Hemson DC Background Study (Nov 2024)

Clarence-Rockland, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 1302cbc7aa73 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

REPORT FOR PUBLIC CONSULTATION PREPARED BY HEMSON FOR THE CITY OF CLARENCE-ROCKLAND DEVELOPMENT CHARGES BACKGROUND STUDY November 15, 2024 1000 - 30 St. Patrick Street, Toronto ON M5T 3A3 416 593 5090 | [email protected] | www.hemson.com CONTENTS 1. EXECUTIVE SUMMARY 1 2. INTRODUCTION 5 A. Legislative Context 6 B. Relevant Analysis 6 C. Consultation and Approval Process 7 3. THE DC METHODOLOGY ALIGNS DEVELOPMENT-RELATED COSTS AND BENEFITS 8 A. Consideration for Area Rated Services 8 B. City-Wide Development Charges are Proposed 8 C. Key Steps in Determining Development Charges for Future Development- Related Projects 2 D. Operating & Capital Cost Impacts and Asset Management Plan Leglislative Requirements 6 4. DEVELOPMENT FORECAST 8 A. Residential Forecast 8 B. Non-Residential Forecast 9 5. SUMMARY OF HISTORICAL CAPITAL SERVICE LEVELS 10 6. THE DEVELOPMENT-RELATED CAPITAL FORECAST 12 A. A Development-Related Capital Forecast is Provided for Council's Approval 12 B. The Development-Related Capital Forecast for General Services and services related to a highway 12 C. The Development-Related Capital Forecast for Engineered Services 15 7. PROPOSED DEVELOPMENT CHARGES ARE CALCULATED IN ACCORDANCE WITH THE DCA 17 A. Development Charges Calculation 17 B. Comparison of Calculated and Current Development Charges 23 8. COST OF GROWTH ANALYSIS 25 B. Asset Management Plan 27 9. OTHER CONSIDERATIONS AND LEGISLATIVE REQUIREMENTS 29 A. Development Charges Administration and Collection 29 B. Changes Arising from Bill 23 and Bill 185 30 C. Development Charges Administration 31 D. Local Service Guidelines 32 LIST OF APPENDICES A. DEVELOPMENT FORECAST 33 B. GENERAL SERVICES - TECHNICAL APPENDIX 46 B.1 Library Services 51 B.2 Parks & Recreation 58 B.3 By-law Services 75 B.4 Development Related Studies 83 B.5 Fire Service 88 B.6 Services Related to a Highway - Public Works 97 B.7 Services Related to a Highway - Roads and Related 107 C. ENGINEERED SERVICES - TECHNICAL APPENDIX 118 C.1 Waterworks Services 120 C.2 Sanitary Sewer Services 131 D. RESERVE FUNDS 140 E. COST OF GROWTH 143 F. LOCAL SERVICE POLICY 152 G. DEVELOPMENT CHARGE BY-LAW (AVAILABLE UNDER SEPARATE COVER) 168 Executive Summary | 1 1. EXECUTIVE SUMMARY The following summarizes the findings of the City of Clarence-Rockland's 2024 Development Charges Background Study. A. PURPOSE OF DEVELOPMENT CHARGES (DC) BACKGROUND STUDY Hemson Consulting Ltd. was retained by the Clarence-Rockland to complete a Development Charges (DC) Background Study (the "Background Study"). The Background Study provides the basis and background to update the City's DCs to reflect the servicing needs of development and redevelopment. The study process is intended to facilitate the passage of a new by-law to implement new DCs. i. Study Consistent with Development Charges Legislation The City's Background Study is presented as part of a process to approve a new DC By-law in compliance with the Development Charges Act (DCA). The study is prepared in accordance with the DCA and associated regulations, including amendments that came into force through the More Homes, More Choice Act, the COVID-19 Economic Recovery Act, the More Homes Built Faster Act, and the Cutting Red Tape to Build More Homes Act, 2024, the latter of which was granted Royal Asset on June 6, 2024. In December of 2019, Council passed By-Law 2019-85 in advance of the expiry of By-law 2015-13 for the services of Fire Protection, Services Related to a Highway of Public Works & Roads and Related, Waterworks and Sanitary Sewage in order to continue collecting development charges. In 2019, due to proposed provincial legislative changes, development charges for soft services of Library, Parks and Recreation, By-law and Development Related Studies were not updated until 2021 and as permitted were levied under By-law 2015-13. In October of 2021, By-Law 2021-90 was passed for the soft services. The City needs to continue implementing DCs to fund capital projects throughout Clarence- Rockland so that new development pays for its capital requirements to the extent allowed by the DCA and so that new services required by growth are provided in a fiscally responsible manner. Executive Summary | 2 ii. Key Steps of the Development Charges Calculation In accordance with the DCA and associated regulation, several key steps are required to calculate development charges. These include:  preparing a development (growth) forecast;  establishing historical service levels;  determining the increased needs for services arising from development and appropriate shares of capital costs; and  determining how these costs are attributed to development types (i.e. residential and non-residential). iii. Development-Related Capital Forecast is Subject to Change One of the recommendations contained in the Background Study is for Council to adopt the development-related capital program derived for the purposes of the development charges calculation. It is assumed that future capital budgets and forecasts will continue to bring forward the development-related projects contained herein that are consistent with the development occurring in the City. It is acknowledged that changes to the capital program presented here may occur through the City's normal capital budget process. B. DEVELOPMENT FORECST The table below summarizes the residential and non-residential development forecast over the 10-year planning period (2024-2033) and over the longer-term to 2046. The forecast is further discussed in Appendix A. Executive Summary | 3 C. DEVELOPMENT-RELATED CAPITAL PROGRAM The development-related capital program for general services and services related to a highway is planned over a 10-year period from 2024 to 2033. The gross cost of the program amounts to $129.15 million, of which $61.32 million is eligible for recovery through development charges. For the engineered services of water and sanitary sewer services, the capital programs cover a long-term planning period from 2024-2046. The gross cost of the program amounts to $148.68 million, of which $62.58 million is eligible for recovery through development charges. Details regarding the capital programs for each service are provided in Appendix B for services under the 10-year planning horizon and Appendix C for engineered services of water and sanitary sewer under the planning horizon to 2046. D. CALCULATED DEVELOPMENT CHARGES Development charge rates have been established under the parameters and limitations of the DCA. A City-wide uniform cost recovery approach is used to calculate development charges for all services. This approach is in keeping with current DC practice in the City. The table below provides the maximum calculated City-wide charges for residential and non-residential development based on the aforementioned development forecast. The total charge represents a serviced unit or non-residential development. 2023 Estimate Residential Total Occupied Dwellings 10,493 1,780 12,273 3,437 13,930 Total Population Census 27,153 3,282 30,435 6,769 33,922 Population In New Dwellings 4,775 9,222 Non-Residential Employment 6,209 409 6,618 956 7,165 Non-Residential Building Space (sq.m.) 20,450 47,800 Growth Total at 2033 Growth Total at 2046 City-wide Development Forecast 10-Year Planning Period 2024 - 2033 Long-Term Planning Period 2024 - 2046 Executive Summary | 4 E. COST OF GROWTH ANALYSIS An overview of the long-term capital and operating costs, as well as the asset management-related annual provisions for capital facilities and infrastructure to be included in the DC by-law, is provided in Section 8 and Appendix E of the Background Study. This examination is required by the DCA. F. DC BY-LAW INCLUDED UNDER SEPARATE COVER The City's proposed DC By-law will be released in draft at least two weeks prior to the public meeting being held under the DCA on December 11, 2024. Service Single & Semi- Rows & Detached Other Multiples ($/sq.m) Library Services $667 $530 $353 $0.00 Parks And Recreation $9,200 $7,311 $4,874 $0.00 By-Law Services $36 $28 $19 $0.26 Development Related Studies $192 $153 $102 $1.29 Fire Services $1,244 $988 $659 $8.44 Services Related to a Highway Public Works $873 $694 $463 $5.98 Roads And Related $24,297 $19,309 $12,872 $164.95 Waterworks $9,373 $7,449 $4,966 $62.28 Sanitary Sewer Services $13,307 $10,575 $7,050 $88.50 TOTAL DEVELOPMENT CHARGE (SERVICED) $59,189 $47,037 $31,358 $331.70 Non-Residential Apartments Charge By Unit Type Introduction | 5 2. INTRODUCTION The City of Clarnece-Rockland's 2024 Development Charges (DC) Background Study is presented as part of the process to approve a new DC by-law in compliance with the Development Charges Act, 1997 (DCA). As the City experiences residential and non-residential development that will increase the demand on municipal services, the City wishes to implement development charges to fund capital projects related to growth so that development continues to be serviced in a fiscally responsible manner. The DCA and O. Reg. 82/98 require that a DC background study be prepared in which development charges are determined with reference to:  A forecast of the amount, type and location of population, housing, and non-residential development anticipated in the City;  The average capital service levels provided in the City over the 15-year period immediately preceding the preparation of the background study;  A review of future capital projects, including an analysis of gross expenditures, funding sources, and net expenditures incurred, or to be incurred, by the City or its local boards to provide for the anticipated development, including the determination of the eligible and ineligible components of the capital projects;  An asset management plan that demonstrates that all assets are financially sustainable over their full life cycle; and,  An examination of the long-term capital and operating costs for the capital infrastructure required for each service to which the development charges by-laws would relate. This study presents the results of the review to determine the development-related net capital costs that are attributable to development that is forecast to occur in the City. The development-related net capital costs are then apportioned among various types of development (residential and non-residential) in a manner that reflects the increase in the need for each service attributable to each type of development. The study therefore calculates development charges for various types of development. The DCA provides for a period of public review and comment regarding the proposed development charges. This process includes considering and responding to comments received by members of the public about the calculated charges. Following completion of Introduction | 6 this process, in accordance with the DCA and Council's review of this study, it is intended that Council will pass a new development charges by-law for the City. The remainder of this study sets out the information and analysis upon which the proposed development charges are based. A. LEGISLATIVE CONTEXT The study is prepared in accordance with the DCA and associated regulations, including the amendments that came into force most recently on November 28, 2022 under the More Homes Built Faster Act, 2022, and on June 6, 2024 under the Cutting Red Tape to Build More Homes Act, 2024. The latter reversed the 5-year mandatory phase-in of DCs and implemented DC exemptions for affordable housing projects that meet the DCA eligibility requirements. Key legislative changes incorporated into this study include:  Historical service level standards have been extended from a 10 to 15-year planning period;  DC by-laws now expire every 10 years instead of 5 years;  The amount of interest paid on DC deferrals and freeze is capped at prime plus 1%;  Costs associated with affordable housing services are now ineligible for recovery through DCs;  Municipalities must spend or allocate 60% of available DC reserve funds per year for roads, water and wastewater services;  DC discounts for purpose-built rentals based on the number of bedrooms; and  DC exemptions for affordable and attainable housing developments which meet the provisions of the DCA. B. RELEVANT ANALYSIS The underlying assumptions and calculation methodologies contained in the DC Background Study have been informed by a range of inputs including the City's capital budget and forecasts, existing master plans, and discussions with City staff and Council. Introduction | 7 C. CONSULTATION AND APPROVAL PROCESS The following provides a summary of the consultation and approval process undertaken to complete the Background Study. Following the release of the Background Study, consultation will continue with the public prior to the passage of the new DC By-law(s) anticipated to occur in January 2025. Activity Date Council Information Package November 8, 2024 Public Release of DC Background Study November 15, 2024 Statutory Public Meeting of Council December 11, 2024 Passage of 2025 DC By-law January 2025 (targeted) The DC Methodology Aligns Development-Related Costs and Benefits | 8 3. THE DC METHODOLOGY ALIGNS DEVELOPMENT-RELATED COSTS AND BENEFITS Several key steps are required in calculating a development charge. However, specific circumstances arise in each municipality which must be reflected in the calculation. In this study, we have tailored our approach to the Clarence-Rockland's unique circumstances. The approach to the calculated DCs is focused on providing a reasonable alignment of development-related costs with the development that necessitates them. This study calculates charges on a City-wide basis. A. CONSIDERATION FOR AREA RATED SERVICES In accordance with the DCA, Council must consider the use of area rating, also known as area-specific DCs, as part of the Background Study. Based on discussions with staff and Council, a City-wide approach has been used as part of this Background Study update. B. CITY-WIDE DEVELOPMENT CHARGES ARE PROPOSED The DCA requires that DC by-laws designate the areas within which DCs shall be imposed. The DC's may apply to all lands in a municipality or to other designated development areas as specified in the by-laws. For all services, a range of capital facilities and infrastructure is available throughout the City, and all Clarence-Rockland residents and employees have access to these assets. As new development occurs, new infrastructure will be needed in order to maintain overall service levels in the City. A widely accepted method of sharing the development-related capital costs for such City services is to apportion them over all the anticipated growth. The following services are included in the City-wide DC calculations:  Library Services  Parks and Recreation  By-Law Services  Development-Related Studies  Fire Services  Services Related to a Highway (Public Works and Roads and Related)  Waterworks Services  Sanitary Sewer Services The DC Methodology Aligns Development-Related Costs and Benefits | 2 These services form a reasonable basis in which to plan and administer the City-wide development charges. It is noted that the analysis of each of these services examines the individual capital facilities and equipment that constitute it. The resulting DCs for these services would be imposed against all development anywhere in the City. C. KEY STEPS IN DETERMINING DEVELOPMENT CHARGES FOR FUTURE DEVELOPMENT-RELATED PROJECTS Several key steps are required in calculating development charges for future development- related projects. These are summarized below and illustrated in Figure 1. The DC Methodology Aligns Development-Related Costs and Benefits | 3 Figure 1: Statutory Requirements of Development Charge Calculation and Study Process The DC Methodology Aligns Development-Related Costs and Benefits | 4 i. Development Forecast The first step in the methodology requires that a development forecast be prepared for forecast study period, in this case, a 10-year period from 2024-2033 is employed for general services and services related to a highway while a 23-year period to 2046 is employed for engineered services of water and sanitary sewer. The forecast of the future residential and non-residential development is based on growth anticipated to occur in the City. For the residential portion of the forecast both the Census or "net" population growth and population growth in new units is estimated. Net population growth determines the need for additional facilities and provides the foundation for the development-related capital program. When calculating the development charge however, the development-related net capital costs are spread over the total additional population that occupy new housing units. This population in new units represents the population from which development charges will be collected. The non-residential portion of the forecast estimates the gross floor area (GFA) of building space to be developed over the full planning period. The forecast of GFA is based on the employment forecasts for the City. Factors for floor space per worker are used to convert the employment forecast into gross floor areas for the purposes of the Background Study. ii. Service Categories and Historical Service Levels The DCA provides that the increase in the need for service attributable to anticipated development: ... must not include an increase that would result in the level of service exceeding the average level of that service provided in the municipality over the 15-year period immediately preceding the preparation of the background study...(s. 5. (1) 4.) Historical 15-year average service levels thus form the basis for development charges. A review of the City's capital service levels for buildings, land, vehicles, and so on has therefore been prepared as a reference for the calculation so that the portion of future capital projects that may be included in the development charge can be determined. The historical service levels used in this study have been calculated based on the period 2009- 2023. The DC Methodology Aligns Development-Related Costs and Benefits | 5 iii. Development-Related Capital Forecast and Analysis of DC Eligible Costs to be Recovered through Development Charges A development-related capital program has been prepared by the City's departments, in consultation with Hemson, as part of the study. The program identifies development-related projects and their gross and net municipal costs, after allowing for capital grants, subsidies or other recoveries as required by the Act (DCA, s. 5. (2)). The capital program provides another cornerstone upon which development charges are based. The DCA requires that the increase in the need for service attributable to the anticipated development may include an increase: ... only if the council of the Municipality has indicated that it intends to ensure that such an increase in need will be met. (s. 5. (1) 3.) In conjunction with DCA, s. 5. (1) 4. referenced above, these sections have the effect of requiring that the development charge be calculated on the lesser of the historical 15-year average service levels or the service levels embodied in future plans of the City. The development-related capital program prepared for this study ensures that development charges are only imposed to help pay for projects that have been or are intended to be purchased or built in order to accommodate future anticipated development. It is not sufficient in the calculation of development charges merely to have had the service in the past. There must also be a demonstrated commitment to continue to emplace facilities or infrastructure in the future. In this regard, O. Reg. 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a Municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. For some projects in the development-related capital program, a portion of the project may confer benefits to existing residents. As required by the DCA, s. 5. (1) 6., these portions of projects and their associated net costs are the funding responsibility of the City from non- development charges sources. The amount of municipal funding for such non-DC-eligible shares of projects is also identified as part of the preparation of the development-related capital program. There is also a requirement in the DCA to reduce the applicable development charge by the amount of any "uncommitted excess capacity" that is available for a service. Such capacity The DC Methodology Aligns Development-Related Costs and Benefits | 6 is available to partially meet the future servicing requirements. Adjustments are made in the capital program analysis to meet this requirement of the DCA. iv. Attribution of Types of Development The next step in the determination of development charges is the allocation of the development-related net capital costs between the residential and the non-residential sectors. In the City of Clarence-Rockland, the allocation is based on projected changes in population in new units and employment over the planning periods. Where reasonable data exist, the apportionment is based on the expected demand for, and use of, the service by sector (e.g. shares of population in new units and employment). The residential component of the development charges is applied to different housing types based on average occupancy factors. The non-residential component is applied on the basis of gross floor area of building space in square metres. v. Final Adjustment The final determination of the development charge results from adjustments made to development-related DC eligible costs for each service and sector resulting from the application of any unallocated growth-related reserve fund balances that are available to fund the development-related capital costs in the capital program. D. OPERATING & CAPITAL COST IMPACTS AND ASSET MANAGEMENT PLAN LEGLISLATIVE REQUIREMENTS Section 10 of the DCA identifies what must be included in a Development Charges Background Study, namely: s.10 (2) The development charge background study shall include, (c) an examination, for each service to which the development charge by-law would relate, of the long-term capital and operating costs for capital infrastructure required for the service; and (c.2) an asset management plan prepared in accordance with subsection (3). i. Asset Management Plan (3) The asset management plan shall, The DC Methodology Aligns Development-Related Costs and Benefits | 7 (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in a prescribed manner. The requirement to include an Asset Management Plan (AMP) was part of the DCA amendments that came into effect on January 1, 2016. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. The section of the DC Background Study that deals with the operating and capital cost impacts and the asset management plan can be found in Appendix E. Development Forecast | 8 4. DEVELOPMENT FORECAST This section provides the basis for the development forecasts used to calculate the development charges for the City of Clarence-Rockland. A more detailed summary of the forecasts, including tables illustrating historical trends and forecast results is provided in Appendix A. The forecasts are based on a range of statistical data including Statistics Canada Census and National Household Survey data, Canada Mortgage Housing Corporation (CMHC) housing market information. The development forecasts are also based on the United Counties of Prescott and Russell's 2022 Growth Management Strategy Update (March 30th, 2022). A. RESIDENTIAL FORECAST DCs are levied on residential development as a charge per new unit. Therefore, for the residential forecast, a projection of the population growth (or net population growth) as well as the population growth in new units is required.  The population growth determines the need for additional facilities and provides the foundation for the development-related capital program.  When calculating the development charge, the development-related net capital costs are spread over the total additional population that occupy new housing units. This population in new units represents the population from which development charges will be collected. Table 1 provides a summary of the residential forecast for a ten-year period from 2024 to 2033 and a long-term planning period to 2046. The 10-year planning period is applicable to all general services and services related to a highway while the 23-year period is applicable to the engineered services of water and sanitary sewer. As shown on Table 1, over the 10-year planning period from 2024 to 2033, the number of households is forecast to increase by 1,780. This translates to population growth in new units of 4,775 persons. Over the 23-year planning period to 2046, the number of households is estimated to increase by 3,437, translating to a population growth in new units of 9,222 persons. The City's census population is forecast to increase by 3,282 over the next 10 years and 6,769 over the next 23 years, reaching 30,435 people by 2033 and 33,922 people by 2046. Development Forecast | 9 B. NON-RESIDENTIAL FORECAST DCs are levied on non-residential development as a charge per square metre of GFA. The non- residential forecast requires a projection of employment growth as well as a projection of new floor space in the City. The non-residential forecast projects an increase of 409 jobs by 2033 and 956 jobs by 2046, excluding work from home employment. The net employment growth will be accommodated with approximately 20,450 square metres of new non-residential building space by 2033 and 47,800 square metres by 2046. A summary of the non-residential growth forecast can be found in Table 1. CITY OF CLARENCE-ROCKLAND SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT FORECAST 2023 Estimate Residential Total Occupied Dwellings 10,493 1,780 12,273 3,437 13,930 Total Population Census 27,153 3,282 30,435 6,769 33,922 Population In New Dwellings 4,775 9,222 Non-Residential Employment 6,209 409 6,618 956 7,165 Non-Residential Building Space (sq.m.) 20,450 47,800 TABLE 1 Growth Total at 2033 Growth Total at 2046 City-wide Development Forecast 10-Year Planning Period 2024 - 2033 Long-Term Planning Period 2024 - 2046 Summary of Historical Capital Service Levels | 10 5. SUMMARY OF HISTORICAL CAPITAL SERVICE LEVELS The DCA and O. Reg. 82/98 require that the development charges be set at a level no higher than the average service level provided in the City over the 15-year period immediately preceding the preparation of the background study, on a service-by-service basis. For General Services (Library, Parks and Recreation, By-Law, Fire) and Services Related to a Highway (Public Works, and Parks and Recreation), the legislative requirement is met by documenting historical service levels for the preceding 15 years; in this case, for the period 2009 to 2023. Typically, service levels are measured as a ratio of inputs per capita or per capita and employee. O. Reg. 82/98 requires that when determining historical service levels both quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet per capita. The qualitative aspect is introduced by the consideration of the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of dollars per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be charged to new development reflect not only the quantity (number and size) but also the quality (value or replacement cost) of service provided historically by the City. Both the quantitative and qualitative aspects of service levels used in the present analysis are based on information provided by City staff based on historical records and their experience with costs to acquire or construct similar facilities, equipment and infrastructure. Table 2 summarizes service levels for all services included in the development charges calculations. Appendix B provides detailed historical inventory data upon which the calculation of service levels is based on. Summary of Historical Capital Service Levels | 11 TABLE 2 CITY OF CLARENCE-ROCKLAND SUMMARY OF AVERAGE HISTORICAL SERVICE LEVELS 2009 - 2023 Service 1.0 LIBRARY SERVICES $318.52 per capita Buildings $240.65 per capita Land $5.16 per capita Materials $55.63 per capita Furniture And Equipment $17.08 per capita 2.0 PARKS AND RECREATION $5,147.48 per capita Indoor Recreation $4,216.98 per capita Park Facilities $930.50 per capita 3.0 BY-LAW SERVICES $13.97 per capita Buildings $2.18 per capita Land $0.01 per capita Furniture And Equipment $11.78 per capita 4.0 FIRE SERVICES $550.99 per pop & empl Buildings $225.83 per pop & empl Land $23.36 per pop & empl Furniture & Equipment At Stations $17.71 per pop & empl Vehicles $232.89 per pop & empl Equipment And Gear $51.20 per pop & empl 5.0 PUBLIC WORKS $400.09 per pop & empl Buildings $125.08 per pop & empl Land $17.49 per pop & empl Furniture And Equipment $4.48 per pop & empl Small Tools $3.27 per pop & empl Fleet $245.69 per pop & empl Fleet Contracted Services $4.08 per pop & empl 6.0 ROADS AND RELATED $16,536.03 per pop & empl Roads $15,060.70 per pop & empl Bridges & Culverts $772.86 per pop & empl Streetlights $319.97 per pop & empl Sidewalks $382.50 per pop & empl 2009 - 2023 Service Level Indicator The Development-Related Capital Forecast | 12 6. THE DEVELOPMENT-RELATED CAPITAL FORECAST The DCA requires the Council of a Municipality to express its intent to provide future capital facilities at the level incorporated in the development charges calculation. As noted above in Section 2, O. Reg. 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a Municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. A. A DEVELOPMENT-RELATED CAPITAL FORECAST IS PROVIDED FOR COUNCIL'S APPROVAL Based on the development forecasts summarized in Section 4 and detailed in Appendix A, City staff, in collaboration with the consultants, developed a development-related capital program setting out those projects that are required to service anticipated development. For all general services and services related to a highway, the capital plan covers the 10-year period from 2024-2033. A long-term planning period to 2046 is used for the capital plan for the engineered services of water and sanitary sewer services. One of the recommendations contained in the Background Study is for Council to adopt the development-related capital program derived for the purposes of the development charges calculation. It is assumed that future capital budgets and forecasts will continue to bring forward the development-related projects contained herein that are consistent with the development occurring in the City. It is acknowledged that changes to the capital program presented here may occur through the City's normal capital budget process. B. THE DEVELOPMENT-RELATED CAPITAL FORECAST FOR GENERAL SERVICES AND SERVICES RELATED TO A HIGHWAY A summary of the development-related capital forecast for general services and services related to a highway is presented in Table 3. The Development-Related Capital Forecast | 13 The development-related capital forecast estimates a total gross cost of $129.15 million. A total of $2.93 million of grants and subsidies has been identified to help fund the program. Therefore, the City's share of the capital forecast is reduced to $126.22 million. The capital forecast incorporates those projects identified to be related to development anticipated in the next 10 years. It is not implied that all of these costs are to be recovered from new development by way of development charges. Portions of the capital forecast may relate to replacement of existing facilities, shares of projects that benefit the existing population, or growth anticipated to occur beyond the 2024-2033 planning period. After these reductions, the remaining development-related capital costs are brought forward to the development charges calculation. The capital forecast associated with Library Services includes provisions for additional facility expansions, parking spaces, materials, and a book mobile, for a total of $3.05 million. The capital program for Parks and Recreation amounts to $17.07 million and provides for new parkland development (including new playgrounds, washrooms, waterfront, and sports parks), debenture repayment recoveries, upgrades to various existing facility features, and parks and recreation master plans. The capital forecast associated with By-Law Services provides for the recovery of negative reserve balance and additional vehicles and equipment totalling about $171,600. The capital forecast associated with Development-Related Studies includes various planning studies and master plans over the planning period amounting to approximately $337,900. The capital forecast associated with Fire Services totals $3.99 million and provides for the recovery of DC debenture payments associated to a fire hall expansion, a new vehicle and a Fire Master Plan. The capital works for Services Related to a Highway - Public Works totals $6.62 million. This includes new snow depots (including land acquisition) at Rockland and Bourget, a garage renovation and expansion, and the acquisition of fleet and equipment. The Services Related to a Highway - Roads and Related capital program includes bike and multi-use paths, roadworks, intersection improvements, sidewalk improvements, developer projects, County roadworks, and transportation master plan and studies at a total cost of $94.98 million. The Development-Related Capital Forecast | 14 Further details on the capital forecasts for each individual service are available in Appendix B. Gross Grants/ Municipal Service Cost Subsidies Cost 1.0 LIBRARY SERVICES $3,053.4 $0.0 $3,053.4 1.1 Branch Expansion $2,810.8 $0.0 $2,810.8 1.2 Materials and Equipment $182.6 $0.0 $182.6 1.3 Materials and Equipment $60.0 $0.0 $60.0 2.0 PARKS AND RECREATION $20,003.1 $2,930.0 $17,073.1 2.1 Indoor Recreation Debt $1,584.1 $0.0 $1,584.1 2.2 Indoor Recreation Facilities $6,760.0 $2,930.0 $3,830.0 2.3 Park Facilities $11,359.0 $0.0 $11,359.0 2.4 Studies $300.0 $0.0 $300.0 3.0 BY-LAW SERVICES $171.6 $0.0 $171.6 3.1 Recovery of Negative Reserve Fund Balance $76.8 $0.0 $76.8 3.2 Buildings & Equipment $94.8 $0.0 $94.8 4.0 DEVELOPMENT RELATED STUDIES $337.9 $0.0 $337.9 4.1 Negative Reserve Fund Balance $12.9 $0.0 $12.9 4.2 Development-Related Studies $325.0 $0.0 $325.0 5.0 FIRE SERVICES $3,987.1 $0.0 $3,987.1 5.1 Buildings, Land & Furnishings $2,362.1 $0.0 $2,362.1 5.2 Vehicles $1,500.0 $0.0 $1,500.0 5.3 Equipment & Studies $125.0 $0.0 $125.0 SERVICES RELATED TO A HIGHWAY 6.0 PUBLIC WORKS $6,620.0 $0.0 $6,620.0 6.1 Buildings & Equipment $5,020.0 $0.0 $5,020.0 6.2 Fleet & Equipment $1,600.0 $0.0 $1,600.0 7.0 ROADS AND RELATED $94,981.4 $0.0 $94,981.4 7.1 City-Wide Roads Projects $94,981.4 $0.0 $94,981.4 TOTAL - GENERAL SERVICES + SERVICES RELATED TO A HIGHWAY $129,154.5 $2,930.0 $126,224.5 TABLE 3 CITY OF CLARENCE-ROCKLAND SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM FOR GENERAL SERVICES 2024 - 2033 (in $000) The Development-Related Capital Forecast | 15 C. THE DEVELOPMENT-RELATED CAPITAL FORECAST FOR ENGINEERED SERVICES Table 4 provides the City-wide development-related capital recoveries for the Waterworks and Sanitary Sewage services. The City-wide gross capital program totals $148.68 million and provides servicing for anticipated development over the 23-year planning period from 2024-2046. There are a substantial amount of funding contributions anticipated from other municipalities to pay for a share of the water related expansion projects. The $61.62 million in contributions have been considered which reduces the capital program to a net municipal cost of $87.06 million. The largest proportion of the net municipal engineering capital program cost is associated with growth-related Sanitary Sewer projects. The various treatment plant improvements, pumping stations, linear infrastructure projects and studies have a net municipal cost of $51.19 million. Waterworks projects include investments in the treatment plant, as well as linear infrastructure, pumping stations and studies. The net municipal cost totals $35.88 million. The Development-Related Capital Forecast | 16 Service 1.0 WATERWORKS $97,494.3 $61,616.0 $35,878.3 1.1 Water Treatment Plant Projects $34,770.0 $11,242.1 $23,527.9 1.2 Studies $3,150.0 $1,020.0 $2,130.0 1.3 Watermains $49,950.3 $43,343.4 $6,606.8 1.4 Water Pumping Station and Storage $9,624.0 $6,010.5 $3,613.5 2.0 SANITARY SEWER SERVICES $51,185.0 $0.0 $51,185.0 2.1 Water Pollution Conrol Plant Projects $30,329.0 $0.0 $30,329.0 2.2 Studies $300.0 $0.0 $300.0 2.3 Sewage Pumping Stations $18,551.0 $0.0 $18,551.0 2.4 Sewers $2,005.0 $0.0 $2,005.0 TOTAL - 23-YEAR PROGRAM $148,679.3 $61,616.0 $87,063.3 Gross Cost Grants / Subsidies Net Municipal TABLE 4 CITY OF CLARENCE-ROCKLAND SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM FOR ENGINEERED SERVICES 2024 - 2046 (in $000) Proposed Development Charges are Calculated in Accordance with the DCA | 17 7. PROPOSED DEVELOPMENT CHARGES ARE CALCULATED IN ACCORDANCE WITH THE DCA This section summarizes the calculation of development charges for each service and the resulting total development charge by type of development. For all services, the calculation of the per capita (residential) and per square metre (non-residential) charges is reviewed. For residential development, the total per capita amount is applied to different housing types on the basis of average occupancy factors. For non-residential development, the calculated development charges rates are based on gross floor area (GFA) of building space. It is noted that the calculation of the development charges does not include any provision for exemptions required under the DCA, for example, the exemption for enlargements of up to 50% on existing industrial buildings or for affordable housing exemptions. Such legislated exemptions, or other exemptions which Council may choose to provide, will result in a loss of development charges revenue for the affected types of development. Any such revenue loss may not be offset by increasing other portions of the calculated charge. A. DEVELOPMENT CHARGES CALCULATION A summary of the "unadjusted" residential and non-residential development charges is presented in Tables 5 for services using a 10-year planning horizon and Table 6 for engineered services of water and sanitary sewer under a longer-term planning horizon to 2046. Further details of the calculations for each individual City service category are available in Appendix B for the general services and services related to a highway (10-year program) and Appendix C for engineered services of water and sanitary sewer (to 2046). i. General Services and Services Related to a Highway A summary of the "unadjusted" residential and non-residential development charges for general services is presented in Table 5. Proposed Development Charges are Calculated in Accordance with the DCA | 18 The capital forecast for general services and services related to a highway incorporates those projects identified to be related to development anticipated in the next 10-years. However, not all of the capital costs are to be recovered from new development by way of development charges. Table 5 shows that $16.69 million of the capital forecast relates to replacement of existing capital facilities or for shares of projects that provide benefit to the existing community. These portions of capital costs will have to be funded from non- development charge revenue sources. Another share of the forecast, $34.47 million, is attributable to development beyond the 2033 period (and may therefore be recovered under future development charge studies). 10 Year Growth in Population in New Units 4,775 10 Year Growth in Square Metres 20,450 Total DC Service Net Replacement Eligible Municipal & Benefit to Other Available Post-2033 Costs for Cost Existing Contributions DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) 1.0 LIBRARY SERVICES $3,053.4 $0.0 $0.0 $379.9 $1,628.1 $1,045.4 100% $1,045.4 0% $0.00 Unadjusted Development Charge Per Capita $218.9 Unadjusted Development Charge Per Sq.M $0.00 2.0 PARKS AND RECREATION $17,073.1 $993.5 $0.0 $1,921.0 $0.0 $14,158.6 100% $14,158.6 0% $0.00 Unadjusted Development Charge Per Capita $2,965.2 Unadjusted Development Charge Per Sq.M $0.00 3.0 BY-LAW SERVICES $171.6 $0.0 $0.0 $0.0 $120.0 $51.6 92% $47.4 8% $4.13 Unadjusted Development Charge Per Capita $9.9 Unadjusted Development Charge Per Sq.M $0.20 4.0 DEVELOPMENT RELATED STUDIES $337.9 $37.5 $0.0 $0.0 $0.0 $300.4 92% $276.3 8% $24.03 Unadjusted Development Charge Per Capita $57.9 Unadjusted Development Charge Per Sq.M $1.18 5.0 FIRE SERVICES $3,987.1 $1,125.0 $0.0 $340.4 $488.0 $2,033.7 92% $1,871.0 8% $162.70 Unadjusted Development Charge Per Capita $391.83 Unadjusted Development Charge Per Sq.M $7.96 SERVICES RELATED TO A HIGHWAY 6.0 PUBLIC WORKS $6,620.0 $2,510.0 $0.0 $1,114.7 $1,518.5 $1,476.7 92% $1,358.6 8% $118.14 Unadjusted Development Charge Per Capita $284.5 Unadjusted Development Charge Per Sq.M $5.78 7.0 ROADS AND RELATED $94,981.4 $12,027.1 $5,170.5 $4,811.2 $30,717.0 $42,255.5 92% $38,875.1 8% $3,380.44 Unadjusted Development Charge Per Capita $8,141.4 Unadjusted Development Charge Per Sq.M $165.30 TOTAL 10-YEAR GENERAL SERVICES $126,224.5 $16,693.1 $5,170.5 $8,567.3 $34,471.7 $61,321.9 $57,632.5 $3,689.4 Unadjusted Development Charge Per Capita $12,069.61 Unadjusted Development Charge Per Sq.M $180.42 Share Share TABLE 5 CITY OF CLARENCE-ROCKLAND SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES 10-YEAR CAPITAL PROGRAM FOR GENERAL SERVICES AND SERVICES RELATED TO A HIGHWAY Development-Related Capital Program (2024 - 2033) Residential Non-Residential Proposed Development Charges are Calculated in Accordance with the DCA | 19 Direct developer contributions of $5.17 million has been identified for capital projects associated with Roads and Related and are netted off the total capital costs. After accounting for the development-related reserves ($8.57 million), the total costs eligible for recovery through development charges is $61.32 million. This amount is allocated between the residential and non-residential sectors to derive the unadjusted development charges. Library and Parks and Recreation are deemed to benefit residential development only, while the remaining services are allocated between both sectors based on shares of population in new units and employment growth over the next ten years. The allocation to the residential sector for these services is calculated at 92 per cent and 8 per cent to the non-residential sector. Approximately $57.63 million of the development charges eligible capital program is deemed to benefit residential development. When this amount is divided by the ten-year growth in population in new housing units an unadjusted charge of $12,069.61 per capita is the result. The non-residential share of the capital program totals $3.69 million and when this amount is divided by the 10-year forecast of non-residential space growth, an unadjusted charge of $180.42 per square metre is the result. ii. Engineered Services A summary of the "unadjusted" residential and non-residential development charges for engineered services of water and sanitary sewer is presented in Table 6. 23-Year Growth in Population in New Units 9,222 Employment Growth 956 23-Year Growth in Square Meters 47,800 Total DC Service Net Replacement Direct Eligible Municipal & Benefit to Developer Available Post-Period Costs for Cost Existing Contributions DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) 1.0 WATERWORKS $35,878.3 $1,056.6 $0.0 $2,415.1 $7,346.6 $25,060.1 91% $22,804.7 9% $2,255.41 Unadjusted Development Charge Per Capita $2,472.85 Unadjusted Development Charge Per Sq.M $47.18 2.0 SANITARY SEWER SERVICES $51,185.0 $395.6 $151.3 $937.6 $12,182.2 $37,518.3 91% $34,141.6 9% $3,376.65 Unadjusted Development Charge Per Capita $3,702.19 Unadjusted Development Charge Per Sq.M $70.64 TOTAL 23-YEAR ENGINEERED SERVICES $87,063.3 $1,452.2 $151.3 $3,352.7 $19,528.8 $62,578.4 $56,946.3 $5,632.1 Unadjusted Development Charge Per Capita $6,175.04 Unadjusted Development Charge Per Sq.M $117.82 Share Share Residential Non-Residential TABLE 6 CITY OF CLARENCE-ROCKLAND SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CAPITAL PROGRAM FOR ENGINEEERING SERVICES: WATER AND SANITARY SEWER Development-Related Capital Program (2024 - 2046) Proposed Development Charges are Calculated in Accordance with the DCA | 20 Not all of the net municipal costs are to be recovered from new development by way of development charges. Table 6 shows that $1.45 million of the capital program relates to replacement of existing capital works or for shares of projects that provide benefit to the existing community. This amount has been netted off the chargeable capital cost. Other costs not included in the development charges calculation include $151,300 in direct developer contributions and $3.35 million in available reserve fund balances. Post-period shares in the amount of $19.53 million have also been netted out. The remaining $62.58 million is related to development in the 2024-2046 planning period and has been included in the development charge calculation. The capital program eligible for recovery through development charges is allocated to the residential and non-residential sectors based on future shares of population in new units and employment growth over the planning period to 2046. On this basis, the allocation to the residential and non-residential sectors is also calculated at 91 per cent and 9 per cent, respectively. Approximately $56.95 million of the engineered services development charges eligible capital program is deemed to benefit residential development. When this amount is divided by the 23-year growth in population in new housing units an unadjusted charge of $6,175.04 per capita is the result. The non-residential share of the capital program totals $5.63 million and when this amount is divided by the 23-year forecast of non-residential space growth, an unadjusted charge of $117.82 per square metre is the result. iii. Adjusted Residential and Non-Residential Development Charges Final adjustments to the "unadjusted" development charge rates summarized above are made through a cash flow analysis. The analysis, details of which are included in the Appendices, considers the borrowing cost and interest earnings associated with the timing of expenditures and development charge receipts for each service category. Table 7 summarizes the results of the cash flow adjustments for the residential development charges rates. The adjusted per capita rate increases from $18,244.66 per capita to $19,598.87 per capita after the cash flow analysis for the residential charge. Table 7 also provides the calculated rates by residential unit. The charge for a single or semi-detached unit is $59,189 per unit, $47,037 for a row or other type of multiple units, and $31,358 for an apartment unit. The total charge represents a serviced unit (with water and sanitary sewer) in the City. Proposed Development Charges are Calculated in Accordance with the DCA | 21 Table 8 shows the non-residential uniform charge also experiences an increase after cash flow considerations, from $298.23 to $331.70 per square metre. Unadjusted Adjusted Charge Service Charge After Cashflow Single & Semi- Rows & Per Capita Per Capita Detached Other Multiples Library Services $218.93 $220.79 $667 $530 $353 Parks And Recreation $2,965.15 $3,046.39 $9,200 $7,311 $4,874 By-Law Services $9.93 $11.80 $36 $28 $19 Development Related Studies $57.87 $63.65 $192 $153 $102 Fire Services $391.83 $411.77 $1,244 $988 $659 Services Related to a Highway Public Works $284.52 $289.23 $873 $694 $463 Roads And Related $8,141.38 $8,045.24 $24,297 $19,309 $12,872 Waterworks $2,472.85 $3,103.69 $9,373 $7,449 $4,966 Sanitary Sewer Services $3,702.19 $4,406.31 $13,307 $10,575 $7,050 TOTAL RESIDENTIAL CHARGE (SERVICED) $18,244.66 $19,598.87 $59,189 $47,037 $31,358 (1) Based on Persons Per Unit of: 3.02 2.40 1.60 TABLE 7 CITY OF CLARENCE-ROCKLAND Apartments Charge By Unit Type CITY-WIDE DEVELOPMENT CHARGES RESIDENTIAL DEVELOPMENT CHARGES Proposed Development Charges are Calculated in Accordance with the DCA | 22 CITY OF CLARENCE-ROCKLAND CITY-WIDE DEVELOPMENT CHARGES NON-RESIDENTIAL DEVELOPMENT CHARGES Unadjusted Service Charge ($/sq.m) ($/sq.m) Library Services $0.00 $0.00 Parks And Recreation $0.00 $0.00 By-Law Services $0.20 $0.26 Development Related Studies $1.18 $1.29 Fire Services $7.96 $8.44 Services Related to a Highway Public Works $5.78 $5.98 Roads And Related $165.30 $164.95 Waterworks $47.18 $62.28 Sanitary Sewer Services $70.64 $88.50 TOTAL NON-RESIDENTIAL CHARGE PER SQ.M (SERVICED) $298.23 $331.70 TABLE 8 Non-Residential Proposed Development Charges are Calculated in Accordance with the DCA | 23 B. COMPARISON OF CALCULATED AND CURRENT DEVELOPMENT CHARGES For illustration purposes, Tables 9 and 10 present a comparison of the newly calculated residential and non-residential development charges with currently imposed development charge rates. It illustrates that the residential development charge for a fully serviced single- or semi-detached unit increases by $27,125 per unit, or 85 per cent. The current development charge rate for fully serviced non-residential development increases from $169.57 per square metre to $331.70 per square metre (96 per cent or 162.13 per square metre). The rate increases can largely be attributed to the capital needs associated with emplacing necessary road, water and sanitary sewer infrastructure in the City. Current Calculated Service Residential Residential Charge / SDU Charge / SDU Library Services $941 $667 ($274) (29%) Parks And Recreation $7,153 $9,200 $2,047 29% By-Law Services $27 $36 $9 36% Development Related Studies $124 $192 $68 54% Fire Services $1,419 $1,244 ($175) (12%) Services Related to a Highway Public Works $1,258 $873 ($385) (31%) Roads And Related $12,075 $24,297 $12,222 101% Waterworks $3,680 $9,373 $5,693 155% Sanitary Sewer Services $5,387 $13,307 $7,920 147% TOTAL RESIDENTIAL CHARGE (SERVICED) $32,064 $59,189 $27,125 85% TABLE 9 CITY OF CLARENCE-ROCKLAND Difference in Charge COMPARISON OF CURRENT AND CALCULATED RESIDENTIAL UNSERVICED DEVELOPMENT CHARGES Proposed Development Charges are Calculated in Accordance with the DCA | 24 Current Calculated Service Non-Residential Non-Residential Charge / Sq.m Charge / Sq.m Library Services $0.00 $0.00 $0.00 N/A Parks And Recreation $0.00 $0.00 $0.00 N/A By-Law Services $0.20 $0.26 $0.06 32% Development Related Studies $0.86 $1.29 $0.43 50% Fire Services $10.09 $8.44 ($1.65) (16%) Services Related to a Highway Public Works $8.94 $5.98 ($2.96) (33%) Roads And Related $85.70 $164.95 $79.25 92% Waterworks $25.89 $62.28 $36.39 141% Sanitary Sewer Services $37.89 $88.50 $50.61 134% TOTAL NON-RESIDENTIAL CHARGE PER SQ.M (SERVICED) $169.57 $331.70 $162.13 96% TABLE 10 NON-RESIDENTIAL UNSERVICED DEVELOPMENT CHARGES CITY OF CLARENCE-ROCKLAND COMPARISON OF CURRENT AND CALCULATED Difference in Charge Cost of Growth Analysis | 25 8. COST OF GROWTH ANALYSIS This section examines the long-term capital and operating costs as well as the asset management-related annual provisions for the capital facilities and infrastructure to be included in the DC By-law. This examination is required as one of the provisions of the DCA. The analysis for all services is included in Appendix E. i. Net Operating Costs for the City's Services are Estimated to Increase over the Forecast Period Table 11 summarizes the estimated increase in net operating costs that the City will experience for additions associated with the planned capital program. Additional details are included in Appendix E. As shown in Table 11, by 2033, the City's net operating costs are estimated to increase by $2.12 million. The most significant portion of this increase relates to the Parks and Recreation capital programs. ii. Long-Term Capital Financing from Non-Development Charge Sources Table 11 also summarizes the components of the development-related capital program that will require funding from non-development charge sources as discussed in Sections 7. In total, $21.86 million will need to be financed from non-development charge sources over the next ten years for general services and services related to a highway. A total of $1.60 million will need to be financed from non-development charge sources for engineered services over a 23-year period. Most of the funding from non-growth sources is related to shares of the program that provide benefit to the existing community ($16.69 for tax supported services and $1.45 million for rate supported services of water and sanitary sewer). The remaining share can be attributed to contributions from developers to fund a portion of the program. In addition, $34.47 million in interim financing may be required for projects related to growth in the post-2033 period for general services and services related to a highway. For engineered services of water and sanitary sewer, the financing related to post-2046 growth- related projects total $19.53 million. It is likely that most of these monies could be recovered from future development charges as the by-laws are revisited at least every ten years. Cost of Growth Analysis | 26 at 2033 ($000) Net Operating Impacts (1) Library Services $212.8 Parks and Recreation $717.0 By-law Services $0.0 Development-Related Studies $0.0 Fire Services $37.5 Services Related to a Highway - Public Works $616.5 Services Related to a Highway - Roads and Related $534.0 Waterworks $0.0 Sanitary Sewage $0.0 NET OPERATING IMPACTS $2,117.8 GENERAL SERVICES (2024-2033) Total Long-term Capital Impact (1) Total Net Cost $126,224.5 Net Cost From Development Charges $61,321.9 Prior Growth Share from DC Reserve Balances (2) $8,567.3 Portion for Post-2033 Development (3) $34,471.7 Funding From Non-DC Sources Other Contributions (4) $5,170.5 Replacement $16,693.1 FUNDING FROM NON-DC SOURCES $21,863.6 Utility Rate Supported ENGINEERED SERVICES (2024-2046) Total Long-term Capital Impact (1) Total Net Cost $87,063.3 Net Cost From Development Charges $62,578.4 Prior Growth Share from DC Reserve Balances (2) $3,352.7 Portion for Post-2046 Development (3) $19,528.8 Funding From Non-DC Sources Other Contributions (4) $151.3 Replacement $1,452.2 FUNDING FROM NON-DC SOURCES $1,603.5 Notes: (1) See Appendix E (2) Existing development charge reserve fund balances collected from growth prior to 2024 are applied to fund initial projects in development-related capital forecast (3) Post-period development-related net capital costs may be eligible for development charge funding in future DC by-laws (4) Other Contributions shown for engineered services includes Direct Developer Contributions. TABLE 11 CITY OF CLARENCE-ROCKLAND SUMMARY OF LONG TERM CAPITAL AND OPERATING COST IMPACTS FOR TAX SUPPORTED SERVICES (in thousands of constant dollars) Cost of Growth Analysis | 27 B. ASSET MANAGEMENT PLAN The Development Charges Act now requires that municipalities complete an Asset Management Plan before the passing of a development charges by-law. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. Further details relating to the Asset Management Plan are discussed in Appendix E. i. Annual Capital Provisions for Tax and Rate Supported Assets Table 12 and 13 shows the annual capital provisions required to replace the development eligible and ineligible costs associated with the capital infrastructure identified in the DC Background Study for general and engineering services, respectively. This estimate is based on information obtained through discussions with municipal staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset. For general services, table 12 illustrates that, by 2034, the City will need to fund an additional $1.67 million per annum in order to properly fund the full life cycle costs of the new City-wide assets supported under the proposed Development Charges By-Law. For engineering services of water and sanitary sewer, Table 13 illustrates that, by 2047, the City will need to fund an additional $191,000 per annum in order to properly fund the full life cycle costs of the new City-wide assets supported under the proposed Development Charges By-Law. DC-Eligible Non DC-Eligible DC-Related Non DC-Related LIBRARY SERVICES $1,425,000 $1,628,000 $34,000 $56,000 PARKS AND RECREATION $16,080,000 $3,923,000 $345,000 $345,000 BY-LAW SERVICES $52,000 $120,000 $0 $11,000 DEVELOPMENT RELATED STUDIES $300,000 $38,000 $0 $0 FIRE SERVICES $2,374,000 $1,613,000 $39,000 $118,000 SERVICES RELATED TO A HIGHWAY PUBLIC WORKS $2,591,000 $4,029,000 $109,000 $126,000 ROADS AND RELATED $47,067,000 $47,915,000 $1,147,000 $1,079,000 TOTAL $69,889,000 $59,266,000 $1,674,000 $1,735,000 Note: DC Eligble funding includes 10-year period funding from DCs and DC Reserve Funding Table 12 Calculated Annual AMP Provisions General Services 2024-2033 Capital Program Annual AMP Provision by 2034 Cost of Growth Analysis | 28 ii. Future Revenue Growth The calculated annual funding provision should be considered within the context of the City's projected growth. Over the next ten years, the City is projected to increase by approximately 1,780 households. In addition, the City will also add 409 new employees that will result in approximately 20,450 square metres of additional non-residential building space. Over the 23-year period, the City will increase by 3,437 households and add 956 employees, resulting in an increase of 47,800 square metres of non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenue to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the Development Charges By-law. iii. Assets are Deemed to be Financial Sustainable In summary, the asset management plan and long-term capital and operating analysis included in this appendix demonstrates that the City can afford to invest and operate the identified services infrastructure over the 10 and 23-year planning period. Importantly, the City's annual budget review allows staff to continue to monitor and implement mitigating measures should the program become less sustainable. DC-Eligible Non DC-Eligible DC-Related Non DC-Related WATERWORKS $27,475,000 $70,019,000 $29,000 $81,000 SANITARY SEWER SERVICES $38,456,000 $12,729,000 $162,000 $54,000 TOTAL $65,931,000 $82,748,000 $191,000 $135,000 Note: DC Eligble funding includes 23-year period funding from DCs and DC Reserve Funding Table 13 Calculated Annual AMP Provisions Engineering Services 2024-2046 Capital Program Annual AMP Provision by 2047 Other Considerations and Legislative Requirements | 29 9. OTHER CONSIDERATIONS AND LEGISLATIVE REQUIREMENTS A. DEVELOPMENT CHARGES ADMINISTRATION AND COLLECTION The DCA requirements in respect of the collection of DCs, certification and remittance, as well as reserve fund management are outlined in this section. i. Development Charges Amount Payable and Date of Payment The total amount of a DC is the amount that would be determined under the by-law on the day of an application for site plan approval or the day of an application for rezoning or, if neither of these apply, the day of building permit issuance. Full details on determining the DCs payable in any particular case are provided in s.26, s.26.1 and s.26.2 of the DCA. The default date of payment of a DC is the date of building permit issuance. However, under s.27 of the DCA the City may enter into an agreement with a developer to alter the timing of payment. For two specific types of development, DCs must be paid according to the following plan:  Six equal annual installments beginning at building occupancy (permit or actual occupancy) and for the following five anniversaries of that date for rental housing and institutional development. For required instalments, the City may charge interest from the date the DC would have been payable to the date the instalment is paid. Interest may accrue on each installment until the final payment has been made. Any skipped or late payments can be added to the tax roll (including interest). Full details on the prescribed payment plans are provided in s.26.1 of the DCA. In accordance with s.26.3 of the DCA the maximum interest rate a municipal can charge is prime plus 1%. ii. Reserve Funds Under the DCA, a municipality that has passed a development charge by-law must establish a separate reserve fund for each service to which the development charge relates and pay each development charge it collects into the respective reserve fund. Beginning in 2023 and each calendar year thereafter, a municipality shall spend or allocate at least 60% of the Other Considerations and Legislative Requirements | 30 monies in a reserve fund associated with Water supply, Wastewater services and Services Related to a Highway. While the DCA does permit municipalities to borrow from the reserve fund, the amount borrowed is to be repaid with interest at a rate not less than the prescribed minimum interest rate. Additionally, money in the reserve fund is to be spent only on development- related capital costs. Annual financial statements are to be provided to Council and must include the following:  Opening and closing balances and in-year transactions  A description of service or category of service  Details on credits paid by individual credit holders  Amounts borrowed and purpose of borrowing  Interest accrued on borrowing  Amount and source of money used to repay borrowing  Projects funded from DCs including amount and source of DC and non-DC funding B. CHANGES ARISING FROM BILL 23 AND BILL 185 As of November 28, 2022, there are several changes to the DCA due to the enactment and Royal Assent of Bill 23. A list of the changes that are now in force is provided below in Table 14. Table 14: Recent Changes to the DCA Section Description Section 2(1) Exemptions for existing rental residential buildings and a range of residential units in existing and new houses. Section 2(4) Housing services are ineligible for DC funding (repeal of paragraph 17 of ss.2(4) of the DCA). Existing by-laws are deemed to be "amended" and no development charges can be collected for housing services from November 28, 2022 onward. Section 4.1 Exemptions for affordable and attainable residential units as defined in the Affordable Residential Units Bulletin. Section 4.2 Exemptions for non-profit housing development. This does not apply with respect to a DC payable before November 28, 2022. Other Considerations and Legislative Requirements | 31 Section Description Section 4.3 Exemption for inclusionary zoning residential units. This does not apply with respect to a DC payable before November 28, 2022. Section 5(1) Historical service level calculation period extended from 10 years to 15 years. Does not apply to by-laws in force prior to November 28, 2022. Section 9(1) Maximum life of a DC by-law extended from 5 years to 10 years. This does not apply to by-laws in-force before November 28, 2022. Section 26.1 Deferral payments now apply to rental housing and institutional development. Interest on deferral payments is now capped at prime plus 1% in accordance with s.26.3. Section 26.2 DCs for rental housing development are now discounted based on the number of bedrooms proposed. Interest on DC freeze now capped at prime plus 1% in accordance with section 26.3. Section 26.3 Maximum interest rates are capped at prime plus 1%. This does not apply with respect to a DC that was payable before November 28, 2022. Section 35 Municipalities are now required to spend or allocate at least 60% of reserve balances each year for Water Supply, Wastewater, and Services Related to a Highway beginning in 2023. Section 44(4) Rules for front ending agreements as they relate to affordable and attainable residential units. Section 60(1)(s.4) Additional services for which municipalities are required to spend or allocate at least 60% of reserve fund balances may be prescribed through Regulations (none are proposed as of yet). Section 60(1)(d.2) and 9d.3) Prescribes developments and criteria related to attainable residential units (section 4.1). C. DEVELOPMENT CHARGES ADMINISTRATION A draft copy of the development charges by-law will be made available on the City's website at least two weeks before the scheduled public meeting for review. The by-law itself will contain a series of polices as it relates to the City's policies and practices regarding development charge administration. In this regard, a few specific recommendations: Other Considerations and Legislative Requirements | 32  It is recommended that the City develop reporting policies consistent with the requirements of the DCA;  It is recommended that the by-law permit the payment of a development charge in cash or through services-in-lieu agreements. The municipality is not obligated to enter into services-in-lieu agreements;  The proposed draft by-law sets out the rules to determine development charges applicable in any particular case. Rules for exemptions are also to be outlined in the proposed draft by-law;  It is recommended that Council adopt the development-related capital forecast included in this background study, subject to annual review through the City's normal capital budget process. D. LOCAL SERVICE GUIDELINES Local Service Guidelines are provided under Appendix F of this DC Background Study and are subject APPENDIX A DEVELOPMENT FORECAST Appendix A | 33 APPENDIX A - DEVELOPMENT FORECAST This appendix provides details of the development forecast used to prepare the 2024 Development Charges Background Study for the City of Clarence-Rockland. Forecasts of population, households, employment and non-residential building space were prepared by Hemson with information provided by City planning staff and the United Counties of Prescott and Russell's 2021 Growth Management Strategy (March 30, 2022). The tables take into consideration data from the 2021 Census, historical building permit and completion data and the current economic climate. The forecast results are provided in a series of tables. Table A-1 Historical Population, Occupied Households and Employment Summary Table A-2 Historical Annual Housing Completions by Type Table A-3 Historical Households by Period of Construction Showing Household Size Table A-4 Population, Household & Employment Forecast Summary Table A-5 Forecast of Household Growth by Unit Type Table A-6 Forecast of Population Growth in New Households by Unit Type Table A-7 Non-Residential Space Forecast A. FORECAST APPROACH AND KEY ASSUMPTIONS The Development Charges Act (DCA) requires the City, as part of its development charge background study, to estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The forecast must cover both residential and non-residential development and be specific enough with regards to the quantum, type, location and timing of such development to allow the City to prepare a reasonable development-related capital program. In this study, a ten-year planning period from 2024-2033 has been used to calculate development charges for all general services and services related to a highway considered under this study. Additionally, a 23-year planning period from 2024-2046 has been used to calculate development charges for the engineered services of water and sanitary sewer. Appendix A | 34 B. HISTORICAL DEVELOPMENT IN THE CITY OF CLARENCE- ROCKLAND The City of Clarence-Rockland has experienced steady household and population growth over the last fifteen years. Historical growth and development figures presented here are based on Statistics Canada Census data. A "Census-based" definition of population is used for the purpose of the development charges study. This definition does not include the Census net undercoverage, which is typically included in the definition of "total" population commonly used in municipal planning documents. For development charges purposes, a 15- year historical period of 2009 to 2023 is used for calculating historical service levels. Since 2021 was the last year of the Census, figures from 2022 to 2023 are estimated. Table A-1 shows that over the historical period from 2008 to 2023, the City's Census population increased by roughly 5,437 people (or 22%) to approximately 27,153 people by 2023. The number of occupied household units in the City increased at a higher rate than population (33% or 2,645 units) over the same period. This difference is the result of a decline in the average number of persons residing in household units. Total employment numbers shown in Table A-1 are based on Statistics Canada place of work data. Place of work employment figures record where people work rather than place of residence. The employment figures shown in this table include workers with no fixed address. However, work-at-home employment is excluded from the figures, for development charge purposes, as this type of employment does not require building floorspace for its activities. Table A-1 shows that the City's employment increased over the last fifteen years, from about 4,804 jobs in 2008 to 6,209 jobs in 2023. The rate of employment growth was, on average, fairly steady with population with the activity rate maintaining around 23% over the period. Table A-2 provides historical annual housing completions from the Canada Mortgage and Housing Corporation between 2009 and 2023. The number of completions by household unit type is shown along with the resulting percentages. The vast majority, 65 per cent, of all housing completions over the historical period were single and semi-detached units. Apartment units accounted for 14 per cent of the unit mix and the remaining 20 per cent were for rows and other multiple unit types. Table A-3 provides details on historical occupancy patterns for permanently occupied dwelling units in the City. The overall average occupancy level in the City for single and semi-detached units is 2.74 persons per housing unit (PPU). Occupancy levels for recently constructed units, between 2011 and 2021, are used in the development charges calculation Appendix A | 35 for single/semi detached units since they better reflect the number of people that are likely to reside in new development. The average PPU of permanent single and semi-detached units built in the City in the period 2011 to 2021 is 3.02. A similar approach is used for multiples and apartments, the average PPU of multiples and apartments built in the City in the period from 2011 to 2021 is 2.40 and 1.60 respectively. These PPU factors are used in the forecast calculations below. C. FORECAST METHOD AND RESULTS The forecast described herein is consistent with governing legislation and represents a best estimate of the amount and type of development that is likely to occur. Population, household unit and employment forecast numbers are generally based on the targets set for the City under the United Counties of Prescott-Russel's 2021 Growth Management Strategy1. The forecast for population, occupied households, and employment are presented in Table A-4. Development charges are levied on residential development as a charge per new unit. Therefore, for the residential forecast, a projection of both the population growth as well as the population in new housing is required.  The population growth determines the need for additional facilities and provides the foundation for the development-related capital program.  When calculating the development charge, however, the development-related net capital costs are spread over the total additional population that occupies new household units. This population in new units represents the population from which development charges will be collected. Development charges are levied on non-residential development as a charge per unit of gross floor area (GFA). The non-residential forecast includes both a projection of employment growth as well as a projection of the employment growth associated with new floorspace in the City. 1 Specifically related to the employment forecast used for the purposes of the DC Study, the forecast was adjusted to reflect the same growth increment as the UCPR Growth Management Strategy as the 2021 Census results were higher than what was initially outlined in the GMS. Additionally, adjustments were made to the work at home assumption to account for the impacts of COVID pandemic recorded in the 2021 Census. Therefore, the 2046 place of work employment figure in this DC Study is higher than the GMS projection. Appendix A | 36 i. Residential Forecast The residential forecast is based on a forecast of population and household unit growth, as well as population in new units in the City. The allocation of development-related capital costs between the residential and non-residential sector is based on forecasts of population in new housing units and employment. As detailed in Tables A-4 and A-5, the City's Census population is forecast to rise from 27,153 in 2023 to 30,435 in 2033 and 33,922 in 2046 - this represents an increase of approximately 3,282 persons in the 10-year forecast period and 6,769 persons in the 23- year forecast. Over the 10-year planning period from 2024-2033, the total number of occupied household units is forecast to increase from 10,493 in 2023 to 12,273 in 2033 - this represents increases approximately 1,780 units. Over the 23-year forecast from 2024-2046, the total number of occupied household units is forecast to increase to 13,930 in 2046, representing an increase of approximately 3,437 units. Of the total household unit growth, approximately 65% of the units will be of single and semi-detached unit form, about 15% of units will be apartment units and the remaining will be related to rows & other multiple units (Table A- 5). In addition to the Census population forecast, a forecast of "population in new units" that will result from the addition of new housing units has been made. The population growth in new units is estimated by applying the following PPUs to the dwelling unit forecast: 3.02 for single and semi-detached units; 2.40 for rows and other multiples; and 1.60 for apartments. The per capita residential development charge rates are calculated based on these estimates. As indicated in Table A-6, the forecasted population growth in the new household units is anticipated at 4,775 persons over the 10-year period and 9,222 persons over the 23-year period. ii. Non-Residential Forecast Development charges are levied on non-residential development as a charge per unit of Gross Floor Area (GFA). As with the residential forecast, the non-residential forecast requires both a projection of employment growth, as well as a projection of the employment growth associated with new floor space in the City. As with the residential forecast, the GFA forecast covers the 10-year period from 2024 to 2033 for General Services and Services Related to a Highway. The 23-year period to 2046 is used for engineered services of water and sanitary sewer. Appendix A | 37 The floor space assumptions are based on historical floor space trends and averages. An assumed Floor Space per Worker (FSW) is applied to forecast employment numbers in order to estimate the growth in non-residential building space across the City of Clarence- Rockland. The FSW assumption used herein is 50 m2 per employee. The employment and floor space forecasts for the City are summarized in Table A-7. Total employment is forecast to grow by 409 employees over the ten-year forecast period from 2024 to 2033 and 956 employees over the 23-year forecast period to 2046. The total floor space growth is forecast at 20,450 square metres over the 10-year planning period and 47,800 square metres over the 23-year planning period. Appendix A | 38 APPENDIX A - TABLE A-1 CITY OF CLARENCE-ROCKLAND HISTORICAL POPULATION, OCCUPIED HOUSEHOLDS & EMPLOYMENT SUMMARY Household Mid-Year Growth Growth PPU Growth Activity Rate 2008 21,716 468 7,931 223 2.74 4,804 292 22.1% 2009 22,195 479 8,161 230 2.72 5,115 311 23.0% 2010 22,684 489 8,397 236 2.70 5,446 331 24.0% 2011 23,185 501 8,641 244 2.68 5,799 353 25.0% 2012 23,445 260 8,774 133 2.67 5,667 -132 24.2% 2013 23,707 262 8,909 135 2.66 5,539 -128 23.4% 2014 23,972 265 9,047 138 2.65 5,413 -126 22.6% 2015 24,240 268 9,187 140 2.64 5,290 -123 21.8% 2016 24,512 272 9,329 142 2.63 5,171 -119 21.1% 2017 24,898 386 9,477 132 2.63 5,352 181 21.5% 2018 25,290 392 9,628 250 2.63 5,540 188 21.9% 2019 25,688 398 9,781 153 2.62 5,735 195 22.3% 2020 26,093 405 9,937 156 2.61 5,936 201 22.7% 2021 26,505 412 10,095 158 2.60 6,145 209 23.2% 2022 26,827 322 10,292 197 2.59 6,177 32 23.0% 2023 27,153 326 10,493 201 2.58 6,209 32 22.9% Growth 2009 - 2023 5,437 2,645 1,405 Source: Statistics Canada, Census of Canada Census Population Occupied Households Employment by Place of Work Appendix A | 39 APPENDIX A - TABLE A-2 CITY OF CLARENCE-ROCKLAND HISTORICAL ANNUAL HOUSING COMPLETIONS BY TYPE (CMHC) Year Singles & Semis Rows Apts. Total Singles & Semis Rows Apts. Total 2009 127 7 0 134 95% 5% 0% 100% 2010 198 37 46 281 70% 13% 16% 100% 2011 172 18 80 270 64% 7% 30% 100% 2012 145 23 24 192 76% 12% 13% 100% 2013 124 37 48 209 59% 18% 23% 100% 2014 87 43 0 130 67% 33% 0% 100% 2015 84 11 12 107 79% 10% 11% 100% 2016 85 9 20 114 75% 8% 18% 100% 2017 88 20 24 132 67% 15% 18% 100% 2018 144 46 60 250 58% 18% 24% 100% 2019 81 44 10 135 60% 33% 7% 100% 2020 134 55 20 209 64% 26% 10% 100% 2021 148 97 8 253 58% 38% 3% 100% 2022 153 95 78 326 47% 29% 24% 100% 2023 179 70 0 249 72% 28% 0% 100% Growth 2009 - 2023 1,949 612 430 2,991 65% 20% 14% 100% 5-Year Avg. 139 72 23 234 Source: Canada Mortgage and Housing Corporation (CMHC), Housing Market Information CMHC Annual Housing Completions - Units Completions - Shares By Unit Type Appendix A | 40 Period of Construction Period of Construction Summaries Dwelling Unit Type Pre 1945 1946-1960 1961-1970 1971-1980 1981-1990 1991-1995 1996-2000 2001-2005 2006-2010 2011-2016 2016-2021 Pre 2011 2011-2021 Total Singles and Semis Household Population 1,445 665 940 2,770 3,870 2,675 1,540 1,760 2,400 1,885 1,975 18,065 3,860 21,925 Households 580 285 405 1,070 1,490 945 535 620 785 625 655 6,715 1,280 7,995 Household Size 2.49 2.33 2.32 2.59 2.60 2.83 2.88 2.84 3.06 3.02 3.02 2.69 3.02 2.74 Rows Household Population 0 0 0 40 95 195 95 145 195 310 255 765 565 1,330 Households 0 10 0 25 60 80 25 65 75 110 125 340 235 575 Household Size 0.00 0.00 0.00 1.60 1.58 2.44 3.80 2.23 2.60 2.82 2.04 2.25 2.40 2.31 Apartments (excl. Duplexes) Household Population 125 85 140 130 240 100 70 220 180 205 195 1,290 400 1,690 Households 70 70 90 95 180 55 65 115 125 130 120 865 250 1,115 Household Size 1.79 1.21 1.56 1.37 1.33 1.82 1.08 1.91 1.44 1.58 1.63 1.49 1.60 1.52 Duplexes Household Population 50 60 110 240 110 50 35 45 35 90 0 735 90 825 Households 40 35 60 95 35 20 25 15 15 25 15 340 40 380 Household Size 1.25 1.71 1.83 2.53 3.14 2.50 1.40 3.00 2.33 3.60 0.00 2.16 2.25 2.17 All Units Household Population 1,620 810 1,190 3,180 4,315 3,020 1,740 2,170 2,810 2,490 2,425 20,855 4,915 25,770 Households 690 400 555 1,285 1,765 1,100 650 815 1,000 890 915 8,260 1,805 10,065 Household Size 2.35 2.03 2.14 2.47 2.44 2.75 2.68 2.66 2.81 2.80 2.65 2.52 2.72 2.56 Source: Statistics Canada, 2021 National Household Survey Special Run. APPENDIX A - TABLE A-3 CITY OF CLARENCE-ROCKLAND HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE Appendix A | 41 Census Census Employment Employment by Mid-Year Population Pop'n Growth by POW POW Growth Activity Rate 2023 27,153 326 10,493 201 2.59 6,209 32 23% 2024 27,483 330 10,698 205 2.57 6,241 32 23% 2025 27,817 334 10,907 209 2.55 6,273 32 23% 2026 28,153 336 11,120 213 2.53 6,305 32 22% 2027 28,489 336 11,289 169 2.52 6,350 45 22% 2028 28,829 340 11,460 171 2.52 6,396 46 22% 2029 29,173 344 11,634 174 2.51 6,442 46 22% 2030 29,521 348 11,811 177 2.50 6,488 46 22% 2031 29,872 351 11,990 179 2.49 6,535 47 22% 2032 30,152 280 12,131 141 2.49 6,576 41 22% 2033 30,435 283 12,273 142 2.48 6,618 42 22% 2034 30,720 285 12,417 144 2.47 6,660 42 22% 2035 31,008 288 12,563 146 2.47 6,702 42 22% 2036 31,300 292 12,710 147 2.46 6,745 43 22% 2037 31,561 261 12,835 125 2.46 6,786 41 22% 2038 31,825 264 12,962 127 2.46 6,828 42 21% 2039 32,091 266 13,090 128 2.45 6,870 42 21% 2040 32,359 268 13,219 129 2.45 6,912 42 21% 2041 32,630 271 13,350 131 2.44 6,955 43 21% 2042 32,885 255 13,464 114 2.44 6,997 42 21% 2043 33,141 256 13,579 115 2.44 7,039 42 21% 2044 33,399 258 13,695 116 2.44 7,081 42 21% 2045 33,659 260 13,812 117 2.44 7,123 42 21% 2046 33,922 263 13,930 118 2.44 7,165 42 21% 2024-2033 3,282 1,780 409 2024- 2046 6,769 3,437 956 Source: City of Clarence-Rockland and Hemson Consulting, 2024 Total Household Growth Household Size APPENDIX A - TABLE A-4 CITY OF CLARENCE-ROCKLAND POPULATION, HOUSEHOLD & EMPLOYMENT FORECAST SUMMARY Occupied Households Appendix A | 42 APPENDIX A - TABLE A-5 CITY OF CLARENCE-ROCKLAND FORECAST OF HOUSEHOLD GROWTH BY UNIT TYPE Annual Growth in Total Occupied Households Shares By Unit Type Mid-Year Singles & Semis Rows & Other Multiples Apartments Total New Households Singles & Semis Rows & Other Multiples Apartments Total 2024 133 41 31 205 65% 20% 15% 100% 2025 136 42 31 209 65% 20% 15% 100% 2026 138 43 32 213 65% 20% 15% 100% 2027 110 34 25 169 65% 20% 15% 100% 2028 111 34 26 171 65% 20% 15% 100% 2029 113 35 26 174 65% 20% 15% 100% 2030 115 35 27 177 65% 20% 15% 100% 2031 116 36 27 179 65% 20% 15% 100% 2032 92 28 21 141 65% 20% 15% 100% 2033 92 28 21 142 65% 20% 15% 100% 2034 94 29 22 144 65% 20% 15% 100% 2035 95 29 22 146 65% 20% 15% 100% 2036 96 29 22 147 65% 20% 15% 100% 2037 81 25 19 125 65% 20% 15% 100% 2038 83 25 19 127 65% 20% 15% 100% 2039 83 26 19 128 65% 20% 15% 100% 2040 84 26 19 129 65% 20% 15% 100% 2041 85 26 20 131 65% 20% 15% 100% 2042 74 23 17 114 65% 20% 15% 100% 2043 75 23 17 115 65% 20% 15% 100% 2044 75 23 17 116 65% 20% 15% 100% 2045 76 23 18 117 65% 20% 15% 100% 2046 77 24 18 118 65% 20% 15% 100% 2024-2033 1,157 356 267 1,780 65% 20% 15% 100% 2024-2046 2,234 687 516 3,437 65% 20% 15% 100% Source: Hemson Consulting Ltd. 2024 Appendix A | 43 APPENDIX A - TABLE A-6 CITY OF CLARENCE-ROCKLAND FORECAST POPULATION GROWTH IN NEW HOUSEHOLDS BY UNIT TYPE* Mid-Year 2024 402 98 49 549 2025 410 100 50 560 2026 418 102 51 571 2027 332 81 41 454 2028 336 82 41 459 2029 342 84 42 468 2030 347 85 42 474 2031 351 86 43 480 2032 277 68 34 379 2033 279 68 34 381 2034 283 69 35 387 2035 287 70 35 392 2036 289 71 35 395 2037 245 60 30 335 2038 249 61 30 340 2039 251 61 31 343 2040 253 62 31 346 2041 257 63 31 351 2042 224 55 27 306 2043 226 55 28 309 2044 228 56 28 312 2045 230 56 28 314 2046 232 57 28 317 2024-2033 3,494 854 427 4,775 2024-2046 6,748 1,650 824 9,222 *Based on PPUs 3.02 2.40 1.60 Source: Hemson Consulting Ltd., 2024 Singles & Semis Rows & Other Multiples Apartments Total Population in New Households Appendix A | 44 APPENDIX A - TABLE A-7 CITY OF CLARENCE-ROCKLAND NON-RESIDENTIAL SPACE FORECAST Average Sq.M. Per Employee 50.0 m2 per employee Mid-Year Place of Work Employment Annual Growth Growth in Space (m2) 2024 6,241 32 1,600 2025 6,273 32 1,600 2026 6,305 32 1,600 2027 6,350 45 2,250 2028 6,396 46 2,300 2029 6,442 46 2,300 2030 6,488 46 2,300 2031 6,535 47 2,350 2032 6,576 41 2,050 2033 6,618 42 2,100 2034 6,660 42 2,100 2035 6,702 42 2,100 2036 6,745 43 2,150 2037 6,786 41 2,050 2038 6,828 42 2,100 2039 6,870 42 2,100 2040 6,912 42 2,100 2041 6,955 43 2,150 2042 6,997 42 2,100 2043 7,039 42 2,100 2044 7,081 42 2,100 2045 7,123 42 2,100 2046 7,165 42 2,100 2024-2033 409 20,450 2024-2046 956 47,800 Source: City of Clarence-Rockland and Hemson Consulting, 2024 Appendix A | 45 APPENDIX B GENERAL SERVICES TECHNICAL APPENDIX Appendix B | 46 1. GENERAL SERVICES TECHNICAL APPENDIX This appendix provides the detailed analysis undertaken to establish the development charge rates for each of the eligible general services provided by the City of Clarence- Rockland. Seven general services have been analysed as part of this Development Charges (DC) Background Study: Appendix B.1 Library Appendix B.2 Parks and Recreation Appendix B.3 By-law Services Appendix B.4 Development Related Studies Appendix B.5 Fire Services Appendix B.6 Services Related to a Highway - Public Works Appendix B.7 Services Related to a Highway - Roads and Related Every sub-section, with the exception of Development-Related Studies and Services Related to a Highway - Roads and Related, contains a set of three tables. The tables provide the background data and analysis undertaken to arrive at the calculated development charge rates for that particular service. An overview of the content and purpose of each of the tables is given below. TABLE 1 HISTORICAL SERVICE LEVELS Table 1 presents the data used to determine the fifteen-year historical service level. The DCA and Ontario Regulation 82/98 require that development charges be set at a level no higher than the average service level provided in a City over the fifteen-year period immediately preceding the preparation of the background study, on a service by service basis. For the purpose of this study, the historical inventory period is defined as 2009-2023. O. Reg. 82/98 requires that when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet. The qualitative aspect is introduced by considering the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of cost per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be funded by new growth reflect not only the quantity (number and size), but Appendix B | 47 also the quality (replacement value or cost) of service provided by the City in the past. Both the quantitative and qualitative aspects of service levels used in the current analysis are based on information provided by City staff in consultation with Hemson Consulting Ltd. This information is generally based on historical records and experience with costs to acquire or construct similar facilities, equipment and infrastructure. The approach used to calculate service levels and maximum funding envelopes is described as follows: for those services with only a residential impact (Library and Parks and Recreation), the service level measure of net population has been utilized. For the remaining services that levy both a residential and non-residential charge, the service level measure of net population and employment has been utilized. There is also a requirement in the DCA to consider "excess capacity" within the Cityʼs existing infrastructure that may be available to partially meet future servicing requirements. If Council has expressed its intent before or at the time the capacity was created to recoup the cost of providing the capacity from new development, it is considered "committed excess capacity" under the DCA, and the associated capital cost is eligible for recovery. This requirement has been addressed through the use of "net" population and employment in the determination of maximum permissible funding envelopes. Table 1 also shows the calculation of the maximum allowable funding envelope. The maximum allowable funding envelope is defined as the fifteen-year historical service level (expressed as $/capita or $/population and employment) multiplied by the forecast increase in net population or net population and employment over the future planning period. The resulting figure is the value of capital infrastructure that would have to be constructed for that particular service so that the fifteen-year historical service level is maintained. TABLE 2 2024 - 2033 DEVELOPMENT-RELATED CAPITAL PROGRAM AND CALCULATION OF THE DEVELOPMENT CHARGES The DCA requires that Council express its intent to provide capital facilities to support future development. Based on the development forecasts presented in Appendix A, City staff in collaboration with consultants, have created a development-related capital forecast that sets out the projects required to service anticipated development for the ten-year period from 2024 - 2033. To determine the share of the program that is eligible for recovery through development charges, the project costs are reduced by any anticipated grants, subsidies or other recoveries, and "replacement" shares and benefit to existing shares. Appendix B | 48 A replacement share represents the portion of a capital project that will benefit the existing community. It could for example, represent a portion of a new facility that will, at least in part, replace a facility that is demolished, redeployed or will otherwise not be available to serve its former function. The replacement share of the capital program is not deemed to be development-related and is therefore removed from the development charge calculation. The capital cost for replacement will require funding from non-development charge sources, typically property taxes or user fees. The capital program less any replacement shares or benefit to existing shares yields the development-related costs. Although deemed development-related, not all of the net development-related capital program may be recoverable from development charges in the period from 2024 to 2033. For some services, reserve fund balances may be available to fund a share of the program. In addition, a portion of the capital program may service growth occurring beyond 2033. This portion of the capital program is deemed "pre-built" service capacity and is considered as committed excess capacity to be recovered under future development charges or is a service level increase. The remaining portion of the net capital program represents the development-related cost that may be included in the DC calculation. In all cases, as required, this amount is equal to or less than the maximum allowable capital amount as calculated at the end of Table 1. The result is the discounted development-related net capital costs eligible for recovery against growth over the forecast period from 2024 to 2033. i. Calculation of the Development Charges Rates The section below the capital program displays the calculation of the calculated development charge rates. The first step in determining the development charge rate is to allocate the development- related net capital cost between the residential and non-residential sectors. For all general services with the exception of Library Service and Parks & Recreation the development- related costs have been apportioned as 92 per cent residential and 8 per cent non- residential. This apportionment is based on the anticipated shares of population growth in new units and employment growth in new space over the ten-year forecast period. The development-related costs associated with Library, Parks & Recreation, have been allocated 100 per cent to the residential sector, as the need for these services is driven by residential development. Appendix B | 49 The residential share of the 2024 - 2033 DC eligible costs is then divided by the forecasted population growth in new dwelling units. This gives the calculated residential development charge per capita. The non-residential development-related net capital costs are divided by the forecasted increase in non-residential gross floor area (GFA). This yields a charge per square metre of new non-residential development. TABLE 3 CASH FLOW ANALYSIS A cash flow analysis is also undertaken to account for the timing of projects and receipt of development charges. Interest earnings or borrowing costs are accounted for in the calculation as allowed under the DCA. Based on the development forecast, the analysis calculates the DC rate required to finance the net development-related capital spending plan, including provisions for any borrowing costs or interest earnings on the reserve funds. The cash flow analysis is designed so that the closing cash balance at the end of the planning period is as close to nil as possible. In order to determine appropriate development charge rates reflecting borrowing and earnings necessary to support the net development-related funding requirement, assumptions are used for the inflation rate and interest rate. An inflation rate of 2.0 per cent is used for the funding requirements, an interest rate of 5.5 per cent is used for borrowing on the funds and an interest rate of 3.5 per cent is applied to positive balances. Table 3 displays the results of the cash flow analysis and provides the adjusted or final per capita residential and per square metre (of GFA) non-residential development charges. Appendix B | 50 APPENDIX B.1 LIBRARY SERVICE Appendix B | 51 The Clarence-Rockland Public Library provides library services from five branches in the City. The libraries offer an array of collection materials and delivers various community services such as virtual story time, summer youth clubs for children and teens, and virtual programs such as mindful meditation and book clubs. TABLE B.1-1 HISTORICAL SERVICE LEVELS Table B.1-1 displays the fifteen-year historical inventory for buildings, land, materials and furniture and equipment (excluding computer equipment) for Library Service in the City of Clarence-Rockland. At the end of 2023, the two library branches located in the City total approximately 10,800 square feet and are valued at $5.41 million. The library occupies 0.15 hectares of land, which is worth approximately $124,200. Collection materials total $1.44 million and the total value of all furniture and equipment, other than computer equipment adds approximately $379,000 to the total value of the inventory. The combined replacement value of the inventory of capital assets in 2023 for Library Services is $7.35 million, resulting in a fifteen-year historical average service level of $318.52 per capita. This historical service level, multiplied by the ten-year net population growth (3,282), results in a fifteen-year maximum allowable funding envelope of $1.05 million. TABLE B.1-2 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The development-related capital program for Library Service totals $3.05 million and provides for branch expansions, additional parking spaces, additional materials and equipment and a new book mobile. There is no additional funding or contributions and there are no items included in the capital program are not required as a result of new development, therefore, the entire amount will be eligible for development charge funding. The City has approximately $380,000 in DC reserves to offset a potion of the DC eligible capital costs. The share of eligible costs exceeding the maximum permissible funding envelope, $1.63 million is determined to benefit development beyond 2033 and will be eligible for funding under subsequent development charge studies. The remaining share of $1.05 million is eligible for recovery through development charges in the 2024 to 2033 period. Appendix B | 52 The development-related net capital cost is allocated entirely to residential development and, when divided by the ten-year growth in population in new dwelling units (4,775), a charge of $218.93 per capita results. TABLE B.1-3 CASH FLOW ANALYSIS After cash flow consideration, the residential calculated charge increases to $220.79 per capita. The following table summarizes the calculation of the Library Services development charge: 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $318.52 $3,053,400 $1,045,383 $218.93 $0.00 $220.79 $0.00 Adjusted Development Charge Development Charge LIBRARY SERVICES SUMMARY Development-Related Capital Program 2024 - 2033 Unadjusted Appendix B | 53 BUILDINGS UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Rockland 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 8,980 $500 Bourget 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 $500 Clarence Creek 780 780 780 780 780 780 780 780 780 780 - - - - - $500 Hammond 770 770 770 770 770 770 770 770 - - - - - - - $500 Saint-Pascal de Baylon 83 83 83 83 83 83 83 83 83 83 - - - - - $500 Total (sq.ft.) 12,449 12,449 12,449 12,449 12,449 12,449 12,449 12,449 11,679 11,679 10,816 10,816 10,816 10,816 10,816 Total ($000) $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $5,839.5 $5,839.5 $5,408.0 $5,408.0 $5,408.0 $5,408.0 $5,408.0 LAND UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Rockland 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 $870,000 Bourget 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 $235,000 Clarence Creek 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 $235,000 Hammond 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $235,000 Saint-Pascal de Baylon 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.00 0.00 0.00 0.00 0.00 $235,000 Total (ha) 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.16 0.16 0.15 0.15 0.15 0.15 0.15 Total ($000) $129.0 $129.0 $128.3 $128.3 $128.3 $128.3 $128.3 $128.3 $126.7 $126.7 $124.2 $124.2 $124.2 $124.2 $124.2 MATERIALS UNIT COST Type of Collection 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/item) All 5 Branches 55,980 57,834 57,834 52,180 52,909 53,762 46,879 37,275 43,404 48,180 48,310 48,810 45,412 49,399 52,873 $27.03 Overdrive and Cantook Station 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Total (#) 55,981 57,835 57,835 52,181 52,910 53,763 46,880 37,276 43,405 48,181 48,311 48,811 45,413 49,400 52,874 Total ($000) $1,524.1 $1,574.3 $1,574.3 $1,421.4 $1,441.1 $1,464.2 $1,278.1 $1,018.5 $1,184.2 $1,313.3 $1,316.8 $1,330.3 $1,238.5 $1,346.3 $1,440.2 FURNITURE AND EQUIPMENT UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/item) Rockland $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $314,300 $35 Bourget $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $64,260 $35 Clarence Creek $27,300 $27,300 $27,300 $27,300 $27,300 $27,300 $27,300 $27,300 $27,300 $27,300 $0 $0 $0 $0 $0 $35 Hammond $26,950 $26,950 $26,950 $26,950 $26,950 $26,950 $26,950 $26,950 $0 $0 $0 $0 $0 $0 $0 $35 Saint-Pascal de Baylon $11,420 $11,420 $11,420 $11,420 $11,420 $11,420 $11,420 $11,420 $11,420 $11,420 $0 $0 $0 $0 $0 $138 Total ($000) $444 $444 $444 $444 $444 $444 $444 $444 $417 $417 $379 $379 $379 $379 $379 APPENDIX B.1 TABLE B.1-1 # of Square Feet # of Hectares # of Collection Materials Total Value of Furniture and Equipment ($) CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS LIBRARY SERVICES Appendix B | 54 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS LIBRARY SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 INVENTORY SUMMARY ($000) Buildings $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $6,224.5 $5,839.5 $5,839.5 $5,408.0 $5,408.0 $5,408.0 $5,408.0 $5,408.0 Land $129.0 $129.0 $128.3 $128.3 $128.3 $128.3 $128.3 $128.3 $126.7 $126.7 $124.2 $124.2 $124.2 $124.2 $124.2 Materials $1,524.1 $1,574.3 $1,574.3 $1,421.4 $1,441.1 $1,464.2 $1,278.1 $1,018.5 $1,184.2 $1,313.3 $1,316.8 $1,330.3 $1,238.5 $1,346.3 $1,440.2 Furniture And Equipment $444.2 $444.2 $444.2 $444.2 $444.2 $444.2 $444.2 $444.2 $417.3 $417.3 $378.6 $378.6 $378.6 $378.6 $378.6 Total ($000) $8,321.9 $8,372.0 $8,371.3 $8,218.5 $8,238.2 $8,261.2 $8,075.2 $7,815.6 $7,567.7 $7,696.7 $7,227.5 $7,241.0 $7,149.2 $7,257.0 $7,350.9 Average SERVICE LEVEL ($/capita) Service Level Buildings $280.45 $274.40 $268.47 $265.49 $262.56 $259.66 $256.79 $253.94 $234.54 $230.90 $210.53 $207.26 $204.04 $201.59 $199.17 $240.65 Land $5.81 $5.69 $5.53 $5.47 $5.41 $5.35 $5.29 $5.23 $5.09 $5.01 $4.83 $4.76 $4.68 $4.63 $4.57 $5.16 Materials $68.67 $69.40 $67.90 $60.63 $60.79 $61.08 $52.73 $41.55 $47.56 $51.93 $51.26 $50.98 $46.73 $50.18 $53.04 $55.63 Furniture And Equipment $20.01 $19.58 $19.16 $18.95 $18.74 $18.53 $18.33 $18.12 $16.76 $16.50 $14.74 $14.51 $14.28 $14.11 $13.94 $17.08 Total ($/capita) $374.94 $369.07 $361.07 $350.54 $347.50 $344.62 $333.13 $318.85 $303.95 $304.34 $281.36 $277.51 $269.73 $270.51 $270.72 $318.52 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE LIBRARY SERVICES 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $318.52 Net Population Growth 2024 - 2033 3,282 Maximum Allowable Funding Envelope $1,045,383 APPENDIX B.1 TABLE B.1-1 Appendix B | 55 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 1.0 LIBRARY SERVICES 1.1 Branch Expansion 1.1.1 Rockland Branch Expansion - Design Study 2025 60,000 $ - $ 60,000 $ 0% - $ 60,000 $ 60,000 $ - $ - $ 1.1.2 Rockland Branch Expansion - 3,000 sq.ft 2028 1,500,000 $ - $ 1,500,000 $ 0% - $ 1,500,000 $ 259,684 $ 1,045,383 $ 194,933 $ 1.1.3 Rockland Branch Expansion - Furniture & Equipment 2028 104,000 $ - $ 104,000 $ 0% - $ 104,000 $ - $ - $ 104,000 $ 1.1.4 5 Additional Parking Spaces 2028 25,000 $ - $ 25,000 $ 0% - $ 25,000 $ - $ - $ 25,000 $ 1.1.5 Additional Library Space - Land 2031 121,800 $ - $ 121,800 $ 0% - $ 121,800 $ - $ - $ 121,800 $ 1.1.6 Additional Library Space - 2,000 sq.ft 2032 1,000,000 $ - $ 1,000,000 $ 0% - $ 1,000,000 $ - $ - $ 1,000,000 $ Subtotal Branch Expansion 2,810,800 $ - $ 2,810,800 $ - $ 2,810,800 $ 319,684 $ 1,045,383 $ 1,445,733 $ 1.2 Materials and Equipment 1.2.1 Additional Collections Materials Various 182,600 $ - $ 182,600 $ 0% - $ 182,600 $ 60,258 $ - $ 122,342 $ Subtotal Materials and Equipment 182,600 $ - $ 182,600 $ - $ 182,600 $ 60,258 $ - $ 122,342 $ 1.3 Materials and Equipment 1.3.1 Book Mobile 2032 60,000 $ - $ 60,000 $ 0% - $ 60,000 $ - $ - $ 60,000 $ Subtotal Materials and Equipment 60,000 $ - $ 60,000 $ - $ 60,000 $ - $ - $ 60,000 $ TOTAL LIBRARY SERVICES 3,053,400 $ - $ 3,053,400 $ - $ 3,053,400 $ 379,942 $ 1,045,383 $ 1,628,075 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $1,045,383 10-Year Growth in Population in New Units 4,775 2024 - 2033 Net Funding Envelope $1,045,383 Unadjusted Development Charge Per Capita $218.93 Reserve Fund Balance Non-Residential Development Charge Calculation Balance as at December 31, 2023 $379,942 Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $0.00 LIBRARY SERVICES DC Eligible Costs APPENDIX B.1 TABLE B.1-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM Ineligible Costs Appendix B | 56 APPENDIX B.1 TABLE B.1-3 LIBRARY SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $379.9 $510.4 $588.1 $735.8 $863.2 ($452.0) ($367.6) ($274.8) ($173.1) ($90.0) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $6.0 $66.0 $6.0 $6.0 $265.7 $6.0 $6.0 $6.0 $6.0 $6.0 $379.9 - Library Services: Non Inflated $0.0 $0.0 $0.0 $0.0 $1,045.4 $0.0 $0.0 $0.0 $0.0 $0.0 $1,045.4 - Library Services: Inflated $6.0 $67.3 $6.3 $6.4 $1,419.2 $6.7 $6.8 $6.9 $7.1 $7.2 $1,539.8 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $121.2 $126.1 $131.2 $106.4 $109.7 $114.1 $117.9 $121.7 $98.0 $100.5 $1,146.8 INTEREST - Interest on Opening Balance $13.3 $17.9 $20.6 $25.8 $30.2 ($24.9) ($20.2) ($15.1) ($9.5) ($5.0) $33.1 - Interest on In-year Transactions $2.0 $1.0 $2.2 $1.7 ($36.0) $1.9 $1.9 $2.0 $1.6 $1.6 ($20.0) TOTAL REVENUE $136.5 $145.0 $153.9 $133.9 $103.9 $91.1 $99.6 $108.6 $90.1 $97.2 $1,159.9 CLOSING CASH BALANCE $510.4 $588.1 $735.8 $863.2 ($452.0) ($367.6) ($274.8) ($173.1) ($90.0) ($0.0) 2024 Adjusted Charge Per Capita $220.79 Allocation of Capital Program Residential Sector 100.0% Non-Residential Sector 0.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE LIBRARY SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 57 APPENDIX B.2 PARKS & RECREATION Appendix B | 58 The City of Clarence-Rockland Parks, Facilities and Recreation Department is responsible for all indoor recreation facilities and programs, and all parks (including parkland and trails, and park facilities). TABLE B.2-1 HISTORICAL SERVICE LEVELS The fifteen-year historical inventory of capital assets for indoor recreation facilities includes 195,200 square feet of recreation building space located throughout the City1. The total value of these facilities is $93.40 million. The land associated with the various community centres, arenas, and multi-use facility totals 13.55 hectares, and is valued at $8.58 million. The City owns and maintains a substantial amount of furniture and equipment used to provide indoor recreation services. The total replacement value of all indoor recreation equipment in 2023 is $2.42 million. The fifteen-year historical inventory of capital assets for Clarence-Rocklandʼs parks includes 85.7 hectares of developed parkland. Various types of parks have been included in the inventory, including neighbourhood parks and an off-leash dog park. The combined value of all developed parkland amounts to $8.33 million. A development cost of $164,100 per hectare has been used in the inventory for most sites, which represents the site preparation and servicing costs to the City to develop basic land into a useable park. The City also owns and maintains a variety of park facilities. The combined value of play fields, courts, and outdoor skating rinks in 2023 is $7.97 million. Playgrounds and other park facilities such as waterparks, skateboard parks, boat launch and docks are value at $3.06 million. Park buildings make up $3.3 million of the inventory with 0.32 hectares of land for the Recreation Garage Help Centre valued at $278,400. Additionally, the 2.6 kilometres of developed trails adds $1.58 million to the value of the inventory. Lastly, parks fleet and equipment add $842,700 to the value of the inventory. The total combined value of capital assets for Parks and Recreation in the City of Clarence- Rockland amounts to $129.76 million in 2023. The fifteen-year historical average service level is $5,147.48 per capita, and this, multiplied by the ten-year net population growth (3,282), results in a fifteen-year maximum allowable funding envelope of $16.89 million. 1 Indoor Recreation space of 2,881 square feet associated with both the Recreation Complex and the Area (AETC) has been deducted from the building inventory to account for outstanding debt being recovered for. Appendix B | 59 TABLE B.2-2 2024-2033 DEVELOPMENT-RELATED PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The 2024-2033 development-related capital program for Parks and Recreation totals $20.00 million and is largely related to the recovery of indoor recreation debt, new indoor recreation facilities, various park facilities, and updates to the Parks and Recreation Master Plan. Of the gross capital costs of $20.00 million, approximately $2.93 million in grants, subsidies and other recoveries are assumed to help offset the cost of the soccer dome (assumed at 50% of the value). A share of 11 percent, or $143,492, has been netted off as a benefit to existing share of the debt recovery for the complex. In addition, a benefit to existing share of 50 per cent (or $550,000) related to the Bourget Train Station and Bourget Skate Park have also been netted off the net municipal cost resulting in total DC eligible costs of $16.08 million. The City has $1.92 million in DC reserves to offset a portion of the DC eligible capital costs. The 2024-2033 in-period DC eligible cost is $14.16 million, resulting in an unadjusted development charge of $2,965.15 per capita. TABLE B.2-3 CASH FLOW ANALYSIS After cash flow consideration, the residential calculated charge increases to $3,046.39 per capita largely associated to the timing of the capital projects. The following table summarizes the calculation of the Parks and Recreation development charge: 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $5,147.48 $20,003,051 $14,158,582 $2,965.15 $0.00 $3,046.39 $0.00 PARKS AND RECREATION SUMMARY 2024 - 2033 Development-Related Capital Program Development Charge Development Charge Unadjusted Adjusted Appendix B | 60 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION INDOOR RECREATION BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Community Centres Bourget 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686 $300 Hammond (Alphonse-Carrière) 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 2,296 $300 Saint-Pascal de Baylon (Ronald Lalonde) 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 5,756 $300 Clarence Creek 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 7,012 $500 Jean-Marc Lalonde 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 - $500 Recreation Complex 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 49,173 $500 Recreation Complex (Committed Excess Capacity) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) (2,251) $500 Centre Chamberland 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 $300 Arenas Clarence Creek 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 20,978 $500 Jean-Marc Lalonde (Arena) 26,767 26,767 26,767 26,767 26,767 - - - - - - - - - - $500 Clarence-Rockland Arena (AETC) - - - 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 $500 Commited Excess Capacity - (630) (630) (630) (630) (630) (630) (630) (630) (630) (630) (630) (630) $500 Others Jean-Marc Lalonde (Multi-Use Facility) - - - - - - 26,767 26,767 26,767 26,767 26,767 26,767 26,767 26,767 - $300 Total (sq.ft.) 125,022 125,022 127,150 226,520 226,520 199,753 226,520 226,520 226,520 226,520 226,520 226,520 226,520 226,520 195,148 Total ($000) 58,763 58,763 59,402 109,087 109,087 95,703 $103,733.3 $103,733.3 $103,733.3 $103,733.3 $103,733.3 $103,733.3 $103,733.3 $103,733.3 $93,400.7 LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Bourget 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $235,000 Hammond 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 $235,000 Saint-Pascal de Baylon 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 $235,000 Clarence Creek 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $235,000 Jean-Marc Lalonde (Arena/Multi-Use Facility) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $870,000 Recreation Complex 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 $870,000 Clarence-Rockland arena AETC - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 $870,000 Total (ha) 9 9 9 14 14 14 14 14 14 14 14 14 14 14 14 Total ($000) 4,232 4,232 4,232 8,582 8,582 8,582 $8,581.8 $8,581.8 $8,581.8 $8,581.8 $8,581.8 $8,581.8 $8,581.8 $8,581.8 $8,581.8 # of Square Feet # of Hectares APPENDIX B.2 TABLE B.2-1 Appendix B | 61 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION INDOOR RECREATION FURNITURE & EQUIPMENT UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Community Centres Bourget $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $267,150 $25 Hammond (Alphonse-Carrière) $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $57,400 $25 Saint-Pascal de Baylon (Ronald Lalonde) $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $143,900 $25 Clarence Creek $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $175,300 $25 Jean-Marc Lalonde (Arena) $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $115,125 $0 $25 Recreation Complex $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $1,229,325 $25 Centre Chamberland $0 $0 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $53,200 $25 Clarence-Rockland Arena Clarence Arena Zamboni $233,600 $233,600 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 Rockland Arena Zamboni $233,600 $233,600 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 $208,000 Clarence Arena Edger $2,500 $3,800 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 $7,000 Rockland Arena Edger $2,500 $3,800 $7,000 $7,000 $7,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electronic Board Clarence and JML Arena $50,500 $50,500 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 $66,300 Total ($000) $2,510.9 $2,513.5 $2,537.7 $2,537.7 $2,537.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,530.7 $2,415.6 Total Value of Furniture & Equipment ($) APPENDIX B.2 TABLE B.2-1 Appendix B | 62 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES PARK LAND UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Du Moulin 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 $300,300 Richelieu Grande Rivière 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 $164,100 Patricia Charron 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 $164,100 Laviollette 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 $164,100 Dalrymple 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 $164,100 Dutrisac 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 $164,100 Simon 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 $164,100 Alain Potvin - - - - - - - - - - 3.01 3.01 3.01 3.01 3.01 $164,100 Mountainview - - - - - - - - - 0.50 0.50 0.50 0.50 0.50 0.50 $164,100 Deschamps - - - - - 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 $164,100 Bellevue 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 $164,100 Clarence Creek 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 $164,100 Jules-Saumure - - - - - 2.48 2.48 2.48 2.48 2.48 2.48 2.48 2.48 2.48 2.48 $164,100 St Pascal 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 $164,100 Bourget 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 5.62 $164,100 Cheney 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 $164,100 Hammond 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 5.13 $164,100 Cathy Cain 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 $164,100 Naturel Lavigne 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 46.13 $34,100 Parc de Chien sans laisse - Off leash dog park - - - - - - 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 $164,100 James & Marie Fox 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 $164,100 Héritage 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 $164,100 Total (ha) 75.4 75.4 75.4 75.4 75.4 78.6 79.7 79.7 79.7 80.2 83.2 83.2 83.2 83.2 85.7 Total ($000) $6,630.9 $6,630.9 $6,630.9 $6,630.9 $6,630.9 $7,164.2 $7,346.4 $7,346.4 $7,346.4 $7,428.4 $7,922.4 $7,922.4 $7,922.4 $7,922.4 $8,332.6 APPENDIX B.2 TABLE B.2-1 # of Hectares Appendix B | 63 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 BASEBALL DIAMONDS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bourget 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Clarence Creek 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Hammond 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Simon - (Not Lit, Mini) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $170,000 Simon - Lit 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 St Pascal (on School Property) 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Total (#) 5 6 6 6 6 6 6 6 6 6 6 6 6 6.0 6.0 Total ($000) $1,770.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 $2,170.0 SOCCER FIELDS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bourget 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,000 Cathy-Cain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,000 Patricia-Charron 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,000 Cheney - (Lit) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $472,000 Clarence Creek 1 1 1 1 1 1 - - - - - - - - - $197,000 Dutrisac 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,000 School Leased Fields (Un-lit) - RDHS 4 2 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,000 School Leased Fields (Lit) - L'Escale 0 1 1 1 1 1 1 1 1 1 1 1 1 1 $472,000 Clarence-Rockland (AETC) 0 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $197,000 Total (#) 12 12 12 12 12 12 11 11 11 11 11 11 11 11.0 11.0 Total ($000) $2,914.0 $2,914.0 $3,189.0 $3,189.0 $3,189.0 $3,189.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 $2,992.0 # of Fields # of Fields Appendix B | 64 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 TENNIS COURTS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Clarence Creek 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $163,800 Hammond 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $163,800 Simon 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $163,800 Total (#) 7 7 7 7 7 7 7 7 7 7 7 7 7 7.0 7.0 Total ($000) $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 $1,146.6 BASKETBALL COURTS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bellevue 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Cathy-Cain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Cheney 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Clarence Creek 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Hammond 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Laviolette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Richelieu Grand Riv. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Simon 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Mountainview - - - - - - - 1 1 1 1 1 1 1 1 $90,000 Total (#) 8 8 8 8 8 8 8 9 9 9 9 9 9 9.0 9.0 Total ($000) 720 720 720 $720.0 $720.0 $720.0 $720.0 $810.0 $810.0 $810.0 $810.0 $810.0 $810.0 $810.0 $810.0 # of Courts # of Courts Appendix B | 65 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 PLAYGROUNDS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bellevue 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Bourget 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $160,000 Cathy-Cain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Grand Tronc 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Clarence Creek 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Dalrymple 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 DuMoulin 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Dutrisac 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Hammond 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $145,000 Laviolette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Richelieu Grand Riv. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Simon 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Deschamps 0 0 - 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Jules Saumure 0 0 - 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Mountainview 0 0 - - - - - 1 1 1 1 1 1 1 1 $90,000 St. Pascal 0 0 - - - - - - - - 1 1 1 1 1 $90,000 Total (#) 11 11 12 14 14 14 14 15 15 15 16 16 16 16 16 Total ($000) $1,235.0 $1,235.0 $1,325.0 $1,565.0 $1,565.0 $1,565.0 $1,565.0 $1,655.0 $1,655.0 $1,655.0 $1,700.0 $1,700.0 $1,700.0 $1,700.0 $1,700.0 # of Playgrounds Appendix B | 66 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 OUTDOOR SKATING RINKS UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bourget 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Cathy-Cain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Grand Tronc (wood boards) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Dalrymple 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Hammond 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Laviolette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Richelieu Grand Riv. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,800 Simon 1 1 1 1 1 1 1 1 - - - - - - - $25,000 St-Pascal (wood boards) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Clarence Creek - - 1 1 1 1 1 1 - - - - - - - $12,500 Total (#) 7 7 10 10 10 10 10 10 8 8 8 8 8 8.0 8.0 Total ($000) $827.8 $827.8 $890.3 $890.3 $890.3 $890.3 $890.3 $890.3 $852.8 $852.8 $852.8 $852.80 $852.8 $852.8 $852.8 OTHER PARK FACILITIES UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Waterparks Parc Simon - - - - - 1 1 1 1 1 1 1 1 1 1 $240,000 Parc Jules Saumure - - - - - - - 1 1 1 1 1 1 1 1 $240,000 Parc Bourget - - - - - - - 1 1 1 1 1 1 1 1 $240,000 Skateboard Parks Bourget 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $170,000 Rockland - - - 1 1 1 1 1 1 1 1 1 1 1 1 $340,000 Boat Launch and Docks DuMoulin 10 23 23 23 23 23 23 23 23 23 23 23 23 23 23 $5,500 Total (#) 11 24 24 25 25 26 26 28 28 28 28 28 28 28.0 28.0 Total ($000) $225.0 $296.5 $296.5 $636.5 $636.5 $876.5 $876.5 $1,356.5 $1,356.5 $1,356.5 $1,356.5 $1,356.50 $1,356.5 $1,356.5 $1,356.5 # of Rinks # of Units Appendix B | 67 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 PARK BUILDINGS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft) Bourget Pavillion 995 995 995 995 995 995 995 995 995 995 1,595 1,595 1,595 1,595 1,595 $100 St. Pascal Pavillion 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $100 Fanfare Pavillion 756 756 756 756 756 756 756 756 756 756 756 756 756 756 756 $200 Tennis Clubhouse 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 1,384 $200 Chalet - Forest Hill Park 384 384 384 384 384 384 384 384 384 384 384 384 384 384 384 $100 Chalet Dalrymple 384 384 384 384 384 384 384 384 384 384 384 384 384 384 384 $100 Chalt Laviolette 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 $100 Chalet Cheney 384 384 384 384 384 384 384 384 384 384 384 384 384 384 384 $100 Recreation Garage HelpCentre 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 6,312 $300 Soccer Offices Laurier St. 6,879 6,879 800 800 800 800 800 800 800 800 800 800 800 800 800 $300 Shelter - Simon Park - - - - - - - - 600 600 600 600 600 600 600 $100 Bourget Shelter - - - - - - - - - 1,200 1,200 1,200 1,200 1,200 1,200 $100 St-Pascal Baseball Field Shelter - - - - - - - - - - 600 600 600 600 600 $100 Alain Potvin Park Shelter - - - - - - - - - - - 900 900 900 900 $100 Total (sq.ft) 18,798 18,798 12,719 12,719 12,719 12,719 12,719 12,719 13,319 14,519 15,719 16,619 16,619 16,619.0 16,619.0 Total ($000) $4,732.0 $4,732.0 $2,908.3 $2,908.3 $2,908.3 $2,908.3 $2,908.3 $2,908.3 $2,968.3 $3,088.3 $3,208.3 $3,298.30 $3,298.3 $3,298.3 $3,298.3 PARK BUILDINGS LAND UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Recreation Garage HelpCentre - - 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 $870,000 Total (ha) - - 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0 0.32 0.32 Total ($000) $0.0 $0.0 $278.4 $278.4 $278.4 $278.4 $278.4 $278.4 $278.4 $278.4 $278.4 $278.40 $278.4 $278.4 $278.4 # of Square Feet # of Hectares Appendix B | 68 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 PARKS EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Tools 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $68,000 Dumping Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Covered Trailer + Electrcal 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $14,000 Tym - - 1 - 1 1 1 1 1 1 - - - - - $68,000 Kubota - 50HP - - - - - - - - - - 1 1 1 1 1 $96,000 Case - 80HP - - - - - - - - - 1 1 1 1 1 1 $123,000 John Deere 1 1 1 1 1 1 1 1 1 - - - - - - $109,000 Sky Jack Lift 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Flat bed trailer - 1 - 1 1 1 1 1 1 1 1 1 1 1 1 $8,000 Kubota Lawn mower - - - - - - 1 1 1 1 1 1 1 1 1 $35,000 Kubota Sweeper - - - - - - - 1 1 1 1 1 1 1 1 $82,000 Total (#) 5 6 6 6 7 7 8 9 9 9 9 9 9 9.0 9.0 Total ($000) $231.0 $239.0 $299.0 $239.0 $307.0 $307.0 $342.0 $424.0 $424.0 $438.0 $466.0 $466.00 $466.0 $466.0 $466.0 TRAILS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Paved - Dutrisac - - 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 $608,800 Paved - Parc Jule Saumure - - - - - - - - - - 0.17 0.17 0.17 0.17 0.17 $608,800 Paved - Parc Dalrymple - - 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $608,800 Paved - Parc Laviolette - - 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 $608,800 Paved - Parc Richelieu Grande Rivière - - 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 $608,800 Paved - Pac Simon - - 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 $608,800 Paved - Parc Deschamps - - - - 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 $608,800 Paved - Parc Bourget - - - - - - - - - - 0.11 0.11 0.11 0.11 0.11 $608,800 Paved - Parc Hammond - - - - - - - - - - 0.33 0.33 0.33 0.33 0.33 $608,800 Paved - Parc Alain Potvin - - - - - - - - - - - - - - - $608,800 Paved - Morris village - - - - - - - - - - 1 1 1 1 1 $608,800 Total (#) - - 0.98 0.98 1.29 1.29 1.29 1.29 1.29 1.29 2.60 2.60 2.60 2.6 2.60 Total ($000) $0.0 $0.0 $593.6 $593.6 $785.4 $785.4 $785.4 $785.4 $785.4 $785.4 $1,579.8 $1,579.8 $1,579.8 $1,579.8 $1,579.8 # of Pieces of Equipment # of Km Appendix B | 69 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES APPENDIX B.2 TABLE B.2-1 FLEET UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Pick up (1/2 ton) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $53,000 Pick up (3/4 ton) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pick up (1 ton) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $80,000 Cube Van 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 $80,000 Service Van - - - - - - - - 1 1 1 1 1 1 1 $80,000 Skidoo 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 $15,000 GPS 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 $730 Total (#) 9 9 9 9 9 9 9 9 10 12 11 12 11 11.0 11.0 Total ($000) $295.9 $295.9 $295.9 $295.9 $295.9 $295.9 $295.9 $295.9 $375.9 $456.7 $376.7 $391.7 $376.7 $376.7 $376.7 # of Fleet Appendix B | 70 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS PARKS AND RECREATION 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historic Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 INVENTORY SUMMARY ($000) Indoor Recreation $65,506.1 $65,508.7 $66,171.3 $120,206.2 $120,206.2 $106,815.7 $114,845.8 $114,845.8 $114,845.8 $114,845.8 $114,845.8 $114,845.8 $114,845.8 $114,845.8 $104,398.1 Park Facilities $20,728.2 $21,207.7 $20,743.5 $21,263.5 $21,523.3 $22,296.6 $22,316.7 $23,058.7 $23,161.2 $23,458.0 $24,859.5 $24,964.5 $24,949.5 $24,949.5 $25,359.7 Total ($000) $86,234.3 $86,716.4 $86,914.8 $141,469.7 $141,729.5 $129,112.3 $137,162.5 $137,904.5 $138,007.0 $138,303.8 $139,705.2 $139,810.2 $139,795.2 $139,795.2 $129,757.8 Average SERVICE LEVEL ($/capita) Service Level Indoor Recreation $2,951.39 $2,887.88 $2,854.06 $5,127.16 $5,070.49 $4,455.85 $4,737.86 $4,685.29 $4,612.65 $4,541.15 $4,470.80 $4,401.40 $4,332.99 $4,280.98 $3,844.81 $4,216.98 Park Facilities $933.91 $934.92 $894.69 $906.95 $907.89 $930.11 $920.66 $940.71 $930.25 $927.56 $967.75 $956.75 $941.31 $930.01 $933.96 $930.50 Total ($/capita) $3,885.30 $3,822.80 $3,748.75 $6,034.11 $5,978.38 $5,385.96 $5,658.52 $5,626.00 $5,542.90 $5,468.72 $5,438.54 $5,358.15 $5,274.30 $5,210.99 $4,778.76 $5,147.48 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE PARKS AND RECREATION 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $5,147.48 Net Population 2024 - 2033 3,282 Maximum Allowable Funding Envelope $16,894,029 APPENDIX B.2 TABLE B.2-1 Appendix B | 71 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 2.0 PARKS AND RECREATION 2.1 Indoor Recreation Debt 2.1.1 Complex Debt Recovery (Principal) Various 1,268,974 $ - $ 1,268,974 $ 11% 143,492 $ 1,125,482 $ - $ 1,125,482 $ - $ 2.1.2 Clarence-Rockland Arena Debt Recovery (Principal) 2024 155,940 $ - $ 155,940 $ 0% - $ 155,940 $ - $ 155,940 $ - $ 2.1.3 Clarence-Rockland Arena Debt Recovery (Principal) 2025 159,136 $ - $ 159,136 $ 0% - $ 159,136 $ - $ 159,136 $ - $ Subtotal Indoor Recreation Debt 1,584,051 $ - $ 1,584,051 $ 143,492 $ 1,440,559 $ - $ 1,440,559 $ - $ 2.2 Indoor Recreation Facilities 2.2.1 Bourget Train Station 2024 900,000 $ - $ 900,000 $ 50% 450,000 $ 450,000 $ 450,000 $ - $ - $ 2.2.2 Soccer Dome (turf) 2027 5,860,000 $ 2,930,000 $ 2,930,000 $ 0% - $ 2,930,000 $ 1,120,977 $ 1,809,023 $ - $ Subtotal Indoor Recreation Facilities 6,760,000 $ 2,930,000 $ 3,830,000 $ 450,000 $ 3,380,000 $ 1,570,977 $ 1,809,023 $ - $ APPENDIX B.2 PARKS AND RECREATION CITY OF CLARENCE-ROCKLAND TABLE B.2-2 DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM Ineligible Costs Appendix B | 72 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 2.0 PARKS AND RECREATION CONTINUED 2.3 Park Facilities 2.3.1 Regional Group Park Development (Du Rivage) 2025 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ 300,000 $ - $ - $ 2.3.2 Waterfront Development 2025 2,000,000 $ - $ 2,000,000 $ 0% - $ 2,000,000 $ - $ 2,000,000 $ - $ 2.3.3 Brigil Park Development 2026 400,000 $ - $ 400,000 $ 0% - $ 400,000 $ - $ 400,000 $ - $ 2.3.4 Bike Trails and Network Various 400,000 $ - $ 400,000 $ 0% - $ 400,000 $ - $ 400,000 $ - $ 2.3.5 Bourget Skate Park 2025 200,000 $ - $ 200,000 $ 50% 100,000 $ 100,000 $ - $ 100,000 $ - $ 2.3.6 Baseball Hub (Land) 2026 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 2.3.7 Baseball Hub (2 soccer and 2 baseball - lit fields) 2030 1,444,000 $ - $ 1,444,000 $ 0% - $ 1,444,000 $ - $ 1,444,000 $ - $ 2.3.8 Bourget Baseball Diamond 2026 300,000 $ - $ 300,000 $ 100% 300,000 $ - $ - $ - $ - $ 2.3.9 Rockland Splash Pad 2028 220,000 $ - $ 220,000 $ 0% - $ 220,000 $ - $ 220,000 $ - $ 2.3.10 Cheney Playground 2025 100,000 $ - $ 100,000 $ 0% - $ 100,000 $ - $ 100,000 $ - $ 2.3.11 Hammond Skate Park 2027 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 2.3.12 St-Pascal Playground 2024 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ 50,000 $ - $ - $ 2.3.13 Rockland Dog Park 2031 250,000 $ - $ 250,000 $ 0% - $ 250,000 $ - $ 250,000 $ - $ 2.3.14 Trillium Project - Park Development 2027 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 2.3.15 Loda - Park development 2024 200,000 $ - $ 200,000 $ 0% - $ 200,000 $ - $ 200,000 $ - $ 2.3.16 Clarance-Crossing Parkette (Village 1) 2029 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 2.3.17 Clarance-Crossing Community Park & Dog Park 2026 1,420,000 $ - $ 1,420,000 $ 0% - $ 1,420,000 $ - $ 1,420,000 $ - $ 2.3.18 Ottawa River Look-out Park 2026 125,000 $ - $ 125,000 $ 0% - $ 125,000 $ - $ 125,000 $ - $ 2.3.19 Ottawa River Look-out Park 2030 900,000 $ - $ 900,000 $ 0% - $ 900,000 $ - $ 900,000 $ - $ 2.3.20 Clarence-Creek Pago Look Out 2026 100,000 $ - $ 100,000 $ 0% - $ 100,000 $ - $ 100,000 $ - $ 2.3.21 Clarence-Creek Low Level Water Crossing 2026 450,000 $ - $ 450,000 $ 0% - $ 450,000 $ - $ 450,000 $ - $ 2.3.22 Morris Village Stage 6 Park 2027 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 2.3.23 Secondary Plan Park Development 2031 1,000,000 $ - $ 1,000,000 $ 0% - $ 1,000,000 $ - $ 1,000,000 $ - $ Subtotal Park Facilities 11,359,000 $ - $ 11,359,000 $ 400,000 $ 10,959,000 $ 350,000 $ 10,609,000 $ 2.4 Studies 2.4.1 Parks and Recreation Master Plan 2024 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ 150,000 $ - $ 2.4.2 Parks and Recreation Master Plan 2030 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ 150,000 $ - $ Subtotal Studies 300,000 $ - $ 300,000 $ - $ 300,000 $ - $ 300,000 $ - $ TOTAL PARKS AND RECREATION 20,003,051 $ 2,930,000 $ 17,073,051 $ 993,492 $ 16,079,559 $ 1,920,977 $ 14,158,582 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $14,158,582 2024 - 2033 Net Funding Envelope $16,894,029 10-Year Growth in Population in New Units 4,775 Unadjusted Development Charge Per Capita $2,965.15 Reserve Fund Balance Balance as at December 31, 2023 $1,920,977 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $0.00 PARKS AND RECREATION Ineligible Costs DC Eligible Costs APPENDIX B.2 TABLE B.2-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM Appendix B | 73 APPENDIX B.2 TABLE B.2-3 PARKS AND RECREATION 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $1,920.98 $2,519.26 $1,465.89 $244.46 ($2,560.40) ($1,548.56) ($515.11) ($1,906.60) ($1,911.27) ($788.82) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $500.0 $300.0 $0.0 $1,121.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $1,921.0 - Principal Payments on Complex Debt $63.3 $65.4 $67.5 $69.7 $71.9 $74.3 $76.7 $79.2 $81.8 $475.6 $1,125.5 - Principal Payments on Clarence-Rockland Arena Debt $155.9 $159.1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $315.1 - Parks And Recreation: Non Inflated $390.0 $2,240.0 $2,835.0 $2,749.0 $260.0 $340.0 $2,534.0 $1,290.0 $40.0 $40.0 $12,718.0 - Parks And Recreation: Inflated $1,109.20 $2,815.35 $3,017.07 $4,176.60 $353.35 $449.72 $2,930.44 $1,561.04 $128.62 $523.37 $17,064.8 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $1,672.5 $1,740.1 $1,809.8 $1,467.7 $1,513.6 $1,574.1 $1,626.2 $1,679.7 $1,352.8 $1,387.1 $15,823.5 INTEREST - Interest on Opening Balance $67.2 $88.2 $51.3 $8.6 ($140.8) ($85.2) ($28.3) ($104.9) ($105.1) ($43.4) ($292.4) - Interest on In-year Transactions $9.9 ($29.6) ($33.2) ($74.5) $20.3 $19.7 ($35.9) $2.1 $21.4 $15.1 ($84.7) - Interest Payments on Complex Debt ($36.5) ($34.4) ($32.2) ($30.0) ($27.9) ($25.4) ($23.0) ($20.5) ($18.0) ($46.7) ($294.6) - Interest Payments on Clarence-Rockland Arena Debt ($5.6) ($2.4) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($7.9) TOTAL REVENUE $1,707.5 $1,762.0 $1,795.6 $1,371.7 $1,365.2 $1,483.2 $1,538.9 $1,556.4 $1,251.1 $1,312.2 $15,143.8 CLOSING CASH BALANCE $2,519.3 $1,465.9 $244.5 ($2,560.4) ($1,548.6) ($515.1) ($1,906.6) ($1,911.3) ($788.8) $0.0 2024 Adjusted Charge Per Capita $3,046.39 Allocation of Capital Program Residential Sector 100.0% Non-Residential Sector 0.0% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE PARKS AND RECREATION RESIDENTIAL DEVELOPMENT CHARGE (in $000) CITY OF CLARENCE-ROCKLAND Appendix B | 74 APPENDIX B.3 BY-LAW SERVICES Appendix B | 75 The Clarence-Rockland has enacted several by-laws to protect the health, safety and peace of every resident in the Municipality. These by-laws are enforced by Municipal Law Enforcement Officers and include animal control, property maintenance, and noise control. TABLE B.3-1 HISTORICAL SERVICE LEVELS Table B.3-1 displays the fifteen-year historical inventory for buildings, land, furniture and equipment for By-law services. The building area totals 120 square feet with a replacement value of $66,000. The land associated with the facility is estimated is negligible. In addition, various types of equipment, including animal control, personal safety, office, vehicle, bike patrol, and technical equipment are also included in the service level calculations. The 2023 combined replacement value of the inventory of capital assets for By-law services is $410,400, resulting in a fifteen-year historical average service level of $13.97 per capita and employee. The historical service level, multiplied by the ten-year net population and employment growth (3,691), results in a fifteen-year maximum allowable funding envelope of about $51,563. The service level calculation has been adjusted to reflect the recovery of the existing negative reserve fund balance moving forward. TABLE B.3-2 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The 2024 to 2033 development-related capital program includes the recovery of a negative reserve balance and additional vehicles and protective equipment. In total, the By-law Services capital program amounts to $171,609. There is negative balance of $76,809 in DC reserves that will be partially recovered during the current planning period. As a result, the full maximum funding envelope of $51,563 will be used for the recovery of the negative reserve balance. The remaining total DC eligible costs, approximately $120,046, is deemed to provide benefit to development beyond 2033. This share of costs will be recovered through future DCs. The development-related net capital cost is allocated 92 per cent to residential development ($47,438) and 8 per cent ($4,125) to non-residential development. The residential share of the net development-related capital cost is divided by the ten-year growth in population in new dwelling units to derive a charge of $9.93 per capita. The non- Appendix B | 76 residential share of the net growth-related capital cost is divided by the ten-year forecast growth in floor space, resulting in a charge of $0.20 per square metre. TABLE B.3-3 CASH FLOW ANALYSIS The cash-flow analysis is displayed in Table B.3-3 and considers the timing of the development charges revenues to determine the adjusted rates. After cash flow considerations, the residential development charge increases to $11.80 per capita. The non- residential development charge increases to $0.26 per square metre. 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $13.97 $171,609 $51,563 $9.93 $0.20 $11.80 $0.26 Development-Related Capital Program Development Charge Unadjusted Adjusted BY-LAW SERVICES SUMMARY 2024 - 2033 Development Charge Appendix B | 77 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS BY-LAW SERVICES BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Dog Pound Facility 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 $550 Total (#) 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 Total ($000) $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Dog Pound Facility 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 $235,000 Total (ha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total ($000) $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 FURNITURE AND EQUIPMENT Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Animal Control $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 Personel Safety & Equipment $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 Office $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Vehicle Patrol - Off Road $10,300 $15,900 $21,200 $21,200 $21,200 $24,400 $24,400 $24,400 $0 $0 $0 $0 $0 $0 $0 Bike Patrol (8) $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 Technical $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Vehicles (4) $0 $0 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 $360,000 Total ($000) $71.3 $76.9 $442.2 $442.2 $442.2 $445.4 $445.4 $445.4 $421.0 $421.0 $421.0 $421.0 $421.0 $421.0 $421.0 APPENDIX B.3 TABLE B.3-1 # of Square Feet # of Hectares Total Value of Furniture & Equipment ($) Appendix B | 78 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS BY-LAW SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historic Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 Historical Employment 5,115 5,446 5,799 5,667 5,539 5,413 5,290 5,171 5,352 5,540 5,735 5,936 6,145 6,177 6,209 Total Historical Population & Employme 27,310 28,130 28,984 29,112 29,246 29,385 29,530 29,683 30,250 30,830 31,423 32,029 32,650 33,004 33,362 INVENTORY SUMMARY ($000) Buildings $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 $66.0 Land $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 $0.2 Furniture And Equipment $71.3 $76.9 $442.2 $442.2 $442.2 $445.4 $445.4 $445.4 $421.0 $421.0 $421.0 $421.0 $421.0 $421.0 $421.0 Committed Excess Capacity ($76.8) ($76.8) ($76.8) ($76.8) ($76.8) Total ($000) $137.5 $143.1 $508.4 $508.4 $508.4 $511.6 $511.6 $511.6 $487.2 $487.2 $410.4 $410.4 $410.4 $410.4 $410.4 Average SERVICE LEVEL ($/pop &emp) Service Level Buildings $2.42 $2.35 $2.28 $2.27 $2.26 $2.25 $2.24 $2.22 $2.18 $2.14 $2.10 $2.06 $2.02 $2.00 $1.98 $2.18 Land $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 $0.01 Furniture And Equipment $2.61 $2.73 $15.26 $15.19 $15.12 $15.16 $15.08 $15.01 $13.92 $13.66 $13.40 $13.14 $12.89 $12.76 $12.62 $12.57 Committed Excess Capacity $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($2.44) ($2.40) ($2.35) ($2.33) ($2.30) ($0.79) Total ($/pop & emp) $5.04 $5.09 $17.54 $17.46 $17.38 $17.41 $17.33 $17.24 $16.11 $15.80 $13.06 $12.81 $12.57 $12.44 $12.30 $13.97 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE BY-LAW SERVICES 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $13.97 Net Population Growth 2024 - 2033 3,691 Maximum Allowable Funding Envelope $51,563 APPENDIX B.3 TABLE B.3-1 Appendix B | 79 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 3.0 BY-LAW SERVICES 3.1 Recovery of Negative Reserve Fund Balance 3.1.1 Recovery of Negative Reserve Fund Balance 2024 76,809 $ - $ 76,809 $ 0% - $ 76,809 $ - $ 51,563 $ 25,246 $ Subtotal Recovery of Negative Reserve Fund Balance 76,809 $ - $ 76,809 $ - $ 76,809 $ - $ 51,563 $ 3.2 Buildings & Equipment 3.2.1 Additional Vehicle 2029 90,000 $ - $ 90,000 $ 0% - $ 90,000 $ - $ - $ 90,000 $ 3.2.2 Protective Equipment 2030 4,800 $ - $ 4,800 $ 0% - $ 4,800 $ - $ - $ 4,800 $ Subtotal Buildings & Equipment 94,800 $ - $ 94,800 $ - $ 94,800 $ - $ - $ TOTAL BY-LAW SERVICES 171,609 $ - $ 171,609 $ - $ 171,609 $ - $ 51,563 $ 120,046 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 92% $47,438 2024 - 2033 Net Funding Envelope $51,563 10-Year Growth in Population in New Units 4,775 Unadjusted Development Charge Per Capita $9.93 Reserve Fund Balance Balance as at December 31, 2023 ($76,809) Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 8% $4,125 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $0.20 APPENDIX B.3 TABLE B.3-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM BY-LAW SERVICES DC Eligible Costs Ineligible Costs Appendix B | 80 APPENDIX B.3 TABLE B.3-3 BY-LAW SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($47.4) ($43.5) ($39.0) ($34.0) ($30.1) ($25.8) ($21.0) ($15.7) ($10.0) ($5.2) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Non Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $6.5 $6.7 $7.0 $5.7 $5.9 $6.1 $6.3 $6.5 $5.2 $5.4 $61.3 INTEREST - Interest on Opening Balance ($2.6) ($2.4) ($2.1) ($1.9) ($1.7) ($1.4) ($1.2) ($0.9) ($0.5) ($0.3) ($14.9) - Interest on In-year Transactions $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $1.1 TOTAL REVENUE $4.0 $4.5 $5.0 $3.9 $4.3 $4.8 $5.3 $5.8 $4.8 $5.2 $47.4 CLOSING CASH BALANCE ($43.5) ($39.0) ($34.0) ($30.1) ($25.8) ($21.0) ($15.7) ($10.0) ($5.2) $0.0 2024 Adjusted Charge Per Capita $11.80 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE BY-LAW SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 81 APPENDIX B.3 TABLE B.3-3 BY-LAW SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($4.13) ($3.93) ($3.72) ($3.48) ($3.05) ($2.56) ($2.03) ($1.46) ($0.83) ($0.25) 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Non Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 NON-RESIDENTIAL SPACE GROWTH - Growth in Square Metres 1,600 1,600 1,600 2,250 2,300 2,300 2,300 2,350 2,050 2,100 20,450 REVENUE - DC Receipts: Inflated $0.4 $0.4 $0.4 $0.6 $0.6 $0.7 $0.7 $0.7 $0.6 $0.6 $5.8 INTEREST - Interest on Opening Balance ($0.2) ($0.2) ($0.2) ($0.2) ($0.2) ($0.1) ($0.1) ($0.1) ($0.0) ($0.0) ($1.4) - Interest on In-year Transactions $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.1 TOTAL REVENUE $0.2 $0.2 $0.2 $0.4 $0.5 $0.5 $0.6 $0.6 $0.6 $0.6 $4.5 CLOSING CASH BALANCE ($3.9) ($3.7) ($3.5) ($3.0) ($2.6) ($2.0) ($1.5) ($0.8) ($0.2) $0.4 2024 Adjusted Charge Per Square Metre $0.26 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE BY-LAW SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 82 APPENDIX B.4 DEVELOPMENT RELATED STUDIES Appendix B | 83 Subsection 7 (3) of the DCA allows for a development related studies class in respect of any service in subsection 2 (4). This appendix covers the costs included for recovery of development-related studies. TABLE B.4-1 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM AND CALCULATION OF THE DEVELOPMENT CHARGES As shown in Table B.4-1, the 2024-2033 development-related gross cost for this service area is $337,872. The capital program relates to various development-related studies, including a special area secondary plan, DC background studies, a zoning by-law update, and an Official Plan update. As many of these studies are related to growth in the City of Clarence-Rockland, most projects are entirely attributable to new development. However, benefit to existing shares have been considered for certain projects including the Zoning By-law and Official Plan updates, which total $37,500. The resulting 2024-2033 DC eligible cost considered for recovery under this by-law is $300,372. This amount is apportioned 92 per cent ($276,342) to residential development and 8 per cent ($24,030) to non-residential development. The resulting development charges for Development Related Studies are $57.87 per capita and $1.18 per square metre of new non-residential building space. TABLE B.4-2 CASH FLOW ANALYSIS The cash-flow analysis is displayed in Table B.4-2 and considers the timing of the development charges revenues to determine the adjusted rates. After cash flow considerations, the residential development charge increases to $63.65 per capita. The non- residential development charge increases to $1.29 per square metre. Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $337,872 $300,372 $57.87 $1.18 $63.65 $1.29 DEVELOPMENT RELATED STUDIES SUMMARY Development-Related Capital Program Development Charge Development Charge Unadjusted Adjusted 2024 - 2033 Appendix B | 84 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 4.0 DEVELOPMENT RELATED STUDIES 4.1 Negative Reserve Fund Balance 4.1.1 Negative Reserve Fund Balance 2024 12,872 $ - $ 12,872 $ 0% - $ 12,872 $ - $ 12,872 $ - $ 4.2 Development-Related Studies 4.1.1 Special Area Secondary Plan 2024 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ 150,000 $ - $ 4.1.2 Development Charges Study 2024 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ 50,000 $ - $ 4.1.3 Zoning By-law Update 2024 25,000 $ - $ 25,000 $ 50% 12,500 $ 12,500 $ - $ 12,500 $ - $ 4.1.4 Development Charges Study 2033 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ 50,000 $ - $ 4.1.5 Official Plan Update 2026 50,000 $ - $ 50,000 $ 50% 25,000 $ 25,000 $ - $ 25,000 $ - $ Subtotal Development-Related Studies 325,000 $ - $ 325,000 $ 37,500 $ 287,500 $ - $ 287,500 $ TOTAL DEVELOPMENT RELATED STUDIES 337,872 $ - $ 337,872 $ 37,500 $ 300,372 $ - $ 300,372 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 92% $276,342 Reserve Fund Balance 10-Year Growth in Population in New Units 4,775 Balance as at December 31, 2023 ($12,872) Unadjusted Development Charge Per Capita $57.87 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 8% $24,030 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $1.18 Ineligible Costs DEVELOPMENT RELATED STUDIES DC Eligible Costs APPENDIX B.4 TABLE B.4-1 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM Appendix B | 85 APPENDIX B.4 TABLE B.4-2 DEVELOPMENT RELATED STUDIES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($11.8) ($177.5) ($150.2) ($144.4) ($121.1) ($95.6) ($67.4) ($36.5) ($2.8) $25.8 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - Development Related Studies: Non Inflated $195.5 $0.0 $23.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $46.0 $264.5 - Development Related Studies: Inflated $195.5 $0.0 $23.9 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $55.0 $274.4 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $34.9 $36.4 $37.8 $30.7 $31.6 $32.9 $34.0 $35.1 $28.3 $29.0 $330.6 INTEREST - Interest on Opening Balance ($0.7) ($9.8) ($8.3) ($7.9) ($6.7) ($5.3) ($3.7) ($2.0) ($0.2) $0.9 ($43.5) - Interest on In-year Transactions ($4.4) $0.6 $0.2 $0.5 $0.6 $0.6 $0.6 $0.6 $0.5 ($0.7) ($0.9) TOTAL REVENUE $29.9 $27.2 $29.8 $23.3 $25.5 $28.2 $30.9 $33.7 $28.6 $29.2 $286.2 CLOSING CASH BALANCE ($177.5) ($150.2) ($144.4) ($121.1) ($95.6) ($67.4) ($36.5) ($2.8) $25.8 $0.0 2024 Adjusted Charge Per Capita $63.65 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE DEVELOPMENT RELATED STUDIES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 86 APPENDIX B.4 TABLE B.4-2 DEVELOPMENT RELATED STUDIES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($1.03) ($16.44) ($15.20) ($15.90) ($13.64) ($11.13) ($8.42) ($5.49) ($2.26) $0.76 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - Development Related Studies: Non Inflated $17.0 $0.0 $2.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $4.0 $23.0 - Development Related Studies: Inflated $17.0 $0.0 $2.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $4.0 $23.0 NON-RESIDENTIAL SPACE GROWTH - Growth in Square Metres 1,600 1,600 1,600 2,250 2,300 2,300 2,300 2,350 2,050 2,100 20,450 REVENUE - DC Receipts: Inflated $2.1 $2.1 $2.1 $3.1 $3.2 $3.3 $3.3 $3.5 $3.1 $3.2 $29.0 INTEREST - Interest on Opening Balance ($0.1) ($0.9) ($0.8) ($0.9) ($0.8) ($0.6) ($0.5) ($0.3) ($0.1) $0.0 ($4.9) - Interest on In-year Transactions ($0.4) $0.0 $0.0 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 ($0.0) ($0.1) TOTAL REVENUE $1.6 $1.2 $1.3 $2.3 $2.5 $2.7 $2.9 $3.2 $3.0 $3.2 $24.0 CLOSING CASH BALANCE ($16.4) ($15.2) ($15.9) ($13.6) ($11.1) ($8.4) ($5.5) ($2.3) $0.8 $0.0 2024 Adjusted Charge Per Square Metre $1.29 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE DEVELOPMENT RELATED STUDIES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 87 APPENDIX B.5 FIRE SERVICE Appendix B | 88 The Clarence-Rockland Fire Services protects the lives, property and environment of the people who live, work and visit the City. The department is responsible for fire prevention, public education and emergency preparedness programs. TABLE B.5-1 HISTORICAL SERVICE LEVELS Table B.5-1 displays the 15-year historical inventory for buildings, land, vehicles, furniture, and equipment for Fire Services. The City of Clarence-Rockland Fire Department operates out of three fire stations with a total building area of 28,632 square feet. The total replacement value of the stations is $14.32 million2. The land associated with all three fire stations totals 7.87 hectares and is valued at $2.07 million. Station equipment, such as tools, pumps and gas detectors totals $909,200. The 2023 Fire Department fleet totals 15 vehicles with a replacement value of $7.34 million. Finally, personal equipment and gear, such as protective clothing, communications equipment and breathing apparatuses are valued at $1.95 million. The 2023 combined replacement value of the inventory of capital assets for Fire services is $26.59 million, resulting in a 15-year historical average service level of $550.99 per population and employment. The historical service level, multiplied by the ten-year net growth in population and employment (3,691), results in a fifteen-year maximum allowable funding envelope of $2.03 million. TABLE B.5-2 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The 2024 to 2033 development-related capital program recovers for existing debenture payments associated with the recent expansions, one new ladder truck, and a Fire Master Plan. The development-related capital program includes the recovery of the principal payment of the debenture related to the expansion of the Rockland and Bourget Fire Stations totalling $2.36 million over the 10-year planning period. The debt included in the capital program 2 Fire space of 4,724 square feet of space associated with the stations has been deducted from the building inventory to account for outstanding debt being recovered for. Appendix B | 89 only included the principal portion of the payments and only the growth-related share3. Additionally, the department anticipates acquiring a new 100 foot ladder truck which will increase servicing capacity over the existing 75 foot ladder truck which will be replaced upon this asset coming into service. A Fire Master Plan Study is anticipated to occur over the ten-year planning period for a total of $125,000. Altogether, the ten-year capital program for Fire Services amounts to $3.99 million. Non- growth shares relating to replacement and benefit to existing shares of the ladder truck total $1.13 million. The DC eligible costs exceed the funding envelope by $488,030, which is deemed to provide benefit to development beyond 2033. This share will be eligible for funding under subsequent development charges studies. The City has $340,413 in DC reserves to offset a portion of the DC eligible capital costs. The remaining $2.03 million is related to development in the 2024-2033 planning period and is eligible for DC recovery. The development-related net capital cost is allocated 92 per cent to residential development ($1.87 million) and 8 per cent to non-residential development ($162,696). The residential share of the net development-related capital cost is divided by the 10-year growth in population in new housing units to derive an unadjusted charge of $391.83 per capita. The non-residential share of the net growth-related capital cost is divided by the 10-year forecast growth in floor space, resulting in an unadjusted charge of $7.96 per square metre. TABLE B.5-3 CASH FLOW ANALYSIS After cash flow consideration, both the residential and non-residential calculated charges increase to $411.77 per capita and $8.44 per square metre. This increase reflects the front- ended nature of the timing of anticipated capital projects. The following table summarizes the calculation of the Fire Services development charge: 3 Interest Payments associated with the debt are included for recover in the cash flow analysis 15-year Hist. Service Level per pop & emp Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $550.99 $3,987,147 $2,033,704 $391.83 $7.96 $411.77 $8.44 FIRE SERVICES SUMMARY 2024 - 2033 Unadjusted Adjusted Development Charge Development Charge Development-Related Capital Program Appendix B | 90 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS FIRE SERVICES BUILDINGS UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Bourget (#1) 2,331 2,331 2,331 2,331 2,331 2,331 2,331 2,331 2,331 2,331 2,331 10,542 10,542 10,542 10,542 $500 Clarence Creek (#2) 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 $500 Rockland (#3) 4,032 4,032 4,032 4,032 4,032 4,032 4,032 4,032 4,032 4,032 4,032 20,414 20,414 20,414 20,414 $500 Excess Capacity - - - - - - - - - - - (4,724) (4,724) (4,724) (4,724) $500 Total (sq.ft.) 8,763 8,763 8,763 8,763 8,763 8,763 8,763 8,763 8,763 8,763 8,763 28,632 28,632 28,632 28,632 Total ($000) $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $14,315.9 $14,315.9 $14,315.9 $14,315.9 LAND UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Bourget (#1) 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 7.23 7.23 7.23 7.23 $235,000 Clarence Creek (#2) 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 $235,000 Rockland (#3) 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.21 0.21 0.35 0.35 0.35 0.35 0.35 0.35 $870,000 Total (ha) 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.62 0.62 0.76 0.76 7.87 7.87 7.87 7.87 Total ($000) $218.2 $218.2 $218.2 $218.2 $218.2 $218.2 $218.2 $279.1 $279.1 $400.9 $400.9 $2,071.7 $2,071.7 $2,071.7 $2,071.7 FURNITURE & EQUIPMENT AT STATIONS UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Heavy Hydraulics 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 $60,000 Miscallaneous (Bourget) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Miscallaneous (Clarence Creek) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Miscallaneous (Rockland) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Portable Pumps 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $4,400 Generators 7 8 7 8 8 8 8 6 6 6 6 6 11 11 11 $20,000 Power tools 1 1 1 1 1 1 1 1 1 1 2 2 11 11 11 $2,000 Thermal Imager 3 3 3 3 3 3 3 3 3 3 3 4 14 14 14 $15,000 Gas detectors 4 4 4 4 4 4 4 4 4 4 4 4 6 6 6 $1,000 Small tools 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 $5,900 First aid equip 1 1 4 4 4 4 4 4 4 4 11 11 12 12 12 $10,000 Forcible entry tool - - - - - - - - 1 1 1 1 1 1 1 $14,700 Fire extinguisher training simulator - - - - - - - - 1 1 1 1 2 2 2 $17,600 Spare portable tank - - - - - - - 1 1 1 1 1 2 2 2 $5,000 Container for storage - - - - - - - - - - 1 1 3 3 3 $6,600 Total (#) 24 25 27 28 28 28 28 27 30 30 39 42 73 73 73 Total ($000) $380.7 $400.7 $410.7 $430.7 $430.7 $430.7 $430.7 $395.7 $488.0 $488.0 $566.6 $593.4 $909.2 $909.2 $909.2 APPENDIX B.5 TABLE B.5-1 # of Square Feet # of Hectares # of Pieces of Equipment Appendix B | 91 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS FIRE SERVICES VEHICLES UNIT COST Vehicle Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/vehicle) Triple Combo Pumper 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $850,000 Tanker 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 $794,700 Service Vehicle 0 0 0 0 0 1 3 3 3 3 5 5 5 5 5 $90,000 Rescue Van 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 $500,000 Rehabilitation Truck 0 0 0 0 0 0 0 0 1 1 $500,000 Boat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $85,000 Ladder Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,200,000 Mobile air mangement trailer 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 $45,000 Utility Trailer 0 0 0 0 0 0 0 0 1 1 $10,000 Pumper tanker 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 $900,000 Total (#) 9 9 9 9 10 11 13 13 13 13 15 15 15 15 15 Total ($000) $6,774.4 $6,774.4 $6,774.4 $6,774.4 $6,819.4 $6,909.4 $7,089.4 $7,089.4 $7,089.4 $7,089.4 $7,269.4 $7,269.4 $7,374.7 $7,339.7 $7,339.7 EQUIPMENT AND GEAR UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Fire Fighter Protective Clothing PPE 80 80 80 80 80 80 80 80 80 80 80 90 100 100 100 $3,300 Station Wear 70 70 70 70 70 70 70 70 70 70 70 80 100 100 100 $1,000 Communications Equipment Pagers* 70 70 70 70 70 70 70 70 70 70 80 80 90 - - $800 Mobile Radios 12 12 12 12 12 12 12 12 12 12 14 14 14 - - $1,500 Portable Radios* 20 50 20 50 72 72 72 72 72 72 80 80 90 - - $1,500 Base Station 5 5 5 5 5 5 5 5 5 5 5 5 4 - - $2,900 Station Recievers & Transmitters 3 3 3 3 3 3 3 3 3 3 $125,000 Communcations Tower (Bourget) - - - - - - - - - 1 $130,000 Transmitters/Communications (Rockland) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Transmitters/Communications (Bourget) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,000 Transmitters/Communications (Bouvier Road on Water Tower) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 Breathing Apparatus Harness & Regulator 30 30 30 30 30 40 40 40 40 40 40 40 40 40 40 $7,500 Face pieces 70 72 70 72 72 72 72 72 72 72 72 80 80 80 80 $2,000 Extra SCBA bottle 60 60 60 60 60 80 80 65 65 65 65 65 90 90 90 $1,100 RIT Tool Bag - 1 - 1 1 2 2 2 2 2 2 3 3 3 3 $6,000 Air compressor (SCBA) 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $60,000 Extractor - - - - - - - - - - 1 1 5 5 5 $5,000 Air Bags - - - - - - - 2 2 2 2 2 2 2 2 $10,000 Electric Fan 5 5 5 5 5 5 5 5 5 5 $5,000 Car Stabilizer - - - - - - 2 2 2 2 $12,000 Triaining Props** - - - - - - - 0.25 0.25 0.25 $300,000 Total (#) 421 454 421 454 476 515 515 502 502 502 523 554 633 435 436 Total ($000) $1,093.5 $1,148.5 $1,093.5 $1,148.5 $1,181.5 $1,684.5 $1,684.5 $1,688.0 $1,688.0 $1,688.0 $1,716.0 $1,805.0 $2,060.6 $1,821.0 $1,951.0 * Leased from County ** includes props used by other agencies; 25% of time attributed to City Fire APPENDIX B.5 TABLE B.5-1 # of Vehicles # of Pieces of Equipment and Gear Appendix B | 92 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS FIRE SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 Historical Employment 5,115 5,446 5,799 5,667 5,539 5,413 5,290 5,171 5,352 5,540 5,735 5,936 6,145 6,177 6,209 Total Historical Population & Employment 27,310 28,130 28,984 29,112 29,246 29,385 29,530 29,683 30,250 30,830 31,423 32,029 32,650 33,004 33,362 INVENTORY SUMMARY ($000) Buildings $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $4,381.5 $14,315.9 $14,315.9 $14,315.9 $14,315.9 Land $218.2 $218.2 $218.2 $218.2 $218.2 $218.2 $218.2 $279.1 $279.1 $400.9 $400.9 $2,071.7 $2,071.7 $2,071.7 $2,071.7 Furniture & Equipment At Stations $380.7 $400.7 $410.7 $430.7 $430.7 $430.7 $430.7 $395.7 $488.0 $488.0 $566.6 $593.4 $909.2 $909.2 $909.2 Vehicles $6,774.4 $6,774.4 $6,774.4 $6,774.4 $6,819.4 $6,909.4 $7,089.4 $7,089.4 $7,089.4 $7,089.4 $7,269.4 $7,269.4 $7,374.7 $7,339.7 $7,339.7 Equipment And Gear $1,093.5 $1,148.5 $1,093.5 $1,148.5 $1,181.5 $1,684.5 $1,684.5 $1,688.0 $1,688.0 $1,688.0 $1,716.0 $1,805.0 $2,060.6 $1,821.0 $1,951.0 Total ($000) $12,848.3 $12,923.3 $12,878.3 $12,953.3 $13,031.3 $13,624.3 $13,804.3 $13,833.7 $13,926.0 $14,047.8 $14,334.4 $26,055.4 $26,732.1 $26,457.5 $26,587.5 Average SERVICE LEVEL ($/pop &emp) Service Level Buildings $160.4 $155.8 $151.2 $150.50 $149.82 $149.11 $148.37 $147.61 $144.84 $142.12 $139.44 $446.97 $438.46 $433.76 $429.11 $225.83 Land $7.99 $7.76 $7.53 $7.49 $7.46 $7.42 $7.39 $9.40 $9.22 $13.00 $12.76 $64.68 $63.45 $62.77 $62.10 $23.36 Furniture & Equipment At Stations $13.94 $14.24 $14.17 $14.79 $14.73 $14.66 $14.59 $13.33 $16.13 $15.83 $18.03 $18.53 $27.85 $27.55 $27.25 $17.71 Vehicles $248.06 $240.82 $233.73 $232.70 $233.17 $235.13 $240.07 $238.84 $234.36 $229.95 $231.34 $226.96 $225.87 $222.39 $220.00 $232.89 Equipment And Gear $40.04 $40.83 $37.73 $39.45 $40.40 $57.33 $57.04 $56.87 $55.80 $54.75 $54.61 $56.36 $63.11 $55.18 $58.48 $51.20 Total ($/pop & emp) $470.46 $459.41 $444.33 $444.95 $445.57 $463.65 $467.47 $466.05 $460.36 $455.65 $456.17 $813.49 $818.75 $801.64 $796.94 $550.99 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE FIRE SERVICES 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $550.99 Net Population & Employment Growth 2024 - 2033 3,691 Maximum Allowable Funding Envelope $2,033,704 TABLE B.5-1 APPENDIX B.5 Appendix B | 93 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 5.0 FIRE SERVICES 5.1 Buildings, Land & Furnishings 5.1.1 Fire Hall Expansion - DC Debenture (Principal) Various 2,362,147 $ - $ 2,362,147 $ 0% - $ 2,362,147 $ - $ 1,874,117 $ 488,030 $ Subtotal Buildings, Land & Furnishings 2,362,147 $ - $ 2,362,147 $ - $ 2,362,147 $ - $ 1,874,117 $ 488,030 $ 5.2 Vehicles 5.2.1 Ladder Truck (100ft) 2026 1,500,000 $ - $ 1,500,000 $ 75% 1,125,000 $ 375,000 $ 340,413 $ 34,587 $ - $ Subtotal Vehicles 1,500,000 $ - $ 1,500,000 $ 1,125,000 $ 375,000 $ 340,413 $ 34,587 $ - $ 5.3 Equipment & Studies 5.3.1 Fire Master Plan 2027 125,000 $ - $ 125,000 $ 0% - $ 125,000 $ - $ 125,000 $ - $ Subtotal Equipment & Studies 125,000 $ - $ 125,000 $ - $ 125,000 $ - $ 125,000 $ - $ TOTAL FIRE SERVICES 3,987,147 $ - $ 3,987,147 $ 1,125,000 $ 2,862,147 $ 340,413 $ 2,033,704 $ 488,030 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 92% $1,871,008 2024 - 2033 Net Funding Envelope $2,033,704 10-Year Growth in Population in New Units 4,775 Unadjusted Development Charge Per Capita $391.83 Reserve Fund Balance Balance as at December 31, 2023 $340,413 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 8% $162,696 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $7.96 DC Eligible Costs Ineligible Costs APPENDIX B.5 TABLE B.5-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM FIRE SERVICES Appendix B | 94 APPENDIX B.5 TABLE B.5-3 FIRE SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $313.2 $402.6 $504.0 $250.4 $183.2 $244.1 $314.8 $394.5 $483.9 $530.7 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $313.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $313.2 - Fire Debt Principal $111.0 $113.3 $115.8 $118.2 $120.7 $123.3 $125.9 $128.6 $131.4 $635.9 $1,724.2 - Fire Services: Non Inflated $0.0 $0.0 $31.8 $115.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $146.8 - Fire Services: Inflated $111.0 $113.3 $474.7 $240.3 $120.7 $123.3 $125.9 $128.6 $131.4 $635.9 $2,205.2 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $226.1 $235.2 $244.6 $198.4 $204.6 $212.8 $219.8 $227.0 $182.8 $187.5 $2,138.8 INTEREST - Fire Debt - Interest (38.6) (36.8) (34.8) (32.9) (30.9) (28.8) (26.8) (24.6) (22.4) (88.5) ($365.2) - Interest on Opening Balance $11.0 $14.1 $17.6 $8.8 $6.4 $8.5 $11.0 $13.8 $16.9 $18.6 $126.7 - Interest on In-year Transactions $2.0 $2.1 ($6.3) ($1.2) $1.5 $1.6 $1.6 $1.7 $0.9 ($12.3) ($8.4) TOTAL REVENUE $200.4 $214.7 $221.1 $173.1 $181.6 $194.0 $205.7 $217.9 $178.2 $105.2 $1,892.0 CLOSING CASH BALANCE $402.6 $504.0 $250.4 $183.2 $244.1 $314.8 $394.5 $483.9 $530.7 $0.0 2024 Adjusted Charge Per Capita $411.77 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE FIRE SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 95 APPENDIX B.5 TABLE B.5-3 FIRE SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $27.23 $28.75 $30.54 $0.61 ($2.99) $4.85 $13.41 $22.65 $33.10 $41.31 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $0.0 $27.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $27.2 - Fire Debt Principal $9.6 $9.9 $10.1 $10.3 $10.5 $10.7 $11.0 $11.2 $11.4 $55.3 $149.9 - Fire Services: Non Inflated $0.0 $0.0 $2.8 $10.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $12.8 - Fire Services: Inflated $9.6 $9.9 $41.3 $20.9 $10.5 $10.7 $11.0 $11.2 $11.4 $55.3 $191.8 NON-RESIDENTIAL SPACE GROWTH - Growth in Square Metres 1,600 1,600 1,600 2,250 2,300 2,300 2,300 2,350 2,050 2,100 20,450 REVENUE - DC Receipts: Inflated $13.5 $13.8 $14.0 $20.2 $21.0 $21.4 $21.9 $22.8 $20.3 $21.2 $190.0 INTEREST - Fire Debt Interest (3.36) (3.20) (3.03) (2.86) (2.69) (2.51) (2.33) (2.14) (1.95) (7.70) ($31.8) - Interest on Opening Balance $1.0 $1.0 $1.1 $0.0 ($0.2) $0.2 $0.5 $0.8 $1.2 $1.4 $6.9 - Interest on In-year Transactions $0.1 $0.1 ($0.7) ($0.0) $0.2 $0.2 $0.2 $0.2 $0.2 ($0.9) ($0.7) TOTAL REVENUE $11.2 $11.7 $11.3 $17.3 $18.3 $19.3 $20.2 $21.6 $19.6 $14.0 $164.5 CLOSING CASH BALANCE $28.7 $30.5 $0.6 ($3.0) $4.9 $13.4 $22.7 $33.1 $41.3 $0.0 2024 Adjusted Charge Per Square Metre $8.44 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE FIRE SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 96 APPENDIX B.6 SERVICES RELATED TO A HIGHWAY - PUBLIC WORKS Appendix B | 97 The Clarence-Rockland Infrastructure and Engineering Department provides Public Works servicing to the City. The department is responsible for maintaining and repairing municipal roads, sidewalks, shoulders, bridges, culverts, and drainage ditches. Another key component of the department is the maintenance of municipal drains. It is also responsible for winter maintenance such as salting, plowing, and removing snow. TABLE B.6-1 HISTORICAL SERVICE LEVELS The current inventory of capital assets for Public Works includes approximately 22,180 square feet of building space with a total replacement value of $3.94 million. The 2.25 hectares of land associated with Public Works buildings are valued at $528,800. Furniture and equipment total $137,500. Tools required to provide the municipal services are worth approximately $186,100. The 42 vehicles in the Public Works fleet add an additional $7.70 million to the value of capital assets. Additional fleet contracted services add $140,000. The total value of the Public Works capital inventory is $12.63 million. The 15-year historical average service level is $400.09 per population and employment, and this, multiplied by the 10-year net growth in population and employment, results in a maximum allowable funding envelope of $1.48 million. TABLE B.6-2 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The 10-year development-related capital program for Public Works totals $6.62 million. This provides for an expansion of the municipal public works garage, two snow depots (including land), and various fleet and equipment acquisitions. Replacement shares in the amount of $2.51 million have been identified and netted off the capital program. This share of costs represents 50 per cent of the project cost for the public work garage expansion and new snow dumps in Rockland and Bourget. The eligible DC reserve fund balance of $1.11 million has been applied to the capital program. A portion of the program totalling $1.52 million cannot be funded through this development charges by- law due to funding envelope restrictions and will be considered in future studies. The remaining $1.48 million is related to development in the 2024 to 2033 planning period and is eligible for DC recovery in this period. This development related cost is allocated 92 per cent or $1.36 million against new residential development, and 8 per cent or $118,139 Appendix B | 98 against new non-residential development. This yields an unadjusted residential development charge of $284.52 per capita and $5.78 per square metre of new non- residential development. TABLE B.6-3 CASH FLOW ANALYSIS After cash flow consideration, both the residential and non-residential calculated charges increase to $289.23 per capita and $5.98 per square metre, respectively. The following table summarizes the calculation of the Public Works development charge: 15-year Hist. Service Level per pop & emp Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $400.09 $6,620,000 $1,476,732 $284.52 $5.78 $289.23 $5.98 PUBLIC WORKS SUMMARY 2024 - 2033 Unadjusted Adjusted Development Charge Development-Related Capital Program Development Charge Appendix B | 99 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PUBLIC WORKS BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Garage Lemay St. 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 6,780 $360 Garage Lemay St. Office & Lunch room 620 620 620 620 620 620 620 620 620 620 620 620 620 620 620 $360 Clarence Creek Container 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 $40 Town Hall Container 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 $40 Sewage Plant (PW Storage) 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 $360 Salt Dome - - 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 $40 Sand Dome - - - - - - - - - - 4,200 4,200 4,200 4,200 4,200 $40 Total (#) 9,980 9,980 17,980 17,980 17,980 17,980 17,980 17,980 17,980 17,980 22,180 22,180 22,180 22,180 22,180 Total ($000) $3,455.2 $3,455.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,943.2 $3,943.2 $3,943.2 $3,943.2 $3,943.2 LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Garage Lemay St. Office & Lunch room 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 $235,000 Sewage Plant (PW Storage) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 $235,000 Total (ha) 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 Total ($000) $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 FURNITURE AND EQUIPMENT Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Garage Lemay Street $7,600 $7,600 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 $7,800 Garage Laurier $116,000 $116,000 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 $129,700 Total ($000) $123.6 $123.6 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 APPENDIX B.6 TABLE B.6-1 # of Square Feet # of Hectares Total Value of Furniture & Equipment ($) Appendix B | 100 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PUBLIC WORKS SMALL TOOLS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Quick Saw 3 2 2 1 1 1 1 1 1 1 1 1 2 2 2 $1,380 Chain Saw 3 4 3 4 4 4 4 4 4 4 4 4 9 9 9 $863 Compactor 3 2 3 2 2 2 2 1 1 1 1 1 1 1 1 $3,335 Weed Eater 4 5 4 5 5 6 6 3 3 3 3 3 5 5 5 $426 Generator 3 3 3 3 3 3 3 3 3 3 4 4 2 2 2 $1,461 Water Pump Gas 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 $5,980 Water Pump Electric 2 2 2 2 3 3 3 - - - - - 2 2 2 $403 Lawn Mower 2 2 2 2 2 2 2 1 1 1 1 1 - - - $863 Crack Sealer 1 - 1 - - - - - - - - - - - - $1,840 Pole Saw 1 1 1 1 2 2 2 2 3 3 3 3 3 3 3 $667 Gas Boom 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $598 Traffic Counter 3 3 3 3 2 2 2 2 2 4 4 4 4 4 4 $2,921 GPS 4 5 27 27 30 32 32 23 25 27 28 32 50 50 50 $575 Light Tower - - - - 1 1 1 1 1 1 1 1 1 1 1 $13,260 ASP Cutting Saw - - - - - 1 1 1 2 2 2 2 1 1 1 $2,657 Hydraulic Jack Hammer - - - - 1 1 1 1 1 1 1 1 1 1 1 $10,603 Jumping Jack - 1 - 1 1 1 1 1 1 1 1 1 1 1 1 $1,990 Pressure Washer - - - - - - - - - - - 1 1 1 1 $9,200 Electronic Speed controller - - - - - - - - - - - 1 1 1 1 $3,450 Wood Chipper - - - - - - - - - - - 1 1 1 1 $63,250 Diesel Welder - - - - - - - - - - - 1 1 1 1 $6,325 Diesel plate - - - - - - - - - - - - 1 1 1 $6,000 Total (#) 32 33 54 54 60 64 64 46 50 54 56 64 90 90 90 Total ($000) $51.5 $48.8 $63.3 $60.1 $83.8 $88.0 $88.0 $70.2 $74.7 $81.6 $83.7 $168.2 $186.1 $186.1 $186.1 APPENDIX B.6 TABLE B.6-1 # of Tools Appendix B | 101 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS PUBLIC WORKS FLEET UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Pick ups 15 15 13 13 13 13 14 14 14 14 14 14 8 8 8 $45,000 Tandem Axel Trucks 4 4 6 6 6 6 6 7 7 8 8 8 7 7 7 $400,000 Back Hoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $185,000 Front End Loader 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $300,000 Grader 1 2 1 2 2 2 2 2 2 2 2 2 2 2 2 $750,000 Steamer 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 $25,000 Sewer Cleaner Flusher 1 1 1 1 1 1 1 - - - - - - - - $162,000 Snow Machine Trackless & Equip. 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 $160,000 Tractor 2 2 2 2 2 2 2 3 3 3 3 3 1 1 1 $110,000 Bomag 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $950,000 Cube Van 1 1 1 1 1 1 1 1 1 1 1 1 - - - $110,000 Excavator 1 1 1 1 1 - - - - - - - - - - $344,000 4 Wheeler 1 1 1 1 1 1 1 - - - - - - - - $29,000 Enclosed Trailer - 1 - 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Boom flail - - - - 1 1 1 1 1 1 1 1 - - - $63,000 SUV - - - - - - 1 1 2 2 2 2 1 1 1 $35,000 Service Van - - - - - - - - - - 2 2 1 1 1 $125,000 Line Painter - - 1 1 1 1 1 1 1 1 1 1 2 2 2 $40,000 Plow & Salt Spreader - - - - - 1 1 1 1 1 1 1 1 1 1 $30,000 Tilt Truck Bed - - - - - - - - - 1 1 1 1 1 1 $10,000 Hot Box - - - - - - - - - - 1 1 1 1 1 $60,000 Snow Blower - Case - - - - - - - - - - - - 1 1 1 $10,000 Snow Blower Larue - - - - - - - - - - - - 1 1 1 $185,000 Asphalt Roller - - - - - - - - - - - - 1 1 1 $25,000 Trailer - - - - - - - - - - - - 5 5 5 $20,000 Total (#) 33 35 34 36 37 38 40 40 41 43 46 46 42 42 42 Total ($000) $5,835.0 $6,610.0 $6,585.0 $7,360.0 $7,423.0 $7,269.0 $7,349.0 $7,668.0 $7,703.0 $8,113.0 $8,423.0 $8,423.0 $7,695.0 $7,695.0 $7,695.0 FLEET CONTRACTED SERVICES UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Grader 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 $80,000 Snow Clearing 2 1 - - - - - - - - 1 1 1 1 1 $60,000 Total (#) 4 2 2 1 1 1 1 1 1 1 2 2 2 2 2 Total ($000) $280.0 $140.0 $160.0 $80.0 $80.0 $80.0 $80.0 $80.0 $80.0 $80.0 $140.0 $140.0 $140.0 $140.0 $140.0 APPENDIX B.6 # of Vehicles and Equipment # of Vehicles TABLE B.6-1 Appendix B | 102 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS PUBLIC WORKS 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historic Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 Historic Employment 5,115 5,446 5,799 5,667 5,539 5,413 5,290 5,171 5,352 5,540 5,735 5,936 6,145 6,177 6,209 Total Historic Population & Employmen 27,310 28,130 28,984 29,112 29,246 29,385 29,530 29,683 30,250 30,830 31,423 32,029 32,650 33,004 33,362 INVENTORY SUMMARY ($000) Buildings $3,455.2 $3,455.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,775.2 $3,943.2 $3,943.2 $3,943.2 $3,943.2 $3,943.2 Land $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 $528.8 Furniture And Equipment $123.6 $123.6 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 $137.5 Small Tools $51.5 $48.8 $63.3 $60.1 $83.8 $88.0 $88.0 $70.2 $74.7 $81.6 $83.7 $168.2 $186.1 $186.1 $186.1 Fleet $5,835.0 $6,610.0 $6,585.0 $7,360.0 $7,423.0 $7,269.0 $7,349.0 $7,668.0 $7,703.0 $8,113.0 $8,423.0 $8,423.0 $7,695.0 $7,695.0 $7,695.0 Fleet Contracted Services $280.0 $140.0 $160.0 $80.0 $80.0 $80.0 $80.0 $80.0 $80.0 $80.0 $140.0 $140.0 $140.0 $140.0 $140.0 Total ($000) $10,274.0 $10,906.3 $11,249.8 $11,941.5 $12,028.2 $11,878.5 $11,958.5 $12,259.6 $12,299.1 $12,716.1 $13,256.1 $13,340.7 $12,630.5 $12,630.5 $12,630.5 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings $126.52 $122.83 $130.25 $129.68 $129.08 $128.47 $127.84 $127.19 $124.80 $122.45 $125.49 $123.11 $120.77 $119.48 $118.19 $125.08 Land $19.36 $18.80 $18.24 $18.16 $18.08 $17.99 $17.91 $17.81 $17.48 $17.15 $16.83 $16.51 $16.19 $16.02 $15.85 $17.49 Furniture And Equipment $4.53 $4.39 $4.74 $4.72 $4.70 $4.68 $4.66 $4.63 $4.55 $4.46 $4.38 $4.29 $4.21 $4.17 $4.12 $4.48 Small Tools $1.89 $1.73 $2.18 $2.06 $2.86 $3.00 $2.98 $2.36 $2.47 $2.65 $2.66 $5.25 $5.70 $5.64 $5.58 $3.27 Fleet $213.66 $234.98 $227.20 $252.82 $253.81 $247.37 $248.87 $258.33 $254.64 $263.15 $268.05 $262.98 $235.68 $233.15 $230.65 $245.69 Fleet Contracted Services $10.25 $4.98 $5.52 $2.75 $2.74 $2.72 $2.71 $2.70 $2.64 $2.59 $4.46 $4.37 $4.29 $4.24 $4.20 $4.08 Total ($/pop & emp) $376.20 $387.71 $388.14 $410.19 $411.28 $404.24 $404.96 $413.02 $406.58 $412.46 $421.86 $416.52 $386.85 $382.70 $378.59 $400.09 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE PUBLIC WORKS 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $400.09 Net Population & Employment Growth 2024 - 2033 3,691 Maximum Allowable Funding Envelope $1,476,732.19 APPENDIX B.6 TABLE B.6-1 Appendix B | 103 Gross Grants/ Net Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 6.0 PUBLIC WORKS 6.1 Buildings & Equipment 6.1.1 Snow Depot (including Land) - Rockland 2025 2,140,000 $ - $ 2,140,000 $ 50% 1,070,000 $ 1,070,000 $ 1,070,000 $ - $ - $ 6.1.2 Snow Dump (including Land) - Bourget 2030 880,000 $ - $ 880,000 $ 50% 440,000 $ 440,000 $ - $ - $ 440,000 $ 6.1.3 Garage Renovation and Expansion 2029 2,000,000 $ - $ 2,000,000 $ 50% 1,000,000 $ 1,000,000 $ - $ 721,461 $ 278,539 $ Subtotal Buildings & Equipment 5,020,000 $ - $ 5,020,000 $ 2,510,000 $ 2,510,000 $ 1,070,000 $ 721,461 $ 718,539 $ 6.2 Fleet & Equipment 6.2.1 Sidewalk Machine 2025 200,000 $ - $ 200,000 $ 0% - $ 200,000 $ 44,729 $ 155,271 $ - $ 6.2.2 Tandem 2025 400,000 $ - $ 400,000 $ 0% - $ 400,000 $ - $ 400,000 $ - $ 6.2.3 New Vehicles and Equipment Various 1,000,000 $ - $ 1,000,000 $ 0% - $ 1,000,000 $ - $ 200,000 $ 800,000 $ Subtotal Fleet & Equipment 1,600,000 $ - $ 1,600,000 $ - $ 1,400,000 $ 44,729 $ 755,271 $ 800,000 $ TOTAL PUBLIC WORKS 6,620,000 $ - $ 6,620,000 $ 2,510,000 $ 4,110,000 $ 1,114,729 $ 1,476,732 $ 1,518,539 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 92% $1,358,594 2024 - 2033 Net Funding Envelope $1,476,732 10-Year Growth in Population in New Units 4,775 Unadjusted Development Charge Per Capita $284.52 Reserve Fund Balance Balance as at December 31, 2023 $1,114,729 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 8% $118,139 10-Year Growth in Square Metres 20,450 Unadjusted Development Charge Per Square Metre $5.78 Ineligible Costs APPENDIX B.6 TABLE B.6-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM PUBLIC WORKS DC Eligible Costs Appendix B | 104 APPENDIX B.6 TABLE B.6-3 PUBLIC WORKS 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $1,025.6 $1,204.3 ($213.3) ($69.7) $48.4 $176.0 ($438.1) ($326.2) ($203.4) ($105.8) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $1,025.6 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $1,025.6 - Public Works: Non Inflated $18.4 $529.2 $18.4 $18.4 $18.4 $682.1 $18.4 $18.4 $18.4 $18.4 $1,358.6 - Public Works: Inflated $18.4 $1,585.9 $19.1 $19.5 $19.9 $753.1 $20.7 $21.1 $21.6 $22.0 $2,501.4 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $158.8 $165.2 $171.8 $139.3 $143.7 $149.4 $154.4 $159.5 $128.4 $131.7 $1,502.3 INTEREST - Interest on Opening Balance $35.9 $42.2 ($11.7) ($3.8) $1.7 $6.2 ($24.1) ($17.9) ($11.2) ($5.8) $11.3 - Interest on In-year Transactions $2.5 ($39.1) $2.7 $2.1 $2.2 ($16.6) $2.3 $2.4 $1.9 $1.9 ($37.7) TOTAL REVENUE $197.1 $168.3 $162.8 $137.6 $147.6 $139.0 $132.6 $144.0 $119.1 $127.8 $1,475.9 CLOSING CASH BALANCE $1,204.3 ($213.3) ($69.7) $48.4 $176.0 ($438.1) ($326.2) ($203.4) ($105.8) $0.0 2024 Adjusted Charge Per Capita $289.23 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE PUBLIC WORKS RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 105 APPENDIX B.6 TABLE B.6-3 PUBLIC WORKS 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $89.18 $100.41 ($27.75) ($20.84) ($9.18) $3.70 ($47.86) ($36.56) ($24.02) ($12.63) 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Prior Growth $0.0 $89.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $89.2 - Public Works: Non Inflated $1.6 $46.0 $1.6 $1.6 $1.6 $59.3 $1.6 $1.6 $1.6 $1.6 $118.1 - Public Works: Inflated $1.6 $137.9 $1.7 $1.7 $1.7 $65.5 $1.8 $1.8 $1.9 $1.9 $217.5 NON-RESIDENTIAL SPACE GROWTH - Growth in Square Metres 1,600 1,600 1,600 2,250 2,300 2,300 2,300 2,350 2,050 2,100 20,450 REVENUE - DC Receipts: Inflated $9.6 $9.8 $10.0 $14.3 $14.9 $15.2 $15.5 $16.1 $14.4 $15.0 $134.6 INTEREST - Interest on Opening Balance $3.1 $3.5 ($1.5) ($1.1) ($0.5) $0.1 ($2.6) ($2.0) ($1.3) ($0.7) ($3.1) - Interest on In-year Transactions $0.1 ($3.5) $0.1 $0.2 $0.2 ($1.4) $0.2 $0.3 $0.2 $0.2 ($3.2) TOTAL REVENUE $12.8 $9.8 $8.6 $13.4 $14.6 $13.9 $13.1 $14.4 $13.3 $14.5 $128.3 CLOSING CASH BALANCE $100.4 ($27.7) ($20.8) ($9.2) $3.7 ($47.9) ($36.6) ($24.0) ($12.6) $0.0 2024 Adjusted Charge Per Square Metre $5.98 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE PUBLIC WORKS NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 106 APPENDIX B.7 SERVICES RELATED TO A HIGHWAY - ROADS AND RELATED Appendix B | 107 The Infrastructure and Engineering Department, maintains approximately 272 kilometres of road surfaces, and maintains the sidewalks, shoulders, bridges, culverts, surface drainage ditches and winter maintenance each year in the City of Clarence-Rockland. The capital program contained herein was largely prepared using the Cityʼs ongoing transportation master plan with input from City staff and with some input from the development community thus far. The program is designed to serve the population and employment growth between 2024 and 2033 with some projects deemed to have an extended benefit over the longer-term. Furthermore, in some instances, the capital projects costs and timing have been revised to reflect recent project tendering. TABLE B.7-1 HISTORICAL SERVICE LEVELS The City has 272 kilometers of roads valued at $638 million, as well as 24 bridges and culverts worth $35.46 million. Streetlights have a replacement cost of $13.77 million, while the 36.8 kilometers of sidewalks are valued at $14.72 million. The total 2023 value of the Roads and Related inventory is $701.95 million, which provides a 15-year average service level of $16.536.03 per population and employment. When multiplied by the expected net population and employment growth between 2024 and 2033, this results in a maximum allowable funding envelope of $61.03 million. TABLES B.7-2 & B.7-3 2024-2033 DEVELOPMENT-RELATED CAPITAL PROGRAM & CALCULATION OF THE DEVELOPMENT CHARGES The 2024-2033 Roads and Related capital program totals $94.98 million and provides for various cycling and multi-use paths, roadway improvements, sidewalk projects, intersection improvements and development-related studies. The details and timing of each road project and the cost breakdown are shown on Table B.7-2. Replacement and benefit to existing shares been identified and total $12.03 million. This total share of cost includes 50 per cent shares for all cycling projects, 25 per cent related to the Clarence Crossing Muti-Use Path project, as well as 20 per cent for various roadway improvements, 30 per cent for the Caron Street road widening, 50 per cent for sidewalks on Sterling Avenue and 20 per cent reductions to the costs of a TMP update and a Master Transportation Study. No benefit to existing shares have been applied to the other projects which are entirely driven by new growth and needed to support the development occurring in period. Appendix B | 108 Finally, direct developer contributions of $5.17 million have been identified for various roadway projects. Lastly, a 52% post-period benefit allocation has been attributed to a series of projects which are deemed to service development occurring beyond the ten-year planning period - this share represents $30.72 million and will be considered for recovery in subsequent DC by-laws. The remaining net capital costs eligible for DC recovery between 2024 and 2033 total $47.07 million (prior to reserve fund adjustments). Table B.7-3 provides an overview of the calculation of the unadjusted development charge with consideration of the existing DC reserve fund balance of $4.81million. Of the total gross program cost of $94.98 million, about $42.26 million is considered to be the remaining net DC costs eligible for recovery in the 2024-2033 period after all reductions described have been considered. The total $42.26 million is then allocated: 92 per cent residential and 8 per cent non-residential. The allocation of costs is based on the future shares of population in new units and employment growth to 2033. The residential share of the capital program totals $38.88 million and, when divided by the forecast growth in population in new units (4,775), an unadjusted charge of $8,141.38 per capita results. The non-residential share of $3.38 million is applied against the forecast increase in square metres of non-residential floor space (20,450), yielding an unadjusted charge of $165.30 per square metre. TABLE B.7-4 CASH FLOW ANALYSIS The cash flow analysis is shown on Table B.7-4. The analysis takes into consideration expenditure timing and DC revenue projections. After cash flow considerations, both the residential and non-residential charges modestly decrease to $8,045.24 per capita and $164.95 per square metre, respectively. 15-year Hist. Service Level per pop & emp Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $16,536.03 $94,981,392 $42,255,548 $8,141.38 $165.30 $8,045.24 $164.95 ROADS AND RELATED SUMMARY Development-Related Capital Program Development Charge Development Charge 2024 - 2033 Unadjusted Adjusted Appendix B | 109 CITY OF CLARENCE-ROCKLAND INVENTORY OF CAPITAL ASSETS ROADS AND RELATED ROADS UNIT COST Type of Road 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Gravel Roads 39 39 39 41 95 96 101 108 101 99 89 81 89 89 89 $1,000,000 Asphalt Roads 51 51 51 54 126 127 134 143 151 153 164 171 180 181 183 $3,000,000 Total (km) 90 90 90 95 221 223 235 251 252 252 252 252 269 270 272 Total ($000) $192,000.0 $192,000.0 $192,000.0 $203,000.0 $473,000.0 $477,000.0 $503,000.0 $537,000.0 $554,000.0 $558,000.0 $579,000.0 $594,118.0 $629,000.0 $632,000.0 $638,000.0 BRIDGES & CULVERTS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bridges 4 4 4 4 10 10 10 11 11 11 11 11 11 11 11 $1,486,000 Culverts 2 2 2 2 4 4 5 5 5 5 15 15 15 15 13 $1,470,000 Total (#) 6 6 6 6 14 14 15 16 16 16 26 26 26 26 24 Total ($000) $8,884.0 $8,884.0 $8,884.0 $8,884.0 $20,740.0 $20,740.0 $22,210.0 $23,696.0 $23,696.0 $23,696.0 $38,396.0 $38,396.0 $38,396.0 $38,396.0 $35,456.0 STREETLIGHTS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Streetlights 476 476 476 507 1,171 1,186 1,244 1,332 1,332 1,352 1,355 1,363 1,543 1,563 1,603 $7,500 Traffic Lights 4 4 4 4 4 4 4 5 6 7 7 7 7 7 7 $250,000 Total (#) 480 480 480 511 1,175 1,190 1,248 1,337 1,338 1,359 1,362 1,370 1,550 1,570 1,610 Total ($000) $4,570.0 $4,570.0 $4,570.0 $4,802.5 $9,782.5 $9,895.0 $10,330.0 $11,240.0 $11,490.0 $11,890.0 $11,912.5 $11,972.5 $13,322.5 $13,472.5 $13,772.5 SIDEWALKS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Sidewalk 12.6 12.6 12.6 13.5 31.1 31.9 32.4 34.3 36.1 36.6 37.9 38.4 36.8 36.8 36.8 $400,000 Total (km) 12.6 12.6 12.6 13.5 31.1 31.9 32.4 34.3 36.1 36.6 37.9 38.4 36.8 36.8 36.8 Total ($000) $5,040.0 $5,040.0 $5,040.0 $5,400.0 $12,449.2 $12,760.4 $12,974.0 $13,705.2 $14,457.6 $14,644.0 $15,175.2 $15,355.2 $14,720.0 $14,720.0 $14,720.0 APPENDIX B.7 TABLE B.7-1 # of Kilometres # of Bridges & Culverts # of Units # of Kilometres Appendix B | 110 CITY OF CLARENCE-ROCKLAND CALCULATION OF SERVICE LEVELS ROADS AND RELATED 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 22,195 22,684 23,185 23,445 23,707 23,972 24,240 24,512 24,898 25,290 25,688 26,093 26,505 26,827 27,153 Historical Employment 5,115 5,446 5,799 5,667 5,539 5,413 5,290 5,171 5,352 5,540 5,735 5,936 6,145 6,177 6,209 Total Historical Pop. & Emp. 27,310 28,130 28,984 29,112 29,246 29,385 29,530 29,683 30,250 30,830 31,423 32,029 32,650 33,004 33,362 INVENTORY SUMMARY ($000) Roads $192,000.0 $192,000.0 $192,000.0 $203,000.0 $473,000.0 $477,000.0 $503,000.0 $537,000.0 $554,000.0 $558,000.0 $579,000.0 $594,118.0 $629,000.0 $632,000.0 $638,000.0 Bridges & Culverts $8,884.0 $8,884.0 $8,884.0 $8,884.0 $20,740.0 $20,740.0 $22,210.0 $23,696.0 $23,696.0 $23,696.0 $38,396.0 $38,396.0 $38,396.0 $38,396.0 $35,456.0 Streetlights $4,570.0 $4,570.0 $4,570.0 $4,802.5 $9,782.5 $9,895.0 $10,330.0 $11,240.0 $11,490.0 $11,890.0 $11,912.5 $11,972.5 $13,322.5 $13,472.5 $13,772.5 Sidewalks $5,040.0 $5,040.0 $5,040.0 $5,400.0 $12,449.2 $12,760.4 $12,974.0 $13,705.2 $14,457.6 $14,644.0 $15,175.2 $15,355.2 $14,720.0 $14,720.0 $14,720.0 Total ($000) $210,494.0 $210,494.0 $210,494.0 $222,086.5 $515,971.7 $520,395.4 $548,514.0 $585,641.2 $603,643.6 $608,230.0 $644,483.7 $659,841.7 $695,438.5 $698,588.5 $701,948.5 Average SERVICE LEVEL ($/pop & emp) Service Level Roads $7,030.39 $6,825.45 $6,624.39 $6,973.07 $16,173.15 $16,232.77 $17,033.53 $18,091.36 $18,314.05 $18,099.25 $18,425.99 $18,549.38 $19,264.93 $19,149.19 $19,123.55 $15,060.70 Bridges & Culverts $325.3 $315.8 $306.5 $305.2 $709.2 $705.8 $752.1 $798.3 $783.3 $768.6 $1,221.9 $1,198.8 $1,176.0 $1,163.4 $1,062.8 $772.86 Streetlights $167.3 $162.5 $157.7 $165.0 $334.5 $336.7 $349.8 $378.7 $379.8 $385.7 $379.1 $373.8 $408.0 $408.2 $412.8 $319.97 Sidewalks $184.5 $179.2 $173.9 $185.5 $425.7 $434.2 $439.3 $461.7 $477.9 $475.0 $482.9 $479.4 $450.8 $446.0 $441.2 $382.50 Total ($/pop & emp) $7,707.58 $7,482.90 $7,262.47 $7,628.69 $17,642.47 $17,709.56 $18,574.81 $19,730.07 $19,955.16 $19,728.51 $20,509.94 $20,601.38 $21,299.80 $21,166.78 $21,040.36 $16,536.03 CITY OF CLARENCE-ROCKLAND CALCULATION OF MAXIMUM ALLOWABLE ROADS AND RELATED 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $16,536.03 Net Population & Employment Growth 2024 - 2033 3,691 Maximum Allowable Funding Envelope $61,034,487 APPENDIX B.7 TABLE B.7-1 Appendix B | 111 Timing NO. Infrastructure Requirement Description / Remarks Limits Term From To Gross Cost Other Contributions Post Period Allocation1 Net Growth- Related City-Wide Roads Projects Cycling 1 Bronze Avenue Extension Painted bike lane with signage and cycling lane markings both directions. Between Caron Street in the west and David Street in the East Mid-Term 2029 - 2033 $462,599 50% $231,300 $231,300 2 David Street Buffered paved shoulder with signage on both sides Between County Road 17 in the north and Richelieu Street in the South Mid-Term 2029 - 2033 $324,624 50% $162,312 $162,312 3 Expansion Lands Street B Painted bike lane with signage and cycling lane markings both directions. Between David Street in the north and the urban area boundary in the South Mid-Term 2029 - 2033 $358,660 50% $179,330 $179,330 4 Heritage Drive Painted bike lane with signage and cycling lane markings both directions. Between the proposed connection to Sylvain Street in the south and Laurier Street in the north. Mid-Term 2029 - 2033 $18,444 50% $9,222 $9,222 5 La Berge Street Painted bike lane with signage and cycling lane markings both directions. Between County Road 17 in the north and the existing Laurier Street in the South Mid-Term 2029 - 2033 $97,717 50% $48,859 $48,859 6 Laurier Street Buffered bike lane with flex bollards with signage and cycling lane markings both directions. Between Richelieu Street in the west, and Heritage Drive in the east Mid-Term 2029 - 2033 $536,336 50% $268,168 $268,168 7 Laurier Street Painted bike lane with signage and cycling lane markings both directions. Between Heritage Drive in the west and County Road 17 in the east Mid-Term 2029 - 2033 $112,039 50% $56,020 $56,020 8 Patricia Street Painted bike lane with signage and cycling lane markings both directions. Between St. Joseph Street in the east and Heritage Drive in the west. Short-Term 2024 - 2028 $38,329 50% $19,165 $19,165 Multi-Use Path 9 Caron Street New Multi-Use Path to provide neighborhood internal bicycle and pedestrian connections Between David Street in the north and the new Bronze Avenue in the south Mid-Term 2029 - 2033 $133,817 0% $0 $133,817 10 Des Pins Avenue New Multi-Use Path to provide neighborhood internal bicycle and pedestrian connections Between Dalrymple Drive in the east and the existing school pathway in the west Mid-Term 2029 - 2033 $224,765 0% $0 $224,765 11 Laporte Street Replace existing sidewalk with multi-use path to provide neighbourhood with integrated bike connections Between Laurier Stree in the west and Sylvanian Street in the east Mid-Term 2029 - 2033 $165,468 0% $0 $165,468 12 Poupart Road New multi-use path on the north side of Poupart Road built as part of the Poupart Road widening. Between St-Jean Street in the east and the proposed West Roadway extension. Mid-Term 2029 - 2033 $428,696 0% $0 $428,696 13 Poupart Road New multi-use path on the east side of Poupart Road built as part of the Poupart Road widening. Between the proposed West Roadway extension in the south and Richilieu Street in the north. Short-term 2024 - 2028 $174,283 0% $0 $174,283 14 Richelieu Street New Multi-Use Path to provide neighborhood internal bicycle and pedestrian connections Between Poupart Road in the west and Descôtes Circle in the east Mid-Term 2029 - 2033 $90,948 0% $0 $90,948 15 Saint Jean Street New multi-use path on the north side of St. Jean Street built as part of development. Between the new Bronze Avenue in the east and Poupart Road in the west. Short-term 2024 - 2028 $235,582 0% $0 $235,582 16 Clarence Crossing Multi Use Path 2025 - 2025 $500,000 25% $125,000 $375,000 17 Clarence Crossing Multi Use Path 2028 - 2028 $450,000 25% $112,500 $337,500 Estimated Project Costs Benefit to Existing Share APPENDIX B.7 TABLE B.7-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM ROADS AND RELATED (2024-2033) Appendix B | 112 Timing NO. Infrastructure Requirement Description / Remarks Limits Term From To Gross Cost Other Contributions Post Period Allocation1 Net Growth- Related City-Wide Roads Projects Estimated Project Costs Benefit to Existing Share APPENDIX B.7 TABLE B.7-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM ROADS AND RELATED (2024-2033) Roadway 18 La Berge Street Extension (Proposed) Extension of La Berge Street with painted bike lanes and sidewalks on both sides of the road. Between County Road 17 in the north and the existing Laurier Street in the south. Mid-Term 2029 - 2033 $1,284,290 0% $0 $667,831 $616,459 20 Poupart Road Road widening from two lanes to four. Will include a multi-use pathway on the north side of the roadway. Between the proposed West Roadway in the west and St- Jean/Poupart intersection Mid-Term 2029 - 2033 $19,000,000 20% $3,800,000 $7,904,000 $7,296,000 27 Saint Jean Street Road widening from two lanes to four south of new roundabout. Between Poupart Road in the north and the urban area boundary in the south. Short-term 2024 - 2028 $2,100,236 20% $420,047 $0 $1,680,189 28 Saint Jean Street Road widening from two lanes to four. Will include a multi-use pathway on the north side of the roadway. east of new roundabout Between St-Jean/Poupart Road intersection in the west and the new Bronze Avenue in the east. Short-term 2024 - 2028 $15,000,000 20% $3,000,000 $0 $12,000,000 29 Caron Street Road widening from three lanes to four Mid-Term 2029 - 2033 $8,400,000 30% $2,520,000 $5,880,000 $0 30 David Street Road widening from three lanes to four Mid-Term 2029 - 2033 $4,620,000 20% $924,000 $3,696,000 $0 31 Saint Jean Street Painted bike lane with signage and cycling lane markings both directions Between Laurier Street in the north and Patricia Street in the south. Mid-Term 2029 - 2033 $13,825 0% $0 $7,189 $6,636 Intersections 19 La Berge Street/County Road 17 Upgrade existing stop controlled intersection with a signalized intersection. At the intersection of La Berge Street, County Road 17, and the proposed La Berge Street extension. Short-term 2024 - 2028 $400,000 0% $0 $0 $400,000 21 Poupart Road New roundabout at new intersection. At the entrance to the future Stewart Village development Mid-Term 2029 - 2033 $5,000,000 0% $0 $2,500,000 $1,300,000 $1,200,000 22 Poupart Road/Richilieu Street Upgrade existing stop controlled intersection with a signalized intersection At the intersection of Poupart Road and Richilieu Street. Mid-Term 2029 - 2033 $750,000 0% $0 $390,000 $360,000 23 Poupart Street/Saint Jean Street New roundabout to replace the existing STOP controlled intersections. At the intersection of St-Jean Street and Poupart Road. (hydro station) Short-term 2024 - 2028 $5,000,000 0% $0 $2,600,000 $2,400,000 24 Poupart Street/New West Roadway New roundabout at new intersection. At the future intersection of Poupart Road and the New West Roadway. Mid-Term 2029 - 2033 $5,000,000 0% $0 $2,600,000 $2,400,000 25 Richilieu Street/Carmen Bergeron Street Upgrade existing stop controlled intersection with a signalized intersection At the intersection of Richilieu Street and Carmen Bergeron Street Mid-Term 2029 - 2033 $750,000 0% $0 $390,000 $360,000 26 Saint Jean Street/Broze Avenue New roundabout at new intersection. At the future intersection of St-Jean and the new Bronze Avenue servicing the southern end of Morris Village. Short-term 2024 - 2028 $5,000,000 0% $0 $0 $5,000,000 32 County Road 17 Intersection modification and roundabout. Relocates the Pago Road access for the Clarence Crossing subdivision, and future development potential of the Scott Parcel, and Bedard Parcel Street 1 at CR17 Mid-Term 2029 - 2033 $3,500,000 0% $0 $1,820,000 $1,680,000 Appendix B | 113 Timing NO. Infrastructure Requirement Description / Remarks Limits Term From To Gross Cost Other Contributions Post Period Allocation1 Net Growth- Related City-Wide Roads Projects Estimated Project Costs Benefit to Existing Share APPENDIX B.7 TABLE B.7-2 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM ROADS AND RELATED (2024-2033) Pedestrian (Sidewalk) 33 Caron Street Build sidewalk on the west side of the street to complement the proposed Multi-Use Path. Between David Street in the north and the new Bronze Avenue in the south Mid-Term 2029 - 2033 $132,605 0% $0 $132,605 34 David Street Build sidewalks on both sides of the street. Between Caron Street in the west and the new Bronze Avenue in the east Mid-Term 2029 - 2033 $704,313 0% $0 $704,313 35 Industrielle Street Sidewalk on both sides of the street Between County Road 17 in the south and the roundabout in the east Mid-Term 2029 - 2033 $399,402 0% $0 $399,402 36 La Berge Street Extension (Proposed) Sidewalk on both sides of the street Between County Road 17 In the north and the existing Laurier Street in the south. Mid-Term 2029 - 2033 $106,004 0% $0 $106,004 37 Patricia Street Build sidewalk on the south side of the street to continue existing sidewalk. Between St-Jacques Street In The East To Heritage Drive In The West Short-term 2024 - 2028 $281,090 0% $0 $281,090 38 Poupart Road Sidewalk on one side of the street on the south side. Between St Jean Street in the east to the proposed West Roadway in the west. Mid-Term 2029 - 2033 $424,811 0% $0 $424,811 39 Poupart Road Sidewalk on one side of the street on the west side. Between the proposed West Roadway in the south and Richelieu Street in the north. Mid-Term 2029 - 2033 $172,704 0% $0 $172,704 40 Saint Jean Street Sidewalk on one side of the street on the south side. Between the new Bronze Avenue in the east and Poupart Road in the west Short-term 2024 - 2028 $233,448 0% $0 $233,448 41 Sterling Avenue Add sidewalk on the other side of the street so that both sides of the road have a sidewalk. Between Silver Lane In The North To Docteur Corbeil Boulevard In The South Short-Term 2024 - 2028 $162,381 50% $81,191 $81,191 42 Clarence Crossing Pedestrian Bridge 2028 - 2028 $3,500,000 0% $0 $1,820,000 $1,680,000 Developer 43 Bronze Avenue (New) Complete two-lane roadway construction (Major Collector). Between Caron Street in the east and Cobalt Street in the west, Granite Street in the east and St-Jean Street in the west. Short-Term 2024 - 2028 $2,094,339 $0 $2,094,339 $0 $0 44 Bronze Avenue (New) Multi-Use pathway built on the north side of the roadway as part of the construction of the New east-west roadway to service a new subdivision in south Rockland Between Caron Street in the east and Cobalt Street in the west, Granite Street in the east and St-Jean Street in the west Short-Term 2024 - 2028 $260,423 $0 $260,423 $0 $0 45 Bronze Avenue (New) Build sidewalk on one side of the street (south). Between Caron Street in the east and Cobalt Street in the west, Granite Street in the east and St-Jean Street in the west. Short-Term 2024 - 2028 $258,063 $0 $258,063 $0 $0 46 Sylvain Street New Multi-Use Path to provide neighborhood internal bicycle and pedestrian connections Between Laporte Street in the north and the proposed connection to Heritage Drive in the south. Mid-Term 2029 - 2033 $57,694 $0 $57,694 $0 $0 47 Expansion Lands Street "B" New two-lane north-south roadway to service the new expansion lands area. Will have sidewalks and on-street bike lanes on both sides of the road Between David Street in the north and the urban boundary in the south Mid-Term 2029 - 2033 $3,157,619 $0 $1,641,962 $1,515,657 County 48 County Road 17 Bi-directional mutli-use path on the south side of County Road 17 for pedestrian and cyclist use. Between Laurier Street in the east and the proposed West Roadway in the west. Mid-Term 2029 - 2033 $2,365,838 $0 $2,365,838 Studies 49 TMP Update 2027 - 2027 $100,000 20% $20,000 $80,000 50 Master Transportation Study 2031 - 2031 $250,000 20% $50,000 $200,000 51 Provison for other Development-Related Studies includes signilized intersections 2024 - 2033 $150,000 0% $0 $150,000 Total Roads Projects: 2024-2033 $94,981,392 $12,027,112 $5,170,519 $30,716,982 $47,066,780 Notes 1) The post period allocation are based on share of population and employment growth to 2046. The post-period share is: 52% 2) Available DC Reserve Funds have been accounted for through the cash flow analysis Appendix B | 114 10-Year Growth in Population in New Units 4,775 Employment Growth 409 10-Year Growth in Square Meters 20,450 Total DC Benefit Available Post Eligible Gross to Existing Other DC Period Costs for Project Cost Share Contributions Reserves Allocation Recovery ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 ROADS AND RELATED 2024-2033 City-Wide Roads Projects $94,981.39 $12,027.11 $5,170.52 $4,811.23 $30,716.98 $42,255.55 92% $38,875.10 8% $3,380.44 TOTAL ROADS AND RELATED 2024-2033 $94,981.39 $12,027.11 $5,170.52 $4,811.23 $30,716.98 $42,255.55 $38,875.10 $3,380.44 Unadjusted Development Charge Per Capita ($) $42,255.55 $8,141.38 Unadjusted Development Charge Per Sq. M. ($) $165.30 Development-Related Capital Forecast Residential Non-Residential Share Share ROADS AND RELATED 2024-2033 APPENDIX B.7 TABLE B.7-3 CITY OF CLARENCE-ROCKLAND SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix B | 115 ROADS: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $4,426.3 $4,848.0 $5,023.5 $5,664.2 $5,234.6 $2,839.7 $2,657.0 $2,518.1 $2,209.5 $1,125.5 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS Roads: Residential: Non Inflated $4,154.7 $4,499.7 $4,154.7 $4,228.3 $6,010.8 $4,013.8 $4,013.8 $4,197.8 $4,013.8 $4,013.8 $43,301.4 Roads: Residential: Inflated $4,154.7 $4,589.7 $4,322.6 $4,487.1 $6,506.3 $4,431.6 $4,520.2 $4,822.0 $4,702.9 $4,796.9 $47,334.0 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 549 560 571 454 459 468 474 480 379 381 4,775 REVENUE - DC Receipts: Inflated $4,416.8 $4,595.4 $4,779.4 $3,876.1 $3,997.2 $4,157.1 $4,294.6 $4,435.9 $3,572.6 $3,663.2 $41,788.3 INTEREST - Interest on Opening Balance $154.9 $169.7 $175.8 $198.2 $183.2 $99.4 $93.0 $88.1 $77.3 $39.4 $1,279.1 - Interest on In-year Transactions $4.6 $0.1 $8.0 ($16.8) ($69.0) ($7.6) ($6.2) ($10.6) ($31.1) ($31.2) ($159.8) TOTAL REVENUE $4,576.3 $4,765.2 $4,963.2 $4,057.5 $4,111.4 $4,248.9 $4,381.3 $4,513.4 $3,618.8 $3,671.5 $42,907.6 CLOSING CASH BALANCE $4,848.0 $5,023.5 $5,664.2 $5,234.6 $2,839.7 $2,657.0 $2,518.1 $2,209.5 $1,125.5 $0.0 2024 Adjusted Charge Per Capita $8,045.24 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% ROADS AND RELATED 2024-2033 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE APPENDIX B.7 TABLE B.7-4 CITY OF CLARENCE-ROCKLAND Appendix B | 116 ROADS: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $384.9 $298.3 $175.3 $77.3 $83.8 ($72.7) ($42.6) ($10.2) $15.7 $3.1 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS Roads: Non-Residential: Non: Inflated $361.3 $391.3 $361.3 $367.7 $522.7 $349.0 $349.0 $365.0 $349.0 $349.0 $3,765.3 Roads: Non-Residential: Inflated $361.3 $399.1 $375.9 $390.2 $565.8 $385.4 $393.1 $419.3 $408.9 $417.1 $4,116.0 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 1,600 1,600 1,600 2,250 2,300 2,300 2,300 2,350 2,050 2,100 20,450 REVENUE - DC Receipts: Inflated $263.9 $269.2 $274.6 $393.8 $410.6 $418.9 $427.2 $445.3 $396.2 $414.0 $3,713.7 INTEREST - Interest on Opening Balance $13.5 $10.4 $6.1 $2.7 $2.9 ($4.0) ($2.3) ($0.6) $0.5 $0.1 $29.4 - Interest on In-year Transactions ($2.7) ($3.6) ($2.8) $0.1 ($4.3) $0.6 $0.6 $0.5 ($0.4) ($0.1) ($12.0) TOTAL REVENUE $274.7 $276.1 $277.9 $396.6 $409.3 $415.5 $425.5 $445.2 $396.4 $414.0 $3,731.1 CLOSING CASH BALANCE $298.3 $175.3 $77.3 $83.8 ($72.7) ($42.6) ($10.2) $15.7 $3.1 $0.0 2024 Adjusted Charge Per Square Metre $164.95 Allocation of Capital Program Residential Sector 92.0% Non-Residential Sector 8.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.7 TABLE B.7-4 CITY OF CLARENCE-ROCKLAND ROADS AND RELATED 2024-2033 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE Appendix B | 117 APPENDIX C ENGINEERED SERVICES TECHNICAL APPENDIX Appendix C | 118 1. ENGINEERED SERVICES TECHNICAL APPENDIX The Clarence-Rockland Roads, Traffic and Sidewalks and Public Works teams provides public works and engineered infrastructure to the City. The departments are responsible for the services of roads, sidewalks, municipal drains, sanitary sewers, environmental protection and waterworks. This appendix provides the detailed analysis undertaken to establish the development charge rates for the eligible municipal-wide engineered services of waterworks and sanitary sewerage for the City of Clarence-Rockland. The following tables set out the 2024 to 2046 development-related capital forecast and the calculation of the development charges for City-wide Waterworks and Sanitary Sewer services. The basis of the development-related capital program is the City's capital budget, detailed discussions with City staff and the results of master servicing studies prepared by the City's engineering consultants. The projects identified in the capital program are required to service the demands of new development between 2024 and 2046 and beyond, subject to annual capital budget reviews. Appendix C | 119 APPENDIX C.1 WATERWORKS SERVICES Appendix C | 120 The capital program contained herein was assembled by the City's engineering staff in consultation with Hemson based on the Master Servicing Plan recently completed. The projects outlined in this capital program are designed to serve the population and employment growth between 2024 and 2046 while some projects can benefit to development occurring beyond the planning period. The following tables provide details of the projects included in the City-wide Waterworks development charges calculation. Waterworks included in the DC capital forecast are required to achieve health and safety standards as identified in relevant legislation including Provincial regulations, other relevant legislation as well as fire standards. As such, in accordance with section 4(3) of O.Reg. 82/98, the 15-year historical service level does not apply. TABLE C.1-1 2024-2046 DEVELOPMENT-RELATED CAPITAL PROGRAM The 2024-2046 capital program totals $97.49 million and related to water projects in four categories: Water Treatment Plant, Studies, Watermains and Pumping Station projects. Of the total gross program, $34.77 million is related to treatment plant projects, $3.15 million for Studies, $49.95 million related to watermains and $9.64 million to water pumping stations. The single largest project in the capital program can be related to the Rockland Water Treatment Plant capacity expansion that is estimated to cost $33.07 million. In addition, new transmissions from Caron Booster Station to Baseline Road and from Bourget to Cheney Tower total $21.16 million and $16.02 million, respectively. A significant share of the City waterworks capital program will be funded from other sources, which includes grants and funding from neighbouring communities for the benefitting infrastructure. As outlined in the table, about $61.62 million of the total gross program will be funded from these parties with different contribution levels for each project set relative to existing agreements and discussions with those communities. As a result, this $61.62 million in funding has been considered in the calculation and used to reduce the net DC eligible share for recovery. A benefit to existing share of 50 per cent has been applied to some of the water treatment plant projects, as well as a 43 per cent benefit to existing share has been applied to the replacement of water mains from the WTP to Highway 17. As a result, the total benefit to existing share amounts to $1.06 million and has been removed from the calculation. Lastly, it is assumed that most of the projects outlined in the capital program can benefit development occurring outside the planning period (to 2046), as a result, a 25% post period allocation has been applied to most projects in the capital program which are assumed to Appendix C | 121 service development beyond the planning horizon. This post period allocation amounts to $7.35 million and this amount can be considered for recovery in a subsequent development charges by-law. This share of costs is not included for recovery in this planning period. TABLE C.1-2 CALCULATION OF THE DEVELOPMENT CHARGES Table C.1-2 provides an overview of the calculation of the unadjusted development charge with consideration of the existing DC reserve fund balance of $2.42 million. Of the total gross program cost of $97.50 million, about $25.06 million is considered to be the remaining net DC costs eligible for recovery in the 2024-2046 period after all reductions described have been considered. The total $25.06 million is then allocated: 91 per cent residential and 9 per cent non-residential. The allocation of costs is based on the future shares of population in new units and employment growth to 2046. The residential share of the capital program totals $22.80 million and, when divided by the forecast growth in population in new units (9,222) to 2016, an unadjusted charge of $2,472.85 per capita results. The non-residential share of $2.26 million is applied against the forecast increase in square metres of non-residential floor space (47,800), yielding an unadjusted charge of $47.18 per square metre. TABLE C.1-3 CASH FLOW ANALYSIS The cash flow analysis is shown on Table 3. The analysis takes into consideration expenditure timing and DC revenue projections. After cash flow considerations, both the residential and non-residential charges increase to $3,103.69 per capita and $62.28 per square metre, respectively. Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $97,494,283 $25,060,070 $2,472.85 $47.18 $3,103.69 $62.28 WATERWORKS SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix C | 122 Infrastructure Requirement From - To Gross Cost Grants/ Subsidies & Contributions Net Municipal Costs Direct Developer Contribution Post Period Allocation Net Growth- Related Water Treatment Plant Projects 1 W-1 13.5 ML/d Treatment Expansion for Rockland WTP 2025 - 2028 $33,065,000 $11,242,100 $21,822,900 0% $0 $0 $5,455,725 $16,367,175 2 W-4 WTP - PLC (and panel), local control panels, and network communication Upgrades 2025 - 2025 $1,089,000 $0 $1,089,000 50% $544,500 $0 $0 $544,500 3 W-5 WTP - SCADA software & hardware upgrades 2025 - 2025 $290,000 $0 $290,000 50% $145,000 $0 $0 $145,000 4 W-6 WTP - PLC, SCADA Software & hardware upgrades 2025 - 2025 $326,000 $0 $326,000 50% $163,000 $0 $0 $163,000 Subtotal Water Treatment Plant Projects $34,770,000 $11,242,100 $23,527,900 $852,500 $0 $5,455,725 $17,219,675 Studies 5 W-1 Water Treatment Plant Capacity Study 2024 - 2025 $3,000,000 $1,020,000 $1,980,000 0% $0 $0 $0 $1,980,000 6 Water Master Plan Update 2026 - 2027 $150,000 $0 $150,000 0% $0 $0 $0 $150,000 Subtotal Studies $3,150,000 $1,020,000 $2,130,000 $0 $0 $0 $2,130,000 Watermains 7 W-28 Replace existing 300 WM with a 600 - on Edwards from WTP to Hwy 17 2025 - 2026 $2,292,465 $1,815,861 $476,604 43% $204,050 $0 $68,139 $204,416 8 W-29 New Transmission from Caron BS to 10.0km south of Baseline Road (elevated tower on Bouvier) 2025 - 2026 $23,573,918 $21,155,234 $2,418,684 0% $0 $0 $604,671 $1,814,013 9 W-31 New Transmission from Bouvier BS to Bourget (Bouvier Rd and Lacroix) 2029 - 2029 $5,021,000 $4,769,950 $251,050 0% $0 $0 $62,763 $188,288 10 W-32 Install 2 PRVs on the existing transmission main before and after Bouvier BS for Pressure Control 2029 - 2029 $134,000 $127,300 $6,700 0% $0 $0 $1,675 $5,025 11 W-33 New Transmission from Bourget (Bouvier Rd. and Lacroix) to Cheney Tower 2029 - 2029 $16,024,000 $15,222,800 $801,200 0% $0 $0 $200,300 $600,900 12 W-34 Install 1 PRV on the existing transmission main for Pressure Management in Hammond 2034 - 2034 $67,000 $63,650 $3,350 0% $0 $0 $838 $2,513 13 W-35 Twin watermains on Caron St. from Dr Corbeil to Caron BS 2034 - 2034 $385,000 $188,650 $196,350 0% $0 $0 $49,088 $147,263 14 - St-Jean & Poupart (from PS #9 to Walmart) a - 400mm dia W/M from PS#9 to Hydro Station (585 Metres) 2026 - 2026 $472,000 $0 $472,000 0% $0 $0 $0 $472,000 b - 400mm dia W/M from St-Jean Hydro Station to Richelieu (1490 metres) 2026 - 2026 $1,203,000 $0 $1,203,000 0% $0 $0 $0 $1,203,000 15 - 400mm dia W/M from Bronze Avenue Crossing - Morris Village Stage 6 (400 Metres) (Cobalt to Caron) 2026 - 2026 $323,000 $0 $323,000 0% $0 $0 $0 $323,000 16 - 400mm dia W/M from Bronze Ave. (Caron - 400 metres East) 2026 - 2026 $323,000 $0 $323,000 0% $0 $0 $0 $323,000 17 - 400mm dia W/M from Rockland East (Laurier - County Road 17) 2025 - 2025 $44,000 $0 $44,000 0% $0 $0 $0 $44,000 Benefit to Existing Share APPENDIX C.1 TABLE C.1-1 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM WATERWORKS (2024-2046) Estimated Project Costs Timing Project NO. Water Master Plan Ref Appendix C | 123 Infrastructure Requirement From - To Gross Cost Grants/ Subsidies & Contributions Net Municipal Costs Direct Developer Contribution Post Period Allocation Net Growth- Related Benefit to Existing Share APPENDIX C.1 TABLE C.1-1 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM WATERWORKS (2024-2046) Estimated Project Costs Timing Project NO. Water Master Plan Ref 18 - Watermain transmission main through Honeywell Sub (Water Plant to 17) Oversizing (±700m) 2028 - 2033 $87,900 $0 $87,900 0% $0 $0 $0 $87,900 Subtotal Water Treatment Plant Projects $49,950,283 $43,343,445 $6,606,838 $204,050 $0 $987,472 $5,415,316 Appendix C | 124 Infrastructure Requirement From - To Gross Cost Grants/ Subsidies & Contributions Net Municipal Costs Direct Developer Contribution Post Period Allocation Net Growth- Related Benefit to Existing Share APPENDIX C.1 TABLE C.1-1 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM WATERWORKS (2024-2046) Estimated Project Costs Timing Project NO. Water Master Plan Ref Water Pumping Station and Storage 19 W-23 Caron Booster Station - Zone 2 Pumping Capacity Expansion 2025 - 2025 5,000,000 $ 2,450,000 $ $2,550,000 $0 $0 $0 $637,500 $1,912,500 20 W-24 Bouvier Booster Station - Zone 3 Pumping Capacity Expansion 2030 - 2030 $4,624,000 3,560,480 $ $1,063,520 $0 $0 $0 $265,880 $797,640 Subtotal Water Pumping Station and Storage 9,624,000 $ 6,010,480 $ 3,613,520 $ - $ - $ 903,380 $ 2,710,140 $ Total Water Projects 97,494,283 $ 61,616,025 $ 35,878,258 $ 1,056,550 $ - $ $7,346,577 27,475,131 $ Notes 1) The post period allocation are based on share of population growth to 2046 relative to the projections in the Water and Wastewater Master Plan . The post-period share is: 25% 2) Available DC Reserve Funds have been accounted for through the cash flow analysis Appendix C | 125 23-Year Growth in Population in New Units 9,222 Employment Growth 956 23-Year Growth in Square Meters 47,800 Total DC Grants Benefit Direct Available Post Eligible Gross Subsidies & to Existing Developer DC Period Costs for Project Cost Other Contrib. Share Contributions Reserves Allocation Recovery ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 WATERWORKS 2024-2046 Water Treatment Plant Projects $34,770.00 $11,242.10 $852.50 $0.00 $2,415.06 $5,455.73 $14,804.61 91% $13,472.20 9% $1,332.42 Studies $3,150.00 $1,020.00 $0.00 $0.00 $0.00 $0.00 $2,130.00 91% $1,938.30 9% $191.70 Watermains $49,950.28 $43,343.45 $204.05 $0.00 $0.00 $987.47 $5,415.32 91% $4,927.94 9% $487.38 Water Pumping Station and Storage $9,624.00 $6,010.48 $0.00 $0.00 $0.00 $903.38 $2,710.14 91% $2,466.23 9% $243.91 TOTAL WATERWORKS 2024-2046 $97,494.28 $61,616.03 $1,056.55 $0.00 $2,415.06 $7,346.58 $25,060.07 $22,804.66 $2,255.41 Unadjusted Development Charge Per Capita ($) $2,472.85 Unadjusted Development Charge Per Sq. M. ($) $47.18 Note: As many of the works are being designed to benefit growth both in this period and beyond the 2046-year planning period, a share of the costs are considered to be recovered from future DCs outside this planning period Development-Related Capital Forecast Residential Non-Residential Share Share WATERWORKS 2024-2046 APPENDIX C.1 TABLE C.1-2 CITY OF CLARENCE-ROCKLAND SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 126 WATER: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $2,197.7 $3,091.7 ($3,466.7) ($9,055.9) ($12,152.1) ($15,392.2) ($15,433.8) ($15,444.0) ($14,567.7) ($13,982.5) 2024-2046 RESIDENTIAL FUNDING REQUIREMENTS Water: Residential: Non Inflated $900.9 $8,099.0 $6,822.3 $3,791.8 $3,736.9 $736.1 $739.2 $13.3 $13.3 $13.3 $24,866.1 Water: Residential: Inflated $900.9 $8,261.0 $7,097.9 $4,023.9 $4,044.9 $812.7 $832.4 $15.3 $15.6 $15.9 $26,020.5 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units $549.0 $560.0 $571.0 $454.0 $459.0 $468.0 $474.0 $480.0 $379.0 $381.0 $4,775.0 REVENUE - DC Receipts: Inflated $1,703.9 $1,772.8 $1,843.8 $1,495.3 $1,542.0 $1,603.7 $1,656.8 $1,711.3 $1,378.2 $1,413.2 $16,121.1 INTEREST - Interest on Opening Balance $76.9 $108.2 ($190.7) ($498.1) ($668.4) ($846.6) ($848.9) ($849.4) ($801.2) ($769.0) ($5,287.1) - Interest on In-year Transactions $14.1 ($178.4) ($144.5) ($69.5) ($68.8) $13.8 $14.4 $29.7 $23.8 $24.5 ($341.0) TOTAL REVENUE $1,794.9 $1,702.6 $1,508.6 $927.7 $804.8 $771.0 $822.3 $891.5 $600.8 $668.6 $10,493.0 CLOSING CASH BALANCE $3,091.7 ($3,466.7) ($9,055.9) ($12,152.1) ($15,392.2) ($15,433.8) ($15,444.0) ($14,567.7) ($13,982.5) ($13,329.8) WATERWORKS 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE APPENDIX C.1 TABLE C.1-3 CITY OF CLARENCE-ROCKLAND Appendix C | 127 WATER: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 TOTAL OPENING CASH BALANCE ($000) ($13,329.8) ($12,742.2) ($11,903.9) ($10,976.5) ($10,211.7) ($9,356.6) ($8,413.4) ($7,376.1) ($6,229.7) ($5,192.1) ($4,056.1) ($2,815.1) ($1,467.0) 2024-2046 RESIDENTIAL FUNDING REQUIREMENTS Water: Residential: Non Inflated $136.3 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $136.3 Water: Residential: Inflated $166.1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $166.1 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units $387.0 $392.0 $395.0 $335.0 $340.0 $343.0 $346.0 $351.0 $306.0 $309.0 $312.0 $314.0 $317.0 $4,447.0 REVENUE - DC Receipts: Inflated $1,464.2 $1,512.7 $1,554.8 $1,345.0 $1,392.4 $1,432.8 $1,474.2 $1,525.4 $1,356.4 $1,397.1 $1,438.9 $1,477.1 $1,521.0 $18,892.1 INTEREST - Interest on Opening Balance ($733.1) ($700.8) ($654.7) ($603.7) ($561.6) ($514.6) ($462.7) ($405.7) ($342.6) ($285.6) ($223.1) ($154.8) ($80.7) ($5,723.9) - Interest on In-year Transactions $22.7 $26.5 $27.2 $23.5 $24.4 $25.1 $25.8 $26.7 $23.7 $24.4 $25.2 $25.8 $26.6 $327.7 TOTAL REVENUE $753.7 $838.4 $927.3 $764.8 $855.1 $943.2 $1,037.3 $1,146.4 $1,037.6 $1,136.0 $1,241.0 $1,348.1 $1,467.0 $13,496.0 CLOSING CASH BALANCE ($12,742.2) ($11,903.9) ($10,976.5) ($10,211.7) ($9,356.6) ($8,413.4) ($7,376.1) ($6,229.7) ($5,192.1) ($4,056.1) ($2,815.1) ($1,467.0) $0.0 2024 Adjusted Charge Per Capita 3,103.69 $ Allocation of Capital Program Residential Sector 91.0% Non-Residential Sector 9.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND APPENDIX C.1 TABLE C.1-3 WATERWORKS 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE Appendix C | 128 WATER: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $217.4 $235.7 ($491.1) ($1,132.9) ($1,451.3) ($1,782.9) ($1,801.8) ($1,820.5) ($1,751.2) ($1,696.8) 2024-2046 NON-RESIDENTIAL FUNDING REQUIREMENTS Water: Non-Residential: Non: Inflated $89.1 $801.0 $674.7 $375.0 $369.6 $72.8 $73.1 $1.3 $1.3 $1.3 $2,459.3 Water: Non-Residential: Inflated $89.1 $817.0 $702.0 $398.0 $400.0 $80.4 $82.3 $1.5 $1.5 $1.6 $2,573.5 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres $1,600 $1,600 $1,600 $2,250 $2,300 $2,300 $2,300 $2,350 $2,050 $2,100 $20,450.0 REVENUE - DC Receipts: Inflated $100 $102 $104 $149 $155 $158 $161 $168 $150 $156 $1,402.2 INTEREST - Interest on Opening Balance $8 $8 ($27) ($62) ($80) ($98) ($99) ($100) ($96) ($93) ($640.2) - Interest on In-year Transactions $0 ($20) ($16) ($7) ($7) $1 $1 $3 $3 $3 ($38.6) TOTAL REVENUE $107 $90 $60 $80 $68 $61 $64 $71 $56 $66 $723.4 CLOSING CASH BALANCE $236 ($491) ($1,133) ($1,451) ($1,783) ($1,802) ($1,821) ($1,751) ($1,697) ($1,633) APPENDIX C.1 TABLE C.1-3 CITY OF CLARENCE-ROCKLAND WATERWORKS 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE Appendix C | 129 WATER: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 TOTAL OPENING CASH BALANCE ($000) ($1,633) ($1,577) ($1,498) ($1,408) ($1,317) ($1,214) ($1,102) ($980) ($843) ($699) ($544) ($376) ($195) 2024-2046 NON-RESIDENTIAL FUNDING REQUIREMENTS Water: Non-Residential: Non: Inflated $13 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13 Water: Non-Residential: Inflated $16 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres $2,100 $2,100 $2,150 $2,050 $2,100 $2,100 $2,100 $2,150 $2,100 $2,100 $2,100 $2,100 $2,100 $27,350 REVENUE - DC Receipts: Inflated $159 $163 $170 $165 $173 $176 $180 $187 $187 $191 $194 $198 $202 $2,345 INTEREST - Interest on Opening Balance ($90) ($87) ($82) ($77) ($72) ($67) ($61) ($54) ($46) ($38) ($30) ($21) ($11) ($736) - Interest on In-year Transactions $3 $3 $3 $3 $3 $3 $3 $3 $3 $3 $3 $3 $4 $41 TOTAL REVENUE $72 $79 $90 $91 $103 $112 $122 $137 $144 $155 $168 $181 $195 $1,649 CLOSING CASH BALANCE ($1,577) ($1,498) ($1,408) ($1,317) ($1,214) ($1,102) ($980) ($843) ($699) ($544) ($376) ($195) $0 2024 Adjusted Charge Per Square Metre 62.28 $ Allocation of Capital Program Residential Sector 91.0% Non-Residential Sector 9.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX C.1 TABLE C.1-3 CITY OF CLARENCE-ROCKLAND WATERWORKS 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE Appendix C | 130 APPENDIX C.2 SANITARY SEWER SERVICES Appendix C | 131 Sanitary sewage and wastewater treatment services are provided through sewer system and a central Wastewater Treatment Plant in Rockland. The capital program contained herein was assembled by the City's engineering staff as well as the City's engineering consultants and is designed to serve the population and employment growth between 2024 and 2046. Sanitary Sewage works included in the DC capital forecast are required to achieve health and safety standards as identified in relevant legislation including Provincial regulations, other relevant legislation as well as City standards. As such, in accordance with section 4(3) of O.Reg. 82/98, the fifteen-year historical service level does not apply. TABLE C.2-1 2024-2046 DEVELOPMENT-RELATED CAPITAL PROGRAM The 2024-2046 capital program totals $51.19 million and related to projects in four categories: Water Pollution Control Plant Projects, Studies, Sewer Pumping Stations and Sewer mains. Of the total gross program, $30.33 million is related to WPCP projects, $300,000 for Studies, $18.55 for SPS works and $2.00 million to sewer mains. The details and timing of each project, and the cost breakdown are shown on Table The single largest project in the capital program can be related to the Rockland WPCP capacity expansions (Phase 1 and 2) that is estimated to cost $30.33 million. In addition, new sewage pumping stations #1, 6 and 10 add a further $16.52 million to the total gross program cost. Unlike water, no share of the sanitary sewer program is anticipated to be offset by funding contributions from other municipalities nor is any confirmed grant funding for these projects anticipated. The total gross cost of the capital program is not to be entirely recovered through future development charges. Approximately $395,000 of the program has been identified as a benefit to existing, or non-growth share and has been removed from the calculation. The total non-growth share relates to the replacement component of the sanitary sewer from Laurier Trunk Sewer to Pump Station #1. Lastly, it is expected that the capacity upgrade and additional flow monitoring and calibration associated with Pump Station #6 be partially paid for by the developers, therefore, $151,300 has been removed from the calculation. Lastly, it is assumed that the WPCP projects and Sewage Pumping Station Projects outlined in the capital program can benefit development occurring outside the planning period (to 2046). As a result, a 25% post period allocation has been applied to these specific projects in the capital program which Appendix C | 132 are assumed to service development beyond the planning horizon. This post period allocation amounts to $12.18 million and this amount can be considered for recovery in a subsequent development charges by-law. This share of costs is not included for recovery in this planning period. TABLE C.2-2 CALCULATION OF THE DEVELOPMENT CHARGES Table C.2-2 provides an overview of the calculation of the unadjusted development charge with consideration of the existing DC reserve fund balance of approximately $937,640. Of the total gross program cost of $51.19 million, about $37.52 million is considered to be the remaining net DC costs eligible for recovery in the 2024-2046 period after all reductions described have been considered. The total $37.52 million is then allocated: 91 per cent residential and 9 per cent non-residential. The allocation of costs is based on the future shares of population in new units and employment growth to 2046. The residential share of the capital program totals $34.14 million and, when divided by the forecast growth in population in new units (9,222) to 2046, an unadjusted charge of $3,702.19 per capita results. The non-residential share of $3.38 million is applied against the forecast increase in square metres of non-residential floor space (47,800) to 2046, yielding an unadjusted charge of $70.64 per square metre. TABLE C.2-3 CASH FLOW ANALYSIS After cash flow considerations, both the residential and non-residential charges increase to $4,406.31 per capita and $88.50 per square metre, respectively. Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $51,185,008 $37,518,287 $3,702.19 $70.64 $4,406.31 $88.50 SANITARY SEWER SERVICES SUMMARY Development-Related Capital Program Development Charge Development Charge 2024 - 2033 Unadjusted Adjusted Appendix C | 133 NO. WW Master Plan Ref Infrastructure Requirement From - To Gross Cost Grants/ Subsidies & Contributions Direct Developer Contribution Post Period Allocation Net Growth- Related Water Pollution Conrol Plant Projects 1 3 Rockland WPCP Phase 1 Expansion 2024 - 2029 $24,546,000 $0 0% $0 $0 $6,136,500 $18,409,500 2 6 Rockland WPCP Phase 2 Expansion 2029 - 2033 $5,783,000 $0 0% $0 $0 $1,445,750 $4,337,250 Subtotal Water Pollution Conrol Plant Projects $30,329,000 $0 $0 $0 $7,582,250 $22,746,750 Studies 3 - Sanitary System Master Plan 2026 - 2027 $150,000 $0 0% $0 $0 $0 $150,000 4 - Provison for other Development-Related Studies 2024 - 2024 $150,000 $0 0% $0 $0 $0 $150,000 Subtotal Studies $300,000 $0 $0 $0 $0 $300,000 Sewage Pumping Stations 5 WW-1 SPS-1 - Upgrade Capacity to 670 L/s (Pump Station #1) 2033 - 2040 $5,552,000 $0 0% $0 $0 $1,388,000 $4,164,000 6 WW-10 SPS-4 - Pump 2 Replacement for Capacity 2026 - 2027 $511,000 $0 0% $0 $0 $127,750 $383,250 7 WW-14 SPS-5 - Capacity Upgrade to 34L/s 2024 - 2024 $1,462,000 $0 0% $0 $0 $365,500 $1,096,500 8 WW-19 SPS-6 - Additional Flow monitoring and recalibration 2024 - 2024 $58,000 $0 0% $0 $2,900 $13,775 $41,325 9 WW-20 SPS-6 - Capacity Upgrade to 57L/s 2026 - 2026 $2,968,008 $0 0% $0 $148,400 $704,902 $2,114,706 10 WW-31 SPS-10 - New (Caron Expansion Lands) 2027 - 2028 $8,000,000 $0 0% $0 $0 $2,000,000 $6,000,000 Subtotal Sewage Pumping Stations $18,551,008 $0 $0 $151,300 $4,599,927 $13,799,781 Sewers 11 - Replace Sanitary Sewers - Laurier Trunk Sewer to Pump Station #1 2024 - 2024 $920,000 $0 43% $395,600 $0 $0 $524,400 12 - Mtée Poupart (St-Jean - End Asphalt W-Mart) 2025 - 2025 $228,000 $0 0% $0 $0 $0 $228,000 13 WW-40 Dalrymple Drive Sewer - Increase Capacity 2027 - 2027 $332,000 $0 0% $0 $0 $0 $332,000 14 - Clarence Creek Sanitary Siphon Crossing 2024 - 2025 $525,000 $0 0% $0 $0 $0 $525,000 Subtotal Sewers $2,005,000 $0 $395,600 $0 $0 $1,609,400 Total Sanitary Sewer Projects $51,185,008 $0 $395,600 $151,300 $12,182,177 $38,455,931 Notes 1) The post period allocation are based on share of population growth to 2046 relative to the projections in the Water and Wastewater Master Plan . The post-period share is: 25% 2) Available DC Reserve Funds have been accounted for through the cash flow analysis Benefit to Existing Share APPENDIX C.2 TABLE C.2-1 CITY OF CLARENCE-ROCKLAND DEVELOPMENT-RELATED CAPITAL PROGRAM SANITARY SEWAGE (2024-2046) Estimated Project Costs Timing Appendix C | 134 23-Year Growth in Population in New Units 9,222 Employment Growth 956 23-Year Growth in Square Meters 47,800 Total DC Grants Benefit Direct Available Post Eligible Gross Subsidies & to Existing Developer DC Period Costs for Project Cost Other Contrib. Share Contributions Reserves Allocation Recovery ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 SANITARY SEWAGE 2024-2046 Water Pollution Conrol Plant Projects $30,329.0 $0.0 $0.00 $0.00 $937.64 $7,582.25 $21,809.11 91% $19,846.29 9% $1,962.82 Studies $300.0 $0.0 $0.00 $0.00 $0.00 $0.00 $300.00 91% $273.00 9% $27.00 Sewage Pumping Stations $18,551.0 $0.0 $0.00 $151.30 $0.00 $4,599.93 $13,799.78 91% $12,557.80 9% $1,241.98 Sewers $2,005.0 $0.0 $395.60 $0.00 $0.00 $0.00 $1,609.40 91% $1,464.55 9% $144.85 TOTAL SANITARY SEWAGE 2024-2046 $51,185.01 $0.00 $395.60 $151.30 $937.64 $12,182.18 $37,518.29 $34,141.64 $3,376.65 Unadjusted Development Charge Per Capita ($) $3,702.19 Unadjusted Development Charge Per Sq. M. ($) $70.64 Note: As many of the works are being designed to benefit growth both in this period and beyond the 2046-year planning period, a share of the costs are considered to be recovered from future DCs outside this planning period Development-Related Capital Forecast Residential Non-Residential Share Share SANITARY SEWAGE 2024-2046 APPENDIX C.2 TABLE C.2-2 CITY OF CLARENCE-ROCKLAND SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 135 SEWAGE: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $853.3 ($1,440.1) ($2,327.3) ($5,067.0) ($9,779.6) ($14,209.8) ($16,714.9) ($16,145.5) ($15,484.1) ($15,285.9) 2024-2046 RESIDENTIAL FUNDING REQUIREMENTS Sewage: Residential: Non Inflated $4,680.1 $3,238.5 $4,959.1 $6,066.9 $5,522.1 $3,581.5 $789.4 $789.4 $789.4 $1,263.0 $31,679.3 Sewage: Residential: Inflated $4,680.1 $3,303.2 $5,159.5 $6,438.2 $5,977.3 $3,954.3 $889.0 $906.7 $924.9 $1,509.4 $33,742.6 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units $549.0 $560.0 $571.0 $454.0 $459.0 $468.0 $474.0 $480.0 $379.0 $381.0 $4,775.0 REVENUE - DC Receipts: Inflated $2,419.1 $2,516.9 $2,617.6 $2,122.9 $2,189.2 $2,276.8 $2,352.1 $2,429.5 $1,956.7 $2,006.3 $22,887.1 INTEREST - Interest on Opening Balance $29.9 ($79.2) ($128.0) ($278.7) ($537.9) ($781.5) ($919.3) ($888.0) ($851.6) ($840.7) ($5,275.1) - Interest on In-year Transactions ($62.2) ($21.6) ($69.9) ($118.7) ($104.2) ($46.1) $25.6 $26.6 $18.1 $8.7 ($343.7) TOTAL REVENUE $2,386.7 $2,416.1 $2,419.7 $1,725.6 $1,547.2 $1,449.1 $1,458.4 $1,568.1 $1,123.1 $1,174.3 $17,268.3 CLOSING CASH BALANCE ($1,440.1) ($2,327.3) ($5,067.0) ($9,779.6) ($14,209.8) ($16,714.9) ($16,145.5) ($15,484.1) ($15,285.9) ($15,621.1) APPENDIX C.2 TABLE C.2-3 CITY OF CLARENCE-ROCKLAND SANITARY SEWAGE 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE Appendix C | 136 SEWAGE: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 TOTAL OPENING CASH BALANCE ($000) ($15,621.1) ($14,952.7) ($14,189.1) ($13,334.7) ($12,748.6) ($12,074.3) ($11,317.4) ($10,471.9) ($8,844.3) ($7,371.3) ($5,758.5) ($3,996.6) ($2,082.7) 2024-2046 RESIDENTIAL FUNDING REQUIREMENTS Sewage: Residential: Non Inflated $473.7 $473.7 $473.7 $473.7 $473.7 $473.7 $473.7 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $3,315.6 Sewage: Residential: Inflated $577.4 $588.9 $600.7 $612.7 $625.0 $637.5 $650.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $4,292.4 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units $387.0 $392.0 $395.0 $335.0 $340.0 $343.0 $346.0 $351.0 $306.0 $309.0 $312.0 $314.0 $317.0 $4,447.0 REVENUE - DC Receipts: Inflated $2,078.7 $2,147.6 $2,207.4 $1,909.5 $1,976.8 $2,034.1 $2,092.9 $2,165.6 $1,925.7 $1,983.5 $2,042.8 $2,097.0 $2,159.4 $26,821.2 INTEREST - Interest on Opening Balance ($859.2) ($822.4) ($780.4) ($733.4) ($701.2) ($664.1) ($622.5) ($576.0) ($486.4) ($405.4) ($316.7) ($219.8) ($114.5) ($7,302.0) - Interest on In-year Transactions $26.3 $27.3 $28.1 $22.7 $23.7 $24.4 $25.2 $37.9 $33.7 $34.7 $35.7 $36.7 $37.8 $394.3 TOTAL REVENUE $1,245.8 $1,352.5 $1,455.1 $1,198.8 $1,299.3 $1,394.4 $1,495.7 $1,627.6 $1,473.0 $1,612.8 $1,761.9 $1,913.9 $2,082.7 $19,913.5 CLOSING CASH BALANCE ($14,952.7) ($14,189.1) ($13,334.7) ($12,748.6) ($12,074.3) ($11,317.4) ($10,471.9) ($8,844.3) ($7,371.3) ($5,758.5) ($3,996.6) ($2,082.7) ($0.0) 2024 Adjusted Charge Per Capita 4,406.31 $ Allocation of Capital Program Residential Sector 91% Non-Residential Sector 9% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% SANITARY SEWAGE 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE APPENDIX C.2 TABLE C.2-3 CITY OF CLARENCE-ROCKLAND Appendix C | 137 SEWAGE: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($000) $84.4 ($242.8) ($443.4) ($840.7) ($1,324.1) ($1,777.9) ($2,046.6) ($2,015.4) ($1,974.4) ($1,959.8) 2024-2046 NON-RESIDENTIAL FUNDING REQUIREMENTS Sewage: Non-Residential: Non: Inflated $462.9 $320.3 $490.5 $600.0 $546.1 $354.2 $78.1 $78.1 $78.1 $124.9 $3,133.1 Sewage: Non-Residential: Inflated $462.9 $326.7 $510.3 $636.7 $591.2 $391.1 $87.9 $89.7 $91.5 $149.3 $3,337.2 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres $1,600.0 $1,600.0 $1,600.0 $2,250.0 $2,300.0 $2,300.0 $2,300.0 $2,350.0 $2,050.0 $2,100.0 $20,450.0 REVENUE - DC Receipts: Inflated $141.6 $144.4 $147.3 $211.3 $220.3 $224.7 $229.2 $238.9 $212.6 $222.1 $1,992.5 INTEREST - Interest on Opening Balance $3.0 ($13.4) ($24.4) ($46.2) ($72.8) ($97.8) ($112.6) ($110.8) ($108.6) ($107.8) ($691.4) - Interest on In-year Transactions ($8.8) ($5.0) ($10.0) ($11.7) ($10.2) ($4.6) $2.5 $2.6 $2.1 $1.3 ($41.8) TOTAL REVENUE $135.7 $126.1 $113.0 $153.4 $137.3 $122.4 $119.1 $130.7 $106.1 $115.6 $1,259.3 CLOSING CASH BALANCE ($242.8) ($443.4) ($840.7) ($1,324.1) ($1,777.9) ($2,046.6) ($2,015.4) ($1,974.4) ($1,959.8) ($1,993.5) SANITARY SEWAGE 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE APPENDIX C.2 TABLE C.2-3 CITY OF CLARENCE-ROCKLAND Appendix C | 138 SEWAGE: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 TOTAL OPENING CASH BALANCE ($000) ($1,993.5) ($1,930.8) ($1,861.1) ($1,778.4) ($1,699.0) ($1,605.9) ($1,503.8) ($1,392.4) ($1,197.9) ($993.7) ($772.8) ($534.3) ($277.1) 2024-2046 NON-RESIDENTIAL FUNDING REQUIREMENTS Sewage: Non-Residential: Non: Inflated $46.8 $46.8 $46.8 $46.8 $46.8 $46.8 $46.8 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $327.9 Sewage: Non-Residential: Inflated $57.1 $58.2 $59.4 $60.6 $61.8 $63.0 $64.3 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $424.5 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres $2,100.0 $2,100.0 $2,150.0 $2,050.0 $2,100.0 $2,100.0 $2,100.0 $2,150.0 $2,100.0 $2,100.0 $2,100.0 $2,100.0 $2,100.0 $27,350.0 REVENUE - DC Receipts: Inflated $226.5 $231.1 $241.3 $234.7 $245.2 $250.1 $255.1 $266.4 $265.4 $270.7 $276.2 $281.7 $287.3 $3,331.9 INTEREST - Interest on Opening Balance ($109.6) ($106.2) ($102.4) ($97.8) ($93.4) ($88.3) ($82.7) ($76.6) ($65.9) ($54.7) ($42.5) ($29.4) ($15.2) ($964.7) - Interest on In-year Transactions $3.0 $3.0 $3.2 $3.0 $3.2 $3.3 $3.3 $4.7 $4.6 $4.7 $4.8 $4.9 $5.0 $50.9 TOTAL REVENUE $119.9 $127.9 $142.1 $139.9 $155.0 $165.1 $175.8 $194.5 $204.2 $220.8 $238.5 $257.2 $277.1 $2,418.0 CLOSING CASH BALANCE ($1,930.8) ($1,861.1) ($1,778.4) ($1,699.0) ($1,605.9) ($1,503.8) ($1,392.4) ($1,197.9) ($993.7) ($772.8) ($534.3) ($277.1) $0.0 2024 Adjusted Charge Per Square Metre 88.50 $ Allocation of Capital Program Residential Sector 91.0% Non-Residential Sector 9.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% CITY OF CLARENCE-ROCKLAND SANITARY SEWAGE 2024-2046 CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE APPENDIX C.2 TABLE C.2-3 Appendix C | 139 APPENDIX D RESERVE FUNDS Appendix D | 140 APPENDIX D - DEVELOPMENT CHARGES RESERVE FUNDS The Development Charges Act requires that a reserve fund be established for each service for which development charges are collected. Table 1 presents the uncommitted reserve fund balances, as at December 31, 2023, that are available to help fund the development- related net capital costs identified in this study. As shown in Table D-1, the December 2023 total reserve fund balance was in a positive position of $11.83 million. These funds are typically assigned to projects in the initial years of the capital program for each service. This has the effect of reducing and deferring capital costs brought forward to the development charge calculation and the cash flow analysis. Where there is a negative balance, as in the case of by-law services and development- related studies) the amount is brought forward in the DC capital program for recovery through future development charges. Appendix D | 141 DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT YEAR ENDING DECEMBER 31, 2023 Uncommitted Service Reserve Funds Library Services $379,942 Parks And Recreation $1,920,977 By-Law Services ($76,809) Development Related Studies ($12,872) Fire Services $340,413 Public Works $1,114,729 Roads And Related $4,811,232 Waterworks $2,415,061 Sanitary Sewer Services $937,644 Total Development Charge Reserves $11,830,316 APPENDIX D TABLE D-1 CITY OF CLARENCE-ROCKLAND Appendix D | 142 APPENDIX E COST OF GROWTH ANALYSIS Appendix E | 143 APPENDIX E - COST OF GROWTH ANALYSIS A. ASSET MANAGEMENT PLAN The Development Charges Act requires that municipalities complete an Asset Management Plan before passing a development charges by-law. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life-cycle. i. Asset Types A summary of the future City-owned assets and estimated useful life assumptions for eligible DC services considered as part of the study are outlined in Table E-1. Although all capital assets considered in the study have been identified, not all assets necessitate future replacement or ongoing maintenance activities. Some projects do not relate to the emplacement of a tangible capital asset, such as the recovery of completed projects. It should be noted that the capital cost estimates prepared for each of the projects identified in this section include grouped costs of various individual elements, which, as a stand-alone item, may have its own useful life (for example, new buildings include HVAC, structural elements, roof, etc.). Accordingly, the average useful life assumptions noted below are applicable to all project components. Appendix E | 144 Table E-1 - Summary of Municipal Assets Useful Lives Service Estimated Useful Life Library Services Buildings Parking Spaces Furniture, Equipment, and Materials 50 years 10 years 10-15 years Parks and Recreation Indoor Recreation Facilities Debentures Studies 30-50 years 0 years 0 years By-Law Services Recovery of Negative Reserve Balance Vehicles and Equipment 0 years 10 years Development Related Studies Recovery of Negative Reserve Balance Growth Studies 0 years 0 years Fire Services Debentures Vehicles Studies 0 years 10 years 0 years Services Related to a Highway - Public Works Buildings Fleet and Equipment 50-75 years 10 years Services Related to a Highway - Roads and Related Cycling Multi-Use Path Roadways Intersections Pedestrian Sidewalks Developer Projects County Roadworks Studies 25 years 25-75 years 25-50 years 50 years 25 years 25-50 years 25 years 0 years Waterworks Services Treatment Plant Studies Watermains Pumping Station and Storage 100 years 0 years 100 years 100 years Appendix E | 145 Service Estimated Useful Life Sanitary Sewer Services Water Pollution Control Plant Studies Sewage Pumping Station Sewer mains 50-100 years 0 years 50-100 years 100 years ii. Annual Provision When assets require rehabilitation or are due for replacement, the source of funds is limited to reserves or contributions from operating. Capital expenditures to carry out the rehabilitation and replacement of aging infrastructure are not growth-related and are therefore not eligible for funding through development charge revenues or other developer contributions. Based on the useful life assumptions and the capital cost of acquiring and/or emplacing each asset, a provision for infrastructure replacement has been calculated for both the general and engineered services. Provisions for infrastructure replacement are initially calculated for each asset based on their useful life and the anticipated cost of replacement. The aggregate of all individual provisions forms the required annual capital provision. In calculating the annual provisions, a number of assumptions are made to account for inflation (2.0 per cent) and interest (3.5 per cent). Consistent with the requirements of the DCA, assets that are proposed to be funded under the development charges by-law have been included in the analysis. As a result, the total calculated annual provision for development charge related infrastructure has been netted down to consider the replacement of existing infrastructure or benefit-to-existing development. However, for reference, the annual replacement provisions associated with the non-development charge funded costs, including costs related to the benefit-to-existing and post-period benefit have also been calculated. Table E-2 provides the calculated annual asset management contribution for both the gross capital expenditures and the share related to the 2024 to 2034 DC recoverable portion for all general services and services related to a highway. The year 2034 has been included to calculate the annual contribution for the planning periods 2024 to 2033 and as the expenditures in 2033 will not trigger asset management contributions until 2034. As shown, by 2034, the City will need to fund an additional $1.67 million per annum in order to properly fund the full life cycle costs of the new assets related to the general services and services related to a highway works supported under the development charges by-law. Appendix E | 146 Table E-3 provides the calculated annual asset management contribution for both the gross capital expenditures and the share related to the 2024 to 2046 DC recoverable portion for the engineered services. The year 2047 has been included to calculate the annual contribution for the planning periods 2024 to 2046 and as the expenditures in 2046 will not trigger asset management contributions until 2047. As shown, by 2047, the City will need to fund an additional $191,000 per annum in order to properly fund the full life cycle costs of the new assets related to the general services supported under the development charges by-law. iii. Future Revenue Growth The calculated annual funding provision should be considered within the context of the City's projected growth. Over the next ten years, the City's census population is projected to increase by 3,282. In addition, the City will also add 409 employees that will result in approximately 20,450 square metres of additional non-residential building space. Over the 23-year period, the City's census population is projected to increase by 6,769 and employment will grow by 956 employees resulting in an increase of 47,800 square metres of non-residential space. DC-Eligible Non DC-Eligible DC-Related Non DC-Related LIBRARY SERVICES $1,425,000 $1,628,000 $34,000 $56,000 PARKS AND RECREATION $16,080,000 $3,923,000 $345,000 $345,000 BY-LAW SERVICES $52,000 $120,000 $0 $11,000 DEVELOPMENT RELATED STUDIES $300,000 $38,000 $0 $0 FIRE SERVICES $2,374,000 $1,613,000 $39,000 $118,000 SERVICES RELATED TO A HIGHWAY PUBLIC WORKS $2,591,000 $4,029,000 $109,000 $126,000 ROADS AND RELATED $47,067,000 $47,915,000 $1,147,000 $1,079,000 TOTAL $69,889,000 $59,266,000 $1,674,000 $1,735,000 Table E-2 Calculated Annual AMP Provisions General Services 2024-2033 Capital Program Annual AMP Provision by 2034 DC-Eligible Non DC-Eligible DC-Related Non DC-Related WATERWORKS $27,475,000 $70,019,000 $29,000 $81,000 SANITARY SEWER SERVICES $38,456,000 $12,729,000 $162,000 $54,000 TOTAL $65,931,000 $82,748,000 $191,000 $135,000 Table E-3 Calculated Annual AMP Provisions Engineering Services 2024-2046 Capital Program Annual AMP Provision by 2047 Appendix E | 147 This growth will have the effect of increasing the overall assessment base. This leads to additional user fee and charge revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the development charges by-law. The collection of these funds is intended to be allocated to the City's reserves for future replacement of these assets. B. LONG-TERM CAPITAL AND OPERATING IMPACT ANALYSIS As shown in Table E-4, by 2034 the City's net operating costs are estimated to increase by $2.12 million for property tax supported services. Increases in net operating costs will be experienced as there are operational costs associated with additional capital. Table E-5 and E-6 summarizes the components of the development-related capital forecast that will require funding from non-DC sources (e.g. property tax) for the planning period 2024 to 2033 for general services and services related to a highway and from 2024 to 2046 for engineering services of water and sanitary sewer. For the services under the 10-year planning horizon, $16.69 million will need to be funded from non-DC sources over a 10-year planning period and is related to facilities and infrastructure that will benefit the existing community. In addition, $34.47 million in interim DC financing related to post-period shares of projects may be required or these costs may be recovered from other growth funding tools. For the engineered services of water and sanitary sewer, $1.45 million will need to be funded from non-DC sources over a 23-year planning period and is related to infrastructure that will benefit the existing community. In addition, $19.53 million in interim DC financing related to post-period shares of projects may be required or these costs may be recovered from other growth funding tools. Council is made aware of these factors so that they understand the operating and capital costs that will not be covered by DCs as it adopts the development-related capital forecast set out in the study. Appendix E | 148 APPENDIX E TABLE E-4 CITY OF CLARENCE-ROCKLAND ESTIMATED NET OPERATING COST OF THE PROPOSED DEVELOPMENT-RELATED CAPITAL PROGRAM Additional Category Operating Costs $ unit meaure at 2033 ($000) Library Services $212.8 - New Library Materials $0.01 per $1.00 of addt'l capital $2.4 - New Furniture and Equipment $0.10 per $1.00 of new infrastructure $10.4 - Rockland Branch Expansion (3,000 sqft) $40 per sq.ft. added $120.0 - Bourget Branch Expansion (2,000 sqft) $40 per sq.ft. added $80.0 Parks and Recreation $717.0 - Development-Related Capital Projects Parks $0.05 per $1.00 of addt'l capital $717.0 - Excludes debt payments By-law Services $0.0 - no additional op costs N/A $0.0 Development Related Studies $0.0 - Development-Related Capital Projects N/A $0.0 Fire Services $37.5 - New Additional Space, Equipment and Vehicles $0.10 per $1.00 of new infrastructure $37.5 - Excludes debt payments and study Public Works $616.5 - New Additional Space, Equipment and Vehicles $0.15 per $1.00 of new infrastructure $616.5 Roads and Related $534.0 - Development-Related Roads Infrastructure $300 per household $534.0 Waterworks $0.0 - Rate supported service - no additional op costs $0.0 Sanitary Sewage $0.0 - Rate supported service - no additional op costs $0.0 TOTAL ESTIMATED OPERATING COSTS $2,117.8 (in constant 2024 dollars) Cost Driver (in 2024 $) Appendix E | 149 Total DC Net Replacement Eligible Service Municipal & Benefit to Other Available Post-Period Costs for Cost Existing Contributions DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) ($000) 1.0 LIBRARY SERVICES $3,053.4 $0.0 $0.0 $379.9 $1,628.1 $1,045.4 2.0 PARKS AND RECREATION $17,073.1 $993.5 $0.0 $1,921.0 $0.0 $14,158.6 3.0 BY-LAW SERVICES $171.6 $0.0 $0.0 $0.0 $120.0 $51.6 4.0 DEVELOPMENT RELATED STUDIES $337.9 $37.5 $0.0 $0.0 $0.0 $300.4 5.0 FIRE SERVICES $3,987.1 $1,125.0 $0.0 $340.4 $488.0 $2,033.7 SERVICES RELATED TO A HIGHWAY 6.0 PUBLIC WORKS $6,620.0 $2,510.0 $0.0 $1,114.7 $1,518.5 $1,476.7 7.0 ROADS AND RELATED $94,981.4 $12,027.1 $5,170.5 $4,811.2 $30,717.0 $42,255.5 TOTAL 10-YEAR PROGRAM $126,224.5 $16,693.1 $5,170.5 $8,567.3 $34,471.7 $61,321.9 APPENDIX E CITY OF CLARENCE-ROCKLAND SUMMARY OF TAX AND RATE SUPPORTED FUNDING REQUIREMENTS CAPITAL PROGRAM FOR GENERAL SERVICES AND SERVICES RELATED TO A HIGHWAY (10-YEAR) Development-Related Capital Program (2024 - 2033) TABLE E-5 Appendix E | 150 C. THE PROGRAM IS DEEMED FINANCIALLY SUSTAINABLE In summary, the Asset Management Plan and long-term capital and operating analysis included in this appendix demonstrates that the City can afford to invest and operate the identified general and engineered services infrastructure over the 10-year and 23-year planning periods. Importantly, the City's annual budget review allows staff to continue to monitor and implement mitigating measures should the program become less sustainable. Total DC Net Replacement Direct Eligible Service Municipal & Benefit to Developer Available Post-Period Costs for Cost Existing Contributions DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) ($000) 1.0 WATERWORKS $35,878.3 $1,056.6 $0.0 $2,415.1 $7,346.6 $25,060.1 2.0 SANITARY SEWER SERVICES $51,185.0 $395.6 $151.3 $937.6 $12,182.2 $37,518.3 TOTAL 23-YEAR PROGRAM $87,063.3 $1,452.2 $151.3 $3,352.7 $19,528.8 $62,578.4 Development-Related Capital Program (2024 - 2046) CITY OF CLARENCE-ROCKLAND APPENDIX E TABLE E-6 SUMMARY OF TAX AND RATE SUPPORTED FUNDING REQUIREMENTS CAPITAL PROGRAM FOR ENGINEERED SERVICES: WATER AND SANITARY SEWER Appendix E | 151 APPENDIX F LOCAL SERVICE POLICY Appendix F | 152 City of Clarence-Rockland CITY OF CLARENCE-ROCKLAND LOCAL SERVICE GUIDELINES GENERAL POLICY GUIDELINES ON DEVELOPMENT CHARGES AND LOCAL SERVICE FUNDING FOR CITY-WIDE GROWTH-RELATED WORKS The following guidelines set out, in general terms, the size and nature of the engineered infrastructure that is included in the City of Clarence-Rockland Development Charges (DC) Background Study, which is eligible to be funded in part by DCs. In order for a project to be partially funded through DCs, the following will apply: 1. The project will be listed in the most current City of Clarence-Rockland Development Cost Background Study. a. The City, at its sole discretion, may deem a project not listed in the most current DC Study to be development-related and potentially fundable, in whole or in part, from DCs. Inclusion of the new project may require the substitution (removal) of a similar project from the related service project list, as contained in the most current DC Study, or require consideration for future DC funding pending a DC Background Study update or amendment. b. The City, at its sole discretion, may deem a project not specifically listed in the most recent DC Study to be part of the "unallocated improvements" referenced in the most current DC Study. Therefore, the project may be considered development related and potentially fundable, in whole or in part from DC's. 2. The project will add additional capacity to the servicing network. If the proposed infrastructure does not add any additional capacity beyond the Appendix F | 153 City of Clarence-Rockland servicing requirement for a particular development, the projects are assumed the sole responsibility of the developer. a. The City may require larger infrastructure than what may be necessitated by a given development in order to conform to the standard infrastructure sizes and capacity as per the City's design criteria. This is not considered "excess" capacity and will be required at the direct expense of the developer and no share of the cost will be eligible for DC credits. b. Projects eligible to be funded in part by development changes include infrastructure that provides servicing or capacity for more than one development is not necessarily fully or partially funded from development charges. If a project is considered fully or partially local in nature, the City will require the benefitting land owners to fund the works directly. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development in any existing development and proposed development in its surrounding area these policy guidelines, the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area, and subsection 59(2) of the Development Charges Act, 1997. These local service policy guidelines are subject to review and amendment by the City, which may be independent of an amendment or update to the City's development charge by-law. The detailed engineering requirements for all work and/or development are governed by the City of Clarence-Rockland Official Plan, or if not specified in the Official Plan, by the approved detailed engineering standards and/or related master plans. DEFINITIONS Appendix F | 154 City of Clarence-Rockland A local service is defined as an infrastructure service that is: Internal to a development, or external to a development, in order to support a specific development or required to link with the area to which the plan relates. "Local service" funding is specifically considered for the following services: 1.0 Water Services 2.0 Sanitary Sewer Services 3.0 Storm Sewer Services 4.0 Transportation 1.0 WATER 1.1 Water Supply, Storage and Booster Pumping Stations 1.1.1 All projects related to upgrading, expanding or constructing water supply and treatment facilities (plants and water conservation), storage facilities (storage tanks, etc.), and pumping stations, including costs to acquire/expropriate land, considered to be in whole or in part related to development, are considered to be a DC project. 1.1.2 New or expanded local pumping stations, including upgrades identified through a development proposal, servicing a localized area and needs (specific development) are a local service and a direct developer responsibility. 1.1.3 Upgrades to, or construction of, temporary water booster pumping stations and reservoir projects are considered to be the developer's responsibility. Appendix F | 155 City of Clarence-Rockland 1.1.4 Upgrades to, or construction of, permanent water booster pumping stations and reservoir projects may be considered development charge eligible projects. Included in the cost of these projects is a 12% engineering fee. 1.1.5 Where a temporary facility precedes the construction of a permanent facility, the developer that requires the temporary facility will be required to also assist in making provision for the permanent facility (e.g. secure land for permanent facility) as a condition of approval for the temporary facility. 1.2 Watermains 1.2.1 Watermains that are required to service a specific development, either internal or external to the site, are considered to be the developer's responsibility. 1.2.2 Connections to transmission watermains and pumping stations to service specific areas are considered to be a direct developer responsibility. 1.2.3 Transmission watermains (generally located outside the development area) may be required to provide network integrity, security or reliability to the distribution system. Where such transmission watermains are identified by a Class Environmental Assessment, Servicing Study or listed in the City's most current DC Study, they are considered to be a DC project. 1.2.4 A developer-implemented infrastructure upgrade required to service the needs of a specific development will not be eligible for City reimbursement or DC credits when it provides some Appendix F | 156 City of Clarence-Rockland additional capacity as a by-product (i.e. due to the selection of standard pipe sizes). 1.2.5 Watermains within and external to the development that are larger than 300 mm and service other development areas are to be included in the development charge calculation. The amount of cost contribution for watermains within a development shall be calculated using tendered unit prices or the City's unit cost at the time of construction and shall be the difference between the cost of the actual pipe diameter and the cost of a 300 mm pipe diameter including a 12% engineering fee. Only watermain and valves will be included in the calculation. Any costs related to the depth of pipe are the responsibility of the developer. Watermain Size Charged to DCs 300 mm NIL 405 mm cost of 405 mm - cost of 300 mm 610 mm cost of 610 mm - cost of 300 mm 750 mm cost of 750 mm - cost of 300 mm 900 mm cost of 900 mm - cost of 300 mm 1050 mm cost of 1050 mm - cost of 300 mm 1200 mm cost of 1200 mm - cost of 300mm 2.0 SANITARY SYSTEMS 2.1 Wastewater Treatment 2.1.1 All projects providing for the upgrading, improvement and/or expansion of existing wastewater treatment facilities, including the cost to acquire/convey land, are considered in Appendix F | 157 City of Clarence-Rockland whole or in part to be related to development are considered to be a DC project. 2.2 Sanitary Sewers 2.2.1 A developer will be solely responsible for the cost and implementation of new or upgraded sewer infrastructure, either internal or external, that are required to adequately service a specific development in accordance with applicable City policies, standards and criteria. 2.2.2 A developer-implemented infrastructure upgrade required to service the needs of a specific development will not be eligible for DC credits when it provides some additional capacity as a by-product (i.e. due to the selection of standard pipe sizes). 2.2.3 Sanitary sewers within and external to the development that are larger than 375 mm and service other development areas are to be included in the development charge calculation. The amount of cost contribution for Sanitary sewers within a development shall be calculated using tendered unit prices or the City's unit cost at the time of construction and shall be the difference between the cost of the actual pipe diameter and the cost of a 375 mm pipe diameter including a 12% engineering fee. Only Sanitary sewers, and appurtenances will be included in the calculation. Any costs related to the depth of pipe are the responsibility of the developer. 2.2.4 A sanitary or combined sewer, of any size, required to connect a specific development to a major pumping station to service development, is considered the sole responsibility of a developer. Appendix F | 158 City of Clarence-Rockland 2.2.5 Trunk sanitary sewers, external to the development, and major pumping stations serving more than one development are to be included in the development charge calculation. These services will be identified through a Class Environmental Assessment, Servicing Study or by City staff. 2.2.6 Development Charges funding will also extend to correct a health related and/or environmental concern with a growth- related component. 2.2.7 Over-depth costs for upstream lands and rock excavation will be considered on an individual project basis, up to a maximum allowance of 15% of the over-sizing costs. 2.3 Pumping Stations 2.3.1 Pumping Stations 2.3.2 Upgrades to, or construction of, temporary sanitary pumping stations are considered to be the developer's responsibility. 2.3.3 Upgrades to, or construction of, permanent pumping stations that are required as a result of an approved serviceability study, service more than one developer, and have a tributary flow greater than 80 L/s are considered to be development charges projects. The flow criteria is used to identify development charges eligible projects with reimbursement made upon acceptance of the work by the City and all the proper documentation received. Appendix F | 159 City of Clarence-Rockland 2.3.4 New or expanded pumping stations that do not qualify as development charges projects are the developer's responsibility. 3.0 Stormwater 3.1 Storm Sewers 3.1.1 Storm sewers that are required for a development, either internal or external, are considered to be the developer's responsibility. 3.1.2 If a storm sewer upgrade is required based on existing flows from the storm sewer service area as well as proposed flows generated by the development according to applicable City policies, guidelines and standard, the developer will be responsible for the cost of the sewer upgrade. 3.1.3 Watermains within and external to the development that are larger than 300 mm and service other development areas are to be included in the development charge calculation. The amount of cost contribution for watermains within a development shall be calculated using tendered unit prices or the City's unit cost at the time of construction and shall be the difference between the cost of the actual pipe diameter and the cost of a 300 mm pipe diameter including a 12% engineering fee. 3.2 Stormwater Management Facilities 3.2.1 Stormwater quality and quantity works required to service a specific development, either internal or external, are a direct developer responsibility. Appendix F | 160 City of Clarence-Rockland 3.2.2 Stormwater management facilities that benefit multiple developments will be subject to "collect back agreements" and will be detailed in conditions of subdivision approval. 4.0 TRANSPORTATION 4.1 Overriding Principals 4.1.1 Transportation infrastructure needs that are within, adjacent to, or related to, a specific development application, including rezonings, are considered to be a local service and direct responsibility of the developer as a condition of development approval process; 4.1.2 Transportation infrastructure needs that are driven by overall City wide development and are external to a development site will be considered as "non-local" and potentially funded by DCs. Included in the cost of these projects is a 12% engineering fee. 4.2 Definitions Table 1 (see attached) provides a summary of the characteristics of local roadways; major and minor collectors; industrial and arterial roadways. 4.3 Arterial Roads 4.3.1 New Arterial Roads: Appendix F | 161 City of Clarence-Rockland The cost of constructing an arterial roadway beyond 11 m represents an eligible DC expenditure. When development proceeds construction of a new arterial road and the road is either adjacent to or runs through the development plans, the developer is responsible for the cost equivalent of a collector road [11 m pavement surface] which will include streetlights, landscaping elements, sidewalks etc. The timing of the arterial road construction will be dependent on growth demands and may have to be included in a subsequent DC study. Multi-Use Paths within the road allowance and part of a local service project will be considered as a local service. 4.3.2 Widening of Existing Arterial Roads For existing arterial roadways, the oversizing costs associated with any additional width beyond 11 m of pavement will be considered as a DC eligible expense. 4.4 Collector Roads 4.4.1 The cost of the first 11 m of asphalt for new major and minor collector roads is the financial responsibility of the developer(s). 4.4.2 For existing collector roadways, the oversizing cost associated with any additional width beyond 11 m of pavement width shall be deemed a DC eligible expense. Appendix F | 162 City of Clarence-Rockland 4.5 Internal Roads 4.5.1 All local and collector roads internal to a development (including road base and surface, street lighting, storm sewers, bridges, culverts, sidewalks, bike lanes, bike paths, noise walls, utilities, turning lanes, line painting, signage, etc.) - are the direct responsibility of the developer. 4.6 Road Reconstruction 4.6.1 Road reconstruction projects are projects that are intended to maintain the same number of basic lanes. However, if the existing roadway is required to be significantly rehabilitated [i.e. full depth granular replacement] in order to accommodate current and future transportation needs or requires upgrading such as urbanization to engineering standards, the cost of these works shall be deemed to be a DC eligible expenditures. These projects may also include the construction of appropriate turning lanes as required to service future growth. The cost of these works again will be considered to be a DC related costs. 4.7 Road Resurfacing 4.7.1 Road resurfacing projects are those that are intended to maintain the same number of basic lanes. However, if the asphalt requires partial or full depth replacement in order to support growth related traffic, the cost of these works will be included in the Background Development Charge Study and will be considered as a DC eligible cost. 4.8 Bridges Appendix F | 163 City of Clarence-Rockland 4.8.1 New bridges that are required to service future growth [as identified in the city's Master Transportation Plan] are considered to be DC eligible expenditures. 4.9 Traffic Signals and Intersection Improvements 4.9.1 Traffic signals required for private site entrances and/or road intersections external to a development that are warranted due to the development are considered a direct developer responsibility. Other traffic signals that are required on any type of roadway as a result of increasing growth related traffic volumes are considered to be DC eligible projects. 4.10 Streetlights 4.10.1 Streetlights on arterial roads and for the oversized portion of major collector roads are considered to be development charge projects. 4.10.2 Streetlights on all other roads are considered to be a developer financial responsibility. 4.11 Sidewalks 4.11.1 Sidewalks on arterial roads will be considered a development charge related expenditure. Appendix F | 164 City of Clarence-Rockland 4.11.2 Sidewalks on one or both sides of all other new roadways are not development charges projects and are considered to be the developers' financial responsibility. 4.11.3 Sidewalks that are external to a development and are necessary to connect the development to public spaces are considered to be the developers' financial responsibility. 4.11.4 The cost of sidewalks on arterial and collector roadways will be considered as an eligible expense for DC funding 4.12 Cycling Facilities 4.12.1 Bike lanes within the road allowance are considered to be part of the road construction and should follow the guidelines explained in the road construction section. 4.12.2 Bike paths outside of road allowances are considered to be the developers' financial responsibility if they are identified as part of a plan of subdivision. 4.12.3 Mixed use trails located outside of a road allowance and provide benefit to users beyond the development under consideration, may be considered as a DC eligible expense. 4.13 Land Acquisition from Road Works 4.13.1 Land acquisitions for Arterial or Major Collector roads that are to be constructed to approved engineering standard widths are primarily acquired by dedications under the Planning Act. In instances where limited or no development is anticipated and direct dedication is unlikely, the land acquisition is considered Appendix F | 165 City of Clarence-Rockland to be part of the capital cost of the related development charge project. 4.13.2 Land Acquisition for Grade Separations (beyond normal dedication requirements) is considered to be included in the capital cost of the related development charge project. Appendix F | 166 TABLE 1 City of Clarence-Rockland Roadway Classifications Characteristic Local Collector Industrial Arterial Minor Major Standard Collector Traffic move / Property access Primary - Property access Property access & Traffic movement equal Primary - Traffic movement Primary - Property Access Property Access / Traffic movement equal Primary - Traffic movement AADT <1,000 1,000-5,000 >5,000 <1,000 1,000-12,000 5,000-30,000 Peak Period Lanes 2 2 2 - 4 2 2-4 4 Connections Locals, collectors Locals, collectors Locals, collectors, and arterials Locals, collectors Locals, collectors, arterials Collectors, arterials Flow Character Interrupted Interrupted Interrupted Interrupted Interrupted Uninterrupted Speed Limit (km/h) 40-50 40-50 50-80 40-50 40-50 80-100 Sidewalks As required One side Both sides As required As required As required Cyclists No Cycling lanes Widen Curb Lanes Widen Curb Lanes No cycling Lanes Cycling Lanes as required Cycling Lanes as required Transit Generally not permitted Permitted Permitted Generally not provided Permitted Permitted Truck restrictions Restrictions preferred Restrictions permitted Restrictions permitted No restrictions No restrictions No restrictions Row width (m) 15-22 40-50 40-60 20-30 40-60 >30 Appendix F | 167 APPENDIX G AVAILABLE UNDER SEPARATE COVER: DEVELOPMENT CHARGE BY-LAW Appendix G | 168