsibility through local service provisions (s.59 of D.C.A.). 6.6 Trail bridges/underpasses and associated works - Include in Township D.C. (consistent with the service standard provisions of the D.C.A., s.5(1)). 7. Parkland Development 7.1 Internal to Development - Direct developer responsibility under s.59 of D.C.A. for all costs associated with the provision of parking (if required by the Township), rough grading, fencing, municipal sewer, and water (if required by the Township), topsoil, seeding, lighting, trails/pathways/multi-use pathways within a park, stormwater infrastructure and drainage features, electrical, fiber, and developer requested enhancements. 7.2 External to Development - Include in Township D.C. consistent with the service standard provisions of the D.C.A., s.5(1). 8. Noise Abatement Measures 8.1 Internal to Development - Direct developer responsibility through local service provisions (s.59 of D.C.A.). Watson & Associates Economists Ltd. PAGE E-8 8.2 Noise abatement measures external and internal to development where it is related to, or a requirement of a specific development; direct developer responsibility through local service provisions (s.59 of D.C.A.). 8.3 Noise abatement measures on new arterial roads and arterial road improvements abutting an existing community and unrelated to a specific development: included as part of road costing funded through D.C.'s. 9. Stormwater Management 9.1 All stormwater management works will be direct developer responsibility through local service provisions (s.59 of D.C.A.). 9.2 Over sizing of stormwater management works for development external to developments will be subject to negotiations and cost sharing agreements between affected landowners. 10. Natural Heritage System (N.H.S.) 10.1 N.H.S. includes engineered and in situ stream corridors, natural buffers for woodlots, wetland remnants, etc. as well as subwatersheds within the boundaries of the Township. 10.2 Direct developer responsibility as a local service provision including but not limited to the following: a) Riparian planting and landscaping requirements (as required by the Township, Conservation Authority or other authorities having jurisdiction) as a result of creation of, or construction within the N.H.S. and associated buffers; b) Perimeter fencing of the N.H.S. to the Township's standard located on the public property side of the property line adjacent land uses (residential, non-residential) as required by the Township; c) All works (as required by the Township, Conservation Authority or other authorities having jurisdiction) for stream corridors, natural buffers and sub watershed areas as directed by the approved studies and reports related to the Secondary Plan that development occurs in. Watson & Associates Economists Ltd. PAGE E-9 11. Water 11.1 Water treatment, storage facilities, pumping stations, transmission mains, booster stations, re-chlorination/sampling stations and Wells that benefit more than one Development and located external to the Development: include in Township D.C. 11.2 Water treatment, storage facilities, pumping stations, transmission mains, booster stations, re-chlorination/sampling stations and Wells that benefit one Development and located external to the Development to be direct developer responsibility. 11.3 Watermains external to the Development, which upgrade the size of the main or provides new watermains greater than 300 mm nominal diameter (over sizing), included in the D.C. 11.4 Over sizing costs of waterworks within the Development greater than 300mm nominal diameter included in D.C.. 11.5 Connection to trunk mains and pumping stations to service specific areas, to be direct developer responsibility. 11.6 Watermains, district metering chambers, hydrants, booster stations, valves, and rechlorination/sampling stations internal to the Development, to be direct developer responsibility as a local service. 12. Sanitary Sewer 12.1 Wastewater treatment plants, pumping stations and transmission mains that benefit more than one Development and are external to the Development shall be included in the D.C. 12.1 Wastewater treatment plants, pumping stations and transmission mains that benefit one Development and are external to the Development to be direct developer responsibility. 12.2 Sanitary sewers external to Development, which upgrades the size of the existing main, or provides a new main greater than 250 mm nominal diameter, included in the D.C. Watson & Associates Economists Ltd. PAGE E-10 12.3 Connections to trunk sewers to service specific areas, to be direct developer responsibility. 12.4 Incremental costs of sanitary sewer works within the Development, which benefits upstream developers, greater than 250 mm nominal diameter and depth of 5 metres of greater included in D.C. . 13. Infrastructure Assets Constructed by Developers 13.1 All infrastructure assets designed and constructed by Developers must be in accordance with the Township's Development Manual, as revised. 13.2 All infrastructure assets shall be conveyed in accordance with the Township's Development Manual, as revised, and all applicable agreements with the Township. 13.3 Any Parks and Open Space infrastructure assets approved to be built by the developer on behalf of the Township shall be in accordance with the Township's Development Manual. 14. Studies 14.1 The infrastructure planning studies, master plans, and major Township studies are included in the D.C. Studies that take the recommendations from the Township's studies to further develop details and design for specific developments shall be a direct developer responsibility as a local service. 14.2 Where a Developer Initiated Urban Boundary Expansion is approved, master plans and the D.C. Background Study will need to be updated. As a requirement of the development application, updates to these studies shall be direct developer responsibility as a local service, if the master plans/D.C. Background Study were completed within 5 years of the Urban Boundary Expansion application approval. Watson & Associates Economists Ltd. PAGE F-1 Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 Appendix F: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which were to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE F-4 made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the Township prepared an A.M.P. in 2025 for its existing assets. Although the A.M.P. included an analysis on growth-related assets, the future annual investment needs are based on the previous D.C. background study. To reflect the updated capital project listing and to meet the requirements of the legislation, the following table (presented in 2025 $) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C.- eligible capital costs are not included in the Township's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that will require financing from municipal financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2025 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $58.24 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are approximately $20.70 million. This amount, totaled with the existing operating revenues of approximately $78.07 million, provides annual revenues of approximately $98.77 million by the end of the period. 6. In consideration of the above, the capital plan is deemed to be financially sustainable. Watson & Associates Economists Ltd. PAGE F-5 Township of Centre Wellington Asset Management - Future Expenditures and Associated Revenues 2025$ Asset Management - Future Expenditures and Associated Revenues 2051 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 $5,430,394 Annual Debt Payment on Post Period Capital2 $6,745,261 Lifecycle: Annual Lifecycle - Municipal-wide Services Annual Lifecycle - Area-specific Services Sub-Total - Annual Lifecycle $30,629,758 Incremental Operating Costs (for D.C. Services) $15,433,605 Total Expenditures $58,239,018 Revenue (Annualized) Total Existing Revenue3 $78,074,893 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $20,698,093 Total Revenues $98,772,986 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 Appendix G Capital Cost and Benefit to Existing Methodology Watson & Associates Economists Ltd. PAGE G-2 Appendix G: Capital Cost and Benefit to Existing Methodology Based on the regulatory changes provided through Bill 60: Fighting Delays, Building Faster Act, 2025, there is a requirement to provide greater detail regarding how capital costs and non-growth-related shares (i.e., B.T.E. deduction methodology) of the costs are determined. These methodologies are provided below on a service-by-service basis: Watson & Associates Economists Ltd. PAGE G-3 Table G-1 Township of Centre Wellington Methodology for Determining Capital Costs and B.T.E. Calculations Service Capital Cost Methodology B.T.E. Calculation Methodology Fire Protection Services - Facilities: the total size of the new fire hall was determined by reviewing existing facility sizes and the relative need for new growth. The total anticipated square footage for this facility was multiplied by a cost per square foot, which was determined based on a review of recent cost estimates. - Vehicles & Equipment: New vehicles and equipment needed have been identified based on the new fire hall that is anticipated to be built. This need has been identified based on the standard vehicles and equipment provided at the Township's existing stations. Cost estimates are based on current costs of these items. - Facilities: given that the new fire hall included in the D.C. calculation is new and required to accommodate new development in the Township, there was no B.T.E. deduction applied to any of the fire stations. - Vehicles & Equipment: similarly, all of the vehicles and equipment identified for inclusion in the D.C. calculation is new (i.e. not replacing any existing items). Further, these new vehicles and equipment items are required to accommodate new growth within the forecast period. Services Related to a Highway - Cost estimates were developed by the Township's engineering staff based on a detailed review of the work anticipated for each project relative to current construction costs. - The costing for active transportation works is based on the recently completed Active Transportation & Mobility Plan. - New Roads/Road Extensions: considered fully growth-related given that they are adding additional capacity to accommodate new growth. - Road Upgrades/Widenings: a project-by-project review was undertaken to determine the B.T.E. deduction. In addition, as part of the previous D.C. background study, Triton Engineering Services Ltd. reviewed the B.T.E. deductions. Where the scope of work was unchanged relative to the previous study, the same B.T.E. deductions were utilized. Based on the scope of work, and whether the full road is being urbanized or urbanized and widened, the B.T.E. deduction ranges from 5% to 60%. - Intersection Improvements: a 5% benefit to existing deduction has been made on an allocation basis to provide recognition of a minor benefit to the existing community. - Gravel Road Conversions to Asphalt: a 90% B.T.E. deduction has been made on an allocation basis to provide a minor recognition of the growth-related benefit. - Bridge Expansions: given that existing bridges are being replaced and expanded from one to two lanes, the B.T.E. deduction is reflective of the portion of costs related to the additional lane relative to the overall project cost. - Active Transportation: These projects are related to adding active transportation networks and capacity throughout the Township for new growth. As a result, a benefit to existing deduction has not been made for these works. Note, the B.T.E. deduction noted in the roads capital cost listing is related to the non-growth-related works included in the Township's Active Transportation & Mobility Plan (see Appendix I for a complete list of the Active Transportation projects). Watson & Associates Economists Ltd. PAGE G-4 Service Capital Cost Methodology B.T.E. Calculation Methodology Public Works - Facilities: cost estimates have been determined based on the anticipated size of the new facilities relative to the replacement costs of similar public works facilities. - Vehicles/Equipment: current costs for the new vehicles and equipment have been multiplied by the total growth-related need identified for each vehicle and equipment type. - Facilities: With respect to the new snow storage and treatment facility, a 10% B,T.E. allocation has been made to account for the minor benefit to existing development. This facility is being built given that there is less space in the built-up area to store snow with the intensification of growth. All other facility space included in the D.C. calculation is new and required to accommodate development in the Town, and as a result, there was no B.T.E. deduction applied. - Vehicles/Equipment: All vehicles and equipment are new to provide services for new growth and are not replacing any existing items. As a result, a B.T.E. deduction has not been applied. Parks and Recreation - Recreation facilities: the anticipated size of the various facilities was multiplied by the replacement cost per sq.ft. of similar recreation facilities. Costing estimates were provided based on a detailed costing review undertaken as part of the Parks and Recreation Plan. - Parkland Development: based on the anticipated new parkland, development costs have been applied to the total acres based on recent construction costs. - Amenities: the new amenities to be added to new parks are based on standards set out by the Township for new parks multiplied by current cost estimates for the amenities. Current cost estimates were provided based on a detailed costing review undertaken as part of the Parks and Recreation Plan. - Vehicles & Equipment: current costs for the new vehicles and equipment have been multiplied by the total growth-related need identified for each vehicle and equipment type. - Recreation facilities: given that all of the recreation facilities included in the D.C. calculation are new and providing additional facility space to accommodate growth, a benefit to existing deduction has not been made. It is anticipated that new facilities will not be replacing any existing facilities in the Township, which would continue to remain in service. - Parks: Similarly, most parkland development, trails, and amenities included in the D.C. calculation are related to new parks and amenities. As a result, a benefit to existing deduction has not been applied, as these costs are related to providing parks services to new development across the Township. The exceptions are as follows: o Pave Victoria Park Track (Project #25): the paving of the track allows the use of the track for the full year. The track is currently in use for 7 months of the year, and as a result, the B.T.E. deduction is based on the additional usage allowed in a calendar year due to the paving (i.e. expansion of service related to paving). o Confederation Park - Additional Amenities (Project #32): a 70% B.T.E. deduction has been applied related to the costs related to replacing the existing amenities. The growth related costs are for the new amenities to be added. Growth Studies - Cost estimates are determined based on a review of recent cost estimates for similar studies. - Non-growth-related shares for studies have been determined on a project-by-project basis through a review of the scope of each study. Based on this review, an allocation to account for the benefit to existing development is made. For example, although parks and recreation plans are generally undertaken to identify the new capital projects that are required to accommodate new development, there is a benefit to the existing community wherein existing policies and practices are also reviewed through Watson & Associates Economists Ltd. PAGE G-5 Service Capital Cost Methodology B.T.E. Calculation Methodology the study. As a result, a 20% allocation to account for the non-growth-related share of this project has been made. Wastewater - Facilities: costing is based on current estimated construction costs. - Linear Infrastructure: costing is based on recent estimates provided through the Water and Wastewater Master Servicing Plan, in addition to current estimated construction costs. - Facilities: o a 10% B.T.E. deduction was applied to the future expansion of the Fergus wastewater treatment plant to recognize rerating of the existing plant. o The B.T.E. deduction for the South Fergus Sewage Pumping Stations is based on the share of flows to the new pumping station that would be related to existing development. o A 70% allocation has been applied to the Fergus Headworks Bar Screen project to recognize that a minor portion of this work would benefit new growth as this will address the additional capacity resulting from the future expansion. - Linear Infrastructure: o New sanitary sewers that are being built to accommodate new development are considered to be fully growth related, and as such, a B.T.E. deduction is not applied to these projects. o The growth-related share related to upgrades/upsizing of existing pipes is based on a combination of the following: - the share of the costs related to the incremental size of the diameter of the pipe. - The proportion of useful life remaining for the existing pipe being replaced with a larger pipe. Given that, due to growth, the pipe is being replaced in advance of its typical replacement date, this share of the costs of replacing the existing pipe would be considered growth-related. Water - Facilities: costing is based on current estimated construction costs. - Linear Infrastructure: costing is based on recent estimates provided through the Water and Wastewater Master Servicing Plan, in addition to current estimated construction costs. - Facilities: o A B.T.E. deduction has been made with respect to the replacement and expansion of existing wells for the portion of the costs related to replacing the existing capacity. o All other works are considered to be fully growth-related as they are adding new capacity to the system (e.g. new wells). - Linear Infrastructure: Watson & Associates Economists Ltd. PAGE G-6 Service Capital Cost Methodology B.T.E. Calculation Methodology o New watermains that are being built to accommodate new development are considered to be fully growth related, and as such, a B.T.E. deduction is not applied to these projects. o The growth-related share related to upgrades/upsizing of existing pipes is based on a combination of the following: - the share of the costs related to the incremental size of the diameter of the pipe. - The proportion of useful life remaining for the existing pipe being replaced with a larger pipe. Given that, due to growth, the pipe is being replaced in advance of its typical replacement date, this share of the costs of replacing the existing pipe would be considered growth-related. Land - Cost estimates are based on the application of per acre land costs to the total acres of land required to be purchased for the new facilities. Land costs are based on current cost estimates for land. - The land costs included in the D.C. calculation are related to new facilities that are fully growth-related. As a result, the land required for these facilities would also be considered fully growth-related. Watson & Associates Economists Ltd. PAGE H-1 Appendix H Changes to the D.C.A. Watson & Associates Economists Ltd. PAGE H-1 Appendix H: Changes to the D.C.A. Since the passage of the Township's previous D.C. by-law, there have been a number of changes to the D.C.A. This appendix summarizes the changes. H.1 Changes to the D.C.A.: Bill 213 and Bill 109 H.1.1 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. H.1.2 Bill 109: More Homes for Everyone Act, 2022 On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. - The following additional information must be provided for each D.C. service being collected for during the year: a. whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; and b. if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and - For any service for which a D.C. was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Watson & Associates Economists Ltd. PAGE H-2 The changes to the D.C.A. has also been amended to now require that the annual Treasurer's statement be made available to the public on the website of the municipality or, if there is no such website, in the municipal office. H.2 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amended a number of pieces of legislation including the Planning Act and D.C.A. The following provides a summary of the changes to the D.C.A.: H.2.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. H.2.2 Removal of Housing as an Eligible D.C. Service Housing is removed as an eligible service as of November 28, 2022. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. It is noted that the charge for housing services is still applicable where rates have been frozen for the purposes of instalment payments under the D.C.A. Watson & Associates Economists Ltd. PAGE H-3 H.2.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. H.2.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Note: As discussed in Section H.2.13, the definitions above of an Affordable Rental Unit and Affordable Owned Unit have been modified through Bill 134. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Note: the above Affordable Owned and Rental Unit exemptions came into force as of June 1, 2024. At the time of writing, it is not known when the exemption for Attainable Units will be in force. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. Watson & Associates Economists Ltd. PAGE H-4 H.2.5 Historical Level of Service Extended to 15-Year Period Instead of the Historical 10-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. H.2.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed. H.2.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. H.2.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five (5) years, prior to Bill 23. H.2.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of a D.C. H.2.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: Watson & Associates Economists Ltd. PAGE H-5 - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. H.2.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. H.2.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities are required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation. H.2.13 Bill 134: Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions is based on the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin" published by the Minister of Municipal Affairs and Housing. This bulletin informs the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. This bulletin was published on April 5, 2024. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. Watson & Associates Economists Ltd. PAGE H-6 This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). The following table provides a comparison of the definitions provided through Bill 23 and those provided through Bill 134 (underlining added for emphasis). Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than 80 per cent of the average market rent, as determined in accordance with subsection (5). The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The average market rent for the year in which the residential unit is occupied by a tenant, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin." The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is Watson & Associates Economists Ltd. PAGE H-7 Item Bill 23 Definition Bill 134 Definition (Current D.C.A. Definition) equal to 30 per cent of the income of the household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than 80 per cent of the average purchase price, as determined in accordance with subsection (6). The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The average purchase price for the year in which the residential unit is sold, as identified in the bulletin entitled the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin," as it is amended from time to time, that is published by the Minister of Municipal Affairs and Housing on a website of the Government of Ontario. The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the household referred to in clause (a) Note: the Affordable Unit exemption came into force on June 1, 2024. Watson & Associates Economists Ltd. PAGE H-8 H.3 Bill 185: Cutting Red Tape to Build More Homes Act On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. The Bill received Royal Assent on June 6, 2024. This Bill reversed many of the key changes that were implemented through Bill 23. The following sections provide a summary of the changes. H.3.1 Revised Definition of Capital Costs Bill 185 reversed the capital cost amendments of Bill 23 by reinstating studies as an eligible capital cost. The following paragraphs were added to subsection 5(3) of the D.C.A.: 5. Costs to undertake studies in connection with any of the matters referred to in paragraphs 1 to 4. 6. Costs of the development charge background study required under section 10. H.3.2 Removal of the Mandatory Phase-in As noted in Section G.2 above, Bill 23 required the phase-in of charges imposed in a D.C. by-law over a five-year term for any by-laws passed after January 1, 2022. Bill 185 removed this mandatory phase-in. This change is effective for any D.C. by-laws passed after Bill 185 came into effect. For site plan and zoning by-law amendment applications that were made prior to Bill 185 receiving Royal Assent, the charges payable will be the charges that were in place on the day the planning application was made (i.e., including the mandatory phase-in). H.3.3 Process for Minor Amendments to D.C. By-laws Section 19 of the D.C.A. requires that a municipality must follow sections 10 through 18 of the D.C.A. (with necessary modifications) when amending D.C. by-laws. Sections 10 through 18 of the D.C.A. generally require the following: - Completion of a D.C. background study, including the requirement to post the background study 60 days prior to passage of the D.C. by-law; - Passage of a D.C. by-law within one year of the completion of the D.C. background study; Watson & Associates Economists Ltd. PAGE H-9 - A public meeting, including notice requirements; and - The ability to appeal the by-law to the Ontario Land Tribunal. Bill 185 allows municipalities to undertake minor amendments to D.C. by-laws for the following purposes without adherence to the requirements noted above (with the exception of the notice requirements): 1. To repeal a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date (subject to the 10-year limitations provided in the D.C.A.); 2. To impose D.C.s for studies, including the D.C. background study; and 3. To remove the provisions related to the mandatory phase-in of D.C.s. Minor amendments related to items 2 and 3 noted above may be undertaken only if the D.C. by-law being amended was passed after November 28, 2022, and before Bill 185 took effect. Moreover, the amending by-law must be passed within six months of Bill 185 coming into effect. Notice requirements for these minor amending by-laws are similar to the typical notice requirements, with the exception of the requirement to identify the last day for appealing the by-law (as these provisions do not apply). H.3.4 Reduction of D.C. Rate Freeze Timeframe Bill 108 provided for the requirement to freeze the D.C.s imposed on developments subject to a site plan and/or a zoning by-law amendment application. The D.C. rate for these developments is "frozen" at the rates that were in effect at the time the site plan and/or zoning by-law amendment application was submitted (subject to applicable interest). Once the application is approved by the municipality, if the date the D.C. is payable is more than two years from the approval date, the D.C. rate freeze would no longer apply. Bill 185 reduced the two-year timeframe to 18 months. H.3.5 Modernizing Public Notice Requirements The D.C.A. sets out the requirements for municipalities to give notice of public meetings and of by-law passage. These requirements are prescribed in sections 9 and 10 of O. Reg. 82/98 and include giving notice in a newspaper of sufficiently general circulation in Watson & Associates Economists Ltd. PAGE H-10 the area to which the by-law would apply. The regulatory changes modernized public notice requirements by allowing municipalities to provide notice on a municipal website if a local newspaper is not available. H.4 Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 On May 12, 2025, the Province released Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025. The Bill received Royal Assent on June 5, 2025. This Bill introduces some additional exemptions, changes to the timing of payment for residential D.C.s, and provides regulatory authority to make future changes. The following subsections provide a summary of the changes: H.4.1 Deferral of Residential D.C. Payments to Occupancy Changes to section 26.1 of the D.C.A. provide that a D.C. payable for residential development (other than rental housing developments, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Only under circumstances prescribed in the regulations may the municipality require a financial security. As such, the prescribed circumstances may allow for securities when no occupancy permit is required. Municipalities shall not impose interest on the deferral of D.C. payment to occupancy. H.4.2 Removal of Interest for Legislated Instalments Changes to section 26.1 of the Act remove the ability to charge interest on instalments for rental housing and institutional development. This also applies to future instalments for existing deferrals. H.4.3 Early Payment for Residential/Institutional Changes provide that a person required to pay a D.C. for residential or institutional development (i.e. instalments or at occupancy), can pay earlier without the requirement to enter into an early payment agreement. Watson & Associates Economists Ltd. PAGE H-11 H.4.4 Exemption for Long-term Care Homes Before this change, long-term care homes were subject to the installment payment provisions of the D.C.A. As of June 5, 2025, Long-term care homes are exempt from D.C.s, as well as all future installment payments, where applicable. H.4.5 Revised Definition of Capital Costs Section 5(3) of the D.C.A. provides for a definition of capital costs that are eligible for inclusion in the D.C. calculations. The changes introduced by Bill 17 added the following wording to the beginning of the section: "Subject to the regulations". As such, the Province may make changes to limit the definition of capital costs via changes to the D.C. regulations. H.4.6 Expanded Simplified D.C. By-law Amendment Process In addition to the reason for the simplified process set out in Section H.3.3, a D.C. by- law may now also be amended through the simplified amendment process to repeal the indexing provision or decrease the D.C. for one or more types of development. H.4.7 Lower Charge - Current vs. Rate Freeze This change provides that the municipality must charge the lower of the D.C. calculated with the rate freeze (including interest) and the D.C. at current rates at the time the D.C. is payable. This change assists where municipalities reduce their D.C. and therefore can impose the reduced D.C. in cases where the rate freeze applies. H.4.8 Grouping of Services for the Purposes of Using Credits This change provides the Province with the ability to make changes through the regulations to group D.C. services together for the purposes of applying D.C. credits. H.4 Bill 60: Fighting Delays, Building Faster Act, 2025 The Provincial government introduced Bill 60, Fighting Delays, Building Faster Act, 2025 and Regulatory Proposals MMAH2018 and 25MMAH030 on October 23, 2025. The Bill received Royal Assent on November 27, 2025. The following subsections provide a summary of the changes: Watson & Associates Economists Ltd. PAGE H-12 H.4.1 Addition of Class of Service for Land Acquisition The legislative change provides for land acquisition as a separate class of service12F1. Anticipated land acquisition capital needs are to be grouped together for the purposes of the D.C. calculations. Land acquisition capital needs are also to be excluded from the historical Level of Service calculations. The anticipated capital costs for land are restricted to 10 years for all services except the following: - Water; - Wastewater; - Stormwater; - Service related to a Highway; - Electrical; - Transit; - Police; and - Fire. As land acquisition is considered a class of service, municipalities are required to establish a separate reserve fund for these capital costs. As such, funds are to be segregated for this purpose only and used solely for land costs. Similar to other reserve funds, monies in this reserve fund can be borrowed and repaid, with interest. With respect to credits, municipalities need to ensure appropriate accounting of credits for land separately from credits for other applicable services. Section 35 of the D.C.A. is amended to add an exception to the use of monies in established reserve funds. This section states that monies in a reserve fund can be used for land acquisition, however, they cannot be used for land acquisition if those costs are to be paid for with the reserve fund established for land acquisition. 1 Section 7 of the D.C.A. states that a class of service may be established for the purposes of a D.C. by-law that is a combination of D.C. eligible services or a subset of a D.C. eligible service. Watson & Associates Economists Ltd. PAGE H-13 H.4.2 Required Timelines for the Annual Treasurer's Statement Section 43(1) of the Act has been amended to require the Treasurer's statements to be completed by June 30 of each year (previously based on a date determined by Council). Further, Section 43(3) of the Act is amended to require a copy of the Treasurer's statement to be submitted to the Minister by July 15 of each year. H.4.3 Addition of Requirements for Local Service Policies Subsections 59(2.2) through 59(2.11) of the Act generally set out the following: - A Local Service Policy is required for all D.C. eligible services to which a D.C. by- law imposes a charge and where some part of the service will be provided as a local service; - A Local Service Policy is required to impose a condition of local services on development and only to the extent it has been identified in the Local Service Policy. That is, a municipality could not require a work or classes of work to be provided as a local service if it is not identified as such in the Local Service Policy; o This does not apply where a municipality does not impose a D.C. for that service; o This applies the day a municipality establishes the Local Services Policy or 18 months after Bill 60 received Royal Assent; - Required content for a Local Service Policy: o Works or classes of works related to development that are intended to be required as a Local Service - Optional content for a Local Service Policy: o Works or classes of works that are not intended to be required as a Local Service; o Works or classes of works that are partially required as a Local Service; - The municipality shall give a copy of the Local Service Policy to the Minister of Municipal Affairs and Housing upon request, by the date requested; and - The Local Service Policy must be reviewed, requiring a resolution of Council declaring if a revision is needed. The Resolution shall be passed at the time of passing any D.C. by-law or when a revision to the policy is required. Watson & Associates Economists Ltd. PAGE H-14 H.4.4 Requirement to Provide Documents to the Minister Changes to Section 10 and Section 13 of the D.C.A. require municipalities to provide copies of documents to the Minister upon request, by the date requested. In addition, section 59(2.8) of the Act requires a copy of the Local Service Policy to be provided to the Minister upon request, by the date requested. H.4.5 Regulatory Changes Bill 60 also provided for regulatory changes to Ontario Regulation 82/98. These changes are with respect to the following matters: Merging of Credits This change merges water supply services and wastewater services for the purposes of credits. As provided in subsection 2 (4) of the D.C.A., the D.C.-eligible services of water supply and wastewater include distribution and treatment, and sewers and treatment, respectively. Transparency of B.T.E. Calculations Regulatory changes require municipalities to provide greater details with respect to how capital costs are determined and how the growth-related and non-growth-related shares of the costs are determined. This appears to be required for each service, rather than on a project-by-project basis. Details of Land Acquisition Section 8 of Ontario Regulation 82/98 has been amended to require land acquisition costs to be included in the D.C. background presentation of: - The total of the estimated capital costs relating to the service; - The allocation of the total of the estimated costs between costs that would benefit new development and costs that would benefit existing development; - The total of the estimated capital costs relating to the service that will be incurred during the term of the proposed development charge by-law; - The allocation of the costs incurred during the term of the proposed by-law between costs that would benefit new development and costs that would benefit existing development; and Watson & Associates Economists Ltd. PAGE H-15 - The estimated and actual value of credits that are being carried forward relating to the service. Information Accessibility The changes increase reporting requirements for the Annual Treasurer's Statements to include: - The amount from each reserve fund that was committed to a project, but had not been spent, as of the end of the year; - The amount of debt that had been issued for a project as of the end of the year; and - Identify where in the D.C. background study the project's capital costs were estimated. This does not apply in circumstances where a municipality uses a unique identifier in both background studies and treasurer's statements to identify each project. Watson & Associates Economists Ltd. PAGE I-1 Appendix I Listing of Active Transportation Projects Watson & Associates Economists Ltd. PAGE I-2 Appendix I: Listing of Active Transportation Projects Table I-1 Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 1 6470 Beatty Line Desire Lines ECT Colborne St 2035-2045 425,250 - 425,250 - 425,250 - - - 2 6490 First Line Desire Lines Garafraxa St First Line 2035-2045 603,750 - 603,750 - 603,750 - - - 3 930 Scotland St Desire Lines Mcqueen Blvd Fourth Line 2035-2045 619,500 - 619,500 - 619,500 - - - 4 968 St David St Desire Lines St David St N N/A 2035-2045 367,500 - 367,500 - 367,500 - - - 5 McGowan-Stratford-ECT Link McGowan St Elora Cataract Trailway 2035-2045 493,500 - 493,500 - 493,500 - - - 6 North Belwood Desire Lines Belwood Settlement Area Boundary County Road 19 2045-2055 1,370,250 - 1,370,250 - 1,370,250 - - - 7 Richarsdon Farm Desire Lines NA NA 2045-2055 462,000 - 462,000 - 462,000 - - - 8 Sideroad 18 Beatty Line N Highway 6 2045-2055 141,400 - 141,400 - 141,400 - - - 9 South Elora Desire Lines First Line/County Road 7 Elora Settlement Area Expanded Boundary 2045-2055 1,454,250 - 1,454,250 - 1,454,250 - - - 10 South Fergus Secondary Plan Desire Lines McQueen Blvd/Tower St S Scotland St/Fergus Settlement Area Expanded Boundary 2035-2045 2,462,250 - 2,462,250 - 2,462,250 - - - 11 South Fergus Secondary Plan Trails Guelph St East of Tower St S 2035-2045 504,000 - 504,000 - 504,000 - - - 12 Kirvan Park Multi-Use Path Elliot Ave W Elliot Ave E 2025-2035 425,250 - 425,250 - 425,250 - - - 13 South Fergus Secondary Plan Trails South Fergus Secondary Plan Trails South Fergus Secondary Plan Desire Lines 2035-2045 283,500 - 283,500 - 283,500 - - - 14 South Fergus Secondary Plan Trails McQueen Blvd Fergus Settlement Area Expansion Boundary 2035-2045 1,727,250 - 1,727,250 - 1,727,250 - - - 15 6560 Gerrie Rd Trails Gerrie Rd Keating Dr 2025-2035 157,780 - 157,780 - 157,780 - - - 16 Harrison Park - South River Road Trail South River Road Harrison Street 2025-2035 38,640 - 38,640 - 38,640 - - - 17 Harrison Park Trail Harrison St Trestle Bridge Trail 2025-2035 167,440 - 167,440 - 167,440 - - - 18 McFarlane Park - ECT Link Elora Cataract Trailway McFarlane Cres 2025-2035 12,880 - 12,880 - 12,880 - - - 19 South Fergus Secondary Plan Trails South Fergus Secondary Plan Trails South Fergus Secondary Plan Trails 2035-2045 318,780 - 318,780 - 318,780 - - - 20 Colborne St Wilson Cres Steven Way 2025-2035 31,500 - 31,500 31,500 (0) (0) (0) 21 Gartshore St Operations Centre Trail Glengarry Cres 2025-2035 63,000 - 63,000 63,000 (0) (0) (0) 22 Robinson Rd Middleton Ave County Road 19 2035-2045 115,500 - 115,500 115,500 (0) (0) (0) 23 Albert St E St David St S Thistle St 2035-2045 23,800 - 23,800 23,800 - - - 24 Albert St W Perth St St David St S 2035-2045 81,200 - 81,200 81,200 (0) (0) (0) 25 Aqua St David St E Sophia St 2025-2035 33,600 - 33,600 33,600 - - - 26 Belsyde Cemetery Road Union St E Belsyde Cemetery-Highland Rd Link 2035-2045 50,400 - 50,400 50,400 - - - 27 Bricker Ave Geddes St Marr Dr 2035-2045 16,800 - 16,800 16,800 - - - 28 Burnett Crt Sideroad 19 S of Sideroad 19 2045-2055 32,200 - 32,200 32,200 (0) (0) (0) 29 Carlton Pl Metcalfe St Wellington Rd 7 2025-2035 36,400 - 36,400 36,400 - - - 30 Cudney St Harpin Way E Elliot Ave E 2035-2045 12,600 - 12,600 12,600 - - - 31 Elizabeth Cres Campbell Ave Woodhill Dr 2025-2035 46,200 - 46,200 46,200 - - - 32 Elliot Ave W Rea Dr Harpin Way E 2025-2035 47,600 - 47,600 47,600 - - - 33 Glengarry Cres Gartshore St Fergus Dog Park 2025-2035 51,800 - 51,800 51,800 - - - 34 Harpin Way E Farley Rd Cudney St 2025-2035 86,800 - 86,800 86,800 - - - Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE I-3 Table I-1 (Cont'd) Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 35 Harpin Way W Elliot Ave Farley Rd 2025-2035 35,000 - 35,000 35,000 - - - 36 John St Geddes St Bricker Ave walkway 2035-2045 18,200 - 18,200 18,200 - - - 37 Keating Dr Walser St Steven Way 2025-2035 79,800 - 79,800 79,800 (0) (0) (0) 38 Marr Dr Bricker Ave Irvine St 2035-2045 79,800 - 79,800 79,800 (0) (0) (0) 39 McFarlane Cres McFarlane Park Middleton Ave 2035-2045 18,200 - 18,200 18,200 - - - 40 McGowan St Spencer Dr McGowan-Stratford-ECT Link 2025-2035 72,800 - 72,800 72,800 - - - 41 McNab St Victoria St McNab-Water St Link Trail 2035-2045 106,400 - 106,400 106,400 - - - 42 North Queen St David St Church St 2025-2035 61,600 - 61,600 61,600 (0) (0) (0) 43 Perth St Union St Elora St 2035-2045 39,200 - 39,200 39,200 - - - 44 Queen St W West of Tower St Bridge St 2035-2045 51,800 - 51,800 51,800 - - - 45 Rea Dr Elliot Ave Farley Rd 2025-2035 77,000 - 77,000 77,000 - - - 46 Revell Dr Elizabeth Cres Black St 2045-2055 65,800 - 65,800 65,800 - - - 47 Runnells Way E Farley Rd Colborne St 2035-2045 72,800 - 72,800 72,800 - - - 48 Runnells Way W Colborne St Farley Rd 2035-2045 61,600 - 61,600 61,600 (0) (0) (0) 49 Spencer Dr Spencer Dr - ECT West Link Stafford St 2025-2035 92,400 - 92,400 92,400 - - - 50 Steven Way Keating Dr Colborne St 2025-2035 44,800 - 44,800 44,800 - - - 51 Tom St Garafraxa St E St Andrew St E 2035-2045 64,400 - 64,400 64,400 (0) (0) (0) 52 Wilson Cres Colborne St Colborne St 2025-2035 50,400 - 50,400 50,400 - - - 53 Confederation Park Trail Extension Gowrie St S St David St S 2045-2055 41,860 - 41,860 41,860 - - - 54 Confederation Park Trail Extension Confederation Park Gowrie St S 2025-2035 119,140 - 119,140 119,140 (0) (0) (0) 55 Treatment Plant - Gow Park Trail Queen St W Union St W 2025-2035 164,220 - 164,220 164,220 - - - 56 Improved Amenities N/A N/A 2025-2035 420,000 - 420,000 - 420,000 298,200 121,800 57 Anderson St N Dianne Cres St Andrew St E 2045-2055 20,300 - 20,300 - 20,300 14,413 5,887 58 Anderson St S St Andrew St E Lamond St 2045-2055 13,400 - 13,400 - 13,400 9,514 3,886 59 Anderson St S Lamond St Pierpoint 2025-2035 2,000 - 2,000 - 2,000 1,420 580 60 Bridge St First Line Stafford St 2035-2045 8,100 - 8,100 - 8,100 5,751 2,349 61 Bridge St Stafford St McNab St 2025-2035 29,200 - 29,200 - 29,200 20,732 8,468 62 Cameron St St Andrew St E Garafraxa St E 2025-2035 15,000 - 15,000 - 15,000 10,650 4,350 63 David St W Wellington Rd 7 Wellington Rd 18 2025-2035 19,100 - 19,100 - 19,100 13,561 5,539 64 Farley Rd Colborne St Beatty Line N 2025-2035 58,900 - 58,900 - 58,900 41,819 17,081 65 Gzowski St Forfar St E Gordon St 2035-2045 31,700 - 31,700 - 31,700 22,507 9,193 66 Gzowski St Garafraxa St E Forfar St E 2025-2035 8,900 - 8,900 - 8,900 6,319 2,581 67 Herrick St Garafraxa St St Andrew St 2025-2035 14,600 - 14,600 - 14,600 10,366 4,234 68 Metcalfe St Mill St McNab St 2035-2045 13,400 - 13,400 - 13,400 9,514 3,886 69 St Andrew St E Lamod St Anderson St S 2025-2035 27,600 - 27,600 - 27,600 19,596 8,004 70 St Andrew St E Cameron St Lamond St 2025-2035 24,000 - 24,000 - 24,000 17,040 6,960 71 Victoria Ter Garafraxa St E Forfar St E 2025-2035 8,900 - 8,900 - 8,900 6,319 2,581 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE I-4 Table I-1 (Cont'd) Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 74 Highway 6 Fergus Settlement Area Boundary Sideroad 18 2025-2035 203,000 - 203,000 - 203,000 - - - 75 North Broadway St County Road 19 Grand River Bridge 2035-2045 497,000 - 497,000 - 497,000 352,870 144,130 76 South Broadway St Grand River Belwood Settlement Area Boundary 2035-2045 385,000 - 385,000 - 385,000 273,350 111,650 77 St David St S St Andrew St Bridge St 2025-2035 112,000 - 112,000 - 112,000 79,520 32,480 78 Tower St S Union St McQueen 2035-2045 630,000 - 630,000 - 630,000 447,300 182,700 79 Tower St S McQueen Second Line 2035-2045 833,000 - 833,000 - 833,000 - - - 79 Elliot Ave SWM Pond - ECT Link Elliot Ave W ECT 2025-2035 70,800 - 70,800 - 70,800 50,268 20,532 80 Sportsplex Expansion Lands NA NA 2045-2055 386,400 - 386,400 - 386,400 274,344 112,056 81 Waterloo St MUP South Extension Trestle Bridge Trail First Line 2025-2035 309,800 - 309,800 - 309,800 219,958 89,842 82 Wellington County Campus Desire Lines NA NA 2045-2055 546,000 - 546,000 - 546,000 387,660 158,340 83 Former Colborne Link Corborne St ECT 2025-2035 362,300 - 362,300 - 362,300 257,233 105,067 84 Hydro Corridor Trail (south of Side Road 10) Sideroad 10 Municipal Boundary 2045-2055 1,380,800 - 1,380,800 - 1,380,800 980,368 400,432 85 Middlebrook Pl Middlebrook Rd Grand River Bridge 2045-2055 77,300 - 77,300 - 77,300 54,883 22,417 86 Weisenberg Rd Middlebrook Bridge Township Boundary 2045-2055 1,001,420 - 1,001,420 - 1,001,420 711,008 290,412 89 Intersection of Church St and Metcalfe St NA NA 2025-2035 140,000 - 140,000 - 140,000 99,400 40,600 91 Intersection of Gartshore St and Glengarry CrNA NA 2025-2035 140,000 - 140,000 - 140,000 99,400 40,600 92 Intersection of Irvine St and David St NA NA 2025-2035 140,000 - 140,000 - 140,000 99,400 40,600 93 Intersection of McQueen Blvd and Hwy 6 NA NA 2025-2035 280,000 - 280,000 - 280,000 198,800 81,200 94 Intersection of South Fergus Trail and Hwy 6 NA NA 2035-2045 700,000 - 700,000 - 700,000 497,000 203,000 95 Intersection of St. George St W and Beatty Li NA NA 2025-2035 630,000 - 630,000 - 630,000 447,300 182,700 96 Beatty Line N Colborne St Farley Rd 2025-2035 1,485,750 - 1,485,750 - 1,485,750 1,054,883 430,868 97 Belsyde Ave E St David St S Scotland St 2025-2035 441,000 - 441,000 - 441,000 313,110 127,890 98 Belsyde Ave W Tower St S St David St S 2025-2035 141,750 - 141,750 - 141,750 100,643 41,108 99 Colborne St Gerrie Rd Township Rd 20 2025-2035 603,750 - 603,750 - 603,750 428,663 175,088 100 Dickson Dr Gartshore St W of First Line 2045-2055 351,750 - 351,750 - 351,750 249,743 102,008 101 Elliot Ave E Farley Rd Beatty Ln 2025-2035 362,250 - 362,250 - 362,250 257,198 105,053 102 Frederick Campbell St Corborne St ECT 2035-2045 105,000 - 105,000 - 105,000 74,550 30,450 103 Guelph St McQueen Blvd Extension Second Line 2035-2045 119,000 - 119,000 - 119,000 - - - 104 Guelph St Elora St McQueen Blvd Extension 2025-2035 105,000 - 105,000 - 105,000 - - - 105 Irvine St Irvine Creek Bridge Bricker Ave 2025-2035 577,500 - 577,500 - 577,500 - - - 106 Jones Baseline 2 Line Built boundary (expanded) 2035-2045 530,250 - 530,250 - 530,250 - - - 107 Lamond St St Andrew St Anderson St 2025-2035 441,000 - 441,000 - 441,000 313,110 127,890 108 McNab St McNab-Water St Link Trail Bridge St 2035-2045 63,000 - 63,000 - 63,000 44,730 18,270 109 McQueen Blvd McTavish Street Scotland St 2025-2035 477,750 - 477,750 - 477,750 - - - 110 McQueen Blvd Extension Guelph St McTavish Street 2025-2035 477,750 - 477,750 - 477,750 - - - Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE I-5 Table I-1 (Cont'd) Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 111 Millage Lane Beatty Ln Black St 2025-2035 115,500 - 115,500 - 115,500 82,005 33,495 112 Scotland St McQueen Blvd Second Line 2035-2045 525,000 - 525,000 - 525,000 - - - 113 Scotland St St Andrew St McQueen Blvd 2025-2035 766,500 - 766,500 - 766,500 544,215 222,285 114 Second Line East of Highway 6 Scotland St 2035-2045 446,250 - 446,250 - 446,250 - - - 115 St David St N Sideroad 18 Sideroad 19 2025-2035 210,000 - 210,000 - 210,000 - - - 116 St David St N Black St Sideroad 19 2025-2035 357,000 - 357,000 - 357,000 253,470 103,530 116 Union St E Thistle St River St 2025-2035 57,750 - 57,750 - 57,750 41,003 16,748 117 Walser St Extension Keating Dr Gerrie Rd 2025-2035 304,500 - 304,500 - 304,500 216,195 88,305 118 Wellington County Road 19 400 m West of North Broadway St 400 m East of North Broadway St 2025-2035 383,250 - 383,250 - 383,250 272,108 111,143 119 Wellington Rd 7 First Line South Elora Urban Boundary Expansion 2035-2045 525,000 - 525,000 - 525,000 - - - 120 Wellington Rd 7 First Line Ross St 2035-2045 745,500 - 745,500 - 745,500 529,305 216,195 121 Wellington Rd 7 Wellington Rd 18 Ross St 2025-2035 981,750 - 981,750 - 981,750 697,043 284,708 122 Woodhill Dr Elizabeth Cres Hwy 6 2025-2035 105,000 - 105,000 - 105,000 74,550 30,450 123 Woolwich St E James St Irvine St 2045-2055 294,000 - 294,000 - 294,000 - - - 124 York St W Wellington Rd 7 Waterloo St 2035-2045 42,000 - 42,000 - 42,000 29,820 12,180 125 Allan St - Queen St Trail Queen St E Allan St 2025-2035 94,500 - 94,500 - 94,500 67,095 27,405 126 Belsyde Cemetery-Highland Rd Link Thistle St Highland Rd 2025-2035 36,750 - 36,750 - 36,750 26,093 10,658 127 Conservation Trail-ECT Connector Conservation Trail ECT 2025-2035 105,000 - 105,000 - 105,000 74,550 30,450 128 Garafraxa-ECT Connector Garafraxa St ECT 2035-2045 283,500 - 283,500 - 283,500 201,285 82,215 129 Garafraxa-St George Connector (Maranatha CWellington Rd 19 St George St E 2035-2045 178,500 - 178,500 - 178,500 126,735 51,765 130 Guelph St Link Trail Union St W Elora St 2025-2035 78,750 - 78,750 - 78,750 55,913 22,838 131 Harper Crescent Park Trail Operations Centre Trail Gordon St 2025-2035 157,500 - 157,500 - 157,500 111,825 45,675 132 Hill St-Beatty Line Rail Trail Beatty Line N Hill St W 2035-2045 693,000 - 693,000 - 693,000 492,030 200,970 133 Maiden Ln - St David St Path Maiden Ln West of Tower St 2035-2045 147,000 - 147,000 - 147,000 104,370 42,630 134 McNab-Water St Link Trail Water St McNab St 2025-2035 52,500 - 52,500 - 52,500 37,275 15,225 135 The Elora Cataract Trailway Kertland St Gerrie Rd 2025-2035 451,500 - 451,500 - 451,500 320,565 130,935 136 Trestle Bridge Trail Waterloo St Beatty Line N 2025-2035 1,900,500 - 1,900,500 - 1,900,500 1,349,355 551,145 137 Waterloo St - Water St Link Nichol St W Water St 2025-2035 110,250 - 110,250 - 110,250 78,278 31,973 138 WR 18 - Woolwich St E Link Geddes St Woolwich St E 2045-2055 31,500 - 31,500 - 31,500 22,365 9,135 139 Ann St Avruskin St Wellington Road 18 2045-2055 30,800 - 30,800 - 30,800 21,868 8,932 140 Barker St St George St E St Andrew St E 2035-2045 40,600 - 40,600 - 40,600 28,826 11,774 141 Beatty Line S Frederick Campbell St St Andrew St W 2035-2045 11,200 - 11,200 - 11,200 7,952 3,248 142 Black St Campbell Ave St David St N 2025-2035 193,200 - 193,200 - 193,200 137,172 56,028 143 Blair St Johnston St S St Andrew St W 2035-2045 54,600 - 54,600 - 54,600 38,766 15,834 144 Bon Accord St St Arnaud St E of Angelica St 2025-2035 130,200 - 130,200 - 130,200 92,442 37,758 145 Breadalbane St St Andrew St W Hill St W 2035-2045 46,200 - 46,200 - 46,200 32,802 13,398 146 Church Sq Church St E Church St E 2025-2035 16,800 - 16,800 - 16,800 11,928 4,872 147 Church St E Metcalfe St Gerrie Rd 2025-2035 103,600 - 103,600 - 103,600 73,556 30,044 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE I-6 Table I-1 (Cont'd) Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 148 Church St W Price St Metcalfe St 2025-2035 18,200 - 18,200 - 18,200 12,922 5,278 149 Colquhoun St Beatty Line Johnston St S 2035-2045 36,400 - 36,400 - 36,400 25,844 10,556 150 David St E Wellington Rd 18 Irvine St 2025-2035 112,000 - 112,000 - 112,000 79,520 32,480 151 Elora St Beatty Line N Township Rd 20 2035-2045 88,200 - 88,200 - 88,200 62,622 25,578 152 Forfar St E St David St N Gartshore St 2025-2035 142,800 - 142,800 - 142,800 101,388 41,412 153 Gowrie St N St George St E Hill St 2025-2035 14,000 - 14,000 - 14,000 9,940 4,060 154 Hill St E Gowrie St Cameron St 2025-2035 25,200 - 25,200 - 25,200 17,892 7,308 155 Irvine St Bricker Ave Church St 2025-2035 186,200 - 186,200 - 186,200 132,202 53,998 156 James St Henderson St Price St 2025-2035 8,400 - 8,400 - 8,400 5,964 2,436 157 Johnston St S Colquhoun St Blair St 2035-2045 14,000 - 14,000 - 14,000 9,940 4,060 158 Mary St Church St Mill St 2025-2035 47,600 - 47,600 - 47,600 33,796 13,804 159 McNab St County Road 7 Victoria St 2035-2045 26,600 - 26,600 - 26,600 18,886 7,714 160 McTavish St Highland Rd McQueen Blvd 2025-2035 110,600 - 110,600 - 110,600 78,526 32,074 161 Middleton Ave Gartshore St Robinson Rd 2025-2035 30,800 - 30,800 - 30,800 21,868 8,932 162 Omar St West of Can Robert St St. Arnaud St 2025-2035 47,600 - 47,600 - 47,600 33,796 13,804 163 Price St James St Church St 2025-2035 9,800 - 9,800 - 9,800 6,958 2,842 164 Queen St E St. David St River St 2025-2035 92,400 - 92,400 - 92,400 65,604 26,796 165 River St Queen St E Union St E-Queen St Link Trail 2025-2035 12,600 - 12,600 - 12,600 8,946 3,654 166 Sideroad 19 Beatty Line N St. David St N 2035-2045 141,400 - 141,400 - 141,400 100,394 41,006 167 Smith St David St Victoria Cres 2025-2035 11,200 - 11,200 - 11,200 7,952 3,248 168 South St County Rd 7 David St W 2045-2055 98,000 - 98,000 - 98,000 69,580 28,420 169 St Andrew St E St. David St Cameron St 2025-2035 47,600 - 47,600 - 47,600 33,796 13,804 170 St George St E St David St N Anderson St N 2025-2035 298,200 - 298,200 - 298,200 211,722 86,478 171 St George St W Beatty Line N St David St N 2025-2035 152,600 - 152,600 - 152,600 108,346 44,254 172 Strathallan St St David St N Gzowski St 2025-2035 93,800 - 93,800 - 93,800 66,598 27,202 173 Thistle St Union St E End 2025-2035 26,600 - 26,600 - 26,600 18,886 7,714 174 Victoria Cres James St Smith St 2025-2035 47,600 - 47,600 - 47,600 33,796 13,804 175 Victoria St Woolwich St W William St 2045-2055 42,000 - 42,000 - 42,000 29,820 12,180 176 Victoria Ter Garafraxa St E Strathallan St 2025-2035 119,000 - 119,000 - 119,000 84,490 34,510 177 Walser St Irvine St Keating Dr 2035-2045 63,000 - 63,000 - 63,000 - - - 178 Anderson St N Dickson Dr Dianne Cres 2045-2055 25,760 - 25,760 - 25,760 18,290 7,470 179 First Line ECT Dickson Dr 2045-2055 128,800 - 128,800 - 128,800 - - - 180 Jones Baseline Built boundary (expanded) Wellington Road 22 2045-2055 842,030 - 842,030 - 842,030 597,841 244,189 181 Middlebrook Rd Municipal boundary County Road 7 2045-2055 1,112,510 - 1,112,510 - 1,112,510 789,882 322,628 182 Second Line E Sideroad 4 Sideroad 10 2045-2055 528,080 - 528,080 - 528,080 374,937 153,143 183 Sideroad 10 Weisenburg Rd Second Line E 2045-2055 803,390 - 803,390 - 803,390 570,407 232,983 184 Sideroad 4 Wellington County Rd 21 Second Line E 2035-2045 386,400 - 386,400 - 386,400 274,344 112,056 185 Union St W Treatment Plant Bridge St 2025-2035 146,510 - 146,510 - 146,510 104,022 42,488 186 Pedestrian Bridge Crossing Grand River at Craighead Cottage Johnston St S Union St W 2025-2035 2,800,000 - 2,800,000 - 2,800,000 1,988,000 812,000 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE I-7 Table I-1 (Cont'd) Infrastructure Costs Included in the Development Charges Calculation Active Transportation Less: Potential D.C. Recoverable Cost Proj. No. Start End Residential Share Non- Residential Share 2025 to 2051 71% 29% 187 Pedestrian Bridge Crossing Grand River at Middlebrook Middlebrook Place Weisenberg Rd 2045-2055 2,800,000 - 2,800,000 - 2,800,000 - - - 188 Gordon St St David St N Gartshore St 2035-2045 304,920 - 304,920 - 304,920 216,493 88,427 189 Drimmie Park - 6560 Gerrie Rd Link Keating Dr Thomas Blvd 2025-2035 93,380 - 93,380 - 93,380 66,300 27,080 190 Fergus Dog Park MUP Glengarry Cres Dog Park - Dickson Dr Trail 2025-2035 74,060 - 74,060 - 74,060 52,583 21,477 191 Hill St-Beatty Line Rail Trail - Black St Link Hill St-Beatty Line Rail Trail Black St 2025-2035 16,100 - 16,100 - 16,100 11,431 4,669 192 Operations Centre Trails Gartshore St Gartshore St 2025-2035 273,700 - 273,700 - 273,700 194,327 79,373 193 Spencer Dr - Trestle Bridge Trail West Link Trestle Bridge Trail Spencer Dr 2025-2035 16,100 - 16,100 - 16,100 11,431 4,669 194 Geddes St Metcalfe St David St W 2025-2035 20,300 - 20,300 - 20,300 14,413 5,887 195 Metcalfe St David St Mill St 2025-2035 20,300 - 20,300 - 20,300 14,413 5,887 196 St Andrew St W Breadalbane St St David St N 2025-2035 39,200 - 39,200 - 39,200 27,832 11,368 197 Wayfinding and Signage Improvements N/A N/A 2025-2035 70,000 - 70,000 - 70,000 49,700 20,300 Total 53,995,100 - - 53,995,100 2,146,620 20,350,470 31,498,010 22,363,587 9,134,423 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE J-1 Appendix J Proposed D.C. By-law Watson & Associates Economists Ltd. PAGE J-2 Appendix J: Proposed D.C. By-law THE CORPORATION OF THE TOWNSHIP OF CENTRE WELLINGTON BY-LAW NUMBER 2026-xxx BEING A BY-LAW FOR THE IMPOSITION OF DEVELOPMENT CHARGES WHEREAS the Township of Centre Wellington will experience growth through development and re-development; AND WHEREAS development and re-development requires the provision of physical and social services by the Township of Centre Wellington; AND WHEREAS Council desires to ensure that the capital cost of meeting growth- related demands for or burden on municipal services does not place an excessive financial burden on the Township of Centre Wellington or its existing taxpayers while at the same time ensuring new taxpayers contribute no more than the net capital cost attributable to providing the current level of municipal services; AND WHEREAS the Development Charges Act, 1997, S.O. 1997, c.27, as amended (the "Act") provides that the council of a Township may by by-law impose development charges against land to pay for increased capital costs required because of increased needs for services; AND WHEREAS a development charge background study has been completed in accordance with the Act; AND WHEREAS the Council of The Corporation of the Township of Centre Wellington has given notice of and held a public meetings on the 9th day of February, 2026 in accordance with the Act and the regulations thereto; NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWNSHIP OF CENTRE WELLINGTON ENACTS AS FOLLOWS: Watson & Associates Economists Ltd. PAGE J-3 1. INTERPRETATION 1.1. In this By-law the following items shall have the corresponding meanings: "accessory use" means where used to describe a use, building, or structure that the use, building, or structure is naturally and normally incidental, subordinate in purpose of floor area or both, and exclusively devoted to a principal use, building or structure, but is not an ancillary residential building; "Act" means the Development Charges Act, as amended, or any successor thereof; "ancillary residential building" means a residential building that would be ancillary to a detached dwelling, semi-detached dwelling, or row dwelling; "affordable residential unit" means a residential unit that meets the criteria set out in subsection 4.1(2) or 4.1(3) of the Act; "agricultural research building" means a specialized facility, designed and equipped for systematic scientific investigation and study aimed at improving agricultural practices and solving related problems and is operated by an academic institute such as an accredited college or university. "apartment unit" means any residential unit within a building containing three or more dwelling units where access to each residential unit is obtained through a common entrance or entrances from the street level and the residential units are connected by an interior corridor, and includes stacked townhouses; "attainable residential unit" means a residential unit that meets the criteria set out in subsection 4.1(4) of the Act; "back-to-back townhouse dwelling" means a building containing more than two dwelling units separated vertically by a common wall, including a rear common wall, that do not have rear yards; "bedroom" means a habitable room larger than seven square metres, including a den, study, or other similar area, but does not include a bathroom, living room, dining room or kitchen; Watson & Associates Economists Ltd. PAGE J-4 "benefiting area" means an area defined by map, plan, or legal description in a front-ending agreement as an area that will receive a benefit from the construction of a service; "board of education" has the same meaning as set out in the Education Act, R.S.O. 1990, c.E.2, as amended, or any successor thereof (the "Education Act"); "bona fide farm uses" means the proposed development will qualify as a farm business operating with a valid Farm Business Registration Number issued by the Ontario Ministry of Agriculture, Food and Rural Affairs and be assessed in the Farmland Realty Tax Class by the Ontario Property Assessment Corporation and includes the cultivation and propagation of cannabis plants; "brownfield site" means an undeveloped or previously developed site with potential for redevelopment, but that may be contaminated by previous activities occurring on or adjacent to the site. They are usually, but not exclusively, former industrial or commercial properties that may be underutilized, derelict or vacant. Without limiting the generality of the foregoing, a Brownfield Site may include former gasoline/service stations, former landfill sites, former industrial sites, or former commercial sites. "Building Code Act" means the Building Code Act, 1992, S.O. 1992, c.23 as amended, or any successor thereof (the "Building Code Act"); "cannabis" means: a) a cannabis plant; b) any part of a cannabis plant, including the phytocannabinoids produced by, or found in, such a plant regardless of whether that part has been processed or not; c) any substance or mixture of substances that contains or has on it any part of such a plant; and d) any substance that is identical to any phytocannabinoid produced by, or found in, such a plant, regardless of how the substance was obtained. Watson & Associates Economists Ltd. PAGE J-5 "cannabis plant" means a plant that belongs to the genus Cannabis. "Cannabis Production Facilities" means a building, or part thereof, designed, used, or intended to be used for one or more of the following: production, processing, harvesting, testing, alteration, destruction, storage, packaging, shipment, or distribution of cannabis where a licence, permit or authorization has been issued under applicable federal law and does include, but is not limited to such buildings as a greenhouse and agricultural building associated with the use. It does not include a building or part thereof solely designed, used, or intended to be used for retail sales of cannabis. "capital cost" means costs incurred or proposed to be incurred by the Township or a local board thereof directly or by others on behalf of and as authorized by the Township or local board, (a) to acquire land or an interest in land, including a leasehold interest, (b) to improve land, (c) to acquire, lease, construct or improve buildings and structures, (d) to acquire, construct or improve facilities including, (i) furniture and equipment other than computer equipment, and (ii) material acquired for circulation, reference or information purposes by a library board as defined in the Public Libraries Act, R.S.O. 1990, Chap. P.44, as amended, or any successor thereof; and (iii) rolling stock with an estimated useful life of seven years or more. (e) to undertake studies in connection with any matter under the Act and any of the matters in clauses (a) to (d) above, including the development charge background study required for the provision of services designated in this By-law within or outside the Township, including interest on borrowing for those expenditures under clauses (a) to (e) above that are growth-related; Watson & Associates Economists Ltd. PAGE J-6 "charitable dwelling" means a residential building, a part of a residential building or the residential portion of a mixed-use building maintained and operated by a corporation approved under the Charitable Institutions Act, R.S.O. 1990, c. C.9, for persons requiring residential, specialized or group care and charitable dwelling includes a children's residence under the Child and Family Services Act, R.S.O. 1990, c. C.11, a home, or a joint home under the Homes for the Aged and Rest Homes Act, R.S.O. 1990, c. H.13, an institution under the Mental Hospitals Act, R.S.O. 1990, c. M.8, a nursing home under the Nursing Homes Act, R.S.O., 1990, c. N.7, and a home for special care under the Homes for Special Care Act, R.S.O. 1990, c, H.12. "commercial" means any use of land, structures, or buildings for the purposes of buying or selling commodities and services, but does not include industrial or agricultural uses, but does include hotels, motels, motor inns and boarding, lodging and rooming houses; "correctional group home" means a residential building or the residential portion of a mixed-use building containing a single housekeeping unit supervised on a 24-hour basis on site by agency staff on a shift rotation basis, and funded wholly or in part by any government or its agency, or by public subscription or donation, or by any combination thereof, and licensed, approved or supervised by the Province of Ontario as a detention or correctional facility under any general or special act and amendments or replacement thereto. A correction group home may contain an office provided that the office is used only for the operation of the correctional group home in which it is located. A correctional group home shall not include any detention facility operated or supervised by the Federal Government nor any correctional institution or secure custody and detention facility operated by the Province of Ontario. "Council" means the Council of the Township; "detached dwelling unit" has the same meaning as a single detached dwelling unit" for the purposes of this by-law. "development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a Watson & Associates Economists Ltd. PAGE J-7 building or structure that the effect of increasing the size of usability thereof, and includes redevelopment; "development charge" means a charge imposed with respect to this By-law; "dwelling unit" means any part of a building or structure used, designed, or intended to be used as a domestic establishment in which one or more persons may sleep and are provided with culinary and sanitary facilities for their exclusive use; "existing" means the number, use and size that existed as of the date this by- law was passed; "existing industrial building" means a building or buildings existing on a site in the Township of Centre Wellington on October 16th, 2006 or the buildings or structures constructed and occupied on a vacant site pursuant to site plan approval under section 41 of the Planning Act, R.S.O. 1990, c. P.13 (the "Planning Act") subsequent to October 16, 2006 for which full development charges were paid, and is used for or in connection with, a) the production, compounding, processing, packaging, crating, bottling, packaging, or assembling of raw or semi-processed goods or materials ("manufacturing") in not less than seventy-five per cent of the total gross floor area of the building or buildings on a site ("manufacturing") or warehousing related to the manufacturing use carried on in the building or buildings, b) research or development in connection with manufacturing in not less than seventy-five per cent of the total gross floor area of the building or buildings on a site, c) retail sales by a manufacturer, if the retail sales are at the site where the manufacturing is carried out, such retail sales are restricted to goods manufactured at the site, and the building or part of a building where such retail sales are carried out does not constitute greater than twenty-five per cent of the total gross floor area of the building or buildings on the site, or Watson & Associates Economists Ltd. PAGE J-8 d) office or administrative purposes, if they are, 1. carried out with respect to the manufacturing or warehousing; and, 2. in or attached to the building or structure used for such manufacturing or warehousing; "farm building" means that part of a bona fide farming operation encompassing barns, silos, and other ancillary development to an agricultural use, but excluding a residential use; "gross floor area" means: (a) in the case of a residential building or structure, the total area of all floors above grade of a dwelling unit measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of party walls dividing the dwelling unit from any other dwelling unit or other portion of a building; and (b) in the case of a non-residential building or structure, or in the case of a mixed-use building or structure in respect of the non-residential portion thereof, the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or between the outside surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: (i) loading facilities above or below grade; (ii) a part of the building or structure below grade that is used for the parking of motor vehicles or for storage or other accessory use; and (iii) wind turbines, which are defined in (c). (c) in the case of a non-residential wind turbine, the total area of the concrete base of the structure; Watson & Associates Economists Ltd. PAGE J-9 "group home" means a residential building or the residential portion of a mixed- use building containing a single housekeeping unit which may or may not be supervised on a 24-hour basis on site by agency staff on a shift rotation basis, and funded wholly or in part by any government or its agency, or by public subscription or donation, or by any combination thereof and licensed, approved or supervised by the Province of Ontario for the accommodation of persons under any general or special act and amendments or replacements thereto. A group home may contain an office provided that the office is used only for the operation of the group home in which it is located. "hospice" means a building or portion of a mixed-use building designed and intended to provide palliative care and emotional support to the terminally ill in a home or homelike setting so that quality of life is maintained, and family members may be active participants in care. "industrial" means lands, buildings or structures used or designed intended for use for production, compounding, processing, packaging, crating, bottling, or assembly ("manufacturing") of raw goods or semi-processed goods or materials, research and development relating thereto, warehousing or bulk storage of goods, and includes office uses and the sale of commodities to the general public where such uses are accessory to an industrial use, and includes cannabis production facilities, but does not include the sale of commodities to the general public through a warehouse club and does not include self-storage or mini-self storage facilities; "Institutional development means development of a building or structure intended for use, a) as a long-term care home within the meaning of subsection 2 (1) of the Long-Term Care Homes Act, 2007; b) as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010; c) by any of the following post-secondary institutions for the objects of the institution: Watson & Associates Economists Ltd. PAGE J-10 (i) a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario, (ii) a college or university federated or affiliated with a university described in subclause (i), or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institutes Act, 2017; d) as a memorial home, clubhouse, or athletic grounds by an Ontario branch of the Royal Canadian Legion; or e) as a hospice to provide end of life care." "live/work unit" means a unit which contains separate residential and non- residential areas intended for both residential and non-residential uses concurrently, and shares a common wall or floor with direct access between the residential and non-residential areas; "Local Board" means a local board as defined in section 1 of the Municipal Affairs Act other than a board as defined in subsection 1(1) of the Education Act; "local services" means those services, facilities or things which are under the jurisdiction of the Township and are related to a plan of subdivision or within the area to which the plan relates in respect of the lands under Sections 41, 51 or 53 of the Planning Act, R.S.O. 1990, Chap. P.13, as amended, or any successor thereof; "long-term care home" means development as defined in subsection 2(1) of the Fixing Long-Term Care Home Act. "multiple dwellings" means all dwellings other than single-detached, semi- detached and apartment unit dwellings and includes but is not limited to back- to-back townhouses, and the residential portion of a live/work unit; Watson & Associates Economists Ltd. PAGE J-11 "non-residential use" means a building or structure of any kind whatsoever used, designed, or intended to be used for other than a residential use and includes wind turbines; "non-profit housing development" means development of a building or structure intended for use as residential premises by, a. a corporation without share capital to which the Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; b. a corporation without share capital to which the Canada Not-for-profit Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing; or c. a non-profit housing co-operative that is in good standing under the Co- operative Corporations Act, or any successor legislation. "nursing home" means a residential building or the residential portion of a mixed-use building licensed as a nursing home by the Province of Ontario. "Official Plan" means the Official Plan adopted for the Township, as amended, and approved; "owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed' "place of worship" means that part of a building or structure that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, Chap. A.31, as amended, or any successor thereof; "public hospital" means lands, buildings or structures used and occupied by a hospital that receives aid under the Public Hospitals Act, R.S.O. 1990, c. P.40, but excludes (i) any portion of a building occupied by a tenant of the hospital, (ii) any lands, buildings or structures, or portions thereof, owned by a hospital or hospital board that are used for purposes other than a public hospital, and (iii) Watson & Associates Economists Ltd. PAGE J-12 any residential component of such lands, buildings or structures, or portions thereof, that is not a public hospital; "rate" means the interest rate established weekly by the Bank of Canada based on Treasury Bills having a term of 91 days; "regulation" means any regulation made pursuant to the Act; "rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises. "residential dwelling" means a building, occupied or capable of being occupied as a home, residence or sleeping place by one or more persons, containing one or more dwelling units but not including motels, hotels, tents, truck campers, tourist trailers, mobile camper trailers or boarding, lodging or rooming houses; "residential use" means the use of a building or structure or portion thereof for one or more dwelling units. This also includes a dwelling unit on land that is used for an agricultural use; "retirement home or lodge" mans a residential building or the residential portion of a mixed-use building which provides accommodation primarily for retired persons or couples where each private bedroom or living accommodation has a separate private bathroom and separate entrance from a common hall but where common facilities for the preparation and consumption of food are provided, and common lounges, recreation rooms and medical care facilities may also be provided. "row dwelling" means a building containing three or more attached dwelling units in a single row, each of which dwelling units has an independent entrance from the outside and is vertically separated from any abutting dwelling unit and includes street townhouses as defined in the Township's Zoning By-law; "school, private" means a private school defined under the Education Act or any successor thereto, being "an institution at which instruction is provided at any time between the hours of 9 a.m. and 4 p.m. on any school day for five or more pupils who are of, or over compulsory school age in any of the subjects of the elementary or secondary school courses of study". Watson & Associates Economists Ltd. PAGE J-13 "semi-detached dwelling" means a dwelling unit in a residential building consisting of two dwelling units having one vertical wall or one horizontal wall, but not other parts, attached or another dwelling unit where the residential unit are not connected by an interior corridor; "service" means a service designed in Schedule "A" to this By-law, and "services" shall have a corresponding meaning; "single detached dwelling unit" means a residential building consisting of one dwelling unit and not attached to another structure; "site" means a parcel of land which can be legally conveyed pursuant to section 50 of the Planning Act and includes a development having two or more lots consolidated under one identical ownership; "special care/special dwelling" means a residence a) containing two or more dwelling rooms, which rooms have common entrance from street level; and b) where the occupants have the right to use in common with other occupants, halls, stairs, yards, common room, and accessory buildings; and c) that is designed to accommodate persons with specific needs, including but not limited to, independent permanent living arrangements; and where support services, such as meal preparation, grocery shopping, laundry, housing, nursing, respite care and attending services are provided at various levels; and includes but is not limited to retirement homes or lodges, group homes, dormitories, and hospices. "stacked townhouse dwelling" means a building containing two or more dwelling units where each dwelling unit is separated horizontally and/or vertically from another dwelling unit by a common wall or floor; "Township" means the Corporation of the Township of Centre Wellington; Watson & Associates Economists Ltd. PAGE J-14 "township" means the area within the geographic limits of the Township of Centre Wellington; and "Zoning By-Law" means the Zoning By-Law of the Township of Centre Wellington or any successor thereof passed pursuant to Section 34 of the Planning Act, S.O. 1998. 2. DESIGNATION OF SERVICES/CLASS OF SERVICES 2.1 The categories of services and classes of services for which development charges are imposed under this By-law are as follows: (a) Services Related to a Highway; (b) Public Works; (c) Fire Protection Services; (d) Parks and Recreation Services; (e) Growth Studies; (f) Land - 10 Year Forecast; (g) Land - 2051 Forecast; (h) Land - Urban 2051 Forecast; (h) Wastewater Services; and (i) Water Services. 2.2 The components of the services designated in section 2.1 are described in Schedule A. 3. APPLICATION OF BY-LAW RULES 3.1 Development charges shall be payable in the amounts set out in this By-law where: (a) the lands are located in the area described in section 3.2; and Watson & Associates Economists Ltd. PAGE J-15 (b) the development of the lands requires any of the approvals set out in subsection 3.4(a). Area to Which By-law Applies 3.2 Subject to section 3.3, this By-law applies to all lands in the Township of Centre Wellington whether or not the land or use thereof is exempt from taxation under s. 13 or the Assessment Act. 3.3. Notwithstanding clause 3.2 above, this by-law shall not apply to lands that are owned by and used for the purposes of: (a) the Township or a local board thereof; (b) a board of education; or (c) the Corporation of the County of Wellington or a local board thereof; Approvals for Development 3.4 (a) Development charges shall be imposed on all lands, buildings or structures that are developed for residential or non-residential uses if the development requires: (i) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (ii) the approval of a minor variance under section 45 of the Planning Act; (iii) a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; (iv) the approval of a plan of subdivision under section 51 of the Planning Act; (v) a consent under section 53 of the Planning Act; Watson & Associates Economists Ltd. PAGE J-16 (vi) the approval of a description under section 50 of the Condominium Act, R.S.O. 1990, Chap. C.26, as amended, or any successor thereof; or (vii) the issuing of a permit under the Building Code Act in relation to a building or structure. (b) No more than one development charge for each service designated in subsection 2.1 shall be imposed upon any lands, buildings, or structures to which this By-law applies even though two or more of the actions described in subsection 3.4(a) are required before the lands, buildings or structures can be developed. (c) Despite subsection 3.4(b), if two or more of the actions described in subsection 3.4 (a) occur at different times, additional development charges shall be imposed if the subsequent action has the effect of increasing the need for services. Exemptions: Rules with Respect to Exemptions for Intensification of Existing Housing or New Housing 3.5 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to developments or portions of developments as follows: (a) the enlargement to an existing residential dwelling unit; (b) the creation of additional dwelling units equal to the greater of one or 1% of the existing dwelling units in an existing residential rental building containing four or more dwelling units or prescribed ancillary structure to the existing residential building; 3.5.1 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to the creation of any of the following in existing or new dwellings: Watson & Associates Economists Ltd. PAGE J-17 a) A second residential unit in an existing or new detached dwelling, semi-detached dwelling or row dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing or new detached dwelling, semi-detached dwelling or row dwelling cumulatively contain no more than one residential unit. b) A third residential unit in an existing or new detached dwelling, semi- detached dwelling or row dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing or new detached dwelling, semi-detached dwelling or row dwelling contains any residential units. c) One residential unit in a building or structure ancillary to an existing or new detached dwelling, semi-detached dwelling or row dwelling on a parcel of urban residential land, if the existing or new detached dwelling, semi-detached dwelling or row dwelling contains no more than two residential units and no other building or structure ancillary to the existing or new detached dwelling, semi-detached dwelling or row dwelling contains any residential units. 3.6 Exemption for Industrial Development: Notwithstanding any other provision of this by-law, there shall be an exemption from the payment of development charges for one or more enlargements of an existing industrial building on its site, whether attached or separate from the existing industrial building, up to a maximum of fifty per cent of the gross floor area before the first enlargement for which an exemption from the payment of development charges was granted pursuant to the Development Charges Act or this section. Development charges shall be imposed in accordance with this by- law with respect to the amount of the floor area of an enlargement that results in the gross floor area of the industrial building being increased by greater than fifty per cent of the gross floor area of the existing industrial building. Watson & Associates Economists Ltd. PAGE J-18 3.7 If the gross floor area of an existing industrial building is enlarged by greater than 50 percent, the amount of the development charge payable in respect of the enlargement is the amount of the development charge that would otherwise be payable multiplied by the fraction determined as follows: 1) determine the amount by which the enlargement exceeds 50 percent of the gross floor area before the enlargement; 2) divide the amount determined under subsection 1) by the amount of the enlargement 3.8 Other Exemptions and Reductions: Notwithstanding the provision of this by-law, development charges shall not be imposed with respect to: a) Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary education is exempt from development charges imposed under the Development Charges Act, 1997 if the development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university; b) non-profit housing development; c) affordable residential units; d) attainable residential units; e) long-term care homes; f) The D.C. payable for rental housing developments, where the residential units are intended to be used as a rented residential premises will be reduced based on the number of bedrooms in each unit as follows: i) Three or more bedrooms - 25% reduction ii) Two bedrooms - 20% reduction; and Watson & Associates Economists Ltd. PAGE J-19 iii) All other bedroom quantities - 15% reduction. g) A place of worship or buildings for purposes of a churchyard or cemetery; h) Non-residential farm buildings constructed for bona fide farm uses and/or agricultural research buildings constructed for the use of a university or owned/operated by a university; i) Public hospitals; j) Hospices; k) Silos for used for industrial, commercial and/or institutional uses; and l) Shipping containers used for industrial, commercial and/or institutional uses, only when these are an accessory use, as defined in the Township's Zoning By-law. Amount of Charges Residential 3.9 The development charges set out in Schedule B shall be imposed on residential uses of lands, buildings, or structures, including a dwelling unit accessory to a non-residential use and, in the case of a mixed-use building or structure, on the residential uses in the mixed-use building or structure, including the residential component of a live/work unit, according to the type of residential unit, and calculated with respect to each of the services according to the type of residential use. Non-Residential 3.10 The development charges described in Schedule B to this by-law shall be imposed on non-residential uses of lands, buildings, or structures, and, in the case of a mixed-use building or structure, on the non-residential uses in the mixed-use building or structure, including the non-residential component of a live/work unit, and calculated with respect to each of the services according to the total floor area of the non-residential use. Watson & Associates Economists Ltd. PAGE J-20 Reduction of Development Charges for Redevelopment 3.11 Despite any other provisions of this By-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within 60 months prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charge under subsection 3.9 by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed- use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the greater of the applicable development charges under subsection 3.10 by the gross floor area that has been or will be demolished or converted to another principal use; (c) notwithstanding the above, for brownfield redevelopment, the period in which the reduction of development charges applies for redevelopment shall be extended to not more than 300 months prior to the date of payment of development charges in regard to such redevelopment; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. Time of Calculation and Payment of Development Charges 3.12 Subject to subsections 3.13 through 3.15, development charges imposed under this By-law are calculated, payable, and collected upon issuance of the first building permit for the development. Watson & Associates Economists Ltd. PAGE J-21 3.13 Notwithstanding subsection 3.12, development charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment. 3.13 Where the development of land results from the approval of a site plan or zoning by-law amendment received on or after January 1, 2020, and building permit issuance occurs after the approval of the application and within the timeframe set out in section 26.2(5) of the Act, the development charges under subsections 3.9 and 3.10 shall be calculated on the lower of: a) the rates set out in Schedule "B" on the date of the planning application, including interest. Where both planning applications apply, development charges under subsections 3.9 and 3.10 shall be calculated on the rates in effect on the date of the later planning application, including interest. b) the rates set out in Schedule "B" on the day the development charge is payable. 3.14 In accordance with Section 26.1 of the Act, a development charge in respect of residential development, other than rental housing or institutional development, shall be paid in full on the earlier of: a) The day a permit is issued under the Building Code Act, 1992 authorizing occupation of the building; and b) The day the building is first occupied. 3.14.1 The Township may require the person required to pay the development charge to provide an instrument to be used to secure the payment of the development charge, subject to any prescribed limitations. 3.14.2 Notwithstanding Section 3.14.1, should the person required to pay the development charge waive the requirement to pay the Development charge as per section 3.14, the D.C. may be paid in accordance with Section 3.12 of this by-law, without entering into an agreement made under Section 27 of the D.C.A. Watson & Associates Economists Ltd. PAGE J-22 3.15 Despite subsections 3.12 to 3.14, and in accordance with section 27 of the Act, Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable. 4. Payment by Services 4.1 Despite the payment required under subsections 3.9 and 3.10, Council may, by agreement, give a credit towards a development charge in exchange for work that relates to a service to which a development charge relates under this By-law. 5. Indexing 5.1 Development charges imposed pursuant to this By-law shall be adjusted annually, without amendment to this By-law, on January 1st of each year, in accordance with the prescribed index in the Act. 6. Schedules 6.1 The following schedules shall form part of this By-law: Schedule A Components of Services and Classes of Services Designated in section 2.1 Schedule B Residential and Non-Residential Development Charges 7. Conflicts 7.1 Where the Township and an owner or former owner have entered into an agreement with respect to land within the area to which this By-law applies, and a conflict exists between the provisions of this By-law and such agreement, the provisions of the agreement shall prevail to the extent that there is a conflict. 7.2 Notwithstanding section 7.1, where a development which is the subject of an agreement to which section 7.1 applies, is subsequently the subject of one or more of the actions described in subsection 3.4(a), an additional development charge in respect of the development permitted by the action shall be calculated, payable and collected in accordance with the provisions of this By- Watson & Associates Economists Ltd. PAGE J-23 law if the development has the effect of increasing the need for services, unless such agreement provides otherwise. 8. Severability 8.1 If, for any reason, any provision of this By-law is held to be invalid, it is hereby declared to be the intention of Council that all the remainder of this By-law shall continue in full force and effect until repealed, re-enacted, amended or modified. 9. Date By-law in Force 9.1 This By-law shall come into effect at 12:01 AM on February 23, 2026. 10. Date By-law Expires 10.1 This By-law will expire at 12:01 AM on February 23, 2036 unless it is repealed by Council at an earlier date. 11. Existing By-law Repealed 11.1 By-law Number 2021-11 is hereby repealed. Read a first, second and third time and finally passed this 23rd day of February, 2026. ______________________ _____________________ Mayor - Shawn Watters Clerk - Kerri O'Kane Watson & Associates Economists Ltd. PAGE J-24 SCHEDULE "A" TO BY-LAW 2026-xxx COMPONENTS OF SERVICES/CLASS OF SERVICES DESIGNATED IN SUBSECTION 2.1 D.C.-Eligible Services - Services Related to a Highway: Roads Active Transportation - Fire Protection Services: Fire Facilities Fire Vehicles Fire Small Equipment and Gear - Parks and Recreation Services: Parkland Development Parkland Amenities - Parks Parkland Amenities - Recreation Park Trails Recreation Facilities Parks and Recreation Vehicles and Equipment - Wastewater Services: Treatment Plants Collection System - Water Services: Wells, Treatment and Storage Distribution System D.C.-Eligible Classes - Public Works: Public Works (Facilities and Fleet) - Growth Studies: Growth Studies Watson & Associates Economists Ltd. PAGE J-25 - Land Acquisition: 10 Year Forecast 2051 Forecast Urban 2051 Forecast Watson & Associates Economists Ltd. PAGE J-26 Schedule B By-law 2026-XX Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services/Class of Service: Services Related to a Highway 6,952 5,672 4,703 3,430 2,618 3.10 Public Works (Facilities and Fleet) 3,265 2,664 2,209 1,611 1,230 1.46 Fire Protection Services 987 805 668 487 372 0.44 Parks and Recreation Services 16,552 13,503 11,197 8,166 6,233 0.95 Growth Studies 978 798 662 482 368 0.46 Land - 2051 Forecast 383 312 259 189 144 0.17 Land - 10 Year Forecast - - - - - 0.00 Total Municipal Wide Services/Class of Services 29,117 23,754 19,698 14,365 10,965 6.58 Urban Services Wastewater Treatment 7,784 6,350 5,266 3,840 2,931 3.47 Wastewater Sewers 889 725 601 439 335 0.40 Water Treatment plants and storage 3,398 2,772 2,299 1,676 1,280 1.52 Water Distribution 4,718 3,849 3,192 2,328 1,777 2.11 Land - Urban 2051 Forecast 439 358 297 217 165 0.20 Total Urban Services 17,228 14,054 11,655 8,500 6,488 7.70 GRAND TOTAL RURAL AREA 29,117 23,754 19,698 14,365 10,965 6.58 GRAND TOTAL URBAN AREA 46,345 37,808 31,353 22,865 17,453 14.28 Service/Class of Service RESIDENTIAL