In the Township of Champlain, Ontario, building permit rules are set by Township of Champlain By-law Number 2024-63 (Building By-law), verified 2026-10-26. Permit required for: Construction, demolition or change of use of buildings; classes of permits are set out in Schedule A. Permit fees: Based on Schedule B building value per square foot, or proposed value/contract price where per-square-foot is unfeasible, per the User Fees By-Law. Fees set in: User Fees By-Law, as amended.
Township of Champlain By-law Number 2024-63 (Building By-law)
adopted bylaw
permit required for
Construction, demolition or change of use of buildings; classes of permits are set out in Schedule A.
s. 3.1
fee basis
Based on Schedule B building value per square foot, or proposed value/contract price where per-square-foot is unfeasible, per the User Fees By-Law.
s. 6.1; Schedule "B"; Schedule "A" note (a)
fees location
User Fees By-Law, as amended
s. 6.1
authority
Chief Building Official and appointed Inspectors
s. 2.7; s. 2.14
scout note
Champlain's Building By-law requires permits for construction, demolition and change of use, sets permit classes (Schedule A), administrative performance deposits (Schedule A.1), application requirements and refunds; work started without a permit pays an extra 100% of the fee (max $5,000). Dollar amounts are in the separate User Fees By-law; check current schedule.
Charges and Fees — Township of Champlain (Building fee tables)
Township's own fees page publishes current (effective Jan 1, 2026) building permit fee tables for residential, non-residential and agricultural construction, administered by the Chief Building Official; fees are embedded on the page, not a standalone Building By-law document.