Hemson 2024 DC Town-Wide Background Study

Collingwood, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot b63ba1a8fec4 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Consolidated Report Prepared by Hemson for the Town of Collingwood 2024 Development Charges Town-wide Background Study August 16, 2024 1000 - 30 St. Patrick Street, Toronto, ON M5T 3A3 416 593 5090 | [email protected] | www.hemson.com Contents List of Acronyms 1 Executive Summary 2 1. Introduction 7 A. Legislative Context 8 B. Relevant Analysis 9 C. Consultation and Approval Process 9 D. Policy Changes Introduced as part of 2024 DC Background Study 10 2. The Methodology Aligns Development-Related Costs and Benefits 11 A. Town-wide Development Charges are Proposed 11 B. Consideration for Area Rating 12 C. Key Steps when Determining Development Charges for Future Growth-Related Projects 14 D. Operating & Capital Cost Impacts and Asset Management Plan Legislative Requirements 19 3. Development Forecast 21 4. Historical Capital Services Levels 24 5. Development-Related Capital Forecast 27 A. Development-Related Capital Program is Provided for Council's Approval 27 B. The Development-Related Capital Forecast for Town Services 28 C. The Development-Related Capital Forecast for Engineered Services 29 6. Development Charges are Calculated in Accordance with the DCA 32 A. Development Charges Calculation 32 B. Adjusted Residential and Non-Residential Development Charges Rates 37 C. Comparison to 2024 Newly Calculated Development Charges Currently In Force in Collingwood 37 7. Cost of Growth Analysis 42 A. Long-Term Capital and Operating Impact Analysis 42 B. Asset Management Plan 46 8. Development Charges Administration and Policy Considerations 49 A. Development Charges Amount Payable and Date of Payment 49 B. Reserve Funds 50 C. Changes Arising From the More Homes Built Faster Act (Bill 23) and Cutting Red Tape to Build More Homes Act (Bill 185) 51 D. Development Charges Administration 52 List of Appendices Appendix A - Development Forecast 54 Appendix B - Town-wide Services Technical Appendix 73 B.1 Library Services 79 B.2 Fire Protection Services 88 B.3 By-Law Services 98 B.4 Outdoor Recreation 108 B.5 Indoor Recreation 128 B.6 Administration 136 B.7 Transit Services 142 Appendix C - Engineered Services 150 Appendix D - Reserve Fund Balances 194 Appendix E - Cost of Growth 197 Appendix F - Local Service 208 Appendix G - Tatham Engineering DC Background Study Wastewater, Water and Roads 218 Appendix H - Approved 2024 DC By-law (Available Under Separate Cover) 257 List of Acronyms | 1 List of Acronyms AMP Asset Management Plan BTE Benefit to Existing COG Cost of Growth DCA Development Charges Act DC Development Charges GFA Gross Floor Area MCR Municipal Comprehensive Review PPB Post-Period Benefit PPU Persons Per Unit Executive Summary | 2 Executive Summary A. Purpose of Development Charges Background Study Hemson Consulting Ltd. was retained by the Town of Collingwood to complete a Development Charges (DC) Background Study. This Background Study provides the basis and background required to update the Town's development charges to accurately reflect the future servicing needs of new development. A separate DC Background Study has been prepared for the Town's Water Treatment Plant development charge rate. i. Study Consistent with Development Charges Legislation The Town of Collingwood 2024 DC Study is presented as part of the process to lead to the approval of new DC By-law(s) in compliance with the Development Charges Act (DCA). The study is prepared in accordance with the DCA and associated regulations, including amendments that came into force through the More Homes, More Choice Act, the COVID-19 Economic Recovery Act, the More Homes Built Faster Act (Bill 23) as well as Cutting Red Tape to Build More Homes Act (Bill 185) which came into forecast on June 6, 2024. The Town must continue implementing development charges to help fund capital projects related to development throughout Collingwood so that development continues to be serviced in a fiscally responsible manner. The calculated changes to the development charges rates are required in order to reflect the revised costs associated with new infrastructure requirements. ii. Key Steps in Determining Future Development-Related Projects The DCA in Ontario is the most prescriptive of all DC legislation in Canada with respect to recovering development-related costs. Several key steps are required to calculate DCs. These include: Executive Summary | 3  Preparing a development (growth) forecast;  Establishing historical service levels;  Determining the increased needs for services arising from development;  Determining how these costs are attributed to development types (i.e. residential and non-residential); and  Adjusting for a cash flow analysis. iii. DC Eligible and Ineligible Costs Development charges are intended to pay for the initial round of capital costs needed to service new development over an identified planning period. This is based on the overarching principle that "growth pays for growth". However, the DCA and associated regulation includes several statutory adjustments and deductions that prevent these costs from fully being recovered by growth. Such adjustments include but are not limited to: ineligible costs including operating and maintenance costs; ineligible services including parkland acquisition; deductions for costs that exceed historical service level caps; and statutory exemptions for specific uses (i.e. industrial expansions). iv. Engineered Services Capital Programs Have Been Prepared By Tatham Engineering Consistent with the approach used in the Town's 2019 DC Study, an external engineering consultant has been retained to prepare capital program cost estimates related to engineered infrastructure (e.g. Roads and Related, Water and Wastewater Services), including cost estimates, timing and allocations (e.g. benefit to existing, in-period and post-period). The analysis prepared by Tatham is provided in Appendix G. Executive Summary | 4 v. The Development-Related Capital Program is Subject to Change It is recommended that Council adopt the development-related capital program developed for the purposes of the 2024 DC Study. However, it is recognized that the Background Study is a point-in-time analysis and there may be changes to project timing, scope and costs through the Town's normal annual budget process. B. Development Forecast The table below provides a summary of the anticipated Town-wide residential and non-residential growth over the 2024 - 2033 and to 2041. The Town-wide development forecast is further discussed in Appendix A. C. Development-Related Capital Program The development-related capital program for all services in the Town is based on a 10-year planning horizon of 2024-2033 for general services, and 2024-2041 for engineered services. The gross costs amount to $742.72 million where $334.47 million is eligible for recovery through development charges. Details regarding the capital programs for each individual General Service are provided in Appendix B and for Engineered Services area provided in Appendix C of this report. 2023 Estimate Residential Occupied Dwellings 11,674 3,525 15,199 6,676 18,350 Population Census 25,874 5,842 31,716 10,726 36,600 Population In New Dwellings 7,172 13,505 Non-Residential Place of Work Employment1 11,751 1,277 13,028 2,721 14,472 Non-Residential Building Space (sq.m.) 89,390 190,470 1 Excludes Work at Home Employment but includes No Fixed Place of Work Town-wide Development Forecast 10-Year Planning Period 2024 - 2033 Long-Term Planning Period 2024 - 2041 Growth Total at 2033 Growth Total at 2041 Executive Summary | 5 D. Calculated Development Charges The table below provides a summary of the Town-wide development charges for residential and non-residential development based on the aforementioned forecasts. The rate for the Town's Water Treatment Plant service has been calculated under a separate standalone DC Study but is included in the calculated rates shown in this report for transparency. E. Cost of Growth Analysis An overview of the long-term capital and operating costs as well as the asset management-related annual provisions for capital facilities and infrastructure to be included in the DC by-law is provided in Appendix E of the DC Study. This examination is required as one of the provisions of the DCA. F. Development Charges Administration & Policy Considerations i. Town-wide vs Area-Specific DCs As required by the DCA, consideration was given to the use of area rating. Consistent with the Town's historical practice, the infrastructure identified for the general services has been calculated on a Town-wide basis. ii. Changes Introduced as part of 2024 DC Background Study As part of the 2024 DC Study update, the following changes have been introduced:  Removal of Police Services;  Addition of By-law Services; Non-Residential Service Charge ($/sq.m) Town-Wide General Services $20,717 $15,413 $12,330 $7,705 $9.08 Town-Wide Engineered Services $59,267 $44,090 $35,272 $22,044 $321.75 TOTAL CHARGE $79,984 $59,503 $47,602 $29,749 $330.82 Apartments 1 or Fewer Residential Charge By Unit Type Single & Semi- Detached Multiples Apartment 2+ Bedrooms Executive Summary | 6  Removed Water and Wastewater plants from linear infrastructure into separate DC rate categories (e.g. Wastewater Services, Wastewater Treatment Plant, Water Services, Water Treatment Plant);  Reviewed DC By-law definitions and exemptions; and  Alignment with new legislative changes. G. Key Recommendations  It is recommended that the Town's present practices regarding collection of DCs and by-law administration continue to the extent possible;  As required under the DCA, the Town should codify any rules regarding application of the by-laws and any exemptions within the development charges by-laws proposed for adoption;  It is recommended that Council adopt the development-related capital forecast included in this DC Study, subject to annual review through the Town's normal capital budget process; and  The Town review and update its local service definitions as part of this update. H. 2024 Development Charges By-law Provided Under Separate Cover The Town-wide DC By-law was approved on July 8, 2024, and the new rates will come into effect on September 1, 2024. The approved by-law is available on the Town of Collingwood's website: https://www.collingwood.ca/council- government/budget-taxes/development-charges Introduction | 7 1. Introduction The Development Charges Act, 1997 (DCA) and its associated Ontario Regulation 82/98 (O. Reg. 82/98) allow municipalities in Ontario to recover development-related capital costs from new development. The Town of Collingwood 2024 Development Charges (DC) Background Study is presented as part of a process to establish a development charges by-law that complies with this legislation. The Town of Collingwood is experiencing development pressure and is an attractive location for development. The anticipated development in Collingwood will increase the demand on all Town services. The Town wishes to implement development charges to fund development-related capital projects so that development continues to be serviced in a fiscally responsible manner. When a development charges by-law is proposed, the DCA and O. Reg. 82/98 require that a development charges background study be prepared in support of the proposed changes with reference to:  A forecast of the amount, type and location of development anticipated in the Town;  The average capital service levels provided in the Towny over the 15- year period immediately preceding the preparation of the background study;  A review of future capital projects, including an analysis of gross expenditures, funding sources, and net expenditures incurred, or to be incurred, by the Town or its local boards to provide for the expected development, including the determination of the eligible and ineligible components of the capital projects; and, Introduction | 8  An examination of the long-term capital and operating costs for the capital infrastructure required for each service to which the development charges by-laws would relate. This study identifies the development-related capital costs attributable to development that is forecast to occur in the Town. The costs are apportioned to types of development (residential and non-residential) in a manner that reflects the increase in the need for each service attributable to each type of development. The study therefore calculates development charges for each type of development. The DCA provides for a period of public review and comment regarding the calculated development charges. This process includes considering and responding to comments received by members of the public about the calculated charges. Following completion of this process, and in accordance with the DCA and Council's review of this study, it is intended that Council will pass a new development charges by-law for the Town. The remainder of this study sets out the information and analysis upon which the calculated development charges are based. A. Legislative Context The study is prepared in accordance with the DCA and associated regulations, including the amendments that came into force most recently on November 28, 2022 as per Bill 23: More Homes Built Faster Act, 2022. Prior to the publishing of this Consolidated DC Study, Bill 185: Cutting Red Tape to Build More Homes Act, 2024 came into force which reversed the 5- year mandatory phase-in of DCs enacted under Bill 23 and also provided exemptions for Affordable and Attainable housing projects that meet the legislative requirements. Key legislative changes incorporated into this study include: Introduction | 9  Historical service level standards have been extended from a 10 to 15-year planning period;  DC by-laws now expire every 10 years instead of 5 years;  The amount of interest paid on DC deferrals and freeze is capped at prime plus 1%;  Costs associated with affordable housing services are now ineligible for recovery through DCs;  Municipalities must spend or allocate 60% of available DC reserve funds per year for roads, water and wastewater services;  Discounts for purpose-built rentals based on the number of bedrooms; and  Exemptions for Affordable and Attainable housing developments which meet the definitions under the DCA. B. Relevant Analysis The underlying assumptions and calculation methodologies contained in the DC Study have been informed by a range of inputs including the Town's capital budget, existing master plans as well as updated engineering costs provided by Tatham Consulting, and discussions with staff. C. Consultation and Approval Process The following provides a summary of the consultation and approval process undertaken to complete the DC Study. Timeline of Consultation and Approval Process Description Date Council Information Session #1 September 25, 2023 Council Information Session #2 March 18, 2024 Developer Information Session #1 April 8, 2024 Introduction | 10 Description Date Public Release of DC Background Study April 15, 2024 Statutory Public Meeting May 6, 2024 Passage of 2024 DC By-law July 8, 2024 D. Policy Changes Introduced as part of 2024 DC Background Study As part of the Town's 2024 DC Study update, the following changes have been introduced:  Removal of Police Services;  Addition of By-law Services;  Separated Water and Wastewater plants from linear infrastructure into separate DC rate categories (e.g. Wastewater Services, Wastewater Treatment Plant, Water Services, Water Treatment Plant);  Reviewed DC By-law definitions and exemptions; and  Alignment with new legislative changes. The Methodology Aligns Development-Related Costs and Benefits | 11 2. The Methodology Aligns Development- Related Costs and Benefits Several key steps are required when calculating any development charge. However, specific circumstances arise in each municipality which must be reflected in the calculation. In this study, therefore, we have tailored our approach to the Town of Collingwood's unique circumstances. The approach to calculating development charges provides a reasonable alignment of development-related costs with the development that necessitates them. This study uses a Town-wide approach in the cost recovery calculations. The Background Study provides an update to the historical service levels and the cost of providing future development-related capital infrastructure. A. Town-wide Development Charges are Proposed Collingwood provides a range of services to the community it serves and has a sizeable inventory of facilities, land, infrastructure, vehicles and equipment. The DCA provides the Town with flexibility when defining services that are included in the DC By-law(s), provided that the other provisions of the DCA and Regulations are met. The DCA also permits the Town to designate, in its by-laws, the areas within which the development charges shall be imposed. The charges may apply to all lands in the Town or to other designated development areas as specified in the by-law(s). For all services, a range of capital infrastructure is available throughout the Town. All Town residents and employees have access to this infrastructure. As new development occurs, new infrastructure will need to be added so that overall service levels in the Town are maintained. A widely accepted method of sharing the development-related capital costs for these services is to apportion them over all new development anticipated in the Town. The Methodology Aligns Development-Related Costs and Benefits | 12 The following services are included in the development charges calculations:  Library Services  Fire Protection Services  By-Law Services  Outdoor Recreation  Indoor Recreation  Administration  Transit Services  Services Related to a Highway: Roads and Related  Wastewater Services  Wastewater Treatment Plant  Water Services It is noted that at the time of drafting the 2024 DC Study, Development- Related Studies were not DC eligible under the requirements of the DCA. However, prior to the effective date of the Town's DC Bylaws (September 1, 2024) the province introduced further changes to the legislation in order to allow municipalities to recover for these costs. As such, in accordance with the DCA, a capital program and related DC rate calculation has been included in the study and the Town's DC By-law. These services form a reasonable basis in which to plan and administer the Town-wide development charges. It is noted that the analysis of each of these services examines the individual capital facilities and equipment that constitute it. The resulting development charges for these services would be imposed against all development in the Town. B. Consideration for Area Rating In accordance with the DCA, Council must give consideration to the use of area rating, also known as area-specific development charges, as part of the DC Background Study. As part of the Town's 2024 DC update, the appropriateness of implementing area-specific development charges for the various Town services was examined. The Methodology Aligns Development-Related Costs and Benefits | 13 The DCA permits the Town to designate, in its DC By-law, the areas where development charges shall be imposed. The charges may apply to all lands in the Town or to other designated development areas as specified in the DC By-law. The following was considered with respect to area-specific development charges:  Is the use of area-specific charges appropriate for some or all services?  Are there any data limitations with calculating an area-specific development charge? Area-specific development charges are typically considered when there is clear benefit to a particular area (including the population or population and employment) and have been implemented mostly in stand alone green field developments. Based on discussions with staff, and the analysis of the delivery of services, it is proposed that the Town continue to calculate and collect DCs on a uniform, Town-wide basis. The following table provides a description of the servicing needs for general and engineered services. Town Services Servicing Needs General Services Services such as Library, Outdoor Recreation and Indoor Recreation are open and accessible to all residents in the Town and are driven and planned for based on Town-wide population growth. For Fire, Transit Services, By-law and Administration, these services are provided to all residents and employees The Methodology Aligns Development-Related Costs and Benefits | 14 Town Services Servicing Needs Engineered Services Roads and Related are provided through a Town-wide network and is planned based on Town-wide population and employment growth. Water Services and Wastewater are used to provide services to Town-wide population and employee growth. C. Key Steps when Determining Development Charges for Future Growth-Related Projects Several key steps are required in calculating development charges for future development-related projects. These are summarized in Figure 1 and discussed further in the following sections. The Methodology Aligns Development-Related Costs and Benefits | 15 Figure 1: Overview of DC Background Study Process The Methodology Aligns Development-Related Costs and Benefits | 16 i. Development Forecast The first step in the methodology requires that a development forecast be prepared for the 10-year study period from 2024-2033 and the long-term period to 2041. The forecast of future residential and non-residential development used in this study was prepared by Hemson in consultation with Town of Collingwood staff. The forecast has been informed by the Town of Collingwood's Official Plan and adjusted for known and anticipated development proposals and accounts for historical households and recent construction history. For the residential portion of the forecast, the total Census change in population determines the need for additional facilities and provides the foundation for the development-related capital forecast. The non-residential portion of the forecast estimates the amount of building space to be developed in the Town over the planning periods. The forecast is based on the projected increase in employment levels and the anticipated amount of new building space required to accommodate it. ii. Service Categories and Historical Service Levels The DCA states that the increase in the need for service attributable to anticipated development: ... must not include an increase that would result in the level of service exceeding the average level of that service provided in the Town over the 15-year period immediately preceding the preparation of the background study...(s. 5. (1) 4.) Historical 15-year average service levels thus form the basis for the development charges calculation. A review of the Town's capital service levels for buildings, land, vehicles, equipment and others has therefore been prepared as a reference for the calculation so that the portion of future capital projects that may be included in the development charges can be The Methodology Aligns Development-Related Costs and Benefits | 17 determined. The historical service levels used in this study have been calculated based on the period from 2009 to 2023. In accordance with the provisions of the DCA, for the engineered services of water and wastewater, historical service levels are less applicable and reference is made to the Town's engineering standards as well as Provincial health or environmental legislation. Historical service levels for the Services Related to a Highway: Roads and Related service have been included. iii. Development-Related Capital Forecast and Analysis of Net Capital Costs to be included in the Development Charges A development-related capital forecast has been prepared by Town staff as part of this study. The forecast identifies development-related projects and their gross and net costs, after allowing for capital grants, subsidies or other contributions as required by the DCA s.5.(2). The capital forecast provides another foundation upon which development charges are based. The DCA requires that the increase in the need for service attributable to the anticipated development may include an increase: ... only if the council of the municipality has indicated that it intends to ensure that such an increase in need will be met. (s. 5. (1) 3.) In conjunction with DCA, s. 5. (1) 4. referenced above, these sections have the effect of requiring that the development charge be calculated on the lesser of the historical 15-year average service levels or the service levels embodied in future plans of the Town. The development-related capital program prepared for this study ensures that development charges are only imposed to help pay for projects that have been or are intended to be purchased or built in order to accommodate future anticipated development. It is not sufficient in the calculation of development charges merely to have had the service in the past. There must also be a demonstrated commitment to continue to emplace facilities or infrastructure in the future. In this regard, O. Reg. 82/98, s. 3 states that: The Methodology Aligns Development-Related Costs and Benefits | 18 For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an Official Plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. For some projects in the development-related capital forecast, a portion of the project may confer benefits to existing residents. As required by the DCA, s. 5. (1) 6., these portions of projects and associated net costs are to be a funding responsibility of the Town from non-development charges sources. The amount of financing for such non-growth shares is also identified as part of the preparation of the development-related capital forecast. There is also a requirement in the DCA to reduce the applicable development charges by the amount of any "uncommitted excess capacity" that is available for a service. Such capacity is available to partially meet future servicing requirements. Adjustments are made in the analysis to meet this requirement of the DCA. iv. Attribution to Types of Development The next step in the determination of development charges is the allocation of the development-related net capital costs between the residential and the non-residential sectors. In the Town of Collingwood, the allocation is based on the projected changes in population and employment over the planning periods. The residential component of the development charges is applied to different housing types based on average occupancy factors. The non- residential component is applied on the basis of gross building space in square metres. The Methodology Aligns Development-Related Costs and Benefits | 19 v. Final Adjustment The final determination of the development charges results from adjustments made to development-related net capital costs for each service and sector resulting from a cash flow analysis that takes account of the timing of projects and receipt of development charges. Interest earnings or borrowing costs are therefore accounted for in the calculation as allowed under the DCA. D. Operating & Capital Cost Impacts and Asset Management Plan Legislative Requirements Section 10 of the DCA identifies what must be included in a Development Charges Background Study, namely: s.10 (2) The development charge background study shall include, (c) an examination, for each service to which the development charge by-law would relate, of the long term capital and operating costs for capital infrastructure required for the service; and (c.2) an asset management plan prepared in accordance with subsection (3). i. Asset Management Plan (3) The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in a prescribed manner. The Methodology Aligns Development-Related Costs and Benefits | 20 The requirement to include an Asset Management Plan (AMP) was part of the DCA amendments that came into effect on January 1, 2016. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life-cycle. The section of the DC Background Study that deals with the operating and capital cost impacts and the asset management plan can be found in Appendix E. Development Forecast | 21 3. Development Forecast The DCA requires the Town to estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The development forecast must cover both residential and non-residential development and be specific enough with regards to quantum, type, location and timing of development to allow the Town to prepare a reasonable development-related capital program. Appendix A contains additional materials related to the development forecast and the Town's demographics. The forecasts are based on the Town achieving population and employment forecasts set out in the Simcoe County Official Plan, recently amended through the County's Municipal Comprehensive Review (MCR), as well as the Town's new Official Plan which was adopted by Town Council in December 2023. The residential forecast incorporates 2021 Census and historical residential permit data and accounts for seasonal housing development. The forecast shows that the number of dwelling units will increase by approximately 3,530 between 2024-2033 with an accompanying population of 5,840 persons. From 2024-2041 a total of 6,680 new units are anticipated, which will result in 10,730 new residents. In addition to the net population forecast, a forecast of "population in new units" that will result from the addition of new housing units has been made. Population growth in new units is estimated by applying the following PPUs to the housing unit forecast:  2.69 for single and semi-detached units;  2.00 for multiples;  1.60 for large apartments; and  1.00 for small apartments. Development Forecast | 22 The forecasted population growth in new dwelling units over the 10-year planning period amounts to 7,170 persons and 13,500 over the 2024-2041 planning period. For non-residential development, approximately 89,390 square metres of new non-residential gross floor area (GFA) to be added in the Town between 2024- 2033. During the period 2024-2041, GFA is projected to increase by approximately 190,470 square metres. Table 1 provides a summary of the Town-wide residential and non- residential development forecast used in this analysis. TABLE 1 TOWN OF COLLINGWOOD SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT FORECAST 2023 Estimate Residential Occupied Dwellings 11,674 3,525 15,199 6,676 18,350 Population Census 25,874 5,842 31,716 10,726 36,600 Population In New Dwellings 7,172 13,505 Non-Residential Place of Work Employment1 11,751 1,277 13,028 2,721 14,472 Non-Residential Building Space (sq.m.) 89,390 190,470 1 Excludes Work at Home Employment but includes No Fixed Place of Work Town-wide Development Forecast 10-Year Planning Period 2024 - 2033 Long-Term Planning Period 2024 - 2041 Growth Total at 2033 Growth Total at 2041 Development Forecast | 23 Historical Capital Services Levels | 24 4. Historical Capital Services Levels The DCA and O. Reg. 82/98 require that the development charges be set at a level no higher than the average service level provided in the Town over the 15-year period immediately preceding the preparation of the Background Study, on a service-by-service basis. For non-engineered services (e.g. Library, Outdoor Recreation, Indoor Recreation etc.) the legislative requirement is met by documenting service levels for the preceding 15 years: in this case, for the period from 2009 to 2023. Typically, service levels for non-engineered services are measured as a ratio of inputs per capita or inputs per population and employment. For engineered services such as Water and Wastewater, engineering standards are used in lieu of inputs per capita. In accordance with the requirements of the DCA, Transit services are based on a forward planned 10-year service level, as such no historical service level is identified. O. Reg. 82/98 requires that, when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet per unit. The qualitative aspect is introduced by consideration of the monetary value of a facility or service. In the case of buildings, for example, the cost would be shown in terms of dollars per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be charged to new development reflect not only the quantity (number and size) but also the quality (value or cost) of services provided by the Town in the past. Both the quantitative and qualitative aspects of service levels used in the current analysis are based on information provided by Town staff. This information is generally based on historical records and the Town's and surrounding Historical Capital Services Levels | 25 municipalities' experience with costs to acquire or construct similar facilities, equipment and infrastructure. Table 2 summarizes service levels for all services included in the development charges calculations. Appendices B and C provide detailed historical inventory data upon which the calculation of service levels is based for the General and Engineered services, respectively. TABLE 2 TOWN OF COLLINGWOOD SUMMARY OF AVERAGE HISTORIC SERVICE LEVELS 2009 - 2023 Service 1.0 LIBRARY SERVICES $584.95 per capita Buildings $430.26 per capita Land $13.86 per capita Materials $103.19 per capita Furniture And Equipment $41.91 per capita Excess Capacity Adjustment ($4.27) per capita 2.0 FIRE PROTECTION SERVICES $531.11 per pop & empl Buildings $274.40 per pop & empl Land $34.15 per pop & empl Furniture & Equipment $52.20 per pop & empl Vehicles $170.36 per pop & empl 3.0 BY-LAW SERVICES $8.78 per pop & empl Buildings $5.68 per pop & empl Land $0.20 per pop & empl Furniture & Equipment $0.58 per pop & empl Vehicles $2.32 per pop & empl 4.0 OUTDOOR RECREATION $4,282.17 per capita Outdoor Rec Buildings $108.70 per capita Land Associated With Buildings $30.47 per capita Park Land Improvements $2,432.79 per capita Parkland Amenities $910.21 per capita Trails $325.36 per capita Bridges $344.07 per capita Marina and Docks $79.69 per capita Vehicles And Equipment $52.04 per capita Sailing School Equipment $6.17 per capita Excess Capacity Adjustment ($7.33) per capita 6.0 INDOOR RECREATION $3,128.09 per capita Buildings $2,663.48 per capita Land $189.22 per capita Furniture & Equipment $275.39 per capita 7.0 ROADS AND RELATED $17,320.72 per pop & empl Public Works $525.95 per pop & empl Roads $16,794.77 per pop & empl 2009 - 2023 Service Level Indicator Historical Capital Services Levels | 26 Development-Related Capital Forecast | 27 5. Development-Related Capital Forecast The DCA requires that the Council of the Town express its intent to provide future capital facilities at the level incorporated in the development charges calculation. As noted above in Section II, Ontario Regulation 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a Town has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. A. Development-Related Capital Program is Provided for Council's Approval Based on the development forecast summarized in Section 3 and detailed in Appendix A, Town staff, in collaboration with Hemson and Tatham Engineering, have identified a development-related capital forecast that sets out projects required to service anticipated development. For General Services (including Transit), the capital forecast covers the 10-year period from 2024 to 2033. Development charges for the Engineered Services are based on a longer planning horizon to 2041. One of the recommendations contained in the DC Study is for Council to adopt the development-related capital forecast created for the purposes of the development charges calculation. It is assumed that future capital budgets and forecasts will continue to bring forward the capital projects presented herein as they will be needed to service anticipated development in the Town. It is, however, acknowledged that changes to the forecast Development-Related Capital Forecast | 28 presented here may occur through the Town's normal capital budget process. B. The Development-Related Capital Forecast for Town Services A summary of the development-related capital forecast for general services is presented in Table 3. The table shows that the gross cost of the Town's General Services (including Transit) capital forecast is estimated to be $202.58 million. Approximately $1.20 in grants are anticipated to offset the cost of the Outdoor Recreation and Transit programs; therefore, the net municipal cost for the Town is reduced to $201.37 million. Of this net municipal cost, approximately 50%, or $100.41 million, is related to capital works for Indoor Recreation. This capital program recovers for various recreation facilities including the Multi-Purpose Facility valued at $97.80 million. The next largest capital program belongs to Outdoor Recreation. The program provides various facilities including infrastructure related to the implementation of the Waterfront Master Plan. The total Outdoor Recreation capital program amounts to $71.49 million or 35% of the general services costs. The capital forecast associated with Fire Protection Services includes a new fire station, debt recovery for a past station, and additions to the fire fleet. The total municipal cost of the Fire capital program is $18.60 or 9% of the total net municipal cost. The capital program associated with Library Services amounts to $8.86 million, or 4% of the total municipal cost, and provides for a new library, debenture payments, and additional collection materials. The By-law Services capital program includes provisions for additional parking spaces, a parking garage, and a new parking lot. The total cost of the By-law capital program is $110,000. Development-Related Capital Forecast | 29 The portion of the Town's program that relates to the provision of development-related studies is referred to as Administration and amounts to $1.57 million. The capital program for Transit Services includes bus acquisitions and bus shelters, and the net municipal cost totals $779,300. The capital forecast incorporates those projects identified to be related to development anticipated in the next 10 years. It is not implied that all of these costs are to be recovered from new development by way of development charges (see the following Section 6). Portions of the capital forecast may be related to replacement of existing facilities, shares of projects that benefit the existing population, or development anticipated to occur beyond the 2024-2033 or 2024-2041 planning period. Further details on the capital forecasts for each individual service category are available in Appendix B. C. The Development-Related Capital Forecast for Engineered Services Table 3 also provides the development-related capital recoveries for the engineered services of Services Related to a Highway: Roads and Related, Water Services and Wastewater Services. The total Engineered Services gross capital cost is $540.14 million, with $2.76 million in grants, developer contributions and contributions by other municipalities. The net municipal cost is $537.38 million. The largest portion of the net municipal cost is related to Wastewater Treatment Plant services with a cost of $304.60 million or 57% of the engineered service net related costs. The second largest service is Roads and Related Services with a total of $122.19 million or 23%. This includes provisions for roadworks, sidewalks, and public works investments in fleet and facilities. Development-Related Capital Forecast | 30 Water Services net capital program totals $100.78 million or 19% and includes for the recovery of linear infrastructure. Finally, Wastewater Services with a total cost of $9.81 million. Details of the engineered services capital programs can be found in Appendix C. Gross Grants/ Municipal Service Cost Subsidies Cost 1.0 LIBRARY SERVICES $8,857.6 $0.0 $8,857.6 2.0 FIRE PROTECTION SERVICES $18,599.0 $0.0 $18,599.0 3.0 BY-LAW SERVICES $110.0 $0.0 $110.0 4.0 OUTDOOR RECREATION $71,489.0 $436.3 $71,052.8 5.0 INDOOR RECREATION $100,410.0 $0.0 $100,410.0 6.0 ADMINISTRATION $1,565.0 $0.0 $1,565.0 7.0 TRANSIT SERVICES $1,544.8 $765.5 $779.3 GENERAL SERVICES (2024-2033) $202,575.4 $1,201.8 $201,373.7 Service 1.0 ROADS AND RELATED $124,956.7 $2,764.9 $122,191.7 2.0 WASTEWATER SERVICES $9,810.0 $0.0 $9,810.0 2.0 WASTEWATER TREATMENT PLANT $304,600.0 $0.0 $304,600.0 3.0 WATER SERVICES $100,777.2 $0.0 $100,777.2 ENGINEERED SERVICES (2023-2041) $540,143.9 $2,764.9 $537,378.9 *Water Treatment Plant service is dealt with under separate DC Study TOTAL GENERAL AND ENGINEERED SERVICES 742,719.3 $ 3,966.7 $ 738,752.6 $ Gross Cost Grants / Subsidies Net Municipal TABLE 3 TOWN OF COLLINGWOOD SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM FOR GENERAL AND ENGINEERED SERVICES (in $000) Development-Related Capital Forecast | 31 Development Charges are Calculated in Accordance with the DCA | 32 6. Development Charges are Calculated in Accordance with the DCA This section summarizes the calculation of development charges for each service category and the resulting total development charge by type of development. For all services, the calculation of the "unadjusted" per capita (residential) and per square metre (non-residential) charges is reviewed. Adjustments to these amounts resulting from a cash flow analysis that accounts for interest earnings and borrowing costs are also discussed. For residential development, an adjusted total per capita amount is applied to different unit types on the basis average occupancy factors. For non- residential development, the calculated development charges rates are based on gross floor area (GFA) of building space. It is noted that the calculation of the development charges does not include any provision for exemptions required under the DCA, for example, the exemption for enlargements of up to 50% on existing industrial buildings. Such legislated exemptions, or other exemptions, which Council may choose to provide, will result in a loss of development charges revenue for the affected types of development. Any such revenue loss may not be offset, however, by increasing other portions of the calculated charge. A. Development Charges Calculation A summary of the "unadjusted" residential and non-residential development charges for the Town-wide general services is presented in Table 4. Further details of the calculation for each individual general service category are available in Appendix B. Development Charges are Calculated in Accordance with the DCA | 33 i. Unadjusted Residential and Non-Residential DC Rates for Town- wide General Services The capital forecast for Town-wide General Services incorporates those projects identified to be related to development anticipated in the 10-year planning period. However, not all of the capital costs are to be recovered from new development by way of development charges. Table 4 shows that, of the $201.37 million total municipal cost, $17.21 million relates to replacement of existing capital facilities, or to shares of projects that provide benefit to the existing community. These portions of capital costs will require funding from other non-development charge sources, such as fundraising and property taxes. An additional share of $4.65 million has been identified as available DC reserves and represents the revenues collected from previous development charges. This portion has been netted out of the capital costs. Another share of the forecast, $127.70 million, is either attributable to development beyond the recovery period (and can therefore be recovered under future development charges studies) or represents a service level increase in the Town. The remaining $51.82 million is carried forward to the development charges calculation. Of the development-related costs, $51.05 million has been allocated to new residential development, and $772,400 has been allocated to new non-residential development. This results in an unadjusted development charge of $7,117.38 per capita and $8.64 per square metre of non-residential development for the provision of General Services. 10 Year Growth in Population in New Units 7,172 10 Year Growth in Square Metres 89,390 Total DC Service Net Replacement Eligible Municipal & Benefit to Available Post-2033 Costs for Cost Existing DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) 1.0 LIBRARY SERVICES $8,857.6 $823.0 $0.0 $4,617.3 $3,417.3 100% $3,417.3 0% $0.00 Unadjusted Development Charge Per Capita $476.47 Unadjusted Development Charge Per Sq.M $0.00 2.0 FIRE PROTECTION SERVICES $18,599.0 $907.3 $90.6 $13,820.1 $3,781.0 85% $3,209.6 15% $571.47 Unadjusted Development Charge Per Capita $447.51 Unadjusted Development Charge Per Sq.M $6.39 3.0 BY-LAW SERVICES $110.0 $0.0 $0.0 $51.0 $59.0 85% $50.1 15% $8.92 Unadjusted Development Charge Per Capita $6.98 Unadjusted Development Charge Per Sq.M $0.10 4.0 OUTDOOR RECREATION $71,052.8 $14,763.7 $0.0 $31,272.6 $25,016.4 100% $25,016.4 0% $0.00 Unadjusted Development Charge Per Capita $3,488.07 Unadjusted Development Charge Per Sq.M $0.00 5.0 INDOOR RECREATION $100,410.0 $300.0 $3,893.9 $77,941.8 $18,274.2 100% $18,274.2 0% $0.00 Unadjusted Development Charge Per Capita $2,548.00 Unadjusted Development Charge Per Sq.M $0.00 6.0 ADMINISTRATION $1,565.0 $398.9 $310.5 $0.0 $855.7 85% $726.3 15% $129.33 Unadjusted Development Charge Per Capita $101.27 Unadjusted Development Charge Per Sq.M $1.45 7.0 TRANSIT SERVICES $779.3 $12.4 $352.3 $0.0 $414.5 85% $351.9 15% $62.66 Unadjusted Development Charge Per Capita $49.06 Unadjusted Development Charge Per Sq.M $0.70 TOTAL GENERAL SERVICES $201,373.7 $17,205.3 $4,647.3 $127,702.9 $51,818.2 $51,045.8 $772.4 Unadjusted Development Charge Per Capita $7,117.38 Unadjusted Development Charge Per Sq.M $8.64 Share Residential Share Non-Residential TABLE 4 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CAPITAL PROGRAM FOR GENERAL SERVICES Development-Related Capital Program (2024 - 2033) Development Charges are Calculated in Accordance with the DCA | 34 Development Charges are Calculated in Accordance with the DCA | 35 ii. Unadjusted Residential and Non-Residential DC Rates for Town- wide Engineered Services Table 5 presents the calculated residential and non-residential development charges for Engineered Services. The table shows that of the total net cost of the engineered services capital program of $540.14 million, $59.73 million is considered to replace existing infrastructure or to benefit the existing population. Developer and other levels of government contributions total another $2.76 million. A deduction is also made for the available reserve fund balance of $34.84 million, while $160.17 million will benefit development post-2041 and so may be considered for recovery under future by-laws. The remaining $282.65 million is carried forward to the development charges calculation. Of the development-related cost, 83% or $235.25 million, has been allocated to new residential development. The resulting unadjusted non-residential charge is $17,419.39 per capita. The remaining 17% or $47.40 million is attributed to the non-residential sector and results in an unadjusted development charge or $248.84 per square metre. Full capital program and calculation details regarding engineered services can be found in Appendix C. Growth in Population in New Units (2024-2041) 13,505 Growth in Square Meters (2024-2041) 190,470 Total DC Service Net Replacement Direct Eligible Municipal & Benefit to Developer Available Post-Period Costs for Cost Existing Contributions DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) 1.0 ROADS AND RELATED $124,956.7 $22,715.5 $2,764.9 $13,173.1 $7,395.1 $78,908.1 83% $65,675.7 17% $13,232.40 Unadjusted Development Charge Per Capita $4,863.06 Unadjusted Development Charge Per Sq.M $69.47 2.0 WASTEWATER SERVICES $9,810.0 $1,514.5 $0.0 $5,645.3 $1,128.0 $1,522.2 83% $1,266.9 17% $255.26 Unadjusted Development Charge Per Capita $93.81 Unadjusted Development Charge Per Sq.M $1.34 3.0 WASTEWATER TREATMENT PLANT $304,600.0 $19,800.0 $0.0 $13,172.3 $138,302.1 $133,325.6 83% $110,967.7 17% $22,357.87 Unadjusted Development Charge Per Capita $8,216.79 Unadjusted Development Charge Per Sq.M $117.38 4.0 WATER SERVICES $100,777.2 $15,697.6 $0.0 $2,847.1 $13,341.3 $68,891.2 83% $57,338.6 17% $11,552.64 Unadjusted Development Charge Per Capita $4,245.73 Unadjusted Development Charge Per Sq.M $60.65 TOTAL ENGINEERED SERVICES $540,143.9 $59,727.6 $2,764.9 $34,837.7 $160,166.5 $282,647.1 $235,248.9 $47,398.2 Unadjusted Development Charge Per Capita $17,419.39 Unadjusted Development Charge Per Sq.M $248.84 Share Share TABLE 5 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CAPITAL PROGRAM FOR ENGINEERED SERVICES Development-Related Capital Program (2024 - 2041) Residential Non-Residential Development Charges are Calculated in Accordance with the DCA | 36 Development Charges are Calculated in Accordance with the DCA | 37 B. Adjusted Residential and Non-Residential Development Charges Rates Final adjustments to the "unadjusted" development charges rates for general and engineered services are made through a cash flow analysis. The analysis, details of which are included in Appendices B and C, considers the borrowing cost and interest earnings associated with the timing of expenditures and development charges receipts for each service category. Table 6 summarizes the results of the cash flow adjustments for the residential development charges rates and includes the Water Treatment Plant DC rates calculated under a separate DC Study. The adjusted residential rate is $29,750.79 per capita after the cash flow analysis. Persons per unit factors are then applied to the per capita rate to determine the residential rate by unit type. The calculated rates by residential unit type range from a high of $79.984 for a single or semi-detached unit to a low of $29,749 for an apartment with one or fewer bedrooms. The rate for apartments with two or more bedrooms is $47,602 and the rate for rows and other multiples is $59,503. The non-residential charge is displayed in Table 7. After cash flow consideration, the charge per square metre increases to $330.82. C. Comparison to 2024 Newly Calculated Development Charges Currently In Force in Collingwood Tables 8 and 9 present a comparison of the newly calculated residential and non-residential development charges with currently imposed development charge rates. As shown in Table 8, residential development charges for single and semi-detached units will increase from the current rate of $42,855 to $79,984. Table 9 shows the calculated versus current non-residential rates. The rates will increase from the current rate of 196.39 per square metre to $330.82 per square metre. Unadjusted Adjusted Service Charge Charge Per Capita Per Capita Library Services $476.47 $522.46 $1,405 $1,045 $836 $522 1.8% Outdoor Recreation $3,488.07 $3,892.77 $10,466 $7,786 $6,228 $3,893 13.1% Indoor Recreation $2,548.00 $2,659.95 $7,151 $5,320 $4,256 $2,660 8.9% Administration $101.27 $97.24 $261 $194 $156 $97 0.3% Transit $49.06 $49.26 $132 $99 $79 $49 0.2% Fire Protection $447.51 $477.00 $1,282 $954 $763 $477 1.6% By-Law Services $6.98 $7.47 $20 $15 $12 $7 0.0% Town-Wide General Services $7,117.38 $7,706.16 $20,717 $15,413 $12,330 $7,705 25.9% Services Related To A Highway: Roads & Related $4,863.06 $5,052.34 $13,583 $10,105 $8,084 $5,052 17.0% Wastewater Services $93.81 $41.27 $111 $83 $66 $41 0.1% Wastewater Treatment Plant $8,216.79 $8,629.71 $23,201 $17,259 $13,808 $8,630 29.0% Water Services $4,245.73 $4,764.31 $12,809 $9,529 $7,623 $4,764 16.0% Water Treatment Plant (2) $3,052.92 $3,557.00 $9,563 $7,114 $5,691 $3,557 12.0% Town-Wide Engineered Services $20,472.31 $22,044.63 $59,267 $44,090 $35,272 $22,044 74.1% TOTAL RESIDENTIAL CHARGE $27,589.69 $29,750.79 $79,984 $59,503 $47,602 $29,749 100.0% (1) Based on Persons Per Unit of: 2.69 2.00 1.60 1.00 (2) Rate calculated under seperate DC Background Study Percentage of Charge TABLE 6 TOWN OF COLLINGWOOD TOWN-WIDE DEVELOPMENT CHARGES RESIDENTIAL DEVELOPMENT CHARGES Apartments 1 or Fewer Bedrooms Charge By Unit Type (1) Apartment 2+ Bedrooms Multiples Single & Semi- Detached Development Charges are Calculated in Accordance with the DCA | 38 TABLE 7 TOWN OF COLLINGWOOD TOWN-WIDE DEVELOPMENT CHARGES NON-RESIDENTIAL DEVELOPMENT CHARGES Unadjusted Adjusted Charge Service Charge After Cashflow ($/sq.m) ($/sq.m) Library Services $0.00 $0.00 0.0% Outdoor Recreation $0.00 $0.00 0.0% Indoor Recreation $0.00 $0.00 0.0% Administration $1.45 $1.39 0.4% Transit $0.70 $0.71 0.2% Fire Protection $6.39 $6.87 2.1% By-Law Services $0.10 $0.11 0.0% Town-Wide General Services $8.64 $9.08 2.7% Services Related To A Highway: Roads & Related $69.47 $73.71 22.3% Wastewater Services $1.34 $0.60 0.2% Wastewater Treatment Plant $117.38 $125.77 38.0% Water Services $60.65 $69.65 21.1% Water Treatment Plant (1) $43.61 $52.01 15.7% Town-Wide Engineered Services $292.45 $321.75 97.3% TOTAL NON-RESIDENTIAL CHARGE $301.09 $330.82 100.0% (1) Rate calculated under seperate DC Background Study Percentage of Charge Development Charges are Calculated in Accordance with the DCA | 39 Current Calculated Service Residential Residential Charge / SDU (1) Charge / SDU Library Services $1,208 $1,405 $197 16% Outdoor Recreation $7,671 $10,466 $2,795 36% Indoor Recreation $4,187 $7,151 $2,964 71% Administration $209 $261 $52 25% Transit $466 $132 ($334) (72%) Fire Protection $1,407 $1,282 ($125) (9%) Police (2) $424 $0 ($424) (100%) By-Law Services $0 $20 $20 0% Town-Wide General Services $15,572 $20,717 $5,145 33% Services Related To A Highway: Roads & Related $9,959 $13,583 $3,624 36% Wastewater Services $0 $111 $111 0% Wastewater Treatment Plant $9,558 $23,201 $13,643 143% Water Services $5,824 $12,809 $6,985 120% Water Treatment Plant (3) $1,942 $9,563 $7,621 392% Town-Wide Engineered Services $27,283 $59,267 $31,984 117% TOTAL RESIDENTIAL CHARGE $42,855 $79,984 $37,129 87% (1) Current rates as of January 1, 2024 (2) Police Services has been removed as part of 2024 DC Study Update (3) Rate calculated under separate DC Background Study COMPARISON OF CURRENT AND CALCULATED TABLE 8 Difference in Charge TOWN OF COLLINGWOOD RESIDENTIAL DEVELOPMENT CHARGES Development Charges are Calculated in Accordance with the DCA | 40 Current Calculated Service Non-Residential Non-Residential Charge / m2 (1) Charge / m2 Library Services $0.00 $0.00 $0.00 N/A Outdoor Recreation $0.00 $0.00 $0.00 N/A Indoor Recreation $0.00 $0.00 $0.00 N/A Administration $1.27 $1.39 $0.12 9% Transit $2.82 $0.71 ($2.11) (75%) Fire Protection $7.76 $6.87 ($0.89) (11%) Police (2) $2.59 $0.00 ($2.59) (100%) By-Law Services $0.00 $0.11 $0.11 0% Town-Wide General Services $14.44 $9.08 ($5.36) (37%) Services Related To A Highway: Roads & Related $66.21 $73.71 $7.50 11% Wastewater Services $0.00 $0.60 $0.60 0% Wastewater Treatment Plant $64.39 $125.77 $61.38 95% Water Services $38.51 $69.65 $31.14 81% Water Treatment Plant (3) $12.84 $52.01 $39.17 305% Town-Wide Engineered Services $181.95 $321.75 $139.80 77% TOTAL NON-RESIDENTIAL CHARGE $196.39 $330.82 $134.43 68% (1) Current rates as of January 1, 2024 (2) Police Services has been removed as part of 2024 DC Study Update (3) Rate calculated under separate DC Background Study Difference in Charge TOWN OF COLLINGWOOD TABLE 9 COMPARISON OF CURRENT AND CALCULATED NON-RESIDENTIAL DEVELOPMENT CHARGES Development Charges are Calculated in Accordance with the DCA | 41 Cost of Growth Analysis | 42 7. Cost of Growth Analysis This section provides a brief examination of the long-term capital and operating costs as well as the asset management related annual provisions for the capital facilities and infrastructure to be included in the 2024 DC By- law. This examination is required as one of the provisions of the DCA. Additional details on the cost of growth analysis, including asset management analysis, is included in Appendix E. A. Long-Term Capital and Operating Impact Analysis This section provides a brief examination of the long-term capital and operating costs for the capital facilities and infrastructure to be included in the development charges by-law. This examination is required as one of the features of the DCA. i. Net Operating Costs for the Town's Tax Supported Services to Increase over the Forecast Period Table 11 summarizes the estimated increase in net operating costs that the Town will experience for additions associated with the planned capital program. The estimated changes in net operating costs are based on the financial information from the Town. Additional details are included in Appendix E. As shown in Table 10, by 2033 the Town's net operating costs for services based on a 10-year planning horizon are estimated to increase by approximately $11.15 million. The most significant portion of this increase relates to Fire amenities. For Roads and Related services with a longer-term benefitting period, the total estimated operating impacts are anticipated to reach $3.27 million by 2041. Increases in net operating costs will be experienced as new facilities are opened. Cost of Growth Analysis | 43 ii. Long-Term Capital Financing From Non-Development Charges Sources Totals $320.25 million Table 11 summarizes the components of the development-related capital forecast that will require funding from non-development charges sources. For general services, $4.65 million will be financed from reserve funds and $17.21 million is related to replacement of existing Town facilities. In addition, $127.70 million in interim DC financing related to post-period shares of projects may be required. For engineered services, $76.93 million will need to be financed from non- DC sources over the 2024-2041 planning period, which is entirely related to the replacement of existing infrastructure that will benefit the existing community. Approximately $39.49 million will be financed from reserve funds. In addition, $287.87 million in interim DC financing may be necessary for post-period shares of engineered services. TABLE 10 TOWN OF COLLINGWOOD ESTIMATED NET OPERATING COST OF THE PROPOSED DEVELOPMENT-RELATED CAPITAL PROGRAM (GENERAL SERVICES) Service Cost Driver ($) Unit Measure Quantity Additional Operating Costs at 2033 Source & Commentary Library Services $0.13 per dollar of infrastructure $6,550,000 $862,000 FIR & 2024 DC Study Fire Protection Services $0.26 per dollar of infrastructure $16,784,000 $4,280,000 FIR & 2024 DC Study By-Law Services $0.13 per dollar of infrastructure $110,000 $14,000 FIR & 2024 DC Study Outdoor Recreation $0.02 per dollar of infrastructure $70,811,000 $1,742,000 FIR & 2024 DC Study Indoor Recreation $0.04 per dollar of infrastructure $100,410,000 $3,891,000 FIR & 2024 DC Study Administration $0.00 per dollar of infrastructure $0 $0 FIR & 2024 DC Study Transit Services $0.25 per dollar of infrastructure $1,458,000 $365,000 FIR & 2024 DC Study Total $196,123,000 $11,154,000 - Service Cost Driver ($) Unit Measure Quantity Additional Operating Costs at 2041 Source & Commentary Roads & Related $490.00 per household 6,676 $3,271,000 FIR & 2024 DC Study Wastewater Services - Rate supported service - - Wastewater Treatment Plant - Rate supported service - - Water Services - Rate supported service - - Total 6,676 $3,271,000 - Cost of Growth Analysis | 44 General Services Net Replacement & Available Post-2033 Total DC Eligible Municipal Cost Benefit to Existing DC Reserves Benefit Costs for Recovery ($000) ($000) ($000) ($000) ($000) 1.0 LIBRARY SERVICES $8,857.6 $823.0 $0.0 $4,617.3 $3,417.3 2.0 FIRE PROTECTION SERVICES $18,599.0 $907.3 $90.6 $13,820.1 $3,781.0 3.0 BY-LAW SERVICES $110.0 $0.0 $0.0 $51.0 $59.0 4.0 OUTDOOR RECREATION $71,052.8 $14,763.7 $0.0 $31,272.6 $25,016.4 5.0 INDOOR RECREATION $100,410.0 $300.0 $3,893.9 $77,941.8 $18,274.2 6.0 ADMINISTRATION $1,565.0 $398.9 $310.5 $0.0 $855.7 7.0 TRANSIT SERVICES $779.3 $12.4 $352.3 $0.0 $414.5 TOTAL - GENERAL SERVICES (2024-2033) $201,373.7 $17,205.3 $4,647.3 $127,702.9 $51,818.2 Engineered Services Net Replacement & Available Post-2041 Total DC Eligible Municipal Cost Benefit to Existing DC Reserves Benefit Costs for Recovery ($000) ($000) ($000) ($000) ($000) 1.0 SERVICES RELATED TO A HIGHWAY: ROADS & RELATED $122,191.7 $22,715.5 $13,173.1 $7,395.1 $78,908.1 2.0 WATER SERVICES $100,777.2 $15,697.6 $2,847.1 $13,341.3 $68,891.2 3.0 WASTEWATER SERVICES $9,810.0 $1,514.5 $5,645.3 $1,128.0 $1,522.2 4.0 WASTEWATER TREATMENT PLANT $304,600.0 $19,800.0 $13,172.3 $138,302.1 $133,325.6 TOTAL - ENGINEERED SERVICES (2024-2041) $537,378.9 $59,727.6 $34,837.7 $160,166.5 $282,647.1 TOTAL GENERAL AND ENGINEERED SERVICES $738,752.6 $76,932.9 $39,485.0 $287,869.4 $334,465.3 Development-Related Capital Program (2024-20233) Development-Related Capital Program (2024-2041) TABLE 11 TOWN OF COLLINGWOOD SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM FOR GENERALAND ENGINEERED SERVICES (in $000) Cost of Growth Analysis | 45 Cost of Growth Analysis | 46 B. Asset Management Plan The DCA now requires that municipalities complete an Asset Management Plan (AMP) before the passing of a development charges by-law. A key function of the AMP is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. Further details relating to the AMP are discussed in Appendix E. i. Annual Capital Provisions for Tax and Rate Supported Assets Table 12 summarizes the annual capital provisions required to replace the development eligible and ineligible costs associated with the capital infrastructure identified in the DC Study. The estimate is based on information obtained through the Town's AMP as well as discussions with municipal staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset. Table 12 illustrates that, by 2034, the Town will need to fund an additional $1.34 million per annum in order to properly fund the full life cycle costs of the new general services assets supported under the proposed DC By-law. In contrast, for engineered services which have a longer benefiting period to build-out, the calculated annual provision in 2042 for the assets supported under the proposed DC By-law is $5.47 million. ii. Future Revenue Growth The calculated annual funding provision should be considered within the context of the Town's projected growth. Over the next 10 years (to 2033) the Town is projected to increase by approximately 3,525 households. Over the longer-term planning horizon to 2041, the Town will add approximately 6,680 households. In addition, the Town will also add roughly 1,280 new employees that will result in approximately 89,390 square metres of additional non-residential building space by 2033. Over the longer planning period to 2041 the Town will add 2,720 employees that will be Cost of Growth Analysis | 47 accommodated in 190,470 square metres of new non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the proposed DC By-law. iii. Assets Are Deemed to be Financially Sustainable It is anticipated that new assets identified through the 2024 DC Study process will be incorporated into the Town's ongoing asset management plan analyses. The calculated annual provisions identified are considered to be financially sustainable as it is expected that the increased capital asset management requirements can be absorbed by the tax and user base over the long-term. General Services DC-Eligible Non DC Eligible DC-Related Non-DC Related Library Services $3,417,000 $5,440,000 $95,000 $192,000 Fire Protection Services $3,872,000 $14,727,000 $129,000 $462,000 By-Law Services $59,000 $51,000 $5,000 $5,000 Outdoor Recreation $25,016,000 $46,473,000 $716,000 $1,506,000 Indoor Recreation $22,168,000 $78,242,000 $330,000 $1,110,000 Administration $1,166,000 $399,000 $0 $0 Transit Services $767,000 $778,000 $62,000 $68,000 Total $56,465,000 $146,110,000 $1,337,000 $3,343,000 Engineered Services DC-Eligible Non DC Eligible DC-Related Non-DC Related Roads & Related $92,081,000 $32,876,000 $2,360,000 $771,000 Water Services $71,738,000 $29,039,000 $1,019,000 $256,000 Wastewater Services $7,167,000 $2,643,000 $55,000 $18,000 Wastewater Treatment Plant $146,498,000 $158,102,000 $2,040,000 $2,200,000 Total $317,484,000 $222,660,000 $5,474,000 $3,245,000 Capital Program AMP Provision by 2042 GENERAL, PROTECTION AND ENGINEERED SERVICES CALCULATED ANNUAL ASSET MANAGEMENT CONTRIBUTION TOWN OF COLLINGWOOD TABLE 12 2024-2041 Calculated Annual Capital Program 2024-2033 Calculated Annual AMP Provision by 2034 Cost of Growth Analysis | 48 Development Charges Administration and Policy Considerations | 49 8. Development Charges Administration and Policy Considerations This section sets out other considerations and legislative requirements relating to the DCA including administration and collection, recent legislative changes, and consideration for area rating. A. Development Charges Amount Payable and Date of Payment The total amount of a DC is the amount that would be determined under the by-law on the day of an application for site plan approval or the day of an application for rezoning or, if neither of these apply, the day of building permit issuance. Full details on determining the DCs payable in any particular case are provided in s.26, s.26.1 and s.26.2 of the DCA. The default date of payment of a DC is the date of building permit issuance. However, under s.27 of the DCA the Town may enter into an agreement with a developer to alter the timing of payment. For three specific types of development, DCs must be paid according to the following plan:  Six equal annual installments beginning at building occupancy (permit or actual occupancy) and for the following five anniversaries of that date for rental housing and institutional development. For required instalments, the Town may charge interest from the date the DC would have been payable to the date the instalment is paid. Interest may accrue on each installment until the final payment has been made. Any skipped or late payments can be added to the tax roll (including interest). Full details on the prescribed payment plans are provided in s.26.1 of the DCA. In accordance with s.26.3 the maximum interest rate a municipal can charge is prime plus 1%. Development Charges Administration and Policy Considerations | 50 B. Reserve Funds Under the DCA, a municipality that has passed a development charge by- law must establish a separate reserve fund for each service to which the development charge relates and pay each development charge it collects into the respective reserve fund. Beginning in 2023 and each calendar year thereafter, a municipality shall spend or allocate at least 60% of the monies in a reserve fund associated with Water supply, Wastewater services and Services Related to a Highway. While the DCA does permit municipalities to borrow from the reserve fund, the amount borrowed is to be repaid with interest at a rate not less than the prescribed minimum interest rate. Additionally, money in the reserve fund is to be spent only on development-related capital costs. Annual financial statements are to be provided to Council and must include the following:  Opening and closing balances and in-year transactions  A description of service or category of service  Details on credits paid by individual credit holders  Amounts borrowed and purpose of borrowing  Interest accrued on borrowing  Amount and source of money used to repay borrowing  Projects funded from DCs including amount and source of DC and non-DC funding Development Charges Administration and Policy Considerations | 51 C. Changes Arising From the More Homes Built Faster Act (Bill 23) and Cutting Red Tape to Build More Homes Act (Bill 185) As of November 28, 2022, there are several changes to the DCA due to the enactment and Royal Assent of Bill 23. A list of the changes that are now in force is provided below in Table 13. Table 13: Recent Changes to the DCA Section Description Section 2(1) Exemptions for existing rental residential buildings and a range of residential units in existing and new houses. Section 2(4) Housing services are ineligible for DC funding (repeal of paragraph 17 of ss.2(4) of the DCA). Existing by-laws are deemed to be "amended" and no development charges can be collected for housing services from November 28, 2022 onward. Section 4.1 Exemptions for affordable and attainable residential units as defined in the Affordable Residential Units Bulletin. Section 4.2 Exemptions for non-profit housing development. This does not apply with respect to a DC payable before November 28, 2022. Section 4.3 Exemption for inclusionary zoning residential units. This does not apply with respect to a DC payable before November 28, 2022. Section 5(1) Historical service level calculation period extended from 10 years to 15 years. Does not apply to by-laws in force prior to November 28, 2022. Section 9(1) Maximum life of a DC by-law extended from 5 years to 10 years. This does not apply to by-laws in-force before November 28, 2022. Section 26.1 Deferral payments now apply to rental housing and institutional development. Interest on deferral payments is now capped at prime plus 1% in accordance with s.26.3. Development Charges Administration and Policy Considerations | 52 Section Description Section 26.2 DCs for rental housing development are now discounted based on the number of bedrooms proposed. Interest on DC freeze now capped at prime plus 1% in accordance with section 26.3. Section 26.3 Maximum interest rates are capped at prime plus 1%. This does not apply with respect to a DC that was payable before November 28, 2022. Section 35 Municipalities are now required to spend or allocate at least 60% of reserve balances each year for Water Supply, Wastewater, and services related to a highway beginning in 2023. Section 44(4) Rules for front ending agreements as they relate to affordable and attainable residential units. Section 60(1)(s.4) Additional services for which municipalities are required to spend or allocate at least 60% of reserve fund balances may be prescribed through Regulations (none are proposed as of yet). Section 60(1)(d.2) and 9d.3) Prescribes developments and criteria related to attainable residential units (section 4.1). D. Development Charges Administration Many of the administrative requirements of the DCA will be similar to those presently followed by the Town in terms of collection practices. However, changes will likely be required in the use of and reporting on the new development charges. In this regard:  It is recommended that the present practices regarding collection of development charges and by-law administration continue to the extent possible; Development Charges Administration and Policy Considerations | 53  As required under the DCA, the Town should codify any rules regarding application of the by-laws and any exemptions within the development charges by-laws proposed for adoption;  It is recommended that the Town continue to report policies consistent with the requirements of the DCA;  It is recommended that the by-laws permit the payment of a development charge in cash or through services-in-lieu agreements. The municipality is not obligated to enter into services-in-lieu agreements; and  It is recommended that Council adopt the development-related capital forecast included in this background study for Town-wide services, subject to annual review through the Town's normal capital budget process. Appendix A Development Forecast Appendix A | 54 Appendix A - Development Forecast This appendix provides the details of the development forecast used to prepare the 2024 DC Background Study for the Town of Collingwood. The forecast method and key assumptions are discussed. The results of the forecasts are presented in the following tables: Historical Development A.1 Historical Population Summary A.2 Historical Household Summary A.3 Historical Employment Summary A.4 Historical Annual Residential Building Permits A.5 Historical Annual Residential Completions (CMHC) A.6 Historical Households by Period of Construction Showing Household Size Forecast Development A.7 Population & Occupied Dwellings Forecast Summary A.8 Employment Forecast Summary A.9 Forecast of Occupied Dwellings By Usual Residents by Unit Type A.10 Forecast Population Growth in New Occupied Dwellings by Unit Type A.11 Employment in New Space and Non-Residential Space Forecast A. Forecast Approach, Key Assumptions and Definitions The development forecast was prepared by Hemson in consultation with Town planning staff. The DCA requires that the Town estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The forecast must cover both residential and non-residential development and be specific enough Appendix A | 55 regarding the quantum, type, location and timing of development to allow the Town to prepare a reasonable development-related capital program. i. Forecast Targets A 10-year development forecast, from 2024-2033, has been used for General Services. For Engineered Services, including Roads and Related, Water and Wastewater services, a longer term forecast to 2041 has been used. The forecasts are based on the Town achieving population and employment forecasts set out in the Simcoe County Official Plan, recently amended through the County's Municipal Comprehensive Review (MCR), as well as the Town's new Official Plan which was adopted by Town Council in December 2023. Of particular relevance to the development forecast used in the DC Study:  Phase 1 of the Simcoe County's MCR resulted in the adoption of Official Plan Amendment (OPA) No. 7 which establishes population and employment forecasts for its local municipalities, including Collingwood, to 2051 (it is noted that although OPA No. 7 has been adopted by County Council it has not yet been approved by the Minister). Based on this work, the Town is forecast to reach a population of 42,690 and employment of 18,540 by 2051.  For the purposes of the Town's 2024 DC Background Study, the development forecast over the 2024-2033 and 2024-2041 planning horizons accounts for the population and employment growth forecast as part of the County's MCR.  Although a 2041 planning horizon is used for the purposes of the DC Background Study, the Town will continue to plan to achieve the 2051 population and employment forecasts set out in its Official Plan and it is expected that these forecasts will be used in future DC Background Study updates. Appendix A | 56 ii. Total Population and Employment vs. Census Population and Employment Used for the DC Background Study Population figures used in the forecasts represent the population recorded in the Census ("Census population"). This definition excludes the Census net under-coverage (approximately 2.6% of the total population), which represents those who were missed or double-counted by the Census and which is included in the definition of population used in the Town's Official Plan. Population figures shown in the development forecast represent mid- year estimates. Household figures represent occupied private dwellings, and reflect the year in which the dwellings are anticipated to be occupied. Employment figures in the forecasts are based on Statistics Canada place of work data. "Place of work employment" data record where people work rather than their place of residence. It includes all employment with a regular or no fixed place of work. However, work-at-home employment is excluded from the figures as, for development charge purposes, this type of employment is considered not to require building floorspace for its activities. The Town's infrastructure master plans typically include work-at-home employment in assessing servicing capacity needs. B. Historical Development in the Town of Collingwood Historical population and employment set out below is used to determine the average service levels attained in the Town over the last 15 years (2009- 2023). Since 2021 was the year of the most recent Census, population and employment figures for 2022-2023 are estimated. i. Historical Residential Development The Simcoe Census Division is the geographic area containing Simcoe County and the Cities of Barrie and Orillia. Collingwood is one of the fastest Appendix A | 57 growing municipalities in the northern part of Simcoe County, having rapidly expanded its population and employment base over the past decade. Table A-1 shows that between 2009 and 2023 the Town's Census population increased from 18,046 to 25,874, or 43%, with growth accelerating since 2011. The number of households in the Town grew at faster pace than the population over the same period. As of 2023, there are an estimated 11,674 occupied dwellings in the Town. Historically the Town has attracted many seasonal residents who live in Collingwood part-time, thus, the historical population and occupied dwellings shown in Table A-1 and A-2 includes seasonal population and dwelling figures. As shown in Table A-2, there is evidence that seasonal second homes are increasingly being converted into permanent residences. This trend is also evidence in other municipalities in Simcoe County including Wasaga Beach, Midland and Penetanguishene. Additional details on historical housing growth in the Town are provided in Tables A-4, A-5 and A-6. This information is sourced from the Town of Collingwood, CMHC housing market data and Statistics Canada Census data. Single and semi-detach units are the predominate unit type in the Town. Based on the Town's historical building permit data over the 2009- 2023 planning period, about 47% of the permits have related to single and semi-detached units, followed by apartments (32%) and rows (21%). Additional information on available CMHC housing completion data is provided in Table A-5. Table A-6 provides details on historical occupancy patterns for different unit types in the Town by period of unit construction. The overall average occupancy level for single and semi-detached units is 2.48 persons per unit (PPU). Occupancy levels for recently constructed units, built between 2011 and 2021, are higher than the overall average and are used in the development charges calculations since they better reflect the number of people that are likely to reside in new development. The average PPU of single and semi-detached units built in the Town between 2011 to 2021 is Appendix A | 58 2.69. Average PPUs for recently constructed row housing and apartments are 1.79 and 1.02, respectively. For the purpose of the development charges calculations, the following PPUs are assumed:  Single & Semi-Detached = 2.69 PPU, based on occupancy levels for units constructed between 2011 and 2021.  Rows/Multiples = 2.00 PPU has been used due to the limited sample size of recently constructed multiple units.  Apartments = 1.45 PPU has been estimated due to the limited sample size of recently constructed apartment units. The PPU is based on a unit mix of 75% apartments with 2 or more bedrooms (with a PPU of 1.60) and 25% apartments with 1 bedroom or less (with a PPU of 1.00). ii. Historical Non-Residential Development Historical employment figures are shown in Table A-3. Overall employment grew steadily in the Town between 2009 and 2023. As with most communities in Ontario, the COVID-19 pandemic resulted in a severe shock to the local economy, the effects of which are still being felt. At the time of the 2021 Census business closures and stay-at-home orders were still in effect. As such, a large portion of the labour force was unemployed and many others were working from home on a full-time basis, and often outside the Town. Since that time, employment has largely returned to pre-pandemic levels. Although employees have returned to their usual place of work, either full- time or under hybrid arrangements, it is evident that some shifts in work-at- home patterns will be long lasting. As such, the place of work employment in 2021 and for the remainder of the planning period has been restated to reflect a work at home assumption of 10%. Appendix A | 59 C. Forecast Method and Results Development charges are levied on residential development as a charge per new unit. Therefore, for the residential forecast, a projection of both the population growth, commonly referred to as net population in the context of development charges studies, as well as the population in new units is required. 1. The population growth determines the need for additional facilities and provides the foundation for the development-related capital program. 2. When calculating the development charge, however, the development-related net capital costs are spread over the total additional population that occupies new dwelling units. This population in new units represents the population from which development charges will be collected. Development charges are levied on non-residential development as a charge per unit of gross floor area (GFA). As with the residential forecast, the non- residential forecast includes both a projection of employment growth as well as a projection of the employment growth associated with new floorspace in the Town. i. Residential Development Forecast As shown in Table A-7, the Town's population is anticipated to increase from 25,870 2023 to 36,600 in 2041. The number of households is forecast to increase from 11,670 in 2023 to 18,350 in 2041. No forecast of seasonal dwellings has been included as it is anticipated there will be limited construction of these units over the planning horizon. Any seasonal dwellings built in future have been included within the Town's anticipated dwelling forecast. Appendix A | 60 A breakdown of the forecast of housing by unit type in the Town is shown in Tables A-9  The market share of single and semi-detached units is forecast to decline slightly over the long-term, as new development increasingly takes the form of higher density units.  The Town will start to experience a modest shift towards medium and higher density housing, including a greater range and mix of rows and apartment building types over time. Population growth in the new units is estimated by applying the following PPUs to the housing unit forecast: 2.69 for single and semi-detached units; 2.00 for rows; and 1.45 for apartments. The forecast population growth in new units is set out in Table A-10. Over the 10-year planning horizon the population in new units is forecasted to be 7,170, with 13,500 persons anticipated to be accommodated in new units over the long-term planning horizon to 2041. ii. Non-Residential Development Forecast Table A-8 and A-11 summarize the forecast net new employment growth and new non-residential floor space in the Town. An average employment density of 70 square metres per employee have been used to convert the employment forecast into building space estimates. This assumption is based on the Town's anticipated employment mix established through the Simcoe County MCR. As shown in Table A-11, the Town is anticipated to add 89,400 square metres over the 10-year period with an accompanying growth of 1,280 employees. Over the longer planning period to 2041, approximately 2,720 employees will be added and will be accommodated within 190,470 square metres of non-residential space. Appendix A | 61 APPENDIX A - TABLE 1 TOWN OF COLLINGWOOD HISTORICAL POPULATION SUMMARY Mid-Year Growth Growth Growth 2006 17,290 5,994 23,284 2007 17,664 374 6,195 201 23,859 575 2008 18,046 382 6,402 207 24,448 589 2009 18,436 390 6,618 216 25,054 606 2010 18,834 398 6,840 222 25,674 620 2011 19,241 407 7,068 228 26,309 635 2012 19,726 485 6,882 -186 26,608 299 2013 20,224 498 6,699 -183 26,923 315 2014 20,734 510 6,522 -177 27,256 333 2015 21,257 523 6,351 -171 27,608 352 2016 21,793 536 6,183 -168 27,976 368 2017 22,366 573 6,171 -12 28,537 561 2018 22,954 588 6,159 -12 29,113 576 2019 23,557 603 6,147 -12 29,704 591 2020 24,176 619 6,135 -12 30,311 607 2021 24,811 635 6,126 -9 30,937 626 2022 25,337 526 6,126 0 31,463 526 2023 25,874 537 6,126 0 32,000 537 Growth 2009-2023 7,828 -276 7,552 Source: Statistics Canada, Census of Canada, Hemson Consulting 2023 Seasonal Population estimates are based on "Households Not Occupied by Usual Residents" Adjusted Population Census Population Seasonal Population Appendix A | 62 APPENDIX A - TABLE 2 TOWN OF COLLINGWOOD HISTORICAL HOUSEHOLD SUMMARY Mid-Year Growth PPU Growth PPU Growth PPU 2006 7,318 2.36 1,998 3.00 9,316 2.50 2007 7,512 194 2.35 2,065 67 3.00 9,577 261 2.49 2008 7,711 199 2.34 2,134 69 3.00 9,845 268 2.48 2009 7,915 204 2.33 2,206 72 3.00 10,121 276 2.48 2010 8,124 209 2.32 2,280 74 3.00 10,404 283 2.47 2011 8,339 215 2.31 2,356 76 3.00 10,695 291 2.46 2012 8,569 230 2.30 2,294 -62 3.00 10,863 168 2.45 2013 8,806 237 2.30 2,233 -61 3.00 11,039 176 2.44 2014 9,049 243 2.29 2,174 -59 3.00 11,223 184 2.43 2015 9,299 250 2.29 2,117 -57 3.00 11,416 193 2.42 2016 9,556 257 2.28 2,061 -56 3.00 11,617 201 2.41 2017 9,860 304 2.27 2,057 -4 3.00 11,917 300 2.39 2018 10,173 313 2.26 2,053 -4 3.00 12,226 309 2.38 2019 10,496 323 2.24 2,049 -4 3.00 12,545 319 2.37 2020 10,830 334 2.23 2,045 -4 3.00 12,875 330 2.35 2021 11,174 344 2.22 2,042 -3 3.00 13,216 341 2.34 2022 11,424 250 2.22 2,042 0 3.00 13,466 250 2.34 2023 11,674 250 2.22 2,042 0 3.00 13,716 250 2.33 Growth 2009-2023 3,963 -92 3,871 Source: Statistics Canada, Census of Canada Occupied Households Households Not Occupied by Usual Residents Total Private Dwellings Appendix A | 63 APPENDIX A - TABLE 3 TOWN OF COLLINGWOOD HISTORICAL EMPLOYMENT SUMMARY Place of Work Annual Activity Work at Annual Total w/ Work Annual Mid-Year Employment Growth Rate (2) Home Growth At Home Growth 2006 10,054 58.1% 625 10,679 2007 10,089 35 57.1% 654 29 10,743 64 2008 10,125 36 56.1% 685 31 10,810 67 2009 10,161 36 55.1% 717 32 10,878 68 2010 10,197 36 54.1% 750 33 10,947 69 2011 10,233 36 53.2% 785 35 11,018 71 2012 10,351 118 52.5% 841 56 11,192 174 2013 10,469 118 51.8% 901 60 11,370 178 2014 10,589 120 51.1% 966 65 11,555 185 2015 10,710 121 50.4% 1,035 69 11,745 190 2016 10,832 122 49.7% 1,110 75 11,942 197 2017 10,968 136 49.0% 1,142 32 12,110 168 2018 11,105 137 48.4% 1,175 33 12,280 170 2019 11,244 139 47.7% 1,209 34 12,453 173 2020 11,385 141 47.1% 1,244 35 12,629 176 2021 11,527 142 46.5% 1,281 37 12,808 179 2022 11,639 112 45.9% 1,293 12 12,932 124 2023 11,751 112 45.4% 1,305 12 13,056 124 Growth 2009-2023 1,626 620 2,246 Source: Statistics Canada, Census of Canada Appendix A | 64 APPENDIX A - TABLE 4 TOWN OF COLLINGWOOD HISTORICAL ANNUAL RESIDENTIAL BUILDING PERMITS Year Singles/Semis Rows Apartments Total Singles/Semis Rows Apartments Total 2006 116 65 121 302 38% 22% 40% 100% 2007 173 32 0 205 84% 16% 0% 100% 2008 158 148 30 336 47% 44% 9% 100% 2009 125 69 92 286 44% 24% 32% 100% 2010 154 14 4 172 90% 8% 2% 100% 2011 190 27 171 388 49% 7% 44% 100% 2012 133 21 45 199 67% 11% 23% 100% 2013 125 25 12 162 77% 15% 7% 100% 2014 106 18 191 315 34% 6% 61% 100% 2015 97 28 16 141 69% 20% 11% 100% 2016 147 189 66 402 37% 47% 16% 100% 2017 115 134 166 415 28% 32% 40% 100% 2018 90 74 65 229 39% 32% 28% 100% 2019 251 135 285 671 37% 20% 42% 100% 2020 151 99 177 427 35% 23% 41% 100% 2021 264 42 132 438 60% 10% 30% 100% 2022 70 72 1 143 49% 50% 1% 100% 2023 66 0 0 66 100% 0% 0% 100% Growth 2009 - 2023 2,084 947 1,423 4,454 47% 21% 32% 100% Last 10 Years 136 79 110 325 Last 5 Years 160 70 119 349 Source: Town of Collingwood, 2023 Annual Building Permits Building Permits - Shares By Unit Type Appendix A | 65 APPENDIX A - TABLE 5 TOWN OF COLLINGWOOD HISTORICAL ANNUAL RESIDENTIAL COMPLETIONS (CMHC) Year Singles/Semis Rows Apartments Total Singles/Semis Rows Apartments Total 2006 153 85 0 238 64% 36% 0% 100% 2007 115 12 0 127 91% 9% 0% 100% 2008 181 81 51 313 58% 26% 16% 100% 2009 127 113 18 258 49% 44% 7% 100% 2010 136 96 0 232 59% 41% 0% 100% 2011 171 16 38 225 76% 7% 17% 100% 2012 152 13 171 336 45% 4% 51% 100% 2013 122 33 37 192 64% 17% 19% 100% 2014 83 18 0 101 82% 18% 0% 100% 2015 100 23 0 123 81% 19% 0% 100% 2016 104 18 30 152 68% 12% 20% 100% 2017 129 113 194 436 30% 26% 44% 100% 2018 114 108 0 222 51% 49% 0% 100% 2019 172 159 147 478 36% 33% 31% 100% 2020 99 115 0 214 46% 54% 0% 100% 2021 180 120 52 352 51% 34% 15% 100% 2022 159 23 104 286 56% 8% 36% 100% Growth 2009 - 2023 1,848 968 791 3,607 51% 27% 22% 100% Last 10 Years 126 73 56 256 Last 5 Years 145 105 61 310 Source: Canadian Mortgage and Housing Corporation (CMHC), 2023 Annual Housing Completions Housing Completions - Shares By Unit Type Appendix A | 66 APPENDIX A - TABLE 6 TOWN OF COLLINGWOOD HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE Period of Construction Period of Construction Summaries Dwelling Unit Type Pre 1945 1946-1960 1961-1970 1971-1980 1981-1990 1991-1995 1996-2000 2001-2005 2006-2010 2011-2016 2016-2021 Pre 2006 2011-2021 Total Singles and Semis Household Population 2,395 1,385 1,415 1,960 1,800 590 655 1,240 1,820 1,870 2,445 13,260 4,315 17,575 Households 980 605 630 815 675 240 300 540 690 690 915 5,475 1,605 7,080 Household Size 2.44 2.29 2.25 2.40 2.67 2.46 2.18 2.30 2.64 2.71 2.67 2.42 2.69 2.48 Rows Household Population 40 30 80 460 565 125 140 130 320 180 410 1,890 590 2,480 Households 30 15 40 225 315 60 70 75 195 110 220 1,025 330 1,355 Household Size 1.33 2.00 2.00 2.04 1.79 2.08 2.00 1.73 1.64 1.64 1.86 1.84 1.79 1.83 Apartments (excl. Duplexes) All Bedrooms Household Population 455 60 310 580 715 195 245 250 270 270 480 3,080 750 3,830 Households 404 89 319 529 519 154 174 189 173 229 509 2,549 738 3,287 Household Size 1.13 0.67 0.97 1.10 1.38 1.27 1.41 1.33 1.56 1.18 0.94 1.21 1.02 1.17 Apartments (excl. Duplexes) 0-1 Bedrooms Household Population 185 30 90 170 85 20 20 40 35 55 230 675 285 960 Households 145 30 95 145 80 20 20 30 20 45 190 585 235 820 Household Size 1.28 1.00 0.95 1.17 1.06 1.00 1.00 1.33 1.75 1.22 1.21 1.15 1.21 1.17 Apartments (excl. Duplexes) 2+ Bedrooms Household Population 270 30 220 410 630 175 225 210 235 215 250 2,405 465 2,870 Households 259 59 224 384 439 134 154 159 153 184 319 1,964 503 2,467 Household Size 1.04 0.51 0.98 1.07 1.44 1.31 1.46 1.32 1.53 1.17 0.78 1.22 0.93 1.16 Duplexes Household Population 185 60 55 100 60 0 0 0 0 0 0 460 0 460 Households 80 25 30 35 40 10 0 10 0 0 0 230 0 230 Household Size 2.31 2.40 1.83 2.86 1.50 n/a n/a n/a n/a n/a n/a 2.00 n/a 2.00 All Units Household Population 2,890 1,505 1,770 2,930 3,055 890 1,020 1,580 2,375 2,265 3,105 18,015 5,370 23,385 Households 1,349 704 924 1,459 1,469 444 524 784 1,038 984 1,454 8,694 2,438 11,132 Household Size 2.14 2.14 1.92 2.01 2.08 2.00 1.95 2.02 2.29 2.30 2.14 2.07 2.20 2.10 Source: 2021 Statistics Canada Appendix A | 67 APPENDIX A - TABLE 7 TOWN OF COLLINGWOOD POPULATION & HOUSEHOLD FORECAST SUMMARY Census Mid-Year Population Growth Growth 2021 24,811 11,174 2.22 2022 25,337 526 11,424 250 2.22 2023 25,874 537 11,674 250 2.22 2024 26,422 548 11,995 321 2.20 2025 26,982 560 12,324 329 2.19 2026 27,554 572 12,663 339 2.18 2027 28,138 584 13,011 348 2.16 2028 28,734 596 13,368 357 2.15 2029 29,343 609 13,735 367 2.14 2030 29,965 622 14,112 377 2.12 2031 30,600 635 14,500 388 2.11 2032 31,153 553 14,845 345 2.10 2033 31,716 563 15,199 354 2.09 2034 32,289 573 15,561 362 2.07 2035 32,872 583 15,932 371 2.06 2036 33,466 594 16,312 380 2.05 2037 34,071 605 16,701 389 2.04 2038 34,687 616 17,099 398 2.03 2039 35,314 627 17,506 407 2.02 2040 35,952 638 17,923 417 2.01 2041 36,600 648 18,350 427 1.99 2024-2033 5,842 3,525 2024-2041 10,726 6,676 Source: Hemson Consulting 2023, Simcoe Municipal Comprehensive Review Household Size Occupied Dwellings Appendix A | 68 APPENDIX A - TABLE 8 TOWN OF COLLINGWOOD EMPLOYMENT FORECAST SUMMARY Employment Work at Annual Total w/ Work Annual Mid-Year by POW Growth Home Growth At Home Growth 2021 11,527 46.5% 1,281 12,808 2022 11,639 112 45.9% 1,293 12 12,932 124 2023 11,751 112 45.4% 1,305 12 13,056 124 2024 11,864 113 44.9% 1,318 13 13,182 126 2025 11,979 115 44.4% 1,331 13 13,310 128 2026 12,095 116 43.9% 1,344 13 13,439 129 2027 12,212 117 43.4% 1,357 13 13,569 130 2028 12,330 118 42.9% 1,370 13 13,700 131 2029 12,449 119 42.4% 1,383 13 13,832 132 2030 12,569 120 41.9% 1,396 13 13,965 133 2031 12,690 121 41.5% 1,410 14 14,100 135 2032 12,858 168 41.3% 1,429 19 14,287 187 2033 13,028 170 41.1% 1,448 19 14,476 189 2034 13,200 172 40.9% 1,467 19 14,667 191 2035 13,375 175 40.7% 1,486 19 14,861 194 2036 13,552 177 40.5% 1,506 20 15,058 197 2037 13,731 179 40.3% 1,526 20 15,257 199 2038 13,913 182 40.1% 1,546 20 15,459 202 2039 14,097 184 39.9% 1,566 20 15,663 204 2040 14,283 186 39.7% 1,587 21 15,870 207 2041 14,472 189 39.5% 1,608 21 16,080 210 2024-2033 1,277 13,786 137,860 2024-2041 2,721 26,078 260,775 Source: Hemson Consulting, Simcoe MCR Activity Rate Appendix A | 69 APPENDIX A - TABLE 9 TOWN OF COLLINGWOOD FORECAST OF HOUSEHOLD GROWTH IN DWELLINGS OCCUPIED BY USUAL RESIDENTS BY UNIT TYPE Annual Growth in Total Occupied Households Shares By Unit Type Mid-Year Singles & Semis Rows & Other Multiples Apartments Total New Households Singles & Semis Rows & Other Multiples Apartments Total 2021 2022 128 85 37 250 51% 34% 15% 100% 2023 139 20 91 250 56% 8% 36% 100% 2024 119 80 122 321 37% 25% 38% 100% 2025 121 83 125 329 37% 25% 38% 100% 2026 123 86 129 339 36% 25% 38% 100% 2027 126 89 133 348 36% 26% 38% 100% 2028 128 92 137 357 36% 26% 38% 100% 2029 130 95 141 367 36% 26% 39% 100% 2030 133 99 146 377 35% 26% 39% 100% 2031 135 102 150 388 35% 26% 39% 100% 2032 119 92 134 345 35% 27% 39% 100% 2033 121 95 138 354 34% 27% 39% 100% 2034 123 98 141 362 34% 27% 39% 100% 2035 125 101 145 371 34% 27% 39% 100% 2036 127 104 149 380 33% 27% 39% 100% 2037 129 107 153 389 33% 28% 39% 100% 2038 131 111 157 398 33% 28% 39% 100% 2039 132 114 161 407 33% 28% 40% 100% 2040 134 118 165 417 32% 28% 40% 100% 2041 136 121 170 427 32% 28% 40% 100% 2024-2033 1,256 914 1,356 3,525 36% 26% 38% 100% 2024-2041 2,293 1,787 2,596 6,676 34% 27% 39% 100% Source: Hemson Consulting Ltd. 2023 Appendix A | 70 APPENDIX A - TABLE 10 TOWN OF COLLINGWOOD FORECAST POPULATION GROWTH IN NEW HOUSEHOLDS BY UNIT TYPE* Mid-Year 2021 2022 344 170 54 568 2023 374 40 132 546 2024 319 161 177 657 2025 325 166 182 673 2026 332 172 188 692 2027 338 178 193 709 2028 344 184 199 727 2029 350 191 205 746 2030 357 198 211 766 2031 364 205 218 787 2032 321 184 194 699 2033 326 190 200 716 2034 331 195 205 731 2035 336 202 210 748 2036 341 208 216 765 2037 346 215 222 783 2038 351 221 227 799 2039 356 228 233 817 2040 361 235 239 835 2041 366 243 246 855 2024-2033 3,376 1,829 1,967 7,172 2024-2041 6,164 3,576 3,765 13,505 *Based on PPUs 2.69 2.00 1.45 Source: Hemson Consulting Ltd., 2023 Singles & Semis Rows & Other Multiples Apartments Total Pop. in New Households Appendix A | 71 APPENDIX A - TABLE 11 TOWN OF COLLINGWOOD EMPLOYMENT & NEW NON-RESIDENTIAL SPACE FORECAST Average Square metre Per Employee 70.0 m2 per employee Mid-Year Place of Work Employment Annual Growth Growth in Space (m2) 2021 11,527 2022 11,639 112 7,826 2023 11,751 112 7,840 2024 11,864 113 7,910 2025 11,979 115 8,050 2026 12,095 116 8,120 2027 12,212 117 8,190 2028 12,330 118 8,260 2029 12,449 119 8,330 2030 12,569 120 8,400 2031 12,690 121 8,470 2032 12,858 168 11,760 2033 13,028 170 11,900 2034 13,200 172 12,040 2035 13,375 175 12,250 2036 13,552 177 12,390 2037 13,731 179 12,530 2038 13,913 182 12,740 2039 14,097 184 12,880 2040 14,283 186 13,020 2041 14,472 189 13,230 2024-2033 1,277 89,390 2024-2041 2,721 190,470 Source: Hemson Consulting, 2023 Appendix A | 72 Appendix B General Services Technical Appendix Appendix B | 73 Appendix B - Development Charge Calculations Technical Appendix Introduction and Overview This appendix provides the detailed analysis undertaken to establish the development charge rates for each service in the Town of Collingwood. The appendix is divided into the following sub-sections, with one section for each service: Appendix B.1 Library Services Appendix B.2 Fire Protection Services Appendix B.3 By-Law Services Appendix B.4 Outdoor Recreation Appendix B.5 Indoor Recreation Appendix B.6 Administration Appendix B.7 Transit Services Every sub-section, with the exception of Administration, contains a set of three tables. The tables provide the background data and analysis undertaken to arrive at the calculated development charge rates for that particular service. An overview of the content and purpose of each of the tables is given below. Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table 1 presents the data used to determine the 15-year historical service level. The DCA and O. Reg. 82/98 require that development charges be set at a level no higher than the average service level provided in the Town over the 15-year period immediately preceding the preparation of the Appendix B | 74 background study, on a service-by-service basis. For the purpose of this study, the historical inventory period has been defined as 2009 to 2023. O. Reg. 82/98 requires that, when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet. The qualitative aspect is introduced by considering the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of cost per square foot to replace or construct a facility of the same quality. Table 1 also shows the calculation of the "maximum allowable" funding envelope. The maximum allowable is defined as the 15-year historical service level (expressed as $/capita or $/population & employment) multiplied by the forecast increase in net population, or net population and employment growth, over the planning period. The resulting figure is the value of capital infrastructure that must be constructed for that particular service so that the fifteen-year historical service level is maintained. There is also a requirement in the DCA to consider "excess capacity" within the Town's existing infrastructure that may be available to partially meet the future servicing requirements. If Council has expressed its intent before or at the time the capacity was created to recoup the cost of providing the capacity from new development, it is considered "committed excess capacity" under the DCA, and the associated capital cost is eligible for recovery. Should uncommitted excess capacity exist, it is determined whether or not this capacity will be available to service new development and, if so, deductions to the maximum allowable funding envelope are required. Appendix B | 75 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of Development Charge The DCA requires that Council express its intent to provide future capital facilities to support future growth. Based on the development forecasts presented in Appendix A, Hemson, in collaboration with Town staff has developed a development-related capital program which sets out the projects required to service anticipated development for the 10-year period from 2024 to 2033. To determine the share of the program that is eligible for recovery through development charges, the project costs are reduced by any anticipated grants and "replacement" shares. A replacement share occurs when a new facility will, at least in part, replace a facility that is demolished, redeployed or will otherwise not be available to serve its former function. The replacement share of the capital program is not deemed to be development-related and is therefore removed from the development charge calculation. The capital cost for replacement shares will require funding from non-development charge sources, typically property taxes or user fees. The capital program less any replacement or benefit to existing shares, yields the development related costs. Although deemed development- related, not all of the net development-related capital program may be recoverable from development charges in the period from 2024 to 2033. For some of the services, a portion of the capital program will service growth that will not occur until after 2033. This portion of the capital program is either deemed "pre-built" service capacity to be considered as committed excess capacity and recovered under future development, or is a service level increase. Appendix B | 76 The remaining portion of the net capital program represents the development-related cost that may be included in the development charge. In all cases, as required, this amount is equal to or less than the maximum allowable capital amount as calculated at the end of Table 1. The result is the development-related net capital cost that is eligible for recovery against development over the period from 2024 to 2033. i. Calculation of the Development Charge Rates The section below the capital program displays the calculation of the "unadjusted" development charge rates. The term "unadjusted" development charge is used to distinguish the charge that is calculated prior to cash flow financing considerations. The cash flow analysis is shown in Table 3. The first step when determining the unadjusted development charge rate is to allocate the development-related net capital cost between the residential and non-residential sectors. For Fire Protection Services, By- law Services, Administration Services, and Transit Services the development-related costs have been apportioned as 85% residential and 15% non-residential. This apportionment is based on the anticipated shares of population and employment growth over the 10-year forecast period. For Library Services, Outdoor Recreation, and Indoor Recreation development-related costs have been allocated 100% to the residential sector because the need for these services is generally driven entirely by residential development. The residential share of the in-period DC eligible costs are then divided by the number of forecast dwellings. This gives the unadjusted residential development charge per capita. The non-residential development-related net capital costs are divided by the forecast increase in non-residential gross floor area (GFA). This yields a charge per square metre of new non- residential GFA. Appendix B | 77 Table 3 Cash Flow Analysis A cash flow analysis is also undertaken to account for the timing of projects and receipt of development charges. Interest earnings or borrowing costs are, therefore, accounted for in the calculation as allowed under the DCA. Based on the growth forecast, the analysis calculates the development charges rate that is required to finance the net development- related capital spending plan including provisions for any borrowing costs or interest earnings on the reserve funds. The cash flow analysis is designed so that the closing cash balance at the end of the planning period is as close to nil as possible. In order to determine appropriate development charges rates reflecting borrowing and earnings necessary to support the net development-related funding requirement, assumptions are used for the inflation rate and interest rate. An inflation rate of 2.0% is used for the funding requirements, an interest rate of 3.5% is used for positive opening balances, and a rate of 5.5% is used for negative opening balances. Table 3 displays the results of the cash flow analysis and provides the adjusted or final per capita residential and per square metre (of GFA) non- residential development charges. Appendix B | 78 Appendix B.1 Library Services Appendix B | 79 Appendix B.1 - Library Services The Town of Collingwood provides Library Services from one branch located on Ste Marie Street. The library provides a wide range of resources in a variety of formats as well as a number of programs for the residents of the Town. The benefits of Library Services are deemed to be Town-wide for the purposes of calculating the development charge. The analysis is set out in the tables which follow. Table B.1-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table B.1-2 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.1-3 Cash Flow Analysis Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table 1 displays the Library's 15-year historical inventory for buildings, land, materials, and furniture and equipment (excluding computer equipment). The building space amounts to 22,500 square feet and is valued at $12.71 million. An adjustment has been made to the square footage of library space to account for the recovery of $1.91 million in outstanding principal debt associated with the Town's library. As such, roughly 2,940 square feet of library space is removed from the historical inventory calculation. The library building occupies approximately 0.50 acres of land worth $400,000. The collection materials are valued at $2.62 million and the furniture and equipment associated with the library branch is valued at $1.24 million. Appendix B | 80 Paragraph 5 of s.s.5(1) of the DCA requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the Town's "excess capacity" that is "uncommitted". "Excess capacity" is undefined in the DCA, but is considered to relate to the capacity available to meet some or all of the increase in need for service in order to potentially represent a deduction. It is recognized that no "surplus" of capacity exists within Library Services as the deduction of uncommitted excess capacity would occur as part of conceptual planning and feasibility work associated with planning new facilities. However, an adjustment for excess capacity relating to the recovery of the Library negative DC reserve fund balance has been made in the amount of $395,000. After these adjustments, the 2023 full replacement value of the inventory of capital assets amounts to $16.58 million and the 15-year historical average service level is $584.95 per capita. The historical service level multiplied by the 10-year forecast of population growth results in a 10-year maximum allowable funding envelope of $3.42 million ($584.95 per capita x 5,842 population growth). Table 1 provides a summary of the level of service and the calculation of the 10-year funding envelope from 2024-2033. The calculation of the maximum allowable funding envelope is summarized as follows: 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $584.95 Net Population Growth (2024 - 2033) 5,842 Maximum Allowable Funding Envelope $3,417,278 Appendix B | 81 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of the Unadjusted Development Charge The Library Services total 10-year capital program amounts to $8.86 million. The capital program provides for the recovery of a negative reserve fund balance and a series of debenture payments to recover debt for the replacement and expansion of the Town's old library facility. In addition, new library space and land is planned for 2028 in order to address the needs for additional servicing arising from development. As such, the capital program includes the land, building, and materials/equipment associated with this planned facility ($5.7 million). Lastly, new materials to be purchased throughout the 2024-2033 period are included in the program at a cost of $85,000 per annum. No grants, subsidies, or other recoveries are anticipated to fund any shares of the above mentioned projects and as such, the net cost to the municipality remains at $8.86 million. A BTE share of 43% has been removed from the development charges calculation for the debenture payments related to the 2010 library replacement and expansion. The BTE was determined based on the share of the new library's square footage that replaced the older library facility. The remaining $8.03 million is deemed to be DC eligible. However, a share of $4.62 million related mainly to the planned library facility and associated material purchases is deemed a post-period benefit and will not be recovered under this development charges by-law. It will be considered in future development charge studies for recovery, subject to service level restrictions. The remaining $3.42 million is related to growth occurring over the 2024- 2033 period and is allocated entirely against future residential Appendix B | 82 development in the Town of Collingwood. This results in an unadjusted development charge of $476.47 per capita. Table 3 Cash Flow and Reserve Fund Analysis After cash flow, the residential calculated charge increases to $522.46 per capita. The increase reflects the front-ended nature of the capital program. The following table summarizes the calculation of the Public Library development charge. 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $584.95 $8,857,623 $3,417,278 $476.47 $0.00 $522.46 $0.00 LIBRARY SERVICES SUMMARY Development-Related Capital Program 2024 - 2033 Unadjusted Adjusted Development Charge Development Charge Appendix B | 83 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS LIBRARY SERVICES BUILDINGS UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Old Collingwood Public Library 9,058 - - - - - - - - - - - - - - $560 Collingwood Public Library - 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 22,500 $650 New Library Building (excess capacity) - (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) (2,942) $650 Total (sq.ft.) 9,058 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 19,558 Total ($000) $5,072.5 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 LAND UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) Old Collingwood Public Library 0.35 - - - - - - - - - - - - - - $800,000 Collingwood Public Library - 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $800,000 Total (acre) 0.35 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 Total ($000) $280.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 MATERIALS UNIT COST Type of Collection 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/item) Books 49,099 43,165 52,068 52,890 52,397 39,507 40,031 40,335 40,007 46,810 46,723 47,584 46,489 47,052 50,003 $40 Paperbacks 5,692 5,770 5,617 5,463 5,310 2,329 2,359 2,377 2,358 2,759 1,553 1,652 1,672 1,843 1,799 $30 CDs/Audiobooks 4,551 4,695 4,044 3,393 2,742 2,568 2,602 2,622 2,601 3,043 2,327 2,731 2,706 2,464 2,613 $50 Reference Materials 4,650 4,781 4,933 5,590 6,095 3,851 3,902 3,932 3,900 4,563 1,113 1,531 1,492 1,492 951 $150 Videos/DVDs/Games/Bluerays 2,237 2,505 2,529 2,277 4,168 4,379 4,437 4,471 4,435 5,189 4,659 4,438 4,048 4,078 4,349 $60 Public Access Catalogue Stations - 13 13 13 13 13 13 12 11 8 8 8 8 8 5 $1,750 eResources $11,500 $11,500 $11,500 $11,500 $11,500 $11,500 $11,500 $13,000 $13,900 $16,100 $16,500 $20,600 $24,700 $21,000 $20,700 Total (#) 66,229 60,929 69,204 69,626 70,725 52,647 53,345 53,750 53,311 62,372 56,383 57,944 56,415 56,937 59,720 Total ($000) $3,205.5 $3,036.2 $3,379.4 $3,458.5 $3,590.9 $2,653.2 $2,687.9 $2,707.9 $2,685.3 $3,133.2 $2,508.9 $2,620.0 $2,550.4 $2,564.1 $2,617.8 FURNITURE AND EQUIPMENT Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Collingwood Public Library ($55 per sf) $498,200 - - - - - - - - - - - - - - New Library Building ($55 per sf) - $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 $1,237,500 Library Bike - - - - - - - - - - - - - - $5,000 Total ($000) $498.2 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,242.5 EXCESS CAPACITY ADJUSTMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Recovery of Negative Reserve Fund Balance - - - - - - - - - - ($395,004) ($395,004) ($395,004) ($395,004) ($395,004) Total ($000) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($395.0) ($395.0) ($395.0) ($395.0) ($395.0) APPENDIX B.1 TABLE 1 # of Square Feet # of Acres # of Collection Materials Total Value of Furniture and Equipment ($) Total Value of Reserve Fund Balance($) Appendix B | 84 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS LIBRARY SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 INVENTORY SUMMARY ($000) Buildings $5,072.5 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 $12,712.7 Land $280.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 $400.0 Materials $3,205.5 $3,036.2 $3,379.4 $3,458.5 $3,590.9 $2,653.2 $2,687.9 $2,707.9 $2,685.3 $3,133.2 $2,508.9 $2,620.0 $2,550.4 $2,564.1 $2,617.8 Furniture And Equipment $498.2 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,237.5 $1,242.5 Excess Capacity Adjustment $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($395.0) ($395.0) ($395.0) ($395.0) ($395.0) Total ($000) $9,056.2 $17,386.4 $17,729.6 $17,808.7 $17,941.1 $17,003.4 $17,038.1 $17,058.1 $17,035.5 $17,483.4 $16,464.0 $16,575.2 $16,505.6 $16,519.2 $16,578.0 Average SERVICE LEVEL ($/capita) Service Level Buildings $202.46 $495.16 $483.21 $477.78 $472.19 $466.42 $460.47 $454.41 $445.48 $436.67 $427.98 $419.41 $410.92 $404.05 $397.27 $430.26 Land $11.18 $15.58 $15.20 $15.03 $14.86 $14.68 $14.49 $14.30 $14.02 $13.74 $13.47 $13.20 $12.93 $12.71 $12.50 $13.86 Materials $127.94 $118.26 $128.45 $129.98 $133.38 $97.34 $97.36 $96.79 $94.10 $107.62 $84.46 $86.44 $82.44 $81.49 $81.81 $103.19 Furniture And Equipment $19.89 $48.20 $47.04 $46.51 $45.96 $45.40 $44.82 $44.23 $43.36 $42.51 $41.66 $40.83 $40.00 $39.33 $38.83 $41.91 Excess Capacity Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($13.30) ($13.03) ($12.77) ($12.55) ($12.34) ($4.27) Total ($/capita) $361.47 $677.20 $673.90 $669.30 $666.38 $623.84 $617.15 $609.74 $596.96 $600.54 $554.27 $546.84 $533.52 $525.04 $518.06 $584.95 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE LIBRARY SERVICES 10-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $584.95 Population Growth 2024 - 2033 5,842 Maximum Allowable Funding Envelope $3,417,278 APPENDIX B.1 TABLE 1 Appendix B | 85 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 1.0 LIBRARY SERVICES 1.1 Recovery of Negative Reserve Fund Balance 1.1.1 Reserve Fund Balance as of December 31, 2023 2024 - 2024 395,004 $ - $ 395,004 $ 0% - $ 395,004 $ - $ 395,004 $ - $ Subtotal Collections 395,004 $ - $ 395,004 $ - $ 395,004 $ - $ 395,004 $ - $ 1.2 Debenture Payments 1.2.1 Library Facility - Principal 2024 - 2024 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.2 Library Facility - Principal 2025 - 2025 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.3 Library Facility - Principal 2026 - 2026 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.4 Library Facility - Principal 2027 - 2027 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.5 Library Facility - Principal 2028 - 2028 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.6 Library Facility - Principal 2029 - 2029 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ 1.2.7 Library Facility - Principal 2030 - 2030 273,231 $ - $ 273,231 $ 43% 117,574 $ 155,657 $ - $ 155,657 $ - $ Subtotal Debenture Payments 1,912,619 $ - $ 1,912,619 $ 823,021 $ 1,089,598 $ - $ 1,089,598 $ - $ 1.3 Buildings, Land & Equipment 2025 - 2025 400,000 $ - $ 400,000 $ 0% - $ 400,000 $ - $ 400,000 $ - $ 2028 - 2028 4,000,000 $ - $ 4,000,000 $ 0% - $ 4,000,000 $ - $ 682,676 $ 3,317,324 $ 2029 - 2029 1,000,000 $ - $ 1,000,000 $ 0% - $ 1,000,000 $ - $ - $ 1,000,000 $ 1.3.1 Provision for Land for New Library 1.3.2 Provision for New Library Space (10,000 sf) 1.3.3 Provision for Additional Collection Materials 1.3.4 Provision for New Library Space Furniture and Equipment (10,000 sf) 2029 - 2029 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ - $ 300,000 $ Subtotal Buildings, Land & Equipment 5,700,000 $ - $ 5,700,000 $ - $ 5,700,000 $ - $ 1,082,676 $ 4,617,324 $ 1.4 Collection Materials 1.4.1 Provision for Materials 2024 - 2033 850,000 $ - $ 850,000 $ 0% - $ 850,000 $ - $ 850,000 $ - $ Subtotal Collections 850,000 $ - $ 850,000 $ - $ 850,000 $ - $ 850,000 $ - $ TOTAL LIBRARY SERVICES 8,857,623 $ - $ 8,857,623 $ 823,021 $ 8,034,602 $ - $ 3,417,278 $ 4,617,324 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $3,417,278 10-Year Growth in Population in New Units 7,172 2024 - 2033 Net Funding Envelope $3,417,278 Unadjusted Development Charge Per Capita $476.47 Reserve Fund Balance Non-Residential Development Charge Calculation Balance as at December 31, 2018 ($395,004) Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $0.00 APPENDIX B.1 TABLE 2 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM LIBRARY SERVICES DC Eligible Costs Timing Ineligible Costs Appendix B | 86 LIBRARY SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($395.0) ($357.8) ($715.6) ($652.3) ($563.5) ($1,204.2) ($1,098.2) ($960.9) ($632.5) ($333.2) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Library Services: Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - Library Services: Non Inflated $85.0 $485.0 $85.0 $85.0 $767.7 $85.0 $85.0 $85.0 $85.0 $85.0 $1,932.7 - Library Debenture (Principal) $155.7 $155.7 $155.7 $155.7 $155.7 $155.7 $155.7 $0.0 $0.0 $0.0 $1,089.6 - Library Services: Inflated $240.66 $650.36 $244.09 $245.86 $986.61 $249.50 $251.38 $97.64 $99.59 $101.58 $3,167.3 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $343.3 $358.7 $376.2 $393.1 $411.1 $430.3 $450.7 $472.3 $427.9 $447.1 $4,110.6 INTEREST - Interest on Opening Balance ($21.7) ($19.7) ($39.4) ($35.9) ($31.0) ($66.2) ($60.4) ($52.8) ($34.8) ($18.3) ($380.2) - Interest on In-year Transactions $1.8 ($8.0) $2.3 $2.6 ($15.8) $3.2 $3.5 $6.6 $5.7 $6.0 $7.8 - Interest on Library Debenture ($45.4) ($38.4) ($31.8) ($25.1) ($18.5) ($11.8) ($5.0) $0.0 $0.0 $0.0 ($175.9) TOTAL REVENUE $277.9 $292.6 $307.3 $334.7 $345.9 $355.5 $388.8 $426.0 $398.9 $434.8 $3,562.3 CLOSING CASH BALANCE ($357.8) ($715.6) ($652.3) ($563.5) ($1,204.2) ($1,098.2) ($960.9) ($632.5) ($333.2) $0.0 Note: Borrowed funds are not inflated. 2024 Adjusted Charge Per Capita $522.46 Allocation of Capital Program Residential Sector 100.0% Non-Residential Sector 0.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% RESIDENTIAL DEVELOPMENT CHARGE (in $000) APPENDIX B.1 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE LIBRARY SERVICES Appendix B | 87 Appendix B.2 Fire Protection Services Appendix B | 88 Appendix B.2 - Fire Protection Services The Town of Collingwood Fire Department is responsible for education, fire prevention, rescue operations, fire suppression, and basic life support services. Consistent with the provisions of the DCA and the Town's historical practices, development charges for Fire Protection Services is calculated on a long-term benefitting period from 2024 - 2033. The benefits of Fire Protection Services are deemed to be Town-wide for the purposes of calculating the development charge. The analysis is set out in the tables which follow. Table B.2-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table B.2-2 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.2-3 Cash Flow Analysis Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope The Town of Collingwood Fire Department operates from one fire hall located on 45 High Street. The station spans 20,329 square feet and is valued at $12.39 million. An adjustment has been made to the square footage of the fire hall to account for the recovery of $825,200 in outstanding principal debt associated with the facility. As such, 1,270 square feet of space is removed from the historical inventory calculation. The land area associated with the building is approximately 2.04 acres and is valued at $1.63 million. The total cost of all personal equipment as well as furniture and equipment at the station and in vehicles is approximately $2.41 million. Appendix B | 89 There are 13 fire vehicles in service that have a replacement value of $5.94 million. The current replacement value of all Fire Services capital infrastructure is $22.36 million, which provides the Town with a 15-year historical average service level of $531.12 per population and employment. The calculated maximum allowable recoverable through development charges over the 2024 to 2033 planning period is $3.78 million ($531.12 per population and employment x 7,119 population and employment growth). Table 1 provides a summary of the level of service and the calculation of the 10-year funding envelope from 2024-2033. The calculation of the maximum allowable funding envelope is summarized as follows: 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $531.12 Net Population and Employment Growth (2024 - 2033) 7,119 Maximum Allowable Funding Envelope $3,781,043 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charges The Fire Protection Services capital program totals $18.60 million. This includes the recovery of outstanding debenture repayments related to the fire station totaling $1.82 million. The capital program also includes land and building costs for a new 15,000 square foot fire station for $11.35 million and $5.20 million in new vehicles. In addition, 16 new full-time Firefighters are included, which total $224,000. No grants are identified for this service's capital program. Approximately $907,300 has been identified as providing BTE and is related to the outstanding debentures associated with the Town's newest fire hall which replaced the old facility. Appendix B | 90 The remaining $17.69 million represents the total DC eligible costs. Of this amount, $13.82 million has been attributed to growth occurring after 2033 and will be recoverable under future by-laws. Reserve funds of $90,600 are used to fund a portion of the capital program. The remaining $3.78 million is related to development between 2024 and 2033 and is allocated entirely against future development in the Town of Collingwood. The 10-year development-related net capital cost is allocated 85% against residential development, and 15% against non-residential development. The allocation between residential and non-residential development is based on shares of 10-year growth in population in new units and employment. The resulting unadjusted development charge is $447.51 per capita and $6.39 per square metre. Table 2 Cash Flow Analysis After cash flow consideration, the residential charge and non-residential charges increase to $477.00 per capita and $6.87 per square metre, respectively. The following table summarizes the calculation of the Fire Services development charge. 15-year Hist. Service Level per pop + emp Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $531.12 $18,599,000 $3,781,043 $447.51 $6.39 $477.00 $6.87 FIRE PROTECTION SERVICES SUMMARY 2024 - 2041 Unadjusted Adjusted Development Charge Development Charge Development-Related Capital Program Appendix B | 91 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS FIRE PROTECTION SERVICES BUILDINGS UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Fire Station (Old) (Fire Portion Only)* 9,682 9,682 9,682 9,682 - - - - - - - - - - - $650 Storage Garage (Fire Portion Only)* 480 480 480 480 - - - - - - - - - - - $650 Fire Station (New) (45 High Street) - - - - 20,329 20,329 20,329 20,329 20,329 20,329 20,329 20,329 20,329 20,329 20,329 $650 Fire Station (New) (45 High Street) (Excess Capacity) - - - - (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) (1,270) $650 Total (sq.ft.) 10,162 10,162 10,162 10,162 19,059 19,059 19,059 19,059 19,059 19,059 19,059 19,059 19,059 19,059 19,059 Total ($000) $6,605.3 $6,605.3 $6,605.3 $6,605.3 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 *Fire and Police used to be located in a shared facility in the Town. Only the portion of the facilities that relate to Fire are reflected above LAND UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) Fire Station (Old) (Fire Portion Only)* 0.75 0.75 0.75 0.75 - - - - - - - - - - - $800,000 Fire Station (New) (45 High Street) - - - - 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 $800,000 Total (acres) 0.75 0.75 0.75 0.75 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 Total ($000) $600.0 $600.0 $600.0 $600.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 *Fire and Police used to be located in a shared facility in the Town. Only the portion of the facilities that relate to Fire are reflected above FURNITURE & EQUIPMENT UNIT COST 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Equipment and Gear Equipped Firefighters (F/T) 24 24 24 24 24 24 24 24 24 24 25 25 25 25 25 $14,000 Equipped Firefighters (P/T) 16 16 12 12 12 10 10 10 10 10 12 12 12 12 12 $14,000 Thermal Image Camera 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 $16,000 Fire Protection Officers 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 $10,000 Hurst Hydraulics - - - - 2 3 3 3 3 3 3 3 3 3 3 $65,000 Fire Call Response (911) Equipment 1 1 1 1 - - - - - - - - - - - $150,000 Station Furniture and Equipment Station Furniture & Equipment ($40/sf) $406,000 $406,000 $406,000 $406,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 Vehicle Equipment Pumper 1 - 2017 Spartan $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 Pumper 2 - 2008 Seagrave Rescue Pumper $160,000 $160,000 $160,000 $160,000 $160,000 $160,000 $160,000 $160,000 $160,000 $160,000 $0 $0 $0 $0 $0 Tanker 1 - 2005 Tanker $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 $0 $0 $0 $0 $0 Rescue 1 - 2010 Pierce Rescue $0 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 Tower 1 - 2010 Airiel Platform $0 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 Pumper 3 - 2020 Metalfab Spartan $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000 $250,000 $250,000 Total (#) 45.00 45.00 42.00 42.00 43.00 42.00 42.00 42.00 42.00 42.00 44.00 44.00 44.00 44.00 44.00 Total ($000) $1,348.5 $1,673.5 $1,633.5 $1,633.5 $2,020.5 $2,057.5 $2,057.5 $2,057.5 $2,307.5 $2,307.5 $2,159.0 $2,409.0 $2,409.0 $2,409.0 $2,409.0 # of Acres Total Value of Furniture & Equipment ($) APPENDIX B.2 TABLE 1 # of Square Feet Appendix B | 92 APPENDIX B.2 TABLE 1 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS FIRE PROTECTION SERVICES VEHICLES UNIT COST Vehicle Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/vehicle) 1986 Aerial 1 - - - - - - - - - - - - - - $1,750,000 1988 Cube Van 1 - - - - - - - - - - - - - - $135,000 1999 Pumper 1 - - - - - - - - - - - - - - $1,400,000 2002 Ford 1/2 ton Pickup 1 1 - - - - - - - - - - - - - $75,000 2003 Ford 1/2 ton 1 1 1 - - - - - - - - - - - - $75,000 2003 Pumper (AFT/Spartan Rescue) 1 1 1 1 1 1 1 1 1 - - - - - - $1,400,000 2005 Tanker 1 1 1 1 1 1 1 1 1 1 - - - - - $700,000 2006 Zodiak MK111 (Shared at 50%) 0.5 0.5 0.5 0.5 0.5 - - - - - - - - - - $20,000 2008 Ford Escape 1 1 1 1 1 1 1 1 - - - - - - - $50,000 2008 Seagrave Rescue Pumper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $1,400,000 2009 Atlas AU5 Black Cargo Trailer 1 1 1 1 1 1 1 1 1 1 1 - - - - $10,000 2010 Ford Escape 1 1 1 1 1 1 1 1 1 - - - - - - $50,000 2010 Aerial Platform - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,750,000 2010 Pierce Rescue Van - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $800,000 2012 Ford Expedition - - 1 1 1 1 1 1 1 1 - - - - - $60,000 2012 Ford F150 - - - 1 1 1 1 1 1 1 1 - - - - $75,000 2010 MGS A91 Angus Foam Trailer - - 1 1 1 1 1 1 1 1 1 - - - - $90,000 2016 Ford F150 - - - - - - - - 1 1 1 1 1 1 1 $75,000 2016 Kubota RTV - - - - - - - 1 1 1 1 1 1 1 1 $40,000 2015 JDJ AP7 Black Flat Bed - - - - - - - 1 1 1 1 1 1 1 1 $20,000 2017 Spartan Pumper - - - - - - - - 1 1 1 1 1 1 1 $1,400,000 2018 Dodge Durango - - - - - - - - 1 1 1 1 1 1 1 $75,000 2018 Dodge Durango - - - - - - - - 1 1 1 1 1 1 1 $75,000 2020 Ford F150 XLT - - - - - - - - - - - 1 1 1 1 $75,000 2020 Metalfab Spartan - - - - - - - - - - - 1 1 1 1 $1,400,000 2022 Dodge Ram 2500 Series - - - - - - - - - - - - - 1 1 $90,000 2020 Stanley 24' Landing Craft - - - - - - - - - - - 1 1 1 1 $125,000 2020 Marine Trailer - - - - - - - - - - - 1 1 1 1 $10,000 Total (#) 11.5 10.5 11.5 11.5 11.5 11 11 13 16 14 12 13 13 14 13 Total ($000) $7,055.0 $6,320.0 $6,395.0 $6,395.0 $6,395.0 $6,385.0 $6,385.0 $6,445.0 $8,020.0 $6,570.0 $5,810.0 $7,245.0 $7,245.0 $7,335.0 $5,935.0 # of Vehicles Appendix B | 93 APPENDIX B.2 TABLE 1 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS FIRE PROTECTION SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 Historical Employment 10,161 10,197 10,233 10,351 10,469 10,589 10,710 10,832 10,968 11,105 11,244 11,385 11,527 11,639 11,751 Total Historical Population & Employment 35,215 35,871 36,542 36,959 37,392 37,845 38,318 38,808 39,505 40,218 40,948 41,696 42,464 43,102 43,751 INVENTORY SUMMARY ($000) Buildings $6,605.3 $6,605.3 $6,605.3 $6,605.3 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 $12,388.6 Land $600.0 $600.0 $600.0 $600.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 $1,632.0 Furniture & Equipment $1,348.5 $1,673.5 $1,633.5 $1,633.5 $2,020.5 $2,057.5 $2,057.5 $2,057.5 $2,307.5 $2,307.5 $2,159.0 $2,409.0 $2,409.0 $2,409.0 $2,409.0 Vehicles $7,055.0 $6,320.0 $6,395.0 $6,395.0 $6,395.0 $6,385.0 $6,385.0 $6,445.0 $8,020.0 $6,570.0 $5,810.0 $7,245.0 $7,245.0 $7,335.0 $5,935.0 Total ($000) $15,608.8 $15,198.8 $15,233.8 $15,233.8 $22,436.1 $22,463.1 $22,463.1 $22,523.1 $24,348.1 $22,898.1 $21,989.6 $23,674.6 $23,674.6 $23,764.6 $22,364.6 SERVICE LEVEL ($/pop & emp) Service Level Buildings $187.6 $184.14 $180.76 $178.72 $331.32 $327.35 $323.31 $319.23 $313.60 $308.04 $302.55 $297.12 $291.74 $287.43 $283.16 $274.40 Land $17.04 $16.73 $16.42 $16.23 $43.65 $43.12 $42.59 $42.05 $41.31 $40.58 $39.86 $39.14 $38.43 $37.86 $37.30 $34.15 Furniture & Equipment $38.29 $46.65 $44.70 $44.20 $54.04 $54.37 $53.70 $53.02 $58.41 $57.37 $52.73 $57.78 $56.73 $55.89 $55.06 $52.20 Vehicles $200.34 $176.19 $175.00 $173.03 $171.03 $168.71 $166.63 $166.07 $203.01 $163.36 $141.89 $173.76 $170.61 $170.18 $135.65 $170.36 Total ($/pop & emp) $443.24 $423.71 $416.88 $412.18 $600.03 $593.56 $586.23 $580.37 $616.33 $569.35 $537.01 $567.79 $557.52 $551.36 $511.18 $531.12 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE FIRE PROTECTION SERVICES 10-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $531.12 Net Population & Employment Growth 2024 - 2033 7,119 Maximum Allowable Funding Envelope $3,781,043 Appendix B | 94 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 2.0 FIRE PROTECTION SERVICES 2.1 Recovery of Past Commitments 2.1.1 Fire Station Principal Payment 2024 - 2024 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.2 Fire Station Principal Payment 2025 - 2025 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.3 Fire Station Principal Payment 2026 - 2026 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.4 Fire Station Principal Payment 2027 - 2027 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.5 Fire Station Principal Payment 2028 - 2028 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.6 Fire Station Principal Payment 2029 - 2029 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.7 Fire Station Principal Payment 2030 - 2030 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.8 Fire Station Principal Payment 2031 - 2031 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.9 Fire Station Principal Payment 2032 - 2032 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.10 Fire Station Principal Payment 2033 - 2033 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ 82,520 $ - $ 2.1.11 Fire Station Principal Payment 2034 - 2034 165,000 $ - $ 165,000 $ 50% 82,480 $ 82,520 $ - $ - $ 82,520 $ Subtotal Recovery of Past Commitments 1,815,000 $ - $ 1,815,000 $ 907,277 $ 907,723 $ - $ 825,203 $ 82,520 $ 2.2 Buildings, Land & Furnishings 2.2.1 Storage Unit 2024 - 2024 10,000 $ - $ 10,000 $ 0% - $ 10,000 $ 10,000 $ - $ - $ 2.2.2 Land for New Fire Facility (2 Acres) 2027 - 2027 1,600,000 $ - $ 1,600,000 $ 0% - $ 1,600,000 $ 80,582 $ 1,455,840 $ 63,577 $ 2.2.3 East End Fire Station (15,000 sq.ft) 2028 - 2028 9,750,000 $ - $ 9,750,000 $ 0% - $ 9,750,000 $ - $ - $ 9,750,000 $ Subtotal Buildings, Land & Furnishings 11,360,000 $ - $ 11,360,000 $ - $ 11,360,000 $ 90,582 $ 1,455,840 $ 9,813,577 $ 2.3 Vehicles 2.3.1 Pumper - New Station 2028 - 2028 1,400,000 $ - $ 1,400,000 $ 0% - $ 1,400,000 $ - $ 1,400,000 $ - $ 2.3.2 Rescue - New Station 2028 - 2028 1,400,000 $ - $ 1,400,000 $ 0% - $ 1,400,000 $ - $ - $ 1,400,000 $ 2.3.3 Squirt/Aerial - New Station 2025 - 2025 2,400,000 $ - $ 2,400,000 $ 0% - $ 2,400,000 $ - $ - $ 2,400,000 $ Subtotal Vehicles 5,200,000 $ - $ 5,200,000 $ - $ 5,200,000 $ - $ 1,400,000 $ 3,800,000 $ 2.4 Small Equipment and Gear 2.4.1 New Firefighters (16) - Full Time 2028 - 2028 224,000 $ - $ 224,000 $ 0% - $ 224,000 $ - $ 100,000 $ 124,000 $ Subtotal Small Equipment and Gear 224,000 $ - $ 224,000 $ - $ 224,000 $ - $ 100,000 $ 124,000 $ TOTAL FIRE PROTECTION SERVICES 18,599,000 $ - $ 18,599,000 $ 907,277 $ 17,691,723 $ 90,582 $ 3,781,043 $ 13,820,098 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 85% $3,209,568 2024 - 2033 Net Funding Envelope $3,781,043 12-Year Growth in Population in New Units 7,172 Unadjusted Development Charge Per Capita $447.51 Reserve Fund Balance Balance as at December 31, 2023 $90,582 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 15% $571,475 12-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $6.39 TOWN OF COLLINGWOOD DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM FIRE PROTECTION SERVICES Timing TABLE 2 APPENDIX B.2 Ineligible Costs Appendix B | 95 APPENDIX B.2 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE FIRE PROTECTION SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) FIRE PROTECTION SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $76.9 $294.2 $544.4 $821.9 ($292.1) ($1,425.9) ($1,188.8) ($917.4) ($608.9) ($322.4) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Fire Protection Services: Prior Growth $8.5 $0.0 $0.0 $68.4 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $76.9 - Fire Protection Services: Non Inflated $0.0 $0.0 $0.0 $1,235.8 $1,273.3 $0.0 $0.0 $0.0 $0.0 $0.0 $2,509.1 - Fire Protection Debenture (Principal) $70.0 $70.0 $70.0 $70.0 $70.0 $70.0 $70.0 $70.0 $70.0 $70.0 $700.5 - Fire Protection Services: Inflated $78.54 $70.05 $70.05 $1,454.08 $1,448.29 $70.05 $70.05 $70.05 $70.05 $70.05 $3,471.2 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $313.4 $327.4 $343.4 $358.9 $375.4 $392.9 $411.5 $431.2 $390.7 $408.2 $3,752.9 INTEREST - Interest on Opening Balance $2.7 $10.3 $19.1 $28.8 ($16.1) ($78.4) ($65.4) ($50.5) ($33.5) ($17.7) ($200.7) - Interest on In-year Transactions $4.1 $4.5 $4.8 ($30.1) ($29.5) $5.6 $6.0 $6.3 $5.6 $5.9 ($16.8) - Interest on Fire Debenture ($24.3) ($22.0) ($19.7) ($17.5) ($15.3) ($13.0) ($10.7) ($8.5) ($6.2) ($3.9) ($141.1) TOTAL REVENUE $295.9 $320.3 $347.5 $340.1 $314.5 $307.1 $341.4 $378.6 $356.6 $392.4 $3,394.4 CLOSING CASH BALANCE $294.2 $544.4 $821.9 ($292.1) ($1,425.9) ($1,188.8) ($917.4) ($608.9) ($322.4) $0.0 Note: Borrowed funds are not inflated. 2024 Adjusted Charge Per Capita $477.00 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% TABLE 3 Appendix B | 96 APPENDIX B.2 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE FIRE PROTECTION SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) FIRE PROTECTION SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $13.7 $50.9 $93.5 $139.6 ($63.3) ($271.3) ($236.9) ($198.4) ($155.5) ($81.5) 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Fire Protection Services: Prior Growth $1.5 $0.0 $0.0 $12.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $13.7 - Fire Protection Services: Non Inflated $0.0 $0.0 $0.0 $220.0 $226.7 $0.0 $0.0 $0.0 $0.0 $0.0 $446.8 - Fire Protection Debenture (Principal) $12.5 $12.5 $12.5 $12.5 $12.5 $12.5 $12.5 $12.5 $12.5 $12.5 $124.7 - Fire Protection Services: Inflated $13.98 $12.47 $12.47 $258.90 $257.87 $12.47 $12.47 $12.47 $12.47 $12.47 $618.1 NEW NON-RESIDENTIAL DEVELOPMENT - Growth in Square Metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 89,390 REVENUE - DC Receipts: Inflated $54.3 $56.4 $58.0 $59.7 $61.4 $63.2 $65.0 $66.8 $94.7 $97.7 $677.4 INTEREST - Interest on Opening Balance $0.5 $1.8 $3.3 $4.9 ($3.5) ($14.9) ($13.0) ($10.9) ($8.6) ($4.5) ($45.0) - Interest on In-year Transactions $0.7 $0.8 $0.8 ($5.5) ($5.4) $0.9 $0.9 $1.0 $1.4 $1.5 ($2.9) - Interest on Fire Debenture ($4.3) ($3.9) ($3.5) ($3.1) ($2.7) ($2.3) ($1.9) ($1.5) ($1.1) ($0.7) ($25.1) TOTAL REVENUE $51.2 $55.1 $58.6 $56.0 $49.8 $46.8 $51.0 $55.4 $86.4 $94.0 $604.4 CLOSING CASH BALANCE $50.9 $93.5 $139.6 ($63.3) ($271.3) ($236.9) ($198.4) ($155.5) ($81.5) $0.0 Note: Borrowed funds are not inflated. 2024 Adjusted Charge Per Square Metre $6.87 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix B | 97 Appendix B.3 By-law Enforcement Appendix B | 98 Appendix B.3 - By-law Enforcement The By-law Services Division enforces more than 40 regulatory by-laws in the Town to maintain community standards. The Division is responsible for services including animal control, parking control, property related standards and school crossing guards. The analysis is set out in the tables which follow. Table B.3-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table B.3-2 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.3-3 Cash Flow Analysis Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope The By-law Enforcement 15-year historical inventory of capital assets includes additional vehicles and officer. The area of the Town's library building which is related to By-law services totals 616 square feet and is valued at $308,000. The land area associated with this building is 0.01 acres and is valued at $8,000. By-law furniture and equipment add another $58,000 to the inventory and enforcement vehicles add a further $152,800. The current replacement value of the By-law Enforcement capital infrastructure is $526,800 and has provided the Town with a 15-year average service level of $8.78 per population and employment. This service level, when multiplied by the 2024-2033 growth in net population and employment, results in a maximum allowable funding envelope of $62,500 that can be considered for recovery through development charges. The Appendix B | 99 calculation of the maximum allowable funding envelope is summarized as follows: 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $8.78 Net Population and Employment Growth (2024 - 2033) 7,119 Maximum Allowable Funding Envelope $62,505 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The 2024-2033 development-related capital program for By-law Enforcement includes the provision for additional vehicles valued at $100,000 and additional officers valued at $10,000. Altogether, the 10-year capital forecast for By-law Enforcement amounts to $110,000. There are no replacement shares or available DC reserves, therefore, the total eligible cost of $110,000 remains. In total, $51,000 has been identified as a post-period benefit and will be considered for recovery under subsequent DC Studies. The remaining $59,000 is included as a DC recoverable cost over the 2024-2033 planning period. The development-related net capital cost of $59,000 is allocated 85% against residential development, or $50,100, and 15% against non- residential development, or $8,900. The resulting development charge rates are $6.98 per capita for new residential development and $0.10 per square metre for new non-residential development. Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge increases to $7.47 per capita and $0.11 per square metre. Appendix B | 100 The following table summarizes the calculation of the By-law Services development charge. 15-year Hist. Service Level per pop + emp Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $8.78 $110,000 $59,000 $6.98 $0.10 $7.47 $0.11 BY-LAW SERVICES SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix B | 101 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS BY-LAW SERVICES BUILDINGS UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) By-law Office Space (Library) - - - - - - - - - - 392 392 560 616 616 $500 By-law Office Space (Town Hall) 318 318 318 318 318 318 318 318 318 318 - - - - - $650 Total (sq.ft.) 318 318 318 318 318 318 318 318 318 318 392 392 560 616 616 Total ($000) $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $196.0 $196.0 $280.0 $308.0 $308.0 LAND UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) By-law Office Space (Library) - - - - - - - - - - 0.01 0.01 0.01 0.01 0.01 $800,000 By-law Office Space (Town Hall) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - $800,000 Total (acres) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Total ($000) $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 APPENDIX B.3 TABLE 1 # of Square Feet # of Acres Appendix B | 102 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS BY-LAW SERVICES FURNITURE & EQUIPMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Furniture $4,770 $4,770 $4,770 $4,770 $4,770 $4,770 $4,770 $4,770 $4,770 $4,770 $5,880 $5,880 $8,400 $9,240 $9,240 Old Dog Cage ($250/each) $500 $500 $500 $500 $500 $500 $500 $500 $500 $0 $0 $0 $0 $0 $0 New Dog Cage ($900/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,800 $1,800 $1,800 $1,800 $1,800 $1,800 Catch Pole ($250/each) $250 $250 $250 $250 $250 $250 $250 $250 $250 $500 $500 $500 $500 $500 $500 Ticket Printer ($1000/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $5,000 $5,000 Microchip Reader ($250/each) $250 $250 $250 $250 $250 $250 $250 $250 $250 $250 $500 $500 $500 $500 $500 Uniforms for FTEs ($750/each) $4,500 $4,500 $4,500 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,750 $3,750 Uniforms for Students ($500/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000 $1,000 $2,000 $2,500 $2,500 Crossing Guard Vests ($35/each) $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 $420 Standard Stop Signs ($100/each) $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $0 $0 $0 $0 $0 $0 $0 Flashing Stop Signs ($300/each) $0 $0 $0 $0 $0 $0 $0 $0 $4,500 $4,500 $4,500 $4,500 $4,500 $6,000 $6,000 Crossing Guard Raincoats ($250/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500 $2,500 $2,500 $3,000 Snappy Snare ($100/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $100 $100 $100 $100 $100 $100 Cat Grasper ($150/each) $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 LPR Device ($400/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000 $2,000 $2,000 Laptop & Dock for FTEs ($2000/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,000 $12,000 $12,000 Laptop for Students ($1000/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000 $2,000 $4,000 $5,000 $5,000 Cellphone for FTEs ($600/each) $0 $0 $0 $0 $0 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,600 $3,600 Cellphone for Students ($250/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500 $500 $1,000 $1,250 $1,250 Drone ($1,200/each) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,200 Total ($000) $12.8 $12.8 $12.8 $11.3 $11.3 $14.3 $14.3 $14.3 $16.8 $18.5 $23.4 $25.9 $48.9 $56.3 $58.0 VEHICLES UNIT COST Vehicle Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/vehicle) 2010 Ford Ranger - Animal Control - 1 1 1 1 1 1 1 1 - - - - - - $50,000 2018 Ford F150 Pick-up - Animal Control - - - - - - - - - 1 1 1 1 1 1 $50,000 2017 Ford Escape - - - - - - - 1 1 1 1 1 1 1 1 $29,200 2019 Mitsubishi Outlander - - - - - - - - - - 1 1 1 1 1 $42,500 2016 Nissan Rogue - - - - - - 1 1 1 1 1 1 1 1 1 $27,100 Bicycle(s) - - - - - - - - 1 1 1 1 5 5 5 $800 Total (#) - 1.0 1.0 1.0 1.0 1 2 3 4 4 5 5 9 9 9 Total ($000) $0.0 $50.0 $50.0 $50.0 $50.0 $50.0 $77.1 $106.3 $107.1 $107.1 $149.6 $149.6 $152.8 $152.8 $152.8 Total Value of Furniture & Equipment ($) # of Vehicles APPENDIX B.3 TABLE 1 Appendix B | 103 APPENDIX B.3 TABLE 1 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS BY-LAW SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 Historical Employment 10,161 10,197 10,233 10,351 10,469 10,589 10,710 10,832 10,968 11,105 11,244 11,385 11,527 11,639 11,751 Total Historical Population & Employment 35,215 35,871 36,542 36,959 37,392 37,845 38,318 38,808 39,505 40,218 40,948 41,696 42,464 43,102 43,751 INVENTORY SUMMARY ($000) Buildings $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $206.7 $196.0 $196.0 $280.0 $308.0 $308.0 Land $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 $8.0 Furniture & Equipment $12.8 $12.8 $12.8 $11.3 $11.3 $14.3 $14.3 $14.3 $16.8 $18.5 $23.4 $25.9 $48.9 $56.3 $58.0 Vehicles $0.0 $50.0 $50.0 $50.0 $50.0 $50.0 $77.1 $106.3 $107.1 $107.1 $149.6 $149.6 $152.8 $152.8 $152.8 Total ($000) $227.5 $277.5 $277.5 $276.0 $276.0 $279.0 $306.1 $335.3 $338.6 $340.3 $377.0 $379.5 $489.7 $525.1 $526.8 SERVICE LEVEL ($/pop & emp) Service Level Buildings $5.9 $5.76 $5.66 $5.59 $5.53 $5.46 $5.39 $5.33 $5.23 $5.14 $4.79 $4.70 $6.59 $7.15 $7.04 $5.68 Land $0.23 $0.22 $0.22 $0.22 $0.21 $0.21 $0.21 $0.21 $0.20 $0.20 $0.20 $0.19 $0.19 $0.19 $0.18 $0.20 Furniture & Equipment $0.36 $0.36 $0.35 $0.31 $0.30 $0.38 $0.37 $0.37 $0.43 $0.46 $0.57 $0.62 $1.15 $1.31 $1.33 $0.58 Vehicles $0.00 $1.39 $1.37 $1.35 $1.34 $1.32 $2.01 $2.74 $2.71 $2.66 $3.65 $3.59 $3.60 $3.55 $3.49 $2.32 Total ($/pop & emp) $6.46 $7.74 $7.59 $7.47 $7.38 $7.37 $7.99 $8.64 $8.57 $8.46 $9.21 $9.10 $11.53 $12.18 $12.04 $8.78 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE BY-LAW SERVICES 10-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $8.78 Net Population & Employment Growth 2024 - 2033 7,119 Maximum Allowable Funding Envelope $62,505 Appendix B | 104 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 3.0 BY-LAW SERVICES 3.1 Vehicles 3.1.1 Additional Vehicle 2027 - 2027 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ 50,000 $ - $ 3.1.2 Additional Vehicle 2033 - 2033 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ - $ 50,000 $ Subtotal Vehicles 100,000 $ - $ 100,000 $ - $ 100,000 $ - $ 50,000 $ 50,000 $ 3.2 Additional Officers 3.2.1 Provision for Outfitting of Additional Officers 2024 - 2033 10,000 $ - $ 10,000 $ 0% - $ 10,000 $ - $ 9,000 $ 1,000 $ Subtotal Additional Officers 10,000 $ - $ 10,000 $ - $ 10,000 $ - $ 9,000 $ 1,000 $ TOTAL BY-LAW SERVICES 110,000 $ - $ 110,000 $ - $ 110,000 $ - $ 59,000 $ 51,000 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 85% $50,083 2024 - 2033 Net Funding Envelope $62,505 10-Year Growth in Population in New Units 7,172 Unadjusted Development Charge Per Capita $6.98 Reserve Fund Balance Balance as at December 31, 2018 $0 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 15% $8,917 10-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $0.10 BY-LAW SERVICES DEVELOPMENT-RELATED CAPITAL PROGRAM TABLE 2 TOWN OF COLLINGWOOD APPENDIX B.3 DC Eligible Costs Timing Ineligible Costs Appendix B | 105 BY-LAW SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $0.0 $4.2 $8.8 $13.8 ($27.1) ($23.5) ($19.3) ($14.7) ($9.6) ($4.8) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - By-Law Services: Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Non Inflated $0.8 $0.8 $0.8 $43.2 $0.8 $0.8 $0.8 $0.8 $0.8 $0.8 $50.1 - By-Law Services: Inflated $0.8 $0.8 $0.8 $45.9 $0.8 $0.8 $0.9 $0.9 $0.9 $0.9 $53.4 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $4.9 $5.1 $5.4 $5.6 $5.9 $6.2 $6.4 $6.8 $6.1 $6.4 $58.8 INTEREST - Interest on Opening Balance $0.0 $0.1 $0.3 $0.5 ($1.5) ($1.3) ($1.1) ($0.8) ($0.5) ($0.3) ($4.5) - Interest on In-year Transactions $0.1 $0.1 $0.1 ($1.1) $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 ($0.3) TOTAL REVENUE $5.0 $5.3 $5.8 $5.0 $4.5 $5.0 $5.5 $6.0 $5.7 $6.2 $53.9 CLOSING CASH BALANCE $4.2 $8.8 $13.8 ($27.1) ($23.5) ($19.3) ($14.7) ($9.6) ($4.8) $0.5 2024 Adjusted Charge Per Capita $7.47 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.3 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE BY-LAW SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 106 BY-LAW SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $0.0 $0.7 $1.5 $2.3 ($5.0) ($4.4) ($3.8) ($3.2) ($2.4) ($1.2) 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - By-Law Services: Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - By-Law Services: Non Inflated $0.1 $0.1 $0.1 $7.7 $0.1 $0.1 $0.1 $0.1 $0.1 $0.1 $8.9 - By-Law Services: Inflated $0.1 $0.1 $0.1 $8.2 $0.1 $0.2 $0.2 $0.2 $0.2 $0.2 $9.5 NEW NON-RESIDENTIAL DEVELOPMENT - Growth in Square Metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 89,390 REVENUE - DC Receipts: Inflated $0.9 $0.9 $0.9 $0.9 $1.0 $1.0 $1.0 $1.0 $1.5 $1.5 $10.6 INTEREST - Interest on Opening Balance $0.0 $0.0 $0.1 $0.1 ($0.3) ($0.2) ($0.2) ($0.2) ($0.1) ($0.1) ($0.9) - Interest on In-year Transactions $0.0 $0.0 $0.0 ($0.2) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($0.1) TOTAL REVENUE $0.9 $0.9 $1.0 $0.8 $0.7 $0.8 $0.8 $0.9 $1.4 $1.5 $9.6 CLOSING CASH BALANCE $0.7 $1.5 $2.3 ($5.0) ($4.4) ($3.8) ($3.2) ($2.4) ($1.2) $0.1 2024 Adjusted Charge Per Square Metre $0.11 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.3 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE BY-LAW SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 107 Appendix B.4 Outdoor Recreation Appendix B | 108 Appendix B.4 - Outdoor Recreation The Town of Collingwood has many Outdoor Recreation amenities that range from parks and trails to sports fields and marinas. The service also operates a fleet of vehicles to maintain outdoor amenities and an office/shop that is shared with the Public Works Department. The benefits of Outdoor Recreation services are deemed to be Town-wide for the purposes of calculating the development charge. The analysis is set out in the following tables. Table B.4-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table B.4-2 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.4-3 Cash Flow Analysis Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope The 15-year historical inventory of capital assets for Outdoor Recreation includes 17,160 square feet of building space for the portion of the 507 Tenth Line North office and shop that is occupied by Outdoor Recreation. This space is valued at $5.61 million and sits on 5.0 acres of land worth $1.50 million. The inventory also contains parks, separated into the following categories: regional, community, waterfront and neighbourhood parks; natural areas; urban green spaces, and the greenway. Altogether, these parks total 267.30 acres and have a replacement value of $69.15 million. In addition, there are 69 linear kilometers of trails that are valued at $10.39 million. Appendix B | 109 Outdoor Recreation amenities includes sports fields such as baseball diamonds, rinks, soccer pitches, basketball courts, and tennis courts. It also includes picnic shelters, washrooms, and a skateboard park. These amenities combine for a total value of $30.06 million. The Town also has 23 pedestrian bridges worth $10.35 million and various docks and launches worth $4.11 million. Lastly, the Outdoor Recreation fleet totals 129 vehicles and pieces of equipment that are valued at $2.04 million and sailing school equipment which totals $231,600. An adjustment for excess capacity relating to the recovery of a negative reserve fund balance which totals $678,200 is removed from the total value of the Outdoor Recreation historical inventory of assets. The total value of the Outdoor Recreation capital infrastructure is estimated to be $132.76 million. The 15-year historical average service level is $4.282.17 per capita and this, multiplied by the 10-year population growth, results in a 10-year maximum allowable funding envelope of $25.02 million. The calculation of the maximum allowable funding envelope is summarized as follows: 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $4,282,17 Net Population and Employment Growth (2024 - 2033) 5,842 Maximum Allowable Funding Envelope $25,016,437 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The Outdoor Recreation capital program relates largely to the construction of park facilities and projects related to the Waterfront Master Plan, which includes $8.73 million Harbourlands Marina Facility and $3.13 million for the Shipyards Bury Hydro Line. Several new parks are slated to be Appendix B | 110 constructed over the 10-year period, which will accompany new developments in the Town (precise timing is to be determined, dependent on the timing of development). The capital program also includes a $1.50 million provision for trail development and $1.77 million for new vehicles and equipment. Altogether, the Outdoor Recreation capital program totals $71.49 million. $436,300 worth of provincial grants, property tax funding, and donations are expected and are removed from the DC eligible costs. Several projects have BTE shares related to the partial replacement of existing equipment, totaling $14.76 million. The methodology used to determine the BTE shares is described below:  New Projects - 0% BTE as these projects relate to net new infrastructure, which would not be constructed in the absence of growth.  Replacements/Enhancements - 82% BTE share based on shares of existing versus future population growth over the 10-year planning horizon. These projects replace existing assets but also provide increased servicing capacity.  Fisher Field Improvements - 75% BTE share to reflect share of project related to the expansion of the existing parking lot.  St. Marie St North Block 9 Park - Public Realm Plan - 25% BTE allocation reflects $500K in "other funding" as per 2024 capital budget  Equipment Replacement/Enhancements and Parks Equipment - 33% based on a third of the assets being acquired would be replaced (BTE is consistent with 2019 DC Study).  Sunset Point Shoreline Restoration - 95% BTE due to nominal increase in servicing capacity to meet the needs of future development. Appendix B | 111  Sunset Point Black Rock Washroom - 50% BTE as the project includes an replacement and expansion of the existing facility while also providing accessibility improvements. A further $31.72 million in post-period benefit costs have been removed from the DC eligible shares. These projects will be considered for recovery under subsequent DC Study updates. After these adjustments, the DC costs eligible for recovery over the 2024 to 2033 planning period amount to $25.02 million and are allocated 100% against new residential development, yielding an unadjusted residential development charge of $3,488.07 per capita. Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge increases to $3,892.77 per capita. The following table summarizes the calculation of the Outdoor Recreation development charge. 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $4,282.17 $71,489,033 $25,016,437 $3,488.07 $0.00 $3,892.77 $0.00 Development-Related Capital Program Development Charge Development Charge OUTDOOR RECREATION SUMMARY Unadjusted Adjusted 2024 - 2033 Appendix B | 112 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION OUTDOOR REC BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Office - 507 Tenth Line N (Outdoor Rec Portion Only)1 - - - 2,923 2,923 2,923 2,923 2,923 2,923 2,923 2,923 2,923 4,623 4,623 4,623 $400 Shop - 507 Tenth Line N (Outdoor Rec Portion Only)2 - - - 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270 12,540 12,540 12,540 $300 Office - 545 Tenth Line N (Outdoor Rec Portion Only)3 880 880 880 - - - - - - - - - - - - $400 Shop - 545 Tenth Line (Outdoor Rec Portion Only)4 2,280 2,280 2,280 - - - - - - - - - - - - $300 Total (sq.ft.) 3,160 3,160 3,160 9,193 9,193 9,193 9,193 9,193 9,193 9,193 9,193 9,193 17,163 17,163 17,163 Total ($000) $1,036.0 $1,036.0 $1,036.0 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $3,050.3 $5,611.2 $5,611.2 $5,611.2 (1) Shared 60% Outdoor Rec and 40% Public Works (2009-2020). Transferred to Outfoor Rec in 2021. (2) Shared 50% Outdoor Rec and 50% Public Works (2009-2020). Transferred fully to Outfoor Rec in 2021. (3) Shared 16% Outdoor Rec and 84% Public Works (2009-2011). Transferred to Public Works in 2012. (4) Shared 18% Outdoor Rec and 82% Public Works (2009-2011). Transferred to Public Works in 2012. LAND ASSOCIATED WITH BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) Office & Shop - 507 Tenth Line N (Outdoor Rec Portion O - - - 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 5.00 5.00 5.00 $300,000 Office & Shop - 545 Tenth Line N (Outdoor Rec Portion O 1.74 1.74 1.74 - - - - - - - - - - - - $300,000 Total (acres) 1.74 1.74 1.74 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 5.00 5.00 5.00 Total ($000) $522.0 $522.0 $522.0 $792.0 $792.0 $792.0 $792.0 $792.0 $792.0 $792.0 $792.0 $792.0 $1,500.0 $1,500.0 $1,500.0 (1) Land area is based on shares of gross floor area associated with Outdoor Rec (3,160 sf or 17%) and Public Works (15,040 sf or 83%). Transferred to Outdoor Rec in 2021. (2) Land area is based on shares of gross floor area associated with Outdoor Rec (9,193 sf or 53%) and Public Works (8,219 sf or 47%). Transferred to Public Works in 2012. # of Acres APPENDIX B.4 TABLE 1 # of Square Feet Appendix B | 113 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION PARK LAND IMPROVEMENTS UNIT COST Park Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/Acre) Regional Park Central Park 14.00 14.00 14.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 $350,000 Fisher Field 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 25.87 $350,000 Community Parks Heritage Park 12.00 12.00 12.00 12.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 $350,000 Old Village (Legion) Park 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 $350,000 Waterfront Harbourview Park 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 $350,000 Harbourlands Park 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 11.81 $350,000 Millennium Park 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 5.01 $500,000 Sunset Point Park 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 10.04 10.04 10.04 10.04 10.04 $500,000 Shipyards Hillside and Greenspace - - 10.04 10.04 10.04 10.04 10.04 10.04 10.04 10.04 25.30 25.30 25.30 25.30 25.30 $350,000 Shipyards Promenade - - 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 $350,000 Neighbourhood Parks Bell Boulevard Park 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $350,000 Black Ash Park - - - - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $350,000 Cedar Park 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 $350,000 Friendship Gardens 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $350,000 Georgian Meadows Park 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 $350,000 JJ Cooper Park - - - - 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 $350,000 Kinsmen Park 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 4.22 $350,000 Mair Mills Park - 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 $350,000 Morbay Park 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 $350,000 Mountaincroft Park - - - - - - - - - 3.57 3.57 3.57 3.57 3.57 3.57 $350,000 Nip Spooner Park 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 $350,000 Princeton Shores Park 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 $350,000 Riverside Park - - - - - - 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.30 $350,000 Walnut Street Park 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $350,000 The Station 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 $350,000 Natural Area White's Bay Park 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 21.55 $25,000 George Christie Nature Trails 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 58.17 $25,000 Urban Green Spaces Blue Shores Parkette - 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $300,000 First & High Park 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $300,000 Pawplar Dog Park 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 $300,000 Greenway Kauffman 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $25,000 Total (acres) 246.3 248.3 261.0 258.0 258.4 258.4 263.7 263.7 263.7 267.3 267.3 267.3 267.3 267.3 267.3 Total ($000) $64,106.5 $64,809.0 $69,240.0 $68,190.0 $68,337.0 $68,337.0 $70,192.0 $70,192.0 $70,192.0 $71,441.5 $69,152.5 $69,152.5 $69,152.5 $69,152.5 $69,152.5 # of Acres APPENDIX B.4 TABLE 1 Appendix B | 114 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION PARKLAND TRAILS UNIT COST Trail Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Community Trails - limestone 56.0 58.0 58.0 60.0 60.0 44.0 44.0 44.0 45.0 45.0 43.0 43.0 43.0 43.0 43.0 $90,000 Community Trails - asphalt - - - - - 6.0 6.0 7.0 7.0 7.0 8.0 8.0 8.0 8.0 8.0 $200,000 Community Trails - concrete - - - - - 7.0 7.0 7.0 8.0 8.0 9.4 9.4 9.4 9.4 9.4 $360,000 Rail Trail to Stayner 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 - - - - - - $90,000 Georgian Trail 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 $90,000 Boardwalk 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 1.4 1.4 1.4 1.4 1.4 1.4 $650,000 Total (km) 74.8 76.8 76.8 78.8 78.8 75.8 75.8 76.8 78.8 68.4 68.8 68.8 68.8 68.8 68.8 Total ($000) $7,180.0 $7,360.0 $7,360.0 $7,540.0 $7,540.0 $9,820.0 $9,820.0 $10,020.0 $10,470.0 $9,870.0 $10,394.0 $10,394.0 $10,394.0 $10,394.0 $10,394.0 PARKLAND AMENITIES UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Slow Pitch Diamonds (lights/irr/dr) 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 $730,000 Hardball Diamonds 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $650,000 Minorball Diamonds 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 $360,000 Bleachers 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 $15,000 Adult Soccer Pitches (lit) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $870,000 Adult Soccer Pitches (unlit) 5 5 4 3 3 3 3 3 3 3 3 3 3 3 2 $650,000 Mini Soccer Pitches 13 13 13 10 10 10 10 10 10 10 10 10 10 10 10 $440,000 Tennis Courts 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $150,000 Basketball Pads 2 2 3 3 4 4 4 4 4 4 4 4 4 4 4 $110,000 Volleyball Courts 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $70,000 Play Equipment - Small 7 9 13 13 18 18 23 23 31 35 35 35 35 35 44 $25,000 Play Equipment - Medium 2 2 3 3 4 4 6 6 8 9 9 9 9 9 11 $75,000 Play Equipment - Large 5 5 5 5 6 6 8 8 10 12 12 12 12 12 14 $100,000 Picnic Shelter 1 2 2 3 3 3 3 3 3 4 4 5 5 5 5 $75,000 Shade Sails 1 1 1 2 3 4 4 4 5 5 5 5 5 5 7 $50,000 Washrooms and Other Buildings 18 18 18 18 17 17 17 17 17 17 17 17 17 17 18 $450,000 Lawn Bowling Facilities 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $730,000 Skateboard Parks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $730,000 Inukshuk 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $0 Labyrinth - - - - - - 1 1 1 1 1 1 1 1 1 $170,000 Gathering Circle - - - - - - - - - 1 1 1 1 1 1 $950,000 Splashpad - - - - - - - - - - - - - - 1 $2,500,000 Lighthouse at Sunset Park - - - - - - - - - - - - - - 1 $300,000 Wooden Stage 1 1 1 1 1 1 1 1 1 1 1 1 2 $150,000 Total (#) 97.0 101.0 107.0 105.0 112.0 113.0 123.0 123.0 137.0 146.0 146.0 147.0 147.0 147.0 165.0 Total ($000) $26,005.0 $26,280.0 $26,065.0 $24,220.0 $23,500.0 $23,550.0 $24,195.0 $24,195.0 $25,155.0 $26,555.0 $26,555.0 $26,630.0 $26,630.0 $26,630.0 $30,055.0 APPENDIX B.4 TABLE 1 # of Parkland Amenities # of Linear kilometres Appendix B | 115 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION BRIDGES UNIT COST Trail Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Pedestrian Bridges 20.0 20.0 20.0 20.0 20.0 20.0 20.0 23.0 23.0 24.0 23.0 23.0 23.0 23.0 23.0 $450,000 Total (km) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 23.0 23.0 24.0 23.0 23.0 23.0 23.0 23.0 Total ($000) $9,000.0 $9,000.0 $9,000.0 $9,000.0 $9,000.0 $9,000.0 $9,000.0 $10,350.0 $10,350.0 $10,800.0 $10,350.0 $10,350.0 $10,350.0 $10,350.0 $10,350.0 MARINA AND DOCKS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Launch Ramp (1 at Cranberry and 2 at Harbour) 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 $440,000 Docks - Mooring Spots 10 10 10 10 38 38 38 38 38 68 116 116 116 116 116 $10,000 Promenade - Wooden Docks (linear feet) - - - - 300 300 300 300 300 681 681 681 681 681 681 $1,500 Sailing School Docks - - - - - - 12 12 12 12 12 12 12 12 12 $3,000 Floating breakwater (linear feet) - - - - - - - - - - - 250 250 250 250 $2,300 Total (#) 11.0 11.0 11.0 11.0 339.0 341.0 353.0 353.0 353.0 764.0 812.0 1,062.0 1,062.0 1,062.0 1,062.0 Total ($000) $540.0 $540.0 $540.0 $540.0 $1,270.0 $2,150.0 $2,186.0 $2,186.0 $2,186.0 $3,057.5 $3,537.5 $4,112.5 $4,112.5 $4,112.5 $4,112.5 APPENDIX B.4 TABLE 1 # of Bridges # of Units Appendix B | 116 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION VEHICLES AND EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Vehicles 2005 GMC Pick-Up 1 1 1 1 1 1 1 1 1 1 - - - - - $75,000 2008 Chevrolet Express Van - 1 1 1 1 1 1 1 1 1 - - - - - $50,000 2008 DODGE Quad Cab Pick-up 705 and 706 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $75,000 2008 DODGE Quad Cab Pick-up 1 1 1 1 1 1 1 1 1 1 1 - - - - $75,000 2004 Jeep Liberty 1 1 1 1 1 1 1 - - - - - - - - $50,000 2002 Jeep Liberty - - - 1 1 1 1 1 1 $50,000 2008 Ford Escape XLT 4X4 SUV 703 - - - - - - - 1 1 1 1 1 1 1 1 $50,000 2010 Jeep Compass CUV - - - - - - - - - 1 1 1 1 1 1 $50,000 2011 Dodge pick-up 708 - - 2 2 2 2 2 2 2 2 2 2 2 2 2 $75,000 2011 Dodge pick-up - - 1 1 1 1 1 1 1 1 1 $75,000 2014 Chevrolet Silverado 709 - - - - - 1 1 1 1 1 1 1 1 1 1 $75,000 2016 Chevrolet Silverado Pick-up 710 and 711 - - - - - - - 2 2 2 2 2 2 2 2 $75,000 2016 Chevrolet Silverado Pick-up - - - - - - - 1 1 1 1 $75,000 2016 Ford F150 Pick-up - - - - - - - 1 1 1 - - - - - $75,000 2018 Ford F150 Pick-up 701 - - - - - - - - - 1 1 1 1 1 1 $75,000 2019 Ford F550 2 ton 704 - - - - - - - - - - 1 1 1 1 1 $75,000 2022 Dodge 2500 3/4 ton truck 728 and 729 - - - - - - - - - - - - - 2 2 $75,000 2022 Chevrolet Silverado 702 - - - - - - - - - - - - - 1 1 $75,000 Trailers 1988 HOME - Flat 6ʼX15ʼ Tandem Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 1993 JDJ TY FLAT Trailer 1 1 1 1 1 1 1 1 1 1 - - - - - $10,000 1999 HOME - Black Ticket Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $7,000 1999 UPUL TY Water Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $10,000 2002 REMEQ Trailer 1 1 1 1 1 1 1 1 1 1 - - - - - $10,000 2004 Triton XT1 ATV Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $4,000 2009 MIDDLEBURY 8.5X16X6'6" CARGO - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 2009 ATLAS AU5 Cargo Trailer - - - - - - - - - 1 1 1 1 1 1 $7,000 2011 JDJ - TY - Black 80" x 16' Trailer - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 2015 JDJ - DUMP - Black Dump Trailer - - - - - - 1 1 1 1 1 1 1 1 1 $12,000 2016 Middlebury 610 Flat Top Cargo - White - - - - - - - 1 1 1 1 1 1 1 1 $9,000 2017 JDJ - DUMP - Black Dump Trailer - - - - - - - - 1 1 1 1 1 1 1 $12,000 2017 EZ Loader 2100 Galvanized Boat Trailer - - - - - - - - 1 1 1 1 1 1 1 $4,000 2021 Trailer Tandem UT 7' x 16' - - - - - - - - - - - - 1 1 1 $10,000 APPENDIX B.4 TABLE 1 # of Vehicles and Equipment Appendix B | 117 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION VEHICLES AND EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Tractors 1992 HONDA 5013 13hp Tractor 1 1 1 1 1 1 1 1 1 1 - - - - - $65,000 2004 KUBOTA L5030 Tractor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 2011 KUBOTA L5740 Tractor - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 2014 KUBOTA L60606HSTC Tractor 62HP 4WD - - - - - 1 1 1 1 1 1 1 1 1 1 $65,000 2019 Kubota Tractor L6060HSTCC - - - - - - - - - - 1 1 1 1 1 $65,000 Utility Vehicles Plated 2009 Yamaha ATV - - - - - - - - - 1 - - - - - $15,000 2009 Yamaha ATV - - - - - - - - - 1 - - - - - $15,000 2011 KUBOTA RTV500H ATV - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 2018 Kubota RTV X900 - - - - - - - - - 1 1 1 1 1 1 $15,000 2018 YAMAHA Snowmobile - - - - - - - - - 1 1 1 1 1 1 $15,000 2021 Kubota RTV X1100 - - - - - - - - - - - - 1 1 1 $15,000 Utility Vehicles Non Plated 2018 AGT Electric Hobbit 6 + 2 48 volt shutttle - - - - - - - - - 2 2 2 2 2 2 $16,000 2018 AGT Electric Hobbit 6 + 2 48 volt shutttle - - - - - - - - - 1 1 - - - - $16,000 2018 Club Car Golf Cart - - - - - - - - - 1 1 1 1 1 1 $16,000 Mowers 2004 JOHN DEERE ZT 777 60" Zero Turn 1 1 1 1 1 1 1 1 1 1 1 - - - - $22,000 2005 CUB CADET 5252 Mower 1 1 1 1 1 1 1 1 1 1 - - - - - $4,000 2003 JOHN DEERE GT 245 Mower 1 1 1 1 1 1 1 1 1 1 - - - - - $4,000 2012 JOHN DEERE Z930A 60" Zero Turn - - - 1 1 1 1 1 1 1 1 - - - - $22,000 2012 JOHN DEERE Z930A 60" Zero Turn - - - 1 1 1 1 1 1 1 1 - - - - $22,000 2013 JOHN DEERE Z930M 60" Zero Turn - - - - 2 2 2 2 2 2 2 2 2 2 2 $22,000 2013 JOHN DEERE Z930M 60" Zero Turn - - - - 1 1 1 1 1 1 1 - - - - $22,000 2015 BUSH HOG JD1500 Tri-Deck Mower - - - - - - 1 1 1 1 1 1 1 1 1 $25,000 2016 KUBOTA Z725HK-60 60" Zero Turn - - - - - - - 1 1 1 1 1 1 1 1 $16,000 2018 JOHN DEERE 915E Zero Turn - - - - - - - - - 2 2 2 2 2 2 $16,000 2018 JOHN DEERE 915E Zero Turn - - - - - - - - - 1 1 - - - - $16,000 2022 Greenworks Electric Stand Zero Turn mower - - - - - - - - - - - - - 1 1 $16,000 2023 John Deere Z950M Zero Turn - - - - - - - - - - - - - - 1 $16,000 2023 Greenworks C760R Zero Turn mower - - - - - - - - - - - - - - 1 $16,000 APPENDIX B.4 TABLE 1 # of Vehicles and Equipment Appendix B | 118 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION VEHICLES AND EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Tractor Accessories 1995 GRADEMAKER 60" Viking Scraper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,000 1998 AE-60 72" Aerovator 1 1 1 1 1 1 1 1 1 1 - - - - - $2,000 2004 KUBOTA Tractor Bucket 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000 2005 TRACTOR MOUNTED SNOWBLOWER L2185 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 2006 BUSH HOG C50-RD6 SQ600 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $4,000 2007 CUB CADET MOWER DECK 54" for 5252 1 1 1 1 1 1 1 1 1 1 - - - - - $1,000 2007 CUB CADET ROTARY TILLER 42" Att. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000 2008 REIST BASEBALL DIAMOND GROOMER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $6,000 2009 BANNERMAN BTD-20 Top Dresser 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,000 2011 KUBOTA 72" Bucket - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,000 2012 KUBOTA Tractor Forks - - - 1 1 1 1 1 1 1 1 1 1 1 1 $3,000 2014 KUBOTA 72" Tractor Bucket - - - - - 1 1 1 1 1 1 1 1 1 1 $1,000 2014 KUBOTA Tractor LOADER LA1055 - - - - - 1 1 1 1 1 1 1 1 1 1 $7,000 2014 KUBOTA SNOWBLOWER L4479 Att. - - - - - 1 1 1 1 1 - - - - - $12,000 2014 SMYTH Grass Sweeper - - - - - 1 1 1 1 1 - - - - - $5,000 2015 BEFCO C50-RD6 72" Mower Deck - - - - - - 1 1 1 1 1 1 1 1 1 $4,000 2019 Kubota BH92 Tractor Backhoe - - - - - - - - - - 1 1 1 1 1 $5,000 Push Mowers 2007 LAWN BOY 10671 Push Mower 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000 2009 CUB CADET 5.5 Push Mower 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000 2010 CUB CADET B010 Push Mower - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000 2013 CUB CADET 0596 Push Mower - - - - 1 1 1 1 1 1 1 1 1 1 1 $1,000 2016 CUB CADET Push Mower - - - - - - - 1 1 1 1 1 1 1 1 $1,000 2021 Cub Cadet Push Mower - - - - - - - - - - - - 1 1 1 $1,000 # of Vehicles and Equipment APPENDIX B.4 TABLE 1 Appendix B | 119 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION VEHICLES AND EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Lawn Maintenance Equipment 2007 STIHL KM90 Kombi Head 1 1 1 1 1 1 1 1 1 1 - - - - - $1,500 2010 STIHL FS110R Weed Eater - 1 1 1 1 1 1 1 1 1 - - - - - $900 STIHL FS110R Weed Eater - - 2 2 2 3 5 6 6 6 6 6 6 6 6 $900 2011 STIHL FS110R Weed Eater - - 1 1 1 1 1 1 1 1 1 - - - - $900 2013 STIHL FS55RC Weed Eater - - - - 1 1 1 1 1 1 1 1 1 1 1 $400 2014 STIHL FS130R Weed Eater - - - - - 1 1 1 1 1 1 1 1 1 1 $900 2014 STIHL FS110R Weed Eater - - - - - 1 1 1 1 1 1 3 4 4 4 $900 2018 STIHL FS111RX Weed Eater - - - - - - - - - 2 2 2 2 2 2 $900 2015 STIHL FS110R Weed Eater - - - - - - 1 1 1 1 1 - - - - $900 2015 STIHL FS110R Weed Eater - - - - - - 1 1 1 1 1 - - - - $900 2015 STIHL Hedge Trimmer HS46C - - - - - - 1 1 1 1 1 1 1 1 1 $600 2016 STIHL FS110R Weed Eater - - - - - - - 1 1 1 1 - - - - $900 2016 STIHL FS110R Weed Eater - - - - - - - 1 1 1 - - - - - $900 STIHL BR600 Backpack Blower - - 1 1 1 1 1 1 1 1 1 2 2 2 2 $1,000 STIHL Blower hand held - - - - - - - - - 2 2 2 4 4 4 $300 STIHL BG55 Handheld Blower - - 1 1 1 1 1 1 1 1 1 2 2 2 2 $400 STIHLHS45 Hedge Trimmer - - - 1 1 1 2 2 2 2 2 2 3 3 3 $600 STIHL Pole Saw - - - - - - - 1 2 3 3 3 3 3 3 $1,500 STIHL KOMBI ATTACH - - - - - - - 5 5 5 5 5 5 5 5 $300 STIHL KOMBI ATTACH - - - - - - - 1 1 1 1 - - - - $300 STIHL KOMBI ATTACH - - - - - - - 1 1 1 1 - - - - $300 STIHL KOMBI ATTACH - - - - - - - 1 1 1 1 - - - - $300 STIHL KOMBI ATTACH - - - - - - - 1 1 1 1 - - - - $300 STIHL KOMBI ATTACH - - - - - - - 1 1 1 1 - - - - $300 2017 STIHL Pole Saw - - - - - - - - 1 1 1 - - - - $300 2018 STIHL Pole Saw - - - - - - - - - 1 1 - - - - $300 2011 STIHL KM110 Kombi Head - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,500 2002 STIHL Chainsaw 036 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700 2015 STIHL MS362 Chainsaw - - - - - - 1 1 1 1 1 1 1 1 1 $700 2021 STIHL MS250 chainsaw - - - - - - - - - - - - 1 1 1 $700 APPENDIX B.4 TABLE 1 # of Vehicles and Equipment Appendix B | 120 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION VEHICLES AND EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Shop Equipment 1990 CANOX PORTABLE WELDER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,200 1997 3500 Watt GENERATOR 25 amp regular plug 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,900 1997 3500 Watt GENERATOR 25 amp regular plug 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,900 2007 6500 Watt 44.9 amp regular plug Gen. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,800 1995 PONSTAR SUBMERSIBLE PUMP 2" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700 2000 HONDA WN20 Gas Pump 2" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,500 2002 HONDA GX160 Gas Pump 2" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,500 2006 B-WLM-234 Wet Line Marker 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 $700 2011 KODIAC EX-17 PRESSURE WASHER Gas - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,200 2011 HUSQVARNA Rototiller CRT900 - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,200 2012 KING INDUSTRIAL DRILL PRESS 12 speed 2" - - - 1 1 1 1 1 1 1 1 1 1 1 1 $1,500 2013 MILWAUKEE Sawzall - - - - 1 1 1 1 1 1 1 1 1 1 1 $300 2013 HYSPEC HYDRAULIK PRESSURE WASHER - - - - 1 1 1 1 1 1 1 1 1 1 1 $700 2014 STIHL Quick Cut Saw with Cart - - - - - 1 1 1 1 1 1 1 1 1 1 $2,200 2014 MILWAUKEE 14" Chop Saw - - - - - 1 1 1 1 1 1 1 1 1 1 $300 2015 CHICAGO PNEUMATIC IMPACT WRENCH CP749 - - - - - - 1 1 1 1 1 1 1 1 1 $100 2015 DEWALT 20 Volt Hammer Drill - - - - - - 2 2 2 2 2 2 2 2 2 $300 2015 MASTERCRAFT 8" Bench Grinder - - - - - - 1 1 1 1 1 1 1 1 1 $300 2015 MAKITA COMPOUND SAW 10" LS1016 - - - - - - 1 1 1 1 1 1 1 1 1 $1,200 MASTERCRAFT Circular Saw - - - - - - - - - 1 1 1 1 1 1 $100 DEWALT Angle Grinder - - - - - - - - - 2 2 2 2 2 2 $100 OMEGA AIR COMPRESSOR - Portable - - - - - - - 1 1 1 1 1 1 1 1 $400 Shop Air Compressor 7.5 HP - - - 1 1 1 1 1 1 1 1 1 1 1 1 $5,800 Hotsy Pressure Washer - Shop - - - - - 1 1 1 1 1 1 1 1 1 1 $14,500 2021 Snow Tracks - - - - - - - - - - - - 2 2 2 $5,000 2021 Snow groomer - - - - - - - - - - - - 1 1 1 $250,000 1994 Endurable 1 Sail Boat Replica 1 1 1 1 1 1 1 1 1 1 - - - - - $10,000 Total (#) 38 42 57 64 71 83 99 121 125 147 132 116 127 131 129 Total ($000) $644.4 $711.3 $1,042.3 $1,147.2 $1,215.6 $1,400.3 $1,449.7 $1,783.3 $1,801.1 $2,059.6 $1,848.3 $1,500.8 $1,789.6 $2,030.6 $2,035.6 APPENDIX B.4 TABLE 1 # of Vehicles and Equipment Appendix B | 121 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS OUTDOOR RECREATION SAILING SCHOOL EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) 2017 Highfield OM 540 DL PVC Aluminum Boat - - - - - - - - 1 1 1 1 1 1 1 $32,700 2017 YAMAHA boat motor - - - - - - - - 1 1 1 1 1 1 1 $17,500 2018 Highfield CL 340 11'-6" Light Grey Boat - - - - - - - - - 1 1 1 1 1 1 $10,200 2018 TOHATSU boat motor - - - - - - - - - 1 1 1 1 1 1 $6,100 2018 Highfield CL 310 N 10'-6" Light Grey Boat - - - - - - - - - 1 1 1 1 1 1 $4,600 2018 YAMAHA boat motor - - - - - - - - - 1 1 1 1 1 1 $4,400 Albacore 15' Dinghy 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $20,400 Mistral 14' Dinghy 3 3 3 3 3 3 3 3 3 3 - - - - - $20,400 Force 5 13' Board Boat 1 1 1 1 1 1 1 1 1 1 - - - - - $7,300 Laser 12' Board Boat 1 1 1 1 1 1 1 1 1 1 - - - - - $7,300 420 Dinghy - - - - - - - - - - 13 13 13 13 13 $7,300 Total (#) 8 8 8 8 8 8 8 8 10 14 22 22 22 22 22 Total ($000) $137.0 $137.0 $137.0 $137.0 $137.0 $137.0 $137.0 $137.0 $187.2 $212.5 $231.6 $231.6 $231.6 $231.6 $231.6 EXCESS CAPACITY ADJUSTMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Recovery of Negative Reserve Fund Balance - - - - - - - - - - ($678,193) ($678,193) ($678,193) ($678,193) ($678,193) Total ($000) $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($678.2) ($678.2) ($678.2) ($678.2) ($678.2) Total Value of Reserve Fund Balance($) APPENDIX B.4 TABLE 1 # of Vehicles and Equipment Appendix B | 122 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS OUTDOOR RECREATION 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 INVENTORY SUMMARY ($000) Outdoor Rec Buildings $1,036 $1,036 $1,036 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $5,611 $5,611 $5,611 Land Associated With Buildings $522 $522 $522 $792 $792 $792 $792 $792 $792 $792 $792 $792 $1,500 $1,500 $1,500 Park Land Improvements $64,107 $64,809 $69,240 $68,190 $68,337 $68,337 $70,192 $70,192 $70,192 $71,442 $69,153 $69,153 $69,153 $69,153 $69,153 Parkland Amenities $26,005 $26,280 $26,065 $24,220 $23,500 $23,550 $24,195 $24,195 $25,155 $26,555 $26,555 $26,630 $26,630 $26,630 $30,055 Trails $7,180 $7,360 $7,360 $7,540 $7,540 $9,820 $9,820 $10,020 $10,470 $9,870 $10,394 $10,394 $10,394 $10,394 $10,394 Bridges $9,000 $9,000 $9,000 $9,000 $9,000 $9,000 $9,000 $10,350 $10,350 $10,800 $10,350 $10,350 $10,350 $10,350 $10,350 Marina and Docks $540 $540 $540 $540 $1,270 $2,150 $2,186 $2,186 $2,186 $3,058 $3,538 $4,113 $4,113 $4,113 $4,113 Vehicles And Equipment $644 $711 $1,042 $1,147 $1,216 $1,400 $1,450 $1,783 $1,801 $2,060 $1,848 $1,501 $1,790 $2,031 $2,036 Sailing School Equipment $137 $137 $137 $137 $137 $137 $137 $137 $187 $213 $232 $232 $232 $232 $232 Excess Capacity Adjustment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ($678) ($678) ($678) ($678) ($678) Total ($000) $109,170.9 $110,395.3 $114,942.3 $114,616.5 $114,841.9 $118,236.6 $120,822.0 $122,705.6 $124,183.6 $127,838.4 $125,233.0 $125,535.5 $129,093.2 $129,334.2 $132,764.2 Average SERVICE LEVEL ($/capita) Service Level Outdoor Rec Buildings $41.4 $40.4 $39.4 $114.6 $113.3 $111.9 $110.5 $109.0 $106.9 $104.8 $102.7 $100.6 $181.4 $178.3 $175.4 $108.7 Land Associated With Buildings $20.8 $20.3 $19.8 $29.8 $29.4 $29.1 $28.7 $28.3 $27.8 $27.2 $26.7 $26.1 $48.5 $47.7 $46.9 $30.5 Park Land Improvements $2,558.7 $2,524.3 $2,631.8 $2,562.8 $2,538.2 $2,507.2 $2,542.5 $2,509.0 $2,459.7 $2,453.9 $2,328.1 $2,281.4 $2,235.3 $2,197.9 $2,161.0 $2,432.8 Parkland Amenities $1,038.0 $1,023.6 $990.7 $910.3 $872.9 $864.0 $876.4 $864.8 $881.5 $912.1 $894.0 $878.6 $860.8 $846.4 $939.2 $910.2 Trails $286.6 $286.7 $279.8 $283.4 $280.1 $360.3 $355.7 $358.2 $366.9 $339.0 $349.9 $342.9 $336.0 $330.4 $324.8 $325.4 Bridges $359.2 $350.5 $342.1 $338.2 $334.3 $330.2 $326.0 $370.0 $362.7 $371.0 $348.4 $341.5 $334.6 $329.0 $323.4 $344.1 Marina and Docks $21.6 $21.0 $20.5 $20.3 $47.2 $78.9 $79.2 $78.1 $76.6 $105.0 $119.1 $135.7 $132.9 $130.7 $128.5 $79.7 Vehicles And Equipment $25.7 $27.7 $39.6 $43.1 $45.2 $51.4 $52.5 $63.7 $63.1 $70.7 $62.2 $49.5 $57.8 $64.5 $63.6 $52.0 Sailing School Equipment $5.5 $5.3 $5.2 $5.1 $5.1 $5.0 $5.0 $4.9 $6.6 $7.3 $7.8 $7.6 $7.5 $7.4 $7.2 $6.2 Excess Capacity Adjustment $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 ($22.8) ($22.4) ($21.9) ($21.6) ($21.2) ($7.3) Total ($/capita) $4,357.4 $4,299.9 $4,368.9 $4,307.6 $4,265.6 $4,338.0 $4,376.3 $4,386.1 $4,351.7 $4,391.1 $4,216.0 $4,141.6 $4,172.8 $4,110.7 $4,148.9 $4,282.2 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE OUTDOOR RECREATION 10-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $4,282.17 Population Growth 2024 - 2033 5,842 Maximum Allowable Funding Envelope $25,016,437 APPENDIX B.4 TABLE 1 Appendix B | 123 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 4.0 OUTDOOR RECREATION 4.1 Recovery of Negative Reserve Fund Balance 4.1.1 Reserve Fund Balance as of December 31, 2023 2024 - 2024 678,193 $ - $ 678,193 $ 0% - $ 678,193 $ - $ 678,193 $ - $ Subtotal Recovery of Negative Reserve Fund Balance 678,193 $ - $ 678,193 $ - $ 678,193 $ - $ 678,193 $ - $ 4.2 Park Facilities 4.2.1 Town Signage 2024 - 2024 100,000 $ - $ 100,000 $ 0% - $ 100,000 $ - $ 100,000 $ - $ 4.2.2 Pump Track Installation 2024 - 2024 175,000 $ - $ 175,000 $ 0% - $ 175,000 $ - $ 175,000 $ - $ 4.2.3 Central Park Outdoor Rink Facility Maintenance and Improvements 2024 - 2024 370,000 $ - $ 370,000 $ 82% 301,847 $ 68,153 $ - $ 68,153 $ - $ 4.2.4 Old Village (Legion) Washroom 2024 - 2024 450,000 $ - $ 450,000 $ 0% - $ 450,000 $ - $ 450,000 $ - $ 4.2.5 Provision for New Development-Related Park - Summitview 2024 - 2024 1,400,000 $ - $ 1,400,000 $ 0% - $ 1,400,000 $ - $ 1,400,000 $ - $ 4.2.6 St. Marie St North Block 9 Park - Public Realm Plan 2024 - 2024 2,000,000 $ - $ 2,000,000 $ 25% 500,000 $ 1,500,000 $ - $ 1,500,000 $ - $ 4.2.7 Trail Bridges 2024 - 2024 475,000 $ 356,250 $ 118,750 $ 0% - $ 118,750 $ - $ 118,750 $ - $ 4.2.8 Fisher Field Improvements 2024 - 2024 185,000 $ - $ 185,000 $ 75% 138,750 $ 46,250 $ - $ 46,250 $ - $ 4.2.9 Promenade Dock Phase 3 2024 - 2025 580,000 $ - $ 580,000 $ 0% - $ 580,000 $ - $ 580,000 $ - $ 4.2.10 Provision for New Development-Related Park - Wilson Sheffied 2024 - 2025 2,800,000 $ - $ 2,800,000 $ 0% - $ 2,800,000 $ - $ 2,800,000 $ - $ 4.2.11 Equipment Replacement/Enhancements 2024 - 2033 860,000 $ - $ 860,000 $ 33% 283,800 $ 576,200 $ - $ 288,100 $ 288,100 $ 4.2.12 Neighbourhood Park Replacement/Enhancements 2024 - 2033 1,310,000 $ - $ 1,310,000 $ 82% 1,068,702 $ 241,298 $ - $ 120,649 $ 120,649 $ 4.2.13 Playground Replacements/Enhancements 2024 - 2033 2,250,000 $ - $ 2,250,000 $ 82% 1,835,556 $ 414,444 $ - $ 207,222 $ 207,222 $ 4.2.14 Shade Shelters 2024 - 2033 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 150,000 $ 150,000 $ 4.2.15 Sunset Point Shoreline Restoration 2024 - 2033 500,000 $ - $ 500,000 $ 95% 475,000 $ 25,000 $ - $ 12,500 $ 12,500 $ 4.2.16 Sunset Point Black Rock Washroom 2024 - 2033 500,000 $ - $ 500,000 $ 50% 250,000 $ 250,000 $ - $ - $ 250,000 $ 4.2.17 Sunset Point Canteen Washroom 2024 - 2033 500,000 $ - $ 500,000 $ 50% 250,000 $ 250,000 $ - $ - $ 250,000 $ 4.2.18 Provision for New Development-Related Park - 580 Sixth St 2026 - 2026 1,750,000 $ - $ 1,750,000 $ 0% - $ 1,750,000 $ - $ - $ 1,750,000 $ 4.2.19 Millenium Shoreline Restoration 2028 - 2028 1,000,000 $ - $ 1,000,000 $ 95% 950,000 $ 50,000 $ - $ - $ 50,000 $ 4.2.20 Boat Launch - End of Birch Street - Replacing sidewalls etc. 2026 - 2027 450,000 $ - $ 450,000 $ 82% 367,111 $ 82,889 $ - $ - $ 82,889 $ 4.2.21 Washroom & Harbour Shack 2028 - 2028 450,000 $ - $ 450,000 $ 0% - $ 450,000 $ - $ - $ 450,000 $ 4.2.22 Parking Lot 2029 - 2029 500,000 $ - $ 500,000 $ 0% - $ 500,000 $ - $ - $ 500,000 $ 4.2.23 Provision for New Development-Related Park - Panorama 2029 - 2029 1,750,000 $ - $ 1,750,000 $ 0% - $ 1,750,000 $ - $ - $ 1,750,000 $ 4.2.24 Skate Park 2031 - 2031 730,000 $ - $ 730,000 $ 0% - $ 730,000 $ - $ - $ 730,000 $ 4.2.25 Splash Pad 2035 - 2035 2,500,000 $ - $ 2,500,000 $ 0% - $ 2,500,000 $ - $ - $ 2,500,000 $ Subtotal Park Facilities 23,885,000 $ 356,250 $ 23,528,750 $ 6,420,766 $ 17,107,984 $ - $ 8,016,624 $ 9,091,360 $ Ineligible Costs DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM OUTDOOR RECREATION TOWN OF COLLINGWOOD TABLE 2 APPENDIX B.4 Timing Appendix B | 124 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 Ineligible Costs DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM OUTDOOR RECREATION TOWN OF COLLINGWOOD TABLE 2 APPENDIX B.4 Timing 4.2 Waterfront Master Plan 4.2.1 Block 9 Piazza - Sidelaunch District 2024 - 2024 3,000,000 $ - $ 3,000,000 $ 0% - $ 3,000,000 $ - $ 3,000,000 $ - $ 4.2.2 Sunset Point Raised Crosswalk 2024 - 2028 100,000 $ - $ 100,000 $ 0% - $ 100,000 $ - $ 100,000 $ - $ 4.2.3 Ridgeline General Landscape Improvements 2024 - 2028 183,000 $ - $ 183,000 $ 0% - $ 183,000 $ - $ 183,000 $ - $ 4.2.4 Ridgeline Amphitheatre Seating Upgrade 2024 - 2028 122,000 $ - $ 122,000 $ 82% 99,528 $ 22,472 $ - $ 22,472 $ - $ 4.2.5 Ridgeline Amphitheatre Stage Upgrade 2024 - 2028 183,000 $ - $ 183,000 $ 82% 149,292 $ 33,708 $ - $ 33,708 $ - $ 4.2.6 Harbourlands Marina Facility - GT 2024 - 2028 8,726,000 $ - $ 8,726,000 $ 0% - $ 8,726,000 $ - $ 8,726,000 $ - $ 4.2.7 Western Habour Tree Planting 2024 - 2028 81,000 $ - $ 81,000 $ 0% - $ 81,000 $ - $ 81,000 $ - $ 4.2.8 Western Habour Signage 2024 - 2028 51,000 $ - $ 51,000 $ 0% - $ 51,000 $ - $ 51,000 $ - $ 4.2.9 Western Harbour Hen and Chickens Trail Boardwalk Extension 2024 - 2028 424,000 $ - $ 424,000 $ 0% - $ 424,000 $ - $ 424,000 $ - $ 4.2.10 Ridgeline Electrical Servicing to Overlook park 2024 - 2028 232,000 $ - $ 232,000 $ 0% - $ 232,000 $ - $ 232,000 $ - $ 4.2.11 Collingwood Pier Heritage Drive Reconstruction and Parking 2025 - 2027 2,240,000 $ - $ 2,240,000 $ 82% 1,827,398 $ 412,602 $ - $ 412,602 $ - $ 4.2.12 Collingwood Pier Pedestrian Lighting 2025 - 2027 232,000 $ - $ 232,000 $ 0% - $ 232,000 $ - $ 60,538 $ 171,462 $ 4.2.13 Collingwood Pier Services 2025 - 2027 2,560,000 $ - $ 2,560,000 $ 0% - $ 2,560,000 $ - $ - $ 2,560,000 $ 4.2.14 Collingwood Pier Terminals Repair 2025 - 2027 1,018,000 $ - $ 1,018,000 $ 82% 830,487 $ 187,513 $ - $ - $ 187,513 $ 4.2.15 Collingwood Pier Tree Planting Trail 2025 - 2027 215,000 $ - $ 215,000 $ 0% - $ 215,000 $ - $ - $ 215,000 $ 4.2.16 Boardwalk - Sidelaunch District 2026 - 2026 1,173,550 $ - $ 1,173,550 $ 0% - $ 1,173,550 $ - $ - $ 1,173,550 $ 4.2.17 Harbourview Park Pavilion 2026 - 2027 1,500,000 $ - $ 1,500,000 $ 0% - $ 1,500,000 $ - $ - $ 1,500,000 $ 4.2.18 Harbourview Park Floating Docks 2026 - 2027 262,000 $ - $ 262,000 $ 0% - $ 262,000 $ - $ - $ 262,000 $ 4.2.19 Shipyards Walkway 2026 - 2027 1,326,000 $ - $ 1,326,000 $ 0% - $ 1,326,000 $ - $ - $ 1,326,000 $ 4.2.20 Harbour East Wall Docking - GT 2026 - 2027 1,164,000 $ - $ 1,164,000 $ 0% - $ 1,164,000 $ - $ - $ 1,164,000 $ 4.2.21 Sunset Point Concrete Pathway Widen/Extension 2026 - 2028 624,000 $ - $ 624,000 $ 82% 509,061 $ 114,939 $ - $ - $ 114,939 $ 4.2.22 Sunset Point Eastern Parking Lot (60 Spaces) 2026 - 2028 1,018,000 $ - $ 1,018,000 $ 0% - $ 1,018,000 $ - $ - $ 1,018,000 $ 4.2.23 Sunset Point EnviroPark parking Lot (53 Spaces) 2026 - 2028 916,000 $ - $ 916,000 $ 0% - $ 916,000 $ - $ - $ 916,000 $ 4.2.24 Collingwood Pier Additional Marina Slips 2026 - 2029 1,735,000 $ - $ 1,735,000 $ 0% - $ 1,735,000 $ - $ - $ 1,735,000 $ 4.2.25 Collingwood Pier Parking Lot Improvements 2026 - 2029 2,301,000 $ - $ 2,301,000 $ 82% 1,877,162 $ 423,838 $ - $ - $ 423,838 $ 4.2.26 Collingwood Pier Millennium Park 2026 - 2029 415,000 $ - $ 415,000 $ 0% - $ 415,000 $ - $ - $ 415,000 $ 4.2.27 Collingwood Pier Watt's Boathouse Renovation 2026 - 2029 371,000 $ - $ 371,000 $ 82% 302,663 $ 68,337 $ - $ - $ 68,337 $ 4.2.28 Collingwood Pier Seasonal Shop Buildings 2026 - 2029 590,000 $ - $ 590,000 $ 0% - $ 590,000 $ - $ - $ 590,000 $ Appendix B | 125 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 Ineligible Costs DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM OUTDOOR RECREATION TOWN OF COLLINGWOOD TABLE 2 APPENDIX B.4 Timing 4.2.29 Collingwood Pier Additional Deck 2026 - 2029 916,000 $ - $ 916,000 $ 0% - $ 916,000 $ - $ - $ 916,000 $ 4.2.30 Collingwood Pier Guard Rail 2026 - 2029 51,000 $ - $ 51,000 $ 0% - $ 51,000 $ - $ - $ 51,000 $ 4.2.31 Seating Docks Swimming Area - Sidelaunch District 2027 - 2027 935,200 $ - $ 935,200 $ 0% - $ 935,200 $ - $ - $ 935,200 $ 4.2.32 Harbourview Park Boat Storage Building 2027 - 2028 1,324,000 $ - $ 1,324,000 $ 0% - $ 1,324,000 $ - $ - $ 1,324,000 $ 4.2.33 Western Harbour Bridge over Black Ash Creek 2027 - 2028 500,000 $ - $ 500,000 $ 0% - $ 500,000 $ - $ - $ 500,000 $ 4.2.34 Western Harbout Kaufman Site Trail 2027 - 2028 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ - $ 50,000 $ 4.2.35 Shipyards Docks along west side of Side Launch 2027 - 2029 409,000 $ - $ 409,000 $ 0% - $ 409,000 $ - $ - $ 409,000 $ 4.2.36 Shipyards Signage 2027 - 2029 81,000 $ - $ 81,000 $ 0% - $ 81,000 $ - $ - $ 81,000 $ 4.2.37 Shipyards Electrical /Water Pedestals for Docks 2027 - 2029 6,000 $ - $ 6,000 $ 0% - $ 6,000 $ - $ - $ 6,000 $ 4.2.38 Shipyards Promenade Extension 2027 - 2029 825,000 $ - $ 825,000 $ 0% - $ 825,000 $ - $ - $ 825,000 $ 4.2.39 Shipyards Docks in Dry Dock 2027 - 2029 289,000 $ - $ 289,000 $ 0% - $ 289,000 $ - $ - $ 289,000 $ 4.2.40 Shipyards Side Launch Way (Curb, Furnishings, Lighting, Trees, Paving) 2027 - 2029 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ - $ 150,000 $ 4.2.41 Shipyards Bury Hydro Line - GT & Sidelaunch District 2027 - 2029 3,129,000 $ - $ 3,129,000 $ 82% 2,552,647 $ 576,353 $ - $ - $ 576,353 $ 4.2.42 Ridgeline Signage 2027 - 2028 14,000 $ - $ 14,000 $ 0% - $ 14,000 $ - $ - $ 14,000 $ 4.2.43 Ridgeline Overlook Park 2027 - 2028 52,000 $ - $ 52,000 $ 0% - $ 52,000 $ - $ - $ 52,000 $ 4.2.44 Brew Pub - GT 2028 - 2028 1,534,400 $ - $ 1,534,400 $ 0% - $ 1,534,400 $ - $ - $ 1,534,400 $ 4.2.45 Crossing at St. Marie & Huron - Sidelaunch District 2028 - 2028 627,690 $ - $ 627,690 $ 0% - $ 627,690 $ - $ - $ 627,690 $ Subtotal Waterfront Master Plan 43,655,840 $ - $ 43,655,840 $ 8,148,238 $ 35,507,602 $ - $ 13,326,320 $ 22,181,282 $ 4.3 Trails 4.3.1 Trail Development 2024 - 2033 1,500,000 $ 80,000 $ 1,420,000 $ 0% - $ 1,420,000 $ - $ 1,420,000 $ - $ Subtotal CommunityTrails 1,500,000 $ 80,000 $ 1,420,000 $ - $ 1,420,000 $ - $ 1,420,000 $ - $ 4.4 Vehicles & Equipment 4.4.1 Acquisition of New Vehicles 2024 - 2033 430,000 $ - $ 430,000 $ 0% - $ 430,000 $ - $ 430,000 $ - $ 4.4.2 Urban Forestry Equipment 2024 - 2033 750,000 $ - $ 750,000 $ 0% - $ 750,000 $ - $ 750,000 $ - $ 4.4.3 Parks Equipment 2024 - 2024 590,000 $ - $ 590,000 $ 33% 194,700 $ 395,300 $ - $ 395,300 $ - $ Subtotal Vehicles and Equipment 1,770,000 $ - $ 1,770,000 $ 194,700 $ 1,575,300 $ - $ 1,575,300 $ - $ TOTAL OUTDOOR RECREATION 71,489,033 $ 436,250 $ 71,052,783 $ 14,763,704 $ 56,289,079 $ - $ 25,016,437 $ 31,272,642 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $25,016,437 2024 - 2033 Net Funding Envelope $25,016,437 10-Year Growth in Population in New Units 7,172 Unadjusted Development Charge Per Capita $3,488.07 Reserve Fund Balance Balance as at December 31, 2018 ($678,193) Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $0.00 Appendix B | 126 OUTDOOR RECREATION 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE ($678.2) ($9,729.0) ($11,955.8) ($12,454.9) ($12,906.7) ($13,127.9) ($10,879.7) ($8,359.1) ($5,542.1) ($2,912.9) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Outdoor Recreation: Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 - Outdoor Recreation: Non Inflated $11,329.8 $4,234.0 $2,544.0 $2,544.0 $2,386.3 $260.0 $260.0 $260.0 $260.0 $260.0 $24,338.2 - Outdoor Recreation: Inflated $11,329.8 $4,318.7 $2,646.8 $2,699.8 $2,583.0 $287.1 $292.8 $298.7 $304.6 $310.7 $25,072.0 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $2,557.5 $2,672.2 $2,802.6 $2,928.9 $3,063.3 $3,206.3 $3,358.1 $3,519.1 $3,188.1 $3,331.0 $30,627.2 INTEREST - Interest on Opening Balance ($37.3) ($535.1) ($657.6) ($685.0) ($709.9) ($722.0) ($598.4) ($459.8) ($304.8) ($160.2) ($4,870.0) - Interest on In-year Transactions ($241.2) ($45.3) $2.7 $4.0 $8.4 $51.1 $53.6 $56.4 $50.5 $52.9 ($7.0) TOTAL REVENUE $2,279.0 $2,091.9 $2,147.8 $2,247.9 $2,361.9 $2,535.3 $2,813.3 $3,115.7 $2,933.8 $3,223.6 $25,750.2 CLOSING CASH BALANCE ($9,729.0) ($11,955.8) ($12,454.9) ($12,906.7) ($13,127.9) ($10,879.7) ($8,359.1) ($5,542.1) ($2,912.9) ($0.0) 2024 Adjusted Charge Per Capita $3,892.77 Allocation of Capital Program Residential Sector 100.0% Non-Residential Sector 0.0% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.4 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE OUTDOOR RECREATION RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 127 Appendix B.5 Indoor Recreation Appendix B | 128 Appendix B.5 - Indoor Recreation The Town of Collingwood operates and maintains several Indoor Recreation facilities, including a Curling Club, several Arenas, and facilities for swimming and skating. The benefits of Indoor Recreation services are deemed to be Town-wide for the purposes of calculating the development charge. The analysis is set out in the following tables. Table B.5-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table B.5-2 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.5-3 Cash Flow Analysis Table 1 2009 - 2023 Historical Service Levels The 15-year historical inventory of capital assets for Indoor Recreation includes a Curling Club, two arenas, an ice pad and indoor pool, a fitness centre, an aquatic centre, and some storage space. The buildings total 177,700 square feet and are valued at $84.77 million. They sit on 7.5 acres of land worth $6.00 million. In addition, the furniture and equipment associated with these facilities is worth another $8.94 million. The total combined value of the inventory of Indoor Recreation capital assets is $99.71 million. The resulting 15-year historical average service level of $3,128.08 per capita. When multiplied by the 10-year forecast population growth, this results in a 10-year maximum allowable funding envelope of $18.27 million. The calculation of the maximum allowable funding envelope is summarized as follows: Appendix B | 129 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $3,128.08 Net Population and Employment Growth (2024 - 2033) 5,842 Maximum Allowable Funding Envelope $18,274,243 Table 2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The 10-year development-related capital plan for Indoor Recreation provides $2.00 million worth of enhancements to the indoor rink in Central Park that would include an ice storage building and rink dressing room improvements. A new multi-purpose facility as identified in the Parks, Recreation and Culture Master Plan will be constructed for $97.80 million in 2027-2028. In total, the gross project costs are $100.41 million. No grants or subsidies are anticipated to fund these projects. An 81% "benefit to existing" share of $300,000 related to the Central Park Outdoor Rink has been removed and will be funded by non-DC revenues. The total DC eligible costs amount to $100.11 million, of which $3.89 million will be funded from available DC reserves. Another $77.94 million is deemed to provide post-period benefit and will be considered for recovery in future DC studies. The remaining $18.27 million is related to development occurring between 2024 and 2033 and is included in the development charges calculation. The development-related cost is allocated 100% to residential development, resulting in a per capita unadjusted charge of $2,548.00 per capita. Appendix B | 130 Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge increases to $2,659.95 per capita. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the Indoor Recreation development charge. 15-year Hist. Service Level per capita Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $3,128.08 $100,410,000 $18,274,243 $2,548.00 $0.00 $2,659.95 $0.00 INDOOR RECREATION SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix B | 131 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS INDOOR RECREATION BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Curling Club 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 19,700 $450 Eddie Bush Memorial Arena (EDBM) 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 $450 Collingwood Fitness Centre 24,200 - - - - - - - - - - - - - - $400 Ice Pad and Indoor Pool 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000 $600 Central Aquatic Centre (CAC) - - - - 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 $600 Central Park Arena (CPA) - - - - 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 $450 Storage for Indoor Recreation Equipment and Vehciles 600 600 600 600 600 600 600 600 600 600 600 600 600 600 - $200 Total (sq.ft.) 127,500 103,300 103,300 103,300 178,300 178,300 178,300 178,300 178,300 178,300 178,300 178,300 178,300 178,300 177,700 Total ($000) $58,565.0 $48,885.0 $48,885.0 $48,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,765.0 LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) Curling Club 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 $800,000 Eddie Bush Memorial Arena (EBMA) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $800,000 Collingwood Fitness Centre 0.70 - - - - - - - - - - - - - - $800,000 Central Aquatic Centre (CAC) 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $800,000 Central Park Arena (CPA) - - - 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $800,000 Total (acres) 4.20 3.50 3.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 Total ($000) $3,360.0 $2,800.0 $2,800.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 FURNITURE & EQUIPMENT Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Curling Club $1,816,406 $1,817,813 $1,820,625 $1,826,250 $1,837,500 $1,860,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 $1,905,000 Eddie Bush Memorial Arena (EBMA) $3,209,000 $3,209,000 $3,209,000 $3,209,000 $3,209,000 $3,209,000 $3,209,000 $3,209,000 $3,234,000 $3,259,000 $3,259,000 $3,259,000 $3,259,000 $3,259,000 $3,259,000 Central Aquatic Centre (CAC) $0 $0 $0 $0 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 $2,783,000 Central Park Arena (CPA) $0 $0 $0 $0 $954,500 $954,500 $954,500 $954,500 $966,500 $996,500 $996,500 $996,500 $996,500 $996,500 $996,500 Total ($000) $5,025.4 $5,026.8 $5,029.6 $5,035.3 $8,784.0 $8,806.5 $8,851.5 $8,851.5 $8,888.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 Total Value of Furniture & Equipment ($) APPENDIX B.5 TABLE 1 # of Square Feet # of Acres Appendix B | 132 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS INDOOR RECREATION 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 INVENTORY SUMMARY ($000) Buildings $58,565.0 $48,885.0 $48,885.0 $48,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,885.0 $84,765.0 Land $3,360.0 $2,800.0 $2,800.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 $6,000.0 Furniture & Equipment $5,025.4 $5,026.8 $5,029.6 $5,035.3 $8,784.0 $8,806.5 $8,851.5 $8,851.5 $8,888.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 $8,943.5 Total ($000) $66,950.4 $56,711.8 $56,714.6 $59,920.3 $99,669.0 $99,691.5 $99,736.5 $99,736.5 $99,773.5 $99,828.5 $99,828.5 $99,828.5 $99,828.5 $99,828.5 $99,708.5 Average SERVICE LEVEL ($/capita) Service Level Buildings $2,337.55 $1,904.07 $1,858.11 $1,837.23 $3,152.88 $3,114.36 $3,074.65 $3,034.21 $2,974.56 $2,915.71 $2,857.70 $2,800.47 $2,743.80 $2,697.93 $2,648.91 $2,663.48 Land $134.11 $109.06 $106.43 $225.50 $222.86 $220.14 $217.33 $214.47 $210.25 $206.09 $201.99 $197.95 $193.94 $190.70 $187.50 $189.22 Furniture & Equipment $200.58 $195.79 $191.18 $189.24 $326.26 $323.10 $320.61 $316.40 $311.47 $307.20 $301.09 $295.06 $289.09 $284.25 $279.48 $275.39 Total ($/capita) $2,672.24 $2,208.92 $2,155.71 $2,251.96 $3,702.00 $3,657.60 $3,612.59 $3,565.07 $3,496.29 $3,429.00 $3,360.78 $3,293.47 $3,226.83 $3,172.89 $3,115.89 $3,128.08 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE INDOOR RECREATION 10-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $3,128.08 Population Growth 2024 - 2033 5,842 Maximum Allowable Funding Envelope $18,274,243 TABLE 1 APPENDIX B.5 Appendix B | 133 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 5.0 INDOOR RECREATION 5.1 Buildings, Land and Equipment 5.1.1 PRC Facilities E-Truck 2024 - 2024 90,000 $ - $ 90,000 $ 0% - $ 90,000 $ 90,000 $ - $ - $ 5.1.2 PRC Facilities E-Vehicle 2024 - 2024 75,000 $ - $ 75,000 $ 0% - $ 75,000 $ 75,000 $ - $ - $ 5.1.3 PRC Facilities E-Vehicle 2024 - 2024 75,000 $ - $ 75,000 $ 0% - $ 75,000 $ 75,000 $ - $ - $ 5.1.4 Central Park Indoor Rink 2024 - 2025 2,000,000 $ - $ 2,000,000 $ 0% - $ 2,000,000 $ 2,000,000 $ - $ - $ 5.1.5 Central Park Outdoor Rink 2024 - 2024 370,000 $ - $ 370,000 $ 81% 300,000 $ 70,000 $ 70,000 $ - $ - $ 5.1.6 Multi-Purpose Facility 2027 - 2028 97,800,000 $ - $ 97,800,000 $ 0% - $ 97,800,000 $ 1,583,946 $ 18,274,243 $ 77,941,811 $ Subtotal Buildings, Land and Equipment 100,410,000 $ - $ 100,410,000 $ 300,000 $ 100,110,000 $ 3,893,946 $ 18,274,243 $ 77,941,811 $ TOTAL INDOOR RECREATION 100,410,000 $ - $ 100,410,000 $ 300,000 $ 100,110,000 $ 3,893,946 $ 18,274,243 $ 77,941,811 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $18,274,243 2024 - 2033 Net Funding Envelope $18,274,243 10-Year Growth in Population in New Units 7,172 Unadjusted Development Charge Per Capita $2,548.00 Reserve Fund Balance Balance as at December 31, 2018 $3,893,946 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $0.00 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM INDOOR RECREATION DC Eligible Costs Timing APPENDIX B.5 TABLE 2 Ineligible Costs Appendix B | 134 INDOOR RECREATION 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $3,893.9 $4,475.5 $5,452.2 $7,591.6 ($913.0) ($9,855.5) ($8,168.4) ($6,282.9) ($4,181.8) ($2,195.2) 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Indoor Recreation: Prior Growth $1,310.0 $1,000.0 $0.0 $792.0 $792.0 $0.0 $0.0 $0.0 $0.0 $0.0 $3,893.9 - Indoor Recreation: Non Inflated $0.0 $0.0 $0.0 $9,137.1 $9,137.1 $0.0 $0.0 $0.0 $0.0 $0.0 $18,274.2 - Indoor Recreation: Inflated $1,310.0 $1,020.0 $0.0 $10,536.8 $10,747.6 $0.0 $0.0 $0.0 $0.0 $0.0 $23,614.4 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $1,747.6 $1,825.9 $1,915.0 $2,001.3 $2,093.2 $2,190.9 $2,294.6 $2,404.6 $2,178.5 $2,276.1 $20,927.7 INTEREST - Interest on Opening Balance $136.3 $156.6 $190.8 $265.7 ($50.2) ($542.1) ($449.3) ($345.6) ($230.0) ($120.7) ($988.4) - Interest on In-year Transactions $7.7 $14.1 $33.5 ($234.7) ($238.0) $38.3 $40.2 $42.1 $38.1 $39.8 ($218.9) TOTAL REVENUE $1,891.5 $1,996.7 $2,139.4 $2,032.3 $1,805.0 $1,687.1 $1,885.5 $2,101.2 $1,986.6 $2,195.2 $19,720.5 CLOSING CASH BALANCE $4,475.5 $5,452.2 $7,591.6 ($913.0) ($9,855.5) ($8,168.4) ($6,282.9) ($4,181.8) ($2,195.2) $0.0 2024 Adjusted Charge Per Capita $2,659.95 Allocation of Capital Program Residential Sector 100.0% Non-Residential Sector 0.0% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.5 TABLE 3 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE INDOOR RECREATION RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 135 Appendix B.6 Administration Appendix B | 136 Appendix B.6 - Administration Administration includes the costs associated with development-related studies to be undertaken in by the Town. The analysis is set out in the following tables. Table B.6-1 2024-2033 Development-Related Capital Forecast and Calculation of the Growth-Related Net Capital Costs Table B.6-2 Cash Flow Analysis Table 1 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The 10-year development-related capital plan for Administration includes two Development Charges Studies, an Official Plan Update, a Multi- Purpose Facility Feasibility Study, a Library Strategic Plan, a Fire Master Plan, Building and Shop Renovations, and a Multi-Purpose Facility Feasibility Study. The gross project costs total $1.57 million. No grants or subsidies have been identified. A total BTE share of $50,000 related to the Fire Master Plan has been deducted. The benefit to existing share for this project is 50%, because the existing population will also benefit from the plan. Additionally, $336,400 (84%) has been deducted as a BTE allocation for the Building and Shop Renovations and $12,500 (25%) has been deducted for the Public Realm Plan. Available DC reserve funds of $310,500 is removed from the DC eligible costs occurring in the initial years of the planning horizon. The remaining DC costs recoverable for 2024 - 2033 total $855,700. The total 2024-2033 development related cost is allocated 85% to the residential sector and 15% to non-residential development. This yields an Appendix B | 137 unadjusted development charge of $101.27 per capita and $1.45 per square metre. Table 2 Cash Flow Analysis After cash flow, the residential calculated charge decreases to $97.24 per capita and the non-residential charge decreases to $1.39 per square metre. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the Administration development charge. Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $1,565,000 $855,658 $101.27 $1.45 $97.24 $1.39 ADMINISTRATION SUMMARY Development-Related Capital Program Development Charge Development Charge Unadjusted Adjusted 2024 - 2033 Appendix B | 138 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 6.0 ADMINISTRATION 6.1 Development-Related Studies 6.1.1 Development Charge Study 2024 - 2024 65,000 $ - $ 65,000 $ 0% - $ 65,000 $ 65,000 $ - $ - $ 6.1.2 Public Realm Plan 2024 - 2024 50,000 $ - $ 50,000 $ 25% 12,500 $ 37,500 $ 37,500 $ - $ - $ 6.1.3 Multi-Purpose Facility Feasibility Study 2024 - 2024 125,000 $ - $ 125,000 $ 0% - $ 125,000 $ 125,000 $ - $ - $ 6.1.4 New Accomodation - P/W Building & Shop Renovations 2024 - 2024 400,000 $ - $ 400,000 $ 84% 336,358 $ 63,642 $ 63,642 $ - $ - $ 6.1.5 Library Strategic Plan 2029 - 2029 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ 19,342 $ 30,658 $ - $ 6.1.6 Fire Master Plan 2030 - 2030 100,000 $ - $ 100,000 $ 50% 50,000 $ 50,000 $ - $ 50,000 $ - $ 6.1.7 Official Plan Update 2032 - 2032 200,000 $ - $ 200,000 $ 0% - $ 200,000 $ - $ 200,000 $ - $ 6.1.8 Development Charge Study 2033 - 2033 75,000 $ - $ 75,000 $ 0% - $ 75,000 $ - $ 75,000 $ - $ 6.1.9 Provision for Future Development-Related Studies 2029 - 2033 500,000 $ - $ 500,000 $ 0% - $ 500,000 $ - $ 500,000 $ - $ Subtotal Development-Related Studies 1,565,000 $ - $ 1,565,000 $ 398,858 $ 1,166,142 $ 310,484 $ 855,658 $ - $ TOTAL ADMINISTRATION 1,565,000 $ - $ 1,565,000 $ 398,858 $ 1,166,142 $ 310,484 $ 855,658 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 85% $726,332 Reserve Fund Balance 10-Year Growth in Population in New Units 7,172 Balance as at December 31, 2023 $310,484 Unadjusted Development Charge Per Capita $101.27 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 15% $129,326 10-Year Growth in Square Metres 89,390 Unadjusted Development Charge Per Square Metre $1.45 Timing DC Eligible Costs TABLE 1 Ineligible Costs ADMINISTRATION APPENDIX B.6 DEVELOPMENT-RELATED CAPITAL PROGRAM TOWN OF COLLINGWOOD Appendix B | 139 ADMINISTRATION 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $263.6 $84.5 $155.4 $232.0 $314.6 $403.5 $355.5 $306.7 $307.6 $93.6 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Administration: Prior Growth $247.1 $0.0 $0.0 $0.0 $0.0 $16.4 $0.0 $0.0 $0.0 $0.0 $263.6 - Administration: Non Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $110.9 $127.3 $84.9 $254.7 $148.6 $726.3 - Administration: Inflated $247.1 $0.0 $0.0 $0.0 $0.0 $140.6 $143.4 $97.5 $298.4 $177.5 $1,104.5 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $63.9 $66.8 $70.0 $73.2 $76.5 $80.1 $83.9 $87.9 $79.6 $83.2 $765.1 INTEREST - Interest on Opening Balance $9.2 $3.0 $5.4 $8.1 $11.0 $14.1 $12.4 $10.7 $10.8 $3.3 $88.1 - Interest on In-year Transactions ($5.0) $1.2 $1.2 $1.3 $1.3 ($1.7) ($1.6) ($0.3) ($6.0) ($2.6) ($12.2) TOTAL REVENUE $68.1 $70.9 $76.7 $82.6 $88.9 $92.6 $94.7 $98.4 $84.4 $83.9 $841.0 CLOSING CASH BALANCE $84.5 $155.4 $232.0 $314.6 $403.5 $355.5 $306.7 $307.6 $93.6 $0.0 2024 Adjusted Charge Per Capita $97.24 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.6 TABLE 2 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE ADMINISTRATION RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 140 ADMINISTRATION 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $46.9 $14.7 $26.8 $39.8 $53.5 $68.0 $57.9 $47.2 $45.0 $11.7 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Administration: Prior Growth $44.0 $0.0 $0.0 $0.0 $0.0 $2.9 $0.0 $0.0 $0.0 $0.0 $46.9 - Administration: Non Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $19.7 $22.7 $15.1 $45.3 $26.4 $129.3 - Administration: Inflated $44.0 $0.0 $0.0 $0.0 $0.0 $25.0 $25.5 $17.4 $53.1 $31.6 $196.7 NEW NON-RESIDENTIAL DEVELOPMENT - Growth in Square Metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 89,390 REVENUE - DC Receipts: Inflated $11.0 $11.4 $11.8 $12.1 $12.5 $12.8 $13.2 $13.6 $19.2 $19.8 $137.4 INTEREST - Interest on Opening Balance $1.6 $0.5 $0.9 $1.4 $1.9 $2.4 $2.0 $1.7 $1.6 $0.4 $14.4 - Interest on In-year Transactions ($0.9) $0.2 $0.2 $0.2 $0.2 ($0.3) ($0.3) ($0.1) ($0.9) ($0.3) ($2.1) TOTAL REVENUE $11.8 $12.2 $12.9 $13.7 $14.6 $14.9 $14.9 $15.1 $19.9 $19.9 $149.7 CLOSING CASH BALANCE $14.7 $26.8 $39.8 $53.5 $68.0 $57.9 $47.2 $45.0 $11.7 $0.0 2024 Adjusted Charge Per Square Metre $1.39 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% TABLE 2 APPENDIX B.7 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE ADMINISTRATION NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 141 Appendix B.7 Transit Services Appendix B | 142 Appendix B.7 - Transit Services This appendix provides details of the Transit Services ridership forecast and capital program used in the 2024 DC Study for the Town of Collingwood. The forecast method and key assumptions are discussed and the results of the forecasts are presented in the following sections. The Town of Collingwood's Colltrans public transit system runs two regularly scheduled routes as well as transit links that connect the Town of The Blue Mountains and the Town of Collingwood. The anticipated ridership of the system and the related capital program requirements are discussed further in the following sections. The benefits of Transit Services are deemed to be Town-wide for the purposes of calculating the development charge. A. Transit Ridership In accordance with the DCA, Transit services must be based on a "planned level of service" rather than the "15-year historical average level of service". For the purposes of determining the "planned level of service" for transit, the Town's Transit service development-related capital program have been informed based on existing and proposed capital budget documents and discussions with staff. In addition, any background study that incorporates Transit services into the calculation must now include the following: - An assessment of ridership forecast for all modes of transit and whether ridership is generated from existing or planned development (O.Reg. 82/98 s.8(2)4). - An assessment of ridership capacity for all modes of transit over the 10- year forecast period (O. Reg. 82/98 s.8(2)4). Appendix B | 143 Using historical ridership data on the number of annual trips (one-way) over the 2021-2023 period and the projected trips for 2024, a ridership forecast was calculated for the DC planning period of 2024-2033. The table below shows that ridership is expected to grow by approximately 134,140 trips over the 2024-2033 planning period. Year Annual Transit Ridership 2020 117,255 2021 86,247 2022 112,810 2023 132,423 2024 142,019 2033 266,561 Growth 2024-2033 134,138 The Town does not have an identified transit mode share and no formal ridership forecast exists. However, through discussions with staff, it was determined that the historical average ridership increase of 7.25% per annum would be a reasonable estimate of anticipated future ridership over the future planning period. In particular, this estimate reflects the planned expansion of transit infrastructure as identified in the capital program. B. Transit Ridership Allocations Using the ridership forecast shown in the previous table, the benefit to existing share is calculated based on the 2023 ridership plus the growth in 2024-2033 ridership (134,138). This results in a total of 266,561 trips over the 2024-2033 period. Of the total trips, 50% is attributed to the existing population in the Town and the remaining 50% is attributed to new development occurring over the planning period. Appendix B | 144 Transit DC Capital Program Allocations Allocation Year Annual Ridership Allocation % BTE 2023 132,423 50% In Period Growth 2024-2033 134,138 50% Total 266,561 100% Table 1 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The capital program for Transit Services includes $1.43 million in transit vehicles to service new development. In addition, the capital program includes $32,800 for new bus shelters and $87,000 for a Transit Study related to future needs of development. The gross development-related capital program totals $1.54 million. Grant funding totalling $722,000 is anticipated for the acquisition of future buses and $43,500 of the Transit Study is anticipated to be funded from the Town of The Blue Mountains. As such, the net capital program costs total $779,300. A BTE share of $12,400 has been applied to the acquisition of bus shelters and is based on shares of anticipated ridership over the 10-year planning horizon. No benefit to existing share is applied to the acquisition of buses, as these are net new assets required to service new ridership. The resulting DC eligible costs total $766,800. A total of $352,300 is available in the Transit Services DC reserve fund and is removed from the DC eligible costs, the remaining $414,500 will be eligible for DC recovery. The $414,500 is allocated 85% to residential development and 15% to non- residential development, resulting in an unadjusted development charge of $49.06 per capita and an unadjusted non-residential charge of $0.70 per square metre. Appendix B | 145 Table 2 Cash Flow Analysis After cash flow analysis, the residential charge increases to $49.26 per capita and the non-residential charge increases to $0.71 per square metre. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the Transit Services development charge. Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $1,544,750 $414,545 $49.06 $0.70 $49.26 $0.71 TRANSIT SERVICES SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix B | 146 Gross Grants/ Net Total Project Description Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Post Cost Recoveries Cost (%) & BTE Shares Costs DC Reserves 2033 2033 7.0 TRANSIT SERVICES 7.1 Vehicles 7.1.1 New Bus Service Route 2024 - 2024 475,000 $ - $ 475,000 $ 0% - $ 475,000 $ 352,285 $ 122,715 $ - $ 7.1.2 New Bus Acquistion 2029 - 2033 950,000 $ 722,000 $ 228,000 $ 0% - $ 228,000 $ - $ 228,000 $ - $ Subtotal Vehicles 1,425,000 $ 722,000 $ 703,000 $ - $ 703,000 $ 352,285 $ 350,715 $ - $ 7.2 Equipment 7.2.1 Additional Bus Shelters - Growth-Related 2024 - 2024 7,750 $ - $ 7,750 $ 0% - $ 7,750 $ - $ 7,750 $ - $ 7.2.2 Additional Bus Shelters 2024 - 2033 25,000 $ - $ 25,000 $ 50% 12,420 $ 12,580 $ - $ 12,580 $ - $ Subtotal Equipment 32,750 $ - $ 32,750 $ 12,420 $ 20,330 $ - $ 20,330 $ - $ 7.3 Studies 7.3.1 Transit Study - Growth-Related Needs 2029 - 2033 87,000 $ 43,500 $ 43,500 $ 0% - $ 43,500 $ - $ 43,500 $ - $ Subtotal New Projects 87,000 $ 43,500 $ 43,500 $ - $ 43,500 $ - $ 43,500 $ - $ TOTAL TRANSIT SERVICES 1,544,750 $ 765,500 $ 779,250 $ 12,420 $ 766,830 $ 352,285 $ 414,545 $ - $ Residential Development Charge Calculation 2019 DC Study Allocations Residential Share of 2024 - 2033 DC Eligible Costs 85% $351,890 Allocation Year Ridership % 10-Year Growth in Population in New Units 7,172 BTE 2024 132,423 50% Unadjusted Development Charge Per Capita $49.06 In-Period (Growth) 2024-2033 134,138 50% Total 266,561 100% Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 15% $62,655 10-Year Growth in Square Metres 89,390 Reserve Fund Balance Unadjusted Development Charge Per Square Metre $0.70 Balance as at December 31, 2023 $352,285 APPENDIX B.7 TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM Timing TRANSIT SERVICES DC Eligible Costs Ineligible Costs Appendix B | 147 TRANSIT SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $299.04 ($79.39) ($50.45) ($18.27) $17.29 $56.16 $46.32 $37.03 $28.43 $14.10 2024 - 2033 RESIDENTIAL FUNDING REQUIREMENTS - Transit Services: Prior Growth $299.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $299.0 - Transit Services: Non Inflated $111.8 $1.1 $1.1 $1.1 $1.1 $47.2 $47.2 $47.2 $47.2 $47.2 $351.9 - Transit Services: Inflated $410.9 $1.1 $1.1 $1.1 $1.2 $52.1 $53.1 $54.2 $55.3 $56.4 $686.3 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 7,172 REVENUE - DC Receipts: Inflated $32.4 $33.8 $35.5 $37.1 $38.8 $40.6 $42.5 $44.5 $40.3 $42.2 $387.6 INTEREST - Interest on Opening Balance $10.5 ($4.4) ($2.8) ($1.0) $0.6 $2.0 $1.6 $1.3 $1.0 $0.5 $9.3 - Interest on In-year Transactions ($10.4) $0.6 $0.6 $0.6 $0.7 ($0.3) ($0.3) ($0.3) ($0.4) ($0.4) ($9.6) TOTAL REVENUE $32.4 $30.0 $33.3 $36.7 $40.0 $42.2 $43.8 $45.6 $40.9 $42.3 $387.3 CLOSING CASH BALANCE ($79.4) ($50.5) ($18.3) $17.3 $56.2 $46.3 $37.0 $28.4 $14.1 $0.0 2024 Adjusted Charge Per Capita $49.26 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.7 TABLE 2 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE TRANSIT SERVICES RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 148 TRANSIT SERVICES 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 TOTAL OPENING CASH BALANCE $53.2 ($14.3) ($9.4) ($4.0) $1.8 $8.1 $5.5 $2.8 $0.1 ($0.0) 2024 - 2033 NON-RESIDENTIAL FUNDING REQUIREMENTS - Transit Services: Prior Growth $53.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $53.2 - Transit Services: Non Inflated $19.9 $0.2 $0.2 $0.2 $0.2 $8.4 $8.4 $8.4 $8.4 $8.4 $62.7 - Transit Services: Inflated $73.2 $0.2 $0.2 $0.2 $0.2 $9.3 $9.5 $9.6 $9.8 $10.0 $122.2 NEW NON-RESIDENTIAL DEVELOPMENT - Growth in Square Metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 89,390 REVENUE - DC Receipts: Inflated $5.6 $5.8 $6.0 $6.1 $6.3 $6.5 $6.7 $6.9 $9.7 $10.0 $69.7 INTEREST - Interest on Opening Balance $1.9 ($0.8) ($0.5) ($0.2) $0.1 $0.3 $0.2 $0.1 $0.0 ($0.0) $1.0 - Interest on In-year Transactions ($1.9) $0.1 $0.1 $0.1 $0.1 ($0.1) ($0.1) ($0.1) ($0.0) $0.0 ($1.7) TOTAL REVENUE $5.6 $5.1 $5.6 $6.0 $6.5 $6.7 $6.8 $6.9 $9.7 $10.0 $69.0 CLOSING CASH BALANCE ($14.3) ($9.4) ($4.0) $1.8 $8.1 $5.5 $2.8 $0.1 ($0.0) ($0.0) 2024 Adjusted Charge Per Square Metre $0.71 Allocation of Capital Program Residential Sector 84.9% Non-Residential Sector 15.1% Rates for 2024 Inflation Rate: 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% APPENDIX B.7 TABLE 2 TOWN OF COLLINGWOOD CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE TRANSIT SERVICES NON-RESIDENTIAL DEVELOPMENT CHARGE (in $000) Appendix B | 149 Appendix C Engineering Infrastructure Technical Appendix Appendix C | 150 Appendix C - Engineered Services Technical Appendix The Town's Public Works, Engineering, and Environmental Services department is responsible for a wide-range of services in Collingwood including the development review and management of capital infrastructure projects as well as the implementation and support for land development processes. This appendix outlines of the engineered services that are included in the 2024 DC Study including: Services Related to a Highway: Roads and Related, Water Services, Wastewater Services and Wastewater Treatment Plant. Consistent with the Town's historical practice, Public Works infrastructure is included within the Roads and Related category of service. As part of the 2024 DC Study, infrastructure related to the Town's Wastewater Treatment Plant is now a standalone category of service whereas historically, it has been combined with Wastewater Services linear infrastructure. The technical tables for each service set out the capital forecast and the calculation of the development charges. The cost, quantum and description of the projects included in the forecast are based upon the Town's 2024 capital budget, previous DC Studies, analysis provided by Tatham Engineering who was retained as part of the 2024 DC Study process to review and update engineering unit costs for roads, water and wastewater infrastructure. The findings from the analysis completed by Tatham Engineering are outlined in a report available under separate cover. This appendix includes all engineering projects that will meet the servicing demands within the Town. The development charges are calculated on a Town-wide basis. Appendix C | 151 The planning horizon utilized for all engineering services is 2024-2041. The following appendices comprise the Town's engineering related services: C.1 Services Related to a Highway: Roads and Related C.2 Water Services C.3 Wastewater Services C.4 Wastewater Treatment Plant Appendix C | 152 Appendix C.1 Services Related to a Highway: Roads and Related Services Appendix C | 153 Appendix C.1 - Roads and Related Services This appendix provides a brief outline of the infrastructure included in the Services Related to A Highway: Roads and Related development charge and includes both Public Works and Roads and Related infrastructure. The development-related projects outlined in this appendix are required to service the demands of new development to 2041. The benefits of the services are considered to be town-wide for the purposes of calculating the development charge. The following discusses the individual components included in the Roads service category. The analysis is set out in the tables which follow. Table C.1-1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Table C.1-2 2024-2041 Development-Related Capital Program Table C.1-3 Calculation of the Unadjusted Development Table C.1-4 Cash Flow Analysis Table 1 15-Year Historical Service Levels and Calculation of Maximum Allowable Funding Envelope Public Works assets are included in the Roads and Related inventory. Public Works buildings occupy 33,360 square feet of space and includes offices, shops, storage containers, and other structures valued at $5.63 million. These facilities occupy 10.0 acres of land valued at $3.0 million. The furniture and equipment contained within these facilities are valued at $675,200 In addition, the Public Works fleet numbers 60 vehicles worth $11.26 million and the department contracts out three plows at a cost of $1.14 million. Appendix C | 154 Table 1 demonstrates that the Town's current road infrastructure is comprised of 15 kilometres of urban collector roads, 21 kilometres of semi- urban arterial roads, 47 kilometres of urban arterial roads and 30 kilometres of semi-urban arterial roads. The service level also includes 26 kilometres of sidewalks, 32 sets of traffic signals and 22 bridges and culverts. The total inventory of Roads and Related capital assets has a full replacement value of $697.09 million. This produces a 15-year historical service level of $17,320.71 per capita and employment. The resulting maximum allowable funding envelope is $232.91 million. The calculation of the maximum allowable funding envelope is summarized as follows: 10-Year Funding Envelope Calculation 15-Year Average Service Level (2009 - 2023) $17,320.71 Net Population & Employment Growth (2024 - 2041) 13,447 Maximum Allowable Funding Envelope $232,911,587 The existing facilities have been examined and consideration has been given to whether or not "excess capacity" exists within the Town's infrastructure that may be available to partially meet the future servicing requirements. It has been determined that no "uncommitted excess capacity" exists within the Town's Roads and Related infrastructure, and as such, no adjustments have been made to the service level calculations. Table 2 2024-2041 Development-Related Capital Program Table 2 provides a summary of the development-related capital program for Roads and Related services. Cost estimates for roads projects were prepared by Tatham Engineering. As shown in Table 2, the gross Roads and Related capital program totals $124.96 million. This includes $107.89 million in road widening and upgrade projects and another $10.80 million in intersection improvements such as Appendix C | 155 turning lanes and signalizations. The capital program also contains $1.61 million of sidewalk projects and $3.59 million for development-related vehicles. In addition, there will be two Transportation Master Plan updates during the planning horizon with a total value of $650,000. There are also two Public Works projects. An expansion of the Public Works headquarter building to accommodate staff from Water Services as well as future Public Works staff has roughly $400,000 left to be funded. There is also a provision for future storage space valued at $21,800. Some offsetting contributions anticipated from developers for a total of $2.76 million related to intersection improvements. The net municipal cost after those deductions is $122.19 million. Approximately $22.72 million has been identified as a BTE share allocation and is removed from the DC eligible costs. BTE shares were determined by Tatham Engineering and are based on the value of replacing existing municipal assets, based on its existing road base and length, as part of growth-related projects. The shares therefore vary based on the scope of each project. The BTE share for the expansion of the Public Works headquarters of 86% represents the incremental increase in square footage over the total expected square footage and is consistent with the assumption used in the 2019 DC Study. The available Roads and Related reserve fund balance of $13.17 million has been applied to projects occurring in the initial years of the 2024-2033 planning period. The portion of projects slated to benefit growth beyond 2041 are removed from the DC calculation and are deemed as the post- period benefit share. The share of these works amount to $7.40 million and will be considered for recovery in subsequent by-law reviews. The DC recoverable share is therefore reduced to $79.91 million. Appendix C | 156 Table 3 Calculation of Unadjusted Development Charges Tables 3 displays the DC recoverable costs apportioned to the residential and non-residential sectors: 83% to residential and 17% to the non- residential, based on shares of anticipated shares of population and employment growth. The residential sector's share of $65.68 million in development-related net capital costs yields an "unadjusted" development charge of $4,863.06 per capita. The non-residential sector's share of $13.23 million in development-related net capital costs results in an unadjusted charge of $69.47 per square metre of GFA for the non-residential sector. Table 4 Cash Flow Analysis After cash flow and reserve fund analysis, the residential and non- residential calculated charges both increase to $5,052.34 per capita and $73.71 per square metre, respectively. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the Roads and Related development charge: Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $124,956,679 $78,908,080 $4,863.06 $69.47 $5,052.34 $73.71 SERVICES RELATED TO A HIGHWAY: ROADS & RELATED SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix C | 157 TOWN OF COLLINGWOOD . INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED PUBLIC WORKS BUILDINGS UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Office - 507 Tenth Line N (Public Works Portion Only)1 - - - 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 - - - $300 Shop - 507 Tenth Line N (Public Works Portion Only)2 - - - 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270 - - - $225 Office - 545 Tenth Line N (Public Works Portion Only)3 4,720 4,720 4,720 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600 $300 Shop - 545 Tenth Line N (Public Works Portion Only)4 10,320 10,320 10,320 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 $225 Sign Shed 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 $150 Salt Shed 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 4,464 $150 Sand Dome 8,176 8,176 8,176 8,176 8,176 8,176 8,175 8,176 8,176 8,176 8,176 8,176 8,176 8,176 8,176 $40 Storage Containers - - - - - - 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 $15 Total (#) 25,216 25,216 25,216 36,595 36,595 36,595 38,514 38,515 38,515 38,515 38,515 38,515 30,296 30,296 33,360 Total ($000) $4,365.0 $4,365.0 $4,365.0 $7,137.4 $7,137.4 $7,137.4 $7,166.2 $7,166.2 $7,166.2 $7,166.2 $7,166.2 $7,166.2 $5,170.8 $5,170.8 $5,630.4 (1) Shared 60% Outdoor Rec and 40% Public Works (2009-2020). Transferred to Outfoor Rec in 2021. (2) Shared 50% Outdoor Rec and 50% Public Works (2009-2020). Transferred fully to Outfoor Rec in 2021. (3) Shared 16% Outdoor Rec and 84% Public Works (2009-2011). Transferred to Public Works in 2012. (4) Shared 18% Outdoor Rec and 82% Public Works (2009-2011). Transferred to Public Works in 2012. LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/acre) Office & Shop - 507 Tenth Line N (Public Works Only)1 - - - 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 - - - $300,000 Works Yard - 545 Tenth Line (Public Works Only)2 8.26 8.26 8.26 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 $300,000 Total (acres) 8.26 8.26 8.26 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 10.00 10.00 10.00 Total ($000) $2,478.0 $2,478.0 $2,478.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,708.0 $3,000.0 $3,000.0 $3,000.0 (1) Land area is based on shares of gross floor area associated with Outdoor Rec (3,160 sf or 17%) and Public Works (15,040 sf or 83%). Transferred to Outdoor Rec in 2021. (2) Land area is based on shares of gross floor area associated with Outdoor Rec (9,193 sf or 53%) and Public Works (8,219 sf or 47%). Transferred to Public Works in 2012. FURNITURE AND EQUIPMENT Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Public Works Office Building - 545 Tenth Line $343,000 $343,000 $343,000 $407,000 $407,000 $407,000 $407,000 $407,000 $407,000 $407,000 $407,000 $407,000 $407,000 $436,000 $436,000 Office - 507 Tenth Line N - Shared 60% Parks / 40% PW $0 $0 $0 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 $57,000 Shop - 507 Tenth Line N - Shared 50% Parks / 50% PW $0 $0 $0 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 $182,000 Emergency Generator $0 $0 $0 $0 $0 $0 $0 $0 $170 $170 $170 $170 $170 $170 $170 Total ($000) $343.0 $343.0 $343.0 $646.0 $646.0 $646.0 $646.0 $646.0 $646.2 $646.2 $646.2 $646.2 $646.2 $675.2 $675.2 APPENDIX C.1 TABLE 1 # of Square Feet # of Acres Total Value of Furniture & Equipment ($000) Appendix C | 158 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED PUBLIC WORKS FLEET UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) 2004 Ford F150 1/2 Ton Pickup 301 1 1 1 1 1 1 1 1 1 1 - - - - - $68,500 2018 Ford F150 1/2 Ton Pick-up 301 - - - - - - - - - 1 1 1 1 1 1 $68,500 1996 Chev 1/2 Ton Pickup 1 - - - - - - - - - - - - - - $68,500 2011 Dodge Pickup 302 - - - 1 1 1 1 1 1 1 1 1 1 1 1 $68,500 2007 Ford F150 1/2 Ton Pickup 303 1 1 1 1 1 1 1 1 - - - - - - - $68,500 2018 Ford F150 1/2 Ton Pick-up 303 - - - - - - - - - 1 1 1 1 1 1 $68,500 2000 Dodge 1/2 Ton Pickup 304 1 1 1 1 1 1 - - - - - - - - - $68,500 2014 Chevrolet Silverado 304 - - - - - 1 1 1 1 1 1 1 1 1 1 $68,500 2006 Sterling Plow/Dump/Sander 305 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $262,000 2002 Ford 1 Ton Dump 306 1 1 1 1 1 1 1 1 1 - - - - - - $95,000 2018 Dodge Ram 5500 Dump 306 - - - - - - - - - 1 1 1 1 1 1 $95,000 2000 Dodge 1/2 Ton Pickup 307 1 1 1 - - - - - - - - - - - - $68,500 2014 Chevrolet Silverado 307 - - - - - 1 1 1 1 1 1 1 1 1 1 $68,500 2004 Chevrolet Silverado 1 Ton 308 1 1 1 1 1 1 1 1 1 1 - - - - - $110,000 2021 Dodge 1 Ton Dump - - - - - - - - - - 1 1 1 1 1 $110,000 2007 Ford F150 Pickup 309 1 1 1 1 1 1 1 1 1 1 - - - - - $68,500 2020 Ford F150 - - - - - - - - - - 1 1 1 1 1 $68,500 1996 Ford 5 Ton Dump and Viking Sander 1 1 - - - - - - - - - - - - - $262,000 2012 International Durastar 4400 Hook Lift/ Flat Deck / Sander 310 - - - - 1 1 1 1 1 1 1 1 1 1 1 $300,000 2001 International Plow/Sander 311 1 1 1 1 1 1 1 - - - - - - - - $385,000 2016 Freightliner 114SD Tandem Plow Sander 311 - - - - - - - - 1 1 1 1 1 1 1 $400,000 2001 International 5 Ton Dump and Snowplow 312 1 1 1 1 1 1 1 1 1 1 - - - - - $385,000 2020 International Plow/Dump Combo - - - - - - - - - - 1 1 1 1 1 $385,000 2006 Sterling Dump Plow 314 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $385,000 1996 Ford 5 Ton Dump and Snowplow 1 - - - - - - - - - - - - - - $262,000 2010 Freightliner Plow/Dump 315 - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $385,000 2007 Sterling Plow 316 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $385,000 1995 Ford 5 Ton Dump, Snowplow and Flusher 1 - - - - - - - - - - - - - - $262,000 2012 International 7400 SFA 4X2 Plow / Comb. Sander / Dump 317 - - - - 1 1 1 1 1 1 1 1 1 - - $385,000 APPENDIX C.1 TABLE 1 # of Vehicles Appendix C | 159 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED PUBLIC WORKS FLEET UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) 2023 International Plow/Dump Combo - - - - - - - - - - - - - 1 1 $385,000 2003 Freightliner Tandem 318 1 1 1 1 1 1 1 1 1 1 1 - - - - $385,000 2020 International Plow/Dump Combo - - - - - - - - - - - 1 1 1 1 $385,000 2003 Ford Escape SUV 354 1 1 1 1 1 1 1 1 - - - - - - - $50,000 2007 Sterling Sander with Slush Blade 323 1 1 1 1 1 1 1 1 1 1 1 - - - - $385,000 2020 International Plow/Dump Combo 319 - - - - - - - - - - - 1 1 1 1 $385,000 2020 International Plow/Dump Combo 320 - - - - - - - - - - - 1 1 1 1 $385,000 2017 Freightliner 114 SD Tandem Sander 321 - - - - - - - - - 1 1 1 1 1 1 $400,000 2015 Case Front End Loader 621F - - - - - - 1 1 1 1 1 1 1 1 1 $290,000 2022 Dodge 2500 - 323 - - - - - - - - - - - - - 1 1 $90,000 2007 Ford F150 1/2 Ton Pickup 324 1 1 1 1 1 1 1 1 1 1 - - - - - $68,500 2018 Ford F150 1/2 Ton Pick-up 324 - - - - - - - - - 1 1 1 1 1 1 $68,500 2007 John Deere Backhoe-Loader 410 G - 325 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $210,000 2019 JCB Backhoe -Loader with Forks/thumb - 325 - - - - - - - - - - 1 1 1 1 1 $210,000 2021 Ford F150 - 326 - - - - - - - - - - - 1 1 1 1 $68,500 2009 Ford F150 Pickup 326 - 1 1 1 1 1 1 1 1 1 1 1 - - - $68,500 2021 Ford F150 - 326 - - - - - - - - - - - - 1 1 1 $68,500 2009 Chevrolet Silverado W/T 327 - 1 1 1 1 1 1 1 1 1 1 1 1 1 - $68,500 2023 Ford F150 - 327 - - - - - - - - - - - - - - 1 $68,500 2011 Dodge Pickup 328 - - - 1 1 1 1 1 1 1 1 1 - - - $68,500 2021 Ford F150 - 328 - - - - - - - - - - - - 1 1 1 $68,500 2011 Ford F450 Dump 329 - - - 1 1 1 1 1 1 1 1 1 1 - - $110,000 2022 Ford 1 Ton Dump - - - - - - - - - - - - - 1 1 $110,000 2022 International Plow/Dump Combo - 330 - - - - - - - - - - - - - 1 1 $385,000 1990 Champion 730A Road Grader 331 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $450,000 2016 Freightliner 114 SD Tandem Sander 332 - - - - - - - - 1 1 1 1 1 1 1 $400,000 2015 Kubota Sidewalk Tractor M8540 - 333 - - - - - - - - 1 1 1 1 1 1 1 $135,000 2008 Sterling Vactor Sewer Flusher 319 1 1 1 1 1 1 1 1 1 1 1 - - - - $550,000 2020 Western Star - Sewer Flushing with Hydro-Vac - 334 - - - - - - - - - - - 1 1 1 1 $550,000 2018 Ford F150 1/2 Ton Pick-up 335 - - - - - - - - - 1 1 1 1 1 1 $68,500 2016 Elgin Street Sweeper - - - - - - - - 1 1 1 1 1 1 - $378,000 2023 Elgin Sweeper - Pelican - 336 - - - - - - - - - - - - - - 1 $378,000 1966 Thompson Steam Jenny 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $25,000 2023 Thompson Steamer - 337 - - - - - - - - - - - - - - 1 $25,000 2019 Izuzu Garbage Compactor Truck - 338 - - - - - - - - - - 1 1 1 1 1 $230,000 APPENDIX C.1 TABLE 1 # of Vehicles Appendix C | 160 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED PUBLIC WORKS FLEET UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) 2007 Jeep Patriot 339 - - - - - - - 1 1 - 1 1 1 1 1 $50,000 2016 Ford F150 Pick-up 340 - - - - - - - 1 1 1 1 1 1 1 1 $68,500 2019 Outlander Hybrid - - - - - - - - - 4 1 1 1 1 1 $65,000 2017 Ford Escape SUV 352 - - - - - - - - 1 1 1 1 1 1 1 $50,000 2010 Ford Escape 354 - - - - - - - - - 1 1 1 1 1 1 $50,000 2008 Jeep Compass 355 1 1 1 1 1 1 1 1 1 - - - - - - $50,000 2007 Ford Escape XLT 4 Wheel Drive 356 - - - - - - 1 1 1 1 1 1 1 1 1 $50,000 1993 John Deere 544 G Wheel Loader 1 1 1 1 1 1 1 1 1 1 1 - - - - $290,000 2020 JD Loader - Unit 361 - - - - - - - - - - - 1 1 1 1 $290,000 1982 Canox 300 Amp Portable Welder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 2000 Trackless Tractor, Blower, and Sidewalk Sander 1 1 1 - - - - - - - - - - - - $190,000 2007 Sidewalk Plow - MacLean Engineering 1 1 1 1 1 1 1 1 1 1 1 - - - - $210,000 2020 Trackless Tractor/Blower/Plow/Sander - 374 - - - - - - - - - - - 1 1 1 1 $210,000 2008 Macleans Sidewalk Plow 1 1 1 1 1 1 1 1 1 1 1 1 - - - $210,000 2021 Trackless Tractor/Blower.Plow/Sander - 375 - - - - - - - - - - - - 1 1 1 $210,000 2011 Macleans Sidewalk Plow - - - 1 1 1 1 1 1 1 1 - - - - $210,000 2020 Trackless Tractor/Blower/Plow/Sander - 376 - - - - - - - - - - - 1 1 1 1 $210,000 2011 Macleans Sidewalk Plow - - - 1 1 1 1 1 1 1 1 - - - - $210,000 2020 Trackless Tractor/Blower/Plow/Sander - 377 - - - - - - - - - - - 1 1 1 1 $210,000 2003 Trackless Tractor, Blower, and Sidewalk Sander 1 1 1 1 1 1 1 1 - - - - - - - $210,000 2021 Trackless Tractor/Blower/Plow/Sander - 378 - - - - - - - - - - 1 1 1 1 1 $210,000 2023 Trackless Tractor/Plow/Blower/Sander - - - - - - - - - - - - - - 1 $210,000 2011 McConnel Boom Flail Mower - - - 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Shop Air Compressor 7.5 HP - - - 1 1 1 1 1 1 1 1 1 1 1 1 $4,000 Vehicle Hoist - Rotary :Lift SM014EL2 - - - - - - - 1 1 1 1 1 1 1 1 $35,000 2011 Ford F450 Dump 308 - - - 1 1 1 1 1 1 1 1 1 1 1 1 $75,000 2005 Toromont CAT 928G Wheel Loader and Forks 1 1 1 1 1 1 - - - - - - - - - $320,000 2002 Rhino Disc Mower 1 1 1 - - - - - - - - - - - - $20,000 2004 Johnston 3000 Sweeper 1 - - - - - - - - - - - - - - $350,000 1983 Eeger Beever Brush Chipper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $70,000 2009 Allianz 3000 Sweeper - 1 1 1 1 1 1 1 - - - - - - - $350,000 1996 Ford 5 Ton Dump and Plow 1 1 1 - - - - - - - - - - - - $260,000 Seasonal Lease of Tree Truck with Boom - - - - - - - - 1 1 1 1 1 1 $320,000 2019 Silverado 1500 WT - - - - - - - - - 1 1 1 1 1 1 $75,000 2019 Ford 550 - - - - - - - - - 1 1 1 1 1 1 $75,000 Total (#) 36 35 35 39 41 43 43 45 46 57 56 58 58 59 60 Total ($000) $7,532.5 $7,077.0 $7,200.0 $7,432.5 $8,117.5 $8,254.5 $8,206.0 $7,974.5 $8,659.0 $10,013.0 $10,381.0 $10,834.5 $10,834.5 $11,047.5 $11,257.5 APPENDIX C.1 TABLE 1 # of Vehicles Appendix C | 161 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED PUBLIC WORKS FLEET CONTRACTED SERVICES UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Contract Seasonal Sander 1 1 1 1 1 1 1 - - - - - - - - $380,000 Contract Seasonal 5 Ton Plow 1 1 1 1 1 1 1 - - - - - - - - $380,000 Contract Seasonal 5 Ton Plow 1 1 1 1 1 1 1 - - - - - - - - $380,000 Contract Seasonal 1 Ton Plow 1 1 1 1 1 1 1 - - - - - - - - $380,000 Contract Seasonal 5 Ton Plow 1 1 1 1 1 1 1 - - - - - - - - $380,000 Contract Seasonal Tandem Plow Sander - - - - - - - 1 1 1 1 1 1 1 1 $380,000 Contract Seasonal Tandem Plow Sander - - - - - - - 1 1 1 1 1 1 1 1 $380,000 Contract Seasonal Single Axle Plow - - - - - - - 1 1 1 1 1 1 1 1 $380,000 Contract Seasonal Pick-up Plow Sander - - - - - - - 1 1 1 1 - - - - $110,000 Total (#) 5 5 5 5 5 5 5 4 4 4 4 3 3 3 3 Total ($000) $1,900.0 $1,900.0 $1,900.0 $1,900.0 $1,900.0 $1,900.0 $1,900.0 $1,250.0 $1,250.0 $1,250.0 $1,250.0 $1,140.0 $1,140.0 $1,140.0 $1,140.0 # of Vehicles and Equipment APPENDIX C.1 TABLE 1 Appendix C | 162 TOWN OF COLLINGWOOD INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED ROADS ROADS UNIT COST Type of Road 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Arterial Roads Urban 37.6 39.7 39.7 39.7 39.7 39.7 40.1 40.1 40.1 40.1 41.4 42.7 43.9 45.2 46.5 $7,253,000 Arterial Roads Semi Urban 42.8 42.8 42.8 42.8 42.8 28.2 28.2 28.2 28.2 28.2 28.5 28.9 29.2 29.6 29.9 $4,621,000 Collector Roads Urban 13.8 13.8 13.8 13.8 13.8 13.8 15.3 15.3 15.3 15.3 15.2 15.0 14.9 14.7 14.6 $5,537,000 Collector Roads Semi Urban 24.2 25.3 25.3 25.3 25.3 21.6 21.6 21.6 21.6 21.6 21.4 21.3 21.1 21.0 20.8 $2,396,000 Total (km) 118.4 121.6 121.6 121.6 121.6 103 105 105 105 105 107 108 109 110 112 Total ($000) $604,885.4 $622,752.3 $622,752.3 $622,752.3 $622,752.3 $546,420.5 $557,627.2 $557,627.2 $557,627.2 $557,627.2 $567,323.6 $577,020.1 $586,716.5 $596,413.0 $606,109.4 SIDEWALKS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Sidewalks 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 $204,000 Total (km) 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 26.2 Total ($000) $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 $5,344.8 TRAFFIC SIGNALS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Intersection Traffic Signal Sets 23 23 23 23 24 24 26 26 26 26 27.0 27.0 28.0 28.0 28.0 $321,000 Mid Block Pedestrian Signals - - - - - - - - - - 1.0 1.0 2.0 3.0 4.0 $124,000 Total (units) 23.0 23.0 23.0 23.0 24.0 24.0 26.0 26.0 26.0 26.0 28.0 28.0 30.0 31.0 32.0 Total ($000) $7,383.0 $7,383.0 $7,383.0 $7,383.0 $7,704.0 $7,704.0 $8,346.0 $8,346.0 $8,346.0 $8,346.0 $8,791.0 $8,791.0 $9,236.0 $9,360.0 $9,484.0 BRIDGES & CULVERTS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bridges & Culverts 24.0 24.0 24.0 24.0 24.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 22.0 22.0 $2,475,000 Total (units) 24.0 24.0 24.0 24.0 24.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 22.0 22.0 Total ($000) $59,400.0 $59,400.0 $59,400.0 $59,400.0 $59,400.0 $51,975.0 $51,975.0 $51,975.0 $51,975.0 $51,975.0 $51,975.0 $51,975.0 $51,975.0 $54,450.0 $54,450.0 km of Sidewalks Signals Bridges/Culverts APPENDIX C.1 TABLE 1 Lane Kilometres Appendix C | 163 TOWN OF COLLINGWOOD CALCULATION OF SERVICE LEVELS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 25,054 25,674 26,309 26,608 26,923 27,256 27,608 27,976 28,537 29,113 29,704 30,311 30,937 31,463 32,000 Historical Employment 10,161 10,197 10,233 10,351 10,469 10,589 10,710 10,832 10,968 11,105 11,244 11,385 11,527 11,639 11,751 Total Historical Pop. & Emp. 35,215 35,871 36,542 36,959 37,392 37,845 38,318 38,808 39,505 40,218 40,948 41,696 42,464 43,102 43,751 INVENTORY SUMMARY ($000) Public Works $16,618.5 $16,163.0 $16,286.0 $20,823.9 $21,508.9 $21,645.9 $21,626.2 $20,744.7 $21,429.4 $22,783.4 $23,151.4 $23,494.9 $20,791.5 $21,033.5 $21,703.1 Roads $677,013.2 $694,880.1 $694,880.1 $694,880.1 $695,201.1 $611,444.3 $623,293.0 $623,293.0 $623,293.0 $623,293.0 $633,434.4 $643,130.9 $653,272.3 $665,567.8 $675,388.2 Total ($000) $693,631.7 $711,043.1 $711,166.1 $715,704.0 $716,710.0 $633,090.2 $644,919.2 $644,037.7 $644,722.4 $646,076.4 $656,585.8 $666,625.8 $674,063.8 $686,601.3 $697,091.3 Average SERVICE LEVEL ($/pop & emp) Service Level Public Works $471.92 $450.59 $445.67 $563.43 $575.23 $571.96 $564.39 $534.54 $542.45 $566.50 $565.39 $563.48 $489.62 $487.99 $496.06 $525.95 Roads $19,225.14 $19,371.64 $19,015.67 $18,801.38 $18,592.24 $16,156.54 $16,266.32 $16,060.75 $15,777.57 $15,497.86 $15,469.24 $15,424.28 $15,384.07 $15,441.69 $15,437.09 $16,794.77 Total ($/pop & emp) $19,697.05 $19,822.23 $19,461.35 $19,364.81 $19,167.47 $16,728.50 $16,830.71 $16,595.29 $16,320.02 $16,064.36 $16,034.63 $15,987.76 $15,873.70 $15,929.68 $15,933.15 $17,320.71 TOWN OF COLLINGWOOD CALCULATION OF MAXIMUM ALLOWABLE SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $17,320.71 Net Population & Employment Growth 2024 - 2041 13,447 Maximum Allowable Funding Envelope $232,911,587 APPENDIX C.1 TABLE 1 Appendix C | 164 NO. Location Type Description / Remarks Length (metres) Gross Cost Grants, Subsidies & Other Net Municipal Costs Total DC Eligible Costs Available DC Reserves DC Eligible Costs 2024-2041 Widenings and Upgrades 1 Hwy 26: Harbour Street West to Silver Creek Drive Arterial Upgrade & widen 3 lane rural to 5 lane urban 3,600 2041 - 2041 $22,233,000 $0 $22,233,000 11% $2,473,000 $19,760,000 $0 $13,013,700 34% $6,746,300 2 Mountain Road: Tenth Line to Eleventh Line Arterial Upgrade 2 lane rural to 2 lane rural 3 m trail on one side 1,130 2029 - 2029 $4,556,500 $0 $4,556,500 24% $1,088,500 $3,468,000 $0 $3,468,000 0% $0 3 Sixth Line: Poplar Sideroad to Sandford Fleming Dr Collector Upgrade 2 lane rural to 2 lane rural 680 2031 - 2031 $2,952,000 $0 $2,952,000 16% $477,600 $2,474,400 $0 $2,474,400 0% $0 4 Hurontario Street: Hume Street to Collins Street Arterial Widen 2 lane urban to 3 lane urban 780 2027 - 2027 $5,241,100 $0 $5,241,100 12% $606,400 $4,634,700 $0 $4,634,700 0% $0 5 Collins Street: Ste. Marie Street to Katherine Street Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 360 2028 - 2028 $2,258,400 $0 $2,258,400 15% $332,100 $1,926,300 $0 $1,926,300 0% $0 6 High Street: Third Street to Fifth Street Arterial Widen 4 lane urban to 5 lane urban West: 3 m wide sidewalk; East: 1.5 m wide sidewalk 450 2027 - 2027 $3,495,100 $0 $3,495,100 30% $1,048,500 $2,446,600 $0 $2,446,600 0% $0 7 Tenth Line: Sixth Street to Mountain Road Collector Upgrade 2 lane rural to 2 lane urban 4 m wide trail on one side 1,240 2030 - 2030 $8,147,700 $0 $8,147,700 10% $844,700 $7,303,000 $0 $7,303,000 0% $0 8 High Street: Poplar Sideroad to Tenth Street Arterial Upgrade & widen 2 lane rural to 4 lane urban 3 m wide trail on one side 1,400 2029 - 2029 $10,734,500 $0 $10,734,500 34% $3,607,900 $7,126,600 $0 $7,126,600 0% $0 9 Third Street: High Street to Birch Street Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 865 2028 - 2028 $5,275,800 $0 $5,275,800 38% $2,023,800 $3,252,000 $0 $3,252,000 0% $0 10 Cameron Street: Hurontario St to Walnut St Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 830 2028 - 2028 $5,176,900 $0 $5,176,900 40% $2,062,300 $3,114,600 $0 $3,114,600 0% $0 11 Mountain Road: Cambridge Street to Tenth Line Arterial Upgrade & widen 3 lane rural to 5 lane urban North: 1.5 m wide sidewalk; South: 4 m wide sidewalk 1,075 2024 - 2024 $15,347,675 $0 $15,347,675 16% $2,526,300 $12,821,375 $12,821,375 $0 0% $0 12 Peel Street: Hume Street to Bush Street Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 365 2026 - 2026 $2,655,900 $0 $2,655,900 40% $1,052,000 $1,603,900 $0 $1,603,900 0% $0 13 Peel Street: Ontario Street to Hume Street Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 560 2031 - 2031 $3,700,500 $0 $3,700,500 40% $1,490,700 $2,209,800 $0 $2,209,800 0% $0 14 Sixth Street: Tenth Line to High Street Arterial Widen 2 lane rural to 3 lane urban 1.5 m wide sidewalk on both sides 1,320 2035 - 2035 $8,874,500 $0 $8,874,500 15% $1,334,800 $7,539,700 $0 $7,539,700 0% $0 15 Tenth Line: Mountain Road to Harbour Street Collector Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 620 2032 - 2032 $3,364,900 $0 $3,364,900 42% $1,402,900 $1,962,000 $0 $1,962,000 0% $0 16 Harbour Street Extension: Tenth Line to Georgian Trail Collector Extend 2 lane rural through unopened R.O.W. 560 2032 - 2032 $3,872,800 $0 $3,872,800 0% $0 $3,872,800 $0 $3,872,800 0% $0 Subtotal: Widenings and Upgrades $107,887,275 $0 $107,887,275 $22,371,500 $85,515,775 $12,821,375 $65,948,100 $6,746,300 Replacement/ Benefit to Existing Timing Post Period Allocation APPENDIX C.1 TABLE 2 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Appendix C | 165 NO. Location Type Description / Remarks Length (metres) Gross Cost Grants, Subsidies & Other Net Municipal Costs Total DC Eligible Costs Available DC Reserves DC Eligible Costs 2024-2041 Replacement/ Benefit to Existing Timing Post Period Allocation APPENDIX C.1 TABLE 2 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Intersection Improvements 17 Highway 26 and Silver Creek Drive Left turn lane 2025 - 2025 $1,191,000 $0 $1,191,000 0% $0 $1,191,000 $0 $1,191,000 0% $0 18 Highway 26 and Cranberry Trail E/Gun Club Road Signalization, left turn lanes 2025 - 2025 $819,000 $819,000 $0 0% $0 $0 $0 $0 0% $0 19 High Street and First Street (Phase 1) Additional turning lanes and revise timing 2029 - 2029 $819,000 $0 $819,000 0% $0 $819,000 $0 $819,000 0% $0 20 High Street and Home Depot Access Relocate access to 3rd Street or Cambridge Street (widening) 2027 - 2027 $176,904 $176,904 $0 0% $0 $0 $0 $0 0% $0 21 Mountain Road / First Street Extension / Cambridge Street (Phase 1) Additional turning lanes 2030 - 2030 $1,309,000 $0 $1,309,000 0% $0 $1,309,000 $0 $1,309,000 0% $0 22 High Street and Third Street Signalization, left turn lanes and phases 2028 - 2028 $1,965,600 $1,769,040 $196,560 0% $0 $196,560 $0 $196,560 0% $0 23 High Street and Campbell Street Double lane roundabout 2028 - 2028 $1,638,000 $0 $1,638,000 0% $0 $1,638,000 $0 $1,638,000 0% $0 24 Highway 26 and Habour Street / Balsam Street Additional turning lanes 2030 - 2030 $982,800 $0 $982,800 0% $0 $982,800 $0 $982,800 0% $0 25 High Street and First Street (Phase 2) Additional turning lane 2041 - 2041 $595,000 $0 $595,000 0% $0 $595,000 $0 $391,900 34% $203,100 26 Mountain Road / First Street Extension / Cambridge Street (Phase 2) Additional turning lane 2041 - 2041 $595,000 $0 $595,000 0% $0 $595,000 $0 $391,900 34% $203,100 27 High Street and Sixth Street Additional turning lanes 2041 - 2041 $710,500 $0 $710,500 0% $0 $710,500 $0 $467,900 34% $242,600 Subtotal: Intersection Improvements $10,801,804 $2,764,944 $8,036,860 $0 $8,036,860 $0 $7,388,060 $648,800 Sidewalks 28 Poplar Sideroad: Hurontario to High St north 3m wide trail 2033 - 2033 $316,600 $0 $316,600 0% $0 $316,600 $0 $316,600 0% $0 29 Highway 26: osler Bluff Road to Silver Glen Blvd 3m wide trail on one side 2033 - 2033 $618,800 $0 $618,800 0% $0 $618,800 $0 $618,800 0% $0 30 Tenth Line: Poplar Sideroad to Sixth St 3m wide trail on one side 2033 - 2033 $673,400 $0 $673,400 0% $0 $673,400 $0 $673,400 0% $0 $1,608,800 $0 $1,608,800 $0 $1,608,800 $0 $1,608,800 $0 Rolling Stock 31 Provision for Development-Related Vehicles 2024 - 2024 $387,000 $0 $387,000 0% $0 $387,000 $351,680 $35,320 0% $0 32 Provision for Development-Related Vehicles 2025 - 2041 $3,200,000 $0 $3,200,000 0% $0 $3,200,000 $0 $3,200,000 0% $0 $3,587,000 $0 $3,587,000 $0 $3,587,000 $351,680 $3,235,320 $0 Subtotal: Sidewalks Subtotal: Rolling Stock Appendix C | 166 NO. Location Type Description / Remarks Length (metres) Gross Cost Grants, Subsidies & Other Net Municipal Costs Total DC Eligible Costs Available DC Reserves DC Eligible Costs 2024-2041 Replacement/ Benefit to Existing Timing Post Period Allocation APPENDIX C.1 TABLE 2 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Public Works Facilities 33 New Accommodation - P/W Building and Shop renovations - tied to Accommodation Plan 2024 - 2024 $400,000 $0 $400,000 86% $344,000 $56,000 $0 $56,000 0% $0 34 Provision for New Storage Space (Containers) 2029 - 2031 $21,800 $0 $21,800 0% $0 $21,800 $0 $21,800 0% $0 $421,800 $0 $421,800 $344,000 $77,800 $0 $77,800 $0 Studies 35 Transportation Master Plan 2024 - 2024 $400,000 $0 $400,000 0% $0 $400,000 $0 $400,000 0% $0 36 Transportation Master Plan Update 2029 - 2029 $250,000 $0 $250,000 0% $0 $250,000 $0 $250,000 0% $0 $650,000 $0 $650,000 $0 $650,000 $0 $650,000 $0 TOTAL Roads & Related Projects $124,956,679 $2,764,944 $122,191,735 $22,715,500 $99,476,235 $13,173,056 $78,908,080 $7,395,100 2024 - 2041 Net Funding Envelope $232,911,587 Reserve Fund Balance Balance as at December 31, 2023 $13,173,056 Subtotal: Studies Subtotal: Public Works Facilities Appendix C | 167 2024-2041 Growth in Population in New Units 13,505 2024-2041 Employment Growth 2,721 2024-2041 Growth in Square Meters 190,470 Total Benefit Grants/ Available Post Net Capital Gross to Existing Subsidies DC Period Costs After Project Cost Share Contributions Reserves Allocation Adjustments ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Widenings and Upgrades $107,887.28 $22,371.50 $0.00 $13,173.06 $6,746.30 $65,596.42 83% $54,596.31 17% $11,000.11 Intersection Improvements $10,801.80 $0.00 $2,764.94 $0.00 $648.80 $7,388.06 83% $6,149.13 17% $1,238.93 Sidewalks $1,608.80 $0.00 $0.00 $0.00 $0.00 $1,608.80 83% $1,339.01 17% $269.79 Rolling Stock $3,587.00 $0.00 $0.00 $0.00 $0.00 $3,587.00 83% $2,985.48 17% $601.52 Public Works Facilities $421.80 $344.00 $0.00 $0.00 $0.00 $77.80 83% $64.75 17% $13.05 Studies $650.00 $0.00 $0.00 $0.00 $0.00 $650.00 83% $541.00 17% $109.00 TOTAL SERVICES RELATED TO A HIGHWAY: ROADS & RELATED $124,956.68 $22,715.50 $2,764.94 $13,173.06 $7,395.10 $78,908.08 $65,675.68 $13,232.40 Unadjusted Development Charge $4,863.06 $69.47 Development-Related Capital Forecast 2024-2041 Residential Non-Residential Share Share SERVICES RELATED TO A HIGHWAY: ROADS & RELATED APPENDIX C.1 TABLE 3 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 168 APPENDIX C.1 TABLE 4 TOWN OF COLLINGWOOD SERVICES RELATED TO A HIGHWAY: ROADS & RELATED CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE ROADS: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $10,964.0 $3,072.7 $5,517.8 $7,833.0 $5,415.7 $141.2 ($6,775.5) ($12,098.8) ($12,864.8) ($15,355.9) 2019 TO 2031 RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $10,964.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Roads: Residential: Non Inflated $408.9 $1,147.9 $1,491.6 $6,050.5 $8,585.8 $9,870.4 $8,148.5 $4,061.4 $5,013.0 $1,495.7 Roads: Residential: Inflated $11,372.9 $1,170.9 $1,551.9 $6,420.8 $9,293.6 $10,897.7 $9,176.6 $4,665.3 $5,873.5 $1,787.5 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 REVENUE - DC Receipts: Inflated $3,319.4 $3,468.2 $3,637.5 $3,801.4 $3,975.8 $4,161.3 $4,358.3 $4,567.4 $4,137.8 $4,323.2 INTEREST - Interest on Opening Balance $383.7 $107.5 $193.1 $274.2 $189.5 $4.9 ($372.7) ($665.4) ($707.6) ($844.6) - Interest on In-year Transactions ($221.5) $40.2 $36.5 ($72.0) ($146.2) ($185.3) ($132.5) ($2.7) ($47.7) $44.4 TOTAL REVENUE $3,481.7 $3,616.0 $3,867.1 $4,003.5 $4,019.1 $3,981.0 $3,853.2 $3,899.3 $3,382.5 $3,523.0 CLOSING CASH BALANCE $3,072.7 $5,517.8 $7,833.0 $5,415.7 $141.2 ($6,775.5) ($12,098.8) ($12,864.8) ($15,355.9) ($13,620.3) ROADS: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($13,620.3) ($9,982.9) ($13,921.2) ($9,901.4) ($5,445.2) ($535.3) $4,873.3 $10,717.8 2019 TO 2031 RESIDENTIAL FUNDING REQUIREMENTS Prior Growth : Non: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $10,964.0 Roads: Residential: Non: Inflated $156.7 $6,432.0 $156.7 $156.7 $156.7 $156.7 $156.7 $12,029.8 $65,675.7 Roads: Residential: Inflated $191.0 $7,997.4 $198.7 $202.7 $206.7 $210.9 $215.1 $16,844.7 $88,277.8 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 731 748 765 783 799 817 835 855 13,505 REVENUE - DC Receipts: Inflated $4,502.1 $4,698.9 $4,901.8 $5,117.5 $5,326.5 $5,555.4 $5,791.4 $6,048.7 $81,692.6 INTEREST - Interest on Opening Balance ($749.1) ($549.1) ($765.7) ($544.6) ($299.5) ($29.4) $170.6 $375.1 ($3,828.8) - Interest on In-year Transactions $75.4 ($90.7) $82.3 $86.0 $89.6 $93.5 $97.6 ($296.9) ($550.0) TOTAL REVENUE $3,828.4 $4,059.1 $4,218.4 $4,658.9 $5,116.6 $5,619.5 $6,059.5 $6,126.9 $77,313.8 CLOSING CASH BALANCE ($9,982.9) ($13,921.2) ($9,901.4) ($5,445.2) ($535.3) $4,873.3 $10,717.8 $0.0 2024 Adjusted Charge Per Capita $5,052.34 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 169 APPENDIX C.1 TABLE 4 TOWN OF COLLINGWOOD SERVICES RELATED TO A HIGHWAY: ROADS & RELATED CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE ROADS: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $2,209.0 $531.0 $925.3 $1,273.2 $646.7 ($577.5) ($2,168.8) ($3,471.4) ($3,891.3) ($4,277.7) NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $2,209.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Roads: Non-Residential: Non: Inflated $82.4 $231.3 $300.5 $1,219.1 $1,729.9 $1,988.7 $1,641.8 $818.3 $1,010.0 $301.4 Roads: Non-Residential: Inflated $2,291.4 $235.9 $312.7 $1,293.7 $1,872.5 $2,195.7 $1,848.9 $940.0 $1,183.4 $360.1 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 REVENUE - DC Receipts: Inflated $583.0 $605.2 $622.7 $640.6 $659.0 $677.9 $697.3 $717.1 $1,015.6 $1,048.2 INTEREST - Interest on Opening Balance $77.3 $18.6 $32.4 $44.6 $22.6 ($31.8) ($119.3) ($190.9) ($214.0) ($235.3) - Interest on In-year Transactions ($47.0) $6.5 $5.4 ($18.0) ($33.4) ($41.7) ($31.7) ($6.1) ($4.6) $12.0 TOTAL REVENUE $613.4 $630.3 $660.5 $667.2 $648.3 $604.4 $546.3 $520.1 $797.0 $825.0 CLOSING CASH BALANCE $531.0 $925.3 $1,273.2 $646.7 ($577.5) ($2,168.8) ($3,471.4) ($3,891.3) ($4,277.7) ($3,812.8) ROADS: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($3,812.8) ($2,961.0) ($3,625.9) ($2,687.6) ($1,661.3) ($534.4) $693.1 $2,013.7 NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $2,209.0 Roads: Non-Residential: Non: Inflated $31.6 $1,295.9 $31.6 $31.6 $31.6 $31.6 $31.6 $2,423.8 $13,232.4 Roads: Non-Residential: Inflated $38.5 $1,611.3 $40.0 $40.8 $41.7 $42.5 $43.3 $3,393.9 $17,786.3 NEW RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 12,040 12,250 12,390 12,530 12,740 12,880 13,020 13,230 190,470 REVENUE - DC Receipts: Inflated $1,081.8 $1,122.7 $1,158.2 $1,194.7 $1,239.0 $1,277.7 $1,317.4 $1,365.5 $17,023.7 INTEREST - Interest on Opening Balance ($209.7) ($162.9) ($199.4) ($147.8) ($91.4) ($29.4) $24.3 $70.5 ($1,341.6) - Interest on In-year Transactions $18.3 ($13.4) $19.6 $20.2 $21.0 $21.6 $22.3 ($55.8) ($104.9) TOTAL REVENUE $890.3 $946.4 $978.4 $1,067.1 $1,168.6 $1,269.9 $1,364.0 $1,380.2 $15,577.2 CLOSING CASH BALANCE ($2,961.0) ($3,625.9) ($2,687.6) ($1,661.3) ($534.4) $693.1 $2,013.7 ($0.0) 2024 Adjusted Charge Per Square Metre $73.71 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 170 Appendix C.2 Water Services Appendix C | 171 Appendix C.2 - Water Services This appendix provides a brief outline of the infrastructure included in the Water Services development charge. The development-related projects outlined in this appendix are required to service the demands of new development to 2041. A separate DC Study has been prepared for the Town's Water Treatment Plant. The details regarding the development forecast, capital program and DC rate calculation are provided in the 2024 Development Charges Background Study: Water Treatment Plant. The benefits of the services are considered to be Town-wide for the purposes of calculating the development charge. The following discusses the individual components included in the Water Services category. The water infrastructure included in the DC capital forecast is required to achieve health and safety standards as identified in relevant legislation, including Provincial regulations. As such, in accordance with section 4(3) of O.Reg. 82/98, the 15-year historical service level does not apply. The analysis is set out in the tables which follow. The tables include: Table C.2-1 2024-2041 Development-Related Capital Program Table C.2-2 Calculation of the Unadjusted Development Charges Table C.2-3 Cash Flow Analysis Table 1 2024-2041 Development-Related Capital Program The gross development-related capital program for Water Services amounts to $100.78 million and is required to service future development. The capital program includes $59.48 million of water distribution projects such as watermain upsizing and extension projects. Water facility projects add another $39.71 million to the capital program and two Water Master Plan Appendix C | 172 Updates (each cost $175,000) will add a further $350,000. In addition, $1.24 million worth of water valve projects are included in the capital program. No grants, subsidies or other recoveries are identified for the Water Services projects. Approximately $15.70 million in BTE shares have been removed from the project costs. BTE shares are determined on a project-by-project basis and are based on the replacement of existing assets, including existing diameter and length, as part of growth-related projects. The net municipal cost of the capital program is thereby reduced to $85.08 million. The available Water Services reserve fund balance of $2.85 million is applied to projects occurring early in the recovery period. Another $13.34 million is considered to be related to projects that will benefit growth beyond 2041; these projects will be considered for recovery under future DC by-laws. The resulting in-period DC-eligible costs total $68.89 million. Table 2 Calculation of Unadjusted Development Charges The in-period DC-eligible cost is allocated 83% to the residential sector and 17% to the non-residential sector (based on shares of future population and employment growth). As such, the residential sector share totals $57.34 million of the development-related capital program. This cost, divided by the anticipated population growth in new units yields an unadjusted charge of $4,245.73 per capita. The non-residential costs of $11.55 million is divided by the anticipated new non-residential floor space, which yields a charge of $60.65 per square metre. Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge increases to $4,764.31 per capita and the non-residential calculated charge increases to $69.65 per square metre. This is a reflection of the timing of the capital program and development charges revenues. Appendix C | 173 The following table summarizes the calculation of the Water Services development charge: Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $100,777,200 $68,891,249 $4,245.73 $60.65 $4,764.31 $69.65 WATER SERVICES SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix C | 174 NO. Infrastructure Requirement Description / Remarks Water Distribution Projects 1 Poplar Sideroad: Raglan Street to Beachwood Road Trunk watermain extension 2000 2029 - 2029 $5,485,300 $0 $5,485,300 0% $0 $5,485,300 $0 $5,485,300 0% $0 2 Sixth Line: Poplar Sideroad to Sandford Fleming Drive Trunk watermain extension 650 2031 - 2031 $1,694,400 $0 $1,694,400 0% $0 $1,694,400 $0 $1,694,400 0% $0 3 Poplar Sideroad: Rowland Street to Tenth Line Trunk watermain extension 920 2032 - 2032 $2,763,700 $0 $2,763,700 0% $0 $2,763,700 $0 $2,763,700 0% $0 4 High Street: Findlay Drive to Campbell Street Trunk watermain extension 300 2028 - 2028 $825,300 $0 $825,300 15% $123,800 $701,500 $0 $701,500 0% $0 5 Tenth Line: Poplar Sideroad to Sixth Street Trunk watermain extension 1850 2044 - 2044 $5,321,500 $0 $5,321,500 0% $0 $5,321,500 $0 $0 100% $5,321,500 6 Tenth Line: Sixth Street to Mountain Road Trunk watermain extension 1125 2026 - 2026 $3,257,300 $0 $3,257,300 0% $0 $3,257,300 $2,750,051 $507,249 0% $0 7 Sixth Street: Georgian Meadows Drive to Tenth Line Trunk watermain extension 275 2026 - 2026 $894,200 $0 $894,200 0% $0 $894,200 $0 $894,200 0% $0 8 Future Secondary Plan Develop: Tenth Line to Conc. 11/12 Oversizing of trunk watermain through future development 1000 2031 - 2031 $120,600 $0 $120,600 0% $0 $120,600 $0 $120,600 0% $0 9 Future Secondary Plan Develop: Conc. 11/12 to Osler Bluff Oversizing of trunk watermain through future development 1200 2044 - 2044 $147,400 $0 $147,400 0% $0 $147,400 $0 $0 100% $147,400 10 Future Secondary Plan Develop: South Extension of 11th Line Oversizing of trunk watermain through future development 1100 2032 - 2032 $137,400 $0 $137,400 0% $0 $137,400 $0 $137,400 0% $0 11 Future Secondary Plan Develop: Sixth Street to Mountain Rd. Oversizing of trunk watermain through future development 1450 2044 - 2044 $179,300 $0 $179,300 0% $0 $179,300 $0 $0 100% $179,300 12 Mountain Road: Thomas Drive to Tenth Line Trunk watermain extension 700 2027 - 2027 $178,300 $0 $178,300 0% $0 $178,300 $0 $178,300 0% $0 13 Watermain Loop along Eleventh Line and Georgian Trail* Trunk watermain extension 3300 2031 - 2031 $0 $0 $0 0% $0 $0 $0 $0 0% $0 14 Cranberry Development to the Georgian Trail* Oversizing of trunk watermain through future development 250 2031 - 2031 $0 $0 $0 0% $0 $0 $0 $0 0% $0 15 Harbour Street Extension to Tenth Line Trunk watermain extension 565 2025 - 2025 $801,800 $0 $801,800 15% $120,300 $681,500 $0 $681,500 0% $0 16 North of First Street: Maple Street to Hickory Street Trunk watermain extension 785 2027 - 2027 $2,255,300 $0 $2,255,300 15% $338,300 $1,917,000 $0 $1,917,000 0% $0 17 North of First Street: Hickory Street to Highway 26 Trunk watermain extension 420 2030 - 2030 $1,155,500 $0 $1,155,500 15% $173,300 $982,200 $0 $982,200 0% $0 18 Simcoe Street: Heritage Street to Water Treatment Plant Upsize existing watermain from 300 to 500 mm 1365 2040 - 2040 $4,962,200 $0 $4,962,200 28% $1,378,400 $3,583,800 $0 $2,360,200 34% $1,223,600 19 Hwy 26: Old Mountain Road to Carmichael Pumping Station Upsize existing watermain from 300 to 400 mm 2122 2045 - 2045 $7,136,600 $0 $7,136,600 48% $3,398,400 $3,738,200 $0 $0 100% $3,738,200 20 Sixth Street: Hurontario Street to High Street Trunk watermain extension to 400 mm 1960 2025 - 2025 $6,375,600 $0 $6,375,600 0% $0 $6,375,600 $0 $6,375,600 0% $0 21 High Street: Old Mountain Road to Fifth Street Upsize existing watermain from 300 to 450 mm 1225 2030 - 2030 $4,374,900 $0 $4,374,900 36% $1,562,500 $2,812,400 $0 $2,812,400 0% $0 22 St. Paul Street: Side Launch Way to Hume Street Upsize existing watermain from 300 to 400 mm 830 2026 - 2041 $2,807,500 $0 $2,807,500 48% $1,336,900 $1,470,600 $0 $1,470,600 0% $0 23 High Street: Sixth Street to Campbell Street Upsize / add new watermain from 200 to 450 mm 1468 2028 - 2028 $4,610,900 $0 $4,610,900 13% $606,700 $4,004,200 $0 $4,004,200 0% $0 24 Poplar Sideroad: Clark Street to Rowland Street Trunk watermain extension 720 2035 - 2035 $1,825,300 $0 $1,825,300 0% $0 $1,825,300 $0 $1,825,300 0% $0 25 Hume Street: Pretty River Parkway to Raglan Street North Upsize existing watermain to 400 mm 410 2035 - 2035 $1,340,700 $0 $1,340,700 48% $638,400 $702,300 $0 $702,300 0% $0 26 Raglan Street: Erie Street to Oliver Crescent Upsize existing watermain from 300 to 400 mm 250 2035 - 2035 $829,200 $0 $829,200 48% $394,900 $434,300 $0 $434,300 0% $0 Subtotal Water Distribution Projects $59,480,200 $0 $59,480,200 $10,071,900 $49,408,300 $2,750,051 $36,048,249 $10,610,000 * Projects are anticipated to be funded by developer (local infrastructure) Length (metres) Total DC Eligible Costs Available DC Reserves DC In-Period Eligible Costs Post Period Allocation Timing Gross Cost Grants, Subsidies & Other Contributions Net Municipal Cost Replacement/ Benefit to Existing APPENDIX C.2 TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM WATER SERVICES Appendix C | 175 NO. Infrastructure Requirement Description / Remarks Length (metres) Total DC Eligible Costs Available DC Reserves DC In-Period Eligible Costs Post Period Allocation Timing Gross Cost Grants, Subsidies & Other Contributions Net Municipal Cost Replacement/ Benefit to Existing APPENDIX C.2 TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM WATER SERVICES Water Facilities Projects 27 Expansion of Public Works Headquarters to Accommodate Staff (Shared Facility Public Works & Water) 2024 - 2024 $690,000 $0 $690,000 86% $593,000 $97,000 $97,000 $0 0% $0 28 Stewart Road Booster Pumping Station and Reservoir (Phase 1) Zone 2 BPS & Reservoir 2026 - 2026 $17,000,000 $0 $17,000,000 0% $0 $17,000,000 $0 $17,000,000 0% $0 29 Stewart Road Booster Pumping Station and Reservoir (Phase 2) Zone 2 BPS & Reservoir 2041 - 2041 $7,000,000 $0 $7,000,000 0% $0 $7,000,000 $0 $4,610,100 34% $2,389,900 30 Stewart Road Ultimate Pump Upgrades Required for Stewart Road Reservoir Phase 2 2038 - 2038 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $0 $658,600 34% $341,400 31 Decommissioning Georgian Meadows BPS Decommision BPS after Stewart Road BPS is commissioned 2028 - 2028 $300,000 $0 $300,000 0% $0 $300,000 $0 $300,000 0% $0 32 Ted Carmichael West End Reservoir (Highway 26 West) West End BPS Improvements 2024 - 2025 $3,400,000 $0 $3,400,000 0% $0 $3,400,000 $0 $3,400,000 0% $0 33 New Elevated Tank (Location TBD) Replacement and enhancement of existing tank 2030 - 2030 $10,000,000 $0 $10,000,000 50% $5,000,000 $5,000,000 $0 $5,000,000 0% $0 34 Water Efficiency Measures 2024 - 2041 $320,000 $0 $320,000 0% $0 $320,000 $0 $320,000 0% $0 Subtotal Water Facilities Projects $39,710,000 $0 $39,710,000 $5,593,000 $34,117,000 $97,000 $31,288,700 $2,731,300 Studies 35 Water Master Plan Update 2025 - 2025 $175,000 $0 $175,000 0% $0 $175,000 $0 $175,000 0% $0 36 Water Master Plan Update 2030 - 2030 $175,000 $0 $175,000 0% $0 $175,000 $0 $175,000 0% $0 Subtotal Studies $350,000 $0 $350,000 $0 $350,000 $0 $350,000 $0 Water Valves 37 Osler Bluff Road PRV, Check Valve and Decomission Osler Booster Pumps Create valve configuration to feed zone 1A or 2 in emergency 2029 - 2029 $742,000 $0 $742,000 0% $0 $742,000 $0 $742,000 0% $0 38 Mountain Road PRV and Chamber Installation New valve to feed Mountain Road low pressure & fire from zone 2 2029 - 2029 $218,000 $0 $218,000 15% $32,700 $185,300 $0 $185,300 0% $0 39 Pretty River Check Valve New check valve to supply zone 2 in emergency 2029 - 2029 $73,000 $0 $73,000 0% $0 $73,000 $0 $73,000 0% $0 40 Sixth Line PRV and Chamber Installation New valve to supply zone 2 in emergency 2035 - 2035 $204,000 $0 $204,000 0% $0 $204,000 $0 $204,000 0% $0 Subtotal Water Valves $1,237,000 $0 $1,237,000 $32,700 $1,204,300 $0 $1,204,300 $0 Total Water Projects $100,777,200 $0 $100,777,200 $15,697,600 $85,079,600 $2,847,051 $68,891,249 $13,341,300 Reserve Fund Balance Balance as at December 31, 2023 $2,847,051 Appendix C | 176 2024-2041 Growth in Population in New Units 13,505 2024-2041 Employment Growth 2,721 2024-2041 Growth in Square Meters 190,470 Total Benefit Available Post Net Capital Gross to Existing DC Period Costs After Project Cost Share Reserves Allocation Discount ($000) ($000) ($000) ($000) ($000) % $000 % $000 WATER SERVICES Water Distribution Projects $59,480.20 $10,071.90 $2,847.05 $10,610.00 $35,951.25 83% $29,922.45 17% $6,028.80 Water Facilities Projects $39,710.00 $5,593.00 $0.00 $2,731.30 $31,385.70 83% $26,122.51 17% $5,263.19 Studies $350.00 $0.00 $0.00 $0.00 $350.00 83% $291.31 17% $58.69 Water Valves $1,237.00 $32.70 $0.00 $0.00 $1,204.30 83% $1,002.35 17% $201.95 TOTAL WATER SERVICES $100,777.20 $15,697.60 $2,847.05 $13,341.30 $68,891.25 $57,338.61 $11,552.64 Unadjusted Development Charge $4,245.73 $60.65 Development-Related Capital Forecast 2024-2041 Residential Non-Residential Share Share WATER SERVICES APPENDIX C.2 TABLE 2 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 177 APPENDIX C.2 TABLE 3 TOWN OF COLLINGWOOD WATER SERVICES CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WATER: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $2,369.6 $4,100.6 ($202.4) ($15,606.1) ($14,798.7) ($16,495.7) ($19,598.2) ($25,197.4) ($24,073.1) ($24,414.4) RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $80.7 $0.0 $2,288.9 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Water: Residential: Non Inflated $1,429.7 $7,449.0 $15,406.9 $1,835.2 $4,257.6 $5,489.3 $7,556.7 $1,601.9 $2,505.9 $91.3 Water: Residential: Inflated $1,510.5 $7,598.0 $18,410.7 $1,947.6 $4,608.5 $6,060.6 $8,510.1 $1,840.1 $2,936.1 $109.1 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 REVENUE - DC Receipts: Inflated $3,130.2 $3,270.5 $3,430.1 $3,584.6 $3,749.2 $3,924.1 $4,109.9 $4,307.0 $3,901.9 $4,076.8 INTEREST - Interest on Opening Balance $82.9 $143.5 ($11.1) ($858.3) ($813.9) ($907.3) ($1,077.9) ($1,385.9) ($1,324.0) ($1,342.8) - Interest on In-year Transactions $28.3 ($119.0) ($412.0) $28.6 ($23.6) ($58.8) ($121.0) $43.2 $16.9 $69.4 TOTAL REVENUE $3,241.4 $3,295.0 $3,007.0 $2,755.0 $2,911.6 $2,958.1 $2,911.0 $2,964.3 $2,594.8 $2,803.4 CLOSING CASH BALANCE $4,100.6 ($202.4) ($15,606.1) ($14,798.7) ($16,495.7) ($19,598.2) ($25,197.4) ($24,073.1) ($24,414.4) ($21,720.1) WATER: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($21,720.1) ($18,708.3) ($18,677.8) ($15,119.6) ($11,161.2) ($7,522.8) ($2,731.2) ($196.1) RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $2,369.6 Water: Residential: Non: Inflated $91.3 $2,726.3 $91.3 $91.3 $639.5 $91.3 $2,055.7 $3,928.3 $57,338.6 Water: Residential: Inflated $111.3 $3,389.8 $115.8 $118.1 $843.7 $122.9 $2,822.0 $5,500.6 $66,555.6 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 731 748 765 783 799 817 835 855 13,505 REVENUE - DC Receipts: Inflated $4,245.4 $4,431.0 $4,622.4 $4,825.7 $5,022.8 $5,238.7 $5,461.2 $5,703.9 $77,035.4 INTEREST - Interest on Opening Balance ($1,194.6) ($1,029.0) ($1,027.3) ($831.6) ($613.9) ($413.8) ($150.2) ($10.8) ($12,765.8) - Interest on In-year Transactions $72.3 $18.2 $78.9 $82.4 $73.1 $89.5 $46.2 $3.6 ($83.6) TOTAL REVENUE $3,123.1 $3,420.3 $3,673.9 $4,076.5 $4,482.1 $4,914.5 $5,357.2 $5,696.6 $64,185.9 CLOSING CASH BALANCE ($18,708.3) ($18,677.8) ($15,119.6) ($11,161.2) ($7,522.8) ($2,731.2) ($196.1) ($0.0) 2024 Adjusted Charge Per Capita $4,764.31 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 178 APPENDIX C.2 TABLE 3 TOWN OF COLLINGWOOD WATER SERVICES CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WATER: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $477.4 $745.0 ($214.3) ($3,432.9) ($3,405.1) ($3,906.6) ($4,718.0) ($6,062.4) ($6,083.6) ($6,043.7) NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $16.3 $0.0 $461.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Water: Non-Residential: Non: Inflated $288.1 $1,500.8 $3,104.2 $369.8 $857.8 $1,106.0 $1,522.5 $322.8 $504.9 $18.4 Water: Non-Residential: Inflated $304.3 $1,530.9 $3,709.4 $392.4 $928.5 $1,221.1 $1,714.6 $370.7 $591.6 $22.0 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 REVENUE - DC Receipts: Inflated $550.9 $571.9 $588.4 $605.3 $622.7 $640.5 $658.8 $677.6 $959.6 $990.5 INTEREST - Interest on Opening Balance $16.7 $26.1 ($11.8) ($188.8) ($187.3) ($214.9) ($259.5) ($333.4) ($334.6) ($332.4) - Interest on In-year Transactions $4.3 ($26.4) ($85.8) $3.7 ($8.4) ($16.0) ($29.0) $5.4 $6.4 $16.9 TOTAL REVENUE $571.9 $571.6 $490.8 $420.2 $427.0 $409.7 $370.3 $349.5 $631.5 $675.0 CLOSING CASH BALANCE $745.0 ($214.3) ($3,432.9) ($3,405.1) ($3,906.6) ($4,718.0) ($6,062.4) ($6,083.6) ($6,043.7) ($5,390.7) WATER: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($5,390.7) ($4,669.9) ($4,542.3) ($3,702.4) ($2,781.6) ($1,916.3) ($818.5) ($175.5) NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth Water: Non-Residential: Non: Inflated $18.4 $549.3 $18.4 $18.4 $128.8 $18.4 $414.2 $791.5 $11,552.6 Water: Non-Residential: Inflated $22.4 $683.0 $23.3 $23.8 $170.0 $24.8 $568.6 $1,108.3 $13,409.7 NEW RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 12,040 12,250 12,390 12,530 12,740 12,880 13,020 13,230 190,470 REVENUE - DC Receipts: Inflated $1,022.2 $1,060.8 $1,094.4 $1,128.9 $1,170.7 $1,207.3 $1,244.8 $1,290.2 $16,085.4 INTEREST - Interest on Opening Balance ($296.5) ($256.8) ($249.8) ($203.6) ($153.0) ($105.4) ($45.0) ($9.7) ($3,139.7) - Interest on In-year Transactions $17.5 $6.6 $18.7 $19.3 $17.5 $20.7 $11.8 $3.2 ($13.4) TOTAL REVENUE $743.2 $810.6 $863.3 $944.6 $1,035.3 $1,122.6 $1,211.6 $1,283.7 $12,932.2 CLOSING CASH BALANCE ($4,669.9) ($4,542.3) ($3,702.4) ($2,781.6) ($1,916.3) ($818.5) ($175.5) ($0.0) 2024 Adjusted Charge Per Square Metre $69.65 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 179 Appendix C.3 Wastewater Services Appendix C | 180 Appendix C.3 - Wastewater Services This appendix provides a brief outline of the infrastructure included in the Wastewater Services development charge. The development-related projects outlined in this appendix are required to service the demands of new development to 2041. The benefits of the services are considered to be Town-wide for the purposes of calculating the development charge. Wastewater infrastructure included in the DC capital forecast is required to achieve health and safety standards as identified in relevant legislation, including Provincial regulations. As such, in accordance with section 4(3) of O.Reg. 82/98, the 15-year historical service level does not apply. The analysis is set out in the tables which follow. The tables include: Table C.3-1 2024-2041 Development-Related Capital Program Table C.3-2 Calculation of the Unadjusted Development Charges Table C.3-3 Cash Flow Analysis Table 1 2024-2041 Development-Related Capital Program The capital program for Wastewater Services projects amounts to $9.81 million. The program includes sewer projects ($7.97 million), studies and environmental assessments ($1.84 million). No grants, subsidies or other contributions are expected, and so the net municipal cost of the capital program remains at $9.81 million. A BTE of $1.51 million is deducted. These shares include $294,700 for the proposed Stormwater Master Plan and is based on shares of population and employment growth over the 2041 planning horizon. As a result, the total eligible costs brought forward to the DC calculation amounts to $8.30 million. Appendix C | 181 The Wastewater Services reserve fund balance of $5.65 million has been applied to projects occurring in the initial years of the planning horizon. Another $1.13 million has been deemed a post-period benefit that will benefit growth occurring after 2041 and will be considered for recovery under future DC by-laws. The remaining in-period DC eligible costs total $1.52 million. Table 2 Calculation of Unadjusted Development Charges In total, $1.52 million is brought forward to the DC calculation, and allocated 83% to the residential sector and 17% to the non-residential sector (based on shares of future population and employment growth). This yields a calculated charge of $93.81 per capita and $1.34 per square metre. Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge decreases to $41.27 per capita and the non-residential charge decreases to $0.60 per square metre. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the Wastewater development charge: Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $9,810,000 $1,522,174 $93.81 $1.34 $41.27 $0.60 WASTEWATER SERVICES SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix C | 182 APPENDIX C.3 TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM WASTEWATER SERVICES NO. Infrastructure Requirement Description / Remarks Sewers 1 Mountain Road: Eleventh Line to the West Extension of the existing trunk sewer 650 2041 - 2041 $2,873,000 $0 $2,873,000 0% $0 $2,873,000 $369,926 $1,522,174 34% $980,900 2 North of Mountain Road: Tenth Line to the West Oversizing of trunk sewer through future development 1900 2029 - 2041 $255,000 $0 $255,000 0% $0 $255,000 $167,900 $0 34% $87,100 3 Black Ash Creek Trunk Main: South of Sixth Street Oversizing of trunk sewer through future development 900 2044 - 2044 $60,000 $0 $60,000 0% $0 $60,000 $0 $0 100% $60,000 4 Mountain Road: Improvements West of Balsam Street Trunk sewer to replace the existing sewer 100 2032 - 2032 $476,000 $0 $476,000 63% $297,500 $178,500 $178,500 $0 0% $0 5 Harbour Street: Georgian Trail to Tenth Line Extension of the existing trunk sewer 650 2030 - 2030 $937,000 $0 $937,000 0% $0 $937,000 $937,000 $0 0% $0 6 Hurontario Street: Lockhart Road to Collins Street Trunk sewer to replace the existing sewer 368 2027 - 2027 $1,568,000 $0 $1,568,000 59% $922,353 $645,647 $645,647 $0 0% $0 7 Black Ash Creek SPS Forcemain: SPS to WPCP (along trail) Twin forcemain to provide additional capacity 1390 2036 - 2036 $1,800,000 $0 $1,800,000 0% $0 $1,800,000 $1,800,000 $0 0% $0 $7,969,000 $0 $7,969,000 $1,219,853 $6,749,147 $4,098,973 $1,522,174 $1,128,000 8 Wastewater Plan Update 2025 - 2026 $175,000 $0 $175,000 0% $0 $175,000 $175,000 $0 0% $0 9 WPCP Municipal Class EA Update & Assimilative Capacity Update 2024 - 2025 $1,091,000 $0 $1,091,000 0% $0 $1,091,000 $1,091,000 $0 0% $0 10 Wastewater Plan Update 2033 - 2034 $175,000 $0 $175,000 0% $0 $175,000 $175,000 $0 0% $0 11 Stormwater Master Plan 2025 - 2026 $400,000 $0 $400,000 74% $294,682 $105,318 $105,318 $0 0% $0 Subtotal Studies $1,841,000 $0 $1,841,000 $294,682 $1,546,318 $1,546,318 $0 $0 Total Wastewater Projects $9,810,000 $0 $9,810,000 $1,514,535 $8,295,465 $5,645,291 $1,522,174 $1,128,000 Reserve Fund Balance Balance as at December 31, 2023 $5,645,291 Post Period Allocation DC In-Period Eligible Costs Total DC Eligible Costs DC Reserves Studies Subtotal Sewer Projects Timing Gross Cost Grants, Subsidies & Other Contributions Net Municipal Cost Benefit to Existing Share Length (metres) Appendix C | 183 2024-2041 Growth in Population in New Units 13,505 2024-2041 Employment Growth 2,721 2024-2041 Growth in Square Meters 190,470 Total Benefit Available Post Net Capital Net to Existing DC Period Costs After Project Cost Share Reserves Allocation Discount ($000) ($000) ($000) ($000) ($000) % $000 % $000 WASTEWATER SERVICES Sewers $7,969.00 $1,219.85 $4,098.97 $1,128.00 $1,522.17 83% $1,266.91 17% $255.26 Studies $1,841.00 $294.68 $1,546.32 $0.00 $0.00 83% $0.00 17% $0.00 TOTAL WASTEWATER SERVICES $9,810.00 $1,514.53 $5,645.29 $1,128.00 $1,522.17 $1,266.91 $255.26 Unadjusted Development Charge $93.81 $1.34 Development-Related Capital Forecast 2024-2041 Residential Non-Residential Share Share WASTEWATER SERVICES APPENDIX C.3 TABLE 2 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 184 APPENDIX C.3 TABLE 3 TOWN OF COLLINGWOOD WASTEWATER SERVICES CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WASTEWATER: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $4,698.6 $4,424.4 $4,010.3 $4,056.5 $3,644.4 $3,805.0 $3,960.7 $3,221.1 $3,359.2 $3,319.7 RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $454.0 $570.7 $116.7 $537.4 $0.0 $10.7 $790.6 $10.7 $159.3 $83.6 Wastewater: Residential: Non Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Wastewater: Residential: Inflated $454.0 $582.1 $121.4 $570.3 $0.0 $11.9 $890.4 $12.3 $186.7 $99.9 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 REVENUE - DC Receipts: Inflated $27.1 $28.3 $29.7 $31.1 $32.5 $34.0 $35.6 $37.3 $33.8 $35.3 INTEREST - Interest on Opening Balance $164.5 $154.9 $140.4 $142.0 $127.6 $133.2 $138.6 $112.7 $117.6 $116.2 - Interest on In-year Transactions ($11.7) ($15.2) ($2.5) ($14.8) $0.6 $0.4 ($23.5) $0.4 ($4.2) ($1.8) TOTAL REVENUE $179.8 $168.0 $167.6 $158.2 $160.6 $167.6 $150.7 $150.5 $147.2 $149.7 CLOSING CASH BALANCE $4,424.4 $4,010.3 $4,056.5 $3,644.4 $3,805.0 $3,960.7 $3,221.1 $3,359.2 $3,319.7 $3,369.6 WASTEWATER: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) $3,369.6 $3,420.6 $3,565.8 $1,765.4 $1,855.6 $1,950.4 $2,050.1 $2,155.0 RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $83.6 $10.7 $1,508.9 $10.7 $10.7 $10.7 $10.7 $318.6 $4,698.6 Wastewater: Residential: Non: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $1,266.9 $1,266.9 Wastewater: Residential: Inflated $101.9 $13.4 $1,913.7 $13.9 $14.2 $14.5 $14.8 $2,220.2 $7,235.3 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 731 748 765 783 799 817 835 855 13,505 REVENUE - DC Receipts: Inflated $36.8 $38.4 $40.0 $41.8 $43.5 $45.4 $47.3 $49.4 $667.4 INTEREST - Interest on Opening Balance $117.9 $119.7 $124.8 $61.8 $64.9 $68.3 $71.8 $75.4 $2,052.1 - Interest on In-year Transactions ($1.8) $0.4 ($51.5) $0.5 $0.5 $0.5 $0.6 ($59.7) ($182.9) TOTAL REVENUE $152.9 $158.5 $113.3 $104.1 $109.0 $114.2 $119.6 $65.1 $2,536.6 CLOSING CASH BALANCE $3,420.6 $3,565.8 $1,765.4 $1,855.6 $1,950.4 $2,050.1 $2,155.0 ($0.0) 2024 Adjusted Charge Per Capita $41.27 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 185 APPENDIX C.3 TABLE 3 TOWN OF COLLINGWOOD WASTEWATER SERVICES CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WASTEWATER: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $946.7 $890.7 $806.4 $814.6 $730.4 $761.4 $791.2 $640.3 $666.1 $659.2 NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $91.5 $115.0 $23.5 $108.3 $0.0 $2.2 $159.3 $2.2 $32.1 $16.8 Wastewater: Non-Residential: Non: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Wastewater: Non-Residential: Inflated $91.5 $117.3 $24.5 $114.9 $0.0 $2.4 $179.4 $2.5 $37.6 $20.1 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 REVENUE - DC Receipts: Inflated $4.7 $4.9 $5.0 $5.2 $5.3 $5.5 $5.6 $5.8 $8.2 $8.5 INTEREST - Interest on Opening Balance $33.1 $31.2 $28.2 $28.5 $25.6 $26.6 $27.7 $22.4 $23.3 $23.1 - Interest on In-year Transactions ($2.4) ($3.1) ($0.5) ($3.0) $0.1 $0.1 ($4.8) $0.1 ($0.8) ($0.3) TOTAL REVENUE $35.5 $33.0 $32.7 $30.7 $31.0 $32.2 $28.5 $28.3 $30.7 $31.2 CLOSING CASH BALANCE $890.7 $806.4 $814.6 $730.4 $761.4 $791.2 $640.3 $666.1 $659.2 $670.3 WASTEWATER: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) $670.3 $681.6 $712.0 $350.3 $369.6 $389.8 $410.9 $433.1 NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $16.8 $2.2 $304.0 $2.2 $2.2 $2.2 $2.2 $64.2 $946.7 Wastewater: Non-Residential: Non: Inflated $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $255.3 $255.3 Wastewater: Non-Residential: Inflated $20.5 $2.7 $385.6 $2.8 $2.9 $2.9 $3.0 $447.3 $1,457.8 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 12,040 12,250 12,390 12,530 12,740 12,880 13,020 13,230 190,470 REVENUE - DC Receipts: Inflated $8.7 $9.1 $9.4 $9.7 $10.0 $10.3 $10.6 $11.0 $137.5 INTEREST - Interest on Opening Balance $23.5 $23.9 $24.9 $12.3 $12.9 $13.6 $14.4 $15.2 $410.4 - Interest on In-year Transactions ($0.3) $0.1 ($10.3) $0.1 $0.1 $0.1 $0.1 ($12.0) ($36.8) TOTAL REVENUE $31.9 $33.0 $23.9 $22.0 $23.1 $24.1 $25.2 $14.2 $511.1 CLOSING CASH BALANCE $681.6 $712.0 $350.3 $369.6 $389.8 $410.9 $433.1 ($0.0) 2024 Adjusted Charge Per Square Metre $0.60 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 186 Appendix C.4 Wastewater Treatment Plant Appendix C | 187 Appendix C.4 - Wastewater Treatment Plant This appendix provides a brief outline of the infrastructure included in the Wastewater Treatment Plant (WWTP) development charge. The development-related projects outlined in this appendix are required to service the demands of new development to 2041. The benefits of the services are considered to be Town-wide for the purposes of calculating the development charge. The following discusses the individual components included in the WWTP service category. WWTP infrastructure included in the DC capital forecast is required to achieve health and safety standards as identified in relevant legislation, including Provincial regulations. As such, in accordance with section 4(3) of O.Reg. 82/98, the 15-year historical service level does not apply. The analysis is set out in the tables which follow. The tables include: Table C.4-1 2024-2041 Development-Related Capital Program Table C.4-2 Unadjusted Development Charge Table C.4-3 Cash Flow Analysis Table 1 2024-2041 Development-Related Capital Program The capital program for WWTP Services projects amounts to $304.60 million and is related to the recovery of two projects: Water Pollution Control Plant - Outfall Improvements ($4.60 million) and the Water Pollution Control Plant Expansion ($300.00 million). Cost estimates have been provided by Tatham Engineering and are informed by current tenders. However, it is recognized that the Town's tender for the expansion of the Water Treatment Plant came in significantly higher than initially estimated. Appendix C | 188 No grants, subsidies or other contributions are expected, and as such municipal cost of the capital program remains $304.6 million. A BTE share of $19.8 million is deducted for the proposed Water Pollution Control Plant expansion and is consistent with the allocation identified in the 2019 DC study. As a result, the total eligible costs brought forward to the DC calculation amounts to $284.8 million. The WWTP reserve fund balance of $13.17 million has been applied to both projects. Another $138.30 million has been deemed a post-period benefit that will benefit growth occurring after 2041 based on anticipated servicing capacity and these costs will be considered for recovery under future DC by- laws. The remaining in-period DC eligible costs total $133.33 million. Table 2 Calculation of Unadjusted Development Charges In total, $133.33 million is brought forward to the DC calculation, and is allocated 83% to the residential sector and 17% to the non-residential sector (based on shares of future population and employment growth). This yields a calculated charge of $8,216.79 per capita and $117.38 per square metre. Table 3 Cash Flow Analysis After cash flow and reserve fund analysis, the residential calculated charge increases to $8,629.71 per capita and the non-residential charge increases to $125.77 per square metre. This is a reflection of the timing of the capital program and development charges revenues. The following table summarizes the calculation of the WWTP development charge: Total Net DC Recoverable $/capita $/sq.m $/capita $/sq.m $304,600,000 $133,325,556 $8,216.79 $117.38 $8,629.71 $125.77 WASTEWATER TREATMENT PLANT SUMMARY 2024 - 2033 Unadjusted Adjusted Development-Related Capital Program Development Charge Development Charge Appendix C | 189 APPENDIX C.4 TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT-RELATED CAPITAL PROGRAM WASTEWATER TREATMENT PLANT NO. Infrastructure Requirement Description / Remarks Wastewater Facilities 1 Water Pollution Control Plant - Outfall Improvements Plant Outfall Improvements 2027 - 2027 $4,600,000 $0 $4,600,000 0% $0 $4,600,000 $4,600,000 $0 0% $0 2 Water Pollution Control Plant Expansion of the WPCP to increase the capacity by 12,000 m3/day 2026 - 2036 $300,000,000 $0 $300,000,000 6.6% $19,800,000 $280,200,000 $8,572,344 $133,325,556 49% $138,302,100 Subtotal Wastewater Facilities $304,600,000 $0 $304,600,000 $19,800,000 $284,800,000 $13,172,344 $133,325,556 $138,302,100 Total Wastewater Projects $304,600,000 $0 $304,600,000 $19,800,000 $284,800,000 $13,172,344 $133,325,556 $138,302,100 Water Pollution Control Plant: In-Period Capacity Calculation Identified Need Reserve Fund Balance Weighted Demand (Res & Non-Res) per capita 0.45 m3/d per capita Balance as at December 31, 2023 $13,172,344 Residential Growth 2024-2041 13,505 gross pop Total Residential and Non-Residential Need 2024-2041 6,077 m3/d Total Additional Capacity 12,000 m3/d Total In-Period DC Eligible Share 51% Total Post-Period Share 49% Benefit to Existing Share Total DC Eligible Costs DC Reserves DC In-Period Eligible Costs Post Period Allocation Net Municipal Cost Length (metres) Timing Gross Cost Grants, Subsidies & Other Contributions Appendix C | 190 2024-2041 Growth in Population in New Units 13,505 2024-2041 Employment Growth 2,721 2024-2041 Growth in Square Meters 190,470 Total Benefit Available Post Net Capital Gross to Existing DC Period Costs After Project Cost Share Reserves Allocation Discount ($000) ($000) ($000) ($000) ($000) % $000 % $000 WASTEWATER TREATMENT PLANT Wastewater Facilities $304,600.00 $19,800.00 $13,172.34 $138,302.10 $133,325.56 83% $110,967.68 17% $22,357.87 TOTAL WASTEWATER TREATMENT PLANT $304,600.00 $19,800.00 $13,172.34 $138,302.10 $133,325.56 $110,967.68 $22,357.87 Unadjusted Development Charge $8,216.79 $117.38 Residential Non-Residential Share Share APPENDIX C.4 TABLE 2 TOWN OF COLLINGWOOD SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WASTEWATER TREATMENT PLANT Development-Related Capital Forecast 2024-2041 Appendix C | 191 APPENDIX C.4 TABLE 3 TOWN OF COLLINGWOOD WASTEWATER TREATMENT PLANT CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WASTEWATER TREATMENT PLANT: RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $10,963.4 $17,116.1 $23,742.8 $19,480.1 $10,951.7 $6,371.5 $1,717.7 ($2,996.8) ($7,817.8) ($13,911.3) RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $0.0 $0.0 $648.6 $4,477.2 $648.6 $648.6 $648.6 $648.6 $648.6 $648.6 Wastewater Treatment Plant: Residential: Non Inflated $0.0 $0.0 $10,088.0 $10,088.0 $10,088.0 $10,088.0 $10,088.0 $10,088.0 $10,088.0 $10,088.0 Wastewater Treatment Plant: Residential: Inflated $0.0 $0.0 $11,170.3 $15,456.7 $11,621.6 $11,854.1 $12,091.1 $12,333.0 $12,579.6 $12,831.2 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 657 673 692 709 727 746 766 787 699 716 REVENUE - DC Receipts: Inflated $5,669.7 $5,924.0 $6,213.0 $6,493.0 $6,791.0 $7,107.8 $7,444.3 $7,801.4 $7,067.6 $7,384.3 INTEREST - Interest on Opening Balance $383.7 $599.1 $831.0 $681.8 $383.3 $223.0 $60.1 ($164.8) ($430.0) ($765.1) - Interest on In-year Transactions $99.2 $103.7 ($136.3) ($246.5) ($132.8) ($130.5) ($127.8) ($124.6) ($151.6) ($149.8) TOTAL REVENUE $6,152.7 $6,626.7 $6,907.7 $6,928.3 $7,041.4 $7,200.3 $7,376.7 $7,512.0 $6,486.1 $6,469.4 CLOSING CASH BALANCE $17,116.1 $23,742.8 $19,480.1 $10,951.7 $6,371.5 $1,717.7 ($2,996.8) ($7,817.8) ($13,911.3) ($20,273.1) WASTEWATER TREATMENT PLANT: RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($20,273.1) ($26,934.6) ($33,886.0) ($41,138.0) ($34,506.6) ($27,147.2) ($18,985.3) ($9,964.3) RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $648.6 $648.6 $648.6 $0.0 $0.0 $0.0 $0.0 $0.0 $10,963.4 Wastewater Treatment Plant: Residential: Non: Inflated $10,088.0 $10,088.0 $10,088.0 $0.0 $0.0 $0.0 $0.0 $0.0 $110,967.7 Wastewater Treatment Plant: Residential: Inflated $13,087.8 $13,349.6 $13,616.6 $0.0 $0.0 $0.0 $0.0 $0.0 $139,991.7 NEW RESIDENTIAL DEVELOPMENT - Population Growth in New Units 731 748 765 783 799 817 835 855 13,505 REVENUE - DC Receipts: Inflated $7,689.8 $8,026.0 $8,372.6 $8,741.0 $9,098.0 $9,489.0 $9,892.0 $10,331.5 $139,536.1 INTEREST - Interest on Opening Balance ($1,115.0) ($1,481.4) ($1,863.7) ($2,262.6) ($1,897.9) ($1,493.1) ($1,044.2) ($548.0) ($9,903.8) - Interest on In-year Transactions ($148.4) ($146.4) ($144.2) $153.0 $159.2 $166.1 $173.1 $180.8 ($604.0) TOTAL REVENUE $6,426.3 $6,398.2 $6,364.7 $6,631.4 $7,359.3 $8,162.0 $9,021.0 $9,964.3 $129,028.3 CLOSING CASH BALANCE ($26,934.6) ($33,886.0) ($41,138.0) ($34,506.6) ($27,147.2) ($18,985.3) ($9,964.3) $0.0 2024 Adjusted Charge Per Capita $8,629.71 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 192 APPENDIX C.4 TABLE 3 TOWN OF COLLINGWOOD WASTEWATER TREATMENT PLANT CASHFLOW AND DETERMINATION OF DEVELOPMENT CHARGE WASTEWATER TREATMENT PLANT: NON-RESIDENTIAL 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 OPENING CASH BALANCE ($000) $2,208.92 $3,298.5 $4,464.7 $3,400.2 $1,442.6 $242.6 ($1,014.5) ($2,350.9) ($3,776.0) ($4,807.3) NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $0.0 $0.0 $130.7 $902.1 $130.7 $130.7 $130.7 $130.7 $130.7 $130.7 Wastewater Treatment Plant: Non-Residential: Non: Inflated $0.0 $0.0 $2,032.5 $2,032.5 $2,032.5 $2,032.5 $2,032.5 $2,032.5 $2,032.5 $2,032.5 Wastewater Treatment Plant: Non-Residential: Inflated $0.0 $0.0 $2,250.6 $3,114.2 $2,341.5 $2,388.4 $2,436.1 $2,484.9 $2,534.6 $2,585.2 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 7,910 8,050 8,120 8,190 8,260 8,330 8,400 8,470 11,760 11,900 REVENUE - DC Receipts: Inflated $994.9 $1,032.7 $1,062.5 $1,093.1 $1,124.5 $1,156.7 $1,189.8 $1,223.7 $1,733.0 $1,788.7 INTEREST - Interest on Opening Balance $77.3 $115.4 $156.3 $119.0 $50.5 $8.5 ($55.8) ($129.3) ($207.7) ($264.4) - Interest on In-year Transactions $17.4 $18.1 ($32.7) ($55.6) ($33.5) ($33.9) ($34.3) ($34.7) ($22.0) ($21.9) TOTAL REVENUE $1,089.6 $1,166.2 $1,186.1 $1,156.6 $1,141.5 $1,131.3 $1,099.7 $1,059.7 $1,503.3 $1,502.4 CLOSING CASH BALANCE $3,298.5 $4,464.7 $3,400.2 $1,442.6 $242.6 ($1,014.5) ($2,350.9) ($3,776.0) ($4,807.3) ($5,890.2) WASTEWATER TREATMENT PLANT: NON-RESIDENTIAL 2034 2035 2036 2037 2038 2039 2040 2041 TOTAL OPENING CASH BALANCE ($000) ($5,890.2) ($7,027.0) ($8,208.7) ($9,448.5) ($7,893.8) ($6,176.8) ($4,298.1) ($2,247.1) NON-RESIDENTIAL FUNDING REQUIREMENTS Prior Growth $130.7 $130.7 $130.7 $0.0 $0.0 $0.0 $0.0 $0.0 $2,208.9 Wastewater Treatment Plant: Non-Residential: Non: Inflated $2,032.5 $2,032.5 $2,032.5 $0.0 $0.0 $0.0 $0.0 $0.0 $22,357.9 Wastewater Treatment Plant: Non-Residential: Inflated $2,637.0 $2,689.7 $2,743.5 $0.0 $0.0 $0.0 $0.0 $0.0 $28,205.7 NEW NON-RESIDENTIAL DEVELOPMENT - New Building GFA - square metres 12,040 12,250 12,390 12,530 12,740 12,880 13,020 13,230 190,470 REVENUE - DC Receipts: Inflated $1,845.9 $1,915.7 $1,976.3 $2,038.6 $2,114.3 $2,180.2 $2,248.0 $2,330.0 $29,048.6 INTEREST - Interest on Opening Balance ($324.0) ($386.5) ($451.5) ($519.7) ($434.2) ($339.7) ($236.4) ($123.6) ($2,945.6) - Interest on In-year Transactions ($21.8) ($21.3) ($21.1) $35.7 $37.0 $38.2 $39.3 $40.8 ($106.2) TOTAL REVENUE $1,500.2 $1,507.9 $1,503.7 $1,554.6 $1,717.1 $1,878.7 $2,051.0 $2,247.1 $25,996.7 CLOSING CASH BALANCE ($7,027.0) ($8,208.7) ($9,448.5) ($7,893.8) ($6,176.8) ($4,298.1) ($2,247.1) $0.0 2024 Adjusted Charge Per Square Metre $125.77 Allocation of Capital Program Residential Sector 83.2% Non-Residential Sector 16.8% Rates for 2024 Inflation Rate 2.0% Interest Rate on Positive Balances 3.5% Interest Rate on Negative Balances 5.5% Appendix C | 193 Appendix D Reserve Fund Balances Appendix D | 194 Appendix D - Development charges Reserve Fund Unallocated Balances The DCA requires that a reserve fund be established for each service for which development charges are collected. Table 1 presents the uncommitted reserve fund balances that are available to help fund the growth-related net capital costs identified in this study. The opening balances of the development charges reserve funds as of December 31, 2023 have been adjusted to account for existing commitments and adjustments to reserve fund projects as well as outstanding intra fund borrowing. As shown on Table 1, the December 31, 2023 total adjusted reserve fund balance was in a positive position of $39.12 million. The application of the available uncommitted balance in each of the reserve funds is discussed in the appendix section related to each service. The funds are assigned to projects in the initial years of the capital program for each service. This has the effect of reducing and deferring capital costs brought forward to the development charges calculation and the cash flow analysis. Appendix D | 195 APPENDIX D TABLE 1 TOWN OF COLLINGWOOD DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT YEAR ENDING DECEMBER 31, 2023 Reserve Fund Service Balance as at Dec. 31, 2023 Library Services ($395,004) Fire Protection Services $90,582 By-Law Services1 $0 Outdoor Recreation ($678,193) Indoor Recreation $3,893,946 Transit Services $352,285 Administration $310,484 Services Related To A Highway: Roads & Related $13,173,056 Water Services $2,847,051 Water Treatment Plant $711,763 Wastewater Services $5,645,291 Wastewater Treatment Plant $13,172,344 Total Development Charge Reserves $39,123,604 1 New service therefore no reserve fund currently exists Appendix D | 196 Appendix E Cost of Growth Analysis Appendix E | 197 Appendix E - Cost of Growth Analysis Asset Management Plan The DCA requires that municipalities complete an Asset Management Plan before passing a development charges by-law. A key function of the Asset Management Plan is to demonstrate that all assets funded under the development charges by-law are financially sustainable over their full life cycle. Asset Types A summary of the future municipal-owned assets and estimated useful life assumptions for eligible DC services considered as part of the study are outlined in Table 1 and Table 2. The useful lives, where possible, have been sourced from the Town's Asset Management Plan. Although all capital assets considered in the study have been identified, not all assets necessitate future replacement or ongoing maintenance activities. The exception and the justification is as follows:  Some of the works identified may represent one-time expenditures and may be temporary in nature. Therefore, the assets would not be required to be replaced and no ongoing operation and maintenance costs exist. Such assets are identified as "not a long-term asset" in the table.  Some projects do not relate to the emplacement of a tangible capital asset- some examples include the acquisition of land or the undertaking of development-related studies. These projects/costs do not necessarily require future replacement or ongoing maintenance. Such projects are identified as "not infrastructure" in the table. Appendix E | 198  For assets that have been constructed (i.e. recovery of past commitments) it is assumed that the related contribution is already included within the Town's annual provision. As such, these projects are identified as "not applicable" in the table. It should be noted that the capital cost estimates prepared for each of the projects identified in this section include grouped costs of various individual elements, which, as a stand-alone item, may have its own useful life (ex. New buildings include: HVAC, structural elements, roof, etc.). Accordingly, the average useful life assumptions noted below are applicable to all project components. Table 1 - Summary of Assets Considered Town-wide General Services Service and Amenities Estimated Useful Life Library  Recovery of Negative Reserve Fund Balance  Debt Recovery  Land  Buildings  Collection Materials  Furniture & Equipment Not applicable Not applicable Not infrastructure 70 years 10 years 10 years Fire Services  Recovery of Past Commitments  Debt Recovery  Buildings  Land  Heavy Duty Vehicles  Equipment Not applicable Not applicable 70 years Not infrastructure 13 years 10 years By-law Services  Vehicles  Officer Outfitting 12 years 10 years Appendix E | 199 Service and Amenities Estimated Useful Life Outdoor Recreation  Recovery of Negative Reserve Fund Balance  Land Improvements  Buildings  Trail Development  Vehicles & Equipment Not applicable 30 years 70 years 30 years 12 years Indoor Recreation  Buildings  Vehicles 70 years 12 years Administration  Development-related studies, etc. Not infrastructure Transit  Buses  Bus Shelters  Studies 12 years 15 years Not infrastructure Table 2 - Summary of Assets Considered Engineered Services Service and Amenities Estimated Useful Life Roads and Related  Linear Roads Infrastructure  Intersection Improvements  Sidewalks  Vehicles  Buildings  Studies 50 years 50 years 75 years 10 years 70 years Not infrastructure Water Services  Linear Water Infrastructure  Water Facilities Projects  Studies 75 years 70 years Not infrastructure Appendix E | 200 Service and Amenities Estimated Useful Life  Valves 75 years Wastewater Services  Wastewater Infrastructure  Studies 75 years Not infrastructure Wastewater Treatment Plant  Wastewater Treatment Plant 70 years Annual Provision When assets require rehabilitation or are due for replacement, the source of funds is limited to reserves or contributions from operating. Capital expenditures to carry out the rehabilitation and replacement of aging infrastructure are not growth-related and are therefore not eligible for funding through development charge revenues or other developer contributions. Based on the information obtained from Town staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset, a provision for infrastructure replacement has been calculated for both the general and engineered services. Provisions for infrastructure replacement are initially calculated for each asset based on their useful life and the anticipated cost of replacement. The aggregate of all individual provisions form the required annual capital provision. In calculating the annual provisions, a number of assumptions are made to account for inflation (2.0 per cent) and interest (3.5 per cent). Consistent with the requirements of the DCA, assets that are proposed to be funded under the development charges by-law have been included in the analysis. As a result, the total calculated annual provision for development charge related infrastructure has been netted down to consider the replacement of existing infrastructure or benefit-to-existing development. Appendix E | 201 However, for reference, the annual replacement provisions associated with the non-development charge funded costs, including benefit-to-existing and post-period benefit shares have also been calculated. Tables 3 and 4 provide the calculated annual asset management contribution for both the gross capital expenditures and the share related to the 2024-2033 and 2024-2041 DC recoverable portion. The year 2034 and 2042 have been included to calculate the annual contribution for the 2024- 2033 and 2024-2041 periods as the expenditures in 2033 and 2041 will not trigger asset management contributions until 2034 and 2042, respectively. As shown in Table 3, by 2034, the Town will need to fund an additional $1.34 million per annum in order to properly fund the full life cycle costs of the new assets related to general services supported under the development charges by-law. Table 4 provides a separate analysis of the annual provisions required for the protection and engineered services capital program as the program extends to 2042. As shown in Table 4, the annual provision in 2042 amounts to $5.47 million. Table 3 - Annual Asset Management Contributions General Services 2024-2033 Calculated Annual General Services Capital Program AMP Provision by 2034 DC-Eligible Non DC Eligible DC-Related Non-DC Related Library Services $3,417,000 $5,440,000 $95,000 $192,000 Fire Protection Services $3,872,000 $14,727,000 $129,000 $462,000 By-Law Services $59,000 $51,000 $5,000 $5,000 Outdoor Recreation $25,016,000 $46,473,000 $716,000 $1,506,000 Indoor Recreation $22,168,000 $78,242,000 $330,000 $1,110,000 Administration $1,166,000 $399,000 $0 $0 Transit Services $767,000 $778,000 $62,000 $68,000 Total $56,465,000 $146,110,000 $1,337,000 $3,343,000 Appendix E | 202 Table 4 - Annual Asset Management Contributions Engineered Services 2024-2033 Calculated Annual Engineered Services Capital Program AMP Provision by 2034 DC-Eligible Non DC Eligible DC-Related Non-DC Related Roads & Related $92,081,000 $32,876,000 $2,360,000 $771,000 Water Services $71,738,000 $29,039,000 $1,019,000 $256,000 Wastewater Services $7,167,000 $2,643,000 $55,000 $18,000 Wastewater Treatment Plant $146,498,000 $158,102,000 $2,040,000 $2,200,000 Total $317,484,000 $222,660,000 $5,474,000 $3,245,000 Transit Asset Management in the Town The Town of Collingwood currently operates three regularly scheduled routes, with one main transit terminal. In addition, there are Transit Links to the Town of Wasaga Beach and the Town of The Blue Mountains. The Town of Collingwood also operates an accessible transit service, Red Cross Para Transit. The Town aims to maintain the transit fleet in state of good repair through regular maintenance and inspections to achieve public transit safety and reliability standards. The Town, through its annual budgeting process, also examines the financial sustainability of the proposed transit capital infrastructure, as well as the associated operating impacts and proposed revenue sources. The Town currently plans to add two new buses and new bus shelters. In addition, the Town will conduct a Transit Study to identify future transit growth-related needs. The full cost of the capital program for Transit is valued at $1.54 million over the ten-year planning period. Details on the capital projects and anticipated ridership forecast is found in Appendix B. The additional buses and shelters are expected to have a yearly net operating impact of $365,000 per year by 2033. As previously stated, the Town ensures that the transit system will be financially sustainable through yearly capital and operating budget reviews. Appendix E | 203 Financial Sustainability of the Program Future Revenue Growth The calculated annual funding provision should be considered within the context of the Town's projected growth. Over the next ten years (to 2033) the Town is projected to increase by approximately 3,530 households. In addition, the Town will also add nearly 1,280 new employees that will result in approximately 89,390 square metres of additional non-residential building space. By 2041, there will be an increase of nearly 6,680 new dwelling units and 190,470 square metres of non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the development charges by-law. The collection of these funds is intended to be allocated to the Town's reserves for the future replacement of these assets. Long-term Capital and Operating Impact Analysis As shown in Table 5, by 2033, the Town's net operating costs are estimated to increase by $11.15 million for property tax supported ten-year general services. In Table 6, by 2041, net operating costs will increase by $3.27 million engineered services. Increases in net operating costs will be experienced as new facilities such as the proposed fire station, library, and recreation facility are opened. Operating and maintenance costs will also increase as additions to the Town's road network are made. Water and Wastewater capital expenditures are expected to be offset by user fees and water/wastewater rates rather than property taxes and therefore no impact is reflected in the analysis. Capital costs related to studies are not expected to have an impact on property tax supported operating costs. Table 7 summarizes the components of the development-related capital forecast that will require funding from non-DC sources. For general services Appendix E | 204 with a ten-year benefitting period, $17.21 million will need to be financed from non-DC sources as it relates to benefit to existing shares. In addition, $127.70 million in interim DC financing related to post-period shares of projects may be required. However, because DC by-laws must be revisited at least every ten years, it is difficult to determine the quantum of interim financing that may be necessary. For engineered services, $59.73 million will need to be financed from non- DC sources over the 2024-2041 planning period, which is entirely related to the replacement of existing infrastructure that will benefit the existing community. In addition, $160.17 million in interim DC financing may be necessary for post-period shares of projects. All together, $364.80 million will need to be financed from non-DC sources over the planning period for general and engineered services. Council is made aware of these factors so that they understand the operating and capital costs that will not be covered by DCs as it adopts the development- related capital forecast set out in the study. The Program is Deemed Financially Sustainable In summary, the asset management plan and long-term capital and operating analysis included in this appendix demonstrates that the Town can afford to invest and operate the identified general and engineered services infrastructure over the ten-year and long-term planning period. Importantly, the Town's annual budget review allows staff to continue to monitor and implement mitigating measures should the program become less sustainable. Appendix E | 205 APPENDIX E TABLE 5 TOWN OF COLLINGWOOD ESTIMATED NET OPERATING COST OF THE PROPOSED DEVELOPMENT-RELATED CAPITAL PROGRAM (GENERAL SERVICES) Service Cost Driver ($) Unit Measure Quantity Additional Operating Costs at 2033 Source & Commentary Library Services $0.13 per dollar of infrastructure $6,550,000 $862,000 FIR & 2024 DC Study Fire Protection Services $0.26 per dollar of infrastructure $16,784,000 $4,280,000 FIR & 2024 DC Study By-Law Services $0.13 per dollar of infrastructure $110,000 $14,000 FIR & 2024 DC Study Outdoor Recreation $0.02 per dollar of infrastructure $70,811,000 $1,742,000 FIR & 2024 DC Study Indoor Recreation $0.04 per dollar of infrastructure $100,410,000 $3,891,000 FIR & 2024 DC Study Administration $0.00 per dollar of infrastructure $0 $0 FIR & 2024 DC Study Transit Services $0.25 per dollar of infrastructure $1,458,000 $365,000 FIR & 2024 DC Study Total $196,123,000 $11,154,000 - APPENDIX E TABLE 6 TOWN OF COLLINGWOOD ESTIMATED NET OPERATING COST OF THE PROPOSED DEVELOPMENT-RELATED CAPITAL PROGRAM (ENGINEERED SERVICES) Service Cost Driver ($) Unit Measure Quantity Additional Operating Costs at 2041 Source & Commentary Roads & Related $490.00 per household 6,676 $3,271,000 FIR & 2024 DC Study Wastewater Services - Rate supported service - - Wastewater Treatment Plant - Rate supported service - - Water Services - Rate supported service - - Total 6,676 $3,271,000 - Appendix E | 206 General Services Net Replacement & Available Post-2033 Total DC Eligible Municipal Cost Benefit to Existing DC Reserves Benefit Costs for Recovery ($000) ($000) ($000) ($000) ($000) 1.0 LIBRARY SERVICES $8,857.6 $823.0 $0.0 $4,617.3 $3,417.3 2.0 FIRE PROTECTION SERVICES $18,599.0 $907.3 $90.6 $13,820.1 $3,781.0 3.0 BY-LAW SERVICES $110.0 $0.0 $0.0 $51.0 $59.0 4.0 OUTDOOR RECREATION $71,052.8 $14,763.7 $0.0 $31,272.6 $25,016.4 5.0 INDOOR RECREATION $100,410.0 $300.0 $3,893.9 $77,941.8 $18,274.2 6.0 ADMINISTRATION $1,565.0 $398.9 $310.5 $0.0 $855.7 7.0 TRANSIT SERVICES $779.3 $12.4 $352.3 $0.0 $414.5 TOTAL - GENERAL SERVICES (2024-2033) $201,373.7 $17,205.3 $4,647.3 $127,702.9 $51,818.2 Engineered Services Net Replacement & Available Post-2041 Total DC Eligible Municipal Cost Benefit to Existing DC Reserves Benefit Costs for Recovery ($000) ($000) ($000) ($000) ($000) 1.0 SERVICES RELATED TO A HIGHWAY: ROADS & RELATED $122,191.7 $22,715.5 $13,173.1 $7,395.1 $78,908.1 2.0 WATER SERVICES $100,777.2 $15,697.6 $2,847.1 $13,341.3 $68,891.2 3.0 WASTEWATER SERVICES $9,810.0 $1,514.5 $5,645.3 $1,128.0 $1,522.2 4.0 WASTEWATER TREATMENT PLANT $304,600.0 $19,800.0 $13,172.3 $138,302.1 $133,325.6 TOTAL - ENGINEERED SERVICES (2024-2041) $537,378.9 $59,727.6 $34,837.7 $160,166.5 $282,647.1 TOTAL GENERAL AND ENGINEERED SERVICES $738,752.6 $76,932.9 $39,485.0 $287,869.4 $334,465.3 APPENDIX E TABLE 7 Development-Related Capital Program (2024-20233) Development-Related Capital Program (2024-2041) TOWN OF COLLINGWOOD SUMMARY OF DEVELOPMENT-RELATED CAPITAL PROGRAM FOR GENERALAND ENGINEERED SERVICES (in $000) Appendix E | 207 Appendix F Local Service Appendix F | 208 Appendix F - General Policy Guidelines on Development Charge and Local Service Funding for Town-Related Works. The following guidelines set out in general terms the size and nature of engineered infrastructure that is included in the Town of Collingwood 2024 DC Study. For a project to be eligible to be funded completely or in part by development charges, the following will apply: 1. The project will be identified in the most current Town of Collingwood DC Study. 2. If any infrastructure does not add any additional capacity over and above the capacity requirement for that development, these projects are assumed to be the sole responsibility of the developer. 3. Infrastructure that provides servicing or capacity for more than one development is not necessarily fully or partially funded from development charges. If a project is considered fully or partially local in nature, the Town will require the benefiting land owners to fund the works directly. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development in any existing development and proposed development and the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area, and subsection 59(2) of the DCA. Appendix F | 209 These local service policy guidelines are subject to review and amendment by the Town which may be independent of an amendment or update to the Town's development charge by-law(s). The detailed engineering requirements for all work and/or development are governed by the Town of Collingwood Official Plan, or if not specified in the Official Plan, by the approved detailed engineering standards, and best management practices. 1.0 Roads and Related 1.1 Local Roads internal to a development are a direct developer responsibility under s.59 of the DCA (as a local service). 1.2 Local Roads are two-lanes and generally have a 20.0 m right of way (ROW) including, but not limited to, the following;  Turn lanes;  Parking bays;  Bike lanes (on road and off road);  Streetlights;  Intersection improvements;  Streetscaping;  Utilities;  Municipal services;  Sidewalks and multi use paths; and  Storm water management facilities. 1.3 Collector Roads internal to development are a direct developer responsibility under s.59 of the DCA (as a local service). 1.4 Collector Roads external to development are a direct developer responsibility under s.59 of the DCA if considered to be a requirement related to development to which the plan relates; otherwise, collector roads external to a development are included in Appendix F | 210 the DC calculation to the extent permitted under s.5(1) of the DCA (dependent on local circumstances). 1.5 Stream crossing and rail crossing road works, excluding underground utilities but including all other works within lands to be dedicated to the Town or rail corridors are localized works to be borne by developers. Works associated with Collector Roads external to a development (as described in 1.4) are to be included in the DC calculation. 1.6 New arterial roads and arterial road improvements are included as part of road costing funded through DCs. Only the oversizing component would be recovered through DCs and the local road equivalent costs are considered to be a direct developer responsibility under s.59 of the DCA. 2.0 Traffic Signals 2.1 Traffic signalization external to development are included in the DC calculation to the extent permitted under s.5(1) of the DCA. 2.2 Where a specific development warrants the need for traffic signals, the developer will pay for the cost of the signal under s.59 of the DCA (as a local service). 3.0 Intersection Improvements 3.1 New roads (collector and arterial) and road (collector and arterial) improvements are included as part of road costing noted in Section 1, to limits of ROW. 3.2 Intersections improvements within specific developments and all works necessary to connect to entrances (private and specific subdivision) to the roadway are a direct developer responsibility under s.59 of DCA (as a local service). Appendix F | 211 3.3 Intersections with County roads and provincial highways are included in the DC calculation to the extent that they are Town responsibility. 3.4 Intersection improvements on other roads due to development growth increasing traffic are included in the DC calculation. 4.0 Streetlights 4.1 Streetlights on external roads are included in the DC calculation (linked to collector road funding described in Section 1). Streetlights external to a development but related to the subject lands are a direct developer responsibility through local service provisions (s.59 of the DCA). 4.2 Streetlights within specific developments or direct abutting roads are a direct developer responsibility under s.59 of DCA (as a local service). 5.0 Sidewalks 5.1 Sidewalks on MTO and County roads are included in the DC calculation or, in exceptional circumstances, may be local improvement or direct developer responsibility through local service provisions (s.59 of DCA). 5.2 Sidewalks external to a development but required and related to the subject lands are a direct developer responsibility through local service provisions (s.59 of the DCA). 6.0 Bike Lanes/ Bike Paths/Multi-Use Trails/ Naturalized Walkways 6.1 Bike lanes, within road allowance, external to development are included in DC road costs, consistent with the service standard provisions under s.5(1) of the DCA. Appendix F | 212 6.2 Bike paths/multi-use trails/naturalized walkways external to development are included in DCs consistent with the service standard provisions under s.5(1) of the DCA. 6.3 Bike lanes, within road allowance, internal to development are a direct developer responsibility under s.59 of the DCA (as a local service). 6.4 Bike paths/multi-use trails/naturalized walkways internal to development are a direct developer responsibility under s.59 of the DCA (as a local service). 6.5 Trail Bridges/Underpasses and associated works are included in DC calculation consistent with the service standard provisions of the under s.5(1) of the DCA. 7.0 Noise Abatement Measures 7.1 Internal to development are a direct developer responsibility though local service provisions (s.59 of DCA). 8.0 Land Acquisition for Road Allowance 8.1 Land Acquisition for arterial roads as dedicated under the Planning Act subdivision provisions (s.51) through development lands. However, in areas with limited or no development, included in the DC calculation (to the extent eligible under the DCA). 8.2 Land Acquisition for collector roads as dedicated under the Planning Act subdivision provision (s.51) through development lands (up to 26 metre right-of- way). However, in areas with limited or no development, are included in the DC calculation (to the extent eligible under the DCA). Appendix F | 213 8.3 Land Acquisition for grade separations (beyond normal dedication requirements) are included in the DC calculation to the extent eligible under the DCA. 9.0 Land Acquisition for Easements 9.1 Easement costs external to or not directly associated with a specific subdivision shall be included in DC calculation. 10.0 Stormwater Management 10.1 Stormwater facilities for quality water balance and/or quantity control management, including downstream erosion works, inclusive of land and all associated infrastructure, such as landscaping and perimeter fencing - direct developer responsibility under s. 59 of the DCA as a local service. 10.2 Storm sewer systems and drainage works that are required for a specific development, either internal or external to the area to which the plan relates - direct developer responsibility under s. 59 of the DCA as a local service. 11.0 Water 11.1 Water supply, storage, treatment facilities and booster pumping stations infrastructure may be included in the DC calculation. 11.2 Watermains within a development that are larger than 300mm are to be included in the DC calculation. The amount of cost contribution for watermains within a development shall be calculated using tendered unit prices and shall be the difference between the cost of the actual pipe diameter and the cost of a 300mm pipe diameter including a 12% engineering fee. Only watermain and valves will be included in the calculation. Any costs related to the depth of pipe are the responsibility of the developer. Appendix F | 214 11.3 Watermains within the development that are 300mm and under are deemed to be a local service and are a direct funding responsibility of the developer. 11.4 Connections to trunk mains and pumping stations to service specific areas are to be a direct developer responsibility. 11.5 Trunk watermains, generally outside the development area, identified by a Class Environmental Assessment, Servicing Study or by Town Staff will be included in the development charge calculation. 12.0 Sanitary Sewer 12.1 All sanitary sewage treatment facilities are to be included in the development charge calculation 12.2 Major sanitary trunk sewers, external to the development, and major pumping stations serving more than one development are to be included in the DC calculation. These services will be identified through a Class Environmental Assessment, Servicing Study or by Town staff. 12.3 Sewer collectors within the development that are 300mm and under are deemed to be a local service and are a direct funding responsibility of the developer. Sanitary sewers within the development that are larger than 300mm that also service upstream properties will have cost sharing calculated on the tendered unit prices and shall be the difference between the cost of the actual pipe diameter and the cost of a 300mm pipe including a 12% engineering fee. All other appurtenances with respect to oversizing and any costs related to the depth of pipe are the responsibility of the developer. 12.4 Connections to collectors and pumping stations to service specific areas are to be a direct developer responsibility. Appendix F | 215 12.5 Sewage pumping stations within the development or local pumping stations serving a small localized area are deemed to be a local service and are a direct funding responsibility of the developer or developers on a flow area or proportional basis, or by agreement between the developers. 13.0 Parkland Development 13.1 For the purpose of parkland development, local service includes the requirement for the owner to undertake preparation of a conceptual park plan including proposed grading to demonstrate that the proposed park size, configuration and topography will allow for the construction of park facilities to the satisfaction of the Town. 13.2 The Town also requires the owner to dedicate parkland or provide cash-in-lieu, consistent with the Planning Act provisions. All of these costs are deemed a direct responsibility of the owner and have not been included in the DC calculation. 13.3 With respect to other parkland development costs, the Town policy is to include all other components of parkland development in the DC calculation, including detailed design and contract administration, finished grading, sodding, park furniture, electrical, water, sanitary sewer, signage, plant material, walkways, play courts, parking lots, sports fields, playground equipment, water play equipment, recreational trails, park shelters and lighting. 13.4 All costs associated with any recreational trails to be constructed within the development (as incorporated in Section D6 of the Official Plan) are a direct developer responsibility. 13.5 Rough grading and any associated infrastructure (bridges and abutments, guard and hand rails, retaining walls) of all recreational Appendix F | 216 trails and multi-use paths within the development are a direct developer responsibility. Appendix F | 217 Appendix G Tatham Engineering DC Background Study Wastewater, Water and Roads Appendix G | 218 Development Charges Background Study W A S T E W A T E R , W A T E R , A N D R O A D S Town of Collingwood File 123275 | July 10, 2024 Document Control File: Prepared by: Prepared for: 123275 Tatham Engineering Limited Town of Collingwood Date: 115 Sandford Fleming Drive, Suite 200 Collingwood, Ontario L9Y 5A6 545 Tenth Line North Collingwood, Ontario L9Y 3Z6 July 10, 2024 T 705-444-2565 tathameng.com Authored by: Reviewed by: Adam Timlock, P.Eng. Allan Brownridge, B.E.Sc., P.Eng. Project Manager Director, Manager - Municipal Disclaimer Copyright The information contained in this document is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and Tatham Engineering Limited undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. This document may not be used for any purpose other than that provided in the contract between the Owner/Client and the Engineer nor may any section or element of this document be removed, reproduced, electronically stored or transmitted in any form without the express written consent of Tatham Engineering Limited. Issue Date Description 1 May 28, 2024 Draft 2 July 10, 2024 Final 2024 Development Charges Background Study | Wastewater, Water, and Roads i Document Contents 1 Introduction .................................................................................................................................................... 1 2 Wastewater Projects .................................................................................................................................... 3 2.1 Wastewater Sewers .............................................................................................................. 4 2.2 Wastewater Facilities ........................................................................................................... 6 3 Water Projects ............................................................................................................................................... 7 3.1 Water Distribution ................................................................................................................ 8 3.2 Water Valves ....................................................................................................................... 12 3.3 Water Facilities ................................................................................................................... 13 4 Road Projects ............................................................................................................................................... 15 4.1 Roads .................................................................................................................................. 15 4.2 Intersections ....................................................................................................................... 19 5 Summary ....................................................................................................................................................... 22 Tables Table 1: Costing Summary ............................................................................................................. 23 Appendices Appendix A: Servicing Plans Appendix B: Opinion of Probable Cost 2024 Development Charges Background Study | Wastewater, Water, and Roads 1 1 Introduction The Town of Collingwood retained Tatham Engineering Limited (Tatham) to complete a background study that identifies and provides our opinion of probable cost to construct wastewater, water and road network projects within the Town required to accommodate future development. Information contained within this report will be incorporated in the overall 2024 Development Charges Background Study prepared by Hemson Consulting Limited (Hemson) and associated Town of Collingwood By-Law. Development charge eligible capital projects have been identified in collaboration with Town of Collingwood staff, with consideration of planned and proposed development within the Town and a review of the following:  Official Plan Town of Collingwood (December 2023);  Collingwood Transportation Study Update (August 2019);  Collingwood Water and Sanitary Sewer Systems Master Plan (December 2019);  Town of Collingwood Cycling Plan (October 2019);  Town of Collingwood Development Standards (July 2007);  Servicing Study for Land Acquired under County Restructuring (dated June 1994);  applicable Class EA Study Reports;  Local Service Guidelines (included within 2024 Development Charge Study); and  previous Development Charge studies. This study report identifies and quantifies projects to accommodate growth and development within the planning horizon of 2024-2041. Growth projects for build-out (ultimate conditions) within the boundaries of the Town of Collingwood are also included; however, the costs of these projects are categorized as full or partial post-period benefit. The Collingwood Water and Sanitary Sewer Systems Master Plan was used to determine the applicable development charge related projects within the built boundary. The Servicing Study for Land Acquired under County Restructuring report was used to determine the applicable development charge related projects outside of the built boundary. Development charges related road projects were determined based on the Collingwood Transportation Study Update and the Town Official Plan. Land use designations specified in the Official Plan (Schedule '2' - Land Use Plan) were used; however, the infrastructure projects were developed on the assumption that most lands currently 2024 Development Charges Background Study | Wastewater, Water, and Roads 2 designated Rural will eventually be developed as Residential, which follows assumptions made in the Collingwood Water and Sanitary Sewer Systems Master Plan. For each project, the opinion of probable cost was estimated based on the scope of work anticipated and current construction values (based on recent tender results, master study estimates and EA/design cost estimates). Where appropriate, consideration was given to engineering, property acquisition, contingencies, Town staff allowances and utility relocation costs, which in most cases were estimated based on comparable projects and knowledge of the corresponding study areas. The post-period benefit for wastewater, water and road network projects will provide excess capacity to service future growth beyond the development charge horizon period of 2041. The capital costs of post-period benefit projects have been estimated with input from the Town, Hemson and applicable studies based on projected growth and the expected timing for various developments, reflecting increased demands and needs over time. 2024 Development Charges Background Study | Wastewater, Water, and Roads 3 2 Wastewater Projects The attached Drawing SAN-1 in Appendix A conceptually illustrates the Town's key wastewater infrastructure, showing the existing and proposed trunk wastewater collection system and projects required to accommodate future development. Wastewater projects include:  proposed trunk sewers;  the replacement of undersized trunk sewers; and  the expansion of the Collingwood Water Pollution Control Plant. Wastewater Sewers The centre of Collingwood is serviced through south-to-north trunk sewers that discharge to the First Street and Birch Street collector sewers and ultimately to the Collingwood Water Pollution Control Plant at the north end of Birch Street. The east end of Collingwood is serviced by trunk sewers that discharge to the St. Clair sewage pumping station. The extension of the Lakeshore trunk sewer eastward and additional sewage pumping stations are planned for servicing the existing residential area along the eastern lakeshore through a local improvement project. The western section of Collingwood is serviced by the Highway 26 trunk sewer and the Harbour Street trunk sewer, which discharge into the Black Ash Creek sewage pumping station and the Mountain Road trunk sewer. These sewers discharge to the Water Pollution Control Plant via the Harbourview Park interceptor. Growth in the western areas will be serviced through extensions of the Harbour Street and the Mountain Road trunk sewers, partial replacement of the Mountain Road trunk sewer, expansion of the Black Ash Creek Sewage Pumping Station and forcemain installation to the Water Pollution Control Plant. The opinion of probable costs for wastewater sewer projects within the existing municipal right- of-way were developed based on sewer installation costs, including structures and services if applicable. Based on the typical alignment and depth, estimates also include the cost to remove and reinstate the existing road and boulevards across a typical 20 metre right-of-way. The oversizing of sewers to accommodate future development areas are also included in the development charge projects. The oversizing costs include the incremental difference (above 300 mm nominal diameter) to supply and install the trunk sewer. The pricing was based on a combination of unit prices (developed based on our construction cost database) and on the Collingwood Water and Sanitary Sewer Systems Master Plan. A detailed description of each project is provided below. 2024 Development Charges Background Study | Wastewater, Water, and Roads 4 The benefit to existing development represents the value of replacing existing municipal assets through a growth-related capital project. We note most wastewater projects are an expansion to the existing sewer network and thus provide no benefit to existing development. Based on these principles and input from the Town and Hemson, benefit to existing values was applied accordingly. Wastewater Facilities A Class Environmental Assessment (Class EA) was completed in May 2011 for the expansion of the Collingwood Water Pollution Control Plant to accommodate growth, which will require an amendment. Based on updated growth forecasts and capacity limits, the expansion is expected to be triggerd in 2026 and will require full upgrades by 2036. Project descriptions, estimated timing and the costs for the proposed wastewater sewer and facility projects are summarized in Appendix B. Along with values for post-period benefit, benefit to existing development, and grants, subsidies and other contributions, which reduce the development charge eligible portion of the opinion of probable cost. 2.1 WASTEWATER SEWERS 2.1.1 Project 1: Mountain Road - Eleventh Line to the West The extension of the Mountain Road trunk sewer from the intersection of Mountain Road and the Eleventh Line to the west is intended to service the southwest portion of the Mountain Road West Corridor Secondary Plan. The lands in this area are currently designated Rural; however, it is assumed the lands would be developed as Residential and the sewer would be located along the centreline of Mountain Road. The costs were established based on the installation of a 450 mm diameter sewer and a full road reconstruction. A post-period benefit has been applied based on growth targets following the development charge horizon period. 2.1.2 Project 2: North of Mountain Road - Tenth Line to the West The lands north of Mountain Road from Silver Creek to Tenth Line will be serviced by a 450 mm diameter trunk sewer. It is assumed the lands designated Rural in this area would be developed as Residential and the sewer will be installed through the developments. The Town's development charge eligible capital costs are the incremental difference for oversizing these sewers, greater than 300 mm diameter (in that 300 mm is the minimum recommended pipe size). This project will be further refined in conjunction with the development of the Mountain Road West Corridor Secondary Plan. 2024 Development Charges Background Study | Wastewater, Water, and Roads 5 2.1.3 Project 3: Black Ash Creek Trunk Main - South of Sixth Street The extension of the Black Ash Creek trunk main will service the lands west of Black Ash Creek, south of Sixth Street. It is assumed the land designation will eventually change from Rural to Residential and a 375 mm diameter sewer will be installed through future developments. The Town's development charge eligible capital costs are the incremental difference for oversizing these sewers, greater than 300 mm diameter. This project is considered for long range planning and is scheduled to proceed outside of the growth period and thus the entire cost is categorized as a post-period benefit. 2.1.4 Project 4: Mountain Road - Improvements West of Balsam Street The replacement of the Mountain Road trunk sewer west of Balsam Street will increase capacity, as required to facilitate future development, conveying wastewater to the Harbourview Park interceptor. The costs were established based on the installation of 100 metres of 600 mm diameter sewer and full road reconstruction. 2.1.5 Project 5: Harbour Street - Georgian Trail to Tenth Line The extension of the Harbour Street trunk sewer will service the lands surrounding the landfill and south of Georgian Trail. It is assumed lands currently designated Rural will eventually become Residential and the landfill site will not be redeveloped. The 525 mm diameter sewer extension will also serve the industrial lands between Harbour Street and Mountain Road. The Town's development charge eligible capital costs include only the installation of 650 metres of 525 mm diameter sewer. The road reconstruction portion of the capital costs is covered in the applicable road project. 2.1.6 Project 6: Hurontario Street - Lockhart Road to Collins Street This project consists of replacing the Hurontario Street sewer from Lockhart Road to Collins Street. The Hurontario trunk sewer will provide sewage conveyance capacity for servicing developments in the south end of Collingwood. The pricing was based on installation of a 375 mm diameter sewer and full road reconstruction. 2.1.7 Project 7: Black Ash Creek Sewage Pumping Station Forcemain This project consists of a new forcemain from the Black Ash Creek Sewage Pumping Station to the Water Pollution Control Plant to provide required capacity and redundancy. This forcemain will be installed along the Harbourview Park Trail alongside the existing Harbourview Park interceptor. The pricing was based on the Collingwood Water and Sanitary Sewer Systems Master Plan with an inflation factor applied. 2024 Development Charges Background Study | Wastewater, Water, and Roads 6 2.2 WASTEWATER FACILITIES 2.2.1 Project 8: Water Pollution Control Plant - Outfall Improvements The Water Pollution Control Plant's effluent outfall needs to be extended to meet the Ministry of the Environment, Conservation and Parks requirements in support of the additional treatment capacty. The outfall extension will consist of 228 metres of 900 mm diameter pipe with a multiport diffuser. The pricing was based on the Collingwood Water and Sanitary Sewer Systems Master Plan with an inflation factor applied. 2.2.2 Project 9: Water Pollution Control Plant An expansion of the Collingwood Water Pollution Control Plant will be required to treat the projected future sewage flows generated by residential, commercial and industrial developments. As per the Municipal Class EA completed in 2011, the preferred solution is to increase capacity by 12 ML/day, resulting in a total capacity of 36.5 ML/day. A benefit to existing value was applied to this project to reflect the odour control facility that will handle odours for both the existing and future tanks. We have included for a Class EA amendment, which will be required prior to advancing the design and will evaluate construction phasing options. 2024 Development Charges Background Study | Wastewater, Water, and Roads 7 3 Water Projects The attached Drawing WAT-1 in Appendix A conceptually illustrates the Town's key water infrastructure, outlining the existing and proposed trunk water distribution system and the projects required to accommodate future development. Such projects, which were included in the development charge project list, involve:  watermains;  water valves;  reservoirs;  booster pumping stations;  elevated tanks; and  the expansion of the Raymond A. Barker Water Treatment Plant. Watermains and Valves For watermain and valve projects, the benefit to existing has been estimated based on improvements to the Town's overall watermain distribution system, as the completion of particular development charge projects will strengthen and upgrade the network to meet current standards. Benefit to existing values for trunk extension projects are based on modelling results from the Collingwood Water and Sanitary Sewer Systems Master Plan and consultation with Town staff. The benefit to existing values for upsizing projects are based on the value of replacing existing municipal assets through a growth-related capital project. The opinion of probable costs for watermain projects within existing municipal right-of-ways were developed based on watermain installation including hydrants and gate valves if applicable. Based on the typical alignment and depth, estimates also include the cost to remove and reinstate half of the existing road and boulevards (across a typical 20 metre right-of-way - resulting in a 10 metre wide restoration). Oversizing of watermains to accommodate future development areas is included in the development charge projects. The oversizing costs include the incremental difference (above 300 mm nominal diameter) to supply and install the main. The pricing was based on a combination of unit prices (developed based on our construction cost database) and on the Collingwood Water and Sanitary Sewer Systems Master Plan. Water Facilities The benefit to existing development for water facility projects is based on unconnected units and available capacity within the existing facility to service growth over the planning horizon. Based 2024 Development Charges Background Study | Wastewater, Water, and Roads 8 on these principles and input from the Town and Hemson, benefit to existing values was applied accordingly. Currently, most of Collingwood's water distribution system operates within pressure zone 1 with a water supply from the Raymond A Barker Water Treatment Plant and two reservoirs: the Hume Street elevated tank and the Carmichael grade level tank on Highway 26. Pressure zone 2 is supplied from the R. A. Davey Booster Pumping Station and reservoir on Poplar Sideroad that is filled from the water transmission pipeline from the Water Treatment Plant to New Tecumseth. To service growth in pressure zone 2, the Town plans to add a new booster pumping station and reservoir at Stewart Road, with construction starting in 2026. In accordance with the Schedule C Class EA completed in 2020, the Raymond A Barker Water Treatment Plant will be expanded in two phases from its rated capacity of 31 ML/day to 52 ML/day (phase 1) and to 101 ML/day (phase 2) to provide the capacity for Collingwood growth while accommodating supply commitments to the Town of New Tecumseth and the Town of The Blue Mountains. Project descriptions, estimated timing and the costs for the proposed wastewater sewer and facility projects are summarized in Appendix B. Along with values for post-period benefit, benefit to existing development, and grants, subsidies and other contributions, which reduce the development charge eligible portion of the opinion of probable cost. A detailed description of each project is provided below. 3.1 WATER DISTRIBUTION 3.1.1 Project 10: Poplar Sideroad - Raglan Street to Beachwood Road Along Poplar Sideroad, east of Raglan Street, a 300 mm diameter trunk watermain extension will service the industrial zoned lands in pressure zone 2. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.2 Project 11: Sixth Line - Poplar Sideroad to Sandford Fleming Drive Along Sixth Line, a 300 mm diameter trunk watermain will connect the existing main at Sandford Fleming Drive to the Poplar Sideroad main and will service the industrial zoned lands on Sixth Line. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.3 Project 12: Poplar Sideroad - Rowland Street to Tenth Line A 400 mm diameter trunk watermain will extend from Rowland Street along Poplar Sideroad to Tenth Line. This project includes removal and restoration within half of the right-of-way to 2024 Development Charges Background Study | Wastewater, Water, and Roads 9 facilitate the watermain installation. This watermain extension will supply the southwest quadrant of Collingwood. 3.1.4 Project 13: High Street - Findlay Drive to Campbell Street On High Street, a 300 mm diameter trunk watermain will extend from the existing 400 mm diameter main at High Street and Findlay Drive connecting to the main at Campbell Street. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.5 Project 14: Tenth Line - Poplar Sideroad to Sixth Street Along Tenth Line, from Poplar Sideroad to Sixth Street, a 400 mm diameter trunk watermain will supply water to the west end of Collingwood. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. This project is scheduled to proceed outside of the growth period and thus the entire cost is categorized as a post-period benefit. 3.1.6 Project 15: Tenth Line - Sixth Street to Mountain Road A 400 mm diameter trunk watermain is proposed from Sixth Street to Mountain Road. This project forms part of the pressure zone 2 supply from the proposed Stewart Road Booster Pumping Station and Reservoir. This project includes removal and restoration within half of the right-of- way to facilitate the watermain installation and forms part of the pressure zone 2 supply from the proposed Stewart Road Booster Pumping Station and Reservoir. 3.1.7 Project 16: Sixth Street - Georgian Meadows Drive to Tenth Line Along Sixth Street, the existing 400 mm diameter watermain will be extended (via a trunk watermain) from Georgian Meadows Drive to the proposed Tenth Line trunk watermain. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation and forms part of the pressure zone 2 supply from the proposed Stewart Road Booster Pumping Station and Reservoir. 3.1.8 Project 17: Future Secondary Plan Development - Tenth Line to Concession 11/12 An oversized 350 mm diameter trunk watermain is proposed through future developments north of Sixth Street, from Tenth Line to the Concession 11/12 border, in the Mountain Road West Corridor Secondary Plan. 2024 Development Charges Background Study | Wastewater, Water, and Roads 10 3.1.9 Project 18: Future Secondary Plan Development - Concession 11/12 to Osler Bluff Road An oversized 350 mm diameter trunk watermain is proposed through future developments north of Sixth Street, from the Concession 11/12 border to Osler Bluff Road in the Mountain Road West Corridor Secondary Plan. This project will serve developments in pressure zone 3. This project is scheduled to proceed outside of the growth period and thus the entire cost is categorized as a post-period benefit. 3.1.10 Project 19: Future Secondary Plan Development - Southern Extension of Eleventh Line A 350 mm diameter trunk watermain will extend south of the Eleventh Line and Mountain Road intersection through future developments in the Mountain Road West Corridor Secondary Plan. 3.1.11 Project 20: Future Secondary Plan Development - Sixth Street to Mountain Road A 350 mm diameter trunk watermain will run parallel to Tenth Line in the southwest corner of the Mountain Road West Corridor Secondary Plan, east of Silver Creek, and will primarily serve the future development within pressure zone 3. This project is scheduled to proceed outside of the growth period and thus the entire cost is categorized as a post-period benefit. 3.1.12 Project 21: Mountain Road - Thomas Drive to Tenth Line The existing 400 mm diameter Mountain Road trunk watermain through the Mair Mills Estates subdivision will be extended to Tenth Line. It is assumed this watermain will be installed through the Panorama Subdivision and only includes the incremental difference (above 300 mm nominal diameter) to supply and install the main. 3.1.13 Project 22: Watermain Loop along the Eleventh Line and the Georgian Trail A 300 mm diameter trunk watermain is proposed on the Eleventh Line at Mountain Road, heading north to the Georgian Trail, then east connecting to the watermain along Tenth Line. It is assumed this watermain will be installed through development and since the watermain size is not greater than 300 mm diameter there is no development charge associated with this project. 3.1.14 Project 23: Cranberry Development to the Georgian Trail A 300 mm diameter trunk watermain on Harbour Street is proposed to extend west of the current dead end and connect to the existing Tenth Line watermain. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. It is assumed this watermain will be installed through development and since the watermain size is not greater than 300 mm diameter there is no development charge associated with this project. 2024 Development Charges Background Study | Wastewater, Water, and Roads 11 3.1.15 Project 24: Harbour Street Extension to Tenth Line A 400 mm diameter trunk watermain on Harbour Street is proposed to extend west of the current dead end and connect to the existing Tenth Line watermain. The road reconstruction portion of the capital costs is covered in the applicable road project. 3.1.16 Project 25: North of First Street - Maple Street to Hickory Street The existing 400 mm diameter trunk watermain north of First Street through the existing Shipyards development will be extended westerly to Hickory Street. It will provide additional flow to the west end of Collingwood and will be installed along the existing trail alignment. 3.1.17 Project 26: North of First Street - Hickory Street to Highway 26 A 400 mm diameter trunk main will extend the proposed main at Hickory Street and connect to the existing main at Highway 26. It will provide additional flow to the west end of Collingwood and will be installed along the existing trail alignment. 3.1.18 Project 27: Simcoe Street - Heritage Street to the Water Treatment Plant A new 500 mm diameter trunk watermain will be installed along Huron Street, Rodney Street and Simcoe Street to replace the undersized 300 mm diameter watermain. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. A post-period benefit has been applied based on growth targets following the development charge horizon period. 3.1.19 Project 28: Highway 26 - Old Mountain Road to Carmichael Pumping Station Along Highway 26, a new 400 mm diameter trunk watermain will be installed to replace the undersized 300 mm diameter watermain. This includes removal and restoration within half of the right-of-way to facilitate the watermain installation. This project is scheduled to proceed outside of the growth period and thus the entire cost is categorized as a post-period benefit. 3.1.20 Project 29: Sixth Street - Hurontario Street to High Street Along Sixth Street, from Hurontario Street to High Street, a 400 mm diameter watermain extension will be installed, increasing the overall system capacity. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.21 Project 30 High Street - Old Mountain Road to Fifth Street Along High Street, from Old Mountain Road to Fifth Street, a 450 mm diameter watermain will be installed replacing the 300 mm diameter watermain, increasing the overall system capacity. 2024 Development Charges Background Study | Wastewater, Water, and Roads 12 This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.22 Project 31: St. Paul Street - Side Launch Way to Hume Street Along St. Paul Street, from Side Launch Way to Hume Street, a 400 mm diameter trunk watermain will be installed, increasing the overall system capacity. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. The portion of watermain from Hume Street to Ontario Street is planned to be completed in 2026, with the rest to be completed in 2041. 3.1.23 Project 32: High Street - Sixth Street to Campbell Street Along High Street, from Sixth Street to Campbell Street, a 450 mm diameter trunk watermain will replace the existing 200 mm diameter watermain, increasing the overall system capacity. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.24 Project 33: Poplar Sideroad - Clark Street to Rowland Street Along Poplar Sideroad, from Clark Street heading west to the Summit View Subdivision, a 200 mm diameter watermain will create connectivity. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.25 Project 34: Hume Street - Pretty River Parkway to Raglan Street North A 400 mm diameter watermain will be installed on Hume Street from the Pretty River Parkway to Raglan Street North. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.1.26 Project 35: Raglan Street - Erie Street to Oliver Crescent A 400 mm diameter watermain will be installed on Raglan Street from Erie Street to Oliver Crescent. This project includes removal and restoration within half of the right-of-way to facilitate the watermain installation. 3.2 WATER VALVES 3.2.1 Project 36: Osler Bluff Road Pressure Reducing Valve and Decommission Booster Pumps At the western edge of the Mountain Road West Corridor Secondary Plan, a pressure reducing valve and check valve will be installed at the zone 1 / zone 2 pressure border. The decommissioning of the Osler Bluff Road booster pumping station is included within this project, 2024 Development Charges Background Study | Wastewater, Water, and Roads 13 scheduled to commence after Phase 1 of the Stewart Road booster pumping station and reservoir project is complete. 3.2.2 Project 37: Mountain Road Pressure Reducing Valve and Chamber Installation At the intersection of Mountain Road and Tenth Line, a pressure reducing valve will be installed in a chamber at the zone 1 / zone 2 pressure border. 3.2.3 Project 38: Pretty River Check Valve On Peel Street, a new check valve will be installed at the zone 1 / zone 2 pressure border to supply zone 2 in an emergency. 3.2.4 Project 39: Sixth Line Pressure Reducing Valve and Chamber Installation On Sixth Line, a pressure reducing valve will be installed at the zone 1 / zone 2 pressure border to supply zone 2 in an emergency. 3.3 WATER FACILITIES 3.3.1 Project 40: Stewart Road Reservoir and Booster Pumping Station (Phase 1) The Stewart Road booster pumping station will be required to meet local peak hour water demands and pressure requirements in the west of pressure zone 2 (north of Sixth Street and west of Tenth Line). It will be supported by a grade level reservoir with an approximate volume of 3,700 m3 to meet the storage requirements in pressure zone 2. 3.3.2 Project 41: Stewart Road Reservoir and Booster Pumping Station (Phase 2) Phase 2 of the Stewart Road reservoir and pumping station is scheduled to commence after the current growth period and thus a post-period benefit has been applied based on growth targets following the development charge horizon period. 3.3.3 Project 42: Stewart Road Ultimate Pump Upgrades Pumping upgrades are required prior to the completion of the Stewart Road reservoir and booster pumping station Phase 2. This project is scheduled to commence near the end of the growth period and thus a post-period benefit has been applied based on growth targets following the development charge horizon period. 3.3.4 Project 43: Decommissioning of Georgian Meadows Pumping Station Once Phase 1 of the Stewart Road booster pumping station is commissioned, the decommissioning of the Georgian Meadows pumping station will be completed. 2024 Development Charges Background Study | Wastewater, Water, and Roads 14 3.3.5 Project 44: Ted Carmichael West End Reservoir (Highway 26 West) As outlined in the Collingwood Water and Sanitary Sewer Systems Master Plan, modifications to the Ted Carmichael West End Reservoir are required to operate it as an "in and out" reservoir, with flow filling the reservoir from the east and flowing out to the west. This will assist in maintaining adequate pressures and fire flows in the water distribution system as development proceeds west of the reservoir. 3.3.6 Project 45: New Elevated Tank A new elevated tank is proposed to replace the tank on Hume Street. It will double the current operating volume. The location is to be determined. A 50% benefit to existing value has been applied to account for the replacement of the existing deteriorating asset. 3.3.7 Project 46: Raymond A. Barker Water Treatment Plant (Raglan Street) In accordance with the Collingwood Water and Sanitary Sewer Systems Master Plan, the Raymond A. Barker Water Treatment Plant requires an expansion to 67 ML/day to meet the water demands from growth in the Town of Collingwood. The Water Treatment Plant currently produces treated water for the Town of Collingwood, the Town of New Tecumseth and The Town of The Blue Mountains. An 8% benefit to existing has been applied to account for the maintenance costs that would be required if the Town decided not to proceed with the upgrades. The expansion will involve replacing membranes with higher capacity membranes, installing UV disinfection equipment, expanding the clearwell, adding wastewater management facilities and expanding the low lift pumping station. Costs are based on the construction tender results and 63% of the Water Treatment Plant expansion costs will be funded by the Town of New Tecumseth. This project has been scoped out of the Town-wide DC background study and included as a sole DC study, due to the magnitude of the project. 2024 Development Charges Background Study | Wastewater, Water, and Roads 15 4 Road Projects Road projects include:  improvements to collector or arterial roads as designated in the Town's Official Plan;  intersection improvements including additional lanes, roundabouts and signalization; and  sidewalk, trail, and cycling improvements. Through this update we have combined all sidewalk/trail projects into the applicable road projects and have assumed they will be constructed in conjunction. Project descriptions, estimated timing and the costs for the proposed road projects are summarized in Appendix B. Along with values for post-period benefit, benefit to existing development, and grants, subsidies and other contributions, which reduce the development charge eligible portion of the opinion of probable cost. For road, intersection and sidewalk projects, the benefit to existing development represents the value of replacing existing municipal assets through growth related capital project. More specifically, on substandard roads (i.e. those that are assumed to not meet current road design standards with respect to width, cross section and/or granular type and/or depths), the benefit to existing value applied was based on the cost to replace the existing road base and asphalt at its current configuration. On existing roads constructed to an appropriate standard, the benefit to existing was assigned based on the cost to replace the asphalt surface only at its current configuration (recognizing the road base is sufficient). The conditions of the existing roads and the benefit to existing values assigned to each project, based on these principles were collaboratively established with the Town. The opinion of probable costs for road projects within existing municipal right-of-ways were developed based on the cost to remove and reinstate the existing road and boulevards (across a typical 20 metre right-of-way). Allowances have been included in support of miscellaneous Municipal Class EAs and property aquistion, if applicable. A detailed description of each project is provided below. 4.1 ROADS 4.1.1 Project 47: Highway 26 - Harbour Street West to Silver Creek Drive The arterial road improvements along the 3,600 metre section of Highway 26 from Harbour Street West to Silver Creek Drive will upgrade the existing 3 lane rural to a 5 lane urban road cross section. The majority of this project is already constructed as a 3 lane rural cross section and the 2024 Development Charges Background Study | Wastewater, Water, and Roads 16 remainder is scheduled to be constructed in 2025. We have assumed the project will re-use the granular base and binder course asphalt from the existing 3 lane roadway. The surface course asphalt will be removed along the existing road and replaced following the installation of the additional 2 lanes. The benefit to existing was based on pulverizing and paving of the existing 3 lane surface course asphalt. An allowance for a Schedule C Class EA has been included in the estimate. A post-period benefit has been applied based on growth targets following the development charge horizon period as it is scheduled to proceed at the end of the growth period to service development beyond the development charge horizon period of 2041. 4.1.2 48: Mountain Road - Tenth Line to Eleventh Line Road Project Improvements to the 1,130 metre section of Mountain Road from Tenth Line to Eleventh Line will include road base widening in accordance with the current 2 lane collector rural standards and the installation of a 3 metre wide trail. We have assumed the road was originally constructed to an appropriate standard and the road reconstruction will re-use the existing granular base from the existing roadway. The benefit to existing is based on pulverizing and paving the asphalt along its current alignment. 4.1.3 49: Sixth Line - Poplar Sideroad to Sandford Fleming Drive. Improvements to the 680 metre section of Sixth Line from Poplar Sideroad to Sandford Fleming Drive will include road base widening in accordance with the current 2 lane collector rural standards. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on pulverizing and paving the asphalt along its current alignment. 4.1.4 Project 50: Hurontario Street - Hume Street to Collins Street The arterial road improvements to the 780 metre section of Hurontario Street from Hume Street to Collins Street will consist of constructing a continuous centre turn lane throughout to better serve the abutting developments. The improvements will include satisfying the requirements of a 3 lane urban road cross section. We have assumed the road was originally constructed to an appropriate standard and the road reconstruction will re-use the granular base from the existing 2 lane roadway. The benefit to existing is based on pulverizing and paving the existing asphalt along its current alignment. 4.1.5 Project 51: Collins Street - Ste. Marie Street to Katherine Street The collector road improvements to the 360 metre section of Collins Street from Ste. Marie Street to Katherine Street will include upgrading the existing 2 lane rural road to a 2 lane urban road 2024 Development Charges Background Study | Wastewater, Water, and Roads 17 cross section. Through the urbanizing, a 1.5 metre wide sidewalk will be installed on the south side of the road and the 1.5 metre wide sidewalk on the north side will be removed and replaced. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on pulverizing and paving the asphalt along its current alignment. 4.1.6 Project 52: High Street - Third Street to Fifth Street The arterial road improvements along the 450 metre section of High Street from Third Street to Fifth Street will consist of widening the existing 4 lane urban road to accommodate a continuous centre turn lane throughout (thus providing a continuous centre turn lane from First Street to Sixth Street). The improvements will satisfy the requirements of a 5 lane urban road cross section. A 3 metre wide sidewalk will be installed on the west side and the 1.5 metre wide sidewalk on the east side will be removed and replaced. We have assumed the road was originally constructed to an appropriate standard and the road reconstruction will re-use the granular base from the existing roadway. The benefit to existing is based on resurfacing the existing concrete along its current alignment. 4.1.7 Project 53: Tenth Line - Sixth Street to Mountain Road This collector road project will upgrade 1,240 metre of Tenth Line between Sixth Street and Mountain Road by widening the 2 lane rural cross section to a 3 lane urban cross section to accommodate a continuous centre turn lane throughout. The project will also include the installation of a 4 metre sidewalk on the west side and a 1.5 metre sidewalk on the east side, as per the Class EA Addendum filed in 2023. We have assumed the road was originally constructed to an appropriate standard and the benefit to existing is based on pulverizing and paving the asphalt along its current alignment. 4.1.8 Project 54: High Street - Poplar Sideroad to Tenth Street Arterial road improvements to this 1,400 metre section of High Street from Poplar Sideroad to Tenth Street will consist of widening and upgrading the 2 lane rural road to a 4 lane urban road cross section. A 3 metre wide sidewalk will also be added to the west side of the road and the existing 1.5 metre sidewalk on the east side will be removed and replaced. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. An allowance for a Schedule C Class EA has been included in the estimate. 2024 Development Charges Background Study | Wastewater, Water, and Roads 18 4.1.9 Project 55: Third Street - High Street to Birch Street Collector road improvements to the 865 metre section of Third Street for High Street to Birch Street include upgrading the 2 lane rural road to a 2 lane urban road cross section. The project includes 360 metres of 1.5 metre wide sidewalk installation on both sides of the road. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. 4.1.10 Project 56: Cameron Street - Hurontario Street to Walnut Street Collector road improvements to the 830 metre section of Cameron Street between Hurontario Street and Walnut Street include upgrading the existing 2 lane rural road to a 2 lane urban road cross section and replacement of the 1.5 metre sidewalks on both sides of the road. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. 4.1.11 Project 57: Mountain Road - Cambridge Street to Tenth Line Arterial road improvements to the 1,075 metre section of Mountain Road from Cambridge Street to Tenth Line consist of widening the 2 lane rural road to 5 lane urban road cross section. The scope of this project will include a 5 lane bridge. A 4 metre wide sidewalk will be added to the south and 1.5 metre wide sidewalk will be added to the north side of the road, as per the Class EA Addendum filed in 2023. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on removing and replacing the existing asphalt along its current alignment and the replacement of a 2 lane bridge. Overall costs were based on the current detailed design cost estimate. 4.1.12 Project 58: Peel Street - Hume Street to Bush Street Collector road improvements to the 365 metre section of Peel Street between Ontario Street and Bush Street include upgrading the 2 lane rural road to a 2 lane urban road cross section and the replacement of the 1.5 metre wide sidewalks on both sides of the road. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. 4.1.13 Project 59: Peel Street - Ontario Street to Hume Street Collector road improvements to the 560 metre section of Peel Street between Ontario Street and Bush Street include upgrading the 2 lane rural road to a 2 lane urban road cross section and the 2024 Development Charges Background Study | Wastewater, Water, and Roads 19 replacement of the 1.5 metre wide sidewalks on both sides of the road. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. 4.1.14 Project 60: Sixth Street - Tenth Line to High Street Arterial road improvements for the 1,320 metre section of Sixth Street from Tenth Line to High Street consist of widening and upgrading the road from 2 lane rural to a 3 lane urban road cross section and installation of 1.5 metre wide sidewalks on both sides of the road. We have assumed the road was originally constructed to an appropriate standard and the road reconstruction will re-use the granular base from the existing roadway. The benefit to existing is based on pulverizing and paving the existing asphalt along its current alignment. An allowance for a Schedule C Class EA has been included in the estimate. 4.1.15 Project 61: Harbour Street Extension - Tenth Line to the Georgian Trail This collector road project will construct 525 metres of new road in accordance with 2 lane urban standards with a 3 metre wide trail along one side of the road. An allowance for a Schedule C Class EA has been included in the estimate. 4.1.16 Project 62: Tenth Line - Mountain Road to Harbour Street Collector road improvements to the 620 metre section of Tenth Line between Mountain Road and Harbour Street include upgrading the 2 lane rural road to a 2 lane urban road cross section and installing 1.5 metre wide sidewalks on both sides of the road. We have assumed a new granular road base will be required throughout in support of the proposed improvements. The benefit to existing is based on full road reconstruction of the existing roadway along its current alignment. 4.2 INTERSECTIONS 4.2.1 Project 63: Highway 26 and Silver Creek Drive Improvements include the construction of a westbound left turn lane and converting the existing slip lane into a travel lane. 4.2.2 Project 64: Highway 26 and Cranberry Trail East / Gun Club Road Improvements include the signalization of the existing intersection and the conversion of the existing centre turning lane into excusive westbound and eastbound left turn lanes with permitted and protected phasing. 2024 Development Charges Background Study | Wastewater, Water, and Roads 20 4.2.3 Project 65: High Street and First Street (Phase 1) Improvements include the construction of an exclusive eastbound right turn lane, converting the shared southbound through-left turn lane into an exclusive left turn lane and the construction of a shared southbound through-right lane to maintain two southbound lanes through the intersection. The signal timings are to be revised to include protected left phases for northbound and southbound lefts and eliminating the existing customized timing plans and including permitted and overlap phases for eastbound right turns. 4.2.4 Project 66: High Street and Home Depot Access In conjunction with future commercial development on the lands abutting the Home Depot, the existing signalized Home Depot access will be converted to a right-in / right-out access and the signals will be relocated to the intersection of High Street and Third Street. The extension of Cambridge Street (to be completed as part of future commercial development) will subsequently connect to the new signalized intersection as the new west leg. 100% of this project will be paid for by the developer in accordance with the existing Site Plan Agreement. 4.2.5 Project 67: Mountain Road / First Street Extension / Cambridge Street (Phase 1) Improvement includes the conversion of the existing exclusive westbound right turn lane into a shared through-right lane and the provision of northbound and southbound right turn lanes (thus allowing the existing shared through and right lanes to become exclusive through lanes). Improved signal timings to consider permitted and protected phases for eastbound left turns should also be considered. 4.2.6 Project 68: High Street and Third Street Improvements include the signalization of the existing intersection and the construction of excusive northbound and southbound left turn lanes with permitted and protected phasing. 90% of the signalization cost is to be paid for by the developer, as these lights provide a direct benefit to the future commercial development on Third Street, west of High Street. 4.2.7 Project 69: High Street and Campbell Street As per the Municipal Class EA, this project includes the construction of a two-lane roundabout with widened or flared approaches to incorporate two lanes entering per approach. A 70% post- period benefit has been applied to this project since it is scheduled to proceed towards the end of the growth period to service development beyond the development charge horizon period of 2031. 2024 Development Charges Background Study | Wastewater, Water, and Roads 21 4.2.8 Project 70: Highway 26 and Harbour Street / Balsam Street Improvements include the construction of northbound and southbound left turn lanes, complete with permitted and protected signal phases. 4.2.9 Project 71: High Street and First Street (Phase 2) Improvements include revising the signal timing plans to include a permitted and protected phase for the eastbound left turn lane and the construction of exclusive northbound and southbound right turn lanes. with widened or flared approaches to incorporate two lanes entering per approach. A post-period benefit has been applied based on growth targets following the development charge horizon period as it is scheduled to proceed at the end of the growth period to service development beyond the development charge horizon period of 2041. 4.2.10 Project 72: Mountain Road / First Street Extension / Cambridge Street (Phase 2) Improvements include the construction of eastbound right turn lane. A post-period benefit has been applied based on growth targets following the development charge horizon period as it is scheduled to proceed at the end of the growth period to service development beyond the development charge horizon period of 2041. 4.2.11 Project 73: High Street and Sixth Street Improvements include the construction of eastbound and westbound right turn lanes. A post- period benefit has been applied based on growth targets following the development charge horizon period as it is scheduled to proceed at the end of the growth period to service development beyond the development charge horizon period of 2041. 2024 Development Charges Background Study | Wastewater, Water, and Roads 22 5 Summary Through consultation with Town staff and Hemson, and following a review of applicable studies, standards and guidelines (i.e. master studies, project specific Class EA, project designs, the Town's Official Plan, Town Standards, developing mapping and forecasts, etc.), the previous development charge study list of capital engineering project has been updated. Engineering projects were considered as they relate to the following:  wastewater sewer and facilities (trunk sewers, sewage pumping stations and forcemains and the Water Pollution Control Plant);  water distribution and facilities (watermains, booster pumping stations and reservoirs and the Raymond A. Barker Water Treatment Plant); and  transportation services (roads, intersections, sidewalks and trails, and cycling facilities). Opinion of probable costs were estimated based on the scope of work anticipated and current construction values. Where appropriate, consideration was given to engineering, property acquisition, contingencies, Town staff allowances, and utility relocation costs. Recognizing that projects may vary with respect to their role and function, and who they are intended to benefit, consideration has been given to the following:  benefit to existing developments;  benefit to new developments;  available funding and/or other cost contributions (as may be secured through separate development agreements or government infrastructure programs); and  post-period development (i.e. the degree to which the project will provide benefit beyond the 2041 growth period). A summary of the respective values for the noted servicing systems is provided in Table 1. As noted, the identification of the capital projects, the contributing factors and extent of benefit have been determined based on past studies and/or consideration for future growth. As development occurs and growth is realized (or is not realized), it may be necessary to update the study methodology to reflect the current development environment. In this respect, regular updates of this study are recommended. 2024 Development Charges Background Study | Wastewater, Water, and Roads 23 Table 1: Costing Summary DESCRIPTION GROSS CAPITAL COST ESTIMATE (1) LESS: OTHER CONTRIBUTIONS LESS: BENEFIT TO EXISTING DC IN-PERIOD ELIGIBLE COSTS POST-PERIOD BENEFIT Wastewater Sewers $7,969,000 $0 $1,225,000 $5,616,000 $1,128,000 Wastewater Facilities $304,600,000 $0 $19,800,000 $146,497,900 $138,302,100 Water Distribution $59,480,200 $0 $10,134,200 $38,767,000 $10,579,000 Water Valves $1,237,000 $0 $32,700 $1,204,300 $0 Water Facilities $309,020,000 $170,100,000 $12,800,000 $81,788,700 $44,331,300 Roads $107,887,275 $0 $22,371,500 $78,769,475 $6,746,300 Intersections $10,801,804 $2,764,944 $0 $7,388,060 $648,800 TOTAL $800,995,279 $172,864,944 $66,363,400 $360,031,435 $201,735,500 (1) other contributions include: grants, subsidies and other contributions attributable to new development Appendix A: Servicing Plans TENTH LINE POPLAR SIDEROAD HIGHWAY 26 WEST MOUNTAIN ROAD HIGH STREET SIXTH STREET OAK STREET PEEL STREET MAPLE STREET OSLER BLUFF ROAD BIRCH STREET HURONTARIO STREET GREY ROAD 19 HUME STREET RAGLAN STREET SPRUCE STREET FIRST STREET THIRD STREET SIMCOE COUNTY ROAD 32 FIFTH STREET WALNUT STREET FINDLAY DRIVE ONTARIO STREET SIXTH LINE NAPIER STREET SECOND STREET MINNESOTA STREET HERITAGE DRIVE COLLINS STREET CAMPBELL STREET PINE STREET CEDAR STREET FOURTH STREET HURON STREET DAWSON DRIVE HIGHWAY 26 EAST ERIE STREET HICKORY STREET SEVENTH STREET INT ROAD TENTH STREET NIAGARA STREET EIGHTH STREET GEO LOCKHART ROAD NINTH STREET SILVER CREEK DRIVE ST MARIE STREET ST PAUL STREET ELEVENTH LINE FOREST DRIVE PRETTY RIVER PARKWAY SIMCOE STREET CAMERON STREET MARY STREET STANLEY STREET KATHERINE STREET ROBINSON STREET ELM STREET ALYSSA DRIVE OLIVER CRESCENT TRAILS END TELFER ROAD CLARK STREET ALICE STREET RON EMO ROAD MANNING AVENUE SANDFORD FLEMING DRIVE MARINERS WAY HUGHES STREET HARBOUR STREET WEST CRANBERRY TRAIL WEST CONNOR AVENUE WILLIAMS STREET CONNELL STREET SAUNDERS STREET STEWART ROAD THOMAS DRIVE BRYAN DRIVE BARR STREET ST. LAWRENCE STREET SIDE LAUNCH WAY ALBERT STREET BROOKE AVENUE BARTLETT BOULEVARD TROTT BOULEVARD LAUREL BOULEVARD HIGHWAY 26/BALSAM STREET FOURTH STREET EAST HAMILTON STREET MARINERS HAVEN GREENBRIAR DRIVE PARK ROAD BEECH STREET BALSAM STREET CONSERVATION WAY DAVIS STREET HOLLY COURT LORNE STREET EVERGREEN ROAD COOPER STREET MASON ROAD ROBERTSON STREET FAIR STREET DEY DRIVE NORTH PINE STREET SUMMER VIEW AVENUE SLALOM GATE ROAD HOLDEN STREET MOBERLY STREET SPROULE AVENUE RODNEY STREET MACDONALD STREET MARINE VIEW DRIVE ST VINCENT STREET HURONIAPATHWAY NORTH MAPLE STREET SIERRA TRAIL PATERSON STREET PRINCETON SHORES BOULEVARD GRIFFIN ROAD CLUBHOUSE DRIVE HAROURSIDE MAIR MILLS DRIVE BRANDY LANE DRIVE DICKSON ROAD CHAMBERLAIN CRESCENT GODDEN STREET MARKET LANE PATTON STREET BARRINGTON TRAIL EAST STREET KELLS CRESCENT WEST STREET BUSH STREET FRANCES DRIVE BROCK CRESCENT RIVER RUN LONG LANE NEWPORT BOULEVARD TRAFALGAR ROAD DILLON DRIVE WESTWIND DRIVE PORTLAND STREET SILVER GLEN BOULEVARD FERGUSON ROAD RAMBLINGS WAY WATERPOND PLACE WATERFALLS LANE BAKER STREET REID CRESCENT MATTHEWS WAY NORTH ALBERT LANE KAYLA CRESCENT KEITH AVENUE PARKSIDE DRIVE ST. CLAIR STREET SUNSET COURT ELGIN STREET JOSEPH TRAIL MOUNT VIEW COURT GOLFVIEW DRIVE KRISTA COURT GIBBARD CRESCENT CAMBRIDGE STREET SHANNON COURT WHITE STREET MINTO STREET WATER STREET WILLOW STREET DOCKSIDE DRIVE TESKEY COURT SMART COURT GUN CLUB ROAD ALPINE COURT PRESERVATION ROAD WHIPPS COURT ST MARIE STREET POPLAR SIDEROAD RAGLAN STREET HIGHWAY 26 EAST MARKET STREET GEORGE STREET OLD MOUNTAIN ROAD GEORGIAN MEADOWS DRIVE SHERWOOD STREET HARBOUR STREET EAST ALMA STREET STEPHENS STREET NEWBOURNE STREET HILL STREET SILVER CRESCENT JUNIPER COURT LYNDEN STREET LAKEVIEW AVENUE JEFFERYS WAY BARKER BOULEVARD WATERFRONT CIRCLE RHONDA ROAD ROBBIE WAY CRANBERRY SURF CRANBERRY QUAY BOARDWALK AVENUE CRANBERRY SHORES CHURCHILL COURT SIMCOE STREET SPRUCE STREET CRANBERRY TRAIL EAST RAGLAN STREET RUSSEL STREET CALLARY CRESCENT VETERANS CRESCENT ST PETER STREET PATERSON STREET BELL BOULEVARD BAYSIDE COURT WOODLAND COURT ESCARPMENT CRESCENT FAIRWAY CRESCENT OXBOW CRESCENT WATERSIDE LANE FIRST STREET EXTENSION COURTICE CRESCENT WATTS CRESCENT BRANIFF COURT CLARKSON CRESCENT LESELIE DRIVE SURFSIDE CRESCENT ELIOTT AVENUE ROBERT AVENUE SOUTH SERVICE ROAD GEORGIAN COURT CRAIGLEITH COURT VACATION INN DRIVE VALLEYMEDE COURT JOHNSTON PARK AVENUE CEDAR POINTE COURT SUNCREST CIRCLE MARINA CRESCENT HIGHLANDS CRESCENT WHEELHOUSE CRESCENT WALKER STREET RONELL CRESCENT HARBEN COURT MCKEAN CRESCENT BURNSIDE COURT VICTORY DRIVE BRYAN COURT OSLER CRESCENT HERRINGTON COURT GLEN ROGERS ROAD SUNDIAL COURT EVA CRESCENT CARMICHEAL CRESCENT DUNCAN STREET SHIPLEY AVENUE PLEWES DRIVE MITCHELL AVENUE ARCHER AVENUE FOLEY CRESCENT SPENCER STREET MAIDENS CRESCENT MOUNTAIN ROAD WEST SECONDARY PLAN BOUNDARY PROJECT NO. 4 - 600Ø PROJECT NO. 2 - 450Ø PROJECT NO. 3 - 375Ø PROJECT NO. 1 - 450Ø PROJECT NO. 5 - 525Ø PROJECT NO. 6 - 375Ø PROJECT NO. 7 - 300Ø FORCEMAIN PROJECT NO. 8 - 900Ø OUTFALL PROJECT NO. 9 - WATER POLLUTION CONTROL PLANT EXPANSION HIGHWAY 26 GEORGIAN MANOR DRIVE GLEN ROAD FAIRGROUNDS ROAD BROADVIEW STREET GLENLAKE BOULEVARD LANE D 4TH LINE BEACHWOOD ROAD EDGAR ROAD LANE C LANE A BRAESIDE STREET KING STREET DOWNER STREET BELCHER STREET YORK STREET KOHL STREET INDIAN TRAIL SELKIRK ROAD NOTTAWA SIDEROAD / TONER STREET SANDELL STREET JAMES STREET ARTHUR STREET BELLHOLME LANE MCPHERSON LANE CURRIE AVENUE SYLVIAN ROAD DELLPARR AVENUE CHERRY STREET JANE STREET STALKER STREET BEACHWOOD ROAD SUNNYVIEW AVENUE WOODCREST AVENUE WELLINGTON STREET COOK STREET MACALLISTER STREET NORTH THERESA STREET HIGHWAY 26 EAST SECONDARY PLAN BOUNDARY 2024 DEVELOPMENT CHARGES UPDATE TOWN OF COLLINGWOOD SAN-1 TENTH LINE POPLAR SIDEROAD HIGHWAY 26 WEST MOUNTAIN ROAD HIGH STREET SIXTH STREET OAK STREET PEEL STREET MAPLE STREET OSLER BLUFF ROAD BIRCH STREET HURONTARIO STREET GREY ROAD 19 HUME STREET RAGLAN STREET SPRUCE STREET FIRST STREET THIRD STREET SIMCOE COUNTY ROAD 32 FIFTH STREET WALNUT STREET FINDLAY DRIVE ONTARIO STREET SIXTH LINE NAPIER STREET SECOND STREET MINNESOTA STREET HERITAGE DRIVE COLLINS STREET CAMPBELL STREET PINE STREET CEDAR STREET FOURTH STREET HURON STREET DAWSON DRIVE HIGHWAY 26 EAST ERIE STREET HICKORY STREET SEVENTH STREET TENTH STREET NIAGARA STREET EIGHTH STREET GEORGIAN MANOR DRIVE LOCKHART ROAD NINTH STREET SILVER CREEK DRIVE ST MARIE STREET ST PAUL STREET ELEVENTH LINE FOREST DRIVE PRETTY RIVER PARKWAY SIMCOE STREET CAMERON STREET MARY STREET STANLEY STREET KATHERINE STREET ROBINSON STREET ELM STREET ALYSSA DRIVE OLIVER CRESCENT TRAILS END TELFER ROAD CLARK STREET ALICE STREET RON EMO ROAD MANNING AVENUE SANDFORD FLEMING DRIVE MARINERS WAY HUGHES STREET HARBOUR STREET WEST CRANBERRY TRAIL WEST CONNOR AVENUE WILLIAMS STREET CONNELL STREET BEACHWOOD ROAD SAUNDERS STREET STEWART ROAD THOMAS DRIVE BRYAN DRIVE BARR STREET ST. LAWRENCE STREET SIDE LAUNCH WAY ALBERT STREET BROOKE AVENUE BARTLETT BOULEVARD TROTT BOULEVARD LAUREL BOULEVARD HIGHWAY 26/BALSAM STREET FOURTH STREET EAST HAMILTON STREET MARINERS HAVEN GREENBRIAR DRIVE PARK ROAD BEECH STREET BALSAM STREET CONSERVATION WAY DAVIS STREET HOLLY COURT LORNE STREET EVERGREEN ROAD COOPER STREET MASON ROAD ROBERTSON STREET FAIR STREET DEY DRIVE NORTH PINE STREET SUMMER VIEW AVENUE SLALOM GATE ROAD HOLDEN STREET MOBERLY STREET SPROULE AVENUE RODNEY STREET MACDONALD STREET MARINE VIEW DRIVE ST VINCENT STREET HURONIAPATHWAY NORTH MAPLE STREET SIERRA TRAIL PATERSON STREET PRINCETON SHORES BOULEVARD GRIFFIN ROAD CLUBHOUSE DRIVE HAROURSIDE MAIR MILLS DRIVE BRANDY LANE DRIVE DICKSON ROAD CHAMBERLAIN CRESCENT GODDEN STREET MARKET LANE PATTON STREET BARRINGTON TRAIL EAST STREET KELLS CRESCENT WEST STREET BUSH STREET FRANCES DRIVE BROCK CRESCENT RIVER RUN LONG LANE NEWPORT BOULEVARD TRAFALGAR ROAD DILLON DRIVE WESTWIND DRIVE PORTLAND STREET SILVER GLEN BOULEVARD FERGUSON ROAD RAMBLINGS WAY WATERPOND PLACE WATERFALLS LANE BAKER STREET REID CRESCENT MATTHEWS WAY NORTH ALBERT LANE KAYLA CRESCENT KEITH AVENUE PARKSIDE DRIVE ST. CLAIR STREET SUNSET COURT ELGIN STREET JOSEPH TRAIL MOUNT VIEW COURT GOLFVIEW DRIVE KRISTA COURT GIBBARD CRESCENT CAMBRIDGE STREET SHANNON COURT WHITE STREET MINTO STREET WATER STREET WILLOW STREET DOCKSIDE DRIVE TESKEY COURT SMART COURT GUN CLUB ROAD ALPINE COURT PRESERVATION ROAD WHIPPS COURT ST MARIE STREET POPLAR SIDEROAD RAGLAN STREET HIGHWAY 26 EAST MARKET STREET GEORGE STREET OLD MOUNTAIN ROAD GEORGIAN MEADOWS DRIVE SHERWOOD STREET HARBOUR STREET EAST ALMA STREET STEPHENS STREET NEWBOURNE STREET HILL STREET SILVER CRESCENT JUNIPER COURT LYNDEN STREET LAKEVIEW AVENUE JEFFERYS WAY BARKER BOULEVARD WATERFRONT CIRCLE RHONDA ROAD ROBBIE WAY CRANBERRY SURF CRANBERRY QUAY BOARDWALK AVENUE CRANBERRY SHORES CHURCHILL COURT SIMCOE STREET SPRUCE STREET CRANBERRY TRAIL EAST RAGLAN STREET RUSSEL STREET CALLARY CRESCENT VETERANS CRESCENT ST PETER STREET PATERSON STREET BELL BOULEVARD BAYSIDE COURT WOODLAND COURT ESCARPMENT CRESCENT FAIRWAY CRESCENT OXBOW CRESCENT WATERSIDE LANE FIRST STREET EXTENSION COURTICE CRESCENT WATTS CRESCENT BRANIFF COURT CLARKSON CRESCENT LESELIE DRIVE SURFSIDE CRESCENT ELIOTT AVENUE ROBERT AVENUE SOUTH SERVICE ROAD GEORGIAN COURT CRAIGLEITH COURT VACATION INN DRIVE VALLEYMEDE COURT JOHNSTON PARK AVENUE CEDAR POINTE COURT SUNCREST CIRCLE MARINA CRESCENT HIGHLANDS CRESCENT WHEELHOUSE CRESCENT WALKER STREET RONELL CRESCENT HARBEN COURT MCKEAN CRESCENT BURNSIDE COURT VICTORY DRIVE BRYAN COURT OSLER CRESCENT HERRINGTON COURT GLEN ROGERS ROAD SUNDIAL COURT EVA CRESCENT CARMICHEAL CRESCENT DUNCAN STREET SHIPLEY AVENUE PLEWES DRIVE MITCHELL AVENUE ARCHER AVENUE FOLEY CRESCENT SPENCER STREET MAIDENS CRESCENT MOUNTAIN ROAD WEST SECONDARY PLAN BOUNDARY H SE HIGHWAY 26 E GLEN ROAD FAIRGROUNDS ROAD BROADVIEW STREET GLENLAKE BOULEVARD LANE D 4TH LINE D EDGAR ROAD LANE C LANE A BRAESIDE STREET KING STREET DOWNER STREET BELCHER STREET YORK STREET KOHL STREET INDIAN TRAIL SELKIRK ROAD NOTTAWA SIDEROAD / TONER STREET SANDELL STREET JAMES STREET ARTHUR STREET BELLHOLME LANE MCPHERSON LANE CURRIE AVENUE SYLVIAN ROAD DELLPARR AVENUE CHERRY STREET JANE STREET STALKER STREET BEACHWOOD ROAD SUNNYVIEW AVENUE WOODCREST AVENUE WELLINGTON STREET COOK STREET MACALLISTER STREET NORTH THERESA STREET HIGHWAY 26 EAST SECONDARY PLAN BOUNDARY 2024 DEVELOPMENT CHARGES UPDATE TOWN OF COLLINGWOOD WAT-1 ≥ TENTH LINE POPLAR SIDEROAD HIGHWAY 26 WEST MOUNTAIN ROAD HIGH STREET SIXTH STREET OAK STREET PEEL STREET MAPLE STREET OSLER BLUFF ROAD BIRCH STREET HURONTARIO STREET GREY ROAD 19 HUME STREET RAGLAN STREET SPRUCE STREET FIRST STREET THIRD STREET SIMCOE COUNTY ROAD 32 FIFTH STREET WALNUT STREET FINDLAY DRIVE ONTARIO STREET SIXTH LINE NAPIER STREET SECOND STREET MINNESOTA STREET HERITAGE DRIVE COLLINS STREET CAMPBELL STREET PINE STREET CEDAR STREET FOURTH STREET HURON STREET DAWSON DRIVE HIGHWAY 26 EAST ERIE STREET HICKORY STREET SEVENTH STREET INT ROAD TENTH STREET NIAGARA STREET EIGHTH STREET GEO LOCKHART ROAD NINTH STREET SILVER CREEK DRIVE ST MARIE STREET ST PAUL STREET ELEVENTH LINE FOREST DRIVE PRETTY RIVER PARKWAY SIMCOE STREET CAMERON STREET MARY STREET STANLEY STREET KATHERINE STREET ROBINSON STREET ELM STREET ALYSSA DRIVE OLIVER CRESCENT TRAILS END TELFER ROAD CLARK STREET ALICE STREET RON EMO ROAD MANNING AVENUE SANDFORD FLEMING DRIVE MARINERS WAY HUGHES STREET HARBOUR STREET WEST CRANBERRY TRAIL WEST CONNOR AVENUE WILLIAMS STREET CONNELL STREET SAUNDERS STREET STEWART ROAD THOMAS DRIVE BRYAN DRIVE BARR STREET ST. LAWRENCE STREET SIDE LAUNCH WAY ALBERT STREET BROOKE AVENUE BARTLETT BOULEVARD TROTT BOULEVARD LAUREL BOULEVARD HIGHWAY 26/BALSAM STREET FOURTH STREET EAST HAMILTON STREET MARINERS HAVEN GREENBRIAR DRIVE PARK ROAD BEECH STREET BALSAM STREET CONSERVATION WAY DAVIS STREET HOLLY COURT LORNE STREET EVERGREEN ROAD COOPER STREET MASON ROAD ROBERTSON STREET FAIR STREET DEY DRIVE NORTH PINE STREET SUMMER VIEW AVENUE SLALOM GATE ROAD HOLDEN STREET MOBERLY STREET SPROULE AVENUE RODNEY STREET MACDONALD STREET MARINE VIEW DRIVE ST VINCENT STREET HURONIAPATHWAY NORTH MAPLE STREET SIERRA TRAIL PATERSON STREET PRINCETON SHORES BOULEVARD GRIFFIN ROAD CLUBHOUSE DRIVE HAROURSIDE MAIR MILLS DRIVE BRANDY LANE DRIVE DICKSON ROAD CHAMBERLAIN CRESCENT GODDEN STREET MARKET LANE PATTON STREET BARRINGTON TRAIL EAST STREET KELLS CRESCENT WEST STREET BUSH STREET FRANCES DRIVE BROCK CRESCENT RIVER RUN LONG LANE NEWPORT BOULEVARD TRAFALGAR ROAD DILLON DRIVE WESTWIND DRIVE PORTLAND STREET SILVER GLEN BOULEVARD FERGUSON ROAD RAMBLINGS WAY WATERPOND PLACE WATERFALLS LANE BAKER STREET REID CRESCENT MATTHEWS WAY NORTH ALBERT LANE KAYLA CRESCENT KEITH AVENUE PARKSIDE DRIVE ST. CLAIR STREET SUNSET COURT ELGIN STREET JOSEPH TRAIL MOUNT VIEW COURT GOLFVIEW DRIVE KRISTA COURT GIBBARD CRESCENT CAMBRIDGE STREET SHANNON COURT WHITE STREET MINTO STREET WATER STREET WILLOW STREET DOCKSIDE DRIVE TESKEY COURT SMART COURT GUN CLUB ROAD ALPINE COURT PRESERVATION ROAD WHIPPS COURT ST MARIE STREET POPLAR SIDEROAD RAGLAN STREET HIGHWAY 26 EAST MARKET STREET GEORGE STREET OLD MOUNTAIN ROAD GEORGIAN MEADOWS DRIVE SHERWOOD STREET HARBOUR STREET EAST ALMA STREET STEPHENS STREET NEWBOURNE STREET HILL STREET SILVER CRESCENT JUNIPER COURT LYNDEN STREET LAKEVIEW AVENUE JEFFERYS WAY BARKER BOULEVARD WATERFRONT CIRCLE RHONDA ROAD ROBBIE WAY CRANBERRY SURF CRANBERRY QUAY BOARDWALK AVENUE CRANBERRY SHORES CHURCHILL COURT SIMCOE STREET SPRUCE STREET CRANBERRY TRAIL EAST RAGLAN STREET RUSSEL STREET CALLARY CRESCENT VETERANS CRESCENT ST PETER STREET PATERSON STREET BELL BOULEVARD BAYSIDE COURT WOODLAND COURT ESCARPMENT CRESCENT FAIRWAY CRESCENT OXBOW CRESCENT WATERSIDE LANE FIRST STREET EXTENSION COURTICE CRESCENT WATTS CRESCENT BRANIFF COURT CLARKSON CRESCENT LESELIE DRIVE SURFSIDE CRESCENT ELIOTT AVENUE ROBERT AVENUE SOUTH SERVICE ROAD GEORGIAN COURT CRAIGLEITH COURT VACATION INN DRIVE VALLEYMEDE COURT JOHNSTON PARK AVENUE CEDAR POINTE COURT SUNCREST CIRCLE MARINA CRESCENT HIGHLANDS CRESCENT WHEELHOUSE CRESCENT WALKER STREET RONELL CRESCENT HARBEN COURT MCKEAN CRESCENT BURNSIDE COURT VICTORY DRIVE BRYAN COURT OSLER CRESCENT HERRINGTON COURT GLEN ROGERS ROAD SUNDIAL COURT EVA CRESCENT CARMICHEAL CRESCENT DUNCAN STREET SHIPLEY AVENUE PLEWES DRIVE MITCHELL AVENUE ARCHER AVENUE FOLEY CRESCENT SPENCER STREET MAIDENS CRESCENT MOUNTAIN ROAD WEST SECONDARY PLAN BOUNDARY HIGHWAY 26 GEORGIAN MANOR DRIVE GLEN ROAD FAIRGROUNDS ROAD BROADVIEW STREET GLENLAKE BOULEVARD LANE D 4TH LINE BEACHWOOD ROAD EDGAR ROAD LANE C LANE A BRAESIDE STREET KING STREET DOWNER STREET BELCHER STREET YORK STREET KOHL STREET INDIAN TRAIL SELKIRK ROAD NOTTAWA SIDEROAD / TONER STREET SANDELL STREET JAMES STREET ARTHUR STREET BELLHOLME LANE MCPHERSON LANE CURRIE AVENUE SYLVIAN ROAD DELLPARR AVENUE CHERRY STREET JANE STREET STALKER STREET BEACHWOOD ROAD SUNNYVIEW AVENUE WOODCREST AVENUE WELLINGTON STREET COOK STREET MACALLISTER STREET NORTH THERESA STREET HIGHWAY 26 EAST SECONDARY PLAN BOUNDARY 2024 DEVELOPMENT CHARGES UPDATE TOWN OF COLLINGWOOD ROAD-1 Appendix B: Opinion of Probable Cost TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY WASTEWATER SEWERS - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 1 Mountain Road: Eleventh Line to the West 650 Extension of the existing trunk sewer 2041 $2,873,000 $0 $2,873,000 0% $0 $2,873,000 $1,892,100 $980,900 2 North of Mountain Road: Tenth Line to the West 1,900 Oversizing of trunk sewer through future development 2029 | 2041 $255,000 $0 $255,000 0% $0 $255,000 $167,900 $87,100 3 Black Ash Creek Trunk Main: South of Sixth Street 900 Oversizing of trunk sewer through future development 2044 $60,000 $0 $60,000 0% $0 $60,000 $0 $60,000 4 Mountain Road: Improvements West of Balsam Street 100 Trunk sewer to replace the existing sewer 2032 $476,000 $0 $476,000 63% $299,880 $176,120 $176,120 $0 5 Harbour Street: Georgian Trail to Tenth Line 650 Extension of the existing trunk sewer 2030 $937,000 $0 $937,000 0% $0 $937,000 $937,000 $0 6 Hurontario Street: Lockhart Road to Collins Street 368 Trunk sewer to replace the existing sewer 2027 $1,568,000 $0 $1,568,000 59% $925,120 $642,880 $642,880 $0 7 Black Ash Creek SPS Forcemain: SPS to WPCP (along trail) 1,390 Twin forcemain to provide additional capacity 2036 $1,800,000 $0 $1,800,000 0% $0 $1,800,000 $1,800,000 $0 TOTAL $7,969,000 $0 $7,969,000 $1,225,000 $6,744,000 $5,616,000 $1,128,000 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development PROJECT NO. LOCATION INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT PROJECT LENGTH (m) (1) LESS: OTHER CONTRIBUTIONS TIMING GROSS CAPITAL COST ESTIMATE POST-PERIOD BENEFIT LESS: BENEFIT TO EXISTING DEVELOPMENT NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\1-2024 DC Wastewater Sewers.xlsx TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY WASTEWATER FACILITIES - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 8 Water Pollution Control Plant - Outfall Improvements Plant Outfall Improvements 2027 $4,600,000 $0 $4,600,000 0% $0 $4,600,000 $4,600,000 $0 9 Water Pollution Control Plant Expansion of the WPCP to increase the capacity by 12,000 m3/day 2026-2036 $300,000,000 $0 $300,000,000 6.6% $19,800,000 $280,200,000 $141,897,900 $138,302,100 TOTAL $304,600,000 $0 $304,600,000 $19,800,000 $284,800,000 $146,497,900 $138,302,100 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development LESS: BENEFIT TO EXISTING DEVELOPMENT TIMING GROSS CAPITAL COST ESTIMATE POST-PERIOD BENEFIT PROJECT NO. LOCATION INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT (1) LESS: OTHER CONTRIBUTIONS NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\2-2024 DC Wastewater Facilities.xlsx TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY WATER DISTRIBUTION - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 10 Poplar Sideroad: Raglan Street to Beachwood Road 2,000 Trunk watermain extension 2029 $5,485,300 $0 $5,485,300 0% $0 $5,485,300 $5,485,300 $0 11 Sixth Line: Poplar Sideroad to Sandford Fleming Drive 650 Trunk watermain extension 2031 $1,694,400 $0 $1,694,400 0% $0 $1,694,400 $1,694,400 $0 12 Poplar Sideroad: Rowland Street to Tenth Line 920 Trunk watermain extension 2032 $2,763,700 $0 $2,763,700 0% $0 $2,763,700 $2,763,700 $0 13 High Street: Findlay Drive to Campbell Street 300 Trunk watermain extension 2028 $825,300 $0 $825,300 15% $123,800 $701,500 $701,500 $0 14 Tenth Line: Poplar Sideroad to Sixth Street 1,850 Trunk watermain extension 2044 $5,321,500 $0 $5,321,500 0% $0 $5,321,500 $0 $5,321,500 15 Tenth Line: Sixth Street to Mountain Road 1,125 Trunk watermain extension 2026 $3,257,300 $0 $3,257,300 0% $0 $3,257,300 $3,257,300 $0 16 Sixth Street: Georgian Meadows Drive to Tenth Line 275 Trunk watermain extension 2026 $894,200 $0 $894,200 0% $0 $894,200 $894,200 $0 17 Future Secondary Plan Develop: Tenth Line to Conc. 11/12 1,000 Oversizing of trunk watermain through future development 2031 $120,600 $0 $120,600 0% $0 $120,600 $120,600 $0 18 Future Secondary Plan Develop: Conc. 11/12 to Osler Bluff 1,200 Oversizing of trunk watermain through future development 2044 $147,400 $0 $147,400 0% $0 $147,400 $0 $147,400 19 Future Secondary Plan Develop: South Extension of 11th Line 1,100 Oversizing of trunk watermain through future development 2032 $137,400 $0 $137,400 0% $0 $137,400 $137,400 $0 20 Future Secondary Plan Develop: Sixth Street to Mountain Rd. 1,450 Oversizing of trunk watermain through future development 2044 $179,300 $0 $179,300 0% $0 $179,300 $0 $179,300 21 Mountain Road: Thomas Drive to Tenth Line 700 Trunk watermain extension 2027 $178,300 $0 $178,300 0% $0 $178,300 $178,300 $0 22 Watermain Loop along Eleventh Line and Georgian Trail 3,300 Trunk watermain extension 2031 $0 $0 $0 0% $0 $0 $0 $0 23 Cranberry Development to the Georgian Trail 250 Oversizing of trunk watermain through future development 2031 $0 $0 $0 0% $0 $0 $0 $0 24 Harbour Street Extension to Tenth Line 565 Trunk watermain extension 2030 $801,800 $0 $801,800 15% $120,300 $681,500 $681,500 $0 25 North of First Street: Maple Street to Hickory Street 785 Trunk watermain extension 2027 $2,255,300 $0 $2,255,300 15% $338,300 $1,917,000 $1,917,000 $0 26 North of First Street: Hickory Street to Highway 26 420 Trunk watermain extension 2030 $1,155,500 $0 $1,155,500 15% $173,300 $982,200 $982,200 $0 27 Simcoe Street: Heritage Drive to Water Treatment Plant 1,365 Upsize existing watermain from 300 to 500 mm 2040 $4,962,200 $0 $4,962,200 28% $1,389,400 $3,572,800 $2,353,000 $1,219,800 28 Hwy 26: Old Mountain Road to Carmichael Pumping Station 2,122 Upsize existing watermain from 300 to 400 mm 2045 $7,136,600 $0 $7,136,600 48% $3,425,600 $3,711,000 $0 $3,711,000 29 Sixth Street: Hurontario Street to High Street 1,960 Trunk watermain extension 2025 $6,375,600 $0 $6,375,600 0% $0 $6,375,600 $6,375,600 $0 30 High Street: Old Mountain Road to Fifth Street 1,225 Upsize existing watermain from 300 to 450 mm 2030 $4,374,900 $0 $4,374,900 36% $1,575,000 $2,799,900 $2,799,900 $0 31 St. Paul Street: Side Launch Way to Hume Street 830 Upsize existing watermain from 300 to 400 mm 2026 | 2041 $2,807,500 $0 $2,807,500 48% $1,347,600 $1,459,900 $1,459,900 $0 32 High Street: Sixth Street to Campbell Street 1,468 Upsize / add new watermain from 200 to 450 mm 2028 $4,610,900 $0 $4,610,900 13% $599,400 $4,011,500 $4,011,500 $0 33 Poplar Sideroad: Clark Street to Rowland Street 720 Trunk watermain extension 2035 $1,825,300 $0 $1,825,300 0% $0 $1,825,300 $1,825,300 $0 34 Hume Street: Pretty River Parkway to Raglan Street North 410 Upsize existing watermain to 400 mm 2035 $1,340,700 $0 $1,340,700 48% $643,500 $697,200 $697,200 $0 35 Raglan Street: Erie Street to Oliver Crescent 250 Upsize existing watermain from 300 to 400 mm 2035 $829,200 $0 $829,200 48% $398,000 $431,200 $431,200 $0 TOTAL $59,480,200 $0 $59,480,200 $10,134,200 $49,346,000 $38,767,000 $10,579,000 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS PROJECT NO. LOCATION PROJECT LENGTH (m) INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT TIMING GROSS CAPITAL COST ESTIMATE POST-PERIOD BENEFIT LESS: BENEFIT TO EXISTING DEVELOPMENT (1) LESS: OTHER CONTRIBUTIONS NET MUNICIPAL COST I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\3-2024 DC Watermains.xlsx TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY WATER VALVE - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 36 Osler Bluff Road PRV and Decommissioning Osler Booster Pumps Create valve configuration to feed zone 1A or 2 in emergency 2028 $742,000 $0 $742,000 0% $0 $742,000 $742,000 $0 37 Mountain Road PRV and Chamber Installation New valve to feed Mountain Road low pressure & fire from zone 2 2026 $218,000 $0 $218,000 15% $32,700 $185,300 $185,300 $0 38 Pretty River Check Valve New check valve to supply zone 2 in emergency 2025 $73,000 $0 $73,000 0% $0 $73,000 $73,000 $0 39 Sixth Line PRV and Chamber Installation New valve to supply zone 2 in emergency 2035 $204,000 $0 $204,000 0% $0 $204,000 $204,000 $0 TOTAL $1,237,000 $0 $1,237,000 $32,700 $1,204,300 $1,204,300 $0 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development LESS: BENEFIT TO EXISTING DEVELOPMENT (1) LESS: OTHER CONTRIBUTIONS NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS PROJECT NO. LOCATION INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT TIMING GROSS CAPITAL COST ESTIMATE POST-PERIOD BENEFIT I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\4-2024 DC Water Valves.xlsx TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY WATER FACILITIES - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 40 Stewart Road Booster Pumping Station and Reservoir (Phase 1) Zone 2 BPS & Reservoir 2026 $17,000,000 $0 $17,000,000 0% $0 $17,000,000 $17,000,000 $0 41 Stewart Road Booster Pumping Station and Reservoir (Phase 2) Zone 2 BPS & Reservoir 2044 $7,000,000 $0 $7,000,000 0% $0 $7,000,000 $4,610,100 $2,389,900 42 Stewart Road Ultimate Pump Upgrades Required for Stewart Road Reservoir Phase 2 2038 $1,000,000 $0 $1,000,000 0% $0 $1,000,000 $658,600 $341,400 43 Decommissioning Georgian Meadows BPS Decommision BPS after Stewart Road BPS is commissioned 2028 $300,000 $0 $300,000 0% $0 $300,000 $300,000 $0 44 Ted Carmichael West End Reservoir (Highway 26 West) West End BPS Improvements 2024-2025 $3,400,000 $0 $3,400,000 0% $0 $3,400,000 $3,400,000 $0 45 New Elevated Tank (Location TBD) Replacement of existing tank 2030 $10,000,000 $0 $10,000,000 50% $5,000,000 $5,000,000 $5,000,000 $0 46 Water Treatment Plant (Raglan Street) Expansion and upgrade of Water Treatment Plant 2024-2029 $270,000,000 $170,100,000 $99,900,000 8% $7,800,000 $92,100,000 $50,500,000 $41,600,000 Water Efficiency Measures 2024-2041 $320,000 $0 $320,000 0% $0 $320,000 $320,000 $0 TOTAL $309,020,000 $170,100,000 $138,920,000 $12,800,000 $126,120,000 $81,788,700 $44,331,300 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development (1) LESS: OTHER CONTRIBUTIONS PROJECT NO. LOCATION INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT TIMING GROSS CAPITAL COST ESTIMATE LESS: BENEFIT TO EXISTING DEVELOPMENT POST-PERIOD BENEFIT NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\5-2024 DC Water Facilities.xlsx TOWN OF COLLINGWOOD 2024 DEVELOPMENT CHARGES BACKGROUND STUDY ROAD WORKS - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 47 Hwy 26: Harbour Street West to Silver Creek Drive Arterial 3,600 Upgrade & widen 3 lane rural to 5 lane urban 2041 $22,233,000 $0 $22,233,000 11% $2,473,000 $19,760,000 $13,013,700 $6,746,300 48 Mountain Road: Tenth Line to Eleventh Line Arterial 1,130 Upgrade 2 lane rural to 2 lane rural 3 m trail on one side 2029 $4,556,500 $0 $4,556,500 24% $1,088,500 $3,468,000 $3,468,000 $0 49 Sixth Line: Poplar Sideroad to Sandford Fleming Dr Collector 680 Upgrade 2 lane rural to 2 lane rural 2031 $2,952,000 $0 $2,952,000 16% $477,600 $2,474,400 $2,474,400 $0 50 Hurontario Street: Hume Street to Collins Street Arterial 780 Widen 2 lane urban to 3 lane urban 2027 $5,241,100 $0 $5,241,100 12% $606,400 $4,634,700 $4,634,700 $0 51 Collins Street: Ste. Marie Street to Katherine Street Collector 360 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2028 $2,258,400 $0 $2,258,400 15% $332,100 $1,926,300 $1,926,300 $0 52 High Street: Third Street to Fifth Street Arterial 450 Widen 4 lane urban to 5 lane urban West: 3 m wide sidewalk; East: 1.5 m wide sidewalk 2027 $3,495,100 $0 $3,495,100 30% $1,048,500 $2,446,600 $2,446,600 $0 53 Tenth Line: Sixth Street to Mountain Road Collector 1,240 Upgrade 2 lane rural to 2 lane urban 4 m wide trail on one side 2030 $8,147,700 $0 $8,147,700 10% $844,700 $7,303,000 $7,303,000 $0 54 High Street: Poplar Sideroad to Tenth Street Arterial 1,400 Upgrade & widen 2 lane rural to 4 lane urban 3 m wide trail on one side 2029 $10,734,500 $0 $10,734,500 34% $3,607,900 $7,126,600 $7,126,600 $0 55 Third Street: High Street to Birch Street Collector 865 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2028 $5,275,800 $0 $5,275,800 38% $2,023,800 $3,252,000 $3,252,000 $0 56 Cameron Street: Hurontario St to Walnut St Collector 830 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2028 $5,176,900 $0 $5,176,900 40% $2,062,300 $3,114,600 $3,114,600 $0 57 Mountain Road: Cambridge Street to Tenth Line Arterial 1,075 Upgrade & widen 3 lane rural to 5 lane urban North: 1.5 m wide sidewalk; South: 4 m wide sidewalk 2024 $15,347,675 $0 $15,347,675 16% $2,526,300 $12,821,375 $12,821,375 $0 58 Peel Street: Hume Street to Bush Street Collector 365 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2026 $2,655,900 $0 $2,655,900 40% $1,052,000 $1,603,900 $1,603,900 $0 59 Peel Street: Ontario Street to Hume Street Collector 560 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2031 $3,700,500 $0 $3,700,500 40% $1,490,700 $2,209,800 $2,209,800 $0 60 Sixth Street: Tenth Line to High Street Arterial 1,320 Widen 2 lane rural to 3 lane urban 1.5 m wide sidewalk on both sides 2035 $8,874,500 $0 $8,874,500 15% $1,334,800 $7,539,700 $7,539,700 $0 61 Harbour Street Extension: Tenth Line to Georgian Trail Collector 560 Extend 2 lane rural through unopened R.O.W. 2032 $3,872,800 $0 $3,872,800 0% $0 $3,872,800 $3,872,800 $0 62 Tenth Line: Mountain Road to Harbour Street Collector 620 Upgrade 2 lane rural to 2 lane urban 1.5 m wide sidewalk on both sides 2032 $3,364,900 $0 $3,364,900 42% $1,402,900 $1,962,000 $1,962,000 $0 TOTAL $107,887,275 $0 $107,887,275 $22,371,500 $85,515,775 $78,769,475 $6,746,300 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development (1) LESS: OTHER CONTRIBUTIONS LESS: BENEFIT TO EXISTING DEVELOPMENT NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS TIMING GROSS CAPITAL COST ESTIMATE POST-PERIOD BENEFIT PROJECT NO. LOCATION ROAD CLASSIFICATION PROJECT LENGTH (m) INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\6-2024 DC Roads.xlsx TOWN OF COLLINGWOOD INTERSECTION IMPROVEMENTS - PROJECT LIST JULY 2024 FILE NO. 123275 % AMOUNT 63 Highway 26 and Silver Creek Drive Left turn lane 2025 $1,191,000 $0 $1,191,000 0% $0 $1,191,000 $1,191,000 $0 64 Highway 26 and Cranberry Trail E/Gun Club Road Signalization, left turn lanes 2025 $819,000 $819,000 $0 0% $0 $0 $0 $0 65 High Street and First Street (Phase 1) Additional turning lanes and revise timing 2029 $819,000 $0 $819,000 0% $0 $819,000 $819,000 $0 66 High Street and Home Depot Access Relocate access to 3rd Street or Cambridge Street (widening) 2027 $176,904 $176,904 $0 0% $0 $0 $0 $0 67 Mountain Road / First Street Extension / Cambridge Street (Phase 1) Additional turning lanes 2030 $1,309,000 $0 $1,309,000 0% $0 $1,309,000 $1,309,000 $0 68 High Street and Third Street Signalization, left turn lanes and phases 2028 $1,965,600 $1,769,040 $196,560 0% $0 $196,560 $196,560 $0 69 High Street and Campbell Street Double lane roundabout 2028 $1,638,000 $0 $1,638,000 0% $0 $1,638,000 $1,638,000 $0 70 Highway 26 and Habour Street / Balsam Street Additional turning lanes 2030 $982,800 $0 $982,800 0% $0 $982,800 $982,800 $0 71 High Street and First Street (Phase 2) Additional turning lane 2041 $595,000 $0 $595,000 0% $0 $595,000 $391,900 $203,100 72 Mountain Road / First Street Extension / Cambridge Street (Phase 2) Additional turning lane 2041 $595,000 $0 $595,000 0% $0 $595,000 $391,900 $203,100 73 High Street and Sixth Street Additional turning lanes 2041 $710,500 $0 $710,500 0% $0 $710,500 $467,900 $242,600 TOTAL $10,801,804 $2,764,944 $8,036,860 $0 $8,036,860 $7,388,060 $648,800 (1) - Other contributions includes: grants, subsidies and other contributions attributable to new development 2024 DEVELOPMENT CHARGES BACKGROUND STUDY POST PERIOD BENEFIT (1) LESS: OTHER CONTRIBUTIONS LESS: BENEFIT TO EXISTING DEVELOPMENT PROJECT NO. LOCATION INCREASED SERVICE NEEDS ATTRIBUTABLE TO ANTICIPATED DEVELOPMENT TIMING GROSS CAPITAL COST ESTIMATE NET MUNICIPAL COST TOTAL DC ELIGIBLE COSTS DC IN-PERIOD ELIGIBLE COSTS I:\2023 Projects\123275 - 2024 Development Charges Background Study, Collingwood\Documents\Spreadsheets\7-2024 DC Intersections.xlsx Appendix H Approved 2024 DC By-law (Available Under Separate Cover) Appendix H | 257