Development Charges Background Study (2025/2026)

Clarington, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 5bec7f0df407 · verified 2026-10-28 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Consolidated Report Prepared by Hemson for the Municipality of Clarington 2025 Development Charges Background Study March 5, 2026 1000 - 30 St. Patrick Street, Toronto, ON M5T 3A3 416 593 5090 | [email protected] | www.hemson.com Consolidated Study Forward This consolidated version of the Municipalityʼs 2025 Development Charges Background Study released on March 24, 2025 reflect changes arising from Bill 17, Protect Ontario by Building Faster and Smarter Act, 2025, which was granted Royal Assent on June 5, 2025, and Bill 60, Fighting Delays, Building Faster Act, 2025, which was granted Royal Assent on November 27, 2025. Additionally, this consolidated Development Charges Background Study also includes changes arising from the public and stakeholder consultation process and supports the rates in the Municipalityʼs DC By-law # 2025-070. The amended residential rates are lower than those presented in the March 24th Background Study. The charge for single and semi-detached residential units has decreased from $42,835 to $42,269. The multiple-dwelling residential rate has been reduced from $35,165 to $34,700. The charge for two-bedroom and larger apartment units has decreased from $20,661 to $20,388, while the rate for one-bedroom and smaller apartment units has been reduced from $14,375 to $14,184. In contrast, the amended non-residential rates have increased from those identified in the March 24th Background Study. The non-industrial rate has risen from $201.08 to $208.94, and the industrial rate has increased from $92.04 to $95.40. Table of Contents List of Appendices 1 List of Acronyms 2 Executive Summary 3 1. Introduction 9 A. Background 9 B. Legislative Context 10 C. Relevant Analysis 11 D. Consultation and Approval Process 11 2. A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits 13 A. Municipal-Wide Development Charges are Calculated 13 B. Key Steps in Determining Development Charges for Future Development-Related Projects 15 C. Operating & Capital Cost Impacts and Asset Management Plan Legislative Requirements 19 3. Development Forecast 21 A. Residential Forecast 21 B. Non-Residential Growth Forecast 22 4. Summary of Historical Capital Service Levels 24 5. The Development-Related Capital Program 27 A. A Development-Related Capital Program is Provided for Councilʼs Approval 27 B. The Development-Related Capital Program for General Services 28 6. Development Charges are Calculated in Accordance with the DCA 31 A. Unadjusted Development Charge Calculation for General Services 31 B. Unadjusted Development Charge Calculation for Engineered Services 34 C. Adjusted Residential and Non-Residential Development Charges 36 D. Comparison of 2025 Newly Calculated Development Charges with Charges Currently in Force in Clarington 39 7. Cost of Growth Analysis 42 A. Long-Term Capital and Operating Impact Analysis 42 B. Asset Management Plan 44 8. Development Charges Administration and Policy Considerations 48 A. Development Charges Amount Payable and Date of Payment 48 B. Reserve Funds 49 C. Changes Arising From the More Homes Built Faster Act (Bill 23) and Cutting Red Tape to Build More Homes Act (Bill 185) 50 D. Development Charges Administration 51 E. Local Service Definitions 52 F. 2025 DC By-law Policy Changes 53 G. By-law 2021-011 - Clarington Technology Park 53 List of Appendices | 1 List of Appendices Appendix A - Development Forecast 55 Appendix B - General Services 71 Appendix C - Engineered Services 137 Appendix D - Reserve Fund Balances 174 Appendix E - Cost of Growth 177 Appendix F - Local Service Guidelines 188 Appendix G - DC By-law 197 List of Acronyms | 2 List of Acronyms AMP Asset Management Plan BTE Benefit to Existing COG Cost of Growth DCA Development Charges Act DC Development Charges GFA Gross Floor Area LSG Local Service Guidelines PRCMP Parks, Recreation and Culture Master Plan PPB Post-Period Benefit PPU Persons Per Unit Executive Summary | 3 Executive Summary Hemson Consulting Ltd. was retained by the Municipality of Clarington to complete a Development Charges (DC) Background Study. This Consolidated Background Study provides the basis and background to update the Municipalityʼs general and engineered development charges to reflect the servicing needs of new development in the Municipality. A. Legislative Context The Municipality of Clarington 2025 Consolidated Development Charges (DC) Background Study (herein referred to as the "DC Background Study") is presented as part of the process to lead to the approval of a new DC by- law in compliance with the Development Charges Act, 1997 (DCA). The study is prepared in accordance with the DCA and associated regulations, including the amendments that came into force in 2024. B. All Services with Development-Related Costs Included in the Analysis The following Municipal services have been included in the development charge analysis: - Library Services; - Emergency and Fire Services; - Parks and Indoor Recreation; - General Government; - Services Related to a Highway which includes Roads & Related and Operations; and - Land Acquisition. Executive Summary | 4 C. Approach Used to Calculate Development Charges In accordance with the DCA and associated regulation, several key steps are required to calculate development charges. These include: - Preparing a development (growth) forecast; - Establishing historical service levels; - Determining the increased needs for services arising from development; - Determining how these costs are attributed to development types (i.e. residential and non-residential); and - For some services, adjusting for a cashflow analysis. D. Development Forecast A forecast of residential and non-residential development anticipated in the Municipality has been included in this report for the purposes of this DC Background Study. The capital infrastructure planning period for General Services and Engineered Services is based on the 10-year planning horizon from 2025 to 2034. The Municipalityʼs development forecast for the 10-year planning period from 2025 to 2034, estimates that the Municipality will grow by 28,200 people and add approximately 12,290 new occupied dwelling units. The population in the new dwelling units is expected to accommodate roughly 35,920 persons. The employment forecast for the Municipality is forecasted to add approximately 10,190 employees in the 10-year planning period. This results in the addition of 547,700 square metres of new non-residential building space from 2025 to 2034. Executive Summary | 5 The following is a summary of the projected growth for the Municipality: Development Forecast 2024 2025 - 2034 Growth Total at 2034 2025 - 2051 Growth Total at 2051 Total Occupied Dwellings 37,611 12,294 49,905 42,549 80,160 Census Population 107,334 28,202 135,536 104,358 211,692 Population in New Dwellings 35,923 120,299 Non-Residential Employment 32,477 10,193 42,670 35,389 67,866 Non-Residential Building Space 547,703 2,143,587 E. Development Related Capital Program The development-related capital program for all services is planned over a 10-year period from 2025 to 2034. The gross cost of the program amount to $921.0 million. Details regarding the capital program for each service are provided in Appendix B and C of this report. F. Calculated Development Charges Development charge rates have been established under the parameters and limitations of the DCA. A Municipal-wide uniform cost recovery approach is used to calculate development charges for all services. The table below provides the Municipal-wide charges for residential and non-residential development based on the aforementioned development forecasts. Executive Summary | 6 Calculated Municipal-Wide Development Charges Service Single & Semi- Detached Multiple Dwellings Two- Bedroom & Larger Apartments One- Bedroom & Smaller Apartments Non- Industrial (sq.m.) Industrial (sq.m.) General Services $17,347 $14,241 $8,367 $5,821 $7.16 $7.16 Services Related to a Highway $24,868 $20,415 $11,995 $8,345 $201.35 $88.05 Land Acquisition $54 $44 $26 $18 $0.43 $0.19 Total Charge per Unit $42,269 $34,700 $20,388 $14,184 $208.94 $95.40 The 2025 DC Background Study has been prepared based on the best available information at the time of preparing this report and is subject to change based on future operating and capital business plans presented to Council as part of the annual budgeting process. Any excess capacity that occurs over the 10-year life of the DC By-law is expected to be recovered from future development as part of the capital plans approved by Council during this period. G. Cost of Growth Analysis An overview of the long-term capital and operating costs as well as the asset management-related annual provisions for capital facilities and infrastructure to be included in the DC by-law is provided in the DC Background Study. This examination is required as one of the provisions of the DCA. H. Local Service Definitions A Local Service Definitions has been included in Appendix F of this report. Executive Summary | 7 I. DC By-law The new 2025 DC By-law has been made available under Appendix G of this Background Study. It will be released two weeks prior to the statutory public meeting in accordance with the requirements of the DCA. Of particular importance, the definitions that will be included in the DC By- law are used for the purposes of administering the Municipalityʼs development charges. In the event that definitions in other municipal documents (e.g. Official Plan or Zoning By-law) differs from the DC By-law, the language in the DC By-law prevails. J. 2025 DC Background Study is Based upon the Best Available Information The 2025 DC Background Study has been prepared based on the best available information at the time of preparing this report and is subject to change based on future operating and capital business plans presented to Council as part of the annual budgeting process. Any excess capacity that occurs over the 10-year life of the DC By-law is expected to be recovered from future development as part of the capital plans approved by Council during this period. K. 2025 DC By-law Policy Changes As part of the 2025 DC Background Study update, the policies contained in the 2020 DC By-law have been reviewed and updated. Changes from the 2020 By-law to the draft 2025 DC By-law include: - Definitions - minor modifications to definitions to align with current built forms and development trends in the Municipality. - Undetermined Non-Residential Use - provides options for paying DCs if the use of a non-residential building is not known (e.g. industrial versus non-industrial) at the time of building permit issuance. Executive Summary | 8 - Statutory Exemptions and Discounts Required Under the Act - intended to cover all statutory exemptions under the DCA (e.g. non-profit housing, rental housing, intensification within existing and new residential buildings etc.). - Exemption for Existing Industrial Development - reduced the exemption from 100% to 50% of existing gross floor area to align with the statutory requirements of the DCA. - Exemption for Specific Properties (Science Park and Energy Park) - exemption has been removed. - Purpose Built Rental Housing Development - discount has been removed. There is a statutory requirement to provide DC discounts based on number of bedrooms within a rental residential unit under the DCA. L. By-law 2021-011 - Clarington Technology Park On January 18, 2021, Council of the Municipality of Clarington adopted DC By-law 2021-011 which established area-specific development charge rates for the Clarington Technology Park area. The by-law imposes development charge rates for the recovery of Stormwater Management Services on a per hectare of net developable land area. In accordance with section 19(1.1) of the DCA, a municipality may amend a development charges by-law without producing a DC Background Study, hosting a statutory public meeting, or providing an opportunity to appeal the DC By-law so long as the only effect of the amendment is to repeal the provision specifying the date on which the by-law expires. DC By-law 2021-011 is currently set to expire on January 19, 2026, 5 years after it came into force. As part of the 2025 DC Background Study process, the by-law will be amended to replace the 5-year expiry with a 10-year expiry to align with statutory requirements. Introduction | 9 1. Introduction A. Background The Municipality of Clarington 2025 Development Charge (DC) Background Study is presented as part of a process to lead to the approval of new development charge by-laws in compliance with the Development Charges Act, 1997 (DCA). The anticipated residential and non-residential development in the Municipality of Clarington between 2025 and 2034 will increase demand on all municipal services. The Municipality wishes to continue implementing DCs to fund development-related capital projects so that development continues to be serviced in a fiscally responsible manner. The DCA and O. Reg. 82/98 require that a development charge background study be prepared in which development charges are determined with reference to: - A forecast of the amount, type and location of development anticipated in the Municipality; - The average capital service levels provided in the Municipality over the 15-year period immediately preceding the preparation of the background study; - A review of future capital projects, including an analysis of gross expenditures, funding sources, and net expenditures incurred, or to be incurred, by the Municipality to provide for the expected development, including the determination of the eligible and ineligible components of the capital projects; Introduction | 10 - An examination of the long-term capital and operating costs for the capital infrastructure required for each service to which the development charges by-laws would relate; and - An asset management plan to deal with all assets whose capital costs are proposed to be funded under the DC by-law, demonstrating that all assets included in the capital program are financially sustainable over their full life cycle. The study presents the results of the review which determines the development-related net capital costs attributable to development that is forecast to occur in the Municipality. These development-related net capital costs are then apportioned among various types of development (residential and non-residential) in a manner that reflects the increase in the need for each service attributable to each type of development. The DCA provides for a period of public review and comment regarding the calculated development charges. Following completion of this process in accordance with the DCA, Councilʼs review of this study and the comments it receives regarding this study or other information brought to its attention about the calculated charges, it is intended that Council will pass a new development charges by-law for the Municipality. The remainder of this study sets out the information and analysis upon which the calculated development charges are based. B. Legislative Context The study is prepared in accordance with the DCA and associated regulations, including recent amendments that came into force on November 28, 2022, through Bill 23: the More Homes Built Faster Act, 2022, and Bill 185: the Cutting Red Tape to Build More Homes Act, 2024. Among other provisions, the latter reversed the 5-year mandatory phase-in of DCs Introduction | 11 enacted under Bill 23 and brought into force exemptions for affordable housing projects that meet legislative conditions. Key legislative changes incorporated into this study include: - Historical service level standards have been extended from a 10 to 15- year planning period; - DC by-laws now expire every 10 years instead of 5 years; - The amount of interest paid on DC deferrals and freeze is capped at prime plus 1%; - Costs associated with affordable housing services are now ineligible for recovery through DCs; - Municipalities must spend or allocate 60% of available DC reserve funds per year for Services Related to a Highway; - Discounts for purpose-built rentals based on the number of bedrooms; and - Exemptions for Affordable and Attainable housing developments which meet the definitions under the DCA. C. Relevant Analysis The underlying assumptions and calculation methodologies contained in the DC Background Study have been informed by a range of inputs including the Municipalityʼs capital budget, existing master plans, and discussions with Municipal staff. D. Consultation and Approval Process In keeping with past practice, the Municipality established a highly consultative background study process that included regular meetings with Introduction | 12 a Steering Committee comprised of Municipal staff. In addition to the statutory public meeting required under the DCA, the Municipality also held two information sessions on January 7, 2025, and February 28, 2025, with development industry representatives. At these meetings, the draft inventories, capital program, rates, by-law policies and background study findings were discussed. The following provides a summary of the consultation and approval process undertaken to complete the DC Background Study. Following the release of the DC Study, consultation will continue with the public and development industry stakeholders prior to the passage of the new DC By-law in December 2025. Timeline of Consultation and Approval Process Description Targeted Dates Developer Information Session #1 January 7, 2025 Council Information Session February 3, 2025 Developer Information Session #2 February 28, 2025 Notice of Statutory Public Meeting March 17, 2025 Public Release of DC Background Study & Draft By-law March 24, 2025 Statutory Public Meeting April 7, 2025 Passage of 2025 DC By-law December 15, 2025 A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 13 2. A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits Several key steps are required in calculating a development charge. However, specific circumstances arise in each municipality which must be reflected in the calculation. In this study, therefore, we have tailored our approach to the Municipality of Claringtonʼs unique circumstances. The approach to the calculated development charges is focused on providing a reasonable alignment of development-related costs with the development that necessitates them. This study calculates charges on a Municipal-wide basis which is consistent with the Municipality of Claringtonʼs 2015 and 2020 Development Charges Background Studies. Despite the fact that development charges are calculated on a Municipal-wide basis, legislation allows a municipality to exempt or reduce rates for specific geographic areas. However, the legislation prevents lost revenue, due to discretionary exemptions or reductions from being made up through increasing charges on other areas. A. Municipal-Wide Development Charges are Calculated Clarington provides a range of services to the community it serves and has a sizeable inventory of facilities, infrastructure, vehicles and equipment. The DCA provides the Municipality with flexibility when defining services that will be included in the development charge by-laws, provided that the other provisions of the DCA and Regulations are met. The DCA also permits the Municipality to designate, in its by-laws, the areas within which the development charges shall be imposed. The charges may apply to all lands in the Municipality or to other designated development areas as specified in A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 14 the by-laws. As required under the recent changes to the legislation, consideration for the use of area-rating for development charge eligible services must be considered. i. Consideration for Area Rating For all of the development charge eligible services that the Municipality provides, the full range of capital facilities, land, equipment and infrastructure is available throughout the Municipality. All residents therefore have access to all facilities. A widely accepted method for recovering the development-related capital costs for such services is to apportion them over all new development anticipated in the Municipality. The following services are included in the Municipal-wide development charge calculation: General Services - Library Services; - Parks and Indoor Recreation; - Emergency and Fire Services; and - General Government. Engineered Services - Services Related to a Highway which includes Roads & Related and Operations; and - Land Acquisition. These services form a reasonable basis in which to plan and administer the Municipal-wide development charges. It is noted that the analysis of each of these services examines the individual capital facilities and equipment that make them up. For example, the Emergency and Fire Services category includes fire stations and associated land, vehicles, furniture and equipment. The resulting development charge for all of the above services A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 15 would be imposed uniformly against all new development everywhere in the Municipality. B. Key Steps in Determining Development Charges for Future Development-Related Projects Several key steps are required in calculating development charges for future development-related projects. These steps are shown in Figure 1 and are summarized below. i. Development Forecast The first step in the methodology requires a development forecast to be prepared for the 10-year study period, 2025 to 2034, for all services. The forecast of future residential and non-residential development used in this study was prepared by Hemson in consultation with the staff. The forecast has been informed by the Municipality and Region of Durhamʼs Official Plans, and accounts for historical and recent construction history. For the residential portion of the forecast both the census population growth and population growth in new units is estimated. Net population growth determines the need for additional facilities and provides the foundation for the development-related capital program. The non-residential portion of the forecast estimates the gross floor area (GFA) of building space to be developed over the 10-year period, 2025 - 2034. The forecast of GFA is based on the employment forecast for the Municipality. Factors for floor space per worker by category are used to convert the employment forecast into GFA for the purposes of the development charges study. A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 16 Figure 1: Overview of DC Background Study Process A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 17 ii. Service Categories and Historical Service Levels The DCA provides that the increase in the need for service attributable to anticipated development: ... must not include an increase that would result in the level of service exceeding the average level of that service provided in the municipality over the 15-year period immediately preceding the preparation of the background study...(s. 5. (1) 4.) Historical 15-year average service levels thus form the basis for the general services development charges. A review of the Municipalityʼs capital service levels for buildings, vehicles, and so on has therefore been prepared as a reference for the calculation so that the portion of future capital projects that may be included in the development charge can be determined. The historical service levels used in this study have been calculated based on the period 2010 to 2024. iii. Development-Related Capital Program and Analysis of DC Eligible Costs to be Recovered through Development Charges A development-related capital program has been prepared by the municipal staff as part of the study. The program identifies development-related projects and their gross and net municipal costs, after allowing for capital grants, subsidies or other recoveries as required by legislation (DCA, s. 5. (2)). The capital program provides another cornerstone upon which development charges are based. The DCA requires that the increase in the need for service attributable to the anticipated development may include an increase: ... only if the council of the municipality has indicated that it intends to ensure that such an increase in need will be met. (s. 5. (1) 3.) In conjunction with DCA, s. 5.(1)4. referenced above, the provisions have the effect of requiring that the development charge be calculated on the lesser A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 18 of the historical 15-year average service levels or the service levels embodied in future plans of the Municipality. The development-related capital program prepared for this study ensures that development charges are only imposed to help pay for projects that have been or are intended to be purchased or built in order to accommodate future anticipated development. It is not sufficient in the calculation of development charges merely to have had the service in the past. There must also be a demonstrated commitment to continue to emplace facilities or infrastructure in the future. In this regard, O. Reg. 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a Municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. For some projects in the development-related capital program, a portion of the project may confer benefits to existing residents. As required by the DCA, s. 5.(1)6., these portions of projects and their associated net costs are the funding responsibility of the Municipality from non-development charges sources. The amount of municipal funding for such shares of projects is also identified as part of the preparation of the development-related capital program. There is also a requirement in the DCA to reduce the applicable development charge by the amount of any "uncommitted excess capacity" that is available to partially meet future servicing requirements. Adjustments are made in the analysis to meet this requirement of the DCA. A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 19 iv. Attribution to Types of Development The next step in the determination of development charges is the allocation of the development-related net capital costs between the residential and the non-residential sectors. In the Municipality of Clarington, the allocation for general services is based on the consideration of projected changes in population in new units and employment over the planning periods. The exceptions are for the services of Library and Parks & Indoor Recreation. The development-related costs for these services have been allocated 100% to residential growth. The residential component of the development charge is applied to different housing types based on average occupancy factors. The non-residential component is applied on the basis of gross building space (GFA) in square metres for non-residential development. v. Final Adjustment The final determination of the development charges results from adjustments made to development-related DC eligible costs for each service and sector resulting from the application of any unallocated development- related reserve fund balances that are available to finance the development- related capital costs in the capital program. A cash flow analysis is also undertaken to account for the timing of projects and receipt of development charges. Interest earnings or borrowing costs are therefore accounted for in the calculation as allowed under the DCA. C. Operating & Capital Cost Impacts and Asset Management Plan Legislative Requirements Section 10 of the DCA identifies what must be included in a Development Charges Background Study, namely: s.10 (2) The development charge background study shall include, A Municipal-Wide Methodology Aligns Development-Related Costs and Benefits | 20 (c) an examination, for each service to which the development charge by- law would relate, of the long term capital and operating costs for capital infrastructure required for the service; and (c.2) an asset management plan prepared in accordance with subsection (3). i. Asset Management Plan (3) The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in a prescribed manner. The requirement to include an Asset Management Plan (AMP) was part of the DCA amendments that came into effect on January 1, 2016. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. The section of the DC Background Study that deals with the operating and capital cost impacts and the asset management plan can be found in Appendix E. Development Forecast | 21 3. Development Forecast This section summarizes the development forecasts used to calculate the development charges for the Municipality of Clarington. Appendix A contains additional material related to the growth forecast and the Municipalityʼs demographics. The development forecast used in the DC Background Study is informed by the long-term forecast established for the Municipality by the Region of Durhamʼs Official Plan which provides population, housing and employment projections for the Municipality. A. Residential Forecast Development charges are levied on residential development as a charge per new unit. Therefore, for the residential forecast, a projection of both the population growth as well as the population in new units is required. - The population growth determines the need for additional facilities and provides the foundation for the development-related capital program. - When calculating the development charge, however, the development- related net capital costs are spread over the total additional population that occupy new housing units. This population in new units represents the population from which development charges will be collected. Table 1 provides a summary of the residential forecast for the 10-year planning period from 2025 to 2034. The 10-year planning period is used throughout this study for all services. Over the planning period from 2025 to 2034, the total number of new residential units will increase by approximately 12,290, which translates into a population in new units of approximately 35,920. The population in new Development Forecast | 22 units was derived by using data from Statistics Canada analysing household sizes in recently constructed units. A summary of the residential growth forecast can be found in Table 1. B. Non-Residential Growth Forecast Development charges are levied on non-residential development as a charge per square metre of GFA. As with the residential forecast, the non- residential forecast requires both a projection of employment growth as well as a projection of the employment growth associated with new floorspace in the municipality. The non-residential forecast projects an increase of approximately 10,190 employees to 2034, which will be accommodated in 547,700 square metres of new non-residential building space. A summary of the non-residential growth forecast can be found in Table 1. Development Forecast | 23 TABLE 1 MUNICIPALITY OF CLARINGTON SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT FORECAST Development Forecast 2024 2025 - 2034 Growth Total at 2034 2025 - 2051 Growth Total at 2051 Total Occupied Dwellings 37,611 12,294 49,905 42,549 80,160 Census Population 107,334 28,202 135,536 104,358 211,692 Population in New Dwellings 35,923 120,299 Non-Residential Employment 32,477 10,193 42,670 35,389 67,866 Non-Residential Building Space 547,703 2,143,587 Summary of Historical Capital Service Levels | 24 4. Summary of Historical Capital Service Levels The DCA and O. Reg. 82/98 require that the development charges be set at a level no higher than the average service level provided in the Municipality over the 15-year period immediately preceding the preparation of the background study, on a service-by-service basis. For non-engineered services, or general services, the legislative requirement is met by documenting historical service levels for the preceding 15 years, in this case, for the period 2010 to 2024. Typically, service levels for general services are measured as a ratio of inputs per capita or per capita and employment. O. Reg. 82/98 requires that when determining historical service levels both quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet per capita. For most services, the typical approach to addressing the qualitative aspect is introduced by considering the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of dollars per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be charged to new development reflect not only the quantity (number and size), but also the quality (value or replacement cost) of service provided historically by the Municipality. Both the quantitative and qualitative aspects of service levels used in the present analysis are based on information provided by Municipal staff based on historical records and their experience with costs to acquire or construct similar facilities, equipment and infrastructure. Summary of Historical Capital Service Levels | 25 Table 2 summarizes service levels for all Municipal-wide services included in the development charge calculation (excluding General Government and Land Acquisition). Appendix B and C provide detailed historical inventory data upon which the calculation of service levels is based. TABLE 2 MUNICIPALITY OF CLARINGTON SUMMARY OF AVERAGE HISTORIC SERVICE LEVELS 2010 - 2024 MUNICIPAL-WIDE SERVICES Service 2010 - 2024 Service Level Indicator 1.0 LIBRARY SERVICE $553.88 per capita Buildings $402.33 per capita Parking Lots, Access Roads, & Other Paved Infrastructure $2.55 per capita Materials $119.62 per capita Furniture and Equipment $29.38 per capita 2.0 EMERGENCY & FIRE SERVICES $501.17 per population & emp. Buildings $271.48 per population & emp. Parking Lots, Access Roads & Other Paved Infrastructure $13.13 per population & emp. Vehicles & EV Charging Stations $177.03 per population & emp. Furniture and Equipment $39.53 per population & emp. 3.0 PARKS & INDOOR RECREATION $4,758.32 per capita Indoor Recreation $3,650.64 per capita Parkland $407.03 per capita Park Facilities $479.66 per capita Special Facilities $220.99 per capita 4.0 SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS $9,180.55 per population & emp. Roads and Related $8,790.25 per population & emp. Operations $390.29 per population & emp. Summary of Historical Capital Service Levels | 26 The Development-Related Capital Program | 27 5. The Development-Related Capital Program The DCA requires the Council of a municipality to express its intent to provide future capital facilities at the level incorporated in the development charges calculation. As noted in Section II, O. Reg. 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a Municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. A. A Development-Related Capital Program is Provided for Councilʼs Approval Based on the development forecasts summarized in Section 3 and detailed in Appendix A, Municipal staff, in collaboration with the consultants, developed a development-related capital program setting out those projects that are required to service anticipated development. For all services, the capital plan covers the 10-year period from 2025 - 2034. One of the recommendations contained in the background study is for Council to adopt the development-related capital program developed for the purposes of the development charges calculation. It is assumed that future capital budgets and forecasts will continue to bring forward the development-related projects contained herein that are consistent with the development occurring in the Municipality. It is acknowledged that changes The Development-Related Capital Program | 28 to the capital program presented here may occur through the Municipalityʼs normal capital budget process. B. The Development-Related Capital Program for General Services A summary of the development-related capital forecast for general services is presented in Table 3. The table provides a separate total for services analysed over the 10-year period, 2025 - 2034. Further details on the capital programs for each individual service category are available in Appendix B and Appendix C. The development-related capital program for all services estimates a total gross cost of $921.0 million. Grants, subsidies or other contributions has been identified for Emergency & Fire Services, Parks & Indoor Recreation, and Services Related to a Highway with a total value of 13.2 million. Therefore, the net municipal cost of the capital program is $907.8 million. This capital program incorporates those projects identified to be related to development anticipated in the next 10 years. It is not implied that all of these costs are to be recovered from new development by way of development charges. Portions of this capital program may relate to providing servicing for development which has occurred prior to 2025 (for which development charge reserve fund balances exist), for replacement of existing capital facilities, or for development anticipated to occur beyond the 2025 - 2034 planning period. Of the $907.8 million in 10-year net municipal capital costs, $491.4 million (54%) is related to the provision of Services Related to a Highway. This amount includes for a number of projects including bridge structure works, culvert works, intersection works, active transportation, etc. TABLE 3 MUNICIPALITY OF CLARINGTON SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM 2025 - 2034 in ($000) Gross Grants/ Municipal Service Cost Subsidies Cost 1.0 Library Service $46,122.6 $0.0 $46,122.6 2.0 Emergency & Fire Services $26,808.0 $3,200.0 $23,608.0 3.0 Parks & Indoor Recreation $338,985.5 $10,000.0 $328,985.5 4.0 General Government $10,499.8 $0.0 $10,499.8 5.0 Services Related To A Highway $491,453.2 $30.3 $491,422.9 6.0 Land Acquistion $7,155.0 $0.0 $7,155.0 TOTAL - 10 YEAR GENERAL & ENGINEERED SERVICES $921,024.1 $13,230.3 $907,793.8 The Development-Related Capital Forecast | 29 The Development-Related Capital Program | 30 Approximately 36% or $329.0 million of the net municipal capital costs is related to the provision of Parks & Indoor Recreation including the recovery of debentures, building expansions, park development, etc. The Library Services capital program focuses on the recovery of debentures, the creation of additional library space, new collection materials, and various equipment and structures. The net municipal cost for this program is $46.1 million. Fire & Emergency Services has plans to construct a new Fire Hall #6 and #7 as well as create a new training facility. The program also includes for the acquisition of new vehicles and equipment. The net municipal cost is $23.6 million. The portion of the Municipalityʼs capital program which relates to the provision of General Government has a net municipal cost of $10.4 million. This service includes various planning, library, emergency and fire services, and parks and indoor recreation studies. Land Acquisition includes land related to the South Courtice Satellite Facility, as well as road infrastructure works including culvert and new urban collectors works. The service has a net municipal cost of $7.2 million. Development Charges are Calculated in Accordance with the DCA | 31 6. Development Charges are Calculated in Accordance with the DCA This section summarizes the calculation of development charges for each service category and the resulting total development charge by type of development. Furthermore, the calculation of the "unadjusted" per capita (residential) and per square metre (non-residential) is presented. Adjustments are made to these amounts resulting from a cash flow analysis that considers interest earnings and borrowing costs. For residential development, the adjusted total per capita amount is then converted to a variable charge by housing unit type using unit occupancy factors. The calculated non-residential charges are based on gross floor area (GFA) of building space. It is noted that the calculation of the Municipal-wide development charges does not include any provision for statutory exemptions required under the DCA such as the exemption for enlargements of up to 50 per cent on existing industrial buildings. Such legislated exemptions, or other exemptions or reductions which Council may choose to provide, will result in a loss of development charge revenue for the affected types of development. Any such revenue loss may not be made up, however, by offsetting increases in other portions of the calculated charge. A. Unadjusted Development Charge Calculation for General Services A summary of the "unadjusted" residential and non-residential development charges for general services is presented in Table 4. Further details of the calculation for each individual Municipal service category are available in Appendix B and Appendix C. Development Charges are Calculated in Accordance with the DCA | 32 The capital program incorporates those projects identified to be related to development anticipated in the next ten years. However, not all of the capital costs are to be recovered from new development by way of development charges. Table 4 shows that $21.8 million of the capital program relates to replacement of existing capital facilities or to shares of projects that provide benefit to the existing community. This portion of capital costs will be funded from other sources (i.e., property taxes). A share of $12.3 million has been identified as DC reserve fund monies are available to fund development-related projects and has been reduced from the eligible capital costs. Another share of the forecast, $208.1 million, is attributable to development beyond the 2034 period (which will be considered for recovery in future development charges studies, subject to service level considerations). The total costs eligible for recovery through development charges for all services is approximately $167.0 million. This amount is allocated between the residential and non-residential sectors to derive the unadjusted development charges. Library Services and Parks and Indoor Recreation are deemed to benefit residential development only, while the other services are allocated between both sectors based on shares of population in new units and employment growth. Approximately $163.2 million of the services development charges recoverable amount is deemed to benefit residential development. When this amount is divided by the 10-year population growth in new units (35,920), an unadjusted charge of $4,542.24 per capita is derived. The non-residential share of the services capital program totals $3.8 million and when this amount is divided by the 10-year forecast of new non-residential space growth (547,700 square metres), an unadjusted charge of $6.92 per square metre is derived. TABLE 4 MUNICIPALITY OF CLARINGTON SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES 10-YEAR CAPITAL PROGRAM FOR GENERAL SERVICES 10 Year Growth in Population in New Units 35,923 10 Year Growth in Square Metre 547,703 Service Development-Related Capital Program (2025 - 2034) Residential Share % ($000) Non-Residential Share % ($000) Net Municipal Cost ($000) Replacement & Benefit to Existing ($000) Available DC Reserves ($000) Post-2034 Benefit ($000) Total DC Eligible Costs for Recovery ($000) 1.0 Library Service $46,122.6 $12,912.1 $1,964.3 $15,625.3 $15,620.8 100% $15,620.8 0% $0.00 Unadjusted Development Charge Per Capita $434.84 Unadjusted Development Charge Per Sq.M $0.00 2.0 Emergency & Fire Services $23,608.0 $1,519.5 $5,365.1 $6,560.2 $10,163.2 78% $7,917.1 22% $2,246.07 Unadjusted Development Charge Per Capita $220.39 Unadjusted Development Charge Per Sq.M $4.10 3.0 Parks & Indoor Recreation $328,985.5 $5,186.8 $4,622.1 $184,982.5 $134,194.1 100% $134,194.1 0% $0.00 Unadjusted Development Charge Per Capita $3,735.60 Unadjusted Development Charge Per Sq.M $0.00 4.0 General Government $10,499.8 $2,161.9 $381.3 $974.5 $6,982.1 78% $5,439.1 22% $1,543.05 Unadjusted Development Charge Per Capita $151.41 Unadjusted Development Charge Per Sq.M $2.82 TOTAL 10 YEAR DC ELIGIBLE SERVICES $409,215.9 $21,780.3 $12,332.8 $208,142.6 $166,960.2 $163,171.1 $3,789.1 Unadjusted Development Charge Per Capita Unadjusted Development Charge Per Sq.M $4,542.24 $6.92 Development Charges are Calculated in Accordance with the DCA | 33 Development Charges are Calculated in Accordance with the DCA | 34 B. Unadjusted Development Charge Calculation for Engineered Services Table 5 displays the calculation of the development charge rates for the Municipal-wide engineered service including Services Related to a Highway. Of the total net municipal cost of the Services Related to a Highway development-related projects, $498.6 million, not all are to be recovered from new development by way of development charges. Table 5 shows that $45.3 million is for the replacement of existing capital works or for shares of projects that provide benefit to the existing community. Available reserve funds, $37.2 million have also been removed from the development charges calculation. Post-period share of $74.0 million has been identified as a portion of the engineering services related capital projects will be required to service growth beyond 2034. As such, the total DC eligible cost of $342.0 million is related to development in the 2025 to 2034 and has been included in the development charge calculation. Unlike the general services, the capital program eligible for recovery through development charges is allocated to the residential, industrial and non- industrial sectors based on future shares of population in new units and employment growth over the planning period. On this basis, the allocation to the sectors is calculated at 78% for the residential, 8% for industrial and 14% non-industrial. As a result, $266.4 million of the engineered services capital program is deemed to benefit residential development. When this amount is divided by the long-term growth in population in new dwelling units (35,920), a charge of $7,416.04 per capita is the result. The industrial share totals $28.0 million and, when this amount is divided by the long-term forecast of industrial space growth (314,400 square metres), a charge of $89.08 per square metre results. The non-industrial share totals 10 Year Growth in Population in New Units 35,923 10 Year Industrial Growth in Square Metre 314,400 10 Year Non-Industrial Growth in Square Metre 233,303 Engineered Services Net Municipal Cost Replacement & Benefit to Existing Available DC Reserves Post 2034 Benefit Total DC Eligible Costs Residential Share Non-Residential Industrial Share Non-Residential Non-industrial Share ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) % ($000) 5.0 Services Related To A Highway Unadjusted Development Charge Per Capita Unadjusted Development Charge Per Sq.M $491,422.9 $45,305.8 $37,249.4 $67,538.9 $341,328.8 78% $265,895.2 $7,401.81 8% $27,954.83 $88.91 14% $47,478.84 $203.51 6.0 Land Acquisition Unadjusted Development Charge Per Capita Unadjusted Development Charge Per Sq.M $7,155.0 $18.7 $0.0 $6,480.0 $656.3 78% $511.3 $14.23 8% $53.75 $0.17 14% $91.29 $0.39 $498,577.9 $45,324.5 $37,249.4 $74,018.9 $341,985.1 $266,406.4 $28,008.6 $47,570.1 Unadjusted Development Charge Per Capita Unadjusted Development Charge Per Sq.M $7,416.04 $89.08 $203.90 TABLE 5 MUNICIPALITY OF CLARINGTON SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES 10-YEAR CAPITAL PROGRAM FOR ENGINEERED SERVICES Development Charges are Calculated in Accordance with the DCA | 35 Development Charges are Calculated in Accordance with the DCA | 36 $47.6 million results in a charge of $203.90 per square metre when divided by the long-term non-industrial growth (233,300 square metres). C. Adjusted Residential and Non-Residential Development Charges Final adjustments to the "unadjusted" development charge rates summarized above are made through a cash flow analysis. The analysis, details of which are included in the appendices, considers the borrowing cost and interest earnings associated with the timing of expenditures and development charge receipts for each service. Table 6 summarize the results of the adjustment for the residential development charge rates. The adjusted per capita rate increases from $11,944.05 to $12,701.06 after the cash flow analysis. Residential Municipal- wide development charges are proposed to vary by dwelling unit type to reflect their different occupancy factors and resulting demand for services. The calculated residential development charges for all services are shown in Table 6. As shown in the table, the calculated residential charge ranges from $42,269 for single and semi-detached units, to $14,184 for one-bedroom and smaller apartments. The calculated charge for multiple dwellings is $34,700 and $20,388 for two bedroom and larger apartments. The calculated non-residential development charges rates are presented in Table 7. The calculated adjusted rate for new industrial development is $95.40 per square metre, which is a decrease from the unadjusted rate of $96.00 per square metre. For non-industrial development, the adjusted development charge amounts to $208.94 per square metre which is a decrease from the unadjusted rate of $210.82 per square metre. Service Unadjusted Charge Per Capita Adjusted Charge Per Capita Residential Charge By Unit Type (1) Single & Semi-Detached Multiple Dwellings Two-Bedroom and Larger Apartments One-Bedroom and Smaller Apartments Library Service $434.84 $444.74 $1,478 $1,214 $713 $496 Emergency & Fire Services $220.39 $242.06 $805 $660 $388 $270 Parks & Indoor Recreation $3,735.60 $4,386.08 $14,578 $11,968 $7,032 $4,892 General Government $151.41 $146.18 $486 $399 $234 $163 Subtotal General Services $4,542.25 $5,219.06 $17,347 $14,241 $8,367 $5,821 Services Related to a Highway (2) $7,402 $7,482 $24,868 $20,415 $11,995 $8,345 Land Acquisition $14.23 $16.11 $54 $44 $26 $18 TOTAL CHARGE PER UNIT $11,944.05 $12,701.06 $42,269 $34,700 $20,388 $14,184 TABLE 6 MUNICIPALITY OF CLARINGTON MUNICIPAL-WIDE DEVELOPMENT CHARGES RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE (1) Based on Persons Per Unit Of: 3.32 2.73 1.60 1.12 (2) Services Related to a Highway include Roads & Related and Operations Development Charges are Calculated in Accordance with the DCA | 37 Non-Industrial Industrial Service Unadjusted Charge per Square Metre Adjusted Charge per Square Metre Unadjusted Charge per Square Metre Adjusted Charge per Square Metre Library Service $0.00 $0.00 $0.00 $0.00 Emergency & Fire Services $4.10 $4.37 $4.10 $4.37 Parks & Indoor Recreation $0.00 $0.00 $0.00 $0.00 General Government $2.82 $2.79 $2.82 $2.79 Subtotal General Services $6.92 $7.16 $6.92 $7.16 Services Related to a Highway(1) $203.51 $201.35 $88.91 $88.05 Land Acquisition $0.39 $0.43 $0.17 $0.19 TOTAL CHARGE PER SQUARE METRE $210.82 $208.94 $96.00 $95.40 TABLE 7 MUNICIPALITY OF CLARINGTON MUNICIPAL-WIDE DEVELOPMENT CHARGES NON-RESIDENTIAL DEVELOPMENT CHARGES PER SQUARE METRE (1) Services Related to a Highway include roads and operations Development Charges are Calculated in Accordance with the DCA | 38 Development Charges are Calculated in Accordance with the DCA | 39 D. Comparison of 2025 Newly Calculated Development Charges with Charges Currently in Force in Clarington Tables 8 and 9 present a comparison of the newly calculated residential and non-residential development charges with currently imposed development charge rates (as of July 1, 2024). Table 8 shows that the calculated Municipal-wide residential development charge single or semi-detached unit is increasing by $10,570 over the current charge of $31,645 currently in force. The comparison of calculated non-residential development charges with current rates is shown in Table 9. Service Current Residential Charge / SDU1 Calculated Residential Charge / SDU Difference in Charge Library Service $1,485 $1,478 ($7) 0% Emergency & Fire Services $669 $805 $136 20% Parks & Indoor Recreation $11,321 $14,578 $3,257 29% General Government $466 $486 $20 4% Subtotal General Services $13,941 $17,347 $3,406 24% Services Related to a Highway (2) $17,704 $24,868 $7,164 40% Land Acquisition N/A $54 $54 N/A TOTAL CHARGE PER UNIT $31,645 $42,269 $10,570 33% TABLE 8 MUNICIPALITY OF CLARINGTON COMPARISON OF CURRENT AND CALCULATED RESIDENTIAL DEVELOPMENT CHARGES (1) Effective July 1, 2025 to June 30, 2026 (2) Services Related to a Highway include Operations and Roads & Related infrastructure Development Charges are Calculated in Accordance with the DCA | 40 Non-Industrial ($/Square Metre) Industrial ($/Square Metre) Current Calculated Current Calculated Service Non-Industrial Non-Industrial Difference in Charge Industrial Industrial Difference in Charge Charge Charge Charge Charge Library Service $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 0% Emergency & Fire Services $3.64 $4.37 $0.73 20% $3.64 $4.37 $0.73 20% Parks & Indoor Recreation $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 0% General Government $1.43 $2.79 $1.36 95% $1.43 $2.79 $1.36 95% Subtotal General Services $5.07 $7.16 $2.09 41% $5.07 $7.16 $2.09 41% Services Related to a Highway(1) $153.16 $201.35 $48.19 31% $50.17 $88.05 $37.88 76% Land Acquisition N/A $0.43 $0.43 N/A N/A $0.19 $0.19 N/A TOTAL CHARGE PER SQUARE METRE $158.23 $208.94 $50.71 32% $55.24 $95.40 $40.16 73% TABLE 9 MUNICIPALITY OF CLARINGTON COMPARISON OF CURRENT AND CALCULATED NON-RESIDENTIAL DEVELOPMENT CHARGES (1) Services Related to a Highway include Operations and Roads & Related infrastructure Development Charges are Calculated in Accordance with the DCA | 41 Cost of Growth Analysis | 42 7. Cost of Growth Analysis This section describes the cost of growth analysis for the capital facilities and infrastructure identified in the 10-year capital program as it relates to the assets included in the DC Background Study. The objective of the analysis is to examine the impact of development-related infrastructure needs on the property tax base. The analysis considers both capital and operating implications. A. Long-Term Capital and Operating Impact Analysis This section provides a brief examination of the long-term capital and operating costs for the capital facilities and infrastructure to be included in the development charges by-law. This examination is required as one of the features of the DCA. i. Net Operating Costs for the Municipalityʼs Tax Supported Services to Increase over the Forecast Period Table 10 summarizes the estimated increase in net operating costs that the Municipality will experience for additions associated with the planned capital program. The estimated changes in net operating costs are based on the financial information from the Municipality and from Financial Information Returns (FIR). Additional details are included in Appendix E. As shown in Table 10, by 2034 the Municipalityʼs net operating costs for services is based on a 10-year planning horizon estimated to increase by approximately $16.2 million. The most significant portion of this increase related to Parks and Indoor Recreation and Services Related to a Highway amenities. TABLE 10 MUNICIPALITY OF CLARINGTON COST OF GROWTH ANALYSIS ESTIMATED NET OPERATING COST OF THE PROPOSED 2025-2034 DEVELOPMENT-RELATED CAPITAL PROGRAM (in constant 2025 dollars) Category Cost Driver (in $2025) Additional Operating Costs at 2034 Source and Commentary $ unit meaure Quantity Description Library Service $1,938,000 - Building Expansions $60 per sq.ft. 32,300 Proposed building size in $1,938,000 Based on 2023 FIR and Capital Program library space capital program Emergency & Fire Services $3,683,000 - Buildings, Vehicles & Equipment $237 per $1,000 of total $15,528,297 Facilities operational by 2034 $3,683,000 Based on 2023 FIR and Capital Program infrastructure value Parks & Indoor Recreation $6,191,425 - Buildings, Land & Furnishings $20 per $1,000 of total $ 124,540,517 Facilities operational by 2034 $2,490,810 Based on 2023 FIR and Capital Program infrastructure value - Park Development and Facilities $38 per $1,000 of total $ 98,072,519 Facilities operational by 2034 $3,700,615 Based on 2023 FIR and Capital Program infrastructure value General Government $0 - No additional operating costs $0 No additional costs $ - $0 N/A Services Related to a Highway $4,362,589 - Development-Related Roads Infrastructure $200 per household 12,294 $2,458,800 Based on 2023 FIR and Development Forecast - Vehicles & Equipment $20 per $1,000 of total $ 95,189,453 Facilities operational by 2034 $1,903,789 Based on 2023 FIR and Capital Program Land Acquisition $0 - No additional operating costs $0 No additional costs $ - $0 N/A TOTAL ESTIMATED OPERATING COSTS $16,175,014 Cost of Growth Analysis | 43 Cost of Growth Analysis | 44 ii. Long-Term Capital Financing From Non-Development Charges Totals $509.7 Million Table 11 summarizes the components of the development-related capital forecast that will require funding from non-development sources. For all services, approximately $50.0 million will be financed from reserve funds and $67.1 million is related to replacement of existing Municipal facilities. B. Asset Management Plan The DCA requires that municipalities complete an Asset Management Plan (AMP) before the passing of a development charges by-law. A key function of the AMP is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. Further details relating to the AMP are discussed in Appendix E. i. Annual Capital Provisions for Tax and Rate Supported Assets Table 12 summarizes the annual capital provisions required to replace the development eligible and ineligible costs associated with the capital infrastructure identified in the DC Study. The estimate is based on information obtained through the Municipalityʼs AMP as well as discussions with staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset. Table 12 illustrates that by 2035, the Municipality will need to fund an additional $14.5 million per annum in order to properly fund the full life cycle costs of the new services assets supported under the proposed DC by-law TABLE 11 MUNICIPALITY OF CLARINGTON LONG-TERM CAPITAL FINANCING FROM NON-DC SOURCES Services Development-Related Capital Program (2025 - 2034) Net Replacement Total DC Municipal & Benefit to Available DC Post-Period Eligible Costs Cost Existing Reserves Benefit* for Recovery ($000) ($000) ($000) ($000) ($000) 1 Library Service $46,122.6 $12,912.1 $1,964.3 $15,625.3 $15,620.8 2 Emergency & Fire Services $23,608.0 $1,519.5 $5,365.1 $6,560.2 $10,163.2 3 Parks & Indoor Recreation $328,985.5 $5,186.8 $4,622.1 $184,982.5 $134,194.1 4 General Government $10,499.8 $2,161.9 $381.3 $974.5 $6,982.1 5 Services Related To A Highway $491,422.9 $45,305.8 $37,249.4 $67,538.9 $341,328.8 6 Land Acquisition $7,155.0 $18.7 $0.0 $6,480.0 $656.3 TOTAL GENERAL SERVICES $907,793.8 $67,104.8 $49,582.1 $282,161.5 $508,945.4 *Development related costs to be considered for funding from other tools and/or future DC Studies. Cost of Growth Analysis | 45 2025 - 2034 Calculated AMP Annual Service Capital Program Provision by 2035 DC Related Non-DC Related* DC Related Non-DC Related* Library Service $17,585,137 $28,537,463 $738,070 $593,171 Emergency & Fire Services $15,528,297 $11,279,703 $543,031 $410,979 Parks & Indoor Recreation $138,816,168 $200,169,350 $4,290,178 $4,433,313 General Government $7,363,375 $3,136,425 $0 $0 Services Related To A Highway $378,578,210 $112,875,002 $8,880,675 $1,454,188 Land Acquistion $656,298 $6,498,702 $13,475 $157,203 TOTAL $558,527,484 $362,496,646 $14,465,429 $7,048,854 TABLE 12 MUNICIPALITY OF CLARINGTON ANNUAL ASSET MANAGEMENT PROVISION BY 2035 * Includes costs that will be recovered under future development charges studies (i.e. other development-related), ineligible shares and shares of projects funded from available reserve funds. Cost of Growth Analysis | 46 Cost of Growth Analysis | 47 ii. Future Revenue Growth The calculated annual funding provision should be considered within the context of the Municipalityʼs projected growth. Over the next 10 years (to 2034) the Municipality is projected to increase by approximately 35,920 persons in new households. In addition, the Municipality will also add roughly 10,200 new employees that will result in approximately 597,700 square metres of additional non-residential building space by 2034. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the proposed DC by-law. iii. Assets are Deemed to be Financially Sustainable The calculated annual provisions identified are considered to be financially sustainable as it is expected that the increased capital asset management requirements can be absorbed by the tax and user base over the long-term. Development Charges Administration and Policy Considerations | 48 8. Development Charges Administration and Policy Considerations This section sets out other considerations and legislative requirements relating to the DCA including administration and collection and recent legislative changes. A. Development Charges Amount Payable and Date of Payment The total amount of a DC is the amount that would be determined under the by-law on the day of an application for site plan approval or the day of an application for rezoning or, if neither of these apply, the day of building permit issuance. Full details on determining the DCs payable in any particular case are provided in s.26, s.26.1 and s.26.2 of the DCA. As per recent legislative changes arising from Bill 17, Protect Ontario by Building Faster and Smart Act, 2025, provides for development charge payments for residential development to be deferred until occupancy. However, under s.27 of the DCA the Municipality may enter into an agreement with a developer to alter the timing of payment. For rental housing and institutional development, DCs must be paid according to the following plan: - Six equal annual installments beginning at building occupancy (permit or actual occupancy) and for the following five anniversaries of that date for rental housing and institutional development. For required instalments, the Municipality may charge interest from the date the DC would have been payable to the date the instalment is paid. Interest may accrue on each installment until the final payment has been made. Any Development Charges Administration and Policy Considerations | 49 skipped or late payments can be added to the tax roll (including interest). Full details on the prescribed payment plans are provided in s.26.1 of the DCA. In accordance with s.26.3 the maximum interest rate a municipal can charge is prime plus 1%. B. Reserve Funds Under the DCA, a municipality that has passed a development charge by- law must establish a separate reserve fund for each service to which the development charge relates and pay each development charge it collects into the respective reserve fund. Beginning in 2023 and each calendar year thereafter, a municipality shall spend or allocate at least 60% of the monies in a reserve fund associated with Services Related to a Highway. While the DCA does permit municipalities to borrow from the reserve fund, the amount borrowed is to be repaid with interest at a rate not less than the prescribed minimum interest rate. Additionally, money in the reserve fund is to be spent only on development-related capital costs. Annual financial statements are to be provided to Council and must include the following: - Opening and closing balances and in-year transactions - A description of service or category of service - Details on credits paid by individual credit holders - Amounts borrowed and purpose of borrowing - Interest accrued on borrowing - Amount and source of money used to repay borrowing Development Charges Administration and Policy Considerations | 50 - Projects funded from DCs including amount and source of DC and non- DC funding C. Changes Arising From the More Homes Built Faster Act (Bill 23) and Cutting Red Tape to Build More Homes Act (Bill 185) As of November 28, 2022, there are several changes to the DCA due to the enactment and Royal Assent of Bill 23. A list of the changes that are now in force is provided below in Table 13. Table 13: Recent Changes to the DCA Section Description Section 2(1) Exemptions for existing rental residential buildings and a range of residential units in existing and new houses. Section 2(4) Housing services are ineligible for DC funding (repeal of paragraph 17 of ss.2(4) of the DCA). Existing by-laws are deemed to be "amended" and no development charges can be collected for housing services from November 28, 2022 onward. Section 4.1 Exemptions for affordable and attainable residential units as defined in the Affordable Residential Units Bulletin. Section 4.2 Exemptions for non-profit housing development. This does not apply with respect to a DC payable before November 28, 2022. Section 4.3 Exemption for inclusionary zoning residential units. This does not apply with respect to a DC payable before November 28, 2022. Section 5(1) Historical service level calculation period extended from 10 years to 15 years. Does not apply to by-laws in force prior to November 28, 2022. Development Charges Administration and Policy Considerations | 51 Section Description Section 9(1) Maximum life of a DC by-law extended from 5 years to 10 years. This does not apply to by-laws in-force before November 28, 2022. Section 26.1 Deferral payments now apply to rental housing and institutional development. Interest on deferral payments is now capped at prime plus 1% in accordance with s.26.3. Section 26.2 DCs for rental housing development are now discounted based on the number of bedrooms proposed. Interest on DC freeze now capped at prime plus 1% in accordance with section 26.3. Section 26.3 Maximum interest rates are capped at prime plus 1%. This does not apply with respect to a DC that was payable before November 28, 2022. Section 35 Municipalities are now required to spend or allocate at least 60% of reserve balances each year for Water Supply, Wastewater, and services related to a highway beginning in 2023. Section 44(4) Rules for front ending agreements as they relate to affordable and attainable residential units. Section 60(1)(s.4) Additional services for which municipalities are required to spend or allocate at least 60% of reserve fund balances may be prescribed through Regulations (none are proposed as of yet). Section 60(1)(d.2) and 9d.3) Prescribes developments and criteria related to attainable residential units (section 4.1). D. Development Charges Administration Many of the administrative requirements of the DCA will be similar to those presently followed by the Municipality in terms of collection practices. Development Charges Administration and Policy Considerations | 52 However, changes will likely be required in the use of and reporting on the new development charges. In this regard: - It is recommended that the current practices regarding collection of development charges and by-law administration continue to the extent possible; - As required under the DCA, the Municipality should codify any rules regarding application of the by-laws and any exemptions within the development charges by-laws proposed for adoption; - It is recommended that the Municipality continue to report policies consistent with the requirements of the DCA; - It is recommended that the by-laws permit the payment of a development charge in cash or through services-in-lieu agreements. The municipality is not obligated to enter into services-in-lieu agreements; and - It is recommended that Council adopt the development-related capital forecast included in this background study for Municipal-wide services, subject to annual review through the Municipalityʼs normal capital budget process. E. Local Service Definitions Appendix F outlines the definition of "local service" under the DCA for various services provided by the Municipality. The purpose of defining these local services is to determine the eligible capital costs that can be included in the development charges calculations for the Municipality. Services or functions classified as local in nature are excluded from the calculation of development charges rates. Development Charges Administration and Policy Considerations | 53 F. 2025 DC By-law Policy Changes As part of the 2025 DC Background Study update, the policies contained in the 2020 DC By-law have been reviewed and updated. Changes from the 2020 By-law to the draft 2025 DC By-law include: - Definitions - minor modifications to definitions to align with current built forms and development trends in the Municipality. - Undetermined Non-Residential Use - provides options for paying DCs if the use of a non-residential building is not known (e.g. industrial versus non-industrial) at the time of building permit issuance. - Statutory Exemptions and Discounts Required Under the Act - intended to cover all statutory exemptions under the DCA (e.g. non-profit housing, rental housing, intensification within existing and new residential buildings etc.). - Exemption for Existing Industrial Development - reduced the exemption from 100% to 50% of existing gross floor area to align with the statutory requirements of the DCA. - Exemption for Specific Properties (Science Park and Energy Park) - exemption has been removed. - Purpose Built Rental Housing Development - discount has been removed. There is a statutory requirement to provide DC discounts based on number of bedrooms within a rental residential unit under the DCA. G. By-law 2021-011 - Clarington Technology Park On January 18, 2021, Council of the Municipality of Clarington adopted DC By-law 2021-011 which established area-specific development charge rates for the Clarington Technology Park area. The by-law imposes development Development Charges Administration and Policy Considerations | 54 charge rates for the recovery of Stormwater Management Services on a per hectare of net developable land area. In accordance with section 19(1.1) of the DCA, a municipality may amend a development charges by-law without producing a DC Background Study, hosting a statutory public meeting, or providing an opportunity to appeal the DC By-law so long as the only effect of the amendment is to repeal the provision specifying the date on which the by-law expires. DC By-law 2021-011 is currently set to expire on January 19, 2026, 5 years after it came into force. As part of the 2025 DC Background Study process, the by-law will be amended to replace the 5-year expiry with a 10-year expiry to align with statutory requirements. Appendix A | 55 Appendix A Development Forecast Appendix A - Municipal-wide Development Forecast This appendix provides the details of the development forecast that informs the Municipalityʼs 2025 DC Background Study. The forecast method and key assumptions are discussed, and the results of the forecasts are presented in the following tables: Historical Development Table 1 Historical Population, Households & Employment Table 2 Historical Housing Activity - Building Permits Table 3 Historical Annual Housing Completions Table 4 Housing by Period of Construction Showing Household Size Forecast Development Table 5 Population, Household & Employment Forecast Table 6 Forecast Population, Household & Employment Growth Table 7 Growth in Housing by Unit Type Table 8 Forecast Population in New Housing by Unit Type Table 9 Non-Residential Space Forecast A. Forecast Approach, Key Assumptions and Definitions The Development Charges Act (DCA) requires the Municipality to estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The forecast must cover both residential and non- residential development and be specific enough with regards to quantum, type, location, and timing of development to allow the Municipality to prepare a reasonable development-related capital program. Appendix A | 56 The forecasts of population, households, employment and non-residential building space were prepared by Hemson Consulting and are structured to achieve: - A population of 221,020 and employment of 73,320 by 2051 as set out in Figure 2 of the Region of Durhamʼs Official Plan.1 These forecasts are in accordance with the population and employment forecasts in Schedule 3 of the Provincial Plan A Place to Grow: Growth Plan for the Greater Golden Horseshoe. - The Municipalityʼs pledge to build 13,000 new homes between 2022 and 2031. The Housing Pledge was endorsed by Council on February 27, 2023, in order to achieve a housing target assigned to the Municipality by the Minister of Municipal Affairs and Housing.2 Data sources include information from the Census, Statistics Canada building permits, Canada Mortgage and Housing Corporation (CMHC) housing completions, and municipal data on recent and anticipated development approvals. B. Historical Development in Clarington Historical population and employment set out in this appendix are used to determine the average service levels attained in the Municipality over the last 15 years (2010 - 2024). Population figures are equivalent to the population recorded in the Census ("Census population"). This definition does not include the Census net under-coverage (4.22% of the Census population in Clarington) which represents those who were missed or double-counted by the Census. Population figures shown in the development forecast represent mid-year estimates. Since 2021 was the last year of the Census, figures for 2022 and 1 Note that the population target includes an estimate of Census net under-coverage. 2 See Clarington Staff Report PDS-009-23, Housing Pledge for 13,000 Units by 2031 in Response to Ministerʼs Order, February 27, 2023. Appendix A | 57 2023 are estimated based on Statistics Canadaʼs Annual Demographic Estimates. Historical data indicates the population of Clarington increased from 81,790 in 2009 to 107,335 in 2024 ̶ an increase of 25,545 people. Total households increased from 28,640 to 37,610 over the same period (see Table 1). "Place of Work Employment" figures in the forecasts record where people work rather than their place of residence. It includes employment with a regular or no fixed place of work. However, work-at-home employment is excluded from the figures as, for development charge purposes, this type of employment is considered not to require building floorspace for its activities. Historical place of work employment figures is also shown in Table 1. There are currently about 32,480 jobs in the Municipality. Overall employment has grown steadily since the 2008 financial crisis and subsequent recession. As a result, the Municipalityʼs activity rate (the ratio of employment to population) has risen from just under 27% to about 30% over the last 15 years. The goal of the Regional Official Plan is ultimately to achieve an activity rate of 33% for the Municipality through 2051. Details on recent housing growth in the Municipality are provided in Tables 2 and 3. The overall market share of single and semi-detached units since 2005 has been 62%, though the number of units completed in any one year varies. The market share of row houses and apartments over the same period was 19% and 19%, respectively. There has been a noticeable shift towards higher density construction over the last 5 years, with 26% of all new housing completions since 2019 being row houses and 24% being apartments. Table 4 provides details on historical occupancy patterns for housing in Clarington. The overall average occupancy level in the Municipality is 2.79 persons per housing unit (PPU). Occupancy levels for units constructed between 2011 and 2021 are higher than the overall average and are used in the development charges calculation since they better reflect the number of people Appendix A | 58 that are likely to reside in new development. The average PPU of single and semi-detached units built in the Municipality in the period 2011 to 2021 is 3.32. Average PPUs for recently constructed row and apartment housing are 2.73 and 1.58, respectively. Average PPUs for large (2 or more bedrooms) and small (1 bedroom or less) apartments over the same period are 1.60 and 1.12. C. Development Forecast Summary A 10-year development forecast, from 2025 to 2034, has been used for all services. However, growth over the planning horizon to 2051 is included in the analysis for reference as the Municipality will plan to achieve these targets in subsequent DC Background Studies. Development charges are levied on residential development as a charge per new unit. Therefore, for the residential forecast, a projection of both the population growth as well as the population in new housing units is required. - The population growth3 determines the need for additional facilities and provides the foundation for the development-related capital program. - When calculating the development charge, however, the development- related net capital costs are spread over the total additional population that occupy new housing units. This population in new units represents the population from which development charges will be collected. Development charges are levied on non-residential development as a charge per m2 of gross floor area (GFA). As with the residential forecast, the non-residential forecast requires both a projection of employment growth as well as a projection of the employment growth associated with new floorspace in the Municipality. 3 Commonly referred to as "net population growth" in the context of development charges. Appendix A | 59 i. Residential Development Forecast As shown in Table 5, the Municipalityʼs population is forecast to grow from approximately 107,335 in 2024 to 135,535 in 2034, an increase of about 28,200. Households are forecast to increase by 12,295 units over the same 10-year period. The mix of housing over the 10-year planning horizon is anticipated to be 61% single and semi-detached units, 26% rowhouses, and 13% apartments with the shift towards higher density housing forms continuing over the long-term (see Table 7). Population growth in the new units is estimated by applying the following PPUs to the housing unit forecast: 3.32 for single and semi-detached units; 2.73 for rows; and 1.58 for apartments. These assumptions are informed by the historical occupancy patterns for permanently occupied units set out in Table 4. The forecast growth in population in new housing units over the 2025 to 2034 period is 35,925, of which 24,805 (69%) will be in single and semi-detached housing types (see Table 8). ii. Non-Residential Development Forecast Employment in the Municipality, which has rebounded after a long period of decline, is forecast to increase steadily between 2025 and 2034 (see Table 9). The employment forecast is divided into four land-use based categories: - Population-Related Employment is employment that primarily serves a resident population and includes retail, education, healthcare, and local government. This generally grows in line with population growth. Jobs under this category typically locate in land zoned for commercial and institutional uses but may also be located in residential and mixed-use areas. - Employment-Land Employment refers to traditional industrial-type employment primarily accommodated in low-rise industrial buildings in Appendix A | 60 business parks and employment areas. Given the spatial and operational needs of these types of jobs, they are almost exclusively located in lands zoned for industrial uses. - Major Office Employment refers to office type employment contained within free standing buildings more than 20,000 net square feet (1,858 m2). This comprises only a very small amount of the current employment base but is anticipated to develop within with key employment nodes, including Major Transit Station Areas, over time. - Rural Based Employment refers to refers to all jobs located in rural areas, including agriculture and primary industries plus some uses typically found in urban employment areas, but not located on urban land designated for industrial or commercial use. These uses include agricultural-related uses such as feed or fertilizer facilities, small-scale manufacturing or construction businesses run from rural and farm properties and some scattered retail or service users. The category also includes tourism and recreation. In Clarington, only a small proportion of future employment growth is anticipated to be rural based. An assumed floor space per worker (FSW) is applied to the employment forecast in order to project growth in new non-residential space in the Municipality. The FSWs used are: Population-Related 45 m2 per employee Employment Land-Related 100 m2 per employee Major Office 27 m2 per employee Rural Based 0 m2 per employee The overall growth in new non-residential building space across the Municipality between 2025 and 2034 is forecast to be 547,705 m2, of which 314,400 m2 (57%) will be employment land-related and 233,305 m2 (43%) will be population- related (Table 9). Appendix A | 61 APPENDIX A - TABLE 1 MUNICIPALITY OF CLARINGTON HISTORICAL POPULATION, HOUSEHOLDS & EMPLOYMENT Year Census Population Growth Occupied Dwellings Growth HH Size Employment by POW Growth Activity Rate 2006 77,820 26,865 2.90 21,074 27.1% 2007 79,121 1,301 27,444 579 2.88 21,319 245 26.9% 2008 80,444 1,323 28,035 591 2.87 21,567 248 26.8% 2009 81,789 1,345 28,639 604 2.86 21,818 251 26.7% 2010 83,157 1,368 29,256 617 2.84 22,072 254 26.5% 2011 84,548 1,391 29,885 629 2.83 22,328 256 26.4% 2012 85,990 1,442 30,454 569 2.82 23,196 868 27.0% 2013 87,457 1,467 31,034 580 2.82 24,098 902 27.6% 2014 88,949 1,492 31,625 591 2.81 25,035 937 28.1% 2015 90,466 1,517 32,227 602 2.81 26,008 973 28.7% 2016 92,010 1,544 32,840 613 2.80 27,019 1,011 29.4% 2017 93,821 1,811 33,440 600 2.81 27,576 557 29.4% 2018 95,667 1,846 34,051 611 2.81 28,145 569 29.4% 2019 97,550 1,883 34,673 622 2.81 28,726 581 29.4% 2020 99,470 1,920 35,306 633 2.82 29,319 593 29.5% 2021 101,427 1,957 35,950 644 2.82 29,923 604 29.5% 2022 103,359 1,932 36,570 620 2.83 30,751 828 29.8% 2023 105,328 1,969 36,968 398 2.85 31,602 851 30.0% 2024 107,334 2,006 37,611 643 2.85 32,477 875 30.3% Growth 2010-2024 - 25,545 - 8,972 - - 10,659 - Source: Statistics Canada, Census of Canada; Municipality of Clarington, Building Permit Data; Hemson forecasts Appendix A | 62 APPENDIX A - TABLE 2 MUNICIPALITY OF CLARINGTON HISTORICAL HOUSING ACTIVITY - BUILDING PERMITS Year Building Permits - New Units Building Permits - New Units Singles/Semis Rows Apts. Total Singles/Semis Rows Apts. Total 2005 640 59 56 755 85% 8% 7% 100% 2006 499 83 278 860 58% 10% 32% 100% 2007 555 102 1 658 84% 16% 0% 100% 2008 541 49 1 591 92% 8% 0% 100% 2009 253 7 3 263 96% 3% 1% 100% 2010 461 111 20 592 78% 19% 3% 100% 2011 636 137 90 863 74% 16% 10% 100% 2012 412 108 14 534 77% 20% 3% 100% 2013 287 121 13 421 68% 29% 3% 100% 2014 553 89 15 657 84% 14% 2% 100% 2015 522 99 256 877 60% 11% 29% 100% 2016 479 183 188 850 56% 22% 22% 100% 2017 504 275 191 970 52% 28% 20% 100% 2018 631 151 31 813 78% 19% 4% 100% 2019 88 99 101 288 31% 34% 35% 100% 2020 393 390 212 995 39% 39% 21% 100% 2021 276 223 58 557 50% 40% 10% 100% 2022 125 142 342 609 21% 23% 56% 100% 2023 245 29 535 809 30% 4% 66% 100% Total 8,100 2,457 2,405 12,962 62% 19% 19% 100% 10 year Average 5 year Average 382 168 193 743 225 177 250 652 Source: Statistics Canada, Building Permits; Municipality of Clarington Building Division Appendix A | 63 APPENDIX A - TABLE 3 MUNICIPALITY OF CLARINGTON HISTORICAL ANNUAL HOUSING COMPLETIONS Year CMHC Annual Housing Completions Shares by Unit Type Singles/Semis Rows Apts. Total Singles/Semis Rows Apts. Total 2005 716 91 162 969 74% 9% 17% 100% 2006 524 46 0 570 92% 8% 0% 100% 2007 524 75 234 833 63% 9% 28% 100% 2008 466 113 108 687 68% 16% 16% 100% 2009 442 24 6 472 94% 5% 1% 100% 2010 423 37 6 466 91% 8% 1% 100% 2011 502 93 14 609 82% 15% 2% 100% 2012 584 122 0 706 83% 17% 0% 100% 2013 371 119 86 576 64% 21% 15% 100% 2014 473 104 2 579 82% 18% 0% 100% 2015 421 32 0 453 93% 7% 0% 100% 2016 479 169 0 648 74% 26% 0% 100% 2017 450 114 232 796 57% 14% 29% 100% 2018 406 49 243 698 58% 7% 35% 100% 2019 475 56 193 724 66% 8% 27% 100% 2020 254 185 176 615 41% 30% 29% 100% 2021 384 278 98 760 51% 37% 13% 100% 2022 242 149 229 620 39% 24% 37% 100% 2023 206 152 40 398 52% 38% 10% 100% Total 5,025 824 618 6,467 78% 13% 10% 100% 10 year Average 5 year Average 379 129 121 629 312 164 147 623 Source: CMHC, Housing Completions Data Appendix A | 64 APPENDIX A - TABLE 4 MUNICIPALITY OF CLARINGTON HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE Period of Construction Pre 2011 2011-2021 Total Pre 1945 1946-1960 1961-1970 1971-1980 1981-1990 1991-1995 1996-2000 2001-2005 2006-2010 2011-2016 2016-2021 Singles/Semis Household Population 5,330 4,585 4,280 7,545 14,720 7,535 8,210 8,630 8,300 9,050 8,310 60,835 17,350 78,185 Households 2,040 1,800 1,600 2,745 5,265 2,560 2,745 2,760 2,530 2,690 2,370 21,515 5,220 26,735 Household Size Rows (Including Duplexes) 2.61 2.55 2.68 2.75 2.80 2.94 2.99 3.13 3.28 3.36 3.51 2.83 3.32 2.92 Household Population 280 300 285 645 1,480 1,710 1,375 995 750 1,160 940 7,070 1,910 8,980 Households 145 115 135 295 580 670 535 380 280 420 460 2,855 700 3,555 Household Size Apartments All (Including Duplexes) 1.93 2.61 2.11 2.19 2.55 2.55 2.57 2.62 2.68 2.76 2.04 2.48 2.73 2.53 Household Population 505 370 765 520 295 735 395 365 400 625 625 3,950 1,025 4,975 Households 245 195 400 295 170 405 175 170 245 405 405 2,055 650 2,705 Household Size Apartments (Excluding Duplexes) - 1 Bedroom or Less 2.06 1.90 1.91 1.76 1.74 1.81 2.26 2.15 1.63 1.54 1.54 1.92 1.58 1.84 Household Population 125 30 55 120 155 40 0 90 110 35 445 615 145 760 Households 145 30 50 100 130 45 10 80 100 30 370 590 130 720 Household Size Apartments (Excluding Duplexes) - 2 or More Bedrooms 0.86 1.00 1.10 1.20 1.19 0.89 0.00 1.13 1.10 1.17 1.20 1.04 1.12 1.06 Household Population 270 150 240 350 430 160 120 260 395 110 550 1,980 505 2,485 Households 120 75 125 175 235 95 95 170 250 65 325 1,090 315 1,405 Household Size Apartments All (Excluding Duplexes) 2.25 2.00 1.92 2.00 1.83 1.68 1.26 1.53 1.58 1.69 1.69 1.82 1.60 1.77 Household Population 395 180 295 470 585 200 120 350 505 145 995 2,595 650 3,245 Households 265 105 175 275 365 140 105 250 350 95 695 1,680 445 2,125 Household Size All Units 1.49 1.71 1.69 1.71 1.60 1.43 1.14 1.40 1.44 1.53 1.43 1.54 1.46 1.53 Household Population 6,005 5,065 4,860 8,660 16,785 9,445 9,705 9,975 9,555 10,355 10,245 70,500 20,285 92,140 Households 2,450 2,020 1,910 3,315 6,210 3,370 3,385 3,390 3,160 3,205 3,525 26,050 6,570 32,995 Household Size 2.45 2.51 2.54 2.61 2.70 2.80 2.87 2.94 3.02 3.23 2.91 2.71 3.09 2.79 Source: Statistics Canada, 2011 National Household Survey Special Run Appendix A | 65 APPENDIX A - TABLE 5 MUNICIPALITY OF CLARINGTON POPULATION, HOUSEHOLD & EMPLOYMENT FORECAST Year Census Population Occupied Dwellings Employment by POW PPU Activity Rate 2021 101,427 35,950 29,923 2.82 30% 2022 103,359 36,570 30,751 2.83 30% 2023 105,328 36,968 31,602 2.85 30% 2024 107,334 37,611 32,477 2.85 30% 2025 109,379 38,265 33,376 2.86 31% 2026 111,462 39,185 34,300 2.84 31% 2027 114,089 40,374 35,249 2.83 31% 2028 116,778 41,599 36,224 2.81 31% 2029 119,530 42,861 37,226 2.79 31% 2030 122,347 44,161 38,256 2.77 31% 2031 125,230 45,499 39,315 2.75 31% 2032 128,575 46,923 40,403 2.74 31% 2033 132,010 48,391 41,521 2.73 31% 2034 135,536 49,905 42,670 2.72 31% Source: Hemson Consulting Ltd., based on Durham Regional Official Plan, p.40. Appendix A | 66 APPENDIX A - TABLE 6 MUNICIPALITY OF CLARINGTON FORECAST POPULATION, HOUSEHOLD & EMPLOYMENT GROWTH Year Census Population Occupied Dwellings Employment by POW 2021 2022 2023 2024 1,957 1,932 1,969 2,006 644 620 398 643 604 828 851 875 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2,045 2,083 2,627 2,689 2,752 2,817 2,883 3,345 3,435 3,526 654 920 1,189 1,225 1,262 1,300 1,338 1,424 1,468 1,514 899 924 949 975 1,002 1,030 1,059 1,088 1,118 1,149 2025-2034 28,202 12,294 10,193 Source: Hemson Consulting Ltd. Appendix A | 67 APPENDIX A - TABLE 7 MUNICIPALITY OF CLARINGTON GROWTH IN HOUSING BY UNIT TYPE Year Singles/Semis Rows Apartments Total 2025 407 142 105 654 2026 573 200 148 920 2027 718 317 153 1,189 2028 740 327 158 1,225 2029 763 337 163 1,262 2030 786 347 167 1,300 2031 809 357 172 1,338 2032 862 380 182 1,424 2033 889 392 188 1,468 2034 917 404 194 1,514 2025-2034 7,463 3,202 1,630 12,294 Source: Hemson Consulting Ltd. Appendix A | 68 APPENDIX A - TABLE 8 MUNICIPALITY OF CLARINGTON FORECAST POPULATION IN NEW HOUSING BY UNIT TYPE* Year Singles/Semis Rows Apartments Total 2025 1,353 387 154 1,894 2026 1,904 544 216 2,664 2027 2,388 866 224 3,478 2028 2,461 892 231 3,584 2029 2,535 919 237 3,691 2030 2,611 947 245 3,803 2031 2,688 974 252 3,914 2032 2,864 1,037 266 4,167 2033 2,954 1,069 274 4,297 2034 3,046 1,102 283 4,431 2025-2034 24,804 8,737 2,382 35,923 *Based on PPUs 3.32 2.73 1.46 Appendix A | 69 APPENDIX A - TABLE 9 NON-RESIDENTIAL SPACE FORECAST 100.0 m2 per employee 45.0 m2 per employee 27.0 m2 per employee Employment Density Employment Land Employment Population-Related Employment Major Office Employment Rural Based Employment - m2 per employee Year Total Employment Land Growth Space (m2) Total Population-Related Growth Space (m2) Total Major Office Growth Space (m2) Total Rural Based Growth Space (m2) Total Total Growth Space (m2) 2024 9,590 15,889 73 6,925 32,477 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 9,914 10,249 10,595 10,953 11,323 11,705 12,100 12,509 12,931 13,368 324 335 346 358 370 382 395 409 422 437 32,400 33,500 34,600 35,800 37,000 38,200 39,500 20,450 21,100 21,850 16,442 17,009 17,590 18,185 18,795 19,421 20,063 20,720 21,394 22,084 553 567 581 595 610 626 642 657 674 690 24,885 25,515 26,145 26,775 27,450 28,170 28,890 14,783 15,165 15,525 73 73 73 73 73 73 73 73 73 73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,947 6,969 6,991 7,013 7,035 7,057 7,079 7,101 7,123 7,145 22 22 22 22 22 22 22 22 22 22 0 0 0 0 0 0 0 0 0 0 33,376 34,300 35,249 36,224 37,226 38,256 39,315 40,403 41,521 42,670 899 924 949 975 1,002 1,030 1,059 1,088 1,118 1,149 57,285 59,015 60,745 62,575 64,450 66,370 68,390 35,233 36,265 37,375 2025-2034 - 3,778 314,400 - 6,195 233,303 - 0 0 - 220 0 - 10,193 547,703 Source: Hemson Consulting Ltd. Appendix A | 70 Appendix B | 71 Appendix B General Services Appendix B - General Services Technical Appendix This appendix provides the detailed analysis undertaken to establish the development charge rates for each of the eligible general services provided by the Municipality of Clarington. Four general services have been analysed as part of this Development Charges (DC) Background Study: Appendix B.1 Library Services Appendix B.2 Emergency and Fire Services Appendix B.3 Parks and Indoor Recreation Appendix B.4 General Government Every sub-section, with the exception of General Government, contains a set of three tables. The tables provide the background data and analysis undertaken to arrive at the calculated development charge rates for that particular service. An overview of the content and purpose of each of the tables is provided below. Table 1 Historical Service Levels Table 1 presents the data used to determine the 15-year historical service level. The DCA and Ontario Regulation 82/98 require that development charges be set at a level no higher than the average service level provided in a municipality over the 15-year period immediately preceding the preparation of the background study, on a service-by-service basis. For the purpose of this study, the historical inventory period is defined as 2010 - 2024. Appendix B | 72 O. Reg. 82/98 requires that when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet. The qualitative aspect is introduced by considering the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of cost per square foot to replace or construct a facility of the same quality in current day dollars. This approach helps to ensure that the development-related capital facilities that are to be funded by new growth reflect not only the quantity (number and size), but also the quality (replacement value or cost) of service provided by the municipality in the past. Both the quantitative and qualitative aspects of service levels used in the current analysis are based on information provided by Municipal staff, the Municipalityʼs 2024 Parks, Recreation and Culture Master Plan (PRCMP), recent tenders and cost estimates, benchmarking analysis as well as asset management plans. This information is generally based on historical records and experience with costs to acquire or construct similar facilities, equipment and infrastructure. The approach used to calculate service levels and maximum funding envelopes is described as follows: - For those services with only a residential impact (Library as well as Parks and Indoor Recreation) the service level measure of infrastructure costs per net population has been utilized. - For the remaining services that levy both a residential and non- residential charge, the service level measure of infrastructure costs per net population and employment has been utilized. There is also a requirement in the DCA to consider "excess capacity" within the Municipalityʼs existing infrastructure that may be available to partially meet future servicing requirements. If Council has expressed its intent Appendix B | 73 before or at the time the capacity was created to recoup the cost of providing the capacity from new development, it is considered "committed excess capacity" under the DCA, and the associated capital cost is eligible for recovery. This requirement has been addressed through the use of "net" population and employment in the determination of maximum permissible funding envelopes. Table 1 also shows the calculation of the maximum allowable funding envelope. The maximum allowable funding envelope is defined as the 15- year historical service level (expressed as $/capita or $/population and employment) multiplied by the forecast increase in net population or net population and employment over the future planning period. The resulting figure is the value of capital infrastructure that would have to be constructed for that particular service so that the 15-year historical service level is maintained. Table 2 2025 - 2034 Development-Related Capital Program and Calculation of the "Unadjusted" Development Charges The DCA requires that Council express its intent to provide future capital facilities to support future growth. Based on the growth forecasts presented in Appendix A, Hemson Consulting in collaboration with Municipal staff have developed a development-related capital program which sets out the projects required to service anticipated growth for the 10-year period from 2025 to 2034. The projects identified in the capital program include all "growth-related" capital projects including projects that are ineligible for recovery under the current provisions of the DCA. While any ineligible costs are shown, they are removed from the total development charge eligible costs and are not included in the calculation. The Municipalityʼs recently completed 2024 PRCMP largely informs the capital projects for Library Services as well as Parks and Indoor Recreation. Appendix B | 74 To determine the share of the program that is eligible for recovery through development charges, the project costs are reduced by any anticipated grants, subsidies or other recoveries, and "replacement" shares and BTE shares. A replacement share represents the portion of a capital project that will benefit the existing community. It could for example, represent a portion of a new facility that will, at least in part, replace a facility that is demolished, redeployed or will otherwise not be available to serve its former function. The replacement share of the capital program is not deemed to be development-related and is therefore removed from the development charge calculation. The capital cost for replacement will require funding from non- development charge sources, typically property taxes or user fees. The capital program less any replacement shares or BTE shares yields the development-related costs. Although deemed development-related, not all of the net development-related capital program may be recoverable from development charges in the period from 2025 to 2034. For some services, reserve fund balances may be available to fund a share of the program. In addition, a portion of the capital program may service growth occurring beyond 2034. This portion of the capital program is deemed "pre-built" service capacity and is considered as committed excess capacity to be recovered under future development charges or is a service level increase. The remaining portion of the net capital program represents the development-related cost that may be included in the DC calculation. In all cases, as required, this amount is equal to or less than the maximum allowable capital amount as calculated at the end of Table 1. The result is the discounted development-related net capital costs eligible for recovery against growth over the forecast period from 2025 to 2034. Appendix B | 75 Calculation of the Unadjusted Development Charges Rates The section below the capital program displays the calculation of the "unadjusted" development charge rates. The term "unadjusted" development charge is used to distinguish the charge that is calculated prior to cash flow financing considerations. The cash flow analysis is shown in Table 3. The first step in determining the unadjusted development charge rate is to allocate the development-related net capital costs between the residential and non-residential sectors. For all general services with the exception of Library Services and Parks and Indoor Recreation, the development-related costs have been apportioned as 78% residential, 22% non-residential. This apportionment is based on the anticipated shares of population growth in new units and employment growth in new space over the 10-year forecast period. The development-related costs associated with Library and Parks and Indoor Recreation have been allocated 100% to the residential sector, as the need for these services is driven by residential development. The residential share of the 2025 to 2034 DC eligible costs is then divided by the forecasted population growth in new dwelling units. This gives the unadjusted residential development charge per capita. The non-residential development-related net capital costs are divided by the forecasted increase in non-residential gross floor area (GFA). This yields a charge per square metre of new non-residential development. Table 3 Cash Flow Analysis A cash flow analysis is also undertaken to account for the timing of projects and receipt of development charges. Interest earnings or borrowing costs are accounted for in the calculation as allowed under the DCA. Based on the development forecast, the analysis calculates the DC rate required to Appendix B | 76 finance the net development-related capital spending plan, including provisions for any borrowing costs or interest earnings on the reserve funds. The cash flow analysis is designed so that the closing cash balance at the end of the planning period is as close to nil as possible. In order to determine appropriate development charge rates reflecting borrowing and earnings necessary to support the net development-related funding requirement, assumptions are used for the inflation rate and interest rate. An inflation rate of 2.0% is used for the funding requirements, an interest rate of 5.5% is used for borrowing on the funds and an interest rate of 3.5% is applied to positive balances. Table 3 displays the results of the cash flow analysis and provides the adjusted or final per capita residential and per square metre (of GFA) non- residential development charges. Appendix B | 77 Appendix B.1 Library Services Appendix B | 78 Appendix B.1 Library Services The Clarington Library, Museums & Archives Board operates from four library branches and three other buildings. The Board is responsible for the associated buildings, collection material, and furniture and equipment which provides a wide range of resources in a variety of formats as well as a number of programs to the Municipalityʼs residents. Table 1 Historical Service Levels Table 1 displays Libraries 15-year historical inventory for buildings. The building space for the branches and associated facilities amount to 69,810 square feet and is valued at $49.3 million. Of the total, 12,000 square feet associated with the Courtice Branch Library, approximately 620 square feet relates to the recovery of an outstanding debenture and has been removed from the historical funding envelope calculation. A large number of collection items including books, audiobooks, CDʼs, DVDs, E-Books, games, magazines, achieved material etc. are included in the library inventory and currently amount to approximately $16.1 million. There is also approximately $3.0 million in furniture and equipment related to the library facilities and approximately $325,500 related to parking lots, access roads and other paved infrastructure. The 2025 full replacement value of the inventory of capital assets for Libraries amounts to $68.8 million and the 15-year historical average service level is $553.89 per capita. The historical service level multiplied by the 10- year forecast of net population growth results in a 15-year maximum allowable funding envelope of $15.6 million (28,202 net population growth X historical service level of $553.89/capita). Appendix B | 79 Table 2 2025 - 2034 Development-Related Capital Program and Calculation of the "Unadjusted" Development Charges The 10-year development-related capital plan for Library Services is comprised of the recovery of the remaining principal payments for the Courtice Library Branch which totals $496,000 over the 2025 - 2034 period. In addition, $300,000 has been identified for a book mobile in 2029 and a $100,000 for a kiosks/vending machine in 2025. Table 30 of the PRCMP identified a need for additional library space at a cost of approximately $40.4 million. Expansion to the library collection materials over the 10-year period is included at a cost of $3.9 million which includes new collection materials and opening day collection materials related to a future library facility. A network capacity is planned for at a cost of $1.0 million in 2025 which aims to increase the network capacity to meet the demand for online services. The capital program totals $46.1 million and no grants, subsidies or other recoveries. A BTE share of 32% or $12.9 million has been identified of the future library space based to provide space for existing residents to achieve the library service level target. Of the remaining $33.2 million DC eligible costs, $2.0 million is funded from available DC reserves. The remaining $15.6 million is related to development between 2025 and 2034. Approximately $15.6 million has been identified to benefit growth beyond the planning period. The 2025 - 2034 DC costs eligible for recovery amount to $15.6 million, which is allocated entirely against future residential development in the Municipality of Clarington. This results in an unadjusted development charge of $434.84 per capita. Appendix B | 80 Table 3 Cash Flow Analysis After cash flow consideration, which accounts for the anticipated timing of projects, the rate of development and interest on the outstanding Courtice Library debenture, the residential calculated charge increases to $444.74 per capita. The following table summarizes the calculation of the Library Services development charge: 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $553.89 $46,122,600 $15,620,806 $434.84 $0.00 $444.74 $0.00 LIBRARY SERVICE SUMMARY 2025 - 2034 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix B | 81 APPENDIX B.1 TABLE 1 - PAGE 1 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS LIBRARY SERVICE 2025 Buildings Branch Name # of Square Feet UNIT COST ($/sq.ft.) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bowmanville Branch 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 $800 Courtice Branch 6,000 6,000 6,000 6,000 6,000 6,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 $800 Courtice Branch Excess Capacity Adjustment - - - - - - (620) (620) (620) (620) (620) (620) (620) (620) (620) $800 Newcastle Village - - - - 9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100 $800 Orono Branch 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 3,604 $800 Clarke Schoolhouse - - - - - - - - - - 4,466 4,466 4,466 4,466 4,466 $500 Sarah Jane Williams Heritage Centre - - - - - - - - - - 11,600 11,600 11,600 11,600 11,600 $500 Waverley Place - - - - - - - - - - 5,659 5,659 5,659 5,659 5,659 $500 Total (sq.ft.) 33,604 33,604 33,604 33,604 42,704 42,704 48,084 48,084 48,084 48,084 69,809 69,809 69,809 69,809 69,809 Total ($000) $26,883.2 $26,883.2 $26,883.2 $26,883.2 $34,163.2 $34,163.2 $38,467.2 $38,467.2 $38,467.2 $38,467.2 $49,329.7 $49,329.7 $49,329.7 $49,329.7 $49,329.7 Appendix B | 82 APPENDIX B.1 TABLE 1 - PAGE 2 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS LIBRARY SERVICE 2025 Parkings Lots, Access Roads & Other Paved Infrastructure Branch Name # of Hectares UNIT COST ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Asphalt Newcastle Village - - - - 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 $1,550,000 Orono Branch - - - 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 $1,550,000 Gravel Orono Branch 0.03 0.03 0.03 - - - - - - - - - - - - $930,000 Total (ha) 0.03 0.03 0.03 0.03 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 Total ($000) $26.9 $26.9 $26.9 $44.8 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 2025 Materials Type of Collection # of Collection Materials UNIT COST ($/item) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Books (# of items) 143,512 142,322 126,577 127,316 128,319 111,388 111,896 108,376 110,017 110,117 109,619 108,179 107,128 109,526 117,319 $40 $5,000 Electronic Resources (# Database Subscriptions) 59 27 27 27 29 14 19 9 8 11 14 14 14 13 13 No. Of Audiobooks 3,418 3,569 3,529 3,603 3,798 4,664 4,126 4,229 4,252 4,500 3,798 3,463 3,587 3,720 3,771 $70 No. Of CDs 2,620 2,621 2,333 2,386 2,378 1,975 1,334 1,015 1,134 1,100 - - - - - $20 No. Of DVDs 9,268 9,456 11,696 12,957 14,047 13,806 14,020 14,113 15,208 11,000 17,073 16,666 15,272 15,373 11,155 $40 No. Of Microfilm 230 230 230 230 275 275 275 275 275 275 275 275 275 275 275 $20 No. Of Special Collection Items - - - - - - - - - - 199 263 327 455 471 $200 No. Of Titles of E-Resources 63,912 40,662 82,732 98,765 105,376 101,600 118,650 102,889 112,115 121,753 132,034 148,825 169,168 199,106 199,775 $40 No. Of Videos (games) 1,066 1,106 619 702 867 581 593 627 867 1,350 1,350 1,178 1,429 1,710 1,785 $70 Periodicals (# Print) 2,632 3,183 4,037 4,307 3,143 2,458 2,177 2,235 1,835 2,100 2,100 2,100 2,100 2,976 2,883 $20 Clarke schoolhouse $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,033,000 $1,033,000 $1,033,000 $1,033,000 $1,033,000 Sarah Jane Williams $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $909,000 $909,000 $909,000 $909,000 $909,000 Waverly Place $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $445,000 $445,000 $445,000 $445,000 $445,000 Total (#) 226,717 203,176 231,780 250,293 258,232 236,761 253,090 233,768 245,711 252,206 266,462 280,963 299,300 333,154 337,447 Total ($000) $9,386.2 $8,280.5 $9,397.6 $10,136.3 $10,497.2 $9,603.1 $10,283.7 $9,470.5 $9,956.8 $10,248.8 $13,253.7 $13,828.8 $14,583.7 $15,948.3 $16,128.2 Appendix B | 83 APPENDIX B.1 TABLE 1 - PAGE 3 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS LIBRARY SERVICE Furniture & Equipment Branch Name Total Value of Furniture and Equipment ($) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bowmanville Branch $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 $1,732,980 Courtice Branch $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 $290,000 New Newcastle Village $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 $357,696 Orono Branch $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 $272,850 Clarke Schoolhouse $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $111,650 $111,650 $111,650 $111,650 $111,650 Sarah Jane Williams Heritage Centre $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,150 $90,150 $90,150 $90,150 $90,150 Waverley Place $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $141,475 $141,475 $141,475 $141,475 $141,475 Total ($000) $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,996.8 $2,996.8 $2,996.8 $2,996.8 $2,996.8 Appendix B | 84 APPENDIX B.1 TABLE 1 - PAGE 4 MUNICIPALITY OF CLARINGTON CALCULATION OF SERVICE LEVELS LIBRARY SERVICE 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Historic Population 83,157 84,548 85,990 87,457 88,949 90,466 92,010 93,821 95,667 97,550 99,470 101,427 103,359 105,328 107,334 INVENTORY SUMMARY ($000) Buildings $26,883.2 $26,883.2 $26,883.2 $26,883.2 $34,163.2 $34,163.2 $38,467.2 $38,467.2 $38,467.2 $38,467.2 $49,329.7 $49,329.7 $49,329.7 $49,329.7 $49,329.7 Parking Lots, Access Roads, & Other Paved Infrastructure $26.9 $26.9 $26.9 $44.8 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 $325.5 Materials $9,386.2 $8,280.5 $9,397.6 $10,136.3 $10,497.2 $9,603.1 $10,283.7 $9,470.5 $9,956.8 $10,248.8 $13,253.7 $13,828.8 $14,583.7 $15,948.3 $16,128.2 Furniture and Equipment $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,653.5 $2,996.8 $2,996.8 $2,996.8 $2,996.8 $2,996.8 Total ($000) $38,949.8 $37,844.1 $38,961.1 $39,717.8 $47,639.4 $46,745.3 $51,730.0 $50,916.8 $51,403.1 $51,695.1 $65,905.7 $66,480.8 $67,235.8 $68,600.4 $68,780.3 Average SERVICE LEVEL ($/capita) Service Level Buildings $323.28 $317.96 $312.63 $307.39 $384.08 $377.64 $418.08 $410.01 $402.09 $394.33 $495.93 $486.36 $477.27 $468.34 $459.59 $402.33 Parking Lots, Access Roads, & Other Paved Infrastructure $0.32 $0.32 $0.31 $0.51 $3.66 $3.60 $3.54 $3.47 $3.40 $3.34 $3.27 $3.21 $3.15 $3.09 $3.03 $2.55 Materials $112.87 $97.94 $109.29 $115.90 $118.01 $106.15 $111.77 $100.94 $104.08 $105.06 $133.24 $136.34 $141.10 $151.42 $150.26 $119.62 Furniture and Equipment $31.91 $31.38 $30.86 $30.34 $29.83 $29.33 $28.84 $28.28 $27.74 $27.20 $30.13 $29.55 $28.99 $28.45 $27.92 $29.38 Total ($/capita) $468.39 $447.60 $453.09 $454.14 $535.58 $516.72 $562.22 $542.70 $537.31 $529.93 $662.57 $655.45 $650.51 $651.30 $640.81 $553.89 MUNICIPALITY OF CLARINGTON CALCULATION OF MAXIMUM ALLOWABLE LIBRARY SERVICE 15-Year Funding Envelope Calculation 15 Year Average Service Level (2010-2024) $553.89 Net Population (2025-2034) 28, 202 Maximum Allowable Funding Envelope $15,620,806 Appendix B | 85 APPENDIX B.1 TABLE 2 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM LIBRARY SERVICES Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 1.1 Recovery of Courtice Branch Debenture Principal Payment 2025 2025 $66,000 $0 $66,000 0% $0 $66,000 $66,000 $0 $0 1.2 Recovery of Courtice Branch Debenture Principal Payment 2026 2026 $68,000 $0 $68,000 0% $0 $68,000 $0 $68,000 $0 1.3 Recovery of Courtice Branch Debenture Principal Payment 2027 2027 $69,000 $0 $69,000 0% $0 $69,000 $0 $69,000 $0 1.4 Recovery of Courtice Branch Debenture Principal Payment 2028 2028 $71,000 $0 $71,000 0% $0 $71,000 $0 $71,000 $0 1.5 Recovery of Courtice Branch Debenture Principal Payment 2029 2029 $72,000 $0 $72,000 0% $0 $72,000 $0 $72,000 $0 1.6 Recovery of Courtice Branch Debenture Principal Payment 2030 2030 $74,000 $0 $74,000 0% $0 $74,000 $0 $74,000 $0 1.7 Recovery of Courtice Branch Debenture Principal Payment 2031 2031 $76,000 $0 $76,000 0% $0 $76,000 $0 $76,000 $0 1.8 Buildings and Strucrtures Book Mobile 2029 2029 $300,000 $0 $300,000 0% $0 $300,000 $0 $0 $300,000 1.9 Buildings and Strucrtures Kiosks/Vending Machines 2025 2025 $100,000 $0 $100,000 0% $0 $100,000 $100,000 $0 $0 1.10 Parks, Recreation, and Culture Master Plan Projects Future Library Space 2025 2034 $40,375,000 $0 $40,375,000 32% $12,912,125 $27,462,875 $0 $12,137,537 $15,325,338 1.11 Materials Acquisition of New Collection Materials 2025 2034 $2,601,600 $0 $2,601,600 0% $0 $2,601,600 $798,331 $1,803,269 $0 1.12 Materials Opening Day Collection Materials 2025 2034 $1,250,000 $0 $1,250,000 0% $0 $1,250,000 $0 $1,250,000 $0 1.13 Equipment Network Capacity 2025 2025 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $1,000,000 $0 $0 Total $46,122,600 $0 $46,122,600 $12,912,125 $33,210,475 $1,964,331 $15,620,806 $15,625,338 Residential Development Charge Calculation Residential Share of 2026 - 2035 DC Eligible Costs 100% $15,620,806 2025-2034 Adjusted Funding Envelope $15,620,806 10-Year Growth in Population in New Units 35,923 Unadjusted Development Charge Per Capita $434.84 Reserve Fund Balance Balance as at Dec 31, 2024 $1,964,331 Non-Residential Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 0% $0 10-Year Growth in Square Feet 547,703 Unadjusted Development Charge Per Square Foot $0.00 Appendix B | 86 APPENDIX B.1 TABLE 3 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE LIBRARY SERVICE RESIDENTIAL DEVELOPMENT CHARGE (in $000) LIBRARY SERVICE 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $1,964.3 ($692.6) ($1,162.9) ($1,280.0) ($1,353.8) ($1,378.6) ($1,348.2) ($1,257.7) ($936.3) ($520.5) 2025 - 2034 Funding Requirements: Prior Growth Projects $1,964.3 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $1,964.3 2025 - 2034 Funding Requirements: (New Projects): Non Inflated $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $1,519.1 $15,190.8 2025 - 2034 Funding Requirements: Courtice Debenture Principal Payments $0.0 $68.0 $69.0 $71.0 $72.0 $74.0 $76.0 $0.0 $0.0 $0.0 $430.0 2025 - 2034 Funding Requirements (New Projects): Inflated1 $3,483.4 $1,617.5 $1,649.5 $1,683.1 $1,716.3 $1,751.2 $1,786.7 $1,744.9 $1,779.8 $1,815.4 $19,027.8 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $842.3 $1,208.5 $1,609.3 $1,691.5 $1,776.9 $1,867.4 $1,960.3 $2,128.8 $2,239.1 $2,355.1 $17,679.2 Interest on Opening Balance $68.8 ($38.1) ($64.0) ($70.4) ($74.5) ($75.8) ($74.1) ($69.2) ($51.5) ($28.6) ($477.4) Interest on In-year Transactions ($72.6) ($11.2) ($1.1) $0.1 $1.1 $2.0 $3.0 $6.7 $8.0 $9.4 ($54.5) Interest Payments for Courtice Debenture ($12.0) ($12.0) ($12.0) ($12.0) ($12.0) ($12.0) ($12.0) $0.0 $0.0 $0.0 ($83.8) TOTAL REVENUE $826.5 $1,147.2 $1,532.3 $1,609.3 $1,691.5 $1,781.6 $1,877.3 $2,066.3 $2,195.6 $2,335.9 $17,063.5 CLOSING CASH BALANCE ($692.6) ($1,162.9) ($1,280.0) ($1,353.8) ($1,378.6) ($1,348.2) ($1,257.7) ($936.3) ($520.5) $0.0 Note 1: Debenture principal payments not inflated. 2025 Adjusted Charge Per Capita $444.74 Allocation of Capital Program Residential Sector 100% Non-Residential Sector 0% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 87 Appendix B.2 Emergency and Fire Services Appendix B | 88 Appendix B.2 Emergency and Fire Services Clarington Emergency and Fire Services provides for fire suppression, emergency preparedness, fire prevention and public education throughout the Municipality. The department operates from six buildings including five halls and one operations centre. Table 1 Historical Service Levels The Emergency and Fire Services inventory of capital assets currently includes five fire halls and one operations centre for a combined area of 43,325 square feet, valued at approximately $33.9 million. The parking lots, access roads and other paved infrastructure totals 1.1 hectares valued at $1.6 million. The 50 vehicles, tools, and electric vehicle (EV) charging stations associated with the fire halls in the Municipality have a replacement value of $21.7 million. Personal firefighting equipment, station equipment and gear and other equipment amount to $4.2 million. The current value of the capital infrastructure including buildings, parking lots, access roads, and other paved infrastructure, vehicles, furniture and equipment is approximately $61.4 million and provides the Municipality with a 15-year average historical service level of $501.17 per capita and employee. The calculated maximum allowable recoverable through development charges is $19.2 million (38,395 net population and employment growth x historical service level of $501.17). Appendix B | 89 Table 2 2025 - 2034 Development-Related Capital Program and Calculation of the "Unadjusted" Development Charges The 2025 to 2034 development-related capital program provides for a number of new and expanded facilities including the expansion of Headquarters #1 and new Station #6 including a Fire Training Facility. In total, the cost of the new buildings and furnishings amounts to $21.9 million. No BTE shares has been identified. Approximately, $5.9 million has been identified as a post-period benefit and will service growth occurring beyond the 2034 planning period. The capital program also includes for the acquisition of a number of fire trucks and vehicles. Projects include the acquisition of a heavy-duty rescue truck, two super tankers, a fire prevention vehicle, four EV charging stations, one pumper, and two support vehicles valued at $4.4 million. A 10% BTE share has been identified for the replacement of existing rescue truck which is anticipated to provide significant improvement in service delivery. A 75% BTE share or $1.5 million has been identified for the two super 6,000 litre tankers as they are replacing the three existing 4,500 litre tankers. Finally, 90% or $126,000 related to the EV charging stations has been identified to benefit existing residents and employees of the Municipality, recognizing that these facilities will be used to charge existing fuel vehicles intended to be replaced by electric vehicles. In total, a BTE share of $1.4 million has been identified for the vehicles. Approximately, $596,000 for the one pumper for station #6 has been allocated to growth occurring beyond the 10-year planning period. The program also includes a provision of $443,500 for equipment. Of that, $141,500 is anticipated to benefit existing residents and employees and is removed from the DC eligible costs. A further $55,200 is expected to benefit growth occurring beyond the planning period. Appendix B | 90 Altogether, the 10-year capital forecast for the Emergency and Fire Services amounts to $26.8 million. A grant of $3.2 million has been applied to new Station #6 and the Fire Training Facility in Bowmanville. The replacement shares, relating to the replacement of existing buildings, vehicles and equipment, totals $1.5 million. A portion of this cost, approximately $5.4 million, will be paid for by the Emergency and Fire Services DC reserve fund and is applied to projects occurring in the initial years of the planning period. The remaining $10.2 million is related to development between 2025 and 2034. Approximately $6.6 million has been identified to benefit growth beyond the planning period. The development-related cost is allocated 78%, or $7.9 million to the residential sector and 22%, or $2.2 million to the non-residential sector. This yields an unadjusted development charge of $220.39 per capita and a $4.10 non-residential unadjusted development charge. Table 3 Cash Flow Analysis After cash flow consideration, the residential calculated charge increases to $242.06 per capita, and the non-residential charge increases to $4.37. The following table summarizes the calculation of the Emergency and Fire Services development charge: 15-year Hist. Service Level per household Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $501.17 $26,808,000 $10,163,206 $220.39 $4.10 $242.06 $4.37 Development-Related Capital Program Development Charge Development Charge EMERGENCY & FIRE SERVICES SUMMARY 2025 - 2034 Unadjusted Adjusted Appendix B | 91 APPENDIX B.2 TABLE 1 - PAGE 1 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS EMERGENCY & FIRE SERVICES 2025 Buildings Station Name # of Square Feet UNIT COST ($/sq. ft.) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bowmanville Station (Station 1) 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 $800 Courtice Station 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 $800 Enniskillen Station 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 4,211 $800 Municial Emergency Operations Centre (Newcastle) - - - - 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $700 Municipal Operations Centre (Hampton) 703 703 703 703 - - - - - - - - - - - $700 Newcastle Station 3333 HWY #2 - - - - 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 $800 Old Newcastle Station (Station 2) 6,847 6,847 6,847 6,847 - - - - - - - - - - - $700 Orono Station 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 6,762 $700 Total (sq.ft.) 39,523 39,523 39,523 39,523 43,325 43,325 43,325 43,325 43,325 43,325 43,325 43,325 43,325 43,325 43,325 Total ($000) $30,187.2 $30,187.2 $30,187.2 $30,187.2 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 2025 Parkings Lots, Access Roads & Other Paved Infrastructure Station Name # of Hectares UNIT COST ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Asphalt Bowmanville Station 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 $1,550,000 Courtice Station 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 $1,550,000 Enniskillen Station 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 $1,550,000 Newcastle Station & Operations Centre 3333 HWY #2 - - - - 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 $1,550,000 Old Newcastle Station 0.08 0.08 0.08 0.08 - - - - - - - - - - - $1,550,000 Gravel Old Newcastle Station 0.08 0.08 0.08 0.08 - - - - - - - - - - - $930,000 Orono Station 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $930,000 Total (ha) 1.04 1.04 1.04 1.04 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 Total ($000) $1,463.2 $1,463.2 $1,463.2 $1,463.2 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 2025 Vehicles & EV Charging Stations Vehicle Type # of Vehicles UNIT COST ($/vehicle) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Aerial Station #1 and #2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $2,496,000 Cars and Vans 9 9 9 10 10 8 8 8 8 8 8 8 8 8 12 $62,700 EV Charging Stations - - - - - - - - - - 2 2 2 2 2 $35,000 Grass Fire Truck 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $111,000 Heavy Duty Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,400 Hurst Tools 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 $75,000 Mechanic Vehicle - - - - - - - - - - - - 1 1 1 $99,500 Medium Duty Trucks 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 $111,100 Mobile Fire Safety House 1 1 1 1 1 1 1 1 1 1 1 - - - - $99,400 Polaris ATV - - - 1 1 1 1 1 1 1 1 1 1 1 1 $39,900 Prevention Suburban 1 1 1 - - - - - - - - - - - - $113,600 Pumpers (Heavy Duty Custom) 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 $1,203,400 Rescue Truck 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,142,200 Tankers 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $500,000 Trailers 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 $52,700 Total (#) 43 44 45 47 47 45 45 45 45 45 47 46 47 47 50 Appendix B | 92 APPENDIX B.2 TABLE 1 - PAGE 2 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS EMERGENCY & FIRE SERVICES 2025 Furniture & Equipment Station Name Total Value of Furniture & Equipment ($) UNIT COST ($/unit) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Station Furniture & Equipment Bowmanville Station (Station 1) $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 $238,000 Courtice Station $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 $251,000 Dispatch Equipment Upgrade $2,749,000 $2,749,000 $2,749,000 $2,749,000 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 $135,600 Municipal Operations Centre (Hampton) $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 Newcastle Station 3333 HWY #2 $0 $0 $0 $0 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 $332,146 Old Newcastle Station (Station 2) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Orono Station $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Suppression Equipment $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 $504,000 Training / Communications Equipment $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 $830,700 Number of Fire Fighters - Full Time 55 57 60 61 63 63 63 63 63 63 63 63 63 63 67 Personal Equipment $357,500 $370,500 $390,000 $396,500 $409,500 $409,500 $409,500 $409,500 $409,500 $409,500 $409,500 $409,500 $409,500 $409,500 $435,500 $6,500 Number of Fire Fighters - Part Time 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 Personal Equipment $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $4,000 Other Equipment Self Contained Breathing Appartus' 55 57 60 61 63 63 63 63 63 63 63 65 65 65 67 $10,000 Defibrilators 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $3,200 Total ($000) $6,258.60 $6,291.60 $6,341.10 $6,357.60 $4,109.35 $4,109.35 $4,109.35 $4,109.35 $4,109.35 $4,109.35 $4,109.35 $4,129.35 $4,129.35 $4,129.35 $4,175.35 Appendix B | 93 EMERGENCY & FIRE SERVICES TABLE 1 - PAGE 3 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS EMERGENCY & FIRE SERVICES 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Historic Population 83,157 84,548 85,990 87,457 88,949 90,466 92,010 93,821 95,667 97,550 99,470 101,427 103,359 105,328 107,334 Historic Employment 22,072 22,328 23,196 24,098 25,035 26,008 27,019 27,576 28,145 28,726 29,319 29,923 30,751 31,602 32,477 105,229 106,876 109,186 111,555 113,984 116,474 119,029 121,397 123,812 126,276 128,789 131,350 134,110 136,930 139,811 INVENTORY SUMMARY ($000) Buildings $30,187.2 $30,187.2 $30,187.2 $30,187.2 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 $33,863.8 Parking Lots, Access Roads & Other Paved Infrastructure $1,463.2 $1,463.2 $1,463.2 $1,463.2 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 $1,636.8 Vehicles & EV Charging Stations $20,269.1 $20,380.2 $21,583.6 $21,625.3 $21,625.3 $21,499.9 $21,499.9 $21,499.9 $21,499.9 $21,499.9 $21,569.9 $21,470.5 $21,570.0 $21,570.0 $21,709.7 Furniture and Equipment $6,258.6 $6,291.6 $6,341.1 $6,357.6 $4,109.3 $4,109.3 $4,109.3 $4,109.3 $4,109.3 $4,109.3 $4,109.3 $4,129.3 $4,129.3 $4,129.3 $4,175.3 Total ($000) $58,178.1 $58,322.2 $59,575.1 $59,633.3 $61,235.2 $61,109.8 $61,109.8 $61,109.8 $61,109.8 $61,109.8 $61,179.8 $61,100.4 $61,199.9 $61,199.9 $61,385.6 Average SERVICE LEVEL ($/population & employment) Service Level Buildings $286.87 $282.45 $276.48 $270.60 $297.09 $290.74 $284.50 $278.95 $273.51 $268.17 $262.94 $257.81 $252.51 $247.31 $242.21 $271.48 Parking Lots, Access Roads & Other Paved Infrastructure $13.90 $13.69 $13.40 $13.12 $14.36 $14.05 $13.75 $13.48 $13.22 $12.96 $12.71 $12.46 $12.20 $11.95 $11.71 $13.13 Vehicles & EV Charging Stations $192.62 $190.69 $197.68 $193.85 $189.72 $184.59 $180.63 $177.10 $173.65 $170.26 $167.48 $163.46 $160.84 $157.53 $155.28 $177.03 Furniture and Equipment $59.48 $58.87 $58.08 $56.99 $36.05 $35.28 $34.52 $33.85 $33.19 $32.54 $31.91 $31.44 $30.79 $30.16 $29.86 $39.53 Total ($/population & employment) $552.87 $545.70 $545.63 $534.56 $537.23 $524.67 $513.40 $503.39 $493.57 $483.94 $475.04 $465.17 $456.34 $446.94 $439.06 $501.17 MUNICIPALITY OF CLARINGTON CALCULATION OF MAXIMUM ALLOWABLE EMERGENCY & FIRE SERVICES 15-Year Funding Envelope Calculation 15 Year Average Service Level (2010-2024) $501.17 Household & Employment Growth 2025-2034 38,395 Maximum Allowable Funding Envelope $19,242,422 Appendix B | 94 APPENDIX B.2 TABLE 2 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM EMERGENCY & FIRE SERVICES Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 2.1 Buildings & Furnishings Expansion of Headquarters #1 (4,500 sq.ft.) 2025 2025 $1,732,500 $0 $1,732,500 0% $0 $1,732,500 $1,732,500 $0 $0 2.2 Buildings & Furnishings New Station #6 + Fire Training Facility in Bowmanville (20,000 sq.ft.) 2027 2027 $20,200,000 $3,200,000 $17,000,000 0% $0 $17,000,000 $2,129,091 $8,961,852 $5,909,057 2.3 Vehicles Heavy Duty Rescue 2025 2025 $1,000,000 $0 $1,000,000 10% $100,000 $900,000 $900,000 $0 $0 2.4 Vehicles 2 Super Tankers 2025 2025 $1,536,000 $0 $1,536,000 75% $1,152,000 $384,000 $384,000 $0 $0 2.5 Vehicles Fire Prevention Vehicle 2025 2025 $76,000 $0 $76,000 0% $0 $76,000 $76,000 $0 $0 2.6 Vehicles 4 EV Charging Stations 2025 2034 $140,000 $0 $140,000 90% $126,000 $14,000 $0 $14,000 $0 2.7 Vehicles 1 Pumpers (Station #6) 2028 2028 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $0 $903,965 $596,035 2.8 Vehicles 2 Support Vehicles 2028 2028 $180,000 $0 $180,000 0% $0 $180,000 $0 $180,000 $0 2.9 Equipment 18 Pagers for New Recruits 2025 2025 $13,500 $0 $13,500 0% $0 $13,500 $13,500 $0 $0 2.10 Equipment 20 New Full-Time Recruits - Station #1 Personal Equipment 2025 2025 $130,000 $0 $130,000 0% $0 $130,000 $130,000 $0 $0 2.11 Equipment Public Education Technology 2025 2029 $100,000 $0 $100,000 78% $78,455 $21,545 $0 $21,545 $0 2.12 Equipment Improved Fire Ground Operations (Years 1 - 5) 2025 2029 $35,000 $0 $35,000 90% $31,500 $3,500 $0 $3,500 $0 2.13 Equipment 20 New Full-Time Recruits - Station #6 Personal Equipment 2033 2034 $130,000 $0 $130,000 0% $0 $130,000 $0 $78,344 $51,656 2.14 Equipment Improved Fire Ground Operations (Years 6 - 10) 2030 2034 $35,000 $0 $35,000 90% $31,500 $3,500 $0 $0 $3,500 TOTAL $26,808,000 $3,200,000 $23,608,000 $1,519,455 $22,088,545 $5,365,091 $10,163,206 $6,560,249 Residential Development Charge Calculation Residential Share of 2026 - 2035 DC Eligible Costs 78% $7,917,137 2025-2034 Adjusted Funding Envelope $19,242,422 10-Year Growth in Population in New Units 35,923 Unadjusted Development Charge Per Capita $220.39 Reserve Fund Balance Balance as at Dec 31, 2024 $5,365,091 Non-Residential Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 22% $2,246,068 10-Year Growth in Square Feet 547,703 Unadjusted Development Charge Per Square Foot $4.10 Appendix B | 95 APPENDIX B.2 TABLE 3 - PAGE 1 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE EMERGENCY & FIRE SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) EMERGENCY & FIRE SERVICES 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $4,179.4 $2,201.5 $2,942.6 ($5,295.9) ($5,567.6) ($4,895.3) ($4,131.6) ($3,274.5) ($2,276.9) ($1,199.8) 2025 - 2034 Funding Requirements: Prior Growth $2,520.8 $0.0 $1,658.6 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $4,179.4 2025 - 2034 Funding Requirements: Non Inflated $5.0 $5.0 $6,986.3 $849.4 $5.0 $1.1 $1.1 $1.1 $31.6 $31.6 $7,917.1 2025 - 2034 Funding Requirements: Inflated $2,525.8 $5.1 $8,994.1 $901.4 $5.4 $1.2 $1.2 $1.3 $37.0 $37.8 $12,510.3 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $458.5 $657.7 $875.9 $920.6 $967.1 $1,016.4 $1,066.9 $1,158.6 $1,218.7 $1,281.8 $9,622.3 Interest on Opening Balance $146.3 $77.1 $103.0 ($291.3) ($306.2) ($269.2) ($227.2) ($180.1) ($125.2) ($66.0) ($1,139.0) Interest on In-year Transactions ($56.9) $11.4 ($223.3) $0.3 $16.8 $17.8 $18.7 $20.3 $20.7 $21.8 ($152.4) TOTAL REVENUE $547.9 $746.2 $755.6 $629.7 $677.7 $764.9 $858.4 $998.8 $1,114.1 $1,237.6 $8,330.9 CLOSING CASH BALANCE $2,201.5 $2,942.6 ($5,295.9) ($5,567.6) ($4,895.3) ($4,131.6) ($3,274.5) ($2,276.9) ($1,199.8) ($0.0) 2025 Adjusted Charge Per Capita $242.06 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 96 APPENDIX B.2 TABLE 3 - PAGE 2 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE EMERGENCY & FIRE SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) EMERGENCY & FIRE SERVICES 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $1,185.69 $748.29 $1,040.83 ($1,260.55) ($1,294.63) ($1,057.00) ($789.45) ($490.55) ($337.82) ($178.04) 2025 - 2034 Funding Requirements: Prior Growth Proj $715.2 $0.0 $470.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $1,185.7 2025 - 2034 Funding Requirements: Non Inflated $1.4 $1.4 $1,982.0 $241.0 $1.4 $0.3 $0.3 $0.3 $9.0 $9.0 $2,246.1 2025 - 2034 Funding Requirements: Inflated $716.6 $1.4 $2,551.6 $255.7 $1.5 $0.3 $0.3 $0.4 $10.5 $10.7 $3,549.1 Growth in Square Metres 57,285 59,015 60,745 62,575 64,450 66,370 68,390 35,233 36,265 37,375 547,703 DC Revenue Receipts: Inflated $250.5 $263.2 $276.4 $290.4 $305.1 $320.4 $336.8 $177.0 $185.8 $195.3 $2,600.8 Interest on Opening Balance $41.5 $26.2 $36.4 ($69.3) ($71.2) ($58.1) ($43.4) ($27.0) ($18.6) ($9.8) ($193.3) Interest on In-year Transactions ($12.8) $4.6 ($62.6) $0.6 $5.3 $5.6 $5.9 $3.1 $3.1 $3.2 ($44.0) TOTAL REVENUE $279.2 $294.0 $250.2 $221.6 $239.2 $267.9 $299.2 $153.1 $170.3 $188.8 $2,363.5 CLOSING CASH BALANCE $748.3 $1,040.8 ($1,260.6) ($1,294.6) ($1,057.0) ($789.4) ($490.5) ($337.8) ($178.0) $0.0 2025 Adjusted Charge Per Square Metre $4.37 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 97 Appendix B.3 Parks and Indoor Recreation Appendix B | 98 Appendix B.3 Parks and Indoor Recreation The Municipality of Clarington offers its residents a range of parks and indoor recreation opportunities through various parks, arenas, swimming pools, community centres etc. These facilities are used to provide a range of recreation programs including swimming lessons, fitness classes, daytime programs, etc. The Parks and Indoor Recreation 15-year historical inventory of capital assets and 10-year capital program is largely informed by the Municipalityʼs 2024 PRCMP. The PRCMP has a planning horizon of 2036 and identifies the Municipalityʼs priorities and future capital investments. Table 1 Historical Service Levels The Table 1 displays the Indoor Recreation Services 15-year historical inventory of capital assets. The Municipality of Clarington offers indoor recreation services to its residents through a number of facilities including community centres, soccer facilities, resource centres, etc. The total square footage of these facilities amounts to approximately 488,530 square feet and these facilities are valued at over $317.3 million. There are approximately 10.8 hectares of parking lots, access roads and other paved infrastructure totals about $15.6 million. Indoor recreation facilities also include various furniture and equipment for a total replacement cost of $8.3 million. Finally, the Municipality has one outdoor swimming pool in Orono valued at $1.2 million. The Municipality has roughly 151.6 hectares of parkland valued at $39.6 million. The Parks and Recreation department is also responsible for park facilities including baseball diamonds, softball diamonds, soccer pitches, football fields, pickleball courts, tennis courts, basketball courts, park trails, dog parks, etc. These facilities have a combined total of $50.7 million. Special facilities include shelters and features, parking lots, park access Appendix B | 99 roads, park trails, park bridges, and miscellaneous equipment and special features and have a total value of $22.9 million. The combined value of capital assets for park development and related facilities is $455.6 million. The 15-year historical service level is $4,758.32 capita, and this, multiplied by the 10-year forecast net population growth, results in a maximum allowable funding envelope of approximately $134.2 million (28,202 net population growth x $4,758.32 per capita). Table 2 2025 - 2034 Development-Related Program and Calculation of the "Unadjusted" Development Charges i. Recovery of Authorized/Future Debentures The Parks and Indoor Recreation capital program includes for the recovery of a range of recreation and park facilities. The program includes costs related to the South Bowmanville Recreation Centre, which is a modern facility including multi-purpose rooms, a gymnasium, FIFA-size multi-sport dome with an indoor walking track. The capital program includes the recovery of authorized and future principal debenture payments for the South Bowmanville Recreation Centre of $37.1 million and $3.1 million, respectively. The recovery of issued debentures for the outdoor rinks at the Courtice Community Complex and Diane Hamre Recreation Centre is also included in the capital program valued at $7.1 million. Additionally, between 2025 - 2034 the Municipality is anticipated to fund $2.9 million in principal payments related to the Newcastle Community Park. ii. Indoor Recreation Buildings In addition to the identified debenture payments, the Parks and Indoor Recreation capital program provides for the development-related costs relating to the expansion of the Courtice Community Complex from 2028 - Appendix B | 100 2030 valued at $8.3 million with a BTE share of 5% or $436,840, which reflects that approximately 500 square feet of the existing pool deck will be replaced when the new 9,500 square foot facility is constructed. The Phase 2 expansion of the Diane Hamre Recreation Complex is valued at $59.1 million and is entirely allocated a post-period benefit. iii. Parks, Recreation and Culture Master Plan (PRCMP) Indoor Recreation Projects The Municipalityʼs PRCMP identifies the need for two arenas (ice pads), an indoor aquatic centre, a multi-purpose space/group fitness space, and an indoor walking track. These projects are valued at approximately $125.1 million. A grant of $10.0 million has been applied to the indoor aquatic centre. The two ice pads located at South Courtice Arena are anticipated to benefit growth beyond 2034. A portion of the Indoor Aquatic Centre - South Bowmanville Facility Phase 2, $37.0 million and $187,500 of the indoor walking track, exceeds the maximum permissible funding envelope and is deemed to be a post-period benefit (PPB). The PPB share of the project will be considered for recovery in subsequent DC Background Studies. iv. Park Development Various park development projects have been identified throughout the Municipality such as the South Bowmanville Recreation Centre Park, Newtonville Estates Parkette, Northglen Phase 8 Parkette, etc. In total, the costs for park developments throughout the Municipality amounts to $45.9 million. A BTE share of $2.00 million or 10% has been removed for the Bowmanville Zoo Park Future Phases. The proposed Community Park will be located on the former Bowmanville Zoo lands which is no longer operational. The future park will include natural play structures to an outdoor amphitheatre, connected trails, demonstration gardens, etc. Appendix B | 101 v. Parks, Recreation and Culture Master Plan (PRCMP) - Facilities and Equipment to 2036 The PRCMP also identifies a range of facilities and equipment including outdoor rectangular fields, ball diamonds, cricket fields, tennis/pickle ball/basketball courts, splashpads, cooling stations etc., required to service the needs of development throughout the Municipality. The projects identified for the 2025 - 2036 planning horizon are valued at $43.5 million. A BTE share of $2.8 million has been identified for the 14 outdoor splash pads. Recognizing that the planning horizon in the PRCMP extends beyond the 10-year planning horizon used in the DC Background Study (2025 - 2034), approximately $6.8 million has been identified as a PPB beyond 2034 and will be considered for recovery under subsequent DC Background Studies. vi. Park Trails Proposed park trails are located throughout the Municipality and valued at $6.9 million over the planning period. No BTE shares have been identified as the trails are all net new assets. Soper Creek Trail ($1.2 million) has been identified to benefit growth beyond the planning period and will be considered for recovery under subsequent DC Background Studies. vii. Summary of Parks & Recreation Capital Program Altogether, the 10-year gross development-related capital program for Parks and Indoor Recreation amounts to $339.0 million. A grant of $10.0 million has been applied to the indoor aquatic centre. Approximately $5.2 million, has been identified as ineligible cost for recovery and has been removed from the total DC recoverable share. A portion of this cost, $4.6 million, will be paid for by existing funds in the Parks and Indoor Recreation DC reserve fund. A further $185.0 million relates to development occurring beyond the 2034 planning period and will be considered for recovery under subsequent DC Background Studies. After Appendix B | 102 this adjustment, $134.2 million is considered to be the 2025 - 2034 development-related DC eligible costs. The entire DC eligible in-period amount of $134.2 million is allocated to the residential sector as Parks and Indoor Recreation will benefit the future residential population and is recovered by the forecast of approximately 35,923 persons in new housing units. This yields an unadjusted charge of $3,735.60 per capita. Table 3 Cash Flow Analysis After cash flow consideration, which accounts for the anticipated timing of projects, the rate of development and interest on debentures, the residential calculated charge increases to $4,386.08 per capita. The following table summarizes the calculation of the Parks and Indoor Recreation development charge: 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $4,758.32 $338,985,517 $134,194,095 $3,735.60 $0.00 $4,386.08 $0.00 Development-Related Capital Program Development Charge Development Charge 2025 - 2034 Unadjusted Adjusted PARKS & INDOOR RECREATION SUMMARY Appendix B | 103 APPENDIX B.3 TABLE 1 - PAGE 1 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION INDOOR RECREATION 2025 Buildings Facility Name # of Square Feet UNIT COST ($/sq. ft.) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Alan Strike Aquatic and Squash Centre 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 13,647 $750 Base Line Community Centre 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 $400 Bowmanville Indoor Soccer Facility 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 28,482 $400 Brownsdale Community Centre 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 $400 Clarington Beech Centre 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 $400 Courtice Community Complex 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 $750 Darlington Sports Centre 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900 $750 Diane Harme Recreation Complex 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 61,900 $750 Garnet B. Rickard Community Complex 88,586 88,586 88,586 88,586 88,586 88,586 88,586 88,586 88,723 88,723 88,723 88,723 88,723 88,723 88,723 $750 Hampton Community Centre 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 3,059 $400 Haydon Community Centre 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 $400 Kendal Community Centre 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 8,185 $400 Memorial Park Community Centre 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 2,937 $400 Newcastle Community Centre 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 21,002 $400 Newcastle Memorial Arena 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 27,007 $750 Newtonville Community Centre 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 $400 Orono Arena & Community Hall 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 35,989 $400 Orono Town Hall 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 $400 Solina Community Centre 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 2,766 $400 South Courtice Arena 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 $750 Tyrone Community Centre 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 5,887 $400 Youth Centre - Resource Area 2,000 2,000 2,000 2,000 2,000 - - - - - - - - - - $400 Total (sq.ft.) 490,397 490,397 490,397 490,397 490,397 488,397 488,397 488,397 488,534 488,534 488,534 488,534 488,534 488,534 488,534 Total ($000) $317,972.8 $317,972.8 $317,972.8 $317,972.8 $317,972.8 $317,172.8 $317,172.8 $317,172.8 $317,275.6 $317,275.6 $317,275.6 $317,275.6 $317,275.6 $317,275.6 $317,275.6 Appendix B | 104 APPENDIX B.3 TABLE 1 - PAGE 2 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION INDOOR RECREATION 2025 Parkings Lots, Access Roads & Other Paved Infrastructure Facility Name # of Hectares UNIT COST ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Asphalt Base Line Community Centre 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $1,550,000 Bowmanville Indoor Soccer 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 $1,550,000 Clarington Fitness Centre 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 $1,550,000 Courtice Community Centre 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 $1,550,000 Darlington Sports Centre 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 $1,550,000 Garnet B. Richard Arena 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 2.35 $1,550,000 Hampton Community Centre 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 $1,550,000 Haydon Community Centre 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 $1,550,000 Kendal Community Centre 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 $1,550,000 Memorial Park Community Centre 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $1,550,000 Newcastle & District Recreation Complex 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 $1,550,000 Newcastle Arena 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 $1,550,000 Newcastle Community Centre 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 $1,550,000 Orono Arena & Community Hall 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 $1,550,000 Solina Community Centre 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 $1,550,000 South Courtice Arena 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 $1,550,000 Gravel Bowmanville Indoor Soccer 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $930,000 Brownsdale Community Centre 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 $930,000 Darlington Sports Centre 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 $930,000 Hampton Community Centre 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 $930,000 Haydon Community Centre 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 $930,000 Orono Arena & Community Hall 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 $930,000 Solina Community Centre 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 $930,000 Tyrone Community Centre 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 $930,000 Total (ha) 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 10.82 Total ($000) $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 $15,595.8 Appendix B | 105 APPENDIX B.3 TABLE 1 - PAGE 3 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION INDOOR RECREATION Furniture & Equipment Facility Name Total Value of Furniture & Equipment ($) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Alan Strike Centre $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 $207,500 Base Line Community Centre $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 $83,900 Bowmanville Indoor Soccer $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 $346,500 Brownsdale Community Centre $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 Clarington Beech Centre $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 $495,200 Courtice Community Complex $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 $714,800 Darlington Sports Centre $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 $500,300 Garnet B. Rickard Community Complex $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 $1,347,200 Hampton Community Centre $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 Haydon Community Centre $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 $24,300 Kendal Community Centre $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 $103,400 Memorial Park Community Centre $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 $53,500 Newcastle & District Recreation Complex $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 $941,400 Newcastle Community Centre $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 $399,100 Newcastle Memorial Arena $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 Newtonville Community Centre $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 $30,400 Orono Arena & Community Hall $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 $692,300 Orono Town Hall $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 $58,400 Solina Community Centre $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 $47,400 South Courtice Arena $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 $1,171,000 Tyrone Community Centre $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 $73,000 Youth Centre - Resource Area $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 $181,300 Total ($000) $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 $8,276.3 Appendix B | 106 APPENDIX B.3 TABLE 1 - PAGE 4 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION INDOOR RECREATION 2025 Outdoor Swimming Pools # of Pools UNIT COST ($/pool) Park Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Orono Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,205,000 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Total ($000) $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 $1,205.0 Appendix B | 107 APPENDIX B.3 TABLE 1 - PAGE 5 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARKS 2025 Parkettes Parkette Name # of Hectares of Developed Area Unit Cost ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Andrew Parkette 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $390,000 Barlow Court Parkette 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 $390,000 Brookhill Parkette - - - - - - - - - - - - - 0.50 0.50 $390,000 Brookhouse Parkette 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 $390,000 Bruce Cameron Parkette - - - - - - - - - - - - - 0.38 0.38 $390,000 Community Garden Parkette 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 $390,000 Douglas Kemp Parkette - - - - - - - - - - - - 0.59 0.59 0.59 $390,000 Firwood Parkette 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $390,000 Foster Creek Parkette 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 $390,000 Foxhunt Parkette 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $390,000 Gate House Parkette 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $390,000 George Reynolds Parkette 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 $390,000 Glanville Parkette 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $390,000 Glenabbey Parkette 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $390,000 Haydon Hall Parkette 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $390,000 Ida Brown Parkette 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $390,000 Landerville Parkette 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 $390,000 Longworth & Scugog Parkette 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 $390,000 Nelson Street Parkette - 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 $390,000 Peters Pike Parkette 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $390,000 Pickard Gate Parkette (Robinson Ridge) 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 $390,000 Rick Gay Parkette (Cherry Blossom) 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $390,000 Squire Fletcher Parkette 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 $390,000 Trulls and Hwy 2 Parkette - - 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 $390,000 Westview Parkette 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $390,000 Whitecliff Parkette 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 $390,000 Total (ha) 12.93 13.17 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.89 14.77 14.77 Total ($000) $5,042.7 $5,136.3 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,187.0 $5,417.1 $5,760.3 $5,760.3 Appendix B | 108 APPENDIX B.3 TABLE 1 - PAGE 6 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARKS 2025 Neighbourhood Parks Park Name # of Hectares of Developed Area Unit Cost ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Argent Park 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 $210,000 Avondale Park 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $210,000 Baseline Park 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 $210,000 Baxter Park 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 $210,000 Bons Park 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 $210,000 Brownsdale Community Centre 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 $210,000 Clarington Corners Park (aka Green Park) 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 $210,000 Courtice Complex Soccer Field 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 $210,000 Courtice Memorial Park 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 $210,000 Courtice West Park 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 $210,000 East Beach Park 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $210,000 East Beach Properties 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 $210,000 Edward Park 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 $210,000 Elephant Hill Park 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 $210,000 Elliot Memorial Park 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 $210,000 Guildwood Park 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $210,000 Harry Gay Park - - - 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 $210,000 Harvey Jackson Park 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 2.55 $210,000 Harvey Jones Park - - - 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $210,000 Highland Park 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 $210,000 Kendal Park 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 $210,000 Longworth Park 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 $210,000 Lord Elgin 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $210,000 Mearns Park 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 $210,000 Moyse Park 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $210,000 Northglen Park - - - - - - - - - - - - - - 1.98 $210,000 Pearce Farm Park 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 $210,000 Penfound Park 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 $210,000 Rhonda Park 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 $210,000 Roswell Park 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 2.78 $210,000 Stuart Park 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 $210,000 Tooley's Mill Park - - - - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 $210,000 Walbridge Park 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $210,000 West Beach Properties 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 $210,000 West Side Dr. Park 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $210,000 Zion Park 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 $210,000 Total (ha) 52.80 52.80 52.80 56.00 56.40 56.40 56.40 56.40 56.40 56.40 56.40 56.40 56.40 56.40 58.38 Total ($000) $11,088.0 $11,088.0 $11,088.0 $11,760.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $11,844.0 $12,259.8 Appendix B | 109 APPENDIX B.3 TABLE 1 - PAGE 7 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARKS 2025 Community Parks Park Name # of Hectares of Developed Area Unit Cost ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bowmanville Memorial Park 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 2.13 $260,000 Burketon Park 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 $260,000 Clarington Fields Park 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 17.11 $260,000 Darlington Sports Centre 2.80 2.80 2.80 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 $260,000 Enniskillen Community Centre 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $260,000 Lions Parkette 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 $260,000 Newcastle Community Park - - - - - - - - - - - - 12.30 12.30 12.30 $260,000 Excess Capacity Adjustment - - - - - - - - - - - - (11.06) (11.06) (11.06) $260,000 Newcastle Memorial Park 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 $260,000 Optimist Park 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 $260,000 Orono Fountain 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $260,000 Orono Park 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 $260,000 Solina Park 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 3.70 $260,000 Soper Creek Park 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 $260,000 South Courtice Community Park 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 $260,000 Tyrone Park 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 $260,000 Total (ha) 47.08 47.08 47.08 47.11 47.11 47.11 47.11 47.11 47.11 47.11 47.11 47.11 48.35 48.35 48.35 Total ($000) $12,240.8 $12,240.8 $12,240.8 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,248.6 $12,571.0 $12,571.0 $12,571.0 Appendix B | 110 APPENDIX B.3 TABLE 1 - PAGE 8 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARKS 2025 District Parks Park Name # of Hectares of Developed Area Unit Cost ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bennett Road Future Park (Waterfront Trail) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 $300,000 Bond Head Boat Launch 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 $300,000 Bowmanville Boat Launch (leased from CLOCA) 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 $300,000 Bowmanville Leash Free Park - - 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 $300,000 Bowmanville Valley 0.89 0.89 0.89 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 $300,000 Carveth Open Space along Graham Creek 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 $300,000 Clarke Museum 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $300,000 Darlington Hydro Fields 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 $300,000 Lakefront The Glen (east of Bond Head) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $300,000 Newcastle Cenotaph 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 $300,000 Newtonville Cenotaph 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $300,000 Orono Cenotaph 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $300,000 Orono Fairgrounds 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 $300,000 Orono Woods Walk Trail 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 $300,000 Port Darlington West Beach - - 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 $300,000 Port of Newcastle Waterfront Park 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 5.84 $300,000 Rickard Recreation Park 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 $300,000 Rotary Park 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $300,000 Samuel Wilmot Nature Area 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 $300,000 Waterfront Trail Corridor (Ridge Pine Park - OPG) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $300,000 Total (ha) 28.48 28.48 30.01 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.05 Total ($000) $8,544.0 $8,544.0 $9,003.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 $9,015.0 Appendix B | 111 APPENDIX B.3 TABLE 1 - PAGE 9 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Baseball Diamonds Park Name # of Diamonds Unit Cost ($/diamond) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Championship Lit Clarington Fields 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $900,000 Newcastle Community Park - - - - - - - - - - - - - 1 1 $900,000 Lit Harvey Jackson Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Orono Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Soper Creek Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Unlit Longworth Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Penfound Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Total (#) 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 Total ($000) $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $4,100.0 $5,000.0 $5,000.0 Appendix B | 112 APPENDIX B.3 TABLE 1 - PAGE 10 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Softball Diamonds Park Name # of Diamonds Unit Cost ($/diamond) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Championship Lit Clarington Fields 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $900,000 Lit Bowmanville Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Rickard Community Complex 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $500,000 Unlit Argent Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Bowmanville Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Brownsdale Community Centre - - - - - - - - - - - - - - - $400,000 Burketon Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Courtice West Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Courtice Memorial Park - - - - - - - - - - - - - - - $400,000 Edward Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Elephant Hill Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $400,000 Harvey Jackson Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Highland Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Lord Elgin Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $400,000 Optimist Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Rhonda Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Solina Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $400,000 Stuart Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Tyrone Park 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 $400,000 Northglen East Park - - - - - - - - - - - - - - 1 $400,000 Total (#) 24 24 24 24 24 24 24 24 24 24 23 23 23 23 24 Total ($000) $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,900.0 $10,500.0 $10,500.0 $10,500.0 $10,500.0 $10,900.0 Appendix B | 113 APPENDIX B.3 TABLE 1 - PAGE 11 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Soccer Pitches Park Name # of Pitches Unit Cost ($/pitch) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Lit Darlington Hydro Fields 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $500,000 South Courtice Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Lit Artifical Turf South Courtice Community Park - - - - - 1 1 1 1 1 1 1 1 1 1 $2,207,500 Unlit Baxter Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Burketon Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Clarington Corners Park (Green Park) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Clarington Fields 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $200,000 Courtice Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $200,000 Darlington Sports Centre 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Elliot Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Highland Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Northglen Park - - - - - - 1 1 1 1 1 1 1 1 1 $200,000 Optimist Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Pearce Farm Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Rickard Neighbourhood Park - - - - - - - - 1 1 1 1 1 1 1 $200,000 Scugog Street Neighbourhood Park - - - - - - - - 1 1 1 1 1 1 1 $200,000 Solina Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $200,000 South Courtice Community Park - - - - - - - 1 1 1 1 1 1 1 1 $200,000 Tyrone Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $200,000 Walbridge Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 West Side Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Zion Park 1 1 1 1 1 1 1 1 1 1 - - - - - $200,000 Mini Baseline Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Burketon Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Clarington Fields 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $83,000 Courtice Complex 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Darlington Hydro Fields 4 4 4 3 3 3 3 3 3 3 3 3 3 3 3 $83,000 Enniskillen Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Guildwood Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Harry Gay Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Longworth Park - - - - - 2 2 2 2 2 2 2 2 2 2 $83,000 Mearns Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Newcastle Memorial 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Optimist Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $83,000 Orono Fairgrounds Park 2 2 2 2 2 1 1 1 1 1 - - - - - $83,000 Penfound Park 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 $83,000 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Tyrone Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $83,000 Total (#) 41 41 41 41 41 43 44 45 47 47 45 45 45 44 44 Total ($000) $6,718.5 $6,718.5 $6,718.5 $6,718.5 $6,718.5 $9,009.0 $9,209.0 $9,409.0 $9,809.0 $9,809.0 $9,526.0 $9,526.0 $9,526.0 $9,326.0 $9,326.0 Appendix B | 114 APPENDIX B.3 TABLE 1 - PAGE 12 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Football Fields # of Fields Unit Cost ($/field) Park Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Lit Clarington Fields 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Total ($000) $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 $500.0 2025 Pickelball Courts Park Name # of Fields Unit Cost ($/field) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Lit Newcastle Community Park - - - - - - - - - - - - 3 3 3 $86,900 Orono Park - - - - - - - - - - 3 3 3 3 $86,900 Unlit Stuart Park - - - - - - - - - - 3 4 4 4 4 $86,900 Total (#) - - - - - - - - - - 3 7 10 10 10 Total ($000) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $260.7 $608.3 $869.0 $869.0 $869.0 2025 Tennis Courts Park Name # of Courts Unit Cost ($/court) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Lit Lions Parkette (Beech Centre) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $162,100 Orono Park 2 2 - - 2 2 2 2 2 2 2 1 1 1 1 $120,800 Solina Park - - - - - - - 2 2 2 2 2 2 2 2 $162,100 Newcastle Community Park - - - - - - - - - - - - - 2 2 $162,100 South Courtice Arena - - - - - - - - - - - - - - 2 $162,100 Unlit Avondale Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $123,100 Clarington Corners Park (Green Park) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $123,100 Guildwood Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $123,100 Lord Elgin Park 2 2 2 2 2 - - - - - - - - - - $123,100 Orono Park - - 2 2 2 2 2 2 2 2 - - - - - $123,100 Solina Park 2 2 2 2 2 2 2 - - - - - - - - $123,100 Stuart Park 2 2 2 2 2 2 2 2 2 2 - - - - - $123,100 Total (#) 16 16 16 16 18 16 16 16 16 16 12 11 11 13 15 Total ($000) $2,043.0 $2,043.0 $2,047.6 $2,047.6 $2,289.2 $2,043.0 $2,043.0 $2,121.0 $2,121.0 $2,121.0 $1,628.6 $1,507.8 $1,507.8 $1,832.0 $2,156.2 Appendix B | 115 APPENDIX B.3 TABLE 1 - PAGE 13 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Water Play Facilities Park Name # of Facilities Unit Cost ($/facility) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Avondale Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $205,700 Baxter Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Bons Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Bowmanville Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Glenabbey Park 1 1 1 1 1 - - - - - - - - - - $197,800 Guildwood Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,200 Harry Gay Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Harvey Jones Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Longworth Park - - - - - 1 1 1 1 1 1 1 1 1 1 $197,800 Northglen East Park - - - - - - - - - - - - - - 1 $197,800 Northglen Park - - - - - - 1 1 1 1 1 1 1 1 1 $197,800 Orono Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Pearce Farm Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Port Darlington Waterfront Park (East Beach) - - - - - 1 1 1 1 1 1 1 1 1 1 $411,400 Rickard Neighbourhood Park - - - - - - - - 1 1 1 1 1 1 1 $197,800 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Walbridge Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 West Side Drive Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $197,800 Total (#) 11 11 11 13 13 14 15 15 16 16 16 16 16 16 17 Total ($000) $2,183.1 $2,183.1 $2,183.1 $2,578.7 $2,578.7 $2,990.1 $3,187.9 $3,187.9 $3,385.7 $3,385.7 $3,385.7 $3,385.7 $3,385.7 $3,385.7 $3,583.5 Appendix B | 116 APPENDIX B.3 TABLE 1 - PAGE 14 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Playgrounds Park Name # of Playgrounds Unit Cost ($/playground) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Andrew Street - - - - - - - 1 1 1 1 1 1 1 1 $145,300 Argent Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $174,600 Avondale Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $175,400 Barlow Court Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $118,000 Baseline Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $159,300 Baxter Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $146,500 Bruce Cameron Parkette - - - - - - - - - - - - - - 1 $147,500 Brookhill Park - - - - - - - - - - - - - - 1 $188,900 Bons Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,700 Bowmanville Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $129,600 Brookhouse Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $106,600 Burketon Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $147,800 Buttonshaw Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $135,300 Clarington Corners Park (Green Park) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $191,000 Courtice West Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $121,200 Darlington Hydro Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $171,700 Douglas Kemp Parkette - - - - - - - - - - - - - - 1 $188,900 Edward Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $131,100 Elephant Hill Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $133,700 Elliot Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $185,700 Enniskillen Park - - - - - - - - 1 1 1 1 1 1 1 $170,000 Foster Creek Parkette - - - - - 1 1 1 1 1 1 1 1 1 1 $162,600 Garnet B. Rickard Rec Complex Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $141,800 Greenwood Park - - - - - - - - - - - - - - - $191,000 Guildwood Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $148,800 Harry Gay Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $164,200 Harvey Jones Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $125,800 Highland Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $104,500 Kendal Park (Harvey Jackson Park) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $126,000 Lions Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,800 Longworth Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $144,600 Lord Elgin Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $161,500 Mearns Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $161,400 Nelson Street Parkette - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $154,700 Newcastle Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $95,600 Northglen East Park - - - - - - - - - - - - - - 1 $142,200 Northglen Park - - - - - - 1 1 1 1 1 1 1 1 1 $174,000 Orono Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $166,000 Pearce Farm Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $166,000 Penfound Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $126,300 Pickard Gate Parkette - - - - - 1 1 1 1 1 1 1 1 1 1 $157,000 Port Darlington Waterfront Park (East Beach) - - - - - 1 1 1 1 1 1 1 1 1 1 $159,000 Rhonda Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $107,200 Rick Gay Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $142,200 Rickard Neighbourhood Park - - - - - - - - 1 1 1 1 1 1 1 $171,400 Rose Park - - - - - - - - - - - - - - 1 $142,200 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $142,900 Scugog Street Neighbourhood Park - - - - - 1 1 1 1 1 1 1 1 1 1 $169,600 Solina Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $186,900 Soper Creek Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $105,800 Squire Fletcher Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $132,200 Stuart Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $151,300 Tyrone Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $172,400 Walbridge Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $177,300 Westside Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $158,000 Whitecliffe Parkette - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $96,400 Total (#) 38 38 40 42 42 46 47 48 50 50 50 50 50 50 55 Total ($000) $5,500.7 $5,500.7 $5,751.8 $6,041.8 $6,041.8 $6,690.0 $6,864.0 $7,009.3 $7,350.7 $7,350.7 $7,350.7 $7,350.7 $7,350.7 $7,350.7 $8,160.4 Appendix B | 117 APPENDIX B.3 TABLE 1 - PAGE 15 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Lacrosse Bowl # of Rinks Unit Cost ($/bowl) Park Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Lacrosse Bowl 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $994,300 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Total ($000) $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 $994.3 2025 Skateboard Park Park Name # of Parks Unit Cost ($/park) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 G. B. Rickard Community Centre 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $316,800 Hampton Skateboard Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $316,800 Newcastle Community Park 1 1 $316,800 Orono Skateboard Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $316,800 Rob Piontek Skateboard Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $316,800 Total (#) 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 Total ($000) $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,267.2 $1,584.0 $1,584.0 Appendix B | 118 APPENDIX B.3 TABLE 1 - PAGE 16 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Basketball Courts Park Name # of Courts Unit Cost ($/court) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 1/2 Courts Andrew St. Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Barlow Court Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Bons Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Brookhouse Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Elliot Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Foxhunt Parkette 1 1 - - - - - - - - - - - - - $42,600 Gate House Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Glenabbey Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Harvey Jones Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Highland Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Moyse Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,600 Northglen Park - - - - - - 1 1 1 1 1 1 1 1 1 $42,600 Orono Park 1 1 1 1 1 1 1 1 1 1 - - - - - $42,600 Full Courts Clarington Corners Park (Green Park) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Guildwood Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Lord Elgin Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Optimist Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Pearce Farm Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Soper Creek Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 South Courtice Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Stuart Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Tyrone Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Walbridge Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $77,100 Total (#) 22 22 21 22 22 22 23 23 23 23 22 22 22 22 22 Total ($000) $1,316.7 $1,316.7 $1,274.1 $1,316.7 $1,316.7 $1,316.7 $1,359.3 $1,359.3 $1,359.3 $1,359.3 $1,316.7 $1,316.7 $1,316.7 $1,316.7 $1,316.7 Appendix B | 119 APPENDIX B.3 TABLE 1 - PAGE 17 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION PARK FACILITIES 2025 Tot Lots (Playgrounds) Park Name # of Lots Unit Cost ($/lot) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bathgate Commons - - - - - 1 1 1 1 1 1 1 1 1 1 $133,300 Cecil Found Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $141,600 Cherry Blossom Parkette - - - - - - - - - - - - - - - $142,200 Foxhunt Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $157,200 Gate House Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $107,300 Glanville Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 Glenabbey Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $185,400 Haydon Hall Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $113,500 Ina Brown Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $149,800 Landerville Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $91,800 Moyse Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $141,200 Whitecliff Parkette Tot Park - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $88,600 Peters Pike Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $127,100 Tourist Information Centre Park 1 1 1 - - - - - - - - - - - - $92,200 Total (#) 11 11 12 11 11 12 12 12 12 12 12 12 12 12 12 Total ($000) $1,377.1 $1,377.1 $1,465.7 $1,373.5 $1,373.5 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 $1,506.8 2025 Cricket Pitches # of Fields Unit Cost ($/pitch) Park Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Courtice Memorial Park - - - - - - - - - - - - 1 1 $239,100 Total (#) - - - - - - - - - - - - - 1 1 Total ($000) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $239.1 $239.1 Washrooms Park Name # of Washrooms Unit Cost ($/unit) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Clarington Fields Washroom Building (# of) - - - - - - - 1 1 1 1 1 1 1 1 $150,000 East Beach Park Washroom Building - - - 1 1 1 1 1 1 1 1 1 1 1 1 $997,700 Orono Park Washroom Building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,208,300 Rotary Park Washroom Building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $639,680 Bowmanville Memorial Park Washroom Building 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $997,700 Total (#) 3 3 3 4 4 4 4 5 5 5 5 5 5 5 5 Total ($000) $2,845.7 $2,845.7 $2,845.7 $3,843.4 $3,843.4 $3,843.4 $3,843.4 $3,993.4 $3,993.4 $3,993.4 $3,993.4 $3,993.4 $3,993.4 $3,993.4 $3,993.4 Dog Parks Park Name # of Dog Parks Unit Cost ($/unit) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bowmanville Dog Park - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Courtice Dog Park - - - - - - - - 1 1 1 1 1 1 1 $200,000 Newcastle Dog Park - - - - - - 1 1 1 1 1 1 1 1 1 $200,000 Total (#) - - 1 1 1 1 2 2 3 3 3 3 3 3 3 Total ($000) $0.0 $0.0 $200.0 $200.0 $200.0 $200.0 $400.0 $400.0 $600.0 $600.0 $600.0 $600.0 $600.0 $600.0 $600.0 Appendix B | 120 APPENDIX B.3 TABLE 1 - PAGE 18 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Shelters & Features Park Name # of Park Shelters and Other Features UNIT COST ($/unit) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Andrew Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Argent Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Avondale Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Barlow Court Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $135,100 Bathgate Commons - - - - - 1 1 1 1 1 1 1 1 1 1 $69,400 Bond Head Boat Launch 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Bond Head Park - - - - - - 1 1 1 1 1 1 1 1 1 $115,800 Bowmanville Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Bownmanville Valley Fish Channel - - - - 1 1 1 1 1 1 1 1 1 1 1 $616,500 Brookhouse Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $74,400 Burketon Park 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $40,300 Buttonshaw Parkette - - - - - - 1 1 1 1 1 1 1 1 1 $80,100 Clarington Corners Park (Green Park) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Clarington Fields 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $225,100 Courtice Entry Feature 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $192,200 Enniskillen Park - - - - - - - - 1 1 1 1 1 1 1 $70,700 Foster Creek Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Foxhunt Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $39,900 Glenabbey Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Harry Gay Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $23,300 Harvey Jones Park - - - 1 1 1 1 1 1 1 1 1 1 1 1 $102,200 Highland Park 1 1 1 1 1 - - - - - - - - - - $37,700 Ina Brown - - - 1 1 1 1 1 1 1 1 1 1 1 1 $31,100 Landerville Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,000 Longworth Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Longworth Park (2015 shelter) - - - - - 1 1 1 1 1 1 1 1 1 1 $94,000 Mearns Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $40,500 Moyse Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Nelson Street Parkette - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $39,300 Newcastle Cenotaph 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Northglen Park - - - - - - 1 1 1 1 1 1 1 1 1 $186,300 Orono Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Orono Streetscape 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $136,900 Pearce Farm Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $178,400 Penfound Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $36,500 Port Darlington Waterfront Park (East Beach) - - - - - 1 1 1 1 1 1 1 1 1 1 $193,100 Prince William Parkette - - - - - - - 1 1 1 1 1 1 1 1 $8,300 Rhonda Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Rickard Neighbourhood Park - - - - - - 1 1 1 1 1 1 1 1 1 $90,800 Rickard Neighbourhood Park (Fitness Equipment) - - - - - - - - 1 1 1 1 1 1 1 $35,900 Rosswell Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $79,600 Rotary Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Samuel Wilmot Nature Area 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,900 Scugog Street Neighbourhood Park - - - - - 1 1 1 1 1 1 1 1 1 1 $87,600 Solina Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Springfield Parkette - - - - - - 1 1 1 1 1 1 1 1 1 $4,200 Squire Fletcher Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $29,800 Tooley's Mill Park - - - - 1 1 1 1 1 1 1 1 1 1 1 $192,500 Trulls & Hwy 2 Parkette - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,300 Walbridge Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 West Side Drive Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $36,900 Westview Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $72,700 Total (#) 33 33 35 38 40 43 48 49 51 51 51 51 51 50 50 Total ($000) $2,605.1 $2,605.1 $2,687.7 $2,844.3 $3,653.3 $4,059.7 $4,536.9 $4,545.2 $4,651.8 $4,651.8 $4,651.8 $4,651.8 $4,651.8 $4,611.5 $4,611.5 Appendix B | 121 APPENDIX B.3 TABLE 1 - PAGE 19 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Parking Lots Park Name m2 of Parking Lots UNIT COST ($/m2) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Paved Bond Head Boat Launch 750 750 750 750 750 750 750 750 750 750 750 750 750 750 750 $155 Bowmanville Memorial Park 756 756 756 756 756 756 756 756 756 756 756 756 756 756 756 $155 Clarington Fields 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 5,712 $155 Elephant Hill East 437 437 437 437 437 437 437 437 437 437 437 437 437 437 437 $155 Green Park - - - - 820 820 820 820 820 820 820 820 820 820 820 $155 Harry Gay Park - - - 880 880 880 880 880 880 880 880 880 880 880 880 $155 Orono Park 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,980 $155 Rosswell Park - - 861 861 861 861 861 861 861 861 861 861 861 861 861 $155 Tooley's Mill Park - - - - 190 190 190 190 190 190 190 190 190 190 190 $155 Tourism Office Park 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 1,054 $155 Gravel Baseline 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 $93 Bowmanville Boat Launch 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 2,280 $93 Bowmanville Leash Free Park - - 360 360 360 360 360 360 360 360 360 360 360 360 360 $93 Bowmanville Valley 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 2,035 $93 Burketon Park 448 448 448 448 448 448 448 448 448 448 448 448 448 448 448 $93 Courtice Memorial Park 825 825 825 825 825 825 825 825 825 825 825 825 825 825 825 $93 Darlington Hydro Soccer 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 $93 Elephant Hill West 763 763 763 763 763 763 763 763 763 763 763 763 763 763 763 $93 Harvey Jackson 640 640 640 640 640 640 640 640 640 640 640 640 640 640 640 $93 Lakefront the Glen 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 $93 Port Darlington West Beach - - 892 892 892 892 892 892 892 892 892 892 892 892 892 $93 Samuel Wilmot Nature Area 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 $93 Solina Park 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 $93 Soper Creek Park 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 1,140 $93 Tyrone Park 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 2,240 $93 Zion 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 $93 Total (m²) 37,070 37,070 39,183 40,063 41,073 41,073 41,073 41,073 41,073 41,073 41,073 41,073 41,073 41,073 41,073 Total ($000) $4,113.9 $4,113.9 $4,364.1 $4,500.8 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 $4,657.7 Appendix B | 122 APPENDIX B.3 TABLE 1 - PAGE 20 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Park Access Road Park Name m2 of Park Access Road UNIT COST ($/m2) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Paved Baseline Park 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 $155 Bond Head Boat Launch 420 420 420 420 420 420 420 420 420 420 420 420 420 420 420 $155 Clarington Fields 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 $155 Elephant Hill East 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 $155 Harry Gay Park - - - 280 280 364 448 532 616 700 784 868 952 1,036 1,120 $155 Orono Park 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 $155 Rosswell Park - - 36 36 36 54 65 76 86 97 108 119 130 140 151 $155 Solina Park 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168 $155 Soper Creek Park 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,645 $155 Tourism Office 143 143 143 143 143 143 143 143 143 143 143 143 143 143 143 $155 Gravel Baseline Park 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 $93 Bowmanville Boat Launch 854 854 854 854 854 854 854 854 854 854 854 854 854 854 854 $93 Bowmanville Valley 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 $93 Darlington Hydro Soccer 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 $93 Harvey Jackson 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 $93 Lakefront the Glen 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77 $93 Port Darlington West Beach - - 360 360 360 540 648 756 864 972 1,080 1,188 1,296 1,404 1,512 $93 Samuel Wilmot Nature Area 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 $93 Tyrone Park 330 330 330 330 330 330 330 330 330 330 330 330 330 330 330 $93 Total (m²) 14,301 14,301 14,697 14,977 14,977 15,259 15,462 15,665 15,868 16,070 16,273 16,476 16,679 16,882 17,084 Total ($000) $1,626.0 $1,626.0 $1,665.1 $1,708.6 $1,708.6 $1,741.2 $1,766.0 $1,790.7 $1,815.5 $1,840.3 $1,865.0 $1,889.8 $1,914.6 $1,939.4 $1,964.1 2025 Boat Launches # of Boat Launches UNIT COST ($/launch) Park Name 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bond Head 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Bowmanville 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $515,000 Total (#) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Total ($000) $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 $526.0 Appendix B | 123 APPENDIX B.3 TABLE 1 - PAGE 21 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Park Trails Park Name # of Linear Metres UNIT COST ($/metre) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Asphalt Bowmanville Boat Launch Waterfront Trail 465 465 465 465 465 465 465 465 465 465 465 465 465 465 465 $590 Bowmanville Valley 1,785 1,785 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 2,085 $590 Carveth Trail 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 $590 Lion's Memorial Trail 320 320 320 320 320 320 320 320 320 320 320 320 320 320 320 $590 Lion's Memorial Trail - - - - - - - - - - - 310 310 310 310 $590 Port of Newcastle Waterfront Trail 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 1,295 $590 Ridge Pine Park Waterfront Trail 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 $590 Soper Creek Trail 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 $590 Squire Fletcher 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 $590 Granular Courtice Millennium Trail 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 $120 Lion's Memorial Trail 310 310 310 310 310 310 310 310 310 310 310 - - - - Samuel Wilmot Nature Area 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 1,545 $120 Sydney Rutherford Trail 383 383 383 383 383 383 383 383 383 383 383 383 383 383 383 $120 Waterfront Trail 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 $120 Total (linear metres) 14,665 14,665 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 14,965 Total ($000) $5,111.7 $5,111.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,288.7 $5,471.6 $5,471.6 $5,471.6 $5,471.6 Appendix B | 124 APPENDIX B.3 TABLE 1 - PAGE 22 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Park Bridges Park Name # of Bridges UNIT COST ($/bridge) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Long Span Bowmanville Boat Launch Waterfront Trail 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $433,100 Bowmanville Valley 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $322,400 Courtice Millennium Trail 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $135,400 Farewell Creek Trail - - - - - - - - 1 1 1 1 3 3 3 $146,100 Gailbraith Court Bridge - - - - - - - - 1 1 1 1 1 1 1 $209,100 Glenabbey Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $452,800 Ridge Pine Park Bridge 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $401,100 Samuel Wilmot Nature Area 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 $272,200 West Side Park Ped. Bridge - - - - - - - - 1 1 1 1 1 1 1 $255,100 Short Span Bowmanville Valley Fish By-pass/ Platform - - - - 1 1 1 1 1 1 1 1 1 1 1 $238,900 Foxhunt Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $76,800 Graham Creek Pedestrian Bridge - - - - - - - 1 1 1 1 1 1 1 1 Old Kingston Road Ped. Bridge - Courtice 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $199,700 Orono Park 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $114,700 Soper Creek Trail 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $144,000 Squire Fletcher Parkette 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $92,700 Sydney Rutherford Trail 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $109,000 Total (#) 16 16 17 17 18 18 18 20 23 23 23 23 25 25 25 Total ($000) $3,528.4 $3,528.4 $3,850.8 $3,850.8 $4,089.7 $4,089.7 $4,089.7 $4,361.9 $4,972.2 $4,972.2 $4,972.2 $4,972.2 $5,264.4 $5,264.4 $5,264.4 Appendix B | 125 APPENDIX B.3 TABLE 1 - PAGE 23 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS PARKS & INDOOR RECREATION OUTDOOR BUILDINGS & SPECIAL FACILITIES 2025 Misc Equip & Special Features Park Name # of Items UNIT COST ($/items) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Outdoor Fitness Equipment Rickard Neighbourhood Park Fitness Equipment - - - - - - - - 1 1 1 1 1 1 1 $95,000 South Courtice Outdoor Fitness Equipment - - - - - - - - - - - - - - 1 $95,000 Rickard Neighbourhood Park - Inclined Crunch Bench - - - - - - - - - - - - - - - $8,400 Rickard Neighbourhood Park - Pullup Bars - - - - - - - - 1 - - - - - - $8,400 Fountains / Monuments Newcastle Town Hall - Fountain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $22,800 Light Armoured Vehicle Monument - - - - - - - 1 1 1 1 1 1 1 1 $68,100 Scoreboards Clarington Fields Scoreboard - - - - - - - - - - - - - 1 1 $26,500 Clarington Fields Scoreboard 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $52,000 Cricket Equipment Storage Container - - - - - - - - - - - - 1 1 1 $5,500 Cricket Matting - - - - - - - - - - - - 1 1 1 $7,400 Total (#) 3 3 3 3 3 3 3 4 6 5 5 5 7 8 9 Total ($000) $126.8 $126.8 $126.8 $126.8 $126.8 $126.8 $126.8 $194.9 $298.3 $289.9 $289.9 $289.9 $302.8 $329.3 $424.3 Appendix B | 126 15-Year Funding Envelope Calculation 15 Year Average Service Level (2010-2024) $4,758.32 Net Population Growth (2025-2034) 28,202 Maximum Allowable Funding Envelope $134,194,095 APPENDIX B.3 TABLE 1 - PAGE 24 MUNICIPALITY OF CLARINGTON CALCULATION OF SERVICE LEVELS PARKS & INDOOR RECREATION 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Historic Population 83,157 84,548 85,990 87,457 88,949 90,466 92,010 93,821 95,667 97,550 99,470 101,427 103,359 105,328 107,334 INVENTORY SUMMARY ($000) Indoor Recreation $343,049.9 $343,049.9 $343,049.9 $343,049.9 $343,049.9 $342,249.9 $342,249.9 $342,249.9 $342,352.6 $342,352.6 $342,352.6 $342,352.6 $342,352.6 $342,352.6 $342,352.6 Parkland $36,915.5 $37,009.1 $37,518.8 $38,210.6 $38,294.6 $38,294.6 $38,294.6 $38,294.6 $38,294.6 $38,294.6 $38,294.6 $38,294.6 $38,847.1 $39,190.3 $39,606.1 Park Facilities $39,746.3 $39,746.3 $40,248.0 $41,881.7 $42,123.3 $45,360.5 $46,174.9 $46,748.2 $47,887.4 $47,887.4 $46,930.1 $47,156.9 $47,417.6 $48,997.7 $50,729.4 Special Facilities $17,638.0 $17,638.0 $18,509.2 $18,846.0 $20,050.8 $20,489.8 $20,991.8 $21,365.2 $22,210.2 $22,226.6 $22,251.4 $22,459.0 $22,788.9 $22,799.9 $22,919.6 Total ($000) $437,349.6 $437,443.2 $439,325.9 $441,988.2 $443,518.6 $446,394.8 $447,711.1 $448,657.8 $450,744.8 $450,761.2 $449,828.7 $450,263.1 $451,406.2 $453,340.5 $455,607.7 Average Service Level SERVICE LEVEL ($/capita) Indoor Recreation $4,125.33 $4,057.46 $3,989.42 $3,922.50 $3,856.70 $3,783.19 $3,719.70 $3,647.90 $3,578.59 $3,509.51 $3,441.77 $3,375.36 $3,312.27 $3,250.35 $3,189.60 $3,650.64 Parkland $443.93 $437.73 $436.32 $436.91 $430.52 $423.30 $416.20 $408.17 $400.29 $392.56 $384.99 $377.56 $375.85 $372.08 $369.00 $407.03 Park Facilities $477.97 $470.10 $468.05 $478.88 $473.57 $501.41 $501.85 $498.27 $500.56 $490.90 $471.80 $464.93 $458.77 $465.19 $472.63 $479.66 Special Facilities $212.10 $208.61 $215.25 $215.49 $225.42 $226.49 $228.15 $227.72 $232.16 $227.85 $223.70 $221.43 $220.48 $216.47 $213.54 $220.99 Total ($/capita) $5,259.32 $5,173.90 $5,109.03 $5,053.78 $4,986.21 $4,934.39 $4,865.90 $4,782.06 $4,711.60 $4,620.82 $4,522.25 $4,439.28 $4,367.36 $4,304.08 $4,244.77 $4,758.32 MUNICIPALITY OF CLARINGTON CALCULATION OF MAXIMUM ALLOWABLE PARKS & INDOOR RECREATION Appendix B | 127 APPENDIX B.3 TABLE 2 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM PARKS & INDOOR RECREATION Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 3.1 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2025 2025 $1,484,700 $0 $1,484,700 0% $0 $1,484,700 $1,484,700 $0 $0 3.2 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2026 2026 $1,537,900 $0 $1,537,900 0% $0 $1,537,900 $1,116,609 $421,291 $0 3.3 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2027 2027 $1,589,700 $0 $1,589,700 0% $0 $1,589,700 $0 $1,589,700 $0 3.4 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2028 2028 $1,645,000 $0 $1,645,000 0% $0 $1,645,000 $0 $1,645,000 $0 3.5 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2029 2029 $1,703,100 $0 $1,703,100 0% $0 $1,703,100 $0 $1,703,100 $0 3.6 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2030 2030 $1,766,800 $0 $1,766,800 0% $0 $1,766,800 $0 $1,766,800 $0 3.7 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2031 2031 $1,831,200 $0 $1,831,200 0% $0 $1,831,200 $0 $1,831,200 $0 3.8 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2032 2032 $1,901,200 $0 $1,901,200 0% $0 $1,901,200 $0 $1,901,200 $0 3.9 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2033 2033 $1,970,500 $0 $1,970,500 0% $0 $1,970,500 $0 $1,970,500 $0 3.10 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2034 2034 $21,678,239 $0 $21,678,239 0% $0 $21,678,239 $0 $10,839,120 $10,839,120 3.11 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2026 2026 $123,764 $0 $123,764 0% $0 $123,764 $123,764 $0 $0 3.12 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2027 2027 $128,096 $0 $128,096 0% $0 $128,096 $0 $128,096 $0 3.13 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2028 2028 $132,579 $0 $132,579 0% $0 $132,579 $0 $132,579 $0 3.14 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2029 2029 $137,219 $0 $137,219 0% $0 $137,219 $0 $137,219 $0 3.15 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2030 2030 $142,022 $0 $142,022 0% $0 $142,022 $0 $142,022 $0 3.16 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2031 2031 $146,993 $0 $146,993 0% $0 $146,993 $0 $146,993 $0 3.17 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2032 2032 $152,137 $0 $152,137 0% $0 $152,137 $0 $152,137 $0 3.18 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2033 2033 $157,462 $0 $157,462 0% $0 $157,462 $0 $157,462 $0 3.19 South Bowmanville Recreation Centre (Phase 1) - Debt Principal Payment - DC Eligible Share Only 2034 2034 $1,955,679 $0 $1,955,679 0% $0 $1,955,679 $0 $0 $1,955,679 3.20 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2025 2025 $240,000 $0 $240,000 0% $0 $240,000 $240,000 $0 $0 3.21 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2026 2026 $283,000 $0 $283,000 0% $0 $283,000 $0 $283,000 $0 3.22 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2027 2027 $293,000 $0 $293,000 0% $0 $293,000 $0 $293,000 $0 3.23 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2028 2028 $303,000 $0 $303,000 0% $0 $303,000 $0 $303,000 $0 3.24 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2029 2029 $313,000 $0 $313,000 0% $0 $313,000 $0 $313,000 $0 3.25 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2030 2030 $324,000 $0 $324,000 0% $0 $324,000 $0 $324,000 $0 3.26 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2031 2031 $336,000 $0 $336,000 0% $0 $336,000 $0 $336,000 $0 3.27 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2032 2032 $349,000 $0 $349,000 0% $0 $349,000 $0 $349,000 $0 3.28 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2033 2033 $363,000 $0 $363,000 0% $0 $363,000 $0 $363,000 $0 3.29 Outdoor Rinks - Courtice Complex & Diane Hamre - Debt Principal Payment - DC Eligible Share Only 2034 2034 $4,335,258 $0 $4,335,258 0% $0 $4,335,258 $0 $0 $4,335,258 3.30 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2025 2025 $117,000 $0 $117,000 0% $0 $117,000 $117,000 $0 $0 3.31 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2026 2026 $114,000 $0 $114,000 0% $0 $114,000 $0 $114,000 $0 3.32 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2027 2027 $118,000 $0 $118,000 0% $0 $118,000 $0 $118,000 $0 3.33 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2028 2028 $122,000 $0 $122,000 0% $0 $122,000 $0 $122,000 $0 3.34 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2029 2029 $126,000 $0 $126,000 0% $0 $126,000 $0 $126,000 $0 3.35 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2030 2030 $130,000 $0 $130,000 0% $0 $130,000 $0 $130,000 $0 3.36 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2031 2031 $135,000 $0 $135,000 0% $0 $135,000 $0 $135,000 $0 3.37 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2032 2032 $140,000 $0 $140,000 0% $0 $140,000 $0 $140,000 $0 3.38 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2033 2033 $145,000 $0 $145,000 0% $0 $145,000 $0 $145,000 $0 3.39 Newcastle Community Park - Debt Principal Payment - DC Eligible Share Only 2034 2034 $1,727,470 $0 $1,727,470 0% $0 $1,727,470 $0 $0 $1,727,470 3.40 Indoor Recreation Buildings Courtice Community Complex - Aquatic Expansion 2028 2030 $8,300,000 $0 $8,300,000 5% $436,842 $7,863,158 $0 $7,863,158 $0 3.41 Indoor Recreation Buildings Diane Hamre Recreation Complex - Phase 2 Exp. 2034 2034 $59,062,500 $0 $59,062,500 0% $0 $59,062,500 $0 $0 $59,062,500 3.42 PCRMP - Indoor Recreation Projects Indoor Walking Track - South Courtice Arena 2025 2034 $1,875,000 $0 $1,875,000 0% $0 $1,875,000 $0 $1,687,500 $187,500 3.43 PCRMP - Indoor Recreation Projects Multi-Purpose Space/Group Fitness Space - South Bowmanville Facility Phase 2 2027 2028 $7,362,500 $0 $7,362,500 0% $0 $7,362,500 $0 $7,362,500 $0 3.44 PCRMP - Indoor Recreation Projects Indoor Acquatic Centre - South Bowmanville Facility Phase 2 2027 2028 $56,805,000 $10,000,000 $46,805,000 0% $0 $46,805,000 $0 $9,849,185 $36,955,815 3.45 PCRMP - Indoor Recreation Projects 2 Arenas (Ice Pads) - South Courtice Arena Expansion 2031 2034 $59,062,500 $0 $59,062,500 0% $0 $59,062,500 $0 $0 $59,062,500 3.46 Park Development South Bowmanville Rec Centre Park 2025 2026 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $1,500,000 $0 $0 3.47 Park Development Newtonville Estates Parkette 2025 2025 $250,000 $0 $250,000 0% $0 $250,000 $0 $250,000 $0 3.48 Park Development Northglen Phase 8 Parkette 2026 2027 $250,000 $0 $250,000 0% $0 $250,000 $0 $250,000 $0 3.49 Park Development Foster Creek Parkette (Given Rd and Highway 2) 2026 2026 $150,000 $0 $150,000 0% $0 $150,000 $0 $150,000 $0 3.50 Park Development Brookhill Parkette (TonnolDunbury) 2028 2028 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.51 Park Development Brookhill Parkette 1 2027 2027 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.52 Park Development Brookhill Parkette (west of Bowmanville Ck, north of Longworth Ave) 2027 2027 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.53 Park Development Foster Creek Neighbourhood Park West (Newcastle Heritage Park) 2025 2026 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.54 Park Development Clarington Fields Soccer 2027 2028 $2,700,000 $0 $2,700,000 0% $0 $2,700,000 $0 $2,700,000 $0 3.55 Park Development Bowmanville West Parkette (Goodyear) 2028 2028 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.56 Park Development Southwest Courtice Neighbourhood Park 2026 2026 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.57 Park Development Southeast Courtice Neighbourhood Park (Tribute Courtice) 2029 2029 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.58 Park Development Southeast Courtice Neighbourhood Park (Tribute King) 2029 2029 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 Appendix B | 128 APPENDIX B.3 TABLE 2 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM PARKS & INDOOR RECREATION Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 3.59 Park Development Courtice Waterfront Park Phase 1 2027 2027 $500,000 $0 $500,000 0% $0 $500,000 $0 $500,000 $0 3.60 Park Development Port Darlington Neighbourhood Park 2027 2027 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $0 $1,500,000 $0 3.61 Park Development Port Darlington East Beach Phase 2 2027 2027 $600,000 $0 $600,000 0% $0 $600,000 $0 $600,000 $0 3.62 Park Development Brookhill Parkette 2 2029 2029 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.63 Park Development Newcastle Waterfront Park Phase 2 2026 2026 $600,000 $0 $600,000 0% $0 $600,000 $0 $600,000 $0 3.64 Park Development North Newcastle Neighbourhood Park 2 2028 2028 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.65 Park Development Southwest Courtice Parkette 2027 2027 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 $0 3.66 Park Development Southwest Courtice Community Park 2030 2034 $650,000 $0 $650,000 0% $0 $650,000 $0 $487,500 $162,500 3.67 Park Development Soper Hills Neighbourhood Park 2026 2026 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.68 Park Development Ridge Pine Park Bennet Road 2026 2026 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $0 $1,500,000 $0 3.69 Park Development Brookhill Neighbourhood Park 3 (Parkette) 2026 2026 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $0 $1,500,000 $0 3.70 Park Development Soper Springs Neighbourhood Park 2026 2026 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.71 Park Development Courtice Waterfront Park Phase 2 2028 2028 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $0 $1,000,000 $0 3.72 Park Development Port Darlington Waterfront Park West Beach Phase 2 2027 2027 $500,000 $0 $500,000 0% $0 $500,000 $0 $500,000 $0 3.73 Park Development South Courtice Soccer Field Phase 3 2028 2029 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $0 $1,000,000 $0 3.74 Park Development Neighbourhood Park located west of Clarington Blvd., south of future Longworth 2029 2029 $1,500,000 $0 $1,500,000 0% $0 $1,500,000 $0 $1,500,000 $0 3.75 Park Development Soper Hills Community Park - Concession and Lambs 2029 2029 $2,000,000 $0 $2,000,000 0% $0 $2,000,000 $0 $2,000,000 $0 3.76 Park Development Jury Land Park Development 2029 2029 $750,000 $0 $750,000 0% $0 $750,000 $0 $750,000 $0 3.77 Park Development Bowmanville Zoo Park Design and Initial Construction 2025 2025 $1,100,000 $0 $1,100,000 0% $0 $1,100,000 $0 $1,100,000 $0 3.78 Park Development Bowmanville Zoo Park Future Phases 2027 2034 $20,000,000 $0 $20,000,000 10% $2,000,000 $18,000,000 $0 $15,300,000 $2,700,000 3.79 PRCMP - Facilities and Equipment to 2036 Outdoor Rectangular Fields 2025 2034 $10,500,000 $0 $10,500,000 0% $0 $10,500,000 $0 $8,750,000 $1,750,000 3.80 PRCMP - Facilities and Equipment to 2036 Ball Diamonds 2025 2034 $5,500,000 $0 $5,500,000 0% $0 $5,500,000 $0 $4,583,333 $916,667 3.81 PRCMP - Facilities and Equipment to 2036 Cricket Field 2025 2034 $350,000 $0 $350,000 0% $0 $350,000 $0 $291,667 $58,333 3.82 PRCMP - Facilities and Equipment to 2036 17 Outdoor Tennis Fields 2025 2034 $2,550,000 $0 $2,550,000 0% $0 $2,550,000 $0 $2,125,000 $425,000 3.83 PRCMP - Facilities and Equipment to 2036 20 Outdoor Pickleball Courts 2025 2034 $2,000,000 $0 $2,000,000 0% $0 $2,000,000 $0 $1,666,667 $333,333 3.84 PRCMP - Facilities and Equipment to 2036 10 Basketball Courts 2025 2034 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $0 $833,333 $166,667 3.85 PRCMP - Facilities and Equipment to 2036 14 Outdoor Splash Pads 2025 2034 $7,000,000 $0 $7,000,000 39% $2,750,000 $4,250,000 $0 $3,541,667 $708,333 3.86 PRCMP - Facilities and Equipment to 2036 Cooling Stations 2025 2034 $700,000 $0 $700,000 0% $0 $700,000 $0 $583,333 $116,667 3.87 PRCMP - Facilities and Equipment to 2036 5 Small-Scale Skate Zones 2025 2034 $600,000 $0 $600,000 0% $0 $600,000 $0 $500,000 $100,000 3.88 PRCMP - Facilities and Equipment to 2036 Leash-Free Dog Park 2025 2034 $140,000 $0 $140,000 0% $0 $140,000 $0 $116,667 $23,333 3.89 PRCMP - Facilities and Equipment to 2036 2 Compact Leash-Free Dog Parks 2025 2034 $200,000 $0 $200,000 0% $0 $200,000 $0 $166,667 $33,333 3.90 PRCMP - Facilities and Equipment to 2036 Community Garden 2025 2034 $175,000 $0 $175,000 0% $0 $175,000 $0 $145,833 $29,167 3.91 PRCMP - Facilities and Equipment to 2036 4 Outdoor Fitness Equipment 2025 2034 $800,000 $0 $800,000 0% $0 $800,000 $0 $666,667 $133,333 3.92 PRCMP - Facilities and Equipment to 2036 30 Playgrounds 2025 2034 $12,000,000 $0 $12,000,000 0% $0 $12,000,000 $0 $10,000,000 $2,000,000 3.93 Park Trails 1505 Bowmanville Ave to Rhonda Park Trail 2025 2025 $40,000 $0 $40,000 0% $0 $40,000 $40,000 $0 $0 3.94 Farewell Creek Trail Phase 2 (Townline Rd to Phase 1 Trail) 2026 2026 $450,000 $0 $450,000 0% $0 $450,000 $0 $450,000 $0 3.95 Foster Creek Trail (Hwy 2 to north of Grady Drive) 2026 2027 $450,000 $0 $450,000 0% $0 $450,000 $0 $450,000 $0 3.96 Brookhill Trail (Stevens Road to Green Road) 2026 2026 $400,000 $0 $400,000 0% $0 $400,000 $0 $400,000 $0 3.97 Waterfront Trail (Darlington Park Rd to Waterfront) 2027 2028 $350,000 $0 $350,000 0% $0 $350,000 $0 $350,000 $0 3.98 Waterfront Trail extension and CN level crossing at Crago lands 2030 2030 $1,205,000 $0 $1,205,000 0% $0 $1,205,000 $0 $1,205,000 $0 3.99 Bowmanville Valley Trail (King to Nash) 2026 2026 $650,000 $0 $650,000 0% $0 $650,000 $0 $650,000 $0 3.100 Black Creek Trait (Centerfield to Trulls) 2028 2028 $1,080,000 $0 $1,080,000 0% $0 $1,080,000 $0 $1,080,000 $0 3.101 Robinson Creek Trail (Southfield to Prestonvale) 2028 2028 $1,080,000 $0 $1,080,000 0% $0 $1,080,000 $0 $1,080,000 $0 3.102 Soper Creek Trail (Cotton to Conc. Rd. 3) 2034 2034 $1,200,000 $0 $1,200,000 0% $0 $1,200,000 $0 $0 $1,200,000 TOTAL $338,985,517 $10,000,000 $328,985,517 $5,186,842 $323,798,675 $4,622,073 $134,194,095 $184,982,508 Residential Development Charge Calculation Residential Share of 2026 - 2035 DC Eligible Costs 100% $134,194,095 2025-2034 Adjusted Funding Envelope $134,194,095 10-Year Growth in Population in New Units 35,923 Unadjusted Development Charge Per Capita $3,735.60 Reserve Fund Balance Balance as at Dec 31, 2024 $4,622,073 Non-Residential Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 0% $0 10-Year Growth in Square Feet 547,703 Unadjusted Development Charge Per Square Foot $0.00 Appendix B | 129 APPENDIX B.3 TABLE 3 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE PARKS & INDOOR RECREATION RESIDENTIAL DEVELOPMENT CHARGE (in $000) PARKS & INDOOR RECREATION 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $4,622.1 $3,783.5 ($1,801.3) ($11,303.0) ($24,389.4) ($28,169.3) ($25,893.4) ($18,385.4) ($8,901.1) $2,088.3 2025 - 2034 Funding Requirements: Prior Growth $1,881.7 $2,740.4 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $4,622.1 2025 - 2034 Funding Requirements (New Projects): Non Inflated $5,240.8 $11,440.8 $19,959.2 $23,140.2 $14,449.4 $9,401.9 $5,575.8 $5,575.8 $5,575.8 $5,575.8 $105,935.7 2025 - 2034 Funding Requirements: Debenture Principal Payments $0.0 $818.3 $2,128.8 $2,202.6 $2,279.3 $2,362.8 $2,449.2 $2,542.3 $2,636.0 $10,839.1 $28,258.4 2025 - 2034 Funding Requirements (New Projects): Inflated1 $7,122.5 $15,283.1 $22,894.3 $26,759.2 $17,919.8 $12,743.3 $8,728.5 $8,947.2 $9,168.9 $17,502.8 $147,069.6 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $8,307.2 $11,918.2 $15,871.1 $16,681.9 $17,523.5 $18,416.4 $19,333.0 $20,994.3 $22,082.3 $23,226.3 $174,354.2 Interest on Opening Balance $161.8 $132.4 ($99.1) ($621.7) ($1,341.4) ($1,549.3) ($1,424.1) ($1,011.2) ($489.6) $73.1 ($6,169.1) Interest on In-year Transactions $20.7 ($92.5) ($193.1) ($277.1) ($10.9) $99.3 $185.6 $210.8 $226.0 $100.2 $268.9 Interest Payments for Debentures ($2,205.8) ($2,259.7) ($2,186.2) ($2,110.4) ($2,031.3) ($1,947.2) ($1,857.9) ($1,762.4) ($1,660.3) ($7,985.1) ($26,006.5) TOTAL REVENUE $6,283.9 $9,698.4 $13,392.6 $13,672.7 $14,139.9 $15,019.1 $16,236.5 $18,431.5 $20,158.4 $15,414.5 $142,447.5 CLOSING CASH BALANCE $3,783.5 ($1,801.3) ($11,303.0) ($24,389.4) ($28,169.3) ($25,893.4) ($18,385.4) ($8,901.1) $2,088.3 $0.0 Note 1: Debenture principal payments not inflated. 2025 Adjusted Charge Per Capita $4,386.08 Allocation of Capital Program Residential Sector 100% Non-Residential Sector 0% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 130 Appendix B.4 General Government Appendix B | 131 Appendix B.4 General Government Section 5(3) of DCA allows the cost of development-related studies and the cost of undertaking a DC background study in the calculation of the development charges. The General Government DC category of service includes eligible studies over the 2025 - 2034 planning horizon. Table 1 2025 - 2034 Development-Related Capital Program and Calculation of the "Unadjusted" Development Charges As shown on Table 1, the 2025 - 2034 development-related gross cost of the capital program amounts to is $10.5 million. The program includes for the recovery of a number of development-related studies relating to Planning and Development, Library, Emergency and Fire Services, and Parks and Indoor Recreation. An overview of these categories is provided below: - Planning and Development Studies - Includes project such as comprehensive Zoning By-laws, Official Plan reviews, GO Station studies for Courtice and Bowmanville, Municipal Secondary plan studies, etc. The planning and development studies total $9.6 million. Approximately $2.0 million, has been identified as a BTE allocation and has been removed from the total DC recoverable share. - Library Studies - A Service Review and the Library Services share of the PRCMP update has been identified for 2025. The Service Review deals with the centralization and full amalgamation of the existing library and the museum. This study totals $60,000 and a 90% BTE share has been removed. Libraryʼs share of the PRCMP is valued at $31,250 and 25% or $7,800 has been identified as BTE share. - Emergency and Fire Services - Two Fire Master Plans and Location studies have been identified in 2029 and 2034 and are valued at $177,000 Appendix B | 132 each. No grants, subsidies, other recoveries, or BTE shares have been identified. - Parks and Indoor Recreation - Studies include Bowmanville Zoo Park, Accessible Playground Distribution Strategy, Parks Master Plan Update, etc. and are valued at $440,750. Approximately $96,200, are identified as a BTE share and is removed from the total DC recoverable share. No grant, subsidies or other recoveries have been identified for this service. In total, an amount of $2.2 million is considered a BTE share and is removed from the total DC eligible costs. The available DC reserves of approximately $381,300 has been applied to projects occurring in the earlier years of the capital program. After these adjustments, $7.0 million is eligible for development charges funding in the 10-year planning period, while the remaining $974,500 is expected to be recovered beyond 2034. The total costs eligible for DC recovery amounts to $7.0 million and is allocated 78%, or $5.4 million to the residential sector and 22%, or $1.5 million to the non-residential sector. The resulting unadjusted per capita residential charge is $151.41 before cash flow adjustments and non- residential unadjusted development charges is $2.82. Table 2 Cash Flow Analysis After cash flow consideration, the residential calculated charge decreases to $146.18 per capita and non-residential calculated charge decreases to $2.79. The following table summarizes the calculation of the General Government development charge: Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $10,499,800 $6,982,112 $151.41 $2.82 $146.18 $2.79 Development Charge GENERAL GOVERNMENT SUMMARY 2025 - 2034 Unadjusted Adjusted Development-Related Capital Program Development Charge Appendix B | 133 APPENDIX B.4 TABLE 2 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM GENERAL GOVERNMENT Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 4.1 Planning and Development Development Charges Background Study 2025 2025 $138,500 $0 $138,500 $0 $0 $138,500 $138,500 $0 $0 4.2 Planning and Development Courtice GO Station 2025 2025 $75,000 $0 $75,000 $0 $7,500 $67,500 $67,500 $0 $0 4.3 Planning and Development Bowmanville GO Station 2025 2025 $75,000 $0 $75,000 $0 $7,500 $67,500 $67,500 $0 $0 4.4 Planning and Development Population/Employment Demographic Update 2025 2026 $50,000 $0 $50,000 $0 $0 $50,000 $22,526 $27,475 $0 4.5 Planning and Development Commercial Policy Review 2025 2027 $185,400 $0 $185,400 $0 $37,080 $148,320 $0 $148,320 $0 4.6 Planning and Development Municipal Secondary Plan 1 2028 2030 $500,000 $0 $500,000 $0 $0 $500,000 $0 $500,000 $0 4.7 Planning and Development Municipal Secondary Plan 2 2029 2031 $500,000 $0 $500,000 $0 $0 $500,000 $0 $500,000 $0 4.8 Planning and Development Municipal Secondary Plan 3 2030 2032 $500,000 $0 $500,000 $0 $0 $500,000 $0 $500,000 $0 4.9 Planning and Development Municipal Secondary Plan 4 2031 2033 $500,000 $0 $500,000 $0 $0 $500,000 $0 $500,000 $0 4.10 Planning and Development Municipal Secondary Plan Updates 2028 2032 $750,000 $0 $750,000 $0 $0 $750,000 $0 $750,000 $0 4.11 Planning and Development Subwatershed Study/MESP 1 2027 2029 $500,000 $0 $500,000 $1 $250,000 $250,000 $0 $250,000 $0 4.12 Planning and Development Subwatershed Study/MESP 2 2028 2030 $500,000 $0 $500,000 $1 $250,000 $250,000 $0 $250,000 $0 4.13 Planning and Development Subwatershed Study/MESP 3 2029 2031 $500,000 $0 $500,000 $1 $250,000 $250,000 $0 $250,000 $0 4.14 Planning and Development Subwatershed Study/MESP 4 2030 2032 $500,000 $0 $500,000 $1 $250,000 $250,000 $0 $250,000 $0 4.15 Planning and Development Other Plan Implementation Studies/Master Plans 2028 2030 $250,000 $0 $250,000 $1 $125,000 $125,000 $0 $125,000 $0 4.16 Planning and Development Offical Plan Review 2032 2036 $1,186,300 $0 $1,186,300 $0 $237,260 $949,040 $0 $474,520 $474,520 4.17 Planning and Development Transportation Master Plan review/update 2032 2036 $1,000,000 $0 $1,000,000 $0 $0 $1,000,000 $0 $500,000 $500,000 4.18 Planning and Development Population/Employment Demographic Update 2030 2031 $50,000 $0 $50,000 $0 $0 $50,000 $0 $50,000 $0 4.19 Planning and Development Heritage Studies 2027 2030 $222,500 $0 $222,500 $1 $189,125 $33,375 $0 $33,375 $0 4.20 Planning and Development Courtice Waterfront Park Implementation Design 2026 2027 $370,800 $0 $370,800 $1 $185,400 $185,400 $0 $185,400 $0 4.21 Planning and Development Zoning By-Law - Part 1 2026 2027 $216,700 $0 $216,700 $0 $43,340 $173,360 $0 $173,360 $0 4.22 Planning and Development Zoning By-Law - Part 2 2025 2025 $216,700 $0 $216,700 $0 $43,340 $173,360 $0 $173,360 $0 4.23 Planning and Development Intensification Guidelines 2026 2028 $173,400 $0 $173,400 $0 $34,680 $138,720 $0 $138,720 $0 4.24 Planning and Development Landscape and Amenities Design Guidelines 2027 2027 $111,200 $0 $111,200 $0 $31,136 $80,064 $0 $80,064 $0 4.25 Planning and Development Architectural Design Guidelines Update 2025 2025 $103,800 $0 $103,800 $0 $0 $103,800 $0 $103,800 $0 4.26 Planning and Development Development Charge Background Study 2031 2031 $138,500 $0 $138,500 $0 $0 $138,500 $0 $138,500 $0 4.27 Planning and Development On-going Consulting and Legal Advice for Planning & Development Studies 2028 2028 $300,000 $0 $300,000 $0 $62,532 $237,468 $0 $237,468 $0 4.28 Library Service Review 2025 2025 $60,000 $0 $60,000 $1 $54,000 $6,000 $6,000 $0 $0 4.29 Library Parks, Recreation, and Culture Master Plan 2025 2025 $31,250 $0 $31,250 $0 $7,813 $23,438 $23,438 $0 $0 4.30 Emergency & Fire Services Fire Master Plan and Location Study 2029 2029 $177,000 $0 $177,000 $0 $0 $177,000 $0 $177,000 $0 4.31 Emergency & Fire Services Fire Master Plan and Location Study 2034 2034 $177,000 $0 $177,000 $0 $0 $177,000 $0 $177,000 $0 4.32 Parks & Indoor Recreation Bowmanville Zoo Park 2025 2025 $62,000 $0 $62,000 $0 $6,200 $55,800 $55,800 $0 $0 4.33 Parks & Indoor Recreation Accessible Playground Distribution Strategy 2025 2026 $50,000 $0 $50,000 $1 $40,000 $10,000 $0 $10,000 $0 4.34 Parks & Indoor Recreation Parks Master Plan Update 2030 2030 $93,750 $0 $93,750 $0 $0 $93,750 $0 $93,750 $0 4.35 Parks & Indoor Recreation Clarington Fields - Soccer Design 2026 2026 $135,000 $0 $135,000 $0 $0 $135,000 $0 $135,000 $0 4.36 Parks & Indoor Recreation Lambs Road/Concession Street Land Needs Assessment 2030 2030 $100,000 $0 $100,000 $1 $50,000 $50,000 $0 $50,000 $0 TOTAL $10,499,800 $0 $10,499,800 $2,161,905 $8,337,895 $381,263 $6,982,112 $974,520 Residential Development Charge Calculation Residential Share of 2026 - 2035 DC Eligible Costs 78% $5,439,065 Reserve Fund Balance 10-Year Growth in Population in New Units 35,923 Balance as at Dec 31, 2024 $381,263 Unadjusted Development Charge Per Capita $151.41 Non-Residential Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 22% $1,543,047 10-Year Growth in Square Feet 547,703 Unadjusted Development Charge Per Square Foot $2.82 Appendix B | 134 APPENDIX B.4 TABLE 3 - PAGE 1 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE GENERAL GOVERNMENT RESIDENTIAL DEVELOPMENT CHARGE (in $000) GENERAL GOVERNMENT 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $297.00 $231.44 $297.02 $477.16 $371.10 $152.13 ($200.58) ($433.10) ($557.67) ($295.97) 2025 - 2034 Funding Requirements: Prior Growth $81.8 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $81.8 2025 - 2034 Funding Requirements: Non Inflated $269.0 $334.0 $348.1 $636.5 $748.1 $871.5 $763.5 $694.5 $382.9 $390.9 $5,439.1 2025 - 2034 Funding Requirements: Inflated $350.8 $340.7 $362.1 $675.4 $809.8 $962.2 $859.9 $797.7 $448.6 $467.2 $6,074.5 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $276.9 $397.2 $528.9 $556.0 $584.0 $613.8 $644.3 $699.7 $735.9 $774.1 $5,810.8 Interest on Opening Balance $10.4 $8.1 $10.4 $16.7 $13.0 $5.3 ($11.0) ($23.8) ($30.7) ($16.3) ($17.9) Interest on In-year Transactions ($2.0) $1.0 $2.9 ($3.3) ($6.2) ($9.6) ($5.9) ($2.7) $5.0 $5.4 ($15.4) TOTAL REVENUE $285.2 $406.3 $542.3 $569.4 $590.8 $609.5 $627.4 $673.2 $710.3 $763.2 $5,777.5 CLOSING CASH BALANCE $231.4 $297.0 $477.2 $371.1 $152.1 ($200.6) ($433.1) ($557.7) ($296.0) ($0.0) 2025 Adjusted Charge Per Capita $146.18 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 135 APPENDIX B.4 TABLE 3 - PAGE 2 MUNICIPALITY OF CLARINGTON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE GENERAL GOVERNMENT NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) GENERAL GOVERNMENT 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE $84.26 $88.84 $161.76 $242.16 $243.95 $216.27 $153.25 $128.57 $16.45 $7.97 2025 - 2034 Funding Requirements: Prior Growth $81.8 $2.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $84.3 2025 - 2034 Funding Requirements: Non Inflated $76.3 $94.8 $98.7 $180.6 $212.2 $247.2 $216.6 $197.0 $108.6 $110.9 $1,543.0 2025 - 2034 Funding Requirements: Inflated $158.1 $99.2 $102.7 $191.6 $229.7 $273.0 $243.9 $226.3 $127.3 $132.5 $1,784.4 Growth in Square Metres 57,285 59,015 60,745 62,575 64,450 66,370 68,390 35,233 36,265 37,375 547,703 DC Revenue Receipts: Inflated $159.7 $167.8 $176.2 $185.1 $194.5 $204.3 $214.7 $112.8 $118.5 $124.5 $1,658.1 Interest on Opening Balance $2.9 $3.1 $5.7 $8.5 $8.5 $7.6 $5.4 $4.5 $0.6 $0.3 $47.0 Interest on In-year Transactions $0.0 $1.2 $1.3 ($0.2) ($1.0) ($1.9) ($0.8) ($3.1) ($0.2) ($0.2) ($4.9) TOTAL REVENUE $162.7 $172.1 $183.1 $193.4 $202.0 $210.0 $219.3 $114.2 $118.8 $124.6 $1,700.2 CLOSING CASH BALANCE $88.8 $161.8 $242.2 $244.0 $216.3 $153.2 $128.6 $16.5 $8.0 $0.0 2025 Adjusted Charge Per Square Metre $2.79 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 136 Appendix C | 137 Appendix C Engineered Services Appendix C1 - Services Related to a Highway: Roads & Related and Operations The Municipality of Clarington is responsible for all roads within the Municipality, including sidewalks, streetlights, storm sewers and stormwater management ponds, cycling facilities and road and driveway culverts. In addition, the Municipality is also responsible for the winter maintenance of Municipal roads. The Municipalityʼs Services Related to a Highway DC category of service includes both roads and related infrastructure as well as operations assets such as public works buildings, vehicles and equipment. Table 1 Historical Service Levels The 15-year historical inventory of capital assets for Services Related to a Highway includes both roads and operations assets. i. Operations Related Assets The Municipalityʼs Operations currently includes 65,605 square feet of building space related to various operations centres, storage buildings, Quonset hut, salt sheds and sand domes as well as various parks operations depots. In total, the replacement value of these facilities is $16.6 million. The Municipality includes a further $5.7 million related to parking lots, access roads and other paved infrastructure. A further $509,000 relates to miscellaneous equipment including brine and fuel tanks as well as hoists. Approximately $578,100 relates to furniture associated with the facilities. Finally, the Operations fleet comprises of 157 operations and parks vehicles and equipment and adds an additional $28.1 million to the value of the capital assets. Appendix C | 138 ii. Roads and Related Assets As of 2025, the Municipality of Clarington maintained 364 lane kilometres of roads related to rural collectors, rural arterials, urban and semi-urban collectors and arterials with a total replacement value of $850.8 million. There are currently 152 bridges and culverts in the Municipality that provide for a combined value of $185.3 million. In addition, the streetlights, traffic signals and crossings add an additional $74.0 million to the total value of capital assets. iii. Calculation of Maximum Permissible Funding Envelope The total value of the Services Related to a Highway capital infrastructure is estimated to be $1.2 billion. The 15-year historical average service level is $9,180.55 per capita and employment and this, multiplied by the 10-year forecast of net population and employment growth, results in a 10-year maximum allowable of $352.5 million (38,395 net population and employment growth x historical service level of $9,180.55). No uncommitted excess capacity has been identified, and as such, no deductions are made from the funding envelope. Table 2 2025 - 2034 Development-Related Capital Program and Calculation of the Unadjusted Development Charges The 10-year development-related capital plan for Services Related to a Highway is comprised of buildings, vehicles and equipment as well as roads and related projects. The following provides a brief explanation of the assets included in the capital program: i. Operations Related Assets - Buildings & Equipment - relates to a new Clarington Operations Centre ($77.8 million) and South Courtice Satellite facility ($7.5 million). The Appendix C | 139 entirety of the South Courtice Satellite facility is considered to be a PPB and will be considered for recovery under future DC Studies. No BTE shares are identified for these projects as they are all net new assets. - Municipal Fleet and Equipment - Roads - relates to net new vehicle and equipment acquisitions to service the Municipalityʼs roads and related assets. Approximately $10.2 million in capital costs have been identified and related to the acquisition of trucks, street sweepers, mowers, equipment attachments, excavators and plows. No BTE shares have been identified for these assets are they are net new acquisitions. - Municipal Fleet and Equipment - Parks- elates to net new vehicle acquisitions to service Parks amenities. Parks fleet and equipment are included under the Services Related to a Highway capital program as parks fleet and equipment are managed by the Operations department. Future acquisitions total $5.5 million over the 10-year planning horizon. No BTE shares have been identified for these assets are they are net new acquisitions. - Municipal Fleet and Equipment - Community Services - includes vehicles and equipment related to recreation services. This includes the acquisition of a new vans, trucks, ice resurfacers and scissor lifts. The total cost of these projects amounts to $1.5 million. Similar to fleet and equipment acquisitions for roads and parks infrastructure, no BTE shares have been identified for these assets. - Municipal Fleet and Equipment - Legislative Services & Planning & Infrastructure - the capital program includes a provision for additional fleet and the purchase of an electric car. In total, these acquisitions amount to approximately $215,300. No BTE shares have been identified for these assets. - Studies - finally, the capital program includes $40,000 for a future Fleet Master Plan. A 78% BTE allocation has been applied to the project Appendix C | 140 recognizing that the study will review the Municipalityʼs existing and proposed assets. Altogether, the 10-year capital forecast for Operations related infrastructure amounts to $102.7 million. No grants, subsidies or other recoveries have been identified and as such, no reductions are made. Approximately $31,400 has been identified a BTE share and is removed from the total DC eligible costs. After these deductions the total DC eligible costs amount to $102.7 million. Of these eligible costs, $14.5 million is expected to be funded from the DC reserve balance and $7.5 million is deemed to benefit as a post-2034 benefit and will be considered for recovery in subsequent DC Background Studies. ii. Roads and Related Assets The total cost of the 10-year Roads and Related infrastructure capital program is $388.7 million. In total, $30,300 in grants and subsidies have been identified and are removed from the total capital program cost. Approximately $45.3 million of the program has been identified as a BTE share. The BTE share for roads projects has been generally calculated in the following manner. Appendix C | 141 Roads Project Description Bridge Structure Works - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. - A 3% BTE share has been applied to the Lambs Road Grade Separation, based on the cost of resurfacing the existing road segment. - 50% BTE share has been identified for Bennett Road given that the existing structure is being replaced but the new structure will have a greater amount of servicing capacity. - A 9% BTE share has been identified for Providence RD CPR Overpass Railroad Crossing to reflect the replacement cost of the existing facility. Culvert Works - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. - 67% BTE applied to Hancock Rd. Box Culvert, which recognizes that the existing culvert is being replaced. Intersection Works - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. - 50% BTE applied to intersection works where an existing asset is being replaced. The replacement of the existing intersection will result in additional capacity to service development. Appendix C | 142 Roads Project Description Railroad Crossing Improvements - Lights, Traffic Arm, etc. - Projects related to minor improvements to enhance safety of crossing in response to growth occurring. - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. Road Works - New Urban Collectors - Relates to the construction of net new urban collector road segments. - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. Road Works - Collector Road Oversizing - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. Road Works - Rural to Urban Collector - Relates to the redevelopment of existing roads at a "rural" standard to a higher "urban" standard. These upgrades would not be required in the absence of growth occurring across the Municipality. - 8%-14% BTE shares are calculated based on the length of the existing road segment and the cost to maintain the asset over the planning horizon (new overlays often referred to as a "shave and pave" which includes minor base repairs, catchbasin works, and curb repairs). Appendix C | 143 Roads Project Description Road Works - Rural Upgrade / Rural Redevelopment - Includes upgrades of rural roads. Upgrading and redeveloping rural roads creates additional capacity to service future development across the Municipality. - 50% BTE share is applied to these projects. - 7% BTE share has been applied to Concession Road 4 Upgrade. Roads Works - Semi Urban to Urban Collector - 8% -10% BTE shares reflect the upgrade of road segments from a semi-urban to urban standard. Road Works - New 4- lane Urban Collector - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. Road Works - New 4- lane Urban Arterial - 0% BTE has been applied to net new assets required to meet the increased need arising for a new development. Road Works - Reconstruct Rural Road to Regional Standard - Relates to the redevelopment of existing roads at a "rural" standard to a higher "Regional" standard. These upgrades would not be required in the absence of growth occurring across the Municipality. - 10% BTE share calculated based on the length of the existing road segment and the cost to maintain the asset over the planning horizon (new overlays often referred to as a "shave and pave" which includes minor base repairs, catch basin works, and curb repairs). Appendix C | 144 Roads Project Description Sidewalks - 0% BTE share applied to sidewalks located in new development areas - 25-80% BTE share applied to sidewalks within existing areas with anticipated future growth Active Transportation Infrastructure - The Municipalityʼs investment in active transportation infrastructure is, in part, aimed at increasing the share of transportation trips using travel methods other than single occupancy vehicles, this will provide reduce traditional road infrastructure investment needs. - 10% BTE which reflects the overall BTE allocation applied to other road segments (e.g. new collectors and arterials, upgrades to urban and regional standards etc.). Street Lighting Works - BTE shares are based on the BTE shares used for corresponding roads projects in the Region of Durhamʼs 2023 DC Background Study Streetscaping - 50% BTE reflects that existing infrastructure will be replaced as part of streetscaping improvements, but additional servicing capacity will also be created. Studies - 10% BTE applied to Active Transportation related studies - 25% BTE applied to Transportation Master Plan related studies - 0% BTE applied to studies related to DC project implementation (traffic monitoring) Appendix C | 145 Roads Project Description Non-Site Specific Improvements - 33% BTE applied to erosion protection works. After these adjustments, the total Roads and Related capital program amounts to $343.4 million. Available reserves in the amount of $22.8 million have been applied to projects occurring in the initial years of the capital program. Approximately $60.0 million has been deemed a post-2034 share and will be considered for recovery under future development charges. iii. Summary of Capital Costs and Calculation of Unadjusted Rates The development-related cost is allocated 78%, or $264.9 million to the residential sector resulting in an unadjusted rate of $7,402 per capita. A further 8%, or $28.0 million to the industrial sector, 14%, or $47.5 million to the non-industrial sector based on shares of 10-year growth in employment. This yields an unadjusted development charge as follows: - Industrial = $88.91 per square metre - Non-Industrial = $203.51 per square metre Table 3 Cash Flow Analysis The following table summarizes the calculation of the Services Related to a Highway development charge. Services re lated to a Highway Summa ry show the net adjus ted developmen t cha rge is $7482 per capita for re sident ial and non-re sident ial charges for industri al and no n-indu strial of $88.05 and $ 201.35 respectively. Appendix C | 146 APPENDIX C TABLE 1 - PAGE 1 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: OPERATIONS 2025 Buildings Facility Name (# of square feet) UNIT COST ($/sq. ft.) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Clarington Fields Storage Building 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 1,350 $100 Hampton Operations Centre 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 14,812 $500 Hampton Storage Building (Sign Shed) 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 1,152 $100 Hampton Quonset Hut - Old Scugog Road Hampton 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,450 $100 Hampton Salt Shed 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 $100 Hampton Sand Dome 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 $100 Hampton Storage Trailers 704 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 1,344 $100 Orono Operations Centre 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 5,122 $500 Orono Storage Building 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 1,423 $100 Orono Salt Shed 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 1,232 $100 Orono Sand Dome 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 11,035 $100 Parks Operations Depot (Depot 42) 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 5,208 $500 Parks Operations Depot Sand Dome 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 $100 Total (sq.ft.) 64,965 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 65,605 Total ($000) $16,553.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 $16,617.3 Appendix C | 147 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: OPERATIONS APPENDIX C TABLE 1 - PAGE 2 2025 Parkings Lots, Access Roads & Other Paved Infrastructu Facility Name (# of hectares) UNIT COST ($/ha) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Asphalt Hampton Operations Centre 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 $1,550,000 Orono Operations Depot 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 $1,550,000 Gravel Hampton Operations Centre 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 $930,000 Hampton property Old Scugog Road (Quonset Hut) 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 $930,000 Orono Operations Depot 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 $930,000 Parks Operations Depot (Depot 42) 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 $930,000 Total (ha) 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 Total ($000) $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 $5,678.5 Equipment Facility Name Total Value of Furniture and Equipment ($) UNIT COST ($/item) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Brine Tanks - - - - 4 4 4 4 4 4 4 4 4 4 4 $70,000 Fuel Tanks 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $3,000 Hoist 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $110,000 Total (ha) 5 5 5 5 9 9 9 9 9 9 9 9 9 9 9 Total ($000) $229.0 $229.0 $229.0 $229.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 $509.0 Appendix C | 148 APPENDIX C TABLE 1 - PAGE 3 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: OPERATIONS Furniture Facility Name Total Value of Furniture and Equipment ($) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Building Services Expansion (Former Animal Services) $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 $10,200 Depot One - Hampton $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 $395,000 Depot One - Storage Building Sign Shed $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 $33,900 Depot Three - Orono Depot $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 $54,700 Depot Three - Storage Building $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 Hampton property Old Scugog Road (Quonset Hut) $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 $27,400 Miscellaneous Parks/Recreation & Cemetery $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 $19,700 Parks Operations Depot (Depot 42) $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 $9,800 Total ($000) $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 $578.1 Appendix C | 149 APPENDIX C TABLE 1 - PAGE 4 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: OPERATIONS 2025 Raods Fleet & Related Equipment # of Vehicles or Equipment UNIT COST ($/vehicle) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Roads and Public Works Billy Goat 1 1 - - - - - - - - - - - - - $3,400 Bobcat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $130,000 Cars and Vans 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $62,700 Compact Excavator - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $166,400 Gator 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $20,800 Heavy Duty Trucks - Flushers 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $498,800 Heavy Duty Trucks - Single Axle 13 13 13 13 13 13 13 13 13 13 13 14 15 16 17 $312,300 Heavy Duty Trucks - Sweepers 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 $470,300 Heavy Duty Trucks - Tandems 13 13 13 13 13 13 14 16 16 16 16 16 16 16 16 $358,100 Light Duty Trucks 18 19 22 24 24 25 26 27 27 27 27 27 27 27 27 $104,000 Loaders/Graders/Chipper - Brushcutter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $56,700 Loaders/Graders/Chippers - Backhoes 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $259,100 Loaders/Graders/Chippers - Chippers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $124,400 Loaders/Graders/Chippers - Excavator 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 $851,700 Loaders/Graders/Chippers - Graders 2 2 2 2 2 2 2 2 2 2 2 3 3 4 4 $645,500 Loaders/Graders/Chippers - Loaders 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 $417,800 Medium Duty Trucks 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 $125,400 Sidewalk Tractors - - - - - - - - - - - - - - 5 $184,900 Steamer - - - - - 1 1 1 1 1 1 1 1 1 2 $31,200 Tractors 3 3 4 4 4 1 1 1 1 1 1 1 1 1 1 $297,900 Trailers 6 6 7 6 6 5 5 5 5 5 5 5 6 7 8 $50,000 Total (#) 77 79 86 88 88 86 88 91 91 91 91 93 95 98 106 Total ($000) $18,498.4 $18,727.8 $19,634.2 $20,262.5 $20,262.5 $19,454.0 $19,916.1 $20,736.3 $20,736.3 $20,736.3 $20,736.3 $21,694.1 $22,056.4 $23,064.2 $23,948.3 Parks & Rec Vehicles and Equipment # of Vehicles or Equipment Unit Cost ($/vehicle) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 $ 259,100 Ballpark Groomer - - - - - 1 1 1 1 1 1 1 1 1 1 $ 58,400 Beach Groomer - - - - - - - - - 1 1 1 1 1 1 $ 52,000 Cars and Vans 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 62,700 Heavy Duty Trucks - Compactors 1 1 2 2 2 2 2 2 2 2 2 2 2 1 1 $ 250,800 Heavy Duty Trucks - Forestry Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 309,300 Ice Resurfacers 2 2 2 3 4 4 4 4 5 6 6 6 6 6 6 $ 156,000 Light Duty Trucks 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 $ 104,000 Medium Duty Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 125,400 Mobile Stage - - - - - 1 1 1 1 1 1 1 1 1 1 $ 184,900 Top Dresser 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 34,600 Tractor/Mowers/ATV's - ATV's 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 $ 19,300 Tractor/Mowers/ATV's - Loaders 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 172,300 Tractor/Mowers/ATV's - Mowers 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 $ 18,200 Tractor/Mowers/ATV's - Tractors 3 3 3 3 3 3 3 3 3 3 3 5 8 10 10 $ 71,900 Trailers 12 13 15 14 14 10 10 10 10 11 11 11 11 11 11 $ 20,800 Total (#) 34 35 38 38 39 37 38 38 39 43 43 45 48 51 51 Total ($000) $2,346.2 $2,367.0 $2,659.4 $2,794.6 $2,950.6 $3,110.7 $3,214.7 $3,214.7 $3,370.7 $3,618.8 $3,618.8 $3,786.6 $3,954.3 $4,148.6 $4,148.6 Total (#) 111 114 124 126 127 123 126 129 130 134 134 138 143 149 157 TOTAL $20,844.6 $21,094.8 $22,293.6 $23,057.1 $23,213.1 $22,564.7 $23,130.8 $23,951.0 $24,107.0 $24,355.1 $24,355.1 $25,480.7 $26,010.7 $27,212.8 $28,096.9 Appendix C | 150 APPENDIX C TABLE 1 - PAGE 5 MUNICIPALITY OF CLARINGTON INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Lane Kilometres of Major Roadway UNIT COST ($/km) Road Type 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Rural Collector 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 $1,814,703 Rural Arterial 167.39 167.39 167.39 166.96 167.40 167.40 167.40 165.62 165.62 166.3 166.3 166.3 166.3 166.3 168.94 $1,995,952 Urban & Semi-Urban Collector 83.67 84.10 84.35 84.75 85.72 86.27 86.68 86.88 87.01 88.31 88.49 88.63 88.99 88.99 89.62 $2,490,956 Urban & Semi-Urban Arterial 76.21 77.69 80.54 83.61 85.23 86.47 88.56 88.92 88.92 90.43 92.38 94.40 95.01 95.01 95.01 $2,860,979 Total (#) 337 339 342 346 349 350 353 352 352 355 357 360 360 360 364 Total ($000) $779,065.9 $784,384.3 $793,134.4 $802,068.8 $809,976.5 $814,921.5 $821,929.5 $819,887.8 $820,224.4 $829,124.0 $835,163.8 $841,304.1 $843,913.9 $843,913.9 $850,750.8 Bridges & Culverts # of Bridges & Culverts UNIT COST ($/unit) Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Road Bridges 90 90 90 90 91 91 91 91 92 95 95 95 95 95 95 $1,320,000 Structural Culverts 45 57 49 50 50 50 50 52 54 54 54 56 57 57 57 $1,050,000 Total (#) 135 147 139 140 141 141 141 143 146 149 149 151 152 152 152 Total ($000) $166,050.0 $178,650.0 $170,250.0 $171,300.0 $172,620.0 $172,620.0 $172,620.0 $174,720.0 $178,140.0 $182,100.0 $182,100.0 $184,200.0 $185,250.0 $185,250.0 $185,250.0 Streetlights, Signals & Crossings Description # of Streelights, Signals and Crossings UNIT COST ($/unit) 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Streetlight Luminaires 1,869 1,870 1,884 1,894 1,904 1,918 1,918 1,920 2,647 8,062 8,887 8,893 8,927 9,229 9,323 $600 Streetlight Poles 8,592 8,592 8,603 8,603 8,603 8,603 8,603 8,613 8,613 8,615 8,757 8,763 8,769 8,800 8,875 $6,500 Signalized Intersections 15 15 15 17 17 18 18 20 20 20 21 22 23 23 23 $290,000 Pedestrian Crossings - - - - - - - - - 1 4 5 5 5 8 $64,000 Roundabouts 2 2 2 2 2 2 3 3 4 5 6 6 6 6 6 $581,597 Total (#) 10,478 10,479 10,504 10,516 10,526 10,541 10,542 10,556 11,284 16,703 17,675 17,689 17,730 18,063 18,235 Total ($000) $62,482.6 $62,483.2 $62,563.1 $63,149.1 $63,155.1 $63,453.5 $64,035.1 $64,681.3 $65,699.1 $69,606.7 $72,088.3 $72,484.9 $72,834.3 $73,217.0 $73,952.9 Appendix C | 151 APPENDIX C TABLE 1 - PAGE 6 MUNICIPALITY OF CLARINGTON CALCULATION OF SERVICE LEVELS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Historic Population Historic Employment INVENTORY SUMMARY ($000) 2010 83,157 22,072 105,229 2011 84,548 22,328 106,876 2012 85,990 23,196 109,186 2013 87,457 24,098 111,555 2014 88,949 25,035 113,984 2015 90,466 26,008 116,474 2016 92,010 27,019 119,029 2017 93,821 27,576 121,397 2018 95,667 28,145 123,812 2019 97,550 28,726 126,276 2020 99,470 29,319 128,789 2021 101,427 29,923 131,350 2022 103,359 30,751 134,110 2023 105,328 31,602 136,930 2024 107,334 32,477 139,811 Roads and Related $1,007,598.5 $1,025,517.5 $1,025,947.5 $1,036,517.9 $1,045,751.6 $1,050,995.0 $1,058,584.6 $1,059,289.1 $1,064,063.5 $1,080,830.7 $1,089,352.1 $1,097,988.9 $1,101,998.2 $1,102,380.9 $1,109,953.6 Operations $43,883.5 $44,197.7 $45,396.5 $46,160.0 $46,596.0 $45,947.6 $46,513.7 $47,333.9 $47,489.9 $47,738.0 $47,738.0 $48,863.6 $49,393.6 $50,595.7 $51,479.8 Total ($000) $1,051,482.0 $1,069,715.2 $1,071,344.0 $1,082,677.9 $1,092,347.6 $1,096,942.6 $1,105,098.3 $1,106,623.0 $1,111,553.4 $1,128,568.7 $1,137,090.1 $1,146,852.5 $1,151,391.8 $1,152,976.6 $1,161,433.4 Average SERVICE LEVEL ($/capita) Service Level Roads and Related $9,575.29 $9,595.41 $9,396.33 $9,291.54 $9,174.55 $9,023.43 $8,893.50 $8,725.83 $8,594.19 $8,559.27 $8,458.43 $8,359.26 $8,217.12 $8,050.69 $7,938.96 $8,790.25 Operations $417.03 $413.54 $415.77 $413.79 $408.79 $394.49 $390.78 $389.91 $383.56 $378.04 $370.67 $372.01 $368.31 $369.50 $368.21 $390.29 Total ($/population & employment) $9,992.32 $10,008.95 $9,812.10 $9,705.33 $9,583.34 $9,417.92 $9,284.28 $9,115.74 $8,977.75 $8,937.32 $8,829.09 $8,731.27 $8,585.43 $8,420.19 $8,307.17 $9,180.55 MUNICIPALITY OF CLARINGTON CALCULATION OF MAXIMUM ALLOWABLE SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS 15-Year Funding Envelope Calculation 15 Year Average Service Level (2010-2024) $$9,180.55 Household & Employment Growth 2025-2034 38,395 Maximum Allowable Funding Envelope $352,487,086 Appendix C | 152 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Operations Infrastructure Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Buildings & Equipment 1 Future Clarington Operations Centre 2026 - 2028 $77,800,000 $0 $77,800,000 0% $0 $77,800,000 $9,914,805 $67,885,195 $0 2 South Courtice Satellite Facility 2035 - 2035 $7,500,000 $0 $7,500,000 0% $0 $7,500,000 $0 $0 $7,500,000 Municipal Fleet and Equipment - Roads 3 Two 1 Ton Crew Cab Pickup 2025 - 2025 $190,950 $0 $190,950 0% $0 $190,950 $190,950 $0 $0 4 Two 1 Ton Crew Cab Dump 2025 - 2025 $241,200 $0 $241,200 0% $0 $241,200 $241,200 $0 $0 5 Two Single Axle Combo Plow 2025 - 2025 $683,400 $0 $683,400 0% $0 $683,400 $683,400 $0 $0 6 Mechanical Street Sweeper 2025 - 2025 $351,750 $0 $351,750 0% $0 $351,750 $351,750 $0 $0 7 Rotary Mower Head 2025 - 2025 $50,250 $0 $50,250 0% $0 $50,250 $50,250 $0 $0 8 Flail Mower Head 2025 - 2025 $50,250 $0 $50,250 0% $0 $50,250 $50,250 $0 $0 9 Roller Pro Attachments 2025 - 2025 $100,500 $0 $100,500 0% $0 $100,500 $100,500 $0 $0 10 Diagnostic Scanner 2025 - 2025 $20,352 $0 $20,352 0% $0 $20,352 $20,352 $0 $0 11 Small Equipment Upgrades 2025 - 2025 $30,528 $0 $30,528 0% $0 $30,528 $30,528 $0 $0 12 Two Single Axle Combo Plows 2026 - 2026 $686,000 $0 $686,000 0% $0 $686,000 $686,000 $0 $0 13 1 Ton Mini Excavator 2026 - 2026 $261,000 $0 $261,000 0% $0 $261,000 $261,000 $0 $0 14 1 Ton Crew Cab Pickup 2026 - 2026 $95,000 $0 $95,000 0% $0 $95,000 $95,000 $0 $0 15 1 Ton Crew cab Dump 2026 - 2026 $121,000 $0 $121,000 0% $0 $121,000 $121,000 $0 $0 16 Two Single Axle Combo Plows 2027 - 2027 $689,000 $0 $689,000 0% $0 $689,000 $0 $689,000 $0 17 Two Single Axle Combo Plows 2028 - 2028 $691,000 $0 $691,000 0% $0 $691,000 $0 $691,000 $0 18 Two Single Axle Combo Plows 2029 - 2029 $694,000 $0 $694,000 0% $0 $694,000 $0 $694,000 $0 19 1 Ton Crew Cab Dump 2029 - 2029 $126,000 $0 $126,000 0% $0 $126,000 $0 $126,000 $0 20 Provision for Additional Fleet (Years 6 - 10) 2030 - 2034 $5,082,180 $0 $5,082,180 0% $0 $5,082,180 $0 $5,082,180 $0 Municipal Fleet and Equipment - Parks 21 1 Ton Crew Cab Dump 2025 - 2025 $120,600 $0 $120,600 0% $0 $120,600 $120,600 $0 $0 22 Sportsfield Tow Behind Mower Attachment for Tractors 2025 - 2025 $30,150 $0 $30,150 0% $0 $30,150 $30,150 $0 $0 23 Wide Area Mower/Sportsfield Mower 2025 - 2025 $125,625 $0 $125,625 0% $0 $125,625 $125,625 $0 $0 24 Two Landscape Trailers 2025 - 2025 $30,150 $0 $30,150 0% $0 $30,150 $30,150 $0 $0 25 Tractor Attachments-Aerator, Fertilizer Spreader, Top 2025 - 2025 $25,125 $0 $25,125 0% $0 $25,125 $25,125 $0 $0 26 Water Tank Insert 2025 - 2025 $10,050 $0 $10,050 0% $0 $10,050 $10,050 $0 $0 27 Two 1/2 Ton Crew Cab Pickups 2025 - 2025 $230,950 $0 $230,950 0% $0 $230,950 $230,950 $0 $0 28 Water Trailer 2026 - 2026 $19,000 $0 $19,000 0% $0 $19,000 $19,000 $0 $0 29 1 Ton Crew Cab Dump 2026 - 2026 $121,000 $0 $121,000 0% $0 $121,000 $121,000 $0 $0 30 1/2 Ton Crew Cab Pickup 2026 - 2026 $111,000 $0 $111,000 0% $0 $111,000 $111,000 $0 $0 31 Landscape Trailer 2027 - 2027 $15,000 $0 $15,000 0% $0 $15,000 $0 $15,000 $0 32 Foamstream Weed Control Unit 2027 - 2027 $42,000 $0 $42,000 0% $0 $42,000 $0 $42,000 $0 33 1/2 Ton Crew Cab Pickup 2027 - 2027 $112,000 $0 $112,000 0% $0 $112,000 $0 $112,000 $0 34 Four Trailers 2028 - 2028 $68,000 $0 $68,000 0% $0 $68,000 $0 $68,000 $0 35 Foamstream Weed Control Unit 2028 - 2028 $48,000 $0 $48,000 0% $0 $48,000 $0 $48,000 $0 36 Sportsfield Mower/Wide Area Mower (16 ft.) 2028 - 2028 $131,000 $0 $131,000 0% $0 $131,000 $0 $131,000 $0 37 Four Zero Turn Mowers 2028 - 2028 $108,000 $0 $108,000 0% $0 $108,000 $0 $108,000 $0 38 Two Mowers (11 ft.) 2028 - 2028 $168,000 $0 $168,000 0% $0 $168,000 $0 $168,000 $0 39 Haul All Crane - Parks Garbage Truck 2029 - 2029 $253,000 $0 $253,000 0% $0 $253,000 $0 $253,000 $0 40 Zero Turn Mower 2029 - 2029 $26,000 $0 $26,000 0% $0 $26,000 $0 $26,000 $0 41 Mower (11 ft.) 2029 - 2029 $84,000 $0 $84,000 0% $0 $84,000 $0 $84,000 $0 42 Trailer 2029 - 2029 $16,000 $0 $16,000 0% $0 $16,000 $0 $16,000 $0 Appendix C | 153 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Operations Infrastructure Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 43 1 Ton Crew Cab Utility Truck 2029 - 2029 $126,000 $0 $126,000 0% $0 $126,000 $0 $126,000 $0 44 Forestry Crane Truck with Chipper Box 2029 - 2029 $212,000 $0 $212,000 0% $0 $212,000 $0 $212,000 $0 45 Chipper 2029 - 2029 $159,000 $0 $159,000 0% $0 $159,000 $0 $159,000 $0 46 Stump Grinder 2029 - 2029 $106,000 $0 $106,000 0% $0 $106,000 $0 $106,000 $0 47 Dump Trailer 2029 - 2029 $21,000 $0 $21,000 0% $0 $21,000 $0 $21,000 $0 48 Two 1/2 Ton Crew Cab Pickups 2029 - 2029 $225,000 $0 $225,000 0% $0 $225,000 $0 $225,000 $0 49 Provision for Additional Fleet (Years 6 - 10) 2030 - 2034 $2,743,650 $0 $2,743,650 0% $0 $2,743,650 $0 $2,743,650 $0 Municipal Fleet and Equipment - Community Services 50 1 Ton Maintenance Van with Outfitting 2025 - 2025 $90,450 $0 $90,450 0% $0 $90,450 $90,450 $0 $0 51 1/2 Ton Regular Cab Pickup 2025 - 2025 $115,475 $0 $115,475 0% $0 $115,475 $115,475 $0 $0 52 25 ft. Scissor Lift 2026 - 2026 $34,000 $0 $34,000 0% $0 $34,000 $34,000 $0 $0 53 Two Cargo Vans with Outfitting 2026 - 2026 $171,000 $0 $171,000 0% $0 $171,000 $171,000 $0 $0 54 Two Ice Resurfacers 2026 - 2026 $346,000 $0 $346,000 0% $0 $346,000 $346,000 $0 $0 55 Provision for Additional Fleet (Years 6 - 10) 2030 - 2034 $756,925 $0 $756,925 0% $0 $756,925 $0 $756,925 $0 Municipal Fleet and Equipment - Legislative Services 56 Provision for Additional Fleet (Years 6 - 10) 2030 - 2034 $85,325 $0 $85,325 0% $0 $85,325 $0 $85,325 $0 Municipal Fleet and Equipment - Planning & Infrastructure 57 Electric Car 2025 - 2025 $65,000 $0 $65,000 0% $0 $65,000 $65,000 $0 $0 58 Provision for Additional Fleet (Years 6 - 10) 2030 - 2034 $65,000 $0 $65,000 0% $0 $65,000 $0 $65,000 $0 Studies 59 Fleet Master Plan 2025 - 2025 $40,000 $0 $40,000 78% $31,382 $8,618 $8,618 $0 $0 Sub-total Operations $102,720,835 $0 $102,720,835 $31,382 $102,689,453 $14,451,178 $80,738,275 $7,500,000 Appendix C | 154 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Bridge Structure Works 1 Longworth Ave. Structure at Brookhill Brookhill Tributary Crossing 2027 - 2027 $1,826,000 $0 $1,826,000 0% $0 $1,826,000 $0 $1,826,000 $0 2 Grady Dr. Structure (and Road Link) At Foster Creek 2029 - 2029 $4,497,500 $0 $4,497,500 0% $0 $4,497,500 $0 $4,497,500 $0 3 Lambs Rd. Grade Seperation at CNR Crossing 2029 - 2034 $22,588,800 $0 $22,588,800 3% $745,000 $21,843,800 $0 $21,843,800 $0 4 Bennett Rd. At Soper Creek Tributary 2036 - 2036 $1,668,700 $0 $1,668,700 50% $834,350 $834,350 $0 $0 $834,350 5 Providence Rd CPR Overpass Railroad Crossing 2027 - 2034 $12,000,000 $0 $12,000,000 9% $1,064,000 $10,936,000 $0 $10,936,000 $0 Culvert Works 6 Hancock Rd. Box Culvert at Black Creek Tributary 2027 - 2027 $1,457,900 $0 $1,457,900 67% $977,596 $480,304 $0 $480,304 $0 7 Lambs Rd. Box Culvert - Extension at Soper Creek Tributary 2028 - 2028 $286,400 $0 $286,400 0% $0 $286,400 $0 $286,400 $0 8 Baseline Rd. Culvert - Extension at Darlington Creek 2032 - 2032 $286,400 $0 $286,400 0% $0 $286,400 $0 $286,400 $0 9 Baseline Road Culvert - Extension 140m East of Holt Rd. 2033 - 2033 $286,400 $0 $286,400 0% $0 $286,400 $0 $286,400 $0 10 Baseline Rd. Culvert - Extension at Robinson Creek (w. of R.R. 34) 2033 - 2033 $286,400 $0 $286,400 0% $0 $286,400 $0 $286,400 $0 11 Baseline Rd. Culvert - Extension at Tooley Creek (e. of R.R. 34) 2034 - 2034 $286,400 $0 $286,400 0% $0 $286,400 $0 $286,400 $0 Intersection Works 12 George Reynolds Dr. At Courtice Rd. 2025 - 2025 $1,186,400 $0 $1,186,400 0% $0 $1,186,400 $1,186,400 $0 $0 13 Green Rd. At Brookhill 2026 - 2026 $210,900 $0 $210,900 50% $105,450 $105,450 $105,450 $0 $0 14 King Ave./Baldwin St./North Street 2026 - 2026 $415,800 $0 $415,800 50% $207,900 $207,900 $207,900 $0 $0 15 King St. At Ontario St. 2026 - 2026 $210,900 $0 $210,900 50% $105,450 $105,450 $105,450 $0 $0 16 Longworth Ave./Green Rd. (Intersection) 2027 - 2027 $415,800 $0 $415,800 50% $207,900 $207,900 $0 $207,900 $0 17 Bennett Rd. At Lake Road 2027 - 2027 $711,400 $0 $711,400 50% $355,700 $355,700 $0 $355,700 $0 18 Trulls Rd. At Sandringham Dr. 2027 - 2027 $711,400 $0 $711,400 50% $355,700 $355,700 $0 $355,700 $0 19 Baseline Rd. At Haines St. 2028 - 2028 $491,700 $0 $491,700 0% $0 $491,700 $0 $491,700 $0 20 Baseline Rd. At Caristrap St. 2028 - 2028 $491,700 $0 $491,700 0% $0 $491,700 $0 $491,700 $0 21 Baseline Rd. At Mearns Ave./Mearns Ct. 2028 - 2028 $983,400 $0 $983,400 0% $0 $983,400 $0 $983,400 $0 22 Clarington Blvd. At Prince William Blvd 2029 - 2029 $513,600 $0 $513,600 50% $256,800 $256,800 $0 $256,800 $0 23 Mearns Ave./Concession St. (Signals) 2031 - 2031 $415,800 $0 $415,800 50% $207,900 $207,900 $0 $207,900 $0 24 Baseline Rd. At Maple Grove Rd. 2032 - 2032 $983,400 $0 $983,400 0% $0 $983,400 $0 $983,400 $0 25 Conc. St. E/Lambs Rd. Intersection 2032 - 2032 $415,800 $0 $415,800 50% $207,900 $207,900 $0 $207,900 $0 26 King St./Scugog St. (Intersection) 2035 - 2035 $711,400 $0 $711,400 50% $355,700 $355,700 $0 $0 $355,700 27 Toronto St./Mill St. Intersection 2035 - 2035 $210,900 $0 $210,900 50% $105,450 $105,450 $0 $0 $105,450 28 Trulls Rd. At George Reynolds Dr. 2036 - 2036 $711,400 $0 $711,400 50% $355,700 $355,700 $0 $0 $355,700 29 Baseline Rd./Holt Rd. (Signals) 2036 - 2036 $415,800 $0 $415,800 50% $207,900 $207,900 $0 $0 $207,900 30 Baseline Rd. At Simpson Ave. 2036 - 2036 $812,900 $0 $812,900 0% $0 $812,900 $0 $0 $812,900 31 Holt Rd./Bloor St. (Signals) 2036 - 2036 $415,800 $0 $415,800 50% $207,900 $207,900 $0 $0 $207,900 32 Longworth Ave. At Mearns Ave. 2036 - 2036 $312,600 $0 $312,600 50% $156,300 $156,300 $0 $0 $156,300 33 ICS - Hancock Rd At Nash Rd 2025 - 2034 $40,600 $0 $40,600 0% $0 $40,600 $0 $40,600 $0 34 ICS - Hancock Rd At Bloor St 2025 - 2034 $40,600 $0 $40,600 0% $0 $40,600 $0 $40,600 $0 35 ICS - Lambs Rd At Concession St E 2025 - 2034 $40,600 $0 $40,600 0% $0 $40,600 $0 $40,600 $0 Appendix C | 155 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Railroad Crossing Improvements - Lights, Traffic Arm, etc. 36 Bennett Rd. Railroad Crossing at CNR Level Crossing 2027 - 2027 $387,400 $0 $387,400 0% $0 $387,400 $0 $387,400 $0 37 Arthur St. Railroad Crossing at C.P.R Level Crossing 2029 - 2034 $957,100 $0 $957,100 0% $0 $957,100 $0 $957,100 $0 38 Prestonvale Rd. Railroad Crossing at CPR Level Crossing 2031 - 2031 $645,700 $0 $645,700 0% $0 $645,700 $0 $645,700 $0 39 Provision for Future Railroad Crossing Improvements 2025 - 2034 $507,500 $0 $507,500 0% $0 $507,500 $0 $507,500 $0 Road Works - New Urban Collectors 40 George Reynolds Dr. Courtice Rd. Harry Gay Dr. 440.0 2025 - 2025 $3,353,700 $0 $3,353,700 0% $0 $3,353,700 $3,353,700 $0 $0 41 West Side Drive Extension Baseline Road 50m South of Baseline Road 50.0 2025 - 2025 $286,100 $0 $286,100 0% $0 $286,100 $286,100 $0 $0 42 SBRC Road Green Road West Side Drive Extension 500.0 2025 - 2025 $2,861,300 $0 $2,861,300 0% $0 $2,861,300 $2,861,300 $0 $0 43 Bennett Rd. Hwy 2 Concession Rd. 3 3600.0 2036 - 2036 $20,296,998 $0 $20,296,998 0% $0 $20,296,998 $0 $0 $20,296,998 Road Works - Collector Road Oversizing 44 Longworth Ave. (Road Oversizing) West Bowmanville Boundary Green Rd. 420.0 2025 - 2025 $189,500 $0 $189,500 0% $0 $189,500 $189,500 $0 $0 45 Longworth Ave. (Road Oversizing) Bowmanville Creek Green Rd. 1540.0 2027 - 2027 $694,700 $0 $694,700 0% $0 $694,700 $0 $694,700 $0 47 Clarington Blvd Collector Road Oversizing Stevens Rd Nash Rd. 2029 - 2033 $804,996 $0 $804,996 0% $0 $804,996 $0 $804,996 $0 Road Works - Rural to Urban Collector 48 Conc. Rd. 3 500m East of Middle Rd. Liberty St. 330.0 2026 - 2026 $2,122,600 $0 $2,122,600 8% $165,000 $1,957,600 $1,957,600 $0 $0 49 Conc. Rd. 3 Liberty St. 90m W. of Jollow Dr. 390.0 2026 - 2026 $2,454,000 $0 $2,454,000 8% $195,000 $2,259,000 $2,259,000 $0 $0 50 Green Rd. Ross Wright Future Longworth Avenue 150.0 2026 - 2026 $964,800 $0 $964,800 8% $75,000 $889,800 $889,800 $0 $0 51 Baseline Rd. Haines St. Lambs Rd. 420.0 2028 - 2028 $2,642,800 $0 $2,642,800 8% $210,000 $2,432,800 $0 $2,432,800 $0 52 Lambs Rd. Highway 2 Concession St. E 1350.0 2027 - 2027 $8,683,300 $0 $8,683,300 8% $675,000 $8,008,300 $0 $8,008,300 $0 53 Trulls Rd. Bloor St. (Reg. Rd. 22) Baseline Rd. 1820.0 2028 - 2028 $9,527,200 $0 $9,527,200 10% $910,000 $8,617,200 $0 $8,617,200 $0 54 East Shore Dr. Port Darlington Rd. Lake Rd. 425.0 2028 - 2028 $2,733,600 $0 $2,733,600 8% $212,500 $2,521,100 $0 $2,521,100 $0 55 Concession St. E. Soper Creek Dr. Lambs Rd. 490.0 2029 - 2029 $3,405,500 $0 $3,405,500 7% $245,000 $3,160,500 $0 $3,160,500 $0 56 Haines St. Baseline Rd. Reg. Highway 2 920.0 2029 - 2029 $5,917,500 $0 $5,917,500 8% $460,000 $5,457,500 $0 $5,457,500 $0 57 Nash Rd. (Future Clarington Blvd.) South 90 degree Curve North 90 degree Curve 590.0 2030 - 2030 $3,794,900 $0 $3,794,900 8% $295,000 $3,499,900 $0 $3,499,900 $0 58 Lambs Rd. Highway 401 Baseline Rd. 480.0 2031 - 2031 $3,087,400 $0 $3,087,400 8% $240,000 $2,847,400 $0 $2,847,400 $0 59 Prestonvale Rd. CPR Level Crossing 262m S. Southfield Ave. 1038.0 2031 - 2031 $6,676,500 $0 $6,676,500 8% $519,000 $6,157,500 $0 $6,157,500 $0 60 Conc. Rd. 3 200m East of Reg. Rd. 57 100m West of Middle Rd. 520.0 2027 - 2027 $3,344,700 $0 $3,344,700 8% $260,000 $3,084,700 $0 $3,084,700 $0 61 Baseline Rd. 170m East of Darlington Creek Holt Rd. 1460.0 2032 - 2032 $9,416,600 $0 $9,416,600 8% $730,000 $8,686,600 $0 $8,686,600 $0 62 Green Rd. Future Longworth Ave. 670 m North of Longworth Ave. 670.0 2032 - 2032 $4,309,500 $0 $4,309,500 8% $335,000 $3,974,500 $0 $3,974,500 $0 63 Lambs Rd. Concession St. E CPR Tracks 1110.0 2027 - 2032 $7,139,600 $0 $7,139,600 8% $555,000 $6,584,600 $0 $6,584,600 $0 64 Baseline Rd. Prestonvale Rd. Trulls Rd. 1220.0 2033 - 2033 $5,720,700 $0 $5,720,700 11% $610,000 $5,110,700 $0 $5,110,700 $0 65 Baseline Rd. Reg. Rd. 34 (Courtice Rd.) Hancock Road 820.0 2034 - 2034 $3,959,600 $0 $3,959,600 10% $410,000 $3,549,600 $0 $3,549,600 $0 66 Concession St. E. Lambs Rd. Providence Rd. 830.0 2034 - 2034 $5,338,600 $0 $5,338,600 8% $415,000 $4,923,600 $0 $4,923,600 $0 67 Bloor St. Upgrade Courtice Rd Hancock Rd 840.0 2027 - 2030 $5,402,900 $0 $5,402,900 8% $420,000 $4,982,900 $0 $4,982,900 $0 68 Trulls Rd. Billett Gate Pebblestone Rd. 1070.0 2036 - 2036 $6,882,300 $0 $6,882,300 8% $535,000 $6,347,300 $0 $0 $6,347,300 69 Bennett Rd. South Service Rd. South End (East Beach Rd.) 752.0 2027 - 2027 $3,482,100 $0 $3,482,100 11% $376,000 $3,106,100 $0 $3,106,100 $0 70 Conc. Rd. 3 Mearns Ave Lambs Rd. 820.0 2034 - 2034 $6,652,700 $0 $6,652,700 6% $410,000 $6,242,700 $0 $6,242,700 $0 71 Conc. Rd. 3 Reg. Rd. 17 Arthur St. 738.0 2031 - 2034 $2,557,100 $0 $2,557,100 14% $369,000 $2,188,100 $0 $2,188,100 $0 72 Bennett Rd. Highway 401 Reg. Highway 2 940.0 2036 - 2036 $3,257,000 $0 $3,257,000 14% $470,000 $2,787,000 $0 $0 $2,787,000 73 Hancock Rd. Nash Rd. 0.65km North 662.0 2027 - 2027 $2,293,800 $0 $2,293,800 14% $331,000 $1,962,800 $0 $1,962,800 $0 74 Hancock Rd. 275m South of Nash. Rd. Nash Rd. 275.0 2027 - 2027 $952,800 $0 $952,800 14% $137,500 $815,300 $0 $815,300 $0 75 Arthur St. CPR Level Crossing 1.13km N. of CPR 1131.0 2029 - 2029 $3,918,800 $0 $3,918,800 14% $565,500 $3,353,300 $0 $3,353,300 $0 76 Arthur St. 1.13 km North CPR Level Crossing Conc. Rd. 3 515.0 2026 - 2032 $1,784,400 $0 $1,784,400 14% $257,500 $1,526,900 $0 $1,526,900 $0 Appendix C | 156 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Road Works - Rural Upgrade / Rural Redevelopment 77 Lambs Rd. CPR Tracks Conc. Rd. 3 2026 - 2026 $1,062,000 $0 $1,062,000 50% $531,000 $531,000 $531,000 $0 $0 78 Maple Grove Rd. Hwy 2 Future Longworth Ave 2026 - 2026 $902,700 $0 $902,700 50% $451,350 $451,350 $451,350 $0 $0 79 Middle Rd. 890m N of Conc 3 Taunton Rd. 2026 - 2026 $3,525,700 $0 $3,525,700 50% $1,762,850 $1,762,850 $1,762,850 $0 $0 80 Conc. Rd. 3 Lambs Rd. Reg. Rd. 42 2028 - 2028 $2,654,900 $0 $2,654,900 50% $1,327,450 $1,327,450 $0 $1,327,450 $0 81 Old Scugog Rd. Conc. Rd. 4 Taunton Rd. 2030 - 2030 $2,240,700 $0 $2,240,700 50% $1,120,350 $1,120,350 $0 $1,120,350 $0 82 Pebblestone Rd. Reg. Rd. 55 (Townline Rd.) Tooley Rd. 2030 - 2030 $1,306,200 $0 $1,306,200 50% $653,100 $653,100 $0 $653,100 $0 83 Pebblestone Rd. Trulls Rd. Reg. Rd. 34 (Courtice Rd.) 2030 - 2030 $870,800 $0 $870,800 50% $435,400 $435,400 $0 $435,400 $0 84 Temperance St Upgrade King St E Church St 2025 - 2030 $553,200 $0 $553,200 50% $276,600 $276,600 $0 $276,600 $0 86 Concession Road 4 Upgrade (Future Clarington Ops Depot/Fire Station 400.0 2026 - 2028 $3,000,000 $0 $3,000,000 7% $200,000 $2,800,000 $0 $2,800,000 $0 Road Works - Semi Urban to Urban Collector 87 Nash Rd. 50m East of Harry Gay Dr. Hancock Rd. 320.0 2025 - 2028 $1,957,600 $0 $1,957,600 8% $160,000 $1,797,600 $0 $1,797,600 $0 88 Baseline Rd. Mearns Ct. Haines St. 420.0 2028 - 2028 $2,598,700 $0 $2,598,700 8% $210,000 $2,388,700 $0 $2,388,700 $0 89 Trulls Rd. 230m South of Yorkville Dr. Reg. Rd. 22 720.0 2028 - 2028 $3,643,100 $0 $3,643,100 10% $360,000 $3,283,100 $0 $3,283,100 $0 90 Stevens Rd. Reg. Rd. 57 East End 280.0 2032 - 2032 $1,486,300 $0 $1,486,300 9% $140,000 $1,346,300 $0 $1,346,300 $0 91 Queen Street Servicing Upgrade Lambert St St. George St S 120.0 2025 - 2028 $637,000 $0 $637,000 9% $60,000 $577,000 $0 $577,000 $0 Road Works - New 4-lane Urban Collector 92 Prince William Blvd. Pethick St. Reg. Rd. 57 2029 - 2029 $2,082,900 $0 $2,082,900 0% $0 $2,082,900 $0 $2,082,900 $0 93 Longworth Ave. Holt Rd. Maple Grove Rd. 2030 - 2030 $4,684,700 $0 $4,684,700 0% $0 $4,684,700 $0 $4,684,700 $0 94 Longworth Ave. Maple Grove Rd. West Bowmanville Boundary 2030 - 2030 $2,305,500 $0 $2,305,500 0% $0 $2,305,500 $0 $2,305,500 $0 95 Energy Drive 410m East of Osborne Rd. Crago Rd. 2032 - 2032 $3,032,400 $0 $3,032,400 0% $0 $3,032,400 $0 $3,032,400 $0 96 Green Rd. Widening Baseline Rd. Reg. Highway 2 2030 - 2039 $2,632,200 $0 $2,632,200 0% $0 $2,632,200 $0 $1,350,900 $1,281,300 97 Lambs Rd. Port Darlington Rd. Lake Rd. 2036 - 2036 $2,067,000 $0 $2,067,000 0% $0 $2,067,000 $0 $0 $2,067,000 98 Baseline Rd. Lambs Rd. Bennett Rd. 2034 - 2036 $3,679,200 $0 $3,679,200 0% $0 $3,679,200 $0 $1,888,242 $1,790,958 Road Works - New 4-lane Urban Arterial 99 Townline Road Extension Townline Rd S 500m E of Courtice Rd S 2031 - 2041 $18,857,000 $0 $18,857,000 0% $0 $18,857,000 $0 $9,677,806 $9,179,194 100 Hancock Rd. Bloor St. Hwy 2 2027 - 2039 $13,187,700 $0 $13,187,700 0% $0 $13,187,700 $0 $6,768,203 $6,419,497 101 Meadowglade Road East Limits Hancock 1800.0 2027 - 2039 $15,375,283 $0 $15,375,283 0% $0 $15,375,283 $0 $8,541,824 $6,833,459 Road Works - Reconstruct Rural Road to Regional Standard 102 Holt Rd. Reg. Highway 2 Future Longworth Ave. 325.0 2030 - 2030 $1,596,300 $0 $1,596,300 10% $162,500 $1,433,800 $0 $1,433,800 $0 103 Holt Rd. Baseline Rd. 300m South of Baseline Rd. 300.0 2032 - 2034 $1,498,800 $0 $1,498,800 10% $150,000 $1,348,800 $0 $1,348,800 $0 104 Holt Rd. Baseline Rd. Bloor St. 1926.0 2032 - 2034 $9,459,600 $0 $9,459,600 10% $963,000 $8,496,600 $0 $8,496,600 $0 105 Holt Rd. Bloor St. Reg. Highway 2 700.0 2029 - 2034 $3,438,100 $0 $3,438,100 10% $350,000 $3,088,100 $0 $3,088,100 $0 Sidewalks 106 Bloor St. Sidewalk Townline Rd. S 210m E of Townline Rd. 2025 - 2025 $71,100 $0 $71,100 25% $17,775 $53,325 $53,325 $0 $0 107 Manvers Road (East Side Sidewalk) Mill St. Remi Court 2025 - 2025 $115,700 $0 $115,700 80% $92,560 $23,140 $23,140 $0 $0 108 Prestonvale Rd. Sidewalk Bloor St. 230m N of Bloor St. 2025 - 2025 $78,200 $0 $78,200 0% $0 $78,200 $78,200 $0 $0 109 Prestonvale Rd. Sidewalk 230m N of Bloor St. Meadowglade Rd. 2025 - 2025 $55,800 $0 $55,800 0% $0 $55,800 $55,800 $0 $0 110 Reg. Rd. 57 Sidewalk East Side 140m N of Baseline Rd. Waverly Rd. 2026 - 2026 $60,900 $0 $60,900 50% $30,450 $30,450 $30,450 $0 $0 111 Regional Rd. 17 Sidewalk East Side Remi Ct. 375m N of CPR 2026 - 2026 $196,900 $0 $196,900 80% $157,520 $39,380 $39,380 $0 $0 112 Regional Rd. 17 Sidewalk West Side Remi Ct. North of CPR Tracks 2026 - 2026 $113,700 $0 $113,700 80% $90,960 $22,740 $22,740 $0 $0 113 Tooley Rd. Sidewalk 265m N of Nash Rd. Adelaide Ave. 2026 - 2026 $255,800 $0 $255,800 80% $204,640 $51,160 $51,160 $0 $0 114 Highway 2 Sidewalk 35/115 GO Parking Lot Rudell Rd. 2027 - 2027 $326,800 $0 $326,800 0% $0 $326,800 $0 $326,800 $0 115 Highway 2 Sidewalk Newcastle Fire Hall Rudell Rd. 2027 - 2027 $146,200 $0 $146,200 0% $0 $146,200 $0 $146,200 $0 116 Trulls Rd. Sidewalk Sandringham Dr. Strathallan Dr. 2029 - 2029 $106,600 $0 $106,600 50% $53,300 $53,300 $0 $53,300 $0 117 West Scugog Lane Sidewalk Mill Ln (south leg) Mill Ln (north leg) 2029 - 2029 $189,800 $0 $189,800 80% $151,840 $37,960 $0 $37,960 $0 118 Bloor St. (North Side Sidewalk) Courtice Rd. Hancock Rd. 2027 - 2030 $291,300 $0 $291,300 25% $72,825 $218,475 $0 $218,475 $0 Appendix C | 157 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Sidewalks 119 Bloor St. (South Side Sidewalk) Trulls Rd. Courtice Rd. 2025 - 2025 $1,351,000 $0 $1,351,000 25% $337,750 $1,013,250 $0 $1,013,250 $0 120 Bloor St. Sidewalk 210m E of Townline Rd. 415m E of Townline Rd. 2030 - 2030 $69,000 $0 $69,000 25% $17,250 $51,750 $0 $51,750 $0 121 Bloor St. (South Side Sidewalk) Robinson Creek Trulls Rd. 2025 - 2025 $271,000 $0 $271,000 25% $67,750 $203,250 $203,250 $0 $0 122 Reg. Rd. 57 Sidewalk East Side Hartwell Ave. CPR 2028 2028 $125,700 $0 $125,700 50% $62,850 $62,850 $0 $62,850 $0 123 Scugog St. Sidewalk King St. Rehder Ave. 2030 - 2030 $213,200 $0 $213,200 50% $106,600 $106,600 $0 $106,600 $0 124 Highway 2 Sidewalk Soper Creek Bennett Rd. 2031 - 2031 $502,400 $0 $502,400 0% $0 $502,400 $0 $502,400 $0 125 Regional Rd. 17 Sidewalk West Side 375m N of CPR Conc. Rd. 3 2029 2033 $346,100 $0 $346,100 80% $276,880 $69,220 $0 $69,220 $0 126 Highway 2 Sidewalk on South Side East End of Plaza Hancock Road (Realigned) 2029 2033 $180,700 $0 $180,700 0% $0 $180,700 $0 $180,700 $0 127 Liberty St. Sidewalk Conc. Rd. 3 North Urban Boundary 2030 - 2034 $793,700 $0 $793,700 0% $0 $793,700 $0 $793,700 $0 128 Liberty St. Sidewalk Bons Ave. Concession Rd. 3 2025 - 2034 $737,700 $0 $737,700 0% $0 $737,700 $0 $737,700 $0 129 Regional Highway 2 Police Station (2046 Maple Grove Rd.) 170m West of Maple Grove Rd. 2025 - 2025 $57,900 $0 $57,900 50% $28,950 $28,950 $28,950 $0 $0 130 Regional Highway 2 170m West of Maple Grove Rd. Boswell Dr. 2025 - 2025 $705,100 $0 $705,100 0% $0 $705,100 $705,100 $0 $0 131 West Townline Rd. Sidewalk Dudley Court South Regional Urban Limit 2029 - 2029 $520,700 $0 $520,700 80% $416,560 $104,140 $0 $104,140 $0 132 Reg. Rd. 57 Sidewalk East Side Stevens Rd. Nash Rd. 2029 - 2029 $2,863,900 $0 $2,863,900 50% $1,431,950 $1,431,950 $0 $1,431,950 $0 133 Hancock Rd. Highway 2 275m South of Nash. Rd. 2027 - 2027 $716,000 $0 $716,000 0% $0 $716,000 $0 $716,000 $0 134 Regional Rd. 34 Sidewalk Nash Rd. North Urban Boundary 2026 - 2026 $2,332,300 $0 $2,332,300 50% $1,166,150 $1,166,150 $1,166,150 $0 $0 Active Transportation Infrastructure 135 Regional Rd. 17 MUP East Side 375m N of CPR Conc. Rd. 3 2029 2033 $613,900 $0 $613,900 80% $491,120 $122,780 $0 $122,780 $0 136 Bloor St./Reg. Rd. 22 MUP Prestonvale Rd. 65m E of Prestonvale Rd. 2025 - 2025 $64,100 $0 $64,100 10% $6,410 $57,690 $57,690 $0 $0 137 Reg. Rd. 57 (West Side MUP) Aspen Springs Dr. Hwy 2 2025 2025 $483,600 $0 $483,600 10% $48,360 $435,240 $435,240 $0 $0 138 Reg. Rd. 57 (West Side MUP) Baseline Rd. Prestonway Dr. 2025 2025 $836,900 $0 $836,900 10% $83,690 $753,210 $753,210 $0 $0 139 Reg. Rd. 57 (West Side MUP) Prestonway Dr. Aspen Springs Dr. 2025 2025 $463,800 $0 $463,800 10% $46,380 $417,420 $417,420 $0 $0 140 Reg. Rd. 57 (West Side MUP) Stevens Rd. Nash Rd. 2028 2028 $1,302,700 $0 $1,302,700 10% $130,270 $1,172,430 $0 $1,172,430 $0 141 Bloor St./Reg. Rd. 22 MUP 65m E of Prestonvale Rd. Trulls Rd. 2027 - 2030 $986,900 $0 $986,900 10% $98,690 $888,210 $0 $888,210 $0 142 Nash Rd. Green Rd. Future Clarington Blvd. 2030 - 2030 $387,500 $0 $387,500 10% $38,750 $348,750 $0 $348,750 $0 143 Nash Rd. (Cycling Lanes) Solina Rd. Maple Grove Rd. 2033 - 2033 $3,228,900 $0 $3,228,900 10% $322,890 $2,906,010 $0 $2,906,010 $0 144 Baseline Rd. Green Rd. Spicer Sq. 2027 - 2031 $1,026,400 $0 $1,026,400 10% $102,640 $923,760 $0 $923,760 $0 145 Baseline Rd. Regional Rd. 57 Spry Ave. 2027 - 2031 $415,500 $0 $415,500 10% $41,550 $373,950 $0 $373,950 $0 146 Baseline Rd. Spicer Sq. Regional Rd. 57 2027 - 2031 $207,200 $0 $207,200 10% $20,720 $186,480 $0 $186,480 $0 147 Baseline Rd. (South Side Cycling Facility) Spry Ave. Liberty St. 2027 - 2031 $1,260,800 $0 $1,260,800 10% $126,080 $1,134,720 $0 $1,134,720 $0 148 Baseline Rd. Liberty St. Haines St. 2027 - 2034 $1,985,000 $0 $1,985,000 10% $198,500 $1,786,500 $0 $1,786,500 $0 149 Baseline Rd. Haines St. Lambs Rd. 2025 - 2030 $409,600 $0 $409,600 10% $40,960 $368,640 $0 $368,640 $0 150 Courtice Rd. MUP Highway 2 South End of Plaza 2030 - 2030 $123,400 $0 $123,400 10% $12,340 $111,060 $0 $111,060 $0 151 Concession Rd 3 MUP Mearns Ave Lambs Rd 2027 2029 $583,600 $0 $583,600 10% $58,360 $525,240 $0 $525,240 $0 152 Bloor St./Reg. Rd. 22 MUP Trulls Rd. Courtice Rd. 2025 - 2025 $1,563,100 $0 $1,563,100 10% $156,310 $1,406,790 $1,406,790 $0 $0 153 Courtice Rd. MUP South End of Plaza South Urban Boundary 2030 - 2034 $312,600 $0 $312,600 10% $31,260 $281,340 $0 $281,340 $0 154 Courtice Road (East Side Sidewalk) Sandringham Dr. Bloor St. 2030 - 2034 $2,735,400 $0 $2,735,400 10% $273,540 $2,461,860 $0 $2,461,860 $0 155 Coutice Rd. (Regional Road 34) Bloor St. CPR/Future GO Station 2029 - 2029 $3,009,000 $0 $3,009,000 10% $300,900 $2,708,100 $0 $2,708,100 $0 156 Bloor St. (South Side MUP) Prestonvale Rd. Robinson Creek 2025 - 2025 $488,500 $0 $488,500 10% $48,850 $439,650 $0 $439,650 $0 157 Liberty St. Sidewalk & MUP Baseline Rd. King St. 2027 - 2029 $200,000 $30,300 $169,700 10% $16,970 $152,730 $152,730 Appendix C | 158 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Street Lighting Works 158 Reg. Rd. 57 Streetlighting CPR Baseline Rd. 2026 - 2026 $622,200 $0 $622,200 14% $87,108 $535,092 $535,092 $0 $0 159 Highway 2 Boswell Dr. Courtice Rd. 2027 - 2027 $671,900 $0 $671,900 50% $335,950 $335,950 $0 $335,950 $0 160 Hancock Rd. Highway 2 275m South of Nash. Rd. 2027 - 2027 $53,800 $0 $53,800 0% $0 $53,800 $0 $53,800 $0 161 Highway 2 Streetlighting East of Firehall 35/115 GO Parking Lot 2027 - 2027 $188,800 $0 $188,800 50% $94,400 $94,400 $0 $94,400 $0 162 Highway 2 Streetlighting Soper Creek Bennett Rd. 2028 - 2028 $542,000 $0 $542,000 50% $271,000 $271,000 $0 $271,000 $0 163 Reg. Rd. 57 Streetlighting Highway 2 Nash Rd. 2029 - 2029 $571,400 $0 $571,400 21% $119,994 $451,406 $0 $451,406 $0 164 Courtice Rd. Streetlighting Stagemaster Cr. Bloor St. 2029 2033 $413,100 $0 $413,100 0% $0 $413,100 $0 $413,100 $0 165 Coutice Rd. (Regional Road 34) Bloor St. Highway 401 Interchange 2029 2033 $762,300 $0 $762,300 0% $0 $762,300 $0 $762,300 $0 166 Regional Rd. 17 Streetlighting Remi Ct. 375m N of CPR 2029 - 2029 $214,200 $0 $214,200 0% $0 $214,200 $0 $214,200 $0 167 Courtice Road Streetlighting Sandringham Dr. Stagemaster Cr. 2029 - 2029 $43,600 $0 $43,600 0% $0 $43,600 $0 $43,600 $0 168 Bloor St. (Streetlighting) Courtice Rd. Hancock Rd. 2030 - 2030 $314,700 $0 $314,700 0% $0 $314,700 $0 $314,700 $0 169 Bloor St./Reg. Rd. 22 Streetlighting Prestonvale Rd. Courtice Rd. 2029 2033 $658,700 $0 $658,700 41% $270,067 $388,633 $0 $388,633 $0 170 Regional Rd. 17 Streetlighting 375m N of CPR Conc. Rd. 3 2029 2033 $373,500 $0 $373,500 0% $0 $373,500 $0 $373,500 $0 Appendix C | 159 APPENDIX C.1 TABLE 2 MUNICIPALITY OF CLARINGTON 2025 DEVELOPMENT CHARGES BACKGROUND STUDY SERVICES RELATED TO A HIGHWAY: ROADS & RELATED & OPERATIONS Roads Infrastructure From To Length (metres) Timing Total Gross Cost Grants, Subsidies Other Recoveries Net Municipal Cost Benefit to Existing % Benefit to Existing $ Total DC Eligible Available DC Reserves 2025 2034 Post 2034 Streetscaping 171 Newcastle Streetscape Phase 1 North St. Mill St. 2026 - 2026 $1,175,400 $0 $1,175,400 50% $587,700 $587,700 $587,700 $0 $0 172 Frank St. (Streetscape) King St. Future Queen St. 2028 - 2028 $637,400 $0 $637,400 50% $318,700 $318,700 $0 $318,700 $0 173 Newcastle Streetscape Phase 2 Mill St. Beaver St. 2028 - 2028 $391,800 $0 $391,800 50% $195,900 $195,900 $0 $195,900 $0 174 St. George St. Tree Planting (Streetscape) King St. Queen St. 2028 - 2028 $19,300 $0 $19,300 50% $9,650 $9,650 $0 $9,650 $0 175 Newcastle Streetscape Phase 3 Beaver St. Arthur St. 2030 - 2030 $854,600 $0 $854,600 50% $427,300 $427,300 $0 $427,300 $0 176 King St. Corridor Improv. (Streetscape) Liberty St. Simpson Ave. 2033 - 2033 $2,019,900 $0 $2,019,900 50% $1,009,950 $1,009,950 $0 $1,009,950 $0 177 King Street Corridor Improv. (Streetscape) Simpson Ave. Mearns Ave. 2033 - 2033 $1,940,700 $0 $1,940,700 50% $970,350 $970,350 $0 $970,350 $0 178 Highway 2 Streetscape Townline Rd. Darlington Blvd. 2034 - 2034 $554,200 $0 $554,200 50% $277,100 $277,100 $0 $277,100 $0 179 Highway 2 Streetscape Darlington Blvd. Centrefield Dr. 2034 - 2034 $628,300 $0 $628,300 50% $314,150 $314,150 $0 $314,150 $0 180 Highway 2 Streetscape Centrefield Dr. Prestonvale Rd. 2034 - 2034 $1,276,900 $0 $1,276,900 50% $638,450 $638,450 $0 $638,450 $0 181 Highway 2 Streetscape Prestonvale Rd. Trulls Rd. 2034 - 2034 $1,489,000 $0 $1,489,000 50% $744,500 $744,500 $0 $744,500 $0 182 Highway 2 Streetscape Trulls Rd. Maplefield Drive 2034 - 2034 $1,605,700 $0 $1,605,700 50% $802,850 $802,850 $0 $802,850 $0 183 Highway 2 Streetscape Richard Gay Ave. Courtice Rd. 2029 2033 $1,221,000 $0 $1,221,000 50% $610,500 $610,500 $0 $610,500 $0 184 Highway 2 Streetscape Courtice Rd. Hancock Rd. (Realigned) 2029 2033 $1,033,300 $0 $1,033,300 50% $516,650 $516,650 $0 $516,650 $0 Studies 185 Hospital Transportation Review 2025 - 2034 $59,900 $0 $59,900 25% $14,975 $44,925 $0 $44,925 $0 186 Transportation Master Plan Update 2025 - 2029 $225,300 $0 $225,300 25% $56,325 $168,975 $0 $168,975 $0 187 Transportation Master Plan Update 2030 - 2034 $112,700 $0 $112,700 25% $28,175 $84,525 $0 $84,525 $0 188 Bowmanville Waterfront Redevelopment Transportation Network Needs and Feasibility Study 2025 - 2034 $90,300 $0 $90,300 25% $22,575 $67,725 $0 $67,725 $0 189 Active Transportation and Trails MP 2029 - 2034 $90,300 $0 $90,300 10% $9,030 $81,270 $0 $81,270 $0 190 Development Traffic Monitoring Studies for D.C. Project Implementation 2025 - 2034 $180,700 $0 $180,700 0% $0 $180,700 $0 $180,700 $0 191 Active Transportation 401 and Rail Crossing Feasibility Study 2025 - 2028 $100,000 $0 $100,000 10% $10,000 $90,000 $0 $90,000 $0 Non-Site Specific Improvements 192 Erosion Protection Works 2025 - 2034 $4,026,500 $0 $4,026,500 33% $1,328,769 $2,697,731 $0 $2,697,731 $0 Sub-total Roads and Related 36637.0 $388,732,378 $30,300 $388,702,078 $45,274,414 $343,427,664 $22,798,187 $260,590,570 $60,038,906 TOTAL SERVICES RELATED TO A HIGHWAY $491,453,213 $30,300 $491,422,913 $45,305,796 $446,117,117 $37,249,365 $341,328,845 $67,538,906 Residential Development Charge Calculation Residential Share of 2025 - 2034 DC Eligible Costs 78% $265,895,171 2025 - 2034 Net Funding Envelope $352,487,086 10-Year Growth in Population in New Units 35,923 Unadjusted Development Charge Per Capita $7,402 Reserve Fund Balance Balance as at December 31, 2024 $37,249,365 Industrial Development Charges Calculation Non-Residential Share of 2025 - 2034 DC Eligible Costs 8% $27,954,832 10-Year Growth in Square Metres 314,400 Unadjusted Development Charge Per Square Metre $88.91 Non-Industrial Development Charges Calculation Non-Residential Share of 2025 - 2034 DC Eligible Costs 14% $47,478,842 10-Year Growth in Square Metres 233,303 Unadjusted Development Charge Per Square Metre $203.51 Appendix C | 160 APPENDIX C.1 TABLE 3 - PAGE 1 MUNICIPALITY OF CLARINGTON ROADS AND RELATED CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE RESIDENTIAL DEVELOPMENT CHARGE (in $000) ROADS AND RELATED: RESIDENTIAL 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE ($000) $29,017.3 $30,729.2 $19,264.8 ($1,348.8) ($24,184.6) ($28,370.7) ($24,937.2) ($16,875.5) ($15,906.8) ($5,084.6) 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve) $11,425.2 $12,443.0 $2,574.5 $2,574.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $29,017.3 2025 - 2034 Funding Requirements: Non Inflated $2,061.4 $19,454.1 $43,361.4 $45,115.7 $30,183.9 $24,008.8 $21,052.1 $29,554.6 $22,338.5 $28,764.7 $265,895.2 2025 - 2034 Funding Requirements: Inflated $13,486.6 $32,535.0 $47,791.7 $50,609.3 $32,672.0 $26,507.6 $23,708.1 $33,948.9 $26,173.1 $34,376.5 $321,808.9 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $14,170.9 $20,330.7 $27,073.7 $28,456.8 $29,892.5 $31,415.6 $32,979.2 $35,813.1 $37,669.0 $39,620.6 $297,422.1 Interest on Opening Balance $1,015.6 $1,075.5 $674.3 ($74.2) ($1,330.2) ($1,560.4) ($1,371.5) ($928.2) ($874.9) ($279.7) ($3,653.6) Interest on In-year Transactions $12.0 ($335.6) ($569.7) ($609.2) ($76.4) $85.9 $162.2 $32.6 $201.2 $91.8 ($1,005.3) TOTAL REVENUE $15,198.5 $21,070.6 $27,178.2 $27,773.4 $28,485.9 $29,941.1 $31,769.9 $34,917.6 $36,995.3 $39,432.7 $292,763.2 CLOSING CASH BALANCE $30,729.2 $19,264.8 ($1,348.8) ($24,184.6) ($28,370.7) ($24,937.2) ($16,875.5) ($15,906.8) ($5,084.6) ($28.4) 2025 Adjusted Charge Per Capita $$7,482.00 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 161 APPENDIX C.1 TABLE 3 - PAGE 2 MUNICIPALITY OF CLARINGTON ROADS AND RELATED CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL $3,051 $4,617 $4,356 $2,602 $663 $780 $1,750 $3,260 $1,832 $1,305 $1,201.2 $1,308.2 $270.7 $270.7 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $3,050.7 $216.7 $2,045.3 $4,558.8 $4,743.2 $3,173.4 $2,524.2 $2,213.3 $3,107.2 $2,348.6 $3,024.2 $27,954.8 $1,417.9 $3,420.6 $5,024.6 $5,320.8 $3,435.0 $2,786.9 $2,492.5 $3,569.2 $2,751.7 $3,614.2 $33,833.3 32,400 33,500 34,600 35,800 37,000 38,200 39,500 20,450 21,100 21,850 314,400 $2,852.8 $3,008.6 $3,169.6 $3,345.1 $3,526.4 $3,713.6 $3,916.7 $2,068.3 $2,176.8 $2,299.2 $30,077.1 $106.8 $161.6 $152.5 $91.1 $23.2 $27.3 $61.2 $114.1 $64.1 $45.7 $847.6 $25.1 ($11.3) ($51.0) ($54.3) $1.6 $16.2 $24.9 ($41.3) ($15.8) ($36.2) ($142.1) $2,984.7 $3,158.9 $3,271.0 $3,381.8 $3,551.2 $3,757.1 $4,002.9 $2,141.2 $2,225.1 $2,308.7 $30,782.6 ROAD AND RELATED: INDUSTRIAL OPENING CASH BALANCE ($000) 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve) 2025 - 2034 Funding Requirements: Non Inflated 2025 - 2034 Funding Requirements: Inflated New Industrial Building GFA - square metres DC Revenue Receipts: Inflated Interest on Opening Balance Interest on In-year Transactions TOTAL REVENUE CLOSING CASH BALANCE $4,617.5 $4,355.9 $2,602.3 $663.4 $779.6 $1,749.8 $3,260.1 $1,832.1 $1,305.4 $0.0 2025 Adjusted Charge Per Square Metre $88.05 Allocation of Capital Program Residential Sector 78% Industrial 8% Non-Industrial 14% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 162 APPENDIX C.1 TABLE 3 - PAGE 3 MUNICIPALITY OF CLARINGTON ROADS AND RELATED CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) ROAD AND RELATED: NON-INDUSTRIAL 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE ($000) $5,181 $8,011 $7,706 $4,835 $1,597 $1,804 $3,423 $5,901 $3,392 $2,385 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve) $2,040.1 $2,221.8 $459.7 $459.7 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $5,181.4 2025 - 2034 Funding Requirements: Non: Inflated $368.1 $3,473.8 $7,742.7 $8,056.0 $5,389.7 $4,287.1 $3,759.1 $5,277.3 $3,988.8 $5,136.3 $47,478.8 2025 - 2034 Funding Requirements: Inflated $2,408.2 $5,809.5 $8,533.8 $9,036.9 $5,834.0 $4,733.3 $4,233.4 $6,062.0 $4,673.5 $6,138.3 $57,462.9 New Industrial Building GFA - square metres 24,885 25,515 26,145 26,775 27,450 28,170 28,890 14,783 15,165 15,525 233,303 DC Revenue Receipts: Inflated $5,010.6 $5,240.2 $5,477.0 $5,721.1 $5,982.7 $6,262.4 $6,550.9 $3,419.1 $3,577.6 $3,735.8 $50,977.6 Interest on Opening Balance $181.3 $280.4 $269.7 $169.2 $55.9 $63.2 $119.8 $206.5 $118.7 $83.5 $1,548.3 Interest on In-year Transactions $45.5 ($15.7) ($84.1) ($91.2) $2.6 $26.8 $40.6 ($72.7) ($30.1) ($66.1) ($244.3) TOTAL REVENUE $5,237.5 $5,504.9 $5,662.6 $5,799.2 $6,041.2 $6,352.3 $6,711.3 $3,553.0 $3,666.2 $3,753.2 $52,281.5 CLOSING CASH BALANCE $8,010.7 $7,706.1 $4,834.9 $1,597.2 $1,804.4 $3,423.5 $5,901.4 $3,392.4 $2,385.1 $0.0 2025 Adjusted Charge Per Square Metre $201.35 Allocation of Capital Program Residential Sector 78% Industrial 8% Non-Industrial 14% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 163 Maps of Municipal-wide Roads Projects The following maps have been prepared which show the location and type of roads and related projects in the Municipality of Clarington between 2025 - 2034. Appendix C | 164 Map 1 show ing the location of Roads and Rel ated Pro ject s co ntai ned in t he 2 025 Deve lopm ent Ch arg es Upd ate . Appendix C | 165 King St E Simpson Ave Clarington Blvd King St W King St Basel ine R d Longwort h Ave Mearns Av Simpson Av Bloor St Ea st S h or e D r Longworth Av Queen St Por t D arli ngt on Rd Lake Rd Mearns Ave Liberty Street S Liberty Street N Bowmanville Avenue Taunton Road Re gi on al Hi gh wa y 2 2034 2025 2029 2033 2031 2032 2028 2030 2027 2026 2036 44 86 103 173 175 130 109 146 51 117 90 68 100 91 129 142 49 145 178 47 150 88 52 50 177 99 93 137 139 96 56 59 55 122 61 58 123 45 63 131 102 72 147 153 92 97 67 138 80 57 74 144 143 143 128 149 133 140 53 48 124 163 62 159 164 95 160 82 101 83 64 81 46 2027 2029 2036 2028 2032 2033 2026 2026 2027 2028 2028 2028 2029 2031 2032 2032 2035 2036 2036 2036 2027 2036 1 3 4 8 9 10 14 16 17 18 20 21 22 23 25 26 27 28 31 32 33 34 38 Bridge Structure Works Culvert Structure Works Intersection Improvements Railroad Crossing Improvements - Lights, Traffic Arm, etc. Multi-use/Cycling Pathway Construciton Road Construction Sidewalk Construction Street Lighting Works Streetscaping Regional Road Municipal Road Provincial Highway Environmental Protection Residential Parks and Greenspace Non-Residential/Mixed Use Prime Agriculture/Rural Aggregate Extraction & Utility Map 2: Bowmanville 2025 Development Charge Update Roads and Related Projects ¯ 0 1 2 0.5 km Appendix C | 166 Manvers Regional Highway 2 Mill King North Regional Rd 17 2028 2027 2027 2025 2026 2027 2027 2030 2026 2026 2031 2026 2029 2029 2029 2029 174 113 105 111 114 162 176 78 110 167 73 172 171 125 126 77 2029 2026 2035 2029 2 15 29 39 Bridge Structure Works Culvert Structure Works Intersection Improvements Railroad Crossing Improvements - Lights, Traffic Arm, etc. Multi-use/Cycling Pathway Construciton Road Construction Sidewalk Construction Street Lighting Works Streetscaping Regional Road Municipal Road Provincial Highway Environmental Protection Residential Parks and Greenspace Non-Residential/Mixed Use Prime Agriculture/Rural Aggregate Extraction & Utility ¯ Map 3: Newcastle 2025 Development Charge Update Roads and Related Projects 0 1 0.5 km Appendix C | 167 Appendix C2 - Land Acquisition Changes arising from Bill 60, Fighting Delays, Building Faster Act, 2025, which received Royal Assent in November 2025, introduced a new framework governing the use of DCs to fund land acquisition for all services. All land acquisition costs are grouped into a district "class of service" under section 7 of the DCA. The Land Acquisition DC category of service includes eligible land acquisitions over the 2025 - 2034 planning horizon. Table 1 2025 - 2034 Development-Related Capital Program and Calculation of the "Unadjusted" Development Charges As shown on Table 1, the 2025 - 2034 development-related gross cost of the capital program amounts to $7.2 million. Approximately $6.5 million is related to the land acquisition for South Courtice facility and is considered to be entirely related to growth beyond the planning period. An additional $150,000 has been identified for land acquisition related to culvert works, along with $525,000 for land acquisition associated with new urban collector roads. No grants, subsidies or other recoveries have been identified and as such, no reductions are made. A 67% BTE allocation has been applied to Hancock Rd. box culvert which recognizes that the existing culvert is being replaced. After these deductions, the total DC eligible costs amount to $7.1 million. Of these eligible costs, $6.5 million is deemed to benefit as a post-2034 benefit and will be considered for recovery in subsequent DC Background Studies. The total costs eligible for DC recovery amounts to $656,300 and is allocated 78% ($511,300) to the residential sector, 8% ($53,800) to the industrial sector, and 14% ($91,300) to the non-industrial sector. This yields an unadjusted development charge as follows: Appendix C | 168 - Residential = $14 per capita - Industrial = $0.17 per square metre - Non-Industrial = $0.39 per square metre Table 2 Cash Flow Analysis The following table summarizes the calculation of the Land Acquisition development charge. Services re lated to L and Acquisiti on Summary show the n et adjusted de velop ment charge is $ 16.11 pe r capi ta for residen tial a nd non -residenti al charg es for indu stria l and non-i ndust rial of $0. 19 and $0.43 respectively. Appendix C | 169 APPENDIX C.2 TABLE 1 MUNICIPALITY OF CLARINGTON DEVELOPMENT-RELATED CAPITAL PROGRAM LAND ACQUISITION Project Number Project Type Project Description Timing (Start) Timing (End) Gross Project Cost Grants, Subsidies & Other Recoveries Net Municipal Cost Replacement & BTE Shares (%) Replacement & BTE Shares ($) Total Development- Related Costs DC Reserve Commitments 2026-2035 DC Eligible Costs Other Development- Related 2.1 Operations Infrastructure: Buildings, Land & Equipment Land Acquisition for South Courtice Satellite Facility 2035 2035 $6,480,000 $0 $6,480,000 $0 $0 $6,480,000 $0 $0 $6,480,000 2.2 Road Infrastructure: Culvert Works Hancock Rd. Box Culvert 2027 2027 $25,000 $0 $25,000 $1 $16,764 $8,236 $0 $8,236 $0 2.3 Recovery of Courtice Branch Debenture Lambs Rd. Box Culvert - Extension 2028 2028 $25,000 $0 $25,000 $0 $0 $25,000 $0 $25,000 $0 2.4 Recovery of Courtice Branch Debenture Baseline Rd. Culvert - Extension 2032 2032 $25,000 $0 $25,000 $0 $0 $25,000 $0 $25,000 $0 2.5 Recovery of Courtice Branch Debenture Baseline Road Culvert - Extension 2033 2033 $25,000 $0 $25,000 $0 $0 $25,000 $0 $25,000 $0 2.6 Recovery of Courtice Branch Debenture Baseline Rd. Culvert - Extension 2033 2033 $25,000 $0 $25,000 $0 $0 $25,000 $0 $25,000 $0 2.7 Recovery of Courtice Branch Debenture Baseline Rd. Culvert - Extension 2034 2034 $25,000 $0 $25,000 $0 $0 $25,000 $0 $25,000 $0 2.8 Road Infrastructure: Road Works - New Urban Collectors George Reynolds Dr. 2025 2025 $500,000 $0 $500,000 $0 $0 $500,000 $0 $500,000 $0 2.9 Road Infrastructure: Road Works - New Urban Collectors Baseline Rd. 2032 2032 $25,000 $0 $25,000 $0 $1,938 $23,062 $0 $23,062 $0 Total $7,155,000 $0 $7,155,000 $18,702 $7,136,298 $0 $656,298 $6,480,000 Residential Development Charge Calculation Residential Share of 2026 - 2035 DC Eligible Costs 78% $511,256 2025-2034 Adjusted Funding Envelope $0 10-Year Growth in Population in New Units 35,923 Unadjusted Development Charge Per Capita $14 Reserve Fund Balance Balance as at Dec 31, 2024 $0 Industrial Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 8% $53,751 10-Year Growth in Square Metres 314,400 Unadjusted Development Charge Per Square Metre $0.17 Non-Industrial Development Charge Calculation Non-Residential Share of 2026 - 2035 DC Eligible Costs 14% $91,291 10-Year Growth in Square Metres 233,303 Unadjusted Development Charge Per Square Metre $0.39 Appendix C | 170 APPENDIX C.2 TABLE 2 - PAGE 1 MUNICIPALITY OF CLARINGTON LAND ACQUISITION CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE RESIDENTIAL DEVELOPMENT CHARGE (in $000) LAND ACQUISITION: RESIDENTIAL 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE ($000) $0.0 ($368.9) ($344.6) ($311.0) ($286.8) ($237.1) ($181.3) ($119.1) ($90.9) ($59.8) 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 2025 - 2034 Funding Requirements: Non Inflated $389.5 $0.0 $6.4 $19.5 $0.0 $0.0 $0.0 $37.4 $39.0 $19.5 $511.3 2025 - 2034 Funding Requirements: Inflated $389.5 $0.0 $6.7 $20.7 $0.0 $0.0 $0.0 $43.0 $45.6 $23.3 $528.8 Population Growth in New Units 1,894 2,664 3,478 3,584 3,691 3,803 3,914 4,167 4,297 4,431 35,923 DC Revenue Receipts: Inflated $30.5 $43.8 $58.3 $61.3 $64.4 $67.6 $71.0 $77.1 $81.1 $85.3 $640.4 Interest on Opening Balance $0.0 ($20.3) ($19.0) ($17.1) ($15.8) ($13.0) ($10.0) ($6.5) ($5.0) ($3.3) ($110.0) Interest on In-year Transactions ($9.9) $0.8 $0.9 $0.7 $1.1 $1.2 $1.2 $0.6 $0.6 $1.1 ($1.6) TOTAL REVENUE $20.6 $24.3 $40.2 $44.9 $49.7 $55.8 $62.3 $71.2 $76.7 $83.1 $528.8 CLOSING CASH BALANCE ($368.9) ($344.6) ($311.0) ($286.8) ($237.1) ($181.3) ($119.1) ($90.9) ($59.8) $0.0 2025 Adjusted Charge Per Capita $16.11 Allocation of Capital Program Residential Sector 78% Non-Residential Sector 22% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 171 APPENDIX C.2 TABLE 2 - PAGE 2 MUNICIPALITY OF CLARINGTON LAND ACQUISITON CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL $0 ($36) ($31) ($27) ($23) ($17) ($10) ($2) ($2) ($2) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $41.0 $0.0 $0.7 $2.0 $0.0 $0.0 $0.0 $3.9 $4.1 $2.0 $53.8 $41.0 $0.0 $0.7 $2.2 $0.0 $0.0 $0.0 $4.5 $4.8 $2.4 $55.6 32,400 33,500 34,600 35,800 37,000 38,200 39,500 20,450 21,100 21,850 314,400 $6.1 $6.4 $6.8 $7.1 $7.5 $7.9 $8.3 $4.4 $4.6 $4.9 $64.1 $0.0 ($2.0) ($1.7) ($1.5) ($1.3) ($0.9) ($0.5) ($0.1) ($0.1) ($0.1) ($8.3) ($1.0) $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 ($0.0) ($0.0) $0.0 ($0.2) $5.1 $4.5 $5.1 $5.7 $6.4 $7.1 $7.9 $4.3 $4.5 $4.8 $55.6 LAND ACQUISITION: INDUSTRIAL OPENING CASH BALANCE ($000) 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve Balance) 2025 - 2034 Funding Requirements: Non: Inflated 2025 - 2034 Funding Requirements: Inflated New Industrial Building GFA - square metres DC Revenue Receipts: Inflated Interest on Opening Balance Interest on In-year Transactions TOTAL REVENUE CLOSING CASH BALANCE ($35.8) ($31.3) ($26.8) ($23.3) ($16.9) ($9.8) ($1.9) ($2.1) ($2.4) $0.0 2025 Adjusted Charge Per Square Metre $0.19 78% 8% 14% 2.0% 3.5% Allocation of Capital Program Residential Sector Industrial Non-Industrial Rates for 2025 Inflation Rate Interest Rate on Positive Balances Interest Rate on Negative Balances 5.5% Appendix C | 172 APPENDIX C.2 TABLE 2 - PAGE 3 MUNICIPALITY OF CLARINGTON LAND ACQUISTION CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) LAND ACQUISITON: NON-INDUSTRIAL 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TOTAL OPENING CASH BALANCE ($000) $0 ($61) ($52) ($45) ($39) ($28) ($16) ($2) ($3) ($4) 2025 - 2034 Funding Requirements: Prior Growth (Funding from DC Reserve) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 2025 - 2034 Funding Requirements: Non Inflated $69.6 $0.0 $1.1 $3.5 $0.0 $0.0 $0.0 $6.7 $7.0 $3.5 $91.3 2025 - 2034 Funding Requirements: Inflated $69.6 $0.0 $1.2 $3.7 $0.0 $0.0 $0.0 $7.7 $8.1 $4.2 $94.4 New Industrial Building GFA - square metres 24,885 25,515 26,145 26,775 27,450 28,170 28,890 14,783 15,165 15,525 233,303 DC Revenue Receipts: Inflated $10.7 $11.1 $11.7 $12.2 $12.7 $13.3 $13.9 $7.3 $7.6 $7.9 $108.5 Interest on Opening Balance $0.0 ($3.3) ($2.9) ($2.5) ($2.1) ($1.5) ($0.9) ($0.1) ($0.2) ($0.2) ($13.7) Interest on In-year Transactions ($1.6) $0.2 $0.2 $0.1 $0.2 $0.2 $0.2 ($0.0) ($0.0) $0.1 ($0.4) TOTAL REVENUE $9.0 $8.0 $8.9 $9.9 $10.8 $12.0 $13.3 $7.1 $7.4 $7.8 $94.4 CLOSING CASH BALANCE ($60.5) ($52.5) ($44.7) ($38.6) ($27.7) ($15.7) ($2.4) ($2.9) ($3.7) $0.0 2025 Adjusted Charge Per Square Metre $0.43 Allocation of Capital Program Residential Sector 78% Industrial 8% Non-Industrial 14% Rates for 2025 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 173 Appendix D | 174 Appendix D Reserve Fund Balances Appendix D - Reserve Fund Balances The DCA requires that a reserve fund be established for each service for which development charges are collected. Table 1 presents the reserve fund balances that are available to help fund the development-related capital costs identified in the study. The closing balances of the development charges reserve funds as of December 31, 2024 are displayed. As shown on Table 1, the December 31, 2024 total reserve fund balance was approximately $49.6 million. The balances for each service are deemed to be "uncommitted" and have been treated appropriately in each of the cash flow analyses. The application of the available monies in each of the reserve funds is discussed in the appendix section related to each service. Appendix D | 175 APPENDIX D TABLE 1 MUNICIPALITY OF CLARINGTON DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT YEAR ENDING DECEMBER 31, 2024 Reserve Fund Service Balance as at Dec. 31, 2024 Library Service $1,964,331 Emergency & Fire Services $5,365,091 Parks & Indoor Recreation $4,622,073 General Government $381,263 Services Related To A Highway $37,249,365 Land Acquistion* $0 Total Development Charge Reserves $49,582,123 *No reserve funds for Land Acquisiton as it is a new service Appendix D | 176 Appendix E | 177 Appendix E Cost of Growth Appendix E - Cost of Growth Analysis - All Services Asset Management Plan The DCA requires that municipalities complete an Asset Management Plan before passing a development charges by-law. A key function of the Asset Management Plan, as required by the legislation, is to demonstrate that all assets funded under the development charges by-law are financially sustainable over their full life cycle. Asset Types A summary of the future municipal-owned assets and estimated useful life assumptions for eligible DC services considered as part of the study are outlined in Table 1 and Table 2. Although all capital assets considered in the study have been identified, not all assets necessitate future replacement or ongoing maintenance activities. The exception and justification is as follows: - Some of the works identified may represent one-time expenditures and may be temporary in nature. Therefore, the assets would not be required to be replaced, and no ongoing operation and maintenance costs exist. Such assets are identified as "not a long-term asset" in the table. - Some projects do not relate to the emplacement of a tangible capital asset- some examples include the acquisition of land or the undertaking of development-related studies. These projects/costs do not necessarily require future replacement or ongoing maintenance. Such projects are identified as "not infrastructure" in the table. - For assets that have been constructed (i.e. recovery of past debenture commitments) it is assumed that the related contribution is already included within the Municipalityʼs annual provision (see below for Appendix E | 178 additional details). As such, these projects are identified as "not applicable" in the table. It should be noted that the capital cost estimates prepared for each of the projects identified in this section include grouped costs of various individual elements, which, as a stand-alone item, may have its own useful life. For example, new buildings include HVAC, structural elements, roof, etc. Accordingly, the average useful life assumptions noted below are applicable to all project components. Table 1 - Summary of Municipal Assets Considered Municipal-Wide for All Services Service Average Estimated Useful Life Library Services Debentures Buildings Equipment Materials N/A 50 years 10 years 10 years Fire and Emergency Services Buildings Vehicles and Equipment 50 years 10 years Parks and Recreation Debentures Park Development Trails Play Fields Park Facilities Playgrounds Equipment N/A 25 years 20 years 25 years 25 years 15 years 10 years Development-Related Studies Studies N/A Appendix E | 179 Service Average Estimated Useful Life Services Related to a Highway Roads Roads Vehicles Equipment Active Transportation Sidewalks Streetlighting 50 years 10 years 40 years 80 years 80 years Land Acquisition Facilities Roads 50 years 50 years Annual Provision When assets require rehabilitation or are due for replacement, the source of the fund is limited to reserves or contributions from operating. Capital expenditures to carry out the rehabilitation and replacement of aging infrastructure are not growth-related and are therefore not eligible for funding through development charge revenues or other developer contributions. Based on the information obtained from the Municipalityʼs current Asset Management Plans (AMP) and Municipal staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset, a provision for infrastructure replacement has been calculated for both the general and engineered services. Provisions for infrastructure replacement are initially calculated for each asset based on their useful life and the anticipated cost of replacement. The aggregate of all individual provisions forms the required annual capital provision. In calculating the annual provisions, a number of assumptions are made to account for inflation (2.0%) and interest (3.5%). Appendix E | 180 Consistent with the requirements of the DCA, assets that are proposed to be funded under the development charges by-law have been included in the analysis. As a result, the total calculated annual provision for development charge related infrastructure has been netted down to consider the replacement of existing infrastructure or BTE allocations. However, for reference, the annual replacement provisions associated with the non- development charge funded costs, including costs related to the BTE and post-period benefit have also been calculated. Table 2 provides the calculated annual asset management contribution for both the gross capital expenditures and the share related to the 2025 - 2034 DC recoverable portion. The year 2035 has been included to calculate the annual contribution for the 2025 - 2034 period as the expenditures in 2034 will not trigger asset management contributions until 2035. As shown in Table 2, by 2035, the Municipality will need to fund an additional $14.5 million per annum in order to properly fund the full life cycle costs of the new assets related to the services supported under the development charges by-law. Appendix E | 181 2025 - 2034 Calculated AMP Annual Service Capital Program Provision by 2035 DC Related Non-DC Related* DC Related Non-DC Related* Library Service $17,585,137 $28,537,463 $738,070 $593,171 Emergency & Fire Services $15,528,297 $11,279,703 $543,031 $410,979 Parks & Indoor Recreation $138,816,168 $200,169,350 $4,290,178 $4,433,313 General Government $7,363,375 $3,136,425 $0 $0 Services Related To A Highway $378,578,210 $112,875,002 $8,880,675 $1,454,188 Land Acquistion $656,298 $6,498,702 $13,475 $157,203 TOTAL $558,527,484 $362,496,646 $14,465,429 $7,048,854 APPENDIX E TABLE 2 MUNICIPALITY OF CLARINGTON ANNUAL ASSET MANAGEMENT PROVISION BY 2035 * Includes costs that will be recovered under future development charges studies (i.e. other development-related), ineligible shares and shares of projects funded from available reserve funds. Appendix E | 182 Financial Sustainability of the Program Future Revenue Growth The calculated annual funding provision should be considered within the context of the Municipalityʼs projected growth. Over the next ten years (to 2034), the Municipality is projected to increase by approximately 12,295 households. In addition, the Municipality will also add nearly 10,195 new employees that will result in approximately 547,705 square metres of additional non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the development charges by-law. The collection of these funds is intended to be allocated to the Municipalityʼs reserves for the future replacement of these assets. This is aligned with the Municipalityʼs current asset management plan practices. The analysis in Table 2 also assumes the replacement of all assets would occur at the end of their useful life. The Municipality may have different service level standards that would impact the estimated annual allocation. The Municipalityʼs proposed level of service would be defined through future asset management plans. Long-Term Capital and Operating Impact Analysis The long-term capital and operating impact analysis has been informed based on the Municipalityʼs 2023 Financial Information Return (FIR) and the infrastructure identified in the DC capital programs that are anticipated to be open and operational by the end of the planning period. As shown in Table 3, by 2034, the Municipalityʼs net operating costs are estimated to increase by $16.2 million for property tax supported services. Appendix E | 183 Increases in net operating costs will be experienced as new facilities are opened. Operating and maintenance costs will also increase as additions to the Municipalityʼs road network are made. Table 4 summarizes the components of the development-related capital forecast that will require funding from non-DC sources. In total, $67.1 million will need to be financed from non-DC sources over the 2025 - 2034 planning period. In addition, $282.2 million in interim DC financing related to post- period shares of projects may be required, or these costs may be recovered from other growth funding tools. The share of the development-related capital forecast requiring funding from non-DC sources of $67.1 million is related to replacement of existing Municipal facilities with newer and larger facilities that will benefit the existing community. Council is made aware of these factors so that they understand the operating and capital costs that will not be covered by DCs as it adopts the development-related capital forecast set out in the study. The Program is Deemed Financially Sustainable In summary, the asset management plan and long-term capital and operating analysis included in this appendix demonstrates that the Municipality can afford to invest and operate the identified general and engineered services infrastructure over the 10-year and long-term planning period. In addition, as part of the annual budget update the Municipality also contributes to asset replacement reserves and spends on yearly asset replacement needs as needed. Through this annual exercise, staff identify the required funding and propose mitigating measures in order to ensure there are sufficient funds in reserves over the long term. Life-cycle funding methodologies are also reviewed in order to ensure that the Municipality is continuing to implement financially sustainable practices for funding the eventual replacement of assets. Appendix E | 184 The calculated annual provisions identified are considered to be financially sustainable as it is expected that the increased capital asset management requirements can be absorbed by the tax and user base over the long-term. Appendix E | 185 TABLE 3 MUNICIPALITY OF CLARINGTON COST OF GROWTH ANALYSIS ESTIMATED NET OPERATING COST OF THE PROPOSED 2025-2034 DEVELOPMENT-RELATED CAPITAL PROGRAM (in constant 2025 dollars) Category Cost Driver (in $2025) Additional Operating Costs at 2034 Source and Commentary $ unit meaure Quantity Description Library Service $1,938,000 - Building Expansions $60 per sq.ft. 32,300 Proposed building size in $1,938,000 Based on 2023 FIR and Capital Program library space capital program Emergency & Fire Services $3,683,000 - Buildings, Vehicles & Equipment $237 per $1,000 of total $15,528,297 Facilities operational by 2034 $3,683,000 Based on 2023 FIR and Capital Program infrastructure value Parks & Indoor Recreation $6,191,425 - Buildings, Land & Furnishings $20 per $1,000 of total $ 124,540,517 Facilities operational by 2034 $2,490,810 Based on 2023 FIR and Capital Program infrastructure value - Park Development and Facilities $38 per $1,000 of total $ 98,072,519 Facilities operational by 2034 $3,700,615 Based on 2023 FIR and Capital Program infrastructure value General Government $0 - No additional operating costs $0 No additional costs $ - $0 N/A Services Related to a Highway $4,362,589 - Development-Related Roads Infrastructure $200 per household 12,294 $2,458,800 Based on 2023 FIR and Development Forecast - Vehicles & Equipment $20 per $1,000 of total $ 95,189,453 Facilities operational by 2034 $1,903,789 Based on 2023 FIR and Capital Program Land Acquisition $0 - No additional operating costs $0 No additional costs $ - $0 N/A TOTAL ESTIMATED OPERATING COSTS $16,175,014 Appendix E | 186 APPENDIX E TABLE 4 MUNICIPALITY OF CLARINGTON LONG-TERM CAPITAL FINANCING FROM NON-DC SOURCES Services Development-Related Capital Program (2025 - 2034) Net Replacement Total DC Municipal & Benefit to Available DC Post-Period Eligible Costs Cost Existing Reserves Benefit* for Recovery ($000) ($000) ($000) ($000) ($000) 1 Library Service $46,122.6 $12,912.1 $1,964.3 $15,625.3 $15,620.8 2 Emergency & Fire Services $23,608.0 $1,519.5 $5,365.1 $6,560.2 $10,163.2 3 Parks & Indoor Recreation $328,985.5 $5,186.8 $4,622.1 $184,982.5 $134,194.1 4 General Government $10,499.8 $2,161.9 $381.3 $974.5 $6,982.1 5 Services Related To A Highway $491,422.9 $45,305.8 $37,249.4 $67,538.9 $341,328.8 6 Land Acquisition $7,155.0 $18.7 $0.0 $6,480.0 $656.3 TOTAL GENERAL SERVICES $907,793.8 $67,104.8 $49,582.1 $282,161.5 $508,945.4 *Development related costs to be considered for funding from other tools and/or future DC Studies. Appendix E | 187 Appendix F | 188 Appendix F Local Service Guidelines Appendix F - Local Service Guidelines The following guidelines set out in general terms the size and nature of engineered infrastructure that is included in the Municipality of Clarington 2025 DC Background Study. For a project to be eligible to be funded completely or in part by development charges, the following will apply: 1. The project will be identified in the most current Municipality of Clarington DC Background Study. 2. If any infrastructure does not add any additional capacity over and above the capacity requirement for that development, these projects are assumed to be the sole responsibility of the developer. 3. Infrastructure that provides servicing or capacity for more than one development is not necessarily fully or partially funded from development charges. If a project is considered fully or partially local in nature, the Municipality will require the benefiting landowners to fund the works directly. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development in any existing development and proposed development in its surrounding area these policy guidelines, the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area, and subsection 59(2) of the DCA. These local service policy guidelines are subject to review and amendment by the Municipality which may be independent of an amendment or update to the Municipalityʼs development charge by-laws. Appendix F | 189 The detailed engineering requirements for all work and/or development are governed by the Municipality of Clarington, or if not specified in the Official Plan, by the approved detailed engineering standards. Throughout the guideline, the term "local service" refers to infrastructure which is a direct developer responsibility under section 59 of the DCA. Local service funding is specifically considered for the services of: 1. Services Related to a Highways: Roads and Related Services 2. Stormwater Management Facilities 3. Parkland Development A. Services Related to a Highway: Roads and Related i. Arterial Roads New arterial roads and arterial road improvements, including associated infrastructure and land costs, as identified within the current DC Background Study, are funded through the Services Related to a Highway development charges. Where roadway improvements (or new construction) are required on Arterial Roads to support a specific development or required to link the development area with the existing road network, these road improvements are a local service and a direct responsibility of the developer. ii. Collector Roads The local component of a Collector Road internal to a development, up to and including a 10 metre pavement width is a direct developer responsibility. The oversized share of Collector Roads internal to a development, as identified within the current DC Background Study, are funded through the Services Related to a Highway development charge. The oversized share of a Collector Road will be determined based on difference between the cost of Appendix F | 190 providing a local development share of a Collector Road (defined as a 10 metre pavement width) and the proposed Collector Road. The difference represents the oversized share as included in the current DC Background Study. Where roadway improvements (or new construction) are required on Collector Roads external to a development but required to support the development or required to link the development area with the existing road network, these road improvements are a local service and a direct responsibility of the developer. iii. Local Roads A local road is generally defined as a road segment which provides access to individual properties within a development. Typically, these roads include all roads internal to a development to a pavement width up to and including 8.5 metres, including any enhancements within the roads right-of-way. Roads constructed to a greater width, as identified in the current DC Background Study, are funded through the Services Related to a Highway development charge. A local road may also be defined in a Secondary Plan, Official Plan or Transportation Master Plan. All enhancements of a road internal to a subdivision over and above the current municipal standard, as recommended by a Secondary Plan or other document for the subject area, are local services and are the direct responsibility of the developer. Roads within a development or external to the development but related to the development are either in whole or in part a local service and a direct developer responsibility. Further clarification is provided in subsection i "Arterial Roads" and ii "Collector Roads". Appendix F | 191 iv. Traffic Signals and Intersection Improvements Traffic Signals and Intersection Improvements located on any road which is not considered a direct developer responsibility, are required due to development, and are as identified within the current DC Background Study, are funded through the Services Related to a Highway development charge. Intersections within Regional Roads are deemed to be a Regional Responsibility if warrants are met. v. Subdivision/Site Entrances and Related Entrances and all related costs (including, but not limited to signalization, turn lanes, utilities and extensions, etc.), no matter the class of road, are a direct developer responsibility. vi. Streetlights Streetlights internal to a development or site are a direct developer responsibility. Streetlights external to a development but related to the development of the subject lands are a direct developer responsibility. Streetlights in other areas in the Municipality, including streetlights on Regional Roads which are a responsibility of the Municipality, required to meet the servicing needs arising from development, as identified within the current DC Background Study, are funded through the Services Related to a Highway development charge. vii. Sidewalks Sidewalks internal to a development are a direct developer responsibility. Sidewalks external to a development but required and related to the development are a direct developer responsibility. Sidewalks in other areas in the Municipality, including sidewalks on Regional Roads which are a responsibility of the Municipality, required to meet the Appendix F | 192 servicing needs of development, as identified within the current DC Background Study, are funded through the Services Related to a Highway development charge. viii. Noise Abatement Measures Noise abatement measures internal to a development are a direct developer responsibility. Noise abatement measures external to a development but required and related to, or mitigate impacts from, the development of the subject lands, are a direct developer responsibility. ix. Street Tree Planting Street tree planting is considered a direct developer responsibility. x. Traffic Calming Traffic calming measures required to mitigate impacts from proposed development either external or internal to development, not included in the current DC Background Study, and are needed to support the development are considered to be a direct developer responsibility. xi. Land Acquisition for Road Allowances Land acquisition for road allowances within a development is a dedication under the Planning Act subdivision provisions (sections 41, 51 and 53) up to a 26 metre right of way. In areas with limited or new development, land acquisition cost may be included in DC calculation (to the extent eligible under the legislation). If purchased in advance of dedication, costs may be funded on an interim basis from the DC reserve fund with potential future reimbursement from developer contributions. Additional land acquisition for bridges or grade separations (beyond normal dedication requirements) are included in the DC calculation, to the extent in which it is eligible and identified, if applicable, in the DC Background Study. Appendix F | 193 xii. Other Enhancements within the Road Right-of-Way If through the Secondary Plan Process, or other similar development approval process or study, it is determined that enhancements, such as bike lanes, median landscaping, landscape strips, decorative lighting, or other similar works, are deemed necessary for a road, or road segment, that is within, or related to, a plan of subdivision or within the area to which a plan relates, the capital of providing such works are deemed a local service and a direct developer responsibility. B. Stormwater Management Facilities The costs of Stormwater Management Facilities that are required, related to, or within the area needed to support the development, either internal or external to the area to which the development relates are a direct developer responsibility. Local Stormwater Management Facilities include but are not limited to: - Stormwater management facilities servicing local drainage areas - Storm sewer oversizing associated with local drainage areas - Oversized storm sewer works on existing roads - Erosion works, inclusive of all restoration requirements, related to, or within the area needed to support the development - Drainage Studies for a specific development - Temporary drainage infrastructure - Installation of private drain connections or private systems - Land associated with stormwater management facilities Stormwater Management Facilities servicing more than one development plan, may be included in an area-specific DC By-law, subject to local circumstances. Appendix F | 194 C. Parkland Development & Recreational Trails i. Parkland Development Parkland development which is a direct developer responsibility includes the requirement for the owner to undertake preparation of a conceptual park plan including proposed grading to demonstrate that the proposed park size, configuration and topography will allow for the construction of park facilities to the satisfaction of the Municipality. In addition, the owner is required to grade the park to the grading plans approved for construction. Provide fill or excavation, whichever is necessary to achieve the final grades shown on the plan to minus 300mm of finished grade. The owner is required to provide topsoil for the park block use. The quantity shall be sufficient to provide a depth of topsoil over entire park block to municipal standard, less hard surfaced areas, and shall be stockpiled on the park block. The park site must be fenced, with servicing such as storm, hydro, sanitary sewer and water should be stubbed at the property line along the park frontage. If the park block is graded in advance of its development, restoration of the site may be required in a temporary fashion to include seeding and/or sodding. The Municipality also requires the owner to dedicate parkland or provide cash-in-lieu, consistent with the Planning Act provisions. All of these costs are deemed a direct responsibility and are not included in the DC calculation. With respect to other parkland development costs, all other eligible components of parkland development including detailed design and contract administration, finished grading, sodding, park furniture electrical, water, sanitary sewer, signage, plant material, walkways, play courts, parking lots, sports fields, playground equipment, water play equipment, recreational trails (not deemed to be a direct developer responsibility), park shelters, lighting, irrigation and field houses, as identified within the current DC Appendix F | 195 Background Study, are funded through the Parks and Recreation development charge. ii. Recreational Trails Costs related to the following shall be a direct developer responsibility and are not included in the DC calculation: a. All costs associated with recreational trails and multi-use paths (including bridges, guards and retaining walls) constructed within the development. All other recreational trails shall be included in the DC Background Study and funded through the Parks and Recreation development charge. Appendix F | 196 Appendix G | 197 Appendix G DC By-law (Available Under Separate Cover)