Comprehensive Zoning By-law 129-90 - 45 Schedule "F"

Fort Erie, Ontario · No. 129-90 · summary & facts

This is the exact embedded text of the captured official document. Snapshot e4e59a2b770f · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

4 sty. max 2 sty. max. if frontage on side st. 0 sty. max. if frontage on Erie Rd. 2 sty. max 31.0m 10.0m 1.5m Building Side Yard if frontage on side street varies 1.0m Building Setback 1.0m Building Setback 1.0m Building Setback 0 sty. max if frontage on Erie Rd. 10.0m Building Side Yard if frontage on Erie Road Eire Road (example for this illustration) Side Street (typical for this illustration) Side Street (typical for this illustration) REFERENCE POINT - NORTH LIMIT OF ERIE ROAD ROAD ALLOWANCE AT PROPERTY LINE Measured perpendicular from reference point SOUTH LIMIT OF ERIE ROAD ROAD ALLOWANCE SCHEDULE 'F' - BUILDING HEIGHT ILLUSTRATION FOR CMU2-693 to CMU2-703 ZONES ALONG ERIE ROAD, DERBY ROAD AND RIDGEWAY ROAD TOWN OF FORT ERIE COMPREHENSIVE ZONING BY-LAW 129-90 OFFICE CONSOLIDATION The following illustration is supplied for EXAMPLE purposes to help with interpretation of the CONTROLLING setback being applied along several roads in Crystal Beach's main roads. Details of setbacks and the roads the Controlling Setback applies to are found under Site Specific Core Mixed Use Zones CMU2-693, CMU2-694, CMU2-695, CMU2-696, CMU2-697, CMU2-698, CMU2-699, CMU2-700, CMU2-701, CMU2-702 and CMU2-703 as implemented by By-law 144-2021. The illustration is typical and guides most instances where the Controlling Setback is applied. However, each specific site or collection of sites must be reviewed independently and structured on the various properties affected by the setback.