Building permits — Faraday, Ontario

Do I need a building permit? What does it cost?

In the Township of Faraday, Ontario, building permit rules are set by Township of Faraday By-law No. 24-2025 (amends Schedule A of Building By-law 20-2022, permit classes and fees), verified 2026-10-26. Fees set in: Schedule "A" of By-Law 20-2022 (as amended by By-Law 24-2025). Fines: Double fees- minimum of $400.00.

Township of Faraday By-law No. 24-2025 (amends Schedule A of Building By-law 20-2022, permit classes and fees) adopted bylaw
permit required for Permit classes: residential/seasonal buildings, dwellings/guest/additions, demolition, farm/commercial/industrial, garages/decks/porches/accessory/detached buildings, renovations, change of use, plumbing, wood stoves/chimneys, pools, solar panels, sewage systems, towers/turbines/walls. Class of Building or Structure
fee basis Schedule "A" sets fees by class, square footage, construction value, flat amounts, and minimums: e.g., residential $1.40/sq ft per floor; demolition $250; renovations $250 + 2% construction value; plumbing $150 + $12/fixture; solar $250 + $12/$1,000 value; sewage $750, repair $400; minimum $250 for projects under $50,000, $800 for dwelling/renovations over $50,000. Schedule "A"
fees location Schedule "A" of By-Law 20-2022 (as amended by By-Law 24-2025) s. 1
fine range Double fees- minimum of $400.00 "Double fees- minimum of $400.00"
scout note

Amends the Building By-law fee schedule. New dwellings and additions cost $1.40/sq ft per floor plus $1.10/sq ft of foundation; garages, decks and accessory buildings $0.75/sq ft; farm/commercial/industrial $0.60/sq ft; demolition and change of use $250. Minimum fee $250 (projects under $50,000) or $800. Starting without a permit doubles fees (minimum $400).

Building Permits page (references “The Building Bylaw”)

Township's own Building Permits page (accessed via archived snapshot; live site Cloudflare-blocked) names “The Building Bylaw” and reproduces its full permit-fee schedule and penalty provisions, but does not link the bylaw text or give a bylaw number.

May 7, 2025 minutes in June 4 council agenda

Page 14 records council passing building permit fee amendment 24-2025 on May 7, 2025. Retained to corroborate the adopted status of the separate numbered amendment.

Machine-readable: building-permits.json · Official website: http://www.faraday.ca/ · Last verified 2026-10-26 · Building permits across Ontario · Building permits in other municipalities